Mitigation Monitoring and Reporting Program
Uniform Application No. UA2005·30
State Clearinghouse No. 2006081041
Remington Condominiums
Calexico, California
Prepared For:
City of Calexico
Applicant:
Dat·U·Joe Realty, Inc.
Prepared By:
CINEC:nMrANVI M1r•1 .f•l1111iu 1• IDJ.
8690 Balboa Ave, Suite 200
San Diego, CA 92123
October 2006
Table of Contents
1.0 INTRODUCTION .......................................................................................................................................... 1.1 I.I DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1
1.2 MITIGATION MATRIX ................................................................................................. 1-1
1.3 MITIGATION MONITORING PROCEDURES ............................................................ 1-2
1.3. I In-Field Monitoring ............................................................................................ 1-2 I .3.2 Coordination with Contractors ............................................................................ 1-2 I .3.3 Recognized Experts ............................................................................................ 1-2
1.3.4 Arbitration/Dispute Resolution ........................................................................... 1-2
1.3.5 Enforcement ........................................................................................................ 1-2 Appendices
Appendix A Mitigation Monitoring and Reporting Program Checklist '[_ T"'\":> Remlnglon Condominiums
Cl..I .. ' Mitigation Monitoring and Reporting Program
City of Calexico
October 2005
Introduction
1.0 INTRODUCTION
Pursuant to Section 21 081.6 of the Public Resources Code and the California Environmental Quality Act (CEQA) Guidelines Section 15097, public agencies are required to adopt a monitoring or reporting program to assure that the mitigation measures and revisions identified in the Environmental Impact Report (EIR) are implemented. As stated in Section 21 081.6 of the Public Resources Code:
" ... tlze public agency shall adopt a reporting or monitoring program for the changes to the project which it has adopted, or made a condition of project approval, in order to mitigate or avoid significant effects on the environment. " Pursuant to Section 21081 (a) of the Public Resources Code, findings must be adopted by the decision maker coincidental to certification of the EIR. The Mitigation Monitoring and Reporting Program (MMRP) must be adopted when making the findings (at the time of approval of the project).
As defined in the CEQA Guidelines, Section 15097, "reporting" is suited to projects that have readily measurable or quantitative measures or which already involve regular review. "Monitoring" is suited to projects with complex mitigation measures, such as wetland restoration or archaeological protection, which may exceed the expertise of the local agency to oversee, are expected to be implemented over a period of time, or require careful implementation to assure compliance. Both reporting and monitoring would be applicable to the proposed project.
The Initial Study/Mitigated Negative Declaration prepared for Remington Condominiums (SCH #2006081041) provided an analysis of the environmental effects resulting from construction and operation of the project. A thorough scientific and engineering evaluation of each alternative was undertaken in compliance with CEQA, including the identification of measures designed to avoid or substantially reduce the potential adverse effects of each alternative.
1.1 DESCRIPTION OF PROPOSED PROJECT
The proposed project includes the development ofa 272-unit condominium development and associated amenities on approximately 19 acres. Within the City of Calexico, these parcels are zoned Residential Apartment and Residential Single Family. The project proposes a zone change to Residential Condominium and will be constructed in two phases.
1.2 MITIGATION MATRIX
In order to sufficiently track and document the status of mitigation measures, a mitigation matrix has been prepared and includes the following components:
• Mitigation measure number
• Mitigation measure (text)
• Implementation Action
• Monitoring Method
• Responsible Monitoring Party
• Monitoring Phase
• Verification/Approval Party
• Mitigation Measure Implemented? (YIN, and date)
• Documentation Location (Monitoring Record)
L """''":l Remington Condominiums rLI.' Mi/iga/ion Monitoring and Reporting Program 1- 1 City of Calexico
October 2005
Introduction
Mitigation measure timing of verification has been apportioned into several specific timing increments.
Of these, the most common are:
1. Prior to issuance of grading permit
2. Prior to issuance of building permit(s)
3. During construction
4. Prior to issuance of certificate of use and occupancy
1.3 MITIGATION MONITORING PROCEDURES
The City of Calexico Planning Department is the designated lead agency for the Remington Condominiums MMRP. The City is responsible for review of all monitoring reports, enforcement actions, and document disposition. The City will rely on information provided by the monitors (e.g. archaeologists, biologists, etc.) as accurate and up-to-date and will field check mitigation measure status as required.
1.3.1 In-Field Monitoring
Project monitors shall exercise caution and professional practices at all times when monitoring construction. Protective wear (hard hats, glasses, etc.) shall be worn at all times in construction areas.
Injuries shall be reported immediately to the mitigation monitor.
1.3.2 Coordination with Contractors
The construction manager/superintendent is responsible for coordination of contractors, and is also responsible for contractor completion of required measures in accordance with the provisions of this program.
1.3.3 Recognized Experts
The use of recognized experts as a component of the monitoring team is required to ensure compliance with scientific and engineering based mitigation measures. While the mitigation monitoring team recognized experts assess compliance with required mitigation measures, consultation with the City of Calexico planning staff shall take place in the event of a dispute.
1.3.4 Arbitration/Dispute Resolution
If the mitigation monitor has identified an action which, in the opinion of the monitor, has not been implemented or has not been implemented correctly, the problem will be brought to the attention of the City of Calexico for resolution. If the problem cannot be satisfactorily resolved by City staff, it will be brought before the Planning Director or designee for resolution. The City will have the authority to issue stop work orders until the dispute is resolved.
1.3.5 Enforcement
Agencies may enforce conditions of approval through their existing police power, using stop work orders, fines, infraction citations, loss of entitlements, refusal to issue building permits or certificates of use and occupancy or, in some cases, notice of violation for tax purposes. Criminal misdemeanor sanctions could be available where the agency has adopted an ordinance requiring compliance with the monitoring program, similar to the provision in many zoning ordinances which affirm the enforcement power to bring suit against violators of the ordinances provisions.
L "'P""'\"":> Remington Condominiums
.1. .LJ ... '\. Mitigation Monitoring and Reporting Program 1-2 City of Calexico
October 2005
APPENDIX A
Mitigation Monitoring and
Reporting Program Checklist
No. I
Impacts to nesting birds should be avoided
by conducting any vegetalion removal
outside of the February 15 to August 31 bird·
breeding season. If clearing can not be
accomplished outside of the bird-breeding
season. the project appncant shall conduct a
nesting bird survey (migratory birds and burrowing owl) within 30 days of proposed vegetation c:learing or grading to prevent violation of the MBTA.
L RESOURCES
A qualified archaeologist shall monitor inltlal
grading. If any cultural resources are
Identified during these activities. the
archaeologist shall temporarily divert
construction activities untn the significance of
the resources Is ascertained. The City shall
coordinate the appropriate efforts for handling
and/or disposition of these materials.
MM-3 IA qualified paleontologist shall monitor
grading that includes initial cutting Into any
area of the project site as the project area sits
on paleontologlcal sensitive Late Pleistocene
to Holocene lake deposits and older deposits
of Miocene to Pleistocene non-marine and
marine sediments. If any paleontological resources are identified during these activities, the paleontologist shall temporarily
divert construction untll the significance of the
resources Is determined and appropriate
mitigation Is Identified and Implemented.
•cPD- City of Calexico Planning Department
L Remington Condominiums Final ISIMND r:LI ... '\. Mitigation Monitoring and Reporting Program Appendix A
Mitigation Monitoring and Reporting Program Checklist
Mitigation Monitoring and Reporting Program Checklist
I Responsible I Monitoring Method Monitoring Party
Qualified biologist shall Summary of nesting
survey for nesting raptor survey shall be
raptors and flag any submitted to the CPD
trees, shrubs, or Planning Manager
groundcover that shall
be avoided until the
nesting season has
passed.
Appncant to retain the Qualified
services of a qualified archaeologist shall
archaeologist monitor all ground
disturbing activities.
At the monitoring
phase, a summary
report, Including a
dally log of all
monitoring activity
and any
recommendations.
Applicant to retain the Qualified CPD Planning
services of a qualified paleontologist shall Manager
paleontologist. monitor all ground
disturbing activities.
At lhe monitoring
phase, a summary
report, including a
dally log of all
monitoring activity
and any
recommendaUons.
A-1
Verification/
Monitoring I Approval Phase Party
During project CPD
grading. Planning I
Manager
Mitigation
Measure
Implemented?
(Y/N)& Date
Documentation
Location
(Monitoring
Record)
I CPD - Planning
Division
City Calexico
Odober2005
I Implementation No. Mitigation Measure Action
MM-4 I 11 human remains are encountered, State Applicant and/or Health and Safety Code Section 7050.5 archaeologist monitor to states that no further disturbance shall occur stop construction If until the County Coroner has made a human remains are
detennlnation of origin and disposition encountered, and pursuant to Public Resources Code Section contact County Coroner 5097.98. The County Coroner must be
notified of the find immediately. If the remains are determined to be prehistoric, the Coroner will notify the Native American
Heritage Commission (NAHC), which will
determine and notify a Most Likely
Descendant (MLD}. With the permission of
the landowner or his/her authorized
representative, the MLD may Inspect the site
of discovery. The MLO shall complete the
Inspection within 24 hours of notification by
the NAHC. The MLO may recommend
scientific removal and nondestructive
analysis of human remains and items
associated with Native American burials.
Adherence to Section 7050.5 Is required as a
matter of course.
ND HARADOUS MATERIALS
MM-5 I During construction the project applicants
shall dispose of an debris In accordance with
the current local, state, and federal disposal
regulations
MM-6 I Prior to demolition of the existing structure in Asbestos testing the northern portion of the site, an Inspection
of suspected asbestos containing materials
shall be perfonned by an accredited Building
Inspector. These materials shall be properly
abated and disposed of by a state-llcensed
abatement contractor prior to disturbance.
MM-7 I Should demolitlon of the existing structure In Lead based paint the northern portion of the site disturb any testing
suspect paint. a lead-based paint (LBP}
Inspection and/or risk assessment shall be
conducted by a state or EPA certified LBP
Inspector/assessor to Identify areas of
·cPD - City of Calexico Planning Department
H):1 Remington Condominiums Final IS/MND Mitigation Monitoring and Reporting Program Appendix A
Mitigation Monitoring and Reporting Program Checklist
Mitigation Documentation
Verlflcatlonl Measure Location
Responsible Monitoring Approval Implemented? (Monitoring Monitoring Method Monitoring Party Phase Party (YIN)&Date Record) Notification of AppHcant and/or During Grading CPD- CPD - Planning discovery - Riverside applicant- retained Planning Division Coroner/ Native archaeologist Manager
American Heritage
Commission
Testing results CPD Planning Prior to CPD I I CPD Planning submitted to CPD Manager issuance of Planning Division Planning Manager. demolition Manager
permit.
Testing results CPD Planning Prior to CPD CPD Planning
submitted to CPD Manager issuance of Planning Division
Planning Manager. demollUon Manager
permit.
A-2 City Calexico
October 2005
No. I Mitigation Measure
potential worker exposure. Any LBP items
shall be properly disposed or as appropriate
prior to demolition.
MM-8 I Prior to authorization or start of construction
of the proposed project, the project applicant
shall prepare a Spill Prevention and
Contingency Plan (SPCP) for review and
approval of the appropriate jurisdictional
agency and all construction crew members
shall be trained In the requirements of the
SPCP. As a standard condition of approval
for the proposed project, the SPCP shall
Include information on storage of hazardous
materials, emergency response procedures,
employee training requirements, fire safety,
first-aid procedures, hazardous materials
release containmentlcontrol procedures, and release reporting requirements. Additional special precautions shall be taken during
construction close to water bodies to avoid
accidental spills and contamination of water
resources.
A 7-foot high above pad grade perimeter wan
shan be constructed along the northern
border of the project site for the condominium
units facing SR 98. Acceptable barrier
materials include concrete masonry or stucco
wall. The design and materials used must be
approved by the City of Calexico Planning
Department.
•cpo - City of Calexico Planning Department
'[_ T"\":> Remington Condominiums Final IS/MND
Mitigation Monitoring and Reporting Program
Implementation
Action
Preparation of Spin
Prevention
Containment and
Cleanup Plan
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Responsible
Monitoring Method Monitoring Party
Plan review CPD Engineering
Division
A-3
Monitoring
Phase
Prior to
issuance of
grading permit
Plan approval
prior to Issuance
ofbulldlng
permit;
construction
approval prior to
occupancy
Mitigation
Verlflcatlon/ Measure
Approval Implemented?
Party (Y/N)& Data
CPD
Engineering
Division
Documentation
Location
(Monitoring
Record)
CPO Engineering
Division
City Calexico
October 2005
No.
MM·11
MM-12
MM·13
Mitigation Measure
A "window closed" conditlon shall be provided
for aO condominium units adjacent lo SR 98
requiring a means of mechanical ventllaUon
{e.g .• air conditlonlng).
Bulldlng plans shall document that any
proposed common wan assemblies ("party
walls") have a sound test rating of STC=50 or
For stacked units. the floor/ceiling
separation shall have a sound test rating of
STC=50 or higher, and an impact Isolation
dass {llC) of 50 or higher as required by the
Building Code. Any penetrations or sound·
rated assemblies shall be sound protected
with resment isolation devices or special
acoustic wraps and sealing compounds to
mal'ntaln the acoustical integrity of the
assemblies.
Following precise grading and development
of actual building design specifications, an
acoustical analysis shall confirm that architectural measures Identified in MM-10 through MM-12 adequately reduce the
interior noise levels to 45 dBA CNEL.
The project appricant shall be required to pay
the City of Calexico fire department
development fees established by City
Ordinance 890 §1 codified In the 1995 City of Calexico Municipal Code Chapter 3.28 to offset the need ror any additional fire
protection services including new personnel,
construction of new fao1iUes, or purchasing of
new equipment.
·cpo - City of Calexico Planning Department
Implementation
Action
tnstallatlon offorced air
ventllatlon
Construction of
residential units
consistent with
recommendations.
Preparation of noise
Impact analysis.
"[_ 'T"'\"'"> Remington Condominiums Final ISIMND
rLJ ... '- Mitigation Monitoring and Reporling Program
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Monitoring Method
Construction plan
check, Sile
Inspections
Construction plan
check; Sile
Inspections
Plan review.
A-4
Responsible
Monitoring Party
CPOEngtneering
Manager
CPDEngineering
Manager
CPDEngineering
Manager
Monitoring
Phase
Plan approval
prior to Issuance
of building
pennit;
construction
approval prior to
occupancy
Plan approval
prior to Issuance
of building
permit;
construction
approval prior to
occupancy
Plan approval
prior to Issuance
of building
permit;
construction
approval prior to
occupancy
Verification/
Approval
Party
CPDEngineering
Manager
CPDEnglneertng
Manager
CPDEngineering
Manager
Mitigation
Measure
Implemented?
(YIN)& Date
Documentation
Location
(Monitoring
Record)
CPO -
Engineering
Division
CPDEngineering
Division
CPDEngineering
Division
City Calexico
October 2005
lmplementatlon
No. Mitigation Measure Action
MM-15 The project applicant shall be required to pay Payment of fees the City of Calexico Police Department
development fees established by City
Ordinance 892 §1 codified in the 1995 City of
Calexico Municipal Code Chapter 329 to
offset the need for any additional poTice
protection services induding new personnel,
construction of new facilities, or purchasing of
new equipment.
MM-16 IThe project applicant shall pay development I Payment of fees I fees to the Calexico Unified School District {CUSO) for the purpose of developing new school facilllles for grades K-12 within the
City. These fees shall be the current
residential Impact fee under the provision of
SB 50. Further, the project applicant has
agreed to enter into a Memorandum of
Understanding (MOU) with CUSD. This
MOU shall Include the payment of additional
fees as requested by CUSD. These fees
shaU be paid at the time bulldlng permits are
Issued.
MM-17 I Prior to issuance of a building permit, the Payment of fees project applicant shall be required to
contribute to the City of Calexico
Development Impact Fees Program for the
purpose of facilitating lhe expansion of library
services.
MM-18 I Prior to issuance of a building permit, the Payment offees project applicant shall be required to pay
development fees established by City
Ordinance 908 § 1 codified In the City of
Calexico Municipal Code to the City of
Calexico's healthcare system.
The project applicant
-
shall be required to pay
park mitigation fees under Calexico City
Ordinance 953 for the remaining deficiency of
2.7 acres of parkland.
·cpo -City of Calexico Planning Department
lil"{ Remington Condominiums Final ISIMND Mitigation Monitoring and Reporting Program Appendix A
Mitigation Monitoring and Reporting Program Checklist
Mitigation Documentation
Verlflcatlon/ Measure Location
Responsible Monitoring Approval Implemented? !Monitoring Monitoring Method Monitoring Party Pha&e Party (YINI& Date Record I Payment status CPD - Planning Prior to BuDdlng CPD - CPD - Planning review Manager Pennlt Issuance Planning Division
Manager
Payment status I CPD - Planning I Prior to Building I CPD - I I CPD - Planning review Manager Pennlt Issuance Planning Division Manager
Payment status CPD Planning I Prior to I CPD I I CPD Planning review Manager Issuance of Planning Division buHding pennlt. Manager
Payment status CPD - Planning Prior to Building CPD- I I CPD - Planning review Manager Penni! Issuance Planning Division Manager
A-5 City Calexico
October 2005
No.
The following project Improvements shall be
Implemented as part of the proposed project:
• Project applicant shall dedicate right-ofway, per California Department of Transportation (Caltrans} requirements,
extending from the centerline of SR 98
to the northern project boundary
frontage to CaHrans for future
Improvements to SR 98. Project
applicant shan also obtain from the City
of Calexico an Irrevocable Offer of
Dedication (100} and a slope
rights/drainage easement In order to
preserve the necessary right-of-way for
a 4-Jane facility on SR 98.
• The project apptlcant shall obtain an
encroachment permit from the Cafifomla
Department of Transportation (Caltrans)
for any Improvements within Caltrans
right·of-way of SR 98.
• Improvements to project frontage along
SR 98 shall Include curb, gutter, and
sidewalk to accommodate pedestrians and disabled persons. • Re-stripe the south leg of Eady Avenue
at SR 98 with a combined 120-foot
northbound left/through traffic lane and a
right-tum traffic lane. Extend existing 40-
foot red curb on the east side of Eady
Avenue from SR 98 to an additional
200 feet southerly.
• Widen and fully Improve south of the
centerllne or SR 98 along the entire
project frontage of Remington
Condominium project site as a Principal
Arterial Highway within a 112-foot rightof-way.
• Caltrans and the City shall coordinate to
determine the appropriate design and
timing for Improvements to SR 98.
*CPD - City of Calexico Planning Department
Implementation
Action
Applicant to include
specified transportation
Improvements in final
engineering plans and
constructed per plans.
L "f'"'\"":l Remington Condominiums Final IS/MND
.£1...J ... '- Mitigation Monitoring and Reporting Program Appendix A
Mitigation Monitoring and Reporting Program Checklist
Responsible
Monitoring Method I Monitoring Party
A-6
Monitoring
Phase
Plan approval
prior to Building
PermH
Issuance/
Construction
approval prior to
occupancy
Verlflcatlonf
Approval
Party
Mitigation
Measure
Implemented?
(YIN) & Date
Documentation
location
(Monitoring
Record)
City Calexico
October 2005
Implementation
No. Mitigation Measure Action
MM-21 • To miUgate the operating level of service Applicant to Include for Eady Avenue from a LOS "D" to specified transportation acceptable LOS "C." Project
construction shall be phased around the
completion of the SR 98 widening
project, as follows
• Build 240 of the units prior to the
widening of SR 98.
• Building Permit for the remaining 32
dwelling units shall be issued at such
lime after the completion of the widening
of SR 98 to four traffic lanes.
MM-22 The project shall participate in the phased
construction of the following off-site
intersection Improvements through payment
of established City of Calexico fees lo be
determined as a condition of approval.
• Participate on a "fair-share" cost basts
for future widening and traffic
signalization of the intersection of SR 98 and D. Navarro Avenue within a 112-foot right-of-way. Stripe the following intersection traffic lane configurations:
- Two eastbound through traffic
lanes on SR 98
- One eastbound left·tum traffic lane
on SR98
- One eastbound right-tum lane on
SR98
- Two westbound through traffic
lanes on SR 98
- One westbound left-tum traffic lane
on SR 98
- One westbound right·tum traffic
lane on SR 98
- One southbound left-tum lane on
0. Navarro Avenue
- One southbound combined through
and right-tum traffic lane on
D. Navarro Avenue
"CPD - City of Calexlco Planning Department
"[_ Remington Condominiums Final IS/MND
.CU ... ' Monitoring and Reporting Program
improvements In f1T1al
engineering plans and
constructed per plans.
Applicant to indude
specified transportation
Improvements in final
engineering plans and
constructed per plans.
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Responsible Monitoring
Monitoring Method Monitoring Party Phase
Plan Check CPD- Plan approval
Review/Site Engineering prior to Building
Inspection Manager Permit
Issuance/
Construction
approval prior to
occupancy
Plan Check CPD- Plan approval
Review/Site Engineering prior to BuDding
Inspection Manager Permit
Issuance/
Construction
approval prior to
occupancy
A-7
Mitigation
Verlflcatlonf Measure
Approval Implemented?
Party (YfNI& Date
CPDEngineering
Manager
CPDEngineering
Manager
Documentation
Location
(Monitoring
Record)
CPDEngineering
Division
CPDEngineering
Division
City Calexico
Odober2005
No. Mitigation Measure
- One northbound combined through
and right-tum traffic lane on
D. Navarro Avenue.
- One northbound left-tum lane on D.
Navarro Avenue
• Participate on a "fair-share" cost basis
for future widening and modifying of the
existing traffic signal at the Intersection
of SR 96 and Kloke Avenue within a
112-foot right-of-way. Stripe the
following intersection traffic lane
configurations:
- Two eastbound through traffic
lanes on SR 98
- One eastbound left-tum traffic lane
on SR 98
- One eastbound right-tum lane on
SR96
- Two westbound through traffic
lanes on SR 98
- One westbound left-tum traffic lane
on SR98
- One westbound right·tum traffic
lane on SR 98
- Two southbound through traffic
lanes on Kloke Avenue
- One southbound left-tum lane on
Kloke Avenue
- One southbound right-tum lane on
Kloke Avenue
- One northbound left-tum traffic
lane on Kloke Avenue
- One northbound through traffic
lane on Kloke Avenue
- One northbound through and right
tum traffic lane on Kloke Avenue
• Participate on a "falr-share• cost basis
for future widening and modifying of the
existing traffic signal at the Intersection
of SR 96 and Eady Avenue within a
112-foot right-of-way. Str1pe the
"CPD - City of C31exlco Planning Department
"'[___ """'\, Remington Condominiums Final ISIMND .CU.'- Mitigation Monitoring and Reporting Program Implementation
Ac:tlon
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Veriflc:atlonl
Raspons lble Monitoring Approval
Monitoring Method Monitoring Party Phase Party
A-8
Mitigation
Measure
Implemented?
(YIN) & Date
Documentation
Location
(Monitoring
Record)
City Calexico
October 2005
No. Mltlgatlon Measure
following intersection traffic lane
configurations:
- Two eastbound through traffic
lanes on SR 98
- One eastbound left-tum traffic lane
onSR98
- One eastbound right-tum lane on
SR98
- Two westbound through traffic
lanes on SR 98
- One westbound left-tum traffic
lane on SR 98
- One westbound right-tum traffic
lane on SR 98
• Participate on a "fair-share" cost basis
for future widening of the intersection of
SR 98 and V.V. WiUlams within a 112-
foot right-of-way. Stripe the following
intersection traffic lane configurations:
- Two eastbound through traffic
lanes on SR 98
- One eastbound left-tum traffic lane
on SR98
- Two westbound through traffic
lanes on SR 98
- One westbound right-tum traffic
lane on SR 98
- One southbound combined
through. left-tum and right-tum
traffic lane on V.V. Williams
• Participate on a "fair share· cost basis
for the widening of SR 98 between
Dogwood Road and west of Ollie
Avenue lncludtng the bridge over the All
American Canal from two lanes to four
lanes.
• The proposed project shall contribute to
the appropriate fare-share percentage
based on the following equation:
"CPD - City of Calexico Planning Department
Ii)]. Remington Condominiums Final IS/MND Mitigation Monitoring and_ Reporting Program Implementation
Action
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Verification/
Responsible Monitoring Approval
Monitoring Method Monitoring Party Phase Party
A-9
Mitigation
Meas uni
Implemented?
(Y/N) & Date
Documentation
Location
(Monitoring
Record)
City Calexico
Odober 2005
No. Mitigation Measure
(Project Traffic) + (Existing + PrOject
Traffic + Cumulative Project Traffic) -
(Existing Traffic). At the lime of project
approval, the traffic analysis for the
proposed project conduded that
appropriate far share contn"butlons for
the proposed project would Include the
following percentages:
Location Fi!lr 0&
SR 98 and Kloke Rd. 5.98%
SR 98 and Eady Ave. 7.53%
SR 98 and W. 'NilDams Ave. Part of SR 98
widening
fair· share
contribution
'Nidening of SR 98 between
Dogwood Rd. and Onie Ave. 6.47%
Traffic Striping of Eady Ave.
south of SR 98 100%
MM--23 The following mitigation will be incorporated
in to the proposed project to mitigate for
cumulative project impacts to Intersections
and segments along SR 98.
• Because the completion dale and
funding for the SR 98 widening project
have nol been finalized, the City wlll
develop and maintain a Traffic
Mitigation Monitoring Plan (TMMP) to
continuously monltor the operating
levels of service for SR 98 and each of
the cumulative traffic Impacted
intersections along SR 98.
• The TMMP shan be lmptemenled per
City Council Resolution as a part of
proposed project approval.
• The City will use the TMMP to monitor
actual cumulative Impacts from regional development projects lo insure that segments and Intersections on SR 98
·cpo - City of Calexico Planning Department
"[__ """"'\"'") Remington Condominiums Final IS/MND
.cJ....I. '- Mitigation Monitoring and Repor1ing Program Implementation
Action
Applicant to Include
specified transportation
Improvements In final
engineering plans and
constructed per plans.
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Responsible Monitoring
Monitoring Method Monitoring Party Phase
Plan Check CPD - Plan approval
Review/Site Engineering prior to Building
Inspection Manager Penni!
Issuance/
Construction
approval prior to
occupancy
A-1 0
Mitigation
Verlflcatlon/ Measure
Approval Implemented?
Party (YIN)& Date
CPD -
Engineering
Manager
Documentation
Location
(Monitoring
Record)
CPD -
Engineering
Division
City Calaidco
Odober2005
No. Mitigation Measure
remain at acceptable levels of service.
The TMMP will continue until such time
that one of the following events occurs:
1. SR 98 is widened from two to
four lane, or
2. Level of service for the
lnlersections or segments on
SR 98 become unacceplable
• The City wilt use the TMMP as a tool for
tracking unused lraffic capacities for the
issuance of building permits to any
project that could potentially contribute
to cumulative impacts along, the abovementioned segment of SR 98. • Should level of service, for the
intersections and segment on SR 98,
reach unacceptable levels. the City will
delay Issuance of building
permits for any project (that could
potentiany contnbute to the abovemenlloned cumulative Impacts) until the SR 98 widening project is compleled .
MM-24 The following enhancements to Eady Avenue
shall be incorporated to reduce safety
impacts:
• Paint a double-yellow centerline on
Eady Avenue between S.R. 98 and
McKinley Street.
• Post "NO U-TURN" signs along this
segment of Eady Avenue.
• Post "NO U-TURN" signs at the
intersections of Eady Avenue and
Sheridan Slreel.
MM-25 All fighting shall be placed and shielded so as
not to be hazardous to vehicles traveling on
SR98.
·cPD - City of calexlco Planning Department
'[_ 'T"'\":> Remington Condominiums Final IS/MND .CU ... '- Mitigation Monitoring and Reporting Program Implementation
Action
Applicant to Include
specified transportation
improvements In final
engineering plans and
constructed per plans.
Construction of lighting
consistent with
recommendations
Appendix A
Mitigation Monitoring and Reporting Program Checklist
Responsible Monitoring
Monitoring Method Monitoring Party Phase
Plan Check CPD - Plan approval
Review/Site Engineering prlorto BuRdlng
Inspection Manager Permit
Issuance/
Construction
approval prior to
occupancy
Plan Check CPD - Plan approval
Review/Site Engineering prior to building
Inspection Manager permit issuance
A- 11
Mitigation
Verification/ Measure
Approval Implemented?
Party (Y/N) & Date
CPDEngineering
Manager
CPD -
Engineering
Manager
Documentation
Location
(Monitoring
Record)
CPD -
Engineering
Division
CPDEngineering
Division
City Calexico
October 2005
APPENDIX A
REVISED Air Quality Analysis
Remington Condominium Project
Calexico, California
September 22, 2006
Project No.: POS-133
AIR QUALITY ANALYSIS
REMINGTON CONDOMINIUM PROJECT
CALEXICO, CALIFORNIA
Prepared for:
Federal Home Loans
Attn: Marvin Mayne
109 West Highway 98
Calexico, California 92231
Date:
September 22, 2006
EXISTING CONDITIONS
METEOROLOGY/CLIMATE
The proposed project site is located in the Imperial County portion of the Salton Sea Air Basin (SSAB). The SSAB was part of the Southeast Desert Air Basin (SEDAB) until May 1996. The project site is in the hottest and driest part of California. The climate is characterized by hot, dry summers and relatively mild winters. Rainfall is scant in all seasons, so differences between the seasons are marked principally by differences in temperature. Average annual precipitation in the project area averages 3 inches per year.
Seasonal temperature differences in the basin are large, confirming the absence of marine influences due to the blocking action of the mountains to the west. Average monthly maximum temperatures in the project vicinity range from 109°F in July to 69°F in January. Average monthly minima range from about 38°F in January to about 75°F in July.
During much of the year, California is covered by a moderately intense high pressure system. In winter, the Pacific High retreats to the south, so that frontal systems from the North Pacific can move onto the California coast. On average, 20 to 30 frontal systems pass through California each winter. The first front usually arrives around the middle of October, and the average period of frontal activity is five to six months. Most of these systems are relatively weak by the time they reach the SSAB, however, and they become more diffuse as they move southeastward.
Spring is a transition season between the winter period of frontal activity and the generally dry summer; some precipitation continues during the early part of the season.
During the summer, the Paci fie High is well developed to the west of California, and a thermal trough overlies the SSAB. The intensity and orientation of the trough varies from day to day.
While the rugged mountainous country prevents a normal circulation, the influence of the trough does permit some inter-basin exchange with coastal locations through the passes. Summer is also the season with occasional moisture influx from the Gulfs of Mexico or California which causes isolated thundershowers and flash flooding (the summer "monsoon").
Fall is the transition period from the hot summer back to the season of frontal activity, but it is still very dry and temperatures are still mild.
Desert regions tend to be windy, since little friction is generated between the moving air and the low, sparse vegetation cover. In addition, the rapid daytime heating of the lower air over the desert surface leads to convection activity. The exchange between lower and upper air layers tends to accelerate surface winds during the warm part of the day when convection is at a maximum. During winter, however, the rapid cooling in the surface layers at night retards this exchange of momentum, and the result is often a high frequency of calm winds, especially at night.
X:\202JSI City of0 Calexico\J29S7, Rernng1on\l_CEQ,\llSMND-Fintl\Com"""uorumft\Responckn8'11dpomeslllwGi'°""\l'OS·lll Remtn~1on Ce«lom1nium·,\QlllDRoommmu.do< I
During all seasons, the prevailing wind direction across the project site is predominantly from the west. Periodic winds from the south blow into Calexico from Mexicali. A high population density and less strict pollution controls in Mexico result in elevated levels of air pollution in Calexico during periods of cross-border transport. However, the frequency and intensity of any air pollution episodes during south to north wind events appears to have dramatically diminished in Calexico during the last five years.
The mixing depth, i.e., the height available for dispersion of airborne pollutants emitted near the surface, is limited by the occurrence of temperature inversions. A temperature inversion is a layer of air in which the temperature increases with height. The temperature inversion conditions of the SSAB are quite different from those of the coastal regions of California. In coastal environments, warm, subsiding air aloft creates a lid above the shallow marine layer at the surface. The base of this subsidence inversion is perhaps 1,500 feet above the surface in coastal portions of the Los Angeles Basin. When a subsidence inversion exists over the desert, the height of the inversion base lies some 6,000 to 8,000 feet above the surface.
Nighttime surface inversions in the desert are common, especially during the cooler months.
Mixing heights are predominantly 1,000 feet or less. These inversions are caused by nighttime radiational cooling of the land surface in contact with overlying air that cools more slowly. They tend to be destroyed early in the day in summer, due to intense solar radiation and heating of the land surface. In winter, however, these radiation inversions tend to persist until mid-morning, limiting mixing in the lower atmosphere to heights of 200 to 2,000 feet above the surface. "Nuisance" air quality problems in the Imperial Valley, such as dust near mining operations or odors near feedlots or wastewater plants, occur mainly late at night or early in the morning when winds are nearly calm and such radiation inversions are strongest.
X U02J5 I _Cioy _of_ Caleuco\J 2957 _ Remin8I0018 _ CEQ,\\JSMND·Finil\Commeril$0nDnfl\R~.&Respon=\I liruGinxn\J'Ol· I J) Reming!On CondomlniunNIQI I IDR<onvnenL< doc 2 AIR QUALITY SETTING
Ambient Air Quality Standards (AAQS)
In order to analyze the air quality impact of operations at the proposed Remington condominium development, that impact, together with baseline air quality levels, must be compared to the applicable ambient air quality standards. These standards are the levels of air quality considered safe, with an adequate margin of safety, to protect the public health and welfare. They are designed to protect that segment of the public most susceptible to respiratory distress or infection such as asthmatics, the elderly, the very young, people weak from other disease or illness, and persons engaged in heavy work or exercise, called sensitive receptors. Healthy adults can tolerate periodic exposure to air pollution levels somewhat above these standards before adverse health effects are observed. Recent research has shown, however, that chronic exposure to ozone even at the federal clean air standard level can create unhealthful reactions through pulmonary distress. Just meeting clean air standards may therefore ultimately not be enough to protect human health such that an additional margin of safety may need to be created to achieve all clean air objectives.
The Clean Air Act Amendments (CAAA) of 1970 established national AAQS with states retaining the option to adopt more stringent standards or to include other pollution species.
Because California already had standards in existence before the federal AAQS were established, and because of unique meteorological problems in California, there is considerable diversity between state and federal standards. California Ambient Air Quality Standards (CAAQS) and National Ambient Air Quality Standards (NAAQS) for the criteria air pollutants are listed in Table I. Health effects of these criteria pollutants are described in Table 2.
The entries in Table I include the recently (I 997) adopted federal standards for chronic (8-hour) ozone exposure or for ultra-small diameter particulate matter of 2.5 microns or less in diameter (called "PM-2.5"). The Environmental Protection Agency's (EPA) authority to adopt such standards was subsequently challenged. In a unanimous decision published at the end of February 200 I, the Court ruled the EPA did have authority to promulgate standards without specific congressional authority, and that a cost-benefit analysis was not required for healthbased standards. The Court also ruled, however, that there was an attainment schedule inconsistency between "old" and "new" standards. This inconsistency was resolved through a consent decree signed by the EPA in 2002. EPA has designated Imperial County as a "marginal" non-attainment area for the 8-hour ozone standard. The former non-attainment designation for the one-hour standard was revoked when the 8-hour standard took full effect in 2005.
X \2D2J l 1. City .. of _ Calrnco\J 2957 Rtmn&tonlll CEQAUSMNO·Fin<l\Comnl<ntsOnDtaft~\J laruGiroux\J'Ol· Ill Remington Condotturuum·AQ •I IDRromrnenu doc 3 Table 1
Ambient Air Quality Standards
California Standards Federal Standards
Averaging
Pollutant Time Concentration Method Primary Secondary Method 1 Hour 0.09 ppm (180 IJ!lhnll Ul!IBviOlel 0.1 2ppm(235 µghnl) Same as Ultraviolet Ozone(01) 8Hour 0.07 ppm (1 40 µghnl) Photometry 0.08 ppm (1571Jg/m1) Pnmary Standard Pholomeby Resplrable 24Hour 5011glml 150 IJ!l/m"
Gravimemc or Same as Inertial SeparaUon
Particulate Amual Bel! A!Mnuaion Pnmary Standard and Gravimetric Matter (PMu) Arilhmelic 201J9lm1 S0 11glmS Anat,osb
Mean
Fine
24 Hour No Separate Stale Standard 6511g/m"
Same as Inertial Separalm
Particulate Amual Gravine1ric or Beta Prmary Standard and Gravimelic Matter (PMu) Arlt!lmetic 12 IJg/m' Alll!ooatiOn 151J9fml Analysis Mean
8Hour 9.0 ppm (10 l!JJ/m') 9 ppm (10 l!JJ/m') Noo·Oispersi'ie Carbon Noo-Olspetslve None lnl!ared Pholcmetry
Monoxide 1 Hour 20 ppm (231T1:1fml) Infrared Pholomelly 35 ppm (40 mglm3) (NDIR) (CO) 8Hour (NDIR)
(lake Tahoe) 6 ppm(7 nr,ifml) - - -
Nitrogen Annual
Artthmelic - Gas Phase 0.053 ppm (100 IJ!llm') Same as Gasl'hase Dioxide Mean Chemilllllnescence Primary Slandanf Chemihm nescellQI (N<h) 1 Hour 0.25 ppm (470 119hnl) -
JG.Day average 1.5JJ!1/m3 - - -
Lead Calendar Atomic AbSOIJltion Same as HiJhVolume
Quarter - 1.5119/m' Primary Slandaltl Sampler and At:>mlc A~
Annual
Arithmetic - 0.030 ppm (80 IJg/ml) - Mean
Sulfur Dioxide Ulnviolel Spedrophotometry
(502) 24 Hour 0.04 ppm (105 IJ!lhnl) Fluorescence 0.14 ppm (365 IJ!lhnlJ - (Paraiosani!lne Method)
3Hour - - 0.5 ppm (1,300119fmlJ
1 Hour O 25 ppm (655 119/m') - - Extinction coelficlenl ol 0.23 per lllomelerVlslblllty vWily or 10 miles or more (0.07-30 miles a Reducing 8Hour morn for Lake Tahoe) dua to partldes when No relatiVe humidity Is less l/lan 70 peitent
Particles Method: Bela Attenuatlon and Transmlltalloo
through Filler Tape.
Sulfates 24 Hour 25119/ml Ion Chromatography Federal
Hydrogen 1 Hour O.OJ ppm (42119/m1J Ullravlolel
Sulfide Fluorescence
Standards
Vinyl Chloride 24 Hour 0.61 ppm {26 ll!Jlml) Gas
Chromatography
C:IWalliGW'ltCSWAT~ES\TBlE 1-MIBllT ~II Ol'IV STNllllOS.OOC Table 2
Health Effects of Major Criteria Pollutants
Pollutants Sources Primary Effecls
Catbon Monoxide • Incomplete combustion of fuels and other • Reduced tolerance for exercise. (CO) catbon-conlaining substances, such as molor • Impainnent of mental function . exhawt. • lmpainnent of fetal development. • Natural events, such as decomposition of Death al high levels of exposure . • organic matter. • Aggravation of some heart diseases (angina) .
Nitrogen Dioxide • Motor vehicle exhaust. • Aggravation of respiratory illness. (NOz) • High temperature stationary combustion. • Reduced visibility. • Atmospheric reactions. • Reduced plant growth.
• Formation of acid rain .
Ozone • Atmospheric reaction of organic gases with • Aggravation of respiratory and (OJ) nitrogen oxides in sunlight. cardiovascular diseases. • Irritation of eyes .
• Impairment of cardiopulmonary function .
• Plant leaf injury .
Lead (Pb) • Contaminated soil. • Impairment of blood function and nerve construction.
• Behavioral and hearing problems in children .
Fine Particulate Matter • Stationary combustion of solid fuels. • Reduced lung function. (PM-IO) • Construction activities. • Aggravation of the effects of gaseous • Industrial processes . pollutants.
• Atmospheric chemical reactions . • Aggravation ofrcspiratory and cordio respiratory diseases.
• Increased cough and chest discomfort .
• Soiling .
• Reduced visibility .
Fine Particulate Matier • Fuel combustion in molor vehicles, • Increases respiralory disease. (PM-2.5) equipment, and industrial sources. • Lung damage . • Residential and agricultural burning. • Cancer and premature death . • Industrial processes. • Reduces visibility and results in surface • Also, formed from photochemical reactions soiling.
of other pollutants, including NOx, sulfur
oxides, and organics.
Sulfur Dioxide • Combustion of sulfur-conlaining fossil fuels. • Aggravation of respiratory diseases (asthma, (S02) • Smelting of sulfur-bearing melol ores . emphysema). • Industrial processes . • Reduced lung function .
• Irritation of eyes .
• Reduced visibility .
• Plant injury .
• Deteriorarion of melals, textiles, leather,
finishes, coatings, etc.
Source: California Air Resources Boord, 2002.
Analysis of the most current data on the health effects of inhalation of fine particulate matter prompted the California Air Resources Board (ARB) to recommend adoption of the statewide PM-2.5 standard that is more stringent than the federal standard. This standard was adopted on June 20, 2002. The state standard became enforceable in 2003 when it was incorporated into the California Health and Safety Code. There are currently no State PM-2.5 standard attainment deadlines. Although the Imperial Valley experiences high dust levels due to very dry soils, only a small fraction of earthen material is in the PM-2.5 size range. PM-2.5 levels are therefore not as frequently or severely above standards as are PM-10 concentrations.
Because of the strong evidence that chronic ozone exposure is more harmful than short-term hourly levels, the ARB has adopted a new ozone standard. The new standard mirrors the federal longer-term (8 hour) exposure limit. The California 8-hour ozone standard is slightly more stringent than the federal standard. It does not have a specific attainment deadline, but only that continued progress toward attainment must be demonstrated.
BASELINE AIR QUALITY
Existing levels of ambient air quality and historical trends and projections in the project area are best documented from measurements made by the Imperial County Air Pollution Control District (ICAPCD). The closest air monitoring station to the project site with the most complete data record is located in Calexico at the "Ethel Street" monitor. From this data resource, one can readily infer that baseline air quality levels near the project site are occasionally unhealthful, but there are some encouraging signs that the air is slowly, but surely, getting better. Attainment may still be years away, but the frequency and magnitude of air pollution episodes, especially those considered unhealthy for all people, has dropped considerably in the last decade.
Table 3 summarizes the last five years of published monitoring data from the Ethel Street air monitoring station. PM- I 0 levels around Calexico exceed the state standard on a large number of days. Several of the PM- I 0 episodes exceed the federal standard. It had been argued by the U.S. Environmental Protection Agency that most violations of federal PM-10 standards occur due to cross-border dust transport or during high wind episodes, and therefore Imperial County should not be considered a non-attainment area for the PM-I 0 standard. This conclusion was not upheld by federal courts which agreed that the non-attainment designation and any associated planning requirements should remain in place.
The Salton Sea Air Basin stands as non-attainment for ozone. Summer ozone levels routinely exceed standards, particularly the more stringent State one-hour standard. However, since 2002, there has been a dramatic improvement in ozone air quality. Since 2002, there has been an average of only three days above the state ozone standard, and there have been no violations of the federal one-hour, and only one violation of the federal eight-hour standard in three years.
Any air-shed that does not exceed federal standards more than three times in three years is considered to be in attainment. The Calexico area, based upon monitoring data from the Ethel Street monitor, did meet federal clean air criteria for ozone from 2002-2004.
X 12Dll3 I_ Ci1y _o(_ Calcxico\Jl9H _Rcning10nll _ C[QAU S~tNO·final\CommmuO.Or:ofllllcspond<n&:fl"llOmesU IStUGirow<\POl-1 ll Rmunglon Coodomrni..n-AQ fl ID!lcomm"1U doc 6 Table3
Air Quality Monitoring Summary
(Days Standards Were Exceeded and Maximum Observed Concentrations) Pollutant/Standard 2000
Ozone
I-Hour> 0.09 ppm (S) 17
I-Hour> 0. 12 ppm (F) 5
8- Hour > 0.08 ppm (F) 5
Max I-Hour Cone. (ppm) 0.17
Carbon Monoxide
I-Hour> 20. ppm (S) 0
8- Hour> 9. ppm (S, F) 7
Max I-Hour Cone. (ppm) 19.9
Max 8-Hour Cone. (ppm) 15.5
Nitrogen Dioxide
I-Hour > 0.25 ppm (S) 0
Max I-Hour Cone. (ppm) 0.19
Rcspirable Particulates (PM-10)
24-Hour > 50 µg/m3 (S) 52/61
24-Hour > 150 µg/m3 (F) 5161
Max. 24-Hr. Cone. (µg/m3
) 279.
Ultra-Fine Particulates (PM-2.5)
24-Hr. > 65 µg/m3 (F) 11113
Max. 24-Hr. Cone. (µg/m3
) 84.2
(S) - State ambient standard; (P) = Federal ambient standard - "" No data available.
2001 2002 2003
28 4 2
7 0 0
11 I 0
0. 17 0.12 0.11
0 0 0
6 4 0
17.4 15.6 11.8
12.3 11.6 8.8
0 0 0
0.14 0.14 0.15
53/62 51161 46159
3/62 3/61 4159
422. 361. 238.
0/101 0/322 0/283
60.2 46.5 65.0
Source: ICAPCD Air Monitoring Summaries, Calexico (Ethel Street) Monitoring Station 2004
4 0
0 0. 11
0 I
12.5 10.3
0 0.11
36/60
1/60
161.
01352
48.5 X \20B S I_ Cioy _of_ Cale>ico\J29S7 _R.mnj!ton\8 _([QA \JS~L'I -firul '. ommtnliOnt>rall\l(esron<l<R&Resporu<S'IUIHGorou..ll'O · I Jl Remington Condooun1 un,.,\Q t llOR<ommmts doc 7 Due to a combination of south to north winds, less stringent pollution controls, and strong winter temperature inversions, Calexico is one of the last areas of California where the eight-hour carbon monoxide (CO) standard is sometimes exceeded. The federal 8-hour CO standard was exceeded five times in 2002-04 (no more than three violations is required for attainment).
However, there was only one violation in the last two years of published data.
Air basins where ambient air quality standards are exceeded are called "non-attainment" areas. If standards are met, they are designated as "attainment" areas. If there is inadequate or inconclusive data to make a definitive attainment designation, they are considered "unclassified." Federal "non-attainment" areas are considered extreme, serious or moderate as a function of deviation from standards. The current attainment designations for the project area are as follows:
Pollutant Exposure State Federal
I-Hour Non-Attainment No Standard
Ozone
8-Hour Unclassified* Marginal Non-Attainment
co 8-Hour Non-Attainment Attainment/Unclassified
N02 I-Hour Attainment Attainment/Unclassified
or Annual
PM-10 Annual Non-Attainment Serious Non-Attainment
PM-2.5 Annual Non-attainment Unclassified
All Other NIA Attainment or Attainment or
Unclassified Unclassified
* -anticipated to be designated as non-attainment when designations are issued.
Revised federal clean air standards for particulate matter were adopted by EPA on September 21, 2006. A more stringent 24-hour standard for PM-2.5 was adopted, and the PM-I 0 standard was revoked. A new class of "coarse particulates" (PM-10 minus PM-2.5) was developed, but coarse particulate standards may not be enforced in more rural areas. Revisions to federal attainment designations related to particulate matter will therefore be forthcoming.
X.U02JSI , Cuy .of. Calc.iro\329l7 . RcmmglOOIB C~QAllSM/IO.finil\ O<tUT>t11UllnllnO\R"'l'O"d<nkR<sronus Jl &mGirou.\l'Ol· ll1 R"11;ng1on Condominium·AQ•llDRcornmmts doc 8 AIR QUALITY IMPACT
STANDARDS OF SIGNIFICANCE
Many air quality impacts from dispersed mobile sources, i.e., the dominant pollution generators affecting the proposed project, often occur hours later and miles away after photochemical processes have converted primary exhaust pollutants into secondary contaminants such as ozone.
The incremental regional air quality impact of an individual source is generally immeasurably small. The ICAPCD has therefore developed suggested significance thresholds based on the volume of pollution emitted rather than on actual ambient air quality because the direct air quality impact of a project is not quantifiable on a regional scale. The ICAPCD CEQA Air Quality Handbook (2005) states that any projects in Imperial County with daily emissions that exceed any of the following thresholds should be considered as having an individually and cumulatively significant air quality impact:
Pollutant Threshold
ROG 55
NOx 55
co 550
PM-10 150
SOx 150
Projects that do not exceed the above thresholds are considered Tier I projects. If the projectrelated emissions are below the above thresholds, and if standard mitigation measures are implemented as per the ICAPCD CEQA Handbook, then emissions impact may be considered less-than-significant, and a mitigated negative declaration (MND) is considered the appropriate form of CEQA clearance. If these thresholds are exceeded, the project is considered a Tier II project, and an EIR is considered to be required.
CONSTRUCTION IMPACTS
Construction activities will generate dust from surface disturbance and equipment exhaust from heavy off-road equipment. The URBEMIS2002 model indicates that the maximum simultaneous project disturbance size during grading will be 4.2 acres. Emissions of particulates (PM-I 0) from construction activity soil disturbance were evaluated using factors in the SCAQMD CEQA Handbook. Fugitive dust particulate matter is calculated as follows with the use of minimum dust control:
PM-I 0 = 4.2 acres X 26.4 pound/acre/day c 111 pound/day Even with only minimum (once-daily watering) dust control and with maximum daily simultaneous disturbance, the daily PM-I 0 significance threshold of 150 pounds per day will not be exceeded. However, ICAPCD rules require use of best available control measures (BACMs) X U02J5 1 Caty. or C&lrnco\l2957 R<rNngtcnlll QAUSMND·Fin.tl\CommenuOnllr>l\ll\espondm&Kespoi>ses'JINu!ftroo•~ lll Remington Condommh•n·AQtllDRccnvn<111<doc 9 for all construction projects in its adoption of Regulation VI 11. With mandatory use of BACMs, the accepted fugitive dust (PM-I 0) emissions factor is reduced to I 0.0 pounds per acre per day (California Air Resources Board). Project-related construction activity PM-10 emissions will be reduced to 42 pounds per day as a worst-case condition, or 28 percent of the adopted significance threshold of 150 pounds per day.
The ICAPCD CEQA Air Quality Handbook contains a number of standard dust control measures that should be implemented at all construction sites. For sites larger than four (4) acres, such as the Remington Condominiums, use of additional discretionary measures beyond the standard dust control program is recommended. The menu of standard measures and of candidate discretionary measures is included in the mitigation discussion to support a finding of a lessthan-significant impact. The ICAPCD CEQA Handbook does not reflect the passage of Regulation VIII in its present form. Regulation VIII has converted many of the dust control recommendations to mandatory implementation. Preparation and approval of a formal dust control plan is required fo r any substantial construction projects. The language of "should be implemented" as part of CEQA process mitigation has been replaced with "must be implemented" as part of a rule and regulation. Mandatory compliance with Regulation VIII will further strengthen the conclusion that dust emissions during project construction will be maintained at a less-than-significant level.
In addition to particulate matter, construction activities will generate exhaust emissions from onsite equipment, (mainly NOx from diesel equipment), and reactive organic gases (ROG) from application of paints and coatings. ROG and NOx are precursors to regional ozone formation. If temporary construction activity emissions are generated in substantial amounts during the warmer months (the "smog season"), they could be considered to have a significant impact.
Exhaust emissions from typical construction equipment during site clearing and grading activities were calculated using the California ARB URBEMIS2002 computer model. Emissions were calculated for an equipment "fleet" as follows:
Grading Construction Paving
Grader Grader Paver
Dozer Forklift Roller
Water Pull Backhoes (2) Water Truck
Scrapers (2)
The URBEMIS2002 computer model results for construction equipment emissions, plus the fugitive PM-I 0 sources, are as follows:
X UOlJ SI. Ciiy _ C&lmco\J 29l7 _Ren1'ng100'! ,CEQAIJS ~ !N D-Fin &l\ ommm OnOra \Respond<n.tl!dpolues\J in Gtroox\J'O · I JJ Remington Condonuruum·AQt HORronvmnts doc 10 Construction
Pollutant Grading & Paving
co 117.2 61.0
ROG 14.9 77.5
NOx 106.2 45.1
SOx 0.0 0.0
PM- 10 46.8 2.0
The CEQA Handbook thresholds do no apply to temporary construction emissions. However. the handbook does contain an extensive list of standard equipment emissions control recommendations that are included in the mitigation section.
X 120215 I_ City_ of_ Calciico\129 57 _R<1t11ngton\8 _ CcQA\JSMND ·final«Com""'1uQn0rafi1!1e•pondm&:R<spom .. ll l>nsGirD1Rll'O). Ill Rrrnington Condominiun~AQ > HDRcommall.S doc 11 MOBILE SOURCE IMPACTS
The 272 condominium unit project will create around 2, 176 trips per day. The regional emissions from this level of trip generation were calculated using the California Air Resources Board URBEMIS2002 computer model. The results are shows in Table 4. Maximum daily emissions from project traffic, plus minor "area source" emissions such as personal care or cleaning products, paints, and solvents, natural gas combustion, etc., are no more than 72 percent of the significance threshold. Regional project-related air quality impacts are therefore individually less-than-significant. Project-related traffic will not cause any intersection to operate at a congested level of service, and the total CO burden is less than the ICAPCD threshold. With mitigation, project vicinity intersections carrying combined existing plus project plus cumulative area growth traffic will continue to operate at acceptable levels. The potential for any local CO "hot spot" is minimal. A CO impact screening analysis was not conducted.
Because of the role of general growth in contributing to the regional air pollution burden, the CEQA Handbook contains a number of standard measures to minimize cumulative air quality impacts from all regional growth. Those standard measures applicable to the proposed project are included in the mitigation discussion.
Air quality effects from rapid Calexico area growth have been identified by ICAPCD staff as a serious local and regional air quality concern, particularly because of the additional influence of cross-border transport of air pollution. However, that rate of growth has been incorporated into regional plans for mobility, air quality and essential services such that projected levels of growth can be accommodated while still meeting most quality of life goals. The Southern California Association of Governments (SCAG) forecasts the following growth for Calexico between 2005 and 2010:
Analysis Year Pooulation Housin2 Employment
2005 38,233 9,293 10,622
2010 48,720 12,865 16,521
5-Y ear Growth 10,487 3,572 5,899
County Growth +23,953 +9,608 +15,673
Calexico Share 44% 37% 38%
The City of Calexico is forecast to accommodate 44 percent of all new population in Imperial County in the current 5-year planning interval. An increase of 3,572 dwelling units is forecast.
The Remington Condominium project would absorb 7.6% of Calexico's forecast growth. The project's scope is such that it is consistent with growth forecasts that are included in regional air quality planning. However, the current "Imperial County Air Quality Attainment Plan (AQAP) for Ozone" is based on the City's General Plan growth forecasts developed in 1992. Updated growth projections, including Remington Condominiums, far exceed the pace of previously planned growth included in the AQAP. The cumulative air quality impact from all growth is considered significant and not fully mitigable due to conflicts with the adopted AQAP.
X \l02Jl 1 _ Cily _of_ Caleuro\J 2957 _ Rm1ng100\8 _cEQA\J ~ INIJ.fin&l\Common"OnDt>ll\llespoodm&f!J:spomeo\J lauGirouxll'.ll· 133 ReminJ!loo Coodonunii.m·AQ •I tDHcn..,,..,b doc 12 Tablc4
Project-Related Operational Emissions (lb/day)
Activity ROG NOx co SOx PM-10
On-Road Vehicles 21.8 22.6 249.1 0.2 22.1
"Area Sources" 18.0 2.1 1.7 0.0 0.0
!1101JTAt. - - - - . ~ ·- 39.dl I ~-?~ I
-
250.JI o~ ~ ..
Significance Threshold 55 55 550 150 150
Percent of Thresholds 72 45 46 <I 15
Source: URBEMIS2002 Computer Model, Output in Appendix.
X llDll S 1 _City_ of_ Ca!uiro\J 29! 7. Rcnung!Onl!, CEQo\USMND-finJJ',CommmuOnDl>l\\ResponJ<n&kesi-scs\J IWGilllWl\l'OS-1 ll RemmglOn Condominiu111-AQ t I 1Dilro""""1ts doc 13 MITIGATION
The City of Calexico requires implementation of all reasonably available control measures for both construction and operation. The matrix of reasonably available measures (RACMs) derived from Chapter 7 of the JCAPCD CEQA Air Quality Handbook (2005) is detailed below.
Subsequent to the release of the CEQA Handbook, The Board of Supervisors adopted a countywide dust control rule (Regulation VIII) that requires use of best available control measures (BACMs) on construction projects. Use of BACMs has a more beneficial PM-10 reduction than does use of RACMs. All projects must use measures that limit visible dust emissions (VDE) to less than twenty percent opacity, and establish a stabilized surface on any previously disturbed sites. For projects exceeding ten acres, a dust control plan must be submitted and approved by JCAPCD. Failure to comply with an approved plan subjects a construction contractor to possible fines and a cease and desist order to chronic or willful violations.
CONSTRUCTION EQUIPMENT AND FUGITIVE PM-10 MITIGATION MEASURES Standard Mitigation Measures for Construction Equipment:
a. Maintain all construction equipment in proper tune according to manufacturer's specifications.
b. Fuel all off-road and portable diesel-powered equipment, including but not limited to bulldozers, graders, cranes, loaders, scrapers, backhoes, generator sets, compressors, auxiliary power units, with ARB-certified motor vehicle diesel fuel (non-taxed version suitable for off-road).
c. Maximize to the extent feasible, the use of diesel construction equipment meeting the ARB's 1996 or newer certification standard for off-road heavy-duty diesel engines. d. Install diesel oxidation catalysts (DOC), catalyzed diesel particulate filters (CDPF) or other District-approved emission reduction retrofit devices.
Standard Mitigation Measures for Fugitive PM-IO Control:
a. The entire site shall be pre-watered for 48 hours prior to clearing and grubbing. b. Reduce the amount of the disturbed area where possible. c. Water at least twice daily or otherwise stabilize all active construction areas. d. All dirt stock-pile areas should be sprayed daily as needed.
X 1202H I_ Ciry _cf_ Calc.lro\J 29l7, Remingroo'.8 CEQAllSMND-Fi nal'.Comn"'11!0oDnl\'.kesponckn&Respo<Ues\J W..C>irou•IJ'Ol· IJJ Renunl!'OO l'ondomini1.1t1·AQ+ llDRllommcnu doc 14 e. Pave, apply water three times daily, or apply (non-toxic) soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites. f. Haul trucks shall cover loads or maintain at least 6 inches of freeboard when traveling on public roads.
g. Pre-moisten, prior to transport, import and export materials that have a silt content of 5% or greater. Water all materials with a silt content of 5% or greater with a spray bar, or cover trucks hauling dirt, sand, or loose materials. Empty trucks and trucks carrying asphalt material are excluded from this requirement.
h. Sweep streets at the end of each day if visible soil material is carried onto streets, or wash off trucks and equipment leaving the site.
BACM Mitigation Measures for Fugitive PM-I 0 Control:
a. Use of water trucks or sprinkler system in sufficient quantities to prevent airborne dust from leaving the site. When wind speeds exceed 15 mph, the operators shall increase watering frequency.
b. Apply chemical soil stabilizers, or apply water to form and maintain a crust on inactive construction areas (disturbed lands within construction projects that are unused for at least four consecutive days).
c. Apply non-toxic binders (e.g. latex acrylic copolymer) to exposed areas after cut and fill operations, and hydroseed areas.
d. Plant vegetative ground cover in disturbed areas as soon as possible and where feasible. e. Cover or apply water or chemical suppressants to form and maintain a crust on inactive storage piles.
f. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible. In addition, building pads should be laid as soon as possible after grading unless seeding or soil binders are used.
g. Vehicle speed for all construction vehicles shall not exceed J 5 mph on any unpaved surface at the construction site.
h. Install wheel washers, rumble gates, provide a gravel pad or pave the area where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site.
X:l202J SI _ f ny. of_ f alrnco\l 29l7 _Rnnlng1co'll _ CEQAUSMND·Fitu!ICommen110nDraft\Respondm&R<spoo<<>IJ lw Gir0<nll'OS- Ill Rm11ng1on f ondomrnium·AQ 1 I IDll<l:>n"""'l! doc 15 STANDARD MITIGATION MEASURES FOR PROJECT OPERATIONS
RESIDENTIAL PROJECTS
Standard Site Design Measures:
a. Link cul-de-sacs and dead-end streets to encourage pedestrian and bicycle travel; b. Allocate easements or land dedications for bikeways and pedestrian walkways; and c. Provide continuous sidewalks separated from the roadway by landscaping and on-street parking. Adequate lighting for sidewalks must be provided, along with crosswalks at intersections.
Standard energy Efficiency Measures:
a. Increase the building energy efficiency rating by I 0% above what is required by Title 24 requirements. This can be accomplished in a number of ways (increasing attic, wall or floor insulation, etc.).
With implementation of the above measures, project-related air quality impacts will be reduced to an individually less-than-significant level. Because of the cumulative air quality impact from all Calexico area growth, especially a rate of growth that has not been adequately incorporated into the County's air quality plan for ozone, cumulative impacts are considered significant and will not be reduced to less-than-significant by implementation of the above mitigation measures.
X.\202.lll. City cf Colulco\J29l7 ,R<mlngtoo\ll CEQAllSMND-fin1 Conut"'1UOoOrall\Respondm&~pomeslJ""5Girouxll'Ol- lll Rtt11ington Coodom1niurn·AQtllDRoommenlS doc 16 APPENDIX
URBEMIS2002 Model Output
X \20lJ l I_ Ciiy _of_ Caltxioo\!29 5 7 _ Rrnvnglon\8 •. CEQAUSMND·fiOAllCommentsOnDnll\RC>pOn<kn&R<spoous1J U.UGirou.\Nll· I JJ Rernmgion Coodominium·,\Qt I !UKaunmcnts doc I
Page: 1
09725/2006 3:16 PM
Remington out.txt
URBEMIS 2002 For windows 8.7.0
File Name:
8 .7\Projects2k2\Remington.urb Project Name:.
c:\Program Files\URBEMIS 2002 version
Pro)ect Location:
on-Road Motor vehicle
Remington
south coast Air Basin (Los Angeles area) Emissions Based on EMFAC2002 version 2.2
SUMMARY REPORT
(Pounds/Day - s ummer)
CONSTRUCTION EMISSION ESTIMATES
PMlO PMlO
"'"'"' 2006 "'*"' ROG
EXHAUST DUST
TOTALS (lbs/day,unmitigated) 4 .76 42.01
14.89 PMlO PMlO
*"'"' 2007 *"'* ROG
EXHAUST DUST
TOTALS (lbs/day.unmitigated) 77.51
1.85 0.20
AREA SOURCE EMISSION ESTIMATES
ROG
TOTALS (lbs/day,unmitigated) 17.96
OPERATIONAL (VEHICLE) EMISSION ESTIMATES
ROG
TOTALS (lbs/day,unmitigated) 21.82
NOX
106.24
NOx
45.06 NOX
2.06 NOx
22.65 SUM OF AREA AND OPERATIONAL EMISSION ESTIMATES
ROG NOX
TOTALS (lbs/day,unmitigated) 39.79 24.70
Page: 2
09/25/2006 3:16 PM
URBEMIS 2002 For Windows 8.7.0
co S02
117.24 0.00
co S02
61.03 0.00
co S02
1.65 0.00
co S02
249.11 0.15
co S02
250.77 0.15
File Name: c:\Program Files\URBEMIS 2002 version
8.7\Projects2k2\Remington.urb
Project Name: Remington Page 1
PMlO
TOTAL
46.77 PMlO
TOTAL
2.05 PMlO
0.01 PMlO
22.10 PM10
22.11 Remington out.txt
Project Location: South coast Air Basin (Los Angeles area) On-Road Motor Vehicle Emi ssions Based on EMFAC2002 version 2.2
DETAIL REPORT
(Pounds/ Day - summer)
construction Start Month and Year: November, 2006
construction Duration: 12
Total Land use Area to be Developed: 0 acres
Maxi mum Acreage Disturbed Per Day: 4.2 acres
single Family uni ts: o Multi -Family units: 272
Retail / Office/Institutional / Industrial Square Footage: 0 CONSTRUCTION EMISSION ESTIMATES UNMITIGATED (lbs/ day)
PMlO
source ROG
EXHAUST DUST *""" 2006***
Phase 1 - Demolition Emissions
Fugitive oust - 0. 00
off- Road Diesel 0.00
0.00 0.00
on-Road Diesel 0.00
0.00 0.00
worker Trips 0.00
0.00 0.00
Maximum lbs/day 0.00
0.00 0.00
Phase 2 - Site Grading Emissions
Fugitive oust
42.00 off-Road Diesel 14.78
4.76 0.00
on-Road Diesel 0.00
0.00 0.00
worker Trips 0 .11
0.00 0.01
Maximum lbs/day 14.89
4.76 42.01
Phase 3 - Building construction
Bldg Const Off-Road Diesel 4.16
1.42 0.00
Bldg Const worker Trips 0.62
0.01 0.10
Arch coatings off-Gas 0.00
Arch coatings worker Trips 0.00
0.00 0.00
Asphalt off-Gas 0.00
Asphalt Off-Road Diesel 0.00
0.00 0.00
Asphalt On-Road Diesel 0.00
0.00 0.00
Asphalt worker Trips 0.00
0.00 0.00
Maximum lbs/day 4.78
1. 43 0.10
NOX
0 .00
0.00 0.00
0.00 106.03
0.00 0.21
106.24
31.75 0.35
0.00 0.00
0.00 0.00
32.10
co
o.oo
0.00 o.oo
0.00 115.01
0.00 2.23
117.24
30.68 7.48
0.00 0.00
0.00 0.00
38.16 502
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 PM10
TOTAL
0.00 0.00
0.00 0.00
0.00 42.00
4.76 0.00
0.01 46.77
1.42 0.11
0.00 0.00
0.00 0.00
1. 53
PM10
lbs/day all phases
Remin gton out.txt
Max 14.89 106.24 117.24 0 . 00 46. 77
4.76 42.01
1t1'1' 2007**1'
Phase l - Demolition Emissions
Fugitive oust 0.00
0.00 off-Road Diesel 0.00 0.00 0 .00 0.00
0.00 0.00
on-Road Diesel 0 . 00 0.00 0 .00 0 .00 0.00
0.00 0.00
worker Trips 0.00 0.00 0.00 0 .00 0.00
0. 00 0.00
Maximum lbs/ day 0. 00 0.00
0.00 0.00 0.00 0 .00 0.00
Phase 2 - si te Grading Emissions
Fugitive Dust 0.00
0 .00
off- Road Diesel 0.00 0.00 0.00 0.00
0.00 0.00
on-Road Diesel 0.00 0.00 0.00 0.00 0.00
0.00 0.00
worker Tri ps 0.00 0 . 00 0.00 0.00 0.00
0.00 0.00
Maximum lbs/day 0.00 0.00 0.00 0.00 0.00
0.00 0.00
Phase 3 - Building construction
Bld8 Const Off-Road Diesel 4.16 30.39 31.63 1. 30
1. 3 0.00
Bldg Const worker Trips 0. 58 0.33 7.03 0.00 0.11
0.01 0.10
Arch coatings off-Gas 69.99
Arch Coatings worker Trips 0. 58 0.33 7.03 0.00 0.11
0.01 0.10
Asphalt Off-Gas 0.24
Asphalt off-Road Diesel 1.90 13.04 15.01 0.52
0. 52 0.00
Asphalt on-Road Diesel 0.05 0.96 0.18 0.00 0.02
0.02 0.00
Asphalt worker Trips 0.01 0.01 0.14 0.00 0.00
0.00 0.00
Maximum lbs/day 77.51 45.06 61.03 0.00 2.05
1.85 0.20
Max lbs/da~ all phases 77. 51 45.06 61.03 0.00 2.05
1.85 0. 0
Page: 3
09/25/2006 3:16 PM
Remington out.txt
Phase 1 - Demolition Assumptions: Phase Turned OFF
Phase 2 - Site Grading Assumptions Start Month/Year for Phase 2: Nov '06 Phase 2 Du ration: 1.8 months
on-Road Truck Travel (VMT): 0
off-Road Equipment No. Type 1 Graders
1 Other Equipment 1 Rubber Tired Dozers
2 scrapers
Phase 3 - Building construction Assumptions Start Month/Year for Phase 3: Dec '06 Phase 3 Duration: 10.2 months
Horsepower 174
190
352
313
Start Month/Year for subPhase Building: Dec '06
s ubPhase Building Duration: 10.2 months
off-Road Equipment
No. Type Horsepower 1 Other Equipment 190
1 Rough Terrain Forkl ifts 94
Load Factor
0.575
0.620
0.590
0.660
Load Factor
0.620
0.475
2 Tractor/Loaders/Backhoes 79 0.465
Start Month/Year for subPhase Architectural coatings :
subPhase Architectural Coatings Duration: 3 mont hs
start Month/Year for subPhase Asphalt: Oct ' 07
subPhase Asphalt Duration: 0 .5 months
Aug '07
Acres to be Paved: 1
off-Road Equipment No. Type 1 Paving Equipment 1 Rollers Page: 4
09/25/2006 3:16 PM
AREA SOURCE EMISSION ESTIMATES
source
Natural Gas
Hearth - No summer emissions
Landscaping
consumer Prdcts
Architectural coatinQS TOTALS(lbs/day,unmit1gated)
Page: 5
09/25/2006 3:16 PM
(Summer
ROG
0.16 0.12
13.31 4.37
17.96 Horsepower 111
114
Load Factor
0. 530
0.430
Pounds per Day, Unmitigated) NOX co 502
2.05 0.87 0
0.00 0.78 0.00
2.06 1.65 0.00
UNMITIGATED OPERATIONAL EMISSIONS
Hours/Day 8.0
8.0 8.0
8.0 Hours/Day 8.0
8.0 8.0
Hours/Day 8.0
8.0 PMlO
0.00 0.00
0.01 condo/ townhouse general
TOTAL EMISSIONS (lbs/ day)
Remington out.txt
ROG
21.82 21.82
NOx
22.65 22.65
co
249.11
249.11
502
0.15 0.15
Does not include correction for passby trips. Does not include double counting adjustment for internal trips.
OPERATIONAL (Vehicle) EMISSION ESTIMATES
Analysis Year: 2007 Temperature (F): 90 Season: summer
EMFAC version: EMFAC2002 (9/ 2002)
summary of Land uses:
Trip Rate
No.
uni ts
PMlO
22.10 22.10
Total
unit Type Trips
condo/townhouse general
Acreage
17. 00 8.00 trips/dwe ll ing uni t 272.00 2,176.00
vehi cl e Assumptions:
Fleet Mix:
Vehicle Type Percent Type Light Auto 55.20
Light Truck < 3,750 lbs 15.10 Li~ht Truck 3,751- 5,750 16.10 Me Truck 5,751- 8,500 7.10
Lite-Heavy 8,501-10,000 1.10
Lite-Heavy 10,001-14,000 0.40
Med-Heavy 14 ,001-33,000 1.00
Heavy-Heavy 33,001-60,000 0.90
Line Haul > 60,000 lbs 0.00
urban Bus 0.10
Motorcycle 1.70
School BUS 0.10
Motor Home 1.20
s um of Total Trips Total vehicle Miles Traveled
Non-catalyst Catalyst 1.80 97.80
3.30 94.00
1. 90 96.90
1.40 95.80
0.00 81.80
0 .00 50.00
0.00 20.00
0.00 11.10
0.00 0.00
0.00 0.00
82 .40 17.60
0.00 0.00
8.30 83.30
2,176.00
14 , 558.53
Diesel
0.40 2.70
1.20 2.80
18.20 50.00
80.00 88.90
100.00
100.00
0.00 100.00
8.40 Travel conditions
Residential commercial
Home - Home- Home - work shop other commute Non-work
urban Trip Length (miles) 11.5 4.9 6.0 10.3
Rural Trip Length (miles) 11. 5 4.9 6.0 10.3
Trip speeds (mph) 35.0 40.0 40.0 40.0
% of Trips - Residential 20 .0 37.0 43.0
Page: 6
09725/ 2006 3:16 PM
changes made to the default values for Land Use Trip Percentages Page S
5.5 s.s
40.0 Customer
5.5 5.5
40.0 Remington out.txt
The Trip Rate and/or Acreage values for condominium/townhouse general have changed from the defaults 6.9/17. to 8.0/ 17. changes made to t he default values for Construction
The user has overridden the Default Phase Lengths Architectural coatings: # ROG/ft2 (residential) changed from 0.0185 to 0.0074 changes made to the default values for Area
changes made to the default values for Operations
The operational emission year changed from 2005 to 2007.