1 REIMBURSEMENT AGREEMENT
THIS REIMBURSEMENT AGREEMENT (“Agreement”) is made this ___ day of ____________, 2023 (the “Effective Date”), by and between Plains All American Pipeline (“Plains”), whose mailing address is 333 Clay Street, Ste. 1600, Houston, TX 77002 and the City of Burbank, CA (“City”), whose mailing address is P.O. Box 6459, Burbank, CA 91510-6459. Either Plains or City may singularly be hereinafter referred to as “Party” and collectively referred to as “Parties.”
BACKGROUND
A. City desires to construct a bike path on the route of the Southern California Regional Rail Authority, formerly the Union Pacific Railroad right of way, (“Project”).
Plains owns fiber optic cable system of manholes and ducts within the aforementioned right of way as a result of a recorded Memorandum of Easement (“Project”);
B. As a result of the Project, it is necessary for Plains to adjust 5 (five) manhole lids to the future bike path grade in order to accommodate City’s Project in the right of way, as set forth in more detail and as depicted in this Agreement (the “Work”), and in accordance with, and as more particularly described, in the attached Exhibit A (“Engineering Drawing”) and Exhibit B (“Scope of Work”), incorporated herein; and,
C. Plains, under the terms hereinafter stated, is willing to perform the Work, provided City reimburses Plains for all of its costs associated with the Work including actual out-of-pocket expenses, all cost of Plains employees’ time (including the cost of employee benefits), the inclusion of any Conditions and Exclusions defined in Exhibit A, and a fee of thirty percent (30%) to reimburse Plains for internal general and administrative costs (“Costs”).
D. The City Council of the City has determined that it is in the best interests of the City to dispense with competitive bidding in the procurement of the services being purchased by the City under this Agreement.
AGREEMENT
In consideration of the mutual covenants in this Agreement, and other good and valuable consideration, the receipt and sufficiency of which are acknowledged, the Parties agree as follows:
1. Plains will perform the necessary Work subsequent to the execution of this Agreement by both Parties subject to the terms and provisions of this Agreement, and will administer and oversee the Work, including administration of construction contractor work in accordance with the scope of work outlined in Exhibit B.
ATTACHMENT 3-1
2 2. C
ity will bear and be responsible for and pay in accordance herewith the costs incurred by Plains related to the Work, as specified below.
3. The initial estimated cost of the Work is One Hundred Forty Two Thousand One Hundred and Five Dollars ($142,105); City will also reimburse Plains thirty percent (30%) for general and administrative expenses (“G&A”) in the amount of $42,632, for an estimated total reimbursable cost of One-Hundred Eighty Four Thousand Seven Hundred Thirty Seven Dollars ($184,737; the “Estimated Cost”). Actual Costs to be reimbursed by City to Plains hereunder may be more or less than such Estimated Cost, which will not be construed as a limitation of costs for the Project. Payment of the Estimated Cost is due and payable with the execution of this Agreement. If, at any time, it is determined that the costs will exceed the Estimated Cost then City shall pay the additional amounts as necessary to fully compensate Plains for the costs of the Work. Upon completion of the Work, a final summation of costs (“Final Cost”) will be made, and if the Final Cost exceeds the Estimated Cost and any additional costs previously paid by City, Plains will invoice City for the remaining balance of the Final Cost. Plains will endeavor, in good faith, to keep all costs to a reasonable amount considering the scope of the Work, and shall not exceed the Estimated Cost by thirty percent (30%) without obtaining City’s prior written consent, including in the event of unforeseen site conditions. If the Estimated Cost and any additional costs previously paid by City exceed the Final Cost then Plains will refund the difference to City.
4. City understands and acknowledges that all pricing estimates of the actual Work to be performed are good faith estimates and the actual costs may be higher or lower than such estimates.
5. Should actual costs exceed the Estimated Cost, City agrees to submit payment to Plains within thirty (30) days from the receipt and approval of an invoice.
6. Plains shall have no obligation to start the Work until written notice has been provided by City that the Work has been agreed to, approved by and authorized by City; a fully executed Agreement has been received by Plains; a satisfactory starting date has been mutually agreed upon by both City and Plains; the Estimated Costs have been paid to Plains; and City has located and identified all utilities that are not covered by the applicable One Call system. Prior to starting the Work, City shall cooperate with Plains in obtaining or causing to be obtained, in a form acceptable to Plains, any right, permit, permission, easement and access rights, at the sole cost and expense of City required for Plains to perform the Work and City shall, if requested by Plains, survey and stake all easements and access rights that pertain to the Work.
7. For any work performed by Plains that involves entry onto Metropolitan Transportation Authority right of way that is managed by the Southern California Regional Rail Authority, Plains will comply and/or execute any necessary Right-of-Entry forms (Form 5, 6, 37) from the Southern California Regional Rail Authority prior to the performance of such work.
ATTACHMENT 3-2
3 8. IT IS UNDERSTOOD AND AGREED BY AND BETWEEN PLAINS
AND CITY THAT IN PERFORMING THE WORK, PLAINS, ITS AFFILIATES,
OFFICERS, DIRECTORS, AGENTS, SERVANTS, EMPLOYEES,
CONTRACTORS AND SUBCONTRACTORS AND THE EMPLOYEES OF BOTH (“PLAINS INDEMNITEES”) SHALL BE ENTITLED TO RELY UPON THE
PLANS, SURVEYS, PROFILES, AND ANY OTHER INFORMATION
FURNISHED TO PLAINS INDEMNITEES BY CITY AND CITY SHALL
REIMBURSE PLAINS INDEMNITEES FOR, AND DEFEND, INDEMNIFY AND
HOLD PLAINS INDEMNITEES HARMLESS FROM AND AGAINST ANY AND
ALL LOSS, COSTS, DAMAGES, EXPENSES, (INCLUDING WITHOUT
LIMITATION REASONABLE ATTORNEY’S FEES) CLAIMS, SUITS, AND
LIABILITY ARISING DIRECTLY OR INDIRECTLY OUT OF PLAINS
INDEMNITEES’ RELIANCE ON THE INFORMATION PROVIDED BY CITY.
9. CITY HEREBY AGREES TO INDEMNIFY AND HOLD
HARMLESS PLAINS INDEMNITEES FROM AND AGAINST ANY AND ALL
LIABILITIES, CLAIMS, LOSSES, FINES, DAMAGES, COSTS AND EXPENSES (INCLUDING REASONABLE COSTS AND EXPENSES OF DEFENSE), WHICH
ARE CAUSED IN WHOLE OR IN PART BY OR ARISE OUT OF ANY ACT OR
OMISSION OF CITY WITH RESPECT TO THE PROJECT, INCLUDING BUT
NOT LIMITED TO, THE CONSTRUCTION, MAINTENANCE, PRESENCE ON
THE RIGHT OF WAY, OR OTHER OPERATIONS OR ACTIVITIES OF THE CITY.
10. NOTWITHSTANDING ANYTHING IN THIS AGREEMENT TO
THE CONTRARY, NEITHER PARTY HERETO SHALL BE LIABLE TO THE
OTHER PARTY FOR CONSEQUENTIAL, INCIDENTAL, EXEMPLARY OR
PUNITIVE DAMAGES (INCLUDING, BUT NOT LIMITED TO, LOST PROFITS,
LOSS OF PRODUCTION OR OTHER DAMAGES ATTRIBUTABLE TO
BUSINESS INTERRUPTION) ARISING IN CONNECTION WITH THIS
AGREEMENT. EXCEPT THAT A PARTY MAY RECOVER FROM THE OTHER
PARTY ALL COSTS, EXPENSES OR DAMAGES (INCLUDING, WITHOUT
LIMITATION, INDIRECT, SPECIAL, CONSEQUENTIAL, INCIDENTAL,
EXEMPLARY, PUNITIVE AND OTHER DAMAGES) PAID OR OWED TO ANY
THIRD PARTY IN SETTLEMENT OR SATISFACTION OF CLAIMS OF THE
TYPE DESCRIBED HEREIN FOR WHICH SUCH PARTY HAS A RIGHT TO RECOVER FROM THE OTHER PARTY.
11. Neither this Agreement nor any obligation or right hereunder may be assigned or delegated by either Plains or City whether directly or indirectly, without the prior written consent of the other Party.
12. The obligations of Plains are subject to force majeure and Plains shall not be in default of this Agreement if any failure or delay in performance is caused by any event of force majeure, including without limitation, any strike or other labor problems; ATTACHMENT 3-3
4 a
ccidents; acts of God; fire; flood; adverse weather conditions; pandemic; material or facility shortages or unavailability; lack of transportation; the imposition of any governmental codes, ordinances, laws, rules, regulations or restrictions, including without limitation, the necessity of obtaining permits or environmental assessments or environmental approvals; condemnation or the exercise of rights of eminent domain; war; civil disorder or acts of terrorism; or any other cause beyond the reasonable control of Plains.
13. Each Party hereto, whether performing or non-performing, breaching or non-breaching, defaulting or non-defaulting shall be entitled to setoffs, claims, counterclaims, and credits (disregarding whether a Party failed to perform, breached first, or defaulted first) in connection with any payment or the performance of any obligations under or in connection with this Agreement or termination of this Agreement. In case of a breach of this Agreement by either Party, the non-breaching Party shall give the breaching Party notice of the breach and a reasonable period to cure under the circumstances.
14. This Agreement shall constitute the entire agreement between the Parties with respect to the Work. Any and all previous agreements and understandings between or among the Parties regarding the Work, whether written or oral, are superseded by this Agreement. Any waiver or amendment of any requirements and/or provisions of this Agreement must be in writing and signed by an officer or authorized representative of the waiving Party in order to be effective and enforceable; no purported oral waiver or amendment of any requirements and/or provisions of this Agreement shall be effective or enforceable; and no waiver or amendment of any requirements and/or provisions of this Agreement based on course of conduct, course of dealing, or course of performance shall be effective or enforceable.
15. Drafts of this Agreement and prior correspondence regarding this Agreement shall not be used by either Party as evidence of the intent of the Parties or otherwise be admissible in evidence in interpreting this Agreement.
16. If any term or provision of this Agreement shall be found to be invalid, illegal or otherwise unenforceable, the same shall not affect the other terms or provisions hereof or the whole of this Agreement, but such term or provision shall be deemed modified to the extent necessary to render such term or provision enforceable, and the rights and obligations of the Parties shall be construed and enforced accordingly, preserving to the fullest permissible extent the intent and agreements of the Parties as set forth herein.
17. The provisions of this Agreement are solely for the benefit of the Parties to this Agreement and no provision of this Agreement should be deemed to confer upon any other party any remedy, claim or right. It is expressly understood that the provisions of this Agreement do not impart enforceable rights in anyone who is not a Party or a successor or assign of a Party hereto. No third party (including an employee or a contractor of a Party) is intended to have or shall have any rights under this Agreement.
ATTACHMENT 3-4
5 18. This Agreement shall be governed by and construed, interpreted and enforced in accordance with the laws of the State of California, excluding any choice of law rules, which may affect the application of the laws of another jurisdiction. By executing this Agreement, the Parties submit to the exclusive jurisdiction of the courts and agencies located in Los Angeles County, California.
19. Each Party warrants that it has full right and authority to enter into this Agreement. All necessary approvals and authority to enter into this Agreement have been obtained and the person executing this Agreement on behalf of each Party has the express authority to do so and, in doing so, to bind such Party hereto.
20. The headings shown for each section in this Agreement are general descriptions only and not for limitation or alteration of the contents of this Agreement in any way.
21. Any notice required or permitted to be given hereunder shall be in writing and shall be deemed to be given if delivered in person, facsimile, or certified mail return receipt requested, to the attention of the following persons:
To Plains: Plains All American Pipeline
Attn: Land Department
333 Clay Street, Ste. 1600
Houston, Texas 77002
With a mandatory copy via email and prepaid
overnight courier to:
Plains All American Pipeline
Attn: Law Department
333 Clay Street, Ste. 1600
Houston, Texas 77002
Email: [email protected]
To City: City of Burbank
Attn: Patrick Prescott
Community Development Director
P.O. Box 6459, Burbank
Burbank, CA 91510-6459
22. Each Party warrants that it has the full right and authority to enter into this Agreement. All necessary approvals and authority to enter into this Agreement have been obtained and the person executing this Agreement on behalf of each Party has the express authority to do so and, in doing so, to bind such Party hereto.
ATTACHMENT 3-5
6 23. Nothing in this Agreement should be construed to create a partnership, joint venture or employer-employee relationship. Plains is not the agent of City and is not authorized to make any representation, warranty, contract or commitment on behalf of City.
Neither Plains nor any of its employees or independent contractors will be entitled to any of the benefits which City may make available to its employees, such as group insurance, profit-sharing or retirement benefits. City will not withhold or make payments for social security, make unemployment insurance or disability insurance contributions, or obtain worker’s compensation insurance on Plains’ behalf for any individual performing the Work on behalf of Plains. Plains agrees to accept exclusive liability for complying with all applicable state and federal laws governing obligations such as payment of taxes, social security, disability and other contributions based on costs paid to Plains under this Agreement.
IN WITNESS WHEREOF, this instrument is entered into by and between the Parties hereto effective as of the Effective Date.
Plains All American Pipeline, City of Burbank,
a Master Limited Partnership a Municipal Corporation
______________________________ By:_____________________________ George N. Polydoros, Jr. Name: __________________________ Vice President Title: ___________________________
Date: Date:
ATTACHMENT 3-6
7 Exhibit A
ATTACHMENT 3-7
ATTACHMENT 3-8
ATTACHMENT 3-9
ATTACHMENT 3-10
EXHIBIT B
PROJECT DESCRIPTION, LOCATION AND SCOPE OF WORK
TITLE: CITY OF BURBANK SAN FERNANDO BIKE PATH PROJECT
1.0 DESCRIPTION AND LOCATION
PHASE 1. The work consists of temporarily removing the necking and ring and cover at (5) Plains existing manhole locations along the South side of the SCRRA R/W. Steel plates will then be placed at each manhole location to protect in place the Plains manholes during the construction of the City of Burbank’s bike path from Bob Hope Metrolink Station to Empire Ave.
PHASE 2. The work consists of raising the (5) Plains manholes back to final grade along the newly placed bike path. A circular concrete pad will be poured around the raised manholes at the same grade to secure the ring and cover in place.
Work within the SCRRA ROW will require the presence of a SCRRA Railroad flagger. All working inside the SCRRA ROW will be required to take the SCRRA Safety Training Class prior to construction.
Contractor must hold a valid Class ______ License No. _____________, and its sub-contractors possess valid Class _____ or other applicable licenses at the time that the construction agreement is executed and throughout the term of such agreement. Contractor and all subcontractors must maintain current licensing throughout the life of the project.
No contractor or subcontractor may be listed in this construction agreement or awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to California Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.”
2.0 SPECIFICATIONS
2.1 The work shall be performed in strict accordance with Plains Specifications, or the Sprint Specifications for Construction, TS-0213 Construction, Installation and Splicing of Fiber Cable, Rev. 6-2019. Please note that this document contains references to specifications and manufacturers that may be out of date. Please refer all questions and inquiries regarding interpretations of this document to Plains.
2.2 Work within SCRRA R.O.W. shall conform to SCRRA standards. The contractor is hereby notified that all personnel entering the SCRRA R.O.W. must have current SCRRA safety certification.
2.3 THIS JOB IS SUBJECT TO THE REQUIREMENTS OF BUY AMERICA as set forth in 23 USC 313 and 23 CFR 635. At the time of delivery of any iron or steel products which become a permanent part of this project, the Contractor shall provide documentation sufficient to meet the requirements of 23 CFR 635 certifying the iron or steel products were produced domestically. Prior to invoicing for material provided under this agreement, the contractor shall provide a full set of certification documents that are required by an auditor or any other relevant governmental entity to prove compliance with this requirement. Additionally, the contractor shall assure that the same degree of documentation is provided by all subcontractors and suppliers working under the contractor. Documents shall be provided to the Plains representative via paper copy at the time of material delivery and electronic (PDF) copy prior to invoicing for the same.
Temporary construction materials and materials that do not contain iron or steel are exempt from this requirement.
ATTACHMENT 3-11
2.4 THIS JOB IS A PREVAILING WAGE JOB per California Department of Industrial Relations Public Works Case No. 2001-059, dated October 25, 2002. Work performed on this job is a public work under the definition of Labor Code Section 1720(a) and is therefore subject to prevailing wage requirements. Upon completion of this Scope of Work, and prior to invoicing for the same, the contractor shall provide a full set of certified payrolls and all other documentation that may be required by Caltrans or any other relevant governmental entity to satisfy its Prevailing Wage Audit. Additionally, the contractor shall assure that the same degree of documentation is provided by all subcontractors and providers of labor and services working under the contractor.
Documents shall be provided to the Plains representative via paper copy and electronic (PDF) copy.
A. “There shall be paid each craft or type of worker employed by the Contractor or Subcontractor engaged in Work under the construction agreement not less than the applicable wage rate, including legal holiday and overtime rates, found and determined by the Director of the Department of Industrial Relations for the State of California, in accordance with the Standards set forth in Section 1773 of the California Labor Code. Copies are available on the Internet at http://www.dir.ca.gov/DLSR/PWD.
The Contractor shall comply with the provisions of Section 1775 of the Labor Code which, so far as material hereto, reads as follows: 'Except as otherwise provided by law, the contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or subcontractor.”
The Contractor and each Subcontractor performing work, in conjunction with the construction agreement shall comply with the provisions of Section 1776 of the Labor Code of the State of California.
B. The prevailing wage rates specified by the State of California are minimum rates only, and the City will not consider any claims for additional compensation made by the Contractor or Subcontractor because of payment by the Contractor or Subcontractor of any wage rate in excess of the applicable rate contained in this Contract.
Should Premium Time Work and/or Time and Material Work not in the Work be required during the progression of this Project, it may be awarded in accordance with those rates or as agreed otherwise between City and Contractor.
C. Eight (8) hours labor constitutes a legal days' work for each worker employed in the execution of this Project. The time of service of any worker employed in the execution of this Project is limited and restricted to eight (8) hours during any one (1) calendar day, and forty (40) hours during any one (1) calendar week, except as hereinafter provided. The Contractor shall, as a penalty to the City of Burbank, forfeit Twenty-Five Dollars ($25) for each worker employed in the execution of this Project by the Contractor or by any Subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one (1) calendar week in violation of the provisions hereof.
Notwithstanding the provisions of Sections 1810 to 1814 of the Labor Code of the State of California, and notwithstanding the foregoing stipulations inserted herein pursuant to the requirements of said Sections, work performed by employees of the ATTACHMENT 3-12
Contractor or any Subcontractor in excess of eight (8) hours per day, and forty (40) hours during any one (1) week, in the execution of this Project, shall be permitted upon compensation for all hours worked in excess of eight (8) hours per day, and forty (40) hours during any one (1) week, at not less than one and one-half (1-1/2) times the basic rate of pay.
D. The Contractor shall pay to workers needed to execute the Agreement the per diem wages as defined in Labor Code Section 1773.9.
E. Only apprentices who are in training under apprenticeship standards and written apprentice agreements complying with Division 3, Chapter 4, Section 3070, et seq., of the Labor Code, are eligible to be employed in the performance of this Project.
The term 'apprentice' means a person at least sixteen (16) years of age who has entered into a written agreement with an employer or their agent, an association of employers, or an organization of employees, or a joint committee representing both in conformity with the provisions of Division 3, Chapter 4, Section 3070, et seq., of the Labor Code.
Every apprentice employed in performance of this Project shall be paid the standard wage paid to apprentices under the regulations of the craft or trade at which they are employed and shall be employed only at the work of the craft or trade to which they are indentured.
The Contractor or any Subcontractor performing any of the work under this Project who employs journeymen or apprentices in any apprentice-able craft or trade and is not contributing to a fund or funds to administer and conduct the apprenticeship program in any such craft or trade in the area of the site of the public work to be constructed or performed under this Project, to which fund or funds other Contractors in that area are contributing, shall contribute to the fund or funds in each craft or trade in which the Contractor or Subcontractor employees journeymen or apprentices on the public work in the same amount or upon the same basis and in the same manner as other Contractors do, but where the trust fund administrators are unable to accept such funds, Contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council.
The Contractor shall be responsible for complying with Section 1777.5 of the Labor Code for all apprentice-able occupations.
The Contractor shall conform to all requirements of Sections 1777.5 and 1777.6 of the Labor Code.”
3.0 MATERIALS
3.1 The contractor shall provide all materials in accordance with Plains specifications, or Sprint Specification stated in the TS-0213 Construction, Installing and Splicing USSCIS NO. SCIMOSP REV. 99-1.
3.2 The contractor shall provide all materials as may be needed to complete this project except cable, cable splicing hardware, route marker signs and any items proprietary to Plains.
4.0 PERMITS
.
4.1 Contractor will pay for and secure all permits, both SCRRA and The City of Burbank.
4.2 Plains shall pay the contractor the actual cost of the permit.
ATTACHMENT 3-13
4.3 Contractor shall provide copies of all permits to Plains prior to proceeding with the work and shall provide copies of all final acceptance documents after the work is completed and before final invoicing.
5.0 BILLING AND COMMERCIAL TERMS
5.1 Contractor shall submit invoices to Plains. Invoice payment terms shall be net 60 days from the date the invoice is submitted to Plains. Prior to submitting the electronic invoice, the Contractor shall submit a “paper” invoice to the Plains Engineer for review and approval. These can be actual paper, but it is preferred that they are PDF documents.
5.2 Prior to billing for any work that is subject to a preliminary lien notice, the contractor shall secure and provide an unconditional release for each preliminary notice. Contractor shall notify all suppliers that may provide preliminary lien notices that the appropriate address for Plains is 333 Clay Street, Ste. 1600, Houston, TX, 77002.
5.3 Contractor is hereby notified that Plains shall require a payment bond in the sum of not less than 100 percent of the maximum amount of the construction contract price, and listing the “City of Burbank” as a dual oblige. Please note that the AIA form is not an acceptable bond form for Plains.
5.4 Billing for the work shall occur in two bills. The first bill will be issued the month after the covers are removed. The second bill will be issued the month after the covers are re- installed as a final bill.
6.0 LOCATES
6.1 Contractor shall be responsible for all locates of other utilities and/or substructures. No excavation work shall be permitted until all locates are performed. All existing substructure shall be positively identified prior to and during excavation activity.
7.0 THE WORK (PHASE 1)
7.1 Contractor shall document the physical location of each manhole during Phase 1.
7.2 Contractor Shall remove the existing 8’x8’ Concrete apron.
7.3 Contractor shall remove the rings and covers and grade rings at each manhole location as needed.
7.4 Contractor shall install steel plates and EMS Markers on top of the steel plates at each manhole location.
7.5 Contractor shall transport the Plains manhole components that were removed to their facilities and store for future re-installation.
7.6 Contractor shall inspect the cast iron rings and covers to confirm that they have functional provisions to be bolted shut. If bolts are missing to acquire the appropriate stainless penta head bolts.
(PHASE 2)
7.7 Contractor shall return at a future date, to re-install the grade rings, rings and covers. This includes parging the inside the grade rings, grouting under the cover and repairing the asphalt to the City of Burbank’s satisfaction. The return date, though within a 13-month period will be coordinated between Plains and the contractor to occur within no more than 3 weeks after the contractor is asked to return.
7.8 Contractor shall place a concrete apron to grade around the newly raised manhole ring and cover. This apron is used for safety gear during any maintenance at the manhole locations.
7.9 Contractor shall weld each manhole lid once the lids are in place at both locations.
The contractor shall clean up any construction debris and shall leave the construction sites neat and clean each day.
Extreme caution shall be used when performing any work on or near the conduits and cables.
Under NO circumstances shall any work be performed that may cause the cable(s) to be ATTACHMENT 3-14
damaged or cut. All work involving live fiber optic cables and conduits shall be performed under the direct supervision of the owner of the cable.
8.0 Notices
8.1 The contractor shall contact the following, one full week prior to commencing construction:
Underground Service Alert of California (800) 227-2600
Cogent – Jeff York - 213-943-9831
Cascade – Brian Smith (949) 226-1980
Metrolink dig alert - 909-592-1346
END SCOPE OF WORK
MATERIAL LIST
This is a guide and may not include all materials to complete the project. (Contact Plains engineer for acceptable materials.)
__________________________________________________________________________________
MATERIAL SUPPLIED BY THE CONTRACTOR
Grade rings as needed.
Class II Base as needed (backfill for on top of the Steel Plates at each location).
Asphalt/Concrete as needed (Repave around casting).
Storage for MH Components (ring and cover, grade rings, ext..).
MATERIAL SUPPLIED BY PLAINS
Plains warning ribbon
Plains locating device (toilet seats to be placed at each manhole location)
End Material List