Item
No. Description Est. Qty UOM Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 Mobilization/Demobilization (not to exceed 10% of total amount bid) 1 LS $26,178.00 $26,178.00 $51,310.00 $51,310.00 $45,000.00 $45,000.00 $82,000.00 $82,000.00 2 Survey, Layout, and Protection of Existing Facilities 1 LS $6,235.29 $6,235.29 $16,150.00 $16,150.00 $6,000.00 $6,000.00 $7,500.00 $7,500.00 3 Landfill Gas Well Drilling 1,458 LF $64.60 $94,186.80 $39.00 $56,862.00 $125.00 $182,250.00 $145.00 $211,410.00 4 Single Landfill Gas Extraction Well Installation and Backfill 116 LF $68.28 $7,920.48 $101.00 $11,716.00 $90.00 $10,440.00 $255.00 $29,580.00 5 Dual Landfill Gas Extraction Well Installation and Backfill 2,079 LF $56.53 $117,525.87 $71.00 $147,609.00 $90.00 $187,110.00 $146.00 $303,534.00 6 LFG Extraction Wellhead Installation and Connection to Lateral 26 EA $1,733.09 $45,060.34 $965.00 $25,090.00 $2,000.00 $52,000.00 $2,836.00 $73,736.00 7 Drill/Abandon Unusable Well Borings 75 LF $51.71 $3,878.25 $70.00 $5,250.00 $70.00 $5,250.00 $164.00 $12,300.00 8 Landfill Gas Extraction Well Decommissioning 1 EA $4,184.76 $4,184.76 $2,420.00 $2,420.00 $3,000.00 $3,000.00 $3,900.00 $3,900.00 9 Provide and Install 6-inch LFG Well Lateral Pipe, with Supports and Guides 2,087 LF $12.24 $25,544.88 $21.00 $43,827.00 $50.00 $104,350.00 $31.00 $64,697.00 10 Provide and Install 6-inch fittings, Valves and Other Appurtenances 1 LS $20,356.58 $20,356.58 $93,225.00 $93,225.00 $25,000.00 $25,000.00 $19,610.00 $19,610.00 11 Proive and Install 4-inch LFG Well Lateral Pipe, with Supports and Guides 223 LF $10.72 $2,390.56 $21.00 $4,683.00 $50.00 $11,150.00 $24.00 $5,352.00 12 Provide and Install 4-inch Fittings Valves and Other Appurtenances 1 LS $4,033.54 $4,033.54 $23,225.00 $23,225.00 $4,851.00 $4,851.00 $11,082.00 $11,082.00 13 Provide and Install 12-inch CMP and Soil Berm Road Crossing 57 LF $65.79 $3,750.03 $126.00 $7,182.00 $300.00 $17,100.00 $140.00 $7,980.00 14 Traffic Control 1 LS $1,000.00 $1,000.00 $1,240.00 $1,240.00 $3,000.00 $3,000.00 $10,000.00 $10,000.00 15 Construction Site Management 1 LS $8,000.00 $8,000.00 $54,510.00 $54,510.00 $20,000.00 $20,000.00 $2,000.00 $2,000.00 16 Decommission MW-15 1 LS $12,429.41 $12,429.41 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 Total Items 1 - 16 $382,674.79 $549,299.00 $678,501.00 $849,681.00 BSE General Engineering,
Inc.
Stearns, Conrad and
Schmidt, Consulting
Engineers, Inc.
dba SCS Field Services
Mehta Mechanical
Company, Inc. dba
MMC, Inc.
CORRECTED TOTAL
BID TABULATION
Bid Schedule No. 1484 - Burbank Landfill No. 3 - Landfill Gas Collection and Control System Expansion 2021 Bid Opening: April 26, 2022
Environmental
Construction, Inc.
Attachment 3