AGENDA
ITEM
1 AGENDA STAFF REPORT

CALEXICO
DATE: April 27, 2023
TO: Mayor and City Council
APPROVED BY: Esperaza Colo Warn, Cly Manager Cunt eleNa REVIEWED BY: Sandra L. Fonseca, Interim Finance Director PREPARED BY: Lilliana Falomir, Public Works Manager - Administrative Tel SUBJECT: Authorize City Manager to Sign Amendment No. 4 to the Agreement of Professional Services in the Amount of
$100,000.00 with Michael Baker International to provide Construction Support Services to the City, including
Review/Evaluation of Specific Submittals for the Construction of the New River Improvement Project - Calexico Reach.
====== =================
Recommendation:

Authorize City Manager to Sign Amendment No. 4 to the Agreement of Professional Services in the Amount of $100,000.00 with Michael Baker International to provide Construction Support Services to the City, including Review/Evaluation of Specific Submittals for the Construction of the New River Improvement Project - Calexico Reach.

Background:

The New River is a Water of the United States and a California Water. It originates approximately 18 miles south of the US-Mexico Border, in the Mexicali Valley, Mexico. It enters the United States by the Calexico West Port of Entry, in Calexico, California. The City of Calexico (hereafter "City") is proposing to implement the New River Improvement Project - Calexico Reach (hereafter "Project"). The City became Project Lead and pursuant to the California Environmental Quality Act it certified a Mitigated Negative Declaration for the Project in April 2020. The Project consists of three primary construction components:

AGENDA

1. Trash screen and diversion structure for the New River downstream from the International Boundary with Mexico. ITEM

2. Bypass encasement infrastructure for the New River from a point downstream of the International Boundary to a point downstream of the eastern boundary of the City of Calexico to address the public health threat that new River water quality poses to the southern area of the city.

3. A pump-back system to take treated wastewater from the existing Calexico Wastewater Treatment Plant (WWTP) and discharge it into the New River channel at a point near the proposed river diversion and encasement structure.

The City and the California Department of Water Resources (DWR) executed a $28,000,000 Funding Agreement (hereafter "Funding Agreement") in May 2021 to implement the Project. On February 15, 2023, the City Council of City of Calexico adopted Resolution No. 2023-04, which (1) authorizes the city to accept eighteen million, five hundred and thirty thousand, and forty-seven dollars ($18,530,047.00) from the State Water Resources Control Board's California-Mexico Border Rivers Program in additional funding for the construction of the New River Improvement Project Calexico Reach; and (2) authorizes the City Manager to execute Amendment 2 to the Funding Agreement.

Amendment 2, in substantive part, makes the SWRB's $18,530,047 in additional funding available to build the Project and extends the deadlines to complete construction of the Project. The City Manager executed Amendment 2 to the Funding Agreement on February 15, 2023, also.

Michael Baker International (MBI) is the Design Engineer for the Project, and it has been on contract with the city since January 2022 to provide engineering services to the city, which included finalizing the plans and specifications for construction of the Project and other technical support services during the Project's bid process. Dynamic Consulting Engineers (DCE) is the Project's Construction Manager and has been on contract with the City since November 2021. On February 15, 2023, the city awarded to Mountain Cascade, Inc. (MCI) a forty million, six hundred and nine thousand, and nine-hundred and eighty dollars with four cents ($40,609,980.04) contract to construct the Project. Since then, MCI has been submitting technical documentation for review and approval by the city to build the Project, including critical components of the Project (e.g., pump station's backup generator, switchboards, panelboards; proposed 72-inch bypass pipe; ground improvements; electrical switches for Diversion Structure), which DCE recommends are best evaluated by the MBI, the Design Engineer. The Contract Agreement with MBI, as amended to date, has approximately $4,557.91 left in funding for support services, which is not sufficient to cover the MBl's costs for reviewing certain MCI submittals, as recommended by DCE. It is estimated that an additional one hundred thousand dollars ($100,000) would be needed to cover MBI's costs.

Discussion & Analysis:

City staff supports DCE's recommendation that certain MCI submittals be reviewed by MBI for approval—The Project Design Engineer of record, and that is prudent to have MBI participate in certain construction meetings, where key issues may be raised on the plans and specifications for the Project. Therefore, and in concurrence with DCE, the City Public Works Department Manager and City Project Manager are recommending that the City of Calexico Council adopt Amendment No. 4 to the Contract Agreement with MBI to fund an additional $100,000 in support services from MBI. The scope of work under the proposed Amendment is included in Exhibit A and focuses on the review specific submittals from MCI, including submittals dealing with key Project components for the pump station (e.g., standby generator and electrical hardware), bypass pipe, and Diversion Structure; and on participating on key construction meetings.

Exhibit B shows the proposed MBI's hourly rates for the required services. The costs for the additional services will be covered by the City-DWR Funding Agreement. The City Public Works Manager, the City's Project Construction Manager, and New River Improvement Project Manager have reviewed the scope of work and recommend that the City Council of the City of Calexico authorize the City Manager to sign Amendment No. 4 to the Agreement for additional Professional Services with MBI for the New River Improvement Project - Calexico Reach.

Fiscal Impact:

Capital Improvement Program Budgeted Item for FY 2022-2023

REVENUE
State Grant - Fund No. 475-91-902-56001-000 $440,000.00 Total $440,000.00

EXPENDITURE
Michael Baker International - Original Contract $200,000.00 Michael Baker International - Amendment No. 1 $55,000.00 Michael Baker International - Amendment No. 2 $50,000.00 Michael Baker International - Amendment No. 3 $35,000.00 Michael Baker International - Amendment No. 4 $100,000.00 Total $440,000.00
Coordinated With:

City Manager's Office.

Public Works Department.

Office of the City Clerk.

Attachments):

Amendment No. 4 of Agreement of Professional Services between City of Calexico and Michael Baker International for Professional Services for New River Improvement Project - Calexico Reach.
• Exhibit A - Scope of Services
Exhibit B - MBI Schedule of Charges
AMENDMENT NUMBER 4 TO THE AGREEMENT FOR

PROFESSIONALSERVICES BETWEEN THE CITY OF CALEXICO

AND MICHAEL BAKER INTERNATIONAL
AMENDMENT NUMBER 4 dated May 3, 2023, to the agreement for protessional services between the City of Calexico (City") and Michael Baker International (Consultant") dated January 19, 2022 (the "Agreement" concerning Professional Engineering Services for the New River Improvement Project - Calexico Reach (the "Project").

The Consultant has entered into the Agreement with the City for the furnishing of professional services, and the parties now desire to amend the Agreement.

Therefore, it is mutually agreed that the Agreement is amended to include up to one hundred thousand dollars ($100,000) in Additional Services to be performed by Consultant under the scope of work of Exhibit A and under the Schedule of Charges of Exhibit B.

The parties ratify the terms and conditions of the Agreement not inconsistent with this Amendment, all of which are incorporated by reference.

CITY OF CALEXICO: CONSULTANT:

By: By: _
Title: Esperanza Colio Warren, City Manager Title:

Date: Date:

By:

Title: Carlos Campos, City Attorney
Date:

By:

Title: Gabriela Garcia, City Clerk
Date:

Michael Baker

INTERNATIONAL
JN: 188274
April 2023
ADDITIONAL SERVICES REQUEST #03
Project: New River Improvement Project - Calexico Reach Construction Support Services and Coordination
Client: City of Calexico
Work Requested By: City of Calexico
Summary of Additional Work
Construction Support Services and Coordination
At the request of the Client, Michael Baker International (MBI) will provide initial coordination and consultation with team partners (including City of Calexico and the City of Calexico Construction Management Team) related to Construction Support Services for the New River Improvement Project - Calexico Reach.

This initial scope of services for the Construction Support Consultant Team includes Michael Baker International and the following subconsultant team. MBI will coordinate directlywith the followingteam. • Engineering Partners Inc. - Electrical Engineering
• Leighton Geotechnical - Geotechnical Engineering
• Aark Engineering Inc. - Structural Engineering
At the request of the client, construction support services may include the following:
1) Construction startup assistance and schedule discussions 2) Meeting attendance and site walks in the field
3) Attend scheduled meetings and calls (frequency TBD). Attend progress meetings. 4) Review and respond to Submittals from Construction Management Team 5) Review Contractor Change Orders
6) Review and respond to Request for Information (RFls) from Construction Management Team 7) Review and address unforeseen conditions, items, and questions 8) Review contractor redlines
9) Additional requests to support the City of Calexico and the Construction Management Team 10) MBI will coordinate and distribute work requests directly with the subconsultant team An initial budget allowance of one-hundred thousand dollars ($100,000) is allocated for the tasks above. Services will be invoiced on a Time and Materials budget as approved in the Schedule and Charges (Attached Exhibit B).

Because of the unknown nature of construction services, Client will be notified when 80% of the budget has been used. MBI will provide a monthly invoice backup with detailed Time and Materials (T&M) budget allocations from the Consultant Team.

Reimbursable Expenses
Consultant has includeda budget amount within this proposal to cover the direct costs for the project including but not limited to, printing, plotting, reproduction, in-house reproduction, progress prints, mileage, messenger service, and overnight deliveries. Reimbursable expenses will be invoiced monthly.

Fee:

Construction Support Services and Coordination..... ..$100,000 TOTAL AWR $100,000
Work will commence upon written approval of this additional scope and fee.

Prepared By: April 2023
Brian Stup Project Manager
Authorized By:
(Client) (Date)
This is an addendum to the City of Calexico New River Improvement Contract as entered into as December 15, 2021.

All provisions, terms, and conditions remain applicable to this Addendum. 2 Page

EXHIBIT B
MICHAEL BAKER INTL. - SCHEDULE OF CHARGES
Work accomplished pursuant to this Agreement shall be based on the following rates.

Michael Baker Hourly Rate Schedule 2023 (please see notes also)| Office Personnel Hourly Rate
Principal $ 295.00
Project Manager Ş 260.00
Senior Engineer S 215.00
Project Engineer $ 185.00
Environmental Specialist $ 170.00
Design Engineer/Senior Designer/Survey Analyst $ 175.00 Designer/Planner $ 160.00
Design Technician $ 140.00
Assistant Engineer/Planner $ 125.00
Permit Processor $ 100.00
Office Support/ Clerical $ 95.00
Surveying Personnel Hourly Rate
Two Person Survey Crew $ 325.00
One Person Survey Crew $ 200.00
Licensed Surveyor $ 235.00
Field Supervisor $ 210.00
Notes:

1. An escalation factor of approximately 3% to the hourly rates is expected for 2024.

2. Blueprinting, reproduction, messenger service and other direct expenses will be charged as an additional cost plus 15%.

3. A Sub-consultant Management Fee of fifteen percent (15%) will be added to the direct cost of all sub-consultant services to provide for the cost of administration, sub- consultant consultation and insurance.

4. Vehicle mileage will be charged as an additional cost at the IRS approved rate.

ENGINEERING PARTNERS INC. - EXHIBIT B (RATES)
April 13, 2023
Fee Proposal to Michael Baker International, Attn: Brian Stup, P.E., Project Manager Re: CONSTRUCTION SERVICES FOR THE NEW RIVER IMPROVEMENT PROJECT (NRIP)

AT CITY OF CALEXICO, STATE WATER RESOURCES CONTROL BOARD, STATE

OF CALIFORNIA
N. RATES
Rate Category Hourly Rate
Principal $205
Senior Project Manager $195
Design Engineer $170
Drafter $ 90
Administrative $ 75
Thank you for this opportunity to participate on this project. If you have any questions, please feel free to give us a call.

Sincerely,
Rown ju
Romeo Flores, P.E
Engineering Partners, Inc.

P6949
Leighton 2023 PROFESSIONAL FEE SCHEDULE

EXHIBIT B

LABOR RATES
CLASSIFICATION $/HR CLASSIFICATION $/HR
Technician I.. ..95 Project Administrator/Word Processor/Dispatcher . 86 Technician II / Special Inspector. . 105 Information Specialist. 124 Senior Technician / Senior Special Inspector.. 124 CAD Operator..... . 148 Prevailing Wage (field soils / materials tester) * 162 GIS Specialist . 148 Prevailing Wage (Special Inspector) * 167 GIS Analyst 171 Prevailing Wage (On site Source Inspector, NDT and soil remediation Staff Engineer / Geologist / Scientist. . 162 O&M)*. 171 Senior Staff Engineer / Geologist / Scientist / ASMR . 176 System Operation & Maintenance (0&M) Specialist. 157 Operations / Laboratory Manager..... . 195 Non Destructive Testing (NDT).. 167 Project Engineer / Geologist / Scientis .205 Deputy Inspector.. 124 Senior Project Engineer / Geologist / Scientist / SMF .224 Field / Laboratory Supervisor 157 Associate 247
Source Inspector .. 143 Principal.. .276
City of Los Angeles Deputy Building (including Grading) Inspector.... 167 Senior Principal ..328 * See Prevailing Wages in Terms and Conditions

GEOTECHNICAL LABORATORY TESTING
METHOD $/TEST METHOD $/TEST

CLASSIFICATION & INDEX PROPERTIES COMPACTION & PAVEMENT SUBGRADE TESTS Photograph of sample... .......15 Standard Proctor compaction, 4 points (ASTM D698) Moisture content (ASTM D2216) ...25 - 4 inch diameter mold (Methods A & B) . 170 Moisture & density (ASTM D2937) ring samples.. ...35 - 6 inch diameter mold (Method C)....... 230 Moisture & density (ASTM D2937) Shelby tube or cutting ..45 Modified Proctor compaction 4 points (ASTM D1557):

Atterberg limits 3 points (ASTM D4318): 160 - 4 inch diameter mold Methods A & B . 235 - Single point, non-plastic.... ...90 - 6 inch diameter mold Method C . 265 - Atterberg limits (organic ASTM D2487 / D4318) 195 Check point (per point) ...70 - Visual classification as non-plastic (ASTM D2488). ... 15 Relative compaction of untreated/treated soils/aggregates (CTM 216).. .270 Particle size:.... Relative density 0.1 ft mold (ASTM D4253, D4254)... . 250 - Sieve only 1½ inch to #200 (AASHTO T2TIASTM C136/ASTM D6913/CTM 202)... 145 California Bearing Ratio (ASTM D1883) - Large sieve 6 inch to #200 (AASHTO T27IASTM C136/ASTM D6913/CTM 202)... 190 , 535 - Hydrometer only (ASTM D7928) .. 120 - 1 point. .200
- Sieve + hydrometer ≤3 inch sieve, (ASTM D7928).. 200 R-Value untreated soils/aggregates (AASHTO T190/ASTM D2844/CTM 301).. .335 - Percent passing #200 sieve, wash only (ASTM D1140) ..75 R-Value lime or cement treated soils/aggregates (AASHTO T190/ASTM Specific gravity and absorption of fine aggregate D2844/CTM 301) . 365 (AASHTO T84/ASTM C128/ASTM D854/CTM 207).... . 140 SOIL CHEMISTRY & CORROSIVITY Specific gravity and absorption of coarse aggregate pH Method A (ASTM D4972 or CTM 643)... . 50 (AASHTO T85/ASTM C127/CTM 206)... 110 ...50
Electrical resistivity - single point - as received moisture.... - Total porosity - on Shelby tube sample (calculated) . 180 Minimum resistivity 3 moisture content points (ASTM G187/CTM 643) ...95 - Total porosity - on other sample (calculated).. . 165 pH + minimum resistivity (CT 643). 140
Shrinkage limits wax method (ASTM D4943)... . 135
Sulfate content - gravimetric (CTM 417 B Part 2). ...75 Pinhole dispersion (ASTM D4647).. 225
Dispersive characteristics (double hydrometer ASTM D4221)... Sulfate content - by ion chromatograph (CTM 417 Part 2) ...85 .215
Sulfate screen (Hach®).... ....35
As-received moisture & density (chunk/carved samples) ..65 Sand Equivalent (AASHTO T176/ASTM D2419/CTM 217) 115 Chloride content (AASHTO T291/CTM 422) .. ...75 Chloride content - by ion chromatograph (AASHTO T291/CTM 422)..... ...85 SHEAR STRENGTH Corrosion suite: minimum resistivity, sulfate, chloride, pH (CTM 643)... . 285 Pocket penetrometer ... .20 Organic matter content (ASTM D2974).... ...70 Direct shear (ASTM D3080, mod., 3 points):

CONSOLIDATION & EXPANSION/SWELL TESTS
Consolidated undrained - 0.05 inch/min (CU) 305
Consolidation (ASTM D2435):. 210
Consolidated drained - <0.05 inch/min (CD) ... .370
Each additional time curve ...50
Residual shear EM 1110-2-1906-IXA (price per each additional pass after shear)... 55 Each additional load/unload w/o time reading ..45
Remolding or hand trimming of specimens (3 points)... ...95 Expansion Index (ASTM D4829) 140
Oriented or block hand trimming (per hour). ...70 Single load swell/collapse - Method B (ASTM D4546-B, seat, load & inundate only)... 115 Single point shear. 115
Swell collapse Method A up to 10 load/unloads w/o time curves Torsional shear (ASTM D6467 / ASTM D7608) . 880
(ASTM D4546-A) .. 310
Fee/2023 - V www.leightongroup.com

AARK ENGINEERING - EXHIBIT B

FEE SCHEDULE
for Professional Engineering Services
aark enginering inc.

Year 2023 Hourly Rates
Personnel Classification Hourly Rate
Principal Structural Engineer $ 198
Senior Managing Engineer $ 174
Senior Project Manager $ 160
Project Manager $ 154
Senior Project Engineer $ 147
Project Engineer $ 140
Assistant Engineer (EIT) $ 114
Senior Designer $ 112
Designer $ 95
Administrative/Clerical $ 71
Registered Structural Engineer
Expert Witness Testimony $ 349
Fee Schedule Notes:

1. Hourly rates shown are current rates effective January 1, 2023 and are subject to change.

2. Personnel classifications may be amended based on technological and staff changes. Any new classification will be subject to prior approval by the Client.

3. All Other Direct Costs (ODC), including subcontractor costs, will be billed at actual cost with a 10% markup, unless otherwise indicated in the Fee Proposal. Mileage will be billed at approved IRS rate, unless otherwise indicated in the Fee Proposal.
1870 Cordell Court Suite 202 El Cajon, CA 92020 tel 6193126336 fax 619383 6560 aarkengineering.com

← All documents from this meeting