No.

Responsible
Agency/
Department
Title Program Description Goal 2022 Status Updates
AQCC‐1 CDD Greenhouse Gas
Reduction Plan
Prepare and adopt a Greenhouse Gas Reduction Plan
addressing communitywide and municipal sources of
greenhouse gas (GHG) emissions identified in the emissions inventory and projections for 2010, 2020, and 2035.

Concurrently
with
Burbank2035
City Council adopted the Greenhouse Gas Reduction Plan
(GGRP) Update on May 3, 2022.

AQCC‐2 CDD Updates to
Communitywide
Greenhouse Gas
Inventory
Work with Los Angeles County, the Southern California
Association of Governments (SCAG), the South Coast Air
Quality Management District (SCAQMD), and the California Air Resources Board (ARB) to update the communitywide
GHG emissions inventory every 3–5 years.

Every 3–5 years,
beginning in 2016
Staff hired a consultant to prepare the Greenhouse Gas
Reduction Plan Update. Data from SCAG and SCAQMD
were utilized to update the 2019 GHG emissions
inventory.

AQCC‐3 CDD Carbon Offset Fee
Program
Support carbon offset programs, according to established protocols, and encourage local application of regional GHG offset fees. Research the feasibility of implementing and enforcing such programs in Burbank.

Completed In  2022, the Fire Department completed its goal of using Renewing Deisel Fuel in all Deisel Fire Apparatus.

ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE AIR QUALITY AND CLIMATE CHANGE PROGRAMS
ATTACHMENT 2 - 1
ATTACHMENT 2 - 2
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE AQCC‐4 CDD Health Risk
Assessment for
Stationary and Mobile
Sources
Require project proponents to prepare health risk
assessments in accordance with SCAQMD recommended
procedures as part of environmental review when projects could have associated air emissions that have been
designated by the State of California as a toxic air
contaminant or, similarly, by the federal government as a hazardous air pollutant; Also require health risk
assessments for projects that would place sensitive land uses near Bob Hope Airport, the UPRR rail line, or major freeways or arterials.

Ongoing Health  Risk Assessments are required to be prepared as part of a large residential development project submittal and Environmental Impact Report (EIR) review, including those involving a Planned Development with
Development Agreement.

ATTACHMENT 2 - 3
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE AQCC‐5 CDD Environmental Review For  new projects: Provide health risk assessment guidance for use in the CEQA process; use the SCAQMD CEQA
Guidelines and thresholds to evaluate the significance of GHG emissions resulting from projects or plans; Establish appropriate project application and mitigation
requirements necessary for project or plan approval.

Ongoing Ongoing  during the Development Review process
AQCC‐6 CDD Air Quality Mitigation
Plans
Establish a process to require project applicants to prepare an Air Quality Management Plan for proposed projects with the potential to result in substantial air quality impacts exceeding SCAQMD’s operational thresholds for reactive
organic gases and NOx. These plans shall outline how a
project will incorporate design or operational features that reduce emissions by 15% from the level that would be
produced by an unmitigated project.

Ongoing Ongoing.  Require design features that address site air quality issues on a project‐by‐project basis.

AQCC‐7 CDD, Parks
and
Recreation,
Public Works
Reforestation Program Develop  a comprehensive re‐forestation program to expand the City’s tree canopy. Seek out grant funding opportunities and partner with non‐profit organizations in order to
maximize efforts.

Ongoing Parks  and Recreation Department developed the "Plant for Greener Burbank" initiative to plant more trees.

City staff continues to work with large development
projects on incorporating greater tree canopies on site.

City staff is implementing the "Plant for a Greener
Burbank" initiative in collaboration with Burbank water and Power, Community Development, and Public Works.

Since the launch, the City has planted over 700 new trees to improve overall carbon footprint and reduce teh
impacts of global warming. The GGRP Update also
includes a Carbon Sequestration Strategy to plant 2,000 net new trees by 2030.

ATTACHMENT 2 - 4
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE AQCC‐8 CDD Smoke Reduction
from Retail Food
Operations
Cooperate with SCAQMD on requiring measures to prevent
smoke emissions (i.e., grease shields, top fired broilers) for retail food grilling, smoking, barbequing, and cooking with wood‐fired stoves (indoor and outdoor). Cooperate with
SCAQMD on requiring such operations to implement
control measures such as filtering and scrubbing, before discharging cooking fumes to the atmosphere.

Ongoing The  GGRP Update proposes to educate businesses regarding measures to reduce smoke emissions (i.e.,
grease shields, top fired broilers, etc.).

AQCC‐9 Financial
Services
Preference for City
Contractors
Give preference to qualified contractors and vendors using reduced‐emission equipment and sustainable business
practices for City construction projects and contracts for services, as well as businesses that practice sustainable operations.

Ongoing Ongoing.  The Financial Services Department assists with processing City contractors. Potential vendors are
assessed with various criteria on a case‐by‐case basis, and advanced technology (such as reduced‐emission
equipment) may be considered.

ATTACHMENT 2 - 5
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE LU‐1 CDD Zoning Ordinance Implement  Floor Area Ratios (FAR's), for each land use designation; Amend the Zone Map as needed; Establish
criteria for exceptional projects that advance goals of Burbank2035; establish development and design standards for single family residential development; maintain special hillside development standards; etc.
2016 Ongoing.  City Council approved new development
standards for single‐family and mixed use projects
through Zone Text Amendments and updates to existing
specific plans (i.e., Media District and Burbank Center Plan/San Fernanod Blvd. Master Plan) through the
proposed Downtown Burbank Transit Oriented
Development Specific Plan, the Golden State Specific Plan and Media District Specific Plan Update.

LU‐2 CDD Subdivision
Regulations
Revise lot design standards to limit the creation of flag lots; Revise street design standards to require a grid street pattern for all development; review lot design standards; require dedication of parkland at a ratio of 3.0 acres per 1,000 residents.

Ongoing
LU‐3 CDD Specific Plans Review  the three existing specific plans through a public process to determine whether the vision, goals, and policies established by the plans remain applicable and appropriate.

Revise the plans as necessary to ensure that they reflect current desires for each of the three areas.
‐ Consider creating new specific plan areas to create a sense of place, foster neighborhood identity, and address issues that are specific to each area.
‐ Prepare a specific plan for the Golden State
Commercial/Industrial Area to provide a framework for
future development in the area consistent with Goal 13 in the Land Use Element.

Ongoing; Golden
State
Commercial/Indu
strial Area
Specific Plan
completed by
2016
Ongoing based on work to update single‐family and multi‐ family residential development standards and the
proposed specific plan, and existing specific plan updates.

The review of the Burbank Center Plan and creation of
the Golden State Specific Plan is underway. Funding was obtained to update the Media District Specific Plan and the update process will commence in 2022.

LAND USE PROGRAMS
ATTACHMENT 2 - 6
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE LU‐4 CDD Historic Preservation
Plan
Review, revise, and maintain the Historic Preservation Plan to ensure that it is informed by current resource data and its goals and policies are consistent with the Land Use Element; Establish a list of Eligible Historic Resources to be maintained by the Community Development Director;
Periodically review and revise the Historic Resource
Management Ordinance; Require evaluation by a qualified architectural historian for projects subject to CEQA
involving buildings constructed more than 45 years prior to the project application; Require assessment by a qualified archeologist for projects subject to CEQA involving ground disturbing activities on previously undisturbed land to identify the potential to encounter buried historical
resources.

Ongoing; historic
resource list
updates every
five (5) years
Staff and consultant team are still reviewing the Mills Act Contract Updates with a report to the Heritage
Commission and City Council in 2023.

LU‐5 CDD Public Participation Comprehensively  update the General Plan every 5‐10 years; Provide the City Council with an annual report on
implementation of Burbank2035; Create an organized
public outreach program that delivers a consistent message about planning; Continuously create and update
informational handouts and Web pages; Continuously
review and update methods of providing planning
information to the public and soliciting public input; Keep up with technological advances and identify opportunities to use new and advanced technologies; Engage active
neighborhood groups, homeowners’ associations, and other similar groups in the planning process; Require applicants of larger projects to conduct community outreach and
meetings.

Ongoing Ongoing.  As part of the discretionalry review process, staff provides public notices to owners and occupants for proposed projects within or near their neighborhoods
and includes them in all steps of the planning process. In addition, as part of the City's long range planning efforts to develop the Golden State Specific Plan, Media District Specific Plan Update, Downtown Burbank TOD Specific
Plan, Housing Element and Safety Element Update, the
City will continue to be undertaking an extensive public outreach process for each that will include workshops,
study sessions, and stakeholder meetings to obtain
robust public input.

ATTACHMENT 2 - 7
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE LU‐6 CDD Building and Other
Municipal Codes
Review and revise policies related to green building
practices. Provide incentives for the construction of green buildings; Update building and fire codes to incorporate increased energy efficiency and green building and
sustainable development strategies; Develop a new code
providing regulations for public streets and sidewalks.

Ongoing Ongoing.  Existing buildings in the City perform upgrades for energy efficiency, water conservation, appliance and equipment efficiencies as part of remodel and alterations in accordance with adopted building codes. The next
California Building Code Standards will be updated in
2023.

LU‐7 CDD, Public
Works, Citty
Attorney's
Office
Environmental Review
and Impact Analysis
All discretionary projects are required to undergo
environmental review by CEQA.

The City will create formal thresholds of significance for environmental impacts and use these thresholds to guide future CEQA documents and decisions.

Ongoing Long ‐term planninig: Continue to look at the
development of Program Environmental Impact Reports
for the Golden State Specific Plan,  the Dowtown
Burbank TOD Specific Plan, and Media District Specific
Plan Updates, which could result in a more streamlined
CEQA review process.

Reports for the new Golden State and Dowtown Burbank
TOD Specific Plan updates are ongoing. A program EIR
will be prepared for the Media District update that will commence in 2022.

LU‐8 CDD, Parks
and
Recreation
Development Impact
Fees and Art in Public
Places
Update the transportation impact fee program to
implement Land Use Element and Mobility Element goals;
Review and revise the community facilities fee program to ensure that fees are adequately addressing impacts on City services caused by new development; Review the art value and in‐lieu fee requirements of the Art in Public Places program to ensure that they remain adequate; Consider
creating a public benefits program where project applicants for large projects must provide public benefits through methods such as incorporating design features or programs into the project.

Ongoing City  staff held a study session at the December 14, 2021 City Council meeting to review Development Impact
Fees. Additional meetings will be held to discuss the
nexus study and proposed fees in 2022.

ATTACHMENT 2 - 8
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE LU‐9 CDD Code Enforcement Enforce  zoning, building, and other codes to ensure property maintenance, quality, and safety; Use proactive code enforcement strategies in targeted neighborhoods;
Continue proactive enforcement of conditions of approval placed upon development projects; Work with local
organizations to provide information to property owners and tenants of residential and non‐residential properties regarding property maintenance; Provide grants, low
interest loans, and other economic assistance to enable improvement of poorly maintained and deteriorated
buildings.

Ongoing Ongoing.  Code enforcement services are Monday
through Saturday.

ATTACHMENT 2 - 9
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE LU‐10 CDD Inter‐Agency
Consultation
Identify opportunities for public/private partnerships to provide affordable housing and/or address public and social needs; Continue to consult with the Burbank‐Glendale‐
Pasadena Airport Authority, California High Speed Rail
Authority (CHSRA), Los Angeles County Metropolitan
Transportation Authority (MTA), Southern California
Regional Rail Authority (SCRRA), SCAG, and other agencies to ensure that the City’s interests are represented; Refer major land use actions as defined by the Los Angeles
County Airport Land Use Commission Review Procedures
Section 1.5.3, occurring within the Airport Influence Area, to ALUC for review and consistency determination.

Ongoing Burbank  is part of the Arroyo Verdugo Communities Joint Powers Authority (JPA), which includes working with
Cities of Glendale, La Canada Flintridge, Pasadena, South Pasadena, and Los Angeles County. Since the passage of
Measure M (Transportation), the Arroyo Verdugo JPA
was formed in order to receive, program, coordinate, and spend this funding on transportation projects in the
subregion. This  helped transportation funding to
become available to the cities and county areas of the
Arroyo Verdugo subregion.

The City will be cooordinating a Development Review
process in the immediate vicinity of the Airport/ALUC for Airport Review of project and associated environmental
assessment.

MOBILITY PROGRAMS
M‐1 CDD, Public
Works
Infrastructure
Blueprint
Capital Improvement Program and Infrastructure Blueprint were updated as part of the annual budget.  Community
Development Department (Transportation staff) monitors
and pursues funding opportunities to implement Capital
Improvement Projects and reduce impacts to local funds.

Fee study
completed by
2016, ongoing
implementation
The Development Impact Fee study is complete and a
second City Council Study Session was held in December
2021. Staff will return to City Council in May 2022 for review and adoption of an updated Development Impact
Fee ordinance be set in place for use in starting in Fiscal Year 2022‐2023.

Ongoing. The City's Community Development and Public
Works Departments continue to implement multimodal
and Complete Streets projects through capital projects
and private development.  Community Development
Department staff utilizes regional funding sources from Metro, and works to secure grant funds through state
and federal grant funding programs as identified in the Burbank2035 General Plan and the Complete Our Streets
Plan.   These funds agument local transportation and
development impact fee funds.

M‐2 CDD, Public
Works
Capital Improvement
Program
Develop a CIP that identifies and allocates local, regional, state, and federal funds on a project level and schedules necessary improvements; Update the CIP on an annual
basis as part of the City’s yearly budget cycle; Aggressively seek regional, state, and federal funds to leverage local Transportation Impact Fee money earmarked for projects
listed in the CIP.

CIP updates every
5 years, Ongoing
Capital Improvement Program is updated as part of the
annual budget.  Community Development Department
(Transportation staff) monitors and pursues funding
opportunities to implement Capital Improvement
Projects and reduce impacts to local funds.

Public Works' new short‐ and long‐term CIP Program
development process commenced Citywide, including
new project prioritization methodology, resource analysis and delivery capabilities in collobaoration with the
Infrastructure Oversight Board.

ATTACHMENT 2 - 10
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE M‐3 CDD Transportation
Management Districts
Transportation Management Districts (TMDs) establish
limits to determine whether a project takes more than its fair share of roadway capacity. Projects are subject to different limits based on the TMD in which the project is located. Exceeding this limit may result in additional
environmental review to study cumulative traffic impacts; Develop a CEQA cumulative threshold of significance based on the TMDs; Revise OE‐FARs to reflect changing
development patterns and traffic conditions over time.

CEQA thresholds
adopted by 2013;
Ongoing
CEQA thresholds updated as part of the Burbank Center
Plan Update.  Updated thresholds adopted by 2021.  City using interim thresholds from California Office of
Planning and Research.

M‐4 CDD, Public
Works
California
Environmental Quality
Act Program Review
Process
Develop new traffic impact significance thresholds and
measures of mobility that identify the level at which
increased traffic is considered to be significant under CEQA.

Consider alternative thresholds that recognize the mobility of people rather than only vehicles; Review the City’s Traffic Study Guidelines for new development to ensure that
methods for measuring traffic congestion are consistent with Mobility Element and modify, where needed, to
address inconsistencies.

CEQA thresholds
adopted by 2013;
ongoing
implementation
Ongoing. CEQA thresholds will be updated as part of the Downtown Burbank TOD Specific Plan Project, which is
currently underway and is expected to be adopted by
2022.  The City is currently using interim thresholds from the California Office of Planning and Research to comply with July 1, 2020 deadline.

M‐5 CDD, Public
Works
Dedications Map and
Ordinance
The BMC provides for right‐of‐way dedication as needed to facilitate street improvements identified in the Mobility Element and Infrastructure Blueprint;  Update BMC Title 7 (Public Ways and Property) and Title 11 (Subdivisions) to reflect revised street dedications required to facilitate street improvements identified in the Mobility Element and Infrastructure Blueprint. Ensure that these revised
dedication requirements include accommodations for
pedestrian, bicycle, and transit facilities; Update the master street dedications map to identify necessary dedications, including dedications necessary at intersections.
2016 Ongoing.  Staff does implement dedications through large development projects seeking Planned Developments,
Development Agreements and/or City discretionary
permits on a project‐by‐project basis. Need for
dedications called for in Burbank2035 are reviewed by
Transportation Planning Division staff as part of the
Development Review Process.

ATTACHMENT 2 - 11
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE M‐6 CDD Transit System Pursue  funding opportunities to expand BurbankBus transit service; Consult with LA MTA regarding relinquishment of certain local transit routes to local agencies; Develop a short‐ range transit plan for BurbankBus; Work with MTA to
develop the regional transit connections identified in the Long Range Transportation Plan; Consult with Metrolink
and Amtrak to improve commuter and intercity rail
services; etc.

Ongoing Metro's  NexGen service changes were implemented in late fall 2021. Staff coordinated with Metro on the
changes to routes and frequencies in the NextGen
realignment. Staff continues to realign BurbankBus
service to be consistent with the City Council's
BurbankBus Service Policies, and completed a new Short
Range Transit Plan that reflects those policies. Four
Amtrak trains now stop at the Downtown Burbank
Metrolink station, up from one a year ago. Staff is
continuing to coordinate with Metrolink staff to support double trakc and other improvements to the Antelope
Valley line to support frequent, bi‐directional, all day service.

M‐7 CDD, Public
Works
Bicycle Master Plan
and Pedestrian Master
Plan
Prepare a Pedestrian Master Plan; Update the Bicycle
Master Plan to reflect completed bicycle projects and to identify additional bicycle improvements; Revise city
roadway standards to better accommodate all users,
including pedestrians, bicyclists, motorists, and transit riders of all ages and abilities.

Ongoing The  Complete Streets Plan is in its implementation phase. The City Council has programmed four Complete
Streets Projects for implementation as part of the current FY2021‐2022 budget:  Front Street Cycle Track Project
Phase 1, First Street Protected Bike Lanes Phase 1,
Downtown Pedestrian Improvements, and San Fernando
Boulevard Reconfiguration.

M‐8 CDD, Public
Works
Neighborhood
Protection Plans
Monitor existing and identify new neighborhood protection program areas to ensure that implementation measures are effective at reducing cut‐through vehicle traffic.
‐ Revise the City’s Traffic Study Guidelines to ensure
potential cut‐through traffic caused by new development is considered and mitigated.

Revisions to the
Traffic Study
Guidelines
completed by
2016; ongoing
implementation
Staff has begun an update of the Rancho Providencia
Neighborhood Protection Plan.  The update to this plan
will determine if additional neighborhood protection
measures are warranted to reduce cut‐through traffic.

Staff has incorporated neighborhood protection into its revised interim transportation study guidelines for new development projects.

ATTACHMENT 2 - 12
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE M‐9 CDD Parking Management Revise  the City’s parking requirements to implement Burbank2035 goals and policies. Expand innovative parking techniques, such as use of shared parking districts, parking in‐lieu fees, parking information systems, and parking
pricing and/or validation programs.

Ongoing The  City Council approved an ordinance to allow the City to price parking at its City‐owned parking lots. Staff is monitoring demand for parking at the Downtown
Burbank Metrolink Station and will present parking
management to the City Council when demand returns
to a higher level.

M‐10 CDD, Public
Works
Transportation
Demand Management
Expand the City’s employer‐based TDM ordinance to
include the Golden State and Empire Corridor areas; Update the citywide TDM ordinance to better encourage the use of incentives including free transit passes, parking cash out, and free shuttles; Revise the City’s TDM reporting and
participation requirements to facilitate employer
participation with TDM programs; Use TDM to mitigate
traffic impacts resulting from new development. Provide incentives and/or require mitigations to reduce trips;
require reporting to ensure trip reduction targets are met; Integrate TDM programs and measurements in the City’s
traffic study review process and travel demand model.

Ongoing The  TMO now uses its 38 percent commuter trip
reduction goal as the more commonly used Average
Vehicle Ridership metric that the South Coast Air Quality Management District uses.  The City will consider
expanding the TDM ordinance to include the Golden
State Specific Plan, and will consider expanding the TDM ordinance to new areas included in the updated
Downtown Burbank TOD Specific Plan.

M‐11 CDD Performance
Measures
Revise performance standards for bicycle travel and
develop pedestrian standards for the City’s sidewalk
system; Develop performance measures for local and
regional transit; Develop measures of neighborhood traffic intrusion to help the City measure the effectiveness of its neighborhood protection programs;  Review the data
collection and measuring methodology used to determine
TDM reduction to ensure that it accurately measures the level of trips reduced and increases in alternative
transportation modes.

Ongoing CEQA  thresholds will be updated as part of the Burbank Center Plan Update.  Updated thresholds adopted by
2023.  In July 2020, the City established interim
thresholds based on guidance from the California Office of Planning and Research.

ATTACHMENT 2 - 13
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE M‐12 CDD, Public
Works
Funding and Regional
Interaction
Continue to compete for regional funding to implement
transportation projects through the MTA Call for Projects competitive grant process; Continue to consult with MTA to study the feasibility of implementing a regional
development impact fee program.

Ongoing Staff  continues to identify funding for transportation projects through Measure R Highway Operations
Improvements, Measure M subregional funding, and by
participating in Metro's Long Range Transportation Plan update process.  Staff also monitors state and federal
legislation that provides additional funding sources for capital projects.

M‐13 Public Works  Railroad Connections Continue  to monitor progress of the Buena Vista/San Fernando grade crossing design and construction as part of the Empire Interchange Project.
‐ Pursue feasibility of a new railroad grade crossing at Clybourn Avenue and Empire Avenue/ Vanowen Street to
provide a continuous connection between
‐Provide maximum at‐grade crossing improvements to the
Buena Vista Street crossing.

Ongoing The  Federal Railroad Administration approved the City's Buena Vista / Vanowen quiet zone application in May
2021, and the Quiet Zone was established in September
2021.
‐Buena Vista/San Fernando grade crossing was
constructed as part of the Intestate 5 North HOV/Empire Exchange Project.

N‐1 CDD, Police Noise Control
Ordinance
Limit the hours of deliveries to commercial, mixed‐use, and industrial uses adjacent to residential; Limit the hours of operation for commercial and retail uses to limit noise intrusion; Limit commercial and industrial noise levels; Require the placement of all commercial heating,
ventilation, and air conditioning (HVAC)
machinery within mechanical equipment rooms wherever
possible.

Ongoing; Noise
Control
Ordinance
revisions
complete by 2014
In progress. Various departments are looking at a
potential Noise Ordinace in specific areas like downtown.

NOISE PROGRAMS
ATTACHMENT 2 - 14
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE N‐2 CDD Written Warning of
Noise Intrusion
Provide written warning to potential residents about noise intrusion as a condition of project approval, assistance, or facilitation when the City exercises discretionary review, provides financial assistance, or otherwise facilitates residential development in a non‐residential area, as
provided for by Land Use Element policy.

Ongoing Ongoing.  Implemented on a  project‐by‐project basis.

N‐3 Public Works  Noise Standards and
Compatibility Criteria
Review development proposals to ensure that noise
standards and compatibility criteria are met; Consult Noise Element guidelines and standards for noise compatible land uses; Enforce the California Noise Insulation Standards.

Ongoing Ongoing.  Incorporated into project‐specific design features of large development projects near noise
generators.

N‐4 CDD Noise Impact Analysis
Guidelines and
Acoustical Studies
Limit the hours of deliveries to commercial, mixed‐use, and industrial uses; limit the hours of operation for commercial and retail use to limit noise intrusion; limit commercial and industrial noise levels; etc.

Ongoing Ongoing.  Part of environmental assessment/EIRs for large development projects.

ATTACHMENT 2 - 15
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE N‐5 CDD, Public
Works
Vehicle Noise
Reduction
Review and designate local truck routes to reduce truck traffic in noise‐sensitive land use areas.
‐ Use alternative paving materials, such as rubberized
asphalt, to reduce traffic noise where determined feasible and cost efficient.

Ongoing Ongoing.  Part of environmanal assessments/DIR's for large development projects.

Public Works continues to utilize rubbized asphalt on all City funded paving projects.

ATTACHMENT 2 - 16
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE N‐6 CDD, Public
Works
Construction Noise Maintain  construction equipment per manufacturers’ specifications and fit equipment with the best available noise suppression devices; Shroud or shield all impact tools and muffle or shield all intakes and exhaust ports on power equipment; Comply with the operational hours outlined in the Burbank Noise Control Ordinance; Prohibit idling of construction equipment for extended periods of time in the vicinity of noise sensitive receptors; Locate fixed and/or stationary equipment as far as possible from noise‐sensitive receptors; Shroud or shield all impact tools and muffle or shield all intakes and exhaust ports on powered
construction equipment; Place temporary barriers, where feasible, as close to the noise source or as close to the receptor as possible.

Ongoing Ongoing.  Part of environmental assessment/EIRs for large development projects, as well as City construction noise regulations.

N‐7 CDD, Public
Works
Regional Roadway
Noise Abatement
Plan for noise abatement along freeways and highways;
Install, maintain, and update freeway and highway right‐of‐ way buffers and sound walls.

Ongoing Both  the 777 Front Street and First Street Village mixed‐ use housing projects that are adjacent to the 5 freeway in downtown were conditioned to include soundwalls to
mitigate freeway noise.  A soundwall was constructed
along the majority of the freeway frontage adjancet to
the 777 Front Street Project in 2021.  Staff is currently working with the Project Applicants and Caltrans to get a soundwall constructed on the remaining frontage of the
777 Front Street Project. Staff is still in discussion with Caltrans on the proposed construction of the sound wall conditioned on the 1st Street Village Project.

N‐8 CDD Aircraft Noise
Abatement
Regulate the siting and operation of heliports/helistops through the Conditional Use Permit process; Implement
flight profiles, tracks, and operating parameters for noise control with heliport/helistop operators (e.g., police, fire, hospital, private);  Work with the Burbank‐Glendale‐
Pasadena Airport Authority in implementing the Residential Acoustical Treatment Program.

Ongoing Ongoing  on a project‐by‐project basis and ongoing coordiantion between the City, Burbank‐Glendale‐
Pasadena Airport Authority, and the FAA in addressing
noise issues.

ATTACHMENT 2 - 17
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE N‐9 CDD Mixed‐Use Noise
Notification
Requirement
Notify residents in mixed‐use projects located adjacent to commercial or retail land uses that they could be affected by noise from adjacent uses.

Ongoing Ongoing  on a project‐by‐project basis.

OSC‐1 CDD, Parks
and
Recreation,
BWP
Public Involvement
and Education
Continue to implement the City’s docent program to
provide outdoor educational experiences for the public.

Consult with non‐profit organizations to establish docent programs in an effort to provide outdoor educational
experiences for the public. Provide public information
regarding water conservation measures, including low‐
water landscaping.

Ongoing BWP  implements a comprehensive water efficiency education and outreach program where staff helps
customers understand drought and necessity of water
conservation through the BWP website, mailers, and
monthly newsletter currents.

BWP offers monetary rebates for replacing turf grass with drough resistant landscape, installing high efficienty
toilets and washing machines, and utilizing efficient
irrigation methods. BWP hosts a water‐wise gardening
website which promotes the usage of native and drought
tolerant plants.

OSC‐2 CDD, Parks
and
Recreation
Park, Recreation, and
Community Services
Master Plan
Development of a Park, Recreation, and Community
Services Master Plan would direct long‐term acquisition, operation, management, and programming for parks, open
space, and recreation facilities.
2016 As  part of Phase 1 for staff initiated the first step of the Department Park Master Plan through the George Izay
Park Master Plan engagement efforts. The George Izay
Park Master Plan results and report will be presented to the Parks and Recreation Board in June 2022. Phase 2 of the continuation of a Department‐wide Park Master Plan
will begin in fall 2022.

OPEN SPACE AND  CONSERVATION PROGRAMS
ATTACHMENT 2 - 18
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE OSC‐3 Parks and
Recreation
Park, Recreation, and
Community Services
Acquisition Funding
Explore funding sources to support acquisition and
development of new or expanded parks, open space areas, trails, and bikeways that include County, State, and Federal funds; donations; and grants.

Ongoing In  2021, the Department submitted a grant application for Prop 68 funding which secured $243,440  for the
development of the Dick Clark Dog Park. The Department
was also proactive in  applying  for Prop 68 fudning for the McCambridge Aquatic Pool. Although unsuccessful,
staff continues to seek other grant opportunities.

Additionally, the Burbank Unified School District
provided over $18,000 in funding for the batting cage
pad project at George Izay and McCambridge Park
ballfields.

OSC‐4 CDD, Parks
and
Recreation
Joint‐Use Agreements
for Parks and Open
Space
Continue to implement and expand the use of joint‐use
agreements to increase parks and open space resources
available to Burbank residents. Specifically, seek to expand joint‐use agreements with school districts. Investigate conversion or joint use of surplus or otherwise
underutilized lands, including railroad and public utility rights‐of‐way, for open space use.

Ongoing On  May 24, 2021, the City approved agreements with Los Angeles Community Garden Council to manage
community gardens at 1141 North Pass Avenue and 3705
West Clark Avenue.

OSC‐5 Parks and
Recreation
Regional Consultation Consult  with adjacent jurisdictions regarding programs to fulfill regional recreation goals. Meet with adjacent
jurisdictions to pursue: Regional recreation planning and programs in developing regional park facilities in the
Verdugo Mountains; Development of park, trail, and
bikeway linkages; and Development of a Verdugo Hills Trails Master Plan.

Ongoing Ongoing
ATTACHMENT 2 - 19
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE OSC‐6 Parks and
Recreation
Open Space
Management
Establish a management program for open space that
provides appropriate public access for all segments of the population while recognizing preservation goals; Develop a program for the ongoing monitoring of natural resources identified by the California Department of Fish and Game Natural Diversity Data Base and sensitive habitats identified in the City; Evaluate and monitor the impact of public
access on habitat.

Ongoing The  Department permitted the Cougar Conservancy to install camera's to observe Cougars in the Verdugo
Mountains.  Additionally, they  hosted two (2)
community workshops in November at Stough Canyon
Nature Center  to provide information about the
importance of protecting our wildlife and how to coexist.

OSC‐7 CDD Development Review Encourage  applicants to use native plants and low‐water landscaping methods;  Promote the use of native plant
species in landscaping areas adjacent to open space;
Evaluate change to the total mountain area for any
proposed development in the Verdugo Mountains; and
more.

Ongoing Ongoing.  Incorporated as part of project design features and verified through the City's building plan check and permitting process.

ATTACHMENT 2 - 20
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE OSC‐8 CDD, Parks
and
Recreation,
Public Works
Capital Improvement
Program
Continue to use the City’s CIP to prioritize, finance, and complete parks and infrastructure improvements, including:
‐ construction of new parks and improvements to current parklands and park facilities to the standards mentioned in policies above;
‐ construction of a network of multi‐use trails that connects the City’s parks and open spaces; and
‐ maintenance of City‐owned and operated recreation
facilities.

Ongoing The  Parks and Recreation Department completed: Indoor Courts Resurfaced; Park Playground Equipment
Replacement at Robert Lundigan Park, George Izay Park
and Miller Park; irrigation controlllers installed at (10) parks; DeBell netting replaced; DeBell tree removal at 18 hole and Par 3; DeBell Driving Range improved; Ballfield lighting at Larry L Maxam Park; Tennis Center
windscreens replaced; and Ballfield bleacher retrofitted; OSC‐9 CDD, BWP Regional Water
Consultation
Consult with Metropolitan Water District of Southern
California and the Los Angeles Regional Water Quality
Control Board (RWQCB) to: Maintain groundwater recharge areas to protect water quality; Reduce the amount of water used for landscaping and increase use of native and drought tolerant plants; Encourage the production, and use of
recycled water for landscaping; Maintain water quality
objectives for urban runoff; Comply with all provisions of the NPDES permit, and support regional efforts by the Los Angeles RWQCB to improve and protect surface water
quality.

Ongoing BWP  continuously plans and analyzes existing and potential potable water uses that can be feasibly
replaced with recycled water. Per City Ordiance, recycled water use is required for landscape irrigation and
evaporative cooling when the custormer's parcel is close to our adjacent toa recycled water main. BWP offers
monetary rebates for replacing turf grass with drought
resistant landscape and hosts a water‐wise gardening
website which promotes the usage of native and drought
tolerant plants.

OSC‐10 CDD, Parks
and
Recreation
Open space
Preservation
Organizations and
Agencies
Continue to work with adjacent jurisdictions, the Santa Monica Mountains Conservancy, and federal and state
agencies to identify, conserve, and protect urban open
space, hillside areas, and lands accessible for public use.

Pursue grants and other resources to plan for open space preservation and, as appropriate, purchase properties to be included in the open space system. Use conservation
easements where feasible as part of the City’s open space acquisition program.

Ongoing The  GGRP Update seeks to facilitate collaboration with other agencies to help protect urban open space.

ATTACHMENT 2 - 21
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE OSC‐11 CDD, BWP,
Public Works
Burbank Urban Water
Management Plan and
Recycled Water
Master Plan
Continue to update the Burbank Urban Water Management
Plan and Recycled Water Master Plan every five years to serve as foundational documents and source of information for Water Supply Assessments and Written Verifications of Water Supply. Include estimates for population, water
demand, and water supply with projections in five‐year
increments to 2035. Use the Recycled Water Master Plan to ensure the use of recycled water wherever allowed and
feasible.

Ongoing On  June 22, 2021, the City Council approved the 2020 Urban Water Management Plan and Water Shortage
Contingency Plan. The plan includesassessment of past
and future water supplies and demands; evaluation of
the future reliability of Burbank's water supplies; water conservation and water management activities;
discussion of water recycling activities; contingency
planning for water shortages; and evaluation of
distribution system water losses.

The city is in the planning states for its recycled water and wastewater long term master plan and expects to
finalize the report in fiscal year 2022‐2023.

BWP continuously plans and analyzes existing and
potential potable water uses that can be feasibly
replaced with recycled water.

OSC‐12 CDD, Public
Works, BWP
Sustainability Element
and Sustainability
Coordinator
Prepare a Burbank2035 Sustainability Element to provide comprehensive direction regarding how best to incorporate sustainability in all City policies and operations. To ensure quality and efficiency in implementing City sustainability policies, it is important that the City identifies an internal resource person with dedicated job‐hours to carry out the GGRP and Sustainability Element. The City will establish a Sustainability Coordinator position to manage
interdepartmental efforts and the work of the Sustainable Burbank Commission to prioritize and implement
sustainability in all City policies and operations.
2015 The  City is updating the GGRP and prioritizing
sustainability policies, which includes funding for a
sustainability coordinator position.

In February 2022, the City Council establisshed
Sustainability Officer job classification. The City
anticipates opening the position in Burbank Water and
Power.

CDD, Public
Works
S‐1 CDD, Police,
Fire
Review and Update
Safety Plans on a
Regular Basis
Regularly review and update the City’s safety plans every five years: All‐Hazard Mitigation Plan, Multi‐Hazard
Functional Plan, Police Strategic Plan, Fire Strategic Plan, and Hazardous Materials Area Plan.

Every 5 years The  City will replace Multi Hazard Functional Plan with Emergency Operations plan. The Local Hazard Mitigation
Plan is scheduled to go to Council on March 14, 2023.
2015Prepare a Stormwater Master Plan to evaluate the
feasibility of capturing stormwater and recharging
groundwater as part of a comprehensive storm water
The City approved Municipal Agreement with the Los
Angeles County Flood Control District (LACFCD) regarding the use of funding from Measure "W", which is intended
Stormwater Master
Plan
OSC‐13
ATTACHMENT 2 - 22
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE S‐1 CDD, Police,
Fire
Review and Update
Safety Plans on a
Regular Basis
(Continued)
Regularly review and update the City’s safety plans every five years: All‐Hazard Mitigation Plan, Multi‐Hazard
Functional Plan, Police Strategic Plan, Fire Strategic Plan, and Hazardous Materials Area Plan.

Every 5 years City  Staff is updating the Housing and Safety Elements during 2021. As part of the Safety Element Update, the
City is reviewing fire hazard zone maps, emergency
ingress and egress to protect public safety while
facilitating new development consistent with the City's Housing Element and General Plan.

SAFETY PROGRAMS
S‐1 CDD, Police,
Fire
Review and Update
Safety Plans on a
Regular Basis
(Continued)
Regularly review and update the City’s safety plans every five years: All‐Hazard Mitigation Plan, Multi‐Hazard
Functional Plan, Police Strategic Plan, Fire Strategic Plan, and Hazardous Materials Area Plan.

Every 5 years City  Staff is updating the Housing and Safety Elements during 2021. As part of the Safety Element Update, the
City is reviewing fire hazard zone maps, emergency
ingress and egress to protect public safety while
facilitating new development consistent with the City's Housing Element and General Plan.

S‐2 CDD, Police,
Fire
Review Critical
Facilities
Review critical facilities proposed for development or
expansion to ensure that hazardous conditions are
mitigated or hazard reduction features are incorporated to the satisfaction of the responsible agencies. Critical facilities include power and water utilities, roads, hospitals, fire and police stations, emergency operation centers,
communication centers, high‐risk or high‐occupancy
facilities, and dependent care facilities with special
evacuation considerations.

Ongoing Participated  in the ongoing update to the Burbank 2035 General Plan Safety Element which addresses critical
facilities and emergency evacuation routes in addition to other ongoing operations.

ATTACHMENT 2 - 23
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE S‐3 CDD, Fire Fire Protection
Requirements
Regularly update fire protection requirements, especially in transition areas between developed and undeveloped land.

Enforce stringent construction and design standards, and work to preserve open space where wildfire hazards exist.

Ongoing Ongoing.  Fire Hazard Reduction Program (Brush
Clearance) ‐ The Burbank Fire Department has requested
property owners to participate In this program in order to help the fire department protect lives and structures by requesting a Defensible Space Inspection (Established as part of Assembly Bill 38 as of July 1, 2021).

S‐4 CDD Evaluate Liquefaction
Potential
Evaluate the liquefaction potential of a site when, during the course of a geotechnical investigation, shallow
groundwater (50 feet or less) and unconsolidated sandy
alluvium soils are found. Fault investigations in the Verdugo Fault zone should be encouraged where feasible. The state geologist should be informed of any findings pertinent to the activity designation of the fault.

Ongoing Continue  to require building permit applications to conduct a geotechnical investigation in areas known to
have liquefaction, expansive soils and within proximity of known fault areas.

S‐5 CDD, Public
Works
Review Floodplain
Mapping
Annually review floodplain mapping provided by the
Federal Emergency Management Agency, the California
Department of Water Resources, and others. Update
Burbank2035 as necessary to incorporate any changes to
floodplain or flood hazard areas.

Annually Ongoing  coordination with County of Los Angeles Department of Public Works regarding the flood zone
high prone areas as well as coordination with FEMA for
local floold maps and any future updates.

ATTACHMENT 2 - 24
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE S‐6 CDD Compliance with
California Building
Standards Code and
BMC.

Verify that new development complies with the California Building Standards Code’s seismic design standards and the BMC. Verify that structural and architectural features are designed in accordance with the seismic provisions of the California Building Standards Code.

Ongoing Ongoing  through building plan check and permit process.

The City Council adopted the 2022 California Building
Standards Code Ordinance in October 2022. The
California Building Code went into effect on January 1, 2023.

S‐7 CDD Manage Safety
Information with GIS
Technology
Existing and future geotechnical and seismic data contained in public, private, and City archives.
‐ The locations and details of hazardous structures, critical lifelines and critical facilities. Data about these facilities should include the building's age, function, occupancy, and structural risk.
‐ A listing of disaster response plans and resources available so these can be implemented immediately in case of
emergency.
‐ An overlay of seismic constraints to assist
in emergency
response planning.

Ongoing Ongoing  coordination between Community
Development Department, Information Technology,
Public Works Department, Police and Fire Departments
to ensure existing GIS database is updated on an annual basis to address hazardous structures, new location of
new development sites, and existing infrastructure that may be impacted in the event of natural disasters or
other emergency events.

S‐6 CDD Compliance with
California Building
Standards Code and
BMC.

Verify that new development complies with the California Building Standards Code’s seismic design standards and the BMC. Verify that structural and architectural features are designed in accordance with the seismic provisions of the California Building Standards Code.

Ongoing Ongoing  through building plan check and permit process.

ATTACHMENT 2 - 25
No.

Responsible
Agency/
Department
Title Program  Description Goal 2022  Status Updates
ANNUAL REPORT ON GENERAL PLAN IMPLEMENTATION PROGRAMS ‐ PLAN REALIZATION STATUS UPDATE S‐7 CDD Manage Safety
Information with GIS
Technology
Existing and future geotechnical and seismic data contained in public, private, and City archives.
‐ The locations and details of hazardous structures, critical lifelines and critical facilities. Data about these facilities should include the building's age, function, occupancy, and structural risk.
‐ A listing of disaster response plans and resources available so these can be implemented immediately in case of
emergency.
‐ An overlay of seismic constraints to assist in emergency response planning.

Ongoing Ongoing  coordination between Community
Development Department, Public Works Department,
Police, and Fire Departments to ensure existing GIS
database is updated on an annual basis to
address
hazardous structures, new location of new development
sites, and existing infrastructure that may be impacted in the event of natural disasters or other emergency events.