AGENDA STAFF REPORT
DATE:

TO:

APPROVED BY:

PREPARED BY:

SUBJECT:

January 19, 2022
Mayor and City Council
Miguel Figueroa, City Manager 1 (-
Lilliana Falomir, Public Works Manager - Administrd ~
Authorize City Manager to Sign Amendment No. 2 to the
Agreement of Professional Services with Lee & Ro, Inc. for Engineering Services for Sewer Lift Station No. 9 and 11 , Sewer Collection and Water Distribution System Improvement Project.
------------------------------------------------------------------ ------------------------------------------------------------------ Recommendation:

Authorize City Manager to Sign Amendment No. 2 to the Agreement of Professional Services with Lee & Ro, Inc. for Engineering Services for Sewer Lift Station No. 9 and 11 , Sewer Collection and Water Distribution System Improvement Project.

Background:

On September 3, 2019, the City of Calexico Public Works Department solicited proposals from qualified engineering firms to provided engineering services for Sewer Lift Station No. 9 and 11 , Sewer Collection and Water Distribution System Improvement Project. The project will include sewer bypass pumping, rehabilitating sewer manholes if necessary, installation of new manholes, replacement of existing 8-inch force main pipelines, and installing and connecting each existing sewer service laterals along the new pipeline alignment. The project design will also include the lift station upgrades, replacement of the 12-inch diameter Asbestos Cement (AC) water pipeline running north/southerly from State Hwy 98 north along Ollie Avenue, then east-westerly along Vernado Drive (1 O" diameter existing). The existing AC pipelines shall be abandoned in place. There is approximately 3,000 linear feet of 12-inch diameter PVC asbestos cement (AC) pipe water pipeline to be replaced . The project will include connecting each existing water service along the pipeline routes , fire hydrants, valves and connections to existing buried water pipelines.

On November 6, 2019, the City Council of the City of Calexico authorized the City Manager to sign agreement of Professional Services with Lee & Ro, Inc. in the amount of $366, 152.00 for Sewer Lift Station AGENDA
ITEM
No. 9 and 11 , Sewer Collection and Water Distribution System Improvement Project. On April 21, 2021, the City Council authorized Amendment No. 1 in the amount of $25,070.00 for Lee & Ro, Inc. to perform research and analyze the impact of the flow from future development on the sewer system and recommend the upgrades needed to accommodate planned land development.

Discussion & Analysis:

On August 31, 2021, Lee and Ro, Inc. completed the research , analysis and the impact of the flow from future development on the sewer system. City staff reviewed the report and is recommending that the original scope of work be revised as follows:

1. Upgrade existing gravity system to 27"

2. Upgrade existing force main pipe to 1 O"

3. Redesign lift stations to accommodate the increase in the force main size The increased sizes wi ll allow the planned additional development to come on line without reinstalling the pipes. For these reasons, City staff is requesting that the City Council of the City of Calexico authorize the City Manager to sign Amendment No. 2 to the Agreement of Professional Services with Lee and Ro, Inc. for engineering services for Sewer Lift Station No. 9 and 11, Sewer Collection and Water Distribution System Improvement Project.

Fiscal Impact:

Capital Improvement Program - Budgeted Item for FY2021-2022 Wastewater Enterprise Fund
(54 7-90-933-56001 -000)
Total
Coordinated With:

City Manager's Office.

Public Works Department.

Attachment(s):
$29,995.00
$29,995.00

1. Amendment No. 2 of Agreement of Professional Services between City of Calexico and Lee & Ro, Inc.

AMENDMENT NUMBER 2 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF CALEXICO AND LEE AND RO, INC.

AMENDMENT NUMBER 2 dated January 19, 2022, the agreement for professional services between the City of Calexico ("City") and Lee and Ro, Inc. ("Consultant") dated October 23, 2019 (the "Agreement") concerning Sewer Lift Station No. 9 and 11 , Sewer Collection and Water Distribution System Improvement Proj ect (the "Proj ect").

The Consultant has entered into the Agreement with the City for the furnishing of professional services, and the parties now desire to amend the Agreement.

Therefore, it is mutually agreed that the Agreement is amended to include Additional Services to be perfom1ed by Consultant and provisions for additional compensation by the City to the Consultant, all set fo1i h in:

Exhibit A - Amendment No. 2 dated December 13, 2021
The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference.

CITY OF CALEXICO: CONSULTANT:

Title: Miguel Figueroa, City Manager
Title: Carlos Campos, City Attorney
Title: Gabriela Garcia, City Clerk
Labor Caeqay:

EB Managi"g ~ileer. E7 SUP'IVSi"g EfijTieer. E5 Senior Ell<jreer. E4 Ell<jreer. E2 Assislart Eo;J'.neer; T4 Des9ler, T2 Asslsstart Oes;p;r; A1 WOfd Processor: S1 Survey F•~ Crew; S2 SLVVey Tecllli:on; SJ SllVey Manager
Project Tasks
AM!llooal Pr"ecl Management :11d Meelings
Teclni:al Revi:!w t/<eti1gs wlh Cly (1 tl.,ti"g)
lnvol:i"g and Pr'*ct Progress Repa1s
Sublolal Pu~ec l Management and Meelings
Design Phase
Addlonal Cost fa t>'l'paraloo a Desi;in llocumerls (PWis, Sf'cli:.ll00s and Cooslnx:too Ca;t Eslinate)
Addliooat Fees la QA/OC
Sublotal Desl!Jl Phase

CITY OF CALEXICO
FEE TABLE - UFTSTAllONS 9&11 UPGRADES
A~EN Dr.EN NO. 2
11111111
SS, 129
St,009
10 W, 168
111111111111111111111111 ...... _ .. 16 16 24 $11,797
10 $1 ,BJJ
18 18 2B Tl $1~627
Add 1ooru 1~ 11 m• Ml oo ____________________ _.llllllllllllllllllllllll .. llllllll• ro Ad:llicn.11 Fees fa RemotUzatOO arxl Increase fl too'ty rates (10% a Unb~d amruit d s100,ooo a oriJrnl oo<irar:t)
Subtolru Addllooa Amourl ro
12/1 3/2021
II
--
--
$!00 Si,329
$1,009
$!00 ro W,:Ji8
--
$11,797
$1,BJJ
so ro S1~1l27
--
$10,000 $10,000
$10,000 so $1 0,000
----~~"'~•11111111111111111111111111 $19,795
--
$10,200 so $29,995 .. 1111•111111111111111 TOTAL llOHO·EXCEID 19 26 26 28 107 LEE & RO, In c.

LEE & RO, Inc.

FY 2021-2022 HOURLY BILLING RATE SCHEDULE -A
(Effective From November 1, 2021 to October 31, 2022)

BILLING RATES
PERSONNEL CLASSIFICATION ($/ HOUR)

ENGINEERS
Engineer 8 E8 M anaging Engineer $283
Engineer 7 E7 Supervising Engineer $2S7
Engineer 6 E6 Principal Engineer $238
Engineer 5 ES Senior Engineer $214
Engineer 4 E4 Engineer $199
Engineer 3 E3 Associate Engineer $179
Engineer 2 E2 Assistant Engineer $1SS
Engineer 1 El Junior Engineer $138

CAD/ DESIGNERS
Designer 6 T6 Principal Designer $199
Designer S TS Senior Designer $179
Designer 4 T4 Designer $1S5
Designer 3 T3 Associate Designer $138
Designer 2 T2 Assistant Designer $116
Designer 1 Tl Junior Designer $97

FIELD PROFESSIONALS
Field Professional S FS Senior Resident Engineer $214
Field Professional 4 F4 Resident Engineer $199
Field Professional 3 F3 Senior Inspector $179
Field Professional 2 F2 Inspector $1SS
Field Professional 1 Fl Assistant Inspector $138

ADMINISTRATIVE
Administrative 4 A4 Senior Contract Manager $1S2
Administrative 3 A3 Contract Manager $141
Administrative 2 A2 Senior Word Processor $136
Administrative 1 Al Word Processor I Admin. Assistant $121