From: Clara A. Johnson <[email protected]>
Sent: Monday, November 23, 2026 3:34 PM
To: Council Members <[email protected]>
Cc: Dennis, Jeremy <[email protected]>; Cheung, Caroline <[email protected]>; Zutler, Samantha W. <[email protected]>; Leiter Robin at Yahoo <[email protected]>; Dillworth, Dana <[email protected]>; Salmon, Michele (personal) <[email protected]>; Clara A. Johnson <[email protected]>; Attard, Tony <[email protected]>
Subject: ownership of infrastructure
Hello
I have been thinking. I think there has been a problem in thinking about infrastructure relating to water and to energy, specifically to solar panels and the big battery When a developer builds a large project, cities usually require amenities for the stress and services required by the project. An example of this is the Mission Blue Comminity Center and Performing Arts Facility.

The Baylands needs to do the same and more than has been discussed so far.

The Baylands Developer and owners are required to build all infrastructure. Pay for it and it should say Dedicate it to the City of Brisbane and it's GVMID. It is clear that the streets will be dedicated (made the property of)to the city. It should also be clear that after the water system is built including the water recycling facility should become the property of the City and GVMID that is what it means when the developer is paying for the infrastructure. If the City gives away the infrastructure to the California Water Company. It is a gift of what should be recognized as City Property.

The agreement written by BDI and California is one written for their benefit not the City's. The City owns the water infrastructure on Sierra Point and when the infrastructure is built on the Baylands it should be turned over to the City like the roads will be.

People have kept asking about the water infrastructure ownership and that is they know something doesn't make sense for Brisbane financially.

Who is going to build the water infrastructure for BDI. Is it Cal. Water Co.? Couldn't Cal Water give them a break on building it in order to have the.pipes and other infrastructure given to them. It may be a conflict of interest.

Please do not agree to give city assets away.

These are two.private companies taking care of their own interests. They are not taking care of the city and your duty is to do that.

You can buy water from Cal Water Co. And you can sell them recycled water but don't enrich them at our expense and don't make us subject us to their future rise in rates to use the pipes that we gave to them for nothing.

The only money making thing that I have seen on the Baylands is the water recycling facility.

It appears everyone has water it needs to recycle. It should belong to the City. It offsets water supply pressures caused by this development.

I believe the city is being taken advantage of, at the least and perhaps it is being scammed.

All infrastructure construction must be inspected by a completely independent firm without any connections to BDI or California Water Company.

The energy infrastructure has some of the same problems. The solar panels and micro inverters and the big battery should be dedicated to the City of Brisbane after they are inspected.

This is an essential issue to resolve. We cannot give away infrastructure. Why haven't your staff or attorneys raised the problem?
Sincerely
Clara Johnson
Yahoo Mail: Search, Organize, Conquer
020962.0001 4918-5453-1805.6
Frank Petrilli
D (415) 268-0503
[email protected]
November 23, 2026
Mayor and Members of the City Council
City of Brisbane
50 Park Place
Brisbane, California 94005
Re: Baylands Specific Plan – Proposed 45-Acre High-Speed Rail LMF Reservation Mayor and Members of the City Council:

We represent Baylands Development, Inc. (“BDI”) as land use counsel and write on BDI’s behalf to respectfully request the Council to remove the proposed 45-acre High-Speed Rail Light Maintenance Facility (“LMF”) reservation from the Baylands Specific Plan.

There are three reasons the City should not move forward with the LMF provisions.

First, we do not believe the bargain is a good one for Brisbane. The City would be setting aside 45 acres of the Baylands Sustainability District for a large industrial rail maintenance facility that may never be built, while giving up the opportunity to put that land to productive sustainability uses in the near term. BDI is positioned to advance a privately financed, utility-scale battery storage project within this area on a far shorter timeline. That project would put the property to productive use now and advance the very sustainability objectives the City has long emphasized for the Baylands, as contemplated by Measure JJ.

By contrast, CHSRA has not funded the Revised LMF and has not committed to acquire the property.

Even if the LMF ultimately moves forward, we believe the Framework Agreement gives Brisbane far less control over the facility than some public discussion has suggested: the City may participate in the design process and comment on aesthetics and screening, but CHSRA expressly retains “sole discretion” over final design, construction, operations and safety. The City would therefore be sacrificing a near-term sustainability opportunity for an uncertain future rail facility over which it would have very limited ultimate control.

Second, preserving 45 acres for the LMF materially disrupts the Baylands plan that we have all been working on for years. The LMF reservation displaces a large portion of the planned stormwater detention system, the water recycling facility, utility-scale battery storage and other sustainability infrastructure, and reduces by 45 acres the land otherwise available for sustainability-related uses. Those facilities would need to be relocated elsewhere in the Baylands, consuming other land, adding infrastructure, complicating the site plan and increasing costs. The City’s own environmental analysis confirms some of these consequences, but the broader economic and planning effects of redesigning the Baylands around an uncertain future LMF have never been meaningfully addressed.

Third, we believe the proposed reservation is legally problematic and creates direct financial exposure for the City. California courts have held that a city may not use its land use authority to “bank” private property in an undeveloped condition so that it can be acquired later for a public project at lower cost.

Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 2 ends

020962.0001 4918-5453-1805.6
That is exactly what the proposed LMF provisions do: they prohibit permanent uses within the 45-acre footprint and permit only temporary uses designed to disappear if and when CHSRA decides to acquire the property. Under controlling California authority, that kind of restriction can support both writ relief and an inverse condemnation claim against the City itself. For legal reasons, BDI is therefore required to raise these issues now to give the Council the opportunity to avoid creating that exposure in the first place.

For these reasons we urge that you allow the Baylands Sustainability District to proceed without the LMF reservation. If CHSRA ultimately decides years from now that it needs property within the Baylands for an LMF, it can negotiate with BDI or exercise whatever eminent domain authority it possesses at that time.

Brisbane should not burden 45 acres of private property today, displace major elements of the Baylands plan, and assume significant legal and financial risk in order to make a possible future state acquisition easier and less expensive.

1. The Council is not obligated to reserve the 45 acres for the LMF under the Framework Agreement.

First, the policy choice described above remains the Council’s to make. Nothing in the Framework Agreement between the City and CHSRA requires the Council to approve a Specific Plan that reserves 45 acres of BDI’s property for the LMF.

The Agreement required City staff to support and propose revisions to the Specific Plan that would set aside 45-acres for the LMF but expressly preserved the Council’s independent discretion. But it provides that the “City Council retains discretion to determine whether to approve” that design and states that the Agreement does not guarantee City approval.

That preserved discretion is especially important given how uncertain the LMF remains. The Agreement itself describes the 45-acre LMF as a “preliminary” design, acknowledges that CHSRA must still complete environmental review and decide whether to approve it, and states that CHSRA had not obtained funding for environmental review, design, right-of-way acquisition, infrastructure relocation, construction or operations. Framework Agreement §§ A.2-A.3.

The Council therefore does not face a choice between honoring the settlement and breaching it. It faces a land use decision about whether Brisbane should impose a present and potentially indefinite restriction on 45 acres of private property for a state project that remains uncertain. The Framework Agreement deliberately left that decision with the Council.

2. The Specific Plan’s LMF provisions are designed to “bank” 45 acres of BDI’s property for CHSRA.

The proposed LMF provisions do not merely acknowledge that CHSRA might someday construct an LMF within the Baylands. They establish a special land use regime for 45 acres of privately owned property whose express purpose is to preserve that property for CHSRA until CHSRA decides whether and when to acquire it.

The Specific Plan designates the 45 acres for “potential future acquisition” by CHSRA upon future funding and authorization. It then permits only interim uses that can be “easily terminated and removed” and that Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 3 ends

020962.0001 4918-5453-1805.6
will not make CHSRA’s future construction materially more difficult. The restrictions remain in place until CHSRA acquires the property or affirmatively tells the City that it no longer intends to pursue the site.

The restrictions are substantial. Among other things, the Specific Plan expressly prohibits habitat restoration or recreational open space, stormwater detention facilities, utility-scale battery storage facilities, the water recycling facility and water storage tanks within the LMF footprint.

These are not features that appeared on the Baylands plan yesterday. The stormwater system, water recycling facility, energy infrastructure and related improvements have been integral components of Baylands planning for years. Moving them is not a matter of simply shifting boxes around on a land use diagram. The City’s own environmental analysis shows, for example, that accommodating the LMF would move the water recycling facility east of Tunnel Avenue and require approximately 3,800 linear feet of retaining wall ranging from 9 to 15 feet high, plus another approximately 500 feet of 8-foot retaining wall.

The utility-scale battery facility would likewise be relocated, and approximately half of the planned stormwater detention basin would be displaced.

Although the EIR describes some of these physical consequences, the City has not meaningfully evaluated what it will cost BDI to redesign the Baylands around the LMF reservation, how much additional land elsewhere must be consumed, how project infrastructure and phasing will be affected, or what other economic consequences will follow from preserving these 45 acres for CHSRA.

What is clear, however, is that these provisions are designed to keep permanent development and infrastructure off 45 acres of BDI’s private property so CHSRA can acquire it later with fewer complications and at lower cost. The Framework Agreement’s own definition of “compatibility” expressly asks whether Baylands uses would make future LMF construction - “inclusive of property acquisition and relocation of existing uses” - materially more expensive or difficult.

As discussed below, California courts have already addressed this kind of “land banking,” and found that it constitutes a compensable taking (i.e., is “future condemnation.”).

3. Jefferson Street squarely prohibits this type of land banking.

In Jefferson Street Ventures, LLC v. City of Indio (2015) 236 Cal.App.4th 1175, the developer owned approximately 26.85 acres and proposed a master-planned shopping center across the property consisting of approximately 20 buildings and 248,600 square feet of development. At the same time, the City of Indio and other governmental agencies were planning a future reconstruction of the nearby I-10 interchange. The future interchange could require a substantial portion of Jefferson’s property, but remained uncertain because environmental review was incomplete, the final configuration had not been determined, and funding for the interchange had not been secured.

Rather than approve the shopping center as proposed and allow the future acquisition process to run its course if and when the interchange moved forward, the City reduced the area available for the shopping center to approximately 17 acres and required approximately nine acres needed for the anticipated interchange alignment, together with an additional approximately two-acre temporary no-build area, to remain undeveloped. The reason was explicit: City staff explained that if the developer were permitted to construct buildings within the anticipated right-of-way, the governmental agencies would later incur Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 4 ends

020962.0001 4918-5453-1805.6
additional acquisition costs associated with demolishing those buildings and relocating tenants. The City therefore essentially prohibited development in that 11-acre area while everyone waited to see whether the interchange would actually be approved, funded and constructed.

The Court of Appeal held that the City Council could not do that without paying compensation. It described the restrictions as an effort to “bank” otherwise developable private property so that it could potentially be condemned later in an undeveloped and therefore less costly condition, and held that the restrictions constituted an uncompensated taking.

The parallels here are difficult to miss. Brisbane proposes to identify the acreage CHSRA may someday want, prohibit permanent improvements that could complicate or increase the cost of that future acquisition, allow only temporary uses designed to disappear when CHSRA is ready, and leave those restrictions in place while CHSRA completes future environmental review, identifies funding and decides whether to acquire the property at all.

If anything, the record here is more explicit than it was in Jefferson Street. There is no need to infer the acquisition-related purpose from statements at public hearings. Brisbane and CHSRA put the purpose directly into their written agreement, namely to prohibit land uses that would make future LMF construction, including “property acquisition and relocation of existing uses,” materially more expensive or difficult.

Nor was Jefferson Street merely an academic declaration that the City had crossed a constitutional line.

Following remand, the Riverside County Superior Court entered an $18 million judgment against the City of Indio for the taking. The judgment debtor was the City, even though Riverside County had by then become the agency responsible for acquiring the interchange right-of-way and commenced the eventual condemnation action. And that judgment was for a taking of 11 acres, significantly less than the 45 acres envisioned here.

The underlying limitation on the City’s authority is straightforward. As Kissinger v. City of Los Angeles (1958) 161 Cal.App.2d 454 explains: “[a] zoning ordinance may not be used as a device to take property for public use without the payment of compensation.” Id. at p. 462.

That is what the proposed LMF provisions would do.

4. Brisbane could face independent liability for restrictions it adopts, even if CHSRA later acquires the property.

A separate question is which public agency bears responsibility when one agency restricts development in anticipation of another agency’s future acquisition, i.e., whether this is really CHSRA’s problem and not Brisbane’s. The case People ex rel. Department of Public Works v. Southern Pacific Transportation Co. (1973) 33 Cal.App.3d 960 addressed that exact question and held that a zoning restriction imposed in anticipation of future eminent domain proceedings by a different entity itself creates an inverse condemnation claim against the governmental entity that imposed the restriction.

The court specifically rejected shifting that financial responsibility to a different future condemnor. Doing so, it explained, would improperly “shift[] the financial burden of the disguised taking from the city to the Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 5 ends

020962.0001 4918-5453-1805.6
state” and allow an owner who failed to pursue its remedies against the City to recover compensation from an entity “not directly responsible for the damage compensated.” Id. at p. 966.

That principle is particularly important here. If Brisbane adopts the restrictions that effect a compensable taking, Brisbane cannot assume that CHSRA’s subsequent acquisition will eliminate its liability and absorb the financial consequences of what Brisbane does now. Southern Pacific recognizes an inverse condemnation claim against the governmental entity imposing the zoning restrictions, even where another agency ultimately condemns the property.

The Framework Agreement makes that concern more concrete. Unlike Southern Pacific, where the City and State did not act in concert, Brisbane and CHSRA have expressly agreed to coordinate land use planning for a potential future LMF on 45 acres of the Baylands. The Agreement calls for a Specific Plan that excludes uses within that area that would make future LMF construction, including “property acquisition and relocation of existing uses,” materially more expensive or difficult. Framework Agreement § E. Although the Council retains discretion whether to approve that plan, any resulting land use restrictions would be adopted by the City.

That coordination also raises the question of CHSRA’s potential liability. In Diversified Properties, the court recognized that the State may also incur liability where it cooperates with a municipality to prevent development for future state acquisition. (14 Cal.App.4th at pp. 442-444.) The potential involvement of CHSRA, however, does not resolve whether Brisbane’s own restrictions create independent liability.

The Council need not resolve how responsibility might ultimately be allocated between Brisbane and CHSRA. The immediate point is that Brisbane would be voluntarily placing itself in the middle of that dispute and assuming substantial constitutional and financial exposure now, for a future acquisition that CHSRA itself has not yet undertaken and may never take.

4. The City’s potential compensation exposure extends beyond the 45-acre footprint.

The financial consequences are not limited to the value of the 45 acres being held for CHSRA. If the City imposes a taking of the 45-acre area, BDI would have to seek just compensation for any legally compensable injury to the remainder of its property attributable to the restrictions, including their effects on the planned location and configuration of Baylands infrastructure. In practical terms, that means the consequences of taking infrastructure and facilities that were planned for the 45 acres and forcing BDI to find somewhere else to put them.

The City’s own EIR identifies those consequences. The proposed LMF would displace approximately half of the Baylands’ planned stormwater detention basin. The Baylands requires approximately 45.2 acre-feet of detention capacity, while the remaining basin would provide only approximately 23.6 acre-feet. The missing capacity would therefore have to be recreated somewhere else within the Baylands and/or through additional pumping infrastructure. Most importantly, the EIR itself states that this relocation “would not be needed but for the LMF.”
The same is true of other major infrastructure. The water recycling facility would need to move east of Tunnel Avenue, bringing with it thousands of feet of substantial retaining walls. The utility-scale battery storage facility would be shifted to another location. Other land that otherwise could serve different Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 6 ends

020962.0001 4918-5453-1805.6
Baylands purposes would have to absorb infrastructure displaced from the 45-acre footprint. Those changes have costs, consume land and create cascading effects on the layout and economics of the balance of the project.

That all matters for compensation purposes. The constitutional problem is not simply that the City would be holding 45 acres unavailable for the uses BDI planned there. The reservation also pushes the consequences of that decision onto the rest of BDI’s property.

Jefferson Street shows that this exposure is real. The development restriction at issue there ultimately resulted in an $18 million judgment against the City of Indio. Brisbane should not knowingly create comparable exposure here - particularly when the entire purpose of the restriction is to reduce the cost and difficulty of a potential future acquisition by a different public agency, for a project that provides little to no direct benefit to Brisbane residents.

5. BDI must raise these issues now to preserve its rights.

BDI is raising these objections now not because it wants to add more pressure, but because California law requires a property owner to present its taking claim during the administrative process before the agency makes its final decision.

Doing so gives the City the opportunity to address the problem before adopting the challenged restriction and is necessary to preserve BDI’s ability to seek judicial relief later. If the City nevertheless adopts the LMF reservation, BDI would then need to consider a timely writ challenge, joined with an inverse condemnation claim, as in Jefferson Street. BDI is therefore making this record now because it cannot wait until a future CHSRA acquisition and assume that its rights will still be protected.

Conclusion
On this topic, we believe the City has a straightforward choice.

If CHSRA ultimately determines that it requires 45 acres of the Baylands for an LMF, CHSRA can acquire the property in the ordinary way: negotiate with BDI or, if authorized, exercise eminent domain and pay the constitutionally required compensation. The City does not need to solve CHSRA’s future acquisition problem today.

What Brisbane should not do is misuse its police power now to keep 45 acres of privately owned land in an acquisition-ready condition for an uncertain state project, displace major Baylands infrastructure onto the remainder of BDI’s property, and assume the resulting constitutional and financial liability itself. * * *
Mayor and Members of the City Council
City of Brisbane
November 23, 2026

Page 7 ends

020962.0001 4918-5453-1805.6
BDI therefore requests that the Council delete the proposed interim-use provisions for the 45-acre LMF area in their entirety, remove the LMF reservation and all related maps, references, implementing provisions and infrastructure assumptions from the Specific Plan, and restore the affected property to the otherwise applicable Sustainable Infrastructure/Open Space land use framework.

Very truly yours,

COBLENTZ PATCH DUFFY & BASS LLP
Frank Petrilli
Baylands Development, Inc.
2201 Bayshore Blvd.

San Francisco, CA 94134
www.thebaylands.com
To: Mayor and Members of the Brisbane City Council
From: Baylands Development, Inc.

Date: November 23, 2026
RE: Priority Revisions to the 2026 Baylands Specific Plan Honorable Mayor and Councilmembers:

As the Council discussed last week, the schedule for completing the Baylands Specific Plan is now extremely compressed. Staff and ESA need direction in the coming days if they are going to prepare revised Specific Plan language for Council review in early December and preserve the possibility of final action before the end of the year.

With that schedule in mind, BDI is not attempting to revisit every issue that has been discussed over the course of the hearings. We are instead asking the Council to address three issues that directly affect whether the Specific Plan can actually be implemented and whether remediation and housing can begin.

Those issues are:
• Allow reasonable interim uses in the Roundhouse, Icehouse Hill and Campus East Districts, including renewal, extension and expansion of qualifying existing uses. We are not asking for new interim uses in the Bayshore District, which is expected to redevelop first. These uses can generate revenue to support remediation planning, infrastructure engineering, entitlement work and other substantial costs that must be incurred long before individual development phases become financeable. Eliminating those revenue sources prematurely would make it harder— not easier—to advance remediation and the other implementation work necessary to put the Specific Plan into effect.
• Allow remediation to proceed in discrete, regulator-approved phases coordinated with actual development, rather than requiring remediation of an entire district, operable unit or larger portion of the Baylands before development can begin. The City’s own environmental review contemplates phased remediation, and City staff has recommended allowing remediation to proceed in phases while prohibiting occupancy until the applicable regulatory agencies determine that the area is safe for its proposed use. Requiring unrelated portions of a much larger area to be remediated first would add cost and delay without making an occupied area safer, and could make housing substantially more difficult to deliver. • Remove the 45-acre High-Speed Rail Light Maintenance Facility reservation and restore that area for the sustainability and infrastructure uses otherwise contemplated for the property.

Reserving that land now for an uncertain future state project displaces major Baylands infrastructure and sustainability uses, adds cost and complexity to the project, and constrains land that could otherwise be put to productive use in the meantime. BDI’s land use counsel is Baylands Development, Inc.
2201 Bayshore Blvd.

San Francisco, CA 94134
www.thebaylands.com
separately submitting a letter addressing the legal issues associated with the proposed reservation.

These requests share a common theme. They are intended to preserve and protect the City’s ability to comprehensively plan and regulate the Baylands while avoiding requirements that would unnecessarily front-load costs, interfere with regulator-approved remediation sequencing, or make it harder to finance and deliver the housing and other development contemplated by the Specific Plan.

1. Interim uses are necessary to support the work required to move from an adopted Specific Plan to actual development.

BDI previously raised the interim-use issue in September, and we continue to believe the current approach should be revised.

The Baylands will be developed over many years. Adoption of the Specific Plan is an important milestone, but it does not itself produce a project that can be financed and constructed. Before vertical development can begin, BDI and future development partners will need to complete substantial additional remediation planning, engineering, subdivision work, infrastructure design, site planning and entitlement work; pursue grants and other funding sources; and assemble the outside equity and construction financing necessary to undertake individual development projects.

BDI can contribute the land and some capital to that effort, but a project of this scale cannot be financed solely from the landowner’s balance sheet. Each actual development phase will ultimately need to stand on its own as a sufficiently defined and financeable project capable of attracting outside equity and debt. (In simple terms, equity is the cash invested by owners and outside investors who put their capital at risk in anticipation of earning a return once the development phase is built and generating revenue, while debt is borrowed money - typically construction financing - that must be repaid with interest.) In the meantime, existing and future interim uses can provide an important source of revenue to help fund the significant carrying costs and predevelopment work that will be required long before the first major development project is ready to proceed. Avis is one obvious example of an existing permitted use that is productive today and can help support that effort without interfering with long-term redevelopment.

The current Specific Plan takes the opposite approach. Outside of the proposed LMF area, it prohibits any new interim uses, and existing permitted interim uses are expected to terminate as their permits or leases expire, without a mechanism to renew, extend or expand them.

We are not asking the City to allow unrestricted temporary development throughout the Baylands.

Our request remains substantially the same as the proposal we presented in September (which is attached again, for reference):
• New interim uses would be limited to the Roundhouse, Icehouse Hill and Campus East Districts. We are not proposing new interim uses in the Bayshore District, which is expected to be the first major area to redevelop.

Baylands Development, Inc.
2201 Bayshore Blvd.

San Francisco, CA 94134
www.thebaylands.com
• Eligible uses would be limited to compatible, readily removable uses such as screened storage of operable vehicles, equipment and materials and similar temporary activities, together with construction-debris processing associated with Baylands development and the approved zero-waste program. • The City would retain authority to impose reasonable operational conditions addressing matters such as screening, dust, traffic, noise and other potential impacts. • Existing qualifying interim uses could be renewed, extended, modified or expanded, subject to the same standards.
• Interim uses would terminate when the affected property is actually needed for remediation, grading, infrastructure or permanent development, rather than being forced to disappear years earlier for no corresponding development purpose.

Requested Council direction: Direct staff and ESA to revise the Specific Plan to allow appropriately regulated interim uses within the Roundhouse, Icehouse Hill and Campus East Districts, including renewal, extension, modification and expansion of qualifying existing interim uses, with termination tied to the property actually being needed for Baylands development.

2. Remediation should be allowed to proceed in regulator-approved phases coordinated with actual development.

BDI fully understands the Council’s desire to see meaningful remediation occur before people live and work on the Baylands. We share that objective. The issue is how remediation can actually be sequenced and financed.

Various approaches discussed during the hearings would require completion of remediation over an entire district, operable unit, the entire west side of the Baylands, or potentially an even larger area before any meaningful vertical development could proceed within that area.

That approach is not workable.

First, the remediation itself must be physically sequenced. A substantial amount of material must be moved from the former landfill area to the railyard area. Remediation and grading therefore cannot simply be completed everywhere at once. The work needs to proceed in an orderly sequence coordinated with the approved remedial plans, grading, infrastructure and future development. We also understand and want to acknowledge the concerns the Council has raised regarding truck hauling routes and how soil will be moved from the eastern side of the Baylands to the western side. We have heard those concerns and are committed to working with the City to resolve them as the remediation and grading program is developed.

Second, requiring remediation of a very large area before any corresponding development can occur creates a fundamental financing problem. Remediation of the Baylands is an extraordinarily expensive undertaking. It is not realistic to expect hundreds of millions of dollars of remediation and horizontal work to be financed years in advance of the development projects, equity investments and construction loans that will ultimately support that work. Remediation itself does not generate a financial return, so the capital needed to pay for it must ultimately be supported by Baylands Development, Inc.
2201 Bayshore Blvd.

San Francisco, CA 94134
www.thebaylands.com
discrete development projects that can generate a sufficient return to justify putting substantial investment dollars at risk.

The better approach is to allow remediation to proceed in discrete phases approved by DTSC and the Regional Water Board and coordinated with actual development phases. Before a particular area is occupied, the remediation necessary to make that area safe for its intended use must, of course, be completed and approved. Phased remediation does not mean that occupied areas are exposed to uncontrolled work occurring nearby: work in later phases remains subject to agency-approved soil-handling requirements and, as applicable, dust-control, air-monitoring and other health and safety measures designed to prevent off-site exposure, while completed phases are not occupied until the required remediation and protective controls are in place. The Specific Plan therefore should not require remediation of an entire district or operable unit simply because a smaller portion of that area is ready to move forward.

This approach is consistent with City staff’s recommendation that occupancy be prohibited until the remediation necessary to safely support the proposed use has been completed in accordance with the applicable regulatory requirements. It is also consistent with the City’s own environmental review, which expressly contemplates phased remediation and grading where approved by the applicable regulatory agencies. Most importantly, no building would be occupied until the remediation required for that particular use has been completed and approved by the applicable state agency; the issue is simply whether unrelated portions of a much larger district or operable unit must also be remediated first. And finally, it also keeps the City in the appropriate role of requiring compliance with the regulator-approved cleanup program, rather than creating a separate City-imposed remediation sequence that could conflict with the technical decisions of DTSC or the Regional Water Board.

The same issue also affects housing production. If each individual development phase or sub-phase cannot proceed until remediation has been completed across a much larger district or operable unit, smaller residential projects that are otherwise ready to move forward will effectively be prevented from doing so. In practical terms, requiring remediation on that broader basis would make it substantially more difficult, if not impossible, to deliver housing. This is particularly important given the City’s existing Housing Element commitments and HCD’s continuing focus on timely implementation of the Baylands housing program. Allowing remediation to proceed in regulator-approved phases therefore is not only a question of project feasibility; it is also necessary to preserve a realistic path for the City to produce the housing the Specific Plan is intended to accommodate.

Requested Council direction: Direct staff and ESA to revise the Specific Plan so that remediation may proceed in discrete, regulator-approved phases coordinated with development phasing, and so that completion of remediation for an entire district, operable unit or larger geographic area is not a prerequisite to development of a smaller area that has itself been appropriately remediated and approved for its intended use.

Baylands Development, Inc.
2201 Bayshore Blvd.

San Francisco, CA 94134
www.thebaylands.com

3. The Council should remove the LMF reservation and restore the 45 acres for Baylands sustainability and infrastructure uses.

BDI is separately submitting a letter from its land use counsel addressing the proposed 45-acre High-Speed Rail Light Maintenance Facility reservation in greater detail.

At the policy level, our request remains straightforward. The LMF remains an uncertain future state project, while reserving 45 acres for that potential future use has immediate consequences for the Baylands. It displaces planned stormwater, water recycling, battery storage and other sustainability infrastructure; forces those facilities to be relocated elsewhere on the property; consumes land that could otherwise support productive uses; and adds cost and complexity to an already extraordinarily difficult redevelopment project.

BDI therefore continues to request that the City remove the LMF reservation and restore the affected property to the sustainability and infrastructure framework otherwise contemplated for that area.

That issue also needs to be considered in the context of the other changes now being discussed.

We understand that the Council appears inclined to reduce the residential program to 1,800 units.

That change is meaningful to BDI. Reducing development capacity reduces the value of the property and, correspondingly, the resources available to support remediation, infrastructure and the other extraordinary costs associated with redeveloping the Baylands.

At the same time, BDI recognizes that the Council must make policy choices and that not every issue is equally important. From our perspective, removing the LMF reservation and establishing workable interim-use provisions are substantially more important to the near-term ability to advance the Baylands than preserving the additional 400 residential units currently contemplated by the Specific Plan.

Conclusion
We appreciate that the Council and staff are working under significant time pressure and that there are many issues still being discussed.

These three requests are the issues that BDI believes most directly affect whether the Specific Plan can function as a practical framework for moving from planning to remediation, financing and actual development, particularly as it relates to the production of housing. Because each requires changes to the Specific Plan text, however, they need to be addressed now so staff and ESA have sufficient time to prepare appropriate language before the Council begins its final December deliberations.

We respectfully request that the Council provide that direction.

Respectfully submitted,
BAYLANDS DEVELOPMENT, INC.
1 Brisbane Baylands / Proposed Specific Plan
“Conditions” Coleen Mackin
15 Safeguards | Proposed additions to the Specific Plan. (Draft Language for Council Adoption)
This language, if included in an “Approved Specific Plan,” binds the developer to the conditions outlined in each section.

Detailed implementation plans are not required now, but must be submitted later where indicated.

A. Before grading permits and soil movement

1. Remediation and Landfill Closure
The developer shall submit and comply with a City-approved, enforceable, Remediation and Landfill Closure Schedule containing both completion milestones and financial security.

No West-Side residential building permits shall be issued for OU-SM before the remediation of the entirety of OU-SM is completed and signed off by DTSC, the regulatory agency.

No West-Side residential building permits shall be issued for OU-2 before the remediation of the entirety of OU-2 is completed and signed off by RWQCB, the regulatory agency.

Remediation of East-Side sites designated for sustainability facilities shall proceed concurrently with West-Side remediation under the approved schedule.
2 2. Water Supply, Grading, and Soil Transfer
No permits for grading or soil transfer shall be authorized until the City Council approves a secure and reliable long-term water supply that has been established consistent with Measure JJ.

The developer shall be required to submit with permit applications a Construction Water Management Plan addressing: water sources, nonpotable water use where feasible, drought restrictions, and dust control.

The Plan must be approved by the City before any applications for permits will be considered.

3. Construction Impacts and Soil Hauling
Prior to grading or soil movement, the developer shall obtain City approval of a Construction Soil Management Plan.

The plan shall establish haul routes, dust and noise controls, monitoring and inspection, and surety requirements.

Any construction-related soil-hauling trucks shall not use the Tunnel Avenue Bridge.

Unpaved haul routes shall be paved or otherwise controlled to standards approved by the City.

4. Grading and Protection of Existing Properties
Prior to grading permit approval, the developer shall submit a Grading Plan that includes illustrative cross-sections.

The plan must include protective measures in proposed grading that protect existing properties from: flooding, adverse elevation changes, and loss of business, utility, delivery, or emergency access.
3 Planning Commission review and a public hearing shall be required pursuant to reinstated Municipal Code Section 17.32.220.

B. Before Soil Transfer or Grading Permits, or submission of Tentative Subdivision Map

5. Comprehensive Basin Drainage System, Including Visitacion Creek
Prior to grading or soil transfer, the developer shall obtain City approval of a Comprehensive Basin-Wide Drainage and Flood Protection Analysis and Plan addressing the entire Baylands, noting existing developed properties, and Visitacion Creek.

The plan shall identify permanent improvements required at each phase of grading, soil transfer, or construction, to ensure long-term safe and functional drainage if development is delayed or discontinued.

6. One Coordinated Tentative Subdivision Map and Grading Plan A Tentative Subdivision Map must be submitted in conjunction with the application for a grading permit.

The map must first illustrate existing conditions: topography, elevations, drainage, roads, structures, and utilities. It must also indicate areas of constraints: contamination, flood hazards, wetlands, and other limitations on development.

The Tentative map shall include the proposed subdivision boundaries, grading and elevations, streets and access, utilities, drainage, and the relationship of the proposed improvements to the adjoining properties.
4 7. Circulation and Emergency Access
A Circulation and Emergency Access Phasing Plan must be submitted and approved prior to issuance of a grading permit.

The plan shall minimize disruption to existing businesses and maintain appropriate emergency access at every stage of development.

C. Before building permits for each phase or increment

8. Infrastructure Phasing and Completion
The developer shall obtain City approval of a Master Infrastructure and Phasing Plan identifying required improvements and
completion milestones for each phase.

Each phase shall incorporate infrastructure necessary to function independently.

The plan shall include provisions to protect the City and existing properties if development is suspended or terminated.

9. Police, Fire, and Other Public Facilities
The developer shall fund the necessary interim public services and/or facilities to ensure public safety until sufficient Baylands public financing is available.

10. Wastewater Treatment Facility Location and Odors
Before approval of the Wastewater Treatment Facility, the City shall review and approve its location, design, odor-control systems, and operating standards.
5 The facility shall incorporate stringent odor prevention and control measures, monitoring, complaint-response procedures, and City inspection rights.

11. Selected Alternative
The final alternative selected by the Council shall be the development alternative authorized under this Specific Plan.

All land-use tables, development standards, building heights, drawings, and subsequent plans shall be revised by amendment as necessary.

D. Independent engineering and enforcement

12. Independent Engineering, Geotechnical, Structural,
Environmental, and Legal Review
The City retains the right to hire consultants to evaluate developer submitted plans and technical studies. In hiring said consultants, the City shall establish the scope of work or methodology to be employed and consultant fees for said work shall be at developer’s expense.

The developer shall provide access to supporting data, testing, and inspections, and shall correct identified deficiencies before applicable permit approvals.

E. Financial protection and developer accountability

13. Public Financing and Fiscal Protection
Approval of this Specific Plan shall not authorize any CFD (Community Facilities Districts), EIFD (Enhanced Infrastructure 6 Financing District), HOA (Homeowners Association), POA (Property Owners Association), public reimbursement, or any other public financing arrangement unless in the City Council’s sole discretion, approval is granted.

14. Developer and Successor-Builder Responsibility
The Master Developer shall retain responsibility for required remediation, backbone infrastructure, sustainability facilities, and other project obligations following any parcel transfer unless the City expressly approves an assignment and equivalent replacement security. Such obligations shall be established in recorded agreements enforceable by the City.

15. Developer Financial Capacity and Security
Prior to submittal of the Grading permit application and Tentative Subdivision Map, and each subsequent permit approval thereafter, the developer shall demonstrate adequate financial capacity and committed funding necessary to complete required remediation, infrastructure, and all other Specific Plan improvements.

The developer shall be required to provide sufficient financial security, including irrevocable, automatically renewable standby letters of credit or cash deposits, in amounts approved by the City.

From: Mackin, Coleen <[email protected]>
Sent: Monday, November 23, 2026 2:41 AM
To: Gardiner.Kevin <[email protected]>; Phillips, Eric S. <[email protected]> Cc: Dennis, Jeremy <[email protected]>; Zutler, Samantha W. <[email protected]>; Padilla, Ingrid <[email protected]> Subject: Mackin Specific Plan Sugg Chgs
Please find attached, suggested changes to the Specific Plan that I would like reviewed by the full Council.

Could you please disseminate to the full Council.

Thank you.

Coleen
PS. At the last hearing, some members of the Public in attendance suggested that we have copies of all the late additions to the agenda available for distribution to the Public at the Hearings.

COLEEN MACKIN
Mayor | Brisbane City Council
City of Brisbane 50 Park Place | Brisbane, Ca. 94005 USA Email: [email protected]
Phone: (415) 529-8114 Cell: (415) 412-2893
City Hall Public Walk-In Hours: Mon-Thur 8:30-4:30 • Fri 8:30-12:30 From: Kim Follien <[email protected]>
Sent: Monday, November 23, 2026 10:48 AM
To: Padilla, Ingrid <[email protected]>
Subject: Re: 11/23/26 BCC Special Meeting for Baylands: Financing and Revenue-Positive Development
Dear Madam Mayor Mackin and City Council,
I’m writing to express my hope that future Brisbane residents in the Baylands will not pay for police and fire or roads and infrastructure via a CFD. The applicant should pay for these costs as they are the entity who will profit from the housing. I would like to see the specific plan state that these costs will be worked out via the city and the Applicant with a metering plan that requires a to-be-determined amount of commercial and/or hotel development to occur before or concurrently with residential development. I’m very much not in favor of a CFD to cover these costs, as this would likely mean less affordable housing for most levels and does not seem fair. I don’t pay any special funds for police/fire/infrastructure. Why should future Brisbane residents in the Baylands pay in this way? Best Regards,
Kim Follien, Brisbane Resident, 815 Humboldt Rd
--
Kim Follien (she/her)
Business Systems Analysis Expert, ERP Quality Team
Roche Digital Technology (RDT)
Genentech, Inc. - A member of the Roche Group
Building 26 / N1-4
South San Francisco, CA 94080, USA
Phone No.: +1 650-303-7285

---------- Forwarded message ---------
From: William Conway <[email protected]>
Date: Sun, Nov 22, 2026, 12:20 PM
Subject: Letter 2
To: William Conway <[email protected]>
Dear Council members,
I know there is a lot of pressure to move forward. I understand why the Council has committed to adopting the Specific Plan in December. I recognize that there may not be enough time in the upcoming meetings to work through all the changes necessary to adopt Alternative 7.

But if you are serious about Alternative 7, I think there is a way forward. Make a commitment now, and direct staff to come back with the actual language the Council would need to adopt Alternative 7 in early 2027, March or April.

That would give everyone an opportunity to see what those changes really involve, rather than simply being told they would take too much time.

I think it would also be a good-faith demonstration that the Council is genuinely interested in adopting the environmentally superior alternative, rather than letting the pressure of time make that decision for you.

You've all put so much work into this. It seems worth taking a little more time to better the specific plan while honoring the community's vote on Measure JJ.

Sincerely, W. Clarke Conway