Bid Results for Project GEORGE IZAY PARK IRRIGATION REPLACEMENT MODERNIZATION (BS NO. 1520) Issued on 11/13/2024
Bid Due on January 22, 2025  2:00 PM (PST)
Item No. Description Unit
Estimated
Quantity Unit Price Item  Total Unit  Price Item  Total Unit  Price Item  Total Unit  Price Item  Total Unit  Price Item  Total 1 Mobilization LS 1 $53,000.00 $53,000.00 $92,903.00 $92,903.00 $100,000.00 $100,000.00 $58,953.00 $58,953.00 2 Temp fencing LS 1 $30,000.00 $30,000.00 $13,467.00 $13,467.00 $3,000.00 $3,000.00 $7,500.00 $7,500.00 3 Removal of old irrigation equipment/add top‐soil fill LS 1 $35,000.00 $35,000.00 $58,189.00 $58,189.00 $36,000.00 $36,000.00 $20,000.00 $20,000.00 4 Pop Up Rotor (Turf) EA 486 $85.00 $41,310.00 $99.45 $48,332.70 $110.00 $53,460.00 $125.00 $60,750.00 5 Pop Up Rotor (Grasses) EA 23 $70.00 $1,610.00 $83.28 $1,915.44 $110.00 $2,530.00 $125.00 $2,875.00 6 Pop Up Spray (Turf) EA 358 $40.00 $14,320.00 $32.07 $11,481.06 $80.00 $28,640.00 $125.00 $44,750.00 7 Pop Up MP Rotator (Grasses) EA 13
8 Pop Up spray (Grasses) EA 9 $55.00 $495.00 $83.00 $747.00 $80.00 $720.00 $125.00 $1,125.00 9 Dripline with fittings and components SQ/FT 23,000 $4.30 $98,900.00 $2.46 $56,580.00 $3.00 $69,000.00 $4.50 $103,500.00 10 Sleeves LF 180 $23.00 $4,140.00 $43.32 $7,797.60 $90.00 $16,200.00 $300.00 $54,000.00 11 Jack & Bore locations EA 22 $3,000.00 $66,000.00 $1,353.42 $29,775.24 $4,000.00 $88,000.00 $4,000.00 $88,000.00 12 Saw cut hardscape LF 150 $60.00 $9,000.00 $105.71 $15,856.50 $10.00 $1,500.00 $100.00 $15,000.00 13 4" PVC Main line with D.I. fittings LF 1,140 $20.00 $22,800.00 $23.67 $26,983.80 $20.00 $22,800.00 $14.00 $15,960.00 14 3" PVC Main line with fittings LF 780 $15.00 $11,700.00 $18.31 $14,281.80 $16.00 $12,480.00 $14.00 $10,920.00 15 2.5" PVC Main line with fittings LF 440 $13.00 $5,720.00 $13.87 $6,102.80 $15.00 $6,600.00 $14.00 $6,160.00 16 2" PVC Main line with fittings LF 4,420 $10.00 $44,200.00 $11.55 $51,051.00 $14.00 $61,880.00 $14.00 $61,880.00 17 1.5" PVC Main line with fittings LF 40 $8.00 $320.00 $13.92 $556.80 $12.00 $480.00 $14.00 $560.00 18 3" PVC Lateral with fittings LF 1,540 $9.00 $13,860.00 $8.27 $12,735.80 $12.00 $18,480.00 $9.00 $13,860.00 19 2.5" PVC Lateral with fittings LF 1,400 $8.00 $11,200.00 $7.41 $10,374.00 $11.00 $15,400.00 $9.00 $12,600.00 20 2" PVC Lateral with fittings LF 1,000 $7.00 $7,000.00 $5.74 $5,740.00 $10.00 $10,000.00 $9.00 $9,000.00 21 1.5" PVC Lateral with fittings LF 2,400 $6.50 $15,600.00 $5.23 $12,552.00 $9.00 $21,600.00 $9.00 $21,600.00 22 1.25" PVC Lateral with fittings LF 4,100 $6.00 $24,600.00 $5.18 $21,238.00 $8.50 $34,850.00 $9.00 $36,900.00 23 1" PVC Lateral with fittings LF 4,120 $5.50 $22,660.00 $4.84 $19,940.80 $8.00 $32,960.00 $9.00 $37,080.00 24 3/4" PVC Lateral with fittings LF 8,500 $5.00 $42,500.00 $4.51 $38,335.00 $7.50 $63,750.00 $9.00 $76,500.00 25 3/4" PVC Lateral with fittings ‐ DRIP LF 3,000 $4.50 $13,500.00 $5.50 $16,500.00 $7.00 $21,000.00 $9.00 $27,000.00 26 Air relief valve with box EA 1
27 4" Gate Valve with box EA 2 $2,100.00 $4,200.00 $1,010.00 $2,020.00 $2,300.00 $4,600.00 $3,000.00 $6,000.00 28 3" bronze Gate Valve with box EA 2 $1,190.00 $2,380.00 $1,255.00 $2,510.00 $1,200.00 $2,400.00 $3,000.00 $6,000.00 29 2.5" bronze gate Valve with box EA 1 $990.00 $990.00 $1,003.00 $1,003.00 $1,100.00 $1,100.00 $3,000.00 $3,000.00 30 2" bronze gate Valve with box EA 35 $410.00 $14,350.00 $536.16 $18,765.60 $1,000.00 $35,000.00 $800.00 $28,000.00 31 2" bronze angle valve with box EA 9 $1,100.00 $9,900.00 $872.00 $7,848.00 $1,500.00 $13,500.00 $1,000.00 $9,000.00 32 2" Remote Control Valve with box EA 19 $755.00 $14,345.00 $892.77 $16,962.63 $1,500.00 $28,500.00 $1,000.00 $19,000.00 33 1‐1/2" Remote Control Valve with box EA 33 $740.00 $24,420.00 $830.64 $27,411.12 $1,000.00 $33,000.00 $1,000.00 $33,000.00 34 1" Remote Control Valve with box EA 57 $600.00 $34,200.00 $721.60 $41,131.20 $900.00 $51,300.00 $1,000.00 $57,000.00 35 1.5" Remote Control Valve (DRIP) with box EA 1 $910.00 $910.00 $934.00 $934.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 36 1" Remote Control Valve (DRIP) with box EA 29 $565.00 $16,385.00 $827.69 $24,003.01 $900.00 $26,100.00 $1,000.00 $29,000.00 37 1" Quick Coupling Valve EA 45 $325.00 $14,625.00 $341.62 $15,372.90 $900.00 $40,500.00 $400.00 $18,000.00 38 Controller upgrades LS 1 $10,000.00 $10,000.00 $12,776.00 $12,776.00 $16,000.00 $16,000.00 $7,000.00 $7,000.00 39 #14‐1 AWG‐UF Low voltage Wires (Control) LF 55,200 $0.45 $24,840.00 $0.49 $27,048.00 $1.00 $55,200.00 $0.75 $41,400.00 40 #12‐1 AWG‐UF Low voltage Wires (Common) LF 7,590 $0.50 $3,795.00 $0.58 $4,402.20 $1.10 $8,349.00 $1.00 $7,590.00 41 Flow Sensor EA 1 $1,850.00 $1,850.00 $1,083.00 $1,083.00 $2,300.00 $2,300.00 $1,200.00 $1,200.00 42 Master Valve EA 1 $670.00 $670.00 $719.00 $719.00 $2,000.00 $2,000.00 $1,200.00 $1,200.00 43 Relocate and install hydrometers EA 2 $1,080.00 $2,160.00 $1,782.00 $3,564.00 $2,000.00 $4,000.00 $5,000.00 $10,000.00 44 2" Pressure Reducing Valve with plastic vault EA 2 $2,430.00 $4,860.00 $3,052.00 $6,104.00 $2,500.00 $5,000.00 $6,000.00 $12,000.00 45 3" Pressure Reducing Valve with plastic vault EA 1 $6,385.00 $6,385.00 $7,339.00 $7,339.00 $4,000.00 $4,000.00 $6,000.00 $6,000.00 46 2" Schedule 40 PVC Electrical Conduit LF 250 $7.10 $1,775.00 $7.56 $1,890.00 $6.00 $1,500.00 $7.00 $1,750.00 47 1" Schedule 40 PVC Electrical Conduit (sensor wires) LF 1,000 $5.65 $5,650.00 $6.22 $6,220.00 $5.00 $5,000.00 $7.00 $7,000.00 Total Sum Bid for Items 1‐47 $788,125.00 $802,543.00 $1,061,679.00 $1,090,613.00 N/A CORRECTED TOTALCORRECTED TOTAL
ACCU Construction Inc American Landscape IncMarina Landscape Inc SGD Enterprises dba Four
Seasons LandscapingSuperb Engineering Inc
ATTACHMENT 2
Attended Mandatory Job Walk
Bidder's Bond or Bidder's Security P‐6
California State Contractors License (CSLB) No., Class and Expiration: A or C‐27 required Department of Industrial Relations (DIR) Registration No. & Expiration Subcontractor California State Contractors License (CSLB) No., Class and Expiration Subcontractor Department of Industrial Relations (DIR) Registration No. & Expiration Bidder's Proposal Forms (coversheet, pricing, and contractor's license and classification) P‐1, P‐1(a) ‐ P‐1(c )
Addendum Acknowledgement P‐1(d)
Affadavit P‐2, P‐2(a)
Non‐Collusion Declaration P‐3
Workers' Compensation Certification (prime contractor) P‐4 Subcontractors List and Proposal Breakdown P‐5, P‐5(a)
Contractor's References P‐7, P‐7(a), P‐7 (b)
Contractor's References ‐ City of Burbank Projects P‐8
Contractor IIPP Certification P‐9, P‐10
Comments
Responsive? Responsive Responsive Responsive Responsive Non ‐responsive Bidder's Bond is missing
Notarial Certificate of
Principal. Buyer is waiving
this as a minor irregularity
per BS page N‐1 since the
Corporation Affidavit and
Non‐Collusion Declaration
both have the same
siganture and were
notarized.

Page P‐1(c ) with CSLB and DIR info
is missing. Buyer was able to
independently verify the
information that it should've
contained and is waiving this as a
minor irregularity per BS page N‐1.

Subcontractors List on pages P‐5
and P‐5(a) is missing CSLB numbers,
costs for the portion of work, and
percentages of the total bid; missing
information is required to be
submitted up to 24 hours after the
bid due date and time per BS page P‐

5. Page P‐1(d) is missing entirely.

Because P‐1(d) is missing entirely
and the Subcontractors List is
missing information, the bidder is
disqualified.

Vendor resolution attached
on who can sign contracts,
bid documents, and bid
bonds.

Total sum bid on page P‐
1(b) is incorrect.

Calculation for item 37 is
incorrect on bidder's
proposal; it was multiplied
by 5 instead of 1.

Corrected total is
$1,090,613.00.

Total sum bid on page P‐1(b)
is incorrect. Bidder's
proposal is short by $934
(missing item 35). Corrected
total is $802,543.00.

Received; none listedReceived; 3 listed Received;  none listedReceived; none listed ReceivedReceived ReceivedReceived
Received
Received; missing CSLB numbers,
costs, and percentages. Received Received;  no subs listedReceived; no subs listed ReceivedReceived ReceivedReceived
ReceivedReceived ReceivedReceived
ReceivedReceived ReceivedReceived
Received
P‐1(d) missing; only signed
Addendum 1 receivedReceived ReceivedReceived
ReceivedReceived ReceivedReceived
1000004237 exp. 6/30/251000035725 exp. 6/30/26 N/A N/A
Received Received;  missing P‐1 and P‐1(c )Received ReceivedReceived 1000013654 exp. 6/30/251000000079 exp. 6/30/26  1000594916 exp. 6/30/25 1001102935 exp. 6/30/25 926968 Class A exp. 1/31/271011503 Class A exp.  N/AN/A Received & checkedReceived & checked Received  & checkedReceived & checked 822927 Class A & C‐27 exp. 492862 Class A &C‐27 exp.  662720 Class C‐27 exp. 1074243 Class A & C‐27 exp.

ACCU Construction Inc American Landscape IncMarina Landscape Inc SGD  Enterprises dba Four Superb Engineering Inc YesYes YesYes