ATTACHMENT 1-1

ATTACHMENT 1

SUMMARY OF PLANNED DEVELOPMENTS (PD) AND

DEVELOPMENT AGREEMENTS (DA)

The following terms, as defined below are used in this document:
• “Approved PDs” – PD projects approved by the City Council since the PD process was added to the Zoning Ordinance in October 1985.
• “Completed PD/DAs” – PD Projects that have been built out and are in compliance with the related DA and mitigation measures.
• “PDs with Active DAs” – Approved PD projects with an active DA that are either in process of construction, or where the PD or DA has been or will be amended. • “PDs with Expired DAs” – PDs with DAs that were approved but were never built , or were replaced by another PD/DA. The DA has expired and cannot be used. • “Replaced by other PD” – Prior PD approvals that were replaced by new PDs on the City’s Zoning map.
• “Denied or Withdrawn” – PD applications that were denied or were withdrawn before being considered by the City Council.
• “Submitted (Under Review)” – The PD application has been submitted to the Planning Department and is currently in review or on hold.

COMPLETED PD/DAs:

Planned Development No. 89-4
Project: Burbank Town Center Mall
Location: 201 East Magnolia Boulevard
Applicant: Haagan-Burbank Partnership (succeeded by CAPREF Burbank, LLC; CCDP NSFB, LLC; CCDP BB Land, LLC; CCDP Grinnell, LLC)

Approved Effective DA Expiration
PD and DA
(Ord. 3169)
September 19,
1989
October 28,
1989
October 28,
2004
First Amendment
(Ord. 3207)
September 25,
1990
December 6,
1990
No change
Second Amendment
(Ord. 3341)
April 20,
1993
May 29,
1993
No change
Third Amendment
(Ord. 3389)
October 18,
1994
November 20,
1994
No change
Fourth Amendment
(Ord. 3474)
October 21,
1997
November 25,
1997
No change

ATTACHMENT 1-2

Status:

The application for the Fifth Amendment to the Planned Development Zone was filed on June 27, 2016. In 2022, the project request was withdrawn by the landowner, however, the City continues to work with property ownership on possible future land uses to be considered in alignment with the proposed Downtown Burbank Transit Oriented Development Specific Plan Project. City staff continues to engage with the current ownership entities, ( which as of March 2023, includes the Onni Group - a Toronto-based investor and developer with expertise in the construction of office space and mixed-use developments) on the future redevelopment of the properties.

Planned Development No. 97-03
Project: Burbank Empire Center
Location: West Empire Avenue & North Victory Place (former B-1 Site) Applicant: Zelman Retail Partnerships, Inc. (original applicant/developer)

Approved Effective DA Expiration
PD and DA
(Ord. 3554)
September 12,
2000
October 17,
2000
October 17, 2015
(Sub-Area D:

Sept. 6, 2018)
Minor Amendment
(Ord. 16-3,877)
May 10,
2016
June 10,
2016
October 17, 2015
(Sub-Area D:

Sept 6, 2018)

Status & Mitigation Monitoring:

The approved square footage in the approved development agreement has been constructed, and the project has complied with the near-term conditions of approval.

The City is working with the property owner to consider an amendment to the existing PD in order to address changes to the property site plan resulting from property line changes along the south side of Empire Avenue that occurred as part of the public of right of way improvements for the Empire Avenue Interchange. The City Council will consider any future amendment request once the City, Caltrans, and Burbank Empire Center resolve unfinished right of way construction and landscaping issues along the south side of Empire Avenue.

PDs WITH ACTIVE DAs:

Planned Developments No. 88-2 & 99-1
Project: Parc Pointe-Chandler
Location: 3601 W. Verdugo Avenue and 610 and 630 N. Hollywood Way Applicant: Mishenka Properties, LLC and Park Pointe Investors, LLC

ATTACHMENT 1-3

Approved Effective DA Expiration
PD 88-2 and DA
(Ord. 3134)
November 15,
1988
December 2,
1988
December 2,
2038
First Amendment
and PD 99-1 (Ord. 3534)
December 14,
1999
December
15, 1999
No change
Second Amendment
(Ord. 19-3,912)
February 5,
2019
March 8,
2019
No change

Status:

The site is developed with a multiple family residential development consisting of 255 units in seven three-story buildings and one three-story office building totaling 30,000 square feet. Parking is provided in three two-story subterranean garages beneath the commercial and residential buildings. The Project Site has two zoning designations, PD 88-2 and 99-1, that are part of a single Development Agreement for the Project Site. Construction of this project is co mplete, and the project has complied with all conditions of approval.

On February 5, 2019, the City Council approved an ordinance amending the DA allowing a request to allow (1) 51 parking spaces previously allocated for residential use to be used exclusively by tenants of the 30,000- square-foot office building, (2) removing the language that allows commercial parking to be used by residential tenants after hours and on weekends, and (3) a change in the maximum square footage and height allowed for the commercial office building to 30,000 square feet and three stories, excluding parking levels. The PD 88- 2 and 99- 1 zoning designations, boundaries, and acreage remained unchanged for the subject properties comprising the Project Site.

Planned Development No. 89-7
Project: Media Studios North
Location: 3101-3377 Empire Avenue, between Ontario Street and Hollywood Way Applicant: Worthe Real Estate Group, successor-in-interest M. David Paul Development, LLC

Approved Effective DA Expiration
PD and DA
(Ord. 3278)
November 5,
1991
Never Recorded,
no effective date
10 years
First Amendment
(Ord. 3463)
April 15,
1997
May 24,
1997
June 17,
2007
Second Amendment
(Ord. 3667)
March 1,
2005
April 9,
2005
N/A
Third Amendment
(Ord. 3838)
April 16,
2013
June 20,
2013
May 10,
2018
Fourth Amendment
(Ord. 18-3,903)
May 8,
2018
June 15,
2018
January 31,
2019
Fifth Amendment
(Ord. 19-3910)
January 29,
2019
March 1,
2019
May 10,
2028
ATTACHMENT 1-4

Status:

The project is a large office complex in a campus setting, and many tenants are media companies. To date, 622,553 adjusted gross square feet have been constructed. In 2013, the Council approved a five- year extension of the DA to May 10, 2018. In addition to the five-year extension, 73,000 adjusted gross square feet were added to the entitlement (for a new grand total of 783,000 square feet of development) to allow for the construction of a 160,447- square-foot office building. Two subsequent amendments for time extensions have been approved, the F ourth Amendment extended the expiration date from May 10, 2018 to January 31, 2019, and the F ifth Amendment from January 31, 2019 to May 10, 2028.

Mitigation Monitoring:

The project meets all conditions of approval for the DA’s constructed square footage.

Construction of the remaining 160,447 square feet requires additional intersection improvements to be constructed at Hollywood Way / Thornton Ave. and Hollywood Way / Winona Ave. However, these improvements are currently under construction by the Avion Development project, which also contributes additional traffic to the area that is mitigated by the two intersection improvements

Planned Development No. 89-9
Project: Shopping Complex consisting of a supermarket (Pavilions) and ancillary retail and fast-food restaurant spaces totaling 103,965 sf.

Location: 1100 West Alameda Avenue
Applicant: Pacific Theatres, Inc.

Approved Effective DA Expiration
PD and DA
(Ord. 3230)
January 15,
1991
February 26,
1991
December 1,
2023

Status:

The Project is built out and is in compliance with the Conditions of Approval. There are no pending amendments to the PD/DA.

Planned Development No. 91-13
Project: The Walt Disney Studios Master Plan
Location: 500 South Buena Vista Street
Applicant: The Walt Disney Company (succeeded by Disney Enterprises, Inc., a wholly owned subsidiary of The Walt Disney Company)

Approved Effective DA Expiration
PD and DA
(Ord. 3317)
October 20,
1992
November 24,
1992
November 24,
2017
First Amendment
(Ord. 16-3,885)
August 16,
2016
September 16,
2016
November 24,
2035

ATTACHMENT 1-5

Status:

The City Council approved the 18- year extension to the DA on August 16, 2016, extending the term of the DA to November 2035. The PD appr oved construction of 1,932,528 Office Equivalent Gross Square F eet (OE -GSF) of unique studio development, including sound stage and related production facilities, production support facilities, media office buildings, employee center and other facilities to be constructed over a 25-year period. OE-GSF is a calculation used in the Media District to limit development based on traffic impacts. To date, Disney has developed approximately 65% (approximately 1,251,398 OE-GSF) of their total entitlement . All conditions of approval required for the current construction have been met. Disney did not undertake any development projects in 2022 that triggered mitigation measures related to demolition or new construction activities on the Studio Lot. Disney continued to comply with all mitigation measures related to the ongoing operation of the Studio Lot.

Mitigation Monitoring:

The traffic improvements required to- date (i.e., mitigation measures) have been installed and completed on Buena Vista Street, Alameda Avenue, and Riverside Drive.

The traffic mitigation measures were updated with the DA extension (via Supplemental EIR), and the new mitigation measure for the intersection of Olive Avenue/Buena Vista Street will be implemented when total square- footage reaches 1,550,000 OE -GSF.

Disney continued to comply with all mitigation measures related to the ongoing operation of the Studio Lot.

Planned Development No. 94-7
Project: Warner Bros. Studio Main Lot Master Plan
Location: 4000 Warner Boulevard
Applicant: Warner Bros., Inc. (succeeded by Warner Bros. Entertainment, Inc.)

Approved Effective DA Expiration
PD and DA
(Ord. 3415)
October 10,
1995
November 25,
1995
November 25,
2015
First Amendment
(Ord. 3807)
April 26,
2011
May 27,
2011
November 25,
2030

Status:

The PD was approved in 1995, and development has occurred slowly but steadily since. To date, Warner Bros. has develo ped approximately 8.9 % of their entitled Master Plan for the Main Lot. With the existing development to date, the Main Lot has constructed approximately 188,491 net new Office Equivalent Gross Square Feet (OE-GSF) of the 2,123,000 net new OE-GSF (2,664,714 gross square feet) that was entitled. OE-GSF is a calculation used in the Media District to limit development based on traffic impacts. The most recent developments were Stage 29 within Subarea 3, completed in Q3 of 2018 and the Tour Center and Parking Structure, completed in Q1 of 2020. An appli cation was received in 2021 for a proposed 15,620 square feet employee Child Care Center for 132 children on the main studio lot as well as a permit ATTACHMENT 1-6

for new perimeter fencing. The proposed Child Care Center was approved in 2022 and is currently under construction, which is anticipated to be completed in 2023.

Mitigation Monitoring:

All conditions of approval required for the construction to date have been met , including near-term traffic improvements (mitigation measures) such as signal control systems improvements. Additional long-term traffic improvements will be implemented when future construction reaches square-footage thresholds specified in the DA.

Planned Development No. 94-8
Project: Warner Bros. Studio Ranch Lot Master Plan
Location: 3701 Oak Street
Applicant: Warner Bros., Inc. (succeeded by Warner Bros. Entertainment, Inc.)

Approved Effective DA Expiration
PD and DA
(Ord. 3416)
October 10,
1995
November 25,
1995
November 25,
2015
First Amendment
(Ord. 3808)
April 26,
2011
May 27,
2011
November 25,
2030

Status:

The PD approved 749,000 Office-Equivalent Gross Square Feet (OE-GSF) in addition to the square footage that existed at the time, which is 94,673 sf. In 2011, the DA was extended an additional 15 years until 2030. Since then, several buildings have been constructed. The new campus will contain approximately 337,164 net new OE -GSF.

When built, Warner Bros. will develop approximately 45% (or 337,164 OE-GSF) of the 749,00 OE-GSF that was entitled.

Mitigation Monitoring:

The applicant has conducted a project condition compliance review. City s taff is working with the Worthe Real Estate Group (property owner) and Krismar Construction (contractor) to ensure compliance with all mitigation measures applicable with the proposed redevelopment of the project site, including traffic mitigation measures addressed as part of the proposed development.

Planned Development No. 96-01
Project: Burbank Studios Master Plan (formerly NBC Studios Master Plan) Location: 2900 & 3000 West Alameda Avenue
Applicant: Worthe Real Estate Group, successor-in-interest to NBC Catalina Media; Development II, LLC)

Approved Effective DA Expiration
PD and DA
(Ord. 3461)
March 11,
1997
March 19,
1997
March 19,
2017
ATTACHMENT 1-7

First Amendment
(Ord. 3846)
December 17,
2013
January 17,
2014
March 19,
2024
Status:

Originally approved in 1997, PD 96- 01 approved the Burbank Studios Master Plan (also known as, “the former NBC Studios Property”). When approved the City also approved a 20- year Development Agreement that provided the property owner the right to develop a total of 1,825,865 Office- Equivalent Gross Square Feet (OE -GSF) on the property by 2017. OE-GSF is a calculation used in the Media District to limit development based on traffic impacts. The term of this Development Agreement was extended by the City Council in 2013, to March 19, 2024.

Following the approval of PD 96- 01, The Pointe Burbank was constructed in 2006/2007 – an approximately 480,000-square-foot (329,000 OE-GSF) office building at 2900 West Alameda Avenue. Also, more recently in 2020 Worthe Real Estate Group began work on building two new iconic Frank Gehry Buildings on the Burbank Studios Lot that contain an approximate office floor area of 800,000 square feet (566,046 OE-GSF). It is expected that these new buildings – as well as the rest of the Burbank Studios Lot – will be fully occupied by Warner Brothers once construction is completed in June 2023.

Two Frank Gehry-designed Buildings, also known as “Second Century Project,” are currently under construction. When complete, the Burbank Studios Master Plan will have 617,983 OE-GSF of vested development potential remaining. This development potential is vested through the term of the Development Agreement (2024).

Mitigation Monitoring:

PD 96-01 is complying with all conditions of approval, including the construction of traffic improvements that are required as certain OE -GSF thresholds are met. This includes signal improvements at the Buena Vista / Riverside / SR -134 Ramps intersection, pos sible intersection improvements at the intersection of Barham and Forest Lawn Drive, and site access improvements at Bob Hope Drive and Parkside Avenue. Additionally, the property owner and City staff will work collaboratively with City of Los Angeles, NBC Universal, and Caltrans in confirming that mitigation measures resulting from PD 96-01 that are within their jurisdictions are completed.

Airport Development Agreement
Project: Airport Development Agreement and Planned Development Nos. 2004-169 and 2004-170
Location: Hollywood-Burbank Airport
Applicant: Burbank-Glendale-Pasadena Airport Authority

ATTACHMENT 1-8

Approved Effective DA Expiration
Replacement
Terminal DA and
Minor Amendments
to PD Nos.
2004-169 & 2004-
170
(Ord. 16-3,882)
August 1,
2016
February 7,
2017
February 7,
2037

Status:

On August 1, 2016, the City Council adopted an ordinance approving a Development Agreement (and related PD Amendments) for a 14- gate replacement terminal, other airport buildings and facilities, and related improvements. On November 8, 2016, Burbank residents approved Measure B (with 70% of the vote) to allow a new 14-gate, 355,000-square-foot replacement terminal to be built with up to 6,637 parking spaces.

The Authority began the Replacement Terminal Design Process by holding a total of nine public design charrette workshops between March 27, 2019, and October 26, 2019. A total of five design charrette work shops were held in Burbank and one each was held in the cities of Glendale, Pasadena, and Los Angeles. Furthermore, the Authority conducted a procurement and later released a request for proposals for the selection of a consultant firm that would provide project management and associated services for the replacement terminal project which include setting up the program control processes, supporting the Authority in soliciting progressive design- builder firms, and helping define the selection process by which the best value design-builder firm will be selected. In 2019, the Authority selected the firm of AECOM Technical Services, Inc. (AECOM) to provide program management and associated services for the replacement terminal project.

In March 2020, the Airpo rt Authority (Authority) suspended planning and implementation of all discretionary projects, including the replacement terminal, due to the COVID-19 Pandemic. As of September 2021, the Authority had authorized the restart of the replacement terminal proj ect by re -engaging AECOM Technical Services, Inc. consulting firm (AECOM) to manage the project and continue work on development of the Program Development Manual and preparation of a Request for Qualification in order to begin the selection of a progressi ve design builder for the project. On April 27, 2022 the Authority Commission voted to have Jacobs Project Management Co. (Jacobs) assume the program management services for the replacement terminal project.

In early 2022, the Authority initiated a two-step procurement process for the project to solicit for a design -builder to provide planning, design, construction, and commissioning services. The first step included a Request for Qualification (RFQ) being posted on May 20, 2022. The Authority received five statements of qualifications and subsequently selected a shortlist of three progressive-design build teams that was later approved by the Authority Commission. The three teams were invited to respond ATTACHMENT 1-9

to a Request for Proposals that was issued in July 202 2. On December 19, 2022 the Authority Commission awarded a design- build agreement to the Holder, Pankow, TEC, Joint Venture (HPTJV) to provide design- build services for the replacement terminal project. A notice to proceed was subsequently issued to HPTJV the same day for Phase 1 (Preliminary State) of the project which involves construction specifications up to 60% completion and construction planning services.

On October 3, 2022 the Authority Commission designated the Adjacent Property as the site of th e replacement passenger terminal and approved a Covenant and Environmental Restriction on Property (Land Use Covenant) for the Benefit of the Los Angeles Regional Water Quality Control Board (LARWQCB). The Land Use Covenant memorializes development and use restrictions imposed on the Adjacent Property by the LARWQCB. The Memorandum of Adjacent Property Replacement Passenger Terminal Selection was recorded with the County Registrar -Recorder on October 6, 2022 and the Land Use Covenant was recorded with the C ounty Registrar-Recorder on December 5, 2022.

In November 2022, Jacobs began the process of meeting with various City departments and divisions to discuss various City requirements as they began to work with the design-build team to formalize a project schedule. The project applicant and staff met on March 7 to discuss timelines for plan check submittal.

Mitigation Monitoring:

The Authority received LA County approval in 2018 of the Human Health Risk Assessment (HRRA) and conditional Federal Aviation Administration ( FAA) approval on the Airport Layout Plan (ALP) in 2020.

In 2018 t he Authority began work on the Environmental Impact Statement (EIS) required under the National Environmental Protection Act (NEPA) and a Notice of Intent was released in December 2018. A 30- day public scoping period was held in early 2019 with two scoping meetings being held for the Agency and public to solicit input on the EIS. The Draft EIS was released for a 67-day public review and comment period starting on August 21, 2020 and ending on October 27, 2020. During the public review and comment period, two virtual public workshops were held where the FAA provided a presentation about the project, the alternatives, and an overview of the impacts; and one public hearing was held to allow the public to provide oral comments.

In May 2021, the FAA issued a Final EIS and Record of Decision (ROD) for the proposed construction and operation of the 14-gate replacement passenger terminal.

As noted above, the Authority has selected both a project manager and design- build team for the project. City staff continues to monitor the project and compliance with the Mitigation Monitoring and Reporting Program (MMRP) that was approved as part of the DA and Final EIR.

ATTACHMENT 1-10

Planned Development No. 2012-01
Project: IKEA Store
Location: 600 South San Fernando Boulevard
Applicant: IKEA Property, Inc.

Approved Effective DA Expiration
PD and DA
(Ord. 14-3,850)
March 18,
2014
April 18,
2014
April 18,
2034

Status:

Construction was completed, and the store opened in Spring 2017. In 2022, IKEA in partnership with the Downtown Burbank Property -Based Business Improvement District (PBID) and the City of Burbank Community Development Department completed landscaping improvements for two (2) medians along South San Fernando Boulevard. The improvements were fully funded by IKEA. Additionally, City staff is working with IKEA on completion of an outstanding condition of approval that includes the installment of landscape planters on the parking deck of the existing IKEA store.

It is anticipated that this work will be completed in 2023.

Mitigation Monitoring:

A Mitigation Monitoring and Reporting Program (MMRP) was approved as part of the Final EIR. All mitigation measures have been completed.

Planned Development No. 2013-01
Project: The Talaria at Burbank Mixed Use Project
Location: 3401 West Olive Avenue
Applicant: MBV Investment Co., L.L.C.

Approved Effective DA Expiration
PD and DA
(Ord. 14-3,856)
October 28,
2014
November 28,
2014
November 28,
2029

Status:

The Talaria at Burbank Mixed Use Project is a mixed- use residential and retail development with 241 rental units, a 42,950- square-foot grocery store, and 760 parking spaces on a 3.86- acre site. The project construction of the approved project commenced in 2016 was completed in 2019. The residential and commercial components of the project are open and fully operational.

Mitigation Monitoring:

The applicant restriped the eastbound leg of Hollywood Way and Alameda Avenue from a left turn to a through lane. The Developer paid into a fund to construct intersection improvements, including funds for improvements identified in the Alameda North Neighborhood Protection Plan. These s idewalk/traffic calming improvements were completed in 2020.

ATTACHMENT 1-11

Planned Development No. 2014-01
Project: First Street Village
Location: 275, 325, & 375 North First Street (Approved as 315 North First Street) Applicant: First Street Village, L.L.C.

Approved Effective DA Expiration
PD and DA
(Ord. 17-3,894)
June 6,
2017
July 14,
2017
July 14,
2027

Status:

First Street Village Mixed Use Project, comprises a total of 275 multifamily apartments (including 14 “Workforce Housing Units”) including resident amenities and a total of 18,976 square-feet of retail/commercial space on the ground floors (of which may be a maximum of 9,711 square-feet for retail uses, and a maximum of 9,265 square-feet for restaurant uses).

The project is in the process of being constructed on three acres (three blocks) in downtown Burbank in three phases with one building (one block) to be completed in each phase. Building A, located at 325 N First Street, has been completed, and was issued a temporary Certificate of Occupancy. The units and commercial tenant spaces are currently being leased. The ground floor of building A is beginning to be occupied by tenants including an art gallery and fitness studio. Building C, located at 375 N First Street, is underway and the construction has reached the ground levels. Building B is in plan check, and the demolition has not yet been commenced.

Mitigation Monitoring:

Mitigation monitoring is ongoing through the plan check process. Public improvements adjacent to the project site include pedestrian amenities, street furniture, intersection bulb-outs, landscape and lighting within the public right-of-way, a raised bicycle paths, and a public “pocket park” located at the northeastern corner of the project site, where N First Street and W Magnolia Blvd meet. The excavation permit for the above mentioned improvements was issued in early February 2023.

Planned Development No. 16-01
Project: Avion
Location: 3001 N. Hollywood Way
Applicant: Burbank Industrial Investors, LLP

Approved Effective DA Expiration
PD and DA
(Ord. 19-3916)
March 26,
2019
May 17,
2019
May 17,
2029

Status:

On April 16, 2019, the City Council approved this project , which consists of six industrial/flex buildings totaling 1,004,307 square feet; 9 creative office buildings of 142,250 square feet total; 2 retail and restaurant buildings of 15,475 square feet total, ATTACHMENT 1-12

and a 150- room hotel. Co nstruction commenced in October 2019 and the applicant has completed construction of the industrial buildings, office buildings and retail/restaurant buildings . A Development Review application (DR) for the construction of a six-story, 150-room hotel was approved on February 11, 2021, and the building permit was issued on February 25, 2022 . The hotel is currently under construction.

Mitigation Monitoring:

The Mitigation Monitoring and Reporting Program (MMRP) was approved as part of the Final EIR. C urrently, a majority of the required o n- and off -site improvements (buffered bike lanes, onsite parking for M etrolink, green streets infrastructure, tree installation, new streets and associated curb & gutter improvements) have been completed or are under construction.

Planned Development No. 17-01
Project: 777 N. Front Street
Location: 777 N. Front Street
Applicant: LaTerra Development, LLC for SJ4 Burbank, LLC

Approved Effective DA Expiration
PD and DA
(Ord. 19-3,926)
December 17,
2019
January 17,
2020
January 17,
2030

Status:

On December 17, 2019, the City Council approved the project which consists of a mixed-use project with 573 residential (rental) units, a hotel with 307 rooms, and 1,067 square feet of ground floor retail space on a vacant 7-acre site. Site demolition permits were issued in July 2020 and grading and shoring permits were issued in November 2020. Grading and shoring permits were issued In November 2020; foundation permit for two residential buildings I and II (but not hotel) were issued in September 2021; and permits for residential buildings I and II were issued in May 2022. The final map has been recorded with LA County and subdivision improvement covenant and bonds have been completed and issued. Soil remediation, grading, shoring, and foundation are near completion and post-tension slab construction has commenced. Framing on the residential buildings was initiated in January 2023.

Mitigation Monitoring:

Mitigation monitoring is ongoing through the plan check and construction process. City staff is currently reviewing the proposed off -site improvements which include the following: 28,000 square feet of publicly accessible open space area, adjacent bicycle path, elevator and staircase leading up to the Magnolia bridge, roadway improvements between Burbank Boulevard and the Downtown Burbank Metrolink Station. City Staff continues to monitor the Mitigation Monitoring and Repor ting Program (MMRP) that was approved as part of the Final EIR.

ATTACHMENT 1-13

PDs WITH EXPIRED DAs:

Since staff’s last PD/DA update to the City Council, PD 2001-2 (Bob Hope Office Center Development) has expired.

PD 2001- 02 (Bob Hope Office Center Development) and the associated DA was approved in 2001 to allow construction of an office building of 103,500 square feet and a performing arts theater or museum of 20,000 square feet. On May 14, 2019, the City Council approved an extension for PD 2001-2 (“Bob Hope Center Development Project”) through December 31, 2020. Just prior to the December 2020 expiration, the applicant indicated continued interest in pursuing the Project. To avoid expiration of the DA on December 31, 2020 and to allow staff to complete the Project EI R, the Applicant requested an extension pursuant to Section 7.03 in Article 7 of the DA pertaining to Enforced Delay and Extension of Time Performance. Upon reviewing the request, the Community Development Director approved a 4-month extension of the DA for PD 2001- 2 through April 30, 2021. Because the long-term extension still requires completion of an EIR, staff recommended a 12-month extension of the DA to April 30, 2022, to provide the necessary time to complete the pending EIR process. On March 2, 2021, the City Council approved another extension through April 30, 2022.

The extension is no longer valid as it expired on April 30, 2022. The Project which included entitlements for a 109,470 adjusted gross square foot office building on 61,301.5 square feet (1.4 acres) of vacant land within the Media District did not move for ward. Since the date of expiration, the PD has reverted to the Media District Commercial (MDC-2) Zone.

On June 24, 2022, Worthe Real Estate Group (applicant) submitted an SB 35 Notice of Intent (NOI) application to redevelop the subject property as a proposed mixed -use project of 144 new rental units with 1,058 square feet of ground floor commercial and a publicly accessible Bob Hope Park. Proposed parking would be provided at subterranean level consisting of 196 spaces.

The project is currently in the NOI application review stage. Once the SB 35 NOI application process is considered complete, the applicant may submit for a SB 35 streamlined ministerial approval process application review in accordance with Burbank Municipal Code Section 10-1-19302 (Streamlined Ministerial Approval Process).

DENIED OR WITHDRAWN:

Since staff’s last PD/DA update to the City Council, PD 2008 (103 E Verdugo Ave – Michael Cusumano) has been withdrawn.