ATTACHMENT 1-1

ATTACHMENT 1

SUMMARY OF PLANNED DEVELOPMENTS (PD) AND

DEVELOPMENT AGREEMENTS (DA)

The following terms, as defined below are used in this document:
• “Approved PDs” – PD projects approved by the City Council since the PD process was added to the Zoning Ordinance in October 1985.
• “Completed PD/DAs” – PD Projects that have been built out and are in compliance with the related DA and mitigation measures.
• “PDs with Active DAs” – Approved PD projects with an active DA that are either in process of construction, or where the PD or DA has been or will be amended. • “PDs with Expired DAs” – PDs with DAs that were approved but were never built , or were replaced by another PD/DA. The DA has expired and cannot be used. • “Replaced by other PD” – Prior PD approvals that were replaced by new PDs on the City’s Zoning map.
• “Denied or Withdrawn” – PD applications that were denied or were withdrawn before being considered by the City Council.
• “Submitted (Under Review)” – The PD application has been submitted to the Planning Department and is currently in review or on hold.

COMPLETED PD/DAs:

Planned Development No. 89-4
Project: Burbank Town Center Mall
Location: 201 East Magnolia Boulevard
Applicant: Haagan-Burbank Partnership (succeeded by CAPREF Burbank, LLC; CCDP NSFB, LLC; CCDP BB Land, LLC; CCDP Grinnell, LLC)

Approved Effective DA Expiration
PD and DA
(Ord. 3169)
September 19,
1989
October 28,
1989
October 28,
2004
First Amendment
(Ord. 3207)
September 25,
1990
December 6,
1990
No change
Second Amendment
(Ord. 3341)
April 20,
1993
May 29,
1993
No change
Third Amendment
(Ord. 3389)
October 18,
1994
November 20,
1994
No change
Fourth Amendment
(Ord. 3474)
October 21,
1997
November 25,
1997
No change

ATTACHMENT 1-2

Status:

This PD was previously built out (completed) and the DA expired in 2004. However, it is being included in this this report to provide the Council an update on updates about potential redevelopment of the site.

The application for the Fifth Amendment to the Planned Development Zone was filed on June 27, 2016. In 2022, the project request was withdrawn by the landowner, however, the City continues to work with property ownership on possible future land uses to be considered in alignment with the proposed Downtown Burbank Transit Oriented Development (TOD) Specific Plan Project. City staff continues to engage with the current ownership entities, (which as of March 2023, includes the Onni Group - a Toronto-based investor and developer with expertise in the construction of office space and mixed-use developments) on the future redevelopment of the properties , and any amendments will be submitted after the Downtown Burbank TOD Specific Plan is adopted.

Planned Development No. 89-9
Project: Shopping Complex consisting of a supermarket (Pavilions) and ancillary retail and fast-food restaurant spaces totaling 103,965 sf.

Location: 1100 West Alameda Avenue
Applicant: Pacific Theatres, Inc.

Approved Effective DA Expiration
PD and DA
(Ord. 3230)
January 15,
1991
February 26,
1991
December 1,
2023

Status:

This PD was previously built out (completed) and the DA expired in this reporting period of 2023. In addition, as of the date of this report, the property owners comply with the terms of the PD/DA.

Planned Development No. 97-03
Project: Burbank Empire Center
Location: West Empire Avenue & North Victory Place (former B-1 Site) Applicant: Zelman Retail Partnerships, Inc. (original applicant/developer)

Approved Effective DA Expiration
PD and DA
(Ord. 3554)
September 12,
2000
October 17,
2000
October 17, 2015
(Sub-Area D:

Sept. 6, 2018)
Minor Amendment
(Ord. 16-3,877)
May 10,
2016
June 10,
2016
October 17, 2015
(Sub-Area D:

Sept 6, 2018)

ATTACHMENT 1-3

Status:

This PD was previously built out (completed) and the DA expired in 2018. However, it is being included in this this report to provide the Council an update on a recent activities, including a new addition, and a lot line adjustment and variance application submitted for City review.

In March 2024, a request was submitted to allow an increase in the total square footage allowed in Sub Area A of the PD to accommodate a 400-square foot addition to provide the building engineers with a location to store and work on minor building related work. Through Condition of Approval #1, the Community Development Department Director authorized the square footage addition and deemed it to be in substantial conformance with the approved PD and associated conditions of approval.

Further, the City is currently working with the property owner and Caltrans to correct the current lot line location of the Empire Center property as a result of the Empire Avenue Interchange project. The affected project site area includes the unfinished right-of-way construction and landscaping along the south side of Empire Avenue near Victory Place that was part of the public right -of-way improvement for the Empire Avenue Interchange project. To address this change in property line location and the resulting reduction in existing building setback along this portion of the Empire Center, the property owner has requested and submitted a lot line adjustment and variance application with the City for review on May 6, 2024. The application is currently under review.

PDs WITH ACTIVE DAs:

Planned Developments No. 88-2 & 99-1
Project: Parc Pointe-Chandler
Location: 3601 W. Verdugo Avenue and 610 and 630 N. Hollywood Way Applicant: Mishenka Properties, LLC and Park Pointe Investors, LLC

Approved Effective DA Expiration
PD 88-2 and DA
(Ord. 3134)
November 15,
1988
December 2,
1988
December 2,
2038
First Amendment
and PD 99-1 (Ord. 3534)
December 14,
1999
December
15, 1999
No change
Second Amendment
(Ord. 19-3,912)
February 5,
2019
March 8,
2019
No change

Status:

The site is developed with a multiple family residential development consisting of 255 units in seven three-story buildings and one three-story office building totaling 30,000 square feet. Parking is provided in three two-story subterranean garages beneath the commercial and residential buildings. The Project Site has two zoning designations, PD 88-2 and 99-1, that are part of a single Development Agreement for the Project ATTACHMENT 1-4

Site. Construction of this project is complete, and the project has complied with all conditions of approval.

On February 5, 2019, the City Council approved an ordinance amending the DA allowing a request to allow (1) 51 parking spaces previously allocated for residential use to be used exclusively by tenants of the 30,000- square-foot office building, (2) removing the language that allows commercial parking to be used by residential tenants after hours and on weekends, and (3) a change in the maximum square footage and height allowed for the commercial office building to 30,000 square feet and three stories, excluding parking levels. The PD 88- 2 and 99- 1 zoning designations, boundaries, and acreage remained unchanged for the subject properties comprising the Project Site.

Since staff’s last PD/DA update to the City Council, there have been no changes. The property owner continues to comply with all mitigation measures related to the project.

Planned Development No. 89-7
Project: Media Studios North
Location: 3101-3377 Empire Avenue, between Ontario Street and Hollywood Way Applicant: Worthe Real Estate Group, successor-in-interest M. David Paul Development, LLC

Approved Effective DA Expiration
PD and DA
(Ord. 3278)
November 5,
1991
Never Recorded,
no effective date
10 years
First Amendment
(Ord. 3463)
April 15,
1997
May 24,
1997
June 17,
2007
Second Amendment
(Ord. 3667)
March 1,
2005
April 9,
2005
N/A
Third Amendment
(Ord. 3838)
April 16,
2013
June 20,
2013
May 10,
2018
Fourth Amendment
(Ord. 18-3,903)
May 8,
2018
June 15,
2018
January 31,
2019
Fifth Amendment
(Ord. 19-3910)
January 29,
2019
March 1,
2019
May 10,
2028

Status:

The project is a large office complex in a campus-like setting that includes many media companies. The project was originally approved in 1991 for a maximum development of 710,000 adjusted gross square- feet. In addition, in 2013 the Council approved an additional 73,000 adjusted gross square feet of development for a new total maximum development of 783,000 square feet. To date, 622,553 adjusted gross square feet have been constructed. The PD/DA have been extended several times since originally approved. They are set to expire on May 10, 2028.

ATTACHMENT 1-5

Since staff’s last PD/DA update to the City Council, there have been no changes. The property owner continues to comply with all mitigation measures related to the project.

Mitigation Monitoring:

The project meets all conditions of approval for the DA’s constructed square footage.

Construction of the remaining 160,447 square feet would require additional intersection improvements to be constructed at Hollywood Way / Thornton Ave. and Hollywood Way / Winona Ave. However, these improvements have already been completed by the Avion Burbank Development Project to address traffic impacts associated with the Avion Burbank Development Project.

Planned Development No. 91-13
Project: The Walt Disney Studios Master Plan
Location: 500 South Buena Vista Street
Applicant: The Walt Disney Company (succeeded by Disney Enterprises, Inc., a wholly owned subsidiary of The Walt Disney Company)

Approved Effective DA Expiration
PD and DA
(Ord. 3317)
October 20,
1992
November 24,
1992
November 24,
2017
First Amendment
(Ord. 16-3,885)
August 16,
2016
September 16,
2016
November 24,
2035

Status:

The PD appr oved construction of 1,932,528 Office Equivalent Gross Square F eet (OE-GSF) of unique studio development, including sound stage and related production facilities, production support facilities, media office buildings, employee center and other facilities to be constructed over a 25- year period. OE -GSF is a calculation used in the Media District to limit development based on traffic impacts. To date, Disney has developed approximately 6 5% (approximately 1,251,398 OE-GSF) of their total entitlement. All conditions of approval required for the current construction have been met. The PD/DA was extended on August 16, 2016, for an additional 18 years. They are set to expire November 24, 2035.

Since staff’s last PD/DA update to the City Council, there have been no changes.

Disney continues to comply with all mitigation measures related to the ongoing operation of the Studio Lot.

Mitigation Monitoring:

The traffic improvements required to- date (i.e., mitigation measures) have been installed and completed on Buena Vista Street, Alameda Avenue, and Riverside Drive.

The traffic mitigation measures were updated with the DA extension in 2017, and the new mitigation measure for the intersection of Olive Avenue/Buena Vista Street will be implemented when total square- footage reaches 1,550,000 OE -GSF. Disney continues to comply with all mitigation measures related to the ongoing operation of the Studio Lot.

ATTACHMENT 1-6

Planned Development No. 94-7
Project: Warner Bros. Studio Main Lot Master Plan
Location: 4000 Warner Boulevard
Applicant: Warner Bros., Inc. (succeeded by Warner Bros. Discovery)

Approved Effective DA Expiration
PD and DA
(Ord. 3415)
October 10,
1995
November 25,
1995
November 25,
2015
First Amendment
(Ord. 3807)
April 26,
2011
May 27,
2011
November 25,
2030

Status:

The PD was approved in 1995 and allowed a total of 2,123,000 net new Office Equivalent Gross Square Feet (OE -GSF) , in addition to the square- footage that existing in 1995. OE -GSF is a calculation used in the Media District to limit development based on traffic impacts. T o date, Warner Bros. Discovery has developed approximately 9.3% of their entitled Master Plan for the Main Lot , approximately 196,616 net new OE-GSF. The most recent developments on the Main Lot include the Warner Brothers Tour Center and Parking Structure, completed in Q1 of 2020, and a 15,620-square-foot employee Child Care Center for 132 children , approved in 2022. The Child Care center was completed in 2023. The Certificate of Occupancy was issued on July 6, 2023.

The PD/DA were extended on April 26, 2011, for an additional 15 years. They are set to expire November 25, 2030.

Mitigation Monitoring:

All conditions of approval required for the construction to date have been met , including near -term traffic improvements such as signal control systems improvements. Additional long-term traffic improvements will be implemented when future construction reaches square-footage thresholds specified in the DA.

Planned Development No. 94-8
Project: Warner Bros. Studio Ranch Lot Master Plan
Location: 3701 Oak Street
Applicant: Warner Bros., Inc. (succeeded by Warner Bros. Discovery)

Approved Effective DA Expiration
PD and DA
(Ord. 3416)
October 10,
1995
November 25,
1995
November 25,
2015
First Amendment
(Ord. 3808)
April 26,
2011
May 27,
2011
November 25,
2030

ATTACHMENT 1-7

Status:

The PD was originally approved in 1995 and allowed for 749,000 net new Office- Equivalent Gross Square Feet (OE-GSF) in addition to the square footage that existed in 1995, which was 85,497OE-GSF. In the period between 1995 and 2022 , several buildings and sound stages were constructed. However, in 2023 the entire project site was cleared for the construction of an all- new campus, which, when completed, will contain 16 new sound stages, a five- story media office building, a five- level parking garage, a mill building for production manufacturing, and various site improvements, including modernized infrastructure and new landscaping. The new campus will represent approximately 426,396 OE-GSF. When built, Warner Bros. will develop approximately 50% of the 843,497 OE-GSF that is allowed on site . The construction is expected to be completed in Q4 of 2025.

In addition, on August 8, 2023, the City Council approved Resolution No. 23- 29,452 consenting to the transfer of the Ranch Lot Development Agreement from Warner Bros. Entertainment Inc. to “Ranch Lot Studios Owner, LLC,” as allowed by Section

1.4 of the Development Agreement. The new owner assumes the entirety of the obligations and terms of the Development Agreement.

The PD/DA were extended on April 26, 2011, for an additional 15 years. They are set to expire November 25, 2030.

Mitigation Monitoring:

The applicant has conducted a project condition compliance review. City s taff is working with the Ranch Lot Studios Owner, LLC / Worthe Real Estate Group (property owner) and Krismar Construction (contractor) to ensure compliance with all mitigation measures applicable with the proposed redevelopment of the project site, including traffic mitigation measures addressed as part of the proposed development.

Planned Development No. 96-01
Project: Burbank Studios Master Plan (formerly NBC Studios Master Plan) Location: 2900 & 3000 West Alameda Avenue
Applicant: Worthe Real Estate Group, successor-in-interest to NBC Catalina Media; Development II, LLC)

Approved Effective DA Expiration
PD and DA
(Ord. 3461)
March 11,
1997
March 19,
1997
March 19,
2017
First Amendment
(Ord. 13-3,846)
December 17,
2013
January 17,
2014
March 19,
2024
Second Amendment
(Ord. 24-4,007)
February 13,
2024
March 15,
2024
March 19,
2027

ATTACHMENT 1-8

Status:

Originally approved in 1997, PD 96- 01 approved the Burbank Studios Master Plan (also known as, “the former NBC Studios Property”). When approved the City also approved a 20- year Development Agreement that provided the property owner the right to develop a total of 1,825,865 Office-Equivalent Gross Square Feet (OE -GSF) on the property by 2017. OE-GSF is a calculation used in the Media District to limit development based on traffic impacts. Following the approval of PD 96- 01, The Pointe Burbank was constructed in 2006/2007 – an approximately 480,000- square- foot (329,000 OE -GSF) office building at 2900 West Alameda Avenue. Also, more recently Two Frank Gehry -designed Buildings, also known as “Second Century Project,” were completed between 2022 and 2023. With the completion of the Second Century Project, the Burbank Studios Master Plan has 882,396 of OE-GSF built, and will have 614,458 OE-GSF of vested development potential remaining, or approximately 33.6 percent of the total.

In addition, i n 2023, the Developer completed an internal lot line adjustment for the Project Site. This change resulted in an update to the legal description of the Project site as well as the street addresses associated with the Project site, but did not expand, reduce, or otherw ise change the exterior boundaries of the Project site or create new parcels within the Project site.

Finally, in February of 2024 the Second
Amendment of the Development Agreement was approved by the City Council, extending the term of the DA by three years until March 19, 2027.

The PD/DA were extended on February 13, 2024, for an additional 3 years. They are set to expire March 19, 2027.

Mitigation Monitoring:

PD 96-01 is complying with all conditions of approval, including the construction of traffic improvements that are required as certain OE -GSF thresholds are met. This includes (1) signal improvements at the Buena Vista / Riverside / SR -134 ramps; (2) possible intersection improvements at the intersection of Barham and Forest Lawn Drive; and (3) site access improvements at Bob Hope Drive and Parkside Avenue.

There is a determination from the City of Los Angeles, dated June 29, 2023, that the City of Los Angeles did not consent to the implementation of Condition 18. Condition 18 requires improvements to Barham Boulevard/Forest Lawn Drive/Lakeside Plaza Drive when certain thresholds were met. However, this does not conflict with the terms of the DA, which allow s deviations from the c onditions through Condition 15, when any approving agency other than the City of Burbank does not approve of the implementation of a condition.

Notwithstanding, the property owner and City staff will continue to work collaboratively with City of Los Angeles, NBC Universal , and Caltrans in confirming that mitigation measures resulting from PD 96-01 that are within their jurisdictions are completed.

ATTACHMENT 1-9

Airport Development Agreement
Project: Airport Development Agreement and Planned Development Nos. 2004-169 and 2004-170
Location: Hollywood-Burbank Airport
Applicant: Burbank-Glendale-Pasadena Airport Authority

Approved Effective DA Expiration
Replacement
Terminal DA and
Minor Amendments
to PD Nos.
2004-169 & 2004-
170
(Ord. 16-3,882)
August 1,
2016
February 7,
2017
February 7,
2037

Status:

On August 1, 2016, the City Council adopted an ordinance approving a Development Agreement (and related PD Amendments) for a 14- gate replacement terminal, other airport buildings and facilities, and related improvements. On November 8, 2016, Burbank residents approved Measure B (with 70% of the vote) to allow a new 14-gate, 355,000-square-foot replacement terminal to be built with up to 3,180 public and 600 employee parking spaces.

The Authority began the Replacement Terminal Design Process by holding a series of public design charrette workshops between March 27, 2019, and October 26, 2019.

The design charrette workshops were held in the City of Burbank , as well as in the cities of Glendale, Pasadena, and Los Angeles. Furthermore, the Authority conducted a procurement and later released a request for proposals for the selection of a consultant firm that would provide project management and associated services for the replacement terminal project which include setting up the program control processes, supporting the Authority in soliciting progressive design-builder firms, and helping define the selection process by which the best value design- builder firm will be selected. In 2019, the Authority selected the firm of AECOM Technical Services, Inc. (AECOM) to provide program management and associated services for the replacement terminal project.

In March 2020, the Airport Authority (Authority) suspended planning and implementation of all discretionary projects, including the replacement terminal, due to the COVID-19 Pandemic. As of September 2021, the Authority had authorized the restart of the replacement terminal project by re- engaging AECOM Technical Services, Inc. consulting firm (AECOM) to manage the project and continue work on development of the Program Development Manual and preparation of a Request for Qualification in order to begin the selection of a progressive design builder for the project. On April 27, 2022, the Authority Commission voted to have Jacobs Project Management Co. (Jacobs) assume the program management services for the replacement terminal project.

ATTACHMENT 1-10

In early 2022, the Authority initiated a procurement process for the project to solicit for a design- builder to provide planning, design, construction, and commissioning services. On December 19, 2022, the Authority Commission awarded a design- build agreement to the Holder, Pankow, TEC, Joint Venture (HPTJV) to provide design- build services for the replacement terminal project. A notice to proceed was subsequently issued to HPTJV the same day for Phase 1 (Preliminary State) of the project which involves construction spec ifications up to 60% completion and construction planning services.

On October 3, 2022, the Authority Commission designated the Adjacent Property as the site of the replacement passenger terminal and approved a Covenant and Environmental Restriction on Property (Land Use Covenant) for the Benefit of the Los Angeles Regional Water Quality Control Board (LARWQCB). The Land Use Covenant memorializes development and use restrictions imposed on the Adjacent Property by the LARWQCB. The Memorandum of Adjacent Property Replacement Passenger Terminal Selection was recorded with the County Registrar -Recorder on October 6, 2022, and the Land Use Covenant was recorded with the County Registrar-Recorder on December 5, 2022.

In November 2022, Jacobs began the process of meeting with various City departments and divisions to discuss various City requirements as they began to work with the design-build team to formalize a project schedule. The project applicant and staff met in March 2023 to discuss timelines for plan check submittal.

The Project was formally submitted into Plan Check under a new a ddress, 2827 N .

Hollywood Way, in September of 2023 and began demolition of the property in December of 2023. Other site preparation permits were issued in early 2024 for mass grading and site work. The remainder of the building permits, including permits for the new terminal structure, parking structure, Airline support facility, and utility/infrastructure upgrades are currently in Plan Check. All City Departments are diligently reviewing the project permits against the requirement in the Development Agreement and the Conditions of Compliance contained therein.

The PD/DA are set to expire February 7, 2037.

Mitigation Monitoring:

The Authority received LA County approval in 2018 of the Human Health Risk Assessment (HRRA) and conditional Federal Aviation Administration ( FAA) approval on the Airport Layout Plan (ALP) in 2020.

In 2018, the Authority began work on the Environmental Impact Statement (EIS) required under the National Environmental Protection Act (NEPA) and a Notice of Intent was released in December 2018. A 30- day public scoping period was held in early 2019 with two scoping meetings being held for the Agency and public to solicit input on the EIS. The Draft EIS was released for a 67-day public review and comment period starting on August 21, 2020, and ending on October 27, 2020. During the public ATTACHMENT 1-11

review and comment period, two virtual public workshops were held where the FAA provided a presentation about the project, the alternatives, and an overview of the impacts; and one public hearing was held to allow the public to provide oral comments.

In May 2021, the FAA issued a Final EIS and Record of Decision (ROD) for the proposed construction and operation of the 14-gate replacement passenger terminal.

As noted above, the Authority has selected both a project manager and design- build team for the project. City staff continues to monitor the project and compliance with the Mitigation Monitoring and Reporting Program (MMRP) that was approved as part of the DA and Final EIR.

Planned Development No. 2012-01
Project: IKEA Store
Location: 600 South San Fernando Boulevard
Applicant: IKEA Property, Inc.

Approved Effective DA Expiration
PD and DA
(Ord. 14-3,850)
March 18,
2014
April 18,
2014
April 18,
2034

Status:

The PD was originally approved in 2014 and allowed for the construction of a new IKEA Store. Construction was completed and the store opened in Spring 2017. Most recently, in 2022, IKEA in partnership with the Downtown Burbank Property -Based Business Improvement District (PBID) and the City of Burbank Community Development Department completed landscaping improvements for two (2) medians along South San Fernando Boulevard. The improvements were fully funded by IKEA.

Additionally, City staff is working with IKEA on completion of an outstanding condition of approval that includes the installment of landscape planters on the parking deck of the existing IKEA store. It is anticipated that this work will be completed in 2024.

The PD/DA are set to expire April 18, 2034.

Mitigation Monitoring:

A Mitigation Monitoring and Reporting Program (MMRP) was approved as part of the Final EIR. All mitigation measures have been completed.

Planned Development No. 2013-01
Project: The Talaria at Burbank Mixed Use Project
Location: 3401 West Olive Avenue
Applicant: MBV Investment Co., L.L.C.

Approved Effective DA Expiration
PD and DA
(Ord. 14-3,856)
October 28,
2014
November 28,
2014
November 28,
2029

ATTACHMENT 1-12

Status:

The Talaria at Burbank Mixed Use Project is a mixed- use residential and retail development with 241 rental units, a 42,950- square-foot grocery store, and 760 parking spaces on a 3.86-acre site. Construction of the approved project commenced in 2016 and was completed in 2019. The residential and commercial components of the project are open and fully operational.

Since staff’s last PD/DA update to the City Council, there have been no changes. The PD/DA are set to expire November 28, 2029.

Mitigation Monitoring:

A Mitigation Monitoring and Reporting Program (MMRP) was approved as part of the Final EIR. All mitigation measures have been completed.

Planned Development No. 2014-01
Project: First Street Village
Location: 275, 325, & 375 North First Street (Approved as 315 North First Street) Applicant: First Street Village, L.L.C.

Approved Effective DA Expiration
PD and DA
(Ord. 17-3,894)
June 6,
2017
July 14,
2017
July 14,
2027

Status:

First Street Village Mixed Use Project, comprises a total of 275 multifamily apartments (including 14 “Workforce Housing Units”) including resident amenities and a total of 18,976 square-feet of retail/commercial space on the ground floors (of which may be a maximum of 9,711 square-feet for retail uses, and a maximum of 9,265 square-feet for restaurant uses).

The project is in the process of being constructed on three acres (three blocks) in downtown Burbank. It will be completed in three phases, with one building (one block) to be completed during each phase. Building A, located at 325 N . First Street, has been completed, and was issued a Certificate of Occupancy in August of 2023. The units and commercial tenant spaces are currently being leased. The ground floor of building A is beginning to be occupied by tenants including a dog groomer and a fitness studio. Building B, located at 275 N. First Street, is in plan check a no building permits have yet been issued. As for Building C, located at 375 N . First Street, this project has been delayed util further notice.

The PD/DA are set to expire July 14, 2027.

Mitigation Monitoring:

Mitigation monitoring is ongoing through the plan check process. Public improvements adjacent to the project site include pedestrian amenities, street furniture, intersection bulb-outs, landscape and lighting within the public right-of-way, a raised bicycle paths, ATTACHMENT 1-13

and a public “pocket park” located at the northeastern corner of the project site, where N. First Street and W . Magnolia Blvd meet. The excavation permit for the above mentioned improvements was issued in early February 2023.

Planned Development No. 16-01
Project: Avion
Location: 3001 N. Hollywood Way
Applicant: Burbank Industrial Investors, LLP

Approved Effective DA Expiration
PD and DA
(Ord. 19-3916)
March 26,
2019
May 17,
2019
May 17,
2029

Status:

On April 16, 2019, the City Council approved this project , which consists of six industrial/flex buildings totaling 1,004,307 square feet; 9 creative office buildings of 142,250 square feet total; 2 retail and restaurant buildings of 15,475 square feet total, and a 150- room hotel. Construction commenced in October 2019 and the applicant has completed construction of the industrial buildings, office buildings and retail/restaurant buildings . A Development Review application (DR) for the construction of a six-story, 150-room hotel was approved on February 11, 2021, and the building permit was issued on February 25, 2022 . The hotel officially opened its doors on April 4, 2024.

The PD/DA are set to expire May 17, 2029.

Mitigation Monitoring:

The Mitigation Monitoring and Reporting Program (MMRP) was approved as part of the Final EIR. All of the required on- and off-site improvements (buffered bike lanes, onsite parking for Metrolink, green streets infrastructure, tree installation, new streets and associated curb & gutter improvements) have been completed.

Planned Development No. 17-01
Project: 777 N. Front Street
Location: 777 N. Front Street
Applicant: LaTerra Development, LLC for SJ4 Burbank, LLC

Approved Effective DA Expiration
PD and DA
(Ord. 19-3,926)
December 17,
2019
January 17,
2020
January 17,
2030

Status:

On December 17, 2019, the City Council approved the project which consists of a mixed-use project with 573 residential (rental) units, a hotel with 307 rooms, and 1,067 square feet of ground floor retail space on a vacant 7-acre site. Site demolition permits were issued in July 2020; grading and shoring permits were issued in November 2020; ATTACHMENT 1-14

foundation permits for two residential buildings were issued in September 2021; and permits for two residential buildings were issued in May 2022. Grading, shoring, foundation, and post-tension slab construction work has been completed. Framing on the residential buildings was initiated in January 2023 and is progressing. Further, construction plans for the proposed publicly accessible open space area, approved as part of the project, were submitted for Building Plan Check review in April 2024.

Construction on the residential buildings is ongoing, with completion tentatively scheduled for 2025.

The PD/DA are set to expire January 17, 2030.

Mitigation Monitoring:

Mitigation monitoring is ongoing through the plan check and construction process. City staff is currently reviewing the proposed off -site improvements which include the following: (1) 28,000 square feet of publicly accessible open space area; (2) adjacent bicycle path; (3) elevator and staircase leading up to the Magnolia bridge; and (4) roadway improvements between Burbank Boulevard and the Downtown Burbank Metrolink Station. Furthermore, City staff is also working with the applicant to complete the affor dable housing covenant. City Staff continues to monitor the Mitigation Monitoring and Reporting Program (MMRP) that was approved as part of the Final EIR.

PDs WITH EXPIRED DAs:

Since staff’s last PD/DA update to the City Council, there have been no newly expired PD/DAs.

DENIED OR WITHDRAWN:

Since staff’s last PD/DA update to the City Council, there have been no newly withdrawn PD/DAs.