BID SCHEDULE NO. 1503
ANNUAL SIDEWALK REPAIR PROJECT – ZONES 5 – 8
BIDDER TOTAL SUM BID BID
DEPOSIT
Kalban, Inc $1,299,500 10%
CJ Concrete Construction, Inc. $1,764,000 10%
Toro Enterprises, Inc. $1,817,325 10%
CT& T Concrete Paving, Inc. $1,871,530 10%
Gentry General Engineering * $2,245,060 10%
Vart Construction, Inc. * $1,345,000 10%
* Non-Responsive
Bid Schedule No. 1 503 advertised in the Los Angeles Times on April 27, 2022 and May 4, 2022.
Thirty-two (32) copies of the bid were downloaded, of which fourteen (14) identified themselves as Prime Contractors . Of the Prime Contractors, six (6) bids were received at the bid opening, however, two (2) bidders were disqualified. There were no responses from: