MEMORANDUM

LETY OF BURBANKY
TAnT PUBLIC
WORKS
DATE: May 3, 2022
TO: Justin Hess, City Manager
FROM: Ken Berkman, Public Works Director &B
SUBJECT: Citywide Infrastructure Unfunded Needs
The FY2022/23 Proposed Capital Improvement Program (CIP) includes over $22 million in high priority General City capital projects planned for the upcoming fiscal year. The CIP will fund $9.8 million in repairs and upgrades to City facilities and nearly $3.2 million for enhancements to our parks, in addition to the City Council's annual $8 million commitment to improving the condition of our streets and sidewalks.

In February and March of 2022, the Infrastructure Oversight Board (IOB) reviewed a list of proposed capital projects ranked by priority and available funding and provided feedback and recommendations to staff on the proposed CIP plan. Based on that feedback and that provided by the Development Oversight Committee (DOC), staff incorporated the list of recommended projects into the Proposed FY2022-23 Budget for City Council approval.

Projects that are not included in the Budget are placed on the Citywide Infrastructure Unfunded Needs List (List) so that they may be considered in future years.

The List was created in 2013 to track the amount of capital investment needed to maintain, update, and replace the City's infrastructure. Each year during the budget preparation process, the List is re-evaluated by each department to determine if existing projects should be removed or have their scope and/or budget modified.

The List was presented to the IOB during the May 22 and June 24, 2021 meetings. Based upon those discussions, staff added an additional column to allow assignment of a general priority to the projects on a numerical scale, with one being a high priority, two a medium priority, and three a low priority. The list was last presented and discussed at the IOB's meeting on February 24, 2022, and has been revised since that time to reflect new information (see attachment).

ATTACHMENT
Citywide Infrastructure Unfunded Needs List
CITY of BURBANK

UNFUNDED NEEDS - EXISTING ASSETS
Project Estimated Total
Project Name Description Categorization/Prioritization Funding (1 High, 2 Medium, 3 Low) Required

STREETS
I-5 Unmet Needs Construct landscaping, sidewalk, pavement, curb/gutter repair, and other improvements along City right-of-way that was impacted by the I-5 project.

Unmet needs also include grading and landscaping beside the new railroad $15,200,000 walls built along Victory Place and San Fernando Blvd.

Citywide Parking Manage all public parking throughout the City, including commercial street Management parking, City parking lots, structures, and the Downtown Burbank Metrolink 1 $15,000,000 Station.

Burbank2035 Traffic Intersection improvements to address traffic from growth identified in the 1 $10,000,000
Mitigations City's General Plan.

Downtown Metrolink Station Construct pedestrian safety gates and warning lights to make the Metrolink Rail Crossing Improvements Station crossings safer and allow for a quiet zone in Downtown Burbank. $5,000,000 Victory / Chandler Rail Remove an outdated, substandard freight rail crossing and improve the Crossing Removal Project extension of the Chandler Bikeway to Downtown Burbank. The Chandler ikeway project will study several alignments including one that would $4,000,000 emove this rail crossing to make way for the bikeway. But current grant 3 unding is insufficient to construct this alternative if it is chosen for the bikeway project.

Downtown Metrolink Station This project will provide for rehabilitation of the 20 year-old Downtown 2 $3,700,000 Rehabilitation Metrolink Station.

Complete Bicycle Master onstruct the remaining bicycle projects in the Bicycle Master Plan t Plan prove safety and connectivity for Burbank residents who travel by bicycle 1 $2,200,000 Downtown Infrastructure Replacement of deteriorating brick and concrete walkways to maintain safe 2 $1,200,000
Replacement walking conditions for pedestrians.

Olive and Magnolia Bridge These bridges require widening to provide vehicle lane widths to Caltrans' Improvement Project standards and to provide pedestrian/bicycle accessibility, miscellaneous 1 $45,000,000 deck maintenance and safety railing replacements.

Pedestrian Signals and Install new signals, flashers, and crosswalks for pedestrian safety at the Flashers following 11 locations: Riverside/Maple, Magnolia/Lake, Olive/6th, $3,000,000 2 Thornton/Naomi, Victory/California, Victory/Lincoln, Edison/Allan, Hollywood/Heffron, Pass/Heffron.

I-5 Arterial Phase 4 Upgrade the following six signals: Victory/Chandler, Ontario/Thornton, San 2 $2,200,000
Fernando/Ontario, Avon, Hollywood Way NB, Hollywood Way SB.

SR-134 Arterial Phase 3 Upgrade the following four signals along Alameda at Keystone, Mariposa, $1,500,000 2 Reese, and Rancho Marketplace Shopping Center.

Olive Ave Signal Sync Synchronize 39 signals on Olive Ave. and Glenoaks Blvd. to increase traffic 2 $350,000 capacity and maintain efficiency.

Chandler Bikeway Access
locations (Rose, Kenwood, Avon, Fairview, Catalina, Naomi, Lincoln, Parish, 3 $300,000 Reese, Beachwood).

Downtown Signal Sync Synchronize 30 signals on San Fernando Blvd., Third St, and First St. to $250,000 2 increase traffic capacity and maintain efficiency.

STREETS TOTAL $108,900,000

STORM DRAINS
Storm Drain Pipe Replaces failing storm drain pipes to properly convey storm water and $1,000,000 2 Replacement prevent sinkholes.

STORM DRAINS TOTAL $1,000,000

Page 1 of 3 ends

CITY of BURBANK

UNFUNDED NEEDS - EXISTING ASSETS
Project Estimated Total
Project Name Description Categorization/Prioritization Funding (1 High, 2 Medium, 3 Low) Required
PARKS
Olive Recreation Center Renovate the Olive Recreation Center to reconfigure layout and maximize $30,000,000 1 Renovation community use.

Joslyn Adult Center Modernize the entire Joslyn Adult Center. Modernize Hazel Walker and 2 $1,250,000 Rehabilitation Nardo Auditoriums including new AV system and better lighting.

Burbank Little Theatre (Izav Renovate the interior of the Burbank Little Theatre for expanded community 1 $2,500,000
Park)
Betsy Lueke Creative Arts Expand pottery studio, improve function of outdoor space at the Betsy Lueke Center Enhancements Creative Arts Center, and install outdoor lighting for public safety. 1 $1,500,000 F-104 at Izay Park Conduct a structural analysis; design and complete required upgrades and/or 1 $150,000 improvements.

Verdugo Park Recreation Renovate Verdugo Park Recreation Center and improve the HVAC Center and Aquatics Facility reconfigure the office space and classrooms, and renovate the Aquatics $20,000,000
Renovation Facility including: locker rooms; office space; and family changing room.

Verdugo Aquatic Facility Replace the pool slide at the Verdugo Aquatic Facility. The slide was 1 $400,000 Pool Slide Replacement installed in 2013.

Verdugo Park Log Cabin Phase 1 of Verdugo Park Improvements. This phase will strengthen and Repairs restore the bullding's root structure/ridge.
$1,000,000
Phase 2 of Verdugo Park Improvements. This phase will expand and remodel the patio, kitchenette, lighting, and interior/minor exterior remodeling.

Verdugo Lower Assembly Expand Verdugo LAB to an auditorium size room with the ability to divide it $1,000,000 Building (LAB) Expansion into two smaller rooms
McCambridge Recreation enovate aging recreation center including reconfiguration of the office Center Renovation pace, classrooms, and updating the congregate meal program area ano $13,300,000 kitchen.

McCambridge Park Pool Renovate and remodel the aging pool facility. Upgrades include a new lap Renovation swim pool, activity pool, and equipment and locker room renovations. The $9,000,000 pool given an estimated 5 year life-span until
renovation/improvements are needed.

McCambridge Park Install HVAC and a sound system at the McCambridge Park Recreation Gymnasium HVAC and Center Gymnasium. $150,000
Sound System Installation
Park Restroom Renovation Project will renovate and standardize park restroom facilities to comply with 1 $4,500,000 ADA requirements and improve efficiencies.

DeBell Clubhouse Expansion Expand existing Clubhouse to accommodate up to 250 guests in the banquet 2 $2,500,000 DeBell Golf Course Reduce managed turf acreage, improve conditions (tees, greens), mitigate liability areas (errant balls to roads, etc.), nate better Improvements $2,250,000
1 drainage conditions, and remove tree hazards, as well as, expand cart pathways, and modernize wireless connectivity.

DeBell Golf Course Driving Reorient driving range to maximize golf play. $2,210,000 3 Range
Tuttle Senior Center Reorient, renovate, expand and modernize the Tuttle Senior Center. Facility 1 $3,000,000 Renovation to have dedicated programming and nutrition areas.

Starlight Bowl Renovate the Starlight Bowl to meet existing and future community needs. $75,000,000 2 Hillside Trail Network Expand hillside trail network and include mountain bike course options and $5,500,000 3 Expansion pump track.

Stough Canyon Park enovate StuCk stre to become more of a gatewa Improvements cility into the Starlight Bowl. Replace the damaged arbor with a mor 3 $1,300,000 durable long-lasting structure.

Stough Canyon Nature enovate exhibits and amphitheater to improve the interactive learning Center Rehabilitation xperience for park patrons. Rehabilitation will also include the addition of a 2 $550,000 play structure.

Page 2 of 3 ends

CITY of BURBANK

UNFUNDED NEEDS - EXISTING ASSETS
Project Estimated Total
Project Name Description Categorization/Prioritization Funding (1 High, 2 Medium, 3 Low) Required
Palm Park Ballfield Replace turf at Palm ballfield with artificial turf to create a multi-sports Improvements omplex. The ballfield is built on a reservoir and therefore cannot be irrigate $2,000,000 with recycled water.

Valley Skate Park Expansion Expand surestare This it increase programming and sai ry, and inali $1,000,000 Mountain View Park Building Modernize Mountain View Park Building to expand City programming and 3 $250,000
Improvements rental opportunities.

PARKS TOTAL $180,310,000

FACILITIES
Passport Acceptance Facility Renovate the Passport Acceptance Office to address safety and security Renovation concerns which will enhance the customer service experience and secure 3 $100,000 Civic Plaza All items necessary to execute development of a community civic center including a new Library, Administrative Services Building, parking structure $120,000,000 Buena Vista Library Tenant improvements to modernize Buena Vista Library. 3 $2,000,000 Northwest Library Add 2,000 square foot meeting/event room to the Northwest Library. This 3 $2,000,000 was planned but later removed from the 2013 renovations.

Access Card System The aging security door and elevator access system for the Police and Fire Headquarters was installed in 1998 and needs replacement. This proiect will 3 $1,000,000
also include re-cabling and new devices to address public and employee Range Training House Building structure utilized by Police personnel for tactical training is aged and 3 $125,000 needs a significant amount of repair.

City Hall Preservation This project will restore and preserve historic City Hall's original character Project while renovating interior areas so that they are more efficient. $9,000,000 Parking Structure mprovements to the City Hall, and Courthouse parking structures to meet Improvements current standards and ADA compliance. Includes security enhancements 3 $4,100,000 and elevator modernization.

Fire Station Interior
Renovation 3 $1,200,000
and flooring.

FACILITIES TOTAL $139,525,000
Grand Total: $429,735,000

Page 3 of 3 ends

CITY of BURBANK

UNFUNDED NEEDS - NEW ASSETS
Project Estimated Total
Project Name Description Categorization/Prioritization Funding (1 High, 2 Medium, 3 Low) Required

STREETS
Metrolink Double Track and
other Capital Projects
at identifies the necessary improvements. Metro has allocated $12 millior Measure M funding to advance the design of the projects, but capita 1 $6,600,000 funding needed for construction. Total budget is estimated $220,000,000 to be funded by Metro. The City's portion is anticipated to be approximately 3% of the total budget.

Clybourn Avenue Rail Grade Separate trains from vehicle traffic at the Clybourn rail grade crossing to 1 $50,000,000
Separation Project improve safety and access to Burbank Airport.

Downtown Burbank onstruded bride f pedestrians and bicyclists between the Metrolink Bicycle and Downtown Burbank Metrolink Station and Downtown Burbank. This would 1 $15,000,000
Pedestrian Connection make it easier for commuters to get from transit to Downtown Burbank jobs, retail, and residences.

Citywide Railroad Quiet Projects will construct safety improvements at the railroad crossings to Zones nplement quiet zones, which allow trains to silence their horns as they traverse the City. Improvements were completed to the median at Buena 1 $15,000,000 Vista/Vanowen in Fall 2021 establish a quiet zone at that crossing.

Burbank Bus Maintenance
and Dispatch Facility
1 $10,000,000
Media District Freeway Cap
Transit Center
$5,000,000
for this transformative project.

North San Fernando his project would implement streetscape, bicycle, pedestrian, lighting, and Boulevard Streetscape and other safety improvements on San Fernando Blvd. between Burbank Blvd and Interstate 5. This project implements the proposed North San Fernando 1 $4,000,000 Safety Project
Boulevard Master Plan
owntown Burbank Bikeway Construct protected bicycle lanes or bikeways separate from vehicles in Access Project owntown Burbank. This allows those who live or work in Downtowr 1 $2,000,000 Burbank to travel without a car more safely.

Downtown San Fernando Add walkability to the Downtown Burbank, consistent to the Complete Blvd. Street Improvements Streets Plan, including wider sidewalks, outdoor dining, landscaping and and Amenities other amenities; improve the adjacent public pedestrian walkway (AMC Walkway) to create an enticing place for community gatherings, music, and 1 $5,000,000 additional seating and eating areas; improve pedestrian and motorist safety and community greening; entice more visitors and residents; provide easier event planning; create job growth, and add public art.

San Fernando Blvd Install traffic control bollards to create physical and visual barriers that direct Downtown Street Bollards vehicles on San Fernando Blvd. Posts prevent access to off-limits areas, eparate lanes or directions of traffic, while also allowing pedestrians to pas 1 $300,000 nimpeded. To be used during Downtown Burbank events, or to enhance outdoor dining throughout Downtown Burbank.

Removable Safety Barriers Provide removable barricades in the downtown area that can be utilized for 1 $1,500,000 Downtown
Service Club Welcome Construct a sign identifying Burbank with the option to include service clubs 3 $100,000
Monument/Fixture that support the City.

Page 1 of 2 ends

CITY of BURBANK

UNFUNDED NEEDS - NEW ASSETS
Project Estimated Total
Project Name Description Categorization/Prioritization Funding (1 High, 2 Medium, 3 Low) Required
PARKS
New Soccer Fields Build new soccer fields. 2 $9,000,000 Development of New Parks Develop a new park over Sunset Canyon reservoir and link to Palm Ballfield. $4,600,000 2 Restroom at Bel Aire Construct restrooms at Bell Aire Ballfield. 3 $1,600,000
Ballfield
Security Cameras With an increase in vandalism and break-ins, and the absence of Park Patrol or a Ranger Program, exterior security cameras could assist both the Parks & Recreation and Police Departments in monitoring parks and 1 $1,000,000 facilities. Security cameras and other security measures have proven successful to deter trespassing issues at Verdugo Aquatic Facility.

Improve Nutrition Kitchen Update central Nutrition kitchen at McCambridge Recreation Center and and Offices at McCambridge enhance office space for staff to better serve seniors with home delivered 1 $500,000 Recreation Center
Pickleball Court Complex Build Pickleball Court Complex or convert tennis courts to Pickleball $533,650 2 throughout City to meet community needs.

Horseshoe Pit Court at Izay Renovate horseshoe pit courts at Izay Park 2 $35,000 Park
Splash Pads Build splash pads at existing Park facility to meet community needs. 3 $250,000 Animal Shelter Mister Install an improved mister system to the outside dog kennels at the Burbank $20,000 System Animal Shelter
Animal Shelter Kennel Replace kennel bar doors with tempered glass doors to provide a safer and Doors calmer experience for the pets and public at the Burbank Animal Shelter 1 $60,000 Animal Shelter Turtle Pond Rebuild Turtle pond and renovate adjacent small grass area at the Burbank and Grass Area Animal Shelter. Improvements include removal and installation of a new 1 $40,000
Turtle pond liner, add waterfall, redo art mural and enhance adjacent grass area to utilize as a small dog play yard
Animal Shelter Corral Area Remodel and enclose the corral area of the Burbank Animal Shelter to Remodel rovide temperature controlled environment for rabbits, guinea pigs and 2 $150,000 other pocket pets

FACILITIES
Build dedicated EOC rovide the community with a dedicated Emergency Operations Center (EOC) building for the efficient and effective management of major disasters 3 $2,000,000 3 $1,260,000
3 $500,000
Grand Total $136,048,650

Page 2 of 2 ends