Burbank Housing and Safety Element Update
Final Environmental Impact Report
SCH# 2021020393
prepared by
City of Burbank
Community Development Department
150 North Third Street
Burbank, California 91502
Contact: Shipra Rajesh, Senior Planner
prepared with the assistance of
Rincon Consultants, Inc.
250 East First Street, Suite 1400
Los Angeles, California 90012
September 2022
ATTACHMENT 12-1
Burbank Housing and Safety Element Update
Final Environmental Impact Report
SCH# 2021020393
prepared by
City of Burbank
Community Development Department
150 North Third Street
Burbank, California 91502
Contact: Shipra Rajesh, Senior Planner
prepared with the assistance of
Rincon Consultants, Inc.
250 East First Street, Suite 1400
Los Angeles, California 90012
September 2022
ATTACHMENT 12-2
This report prepared on 50% recycled paper with 50% post-consumer content.
ATTACHMENT 12-3
Table of Contents
Final Environmental Impact Report i
Table of Contents
1 Introduction ................................................................................................................................ 1-1 Format of the Final EIR ............................................................................................................... 1-1 Environmental Review Process ................................................................................................... 1-2 Revisions to the Draft EIR ........................................................................................................... 1-4 Summary of the Project and Alternatives .................................................................................. 1-5 2 Responses to Comments on the Draft EIR .................................................................................. 2-1 3 Responses to Comments on the Recirculated Draft EIR ............................................................. 3-1 4 Errata .......................................................................................................................................... 4-1 Effect of In-Text Revisions .......................................................................................................... 4-1 Conclusion ................................................................................................................................... 4-4 5 Mitigation Monitoring and Reporting Program .......................................................................... 5-1 Tables
Table 1-1 RHNA Percentage of Income Distribution ...................................................................... 1-6 Table 1-2 Estimated Net Housing Units for the City of Burbank .................................................... 1-7 Table 1-3 Projected Specific Plan Units .......................................................................................... 1-7 Table 2-1 List of Commenters on the Draft EIR .............................................................................. 2-1 Table 3-1 List of Commenters on the Recirculated Draft EIR ......................................................... 3-1 Appendices
Appendix H Exhibits to Letter O-1 – Mitchell M. Tsai
ATTACHMENT 12-4
City of Burbank
Burbank Housing and Safety Element Update
ii
This page intentionally left blank.
ATTACHMENT 12-5
Introduction
Final Environmental Impact Report 1-1
1 Introduction
This Final Environmental Impact Report (EIR) has been prepared by the City of Burbank (City) for the Burbank Housing and Safety Element Update (hereafter referred to as the “Housing and Safety Element Update” or “Project”). This Final EIR has been prepared in conformance with the California Environmental Quality Act of 1970 (CEQA) statues (California Public Resources Code, Section 21000 et. seq., as amended) and implementing guidelines (California Code Regs., Title14, Section 15000 et. seq.).
Before approving a project, CEQA requires the lead agency to prepare and certify a Final EIR. The City has the principal responsibility for approval of the proposed Project and is therefore considered the lead agency under CEQA Section 21067. According to the CEQA Guidelines, Section 15132, the Final EIR shall consist of:
The Draft EIR or a revision of the Draft EIR
Comments and recommendations received on the Draft EIR either verbatim or in summary A list of persons, organizations, and public agencies commenting on the Draft EIR The responses of the lead agency to significant environmental points raised in the review and consultation process
Any other information added by the lead agency
The Draft EIR was circulated for a 65-day public review period that began on January 26, 2022, and ended on March 31, 2022. In addition, the Project Description, Biological Resources, and Utilities/Service Systems sections of the Draft EIR were recirculated for a public review period that began on July 22, 2022 and ended on September 6, 2022.
Format of the Final EIR
The Final EIR consists of the following four chapters:
Introduction. This chapter summarizes the contents of the Final EIR, the environmental review process, and provides a summary of the Project characteristics and the alternatives that were analyzed.
Response to Comments. During the public review period for the Draft EIR, written comment letters were received by the City and oral testimony was provided at public meetings. Chapters 2 and 3 of the Final EIR contain the comment letters for the Draft EIR and Recirculated Draft EIR, respectively, a summary of the oral testimony, and the City’s responses to the comments. Errata to the Draft EIR. Several of the comments that are addressed in the Response to Comments resulted in minor revisions to the information contained in the January 2022 Draft EIR. Several other revisions have been made to correct typographical errors. These revisions are shown in strikeout and underline text in this chapter.
Mitigation Monitoring and Reporting Program. This section of the Final EIR provides the mitigation monitoring and reporting program (MMRP) for the proposed Project. The MMRP is presented in table format and identifies mitigation measures for the proposed Project, the implementation period for each measure, the monitoring period for each measure, and the enforcing agency. The MMRP also provides a section for recordation of mitigation reporting.
ATTACHMENT 12-6
City of Burbank
Burbank Housing and Safety Element Update
1-2
Environmental Review Process
Notice of Preparation
The City of Burbank distributed a Notice of Preparation (NOP) of the EIR for a 30-day agency and public review period starting on February 22, 2021 and ending on March 23, 2021. In addition, the City held an online EIR Scoping Meeting on February 27, 2021. The meeting, held from 11:00 AM from 12:30 PM, was aimed at providing information about the proposed Project to members of public agencies, interested stakeholders and residents/community members. Due to COVID19 regulation the meeting was held online via zoom and additionally was live streamed on the City of Burbank YouTube channel.
In addition, the City of Burbank distributed a recirculated NOP of the EIR for an extended 30-day agency and public review period concluding on April 15, 2021. The original NOP stated that the EIR would analyze the addition of 8,800 units under the Regional Housing Needs Assessment (RHNA) that was conducted for the Housing Element Update. However, it was determined that the EIR would analyze 10,088 units to account for a 15 percent buffer for the RHNA. Therefore, the NOP was recirculated on March 17, 2021, with the higher number. In addition, the City held a second EIR Scoping Meeting on March 31, 2021. The meeting, held from 6:00 PM to 7:00 PM, was aimed at providing information about the proposed Project to members of public agencies, interested stakeholders and residents/community members. The meeting was conducted online via zoom.
The City received letters from five agencies in response to the NOP and recirculated NOP during the public review period, as well as various verbal comments during the two EIR Scoping Meetings. The NOP and recirculated NOP are presented in Appendix A of the Draft EIR, along with the NOP responses received for both notices, and the Initial Study that was prepared for the Project is included in Appendix B of the Draft EIR. Table 1-1 in Section 1, Introduction, of the Draft EIR, summarizes the content of the letters and Scoping Meeting comments, and identifies where the issues are addressed in the Draft EIR or the Initial Study.
The NOP that was circulated on March 17, 2021 for the proposed Project included an estimated growth of 10,088 housing units based on the City’s RHNA allocation and 15 percent buffer. 1 However, the estimated growth for the purpose of the Draft EIR analysis was changed to 10,456 housing units to account for the 2029 interpolated housing growth assumed under the two Specific Plans along with the City’s RHNA allocation.
Noticing and Availability of the Draft EIR
The Draft EIR was made available for public review and comment pursuant to CEQA Guidelines Section 15087. The public review period for the Draft EIR started on January 26, 2022, and ended on March 31, 2022. At the beginning of the public review period, the Draft EIR and one copy of the Notice of Completion (NOC) were submitted to the State Clearinghouse.
A Notice of Availability (NOA) of the Draft EIR was mailed to 40 agencies and organizations. An NOA was also sent to individuals who had previously requested such notice in writing. The NOA was filed with the Los Angeles County Clerk and published in the Los Angeles Times on January 26, 2022. The NOA described where the document is available for public review and how to submit comments on
1 Since circulation of the Recirculated Draft EIR on July 22, 2022, the site capacity in the revised version of the Housing Element is 10,011 housing units, which now includes a 14 percent buffer. The Project details in the Summary of Project and Alternatives reflect the revised version of the Housing Element. However, the EIR analysis maintains a conservative analysis using 10,456 housing units as the estimated growth to account for the 2029 interpolated housing growth assumed under the two Specific Plans along with the City’s RHNA al location.
ATTACHMENT 12-7
Introduction
Final Environmental Impact Report 1-3
the Draft EIR. The NOA and Draft EIR were also made available for public review at the City of Burbank, Community Services Building, 1st Floor Community Development Department, at 150 North Third Street, Burbank; the Burbank Central Library at 110 North Glenoaks Boulevard, Burbank; the Buena Vista Branch Library at 300 North Buena Vista Street, Burbank; the Northwest Branch Library at 3323 West Victory Boulevard, Burbank; and on the City’s website. The public review period provided interested public agencies, groups, and individuals the opportunity to comment on the contents of the Draft EIR. During the public review period, oral comments were received during the Planning Commission meeting held on March 14, 2022.
Noticing and Availability of the Recirculated Draft EIR The Recirculated Draft EIR was made available for public review and comment pursuant to CEQA Guidelines Section 15087. The Recirculated Draft EIR included revisions to the Project Description, the Biological Resources section and the Utilities/Service Systems section. The public review period for the Recirculated Draft EIR started on July 22, 2022 and ended on September 6, 2022. At the beginning of the public review period, the Recirculated Draft EIR and the Notice of Completion (NOC) were submitted to the State Clearinghouse. A NOA and an electronic copy of the Recirculated Draft EIR was mailed to 40 agencies and organizations. Relevant agencies were sent electronic copies of the documents. An NOA was also sent to individuals who had previously requested such notice in writing. The NOA was filed at the Los Angeles County Clerk and published in the Los Angeles Times on July 22, 2022. The NOA described where the document is available for public review and how to submit comments on the Recirculated Draft EIR. The NOA and Recirculated Draft EIR were also made available for public review at the City of Burbank, Community Services Building, 1 st Floor Community Development Department, at 150 North Third Street, Burbank; the Burbank Central Library at 110 North Glenoaks Boulevard, Burbank; the Buena Vista Branch Library at 300 North Buena Vista Street, Burbank; the Northwest Branch Library at 3323 West Victory Boulevard, Burbank; and on the City’s website. The public review period provided interested public agencies, groups, and individuals the opportunity to comment on the contents of the Recirculated Draft EIR.
During the public review period, oral comments were received during the Planning Commission meeting held on August 22, 2022.
Final EIR
The Final EIR addresses the comments received during the public review period and includes minor changes to the text of the Draft EIR in accordance with comments that necessitated revisions. This Final EIR will be presented to the Planning Board and City Council for potential certification as the environmental document for the proposed Project. All persons who commented on the Draft EIR will be notified of the availability of the Final EIR prior to the public hearings, and all agencies who commented on the Draft EIR will be provided with a copy of the Final EIR at least 10 days before EIR certification, pursuant to CEQA Guidelines Section 15088(b). The Final EIR will also be posted on the City’s website.
Pursuant to CEQA Guidelines Section 15091, the City shall make findings for each of the significant effects identified in this EIR and shall support the findings with substantial evidence in the record.
After considering the EIR in conjunction with making findings under Section 15091, the lead agency may decide whether or how to approve or carry out the Project. Although the City finds that the inclusion of mitigation measures as part of Project approval will reduce most of the potentially significant effects to less than significant, one transportation impact related to vehicle miles traveled (VMT), and one utilities/service systems impact related to wastewater will remain ATTACHMENT 12-8
City of Burbank
Burbank Housing and Safety Element Update
1-4
significant and unavoidable after implementation of mitigation. As such, the City the prepared a statement of overriding considerations pursuant to CEQA Guidelines Section 15093 for consideration by the City Council.
In addition, when approving a project, public agencies must also adopt a MMRP describing the changes that were incorporated into the proposed Project or made a condition of Project approval to mitigate or avoid significant effects on the environment (CEQA Guidelines Section 15097). The MMRP is adopted at the time of Project approval and is designed to ensure compliance during Project implementation. Upon approval of the proposed Project, the City will be responsible for implementation of the Project’s MMRP.
Revisions to the Draft EIR
The comments received during the public review period for the Draft EIR resulted in several minor clarifications and modifications in the text of the January 2022 Draft EIR. These changes are included in Section 4, Errata to the Draft EIR, of the Final EIR, to be presented to City decision makers for certification and Project approval.
CEQA Guidelines Section 15088.5 sets forth requirements for why a lead agency must recirculate an EIR. A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the Draft EIR but before certification of the Final EIR. New information may include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not considered significant unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project’s proponents have declined to implement. As defined in CEQA Guidelines Section 15088.5(a), significant new information requiring recirculation includes the following:
A new significant environmental impact would result from the project or from a new mitigation measure proposed to be implemented.
A substantial increase in the severity of an environmental impact would result unless mitigation measures are adopted that reduce the impact to a level of insignificance.
A feasible project alternative or mitigation measure considerably different from others previously analyzed would clearly lessen the environmental impacts of the project, but the project’s proponents decline to adopt it.
The Draft EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were precluded.
The minor clarifications and modifications that were made to the Draft EIR are shown in the Errata of this Final EIR. None of the revisions that have been made to the EIR resulted in new significant impacts; none of the revisions resulted in a substantial increase in the severity of an environmental impact identified in the Draft EIR; and none of the revisions introduced a feasible Project alternative or mitigation measure that is considerably different from those set forth in the Draft EIR.
Furthermore, the revisions do not cause the Draft EIR to be so fundamentally flawed that it precludes meaningful public review. As none of the CEQA criteria for recirculation have been met, recirculation of the EIR is not warranted. As stated in CEQA Guidelines Section 15088.5(b), “recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR.” ATTACHMENT 12-9
Introduction
Final Environmental Impact Report 1-5
Summary of the Project and Alternatives
The following is a summary of the full Project description, which can be found in Section 2, Project Description, of the Draft EIR.
The proposed Project would involve an update to the Housing Element of the City’s Burbank2035 General Plan for the 2021-2029 planning period, along with minor updates to the Safety, Land Use, Open Space and Conservation, Air Quality and Climate Change, Noise, and Mobility Elements, and the incorporation of environmental justice goals, policies and objectives into the Burbank2035 General Plan. The proposed Housing and Safety Element Update establishes programs, policies and actions to further the goal of meeting the existing and projected housing needs of all household income levels of the community; provides evidence of the City’s ability to accommodate the RHNA allocation through the year 2029, as established by the Southern California Association of Governments (SCAG), and identifies any rezoning program needed to reach the required housing capacity. The Safety Element update is triggered by various new provisions of State law, the Mobility Element update would incorporate VMT metrics per Senate Bill (SB) 743, and the environmental justice policies would be added pursuant to the requirements of SB 1000 which requires that revisions or adoption of two or more elements of a general plan on or after January 1, 2018 “adopt or review the Environmental Justice Element, or the environmental justice goals, policies, and objectives in other elements” to focus on the inclusion of disadvantaged communities (DACs) in decision making procedures as well as increasing protections for these communities.
The Project would require the following discretionary approvals:
Certification of this EIR prepared for the proposed Project Adoption of the Housing Element Update for the 2021-2029 planning period Adoption of updates to the Safety Element
Adoption of updates to other Burbank2035 General Plan elements to incorporate environmental justice policies
Rezoning of opportunity sites within the Specific Plan areas After adoption by the City Council, the updated Housing Element will be submitted to the California Department of Housing and Community Development for certification. The Safety Element updates will be submitted to CalFire for their review and approval.
Project Characteristics
The Housing and Safety Element Update would apply to the entire geographic area located within the boundaries of the City of Burbank, which encompasses 17.1 square miles. The Project would involve an update to the Housing Element of the City’s 2035General Plan for the 2021-2029 planning period, along with minor updates to the Safety, Land Use, Open Space and Conservation, Air Quality and Climate Change, Noise, and Mobility Elements, and the incorporation of environmental justice goals, policies and objectives into the 2035 General Plan. The proposed Housing Element Update establishes programs, policies and actions to further the goal of meeting the existing and projected housing needs of all household income levels of the community; provides evidence of the City’s ability to accommodate the RHNA allocation through the year 2029, as established by SCAG; and identifies any rezoning program needed to reach the required housing capacity.
ATTACHMENT 12-10
City of Burbank
Burbank Housing and Safety Element Update
1-6
Housing Element
The Housing Element is comprised of the following major components:
Review of effectiveness of existing Housing Element
Assessment of existing and projected housing needs
Identification of resources – financial, land, administrative Evaluation of constraints to the development of housing Housing Plan – goals, policies, and programs including programs 10 and 11 that provide for updates to local density bonus and inclusionary housing regulations that includes an economic feasibility analysis to evaluate the potential impact of adding prevailing wage and workforce training requirements to new housing developments
The Housing Element Update would provide a framework for accommodating new housing at all levels of affordability that is within access to transit, Downtown jobs, services, and open spaces within the 8-year planning period of October 2021-October 2029. New housing units may occur anywhere in the City where residential uses are permitted, as well as in areas that may be rezoned in the future to allow for multi-family residential and mixed-use residential of adequate density to meet State-required housing production and affordability targets as discussed below.
RHNA Allocation
SCAG has allocated the region’s 1,341,827 housing unit growth needs to each city and county through a process called the RHNA. The RHNA represents the minimum number of housing units that the City is required to plan for in its housing element by providing “adequate sites” through the Burbank2035 General Plan and zoning residential capacity. As shown in Table 1-1, Burbank’s RHNA allocation for the 2021-2029 planning period (6
th RHNA cycle) is 8,772 units, which is distributed
among four income categories. Additionally, the City is required to provide a sufficient buffer beyond that required by the RHNA to ensure that adequate site capacity exists throughout the eight-year planning period.
Table 1-1 RHNA Percentage of Income Distribution
Income Level Percent of Area Median Income (AMI) Units Percent Very Low 0-50% 2,553 29%
Low 51-80% 1,418 16%
Moderate 81-120% 1,409 16%
Above Moderate >120% 3,392 39%
Total – 8,772 100%
The RHNA represents the minimum number of housing units that the City is required to plan for in its housing element by providing “adequate sites” through the 2035General Plan and zoning.
Table 1-2 shows the estimated number and affordability level of housing units to accommodate the City’s RHNA under the existing General Plan and zoning, including projects that are entitled and pending entitlement, specified housing opportunity sites, Accessory Dwelling Units (ADUs) expected to be developed over the course of the planning period, and the units produced through the City’s committed assistance program. As shown in Table 1-2, these sources total 7,569, which falls short of the RHNA allocation by 1,203 units.
ATTACHMENT 12-11
Introduction
Final Environmental Impact Report 1-7
Table 1-2 Estimated Net Housing Units for the City of Burbank Sites/Projects Total Net Units
Income Distribution
Very Low Low Moderate
Above
Moderate
2021 – 2029 RHNA Targets 8,772 2,553 1,418 1,409 3,392
Entitled Projects 1,845 91 6 83 1,665
Pending Entitlement 490 27 138 29 296
Opportunity Sites (Zoning in place) 3,624 1,995 1,072 280 277 Accessory Dwelling Units (ADUs)1 1,600 384 704 32 480
Committed Assistance2 10 10 0 0 0
Total Site Capacity 7,569 4,427 424 2,718
RHNA Surplus/(Shortfall) (1,203) +456 (985) (674)
1 ADUs are small backyard units that are either attached or detached from a single-family home. 2 Committed Assistance units are units that the City has provided a legally enforceable agreement to provide. This is through an ongoing partnership with the Burbank Housing Corporation. See the Housing Element for further discussion.
To make up for this shortfall of 1,203 units, the Housing Element includes a housing program to rezone additional opportunity sites through adoption of two specific plan projects: the Downtown Transit-Oriented-Development Specific Plan (Downtown TOD) and the Golden State Specific Plan (GSSP) (see Figure 2-3 in Section 2, Project Description, of the Draft EIR for the Specific Plan locations and opportunity sites). Adoption of these Specific Plans will provide the necessary zoning, development standards, and processing procedures to facilitate the production of the shortfall of housing units required to accommodate the City’s RHNA during the Housing Element planning period. The zone changes required by these Specific Plans will be adopted in 2022-2023, or within three years of the start of the planning period as required by State law.
Table 1-3 shows the number of units expected from the rezoning of the Specific Plan areas. With the additional rezone sites the City would exceed the RHNA requirement by 1,239 units with an additional 2,442 units accommodated. The State requires jurisdictions to create a sufficient buffer in the Housing Element sites inventory beyond that required by the RHNA to ensure that adequate site capacity exists throughout the eight-year planning period. The NOP that was circulated on March 17, 2021 for the proposed Project included an estimated growth of 10,088 housing units based on the City’s RHNA allocation and 15 percent buffer. However, the estimated growth for the purpose of this analysis was changed to 10,456 housing units to account for the 2029 interpolated housing growth assumed under the two Specific Plans along with the City’s RHNA allocation.
Table 1-3 Projected Specific Plan Units
Specific Plan Total Net Units
Downtown TOD rezon e sites 627
Golden State Specific Plan rezone sites 1,815
Total 2,442
Existing GP Units (from Table 1-2) 7,569
New Total with Specific Plans,
Entitled/Pending Projects and ADUs
10,011
RHNA Surplus/(Shortfall) 1,239
ATTACHMENT 12-12
City of Burbank
Burbank Housing and Safety Element Update
1-8
Housing Opportunity Sites
The opportunity sites include 19 locations that have the greatest potential to accommodate the RHNA’s housing growth allocated for Burbank. Twelve of the opportunity sites are located in the proposed Downtown TOD Specific Plan area and seven sites are located in the proposed Golden State Specific Plan area. The locations of these sites of shown in Figure 2-3 of Section 2, Project Description, of the Recirculated Draft EIR.
Safety Element Update
The Safety Element update will ensure consistency with the Housing Element Update and will comply with recent State legislation and guidelines (including Assembly Bill 162, SB 1241, SB 99, Assembly Bill 747, SB 1035 and SB 379). Amendments incorporate data and maps, address vulnerability to climate change; incorporate policies and programs from the City’s Hazard Mitigation Plan and the Greenhouse Gas Reduction Plan, as well as partial or full integration of other City documents and programs (including but not limited to: Ready Burbank and the Emergency Survival Program). Key areas of the Burbank Safety Element update include updated flooding and fire hazard maps, emergency response and preparedness, especially as they relate to the City’s projected climate change exposure, and vulnerability. The Safety Element amendments were submitted to the California State Board of Forestry and Fire Protection (CalFire) for review on August 16, 2022, and the document was revised to incorporate the revisions recommended by the CalFire. The Safety Element will be presented to the CalFire Board on September 20, 2022, for final approval.
Environmental Justice Update
SB 1000 states that revisions or adoption of two or more elements of a general plan on or after January 1, 2018, trigger a requirement to “adopt or review the Environmental Justice Element, or the environmental justice goals, policies, and objectives in other elements.” Environmental justice goals, policies, and objectives must aim to reduce health risks to DACs, promote civil engagement, and prioritize the needs of these communities. Environmental justice goals, policies, and objectives must aim to reduce health risks to DACs, promote civic engagement, and prioritize the needs of these communities. Appendix B of the Draft EIR includes a list of the updates to policies and implementation measures for the Safety, Land Use, Open Space and Conservation, Air Quality and Climate Change, Noise, and Mobility Elements of the Burbank2035 General Plan. These updates focus on the inclusion of disadvantaged communities in decision making procedures as well as increasing protections for these communities.
Mobility Element Update
SB 743 requires the Governor’s Office of Planning and Research (OPR) to establish new metrics for determining the significance of transportation impacts of projects within transit priority areas (TPAs) and allows OPR to extend use of the metrics beyond TPAs. OPR selected VMT as the preferred transportation impact metric and applied their discretion to require its use statewide. In order to comply with this requirement, the Mobility Element would be updated to require the use of VMT analysis according to OPR guidelines.
ATTACHMENT 12-13
Introduction
Final Environmental Impact Report 1-9
Project Objectives
Meet the City’s fair share, plus a reasonable buffer, of the regional housing need to accommodate projected population growth within the City and region consistent with the Regional Housing Needs Assessment (RHNA) allocation
Conserve and enhance the quality of existing housing and neighborhoods Provide housing sites that accommodate a range of housing types to meet the diverse needs of existing and future residents
Continue to facilitate the development of housing affordable for all economic segments of the community and make inroads in addressing the City’s jobs-to-housing imbalance Focus on removing governmental constraints to the maintenance, improvement, and development of housing
Promote non-discrimination and fair and equal housing opportunities for all persons Alternatives
As required by CEQA, the EIR examines alternatives to the proposed Project. Studied alternatives include the following two alternatives discussed below. Alternative 1 would be the environmentally superior alternative.
Alternative 1: No Project
The “No Project” Alternative involves continued implementation of the existing 2013-2021 Housing Element and a continued growth rate predicted by SCAG to yield 3,591 units by 2029. The No Project Alternative assumes that the City’s existing plan and policies would continue to accommodate development in accordance with existing land use designations. Ultimately, this alternative would not fulfill the State requirements regarding updates to the Housing Element and SCAG’s RHNA allocation.
Due to the limitation placed on development in the city under existing plans and policies, the No Project Alternative would not be consistent with Objective 1, which aims to accommodate employment, housing, and population growth projections forecasted through the planning horizon year of 2029 and Objective 4, which aims to facilitate affordable housing options throughout the city.
Alternative 1 (No Project) assumes continued implementation of the existing 2013-2021 Housing Element and a continued growth rate predicted by SCAG to yield 3,591 units by 2029. Alternative 1 also assumes that the City’s existing plan and policies would continue to accommodate development in accordance with existing land use designations. This alternative would result in less impacts to air quality, biological resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials, noise, population and housing, public services, recreation, and utilities and service systems due to the decrease in residential units developed.
However, impacts relating to transportation and traffic would be greater than under the Project as the VMT for the City would not be reduced by the 15 percent required for each of the three service populations because there would not be sufficient population added to the area surrounding the transit corridors and employment areas to reduce driving distances. Furthermore, Alternative 1 would not fulfill Project Objective 1 because the continued implementation of the existing 2013- 2021 Housing Element would result in the development of fewer residential units and therefore, would be unable to accommodate employment, housing, and population growth projections ATTACHMENT 12-14
City of Burbank
Burbank Housing and Safety Element Update
1-10
forecasted through the planning horizon year of 2029. In addition, Alternative 1 would not fulfill Project Objective 4 because continued implementation of the existing 2013-2021 Housing Element would limit additional affordable housing options throughout the City.
Alternative 2: City Build-Out
Alternative 2 (City Build-Out) would involve the buildout of 18,600 units, which would result in 8,144 additional units and bring the City residential units up to the limit established by Measure One. This alternative would increase density throughout the City by accommodating the additional units in the Medium Density, High Density and Various Commercial zone districts. Alternative 2 would result in less impacts to transportation and traffic as the reduction in VMT over the SCAG region would be greater than that of the proposed Project. However, impacts relating to air quality, biological resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials, noise, population and housing, public services, and recreation would be higher than under the Project due to the 78 percent increase in residential units developed. In addition, the increase in residential units would require new connections for water supply, wastewater conveyance and sufficient capacity for wastewater treatment, electricity use, solid waste disposal, and telecommunications and would likely result in the construction of new water, wastewater, electricity, solid waste and telecommunications facilities to serve the expanded population.
Therefore, impacts relating to utilities and service systems under this alternative would be significant and unavoidable, resulting in greater impacts than under the Project. Furthermore, Alternative 2 would not fulfill Objective 2 as it would change the character of existing neighborhoods by increasing the density.
ATTACHMENT 12-15
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR Final Environmental Impact Report
2 Responses to Comments on the Draft EIR
This section includes comments received during the circulation of the Draft Environmental Impact Report (EIR) prepared for the Burbank Housing and Safety Element Update (hereafter referred to as the “Housing and Safety Element Update” or “Project”).
The Draft EIR was circulated for a 65-day public review period that began on January 26, 2022, and ended on March 31, 2022. The City of Burbank received 143 comment letters on the Draft EIR. The commenters and the page number on which each commenter’s letter appear are listed below.
Responses to oral comments received during the Planning Board meeting held on March 14, 2022, are provided under the Planning Board (P) and Speaker (S) sections as identified below.
The comments are typically presented chronologically based on the date received. However, among the letters received by Organizations, one separate commenter (Letter O-1) raised specific concerns regarding the adequacy of the Draft EIR whereas the remaining commenters raise non-CEQA issues pertaining solely to the proposed Project and/or other topics unrelated to the Draft EIR. Therefore, this letter is addressed first to maintain the focus on the Draft EIR prepared for the proposed Project, and the exhibits to the letter are included as Appendix H of this EIR.
In addition, the Project Description, Biological Resources, and Utilities/Service Systems sections of the Draft EIR were recirculated for a 47-day review period that began on July 22, 2022. Responses to comments received on the Recirculated Draft EIR, including oral comments during the Planning Board meeting held on August 22, 2022, are provided in Section 3 of the Final EIR.
Table 2-1 List of Commenters on the Draft EIR
Letter No. and Commenter Page No.
Agencies (A)
A-1 Andre w Salas, Chairman, Gabrieleno Band of Mission Indians – Kizh Nation (January 31, 2022)
2-6
A-2 Miya Edmonson, LDR/CEQA Branch Chief, California Department of Transportation (March 16, 2022)
2-8
A-3 Erinn Wilson-Olgin, Environmental Program Manager I – South Coast Region, California Department of Fish and Wildlife (March 18, 2022) 2-14
A-4 Dianne Doesserich, Team Manager, Environmental Planning Section, Metropolitan Water District of Southern California (March 30, 2022)
2-37
Organizations (O)
O-1 Mitc hell M. Tsai, Attorney, on behalf of Southwest Regional Council of Carpenters (March 14, 2022)
2-70
O-2 Enrique Apodaca, on behalf of Carpenters Local 661 (March 13, 2022) 2-77 O-3 Shaun Mieure, on behalf of Carpenters Local 661 (March 13, 2022) 2-78 O-4 Herbert Hardy, on behalf of Carpenters Local 661 (March 13, 2022) 2-79 O-5 Joel Perez, on behalf of Carpenters Local 661 (March 13, 2022) 2-80 O-6 Ivan Burgara, on behalf of Carpenters Local 661 (March 13, 2022) 2-81 O-7 Eric Valles, on behalf of Carpenters Local 661 (March 13, 2022) 2-82 O-8 Adrian Gudino, on behalf of Carpenters Local 661 (March 13, 2022) 2-83 O-9 Blake Powell, on behalf of Carpenters Local 661 (March 13, 2022) 2-84 2-1
ATTACHMENT 12-16
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter No. and Commenter Page No.
O-10 Peter Rodriguez, on behalf of Carpenters Local 661 (March 13, 2022) 2-85 O-11, O-117 Steven McClenthen, on behalf of Carpenters Local 661 (March 13, 2022; March 28, 2022)
2-86, 2-207
O-12 Dan Langford, on behalf of Carpenters Local 661 (March 13, 2022) 2-87 O-13 Victor Camposeco, on behalf of Carpenters Local 661 (March 13, 2022) 2-89 O-14 Daniel Ayala, on behalf of Carpenters Local 661 (March 13, 2022) 2-90 O-15 Thomas Cummings, on behalf of Carpenters Local 661 (March 13, 2022) 2-91 O-16 Jose Salcedo, on behalf of Carpenters Local 661 (March 13, 2022) 2-92 O-17 Leo Serrano, on behalf of Carpenters Local 661 (March 13, 2022) 2-93 O-18 David A Benzie, on behalf of Carpenters Local 661 (March 14, 2022) 2-94 O-19 Alberto Garcia, on behalf of Carpenters Local 661 (March 14, 2022) 2-95 O-20 Josue Solis Quinones, on behalf of Carpenters Local 661 (March 14, 2022) 2-96 O-21 Daniel Hackler, on behalf of Carpenters Local 661 (March 14, 2022) 2-97 O-22 Marco Saucedo, on behalf of Carpenters Local 661 (March 14, 2022) 2-98 O-23, O-131 Nicolas Reyes, on behalf of Carpenters Local 661 (March 14, 2022; March 28, 2022) 2-99, 2-221 O-24 Sean Mann, on behalf of Carpenters Local 661 (March 14, 2022) 2-100 O-25 Brandon Alexander Solorzano, on behalf of Carpenters Local 661 (March 14, 2022) 2-101 O-26 Michael Zamora, on behalf of Carpenters Local 661 (March 14, 2022) 2-102 O-27 Jason Green, on behalf of Carpenters Local 661 (March 14, 2022) 2-103 O-28 Alejandro Casillas, on behalf of Carpenters Local 661 (March 14, 2022) 2-105 O-29 Daniel Velarde, on behalf of Carpenters Local 661 (March 14, 2022) 2-106 O-30 Erick Villavicencio, on behalf of Carpenters Local 661 (March 14, 2022) 2-107 O-31 Michael Zamora, on behalf of Carpenters Local 661 (March 14, 2022) 2-108 O-32 Harm Veen, on behalf of Carpenters Local 661 (March 14, 2022) 2-109 O-33 Edgardo Franco, on behalf of Carpenters Local 661 (March 14, 2022) 2-110 O-34 Adam Abdalla, on behalf of Carpenters Local 661 (March 14, 2022) 2-111 O-35 Eliezer Roldan, on behalf of Carpenters Local 661 (March 14, 2022) 2-112 O-36 Kamran Sepanlou, on behalf of Carpenters Local 661 (March 14, 2022) 2-114 O-37 Alberto Sandobal Ruiz, on behalf of Carpenters Local 661 (March 14, 2022) 2-116 O-38 Luis Ochoa, on behalf of Carpenters Local 661 (March 14, 2022) 2-118 O-39 Michael Alfaro, on behalf of Carpenters Local 661 (March 14, 2022) 2-120 O-40 Draven Medina, on behalf of Carpenters Local 661 (March 14, 2022) 2-121 O-41 Celestino Rodriguez, on behalf of Carpenters Local 661 (March 14, 2022) 2-122 O-42 Gustavo Ramirez Guerrero, on behalf of Carpenters Local 661 (March 14, 2022) 2-123 O-43 Matthew Rodriguez, on behalf of Carpenters Local 661 (March 14, 2022) 2-124 O-44 Salvador Camacho, on behalf of Carpenters Local 661 (March 14, 2022) 2-125 O-45 Abdul Ashfaq, on behalf of Carpenters Local 661 (March 14, 2022) 2-126 O-46 Alejandro Porcayo, on behalf of Carpenters Local 661 (March 14, 2022) 2-127 O-47 Carlos Perez, on behalf of Carpenters Local 661 (March 14, 2022) 2-128 O-48 Jeremy Diaz, on behalf of Carpenters Local 661 (March 14, 2022) 2-129 O-49 Freddy Fernandez, on behalf of Carpenters Local 661 (March 14, 2022) 2-130 O-50 Kevin Jimenez, on behalf of Carpenters Local 661 (March 14, 2022) 2-131 2-2
ATTACHMENT 12-17
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter No. and Commenter Page No.
O-51 Willi am Galindo, on behalf of Carpenters Local 661 (March 14, 2022) 2-132 O-52 Magdaleno Martinez, on behalf of Carpenters Local 661 (March 14, 2022) 2-133 O-53 Anthony Tamayo, on behalf of Carpenters Local 661 (March 14, 2022) 2-134 O-54 Jonathan Cordova, on behalf of Carpenters Local 661 (March 14, 2022) 2-135 O-55 Manuel Aguirre, on behalf of Carpenters Local 661 (March 14, 2022) 2-136 O-56, O-128 Carlos Carbajal, on behalf of Carpenters Local 661 (March 14, 2022; March 28, 2022) 2-137, 2-218 O-57 Emilio Sandoval, on behalf of Carpenters Local 661 (March 14, 2022) 2-139 O-58 Roberto Reyes, on behalf of Carpenters Local 661 (March 14, 2022) 2-140 O-59 Mitch Cutts, on behalf of Carpenters Local 661 (March 14, 2022) 2-141 O-60 Eduardo Diaz, on behalf of Carpenters Local 661 (March 14, 2022) 2-142 O-61 Martin Arzola, on behalf of Carpenters Local 661 (March 14, 2022) 2-143 O-62 Dmitri Turner, on behalf of Carpenters Local 661 (March 14, 2022) 2-144 O-63 Josh Trejo, on behalf of Carpenters Local 661 (March 14, 2022) 2-145 O-64 Joseph Fuchs, on behalf of Carpenters Local 661 (March 14, 2022) 2-146 O-65 Jesus Gamez, on behalf of Carpenters Local 661 (March 14, 2022) 2-147 O-66 Anthony Perez on behalf of Carpenters Local 661 (March 24, 2022) 2-148 O-67 Emmanuel Vazquez on behalf of Carpenters Local 661 (March 24, 2022) 2-149 O-68 Hector Aguilar on behalf of Carpenters Local 661 (March 24, 2022) 2-150 O-69 Fredy Martinez on behalf of Carpenters Local 661 (March 24, 2022) 2-151 O-70 Ian Letelier on behalf of Carpenters Local 661 (March 24, 2022) 2-152 O-71 Robert Acedo on behalf of Carpenters Local 661 (March 24, 2022) 2-153 O-72 Veronica Letelier on behalf of Carpenters Local 661 (March 24, 2022) 2-154 O-73 Anthony Nilo on behalf of Carpenters Local 661 (March 24, 2022) 2-155 O-74 Frankie March on behalf of Carpenters Local 661 (March 24, 2022) 2-156 O-75 Chuck Powell on behalf of Carpenters Local 661 (March 24, 2022) 2-157 O-76 Cristian Garcia on behalf of Carpenters Local 661 (March 24, 2022) 2-159 O-77, O-94 Alex Hackler on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022) 2-160, 2-183 O-78, O-97 Josue Solis Quinones on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022)
2-161, 2-186
O-79, O-96 Edward Bencomo on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022)
2-162, 2-185
O-80, O-98 Gabriel Castaneda on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022)
2-163, 2-187
O-81, O-95 Jonathan Peraza on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022) 2-164, 2-184 O-82, O-99 Alvaro Aguilera on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022) 2-165, 2-188 O-83, O-101 Jose Resendiz on behalf of Carpenters Local 661 (March 24, 2022; March 28, 2022) 2-167, 2-190 O-84 Rudy Ramirez on behalf of Carpenters Local 661 (March 24, 2022) 2-168 O-85 Bryan De Leon on behalf of Carpenters Local 661 (March 24, 2022) 2-169 O-86 Jose Cardona on behalf of Carpenters Local 661 (March 24, 2022) 2-170 O-87 Gianni Rossi on behalf of Carpenters Local 661 (March 24, 2022) 2-172 O-88 Franklin Rivera on behalf of Carpenters Local 661 (March 24, 2022) 2-174 O-89 Carolina Corona on behalf of Carpenters Local 661 (March 24, 2022) 2-176 O-90 Kory Smith on behalf of Carpenters Local 661 (March 24, 2022) 2-177 2-3
ATTACHMENT 12-18
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter No. and Commenter Page No.
O-91 Justi n Hardy on behalf of Carpenters Local 661 (March 24, 2022) 2-178 O-92 Jerred Langford on behalf of Carpenters Local 661 (March 27, 2022) 2-180 O-93 Crispin Carrasco on behalf of Carpenters Local 661 (March 28, 2022) 2-182 O-100 Emmanuel Milian on behalf of Carpenters Local 661 (March 28, 2022) 2-189 O-102 Gregory Ceja on behalf of Carpenters Local 661 (March 28, 2022) 2-191 O-103 Rudy Martinez on behalf of Carpenters Local 661 (March 28, 2022) 2-192 O-104 Jonathen Hays on behalf of Carpenters Local 661 (March 28, 2022) 2-193 O-105 Noah Iglesias on behalf of Carpenters Local 661 (March 28, 2022) 2-194 O-106 Bonifasio Rojas on behalf of Carpenters Local 661 (March 28, 2022) 2-195 O-107 Diana Camarillo on behalf of Carpenters Local 661 (March 28, 2022) 2-196 O-108 Jose Reyes on behalf of Carpenters Local 661 (March 28, 2022) 2-197 O-109 Paris Jernigan on behalf of Carpenters Local 661 (March 28, 2022) 2-198 O-110 Andres Cabrera on behalf of Carpenters Local 661 (March 28, 2022) 2-199 O-111 Daniel Ochoa on behalf of Carpenters Local 661 (March 28, 2022) 2-200 O-112 David Lopez on behalf of Carpenters Local 661 (March 28, 2022) 2-201 O-113 George Rodarte on behalf of Carpenters Local 661 (March 28, 2022) 2-203 O-114 Brenden Cates on behalf of Carpenters Local 661 (March 28, 2022) 2-204 O-115 John Strickler on behalf of Carpenters Local 661 (March 28, 2022) 2-205 O-116 Ricardo Trejo on behalf of Carpenters Local 661 (March 28, 2022) 2-206 O-118 Angel Andrade on behalf of Carpenters Local 661 (March 28, 2022) 2-208 O-119 Javier Rodriguez on behalf of Carpenters Local 661 (March 28, 2022) 2-209 O-120 Luis Rosales on behalf of Carpenters Local 661 (March 28, 2022) 2-210 O-121 Richard Arellano on behalf of Carpenters Local 661 (March 28, 2022) 2-211 O-122 Elvis Guzman on behalf of Carpenters Local 661 (March 28, 2022) 2-212 O-123 Mauricio Palmero on behalf of Carpenters Local 661 (March 28, 2022) 2-213 O-124 Oscar Jimenez on behalf of Carpenters Local 661 (March 28, 2022) 2-214 O-125 Ricardo Vela on behalf of Carpenters Local 661 (March 28, 2022) 2-215 O-126 Walter Perrine on behalf of Carpenters Local 661 (March 28, 2022) 2-216 O-127 Anthony Vela on behalf of Carpenters Local 661 (March 28, 2022) 2-217 O-129 Emmanuel Delgado on behalf of Carpenters Local 661 (March 28, 2022) 2-219 O-130 Ruben Granillo on behalf of Carpenters Local 661 (March 28, 2022) 2-220 O-132 Jesus Sandoval on behalf of Carpenters Local 661 (March 29, 2022) 2-222 Individuals (I)
I-1 Emil y Gabel-Luddy (March 31, 2022) 2-224
I-2 Susan O’Carroll (March 31, 2022) 2-259
Planning Board Meeting – March 14, 2022
(P) Planning Board Member
(S) Public Speaker
P-1 Christopher Rizzotti, Planning Board Chair 2-265
P-2 Bob Monaco, Planning Board Member 2-268
S-1 Sean Mann, Union Member, on behalf of Southwest Regional Council of Carpenters 2-269 S-2 Michael McCarron, Union Member, on behalf of Carpenters Local 661 2-269 2-4
ATTACHMENT 12-19
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR Final Environmental Impact Report
Letter No. and Commenter Page No.
S-3 Jerred L angford, Union Member, on behalf of Carpenters Local 661 2-269 The comment letters and responses follow. The comment letters have been numbered sequentially and each separate issue raised by the commenter, if more than one, has been assigned a number.
The responses to each comment identify first the number of the comment letter, and then the number assigned to each issue (Response A-1.1, for example, indicates that the response is for the first issue raised in Comment Letter A-1).
Any changes made to the text of the Draft EIR correcting information, data, or intent, other than
minor typographical corrections or minor working changes, are noted in the Final EIR as changes from the Draft EIR. Where a comment results in a change to the Draft EIR text, a notation is made in the response indicating that the text is revised. Changes in text are signified by strikeouts (strikeouts) where text is removed and by underlined font (underlined font) where text is added. All revisions to the Draft EIR can be found in Section 4, Errata, of the Final EIR. 2-5
ATTACHMENT 12-20
Andrew Salas, Chairman Nadine Salas, Vice-Chairman Dr. Christina Swindall Martinez, secretary Albert Perez, treasurer I Martha Gonzalez Lemos, treasurer II Richard Gradias, Chairman of the council of Elders
PO Box 393 Covina, CA 91723 www.gabrielenoindians.org [email protected]
GABRIELENO BAND OF MISSION INDIANS - KIZH NATION
Historically known as The Gabrielino Tribal Council - San Gabriel Band of Mission Indians recognized by the State of California as the aboriginal tribe of the Los Angeles basin
January 31, 2022
Project Name: Burbank Housing and Safety Element Update
Thank you for your letter regarding the project above. This is to concur that we are in agreement with the Housing Element Update. However, our Tribal government would like to request consultation for any and all future projects when ground disturbance will be occurring within this location.
Sincerely,
Andrew Salas, Chairman
Gabrieleno Band of Mission Indians – Kizh Nation
1(844)390-0787
Letter A-1
1 2-6
ATTACHMENT 12-21
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letter A-1
COMMENTER: Andrew Salas, Chairman, Gabrieleno Band of Mission Indians – Kizh Nation DATE: January 31, 2022
Response A-1.1
The commenter states that the Gabrieleno Band of Mission Indians – Kizh Nation are in agreement with the Housing Element Update and requests consultation for any and all future projects within Burbank that include ground disturbance.
The comment is noted, but does not raise specific concerns that pertain to the adequacy of the EIR.
All future projects requiring ground disturbance within Burbank will provide a request for consultation to the Gabrieleno Band of Mission Indians – Kizh Nation. 2-7
ATTACHMENT 12-22
“Provide a safe and reliable transportation network that serves all people and respects the environment” 2-8
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF TRANSPORTATION
DISTRICT 7
100 S. MAIN STREET, MS 16
LOS ANGELES, CA 90012
PHONE (213) 269-1124
FAX (213) 897-1337
TTY 711
www.dot.ca.gov
Making Conservation
a California Way of Life
March 16, 2022
Shipra Rajesh, Associate Planner
City of Burbank
Community Development Department-Planning Division
150 North Third Street
Burbank, CA 91502
RE: Burbank Housing and Safety Element
Update
SCH # 2021020393
Vic. LA-134 & LA-05 Citywide
GTS # LA-2021-03840-DEIR
Dear Shipra Rajesh:
Thank you for including the California Department of Transportation (Caltrans) in the environmental review process for the above referenced environmental document. The Burbank Housing Element Update and Associated General Plan Updates involves an update to the Housing Element for the 2021 -2029 planning period, along with minor updates to the Safety and Mobility Elements, and incorporates environmental justice goals, policies and objectives to the City of Burbank’s 2035 General Plan. The updated Housing Element will lay the foundation for achievement of the City’s fair share housing needs for approximately 10,456 additional units.
The mission of Caltrans is to provide a safe and reliable transportation network that serves all people and respects the environment. Senate Bill 743 (2013) has codified into CEQA law and mandated that CEQA review of transportation impacts of proposed development be modified by using Vehicle Miles Traveled (VMT) as the primary metric in identifying transportation impacts for all future development projects. You may reference the Governor’s Office of Planning and Research (OPR) for more information:
http://opr.ca.gov/ceqa/updates/guidelines/
As a reminder, VMT is the standard transportation analysis metric in CEQA for land use projects after July 1, 2020, which is the statewide implementation date.
Caltrans is aware of challenges that the region faces in identifying viable solutions to alleviating congestion on State and Local facilities. With limited room to expand vehicular capacity, all future developments should incorporate multi -modal and complete streets transportation elements that will actively promote alternatives to car use an d better Letter A-2
1 2
ATTACHMENT 12-23
Shipra Rajesh, Associate Planner
March 16, 2022
“Provide a safe and reliable transportation network that serves all people and respects the environment”
manage existing parking assets. Prioritizing and allocating space to efficient modes of travel such as bicycling and public transit can allow streets to transport more people in a fixed amount of right-of-way.
Caltrans supports the implementation of complete streets and pedestrian safety measures such as road diets and other traffic calming measures. Please note the Federal Highway Administration (FHWA) recognizes the road diet treatment as a proven safety countermeasure, and the cost of a road diet can be significantly reduced if implemented in tandem with routine street resurfacing. Overall, the environmental report should ensure all modes are served well by planning and development activities. This includes reducing single occupancy vehicle trips, ensuring safety, reducing vehicle miles traveled, supporting accessibility, and reducing greenhouse gas emissions.
We encourage the Lead Agency to evaluate the potential of Transportation Demand Management (TDM) strategies and Intelligent Transportation System (ITS) applications in order to better manage the transportation network, as well as transit service and bicycle or pedestrian connectivity improvements. For additional TDM options, please refer to the Federal Highway Administration’s Integrating Demand Management into the Transportation Planning Process: A Desk Reference (Chapter 8). This reference is available online at:
http://www.ops.fhwa.dot.gov/publications/fhwahop12035/fhwahop12035.pdf
You can also refer to the 2010 Quantifying Greenhouse Gas Mitigation Measures report by the California Air Pollution Control Officers Association (CAPCOA), which is available online at:
http://www.capcoa.org/wp-content/uploads/2010/11/CAPCOA-Quantification-Report-9- 14-Final.pdf
Also, Caltrans has published the VMT -focused Transportation Impact Study Guide (TISG), dated May 20, 2020 and the Caltrans Interim Land Development and Intergovernmental Review (LD-IGR) Safety Review Practitioners Guidance, prepared in On December 18, 2020. You can review these resources at the following links:
https://dot.ca.gov/-/media/dot-media/programs/transportation-planning/documents/sb- 743/2020-05-20-approved-vmt-focused-tisg-a11y.pdf
https://dot.ca.gov/-/media/dot-media/programs/transportation-planning/documents/sb- 743/2020-12-22-updated-interim-ldigr-safety-review-guidance-a11y.pdf
3 2
cont.
2-9
ATTACHMENT 12-24
Shipra Rajesh, Associate Planner
March 16, 2022
“Provide a safe and reliable transportation network that serves all people and respects the environment”
Caltrans encourages lead agencies to prepare traffic safety impact analysis for all developments in the California Environmental Quality Act (CEQA) review process so that, through partnerships and collaboration, California can reach zero fatalities and serious injuries by 2050.
Caltrans acknowledges from the DEIR that “As shown in Table 4.11-1, full buildout of the 2029 Housing Element Update would result in 3 percent less average total VMT per service population, 39 percent less average VMT per capita, and 7 percent less average VMT per employee compared to the 2021 SCAG region baseline. This result exceeds the thresholds of significance for average total VMT per service population and average VMT per employee and does not exceed the threshold of significance for average VMT per capita. The analysis shows that the addition of new housing to the Ci ty in conformance with the goals and policies of the Housing Element provides a large reduction in VMT per capita because the Project improves the jobs-to-housing balance in Burbank, allowing more residents to live closer to their work location. The goals and policies of the Housing Element also reduce VMT per employee. However, since a large proportion of employees who work in Burbank live outside of Burbank, the reduction in VMT per employee due to the Project is not as large as the reduction in VMT per capita.
In other words, adding housing supply affects resident travel behavior more so than employee travel behavior. Similarly, the Project provides a reduction in total VMT per service population, but to a lesser extent than VMT per capita. This is because total VMT per service population includes non-home-based trips, such as heavy truck delivery trips (i.e., adding housing supply does not directly affect freight/logistics operations in the City).
Therefore, while the Housing Element would reduce VMT for all three metrics, it would not reduce them beyond the threshold of 15 percent for two of the metrics. Since the Housing Element Update would exceed two of the three thresholds of significance, the project results in a significant impact.”
Potential mitigation measures that would reduce the average total VMT per service population and average VMT per employee are generally project specific mitigation measures such as:
• Provide bicycle parking at employer locations
• Provide parking cash-out programs
• Provide car-sharing, bike sharing, and ride-sharing programs at employer locations
• Provide transit passes to employees
• Improve or increase transit accessibility to employer locations • Improve pedestrian or bicycle networks, or transit service • Provide traffic calming features on City roadways
5 4
2-10
ATTACHMENT 12-25
Shipra Rajesh, Associate Planner
March 16, 2022
“Provide a safe and reliable transportation network that serves all people and respects the environment”
These mitigation measures can be applied at the project specific level but are not feasible at the program level for a housing element as they are beyond the scope of the document.
Therefore, there is no feasible mitigation available to reduce the impacts.
Given the above finding , Caltrans recommends a post -development VMT analysis for each development project with all mitigation measures be prepared for monitoring purpose and for future project threshold s in the area. Additional mitigation measure should be implemented when the post -development VMT analysis discloses any traffic significant impact.
If you have any questions, please feel free to contact Mr. Alan Lin the project coordinator at (213) 269-1124 and refer to GTS # LA-2021-03840-DEIR.
Sincerely,
MIYA EDMONSON
LDR/CEQA Branch Chief
email: State Clearinghouse
6 5
cont.
2-11
ATTACHMENT 12-26
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letter A-2
COMMENTER: Miya Edmonson, LDR/CEQA Branch Chief, California Department of Transportation
DATE: March 16, 2022
Response A-2.1
The commenter provides a description of the Project and states that vehicle miles traveled (VMT) is the primary metric in identifying transportation impacts for all future development projects.
The Project complies with CEQA’s requirements for transportation analyses because VMT was used as the primary metric in identifying the Project’s potential transportation impacts in Section 4.11, Transportation, of the Draft EIR.
Response A-2.2
The commenter states that the California Department of Transportation (Caltrans) supports the implementation of complete streets and pedestrian safety measures and that the EIR should ensure all modes of travel are served well by planning and development activities.
Caltrans’ support for implementation of complete streets and pedestrian safety measures is noted.
As discussed under Impact TRA-3 in Section 4.11, Transportation, of the Draft EIR, reasonably foreseeable development accommodated under the Housing Element Update would be reviewed by the appropriate City staff to ensure consistency with all applicable City and State design standards, including standards for project access points, location, and design, sight lines, roadway modifications, and provisions for bicycle and pedestrian transportation connections.
Response A-2.3
The commenter encourages the City to evaluate the potential of Transportation Demand Management (TDM) strategies and Intelligent Transportation System (ITS) applications in order to better manage the transportation network, as well as transit service and bicycle or pedestrian connectivity improvements.
As discussed in Section 4.11, Transportation, of the Draft EIR, the City of Burbank has an ITS that allows the monitoring and control of traffic signals from a central operations center. City staff can manually adjust traffic signals remotely from the central operations center to respond to collisions, weather, special events, and other major incidents. The City’s ITS is interconnected with the Los Angeles County traffic signal Information Exchange Network and shares information with Los Angeles City and County, and the cities of Glendale and Pasadena. In addition, traffic signal timing is also coordinated with Caltrans.
The Draft EIR discusses potential TDM strategies in Section 4.11, Transportation, to address the VMT per employee and VMT per service population impacts but concludes that enacting TDM measures at an employer location or to address service population impacts is generally beyond the scope of the Housing Element. Therefore, it is infeasible to mitigate the VMT per employee and VMT per service population impacts. However, as each individual project is processed through the entitlement process, VMT impacts will be addressed and mitigated where feasible. 2-12
ATTACHMENT 12-27
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Response A-2.4
The commenter encourages the preparation of traffic safety impact analysis for all developments in the CEQA review process.
The comment is noted, but does not raise specific concerns that pertain to the adequacy of the EIR.
The Housing Element is a land use plan and as such does not grant entitlement for any specific project or future development. All development projects under the CEQA review process would be required to assess the project’s impacts on transportation, including whether the project would conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities; conflict or be inconsistent with CEQA Guidelines Section 15064.3(b); or substantially increase hazards due to a geometric design feature or incompatible use. The Draft EIR also discusses both bicycle and pedestrian safety at a citywide level from a plan/policy consistency perspective.
Response A-2.5
The commenter replicates the information provided in the Draft EIR on page 4.11-16, acknowledging that the information provided in the Draft EIR is correct.
The comment is noted. No further response is required.
Response A-2.6
The commenter recommends preparation of a post-development VMT analysis for each individual development project within the Plan Area that includes mitigation measures to reduce any significant traffic impacts.
Implementation of the requirement to conduct a post development VMT analysis for each development project in the Housing Element plan area (which is the entire City) is beyond the scope of the EIR, is not a requirement of CEQA, and is not currently required as a process that has been adopted by the City of Burbank. Requiring a post development VMT analysis as described in the comment would be unduly burdensome to housing developers and the City of Burbank, and could add an additional impediment to housing production. Projects requiring subsequent environmental analysis where that analysis identifies a VMT impact, and proposes VMT mitigation measures, would be required by the City to adhere to a Mitigation Monitoring and Reporting Program to ensure that when mitigation measures are implemented, they can demonstrate the ability to reduce the project’s VMT impact to less than significant.
2-13
ATTACHMENT 12-28
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director South Coast Region
3883 Ruffin Road
San Diego, CA 92123
(858) 467-4201
www.wildlife.ca.gov
SENT BY EMAIL ONLY
March 18, 2022
Shipra Rajesh
City of Burbank
150 North Third Street
Burbank, CA 91502
[email protected]
Subject: Burbank Housing Element Update and Associated General Plan Updates , Draft Environmental Impact Report, SCH #2021020393, City of Burbank, Los Angeles County
Dear Mr. Rajesh:
The California Department of Fish and Wildlife (CDFW) has reviewed the Draft Environmental Impact Report (DEIR) from the City of Burbank (City; Lead Agency) for the Burbank Housing Element Update and Associated General Plan Updates (Project). Thank you for the opportunity to provide comments and recommendations regarding those activities involved in the Project that may affect California fish and wildlife. Likewise, we appreciate the opportunity to provide comments regarding those aspects of the Project that CDFW, by law, may be required to carry out or approve through the exercise of its own regulatory authority under the Fish and Game Code.
CDFW’s Role
CDFW is California’s Trustee Agency for fish and wildlife resources and holds those resources in trust by statute for all the people of the State [Fish & G. Code, §§ 711.7, subdivision (a) & 1802; Pub. Resources Code, § 21070; California Environmental Quality Act (CEQA) Guidelines, § 15386, subdivision (a)]. CDFW, in its trustee capacity, has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species (Id., § 1802). Similarly, for purposes of CEQA, CDFW is charged by law to provide, as available, biological expertise during public agency environmental review efforts, focusing specifically on projects and related activities that have the potential to adversely affect State fish and wildlife resources.
CDFW is also submitting comments as a Responsible Agency under CEQA (Pub. Resources Code, § 21069; CEQA Guidelines, § 15381). CDFW expects that it may need to exercise regulatory authority as provided by the Fish and Game Code, including lake and streambed alteration regulatory authority (Fish & G. Code, § 1600 et seq.). Likewise, to the extent implementation of the Project as proposed may result in “take”, as defined by State law, of any species protected under the California Endangered Species Act (CESA) (Fish & G. Code, § 2050 et seq.), or CESA-listed rare plant pursuant to the Native Plant Protection Act (NPPA; Letter A-3
1 2
2-14
ATTACHMENT 12-29
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
Fish & G. Code, § 1900 et seq.), CDFW recommends the Project proponent obtain appropriate authorization under the Fish and Game Code.
Project Description and Summary
Objective: The Project proposes an update to the Housing Element outlined in the City of Burbank 2035 General Plan for the 2021-2029 planning period. The HEU sets reasonable goals, objectives, policies, and programs to achieve future housing needs for the City. The Southern California Association of Governments (SCAG) Regional Housing Needs Assessment (RHNA) allocation for the City identified a housing need of 8,772 units. The 8,772 units allocated to the City will be divided into the following categories: 2,553 very low-income units; 1,418 low- income units; 1,409 moderate-income units; and 3,392 above moderate-income units. The City intends to utilize entitled projects, accessory dwelling units (ADUs), and committed assistance to accommodate the RHNA allocation. The City also intends to adopt the Downtown Transit- Oriented Development Specific Plan and the Golden State Specific Plan to achieve the RHNA allocation. Within these two specific plan projects, there are 19 specified housing opportunity sites that can accommodate approximately 2,442 units. In addition to the housing element update, the City proposes minor updates to the Safety and Mobility Elements. The City of Burbank 2035 General Plan will also be updated to incorporate environmental justice policies required by State law. Lastly, there is no physical development, construction, or other ground disturbance activity proposed in the HEU. Adoption of the HEU does not approve any future housing developments.
Location: The Project site encompasses the entire City of Burbank, which stretches 17.1 square miles throughout the central portion of Los Angeles County. The City is bounded by the Verdugo Mountains to the northeast, the City of Glendale to the southeast, and the City of Los Angeles to the south and west. The City is bisected by the Interstate 5 Freeway and the Metrolink Commuter Rail.
Comments and Recommendations
CDFW offers the comments and recommendations below to assist the City in adequately avoiding and/or mitigating the Project’s impacts on fish and wildlife (biological) resources.
CDFW recommends the measures or revisions below be included in a science-based monitoring program that contains adaptive management strategies as part of the Project’s CEQA mitigation, monitoring and reporting program (Pub. Resources Code, § 21081.6; CEQA Guidelines, § 15097).
Specific Comments
Comment #1: Impacts on least Bell’s vireo
Issue: The Project may impact least Bell’s vireo (Vireo bellii pusillus), an Endangered Species Act (ESA)-listed and CESA-listed species. The DEIR does not provide discussion or avoidance measures to reduce impacts to least Bell’s vireo within the Project site.
Specific Impacts: Future housing development during least Bell’s vireo breeding and nesting season could result in nest abandonment, reproductive suppression, or incidental loss of fertile eggs or nestlings.
2 cont.
3 4
2-15
ATTACHMENT 12-30
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
Why impacts would occur: Least Bell’s vireo habitat requirements include dense shrubs, small trees, and a water source such as a river or stream. There are various locations throughout the Project site that may provide potential habitat for this species. Additionally, the California Natural Diversity Database (CNDDB) has recorded observations of least Bell’s vireo within the Project site (CDFW 2022a). Future housing development could result in temporary or long-term loss of suitable nesting and foraging habitat. Future construction activities could create elevated levels of noise, human activity, dust, and ground vibrations. These disturbances and stressors occurring near potential nests could cause least Bell’s vireos to abandon their nests, resulting in the loss of fertile eggs or nestlings. Removal of trees and shrubs within a future project site may also result in direct loss of breeding habitat for least Bell’s vireo.
Evidence impact would be significant: There are only a few populations and breeding pairs of least Bell’s vireo remaining in Los Angeles County. Project construction and activities resulting in loss of breeding pairs or nestlings or habitat supporting least Bell’s vireo may result in the Project potentially causing a wildlife population to drop below self-sustaining levels; threaten to eliminate an animal community; or substantially reduce the number of restrict the range of an endangered, rare, or threatened species (CEQA Guidelines, § 15065). Accordingly, impacts on least Bell’s vireo may require a mandatory finding of significance (CEQA Guidelines, § 15065).
CDFW considers adverse impacts to a species protected by CESA to be significant without mitigation under CEQA. Inadequate avoidance, minimization, and mitigation measures for impacts on the least Bell’s vireo will result in the Project continuing to have a substantial adverse direct, indirect, and cumulative effect, either directly or through habitat modifications, on a wildlife species identified as special status by CDFW and USFWS.
As to CESA, take of any endangered, threatened, candidate species that results from the Project is prohibited, except as authorized by State law (Fish & G. Code, §§ 86, 2062, 2067, 2068, 2080, 2085; Cal. Code Regs., tit. 14, § 786.9). Take under ESA also includes significant habitat modification or degradation that could result in death or injury to a listed species by interfering with essential behavioral patterns such as breeding, foraging, or nesting.
Recommended Potentially Feasible Mitigation Measure(s)
Recommendation #1: If future housing developments will impact least Bell’s vireo, early consultation with CDFW is encouraged, as significant modification to a project and mitigation measures may be required to obtain a CESA Permit. Appropriate authorization from CDFW may include an Incidental Take Permit or a Consistency Determination in certain circumstances, among other options [Fish & G. Code, §§ 2080.1, 2081, subds. (b) and (c)].
Recommendation #2: Take under the ESA also includes significant habitat modification or degradation that could result in death or injury to a listed species by interfering with essential behavioral patterns such as breeding, foraging, or nesting. CDFW recommends consultation with the USFWS, in order to comply with ESA, well in advance of any ground-disturbing activities and/or vegetation removal that may impact least Bell’s vireo.
Mitigation Measure #1: CDFW recommends the DEIR include a measure whereby future housing development sites that may provide potential habitat conduct least Bell’s vireo surveys to determine presence/absence. Future project proponents should retain a qualified biologist to 4 cont.
2-16
ATTACHMENT 12-31
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
conduct protocol surveys for least Bell’s vireo. The qualified biologist should conduct surveys according to USFWS Least Bell’s Vireo Survey Guidelines (USFWS 2001). All potential least Bell’s vireo habitat should be surveyed at least eight times during the period from April 10 through July 31. CDFW recommends CDFW and USFWS should be notified of survey findings, including negative findings, within 45 calendar days following the completion of protocol-level surveys.
Mitigation Measure #2: CDFW recommends all future housing developments avoid any construction activity during nesting season. If not feasible, CDFW recommends that if future housing development occurs between January 1 through September 15, a nesting bird and raptor survey should be conducted within a 500-foot radius of the construction site, prior to any ground-disturbing activities (e.g., staging, mobilization, grading) as well as prior to any vegetation removal within the project site. The nesting bird surveys should be conducted at appropriate nesting times and concentrate on potential roosting or perch sites. CDFW recommends the DEIR require future housing project proponents to retain a qualified biologist to conduct surveys no more than 7 days prior to the beginning of any project-related activity likely to impact raptors and migratory songbirds, for the entire project site. If project activities are delayed or suspended for more than 7 days during the breeding season, repeat the surveys.
If nesting raptors and migratory songbirds are identified, CDFW recommends the following minimum no-disturbance buffers be implemented: 300 feet around active passerine (perching birds and songbirds) nests, 500 feet around active non-listed raptor nests and 0.5 mile around active listed bird nests. These buffers should be maintained until the breeding season has ended or until a qualified biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival.
It should be noted that the temporary halt of project activities within nesting buffers during nesting season does not constitute effective mitigation for the purposes of offsetting project impacts associated with habitat loss. Additional mitigation would be necessary to compensate for the removal of nesting habitat within the project site based on acreage of impact and vegetation composition. Mitigation ratios should increase with the occurrence of a SSC and should further increase with the occurrence of a CESA-listed species.
Comment #2: Impacts on Bats
Issue: The Project could impact bat species, including pallid bat (Antrozous pallidus), big free tailed bat (Nyctinomops macrotis), and hoary bat (Lasiurus cinereus), which are designated as a Species of Special Concern (SSC). The DEIR does not provide avoidance or mitigation measures to reduce impacts to bat species within the Project site.
Specific impacts: Future housing developments may have direct impacts that involves removal of trees, vegetation, and/or structures. These trees, vegetation, and/or structures may provide roosting habitat and therefore has the potential for the direct loss of bats. Indirect impacts from future housing developments may result from increased noise disturbances, human activity, dust, ground disturbing activities (e.g., staging, access, grading, excavating, drilling), and vibrations caused by heavy equipment.
Why impact would occur: According to CNDDB, all three bat species have been historically observed within and adjacent to the Project site (CDFW 2022a). Additionally, a bat observation within the Project site was recorded through iNaturalist (iNaturalist 2019). The DEIR does not
4 cont.
5 2-17
ATTACHMENT 12-32
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
provide biological surveys associated with the presence/absence of bat species within the Project site. Without focused surveys for bat detection, future housing development facilitated by the HEU may impact unidentified bat species within the Project site. In urbanized areas, bats use trees and man-made structures for daytime and nighttime roosts (Avila-Flores and Fenton 2005; Oprea et al. 2009; Remington and Cooper 2014). Trees and crevices in buildings in and adjacent to the Project site could provide roosting habitat for bats. Bats can fit into very small seams, as small as a ¼ inch. Modifications to roost sites can have significant impacts on the bats’ usability of the roost and can impact the bats’ fitness and survivability (Johnston et al. 2004). Extra noise, vibration, or the reconfiguration of large objects can lead to the disturbance of roosting bats which may have a negative impact on the animals. Human disturbance can also lead to a change in humidity, temperatures, or the approach to a roost that could force the animals to change their mode of egress and/or ingress to a roost. Although temporary, such disturbance can lead to the abandonment of a maternity roost (Johnston et al. 2004).
Evidence impact would be significant: Bats are considered non-game mammals and are afforded protection by State law from take and/or harassment (Fish & G. Code, § 4150; Cal.
Code of Regs, § 251.1). Additionally, several bat species are considered Species of Special Concern and meet the CEQA definition of rare, threatened, or endangered species (CEQA Guidelines, § 15380). Take of SSC could require a mandatory finding of significance by the Lead Agency (CEQA Guidelines, § 15065).
Recommended Potentially Feasible Mitigation Measure(s):
Mitigation Measure #3: For any future housing development that may occur near potential bat roosting habitat, CDFW recommends the DEIR require a qualified bat specialist to conduct bat surveys within these areas (plus a 100-foot buffer as access allows). These surveys should identify potential habitat that could provide daytime and/or nighttime roost sites, and any maternity roosts. CDFW recommends using acoustic recognition technology to maximize detection of bats. A discussion of survey results, including negative findings should be provided to the City. Depending on the survey results, a qualified bat specialist should discuss potentially significant effects of the project on bats and include species specific mitigation measures to reduce impacts to below a level of significance (CEQA Guidelines, § 15125). Surveys, reporting, and preparation of robust mitigation measures by a qualified bat specialist should be completed and submitted to the City prior to any project-related ground-disturbing activities or vegetation removal at or near locations of roosting habitat for bats.
Mitigation Measure #4: CDFW recommends the City include the following tree removal process as measure in the DEIR for future housing developments. “If bats are not detected, but the bat specialist determines that roosting bats may be present, trees should be pushed down using heavy machinery rather than felling with a chainsaw. To ensure the optimum warning for any roosting bats that may still be present, trees should be pushed lightly two or three times, with a pause of approximately 30 seconds between each nudge to allow bats to become active.
The tree should then be pushed to the ground slowly and remain in place until it is inspected by a bat specialist. Trees that are known to be bat roosts should not be bucked or mulched immediately. A period of at least 24 hours, and preferable 48 hours, should elapse prior to such operations to allow bats to escape.”
Mitigation Measure #5: CDFW also recommends the City include the following maternity roost measure in the event that maternity roosts are found during surveys for future housing 5 cont.
2-18
ATTACHMENT 12-33
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
developments. “If maternity roosts are found, work should be scheduled between October 1 and February 28, outside of the maternity roosting season when young bats are present but are ready to fly out of the roost (March 1 to September 30). If tree removal occurs during maternity season, trees identified as potentially supporting an active maternity roost shall be closely inspected by the bat specialist. Inspection of each tree should be no more than 7 days prior to tree disturbance to determine the presence or absence of roosting bats more precisely. Trees determined to be maternity roosts shall be left in place until the end of the maternity season.
Work shall not occur within 100 feet of or directly under or adjacent to an active roost and work shall not occur between 30 minutes before sunset and 30 minutes after sunrise.” Comment #3: Impact to Monarch Butterfly
Issue: The Project may impact monarch butterfly (Danaus plexippus) and monarch butterfly overwintering habitat.
Specific impacts: Future housing developments may result in direct impact to monarch butterflies through vegetation removal and tree trimming. Permanent or temporary impacts to overwintering habitat could result in local population decline or local extirpation of monarch butterflies.
Why impact would occur: According to iNaturalist, there are 65 observations of monarch butterflies within the City of Burbank (iNaturalist 2022). In addition, there are numerous eucalyptus trees within the Project site that could provide potential habitat for overwintering monarch butterfly. Furthermore, the future housing developments may require trees and other vegetation to be removed or trimmed in order to facilitate building construction. Removing trees during the overwintering period could have direct impacts on monarch butterflies, potentially resulting in injury or mortality; reduced health and vigor; and reduced success during spring and summer migration to breeding sites. Lastly, the DEIR does not discuss or analyze the Project’s potential impacts on monarch butterflies and potential overwintering habitat within the Project site.
Evidence impact would be significant: Monarch numbers have dropped by 99 percent from an estimated four million butterflies just twenty years ago (CDFW 2022b). Given the precipitous decline of monarch butterflies, the monarch butterfly is currently slated to be listed in 2024 under the Endangered Species Act (CDFW 2022c). The monarch butterfly is included on CDFW’s Terrestrial and Vernal Pool Invertebrates of Conservation Priority list and identified as a Species of Greatest Conservation Need in California's State Wildlife Action Plan (CDFW 2017; CDFW 2015). Additionally, Fish and Game Code section 1002 prohibits the take or possession of wildlife for scientific research, education, or propagation purposes without a valid Scientific Collection Permit issued by CDFW. This applies to handling monarchs, removing them from the wild, or otherwise taking them for scientific or propagation purposes, including captive rearing.
Fish and Game Code section 1021 directs CDFW to take feasible actions to conserve monarch butterflies and the habitats they depend upon for successful migration. Lastly, Fish and Game Code section 1374 directs the Monarch Butterfly and Pollinator Rescue Program, administered by the Wildlife Conservation Board, to recover and sustain populations of monarch butterflies.
The monarch butterfly meets the CEQA definition of rare, threatened, or endangered species (CEQA Guidelines, § 15380). Impacts on the monarch butterfly may require a mandatory finding of significance because the Project would have the potential to threaten to eliminate a plant or 5 cont.
6 2-19
ATTACHMENT 12-34
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
animal community and/or substantially reduce the number or restrict the range of an endangered, rare, or threatened species (CEQA Guidelines, §15065). The reduction in the number of monarch butterflies, either directly or indirectly through habitat loss, would constitute a significant impact absent appropriate mitigation. Inadequate avoidance and mitigation measures will result in the Project continuing to have a substantial adverse direct and cumulative effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by CDFW and/or U.S. Fish and Wildlife Service (USFWS).
Recommended Potentially Feasible Mitigation Measure(s):
Recommendation #3: CDFW recommends the following resources for information on management a monarch overwintering habitat/population:
• Western Monarch Butterfly Conservation Plan (WAFWA 2019); • Overwintering Site Management and Protection (Western Monarch Count 2022); • Protecting California’s Butterfly Groves (Xerces Society 2017); • Managing Monarch Habitat in the West (Xerces Society 2021a); • Pollinator-Friendly Native Plant Lists (Xerces Society 2021b); • Monarch Butterfly Nectar Plant Lists for Conservation Plantings (Xerces Society 2018); • Tropical Milkweed (Wheeler 2018); and,
• CDFW’s Monarch Butterfly webpage (CDFW 2022b).
Mitigation Measure #6: CDFW recommends the DEIR require future project proponents to retain a qualified biologist to assess the future housing development sites for monarch presence and overwintering habitat. A qualified biologist should survey any eucalyptus groves and other trees within the project site that are suitable for overwintering monarchs. A qualified biologist should conduct multiple surveys for overwintering monarchs where potential overwintering habitat has been identified. Monitoring should be done as frequently as possible during the overwintering season (typically September 15 through March 11) to capture changing distributions through the season and in response to storm events.
Mitigation Measure #7: If future housing development sites support an overwintering habitat/population of monarchs, CDFW recommends the DEIR require future project proponents to protect, manage, enhance, and restore potential overwintering habitat. The City should require future project proponents to prepare a long-term Monarch Butterfly Overwintering Habitat Management Plan in consultation with a qualified biologist. A Monarch Butterfly Overwintering Habitat Management Plan should be submitted to the City. At a minimum, the Monarch Butterfly Overwintering Habitat Management Plan should include:
• Protect: Trees should not be removed in overwintering groves unless a tree poses a safety risk. The critical root zone (CRZ) of trees that are not targeted for removal should be protected. Impacts to a tree’s CRZ could result in injury or mortality of the tree causing additional loss of trees and canopy. Shrubs should not be removed in overwintering groves. Shrubs should be maintained to provide a buffer to preserve the microclimate conditions of the overwinter habitat.
• Manage: Management activities, such as tree trimming and mowing, should be conducted in groves from March 15 through September 15 outside of the estimated 6 cont.
2-20
ATTACHMENT 12-35
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
timeframe when monarchs are likely present in the southern California coast. • Enhance: Enhance native, insecticide-free nectar sources by planting fall/winter blooming forbs or shrubs within overwintering groves.
• Restore: Any trees removed as part of the project should be replaced with trees at no less than 2:1. Native insecticide-free trees should be planted such as Monterey pine (Pinus radiata), Monterey cypress (Cupressus macrocarpa), Coast redwood (Sequoia sempervirens), coast live oak (Quercus agrifolia), Douglas fir (Pseudotsuga menzesii), Torrey pine (Pinus torreyana), western sycamore (Platanus racemosa), bishop pine (Pinus radiata) and others, as appropriate for location. • Pesticides: Use of pesticides should be avoided, particularly when monarchs may be present. If pesticides are used, applications should be conducted from March 15 through September 15, when possible. Herbicide should not be applied on blooming flowers.
Herbicide should be applied during young plant phases, when plants are more responsive to treatment, and when monarchs and other pollinators are less likely to be on the plants. Whenever possible, targeted application herbicide methods should be used, large-scale broadcast applications should be avoided, and precautions shall be taken to limit off-site movement of herbicides (e.g., drift from wind and discharge from surface water flows). Neonicotinoids or other systemic insecticides, including coated seeds, should not be used any time of the year in monarch habitat due to their ecosystem persistence, systemic nature, and toxicity. Soil fumigants should not be used.
Non-chemical weed control techniques should be used when possible. • Tropical milkweed and pathogens: Non-native tropical milkweed should not be planted in order to minimize the spread of the pathogen Ophryocystis elektroscirrha (OE), and to encourage natural monarch migration. OE can build up on tropical milkweed because these plants are evergreen, and they do not die back in the winter. OE can be debilitating and/or lethal to monarchs. If possible, tropical milkweed should be removed and replaced with native, insecticide-free nectar plants suitable for the location.
Mitigation Measure #8: If the future housing development sites do not support overwintering habitat, CDFW recommends the DEIR require future project proponents to avoid a and minimize impacts on monarch butterflies by enhancing native, insecticide-free nectar sources; avoid planting additional tropical milkweeds; and avoid using pesticides, insecticides, and soil fumigants.
Additional Recommendations
Data. CEQA requires that information developed in environmental impact reports and negative declarations be incorporated into a database [i.e., California Natural Diversity Database (CNDDB)] which may be used to make subsequent or supplemental environmental determinations [Pub. Resources Code, § 21003, subd. (e)]. Accordingly, please report any special status species detected by completing and submitting CNDDB Online Field Survey Form (CDFW 2022d). The City should ensure that the project applicant has submitted data properly, with all data fields applicable filled out, prior to finalizing/adopting the environmental document.
The data entry should also list pending development as a threat and then update this occurrence after impacts have occurred. The project applicant should provide CDFW with confirmation of data submittal.
Mitigation and Monitoring Reporting Plan. CDFW recommends updating the DEIR’s proposed Biological Resources Mitigation Measures to include mitigation measures 6 cont.
7 8
2-21
ATTACHMENT 12-36
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
recommended in this letter. Mitigation measures must be fully enforceable through permit conditions, agreements, or other legally binding instruments [(Pub. Resources Code, § 21081.6; CEQA Guidelines, § 15126.4(a)(2)]. As such, CDFW has provided comments and recommendations to assist the City in developing mitigation measures that are (1) consistent with CEQA Guidelines section 15126.4; (2) specific; (3) detailed (i.e., responsible party, timing, specific actions, location), and (4) clear for a measure to be fully enforceable and implemented successfully via mitigation monitoring and/or reporting program (Pub. Resources Code, § 21081.6; CEQA Guidelines, § 15097). The City is welcome to coordinate with CDFW to further review and refine the Project’s mitigation measures. Per Public Resources Code section 21081.6(a)(1), CDFW has provided the City with a summary of our suggested mitigation measures and recommendations in the form of an attached Draft Mitigation and Monitoring Reporting Plan (MMRP; Attachment A).
Filing Fees
The Project, as proposed, could have an impact on fish and/or wildlife, and assessment of filing fees is necessary. Fees are payable upon filing of the Notice of Determination by the City of Burbank and serve to help defray the cost of environmental review by CDFW. Payment of the fee is required in order for the underlying Project approval to be operative, vested, and final (Cal. Code Regs, tit. 14, § 753.5; Fish & Game Code, § 711.4; Pub. Resources Code, § 21089).
Conclusion
We appreciate the opportunity to comment on the Project to assist the City of Burbank in adequately analyzing and minimizing/mitigating impacts to biological resources. CDFW requests an opportunity to review and comment on any response that the City of Burbank has to our comments and to receive notification of any forthcoming hearing date(s) for the Project [CEQA Guidelines, § 15073(e)]. If you have any questions or comments regarding this letter, please contact Julisa Portugal, Environmental Scientist, at [email protected] or (562) 330-7563.
Sincerely,
Victoria Tang signing for
Erinn Wilson-Olgin
Environmental Program Manager I
South Coast Region
ec: CDFW
Erinn Wilson-Olgin, Los Alamitos – [email protected] Victoria Tang, Los Alamitos – [email protected] Ruby Kwan-Davis, Los Alamitos – [email protected] Felicia Silva, Los Alamitos – [email protected] Cindy Hailey, San Diego – Cindy [email protected]
CEQA Program Coordinator, Sacramento – [email protected] State Clearinghouse, Office of Planning and Research – [email protected] 8 cont.
9 10
2-22
ATTACHMENT 12-37
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
References:
Avila-Flores, R., and B.M. Fenton. 2005. Use of Spatial features by Foraging Insectivorous Bats in a Large Urban Landscape. Journal of Mammalogy 86(6):1193-1204. [CDFW] California Department of Fish and Wildlife. 2015. State Wildlife Action Plan: A Conservation Legacy for Californians. Available at: https://wildlife.ca.gov/SWAP/Final [CDFW] California Department of Fish and Wildlife. 2017. California Terrestrial and Vernal Pool Invertebrates of Conservation Priority. Available at:
https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=149499&inline [CDFWa] California Department of Fish and Wildlife. 2022. CNDDB Maps and Data. Available at: https://wildlife.ca.gov/Data/CNDDB/Maps-and-Data
[CDFWb] California Department of Fish and Wildlife. 2022. Monarch Butterfly. Available at:
https://wildlife.ca.gov/Conservation/Invertebrates/Monarch-Butterfly [CDFWc] California Department of Fish and Wildlife. 2022. Threatened and Endangered Species. Available at: https://wildlife.ca.gov/Conservation/CESA [CDFWd] California Department of Fish and Wildlife. 2022. Submitting Data to the CNDDB.
Available at: https://wildlife.ca.gov/Data/CNDDB/Submitting-Data. iNaturalist. 2019. Evening Bats Observation. Available at:
https://www.inaturalist.org/observations/28981673
iNaturalist. 2022. Monarch Observations. Available at:
https://www.inaturalist.org/observations?place_id=57695&taxon_id=48662 Johnston, D., Tatarian, G., Pierson, E. 2004. California Bat Mitigation Techniques, Solutions, and Effectiveness. [Internet]. [cited 2020 June 16]. Available at: https://dot.ca.gov/- /media/dot-media/programs/environmental-analysis/documents/env/bio-ca-bat- mitigation-techniques-effectiveness-a11y.pdf
Oprea, M., Mendes, P., Vieira, T.B., Ditchfield, A.D. 2009. Do Wooded Streets Provide Connectivity for Bats in an Urban Landscape? Biodiversity Conservation 18:2361-2371.
Remington, S., and D.S. Cooper. 2014. Bat Survey of Griffith Park, Los Angeles, California. The Southwestern Naturalist 59(4):473-479
[USFWS] United States Fish and Wildlife Service. 2001. Least Bell’s vireo (Vireo bellii pusillus) Survey Guidelines. Available at:
https://www.fws.gov/ventura/docs/species/protocols/lbv/leastbellsvireo_survey- guidelines.pdf
[WAFWA] Western Association of Fish and Wildlife Agencies. 2019. Western Monarch Butterfly Conservation Plan 2019-2069. Available at: https://wafwa.org/wpdm-package/western- monarch-butterfly-conservation-plan-2019
2069/?ind=1602171186650&filename=WAFWA_Monarch_Conservation_Plan.pdf&wpd mdl=13048&refresh=60f9defee81e21626988286
Western Monarch Count. 2022. Overwintering Site Management and Protection. Available at:
https://www.westernmonarchcount.org/overwintering-site-management-and-protection/ Wheeler, J. 2018. Tropical Milkweed – a No-Grow. Xerces Society for Invertebrate Conservation. Available at: https://xerces.org/blog/tropical-milkweed-a-no-grow [Xerces Society] Xerces Society for Invertebrate Conservation. 2021a. Managing Monarch Habitat in the West. Available at: https://xerces.org/monarchs/western-monarch- conservation/habitat
[Xerces Society] Xerces Society for Invertebrate Conservation. 2021b. Pollinator-Friendly Native Plant Lists. Available at: https://xerces.org/pollinator-conservation/pollinator-friendly- plant-lists
2-23
ATTACHMENT 12-38
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
[Xerces Society] Xerces Society for Invertebrate Conservation. 2018. Monarch butterfly nectar plant lists for conservation plantings. Available at:
https://xerces.org/sites/default/files/publications/18-003_02_Monarch-Nectar-Plant-Lists- FS_web%20-%20Jessa%20Kay%20Cruz.pdf
[Xerces Society] Xerces Society for Invertebrate Conservation. 2017. Protecting California’s Butterfly Groves. Management Guidelines for Monarch Butterfly Overwintering Habitat.
Available at: https://www.westernmonarchcount.org/wp-content/uploads/2014/11/2017- 040_ProtectingCaliforniaButterflyGroves.pdf
2-24
ATTACHMENT 12-39
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
State of California – Natural Resources Agency GAVIN NEWSOM, Governor DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director South Coast Region
3883 Ruffin Road
San Diego, CA 92123
(858) 467-4201
www.wildlife.ca.gov
Attachment A: Draft Mitigation and Monitoring Reporting Plan
CDFW recommends the following language to be incorporated into a future environmental document for the Project.
Biological Resources (BIO)
Mitigation Measure (MM) or Recommendation (REC) Timing Responsible Party
MM-BIO-1 – Least
Bell’s Vireo Survey
Future housing development sites that may provide potential habitat shall conduct least Bell’s vireo surveys to determine presence/absence. Future project proponents shall retain a qualified biologist to conduct protocol surveys for least Bell’s vireo. The qualified biologist shall conduct surveys according to USFWS Least Bell’s Vireo Survey Guidelines (USFWS 2001).
All potential least Bell’s vireo habitat shall be surveyed at least eight times during the period from April 10 through July 31.
CDFW and USFWS shall be notified of survey findings,
including negative findings, within 45 calendar days following the completion of protocol-level surveys.
Prior to
construction
activities and
vegetation
removal
Project-level
lead agency/
Designated
Biologist
MM-BIO-2 –
Nesting Bird
Survey
All future housing developments shall avoid any construction activity during nesting season. If not feasible, future housing development occurs between January 1 through September 15, a nesting bird and raptor survey shall be conducted within a 500-foot radius of the construction site, prior to any ground- disturbing activities (e.g., staging, mobilization, grading) as well as prior to any vegetation removal within the project site. The nesting bird surveys shall be conducted at appropriate nesting times and concentrate on potential roosting or perch sites. The DEIR shall require future housing project proponents to retain a qualified biologist to conduct surveys no more than 7 days prior to the beginning of any project-related activity likely to impact raptors and migratory songbirds, for the entire project site. If project activities are delayed or suspended for more than 7 days
Prior to and
during
construction
activities and
vegetation
removal
Project-level
lead agency/
Designated
Biologist
2-25
ATTACHMENT 12-40
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
during the breeding season, repeat the surveys. If nesting raptors and migratory songbirds are identified, the following minimum no-disturbance buffers be implemented: 300 feet around active passerine (perching birds and songbirds) nests, 500 feet around active non-listed raptor nests and 0.5 mile around active listed bird nests. These buffers shall be maintained until the breeding season has ended or until a qualified biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival.
MM-BIO-3 – Bat
Survey
For any future housing development that may occur near
potential bat roosting habitat, the DEIR shall require a qualified bat specialist to conduct bat surveys within these areas (plus a 100-foot buffer as access allows). These surveys shall identify potential habitat that could provide daytime and/or nighttime roost sites, and any maternity roosts. The bat specialist shall use acoustic recognition technology to maximize detection of bats. A discussion of survey results, including negative findings shall be provided to the City. Depending on the survey results, a qualified bat specialist shall discuss potentially significant effects of the project on bats and include species specific mitigation measures to reduce impacts to below a level of significance. Surveys, reporting, and preparation of robust mitigation measures by a qualified bat specialist shall be completed and submitted to the City prior to any project-related ground-disturbing activities or vegetation removal at or near locations of roosting habitat for bats.
Prior to
construction
activities and
vegetation
removal
Project-level
lead agency/
Bat Specialist
MM-BIO-4 – Tree
Removal Process
The City include the following tree removal process as measure in the DEIR for future housing developments. “If bats are not detected, but the bat specialist determines that roosting bats may be present, trees shall be pushed down using heavy
machinery rather than felling with a chainsaw. To ensure the optimum warning for any roosting bats that may still be present, trees shall be pushed lightly two or three times, with a pause of
Prior to and
during any
construction
activities.
Bat Specialist
2-26
ATTACHMENT 12-41
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
approximately 30 seconds between each nudge to allow bats to become active. The tree shall then be pushed to the ground slowly and remain in place until it is inspected by a bat specialist. Trees that are known to be bat roosts shall not be bucked or mulched immediately. A period of at least 24 hours, and preferable 48 hours, shall elapse prior to such operations to allow bats to escape.”
MM-BIO-5 – Bat
Maternity Roosts
The City shall include the following maternity roost measure in the event that maternity roosts are found during surveys for future housing development projects. “If maternity roosts are found, work shall be scheduled between October 1 and
February 28, outside of the maternity roosting season when young bats are present but are ready to fly out of the roost (March 1 to September 30). If tree removal occurs during maternity season, trees identified as potentially supporting an active maternity roost shall be closely inspected by the bat specialist. Inspection of each tree shall be no more than 7 days prior to tree disturbance to determine the presence or absence of roosting bats more precisely. Trees determined to be maternity roosts shall be left in place until the end of the maternity season. Work shall not occur within 100 feet of or directly under or adjacent to an active roost and work shall not occur between 30 minutes before sunset and 30 minutes after sunrise.”
Prior to and
during any
construction
activities.
Bat Specialist
MM-BIO-6 –
Monarch Butterfly
Survey
The DEIR shall require future project proponents to retain a qualified biologist to assess the future housing development sites for monarch presence and overwintering habitat. A qualified biologist shall survey any eucalyptus groves and other trees within the project site that are suitable for overwintering monarchs. A qualified biologist shall conduct multiple surveys for overwintering monarchs where potential overwintering habitat has been identified. Monitoring shall be done as frequently as possible during the overwintering season (typically September 15 through March 11) to capture changing
Prior to
construction
activities and
vegetation
removal
Project-level
lead agency/
Designated
Biologist
2-27
ATTACHMENT 12-42
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
distributions through the season and in response to storm events.
If future housing development sites support an overwintering habitat/population of monarchs, the DEIR shall require future project proponents to protect, manage, enhance, and restore potential overwintering habitat. The City shall require future project proponents to prepare a long-term Monarch Butterfly Overwintering Habitat Management Plan in consultation with a qualified biologist. A Monarch Butterfly Overwintering Habitat Management Plan shall be submitted to the City. At a minimum, the Monarch Butterfly Overwintering Habitat Management Plan shall include:
MM-BIO-7 –
Monarch Butterfly
Overwintering
Habitat
Management Plan
• Protect: Trees shall not be removed in overwintering
groves unless a tree poses a safety risk. The critical root zone (CRZ) of trees that are not targeted for removal
shall be protected. Impacts to a tree’s CRZ could result in injury or mortality of the tree causing additional loss of trees and canopy. Shrubs shall not be removed in
overwintering groves. Shrubs shall be maintained to
provide a buffer to preserve the microclimate conditions of the overwinter habitat.
• Manage: Management activities, such as tree trimming
and mowing, shall be conducted in groves from March
15 through September 15 outside of the estimated
timeframe when monarchs are likely present in the
southern California coast.
• Enhance: Enhance native, insecticide-free nectar
sources by planting fall/winter blooming forbs or shrubs within overwintering groves.
• Restore: Any trees removed as part of the project shall be replaced with trees at no less than 2:1. Native
insecticide-free trees shall be planted such as Monterey pine (Pinus radiata), Monterey cypress (Cupressus
Prior to
construction
activities and
vegetation
removal
Project
Proponent/
Designated
Biologist
2-28
ATTACHMENT 12-43
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
macrocarpa), Coast redwood (Sequoia sempervirens),
coast live oak (Quercus agrifolia), Douglas fir
(Pseudotsuga menzesii), Torrey pine (Pinus torreyana),
western sycamore (Platanus racemosa), bishop pine
(Pinus radiata) and others, as appropriate for location. • Pesticides: Use of pesticides shall be avoided,
particularly when monarchs may be present. If
pesticides are used, applications shall be conducted
from March 15 through September 15, when possible.
Herbicide shall not be applied on blooming flowers.
Herbicide shall be applied during young plant phases,
when plants are more responsive to treatment, and
when monarchs and other pollinators are less likely to
be on the plants. Whenever possible, targeted
application herbicide methods shall be used, large-scale broadcast applications shall be avoided, and precautions shall be taken to limit off-site movement of herbicides (e.g., drift from wind and discharge from surface water flows). Neonicotinoids or other systemic insecticides,
including coated seeds, shall not be used any time of the year in monarch habitat due to their ecosystem
persistence, systemic nature, and toxicity. Soil fumigants shall not be used. Non-chemical weed control
techniques shall be used when possible.
• Tropical milkweed and pathogens: Non-native tropical
milkweed shall not be planted in order to minimize the
spread of the pathogen Ophryocystis elektroscirrha
(OE), and to encourage natural monarch migration. OE
can build up on tropical milkweed because these plants
are evergreen, and they do not die back in the winter.
OE can be debilitating and/or lethal to monarchs. If
possible, tropical milkweed shall be removed and
replaced with native, insecticide-free nectar plants
suitable for the location.
2-29
ATTACHMENT 12-44
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
MM-BIO-8 –
Monarch Butterfly
Landscape
If the future housing development sites do not support
overwintering habitat, the DEIR shall require future project proponents to avoid a and minimize impacts on monarch
butterflies by enhancing native, insecticide-free nectar sources; avoid planting additional tropical milkweeds; and avoid using pesticides, insecticides, and soil fumigants.
Prior to finalizing
Project-level
CEQA document
Project-level
lead agency/
Project
Proponent
REC 1 – CDFW
Consultation
If future housing developments will impact least Bell’s vireo, early consultation with CDFW is encouraged, as significant modification to a project and mitigation measures may be required to obtain a CESA Permit. Appropriate authorization from CDFW may include an Incidental Take Permit or a
Consistency Determination in certain circumstances, among other options.
Prior to finalizing
Project-level
CEQA document
Project-level
lead
agency/Project
Proponent
REC 2 – USFWS
Consultation
Take under the ESA also includes significant habitat
modification or degradation that could result in death or injury to a listed species by interfering with essential behavioral patterns such as breeding, foraging, or nesting. CDFW recommends consultation with the USFWS, in order to comply with ESA, is advised well in advance of any ground-disturbing activities and/or vegetation removal that may impact least Bell’s vireo.
Prior to finalizing
Project-level
CEQA document
Project-level
lead agency/
Project
Proponent
REC 3 – Monarch
Resources
CDFW recommends the following resources for information on management a monarch overwintering habitat/population:
• Western Monarch Butterfly Conservation Plan
• Overwintering Site Management and Protection
• Protecting California’s Butterfly Groves
• Managing Monarch Habitat in the West
• Pollinator-Friendly Native Plant Lists
• Monarch Butterfly Nectar Plant Lists for Conservation Plantings
• Tropical Milkweed
• CDFW’s Monarch Butterfly webpage
Prior to finalizing
Project-level
CEQA document
and during
Project activities
Project-level
lead agency/
Designated
Biologist
REC 4 – Data Please report any special status species detected by completing and submitting CNDDB Online Field Survey Form. The City Prior to finalizing
CEQA document
Project-level
lead
2-30
ATTACHMENT 12-45
DocuSign Envelope ID: FB82E1A5-9ABA-4133-BCF8-845F0FB0C4E9
Shipra Rajesh
City of Burbank
March 18, 2022
should ensure that the project applicant has submitted the data properly, with all data fields applicable filled out, prior to finalizing/adopting the environmental document. The data entry should also list pending development as a threat and then update this occurrence after impacts have occurred. The project Applicant should provide CDFW with confirmation of data submittal.
agency/Project
Proponent
REC 5 - MMRP
The DEIR’s proposed Biological Resources Mitigation Measures should be updated and conditioned to include mitigation measures recommended in this letter. Mitigation measures must be fully enforceable through permit conditions, agreements, or other legally binding instruments. The City is welcome to coordinate with CDFW to further review and refine the project’s mitigation measures.
Prior to finalizing
CEQA document
Project-level
lead agency
2-31
ATTACHMENT 12-46
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letter A-3
COMMENTER: Erinn Wilson-Olgin, Environmental Program Manager I – South Coast Region, California Department of Fish and Wildlife (CDFW)
DATE: March 18, 2022
Response A-3.1
CDFW thanked the City for the opportunity to provide comments and recommendations regarding those activities involved in the project that may affect fish and wildlife and actions for which they may have regulatory authority.
This comment does not address a deficiency in the Draft EIR. This comment has been noted but no response is necessary.
Response A-3.2
The comment provides an overview of CDFW and its roles as trustee agency and responsible agency under CEQA.
This comment indicates that the CDFW expects that it may need to exercise regulatory authority as provided by the Fish and Game Code, including Section 1600 et. seq. (lake and streambed alteration regulatory authority), Section 2050 et. seq. (“take” of species protected under the California Endangered Species Act [CESA]), and Section 1900 et. seq. (CESA-listed rare plants pursuant to the Native Plant Protection Act). The comment recommends that the Project proponent obtain appropriate authorization under the Fish and Game Code.
The comments and recommendations for species protected under CESA have been incorporated as stated in Response A-3.3, below, and in the Biological Resources section of the Recirculated Draft EIR. With the modification to Mitigation Measure BIO-1, we do not anticipate “take” or need for a lake and streambed alteration agreement for development under the Housing Element Update.
Response A-3.3
The comment provides a summary of the proposed project and summarizes recommendations to assist the City in adequately identifying, avoiding, and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife resources. In addition, the comment suggests recommended measures or revisions in later comments be included in a science- based monitoring program that contains adaptive management strategies as part of the project’s Mitigation Monitoring and Reporting Program (MMRP).
Individual responses regarding the CDFW’s concerns on environmental impacts are addressed below in Responses A-3.4 through A-3.10. A MMRP will be published with the Final EIR to assist the City in implementing the mitigation stipulated in the EIR and as reflected in the Recirculated Draft EIR. No revisions are necessary relative to this comment.
Response A-3.4
The comment suggests that the Project may result in adverse impacts to least Bell’s vireo (Vireo bellii pusillus), a federally and State-listed Endangered species, by causing nest abandonment, reproductive suppression, or incidental loss of fertile eggs or nestlings. 2-32
ATTACHMENT 12-47
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
On April 20, 2022, City staff had a call with CDFW staff to discuss the March 18, 2022 comment letter. Based on the discussion, the following revisions have been made to Section 4.2, Biological Resources, of the Draft EIR, which has been included in the Recirculated Draft EIR that was released for a 47-day public review period on July 22, 2022.
The revisions to Mitigation Measure BIO-1 addresses CDFW’s concerns regarding potential impacts to least Bell’s vireo, bat species, or monarch butterflies. Related edits to the biological resources analysis are also shown in the Recirculated Draft EIR.
BIO-1 Biological Resources Avoidance
For individual housing developments that will include disturbance of vegetation, trees, structures, or other areas where biological resources could be present, a qualified biologist shall be retained by the applicant to conduct an initial site assessment that will include review of the California Natural Diversity Database (CNDDB) and iNaturalist maps to determine where sightings have occurred or habitats for the least Bell’s vireo, bat species, or monarch butterflies have previously been identified.
If construction activities or other disturbances occur in areas within 500 feet of a previously identified habitat or observation according to CNDDB or iNaturalist, the following measures shall be implemented:
Prior to the issuance of a grading permit, a qualified biologist shall be retained by the project applicant to conduct a biological resources reconnaissance of the site. The qualified biologist shall thoroughly report on the biological resources present on a project site and submitted to the City.
If the biologist determines that special-status species may occur, focused surveys for special-status plants shall be completed in accordance with Protocols for Surveying and Evaluating Impacts to Special Status Native Plant Populations and Sensitive Natural Communities (California Department of Fish and Wildlife [CDFW], March 20, 2018) and Guidelines for Conducting and Reporting Botanical Inventories for Federally Listed, Proposed and Candidate Plants (USFWS, September 23, 1996). If it is determined that the project site has suitable habitat for special-status wildlife, focused surveys shall be conducted to determined presence/absence including species-specific surveys in accordance with CDFW or United States Fish and Wildlife Service (USFWS) protocols for State or federally listed species, respectively, that may occur. If it is determined that a special-status species may be impacted by a specific project, consultation with USFWS and/or CDFW shall occur prior to issuance of a development permit from the City to determine measures to address impacts, such as avoidance, minimization, or take authorization and mitigation. The report shall include a list of special- status plants and wildlife that may occur on the project site and/or adjacent area.
If construction activities or other disturbances occur during the bird nesting season (February 1 through August 31), prior to issuance of grading permits for individual housing developments that will include disturbance of vegetation, structures, or other areas where bird nests could be present, the following requirements shall be implemented:
Applicant shall submit a pre-construction nesting bird survey shall be conducted no more than seven days prior to initiation of grading or construction activities. The nesting bird pre- construction survey shall be conducted on foot on the construction site, including a 100-foot buffer, and in inaccessible areas (e.g., private lands) from afar using binoculars to the extent practical. The survey shall be conducted by a qualified biologist familiar with the 2-33
ATTACHMENT 12-48
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
identification of avian species known to occur in southern California and a copy of the study shall be submitted to the Community Development Department and Building and Safety Division. The cost to hire a qualified biologist shall be borne entirely by the developer/project applicant.
If nests are found, an avoidance buffer shall be demarcated by a qualified biologist with bright orange construction fencing, flagging, construction lathe, or other means to mark the boundary. All construction personnel shall be notified as to the existence of the buffer zone and to avoid entering the buffer zone during the nesting season. No parking, storage of materials, or construction activities shall occur within this buffer until the biologist has confirmed that breeding/nesting is completed, and the young have fledged the nest.
Encroachment into the buffer shall occur only at the discretion of the qualified biologist. A survey report shall be prepared by the qualified biologist documenting and verifying compliance with the above requirements and applicable State and Federal regulations protecting birds that shall be submitted to the City of Burbank. The qualified biologist shall serve as a construction monitor during those periods when construction activities would occur near active nest areas to ensure that no inadvertent impacts on these nests would occur.
The full text of the Recirculated Draft EIR is available on the City’s website at the following link:
https://www.burbankhousingelement.com/wp-content/uploads/2022/07/Burbank-Housing-and- Safety-Element-Update-Recirculated-DEIR.pdf
Response A-3.5
The comment states that the Project may result in impacts to bat species, such as pallid bat (Antrozous pallidus), big free tailed bat (Nyctinomops macrotis), and hoary bat (Lasiurus cinereus), which are designated as Species of Special Concern (SSC). The Draft EIR does not provide avoidance or mitigation measures to reduce impacts to bat species within the Project site. The comment suggests that the Project may result in direct impacts to bat species, including removal of trees, vegetation, and/or structures that provide roosting habitat, and therefore has the potential for the direct loss of bats. The comment also suggests that indirect impacts from future housing developments may result from increased noise disturbances, human activity, dust, ground disturbing activities, and vibrations caused by heavy equipment.
The comment states that bats are considered non-game mammals and are afforded protection by State law from take and/or harassment (Fish and Game Code Section 4150; California Code of Regulations Section 251.1). In addition, the comment noted that several bat species known to occur within the Project vicinity are considered SSC and take would be considered a significant impact.
The revisions to Section 4.2, Biological Resources, of
the Draft EIR address CDFW’s concerns
regarding potential impacts to least bat species. Refer to Response A-3.4.
Response A-3.6
The comment states that the Project may result in impacts to monarch butterflies (Danaus plexippus) and monarch butterfly overwintering habitat through vegetation removal and tree trimming associated with future housing development. The agency states that there are 65 observations of monarch butterflies within the city recorded in iNaturalist and that there are numerous eucalyptus trees within the Project site that potentially provide overwintering habitat for the species. If eucalyptus trees are removed during the overwintering period, direct impacts such as 2-34
ATTACHMENT 12-49
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
injury or mortality, reduced health and vigor, and reduced success during spring and summer migration may occur. The comment states that the Draft EIR does not provide avoidance or mitigation measures to reduce impacts to the monarch butterfly within the Project site.
The comment states that monarch butterflies are a federal candidate for listing under the Endangered Species Act, is included on CDFW’s Terrestrial and Vernal Pool Invertebrates of Conservation Priority list, and identified as a Species of Greatest Conservation Need in California’s State Wildlife Action Plan. In addition, Fish and Game Code Section 1002 prohibits the take or possession of wildlife without a valid Scientific Collection Permit issued by CDFW, which applied to handling monarchs, removing them from the wild, or otherwise taking them for scientific or propagation purposes. Lastly, the comment states that Fish and Game Code Section 1374 directs the Monarch Butterfly and Pollinator Rescue Program to recover and sustain populations of monarch butterflies. The comment states that impacts to the monarch butterfly may require a mandatory finding of significance because the Project would potentially directly or indirectly reduce the number of monarch butterflies through habitat loss. The comment includes recommendations that the Draft EIR require future project proponents to avoid and minimize impacts to monarch butterflies by enhancing native, insecticide-free nectar sources, avoid planting additional tropical milkweeds, and avoid using pesticides, insecticides, and soils fumigants.
The revisions to Section 4.2, Biological Resources, of
the Draft EIR address CDFW’s concerns
regarding potential impacts to monarch butterflies. Refer to Response A-3.4.
Response A-3.7
The comment requests that all occurrences of special status species on the project site be documented via the California Natural Diversity Database (CNDDB) Field Survey Forms and that the Final EIR include measures where lead agencies of individual projects tiering from the Final EIR report any special status species detected during preparation of project-level environmental impact analyses/environmental documents.
The revisions to Section 4.2, Biological Resources, of
the Draft EIR address CDFW’s concerns
regarding potential impacts to special status species. Refer to Response A-3.4.
Response A-3.8
The comment includes recommendations that the City update the Project’s proposed biological mitigation measures and condition the environmental document to include mitigation measures recommended in their letter. This comment reiterates comments provided in the letter.
Field surveys will be conducted as necessary and in conjunction with a proposed specific development project under the Housing Element Update. The mitigation measures and recommendations provided by the agency are addressed in Response A-3.4. Section 5, Mitigation Monitoring and Reporting Program, of the Final EIR incorporates the revised mitigation measure outlined in Response A-3.4. The MMRP is intended to track and ensure compliance with adopted mitigation measures during the Burbank Housing and Safety Element Update implementation phase. For each mitigation measure recommended in the Final EIR for the Project, specifications are made in the MMRP that identify the action required, the monitoring that must occur, and the agency or department responsible for oversight.
2-35
ATTACHMENT 12-50
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Response A-3.9
The commenter summarizes the CDFW filing fee requirements.
Comment noted. The CDFW filing fee will be paid along with the County fee for the filing of the Notice of Determination.
Response A-3.10
The commenter appreciates the opportunity to comment on the Project to assist the City of Burbank in adequately analyzing and minimizing/mitigating impacts to biological resources. The comment requests an opportunity to review and comment on any response that the City has to their comments and to receive notification of any forthcoming hearing date(s) for the project.
As required under CEQA, the agency will be provided notice of the Final EIR and any forthcoming hearing date(s) for the project.
2-36
ATTACHMENT 12-51
Office of the General Manager
March 30, 2022 Via Electronic Mail
Shipra Rajesh, Associate Planner
Community Development Department
Planning Division
150 North Third Street
Burbank, California 91502
Dear Shipra Rajesh:
Notice of Availability of a
Draft Environmental Impact Report for the City of Burbank Housing & Safety Element Update
The Metropolitan Water District of Southern California (Metropolitan) reviewed the Notice of Availability of a Draft Environmental Impact Report for the City of Burbank Housing and Safety Element Update (Project) and Draft Environmental Impact Report (DEIR). The City of Burbank is acting as the Lead Agency under the California Environmental Quality Act (CEQA). The Project proposes to update the Housing Element of the Burbank2035 General Plan. In addition, the project will include minor updates to the Safety, Land Use, Open Space and Conservation, Air Quality and Climate Change, Noise, and Mobility Elements, as well as incorporate environmental justice policies into the Burbank2035 General Plan, per State law. This letter contains Metropolitan’s response to the public notice as a potentially affected public agency.
Metropolitan is a public agency and regional water wholesaler. It is comprised of 26 member public agencies, serving approximately 19 million people in portions of six counties in Southern California. Metropolitan’s mission is to provide its 5,200 square mile service area with adequate and reliable supplies of high-quality water to meet present and future needs in an environmentally and economically responsible way.
Our review of the DEIR indicates that Metropolitan owns and operates the Santa Monica Feeder and East Valley Feeder pipelines and appurtenant facilities in the project area. The aforementioned pipelines deliver treated water to Metropolitan Member Agencies. Metropolitan is concerned with potential impacts to pipelines and appurtenant facilities, and potential for obstructed access that may result from implementation of the proposed Project. The enclosed map shows Metropolitan facilities in relation to the Project. It will be necessary for the City to consider these facilities in its project planning.
Letter A-4
1 2
2-37
ATTACHMENT 12-52
THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA
Shipra Rajesh, Associate Planner
March 30, 2022
Metropolitan must be allowed to maintain its rights-of-way and requires unobstructed access to its facilities in order to maintain and repair its system. In order to avoid potential conflicts with Metropolitan’s facilities and rights-of-way, we require that any design plans for any activity in the area of Metropolitan’s pipelines or facilities be submitted for our review and written approval. Metropolitan will not permit procedures that could subject the pipeline to excessive vehicle, impact or vibratory loads. Any future design plans associated with this project should be submitted to Metropolitan’s Substructures Team. Approval of the project should be contingent on Metropolitan’s approval of design plans for portions of the proposed project that could impact its facilities.
Detailed prints of drawings of Metropolitan’s pipelines and rights-of-way may be obtained by calling Metropolitan’s Substructures Information Line at (213) 217-7663 or via email at [email protected]. To assist the applicant in preparing plans that are compatible with Metropolitan’s facilities and easements, attached are the “Guidelines for Improvements and Construction Projects Proposed in the Area of Metropolitan’s Facilities and Rights-of-Way.” Please note that all submitted designs or plans must clearly identify Metropolitan’s facilities and rights-of-way.
Additionally, Metropolitan encourages projects within its service area to include water conservation measures. Water conservation, reclaimed water use, and groundwater recharge programs are integral components to regional water supply planning. Metropolitan supports mitigation measures such as using water efficient fixtures, drought-tolerant landscaping, and reclaimed water to offset any increase in water use associated with the proposed project.
We appreciate the opportunity to provide input to your planning process and we look forward to receiving future documentation and plans for this project. For furthe r assistance, please contact Ms. Jolene Ditmar at (213) 217-6184 or [email protected].
Very truly yours,
Diane
Doesserich
Diane Doesserich
Digitally signed by Diane Doesserich
DN: cn=Diane Doesserich,
o=Metropolitan Water District, ou,
emai
[email protected], c=US
Date: 2022.03.30 14:41:20 -07'00'
Team Manager, Environmental Planning Section
JD:rdl
Sharepoint\Burbank\ Housing and Safety Element Update
Enclosures:
(1) Map
(2) Planning Guidelines for Improvements and Construction Projects Proposed in the Area of Metropolitan’s Facilities and Rights-of-Way
700 N. Alameda Street, Los Angeles, California 90012 • Mailing Address: Box 54153, Los Angeles, California 90054-0153 • Telephone (213) 217-6000 3 4
5 2-38
ATTACHMENT 12-53
Burbank Housing and
Safety Element Update
Burbank Housing and Safety
Element Update
Metropolitan
Facilities Map
East Valley Feeder
Santa Monica Feeder
2-39
ATTACHMENT 12-54
Guidelines for
Improvements and Construction Projects Proposed
in the Area of
Metropolitan’s Facilities and Rights-of-Way
July 2018
Prepared By:
The Metropolitan Water District of Southern California
Substructures Team, Engineering Services
700 North Alameda Street
Los Angeles, California 90012
2-40
ATTACHMENT 12-55
Issue Date: July 2018
Disclaimer
Metropolitan assumes no responsibility for the accuracy of the substructure information herein provided.
The user assumes responsibility for verifying substructure locations before excavating and assumes all liability for damage to Metropolitan’s facilities as a result of such excavation. Additionally, the user is cautioned to conduct surveys and other field investigations as deemed prudent, to assure that project plans are correct. The appropriate representative from Metropolitan must be contacted at least t wo working days, before any work activity in proximity to Metropolitan’s facilities.
It generally takes 30 days to review project plans and provide written responses. Metropolitan reserves the right to modify requirements based on case-specific issues and regulatory developments.
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES
Copyright © 2018 by The Metropolitan Water District of Southern California.
Additional Copies: To obtain a copy of this document, please contact the Engineering Services Group, Substructures Team.
PUBLICATION HISTORY:
Initial Release July 2018
2-41
ATTACHMENT 12-56
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018
Table of Contents
1.0 GENERAL INFORMATION ................................ ................................ ............................. 1
1.1 Introduction ................................ ................................ ................................ .................. 1
1.2 Submittal and Review of Project Plans/Utilities and Maps ................................ ............ 1
1.3 Identification of Metropolitan’s Facilities and Rights-of-Way ................................ ......... 3
2.0 General Requirements ................................ ................................ ................................ .... 3
2.1 Vehicular Access ................................ ................................ ................................ ......... 3
2.2 Fences ................................ ................................ ................................ ......................... 3
2.3 Driveways and Ramps ................................ ................................ ................................ . 3
2.4 Walks, Bike Paths, and Trails ................................ ................................ ....................... 3
2.5 Clear Zones ................................ ................................ ................................ ................. 4
2.6 Slopes ................................ ................................ ................................ .......................... 4
2.7 Structures ................................ ................................ ................................ .................... 4
2.8 Protection of Metropolitan Facilities................................ ................................ .............. 4
2.9 Potholing of Metropolitan Pipelines ................................ ................................ .............. 4
2.10 Jacked Casings or Tunnels ................................ ................................ .......................... 4
3.0 Landscaping ................................ ................................ ................................ .................... 5
3.1 Plans ................................ ................................ ................................ ............................ 5
3.2 Drought-Tolerant Native and California Friendly Plants ................................ ................ 5
3.3 Trees ................................ ................................ ................................ ........................... 5
3.4 Other Vegetation ................................ ................................ ................................ .......... 6
3.5 Irrigation ................................ ................................ ................................ ....................... 6
3.6 Metropolitan Vehicular Access ................................ ................................ ..................... 6
4.0 General Utilities ................................ ................................ ................................ ............... 6
4.1 Utility Structures ................................ ................................ ................................ ........... 6
4.2 Utility Crossings ................................ ................................ ................................ ........... 6
4.3 Longitudinal Utilities ................................ ................................ ................................ ..... 7
4.4 Underground Electrical Lines ................................ ................................ ....................... 7
4.5 Fiber Optic Lines ................................ ................................ ................................ .......... 7
4.6 Overhead Electrical and Telephone Lines ................................ ................................ .... 7
4.7 Sewage Disposal Systems ................................ ................................ ........................... 7
4.8 Underground Tanks ................................ ................................ ................................ ..... 8
5.0 Specific Utilities: Non-Potable Utility Pipelines ................................ ................................ . 8
6.0 Cathodic Protection/Electrolysis Test Stations ................................ ................................ . 8
6.1 Metropolitan Cathodic Protection ................................ ................................ ................. 8
6.2 Review of Cathodic Protection Systems ................................ ................................ ....... 8
7.0 Drainage ................................ ................................ ................................ .......................... 9
7.1 Drainage Changes Affecting Metropolitan Rights-of-Way ................................ ............. 9
7.2 Metropolitan’s Blowoff and Pumpwell Structures ................................ .......................... 9
8.0 Grading and Settlement ................................ ................................ ................................ ... 9 2-42
ATTACHMENT 12-57
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018
Table of Contents
8.1 Changes in Cover over Metropolitan Pipelines ................................ ............................. 9
8.2 Settlement................................ ................................ ................................ .................... 9
9.0 Construction Equipment ................................ ................................ ................................ 10
9.1 Review of Proposed Equipment ................................ ................................ .................. 10
9.2 Equipment Restrictions ................................ ................................ ............................... 10
9.3 Vibratory Compaction Equipment ................................ ................................ ................ 10
9.4 Equipment Descriptions ................................ ................................ .............................. 10
10.0 Excavations Close to Metropolitan Facilities ................................ ................................ .. 11
10.1 Shoring Design Submittal ................................ ................................ ........................... 11
10.2 Shoring Design Requirements ................................ ................................ .................... 11
11.0 Support of Metropolitan Facilities ................................ ................................ .................... 11
11.1 Support Design Submittal ................................ ................................ ........................... 11
11.2 Support Design Requirements ................................ ................................ .................... 11
12.0 Backfill ................................ ................................ ................................ ............................ 12
12.1 Metropolitan Pipeline Not Supported ................................ ................................ ........... 12
12.2 Metropolitan Pipeline Partially Exposed ................................ ................................ ...... 12
12.3 Metropolitan Cut and Cover Conduit on Colorado River Aqueduct (CRA) ...................12
13.0 Piles ................................ ................................ ................................ ............................... 13
13.1 Impacts on Metropolitan Pipelines ................................ ................................ ............... 13
13.2 Permanent Cast-in-place Piles ................................ ................................ .................... 13
14.0 Protective Slabs for Road Crossings Over Metropolitan Pipelines ................................ ..13
15.0 Blasting ................................ ................................ ................................ ......................... 13
16.0 Metropolitan Plan Review Costs, Construction Costs and Billing ................................ ....14
16.1 Plan Review Costs ................................ ................................ ................................ ...... 14
16.2 Cost of Modification of Facilities Performed by Metropolitan ................................ ........ 14
16.3 Final Billing ................................ ................................ ................................ ................. 14
17.0 Street Vacations and Reservation of Easements for Metropolitan ................................ ...14
18.0 Metropolitan Land Use Guidelines ................................ ................................ .................. 14
19.0 Compliance with Environmental Laws and Regulations ................................ .................. 15
20.0 Paramount Rights / Metropolitan’s Rights within Existing Rights-of-Way.........................17
21.0 Disclaimer and Information Accuracy ................................ ................................ .............. 17 Table of Contents
Table 1: General Guidelines for Pipeline Separation between Metropolitan’s Pipeline1 and Sanitary Sewer2 or Hazardous Fluid Pipeline3 ................................ ........................... 18 Table 2: General Guidelines for Pipeline “Separation between Metropolitan’s Pipeline1 and Storm Drain and/or Recycled Water2 ................................ ................................ ......... 19 2-43
ATTACHMENT 12-58
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018
Table 3: General Guidelines for Pipeline “Separation1 between Metropolitan’s Pipeline and Recycled Water2,4 Irrigationsm, ................................ ................................ ................. 20 Figure 1: AASHTO H-20 Loading ................................ ................................ .............................. 21 Figure 2: Drawing SK-1 ................................ ................................ ................................ ............. 22 2-44
ATTACHMENT 12-59
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018
This page is intentionally blank.
2-45
ATTACHMENT 12-60
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 1 of 22
1.0 GENERAL INFORMATION
Note: Underground Service Alert at 811 must be notified at least two working days before excavating in proximity to Metropolitan’s facilities.
1.1 Introduction
These guidelines provide minimum design and construction requirements for any utilities, facilities, developments, and improvements, or any other projects or activities, proposed in or near Metropolitan Water District of Southern California (Metropolitan) facilities and rights -of-way. Additional conditions and stipulations may also be required depending on project and site specific conditions. Any adverse impacts to Metropolitan’s conveyance system, as determined by Metropolitan, will need to be mitigated to its satisfaction.
All improvements and activities must be designed so as to allow for removal or relocation at builder or developer expense, as set forth in the paramount rights provisions of Section 20.0. Metropolitan shall not be responsible for repair or replacement of improvements, landscaping or vegetation in the event Metropolitan exercises its paramount rights powers.
1.2 Submittal and Review of Project Plans/Utilities and Maps Metropolitan requires project plans/utilities be submitted for all proposed activities that may impact Metropolitan’s facilities or rights-of-way. Project plans shall include copies of all pertinent utilities, sewer line, storm drain, street improvement, grading, site development, landscaping, irrigation and other plans, all tract and parcel maps, and all necessary state and federal environmental documentation. Metropolitan will review the project plans and provide written approval, as it pertains to Metropolitan’s facilities and rights-of-way. Written approval from Metropolitan must be obtained, pr ior to the start of any activity or construction in the area of Metropolitan’s facilities or rights -of-way. Once complete project plans and supporting documents are submitted to Metropolitan, it generally takes 30 days to review and to prepare a detailed w ritten response. Complex engineering plans that have the potential for significant impacts on Metropolitan’s facilities or rights-of-way may require a longer review time.
Project plans, maps, or any other information should be submitted to Metropolitan’s Substructures Team at the following mailing address:
Attn: Substructures Team
The Metropolitan Water District of Southern California
700 North Alameda St.
Los Angeles, CA 90012
General Mailing Address: P.O. Box 54153
Los Angeles, CA 90054-0153
Email: [email protected]
2-46
ATTACHMENT 12-61
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 2 of 22
For additional information, or to request prints of detailed drawings for Metropolitan’s facilities and rights -of-way, please contact Metropolitan’s Substructures Team at 213 - 217-7663 or [email protected].
2-47
ATTACHMENT 12-62
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 3 of 22
1.3 Identification of Metropolitan’s Facilities and Rights-of-Way Metropolitan’s facilities and rights -of-way must be fully shown and identified as Metropolitan’s, with official recording data, on the following:
A. All applicable plans
B. All applicable tract and parcel maps
Metropolitan’s rights-of-ways and existing survey monuments must be tied dimensionally to the tract or parcel boundaries. Metropolitan’s Records of Survey must be referenced on the tract and parcel maps with the appropriate Book and Page.
2.0 General Requirements
2.1 Vehicular Access
Metropolitan must have vehicular access along its rights -of-way at all times for routine inspection, patrolling, operations, and maintenance of its facilities and construction activities. All proposed improvements and activities must be designed so as to accommodate such vehicular access.
2.2 Fences
Fences installed across Metropolitan’s rights-of-way must include a 16 -foot-wide gate to accommodate vehicular access by Metropolitan. Additionally, gates may be required at other specified locations to prevent unauthorized entry into Metropolitan’s rights-of-way.
All gates must accommodate a Metropolitan lock or Knox -Box with override switch to allow Metropolitan unrestricted access. There should be a minimum 20 -foot setback for gates from the street at the driveway approach. The setback is necessary to allow Metropolitan vehicles to safely pull off the road prior to opening the gate.
2.3 Driveways and Ramps
Construction of 16 -foot-wide commercial-type driveway approaches is required on both sides of all streets that cross Metropolitan’s rights -of-way. Access ramps, if necessary, must be a minimum of 16 feet wide.
There should be a minimum 20 -foot setback for gates from the street at the driveway approach. Grades of ramps and access roads must not exceed 10 percent; if the slope of an access ramp or road must exceed 10 p ercent due to topography, then the ramp or road must be paved.
2.4 Walks, Bike Paths, and Trails
All walkways, bike paths, and trails along Metropolitan’s rights -of-way must be a minimum 12-foot wide and have a 50 -foot or greater radius on all horizontal curve s if also used as Metropolitan’s access roads. Metropolitan’s access routes, including all walks and drainage facilities crossing the access routes, must be constructed to American Association of State Highway and Transportation Officials (AASHTO) H -20 loading standards (see Figure 1). Additional requirements will be placed on equestrian trails to protect the water quality of Metropolitan’s pipelines and facilities. 2-48
ATTACHMENT 12-63
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 4 of 22
2.5 Clear Zones
A 20-foot-wide clear zone is required to be maintained around Met ropolitan’s manholes and other above -ground facilities to accommodate vehicular access and maintenance.
The clear zone should slope away from Metropolitan’s facilities on a grade not to exceed 2 percent.
2.6 Slopes
Cut or fill slopes proposed within Metropolit an’s rights -of-way must not exceed 10 percent. The proposed grade must not worsen the existing condition. This restriction is required to facilitate Metropolitan use of construction and maintenance equipment and allow uninhibited access to above-ground and below-ground facilities.
2.7 Structures
Construction of structures of any type is not allowed within the limits of Metropolitan’s rights-of-way to avoid interference with the operation and maintenance of Metropolitan’s facilities and possible construction of future facilities.
Footings and roof eaves of any proposed buildings adjacent to Metropolitan’s rights -of- way must meet the following criteria:
A. Footings and roof eaves must not encroach onto Metropolitan’s rights-of-way.
B. Footings must not impose any additional loading on Metropolitan’s facilities.
C. Roof eaves must not overhang onto Metropolitan’s rights-of-way.
Detailed plans of footings and roof eaves adjacent to Metropolitan’s rights -of-way must be submitted for Metropolitan’s review and written approval, as pertains to Metropolitan’s facilities.
2.8 Protection of Metropolitan Facilities
Metropolitan facilities within its rights -of-way, including pipelines, structures, manholes, survey monuments, etc., must be protected from damage by the project proponent or property owner, at no expense to Metr opolitan. The exact location, description and method of protection must be shown on the project plans.
2.9 Potholing of Metropolitan Pipelines
Metropolitan’s pipelines must be potholed in advance, if the vertical clearance between a proposed utility and Metropolitan’s pipeline is indicated to be 4 feet or less. A Metropolitan representative must be present during the potholing operation and will assist in locating the pipeline. Notice is required, a minimum of three working days, prior to any potholing activity.
2.10 Jacked Casings or Tunnels
A. General Requirements
Utility crossings installed by jacking, or in a jacked casing or tunnel under/over a Metropolitan pipeline, must have at least 3 feet of vertical clearance between the outside diameter of the pipelines and the jacked pipe, casing, or tunnel. The actual 2-49
ATTACHMENT 12-64
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 5 of 22
cover over Metropolitan’s pipeline shall be determined by potholing, under Metropolitan’s supervision.
Utilities installed in a jacked casing or tunnel must have the annular space between the utility and the jacked casing or tunnel filled wi th grout. Provisions must be made for grouting any voids around the exterior of the jacked pipe, casing, or tunnel.
B. Jacking or Tunneling Procedures
Detailed jacking, tunneling, or directional boring procedures must be submitted to Metropolitan for review a nd approval. The procedures must cover all aspects of operation, including, but not limited to, dewatering, ground control, alignment control, and grouting pressure. The submittal must also include procedures to be used to control sloughing, running, or we t ground, if encountered. A minimum 10 -foot clearance must be maintained between the face of the tunneling or receiving pits and outside edges of Metropolitan’s facility.
C. Shoring
Detailed drawings of shoring for jacking or receiving pits must be submitted to Metropolitan for review and written -approval. (See Section 10 for shoring requirements).
D. Temporary Support
Temporary support of Metropolitan’s pipelines may be required when a utility crosses under a Metropolitan pipeline and is installed by means of an open trench. Plans for temporary support must be reviewed and approved in writing by Metropolitan. (See Section 11, Supports of Metropolitan Facilities).
3.0 Landscaping
3.1 Plans
All landscape plans must show the location and limits of Metropolitan’s right -of-way and the location and size of Metropolitan’s pipeline and related facilities therein. All landscaping and vegetation shall be subject to removal without notice, as may be required by Metropolitan for ongoing maintenance, access, repair, and construction activities. Metropolitan will not be financially responsible for the removal of any landscaping and vegetation.
3.2 Drought-Tolerant Native and California Friendly Plants Metropolitan recommends use of drought-tolerant native and California Friendly® plants (excluding sensitive plants) on proposed projects. For more information regarding California Friendly® plants refer to www.bewaterwise.com.
3.3 Trees
Trees are generally prohibited within Metropolitan’s rights -of-way as they restrict Metropolitan’s ability to operate, maintain and/or install new pipeline(s) located within these rights-of-way. Metropolitan will not be financially responsible for the remo val and replacement of any existing trees should they interfere with access and any current or future Metropolitan project located within the right-of-way. 2-50
ATTACHMENT 12-65
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 6 of 22
3.4 Other Vegetation
Shrubs, bushes, vines, and groundcover are generally allowed within Metropolitan’s rights-of-way. Larger shrubs are not allowed on Metropolitan fee properties; however, they may be allowed within its easements if planted no closer than 15 feet from the outside edges of existing or future Metropolitan facilities. Only groun dcover is allowed to be planted directly over Metropolitan pipeline, turf blocks or similar is recommended to accommodate our utility vehicle access. Metropolitan will not be financially responsible for the removal and replacement of the vegetation should it interfere with access and any current or future Metropolitan project.
3.5 Irrigation
Irrigation systems are acceptable within Metropolitan’s rights -of-way, provided valves and controllers are located near the edges of the right -of-way and do not interfere w ith Metropolitan vehicular access. A shutoff valve should also be located along the edge of the right-of-way that will allow the shutdown of the system within the right -of-way should Metropolitan need to do any excavation. No pooling or saturation of water above Metropolitan’s pipeline and right -of-way is allowed. Additional restrictions apply to non - potable water such as Recycled Water and are covered on Table 3 of Page 20.
3.6 Metropolitan Vehicular Access
Landscape plans must show Metropolitan vehicular access to Metropolitan’s facilities and rights -of-way and must be maintained by the property owner or manager or homeowners association at all times. Walkways, bike paths, and trails within Metropolitan’s rights-of-way may be used as Metropolitan access routes. (See Section
2.4, Walks, Bike Paths, and Trails).
4.0 General Utilities
Note: For non-potable piping like sewer, hazardous fluid, storm drain, disinfected tertiary recycled water and recycled water irrigation see Table 1 through Table 3.
4.1 Utility Structures
Permanent utility structures (e.g., manholes, power poles, pull boxes, electrical vaults, etc.) are not allowed within Metropolitan’s rights -of-way. Metropolitan requests that all permanent utility structures within public streets be placed as far from its pipelines and facilities as practical, but not closer than 5 feet from the outside edges of Metropolitan facilities.
Note: Non-potable utility pipelines are an exception to the 5-foot minimum clearance.
Non-potable utility pipelines should have 10 feet of separation.
4.2 Utility Crossings
Metropolitan requests a minimum of 1 foot of vertical clearance between Metropolitan’s pipeline and any utility crossing the pipeline. Utility lines crossing Metropolitan’s pipe - lines must be as perpendicular to the pipelin e as possible. Cross -section drawings, showing proposed locations and elevations of utility lines and locations of Metropolitan’s pipelines and limits of rights-of-way, must be submitted with utility plans, for all 2-51
ATTACHMENT 12-66
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 7 of 22
crossings. Metropolitan’s pipeline must be potholed under Metropolitan’s supervision at the crossings (See Section 2.9).
4.3 Longitudinal Utilities
Installation of longitudinal utilities is generally not allowed along Metropolitan’s rights -of- way. Within public streets, Metropolitan requests that all utilities parallel to Metropolitan’s pipelines and appurtenant structures (facilities) be located as far from the facilities as possible, with a minimum clearance of 5 feet from the outside edges of the pipeline.
Note: Non -potable utility pipelines are an exception to the 5 -foot minimum clearance.
Non-potable utility pipelines should have 10 feet of separation (for more information See Table 1 on Page 18).
4.4 Underground Electrical Lines
Underground electrical conduit s (110 volts or greater) which cross a Metropolitan’s pipeline must have a minimum of 1 foot of vertical clearance between Metropolitan’s pipeline and the electrical lines. Longitudinal electrical lines, including pull boxes and vaults, in public streets s hould have a minimum separation of 5 feet from the edge of a Metropolitan pipeline or structures.
4.5 Fiber Optic Lines
Fiber optic lines installed by directional boring require a minimum of 3 feet of vertical clearance when boring is over Metropolitan’s pipel ines and a minimum of 5 feet of vertical clearance when boring is under Metropolitan’s pipelines. Longitudinal fiber optic lines, including pull boxes, in public streets should have a minimum separation of 5 feet from the edge of a Metropolitan pipelines o r structures. Potholing must be performed, under Metropolitan’s supervision, to verify the vertical clearances are maintained.
4.6 Overhead Electrical and Telephone Lines
Overhead electrical and telephone lines, where they cross Metropolitan’s rights -of-way, must have a minimum 35 feet of clearance, as measured from the ground to the lowest point of the overhead line. Overhead electrical lines poles must be located at least 30 feet laterally from the edges of Metropolitan’s facilities or outside Metropol itan’s right- of-way, whichever is greater.
Longitudinal overhead electrical and or telephone lines in public streets should have a minimum separation of 10 feet from the edge of a Metropolitan pipelines or structures where possible.
4.7 Sewage Disposal Systems
Sewage disposal systems, including leach lines and septic tanks, must be a minimum of 100 feet from the outside limits of Metropolitan’s rights-of-way or the edge of its facilities, whichever is greater. If soil conditions are poor, or other adverse site -specific conditions exist, a minimum distance of 150 feet is required. They must also comply with local and state health code requirements as they relate to sewage disposal systems in proximity to major drinking water supply pipelines.
2-52
ATTACHMENT 12-67
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 8 of 22
4.8 Underground Tanks
Underground tanks containing hazardous materials must be a minimum of 100 feet from the outside limits of Metropolitan’s rights -of-way or edge of its facilities, whichever is greater. In addition, groundwater flow should be considered with the placement of underground tanks down-gradient of Metropolitan’s facilities.
5.0 Specific Utilities: Non-Potable Utility Pipelines
In addition to Metropolitan’s general requirements, installation of non -potable utility pipelines (e.g., storm drains, sewers, and hazardous f luids pipelines) in Metropolitan's rights -of-way and public street rights -of-way must also conform to the State Water Resources Control Board’s Division of Drinking Water (DDW) regulation (Waterworks Standards) and guidance for separation of water mains and non-potable pipelines and to applicable local county health code requirements. Written approval is required from DDW for the implementation of alternatives to the Waterworks Standards and, effective December 14, 2017, requests for alternatives to the Waterworks Standards must include information consistent with: DDW’s Waterworks Standards Main Separation Alternative Request Checklist.
In addition to the following general guidelines, further review of the proposed project must be evaluated by Metropolitan and requirements may vary based on site spec ific conditions.
A. Sanitary Sewer and Hazardous Fluids (General Guideline See Table 1 on Page 18) B. Storm Drain and Recycled Water (General Guideline See Table 2 on Page 19) C. Irrigation with Recycled Water (General Guideline See Table 3 on Page 20) D. Metropolitan generally does not allow Irrigation with recycled water to be applied directly above its treated water pipelines
E. Metropolitan requests copies of project correspondence with regulating agencies (e.g., Regional Water Quality Control Board, DDW); regarding the application of recycled water for all projects located on Metropolitan’s rights-of-way
6.0 Cathodic Protection/Electrolysis Test Stations
6.1 Metropolitan Cathodic Protection
Metropolitan’s existing cathodic protection facilities in the vicinity of any proposed work must be identified prior to any grading or excavation. The exact location, description, and type of protect ion must be shown on all project plans. Please contact Metropolitan for the location of its cathodic protection stations.
6.2 Review of Cathodic Protection Systems
Metropolitan must review any proposed installation of impressed -current cathodic pro - tection systems on pipelines crossing or paralleling Metropolitan’s pipelines to determine any potential conflicts with Metropolitan’s existing cathodic protection system. 2-53
ATTACHMENT 12-68
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 9 of 22
7.0 Drainage
7.1 Drainage Changes Affecting Metropolitan Rights-of-Way Changes to existing drainage that could affect Metropolitan’s rights -of-way require Metropolitan’s approval. The project proponent must provide acceptable solutions to ensure Metropolitan’s rights -of-way are not negatively affected by changes in the drainage conditions. Plans showing the changes, with a copy of a supporting hydrology report and hydraulic calculations, must be submitted to Metropolitan for review and approval. Long term maintenance of any proposed drainage facilities must be the responsibility of the project proponent, City, County, homeowner’s association, etc., with a clear understanding of where this responsibility lies. If drainage must be discharged across Metropolitan’s rights-of-way, it must be carried across by closed conduit or lined open channel and must be shown on the plans.
7.2 Metropolitan’s Blowoff and Pumpwell Structures
Any changes to the existing local watercourse systems will need to be designed to accommodate Metropolitan’s blowoff and pumpwell structures, which periodically convey discharged water from Metropolitan’s blowoff and pumping well structures during pipeline dewatering. The project proponents’ plans should include details of how these discharges are accommodated within the proposed development and must be submitted to Metropolitan for review and approval. Any blowoff discharge lines impacted must be modified accordingly at the expense of the project proponent.
8.0 Grading and Settlement
8.1 Changes in Cover over Metropolitan Pipelines
The existing cover over Metropolitan’s pipelines must be maintained unless Metropolitan determines that proposed changes in grade and cover do not pose a hazard to the integrity of the pipeline or an impediment to its maintenance capability. Load and settlement or rebound due to change in cover over a Metropolitan pipeline or ground in the area of Metropolitan’s rights-of-way will be factors considered by Metropolitan during project review.
In general, the minimum cover over a Metropolitan pipeline is 4 feet and the maximum cover varies per different pipeline. Any changes to the existing grade may require that Metropolitan’s pipeline be potholed under Metropolitan’s supervision to verify the existing cover.
8.2 Settlement
Any changes to the existing topography in the area of Metropolitan’s pipeline or right -of- way that result in significant settlement or lateral displacement of Metropolitan’s pipelines are not acceptable. Metropolitan may require submittal of a soils report showing the predicted settlement of the pipeline at 10 -foot intervals for review. The data must be carried past the point of zero change in each direction and the actual s ize and varying depth of the fill must be considered when determining the settlement. Possible settlement due to soil collapse, rebound and lateral displacement must also be included. 2-54
ATTACHMENT 12-69
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 10 of 22
In general, the typical maximum allowed deflection for Metropolitan’s pipelines must not exceed a deflection of 1/4 -inch for every 100 feet of pipe length. Metropolitan may require additional information per its Geotechnical Guidelines. Please contact Metropolitan’s Substructures Team for a copy of the Geotechnical Guidelines.
9.0 Construction Equipment
9.1 Review of Proposed Equipment
Use of equipment across or adjacent to Metropolitan’s facilities is subject to prior review and written approval by Metropolitan. Excavation, backfill, and other work in the vicinity of Metropolitan’s facilities must be performed only by methods and with equipment approved by Metropolitan. A list of all equipment to be used must be submitted to Metropolitan a minimum of 30 days before the start of work.
A. For equipment operating within paved public roadways, equipment that imposes loads not greater than that of an AASHTO H -20 vehicle (see Figure 1 on Page 21) may operate across or adjacent to Metropolitan’s pipelines provided the equipm ent operates in non-vibratory mode and the road remains continuously paved.
B. For equipment operating within unpaved public roadways, when the total cover over Metropolitan’s pipeline is 10 feet or greater, equipment imposing loads no greater than those impo sed by an AASHTO H -20 vehicle may operate over or adjacent to the pipeline provided the equipment is operated in non -vibratory mode. For crossings, vehicle path shall be maintained in a smooth condition, with no breaks in grade for 3 vehicle lengths on each side of the pipeline.
9.2 Equipment Restrictions
In general, no equipment may be used closer than 20 feet from all Metropolitan above - ground structures. The area around the structures should be flagged to prevent equipment encroaching into this zone.
9.3 Vibratory Compaction Equipment
Vibratory compaction equipment may not be used in vibratory mode within 20 feet of the edge of Metropolitan’s pipelines.
9.4 Equipment Descriptions
The following information/specifications for each piece of equipment should be included on the list:
A. A description of the equipment, including the type, manufacturer, model year, and model number. For example, wheel tractor-scraper, 1990 Caterpillar 627E.
B. The empty and loaded total weight and the corresponding weight distribution. If equipment will be used empty only, it should be clearly stated.
C. The wheel base (for each axle), tread width (for each axle), and tire footprint (width and length) or the track ground contact (width and length), and track gauge (center to center of track).
2-55
ATTACHMENT 12-70
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 11 of 22
10.0 Excavations Close to Metropolitan Facilities
10.1 Shoring Design Submittal
Excavation that impacts Metropolitan’s facilities requires that the contractor submit an engineered shoring design to Metropolitan for review and acceptance a minimum of 30 days before the scheduled start of excavation. Excavation may not begin until t he shoring design is accepted in writing by Metropolitan.
Shoring design submittals must include all required trenches, pits, and tunnel or jacking operations and related calculations. Before starting the shoring design, the design engineer should consult with Metropolitan regarding Metropolitan’s requirements, particularly as to any special procedures that may be required.
10.2 Shoring Design Requirements
Shoring design submittals must be stamped and signed by a California registered civil or structural engineer. The following requirements apply:
A. The submitted shoring must provide appropriate support for soil adjacent to and under Metropolitan’s facilities.
B. Shoring submittals must include detailed procedures for the installation and removal of the shoring.
C. Design calculations must follow the Title 8, Chapter 4, Article 6 of the California Code of Regulations (CCR) guidelines. Accepted methods of analysis must be used.
D. Loads must be in accordance with the CCR guidelines or a soils report by a geotechnical consultant.
E. All members must be secured to prevent sliding, falling, or kickouts.
Metropolitan’s pipelines must be located by potholing under Metropolitan’s supervision before the beginning construction. Use of driven piles within 20 feet of the centerline of Metropolitan’s pipeline is not allowed. Piles installed in drilled holes must have a minimum 2 -foot clearance between Metropolitan’s pipeline and the edge of the drilled hole, and a minimum of 1 -foot clearance between any part of the shoring and Metropolitan’s pipeline.
11.0 Support of Metropolitan Facilities
11.1 Support Design Submittal
If temporary support of a Metropolitan facility is required, the contractor shall submit a support design plan to Metropolitan for review and approval a minimum of 30 days before the scheduled start of work. Work may not begin until the support design is approved in writing by Metropolitan. Before starting design, the design engineer should consult with Metropolitan regarding Metropolitan’s requirements.
11.2 Support Design Requirements
Support design submittals must be prepared, stamped, and signed by a California registered civil or structural engineer. The following requirements apply:
2-56
ATTACHMENT 12-71
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 12 of 22
A. Support drawings must include detailed procedures for the installation and removal of the support system.
B. Design calculations must follow accepted practices, and accepted methods of analysis must be used.
C. Support designs must show uniform support of Metropolitan’s facilities with minimal deflection.
D. The total weight of the facility must be transferred to the support system before supporting soil is fully excavated.
E. All members must be secured to prevent sliding, falling, or kickouts.
12.0 Backfill
12.1 Metropolitan Pipeline Not Supported
In areas where a portion of Metropolitan pipeline is not supported during construction, the backfill under and to an elevation of 6 inches above the top of the pipeline must be one-sack minimum cement sand slurry. To prevent adhesion of the slurry to Metropolitan’s pipeline, a minimum 6 -mil-thick layer of polyethylene sheeting or similar approved sheeting must be placed between the concrete support and the pipeline.
12.2 Metropolitan Pipeline Partially Exposed
In areas where a Metropolitan pipeline is partially exposed during construction, the backfill must be a minimum of 6 inches above the top of the pipeline with sand com - pacted to minimum 90 percent compaction.
12.3 Metropolitan Cut and Cover Conduit on Colorado River Aqueduct (CRA) In areas where a Metropolitan cut and cover conduit is exposed, the following guidelines apply:
A. No vehicle or equipment shall operate over or cross the conduit when the cover is less than 3 feet.
B. Track-type dozer with a gross vehicle weight of 12,000 lbs or less may be used over the conduit when the cover is a minimum of 3 feet.
C. Wheeled vehicles with a gross vehicle weight of 8,000 lbs or less may operate over the conduit when the cover is a minimum of 4 feet.
D. Tracked dozer or wheeled vehicle should be used to push material over the conduit from the side.
E. Tracked dozer or wheeled vehicle should gradually increase cover on one side of the conduit and then cross the conduit and increase cover on the other side of the con - duit. The cover should be increased on one side of the conduit until a maximum of 2 feet of fill has been placed. The cover over th e conduit is not allowed to be more than 2 feet higher on one side of the conduit than on the other side.
F. The cover should be gradually increased over the conduit until the grade elevations have been restored.
2-57
ATTACHMENT 12-72
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 13 of 22
13.0 Piles
13.1 Impacts on Metropolitan Pipelines
Pile support for structures could impose lateral, vertical and seismic loads on Metropolitan’s pipelines. Since the installation of piles could also cause settlement of Metropolitan pipelines, a settlement and/or lateral deformation study may be required for pile installations within 50 feet of Metropolitan’s pipelines. Metropolitan may require additional information per its Geo -technical Guidelines for pile installation. Please contact Metropolitan’s Substructures Team for a copy of the Geotechnical Guidelines.
13.2 Permanent Cast-in-place Piles
Permanent cast-in-place piles must be constructed so that down drag forces of the pile do not act on Metropolitan’s pipeline. The pile must be designed so that down drag forces are not developed from the ground surface to springline of Metropolitan’s pipeline.
Permanent cast-in-place piles shall not be placed closer than 5 feet from the edge of Metropolitan’s pipeline. Metropolitan may require additional information per its Geo - technical Guidelines for pile installation. Please contact Metropolitan’s Substructures Team for a copy of the Geotechnical Guidelines.
14.0 Protective Slabs for Road Crossings Over Metropolitan Pipelines Protective slabs must be permanent cast-in-place concrete protective slabs configured in accordance with Drawing SK-1 (See Figure 2 on Page 22).
The moments and shear for the protective slab may be derived from the American Association of State Highway and Transportation Officials (AASHTO). The following requirements apply:
A. The concrete must be designed to meet the requirements of AASHTO B. Load and impact factors must be in accordance with AASHTO. Accepted methods of analysis must be used.
C. The protective slab design must be stamped and signed by a California registered civil or structural engineer and submitted to Metropolitan with supportin g calculations for review and approval.
Existing protective slabs that need to be lengthened can be lengthened without modification, provided the cover and other loading have not been increased.
15.0 Blasting
At least 90 days prior to the start of any dri lling for rock excavation blasting, or any blasting in the vicinity of Metropolitan’s facilities, a site -specific blasting plan must be submitted to Metropolitan for review and approval. The plan must consist of, but not be limited to, hole diameters, timing sequences, explosive weights, peak particle velocities (PPV) at Metropolitan pipelines/structures, and their distances to blast locations. The PPV must be estimated based on a site -specific power law equation. The power law equation provides the peak pa rticle velocity versus the scaled distance and must be calibrated based on measured values at the site.
2-58
ATTACHMENT 12-73
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 14 of 22
16.0 Metropolitan Plan Review Costs, Construction Costs and Billing
16.1 Plan Review Costs
Metropolitan plan reviews requiring 8 labor hours or les s are generally performed at no cost to the project proponent. Metropolitan plan reviews requiring more than 8 labor hours must be paid by the project proponent, unless the project proponent has superior rights at the project area. The plan review will inc lude a written response detailing Metropolitan’s comments, requirements, and/or approval.
A deposit of funds in the amount of the estimated cost and a signed letter agreement will be required from the project proponent before Metropolitan begins or continues a detailed engineering plan review that exceeds 8 labor hours.
16.2 Cost of Modification of Facilities Performed by Metropolitan Cost of modification work conducted by Metropolitan will be borne by the project proponent, when Metropolitan has paramount/prior rights at the subject location.
Metropolitan will transmit a cost estimate for the modification work to be performed (when it has paramount/prior rights) and will require that a deposit, in the amount of the estimate, be received before the work will be performed.
16.3 Final Billing
Final billing will be based on the actual costs incurred, including engineering plan review, inspection, materials, construction, and administrative overhead charges calculated in accordance with Metropolitan’s standard accounting practices. If the total cost is less than the deposit, a refund will be made; however, if the cost exceeds the deposit, an invoice for the additional amount will be forwarded for payment.
17.0 Street Vacations and Reservation of Easements for Metropolitan A reservation of an easement is required when all or a portion of a public street where Metropolitan facilities are located is to be vacated. The easement must be equal to the street width being vacated or a minimum 40 feet. The reservation must identify Metropolitan as a “public entity” and not a “public utility,” prior to recordation of the vacation or tract map. The reservation of an easement must be submitted to Metropolitan for review prior to final approval.
18.0 Metropolitan Land Use Guidelines
If you are interested in obtaining permission to use Metropolitan land (temporary or long term), a Land Use Form must be completed and submitted to Metropolitan for review and consideration.
A nonrefundable processing fee is required to cover Metropolitan’ s costs for reviewing your request. Land Use Request Forms can be found at:
http://mwdh2o.com/PDF_Doing_Your_Business/4.7.1_Land_Use_Request_form_revised.pdf The request should be emailed to [email protected],or contact the Real Property Development and Management (RPDM) Group at (213) 217-7750. 2-59
ATTACHMENT 12-74
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 15 of 22
After the initial application f orm has been submitted, Metropolitan may require the following in order to process your request:
A. A map indicating the location(s) where access is needed, and the location & size (height, width and depth) of any invasive subsurface activity (boreholes, tren ches, etc.).
B. The California Environmental Quality Act (CEQA) document(s) or studies that have been prepared for the project (e.g., initial study, notice of exemption, Environmental Impact Report (EIR), Mitigated Negative Declaration (MND), etc.).
C. A copy of an ACORD insurance certification naming Metropolitan as an additional insured, or a current copy of a statement of self-insurance.
D. Confirmation of the legal name of the person(s) or entity(ies) that are to be named as the permittee(s) in the entry permit.
E. Confirmation of the purpose of the land use.
F. The name of the person(s) with the authority to sign the documents and any specific signature title block requirements for that person or any other persons required to sign the document (i.e., legal counsel, Board Secretary/Clerk, etc.).
G. A description of any vehicles that will have access to the property. The exact make or model information is not necessary; however, the general vehicle type, expected maximum dimensions (height, length, width), and a specific maximum weight must be provided.
Land use applications and proposed use of the property must be compatible with Metropolitan’s present and/or future use of the property. Any preliminary review of your request by Metropolitan shall not be construed as a promise to grant any property rights for the use of Metropolitan’s property.
19.0 Compliance with Environmental Laws and Regulations As a public agency, Metropolitan is required to comply with all applicable environmental laws and regulations related to the activities it carries out or approves. Consequently, project plans, maps, and other information must be reviewed to determine Metropolitan’s obligations pursuant to state and federal environmental laws and regulations, including, but not limited to:
A. California Environmental Quality Act (CEQA) (Public Resources Code 21000-21177) and the State CEQA Guidelines (California Code of Regulations, Title 14, Division 6, Chapter 3, Sections 1500-15387)
B. Federal Endangered Species Act (ESA) of 1973, 16 U.S.C. §§ 1531, et seq.
C. California Fish and Game Code Sections 2050-2069 (California ESA) D. California Fish and Game Code Section 1602
E. California Fish and Game Code Sections 3511, 4700, 5050 and 5515 (California fully protected species)
F. Federal Migratory Bird Treaty Act (MBTA), 16 U.S.C. §§ 703-712 G. Federal Clean Water Act (including but not limited to Sections 404 and 401) 33 U.S.C. §§ 1342, 1344)
2-60
ATTACHMENT 12-75
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 16 of 22
H. Porter Cologne Water Quality Control Act of 1969, California Water Code §§ 13000- 14076.
I. Title 22, California Code of Regulations, Chapter 16 (California Waterworks Standards), Section 64572 (Water Main Separation)
Metropolitan may require the project applicant to pay for any environmental review, compliance and/or mitigation costs incurred to satisfy such legal obligations. 2-61
ATTACHMENT 12-76
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 17 of 22
20.0 Paramount Rights / Metropolitan’s Rights within Existing Rights- of-Way
Facilities constructed within Metropolitan’s rights -of-way shall be subject to the paramount right of Metropolitan to use its rights -of-way for the purpose for which they were acquired. If at any time Metropolitan or its assigns should, in the exercise of t heir rights, find it necessary to remove or relocate any facilities from its rights -of-way, such removal and replacement or relocation shall be at the expense of the owner of the facility.
21.0 Disclaimer and Information Accuracy
Metropolitan assumes no r esponsibility for the accuracy of the substructure information herein provided. The user assumes responsibility for verifying substructure locations before excavating and assumes all liability for damage to Metropolitan’s facilities as a result of such exc avation.
Additionally, the user is cautioned to conduct surveys and other field investigations as you may deem prudent, to assure that your project plans are correct. The relevant representative from Metropolitan must be called at least two working days, b efore any work activity in proximity to Metropolitan’s facilities.
It generally takes 30 days to review project plans and provide written responses. Metropolitan reserves the right to modify requirements based on case -specific issues and regulatory developments.
2-62
ATTACHMENT 12-77
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 18 of 22
Table 1: General Guidelines for Pipeline Separation between Metropolitan’s Pipeline1 and Sanitary Sewer2 or Hazardous Fluid Pipeline3
Pipeline Crossings Metropolitan requires that sanitary sewer and hazardous fluid pipelines that cross Metropolitan’s pipelines have special pipe construction (no joints) and secondary containment4. This is required for the full width of Metropolitan’s rights-of-way or within 10 feet tangent to the outer edges of Metropolitan’s pipeline within public streets. Additionally, sanitary sewer and hazardous fluid pipelines crossing Metropolitan’s pipelines must be perpendicular and maintain a minimum 1-foot vertical clearance between the top and the bottom of Metropolitan’s pipeline and the pipe casing.
These requirements apply to all sanitary sewer crossings regardless if the sanitary sewer main is located below or above Metropolitan’s pipeline.
Parallel Pipeline Metropolitan generally does not permit the installation of longitudinal pipelines along its rights-of-way. Within public streets, Metropolitan requires that all parallel sanitary sewer, hazardous fluid pipelines and/or non-potable utilities be located a minimum of 10 feet from the outside edges of Metropolitan’s pipelines. When 10-foot horizontal separation criteria cannot be met, longitudinal pipelines require special pipe construction (no joints) and secondary containment4.
Sewer Manhole Sanitary sewer manholes are not allowed within Metropolitan’s rights-of-way. Within public streets, Metropolitan requests manholes parallel to its pipeline be located a minimum of 10 feet from the outside edges of its pipelines. When 10 foot horizontal separation criteria cannot be met, the structure must have secondary containment5.
Notes:
1 Separation distances are measured from the outer edges of each pipe. 2 Sanitary sewer requirements apply to all recycled water treated to less than disinfected tertiary recycled water (disinfected secondary recycled water or less). Recycled water definitions are included in Title 22, California Code of Regulations, Chapter 3 (Water Recycling Criteria), Section 60301. 3 Hazardous fluids include e.g., oil, fuels, chemicals, industrial wastes, wastewater sludge, etc. 4 Secondary Containment for Pipeline - Secondary containment consists of a continuous pipeline sleeve (no joints).
Examples acceptable to Metropolitan include welded steel pipe with grout in annular space and cathodic protection (unless coated with non-conductive material) and High Density Polyethylene (HDPE) pipe with fusion-welded joints. 5 Secondary Containment for Structures – Secondary containment consists of external HDPE liner or other approved method.
2-63
ATTACHMENT 12-78
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 19 of 22
Table 2: General Guidelines for Pipeline Separation between Metropolitan’s Pipeline1 and Storm Drain and/or Disinfected Tertiary Recycled Water2
Pipeline Crossings Metropolitan requires crossing pipelines to be special pipe construction (no joints) or have secondary containment3 within 10-feet tangent to the outer edges of Metropolitan’s pipeline.
Additionally, pipelines crossing Metropolitan’s pipelines must be perpendicular and maintain a minimum 1-foot vertical clearance.
Parallel Pipeline Metropolitan generally does not permit the installation of longitudinal pipelines along its rights-of-way. Within public streets, Metropolitan requests that all parallel pipelines be located a minimum of 10 feet from the outside edges of
Metropolitan’s pipelines. When 10-foot horizontal separation criteria cannot be met, special pipe construction (no joints) or secondary containment3 are required.
Storm Drain
Manhole
Permanent utility structures (e.g., manhole. catch basin, inlets) are not allowed within Metropolitan’s rights-of-way. Within public streets, Metropolitan requests all structures parallel to its pipeline be located a minimum of 10 feet from the outside edges of its pipelines. When 10 foot horizontal separation criteria cannot be met, the structure must have secondary containment4.
Notes:
1 Separation distances are measured from the outer edges of each pipe. 2 Disinfected tertiary recycled water as defined in Title 22, California Code of Regulations, Chapter 3 (Water Recycling Criteria), Section 60301.
3 Secondary Containment for Pipeline - Secondary containment consists of a continuous pipeline sleeve (no joints).
Examples acceptable to Metropolitan include welded steel pipe with grout in annular space and cathodic protection (unless coated with non-conductive material) and High Density Polyethylene (HDPE) pipe with fusion-welded joints. 4 Secondary Containment for Structures – Secondary containment consists of external HDPE liner or other approved method.
2-64
ATTACHMENT 12-79
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 20 of 22
Table 3: General Guidelines for Pipeline Separation1 between Metropolitan’s Pipeline and Recycled Water2,4 Irrigations
Pressurized recycled
irrigation mainlines
• Crossings - must be perpendicular and maintain a minimum 1-foot vertical clearance. Crossing pressurized recycled irrigation mainlines must be special pipe construction (no joints) or have secondary containment3 within 10-feet tangent to the outer edges of Metropolitan’s pipeline.
• Longitudinal - must maintain a minimum 10-foot horizontal separation and route along the perimeter of Metropolitan’s rights- of-way where possible.
Intermittently
Energized Recycled
Water Irrigation
System Components
• Crossings - must be perpendicular and maintain a minimum 1-foot vertical clearance. Crossing irrigation laterals within 5-feet tangent to the outer edges of Metropolitan’s pipeline must be special pipe construction (no joints) or have secondary containment3. • Longitudinal – must maintain a minimum 5-foot horizontal separation between all intermittently energized recycled water irrigation system components (e.g. irrigation lateral lines, control valves, rotors) and the outer edges of Metropolitan’s pipeline.
Longitudinal irrigation laterals within 5-feet tangent to the outer edges of Metropolitan’s pipeline must be special pipe construction (no joints) or have secondary containment3.
Irrigation Structures Irrigation structures such as meters, pumps, control valves, etc. must be located outside of Metropolitan’s rights-of-way.
Irrigation spray rotors
near Metropolitan’s
aboveground facilities
Irrigation spray rotors must be located a minimum of 20-foot from any Metropolitan above ground structures with the spray direction away from these structures. These rotors should be routinely maintained and adjusted as necessary to ensure no over-spray into 20-foot clear zones.
Irrigations near open
canals and aqueducts
Irrigation with recycled water near open canals and aqueducts will require a setback distance to be determined based on site-specific conditions. Runoff of recycled water must be contained within an approved use area and not impact Metropolitan facilities.
Appropriate setbacks must also be in place to prevent overspray of recycled water impacting Metropolitan’s facilities.
Notes:
1 Separation distances are measured from the outer edges of each pipe. 2 Requirements for recycled water irrigation apply to all levels of treatment of recycled water for non-potable uses.
Recycled water definitions are included in Title 22, California Code of Regulations, Chapter 3 (Water Recycling Criteria), Section 60301.
3 Secondary Containment for Pipeline - Secondary containment consists of a continuous pipeline sleeve (no joints).
Examples acceptable to Metropolitan include welded steel pipe with grout in annular space and cathodic protection (unless coated with non-conductive material) and High Density Polyethylene (HDPE) pipe with fusion-welded joints. 4 Irrigation with recycled water shall not be applied directly above Metropolitan’s treated water pipelines. 2-65
ATTACHMENT 12-80
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES Issue Date: July 2018 Page 21 of 22
Figure 1: AASHTO H-20 Loading
Note: The H loadings consist of a two -axle truck or the corresponding lane loadings as illustrated above. The H loadings are designated “H” followed by a number indicating the gross weight in tons of the standard truck. 2-66
ATTACHMENT 12-81
Issue Date: July 2018 Page 22 of 22
The Metropolitan Water District of Southern California IMPROVEMENTS AND CONSTRUCTION GUIDELINES
Figure 2: Drawing SK-1
2-67
ATTACHMENT 12-82
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letter A-4
COMMENTER: Dianne Doesserich, Team Manager, Environmental Planning Section, Metropolitan Water District of Southern California
DATE: March 30, 2022
Response A-4.1
The commenter provides a description of the Project and provides background information on the Metropolitan Water District of Southern California (Metropolitan).
The comment is noted. Individual responses to Metropolitan’s comments are provided below.
Response A-4.2
The commenter states that implementation of the Project could result in potential impacts to Metropolitan’s Santa Monica Feeder and East Valley Feeder pipelines and appurtenant. The comment also notes a map of the facilities in relation to the Project has been attached to the letter and states that it will be necessary for the City to consider these facilities in its project planning.
The comment is noted, but does not raise specific concerns that pertain to the adequacy of the EIR.
Individual development projects accommodated under the Housing Element Update will be evaluated to determine proximity to these facilities and whether the proposed projects could result in potential impacts to these facilities.
Response A-4.3
The commenter states that Metropolitan requires that any future design plans for development accommodated under the Project that are located in the area of Metropolitan’s pipelines be submitted to Metropolitan for review and written approval. The comment also provides information to assist applicants with preparing project plans that are compatible with Metropolitan’s facilities and easements, including the “Guidelines for Improvements and Construction Projects Proposed in the Area of Metropolitan’s Facilities and Rights-of-Way,” which is attached to the letter.
The comment is noted, but does not raise specific concerns that pertain to the adequacy of the EIR.
Metropolitan is currently on the City’s list of agencies to contact for all CEQA documents and therefore, will have the opportunity to review all future projects going through the CEQA process.
The attachment detailing information to assist applicants with preparing project plans that are compatible with Metropolitan’s facilities and easements is acknowledged but is not relevant to the adequacy of the Draft EIR.
Response A-4.4
The commenter encourages individual projects under the Housing Element Update to use mitigation measures, such as using water efficient fixtures, drought-tolerant landscaping, and reclaimed water, to offset any increase in water use associated with the project.
Policy 3.9 of the Housing Element encourages the use of sustainable and green building design features in new and existing housing, such as working with Burbank Water and Power, and other partners, on energy retrofit programs.
2-68
ATTACHMENT 12-83
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Response A-4.5
The commenter notes their appreciation to provide input in the planning process and looks forward to receiving future documentation and plans for this project.
This comment does not pertain to the analysis and findings of the Draft EIR. As required under CEQA, the agency will be provided notice of the Final EIR and any forthcoming hearing date(s) for the project.
2-69
ATTACHMENT 12-84
P: (626) 381
-9248
F: (626) 389-5414
E: info
@mitchtsailaw.com
Mitc
hell M. Tsai
Attor
ney At Law
139 South Hudson
Avenue
Suite 200
Pasa
dena, California 91101
VIA E-M
AIL
Marc
h 14, 2022
Shipra Rajesh, Associate Planner
City of Burbank
275 East Olive Avenue, P.O. Box 6459
Burbank, CA 91510-6459
Em: [email protected]
Zizette M
ullins, City Clerk
City of Burbank
275 East Olive Avenue, P.O. Box 6459
Burbank, CA 91510-6459
Em: [email protected]
RE: Cit
y of Burbank’s 6th Cycle Housing Element Update (SCH#:
2021020393
).
Dear S
hipra Rajesh and Zizette Mullins,
On behalf of the Southwest Regional Council of Carpenters (“Southwest Carpenter” or “SWRCC”), my Office is submitting these comments for the City of Burbank’s (“City”) March 14, 2022 Planning Board Meeting for its draft 2021-2029 update to the City’s General Plan Housing Element (“Project”).
The Southwest Carpenters is a labor union representing 50,000 union carpenters in six states, including California, and has a strong interest in well ordered land use planning and addressing the environmental impacts of development projects.
Individual members of the Southwest Carpenters live, work and recreate in the City and surrounding communities and would be directly affected by the Project’s environmental impacts.
SWRCC expressly reserves the right to supplement these comments at or prior to hearings on the Project, and at any later hearings and proceedings related to this Project. Cal. Gov. Code § 65009(b); Cal. Pub. Res. Code § 21177(a); Bakersfield Citizens Letter O-1
1 2-70
ATTACHMENT 12-85
City o
f Burbank – 6th Cycle Housing Element Update
March 14, 2022
for L
ocal Control v. Bakersfield (2004) 124 Cal. App. 4th 1184, 1199-1203; see Galante Vineyards v. Monterey Water Dist. (1997) 60 Cal. App. 4th 1109, 1121.
SWRCC incorporates by reference all comments raising issues regarding the EIR submitted prior to certification of the EIR for the Project. Citizens for Clean Energy v City of Woodland (2014) 225 Cal. App. 4th 173, 191 (finding that any party who has objected to the Project’s environmental documentation may assert any issue timely raised by other parties).
Moreover, SWRCC requests that the City provide notice for any and all notices referring or related to the Project issued under the California Environmental Quality Act (“CEQA”), Cal Public Resources Code (“PRC”) § 21000 et seq, and the California Planning and Zoning Law (“Planning and Zoning Law”), Cal. Gov’t Code §§ 65000–65010. California Public Resources Code Sections 21092.2, and 21167(f) and Government Code Section 65092 require agencies to mail such notices to any person who has filed a written request for them with the clerk of the agency’s governing body.
The City should require the use of a local skilled and trained workforce to benefit the community’s economic development and environment. The City should require the use of workers who have graduated from a Joint Labor Management apprenticeship training program approved by the State of California, or have at least as many hours of on-the-job experience in the applicable craft which would be required to graduate from such a state approved apprenticeship training program or who are registered apprentices in an apprenticeship training program approved by the State of California.
Community benefits such as local hire and skilled and trained workforce requirements can also be helpful to reduce environmental impacts and improve the positive economic impact of the Project. Local hire provisions requiring that a certain percentage of workers reside within 10 miles or less of the Project Site can reduce the length of vendor trips, reduce greenhouse gas emissions and providing localized economic benefits. Local hire provisions requiring that a certain percentage of workers reside within 10 miles or less of the Project Site can reduce the length of vendor trips, reduce greenhouse gas emissions and providing localized economic benefits. As environmental consultants Matt Hagemann and Paul E. Rosenfeld note:
[A]ny local hire requirement that results in a decreased worker trip length from the default value has the potential to result in a reduction of construction-related GHG emissions, though the significance of the 1 cont.
2 2-71
ATTACHMENT 12-86
City o
f Burbank – 6th Cycle Housing Element Update
March 14, 2022
redu
ction would vary based on the location and urbanization level of the project site.
March 8, 2021 SWAPE Letter to Mitchell M. Tsai re Local Hire Requirements and Considerations for Greenhouse Gas Modeling.
Skilled and trained workforce requirements promote the development of skilled trades that yield sustainable economic development. As the California Workforce Development Board and the UC Berkeley Center for Labor Research and Education concluded:
. . . labor should be considered an investment rather than a cost – and investments in growing, diversifying, and upskilling California’s workforce can positively affect returns on climate mitigation efforts. In other words, well trained workers are key to delivering emissions reductions and moving California closer to its climate targets.
1 Loca
l skilled and trained workforce requirements and policies have significant environmental benefits since they improve an area’s jobs-housing balance, decreasing the amount of and length of job commutes and their associated greenhouse gas emissions. Recently, on May 7, 2021, the South Coast Air Quality Management District found that that the “[u]se of a local state-certified apprenticeship program or a skilled and trained workforce with a local hire component” can result in air pollutant reductions.
2 Cities
are increasingly adopting local skilled and trained workforce policies and requirements into general plans and municipal codes. For example, the City of Hayward 2040 General Plan requires the City to “promote local hiring . . . to help
1 Cali
fornia Workforce Development Board (2020) Putting California on the High Road: A Jobs and Climate Action Plan for 2030 at p. ii, available at https:
//laborcenter.berkeley.edu/
wp-cont
ent/uploads/2020/09/Putting-California-on-the-High-Road.pdf. 2 South
Coast Air Quality Management District (May 7, 2021) Certify Final Environmental Assessment and Adopt Proposed Rule 2305 – Warehouse Indirect Source Rule – Warehouse Actions and Investments to Reduce Emissions Program, and Proposed Rule 316 – Fees for Rule 2305, Submit Rule 2305 for Inclusion Into the SIP, and Approve Supporting Budget Actions, available at http://w
ww.aqmd.gov/docs/default-
source
/Agendas/Governing-Board/2021/2021-May7-027.pdf?sfvrsn=10 2 cont.
3 4
2-72
ATTACHMENT 12-87
City o
f Burbank – 6th Cycle Housing Element Update
March 14, 2022
achieve a
more positive jobs-housing balance, and reduce regional commuting, gas consumption, and greenhouse gas emissions.”3
In fact
, the City of Hayward has gone as far as to adopt a Skilled Labor Force policy into its Downtown Specific Plan and municipal code, requiring developments in its Downtown area to requiring that the City “[c]ontribute to the stabilization of regional construction markets by spurring applicants of housing and nonresidential developments to require contractors to utilize apprentices from state-approved, joint labor-management training programs, . . .”
4 In addi
tion, the City of Hayward requires
all projects 30,000 square feet or larger to “utilize apprentices from state-approved, joint labor-management training programs.”5
Locat
ing jobs closer to residential areas can have significant environmental benefits. .
As the California Planning Roundtable noted in 2008:
People who live and work in the same jurisdiction would be more likely to take transit, walk, or bicycle to work than residents of less balanced communities and their vehicle trips would be shorter. Benefits would include potential reductions in both vehicle miles traveled and vehicle hours traveled.
6 In ad
dition, local hire mandates as well as skill training are critical facets of a strategy to reduce vehicle miles traveled. As planning experts Robert Cervero and Michael Duncan noted, simply placing jobs near housing stock is insufficient to achieve VMT reductions since the skill requirements of available local jobs must be matched to those held by local residents.
7 Some
municipalities have tied local hire and skilled and
3 City
of Hayward (2014) Hayward 2040 General Plan Policy Document at p. 3-99, available at https://www.hayward-ca.gov/sites/default/files/documents/General_Plan_FINAL.pdf. 4 City
of Hayward (2019) Hayward Downtown Specific Plan at p. 5-24, available at http
s://www.hayward-ca.gov/sites/default/files/Hayward%20Downtown% 20Specif
ic%20Plan.pdf.
5 City o
f Hayward Municipal Code, Chapter 10, § 28.5.3.020(C).
6 Cali
fornia Planning Roundtable (2008) Deconstructing Jobs-Housing Balance at p. 6, available at https:
//cproundtable.org/static/media/uploads/publications/cpr-jobs- housing.
pdf
7 Cerv
ero, Robert and Duncan, Michael (2006) Which Reduces Vehicle Travel More: Jobs- Housing Balance or Retail-Housing Mixing? Journal of the American Planning Association 72 (4), 475-490, 482, available at http://r
econnectingamerica.org/assets/Uploads/UTCT-
825.pdf.
4 cont.
5 2-73
ATTACHMENT 12-88
City o
f Burbank – 6th Cycle Housing Element Update
March 14, 2022
train
ed workforce policies to local development permits to address transportation issues. As Cervero and Duncan note:
In nearly built -out Berkeley, CA, the approach to balancing jobs and housing is to create local jobs rather than to develop new housing.” The city’s First Source program encourages businesses to hire local residents, especially for entry- and intermediate-level jobs, and sponsors vocational training to ensure residents are employment -ready. While the program is voluntary, some 300 businesses have used it to date, placing more than 3,000 city residents in local jobs since it was launched in 1986. When needed, these carrots are matched by sticks, since the city is not shy about negotiating corporate participatio n in First Source as a condition of approval for development permits.
The City should consider utilizing skilled and trained workforce policies and requirements to benefit the local area economically and mitigate greenhouse gas, air quality and transportation impacts.
Sincerely,
______________________
Mitchell M. Tsai
Attorneys for Southwest Regional
Council of Carpenters
Attached:
March 8, 2021 SWAPE Letter to Mitchell M. Tsai re Local Hire Requirements and Considerations for Greenhouse Gas Modeling (Exhibit A); Air Quality and GHG Expert Paul Rosenfeld CV (Exhibit B); and Air Quality and GHG Expert Matt Hagemann CV (Exhibit C). 5 cont.
6 2-74
ATTACHMENT 12-89
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letter O-1
COMMENTER: Mitchell M. Tsai, Attorney, on behalf of Southwest Regional Council of Carpenters (SWRCC)
DATE: March 14, 2022
Response O-1.1
The commenter offers an introduction to the labor union that is submitting the comment and notes the legal precedents for commenting on an EIR under CEQA during the approval process. The commenter requests that the City of Burbank send all notices referring or related to the Project to SWRCC.
SWRCC has been added to the Project mailing list. Individual responses to each comment are provided below.
Response O-1.2
The commenter states that the City should require the use of a local skilled and trained workforce to benefit the community’s economic development and environment. The commenter provides supporting statements and notes that local hire and skilled and trained workforce requirements would assist with reducing environmental impacts and improving the Project’s economic impact as the length of vendor trips would likely be reduced due to workers residing within 10 miles or less of the project sites, resulting in a reduction in greenhouse gas (GHG) emissions as well as localized economic benefits.
Implementation of the requirement to use a local skilled and trained workforce is beyond the scope of the Draft EIR since labor and employment is not a required topic under CEQA. Nonetheless, the commenter’s recommendations are noted for review and consideration by the City’s decision- makers. In addition, as discussed in Section 4.5, Greenhouse Gas Emissions, of the Draft EIR, the Project’s impacts to GHG emissions would be less than significant because the Housing Element Update would be consistent with measures from the State Scoping Plan and GHG emission would not exceed per capita emissions levels identified in the State Scoping Plan. The Housing Element Update would also be consistent with the goals of the 2020-2045 SCS/RTP and the Burbank2035 Greenhouse Gas Reduction Plan.
Response O-1.3
The commenter quotes statements from the GHG technical report attached to the letter and notes that skilled and trained workforce requirements and policies have significant environmental benefits as they improve an area’s jobs-housing balance, decreasing the amount of and length of job commutes and their associated GHG emissions.
Refer to Response O-1.2 regarding skilled and trained workforce requirements and policies and associated GHG emissions.
2-75
ATTACHMENT 12-90
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Response O-1.4
The commenter notes that cities are increasingly adopting local skilled and trained workforce policies and requirements into general plans and municipal codes and provides the City of Hayward as an example.
The comment is noted, but does not raise specific concerns that pertain to the adequacy of the Draft EIR. The comment will be provided to the City’s decisionmakers for their consideration. No further response is required.
Response O-1.5
The commenter provides supporting statements and notes that local hire mandates and skill training are critical facets of a strategy to reduce VMT and that placing jobs near housing is insufficient to achieve VMT reductions since the skill requirements of available local jobs must be matched to those held by local residents. The commenter also provides supporting statements and notes that some municipalities have tied local hire and skilled and trained workforce policies to local development permits to address transportation issues.
Refer to Response O-1.2 regarding skilled and trained workforce requirements and policies and associated GHG emissions.
Response O-1.6
The commenter states that the City should consider utilizing skilled and trained workforce policies and requirements to benefit the local area economically and mitigate GHG, air quality, and transportation impacts.
Refer to Response O-1.2 regarding skilled and trained workforce requirements and policies and associated GHG emissions.
2-76
ATTACHMENT 12-91
From: Enrique Apodaca Sent: Sunday, March 13, 2022 6:56 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Enrique Apodaca, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Enrique Apodaca
Letter O-2
2-77
ATTACHMENT 12-92
From: Shaun M
Sent: Sunday, March 13, 2022 6:59 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Shaun Mieure, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Shaun Mieure
Letter O-3
2-78
ATTACHMENT 12-93
From: Herbert Hardy Sent: Sunday, March 13, 2022 7:00 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Herbert Hardy, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
- General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Herbert Hardy
Letter O-4
2-79
ATTACHMENT 12-94
From: Joel Perez Sent: Sunday, March 13, 2022 7:00 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Joel Perez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Joel Perez
Sent from my iPhone
Letter O-5
2-80
ATTACHMENT 12-95
From: Ivan Burgara Sent: Sunday, March 13, 2022 7:01 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Ivan Burgara, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Ivan Burgara
Letter O-6
2-81
ATTACHMENT 12-96
From: Eric Valles Sent: Sunday, March 13, 2022 7:03 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is EricValles , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Eric Valles
Letter O-7
2-82
ATTACHMENT 12-97
From: Adrian Gudino Sent: Sunday, March 13, 2022 7:08 PM To: Rajesh, Shipra Subject: Item no 1 Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Adrian Gudino, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Adrian Gudino
Letter O-8
2-83
ATTACHMENT 12-98
From: Blake E Powell Sent: Sunday, March 13, 2022 7:17 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Blake Powell , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Blake Powell
--
Blake E. Powell
Carpenter / NFS CPFC Services
Cell: 805-796-0291
“A team isn’t a bunch of kids out to win.
A team is something you belong to,
something you feel,
something you have to earn.”
- - - Coach Gordon Bombay.
Letter O-9
2-84
ATTACHMENT 12-99
From: Peter Rodriguez Sent: Sunday, March 13, 2022 7:21 PM To: Rajesh, Shipra Cc: [email protected] Subject: Email: [email protected] Subject: Item No. 1- Burbank Housing Element Associate Planner Rajesh, Hi, my name is ____________,Peter Rodriguez I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 wor...
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Sent from my iPhone
Letter O-10
2-85
ATTACHMENT 12-100
From: Steven McClenthen Sent: Sunday, March 13, 2022 7:29 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is ____________, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Your name here
Letter O-11
2-86
ATTACHMENT 12-101
From: Dan Langford Sent: Sunday, March 13, 2022 8:27 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Dan Langford, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area.
We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather than simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self-perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Dan Langford
Vice President - Western District
Mobile: 213.216.5134
Office: 702.407.1007
United Brotherhood of Carpenters and Joiners of America carpenters.org
Letter O-12
2-87
ATTACHMENT 12-102
The content of this email is confiden al and in tended for the recipient specified in message only. It is strictly forbidden to share any part of this message with any third party, without a wri en consent of the sender. If you received this message by mistake, please reply to this message and follow with its dele on, so tha t we can ensure such a mistake does not occur in the future. 2-88
ATTACHMENT 12-103
From: VICTOR CAMPOSECO Sent: Sunday, March 13, 2022 8:57 PM To: Rajesh, Shipra Subject: No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
A en on: Associate Planner Rajesh,
Hi, my name is Victor Camposeco, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which includes members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family- suppor ng w ages, skills training, and job access to the community members rather than simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans.
-Skilled and trained workforce standards through cer fied appr en ceship. -Paid sick leave. Pension, and vaca on hol iday pay.
High-quality responsible bidder standards should be established to ensure high-quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Victor Camposeco
Letter O-13
2-89
ATTACHMENT 12-104
From: Danny Ayala Sent: Sunday, March 13, 2022 9:17 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Daniel Ayala, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Daniel Ayala
Letter O-14
2-90
ATTACHMENT 12-105
From: [email protected] Sent: Sunday, March 13, 2022 9:24 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Thomas Cummings, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Tom Cummings
Sent from my iPhone
Letter O-15
2-91
ATTACHMENT 12-106
From: Jose Salcedo Sent: Sunday, March 13, 2022 9:26 PM To: Rajesh, Shipra Subject: Item No.1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Jose Salcedo ____________, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jose Salcedo
Letter O-16
2-92
ATTACHMENT 12-107
From: Leonel Serrano Sent: Sunday, March 13, 2022 9:48 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Leo Serrano, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Leo Serrano
Sent from my iPhone
Letter O-17
2-93
ATTACHMENT 12-108
From: david benzie Sent: Monday, March 14, 2022 12:03 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is ______David A Benzie______, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
David A Benzie
Sent from Yahoo Mail on Android
Letter O-18
2-94
ATTACHMENT 12-109
From: ALBERTO GARCIA Sent: Monday, March 14, 2022 5:15 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Alberto Garcia,I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Alberto Garcia
Letter O-19
2-95
ATTACHMENT 12-110
From: Josue Solis Sent: Monday, March 14, 2022 6:14 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Josue Solis Quinones I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Josue solis Quinones
Letter O-20
2-96
ATTACHMENT 12-111
From: Daniel Hackler Sent: Monday, March 14, 2022 6:27 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Daniel Hackler, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Daniel Hackler
Letter O-21
2-97
ATTACHMENT 12-112
From: marco saucedo Sent: Monday, March 14, 2022 6:29 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Marco Saucedo , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Marco Saucedo
Sent from Yahoo Mail for iPhone
Letter O-22
2-98
ATTACHMENT 12-113
From: Nicolas Reyes <[email protected]> Sent: Monday, March 14, 2022 7:24 AM To: Rajesh, Shipra Subject: Item No 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click li nks or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Nicolas , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require; -Full family health plans -Skilled and trained workforce standards through cer fied appr en ceship -P aid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance; -Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a. work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be� er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Nicolás Reyes
Sent from my iPhone
Letter O-23
2-99
ATTACHMENT 12-114
A close up of
a sign
Description
automatically
generated
Thank You,
Sean Mann
Special Representative
Mobile:
213.817.0642
Southwest Regional Council of Carpenters
swcarpenters.org
s
ign
s
ign
s
ign
s
ign
Download our app:
Google Play | iTunes App Store
From: Sean Mann Sent: Monday, March 14, 2022 7:45 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Sean Mann, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
Letter O-24
2-100
ATTACHMENT 12-115
From: Brandon Solorzano Sent: Monday, March 14, 2022 7:46 AM To: Rajesh, Shipra Subject: Item No. 1 - Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Brandon Alexander Solorzano. I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Brandon Alexander Solorzano
Sent from my iPhone
Letter O-25
2-101
ATTACHMENT 12-116
From: Michael Zamora Sent: Monday, March 14, 2022 8:00 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Michael Zamora I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Michael Zamora
Sent from my iPhone
Letter O-26
2-102
ATTACHMENT 12-117
From: Jason Green Sent: Monday, March 14, 2022 8:06 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hello, my name is Jason Green, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship
-Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a
Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jason Green
Get
Outlook for iOS
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that Letter O-27
2-103
ATTACHMENT 12-118
any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
2-104
ATTACHMENT 12-119
From: Alejandro Casillas Sent: Monday, March 14, 2022 8:24 AM To: Rajesh, Shipra Subject: Associate Planner Rajesh Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Alejandro Casillas , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters
Alejandro Casillas
Letter O-28
2-105
ATTACHMENT 12-120
From: Daniel Velarde Sent: Monday, March 14, 2022 8:25 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Daniel Velarde, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Sent from my iPhone
Letter O-29
2-106
ATTACHMENT 12-121
From: Erick Villavicencio Sent: Monday, March 14, 2022 8:25 AM To: Rajesh, Shipra Subject: Subject: Item No. 1- Burbank Housing Element Associate Planner Rajesh, Hi, my name is Erick Villavicencio , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which includ...
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Sent from my iPhone
Letter O-30
2-107
ATTACHMENT 12-122
From: Michael Zamora Sent: Monday, March 14, 2022 8:25 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Michael Zamora I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Michael Zamora
Sent from my iPhone
Letter O-31
2-108
ATTACHMENT 12-123
From: Harm Veen Sent: Monday, March 14, 2022 8:26 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Harm Veen , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Harm Veen
Letter O-32
2-109
ATTACHMENT 12-124
From: Edgardo Franco Sent: Monday, March 14, 2022 8:27 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Edgardo Franco , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Edgardo Franco
Letter O-33
2-110
ATTACHMENT 12-125
From: adam abdalla Sent: Monday, March 14, 2022 8:28 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Adam Abdalla, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Adam Abdalla
Letter O-34
2-111
ATTACHMENT 12-126
From: Eliezer Roldan Sent: Monday, March 14, 2022 8:28 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Eliezer Roldan, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Eliezer Roldan
Letter O-35
2-112
ATTACHMENT 12-127
Sent from my iPhone
2-113
ATTACHMENT 12-128
From: Kamran Sepanlou Sent: Monday, March 14, 2022 8:28 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Kamran Sepanlou, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Kamran S Sepanlou
Letter O-36
2-114
ATTACHMENT 12-129
2-115
ATTACHMENT 12-130
From: Alberto Sandobal Sent: Monday, March 14, 2022 8:31 AM To: Rajesh, Shipra Subject: Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Alberto Sandobal Ruiz , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Alberto Sandobal Ruiz
Letter O-37
2-116
ATTACHMENT 12-131
Sent from my iPhone
2-117
ATTACHMENT 12-132
From: [email protected] Sent: Monday, March 14, 2022 8:31 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Luis Ochoa , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Luis Ochoa
Letter O-38
2-118
ATTACHMENT 12-133
Sent from the all new AOL app for iOS
2-119
ATTACHMENT 12-134
From: Michael Alfaro Sent: Monday, March 14, 2022 8:31 AM To: Rajesh, Shipra Subject: Quality work
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Michael Alfaro I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Michael Alfaro
Sent from my iPhone
Letter O-39
2-120
ATTACHMENT 12-135
From: dra Med
Sent: Monday, March 14, 2022 8:32 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is ____________, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Letter O-40
2-121
ATTACHMENT 12-136
From: Celes no R odriguez Sent: Monday, March 14, 2022 8:33 AM To: Rajesh, Shipra Subject: Ítem no 1_ Burbank housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Associate Planner Rajesh,
Hi, my name is celes no I am a loc al union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Celes no R odríguez
Letter O-41
2-122
ATTACHMENT 12-137
From: Gustavo Ramirez Sent: Monday, March 14, 2022 8:39 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Gustavo Ramirez Guerrero, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Gustavo Ramirez Guerrero.
Letter O-42
2-123
ATTACHMENT 12-138
Associate Planner Rajesh,
Hi, my name is Matthew Rodriguez, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
- General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Matthew Rodriguez
Letter O-43
2-124
ATTACHMENT 12-139
From: salvador camacho Sent: Monday, March 14, 2022 8:39 AM To: Rajesh, Shipra Subject: Item No.1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Salvador Camacho, i am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Salvador Camacho
Letter O-44
2-125
ATTACHMENT 12-140
From: Abdul Rehman Ashfaq Sent: Monday, March 14, 2022 8:46 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Abdul Ashfaq , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Abdul Ashfaq
Letter O-45
2-126
ATTACHMENT 12-141
From: alejandro porcayo Sent: Monday, March 14, 2022 8:54 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Alejandro Porcayo, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Alejandro Porcayo
Sent from my iPhone
Letter O-46
2-127
ATTACHMENT 12-142
From: Carlos Perez Sent: Monday, March 14, 2022 8:54 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Carlos Perez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Carlos Perez
Sent from Yahoo Mail for iPhone
Letter O-47
2-128
ATTACHMENT 12-143
From: [email protected] Sent: Monday, March 14, 2022 8:54 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jeremy Diaz, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jeremy Diaz
Letter O-48
2-129
ATTACHMENT 12-144
From: Freddy Fernandez Sent: Monday, March 14, 2022 8:55 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Freddy Fernandez , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Freddy Fernandez
Letter O-49
2-130
ATTACHMENT 12-145
From: Kevin Jimenez Sent: Monday, March 14, 2022 8:55 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Kevin Jimenez I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices. - General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Kevin Jimenez
Letter O-50
2-131
ATTACHMENT 12-146
From: william galindo Sent: Monday, March 14, 2022 8:55 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is William Galindo , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
William Galindo
Letter O-51
2-132
ATTACHMENT 12-147
From: Magdalenomarneḁz Marneḁz Sent: Monday, March 14, 2022 8:56 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Magdaleno Marneḁz, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng wages, skills training and job access to the community members rather then simply accep ng projects founded on low costs and low wages. Specifically:
The construc on workforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appren ceship -Paid sick leave. Pension, and vaca on-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cra work for which they are responsible.
We believe all Burbank locals deserve an innova ve economic soluon thaȁt puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Your name here
Letter O-52
2-133
ATTACHMENT 12-148
From: Anthony Tamayo Sent: Monday, March 14, 2022 8:57 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is anthony tamayo i am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Anthony tamayo
Letter O-53
2-134
ATTACHMENT 12-149
From: Jonathan Cordova Sent: Monday, March 14, 2022 8:58 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jonathan, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-hol iday pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jonathan Cordova
Letter O-54
2-135
ATTACHMENT 12-150
From: manuelaguirre633 Sent: Monday, March 14, 2022 8:58 AM To: Rajesh, Shipra Subject: Ítem no 1 burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is manuel benjamin Aguirre duarte, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Manuel aguirre
Sent from my T-Mobile 4G LTE Device
Letter O-55
2-136
ATTACHMENT 12-151
From: [email protected] Sent: Monday, March 14, 2022 9:00 AM To: Rajesh, Shipra Subject: Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Carlos , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng wages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Carlos Carbajal
Letter O-56
2-137
ATTACHMENT 12-152
Sent from my iPhone
2-138
ATTACHMENT 12-153
From: Emilio sandoval Sent: Monday, March 14, 2022 10:24 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Emilio Sandoval , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Emilio Sandoval
Letter O-57
2-139
ATTACHMENT 12-154
From: Ramiro Reyes Sent: Monday, March 14, 2022 11:41 AM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Ramiro Reyes, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Roberto Reyes
Letter O-58
2-140
ATTACHMENT 12-155
From: Mitch Cu s Sent: Monday, March 14, 2022 12:04 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Mitch Cu s and I am a loc al union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Mitch Cu s
--
Mitch Cu s
Sláinte
Letter O-59
2-141
ATTACHMENT 12-156
From: Jesus Rodriguez Sent: Monday, March 14, 2022 12:47 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is EDUARDO DIAZ, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
EDUARDO DIAZ
Letter O-60
2-142
ATTACHMENT 12-157
From: Mar n Arz ola Sent: Monday, March 14, 2022 1:02 PM To: Rajesh, Shipra Subject: Mar n Arz ola 562
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Mar n Arz ola, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Your name here
Letter O-61
2-143
ATTACHMENT 12-158
From: Dmitri Turner Sent: Monday, March 14, 2022 1:05 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Dmitri , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Dmitri Turner
Sent from my iPhone
Letter O-62
2-144
ATTACHMENT 12-159
From: Jay on a r6 go fast Sent: Monday, March 14, 2022 2:04 PM To: Rajesh, Shipra Subject: Item #1 burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is josh, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Josh trejo
Letter O-63
2-145
ATTACHMENT 12-160
From: Joe Fuchs Sent: Monday, March 14, 2022 2:32 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name isJoseph Fuchs , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Joe Fuchs
Sent from my iPhone
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
Letter O-64
2-146
ATTACHMENT 12-161
From: o che wy Sent: Monday, March 14, 2022 3:58 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jesus Gamez am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jesus Gamez
Letter O-65
2-147
ATTACHMENT 12-162
From: Anthony Perez Sent: Thursday, March 24, 2022 1:54 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Anthony Perez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member
Sent from my iPhone
Letter O-66
2-148
ATTACHMENT 12-163
From: Manuel Vazquez Sent: Thursday, March 24, 2022 1:54 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Emmanuel Vazquez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Emmanuel Vazquez
Letter O-67
2-149
ATTACHMENT 12-164
From: Hector Aguilar Sent: Thursday, March 24, 2022 1:54 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Hector Aguilar , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship
-Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices. - General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Hector Aguilar
Letter O-68
2-150
ATTACHMENT 12-165
From: fredy mar ne z Sent: Thursday, March 24, 2022 1:56 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is fredy mar ne z, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Fredy mar ne z
Letter O-69
2-151
ATTACHMENT 12-166
From: Ian Letelier Sent: Thursday, March 24, 2022 1:56 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Ian Leteier, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
IAN LETELIER
Letter O-70
2-152
ATTACHMENT 12-167
From: Robert Acedo Sent: Thursday, March 24, 2022 1:59 PM To: Rajesh, Shipra
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Robert F Acedo Jr I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member, Robert Acedo jr
Letter O-71
2-153
ATTACHMENT 12-168
1 From: Ian Letelie
r <[email protected]>
Sent: Thursday, March 24,
2022 2:02 PM
To: Rajesh, Shipra
Subject: Item No. 1- Burbank
Housing Element
CAUTION:
This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Associate P
lanner Rajesh,
Hi, my name is Veronica Leteier , I am a local union carpenter’s wife out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
- General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all
Burbank locals deserve an innovative economic solution that puts them on the path to bu
ild better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member wife
Veronica Letelier
Letter O-72
2-154
ATTACHMENT 12-169
Letter O-73
2-155
ATTACHMENT 12-170
Associate Planner Rajesh,
Hi, my name is Frankie March, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
- General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Frankie march
Letter O-74
2-156
ATTACHMENT 12-171
From: Chuck Powell Sent: Thursday, March 24, 2022 2:14 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Chuck Powell, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Chuck Powell
Letter O-75
2-157
ATTACHMENT 12-172
Chuck Powell
ICRA Specialist
(213)760-0603
[email protected]
www.icrahealthcare.com
Infec on Con trol Risk Assessment Specialist
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
2-158
ATTACHMENT 12-173
From: Daniel Garcia Sent: Thursday, March 24, 2022 2:15 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank housing
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Cris an I am a loc al union carpenter out of Carpenter Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Your name here Cris an Gar cia
Letter O-76
2-159
ATTACHMENT 12-174
From: Alex Hackler Sent: Thursday, March 24, 2022 2:30 PM To: Rajesh, Shipra Subject: Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Alex hackler , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Alex hackler
Sent from my iPhone
Letter O-77
2-160
ATTACHMENT 12-175
From: Josue Solis Sent: Thursday, March 24, 2022 2:32 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Josue Solis Quinones , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Josue Solis Quinones
Letter O-78
2-161
ATTACHMENT 12-176
From: Edward Bencomo Sent: Thursday, March 24, 2022 2:33 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Edward Bencomo, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Edward Bencomo
Sent from my iPhone
Letter O-79
2-162
ATTACHMENT 12-177
From: Gabriel Castaneda Sent: Thursday, March 24, 2022 2:34 PM To: Rajesh, Shipra Subject: Item NO.1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Gabriel castaneda,I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Gabriel castaneda
Letter O-80
2-163
ATTACHMENT 12-178
From: Jonathan Peraza Sent: Thursday, March 24, 2022 2:34 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jonathan Peraza, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jonathan Peraza
Letter O-81
2-164
ATTACHMENT 12-179
From: Alvaro Aguilera Sent: Thursday, March 24, 2022 2:35 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Alvaro Aguilera, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Alvaro Aguilera
Letter O-82
2-165
ATTACHMENT 12-180
Sent from my iPhone
2-166
ATTACHMENT 12-181
From: Jose Resendiz Sent: Thursday, March 24, 2022 2:36 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is jose, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
José resendiz
Letter O-83
2-167
ATTACHMENT 12-182
From: rudy ramirez Sent: Thursday, March 24, 2022 2:43 PM To: Rajesh, Shipra Subject: Item no 1. Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Rudy Ramirez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages. Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -Paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
- General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank locals deserve an innovative economic solution that puts them on the path to build better careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Letter O-84
2-168
ATTACHMENT 12-183
From: Bryan De Leon Sent: Thursday, March 24, 2022 2:46 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Bryan De Leon, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member, Bryan De Leon
Letter O-85
2-169
ATTACHMENT 12-184
From: Jose Cardona Sent: Thursday, March 24, 2022 2:46 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element A achments: Burbank Housing Element.docx
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jose Cardona I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Sent from my iPhone
Letter O-86
2-170
ATTACHMENT 12-185
2-171
ATTACHMENT 12-186
From: [email protected] Sent: Thursday, March 24, 2022 2:50 PM To: Rajesh, Shipra Subject: Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is gianni Rossi , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Gianni Rossi
Letter O-87
2-172
ATTACHMENT 12-187
Sent from Yahoo Mail for iPhone
2-173
ATTACHMENT 12-188
From: Franklin Rivera Sent: Thursday, March 24, 2022 2:53 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Franklin Rivera, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Letter O-88
2-174
ATTACHMENT 12-189
Franklin Rivera
Sent from my iPhone
2-175
ATTACHMENT 12-190
From: Carolina Corona Sent: Thursday, March 24, 2022 2:54 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Carolina Corona, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Carolina Corona
Letter O-89
2-176
ATTACHMENT 12-191
From: Kory Smith Sent: Thursday, March 24, 2022 2:55 PM To: Rajesh, Shipra Subject: Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Associate Planner Rajesh,
Hi, my name is kory smith, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Kory smith
Sent from Yahoo Mail on Android
Letter O-90
2-177
ATTACHMENT 12-192
From: Jay Hardy Sent: Thursday, March 24, 2022 2:56 PM To: Rajesh, Shipra
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Email: [email protected]
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Jus n har dy____, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces. - General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jus n har dy
Your name here
Letter O-91
2-178
ATTACHMENT 12-193
2-179
ATTACHMENT 12-194
From: Jerred Langford Sent: Sunday, March 27, 2022 8:24 PM To: Rajesh, Shipra Cc: Jerred Langford Subject: Item 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Jerred Langford, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area.
We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Jerred Langford
Lead Representative – Local 661
P: 818.364.9303
M: 213.808.2417
Southwest Regional Council of Carpenters
swcarpenters.org
Letter O-92
2-180
ATTACHMENT 12-195
Download our app:
Google Play | iTunes App Store
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
2-181
ATTACHMENT 12-196
From: crispin carrasco Sent: Monday, March 28, 2022 8:39 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Hi my name is crispin Carrasco ,I am a local union carpenter out of carpenters local 661.carpenters local 661 represents over 5000 working families in the area which include members that live ,work,and make us of the business in and around the Burbank area. We would like to see labor standards and policy include in the 2021-2029 housing element.in the future projects under this plan, the city of Burbank should explicitly include language required family suppor ng w ages,skill training and job access to the community members rather then simply accep ng pr ojects founded on low cost and low wages. Specially the construc on workforce should require,full family health plans skilled and trained workforce standards through cer fied appren ceship paid si ck leave.pension and vaca on pa y high quality responsible bidder standards should be established high quality construc on perf ormance
construc on c ontractors at every level comply with labor and law and have no history of fraudulent or grossly negligent business prac ces g eneral contractors should be required to self perform a minimum is 5% of all construc on cr a work for which they are responsible we believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers,increase access to family healthcare, and enrich the community at large. Local-661 carpenters union member. Crispin Sent from my iPhone
Letter O-93
2-182
ATTACHMENT 12-197
From: Alex Hackler Sent: Monday, March 28, 2022 9:19 AM To: Rajesh, Shipra Subject: Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Item No. 1-Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is Alex hackler I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Alex hackler
Sent from my iPhone
Letter O-94
2-183
ATTACHMENT 12-198
From: Jonathan Peraza Sent: Monday, March 28, 2022 9:19 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Development
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jonathan Peraza, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Jonathan Peraza.
Sent from my iPhone
Letter O-95
2-184
ATTACHMENT 12-199
From: Edward Bencomo Sent: Monday, March 28, 2022 9:20 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Edward Bencomo, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Edward Bencomo.
Sent from my iPhone
Letter O-96
2-185
ATTACHMENT 12-200
From: Josue Solis Sent: Monday, March 28, 2022 9:20 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Josue Solis Quinones, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
-General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Josue Solis Quinones
Letter O-97
2-186
ATTACHMENT 12-201
From: Gabriel Castaneda Sent: Monday, March 28, 2022 9:21 AM To: Rajesh, Shipra Subject: Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Gabriel castaneda, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Gabriel castaneda
Letter O-98
2-187
ATTACHMENT 12-202
From: Alvaro Aguilera Sent: Monday, March 28, 2022 9:22 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Alvaro Aguilera, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Álvaro Aguilera.
Sent from my iPhone
Letter O-99
2-188
ATTACHMENT 12-203
From: Mili Nuetron Sent: Monday, March 28, 2022 9:22 AM To: Rajesh, Shipra Subject: Item No.1 Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Emmanuel I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng projects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Emmanuel Milian .
Letter O-100
2-189
ATTACHMENT 12-204
From: Jose Resendiz Sent: Monday, March 28, 2022 9:24 AM To: Rajesh, Shipra Subject: Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is José I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
José resendiz
Letter O-101
2-190
ATTACHMENT 12-205
From: Gregory Ceja Sent: Monday, March 28, 2022 9:25 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Gregorey S Ceja I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
GREGOREY S Ceja
Letter O-102
2-191
ATTACHMENT 12-206
From: rudy ramirez Sent: Monday, March 28, 2022 9:29 AM To: Rajesh, Shipra Subject: Item no.1 - Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Rudy M Ramirez , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices. -General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Rudy M Ramirez.
Letter O-103
2-192
ATTACHMENT 12-207
From: Hotmail
Sent: Monday, March 28, 2022 9:44 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is johnathen hays. I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Johnathen hays
Letter O-104
2-193
ATTACHMENT 12-208
From: Noah Iglesias Sent: Monday, March 28, 2022 9:45 AM To: Rajesh, Shipra
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Noah Iglesias, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
-General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Noah Iglesias
Letter O-105
2-194
ATTACHMENT 12-209
From: bonifacio rojas Sent: Monday, March 28, 2022 9:46 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Bonifasio Rojas, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Bonifasio Rojas.
Sent from my iPhone
Letter O-106
2-195
ATTACHMENT 12-210
From: diana camarillo Sent: Monday, March 28, 2022 9:46 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Diana Camarillo, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Diana Camarillo.
Letter O-107
2-196
ATTACHMENT 12-211
From: Joseph Reyes Sent: Monday, March 28, 2022 9:46 AM To: Rajesh, Shipra Subject: Item 1 Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Jose Reyes, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
-General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Jose Reyes
Letter O-108
2-197
ATTACHMENT 12-212
From: Paris Jernigan Sent: Monday, March 28, 2022 9:46 AM To: Rajesh, Shipra Subject: 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Paris Jernigan, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Paris Jernigan.
Letter O-109
2-198
ATTACHMENT 12-213
From: andres cabrera Sent: Monday, March 28, 2022 9:47 AM To: Rajesh, Shipra Subject: Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Andres cabrera , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Andres cabrera
Letter O-110
2-199
ATTACHMENT 12-214
From: Daniel Ochoa Sent: Monday, March 28, 2022 9:47 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is__Daniel Ochoa__, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
-General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
___________.
Letter O-111
2-200
ATTACHMENT 12-215
From: David Lopez Sent: Monday, March 28, 2022 9:47 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is David Lopez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills, training, and job access to the community members rather than simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship
-paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self-perform a
Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers and enrich the community at large.
Local 661 Carpenters Union Member;
David Lopez.
Get
Outlook for iOS
Letter O-112
2-201
ATTACHMENT 12-216
Disclaimer
THIS MESSAGE IS INTENDED ONLY FOR THE USE OF THE ADDRESSEE. IT MAY CONTAIN PRIVILEGED OR CONFIDENTIAL INFORMATION THAT IS EXEMPT FROM DISCLOSURE. Dissemination, distribution or copying of this message by anyone other than the addressee is strictly prohibited. If you received this message in error, please notify us immediately by replying: "Received in error" and delete the message. 2-202
ATTACHMENT 12-217
From: George Rodarte Sent: Monday, March 28, 2022 9:48 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is George Rodarte, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
George Rodarte.
Sent from my iPhone
Letter O-113
2-203
ATTACHMENT 12-218
From: Brenden Cates <[email protected]> Sent: Monday, March 28, 2022 9:49 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click li nks or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Brenden Cates, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require; -Full family health plans -Skilled and trained workforce standards through cer fied appr en ceship -paid sick l eave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a. work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be� er careers, and enrich the community at large.
Local 213 Carpenters Union Member;
Brenden Cates
Sent from my iPhone
Letter O-114
2-204
ATTACHMENT 12-219
From: Josh Strickler Sent: Monday, March 28, 2022 9:50 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Joshua Strickler , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Joshua Strickler . Sent from my iPhone
Letter O-115
2-205
ATTACHMENT 12-220
From: Ricardo Trejo Sent: Monday, March 28, 2022 10:21 AM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Ricardo Trejo, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Ricardo Trejo
Letter O-116
2-206
ATTACHMENT 12-221
From: Steven McClenthen Sent: Monday, March 28, 2022 10:21 AM To: Rajesh, Shipra Subject: 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Steven McClenthen , I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member; Steven McClenthen
Letter O-117
2-207
ATTACHMENT 12-222
From: angel andrade Sent: Monday, March 28, 2022 10:22 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Angel Andrade, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Angel Andrade.
Letter O-118
2-208
ATTACHMENT 12-223
From: javier rodriguez Sent: Monday, March 28, 2022 10:22 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Javier Rodriguez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Javier Rodriguez.
Letter O-119
2-209
ATTACHMENT 12-224
From: Luis Rosales Sent: Monday, March 28, 2022 10:22 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Luis Rosales , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Luis Rosales
Letter O-120
2-210
ATTACHMENT 12-225
From: Ricardo Arellano Sent: Monday, March 28, 2022 10:23 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
ssociate Planner Rajesh,
Hi, my name is Ricardo Arellano, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family supporting wages, skills training and job access to the community members rather then simply accepting projects founded on low costs and low wages.
Specifically:
The construction workforce should require;
-Full family health plans
-Skilled and trained workforce standards through certified apprenticeship -paid sick leave. Pension, and vacation-holiday pay.
High quality responsible bidder standards should be established to ensure high quality construction performance;
-Construction contractors at every level comply with labor law and have no history of fraudulent or grossly negligent business practices.
-General Contractors should be required to self perform a Minimum of 5% of all construction craft work for which they are responsible.
We believe all Burbank local deserve an innovative economic solution that puts them on a path to build better careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Ricardo Arellano
Letter O-121
2-211
ATTACHMENT 12-226
From: Elvis Guzman Sent: Monday, March 28, 2022 10:24 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Elvis Guzman, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Elvis Guzman
Letter O-122
2-212
ATTACHMENT 12-227
From: Mauricio Palmero Sent: Monday, March 28, 2022 10:24 AM To: Rajesh, Shipra
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Mauricio Palmero, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Mauricio palmero
Sent from my iPhone
Letter O-123
2-213
ATTACHMENT 12-228
From: Oscar Jimenez Sent: Monday, March 28, 2022 10:24 AM To: Rajesh, Shipra Subject: Item no.1 Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Hi, my name is Oscar Jimenez, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Oscar Jimenez. Sent from my iPhone
Letter O-124
2-214
ATTACHMENT 12-229
From: ricardo vela Sent: Monday, March 28, 2022 10:28 AM To: Rajesh, Shipra Subject: 1-Burbank housing element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Ricardo vela, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Ricardo vela
Sent from my iPhone
Letter O-125
2-215
ATTACHMENT 12-230
From: Walter Perrine Sent: Monday, March 28, 2022 10:28 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Walter Perrine I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Walter Perrine
Letter O-126
2-216
ATTACHMENT 12-231
From: Anthony Vela Sent: Monday, March 28, 2022 10:29 AM To: Rajesh, Shipra Subject: item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Anthony Vela, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Anthony Vela
Sent from my iPhone
Letter O-127
2-217
ATTACHMENT 12-232
From: [email protected] Sent: Monday, March 28, 2022 10:30 AM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not cli ck links or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Carlos Carbajal I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on performance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Carlos Carbajal
Sent from my iPhone
Letter O-128
2-218
ATTACHMENT 12-233
From: Emmanuel Delgado Sent: Monday, March 28, 2022 10:40 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Emmanuel Delgado, I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area. We would like to see Labor Standards and or policy included in the 2021- 2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:The construc on w orkforce should require; -Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Emmanuel Delgado
Letter O-129
2-219
ATTACHMENT 12-234
From: ruben granillo Sent: Monday, March 28, 2022 3:59 PM To: Rajesh, Shipra Subject: Item No. 1- Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Subject: Item No. 1- Burbank Housing Element
Associate Planner Rajesh,
Hi, my name is ruben granillo, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represents over 5,000 working families in the area which include members that live, work, and make us of the businesses in and around the Burbank area.
We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages. Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -Paid sick leave. Pension, and vaca on-holida y pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
- General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank locals deserve an innova v e economic solu on tha t puts them on the path to build be er careers, increase access to family healthcare, and enrich the community at large.
Local 661 Carpenters Union Member,
Ruben granillo
Sent from my iPhone
Letter O-130
2-220
ATTACHMENT 12-235
From: Nicolas Reyes Sent: Monday, March 28, 2022 6:39 PM To: Rajesh, Shipra Subject: Item No. 1-Burbank Housing element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Nicolás , I am a local union carpenter out of Carpenters Local 661. Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Nicolás Reyes
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
Letter O-131
2-221
ATTACHMENT 12-236
From: Jesus Sandoval Sent: Tuesday, March 29, 2022 4:17 PM To: Rajesh, Shipra Subject: Burbank Housing Element
CAUTION: This email originated from outside of the organiza on. Do not click link s or open a achments unless you recognize the sender and know the content is safe.
Associate Planner Rajesh,
Hi, my name is Guadalupe Sandoval, I am a local union carpenter out of Carpenters Local 661.
Carpenters Local 661 represent over 5,000 working families in the area which include members that live, work, and make use of the business around in and the Burbank area. We would like to see Labor Standards and or policy included in the 2021-2029 Housing Element. In future projects under this plan, the city of Burbank should explicitly incorporate language requiring family suppor ng w ages, skills training and job access to the community members rather then simply accep ng pr ojects founded on low costs and low wages.
Specifically:
The construc on w orkforce should require;
-Full family health plans
-Skilled and trained workforce standards through cer fied appr en ceship -paid sick leave. Pension, and vaca on-holi day pay.
High quality responsible bidder standards should be established to ensure high quality construc on perf ormance;
-Construc on c ontractors at every level comply with labor law and have no history of fraudulent or grossly negligent business prac ces.
-General Contractors should be required to self perform a Minimum of 5% of all construc on cr a work for which they are responsible.
We believe all Burbank local deserve an innova v e economic solu on tha t puts them on a path to build be er careers, and enrich the community at large.
Local 661 Carpenters Union Member;
Guadalupe Sandoval.
Letter O-132
2-222
ATTACHMENT 12-237
City of Burbank
Burbank Housing and Safety Element Update Responses to Comments on the Draft EIR
Final Environmental Impact Report
Letters O-2 through O-132
COMMENTER: Refer to individuals O-2 through O-132 listed in Table 2-2 DATE: March 13, 2022 – March 29, 2022
Response for Letters O-2 through O-132
The comment notes membership with Carpenters Local 661 and offers an introduction to the labor union. The comment requests that labor standards and/or policies are included in the Housing Element Update and that future projects under the Housing Element Update require family supporting wages, skills training, and job access to community members. The comment also specifically notes that the construction workforce for future projects should require family health plans, skilled workforce standards, paid sick leave, pension, vacation-holiday pay, and high-quality bidder standards to ensure that contractors comply with labor laws.
The commenters’ requests for changes to the Housing Element Update are noted, but does not raise issues with the adequacy of the analysis or conclusions in the Draft EIR. The Draft EIR is not intended or required to provide justification for the Project. Rather, the EIR is an informational document that is intended to provide public agencies and the public with detailed information about the effect that the Project is likely to have on the environment. This EIR also identifies ways in which the significant effects of the Project might be minimized and identifies alternatives to the Project. The City is not required to consider such comments or requests to change the Project in its CEQA analysis absent a commenter providing substantial evidence that the proposed change would feasibly reduce one or more significant adverse environmental impacts identified in the Draft EIR. Requests for changes to the Project may be addressed through the planning process outside of the CEQA process. 2-223
ATTACHMENT 12-238
March 31, 2022
Shipra Rajesh
Pr
oject Manager
Community Development Department
Burbank, CA 91502
via Email
RE: Comments: 1) Burbank Housing and Safety
Element Update, Draft Environmental Impact Report,
January 22, 2022; 2) 2nd Revised Draft Housing
Element, 2021-2029, November 2021
Thank you very much for the meeting to answer my initial questions about the range of dates that accompany the
data maps and tables contained in the detailed
Appendices of the Draft Housing Element (HE).
My letter here covers both documents, raises questions
about major concerns over the Draft EIR, suggests broad policies and detailed revisions in limited cases.
Since the issuance of the 2020 census data on March 17, it is clear that our City is well balanced with a healthy mix of all people (age, ethnicity, income, and housing, etc.).
Our community is unique in many respects: the availability of good schools employment and access to transit is
clear (Appendices, Exhibits B-12, 13,14). What is less well known is that a signi
ficant number of the city’s
Letter I-1
1 2-224
ATTACHMENT 12-239
neighborhoods are identified as located in ar
eas with less
positive environmental outcomes (Appendices, Exhibit
B-16, Environmental Opportunities). I was not surprised to see my census tract identified as a Disadvantaged
Community (Appendices, Exhibit B-17). As a whole,
Burbank is a city with primarily Stable, Moderate Mixed Income neighborhoods (Appendices, Exhibit B-20). The
analyses in the Appendices demonstrate a clear need for populations of extremely low income— both seniors and
families. Anyone who has engaged in city activities
through programs like camper ships, Holiday Baskets and Family Promise know from personal experience that
reality of our residents’ lives include our neighbors.
State pre-emption of local decision-making is a deep
concern for me. This concern is con
firmed by the
inadequacy of the Draft EIR to serve as a basis for
decision-makers on the Housing and Safety Elements.
COMMENTS TO THE DEIR/ELEMENT
According to the Project Description
, the City’s housing
goal is to ensure that sufficient capacity exists in the
Housing Element Update to accommodate the RHNA with
a buffer (a total of 10,456 additional housing units)
throughout the eight-year planning period.
The DEIR is amazing and concerning. The data sets are
incongruous. The DEIR contains very diff
erent housing
unit numbers (SCAG, RHNA and DOF) that beg to be
reconciled in a rational manner, for the non-professional 1 cont.
2 2-225
ATTACHMENT 12-240
who does not understand the sea of acronyms coming at
them. The Element is built around a State-mandated
housing number, but that con
flicts with forecasts by the
local regional agency. The DEIR housing numbers from
DOF conflict with the housing numbers from DOF in the
Housing Element itself.
Nonetheless, here are both comments to the DEIR and
the Element. Hopefully, the Element charts a better path in light of these comments.
Finally, the data for Burbank are derived from very big numbers generated, I understand, by an algorithm(s). An algorithm cannot possibly account for local nuances,
activities, historic gr
owth patterns, infrastructure, its non-
profits etc.
DEIR Comments
1. Unmitigated Impacts, Sewer. This should concern
everyone. The pr
oposed Project, Housing Element, 2nd
Revised Draft causes impacts on the City’s wastewater
treatment capacity that are significant and unavoidable:
“…based on the sewer generation rates that were
calculated for the proposed Project, along with
constraints within the City’
s treatment system, potentially
significant impacts could result on a project-specific
bases with no feasible mitigation at the current plan
2 cont.
3 4
2-226
ATTACHMENT 12-241
level. Therefore, impacts would be signi
ficant an
unavoidable.”
Page ES-24
And also:
Wastewater generation for full buildout of the proposed Housing Element Update is estimated to be up to
appr
oximately 6.3 mgd, which is not within the City’s
currently available treatment capacity of 4 mgd.
Therefore, impacts would be, significant and unavoidable due to constraints within the sewer system and
development under the proposed Project would
contribute to a cumulatively significant impact associated with wastewater generation. Cumulative Impacts 4.12-39
The DEIR identifies an elaborate uncharted approach that Public Works will take over time. But the overall impact is unmistakable.
How will Council to make a Finding of Overriding
Considerations for sewer impacts? What is the benefit
that outweighs this?
What is maximum amount of housing units permitted
before the significant and unavoidable sewer impacts ar
e
reached?
4 cont.
2-227
ATTACHMENT 12-242
How much does the proposed Project need to be
modifi
ed to reduce impacts to less than significant?
2. There are signi
ficant inconsistencies between
RHNA, the SCAG (Burbank/regional forecasts), and
existing numbers offered by the State Department of
Finance 2021. The City is required to plan for the RHNA number, but neither SCAG nor DOF offer any kind of data
that would confirm even modest support of the State-
mandated number (as distributed by SCAG).
Here is how it looks:
HCD Requirement by 2029 = 10,456 housing units
(RHNA)
SCAG Forecast by 2030 = 4,650 housing units
(Table 4.8-2)
over the 8-Year proposed Project (2021-2029), the added number of required units above the forecast is:
= 5,806 MORE units
The discrepancies need a full explanation.
A recent State audit has revealed problems with the
RHNA numbers in some districts. Unfortunately, a similar audit has not been conducted over the RHNA number for
4 cont.
5 2-228
ATTACHMENT 12-243
the SCAG region. The numbers for Burbank make no
sense.
The City should demand an audit of the SCAG RHNA
numbers before it approves the proposed Pr
oject which
contains significant unmitigated impacts, including
sewage.
In plain language, the discrepancies must be explained: if the forecast is for modest growth, why is RHNA 2x
for
ecast?
3. SCAG 2020 estimates fewer residents, jobs and
housing in the region by 2040:
“Based on an evaluation of the 2016 RTP/SCS and the
2020 RTP/SCS demographic projections, the 2020 RTP/
SCS projects fewer residents, jobs, and housing units.
The 2020 RTP/SCS predicts approximately 290,000
fewer residents, 80,000 fewer houses, and 210,000
jobs in the region in 2040 than under the 2016 RTP/SCS, which would represent less activities and associated
emissions than would have been predicted under the
2016 RTP/SCS. Therefore, evaluating again the 2016
RTP/SCS projections would be conservative as the 2016
AQMP assumed greater growth than is currently
anticipated. The impact analysis throughout this EIR uses the demographic data provided in the 2020 RTP/SCS." p.
4.1-10
5 cont.
6 2-229
ATTACHMENT 12-244
With the regional forecasts in mind (and the 2020 forecast by SCAG is signi
ficantly less aggressive than SCAG’s
2016 projections), how are these numbers reconciled with the RHNA for Burbank?
4. The residential vacancy rate is 6%. The Department
of Finance (DOF) identifi
es 45,069 housing units in the
city, of which 2,787 are vacant. This is a 6% vacancy rate, considered a “healthy” vacancy rate by HCD. Rather than showing a critical shortage of housing units, the statistics show an appropriate vacancy rate.
1. The disparity among these housing unit numbers
needs to be reconciled (SCAG, RHNA and DOF).
2. If the vacancy rate is already 6% (2% more than
HCD has used in the past as a maximum rate) how is an
increase to 10,456 new housing units in the 6th Cycle
justi
fiable?
(FYI, the DOF figure in the Housing Element is differ
ent:
44,978 Housing Units. Table 1-13)
5. A 15% added housing unit buffer raises the total
number of units that the city must accommodate to
10,456. Given all the other numbers (SCAG, RHNA, DOF
— 2 numbers—) what is the justification for a further
15%?
6 cont.
7 8
2-230
ATTACHMENT 12-245
The EIR should study the resulting impacts from an
elimination of the 15%; will that reduce sewer impacts?
1. What statute requires this buff
er?
2. Is it a State mandate?
3. Why is there no discussion in the Alternative
sections about this impact?
4. What is the justification for a 15% buffer with
advent of SB35, 9 and 10?
6. Greenhouse Gas Emissions/Air Quality. What factors
ar
e being used to quantify reductions in green house gas
emissions for the 6th Cycle Housing Element?
A. Didn’t the Biden Administration re-instate California’s waiver of the CAA and restore its ability to set its own clean air standards? The Chapter currently states:
“However, as a result of the SAFE Vehicles Rule
discussed above, California’s waiver of Clean Air Act
preemption was revoked, thereby rescinding the CARB’s
authority to implement the Advanced Clean Cars
program.” 4.5-6
It would seem the GHG will be reduced more.
B “As of 2019, the City has reduced GHG emission by
28 percent from 2010 baseline emission levels, well-
exceeding the 2020 target in the original GGRP and
8 cont.
9 10
2-231
ATTACHMENT 12-246
approaching the 2035 target established well in advance of the horizon year. T
o reflect new State goals established
by SB 32 and EO B-55-18, the Draft GGRP Update
recommends aggressive GHG emissions targets
including:
• Reduce GHG emissions to 49 percent below 2010
levels by 2030 (SB 32 target year),
• Reduce GHG emissions to 66 percent below 2010 levels
by 2035 (General Plan horizon year),
• Achieve carbon neutrality by 2045 (EO B-55-18 target
year).”