2024

STREET LIGHTING

MASTER PLAN
ATTACHMENT 1
A1-1

2 TABLE OF CONTENTS

1.0  MISSION ............................................................................................................................. 5

2.0  PERFORMANCE INDICATORS AND GOALS .................................................................. 5 SAFETY ......................................................................................................................................................................... 5 RELIABILITY ................................................................................................................................................................... 5 CUSTOMER SERVICE .................................................................................................................................................... 5 ILLUMINATION LEVELS ................................................................................................................................................... 5 ILLUMINATION QUALITY ................................................................................................................................................. 5 AESTHETICS .................................................................................................................................................................. 5 ENERGY EFFICIENCY .................................................................................................................................................... 5 COST ............................................................................................................................................................................. 5

3.0  BASIC ELEMENTS OF PRESENT-DAY STREETLIGHT SYSTEM .................................. 6 WIRING CIRCUITS ......................................................................................................................................................... 7 120V CIRCUITS ................................................................................................................................................... 7 240V AND 480V CIRCUITS ................................................................................................................................. 7 LUMINAIRES ................................................................................................................................................................... 7 STREETLIGHT STANDARDS AND MAST ARMS .............................................................................................................. 9 STREETLIGHT FOUNDATIONS ..................................................................................................................................... 21

4.0  DESIGN STANDARDS FOR THE CITY’S STREET LIGHTING SYSTEM ....................... 23 STREET CLASSIFICATIONS .......................................................................................................................................... 23 PEDESTRIAN CONFLICT AREA CLASSIFICATIONS....................................................................................................... 24 ILLUMINATION LEVELS ................................................................................................................................................. 24 STREETS WITH CONTINUOUS LIGHTING ............................................................................................................ 24 STREETS WITH PARTIAL LIGHTING .................................................................................................................... 24 INTERSECTIONS ................................................................................................................................................. 25 SELECTION OF LUMINAIRES AND STANDARDS ........................................................................................................... 26 MAJOR (ARTERIAL) STREETS ........................................................................................................................... 26 COLLECTOR STREETS ....................................................................................................................................... 26 LOCAL STREETS ................................................................................................................................................ 27 INTERSECTIONS ................................................................................................................................................. 27 TREE LIGHTING .................................................................................................................................................. 27 FREEWAY UNDERPASS LIGHTING ..................................................................................................................... 28 ALLEY LIGHTING ................................................................................................................................................ 28

5.0  STREETLIGHT OPERATIONS AND MAINTENANCE .................................................... 28 OPERATIONS ............................................................................................................................................................... 28 MAINTENANCE ............................................................................................................................................................. 30 REPAIRS ...................................................................................................................................................................... 31

6.0  CAPITAL IMPROVEMENT GOALS ................................................................................. 31 IMPROVED ELECTRICAL SAFETY ................................................................................................................................ 31 REPLACE 240V AND 480V CIRCUITS WITH LOW-VOLTAGE 120V CIRCUITS .................................................. 32 CONDITION-BASED REPLACEMENTS ................................................................................................................ 32 IMPROVING ROADWAY ILLUMINATION ......................................................................................................................... 33 REPLACING NON-LED STREETLIGHTS WITH LEDS .......................................................................................... 33 IMPROVED RELIABILITY ............................................................................................................................................... 34 REPLACE DETERIORATED UNDERGROUND STREETLIGHT SUBSTRUCTURES ................................................. 34 ATTACHMENT 1
A1-2

3 REPLACE OLD STANDARDS AS NECESSARY .................................................................................................... 34 INSTALL WIRELESS STREETLIGHT NODES ........................................................................................................ 34 AESTHETICS ................................................................................................................................................................ 34 IMPROVE AESTHETICS OF STREET LIGHTING STANDARDS .............................................................................. 34 UNDERGROUND STREETLIGHT CIRCUITS ......................................................................................................... 34 REDUCED ENERGY COST ........................................................................................................................................... 34 ACCOMMODATION OF OTHER DEPARTMENTAL CIPS ................................................................................................ 34 PUBLIC WORKS PROJECTS ............................................................................................................................... 34 POLICE DEPARTMENT CAMERAS ...................................................................................................................... 35 FIBER EQUIPMENT ............................................................................................................................................. 35 ACCOMMODATION OF THIRD-PARTY INSTALLATIONS ................................................................................................ 35 WIRELESS TELECOMMUNICATION ATTACHMENTS (WTA) ............................................................................... 35

FIGURES
FIGURE 1: TYPICAL STREET LIGHTING CONNECTION ................................................................................................................. 6 FIGURE 2: TYPICAL STREETLIGHT PHOTOCELL .......................................................................................................................... 7 FIGURE 3: LED VS HPS STREETLIGHT ....................................................................................................................................... 8 FIGURE 4: VARIOUS TECHNOLOGIES USED IN CITY STREETLIGHTS .......................................................................................... 8 FIGURE 5: TYPICAL OCTAFLUTE STANDARD ............................................................................................................................. 10 FIGURE 6: OCTAFLUTE STANDARD LOCATIONS MAP ................................................................................................................ 10 FIGURE 7: TYPICAL MARBELITE STANDARD .............................................................................................................................. 11 FIGURE 8: MARBELITE STANDARD LOCATIONS MAP ................................................................................................................ 11 FIGURE 9: TYPICAL SINGLE-POLE (3-RING HALO) POST ......................................................................................................... 12 FIGURE 10: SINGLE-POLE (3-RING HALO) POST LOCATIONS MAP .......................................................................................... 12 FIGURE 11: TYPICAL TRI-POLE POST ....................................................................................................................................... 13 FIGURE 12: TRI-POLE POST LOCATIONS MAP .......................................................................................................................... 13 FIGURE 13: TYPICAL GOOSENECK STANDARD ......................................................................................................................... 14 FIGURE 14: GOOSENECK STANDARD LOCATIONS MAP ............................................................................................................ 14 FIGURE 15: TYPICAL CONCRETE CANDLESTICK (AMERON DELPHI) POST .............................................................................. 15 FIGURE 16: CONCRETE CANDLESTICK (AMERON DELPHI) POST LOCATIONS MAP ................................................................. 15 FIGURE 17: TYPICAL CONCRETE CANDLESTICK (AMERON CONTEMPORARY ROUND) POST ................................................. 16 FIGURE 18: CONCRETE CANDLESTICK (AMERON CONTEMPORARY ROUND) POST LOCATIONS MAP .................................... 16 FIGURE 19: TYPICAL LOW-LEVEL SINGLE-POLE POST ............................................................................................................. 17 FIGURE 20: LOW-LEVEL SINGLE-POLE POST LOCATIONS MAP ............................................................................................... 17 FIGURE 21: TYPICAL LOW-LEVEL FIBERGLASS SHAKESPEARE POST ...................................................................................... 18 FIGURE 22: LOW-LEVEL FIBERGLASS SHAKESPEARE POST LOCATIONS MAP ........................................................................ 18 FIGURE 23: TYPICAL HIGH-LEVEL FIBERGLASS SHAKESPEARE POST ..................................................................................... 19 FIGURE 24: HIGH-LEVEL FIBERGLASS SHAKESPEARE POST LOCATIONS MAP ....................................................................... 19 FIGURE 25: TYPICAL PASEO REDONDO METAL POST .............................................................................................................. 20 FIGURE 26: PASEO REDONDO METAL POST LOCATIONS MAP ................................................................................................ 20 FIGURE 27: DIMENSIONS OF DIFFERENT BWP DECORATIVE STREET LIGHTING STANDARDS ............................................... 21 FIGURE 28: REBAR REINFORCEMENT (LEFT) AND INSTALLED REINFORCEMENT (RIGHT) FOR CONCRETE FOUNDATIONS ... 23 FIGURE 29: OCTAFLUTE (LEFT) AND DECORATIVE POST (RIGHT) IN MAGNOLIA PARK ........................................................... 26 FIGURE 30: NON-SIGNALIZED INTERSECTION AT PALM AVENUE AND NINTH STREET ............................................................. 27 FIGURE 31: ALLEY LIGHT WITH A RETROFITTED FRONT SHIELD .............................................................................................. 28 FIGURE 32: 240V AND 480V CIRCUITS LOCATIONS MAP. OVERHEAD (BLUE), UNDERGROUND (RED). ................................ 32

ATTACHMENT 1
A1-3

4 TABLES
TABLE 1: 2024 STREETLIGHT STANDARDS AND MAST ARMS COUNT IN BURBANK ................................................................... 9 TABLE 2: FOUNDATION ANALYSIS FOR SCENARIO 1, EXISTING LIGHT POLE FOUNDATION WITHOUT ATTACHED SIGNAGE/BANNER ............................................................................................................................................................. 22 TABLE 3: FOUNDATION ANALYSIS FOR SCENARIO 2, EXISTING LIGHT POLE FOUNDATION WITH ATTACHED SIGNAGE/BANNER .......................................................................................................................................................................................... 22 TABLE 4: LIGHTING DESIGN CRITERIA FOR STREETS ............................................................................................................... 24 TABLE 5: LIGHTING DESIGN CRITERIA FOR NON-SIGNALIZED INTERSECTIONS ....................................................................... 25 TABLE 6: MONTHLY STREETLIGHT UTILITY BILL. NOTE THAT THIS IS BASED ON AVERAGE NIGHT HOURS IN A YEAR. ACTUAL BILL IS BASED ON NIGHT HOURS FOR EACH MONTH.SERVICE AND COMPOSITE ENERGY CHARGES ARE PUBLISHED IN THE FEE SCHEDULE, AND UPDATED ANNUALLY ............................................................................................................... 30 TABLE 7: STREET LIGHTING CAPITAL PROJECTS 5-YEAR PLAN .............................................................................................. 31

ATTACHMENT 1
A1-4

5 1.0 MISSION
To provide public roadway and related illuminati on to our customers in a safe, responsive, aesthetically-sensitive, and fiscally-sound manner that furthers the goals of the City of Burbank (City).

2.0 PERFORMANCE INDICATORS AND GOALS
Safety
Burbank Water and Power (BWP) is committed to creating a work environment that poses zero harm to people, the environment and property. BWP achieves this goal by:
 Continual improvement through setting objective s to eliminate hazards and reduce EHS risk.  Meeting applicable compliance obligations.
 Fostering a culture of shar ed responsibility and employee participation for the success of BWP’s EHS programs.

Reliability
Reliability is measured by the ti me required to restore lighting a fter a streetlight is reported as out of service. BWP’s goal is for all streetlights to be replaced within 24 hours of being reported out of service during a weekday and to have no st reetlight be out of service for more than 72 hours.

Customer Service
BWP’s goal is to meet customer commitments 100% of the time.

Illumination Levels
Illumination levels shall conform to BWP’s design standards for roadway lighting set forth herein.

Illumination Quality
Illumination quality shall be pleasing to customers and shall allow colors to be distinguished.

Aesthetics
The streetlight standards, mast arms, and luminaires shall enhance the appearance of the community. Streetlight wiring shall be undergrounded in aesthet ically-sensitive areas, if feasible.

Energy Efficiency
The street lighting system shall incorporate all cost-effective energy-efficiency options.

Cost
Streetlight costs shall be in line with the approved budgets. The streetlight fund shall maintain a reserve to cover at least 60 days of operating expenses.

ATTACHMENT 1
A1-5

6 3.0 BASIC ELEMENTS OF PRESENT-DAY STREETLIGHT SYSTEM
The street lighting system has several components:
 The wiring circuit, which connects the streetlight to the local distribution system supplying power to it.
 The luminaire, which is the st reetlight itself, together with the lens, the enclosure, the ballast (driver), and the photocell.
 The street lighting standard, which is the structure supporting the streetlight.  The substructure, which includes the foundat ion, and if applicable, pull boxes and conduits allowing for the energization of underground system.

Figure 1 illustrates these components as they apply within a typical residential neighborhood.

Figure 1: Typical Street Lighting Connection

PHOTOCELL
ATTACHMENT 1
A1-6

7 Wiring Circuits
Most of the streetlight wiring in residential neighborhoods is overhead. For much of Toluca Lake, the newer hillside developments, the Ben Ma r Hills area, and a few other scattered neighborhoods, the streetlight wiring is underground. Most of the streetlight wiring in commercial areas is overhead, but it is underground for recently-redeveloped areas such as the Downtown Burbank, the Media District, and the Burbank Empire Center. BW P Rules and Regulations 1 require new developments to u nderground streetlight facilities along the perimeter of their property.
120V Circuits
Most of the City’s streetlights (8865 out of approximately 9701) receive power at 120 volts (V) from the local low-voltage system. Each streetlight is connected to a photocell that turns it on around dusk and turns it off around dawn. Figure 2 below shows a typical streetlight photocell.

Figure 2: Typical Streetlight Photocell
240V and 480V Circuits
Approximately 836 streetlights, all of them being arterial and collector type, receive power at 240V or 480V. These voltages are used where 120 V is unavailable or for circuits of long distance where voltage drop is a concern.

Luminaires
Light Emitting Diode (LED) technology is the adopt ed standard for new streetlight installations in the City. LED streetlights offer several benefits including:
 Less energy consumption – LED streetlights consume less than half of the energy required by older technologies, which will hel p shorten the “neck of the duck curve” and reduce the amount of energy generation BWP needs.
 Increased longevity – LED streetlights also last up to four times longer, reducing maintenance costs and improving service.
 Better color rendition – LED streetlights have better color rendition and lighting uniformity that results in fewer hotspots and dark areas. LED streetlights are available in a range of

1 BWP Rules and Regulations 3.19(c)(4)
ATTACHMENT 1
A1-7

8 color temperatures from 2700 Kelvin (warm white) to 6500 Kelvin (cool white). BWP chooses 4000 Kelvin for LED streetlights, because it offers the greatest balance of energy efficiency and color rendering, while maintaining a pleas ing illumination. W hen BWP replaces 2200 Kelvin HPS decorative streetlights, BWP can choose a warmer than 4000 Kelvin temperature.
 Reduced light spillage – LED streetlights are directional, focus the light directly downward, and have a well-defined surface-li ghting area. Therefore, light spillage is minimized by the internal optics of the fixture.

Figure 3: LED vs HPS Streetlight
As of May 2024, approximately 93% of the streetlights in Bur bank are LED. The remaining streetlights are high pressure sodium (HPS), me tal halide (MH), and fluor escent (FLO), which are all less-efficient. BWP replaces all non-LED streetlights with LED streetlights.

Figure 4 below breaks down the various lighting technologies used in the City.

Figure 4: Various Technologies Used in City Streetlights HPS
418
4%
LED
9012
93%
FLO
51 1%
MH
220
2%
HPS
LED
FLO
MH
ATTACHMENT 1
A1-8

9 Streetlight Standards and Mast Arms
There are different types of st reetlight installations throughout the City. They include metal Octaflute standards, concrete Marbelite standar ds, decorative standards, wood pole-mounted mast arms, and traffic signal pole lights.

Table 1 below shows today’s count of each type of streetlight standard or post in Burbank.

Standard/Post General Locations Count
Concrete Marbelites Citywide – Residential Streets 3342 Metal Octaflutes Citywide – Major Streets 2251
Lights on Wood Poles Citywide – On Wood Poles 2168
Safety Lights on Traffic Standards Citywide – Intersections 768 Single-Pole (3-Ring Halos) Downtown Burbank 225
Shakespeares (Low-Level) Ben Mar Hills 199
Underpass Lights Freeway Underpasses 129
Tri-Pole Downtown Burbank 109
Concrete Ameron Delphi Victory Tract, Toluca Lake Area 100 Concrete Ameron Contemporary Round Avion Burbank 53
Single-Pole (Goosenecks) San Fernando Blvd 51
Single-Pole (Low-Level, Lake St) Lake St by BWP Campus 31 Shakespeares (High-Level) Hollywood Way/Tulare Ave, and Olive Ave/Angeleno Ave 11
Paseo Redondo Lights Paseo Redondo 9
Other Light Standards Scattered Locations Citywide 5
Total 9451
Table 1: 2024 Streetlight Standards and Mast Arms Count in Burbank  Streetlights on wood poles are installed using mast arms and are ideal in areas (such as alleys) where there are power poles that are already supporting conductors. Mast arms are available in different lengths, for different street types.  Safety lights on traffic standards are installed in intersections using mast arms on traffic posts.
 Decorative standards in the City are of various shapes and heights.

ATTACHMENT 1
A1-9

10 Figure 5: Typical Octaflute Standard

Figure 6: Octaflute Standard Locations Map
 Octaflute standards are 30 feet metal
octagonal poles with 8-foot mast arms
installed on main boulevards (See Figure
5 and Figure 6). Some older installations
have box-like bases, which serve as pull
boxes for underground feeds or housing
for lighting transformers.

ATTACHMENT 1
A1-10

11 Figure 7: Typical Marbelite Standard

Figure 8: Marbelite Standard Locations Map
 Marbelite standards are 25 feet and 9
inches concrete octagonal poles with 8-
foot mast arms installed mostly in
residential neighborhoods (See Figure 7
and Figure 8). Since they cannot be
repainted, BWP st arted ordering
Marbelites with an anti-graffiti coating in
2006.

ATTACHMENT 1
A1-11

12 Figure 9: Typical Single-Pole (3-Ring Halo)
Post

Figure 10: Single-Pole (3-Ring Halo) Post Locations Map  The Single-Pole (or 3-Ring Halo) is
installed around the Burbank Mall and
Third Street (see Figure 10). It has a steel
construction with a V-shape luminaire
lighting downward (See Figure 9). These
standards were installed in the 1990s as
part of the downtown development. In the
past, some of the posts showed signs of
rusting at the base. To prevent this issue
in the future, BWP changed the stock
specifications from steel to stainless
steel. As noted above, new installations
shall have LED lighting. This setup has
been used for Talaria Burbank on Olive
Avenue and Alameda Avenue, and along
First St and Third St in Downtown
Burbank (See Figure 10). BWP will be
retrofitting the lumina ires with brighter
LED fixtures.

ATTACHMENT 1
A1-12

13 Figure 11: Typical Tri-Pole Post

Figure 12: Tri-Pole Post Locations Map
 The Tri-Pole post is used around the
Burbank Village Walk (See Figure 12). It
has the appearance of three bundled
metal poles, with a glass-globe HPS
luminaire on top (See Figure 11). BWP
will be retrofitting the luminaires with
brighter LED lamps as a capital project by
end of 2024. The LED replacements will
be more efficient, while maintaining the
same color output.

ATTACHMENT 1
A1-13

14 Figure 13: Typical Gooseneck Standard

Figure 14: Gooseneck Standard Locations Map
 The Gooseneck standard has two bell-like
luminaires (See Figure 13) and is used on
San Fernando Boulevard between
Verdugo Avenue and Alameda Avenue
(See Figure 14). The MH luminaires have
been discontinued. By end of 2024, BWP
will be retrofitting a ll 102 luminaires with
LED fixtures.

ATTACHMENT 1
A1-14

15 Figure 15: Typical Concrete Candlestick
(Ameron Delphi) Post

Figure 16: Concrete Candlestick (Ameron Delphi) Post Locations Map  The Ameron Delphi concrete posts are 9’-

7.5” in height and ar e mostly used in
residential areas. These may also be
referred to as “candlesticks” as they
resemble a candle with a flame on top
(See Figure 15). These have been
installed around the Vi ctory tract, the
Toluca Lake area, and other scattered
locations (See Figure 16). BWP will be
retrofitting the luminaires with LED lamps
as a capital project.

ATTACHMENT 1
A1-15

16 Figure 17: Typical Concrete Candlestick
(Ameron Contemporary Round) Post

Figure 18: Concrete Candlestick (Ameron Contemporary Round) Post Locations Map  The Low-Level Contemporary Round
Concrete Candlestick posts are 12’ in
height and are used in new commercial
development areas with wide pedestrian
sidewalks in combination with bicycle
pathways. When operating, these
standards resemble a candle with a flame
on top (See Figure 17). These were
recently installed in the Avion project area
(See Figure 18). New installations shall
have LED lighting.

ATTACHMENT 1
A1-16

17 Figure 19: Typical Low-Level Single-Pole
Post

Figure 20: Low-Level Single-Pole Post Locations Map
 The Low-Level Single-Pole posts are 12’ in
height and are installe d on Lake St along
the south west property line of Burbank
Water and Power campus (See Figure 19
and Figure 20). BWP has installed LED
lighting on these posts.

ATTACHMENT 1
A1-17

18 Figure 21: Typical Low-Level Fiberglass
Shakespeare Post

Figure 22: Low-Level Fiberglass Shakespeare Post Locations Map  The Low-Level fiberglass Shakespeare
posts are 12’ in height and have been
installed in the Ben Mar Hills area, along
with other areas in the city (See Figure 22).

When operating, these standards
resemble a candle with a flame on top (See
Figure 21). These posts were installed in
both colors, White and Black. These
fiberglass standards (around 199 units)
are showing signs of deterioration and will
need to be replaced within the next two
years. BWP will be installing LED
luminaires on the new replacement posts.

ATTACHMENT 1
A1-18

19 Figure 23: Typical High-Level Fiberglass
Shakespeare Post

Figure 24: High-Level Fiberglass Shakespeare Post Locations Map  The High-Level fiberglass Shakespeare
posts are 20’ in height and have been
installed in the two locations in Burbank,
on Hollywood Way by Tulare Ave, and
along Olive Ave and Angeleno Ave north
of Glenoaks St (See Figure 24). When
operating, these standards resemble a
candle with a flame on top (See Figure 23).

These posts were installed in both colors,
White and Black. There are (11) of these
posts installed. BWP has started
retrofitting the luminaires with brighter LED
lamps, and will complete the replacement
in 2024 as a capital project.

ATTACHMENT 1
A1-19

20 Figure 25: Typical Paseo Redondo Metal
Post

Figure 26: Paseo Redondo Metal Post Locations Map
 The Low-Level metal posts are 20’ in
height and have been installed in Paseo
Redondo in Burbank (See Figure 25 and
Figure 26). There are (9) of these posts
installed. BWP has retrofitted the
luminaires with brighter LED lamps.

ATTACHMENT 1
A1-20

21 Figure 27 shows photos of all the decorative-post types BWP currently stocks and installs.

Figure 27: Dimensions of Different BWP Decorative Street Lighting Standards

Streetlight Foundations
In 2024, BWP commissioned a foundation analysis study of various existing light poles. The purpose of this study was to determine the adequacy of the existing foundation of the light poles with and without the banners and wayfinding signages that could be attached to the existing light poles. The analysis considered the effect s of wind, self-weight, and seismic loading. For this analysis, it was assumed that the existing light poles were constructed per the City’s standard specifications at the time of installation and all applicable codes in addition to meeting all code minimum design requirements in their as-built conditions. The outcome report was intended to be used to determine whether the existing foundations are adequate or if they need to be upgraded. Two scenarios were considered for the existing foundation analysis:
 Scenario 1: Existing light pole f oundation without attached signage/banner  Scenario 2: Existing light pole foundation wi th a single banner and breakaway brackets Streetlight foundations were analyzed for dead lo ads including pole self-weight, existing luminaires superimposed weight, and additional weight of the new proposed signs/banners. In an effort to minimize wind load imposed on the st reetlights, BWP is spec ifying that all banner installations will be limited to a single banner and util itize breakaway brackets. The maximum effect of either wind or seismic loads in comb ination with vertical dead loads were considered ATTACHMENT 1
A1-21

22 to evaluate size and depth of the existing foundations. The foundat ion was checked for overturning stability and strength in cohesionless soil. Tables 2 and 3 below show the result of our analysis for each scenario.
 Scenario 1: Existing light pole f oundation without attached signage/banner Pole Type Governing
Load
Depth (ft) Depth (ft) Ratio Stress
Ratio
Existing Required Depth Plain
Concrete
Marbelite 8' Arm Double Se ismic 4.5 3.72 83% 33%
Octaflute 8' Arm Double Wind 4.5 3.15 70% 21%
Decorative – Ameron Delphi Seismic 3 2.16 72% 6%
Decorative – 3 Ring Halo Wind 3 1.95 65% 5%
Decorative – Clear Globe 15' Seismic 3 2.21 74% 7%
Decorative – Goosneck Seismic 4.5 2.32 51% 8%

Pole Type W/Helix Governing
Load Helix DCR Shear DCR Shaft
Marbelite 8' Arm Double-Helix Seismic SA11242NG4VP 77% 52% Decorative – Ameron Delphi-Helix Seismic SA1122960 38% 9% Table 2: Foundation Analysis for Scenario 1, Existing light pole foundation without attached signage/banner
 Scenario 2: Existing light pole foundation wi th a single banner and breakaway brackets Pole Type Governing
Load
Sign /
Banner
(Qty)
Size
Depth
(ft) Depth (ft) Ratio Stress
Ratio
Existing Required Depth Plain
Concrete
Marbelite 8' Arm, Double Seis mic (1) 3'x6' 4.5 3.74 83% 33% Marbelite 8' Arm, Double Wind (1) 3'x8' 4.5 3.74 83% 33% Octaflute 8' Arm Double Wind (1) 3'x6' 4.5 3.57 79% 30% Octaflute 8' Arm Double Wind (1) 3'x8' 4.5 3.65 81% 32% Decorative – Ameron Delphi Wind (1) 3'x6' 3 2.18 73% 6% Decorative – 3 Ring Halo Wind (1) 3'x6' 3 2.64 88% 12%
Decorative – Clear Globe 15' Wind (1) 3'x6' 3 2.54 85% 11% Decorative – Goosneck Wind (1) 3'x6' 4.5 2.86 64% 15%

Pole Type W/Helix Governing
Load
Sign/Banner
(Qty) Size Helix DCR
Shear
DCR
Shaft
Marbelite 8' Arm, Double-Helix Seismic (1) 3'x6' SA11242NG4VP 78% 53% Marbelite 8' Arm, Double-Helix Seismic (1) 3'x8' SA11242NG4VP 78% 53% Decorative – Ameron Delphi-Helix Seismic (1) 3'x6' SA1122960 39% 9% Table 3: Foundation Analysis for Scenario 2, Existing light pole foundation with a single banner and breakaway brackets
ATTACHMENT 1
A1-22

23 Analysis of the existing concrete pole foundations show that the stress ra tio in plain concrete (concrete without reinforcing) are at accept able level under the forces induced by wind or seismic loading. However, industry standards include foundation with minimum reinforcement for integrity of the foundation.

For all new installations, BWP is including a rebar reinforcement in concrete foundations. All new streetlight foundations require rebar reinforcement. Figure 28 below shows an example.

Figure 28: Rebar Reinforcement (Left) and Installed Reinforcement (Right) for Concrete Foundations

4.0 DESIGN STANDARDS FOR THE CITY’S STREET LIGHTING SYSTEM The City’s lighting system is over 75 years old; therefore there are a number of “legacy elements”.

What follows are the design standards applied to new street lighting extensions or replacements.

Street Classifications
Street classifications are determined by the City and based on various factors such as the width of the street, vehicular traffic volume, and speed limits. The classifications are as follows:
 Major Arterial
 Secondary Arterial
 Downtown Collector
 Collector
 Local

ATTACHMENT 1
A1-23

24 Pedestrian Conflict Area Classifications
For street lighting, Illuminating Engineering Society of No rth America (IESNA) Recommended Practice 8 (RP-8) standard uses peak hour pedes trian counts as the criterion for potential conflict. Pedestrian Conflict Area classifications are as follows:
 High – A volume greater than 100 pedestrians per hour. Typical: downtown retail areas.  Medium – A volume between 10 and 100 pedestria ns per hour. Typical: downtown office areas, neighborhood shopping.
 Low – A volume of 10 or fewer pedestrians per hour. Typical: suburban single family streets.

Illumination Levels
Streets with Continuous Lighting
All major and most collector streets in the City are designed to have continuous lighting. The IESNA defines continuous lighting as a fixed overhead-lighting system designed to provide a specific level of illuminance, luminance, and uniformity of light on the roadway. Suggested levels for different streets are shown in Tabl e 4 below. BWP will design for these levels or better.

Street
Classification
Pedestrian
Conflict Area
Minimum Average
Luminance Lavg
(cd/m2)
Maximum Average
Uniformity Ratio
Lavg/Lmin
Major (Arterial)
High 1.2 3
Medium 0.9 3
Low 0.6 3.5
Collector
High 0.8 3
Medium 0.6 3.5
Low 0.4 4
Local
High
“Partial Lighting” Medium
Low
New
Developments
New developments will require a complete street lighting system per the BWP Rules and Regulations for Utility Service, and must meet IESNA RP-8 standard (latest revision) for all public right of way areas.

Table 4: Lighting Design Criteria for Streets
Streets with Partial Lighting
Partial lighting is defined as li ghting installed at the decision areas of isolated interchanges and intersections whereby it provides visibility of potential conflicts with other traffic and physical features. Local street s in the City have partial li ghting and do not adhere to the requirements in 4.3.1. In addition to intersection lighting, these streets typically have midblock lighting every 100 to 350 feet for traffic safety.

Historically, various neighborhoo d-assessment districts paid for their street lighting. Since moving to a Citywide cost basis, the City allowed new housing developments to install street lighting but did not actively install continuous lighting on residential streets, as these streets ATTACHMENT 1
A1-24

25 have low-vehicular traffic. Additi onal streetlight installations in such areas incur upfront and recurring costs, while only benefiting a few properties.

Optional midblock additional ligh ting may be installed by BWP, if 50% or more of property owners within 100 feet of the proposed light loca tion do not object to installing the new light.

BWP has a streetlight process in place to review additional lighting requests.

Intersections
Signalized Intersections
Typically, intersections involving major and co llector streets have traffic signal poles with streetlights at the top. These lights are attached on a mast arm and are referred to as “safety lights”. The City’s Public Works’ Traffic Division (Traffic Division) sets the lighting-design criteria for such intersections and installs new safety lights. In accordance with the lighting standards adopted by the Traffic Di vision, BWP crews maintain sa fety lights as part of the City’s street lighting system. When a safety light replacement is required, BWP will use the same streetlight type or other approved equivalent.

Non-Signalized Intersections
Street intersections involving most local st reets and some collector streets might not have traffic signal poles. This is typical on streets, such as Kenneth Road (collector), where all intersections with local streets have stop signs. In such a configuration, BWP is responsible for setting and maintaining the lighting-design criteria. Lighting levels at the intersection should be higher than lighting levels on each of the intersecting streets. Table summarizes different types of non-signalized intersections and how they should be illuminated.

STREET
X
STREET
Y
Local Street Collector Street with 2
lanes
Major or Collector
Street with 3 or
more lanes
Local Street
Install (1) Residential-
type luminaire with
mast arm
perpendicular to wider
street
Install (1) Collector-
type luminaire with
mast arm
perpendicular to wider
street
Install (2) Arterial-
type luminaires on
opposite corners
(ideally with both
arms perpendicular
to wider street)
Collector Street
with 2 lanes
Install (1) Collector-
type luminaire with
mast arm
perpendicular to wider
street
Install (2) Collector-
type luminaires on
opposite corners
(ideally with one arm
perpendicular to each
street)
Install (4) Arterial-
type luminaires at
the corners
Major or
Collector Street
with 3 or more
lanes
Install (2) Arterial-type
luminaires on
opposite corners
(ideally with both arms
perpendicular to wider
street)
Install (4) Arterial-type
luminaires at the
corners
Install (4) Arterial-
type luminaires at
the corners
*Lanes include both directions and center left-turn lane, if applicable.

Table 5: Lighting Design Criteria for Non-Signalized Intersections ATTACHMENT 1
A1-25

26 Selection of Luminaires and Standards
Major (Arterial) Streets
Standards. BWP uses 30-foot metal
Octaflute standards along most major
boulevards. This will continue to be a
BWP standard, with the end goal of
minimizing the type s of streetlight
fixtures installed in the City in order to
reduce the cost of maintaining
inventory of different types of posts.

Typical streetlight spacing is 70 feet to
80 feet staggered (maximum 100
feet). Sometimes luminaires are
installed on streetlight mast arms and
attached to existing power poles.

Decorative Option.

Decorative streetlights, if installed on
arterial streets, shall be combined 2
with Octaflute standards in order to
meet the lighting r equirements. This
setup is used in the Magnolia Park
area and the new Talaria Burbank
development, where pedestrian
streetlights are aided by Octaflutes
(See Figure 29). New installations of
decorative streetlights on arterial
streets shall be the Single-Pole 3-Ring Halo post (See Figure 9).

Luminaires. Leotek’s EC7-18M2 LED luminaire or other BWP-approved equivalent. LED with type III light distribution and 4000K color rendition. For decorative lighting, a case-by- case photometric study shall be conducted to ensure BWP illumination levels (4.3.1) are met.

Collector Streets
Standards. A majority of collector streets have 26-foot Marbelite standards spaced 100 to 150 feet (maximum 250 feet). Occasionally, a roadway will already have power poles running along it, such as Bel Aire Drive; in these cases, the streetlight mast arms are attached to the poles for street lighting rather than installing separate standards.

Decorative Option. Decorative streetlights may be insta lled separately or combined with Marbelite streetlights.

Luminaires. CREE’s XSPLG LED luminaire or other BWP-approved equivalent. LED with type III light distribution and 4000K color rendition.

2 Combinations include having an Octaflute every other few decorative lights or having Octaflutes across the street with enough light throw to surpass the lighting requirements.

Figure 29: Octaflute (Left) and Decorative Post
(Right) in Magnolia Park
ATTACHMENT 1
A1-26

27 Local Streets
Standards. A majority of residential streets have 26-foot Marbelite standards spaced 100 to 150 feet staggered (250 feet maximum).

Decorative Option. Decorative streetlights may be insta lled separately or combined with Marbelite streetlights.The Toluca Lake neighborhood has low-level concrete standards; low- level is defined as a shorter ornamental li ght standard. The Ben Mar Hills neighborhood has low-level fiberglass standards; the area bounded by Burbank Boulevard, Victory Boulevard, Parish Place, and Sparks Street has low-level concrete standards.

Luminaires. Excellence Opto’s ESU-FA01 LED luminaire or other BWP-approved equivalent. LED with type II or III light distribution and 3000-4000K color rendition for Marbelites. For decorative standards, an LED luminaire shall be used for replacements and new installations.

Intersections
Standards. All major
intersections have traffic signal
poles with safety lights on mast
arms at the top of the pole. The
Traffic Division installs and
maintains traffic standards.

Most residential intersections
have stop signs and, therefore, do
not have traffic signal poles or
safety lights. These intersections
typically have Marbelites or
wooden poles. See example in
Figure 30.

Luminaires. Traffic engineers
are responsible for conducting
photometric studies when
installing new or upgrading
existing traffic signals. BWP
maintains the safety lights
thereafter. In 2014, the Traffic
Division standardized on 250
watts (W) HPS for safety lights. In 2021, the Tr affic Division started to follow BWP lighting standards, by installing lights t hat satisfy the design criteria of section 4.3.3.2. For non- signalized intersections, BWP shall install lighting that satisfies the lighting-design criteria of section 4.3.3.2.

Tree Lighting
It is the City’s policy to accommodate decorative lighting in the Burbank Village area; that is, the ‘twinkle lights’ that wrap around the branches of the trees along San Fernando Boulevard from Angeleno Street to Magnolia Boulevard. The existing decorative streetlights, which have built-in 120V outlets, serve as a power source for the twinkle lights.

Figure 30: Non-Signalized Intersection at Palm Avenue
and Ninth Street
ATTACHMENT 1
A1-27

28 Freeway Underpass Lighting
The City is responsible for maintaining many of the freeway underpass lights installed by CALTRANS within the City limits. The majori ty of these underpass light fixtures are T12 fluorescent tubes (old technology) and range fr om High Output (HO) to Very-High Output (VHO) fixtures. Production has c eased for most of these fixtur es; therefore, BWP replaces the lamps on a maintenance basis. An LED luminaire shall be used for replacements and new installations.

Luminaires. Herculux’s H1212FD LED wallpack or other BWP-approved equivalent. LED with 4000K color rendition. BWP shall use the standard for future underpass lighting installations and replacements.

Alley Lighting
Standards. Besides roadway illumination, it is
the City’s policy to pr ovide alley lighting for
neighborhood security at the request of the
customer or police. Where there are alleys,
BWP uses them as power distribution corridors,
so the mast arms can simply attach to the
existing power poles.

Luminaires. Excellence Opto’s XSPR ESU-
FA01 LED luminaire or other BWP-approved
equivalent. Due to the narrow nature of alleys,
many residents complain about light spilling
from alley streetlights into their backyard or
bedroom windows. If feasible, BWP shall create
a new luminaire standard or shielding solution
specific to alleys, in order to minimize light
trespass into private property. Figure 31 shows
an instance of a retrofitted shield to address a
complaint about an alley light.

5.0 STREETLIGHT OPERATIONS AND MAINTENANCE
The City’s street lighting system is operat ed and maintained by in-house BWP crews. The attached proposed Capital and Operations and Maintenance (O&M) Budget sheets show expenses broken down into their respective cat egories. The following is an overview of BWP’s street lighting O&M work.

Operations
The street lighting system turns on and off auto matically using photocells; manual operation is unnecessary. The major operating expense is the elec tric utility bill. Table 6 below shows the monthly kilowatt hour (kWh) consumption and cost for the street lighting system, broken down

Figure 31: Alley Light with a Retrofitted
Front Shield
ATTACHMENT 1
A1-28

29 by type of luminaire and luminaire wattage. The other operating expense is patrolling streetlights using a swing-shift Electrical Distribution staff.
(A) (B) (C) (D)=
(B)x(C)
(E)=
(A)x(B)
(F)= (E)
xHours
xDays
(G) (H)=
(F)x(G)
(I)=
(D)+(H)
Wattage
# of
Lights
Service
Charge
(Per
Lamp)
Service
Charge
(Total)
kW
(Total)
kWh/Mo.
(Total)
Composite
Energy
Charge
(Per kWh)
Composite
Energy
Charge
(Total)
Amount
(Total)

HIGH PRESSURE SODIUM
70W 10 $1.04 $10 0.700 256 $0.1424 $36 $47
100W 156 $1.04 $162 15.600 5,694 $0.1424 $811 $973
175W 10 $1.04 $10 1.750 639 $0.1424 $91 $101
200W 6 $1.04 $6 1.200 438 $0.1424 $62 $69
250W 128 $1.04 $133 32.000 11,680 $0.1424 $1,663 $1,796

LIGHT EMITTING DIODE
17W 32 $1.04 $33 0.544 199 $0.1424 $28 $62
25W 62 $1.04 $64 1.550 566 $0.1424 $81 $145
30W 362 $1.04 $376 10.860 3,964 $0.1424 $564 $941
32W 2 $1.04 $2 0.064 23 $0.1424 $3 $5
34W 2 $1.04 $2 0.068 25 $0.1424 $4 $6
36W 54 $1.04 $56 1.944 710 $0.1424 $101 $157
37W 11 $1.04 $11 0.407 149 $0.1424 $21 $33
40W 13 $1.04 $14 0.520 190 $0.1424 $27 $41
41W 2 $1.04 $2 0.082 30 $0.1424 $4 $6
42W 3351 $1.04 $3,485 140.742 51,371 $0.1424 $7,315 $10,800 45W 1 $1.04 $1 0.045 16 $0.1424 $2 $3
46W 3 $1.04 $3 0.138 50 $0.1424 $7 $10
48W 3 $1.04 $3 0.144 53 $0.1424 $7 $11
50W 9 $1.04 $9 0.450 164 $0.1424 $23 $33
54W 1 $1.04 $1 0.054 20 $0.1424 $3 $4
63W 143 $1.04 $149 9.009 3,288 $0.1424 $468 $617
65W 3 $1.04 $3 0.195 71 $0.1424 $10 $13
68W 16 $1.04 $17 1.088 397 $0.1424 $57 $73
70W 807 $1.04 $839 56.490 20,619 $0.1424 $2,936 $3,775 72W 4 $1.04 $4 0.288 105 $0.1424 $15 $19
75W 1 $1.04 $1 0.075 27 $0.1424 $4 $5
80W 3 $1.04 $3 0.240 88 $0.1424 $12 $16
90W 1 $1.04 $1 0.090 33 $0.1424 $5 $6
100W 8 $1.04 $8 0.800 292 $0.1424 $42 $50
101W 2158 $1.04 $2,244 217.958 79,555 $0.1424 $11,329 $13,573 108W 9 $1.04 $9 0.972 355 $0.1424 $51 $60
110W 382 $1.04 $397 42.020 15,337 $0.1424 $2,184 $2,581 113W 4 $1.04 $4 0.452 165 $0.1424 $23 $28
117W 1 $1.04 $1 0.117 43 $0.1424 $6 $7
120W 38 $1.04 $40 4.560 1,664 $0.1424 $237 $277
130W 1 $1.04 $1 0.130 47 $0.1424 $7 $8
ATTACHMENT 1
A1-29

30 145W 310 $1.04 $322 44.950 16,407 $0.1424 $2,336 $2,659 150W 90 $1.04 $94 13.500 4,928 $0.1424 $702 $795
160W 1246 $1.04 $1,296 199.360 72,766 $0.1424 $10,362 $11,658 163W 6 $1.04 $6 0.978 357 $0.1424 $51 $57
180W 2 $1.04 $2 0.360 131 $0.1424 $19 $21
188W 15 $1.04 $16 2.820 1,029 $0.1424 $147 $162
193W 1 $1.04 $1 0.193 70 $0.1424 $10 $11
195W 1 $1.04 $1 0.195 71 $0.1424 $10 $11
228W 1 $1.04 $1 0.228 83 $0.1424 $12 $13
250W 2 $1.04 $2 0.500 183 $0.1424 $26 $28

FLUORESCENT
23W 4 $1.04 $4 0.092 34 $0.1424 $5 $9
32W 1 $1.04 $1 0.032 12 $0.1424 $2 $3
42W 7 $1.04 $7 0.294 107 $0.1424 $15 $23
85W 38 $1.04 $40 3.230 1,179 $0.1424 $168 $207
250W 1 $1.04 $1 0.250 91 $0.1424 $13 $14

METAL HALIDE
250W 188 $1.04 $196 47.000 17,155 $0.1424 $2,443 $2,638 Total 9710 $10,098 857.33 312,925 $44,561 $54,659

+ In-Lieu Transfer $3,826
Average Monthly Bill $58,485
Table 6: Monthly Streetlight Utility Bill. Note that this is based on average night hours in a year. Actual bill is based on night hours for each month.Service and Composite Energy charges are published in the Fee Schedule, and updated annually
Maintenance
BWP has an inspection program in place that tracks several maintenance activities including:
 Deteriorated or leaning streetlight standards or posts  Deteriorated streetlight foundations
 Failed light fixtures
 Streetlight wiring issues
 Deteriorated streetlight pullboxes or pedestals
 Deteriorated streetlight paint – A painting program was launc hed in 2003 to paint existing metal standards a uniform black color. The program is ongoing and is now mainly focused on maintenance painting. Streetlight standards will be painted on a 10-year cycle.  Removal of graffiti as necessary.

As maintenance issues are found through inspection, BWP addresses the issues in a timely manner. If a significant number of issues are found in a common area, a capital improvement project may be created.

ATTACHMENT 1
A1-30

31 Repairs
All streetlights reports received by BWP during the work week are addressed within 24 hours.

If reported on weekends, streetlight repairs star t within 72 hours. In the event of vehicular accidents that result in streetlight knockdowns after hours, a two-man crew is called out to make the area safe, clean up, and repair affected circuits, w hen practical. A full crew revisits the site the next business day to resume streetlight repairs.

6.0 CAPITAL IMPROVEMENT GOALS
Capital Improvement Projects (CIPs) are given priority according to the following order. Multiple goals are satisfied within a category of CIPs including:
 Improved electrical safety
 Improved roadway illumination
 Improved reliability
 Aesthetics
 Reduced energy costs
 Accommodation of other departmental CIPs
 Accommodation of third-party installations
Improved Electrical Safety
CIPs are categorized under different programs. Every fiscal year (FY), BWP completes projects that address one or more programs. Table 7 below shows the planned CIPs for the upcoming 5 fiscal years.

FY Project CIP Description
2024/
2025
Convert 240V+ CCTs to 120V SL-3 Replace 240V & 480V with multiple 120V circuits Replace Deteriorated Posts SL-7 Replace Deteriorated Shakespeare Streetlights 2025/
2026
Underground Utility District II
San Fernando Blvd SL-2 Convert circuit on San Fernando Blvd Convert 240V+ CCTs to 120V SL-3 Replace 240V & 480V with multiple 120V circuits Replace Deteriorated Posts SL-7 Replace Deteriorated Shakespeare Streetlights 2026/
2027
Convert 240V+ CCTs to 120V SL-3 Replace 240V & 480V with multiple 120V circuits Replace Deteriorated Posts SL-7 Replace Deteriorated Streetlights 2027/
2028
Underground Utility District II
San Fernando Blvd SL-2 Convert circuit on San Fernando Blvd Convert 240V+ CCTs to 120V SL-3 Replace 240V & 480V with multiple 120V circuits Replace Deteriorated Posts SL-7 Replace Deteriorated Streetlights 2028/
2029
Convert 240V+ CCTs to 120V SL-3 Replace 240V & 480V with multiple 120V circuits Replace Deteriorated Posts SL-7 Replace Deteriorated Streetlights Table 7: Street Lighting Capital Projects 5-Year Plan
ATTACHMENT 1
A1-31

32 Replace 240V and 480V Circuits with Low-Voltage 120V Circuits A drawback of using 240V and 480V has been safety procedures that crews have to complete to maintain the circuits at higher than 120V . Both 240V and 480V circuits incur increased maintenance costs and pose more risk because of the higher voltage. Over the years, BWP has taken steps to convert these circuits to low-voltage 120V circuits. Given the priority of this effort, it is recommended that the 240V and 480V circuits should be converted to 120V circuits. This will contribute to improved over all safety and reliabilit y of BWP’s streetlight system. Approximately 836 streetlights in the city, most of which are on arterial and collector streets, receive power at 240V or 480V.

Figure 32: 240V and 480V Circuits Locations Map. Overhead (Blue), Underground (Red).

Condition-Based Replacements
Some of the relatively newer streetlight posts have also reported severe deterioration.

ATTACHMENT 1
A1-32

33 Single-Pole Decorative Posts in the Mall Area
Replacements may be needed due to rust at the base. BWP has taken necessary measures to avoid this issue with future installations by switching from steel to stainless steel. But with more than 250 existing installations in the City, there is a need for additional inspections and replacements within the next five years.

Fiberglass Shakespeare Posts
Although installed less than 20 years ago, some of these posts are showing signs of deterioration, which seems to be accelerated by sunlight. In 2023, as part of the citywide streetlight inspection program, Shakespeare decorative posts have shown deterioration for most of the installed posts around the city. Approximately 71% of low-level Shakespeare posts were identified for replacement. BWP deter mined it is necessary to replace this type with one that has higher quality, better life expectancy, and requires less maintenance over time. There is currently 199 of these low-le vel Shakespeare posts installed citywide in multiple areas. Replacement of these deteriorated posts w ill require resources and funds beyond the LED program completi on target of end of 2024. BWP will replace 100% of this type of decorative posts, along with installing LED lights, over the span of two budget years.

For efficiency purposes, BWP will delay the conv ersion of these 199 lights to LED to align with the replacement of the posts, avoi ding double work and unnecessary resource utilization.

Improving Roadway Illumination
Replacing non-LED Str eetlights with LEDs
Initially, HPS and MH replacement with LE D was carried out on a maintenance basis to minimize the impact on the streetlight fund. However, as LED deployment progressed, fewer non-LED streetlights were left in service an d less replacements were made, slowing down the pace of the LED replacem ent program. In 2014, BWP launc hed a Citywide program to replace non-LED streetlights with newer efficient LED streetlights.

Throughout the program, BWP has conducted extensive resear ch to optimally choose efficient and appropriate LED products. For each type and size of existing old non-LED fixtures, BWP has tested several LED equivalents, and approved as standard the ones that meet Burbank specifications and standards. The research and deployment have been completed for all roadway lighting throughout the city, and now BWP has standard products in place for maintaining roadway lighting. This includes metal Octaflute standards, concrete Marbelite standards, and streetlights on wood poles; 100% of these have been converted to LED. The last main category of lights in the ci ty is decorative posts. Decorative lights by nature require additional research efforts due to the customization and uniqueness of each light post and fixture. Decorative posts in the city are of various shapes and heights.

To date, almost 93% of streetlights in the city of Burbank have been converted to LED. The remaining streetlights are high pressure sodium (HPS), metal halide (MH), and fluorescent, which are all less-efficient. BWP replaces all non-LED streetlights with LED streetlights as maintenance issues arise. By end of 2024, it is anticipated that all streetlights will be converted to LED, with the exception of li ghts installed on Shakespeare decorative posts.

BWP will be conducting a separate capital impr ovement project to replace all Shakespeare decorative posts in the City with concrete posts. For efficiency purposes, the capital ATTACHMENT 1
A1-33

34 improvement project will conver t the Shakespeare streetlights to LED at the time the posts are replaced. The project is planned to-be completed in two years.

Improved Reliability
Replace Deteriorated Underground Streetlight Substructures Aging and deteriorated underground conduits and pullboxes have been the greatest source of reliability problems. In recent history, BWP has replaced the underground system in the Ben Mar Hills area and in Toluca Lake. T here are a few smaller, scattered underground systems that should be replaced, and funds are budgeted annually to aid in the replacement of deteriorated streetlight substructures.

Replace Old Standards as Necessary
Streetlight standards that have de teriorated or have been hit by vehicles will be replaced as necessary.

Install Wireless Streetlight Nodes
All new streetlights are ordered with 7-pin receptacles that are compatible with smart photocells. BWP may decide to pursue smart phot ocells in the future, taking advantage of additional functionalities such as outage notifications, built-in GPS, power monitoring, and remote scheduling.

Aesthetics
Improve Aesthetics of Street Lighting Standards
Replace stub poles with Marbelite standards: streetlights on deteriorating wood stub poles will be systematically replaced wi th Marbelite streetlight standar ds. This provides improved reliability of the system and overall beautification of City streets.

Underground Streetlight Circuits
Underground along major boulevards to be consistent with Council’s policy to eliminate overhead lines along view corridors: the first Underground Utility District (UUD) was established on Olive Avenue in FY 05/06. A second UUD is being proposed for the San Fernando Corridor. Following this designation, all utilities will be converted to underground circuits, including 480V streetlights on San Fernando Boulevard between Amherst Drive/Scott Road and Grismer Avenue.

Reduced Energy Cost
Reduce cost through energy efficiency and r educed need for maintenance by eliminating underground series circuits and investing in new lighting technologies, such as LEDs. Replacing the HPS luminaires with LEDs will result in overall lower life-cycle cost for streetlight facilities.

The current LED lineup saves 58-75% in electric energy and requires less maintenance.

Accommodation of Othe r Departmental CIPs
Public Works Projects
The City is continuously upgrading existing or adding new intersection traffic signals. Safety lights on older traffic signals are fed through overhead wires a ttached to them from nearby ATTACHMENT 1
A1-34

35 streetlights. On newer traffic st andards, safety lights are fed dire ctly from the pole. Work is required from BWP to accommodate these projects.

Police Department Cameras
The Burbank Police Department utilizes security camers that are installed in some locations around the city. Streetlight mast arms, whether on streetlight standards, or wood power poles are a suitable solution for th is purpose. Work is required from BWP to accommodate these installations.

Fiber Equipment
BWP currently operates an extensive fiber optic network connecting utility and City buildings, as well as the Burbank Unified School District, plus many of the largest commercial customers in Burbank. BWP’s ONE Burbank (Optical Network Enterprise) program provides commercial customers Direct Internet Access service, Metro Ethernet, ultra high speed point to point data transfer, dark fiber leasing and other related services.

A sizeable portion of Burbank’s fiber netwo rk is underground with some aboveground connection points. Those overhead connection points utilize fiber gateways and collectors.

These fiber equipment are mostly installed on streetlight mast arms, whether on streetlight standards, or wood power poles. Work is required from BWP to accommodate these projects.

Accommodation of Third-Party Installations
Wireless Telecommunicat ion Attachments (WTA)
Burbank Municipal Code Sectio n 7-3-708 provides reasonable uni form regulations for the installation and management of wireless telecommunications attachments (WTA) in the public right-of-way. The Federal Telecommunications Act of 1996 permits the City to manage the public rights-of-way and require fair and reasonable compensation from telecommunications providers, on a competitively neutral and nondiscriminatory basis, for use of public rights-of- way on a nondiscriminatory basis, if the compensation required is publicly disclosed by such government.

The City has developed a Master License Agr eement (MLA) to attach, install, operate and maintain communications facilities on street li ght poles and other vertical infrastructure to implement BMC 7-3-708 and to reduce barriers to deployment of WTAs in the public right-of- way. The Master License Agreement permits telephone corporations to replace functioning City streets lights with fully concealed and integrated WTA poles that will also serve as street light poles. Under the Master License Agr eement, the City will then perform routine maintenance on the WTA pole, in cluding but not limited to per iodic painting, service and replacement of luminaries, and specialty electrical metering of the WTA installation.

The City’s maintenance costs are necessary to accommodate deploym ent of WTAs in the public right-of-way, and the amount of the costs is reasonable, especially in light of the term of the agreement, which could run between 10 and 25 years.

Companies wishing to attach wireless communications facilities to street light poles and other vertical infrastructure in the public right-of- way pursuant to BMC Section 7-3-708 shall enter into Master License Agreements pr ior to installation of such fac ilities. Work is required from BWP to accommodate these projects.