Scope of Work: Light-Structure System™ - Turnkey ATTACHMENT 3 McCambridge Park Baseball Relight
Burbank, CA
Turnkey Scope of Work
Customer Responsibilities:
1. Complete access to the site for construction utilizing standard 2-wheel drive rubber tire equipment.
2. Locate and mark field reference points per Musco supplied layout. (i.e. home plate, center of FB field)
3. Pay for extra costs associated with foundation excavation in non-standard soils (rock, caliche, high water table, collapsing holes, etc.) or soils not defined in geo-technical report. Standard soils are defined as soils that can be excavated using standard earth auguring equipment.
4. Pay any power company fees and requirements.
5. Provide area on site for dumpsters.
Musco Responsibilities:
1. Provide required foundations, poles, electrical enclosures, luminaires, wire harnesses, and control cabinets.
2. Provide layout of pole locations and aiming diagram.
3. Provide sealed Electrical Plans.
4. Provide Contract Management as required.
5. Provide stamped foundation designs based on soils that meet or exceed those of a Class 5 material as defined by 2022 IBC Table 1806.2.
6. Assist our installing subcontractor and ensure our responsibilities are satisfied.
Subcontractor Responsibilities
General:
1. Obtain any required permitting.
2. Contact your local udig for locating underground public utilities and then confirm they have been clearly marked.
3. Locate existing underground utilities not covered by your local utilities. (i.e. water lines, electrical lines, irrigation systems, and sprinkler heads). Musco or Subcontractor will not be responsible for repairs to undiscovered utilities.
4. Pay all permitting fees and obtain the required electrical permitting.
5. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation systems have been located and are clearly marked to avoid damage from construction equipment. Notify owner and repair damage to marked utilities. Notify owner and Musco regarding damage which occurred to unmarked utilities.
6. Provide labor, equipment, and materials to off load equipment at jobsite per scheduled delivery.
7. Provide storage containers for material, (including electrical components enclosures), as needed.
8. Provide necessary waste disposal and daily cleanup.
9. Provide adequate security to protect Musco delivered products from theft, vandalism or damage during the installation.
10. Keep all heavy equipment off playing fields when possible. Repair damage to grounds which exceeds that which would be expected. Indentations caused by heavy equipment traveling over dry ground would be an example of expected damage. Ruts and sod damage caused by equipment traveling over wet grounds would be an example of damage requiring repair.
11. Provide startup and aiming as required to provide complete and operating sports lighting system.
OOOO
MUSCO.I
2020, 2023 Musco Sports Lighting, LLC Date: 02/07/2023 Proiect #197493. Page 1 of 4 M-3454-en04-q
Scope of Work: Light-Structure System™ - Turnkey
12. Installation to commence upon delivery and proceed without interruption until complete. Notify Musco immediately of any breaks in schedule or delays.
Demolition:
1. Remove and dispose of the existing lighting poles, fixtures, and electrical enclosures. This will include the recycling of lamps, aluminum reflectors, ballast, and steel, as necessary.
2. Demolish existing foundations to 2 ft (0.6 m) below grade.
3. Abandon existing power feed in place for connection to new pole locations (providing new conduit and wire).
Foundations, Poles, and Luminaires:
1. Mark and confirm pole locations per the aiming diagram provided. If there are any issues, immediately notify your Musco Project Manager.
2. Provide labor, materials, and equipment to install (12) LSS foundations as specified on Layout and per the stamped foundation drawings, if applicable.
3. Remove spoils and dispose of off site.
4. Provide labor, materials, and equipment to assemble Musco TLC-LED luminaires, electrical component enclosures, poles, and pole harnesses.
5. Provide labor, equipment, and materials to erect (12) dressed LSS Poles and aim utilizing the pole alignment beam.
Electrical:
1. Provide labor, materials, and equipment to reuse existing electrical service panels as required.
2. Provide labor, materials, and equipment to install all underground conduit, wiring, pull boxes etc. and terminate wiring as required
3. Provide as-built drawings on completion of installation.
Control-Link Control and Monitoring:
1. Provide labor, equipment, and materials to install (1) Musco control and monitoring cabinet and terminate all necessary wiring.
2. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer for 120 V control circuit if not available.
3. Check all zones to make sure they work in both auto and manual mode.
4. Commission Control-Link® by contacting Control-Link Central ™ at 877-347-3319.
OOOO
MUSCO.I
2020, 2023 Musco Sports Lighting, LLC Date: 02/07/2023 Project #197493, Page 2 of 4 M-3454-en04-9
Scope of Work: Light-Structure System™ - Turnkey
CODE OF CONDUCT
In order to maintain a high-quality jobsite and installation, Subcontractor represents to Musco that it has the supervision necessary to, and shall train, manage, supervise, monitor, and inspect the activities of its employees for the purpose of enforcing compliance with these safety requirements. Subcontractor acknowledges that Musco does not undertake any duty toward Subcontractor's employees to train, manage, supervise, monitor, and inspect their work activities for the purpose of enforcing compliance with these safety requirements, but Subcontractor agrees to abide by any reasonable recommendations made by Musco or Musco representatives with respect to safety.
Subcontractor agrees that it is or will be familiar with and shall abide by the safety rules and regulations of Musco and the Owner, including, but not limited to the Occupational Safety and Health Act of 1970 (OSHA), all rules and regulations established pursuant thereto, and all amendments and supplements thereto.
Subcontractor further agrees to require all its employees, subcontractors, and suppliers to comply with these requirements. Subcontractor shall also observe and comply with all laws with respect to environmental protection applicable to the Project.
Subcontractor shall require all its subcontractors, employees, visitors, suppliers, and agents under its direction to comply with the following:
1. GENERAL JOBSITE SAFETY AND CLEANLINESS.
a. Subcontractor's employees and agents shall be required to wear appropriate personal protective equipment including, but not limited to, safety glasses with side shields, work shoes, fall protection devices, and hard hats.
b. Where a walking or working surface has an unprotected side or edge which is six feet or more above a lower level, Subcontractor shall use guardrail systems, safety net systems, or personal fall arrest systems.
c. Jobsite shall be kept free of debris including, but not limited to, cardboard and packing materials which can become windborne.
d. Construction equipment shall be parked during non-use in an orderly fashion so as not to create inconvenience to others using the jobsite.
e. Subcontractor shall provide for and ensure the use of safety equipment for the Project in accordance with Musco's and Owner's safety requirements, to the extent these may be stricter than federal, state, or local standards, or generally recognized industry applicable standards. f. Subcontractor shall provide the Musco project manager with an "Emergency List" showing Subcontractor's designated medical doctor, hospital, insurance company, and any other health service providers, such list to be updated within 24 hours of any change in the information provided. g. Within eight (8) hours from the time of an accident (or such shorter period as laws may require), Subcontractor shall advise Musco of any accident resulting in injury to any person or damage to any equipment or facility. Upon request, Subcontractor shall promptly furnish Musco with a written report of any such accident as well as a copy of all insurance and worker's compensation claims involving the Project.
h. Subcontractor shall maintain and inspect all construction equipment, including cranes and other lifting equipment, prior to each use. Subcontractor warrants that all equipment operators shall be qualified for each piece of construction equipment they intend to operate. Documentation of specific training is the responsibility of the Subcontractor.
OOOO
MUSCO.
2020, 2023 Musco Sports Lighting, LLC Date: 02/07/2023 Project #197493, Page 3 of 4 M-3454-en04-9
Scope of Work: Light-Structure System™ - Turnkey
i. Jobsite shall be policed daily for compliance to the above conditions.
Subcontractor's employees and agents are prohibited from using drugs and alcohol on the Project property or being under the influence of alcohol or drugs while performing work on the Project. Anyone observed participating in or observed under the influence will be removed from the Project immediately and prohibited from returning, with no exceptions.
2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. a. Review and understand installation instructions are provided with every product installation. b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure. c. Verify that components have been assembled per Musco installation instructions. d. Verify plumb of concrete foundations prior to standing of poles.
3. PROVIDING A QUALITY INSTALLATION TEAM.
a. Subcontractor's work directly reflects the quality of the installation and may indirectly relate to the quality of the product upon which Musco's reputation is built.
b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration shall be provided upon request.
Personnel shall be knowledgeable in operation of equipment as well as installation of Musco product. d. All personnel provided by Subcontractor shall understand the relationship developed by and between Subcontractor and Musco, also by and between Musco and the customer, and act accordingly.