Airport Update
Burbank City Council
Presented by Frank Miller, Executive Director
February 28, 2023
2019
5.98 Million
2020
1.9 Million
2021
3.7 Million
Passenger Traffic
2022
5.89 Million
Conceptual
Design
Basis of
Design
30%
Design
60%
Design
3 Months
April 2023
4 Months
August 2023
4 Months
December 2023
5 Months
April 2024
Architectural Form
• Design-Builder is required to develop three conceptual design alternatives
• Conceptual design intended to convey architectural
form and overall layout of terminal, parking structure, and support facilities
Architectural Form
• Concepts informed by:
o Nine community
design charrettes
conducted by Authority
o Recent visioning
workshop conducted with
HPTJV
• Staff will update Commission
as concepts developed
• Determine sustainability model
• Determine sustainability goal (e.g. LEED Silver, Gold, Platinum; Cal Green I, Cal Green II: Envision Bronze, Silver, Gold or Platinum)
• Jacobs analyzing pros and cons of each system and levels to assist the Commission in establishing sustainability goals for project
• Sustainability goals must be evaluated against the project budget
6 7
The PM Team has retained an art consultant to assist in developing the public art program.
• Develop general approach to:
o Locations
o Artwork types
o Themes
o Develop artwork evaluation criteria
• Empanel “Peer Art Advisory Group” comprised
of members from the three Authority cities
8 Process Cont’d
• Develop Request for Proposals(RFP) for each opportunity • Shortlist (3) artists for each opportunity
• Artists will present preliminaryconcepts and budget within proposals • Peer Art Advisory Group will evaluate proposals
• Art consultant and Staff will consider panel evaluations and make recommendationsbest aligned with project goals
• Staff will update Commission on progress
• Staff will bring artist and artwork recommendationsto Commission
Thank You
9