Cities Index.
PowerPoint Presentation

Burbank City Council
January 14, 2025

Document
PowerPoint Presentation
Meeting
January 14, 2025
Body
Burbank City Council
Original file
1.5 MB
Text extracted from the city's file for reading and search. Open the original on burbank.granicus.com. That file is the official record.

WATER AND
POWER
Solar Net Billing
New Solar Program Update
City Council
January 14, 2025
Net Energy Metering (NEM) Background
NEM “1.0” (est. 1995)
Required as a solar rate structure until total
installations meet 5% of peak demand
Billing
Customers billed on net energy delivered to
customer and excess energy received by BWP
Credits
Compensation for excess energy
(more than 100% of usage) as kWh credits
2 No Changes for Current Solar Systems
Same Rates
Current solar customers
can keep their existing
rates
Continued Support
Grandfathered for up to 20
years
3 The Future of Solar in Burbank
Burbank Water and Power (BWP) is exploring a new
customer solar program that aims to:

1. Fairly compensate for solar exported to the grid

2. Increase size caps and simplify the approval process

3. Encourage more efficient use of solar and battery storage 4 What prompts enrollment in the new
program?
Adding PanelsNew Solar Customer
If a new system is installed
or a property with existing
solar is sold or transferred
Increasing the size of
an existing system
5 Net Energy Metering Solar Net Billing
What’s Different?
• Moves to a time of use (TOU) rate
• Removes concept of energy credits
• Instead of energy credits (in kWh), customers receive bill credits (in $) for electricity exported to the grid • Customers will be compensatedat BWP's avoided
cost of energy (ACOE) rate, which varies by season
and time of day
6 to
Avoided Cost of Energy
7 Avoided Generation Renewable Attribute

5.96 ¢ - 10.86 ¢ 1 ¢

Retail Rate for Energy Delivered by BWP
8 Generation Renewable Attribute Utility Cost to Serve

Customer Rates on Solar Net Billing
Residential
Tiered
(¢/kWh)
Time Period
Customer
Retail Rate
(¢/kWh)
ACOE
Compensation
Rate (¢/kWh)
Tier 1
<300kWh/mo

14.72 Tier 2
>300kWh/mo

22.49 Winter Off-Peak
11 PM – 8 AM 11.78 6.96
Summer Off-Peak
11 PM – 8 AM 11.78 7.02
Winter Mid-Peak
8 AM – 11 PM 21.13 6.96
Summer Mid-Peak
8 AM – 4 PM &
7 PM – 11 PM

21.13 8.25
Summer On-Peak
4 PM – 7 PM 32.44 11.86
9 10
Program Comparison
NEM 1.0 Solar Net Billing
Annual Check for Excess Credits
Performance Meter
Time of Use Rate
1 MW Size Limit
5 MW Size Limit
Oversizing Allowed
No Size Review for Systems
under 10kW
Simplified Interconnection
Agreement
Recommendation
11 BWP requests that City Council approve:

1. The transition from the current NEM 1.0 solar program to the Solar Net Billing program; and

2. Approve the methodology for determining the
avoided cost of energy (ACOE); and

3. The GM to make administrative changes to the
methodology.

Drew Johnstone
Sustainability Officer
[email protected]
(818) 238-3791 office
Drew Kidd
Marketing Associate
[email protected]
(818) 238-3653 office

CONTACT

← All documents from this meeting