AGENDA
City Council Bus Rapid Transit Project Subcommittee Meeting
October 8, 2024
1. Proposed Change to Downtown Olive Avenue Bus Lane Configuration (continued from August 6, 2024 meeting)
a. Current Metro Configuration
b. Possible Lane Reconfiguration
c. Benefits and Tradeoffs
2. Olive Avenue Bridge Update
ATTACHMENT 2-1
BURBANKCA.GOV
[email protected]
275 EAST OLIVE AVENUE
BURBANK, CA 91502
MINUTES
City Council Bus Rapid Transit Project Subcommittee Meeting
October 8, 2024, 3:00 PM
Meeting Attendees
Councilmember Mullins, Subcommittee Member
Councilmember Takahashi, Subcommittee Member
Courtney Padgett, Assistant City Manager
Patrick Prescott, Community Development Director
David Kriske, Assistant Community Development Director
Meeting Location
Community Services Building Room 101
1. Proposed Change to Downtown Olive Avenue Bus Lane Configuration
• CDD staff and the Subcommittee resumed a discussion from the August 6, 2024 meeting of the current bus lane configuration planned for the project in Downtown Burbank between First Street and Glenoaks Boulevard, and a proposed alternative configuration. The current planned configuration is to provide a bus lane along this part of the corridor by converting the existing street parking lanes to a bus lanes.
• Staff reviewed the current alignment configuration across the entire corridor (map attached).
• Staff reviewed an alternative configuration developed by staff that would provide a bus lane by converting one travel lane in each direction instead of a parking lane.
This would allow the on- street parking to remain, would maintain a single traffic lane plus turn lane for vehicles, would provide more space to implement wider transit stations with more room for walking, would slow and calm traffic, and would allow the City to implement complete streets improvements. Staff reviewed a slide deck presentation on the possible configuration previously presented (attached).
• Staff discussed tradeoffs of the proposed configuration including slower vehicle speeds, less vehicle throughput, increased congestion at peak times, traffic diversion, and uncertainties with Metro’s ability to change the project description on this portion of the alignment. Staff indicated that other City Departments have not yet reviewed and provided input on the proposal.
• The Subcommittee discussed potential benefits and concerns over the proposed configuration, including improved safety, better transit station waiting area needed ATTACHMENT 2-2
• for high volumes of transit riders, wider sidewalks along Olive, preserved street parking, concerns over traffic congestion on Olive (particularly at First Street), transition from two lanes to one lane on Olive Bridge, and tradeoffs of improved pedestrian access to Downtown versus impacted car access.
• The Subcommittee requested further analysis and information on the potential configuration change prior to review by the City Council including better perspectives and layouts of the current and proposed transit stop at San Fernando and Olive Avenue, more analysis of traffic operations on Olive Bridge leading to Downtown, better depiction of the sidewalks that would be provided on Olive Avenue under both configurations, and information on how the proposed configuration would tie into the San Fernando Reconfiguration Project.
2. Olive Avenue Bridge Update
• This item was agendized for the meeting, but staff and the Subcommittee did not discuss it. It will be added to a future Subcommittee meeting.
Attachments:
1. Proposed BRT Roadway Configuration Map
2. Slide Deck: Proposed BRT Configuration in Downtown Burbank ATTACHMENT 2-3
VICTORY BLVD
OLIVE AVE
ALAMEDA AVE
HOLLYWOOD WAY
OLIVE AVE
MAGNOLIA BLVD
FIRST ST
VICTORY BLVDBURBANK BLVD
RIVERSIDE DR
BUENA VISTA ST
SAN FERNANDO
BLVD
VICTORY BLVD
Bus Lane
Convert Parking
Westbound - Mixed Flow
Eastbound - Bus Lane
Convert Parking
Burbank - Mixed Flow
Metro - Bus Lane
Convert Second Lane
Bus Lane
Convert Third Lane
Mixed Flow
Proposed
Burbank - Bus Lane
Convert Second Lane
Metro - Bus Lane
Convert Parking
Partial Bus Lane
Convert Parking
Mixed Flow
PASS AVE
Metro North Hollywood to Pasadena BRT Project - Project Cross Section by Segment February 2021
ATTACHMENT 2-4
CITY OF
BURBANK
Proposed Bus Rapid Transit
(BRT) Configuration in
Downtown Burbank
City Council BRT Subcommittee
August 6, 2024
COMMUNITY
DEVELOPMENT
ATTACHMENT 2-5
Why We Are Here
2 • Staff seeks feedback to change the Metro Bus Rapid
Transit (BRT) bus-only lane configuration through
Downtown from First Street to Glenoaks Boulevard:
1. Convert travel lane (not parking lane) to bus-only lane
2. Maintain parking lane along curb
3. Allow full width BRT station platforms
ATTACHMENT 2-6
Benefits of Change
3 • Improve bus stop amenities and space to wait
• Slow vehicle speeds on Olive
• Shorten the distance to cross the street
• Maintain on-street parking
• Keep right turn capacity
• Reduce conflicts between pedestrians and bus riders
• Reduce turn conflicts at intersections and driveways
• Integrate with San Fernando Boulevard
• Buffer pedestrians from buses
• Avoid underlying sidewalk issues
ATTACHMENT 2-7
Current Roadway Configuration
4 ATTACHMENT 2-8
Metro Proposed Design
5 ATTACHMENT 2-9
City Proposed Design
6 ATTACHMENT 2-10
City Proposed Design
7 ATTACHMENT 2-11
Olive Transportation Context
8 • 1 in 5 daily Burbank
Metro riders stops on
the corridor
• Configuration feasible
given vehicle volumes
of 12,000 to 23,000 per
day
• Corridor located on the
Safer Streets Burbank’s
Focus Network
ATTACHMENT 2-12
Trade-offs
9 • Slower vehicle speeds
• Less vehicle throughput
• Likely to produce congestion at peak times
• May divert existing traffic to adjacent streets
• Uncertainties:
o PW and Fire need to review
o Metro needs to agree to change
o Funding
ATTACHMENT 2-13
BRT Subcommittee Policy Feedback
10 • Staff seeks feedback to change the Metro Bus Rapid Transit (BRT) bus-only lane configuration through
Downtown from First Street to Glenoaks Boulevard
1. Convert travel lane (not parking lane) to bus-only lane
2. Maintain parking lane along curb
3. Allow full width BRT station platforms
ATTACHMENT 2-14
Questions/Discussion
11 David Kriske
Asst. Community Development Director-
Transportation & Planning
ATTACHMENT 2-15