WATER AND
POWER
Verify Annual Update to the
Burbank Water and Power
Wildfire Mitigation Plan
City Council
May 21, 2024
Presentation Overview
Background
Upcoming activities
Next Steps
Annual Performance
2 Background
3 Annually prepare
Wildfire Mitigation Plan
(WMP)
Include required plan
elements
Present the WMP
in a public meeting
Qualified independent
evaluator
California Wildfire Safety
Advisory Board (WSAB)
Public Utilities Code (PUC) 8387
Comprehensive update
every 3 years
4 Tier 2 HFTD
High
fire-
threat
district
5 Summary
of
Performance
Metrics
6 Annual Performance Metrics
2023 Summary:
• No BWP caused ignition in the HFTD
• No pole failures in the HFTD
• All inspection, maintenance, and
operation activities completed
• Three days with Red Flag Warning
alerts
• One risk driver event in the HFTD
7 Mitigation
Accomplishments
8 Annual
asset and
vegetation
inspection
9 Pole
and
transformer
replaced 10
Tree
trimming
and
removal
11 Upcoming
Mitigation
12 Enhanced
system
monitoring
13 Dry-type
transformers
• Using transformers without oil
significantly reduces fire risk
• Pilot ordered for installation of 3 units
14 Next steps
15 Review the WMP and IER at
BurbankWaterAndPower.com/electric/wildfire-mitigation-plan Next Steps
Next WMP
update
June 2025
Wildfire Safety Advisory Board
By July 1, 2024
City Council presentation
& public comments
May 2024
BWP Board presentation
May 2024
16 CONTACT
Sven Knauth
Senior Electrical Engineer
[email protected]
(818) 238-3575 office
17
PowerPoint Presentation
Burbank City Council
May 21, 2024
- Document
- PowerPoint Presentation
- Meeting
- May 21, 2024
- Body
- Burbank City Council
- Original file
- 3.8 MB