AGENDA STAFF REPORT
DATE: April 3, 2024
Mayor and City Council
REVIEWED BY: Sandra L. Fonseca, Interim Finance Director PREPARED BY: Liliana Falomit, Public Works Manager- Alministrative Halu SUBJECT: Authorize the City Manager to Sign Agreement of Professional Services between the City of Calexico and Dynamic Consulting Engineers in the Amount of $149,925.40 for Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park - Phase I.
Recommendation:
Authorize the City Manager to Sign Agreement of Professional Services between the City of Calexico and Dynamic Consulting Engineers in the Amount of $149,925.40 for Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park - Phase I.
Background:
On February 22, 2024, the City of Calexico Public Works Department began requesting proposals from qualified and experienced construction management, geotechnical and field inspection professionals to provide Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park - Phase I. The services are anticipated to be full- time for the duration of the construction work, which will be completed by private contract secured through the public bidding process.
Discussion and Analysis:
On March 14, 2024, the Office of the City Clerk received two (2) proposals from the following firms:
# Company Amount
1 Dynamic Consulting Engineers $149,925.40
2 | Nicklaus Engineering, Inc. $109,059.00
The City of Calexico Public Works Department has reviewed the proposals and recommends, that the City Council of the City of Calexico authorize the City Manager to sign Agreement of Professional Services with Dynamic Consulting Engineers in the amount of $149,925.40 for Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park - Phase I.
Fiscal Impact:
Capital Improvement Program Budgeted Item for FY 2023-2024 Fund No. 255-91-914-56000-003 $149,925.40
$149,925.40
Total
Coordinated With:
City Manager's Office.
Finance Department.
Public Works Department.
Attachment(s):
1. Agreement of Professional Services between City of Calexico and Dynamic Consulting Engineers.
2. Nicklaus Engineering, Inc. Proposal.
Request for Proposals for Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park - Phase I.
ATTACHMENT NO. 1
AGREEMENT FOR PROFESSIONAL SERVICES
This Agreement is made and entered into as of the 3rd day of April, 2024, by and between the City of Calexico ("City") and Dynamic Consulting Engineers ("Consultant").
RECITALS
A. Consultant is specially trained, experienced and competent to perform the special services which will be required by this Agreement; and
B. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.
AGREEMENT
Scope of Services. The Consultant shall furnish the following services in a professional manner. Consultant shall perform the services described on Exhibit A which is attached hereto and incorporated herein by reference. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A, subject to the direction of the City through its staff that it may provide from time to time.
Time of Performance. The services of Consultant are to commence upon execution of this Agreement and shall continue until all authorized work is approved by the City. All such work shall be completed no later than December 31, 2024. Time is of the essence for every provision of this agreement that states a time for performance and for every deadline imposed by the City.
Compensation. Compensation to be paid to Consultant shall be as set forth in Exhibit B, which is attached hereto and incorporated herein by reference. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment.
4. Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than 30 days after approval of the monthly invoice by City staff.
5. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request.
6 Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and shall not act as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights.
7. Interest of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by and during this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant:
a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and
possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).)
8. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise.
Indemnity. Consultant agrees to indemnify, including the cost to defend, the City, and its officers, agents and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this contract. This indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, damage or expense arising from the sole negligence, 2 willful misconduct or defects in design by the City or its agents, servants, or independent contractors who are directly responsible to the City, or the active negligence of the City.
To the fullest extent permitted by law, the Consultant shall (1) immediately defend and (2) indemnify the City, and its councilmembers, officers, agents, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, or its employees, agents, or subcontractors. Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys' fees; court costs; and costs of alternative dispute resolution. The Consultant's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then Consultant's indemnification obligation shall be reduced in proportion to the established comparative liability.
(b) The duty to defend is a separate and distinct obligation from Consultant's duty to indemnify. Consultant shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, agents, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend under this section. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys' fees and defense costs in proportion to the established comparative liability of the indemnified party. (c) The review, acceptance or approval of the City's work or work product by any indemnified party shall not affect, relieve or reduce the City's indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
10. Insurance Requirements.
a. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. 3 i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. This provision shall not apply if Consultant has no employees performing work under this Agreement. If the Consultant has no employees for the purposes of this Agreement, Consultant shall sign the "Certificate of Exemption from Workers' Compensation Insurance" which is attached hereto as Exhibit C.
i. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.
iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
iv. Errors and Omissions Liability. Consultant shall maintain errors and omissions liability insurance for all work performed under this Agreement in an amount of not less than one million dollars ($1,000,000).
b. Policy Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A: VII and shall be endorsed with the following specific language:
i. The City of Calexico, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work or operations.
4 ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it.
iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.
iv. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers.
V. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City.
c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance and Endorsements. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement.
1l. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations.
12. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall obtain a City of Calexico Business License.
13. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Imperial, California. 5 14. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent prepaid, first class mail. Any such notice, demand, etc. shall be addressed to the other party at the address set forth herein below. Either party may change its address by notifying the other party of the change of address. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Calexico, City Manager
608 Heber Ave.
Calexico, CA 92231
If to Consultant: Dynamic Consulting Engineers
2415 Imperial Business Park Drive, Suite B
Imperial, CA 92251
15. Consultant's Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement.
Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement.
Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so.
Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement.
d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted 6 to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest.
16. Entire Agreement. This Agreement constitutes the complete and exclusive statement of Agreement between the City and Consultant. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Agreement.
17. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney.
18. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder.
19. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart.
20. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law.
21. Termination. This Agreement may be terminated by the City immediately for cause or by either party without cause upon fifteen days' written notice of termination. Upon termination, Consultant shall be entitled to compensation for services performed up to the effective date of termination.
***SIGNATURES ON FOLLOWING PAGE***
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above.
CITY OF CALEXICO: CONSULTANT:
Esperanza Colio Warren Carlos Beltran, P.E.
City Manager Principal Engineer
APPROVED AS TO FORM: ATTEST:
Carlos Campos Veronica L. Alvarado
City Attorney City Clerk
8 EXHIBIT A
SCOPE OF SERVICES
(proposal dated March 14, 2024)
City of Calexico
Public Works Department
March 14, 2024
PROPOSAL FOR CONSTRUCTION MANAGEMENT,
GEOTECHNICAL AND INSPECTION SERVICES FOR
ADRIAN C. CORDOVA MEMORIAL PARK - PHASE 1
CALEXICO
COLIFORNIOI
CONSULTING CIVIL ENGINEERING
Dynamic ENGINEERS
CONSTRUCTION MANAGEMENT
LAND SURVEYING
2415 IMPERIAL BUSINESS PARK DR. SUITE B
IMPERIAL, CA 92251
PHONE: (760) 545-0162
FAX: (760) 545-0163
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. ) CORDOVA MEMORIAL PARK - PHASE 1
)
March 14, 2024 Dynamic ENSUEENS ENGINEERS
)
) Office of the City Clerk, City Hall
) City of Calexico
) 608 Heber Avenue
Calexico, CA 92231
)
SUBJECT: PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION ) SERVICES FOR ADRIAN C. CORDOVA MEMORIAL PARK - PHASE 1 )
) Dynamic Consulting Engineers, Inc. (DCE) appreciates the opportunity to present this proposal to the City of Calexico for Professional Construction Management and Inspection Services. Dynamic Consulting Engineers, Inc. has assembled an exceptional team with extensive experience in Construction Management and Inspection of similar projects.
Dynamic Consulting Engineers, Inc. was founded with the vision to provide clients with high quality work in a timely manner. It is our commitment to go above and beyond and provide our clients with an exceptional level of service. Our project managers and engineers are dedicated to completing projects on time no matter how challenging schedules are. With utmost integrity, we believe we have assembled a project management and inspection team that is not only committed to assisting the City on this important project but share the same intrinsic goals of preserving the public's interests. ) DCE has teamed up with Sierra MTI for Materials Testing, Labor Compliance of Southern California for Labor Compliance to provide the city with an exceptional team with a great deal of experience. )
) Our project management and inspection team is especially well suited to provide professional services on this project as we have extensive experience working on similar projects throughout the Imperial )
Valley and in the City of Calexico.
)
) In closing, we are excited about the possibility of serving you and the possibility to provide the City our ) expertise with similar projects. Thank you for your consideration. If there are any questions or ) comments please feel free to contact me at (760) 545-0162.
Sincerely,
)
)
Carlos Beltran, P.E.
Principal Engineer
) DCE DIR Registration No. 1000007077 (Expires 06/30/2024) )
) 1
) CONSULTI A
Dynamic ENGINEER
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C CORDOVA MEMORIAL PARK - PHASE 1
TABLE OF CONTENTS
............З
DCE COMPANY INFORMATION....
...4
EXECUTIVE SUMMARY.....
) ....4
PROJECT UNDERSTANDING....
) COMPREHENSIVE EXPERIENC...... ...........5
) .5
COORDINATION AND COMMUNICATION
) .6
SCOPE OF WORK FOR FIELD INSPECTIONS...
) SCOPE OF WORK FOR CM AMD PROJECT ADMINISTRATION.. ...6 ..8
) PROJECT APPROCH
KNOWLEDGE OF LOCAL ENVIRONMENT... .10
PROJECT PERSONNEL ORGANIZATIONAL CHART AND TEAM QUALIFI........ ..11 )
...12
RESUMES.
.15
EXPERIENCE AND TECHNICAL SUPPORT...
APPENDIX
•DIR REGISTRATION
1..
)
2 Dynamic ENSUEENG
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 3
COMPANY INFORMATION EXPERIENCE AND SERVICES
Dynamic Consulting Engineers is a California CIVIL ENGINEERING Corporation located at: • Street Improvements
2415 Imperial Business Park Drive, Suite B Grading and Drainage Design Imperial, CA 92251 • Water Distribution Systems, Sanitary City of Calexico Business License No. 211238 Sewer Collection Systems and Storm Federal Tax ID Number 26-1842803 Drainage Facilities.
DCE has maintained a stable financial history. • Water and Sewer Pump Station Design • Water, Sewer and Storm System Master
Contact Person Authorized to Respond to RFP: Planning, including Infrastructure )
Carlos Beltran, P.E. President Capacity Analysis
2415 Imperial Business Park Dr. Ste B Structural Engineering Imperial, CA 92251. Phone: (760) 545-0162 • Design of Pipelines and Open Channels email: [email protected] • Design of Hydraulic Structures
CONSTRUCTION MANAGEMENT (CIV) AND
NSPECTIONS:
• CM and Inspections for small and major
development projects
• CM and Inspections for Street
Improvement Projects
COMPANY PROFILE • CM and Inspections for Industrial and Dynamic Consulting Engineers, Inc. (DCE) is a Commercial Projects professional corporation that provides • Preparation of Traffic Control Plans multidisciplinary engineering, land surveying • Constructability Review and Plan Check and construction management services. DCE • Cost Estimates, Construction Reports, professional engineers and professional land Scheduling and Document Control surveyors have substantial experience working • Risk Management/Claims Management in large scale capital improvement projects
throughout the southern California desert
region. DCE continues to provide exceptional
service to the public and private sectors and
)
continues to work well with local public
) agencies including local cities, county and water
and irrigation districts. DCE has been providing
)
Construction Management and Inspection LAND SURVEYING
) Services for local municipalities and IID for
• Boundary and Topographic Survey
over 13 years. • Tract Maps and Record of Surveys
DCE is certified by the Department of Global Positioning Surveying (GPS) Transportation as a Disadvantaged Business • Right of Way Mapping and Engineering ) Enterprise (DBE No. 37931).
• Level Loops and As-built Surveys
) • Construction Stakin
DCE is has been in Good Financial Status since
the start of the Company in 2008.
3 Dynamic CONSULTING
ENGINEERS
)
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. )
CORDOVA MEMORIAL PARK - PHASE 1
) EXECUTIVE SUMMARY
)
Dynamic Consulting Engineers, Inc. (DCE) is pleased to present this proposal to the City of )
Calexico. DCE has a simple, yet efficient company structure, which stresses client satisfaction, ) quality project management, and efficient technical excellence. )
) We are pleased to offer our experience in inspections and construction management projects ) that are similar to this project. We are excited to have the opportunity to present our proposal because these are the type of projects that are very important for the City of Calexico. We )
understand the driving forces of this proposal and are prepared to undertake the challenge of )
providing solutions that adhere to the city's intrinsic goals and missions. ) DCE is well suited to provide construction management and inspection services for this project since our team has direct experience working on projects similar to this project and within the Imperial Valley.
) DCE has direct experience working on design and inspections of concrete structures including surface concrete improvements, sidewalks driveways, curb and gutter and ADA ramps. DCE has )
extensive experience providing inspection services for numerous paving projects throughout )
the Imperial Valley.
)
PROJECT UNDERSTANDING
)
The City of Calexico is requesting proposals from professional engineering firms to assist the )
City with construction management and inspections for the "Adrian C. Cordova Memorial Park )
- Phase 1". The purpose of this request is for the Construction Management team to assure the City the project is constructed according to the approved plans and specifications.
The City of Calexico is proposing to construct a new parking lot with accessible parking, ) driveway entrances to the park, new walkways to connect the parking lot to the existing ) baseball fields, a new walkway for access to the existing multi-use field, and sewer and water ) laterals with stub-outs for the future concession stand at Adrian C. Cordova Memorial Park. )
The project includes the installation of water and sewer service lines for approximately 130 ft each. The project will also include installation of P.C.C Curb and Gutter, Commercial Driveway )
and installation of approximately 12,000 SF of sidewalks. AC paving and installation of Class I| )
Base will also be part of this project with some utility adjustments. Project will also include )
landscaping and installation of decomposed granite.
)
) 4
) CONSULTING
Dynamic ENGINEERS
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
COMPREHENSIVE EXPERIENCE
Comprehensive Experience Provides Knowledge of the Local Environment and Relevant Project Issues. DCE has been providing professional services to local public agencies in Imperial ) Valley for over thirteen years. Our staff is very knowledgeable of the City of Calexico standards and specifications, contracts, terms and conditions, billing procedures and project administration. Our staff continues to work successfully with City staff over the years.
The Project Team will be led by Carlos Beltran, PE, QSP, QSD. Carlos has been responsible for providing professional services to local public agencies for the last 23 years and has worked in Imperial County for over 23 years. Mr. Beltran is a registered Civil Engineer with a lot of experience in design and construction management and inspection of surface and street )
improvements projects throughout Imperial Valley.
COORDINATION AND COMMUNICATION
Coordination and Communication Provides Streamlined and Efficient Delivery of Services.
Our team is very knowledgeable of the City of Calexico and the stakeholder's standards and specifications, contracts, terms and conditions, billing procedures and project administration.
Our team understands that the City has a high-level of responsibility and accountability in ) completing this project. DCE will maintain close communications with all stakeholders in this ) project including the City of Calexico, the General Contractor and IID.
Our goal is to be efficient and highly responsive to all stakeholders in this project especially the City of Calexico. Our technical team has sufficient resources and specialized expertise that will work in concert with this project's mission. We believe communication and documentation to be the most essential functions of Construction Management and Inspection Services. We ) stand ready to serve with integrity, trust and respect as an extension of your organization. )
5 Dynamic ENSUING
)
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. ) CORDOVA MEMORIAL PARK - PHASE 1
SCOPE OF WORK FOR FIELD INSPECTIONS
)
• Site Work for Demolition, Excavation, Backfill, Embankment and Compaction: Our )
team of inspectors and construction managers will assure the City of Calexico that ) excavation meets CAL OSHA requirements for Excavation, Trenching and Earthwork. ) DCE understands that Safety is the most important factor in any project. DCE inspectors ) and/or project manager will perform a visual inspections to assure any excavation meets ) OSHA requirements.
)
• Site Improvements Including Concrete Flat Work and Asphalt Concrete Paving: DCE inspector along with the Geotechnical Technician will work closely to make sure backfill )
and placement of base material is properly placed and compacted. DCE inspection team will also inspect the placement of Concrete Flat Work and the Placement of Asphalt Concrete Pavement. Our geotechnical consultant will collect concrete samples and )
perform strength test breaks to make sure concrete meets specifications. Also, the )
geotechnical testing consulting will perform the required AC concrete pavement test per )
specifications and City of Calexico QAP manual.
SCOPE OF WORK FOR CONSTRUCTION MANAGEMENT AND PROJECT ADMINISTRATION • Attend Progress Meetings: DCE Project Manager and Inspector will attend project progress meetings with City and local agencies as required. DCE will coordinate with City of Calexico and Contractors construction schedule and material deliveries. DCE will provide construction updates, project progress, schedule updates and set milestones DCE will also coordinate with local residents traffic control and road closures as required. DCE will also coordinate with utility companies work and construction schedules.
)
)
• Assist C&R or Project Manager, Submittals, Schedules, Procurement of Material: DCE Project Manager will coordinate and assist the City of Calexico Public Works Department with submittal reviews and approvals, preparing and updating project schedule, ) procurement of material, preparation of applications to obtain encroachment permits with local municipalities and state and federal agencies. DCE will also assist the City and Contractor with general and specific Dust Control Plans per Imperial County Air Pollution )
) Control District.
• Daily Reports: DCE inspector will prepare daily construction inspection reports. These reports will summarize daily working hours, list of contractors onsite, equipment onsite, )
) 6
) Jynamic CONSULTIN
I ENCINEE
)
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL, PARK - PHASE 1
visitors, problems encountered, construction activity summary and daily photographs with descriptions.
)
• Weekly Statement of Working Days: The Resident Engineer (RE)/CM will prepare the "Weekly Statement of Working Days" (Exhibit 16-A) and will keep daily reports on ) Exhibit 16-C "Resident and Assistant Engineer's Daily Report". Photos will be printed and ) attached to the reports. In addition, a weekly overview of the project will be completed ) by the Resident Engineer and placed in the files.
• Contractor Pay Applications: The RE/CM will review the pay applications from the contractor and compare to the daily reports of the resident engineer. Any discrepancies )
will be resolved with the Contractor prior to sending the applications to the City for ) payment. The final pay application will conform to the format in Exhibit 17-D of the ) LAPM.
)
• RFl's: DCE will assist in processing the RFl's. DCE will review change order requests and claims from the Contractor and will make recommendations to the City. Any change orders will be in accordance with the LAPM manual.
• Labor Compliance: DCE and Labor Compliance Consultants of Southern California will verify contractor compliance with the prevailing wage (per LAPM 16.11 "Labor Compliance") and EEO requirements for the project. This includes interviews per Exhibit 16-N (or 16-P for Spanish) of the LAPM (one per week per trade). A subconsultant who specializes in this type of work will be used. DCE will assist the County with DBE compliance documentation.
Jynamic CONSULTI
ENGINEE
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
PROJECT APPROACH
)
)
DE's philosophy for providing management of the construction activities are as follows:
)
) Making a project a success by:
) • Communicating effectively with the Client, Contractor, affected residents and utility ) companies, and working in a partnership with the Contractor. Constant and open ) communication with the affected public goes a long way to contributing to the success of the project. Community relationships are important and we work hard to ensure that we communicate and address any concerns in the community for all projects.
)
• Providing full time inspection that assures the project is built according to the plans and specifications. In some cases flexibility is important. Many times the Contractor ) has very good ideas on how to solve problems in the field. We believe in listening to ) all sides and recommending the best alternative, even if it is not our own. )
• Providing a QA/QC effort focused on:
• Safety Management
• Risk Management
• Contract Administration
• Change Order Management
• RFI Management
• Submittal Management
• Document Management
• Progress Meetings
• Photo Management
) • Dispute/Claims Management
) • Scheduling Milestones and Management
• Reporting (Daily, Monthly, Accident, Special)
Schedule of Values/Pay Applications
• QA/Inspection
• Community Relations
)
) 8
) Dynamic ENGINEERS CONSULTINE
)
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. )
CORDOVA MEMORIAL PARK - PHASE 1
)
Prevent delays by:
)
• Review and analyze the Contractor's schedule before construction. If there are any )
potential for not meeting milestones, we will review those items with the Contractor and assist with a solution.
• Responding to issues that arise quickly. It is imperative that issues be solved quickly )
before they turn into potential claims. We will work with the Contractor to find ) solutions that all parties agree to.
) • Responding to RFls and Submittals quickly. We believe that responses to RFls and ) Submittals should be done immediately. Sometimes the Contractor will need to stop work until a response is received. If possible we address questions in the field, and base our answers on the plans and specifications. If there is not an answer in the )
plans and specs we use our engineering experience to recommend a solution that )
the City approves.
)
) Prevent Claims by:
) • Providing staff with significant and relevant project experience. The staff will become intimately familiar with the plans and specifications and must be proactive ) to be able to resolve issues at the lowest levels before any issues arise. This is very important for claims management. We will provide all of the skills needed to cover )
the specialized required areas such as earthwork and special inspections )
(dewatering, bore and jack).
) • Documenting, documenting, documenting - Ensuring that the project documentation ) is kept organized and available for the City to review. Keeping excellent field notes ) and daily reports, including a plethora of project photos. ) • Listening to the Contractor's concerns and sincerely working together for a mutually ) acceptable solution. We are sensitive to the need to have a seamless team that integrates the City's staff and the design engineer. We believe that we can give the )
City well-rounded input based on our experience for construction contract decision )
making.
• Keeping it professional - treating each stakeholder in a professional and consistent ) manner. Once the contractors know our expectations, see that the documents are being interpreted in a consistent manner, and that all stakeholders are being treated in a fair and equitable manner, they will respond in a like manner. This will create fewer problems in administering the project. The contract documents set the standards of construction and the interpretation of these documents in a reasonable manner will make for a harmonious construction management atmosphere. 9 Jynamir CONSULTIN
ENGINEER
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
)
)
)
QUALITY CONTROL PROCEDURES
)
Our team has an exceptional track record on work performance with both the public and private sector. The fundamental reason for our successful performance is that we are )
committed to understanding the client's needs. Quality Control is a continuous process used at ) milestones and on a daily basis as work proceeds from desk-to-desk, discipline-to-discipline and ) consultant to client.
)
) KNOWLEDGE OF LOCAL ENVIRONMENT
) Dynamic Consulting Engineers, Inc. is a local firm. The principal engineers and surveyors have been working in Imperial County for over 23 years and are very knowledgeable of the City of ) Calexico, local municipalities, Imperial Irrigation District, Caltrans and Imperial County permitting, ordinances, regulations and requirements. Our engineers and inspectors have )
extensive experience working with local public agencies. )
Our office is conveniently located in Imperial County and our staff is available to meet with City staff on this project within minutes. Dynamic Consulting Engineers, Inc. will work closely with the city's project management team and engineers to assure the City the project is completed ) per plans and specifications, precisely and in a timely manner. ) DCE's engineers and inspectors continue to work closely with local municipalities including the City of Calexico. Our staff has extensive experience coordinating projects with Imperial County Public Works Department, Imperial County Planning Department, Air Pollution Control District, Caltrans, Army Corps of Engineers, CA Fish and Game and local utility companies. 10 Dynamic EASTERS
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
PROJECT PERSONNEL ORGANIZATIONAL CHART AND TEAM QUALIFICATIONS DCE proposes that Carlos Beltran, P.E., QSP, QSD be the Project Manager and main contact for this project. Mr. Beltran has been working in Imperial County for over 23 years. Mr. Beltran has extensive experience working with local public agencies including the City of Calexico, IID and County of Imperial Public Works. Carlos' experience in the Imperial Valley includes coordination of projects with IID, Caltrans, County Public Works, County Planning Department, Air Pollution Control District, US Army Corps of Engineers, local cities and utility companies.
Mr. Beltran is very knowledgeable of the local standards and specifications.
City of Calexico
Public Works Department
TARIA
CALEXICO Liliana Falomir
CALITORBIE
Carlos Beltran, P.E., QSP, QSD
Project Manager
Lead Inspector
Project inspectors David Beltran, PLS
) Inspections and Sierra MTI
Roberto Romo Surveying / As-Builts Material Testing
)
Sam Silva Ubaldo Ortiz
Labor Compliance
) Grade Check/As-
Crystal Ransdel
builts
Francisco Mayoral
Our team is committed to providing the City of Calexico exceptional service. Our dedicated ) project managers and inspectors are available to work anytime, including weekends and around ) the clock if needed to complete this project on time. ) 11
) Jynamic CONSULTIN
ENGINEEI
)
)
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
Carlos is a cofounder of Dynamic Consulting Engineers
CARLOS BELTRAN, P.E. and has been providing construction management, ) Project Manager / Inspections inspections and engineering services in both the ) private and public sectors of the civil engineering
industry. His professional and academic experience
provides a broad-base, multi-disciplinary background
EDUCATION: in the field of civil and structural engineering. Carlos ) University of California, Los is one of the principals at Dynamic Consulting Angeles (UCLA) Engineers and is responsible for project management )
B.S. Civil Engineering, June 2000 and design of water conveyance systems, hydraulic )
structures, grading and drainage systems.
Mr. Beltran has substantial experience working in
REGISTRATIONS: municipal projects throughout Imperial County. Carlos Professional Civil Engineer is very knowledgeable of the local agencies, IID and CA License No. 69121 Caltrans standards and specifications as well as the County of Imperial Standards and Specifications.
PROJECT EXPERIENCE
• lID All American Canal New River Siphon
ASSOCIATIONS:
Repair Project - Carlos is currently providing
American Society of Civil
construction management and inspections.
Engineers
UCLA Engineering Alumni Construction Cost: $5,500,000.00 Association • Imperial Irrigation District (IID) - IID-Caltrans Brawley Bypass Stage III Utility Relocation
Project Construction Management/Inspection
Services.
улувуоти • Imperial Irrigation District (IID) - Date Drain )
Pipeline at Wake Avenue Auto Park Project
) CIVIL ENGINEER
EXPIRATION. Construction Management/Inspection Services.
LICENSE NO.
C 69121 6/30/2014 • Imperial Irrigation District (IID) - Dogwood CARLOS L BELTRAN Canal Pipeline (Heber School District) Construction Management/Inspection Services.
Expires 06/30/2024
• City of Calexico - Town Center Project. Street
Improvements, Drainage Design, Signal Lights
and Water and Sewer Improvements
• Pima Maricopa Irrigation Project - Designed
four bridges spanning 80 ft. to 120 ft per
AASHTO LRFD Manual.
12 Dynamic CONSENS ENGINEERS
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. )
CORDOVA MEMORIAL PARK - PHASE 1
Mr. Beltran is a cofounder of Dynamic Consulting
DAVID BELTRAN, P.L.S. Engineers and a registered professional land surveyor Survey Manager / Inspections with more than eight years of experience in the industry.
David has broad experience in coordinating survey
services for large-scale projects for private
developments and local agencies. He is also experienced ) in the preparation of topographic surveys, Subdivision EDUCATION:
) Maps, Record of Surveys, Right of Way Mapping and
California State Polytechnic
) construction staking.
University, Pomona
B.S. Civil Engineering, June 2002 Mr. Beltran has substantial experience working in ) topographic survey projects in Imperial County. David ) also has substantial experience preparing record maps REGISTRATIONS: locally and is very knowledgeable of the County of )
Imperial guidelines and requirements.
Professional Land Surveyor
CA License No. 8482
PROJECT EXPERIENCE
• Imperial Irrigation District (IID) - 2400 GPS
points Survey. Designed and Implemented a
Geodetic Control Network
• Imperial Irrigation District (IID) - Field Survey
and Prepared As-builts for Brawley Bypass Stage
ASSOCIATIONS: Ill Project, Dogwood Canal Pipeline and Date California Land Surveyors Drain Project.
Association
) • City of Calexico - Topographic Survey and Right
) of Way Mapping for the Town Center/ Portico
) Industrial Development Street Improvement
) Project.
• County of Imperial, Sun Beam Lakes
) LAND SURVEYOR
LICENSE NO. EXPIRATION Recreational Parks - Topographic Survey and L B482 12/31/2014
DAVID BELTRAN preparation of grading plan.
• City of Holtville - Lot Line Adjustment No. 237
Expires 12/31/2024 and No. 243
• City of Brawley - Topographic Surveys and
survey maps for Public Works Department
• Ormat Nevada - Topographic Survey and Grading
Plan for North Brawley Geothermal Plant
13 Dynamic FISHENG
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 3.
ROBERTO ROMO
) Project Inspector
)
EDUCATION:
) California State Polytechnic University, Pomona
B.S. Civil Engineering, June 2003
)
Mr. Romo is a civil designer and a senior inspector. Mr. Romo has extensive experience in providing inspection services for irrigation canals and drains as well as street, water, sewer and )
storm drain projects. Mr. Romo also has extensive experience in design of major construction )
) projects such as underground utilities and street improvement projects.
Relative Project Experience:
)
IID All American Canal New River Siphon Earthquake Repair Project. Mr. Romo provided inspection services. The project included the rebuilding of the north and south embankments of the All American Canal, Concrete Spillway Stabilization including grout injection and installation of drilled piers to stabilize the spillway. Project also included the relocation of existing drains and overhead power lines.
Imperial Irrigation District -Date Drain Pipeline Project Construction Management and Inspections, El Centro, CA. Mr. Romo provided construction management and inspections for the construction of 1900 LF of 60 inch RC Pipe. Mr. Romo was the full time inspection during construction of pipeline, manholes and headwall structure. Mr. Romo worked closely with the contractor, City of El Centro and IID staff coordinating any issues related with the project.
Imperial Irrigation District -Dogwood Canal Pipeline Project Construction Management and Inspections, Heber, CA. Mr. Romo provided construction management and inspections for the construction of 2100 LF of 72 inch RC Pipe. Mr. Romo was the full time inspection during ) construction of pipeline, manholes and headwall structure. During inspections Mr. Rome provided vertical and horizontal verification and documentation for the preparation of as-builts.
County of Imperial Public Works, Earthquake Damage Repairs - Brockman Road at New River; Mr. Romo provided full time inspection for this road reconstruction and bridge repair project for the County of Imperial. The project consisted of performing roadway excavation and earthwork, grouting below abutments, Rip-Rap slope protection, providing and placing Class 2 Aggregate Base over multiple layers of subgrade reinforcement fabrics and geogrids, asphalt concrete, paint striping and signs, bridge deck spall repairs and 20 bridge approach guardrail repairs, and all provisions and work in conformance with the project plans, the Standard Plans and Specifications.
14 ) Dynamic CONSEE
ENGINEERS
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
EXPERIENCE AND TECHNICAL SUPPORT
)
Dynamic Consulting Engineers, Inc. Project Managers and Inspectors have extensive and recent )
experience working on projects similar to this one.
)
) Our staff has recent experience inspecting street improvement projects including:
)
• City of El Centro Imperial Avenue Extension Street Improvements from I-8 to )
Dannenberg Drive. Current Project (Estimated Completion Date April 2024) )
) • County of Imperial Zenos Road Improvements. DCE provided CM and Inspection for , Zenos Road Improvements for County near Holtville CA, Project Completed December ) 2023.
) DCE understands that Safety is the most important factor in any project. DCE enforces ) contractor and personnel working at the project site to work in a safe work environment. Our ) inspectors require contractor to regularly conduct safety tailgate meetings.
Dynamic Consulting Engineers, Inc. staff has extensive experience working on Capital Improvement Projects for local public agencies throughout Imperial Valley. Our professional engineers and project management team is very knowledgeable of the local standards and - specifications.
15 )
) Dynamic CONSULTI
ENGINEE
)
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK -- PHASE 1
$6.5 MILLION, CONSTRUCTION MANAGEMENT FOR THE IMPERIAL IRRIGATION DISTRICT/CALTRANS -
BRAWLEY BYPASS PHASE III UTILITY RELOCATION PROJECT, BRAWLEY, CA (CALTRANS FUNDED ) PROJECT).
DCE assisted the Imperial Irrigation District with construction management and inspections for this project. As part of the utility relocation agreement between IID and Caltrans, lID relocated and re- aligned several canals and drainage systems to accommodate the recently constructed Brawley Bypass Highway 111.
) The project included installation of several precast and cast in place headwall and check structures. The Project also included construction of approximately 1,100 LF of RGRCP pipe ranging in size between 24 )
inches and 48 inches in diameter. The project included installation of 72 inch diameter triple barrel concrete pipe for the West Side Main Canal. The project also included construction of 2,500 LF of 63 inch diameter HDPE pipe and 2,000 LF of 48" diameter HDPE pipe.
DCE also provided inspections during fusing of HDPE pipe. DCE also provided inspections for the construction of 1,600 ft of 2-ft bottom concrete lined canal, 230 ft of 4-ft bottom and 400 ft of 12-ft bottom concrete lined canal for the West Side Main Canal. The West Side Main Canal was a major challenge to construct since this canal has never been shut down. This canal was shut down for one week to allow construction of the new triple barrel pipe and 12-ft bottom concrete lined canal. This portion of the project was completed working around the clock for one week.
DCE provide inspections and survey verification 24 hours a day during construction of this portion of the project.
DCE also inspected production of the RGRCP pipe including the 72 in diameter concrete pipe and also inspected production of the precast concrete headwall structures. DCE also provided periodic inspections of the production of the 63 inch diameter HDPE pipe at the plant in Kingman AZ.
DCE also assisted the district with the preparation of applications and obtained encroachment permits with Imperial County. DCE also prepared traffic control plans, daily observation reports and ) schedules. DCE verified vertical and horizontal alignments through ) surveying with GPS and an Engineer's level. DCE prepared ) electronic As-built records. DCE also assured the district the project was constructed in accordance with the district's requirements and Caltrans standards and specifications. ) DCE kept close communication with all parties involved in this project including IID Water Department, Caltrans, County of Imperial, local farmers, contractors and material suppliers. )
Project took 14 months to complete. Carlos Beltran, P.E. was the Project Manager. Project Inspectors:
)
Mark Bautista, Roberto Romo and David Beltran
) Contact Person: Francisco Pena, IID Construction Division, (760) 427-7675, 333 Barioni Blvd. Imperial CA ) 92251
)
) 16
Dynamic CONSUTIN
ENGINEER
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
$5.5 MILLION, CONSTRUCTION MANAGEMENT FOR THE IMPERIAL IRRIGATION DISTRICT - BUREAU OF
RECLAMATION - ALL AMERICAN CANAL NEW RIVER SIPHON EARTHQUAKE REPAIR PROJECT (FEMA )
FUNDED), CALEXICO, CA: DCE provided construction management and inspections for the All American Canal New River Siphon Repair Project. Several IID canals and drains experienced major damages during the 2010 Easter Sunday 7.2 Magnitude
Earthquake. The All American Canal New River Siphon experienced substantial embankment erosion, extensive damage to the existing concrete inlet and waste-way box culverts, extensive concrete spillway chute cracking, concrete spillway instability and sliding, ) and concrete joints separation.
) There were many challenges encountered during planning and construction of this project. One of the biggest hurdles was to complete this project in a short construction time period or the IID and Bureau of )
Reclamation (BOR) could have potentially lost the FEMA Funding. DCE construction manager and )
inspectors worked very closely with IID, BOR, contractors, Imperial County, Calexico Airport, Border ) Patrol and adjacent property owners to assure this project was completed within the allowed construction time. DCE kept close communication and coordination with all parties involved in this ) project. DCE assisted IID in coordinating work schedules with the contractors and subcontractors, and materials deliveries. Another hurdle encountered in this project was the potential hazards of working )
near and around the New River. DCE coordinated with Imperial County Health Department vaccinations for construction crew and parties regularly visiting the project site. )
Construction of this project included the rebuilding of the north and south embankments of the All American Canal, Concrete Spillway Stabilization including grout injection and installation of drilled piers to stabilize the spillway.
Project also included the relocation of existing drains and overhead power lines. DCE prepared detailed daily reports for IID and Bureau of Reclamation, coordinated weekly progress meetings, updated construction schedules and verified contractors payment requests. )
) Dynamic Consulting Engineers, Inc Carlos Beltran, P.E. was the Construction Manager on this project. Project took 10 Months to Complete. Roberto Romo was the Project Inspector. This Project was managed by Imperial Irrigation District, designed by Bureau of Reclamation and Funded by The Federal Emergency Management Agency (FEMA).
PROJECT HIGHLIGHTS
The All American Canal New River Siphon project was given a short deadline by FEMA to complete construction or lID and BOR could potentially lose the funds. DCE worked very closely with all parties involved and the project was completed within the specified time and under budget.
Contact Person: Francisco Pena, IID Construction Division, (760) 427-7675, 333 Barioni Blvd, Imperial C 17 Dynamic ENSUEENS ENGINEERS
)
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
$1.2 MILLION, ENGINEERING AND CONSTRUCTION MANAGEMENT FOR THE SEELEY COUNTY WATER
DISTRICT MT SIGNAL WASTEWATER PUMP STATION AND DEEP GRAVITY SEWER COLLECTION SYSTEM PROJECT (USDA FUNDED). The intention of the project was to replace two aged and malfunctioning sewer pump stations that were beyond their useful life with one modern submersible pump station with a backup generator. DCE assisted the District in obtaining funding from the USDA. DCE Prepared preliminary
engineering report, prepared the topographic survey,
designed 2,500 linear feet of sanitary sewer collection system, manholes, a sewer pump station and 600 linear feet of force main pipeline. The 15-inch gravity sewer pipelines ranged from 11 feet to 18 feet deep. The pump station was ) 22 feet deep and required dewatering. DCE provided
construction management and administration for the
)
project. DCE coordinated construction with all of the
stakeholders, including the residents, contractor, County of Imperial Public Works Department, Time Warner Cable, the Gas Company, Imperial Irrigation District, USDA and Seeley County Water District. Full time inspection was provided for quality assurance and to ensure the project was constructed per the approved plans and specifications, and that environmental mitigation efforts were maintained. Traffic control and other safety measures were verified. The monthly pay requests were processed and the funding was monitored through the SF 271 Outlay Report form. DCE kept daily reports, photos and records and prepared the record drawings. All close-out paperwork was submitted and the project was a success.. The project took 9 months to complete from the notice to proceed.
Contact Person: Don Turner, Director, Address: 1898 West Main Street, Seeley, CA 92273, Telephone:
(760) 352-6612
IMPERIAL IRRIGATION DISTRICT - DOGWOOD CANAL PIPELINE PROJECT FOR THE HEBER.
SCHOOL DISTRICT, HEBER, CA. DCE provided construction management and inspections for the construction of 1000 LF of 72 inch RC Pipe. DCE
provided full time inspection during construction of
pipeline, manholes and headwall structure. DCE also
provided AS-BUILT data information to IID Water
Engineering Department. AS-BUILTS were prepared
using GPS for horizontal alignment and Survey Level for vertical alignment.
Construction Cost $900,000.00. Carlos Beltran, P.E.
Lead Inspector, David Beltran, P.L.S. provided GPS survey for As-Builts. 18 Dynamic EASIERS ENGINEERS
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. ) CORDOVA MEMORIAL PARK - PHASE 1
IMPERIAL IRRIGATION DISTRICT - DATE DRAIN PIPELINE FOR WAKE AVENUE AUTO PARK )
SUBDIVISION PROJECT, EL CENTRO, CA DCE provided inspections for the installation of ) approximately 1,900 LF of 48" diameter RGRCP Pipe. DCE inspected the manufacturing of the )
concrete pipe, delivery and installation. DCE inspected each joint to assure no defects were )
encountered. DCE also inspected the installation of Inlet and Outlet Structures and Manhole ) Structure. DCE provided elevations certification during installation of concrete pipe and precast structures. DCE provided IID as-built drawings in Autocad format and ascii files. )
) IMPERIAL IRRIGATION DISTRICT - COACHELLA VALLEY SUBSTATION BANK 4 NEW ) TRANSFORMER FOUNDATION DESIGN, COACHELLA, CA. Carlos Beltran, P.E. as a lead ) structural engineer, performed the structural analysis and design for the new 524,000 Ibs Areva Three Phase
Autotransformer. Mr. Beltran performed structural
analysis for the three ft diameter and sixteen ft deep
drilled piers and for the fifty-four inch thick concrete slab for the new transformer. Mr. Beltran also performed
the structural analysis for the anchor bolts.
IMPERIAL IRRIGATION DISTRICT-INSPECTIONS OF THE NILAND GAS TURBINE PLANT CONCRETE FOUNDATIONS. NILAND, CA. Carlos Beltran provided inspections of the IID Niland Gas Turbine Plant concrete foundations. Foundation inspections were performed for the Gas Turbines, Auxiliary Transformers, Cooling Tower, Water Tanks, Ammonia Storage Tanks, GSU )
Transformers, Gas Compressor Skid and Electrical H-Frame Structures. Observations and Inspections included the pad preparation, compaction testing, formwork and installation of )
rebar, pouring of concrete, concrete testing and concrete curing. )
) Carlos Beltran, P.E. Concrete foundation Inspections
)
CITY OF EL CENTRO PUMP STATION NO. 2 AT WAKE AVENUE, EL CENTRO, CA. DCE designed the recently constructed Pump Station No. 2 at Wake Ave. and LaBrucherie Road in El Centro ) CA. The design included the 22 ft deep 10 ft diameter wet well, 1,000 ft of sewer force main, ) pumps and electrical components. DCE also assisted the City with right of way acquisition for ) the pump station location.
)
)
)
) Dynamic ENSEN
ENGINEERS
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C.
CORDOVA MEMORIAL PARK - PHASE 1
IMPERIAL IRRIGATION DISTRICT/CA FISH AND WILDLIFE - RED HILL BAY SHALLOW WATER
HABITAT (SALTON SEA, CA)
)
Dynamic Consulting Engineers (DCE) provided engineering design services to cover )
approximately 530 acres of exposed playa area at Red Hill Bay with shallow water ponds. The main purpose of this project is wildlife conservation, including shore bird habitats, and dust control mitigation.
)
DCE provided field topographic survey of Red Hill Bay area and topographic survey of the )
bottom of the Salton Sea and Alamo River within the project boundary. )
This project included the design of berms to create two shallow water ponds to cover existing )
exposed playa area. The project also included the design of a saline water pump station at the Salton Sea and a freshwater pump station at the Alamo River. The project also included )
the design of a mixing station to mix fresh water and saline water to balance the salinity level of )
the water for the habitats. The project also included design of approximately 14,000 LF of )
HDPE pipe at the bottom of the sea floor and underground at exposed playa areas.
Design of the project was completed in July 2016. Construction cost estimated at )
$3,500,000.00.
PROJECT HIGHLIGHTS
This project needed to be completed within a
short period of time. DCE was given three
months to complete this project. DCE
completed all survey work and final design
within those three months.
)
) This project included extensive coordination
with IID Water and Energy, CA Fish and
)
Wildlife, County of Imperial and CAL Energy.
)
)
)
)
)
)
)
)
) 20
) Dynamic ENSUENS
)
PROPOSAL FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C )
CORDOVA MEMORIAL PARK - PHASE 1
APPENDIX 1
DIR (Department of Industrial Relations)
21 Dynamic CHEERS
)
Department of
Industrial Relations
STATE OF CALIFORNIA
APPLICATION FOR
PUBLIC WORKS CONTRACTOR REGISTRATION
Registration Information
Type: Public Works
Period: 07/01/2023 06/30/2024
)
Contractor Information
Contractor Name: DYNAMIC CONSULTING ENGINEERS, INC
Trade Name: DYNAMIC CONSULTING ENGINEERS, INC
License Type Number: 1000D07077
Contractor Physical Address
) Physical Business City/ IMPERIAL
Physical Business Country: United States of America
) Province:
) Physical Business Address: 2415 IMPERIAL BUSINESS PARK Physical Business State: CA DR., SUITE B
) Physical Business Postal 92251
Code:
Contractor Mailing Address
Mailing Country: United States of America Mailing City/Province: IMPERIAL Mailing Address: 2415 IMPERIAL BUSINESS PARK Malling State: CA DR., SUITE B
) Mailing Postal Code: 92251
Contact Info
Daytime Phone: Daytime Phone Ext.:
Mobile Phone: Business Emall: [email protected]
Applicant's Email: [email protected]
Registration Services:: Page 1 of 2 6/20/2023 10:20:10 AM Workers' Compensation
Professional Employer Organization (PEO)
Do you lease employees through Professional Employer Organization? No Workers' Compensation Overview
Carrier: Ohio Security Insurance Co. Inception Date: 05/14/2023 Pollcyholder Name: Dynamic Consulting Engineers Expiration Date: May 14, 2024 ) Inc
) Policy Number: XWS58868985
)
) Certification
)
)
Yes I certify that the contractor is not currently debarred under Section 1777.1 or under any other federal or state ) law providing for the debarment of contractors from public works.
Yes I certify that one of the following is true: (1) I am licensed by the Contractors State License Board (CSLB) in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code; or (2) my business or trade is not subject to licensing by the CSLB.
I understand refunds are not authorized
1, David Beltran, the undersigned, am, DYNAMIC CONSULTING ENGINEERS, INC with the authority to act for and on behalf of the above named contractor. I certify under penalty of perjury that all of the above information provided is true and correct. I further acknowledge that any untruthful Information provided in this application could result in the certification being canceled.
I certify this on: 10:17 AM
) Legal Entity Information
Legal Entity Type: Corporation
Name: DYNAMIC CONSULTING ENGINEERS, INC
Registration Services:: Page 2 of 2
)
)
EXHIBIT B
SCHEDULE OF CHARGES
(proposal dated March 14, 2024)
10 EXHIBIT C
CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE I hereby certify that in the performance of the work for which this Agreement is entered into, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of the State of California.
Executed on this day of , 2024, at
California.
Consultant
11 ATTACHMENT NO. 2
City of Holtville
Request for Proposal for
CONSTRUCTION MANAGEMENT,
GEOTECHNICAL AND
INSPECTION SERVICES for
Adrian C. Cordova Memorial
Park - Phase l
March 14, 2024
BAR
CALEXICO
We Calenn didhreillher
NICKLAUS Community
Fishing Water
ENGINEERING, INC.
& teaming partners
Labor
Compllance
Consultants
Of
SIERRA Southem
Californla
*
www.neiaw.com
461 Main Street, El Centro, CA 92243
NICKLAUS Civil • Architecture • Environmental Engineering & Consulting Industrial Hygiene • Geotech
8(a) | DBE | WO8B | SBE
ENGINEERING. INC.
March 14, 2024
City of Calexico
549 Pierce Avenue
Calexico, CA 92231
Reference: CITY OF CALEXICO REP FOR CONSTRUCTION MANAGEMENT, GEOTECHNICAL AND INSPECTION SERVICES FOR ADRIAN C. CORDOVA MEMORIAL PARK - PHASE 1 Dear Selection Committee:
Please accept the following as our fee proposal to provide the City of Calexico with full-time Construction Management and Inspection Services for the Adrian C. Cordova Memorial Park -Phase 1 Project. We appreciate the opportunity to submit our proposal and are excited about working with the City of Calexico.
Nicklaus is a 100% woman-owned small business (WOSB) with over four decades of working locally in civil engineering and construction management. Nicklaus has faithfully serviced the Imperial County area and the municipalities within for decades, providing quality, local, and professional construction management for many Architectural and Engineering projects. Our technical competence and responsiveness have been measured at every level by nearly all the current local municipal personnel on some of the most challenging projects. We want to ensure the City of Calexico that we will bring the same enthusiasm and technical expertise to this contract as we've done for all the others. On the following pages, we have provided our approach to executing the requested services and our work history on Construction Management projects. We understand the scope of services and importance of this project, and we believe our team members have the requisite experience to assist the City of Calexico with successfully completing this project.
Sierra Material Testing & Inspection will be our materials testing consultant at a local El Centro, CA firm. We also have Labor Compliance Consultants of Southern California as our labor compliance consultants. We have worked with both firms on numerous construction management projects all over Imperial County. Nicklaus is registered with the California Department of Industrial Relations (DIR #1000034189), and we are a certified DBE firm through Caltrans (CUCP certification No. 42404).
The key individuals authorized to respond to this RFP are:
Stacy Citierrez, PE, CIH, President/CEO Antonio Alvarez PE, Vice President Registered Engineer (Environmental): AZ#36702 Registered Engineer (Civil): CA # C79509 (928) 344-8374; ext. 435 (928) 246-1616
1851 W. 24th Street, Suite 101, Yuma, AZ 85364 1461 Main Street, El Centro, CA 92243 [email protected] [email protected]
Our offer is valid for 90 days. Please do not hesitate to contact me with questions regarding our written proposal, firm, or team members.
Sincerely,
NICKLAUS ENGINEERING, INC.
Antonio Alvarez, PE
Vice President
1461 Main Street, El Centro, CA 92243
www.nelaw.com
Table of Contents
Cover Letter 3
Summary of Qualifications and Experience 4
Qualifications and Resumes 6
Specific Experience 11
Analysis of Effort/Methodology 21
DIR Proof of Registration 25
Cost & Fees (included in a separate sealed envelope)
NICKLAUS Calexico CM Services Adrian C. Cordova Memorial Park • 2 ENGINEERING. INC
Summary of Qualifications and Experience
Nicklaus has 102 employees, including registered civil
NICKLAUS is a multi-discipline corporation and environmental engineers, civil designers, construction managers and inspectors, architects, environmental
founded in 1977 as a civil engineering and survey professionals, geotechnical laboratory technicians, and firm that assists its clients in responsible and other technical and administrative support staff. professional infrastructure development through
a practical solutions approach. Subconsultanis
Our subconsultants are listed below with a brief
Over four decades later, Nicklaus has rooted itself as a description of their services provided:
reliable Disadvantaged Business Enterprise (DBE) and
Woman Owned Small Business (WOSB), providing full- SIERRA MATERIAL TESTING & service engineering and architectural services to both the INSPECTION, INC. (Sierra) is a privately private and public sectors in Imperial County, Yuma County owned California corporation. Sierra is a and across the United States. SIERRA highly qualified, local geotechnical engineering firm that provides
Nicklaus provided more than $27M in consulting services geotechnical engineering and materials for local, state, and federal clients in 2023. We are currently testing and inspection services in the providing or recently provided Construction Management Imperial Valley. Sierra is staffed by local engineers and/or Construction Inspection Services for the City of El technicians who have provided the requested services for Centro, Imperial County, the United States Army Corps of over 15 years to clients, private consultants, and developers Engineers, the US Air Force, Yuma International Airport, and working in the Imperial Valley.
US Customs and Border Protection on construction
projects valued from local-level projects less than $1M to LABOR COMPLIANCE CONSULTANTS Labor OF SOUTHERN CALIFORNIA (LCCSC) is
national-level projects over $100M. Compliance
a consulting firm offering Labor
Consultants
Standards Compliance Consulting and
Our local presence has allowed us to build upon our Of
knowledge of the unique issues and conditions in the City Souther Contractor Monitoring services to private of Calexico (City) and assemble a team that brings Califomla and public-sector clients in Southern * California and Western Arizona. LCCSC
exceptional expertise in resident engineering/construction management, labor compliance, and inspection services. In has a staff of trained and experienced fact, our proposed Construction Manager and Alternate labor compliance monitors and interviewers who will help Construction Manager live in Calexico, within walking us ensure that this project complies with all federal, state, distance of the proposed project. and local labor compliance regulations.
Firm Location Qualifications and work experience for the Our local office is at 1461 Main Street in El Centro, CA. following key staff members begin on page 6 In addition, our corporate office will support our local office of this proposal:
from 1851 W. 24th Street in Yuma, AZ.
Phillip Ramirez, PE Resident Engineer
Omner Alt. Resident Engineer
Antonio Alvarez, PE
As the owner of Nicklaus, Mis. Stacy Gutierrez has a
vested interest in the success of this project. Ms. Gutierrez Karla Be Construction Inspector
is a registered professional engineer (Environmental) and Certified Industrial Hygienist with over 20 years of design Alt. Construction Inspector Crespin Jay Muñoz, CQM
and construction experience.
Materials Testing
Alex Rojas (Sierra MT&) Consultant
Location Of Anticipated Work
The majority of the work will be completed at the project Labor Compliance site. We will support the project from our local and Crystal Ransdel (LCCSC) Consultant
corporate offices.
Calexico CM Services Adrian C. Cordova Memorial Park • 4
NICKLAUS
INGENIERING, INE.
Summary of Qualifications and Experience
ORGANIZATIONAL CHART SOMERTON COUNCIL AVENUE PARK
1. Design Engineering Be Construction Support
The full-time Resident Engineer for this project will Somerton, AZ be Phillip Ramirez, PE, with ten years of experience. He
NILAND PUBLIC SAFETY FACILITY RESIDENT
will be the single point of contact and coordinate all 2. Resident Engineering & Construction work efforts. Below is our organizational chart, describing Inspection Niland, CA how work will flow on each project. SOMERTON SKATE PARK
3. Design Engineering
CLIENT REFERENCES Somerton, AZ
Below, we have listed three client references who are CLEAN CLOSURE OF CRUICKSHANK ROAD
ILLEGAL DISPOSAL SITE
most familiar with our project performance. We have 4. Resident Engineering & Construction also completed projects with a similar scope of work as Inspection El Centro, CA & Imperial County, CA the City of Calexico's. WINTERHAVEN PUBLIC SAFETY FACILITY John Gay, PE 5. Resident Engineering & Construction Inspection Director of Public Works Winterhaven, CA
HAWK STREET IMPROVEMENTS PROJECT
Imperial County Department of Public Works Resident Engineering & Construction
6. PH: (442) 265-1818 Inspection Heber, CA
Abraham Campos, PE HEBER TOWNSITE ROAD IMP'S. PROJECT
7. Resident Engineering & Construction
City Engineer/Public Works Director Inspection Heber, CA City of El Centro Department of Public Works Orchard Road Improvements Project PH: (760) 337-5182 8. Resident Engineering & Construction Inspection Holtville, CA
Jade Padilla, Program Manager PITZER ROAD IMPROVEMENTS
Imperial County Workforce and Economic Development 9. Resident Engineering & Construction PH: (442) 265-1104 Inspection Heber, CA
BOMBAY BEACH TOWNSITE ROADWAY IMPTS
Specific experience and qualifications for 10. Resident Engineering & Construction specific experience and qualifications begin Inspection Imperial County, CA on page 11 of this proposal:
NICKLAUS
CALEXICO ENGINEERING, INC.
CITY OF
CALEXICO
RESIDENT ENGINEER CONSTRUCTION INSPECTOR
Phillip Ranzirez, PE KaNs Be
MATERIALS TESTING
RESIDENT ENGINEER CONSTRUCTION INSPECTOR SUBCONSULTANT
ALTERNATE ALTERNATE Alex Rojas
SERRI
Antonio Alvarez, PE Crespin Jay Munior COM
LABOR COMPLIANCE
SUDCONSULTANT
Crystal Ransdell
Calexico CM Services Adrian C. Cordova Memorial Park • 5
NICKLAUS
ENGINTERING. INC.
2. Summary of Qualifications - Resumes
Phillip A Ramirez, PE
EDUCATION Resident Engineer
B.S. Structural Engineering Mr. Ramirez has worked for various public agencies, spanning more than 10 yéars of University of California combined experience with the requirements for both private and public-funded construction San Diego projects. Mir. Ramirez's primary function as a resident engineer is to oversee the day-to-day operations of the civil, geotechnical, and inspection staff. His responsibilities include PROFESSIONAL coordination between the contractor and the respective design disciplines and stakeholders REGISTRATIONS from the Notice to Proceed into construction and through to the Notice of Completion. Mr.
Civil Engineering Ramirez's experience working on resident engineer projects includes RFI review, submittal CA #C91488 review, change order review, quantity takeoff verification, progress payment review, labor compliance coordination, evaluation and documentation of as-builts, observation, weekly RELEVANT TRAINING progress meetings; contract administration services as required to sufficiently warrant the CALTRANS Resident construction has been accomplished in accordance with the plans, specifications, and codes; Engineer Academy project records administration; and discipline(s) coordination.
PROFESSIONAL RELEVANT EXPERIENCE:
AFFILIATIONS NILAND MAIN STREET IMPROVEMENTS | NILAND, CA ASCE American Society of The project consisted of rehabilitating the north side of Main St. between Highway 111 and Civil Engineers Memphis Ave. The project includes demolishing the existing pavement section and installing a new pavement section, curb and gutter, driveways, and pedestrian facilities along Main St. between Highway 111 and Memphis Ave. Mr. Rameriz is the assistant Resident Engineer, which includes site inspections and documentation during the construction phase to verity compliance with the contract documents. He also reviews and processes pay applications and change orders, leads meetings, and coordinates submittals and RFl reviews.
WESTERN AVENUE IMPROVEMENTS | BRAWLEY, CA
This project included installing a roadway paving section, streetlights, water main line, storm drain main line, manholes, catch basins, pipelining of raw water channel, and pedestrian facilities (sidewalks and ramps). Served as the Resident Engineer as part of the engineering division staff, which included site inspections and revision of pertinent documents during the construction phase to verify compliance with funding sources, plans, specifications, and bid schedule. Duties also included reviewing and processing pay applications and change orders, leading the weekly meetings, and coordinating submittals and RFi reviews.
WILLEY RESERVOIR AND NEW RIVER EROSION CONTROL | WESTMORLAND, CA This project included the redesign of the shared embankment between Willey Reservoir and New River. Imperial Irrigation District engineering department proposed a sloped cut of the south side of New River with the installation of rip rap material along the slope, Served as the construction inspector as part of Imperial Irrigation District staff, which involved documenting material tickets, daily reports, coordination with contractors, keeping track of the project budget, and close-out documents.
Calexico CM Services Adrian C. Cordova Memorial Park • 6
NICKLAUS
ENGINTERING, INC.
2. Summary of Qualifications and Experience - Resumes
EDUCATION Antonio Alvarez, PE
B.S., Civil Engineering Resident Engineer Alternate
San Diego State University
Mr. Alvarez is a former member of the United States Navy and has 19 years of civil and PROFESSIONAL geotechnical engineering experience. His experience spans horizontal A/E design services, REGISTRATIONS including pre-design assessments, feasibility and concept studies, investigations, soils Civil Engineering engineering and seismic analysis, surveying and mapping, site design, value engineering, CA #C79509 cost estimating, construction management and inspections, record drawings, and post- AZ #51919 design review. His responsibilities include coordination between the contractor and the respective design disciplines and stakeholders from the Notice to Proceed into construction RELEVANT TRAINING and through to the Notice of Completion. Mr. Alvarez's experience working on Construction CALTRANS Resident Management projects includes RFl management, submittal management, change order Engineer Academy management, quantity takeoff verification, progress payment review, labor compliance coordination, evaluation and documentation of as-builts, observation, weekly progress US Army Corps of meetings, contract administration services as required to sufficiently warrant the Engineers-Construction construction has been accomplished in accordance with the plans, specifications, and codes; Quality Management for project records administration; and discipline(s) coordination.
Contractors (CQM)
RELEVANT EXPERIENCE:
Radiation Safety Officer BUENA VISTA PARK | EL CENTRO, CA Training The project included the improvements of an existing retention basin located within the Buena Vista Subdivision. The park design included the development of a new 8' multi-use Nuclear Gauge Radiation pathway, pedestrian-level lighting, a new basketball court, a new tot-lot, and a low mow turf Safety Training area. Mr. Alvarez was the designer of record, coordinating both pre-design (topographic ACI Field Technician Level 1 survey and geotechnical study) and design activities.
HEBER TOWNSITE ROADWAY IMPROVEMENTS | HEBER, CA
ACI Concrete Strength The project included reconstructing various roadways within Heber Townsite, including Testing Technician asphalt concrete, ARAM, slurry seal, and dig-out repairs. Served as the Resident Engineer under an existing On-Call Contract with Imperial County. Coordinated the preconstruction
PROFESSIONAL
AFFILIATIONS activities, oversaw the full-time construction inspections, and coordinated progress Society of American meetings with the GC. Provided all closeout documents, including As-Builts, daily and weekly Military Engineers (SAME reports, labor compliance closeout, approval of pay applications, submittals, RFls, and other pertinent project information.
American Society of
Civil Engineers (ASCE) CRUICKSHANK ROAD ILLEGAL DISPOSAL SITE CLOSURE (CRIDS) | EL CENTRO, CA The project included the remediation of impacted waste from CRIDS, including 182,000 tons American Society of of non-hazardous waste and 21,000 tons of hazardous waste. Served as the Resident Professional Engineers Engineer and helped navigate numerous challenges throughout the project. Aided Imperial (ASPE) County and the City of El Centro in limiting potential exposure issues within reason.
Reviewed all documents and submittals and maintained communication between all Arizona Airports Association stakeholders on this project. (AZAA)
Calexico CM Services Adrian C. Cordova Memorial Park • 7
NICKLAUS
ENGINCERiNG, INC.
2. Summary of Qualifications and Experience - Resumes
Karla Be
Construction Inspector
EDUCATION
Bachelors of Architecture Mrs. Be is a graduate of the Autonomous University of Baja California, Mexicali, Mexico, with seven years ofgeneral construction and design experience. Her experience includes enforcing Universidad Autonoma de BC
(UABC) building codes, quality control inspections, and construction inspections, preparing cost estimates, preparing change orders, building design, and site designs. Mrs. Be primary function as a construction inspector is to perform detailed inspections in general
RELEVANT TRAINING
construction, such as road improvements, highway improvements, buildings, and facilities EM 385-1-1 Certified
under construction or alteration. She records the time and material received and used in OSHA-40-hour HAZWOPER construction and assists in making and checking measurements, levels, and layouts. Ms. Be assists with daily reports, as-builts closeout binders, project records, and warranties to be in CPR, Basic First Aid place at project completion.
RELEVANT EXPERIENCE:
NILAND MAIN ST. IMPROVEMENT | NILAND, CA
The project involves rehabilitating and demolishing the existing asphalt pavement and installing a new pavement section, curb and gutter, driveways, and sidewalks along Main Street. Mrs. Be is providing site inspections and documenting work progress during construction to verify compliance with the contract documents. She also generates daily reports, leads weekly meetings, and coordinates submittals and RFl reviews.
HERITAGE TRACK HOME HOMES | IMPERIAL, CA
The project was a new residential area, including horizontal construction of new roads, sidewalks, curbs and gutters, ADA ramps, and wet and dry utilities. The utilities included a sewer force main, pump station, water, gas, electrical, poles, and spectrum service. Vertical construction consisted of building 58 track homes. Vertical construction also included the installation of stucco, insulation, fire sprinklers, electrical fixtures and panels, drywall, paint, cabinets, and flooring. Mrs. Be was the PM assistant and oversaw the design and permitting process. She was a construction inspector and quality control during the construction phase, coordinating with local entities such as IID, SoCal Gas, Spectrum, and the City of Imperial.
FRYE CHAPEL | IMPERIAL, CA
The project consisted of constructing a new metal building and site improvements. The project included the horizontal construction of a new parking lot with sidewalks, cross gutters, and ADA ramps and the installation of wet and dry utilities such as sewers, water lines, gas lines, electrical lines, and transformer spectrum service. Vertical construction comprised a 5,000 SF metal building with 3,000 SF tenant improvement. Tasks included managing and coordinating with clients and the contractor, coordinating with third-party agencies, creating estimates and change orders, identifying and resolving issues that arise, managing the project finance, and developing and leading the best subcontractors to complete the project.
Additionally, she provided all closeout documents, including As-Builts, daily and weekly reports, labor compliance closeout, approval of pay applications, submittals, RFls, and other pertinent project information.
Calexico CM Services Adrian C. Cordova Memorial Park • 8
NICKLAUS
ENGINEERING. INC.
2. Summary of Qualifications and Exoerience - Resumes
Crespin Jay Muñoz, CQM
RELEVANT TRAINING Construction Inspector Alternate
CERTIFICATIONS
40hr Em-385 1-1 Mr. Muñoz is a highly experienced construction and special inspector, geotechnical sed engine and pris proaten in buildin cred i, cades of en are eling meticis, U.S. Army Corps of Egineering and standards is unparalleled, making him an indispensable asset to any project. -Construction Quality Furthermore, Mr. Muñoz's extensive background in field and laboratory testing of Management for Contractors construction materials has earned him a reputation as an expert in the industry. His wealth (CQM) of knowledge and expertise make him an invaluable asset to any team seeking to ensure the highest quality and safety standards in construction projects.
Structural Masonry Special
Inspector (ICC) RELEVANT EXPERIENCE:
BEHAVIORAL HEALTH PARK LOT AND SITE IMPROVEMENTS | EL CENTRO, CA The project included rehabilitating the parking lot and adjacent alleyway pavement for Sprayed- Applied Fireproofing the Behavioral Health Facility. Additionally, improvements included two new concrete Special Inspector (ICC) aprons, cross gutters, a new driveway, an ADA-compliant ramp with handrails, a new curb, and a gutter. Mr. Muñoz was the full-time on-site inspector, coordinating all work Training Course for the Use of activities for the 24-hour facility. Much of the work was completed at night, requiring Nuclear Testing Equipment coordination between the daytime and nighttime shifts at the facility. (Troxler) NON-STRUCTURAL SEISMIC RETROFIT OF IMPERIAL COUNTY ADMINISTRATION CENTER (CAC) | EL CENTRO, CA
30hr Construction Safety and Nicklaus was selected to provide Construction Management Services to ensure the project Health (ISEl) was constructed in compliance with the plans and specifications and that all local, state, and federal provisions were adhered to due to the specific grant funding requirements. 40hr EM-385 1-1 Hazard The work included bracing of the existing suspended ceiling system with tie-downs and Recognition (OSHA) struts in compliance with current seismic design requirements. This included securing ceiling grids, HVAC grilles, light fixtures, and overhead utilities. Nicklaus was responsible for coordinating the pre-construction meeting, conducting weekly progress meetings, CPR, Basic First Aid providing full-time contractor monitoring during construction, and preparing daily logs (Red Cross) for the construction and inspection activities. In addition, Nicklaus ensured that the contractor met all requirements of the Division of Labor Standards Enforcement, -ompin me meting he project in ted rite the corado articio and ratio uties throughout the projec
GA APRON REHABILITATION AT YUMA INTERNATIONAL AIRPORT | YUMA, AZ The project included pavement rehabilitation recommendations relevant to the extent of deterioration, including crack sealing and surface treatment in areas exhibiting non-load- associated distresses and complete removal and replacement in areas with load- associated structural failures. The project included surface treatment for most of the General Aviation Apron, including re-striping. Mr. Muñoz served as the onsite Construction Inspector, providing full-time construction oversight. His duties included documenting labor, equipment and material activities in a daily report, verifying in place quantities, checking certificates of compliance, collecting and logging in the trucking tickets,
Calexico CM Services Adrian C. Cordova Memorial Park • 9
NICKLAUS
ENGINEERING. INC.
2. Summary of Qualifications and Experience - Resumes
Alex Rojas
SIERRA
EDUCATION Geotechnical Consultant
B.S., Civil Engineering
Universidad Autonoma de Baja Mr. Rojas has extensive experience as a general contractor and owner's representative.
California He has provided construction/project management, resident engineering, and field inspection services for land development water and wastewater projects, including pipelines, pump stations, treatment facilities, reservoirs, and roadway construction. Mr.
Rojas has constructed projects in the United States and Mexico.
RELEVANT EXPERIENCE:
HEBER TOWNSITE IMPROVEMENTS FOR VARIOUS ROADS | HEBER, CA Funding for the project was $4.8M for construction-related activities. Improvements include new sidewalks, curb and gutter, ADA pedestrian ramps, cross gutters, adjustment of water valves, striping, signage, and street pavement structure. This is the largest street improvement project for Imperial County.
BOMBAY BEACH TOWNSITE IMPROVEMENTS | BOMBAY BEACH, CA
The project was to improve the Bombay Beach Road System consisting of 5.88 miles of asphalt cement paved roadways. As a consultant, M. Rojas coordinated the geotechnical and materials testing performed as per specifications.
Compilance
Consultants
Crystal Ransdell
Seuthum
Callfemnla
EDUCATION Labor Compliance Subconsultant
Prevailing Wage, Certified
Payroll & Labor Compliance Ms. Ransdell is the CFO and Senior Labor Standards Compliance Officer for Labor Compliance Consultants of Southern California, a consulting firm offering Labor Standards New Laws Affecting Compliance Consulting and Contractor Monitoring services to private and public-sector Contractors Changes for 2018 clients in Southern California. Ms. Ransdell has provided labor compliance consulting and contractor monitoring services to clients for various Public Works projects for over 10 New Public Works years. Ms. Ransdel's skills include knowledge of Davis Bacon and Related Acts and Wage Contractor Registration Guidelines, Department of Industrial Relations prevailing wage requirements, HUD Section Law ISB 854) Section 3 3 Requirements, Implementation, and Monitoring. Her experience includes reviewing certified payroll reports, researching Federal and State wage classifications and Davis-Bacon and Related determinations, preparing requests for corrections and communicating with contractors, Acts/Department of Industrial monitoring receipt of labor compliance documentation, and organizing labor compliance Relations documentation for each project and contractor.
Prevailing Wage RELEVANT EXPERIENCE:
Requirements for Public • CLARK ROAD EMERGENCY BRIDGE REPLACEMENT | IMPERIAL COUNTY, CA Works Projects • WINTERHAVEN FIRST AVENUE | WINTERHAVEN, CA • HEBER TOWNSITE ROAD IMPROVEMENTS | HEBER, CA
• ATEN ROAD CLASS I BICYCLE PATH | IMPERIAL, CA
Calexico CM Services Adrian C. Cordova Memorial Park • 10
NICKLAUS
ENGINEEDING, TNC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 1. Somerton Council Avenue Park
City of Somerton and Athletic Field
CONTACT PERSON: Somerton, AZ
Sam Palacios
(928) 315-5458
SCOPE ELEMENTS:
/ Construction Support
V Engineering Design
/ Architectural Services
/ Master planning
V Landscape Architecture
/ Recreational Facilities
& Federal Grants
The City of Somerton was awarded a Federal Community Development CONTRACT VALUE: Block Grant (CDBG) to develop a Masterplan for a new 10-acre park. $57,990 Nicklaus was selected to develop the final Design Concept Report, the park CONSTRUCTION VALUE: and athletic field Masterplan, and construction documents. Nicklaus closely coordinated with the City of Somerton staff, which helped organize public $2M outreach to ensure the park included all the amenities desired by the surrounding residents.
The project was developed in multiple phases over multiple years, which helped the project include nearly all of the originally imagined elements, including a soccer field, skateboard park, two picnic ramadas, restroom facilities, jungle gym play areas, and an irrigation system with an integrated -acre pond. Parking facilities are shared with the adjacent Somerto ranch Library, providing ample and convenient parking for both the par and the library.
Our team developed complete construction plans for the park amenities.
During construction, our team provided construction support services, including construction staking, materials testing, and construction administration, using our in-house technical and professional staff.
Council Avenue Park has proven to be a popular and successful municipal project and has hosted various community events in Somerton, including the "Somerton Skateboard Battle" and "Beat the Heat Super Soak and Car Show." The City of Somerton has also offered fishing clinics for children to encourage them to be involved in the community.
Calexico CM Services Adrian C. Cordova Memorial Park • 11
NICKLAUS
ENGINEERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 2. Niland Public Safety Facility
Imperial County Department of
Public Works Niland, CA
The County of Imperial
CONTACT PERSON:
hired Nicklaus to
John A. Gay, PE, Director perform Construction
of Public Works
Management Services
(442) 265-1818
[email protected] through an On-Call, As-
Needed Construction
SCOPE ELEMENTS: Management Services
contract,
- / Preconstruction Meeting
/ Weekly Meetings
The project involved The project consisted of the demolition of the existing v Schedule Management County of Imperial Fire Station followed by the / Cost Control demolishing the construction of a new 7,555 s/ County Public Safety Facility. existing County of
v Submittal Management
/ Change Order Management Imperial Fire Station and constructing a 7,555 sf County Public Safety Facility. The south side of the new public safety facility housed three (3) / Request for Information 24-hour fire station employees and provided an apparatus bay for (3) fire Management vehicles. The north side consisted of office space for remote sheriff r Quality Control
employees and an 879 sf cooling center used by the Niland community V Daily Inspection
/ Observe Construction during the extreme summer heat.
Materials & Methods
/ Permit & Environmental Site improvements included parking, improvements to the adjacent streets, sidewalks, masonry walls, a generator, and new utility services. The project Compliance
also included two bid alternatives to construct an additional parking area, / Progress Payment
Management street improvements, trash enclosure, landscape areas, gates, and alley improvements.
r Monthly Status Report
v Project Close-out
Nicklaus performed a preconstruction review of all construction documentation, coordinated with the County of Imperial, prepared an CONTRACT VALUE:
agenda, conducted a preconstruction meeting, and prepared $371,307
preconstruction minutes. Additionally, Nicklaus provided on-site CONSTRUCTION VALUE: inspections and provided a full-time on-site construction inspector and $4,850,533
construction manager during the construction activities. Activities included daily report writing, pay application review and approval, tracking COMPLETION DATE:
of RFl's, submittals, materials testing, and change orders, as well as 11/2020
conducting weekly meetings, schedule coordination, quantity tracking, and stakeholder coordination.
Calexico CM Services Adrian C. Cordova Memorial Park • 12
NICKLAUS
ENGINEERING. INC
Summary of Qualifications and Experience - Specific Experience CLIENT: 3. Somerton Skate Park
City of Somerton
Somerton, AZ
CONTACT PERSON:
Jesus Meza
928) 627-3794
jesusmeza @somertonaz.gov
SCOPE ELEMENTS:
/ Reinforced Concrete Slab
V Erosion Control
/ Drainage
/ Storm drainpipe, inlets, and
The project comprised an open public area with an at-grade concrete outlet structure surface containing several skateboarding features, such as handrails, ramps, / Site lighting half-pipes, and a concrete skate bowl. Nicklaus' services included site r Shotcrete skating bowl investigation, topographic survey, geotechnical investigation, and design V Skateboarding features services.
Nicklaus designed 1,300 square feet of 6-inch reinforced concrete slab for CONTRACT VALUE:
the skating bowl area and approximately 2,700 square foot concrete slab $32,000 for other non-bowl areas. Nicklaus calculated the amount of stormwater CONSTRUCTION VALUE: runoff that would result from the additional impervious areas and designed $127,000 a retention basin piped from the skate bowl. To divert the runoff to the basin, Nicklaus designed the drainage pattern to include an 8" HDPE SDR- 11 pipe, several catch basins, and a concrete headwall. A stormwater pollution prevention plan was also prepared by Nicklaus Engineering.
Nicklaus met with the City of Somerton officials to determine the park's features. Since numerous skateboarding features are available, careful thought was put into deciding which would be most appropriate for City of Somerton residents. The park included the following features: a concrete bowl, round railings, a prefabricated half pipe, a prefabricated quarter pipe, and a cast-in-place concrete prism.
Nicklaus oversaw the design of the park lighting system, including installing a new skate area lighting branch circuit and a new lighting controller branch circuit. The controller was configured to include a manual on/off pushbutton with an override timeclock and a photocell automatic shutoff.
Four skate area dual floodlights were installed on a 30-foot high pole.
Additionally, the project required structural calculations for the numerous concrete features, such as the retaining wall, slabs, ledges, footings, ramps, and skate bowl. All concrete surfaces were coated with anti-graffiti.
Calexico CM Services Adrian C. Cordova Memorial Park • 13
NICKLAUS
ENGINEERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 4. Clean Closure of Cruickshank Road
Imperial County Department
of Public Works Illegal Disposal Site; County Project No. 5680SW CONTACT PERSON: El Centro, CA, and Imperial County, CA
John A. Gay, PE, Director
of Public Works The site was previously
(442) 265-1818 impacted with waste,
[email protected] generally composed of
broken glass, tile, bricks,
concrete, tires, and metallic
SCOPE ELEMENTS:
waste. Nicklaus was
/ Constructability Review contracted to provide
/ Preconstruction Meeting Resident Engineer and
r Weekly Meetings Construction Inspection
The Cruickshank Road Illegal Disposal Site (CRIDS) is a V Schedule Management Services for the site former illegal disposal area consisting of approximately remediation. Services 9 acres owned by Imperial County and 34 acres owned V Cost Control by the City of El Centro.
included the following:
v Submittal Management
r Change Order Management • Client consultation and facilitation of the pre-construction meeting / Request for Information • Continuous on-site inspection during construction Management • Facilitation of weekly contractor meetings • Review and approval of payment applications
r Quality Control • Review and logging of change orders, submittals, RFls, and material V Daily Inspection testing data
/ Observe Construction • Labor Compliance
Materials & Methods • Coordination of the pre-final and final inspections V Permit & Environmental • Completion of a project summary report with closeout documents.
Compliance Nicklaus played a significant role in pre-construction activities, including r Progress Payment
Management
• Monthly Status Report
v Project Close-out Dur experts in regulatore renes and de both the reactor an CONTRACT VALUE:
$446,477
CONSTRUCTION VALUE: uring their negotiations with the Contractor and, through the chang $7,986,162 rder process, assisted the ICDPW in developing a testing progra agreeable to the City of El Centro, Imperial County, Local Enforcemen Agency (LEA), and the Designer of Record. In addition, Nicklaus worker Control District rules was met.
Calexico CM Services Adrian C. Cordova Memorial Park • 14
NICKLAUS
ENGINEERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 5. Winterhaven Public Safety Facility
Imperial County Community &
Economic Development Winterhaven, CA
CONTACT PERSON: Imperial County contracted
Jade Padilla, Program Manager Nicklaus to provide full-time on-site Construction
(442) 265-1104 STA 8
[email protected]. ca.us Management and
Construction Inspection
SCOPE ELEMENTS: Services for the new Public
/ Constructability Review Safety Facility in the town of V Preconstruction Meeting Winterhaven.
/ Weekly Meetings
• Schedule Management The new facility will be shared
• Cost Control between the County of
v Submittal Management Imperial Sheriff Department
& Change Order Management and the County of Imperial
• Request for Information Fire Department.
Management
• Quality Control The 9,700 square foot pre-
/ Daily Inspection engineered building will
V Material Testing contain three vehicle bays,
/ Observe Construction The new facility is a 9,700 square foot pre- living quarters and work
engineered building containing three vehicle bays,
Materials & Methods areas, a booking/processing living quarters and work areas.. / Permit & Environmental area, interview/monitoring
Compliance rooms, an armory, evidence room, offices, records/storage, kitchen, Progress Payment living room, lounge, bedrooms, lockers and a fitness room.
Management
• Monthly Status Report Construction Management services for this project included site / Project Close-out inspections and documentation during the construction phase to verify • Federal / State Funded compliance with the contract documents.
CONTRACT VALUE: Services also included reviewing and processing pay applications and $371,307
CONSTRUCTION VALUE: change orders, lading weekly meathes, and managing submital and $3,754,998
COMPLETION DATE:
11/2020
Calexico CM Services Adrian C. Cordova Memorial Park • 15
NICKLAUS
ENGINTERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: Hawk Street Improvements
Imperial County Department
of Public Works Heber, CA
CONTACT PERSON:
Veronica Atondo, PE, Deputy Nicklaus received a
Task Order to provide
Director of Public Works Resident Engineering
(442) 265-1818 and Construction
[email protected]. Inspection Services for
ca.us the Hawk Street
Improvements Project
SCOPE ELEMENTS: under an existing On-
V Preconstruction Meeting Call contract with
/ Weekly Meetings Imperial County. The
General Contractor's Nicklaus discovered the existing roadway section was not as V Schedule Management described in the construction documents, leading to project (GC) scope of work for quantity underruns.
• Cost Control the Hawk Street
r Submittal Management Improvement Project included reconstructing the roadway with 2" of r Change Order Management conventional Asphalt Concrete (AC) cap over 1" of AC leveling course, / Request for Information fiberglass/polymer matrix, dig-outs, crack cleaning, and filling, construction Management signs and paint striping and signage. The length of the road improvements / Quality Control covered approximately 0.29 miles. All work for the project followed the May 2006 Caltrans Standard Specifications, project specifications, and special • Daily Inspection
provisions.
/ Observe Construction
Materials & Methods Nicklaus performed pre-construction activities, including coordinating and V Permit & Environmental managing pre-construction meetings with representatives from Imperial County, GC Quality Control Material Testing Consultant, Engineer of Compliance Record, and Heber Public Utilities District. Construction services included r Progress Payment full-time construction inspection, daily and weekly reporting to Imperial Management County, and weekly safety and progress meetings with the GC. Nicklaus / Monthly Status Report discovered that the existing roadway section was not as described in the r Project Close-out construction documents, leading to project quantity underruns.
Additionally, as dig-out operations began, Nicklaus discovered the existing CONTRACT VALUE: oadway section was not as described in the construction document $32,219 leadina to project quantity underruns. Nicklaus documente CONSTRUCTION VALUE: measurements with the GC and used the daily reports to help avoid $285,539 potential conflicts with the Contractor's payment requests.
Nicklaus identified additional areas with failed subgrade, marked the areas for removal while maintaining the overall quantity underruns, and provide ore-final and final walkthrough services with Imperial County and the G noting all punch list items. Nicklaus worked with the GC and Imperial County to close the project post-construction, including reviewing and approving the final pay application, retention pay application, As-Builts, closeout documents, and final report.
Calexico CM Services Adrian C. Cordova Memorial Park • 16
NICKLAUS
ENGINEERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: . Heber Townsite Road Improvements
Imperial County Department of
Heber, CA
. Public Works
CONTACT PERSON: Nicklaus received a Task
Veronica Atondo, PE, Deputy Order to provide Resident
Engineering and
Director of Public Works
Construction Inspection
(442) 265-1818
Services for the Heber
[email protected].
Roadway Improvements
- ca.us Project under an existing
On-Call contract with
SCOPE ELEMENTS: Imperial County.
/ Construction Management
r On-Site Inspections The General Contractor's
/ Weekly Meetings (GC) scope of work for the The size of road improvements covered approximately project included 62,000 square yards. All the work for the project / Submittal Reviews followed the Caltrans Standard Specifications, the reconstructing various project specifications, and the special provisions. / Payment Application Reviews
roadways within Heber
/ RFI Reviews with improvements that included a 1.25-inch asphalt concrete leveling / Change Order Reviews course, Asphalt Rubber Aggregate Membrane (ARAM), type 2 slurry seal v Labor Compliance coat, dig-out repairs for localized pavement failure areas and 2-inch skin / Materials Testing Data patch. The area road improvements covered approximately 62,000 square Review yards. All the work for the project followed the May 2006 Caltrans • Pre-Final and Final Standard Specifications, the project specifications, and the special Inspection provisions.
• As-Built Coordination and Nicklaus performed pre-construction activities, including coordinating and Project Closeout managing the pre-construction meeting with representatives from Imperial County, GC, Quality Control Material Testing Consultant, Engineer CONTRACT VALUE: of Record, and Heber Public Utilities District. Construction services $74,496 included full-time construction inspections, daily and weekly reporting to CONSTRUCTION VALUE: Imperial County, and weekly safety and progress meetings with the GC. $1,401,091
Before construction services began, Nicklaus identified additional locations requiring dig-outs, coordinating with the Contractor and Imperial County to ensure the Time and Material Allocation covered the necessary improvements.
In addition, Nicklaus provided Imperial County with all closeout documents, including As-Builts, daily and weekly reports, labor compliance closeout, approved pay applications, submittals, RFls, and other pertinent project information post-construction.
Calexico CM Services Adrian C. Cordova Memorial Park • 17
NICKLAUS
ENGINEtHING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 8. Orchard Road Improvements Project
City of Holtville
Holtville, CA
CONTACT PERSON:
The City of Holtville hired
Nick Wells, City Manager
Nicklaus to perform Resident
(760) 356-2837 Engineer (RE) and Construction
[email protected] Inspection (CI) services. These services included Pre-
SCOPE ELEMENTS: Construction, Construction
/ Construction Management Administration, and Post
/ On-Site Inspections Construction services.
/ Weekly Meetings
Construction included
/ Submittal Reviews demolition of existing asphalt
/ Payment Application pavement, asphalt rubber hot
Reviews mix pavement and Class z Base Work included the installation of curb and gutter, sidewalk, and storm drainage improvement.
/ RFI Reviews installation along Orchard Road
• Change Order Reviews between the north end of the
Alamo River Bridge and 4th Street. The scope of work also included the / Labor Compliance
installation of curb and gutter, sidewalk, and storm drainage improvements. • Materials Testing Data
Review Pre-construction activities included coordinating and managing the pre- / Pre-Final and Final construction meeting with representatives from the City of Holtville, the Inspection General Contractor, the Labor Compliance Consultant, and the Engineer of v As-Built Coordination & Record.
Project Closeout Construction services included full-time construction inspections, daily and weekly reporting to the City of Holtville, and weekly safety and progress CONTRACT VALUE: meetings with the General Contractor.
$74,482
CONSTRUCTION VALUE: Post-construction included Nicklaus providing the City of Holtville with all $367,100 closeout documents, including As-Builts, daily and weekly reports, labor perinea projectout matoved pay aplication, submital, Fl, and other Calexico CM Services Adrian C. Cordova Memorial Park • 18
NICKLAUS
ENGINCERING. INC
Summary of Qualifications and Experience - Specific Experience CLIENT: 9. Pitzer Road Improvements
Imperial County Department of
Public Works Heber, CA
CONTACT PERSON: Nicklaus was selected to provide
Veronica Atondo, PE, Deputy Resident Engineer & Construction Inspection Services for the Imperal
Director of Public Works
County Department of Public
(442) 265-1818 Pitzer Road
[email protected]. Improvements project. The project ca.us involved approximately one mile of
road improvements, including road
SCOPE ELEMENTS: excavation and earthwork, Class 2
/ Preconstruction Meeting Aggregate Base, asphalt paving, • Weekly Meetings concrete, sidewalks, curb, gutter,
pedestrian ramps, storm drains,
v Schedule Management
signage, and related
• Cost Control
appurtenances.
v Submittal Management
v Change Order Management Nicklaus' On-Site Inspector was • Request for Information responsible for monitoring the Management contractor's work performance and
• Quality Control ensuring compliance with codes
and construction documents. The
• Daily Inspection
v Observe Construction inspector drafted daily inspection reports and maintained a daily
Materials & Methods photo catalog of construction
The project involved approximately one mile
/ Permit & Environmental activities. The reports of road improvements.
Compliance photographs were communicated
r Progress Payment daily to the Resident Engineer, the General Contractor, and the County of Management Imperial Representative.
r Monthly Status Report The Resident Engineer prepared notices, agendas, and meeting minutes. • Project Close-out The Resident Engineer tracked the construction progress by evaluating and CONTRACT VALUE:
$29,860
CONSTRUCTION VALUE:
$335,178
Also, Nicklausprovided Imperial County with a project close-outreportand all construction-related documents in binder and digital forms.
Calexico CM Services Adrian C. Cordova Memorial Park • 19
NICKLAUS
ENGINEERING. INC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 10. Bombay Beach Townsite Roadway
Imperial County Department off Improvements Project
Public Works (ICDPW)
Imperial County, CA
CONTACT PERSON:
Veronica Atondo, PE, Deputy ICDPW hired Nicklaus to provide Director of Public Works Resident Engineering and
(442) 265-1818 Construction Inspection services
[email protected]. for the Bombay Beach Townsite ca.us Roadway Improvement Project.
SCOPE ELEMENTS: The General Contractor's (GC)
/ Pre-Construction scope of work for the project
Coordination entailed improving 5.88 miles of
• Construction Management asphalt roadways in the Bombay Beach community. The
r On-Site Inspections
r Daily and Weekly Inspection improvements comprised an A.C Reporting overlay and an Asphalt Rubber
r Weekly Meetings Aggregate Membrane (ARAM)
/ Submittal Reviews overlay, followed by installing a
/ Payment Application Reviews Type 2 slurry seal coat over the open-graded ARAM surface.
/ RFI Reviews
/ Change Order Reviews Additionally, the project included raising utility covers to pavement grade, installing new stormwater swales, v Labor Compliance
v Materials Testing Data and new traffic striping on the newly paved roadways.
Review
Pre-Final and Final Nicklaus was responsible for coordinating and managing pre-construction activities, which included arranging a pre-construction meeting with Inspection
v As-Built Coordination and representatives from Imperial County, the GC, the quality assurance materials testing company, the Engineer of Record, and the labor Project Closeout
compliance consultant.
CONTRACT VALUE:
$140,625 Nicklaus provided full-time construction inspection services during CONSTRUCTION VALUE: construction, including daily and weekly reporting to Imperial County. $2,726,309 Nicklaus also held weekly safety and progress meetings with the GC.
Additionally, Nicklaus addressed change orders, quantity discrepancies, contractor questions, and problem resolution, providing Imperial County with valuable expertise.
Calexico CM Services Adrian C. Cordova Memorial Park • 20
NICKLAUS
ENGINEERING, INC
Analysis of Effort/Methodology
conditions, and they will ensure labor interviews are
Nicklaus fully understands the conducted.
City of Calexico's intent for
The Resident Engineer will supervise the
construction management, construction administration through daily communication with the On-Site Inspector and
geotechnical, and inspection weekly progress meetings with the Contractor and services for Adrian C. Cordova City.
Memorial Park.
The Resident Engineer will receive and review the Contractor Nicklaus plans on approaching this construction payment applications, any change orders, RFls, submittals, management project with two separate personnel: a materials testing results, and certified payroll.
California-licensed Civil Engineer who will act as the
The Resident Engineer and On-Site Construction Inspector Resident Engineer and an experienced field personnel who will participate in the pre-final walkthrough, developing a will serve as the On-Site Construction Inspector,
punch list to distribute to the Contractor and City.
Nicklaus will start with pre-construction activities. Additionally, the On-Site Inspector will monitor the completion of the pre-final punch list items and coordinate The Resident Engineer and On-Site Inspector will review and the final inspection with the Resident Engineer, City, and General Contractor.
familiarize themselves with the Contract Documents, General Conditions, Supplementary Conditions, Special Conditions, After construction, Nicklaus will coordinate As-Built Plans Technical Specifications, Construction Plans, and with the City and conduct the project closeout. The project Addendums. closeout typically includes both a project summary report, submitted in two (2) sets in both hard copies (three-ring Next, Nicklaus will meet with City representatives to discuss the required submittal documents and the project schedule. binders) and digital format (PDF) on one USB thumb drive as a portable document.
Nicklaus will also discuss the pre-construction meeting and formulate an agenda for the conference at this meeting. It is We have outlined our approach's anticipated that Nicklaus will conduct the pre-construction meeting with a reviewed and approved meeting agenda. key components and experience Finally, Nicklaus will prepare the pre-construction meeting minutes for record and deliver them to the City's Project on the following pages.
Administrator and the Contractor within 48 hours.
Organize and Manage the Pre-construction
The On-Site Construction Inspector will Meeting.
concurrently begin full-time inspection services as
construction begins. Nicklaus routinely provides these services, providing an agenda to our client for comment at least 48 hours in
The On-Site Construction Inspector will draft inspection advance. Typical items addressed during the pre- reports and take a daily photo catalog of construction construction meeting include:
activities. The reports and photographs will be • Key Project Personnel Contact Information communicated to the Resident Engineer, the Contractor, and • Project Overview the City. • Review of Contract Documents, Plans, Specifications, and Addendums
In addition, the On-Site Inspector will begin coordinating all • Review of the Construction Schedule material testing required for the project as outlined in the • Labor Compliance contract documents. Test results will be part of the daily • Mobilization and Staging Areas submittals for contract compliance to be reviewed by the • Possible Phasing and Work Hours
Resident Engineer, The On-Site Inspector will also ensure the • Progress Meeting Requirements
Contractor is promoting job site safety, noting as-built • Subcontractors
Calexico CM Services Adrian C. Cordova Memorial Park - 21
NICKLAUS
INGENTERING. INC.
Analysis of Effort/Methodology
• General Safety Requirements • Tracking of Contract Days • Existing Utilities • Controlling Activities
• Outside Agency Coordination Requirements The Resident Engineer will sign each weekly report. • Permit Requirements
• Submittal Requirements Provide Quality Assurance support. • Contract Change Orders and Extra Work Bill
Requirements Nicklaus has an AMRL/CCRL/USACE-certified materials • Materials Testing Requirements testing laboratory at our corporate office in Yuma. Many of • Progress Payment Requirements our staff are trained to use Nuclear Gauges and carry ACI • As-Builts certifications. We will draw from decades of experience • General Discussion and Questions working with testing and materials inspections to help ensure the project is appropriately tested following the QAP.
Verify that the Contractor's work is completed Coordinate construction activity between the according to plans and specifications. various agencies and the General Contractor.
Nicklaus understands this is the root of Construction
We understand that construction projects can be tricky, and Management. Ensuring the Contractor completes work as keeping open and constant communication with the contracted starts before work begins, with careful
examination of the project construction documents before various agencies is essential. Each appropriate agency will portfolio of be invited to the pre-construction meeting, and a weekly mobilization. Nicklaus has an extensive
progress meeting will be established. Each agency will have untangling complex projects before the contractor steps an open invitation to the weekly progress meetings, and we foot on the site.
will send out invites and updates as the project progresses.
As the project progresses, our Resident Engineer and on-site Verify quantities with the General Contractor and inspector will fully engage in construction activities with the complete Quantity Calculation sheets.
Contractor, ensuring the project is completed as contracted.
Our on-site inspector will provide detailed daily reports, and Nicklaus has completed many Resident Engineering and our Resident Engineer will provide weekly summary reports. Management projects requiring quantity Construction
Our daily reports will include, but not be limited to: calculations to accept payment applications. • Project Name, Report Number, and Date Our team will prepare a spreadsheet that includes all the • Shift Hours Start and Stop proposal items, units, unit costs, bid set quantities, and bid • Location and Description of Operations set costs. Our on-site inspector will update this spreadsheet • Weather Conditions Description daily to include material quantities placed at the job site. • List of Numbered Equipment On-Site
Coordinate construction progress meetings during
• Description of Labor and Names
• Hours vs. Bid Item No. for Labor and Equipment construction. • Tracking of Idle or Down Equipment and Labor
• Detailed Description of Work Activities Over the years, we have found that coordinating and • Photo Catalog with Descriptions managing weekly progress meetings better serves each project. Weekly progress meetings will be an essential part Each Daily Report will be signed by the Construction of this project. The weekly progress meetings' day, time, and Inspector and initialed by the Resident Engineer after review. location will be established at the pre-construction meeting.
Our Weekly Reports will include, but not be limited to: In general, the weekly progress meetings will include the following:
• Project Name, Report Number, and Date
• General Breakdown of Daily Work Activities along with • Project Name, Meeting Number, and Date
Weather Conditions
• Review of Old Business
• Tracking of Working Days, Non-Working Days, and • Contractor Discussion on Work Activities Working Days with No Work on Controlling Activity • On-Site Inspector Discussion on Work Activities • Change Order Time Adjustments
Calexico CM Services Adrian C. Cordova Memorial Park • 22
NICKLAUS
ENGINEERING. INC.
Analysis of Effort/Methodology
• Review of Schedule and Discussion of 2-week look Provide troubleshooting support to assist in ahead. finding solutions to any issues between the
• Existing and Proposed Utility Coordination parties,
• Project Safety: Discuss Safety Meetings, Unsafe Acts, Accidents, Near Misses, and Action Items. It is understood that occasionally, it is necessary to help field • Review of the Status of RFls engineer problems and coordinate troubleshooting efforts • Review of the Status of Submittals between multiple parties. The Resident Engineer's role is to • Review of the Status of Change Orders clarify the issue and manage a cost-effective solution • Review of the Status of Pay Applications between the Contractor, Engineer of Record, and the Owner. • General Discussion We understand the importance of juggling the schedule impacts and the budget equally.
Provide labor compliance services to ensure
workers employed by the General Contractor and Most recently, we navigated significant troubleshooting efforts for the Cruickshank Road Illegal Disposal Site and subcontractors are hired and paid in compliance Winterhaven Public Safety Facility projects, each having with all applicable State and Federal laws. issues requiring stop-work orders. We are currently working with Imperial County to restart the Niland Main Street
Nicklaus has teamed with Labor Compliance Consultants Improvements project, which encountered unforeseen gas of Southern California to provide these services for this line location issues, providing field engineering support and contract. They have provided similar local services on various coordination. projects for Nicklaus and others, and we have a trusted relationship with them. We will coordinate appropriate times Track and expedite review and approvals of RFls for Labor Compliance Consultants to conduct labor and change order requests. interviews, and we will provide them with each daily report upon completion of the report. In general, the Labor Submittals, RFls, and Change Orders will be tracked using Compliance will consist of the following: spreadsheets and appropriately numbered as received. Each document will be dated upon receipt, the date sent to the • Ensure Contractor Eligibility Engineer of Record (if necessary), the date received from the • Monitor Certified Payroll Reports Engineer of Record, and the date returned to the Contractor. • Conduct On-Site Interviews
• Provide Progress Payment Review Assistance As previously discussed, Nicklaus is prepared to use Procure • Identify Violations to help expedite and streamline the project. • Provide Monthly Reporting
• Maintain Labor Compliance Review the construction schedule.
Verify that all erosion control is set up and Typically, we would receive a construction schedule at the maintained throughout the project. pre-construction meeting to discuss it with all pertinent stakeholders.
Nicklaus has worked on projects larger and smaller than 1 We will review the Contractor's project schedule before acre and staffs QSD and QSPs. Nicklaus is the sole holder of construction mobilization, and we will require two-week the current NAVFAC SW $100M Stormwater Contract, look-ahead schedules from the Contractor at each progress ensuring stormwater compliance for facilities within the meeting so that any scheduling conflicts can be identified California, Arizona, and Nevada Areas of Responsibility for early to avoid construction delays. In addition, we will track the Navy. Locally, we recently provided SWPPP inspections the controlling activity, ensuring that our weekly reports for Imperial County at the Cruickshank Road Illegal Disposal Site. Monitoring of the erosion control by the Contractor will identify the Contractor's progress. be included in our daily reporting.
Calexico CM Services Adrian C. Cordova Memorial Park • 23
NICKLAUS
İRGINEERING. INC.
Analysis of Effort/Methodology
Evaluate and present all change order proposals to Typically, Nicklaus provides all closeout documentation in a the City for review. binder and digital form. This includes all pertinent project information, including those listed above, daily and weekly reports, fully executed payment applications and change Nicklaus will review and validate change orders before
orders, all tickets and certifications, materials testing reports, proposals are sent to the City. Over the past few years alone, approved submittals, responses to RFI's, directives, and we have reviewed and processed hundreds of change orders general correspondence.
ranging from no-cost change orders to change orders worth over a million dollars.
Sample Project Timeline.
Each change order will include a detailed description of the change's reason, cause, and breakdown, including any cost This project's construction phase is estimated to take 60 or time adjustment. It will also include a cost analysis and working_davs. Two weeks before our pre-construction time adjustment analysis to verify the Contractor's request. meeting, our team will begin familiarizing itself with the project plans and specifications. We will also prepare and Review submittals. conduct weekly progress meetings throughout the project.
Lastly, a project summary report will be delivered to the City Nicklaus is prepared to review project submittals or approximately two weeks after completion. coordinate with the Engineer of Record as per the City's direction. Our goal is a timely return of submittals to the Participation.
Contractor to prevent construction delays. We will prepare a submittal register for the Contractor to ensure we receive all Nicklaus will ask that the City participate in the pre- required submittals on time and in good order. construction and weekly progress meetings conducted throughout this project.
Receive and process payment requisitions for the
owner's review. Deliverables.
Nicklaus commonly receives and provides properly Nicklaus will deliver all previously mentioned closeout completed payment applications for the owner's review and documentation in a binder and digital form. Daily and weekly acceptance. Typically, each application is provided on the reports and material quantity calculations, test results, and required form, with the contractor's invoice, conditional delivery slips will also be promptly delivered to the City's waiver and release form, quantity calculations, and material Project Administrator. tickets. Over the years, we •have developed an
Evaluate all claims and prepare a written response. understanding of managing the construction of various projects. We have tackled small shoulder
If there is a claim or audit on the project, Nicklaus is prepared backing projects, multi-million-dollar rigid to review submitted claims and provide a detailed written pavement and drainage improvement projects, response backed by our daily and weekly reports. complex remediation projects, and various vertical construction projects.
Manage the completion of the punch list.
Nicklaus performs a pre-final walkthrough with the We are ready and excited about contractor and client for all CM projects. All deficiencies are noted, and Nicklaus develops a punch list within 48 hours, this opportunity to provide these depending on the complexity of the list. Upon completing the punch list, Nicklaus coordinates a final walkthrough for services to the City of Calexico. project closeout.
Coordinate all owner and post-completion
activities.
Calexico CM Services Adrian C. Cordova Memorial Park • 24
NICKLAUS
ENGINEERING. INC.
•
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)
Contractor Information Registration History
Effective Date Expiration Date
Legal Entity Name 06/06/18 06/30/19
• Nicklaus Engineering Inc
05/24/17 06/30/18
Legal Entity Type
Corporation 05/16/16 06/30/17
Status 01/15/16 06/30/16
Active 07/01/19 06/30/21
Registration Number 07/01/21 06/30/23
1000034189
Registration effective date
08/18/23
Registration expiration date
06/30/24
Mailing Address
1851 W. 24th St., Ste. 101 Yuma 85364 AZ United States of America Physical Address
303 S. 8th St. El Centro 92243 CA United States of America Email Address
[email protected]
Trade Name/DBA
License Number (s)
Legal Entity Information
Corporation Entity Number: 1000034189
Federal Employment Identification Number: 271395529
President Name: Stacy Gutierrez
Vice President Name: Antonio Alvarez
Treasurer Name:
Secretary Name:
CEO Name: Stacy Gutierrez
Agency for Service:
Agent of Service Name: Stacy Gutierrez
Agent of Service Mailing Address: 1851 W. 24th St., Ste. 101 Yuma 85364 AZ United States of America
NICKLAUS
ENGINLERING, INC.
https://cadir.my.salesforce-sites.com/ContractorSearch/registrationSearchDetails?id=a1R8y000001FbcSEAS
LABOR COMPLIANCE CONSULTANTS OF SOUTHERN CALIFORNIA
N/A as they are a 3' party consulting agency.
SIERRA MATERIAL TESTING & INSPECTION
Registrations shasing Page 10f1 Bai Det
Search Results: 1 found
EE SIERRA MATERIAL TESTING & INSPECTION, INC.
Detall:
Registration Number: 1000006906 sta
Status: Active
CSIB Number:
Legal Entity Type: corporation
Malling Address: 1003 INDUSTRY WAY, SUITE A
EL CENTRO
C^92243
County: Imperial
Craft: Inspector/Feld Solis, Materlal Teste:
Emale: [email protected]
NICKLAUS Civil • Architecture • Environmental Engineering & Consulting Industrial Hygiene • Geotech
ENGINEERING. INC. 8(a) / DBE I WOSE I SBE
March 13, 2024
City of Calexico
549 Pierce Avenue
Calexico, CA 92231
Attention: Ms. Lilliana Falomir, Public Works Manager
Reference: Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova • Memorial Park - Phase I
Dear Ms. Falomir,
Nicklaus Engineering, Inc. (Nicklaus) is pleased to present the City of Calexico (City) with this proposal to provide Construction Management, Geotechnical, and Inspection Services for the above-referenced project. Our fee is based on the Request for Proposals issued on February 22, 2024. We understand the scope of work to include the following:
Pre-Construction Services
Prior to construction, and as part of the Construction Management, Geotechnical, and Inspection Services, we understand our scope of work to include the following:
• Review of Plans, Specifications, and Addendums.
• Pre-Construction Meeting preparation and coordination. • Pre-Construction Meeting.
• Pre-Construction Meeting minutes.
Construction Services
Per the RFP, the General Contractor for the project has a performance period of 60 working days. During construction and as part of the Construction Management, Geotechnical, and Inspection Services, we understand our scope of work to include the following:
• On-site inspection for no more than 8 hours per day on-site. • Weekly contractor meetings.
• Review of payment applications.
• Review of change orders and coordination.
• Tracking of RFI's and coordination with Designer of Record and City. • Tracking of submittals and coordination with the Designer of Record and City. • Perform Labor Compliance.
• Perform, review, and track materials testing.
• Pre-final Inspection and punch list.
• Final inspection and punch list.
www.nelaw.com
NICKLAUS Civil • Architecture • Environmental Engineering & Consulting Industrial Hygiene • Geotech
ENGINEERING. INC. 8(a) | DBE | WOB I SBE
Post-Construction Services
After construction, and as part of the Resident Engineering and Construction Management services, we understand our scope of work to include the following:
• Project Summary Report.
As-built coordination and Project Closeout with the City.
Please see the attached Detailed Cost Summary for a breakdown of our proposed fees.
Should you have any questions regarding this fee proposal, please call me at (928) 246-1616.
Best regards,
Nicklaus Engineering, Inc.
Antonio Alvarez, PE
Vice President
www.neiaw.com
Detailed Cost Summary Sheet (1)
NICKLAUS
A/E FEE ITEMIZATION SHEET ENGINEERING. INC.
DATE OF SCOPE/MOD: 2/22/2024
DATE OF PROPOSAL: 3/14/2024
PROJECT: Cordova Memorial Park - Phase i Work Element 1 Work Element 2 Work Element 3 Post Construction Totals
Pre-Construction Services Construction Services
Services
LOCATION: Calexico, CA
PART I - Direct Services
LABOR CATEGORY RATE HOURS COST HOURS COST HOURS COST HOURS COST Resident Engineer $170.00 10] $1,700 $14,620 $680 100 $17,000 Construction Inspector $100.00 10 $1,000 480 $48,000| $1,200 502 $50,200 Adminstrative Assistant $57.00 $114 $171 $285
Sub Total Direct Labor $2,814[ 566 $62,6201 $2,051| 607 $67,485 Sub Contractors
Labor Compliance Labor Compliance Consultants SC $12,000 $0 $12,000 Materials Testing Sierra Materials Testing SO $24,395 $24,395 Sub Total ODCs and Sub Contractors $36,395
G&A 335,38 $3,199
8.79%
Profit 5.00% $0 $1,980 $1,980
Total ODCs and Sub Contractors $41,574 $41,574
Travel $o
Grand Total $2,814 5104,194 $2,051 $109,059
ATTACHMENT NO. 3
CITY OF CALEXICO
CALEXICO
CALIFORNIA
"Wers Cattants Ones Police Pilsed"
Request for Proposals
Construction Management, Geotechnical
and Inspection Services for Adrian C.
Cordova Memorial Park - Phase I
Public Works Department
549 Pierce Avenue
Calexico, CA 92231
760/768-2160
www.calexico.ca.gov
February 22, 2024
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
Introduction and Background 3
II Project Posting and Scheduling
Scope of Work
IV Notification of Consultant Registration 5
Requirements (Where Required)
V Submittal Requirements
VI Selection Process
VII Tentative Schedule
VIII Inquiries
IX Submittal Deadline
EXHIBITS
A - Sample Proposal Evaluation Form
B - Sample Consultant Agreement and Insurance Requirements 2 1. INTRODUCTION AND BACKGROUND
The City of Calexico is requesting proposals from qualified and experienced construction management, geotechnical and field inspection professionals to provide Construction Management, Geotechnical and Inspection Services for Adrian C. Cordova Memorial Park -Phase I. The services are anticipated to be full time for the duration of the construction work, which will be completed by private contract secured through the public bidding process.
The purpose of the Request for Proposals (RFP) is to provide the City of Calexico with the assurance that this City administered project is constructed in substantial compliance with the plans and specifications and that all local, state, and federal provisions (where applicable) which may be required due to the specific funding requirements are adhered to. An important objective is to maintain a level of high quality Construction Management, Geotechnical and Inspection Services through appropriate documentation and workflow methodology in the most cost-effective manner possible.
The contract will be regulated according to the provisions of all federal, state and local laws and ordinances that are applicable. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1774. All Service Providers and sub- Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available on the Internet at: http://www.dir.ca.gov. All Service Providers and sub-consultants) shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code.
The City of Calexico is proposing to construct a new parking lot with accessible parking, driveway entrances to the park, new walkways to connect the parking lot to the existing baseball fields, a new walkway for access to the existing multi-use field, and sewer and water laterals with stub-outs for the future concession stand at Adrian C. Cordova Memorial Park.
II. PROJECT POSTING AND SCHEDULING
This RFP is being distributed over the internet and is posted at the City's website at the following address: https://www.calexico.ca.gov/bidsandrfps. Consultants wishing to propose in response to this RFP must obtain this document from our website. Due to the fact that anyone can download the RFP and the City has no method for tracking the distribution, the City is not able to maintain a list of potential consultants and/or proposers and cannot provide individual notification of amendments or addendums to this RFP.
3 The City will therefore post any addendums to the RFP on the above mentioned website. All consultants shall refer to the website to verify all addendums that have been issued and that they have acknowledged all such addendums in their proposal.
III. SCOPE OF WORK
Provide Construction Management, Geotechnical and Inspection Services during construction.
This will require providing one qualified individual to observe the construction phase to determine, in general, whether there is compliance with the bidding documents. This includes:
• Attend pre-construction meeting with the City.
• Verify contractor's work is being completed according to plans and specifications. (Work shall include inspecting all aspects of the grading, paving, concrete, street lighting and all other portions of construction shown on the plans/specifications). • Review and recommendation regarding submittals, shop drawings and product substitutions.
• Review and make recommendations regarding construction change orders, contractors' claims and payments.
• Observe and report on construction operations and keep track of progress. • Keeping Contract files in different categories (payments, change orders, RFI's, general correspondence, labor compliance, etc.). These files will be used by the granting agency to audit the work.
• Provide geotechnical engineering services and survey services necessary or the required scope of work.
• Confirm all geotechnical inspections are being completed according to the City approved Quality Assurance Program (QAP), and contract specifications and guidelines. • Prepare daily reports and weekly reports per Exhibit 16-C of the LAPM. These reports shall be submitted to the City for review at the end of each work week. • Labor compliance. Making sure the contractor and subcontractors pay correct wages as determined by Davis Bacon or by the State Department of Industrial Relations, as well as performing the employee interviews.
• Assist the City in the Reporting of Suspected Violations of the Prevailing Wage Law to the Labor Commissioner
4 • Perform employee interviews per CEM-2504. One per week per trade. Once completed, the interviews will be given to the Resident Engineer (City) for review. • Forms Collection, Review and Verifications:
Department of Apprenticeship Standards (DAS) Form 140
Department of Apprenticeship Standards (DAS) Form 142
California Apprentice Council Training Fund Contribution (CAC-2) Fringe Benefits Statement (FBS) Form
Other forms as necessary
• Keep City staff fully advised as to the progress of the work on a weekly basis. • Coordinate inspections with geotech, which includes: production plant testing, onsite material testing, compaction testing, concrete cylinder testing and assist in processing submittals for mix designs for asphalt and concrete. Verifying that asphalt is in accordance to approved mix designs and is installed according to plans and specifications. Verifying imported base material meets contract plan and specifications. Verifying that the pulverized asphalt meets the contract plans and specifications. • Verify that all erosion control is set up and maintained throughout the duration of the project.
• Coordinate final inspection and preparation of punch list and close-out of Project.
IV. NOTIFICATION OF CONSULTANT REGISTRATION REQUIREMENTS (WHERE REQUIRED)
Pursuant to the requirements of California Labor Code section 1771.1, all consultants and sub- consultants that wish to engage in public work through a public works contract must be registered with the Department of Industrial Relations (DIR).
Beginning March 1, 2015, no consultant or sub-consultant may be listed on a bid proposal for a public works project unless registered with DIR.
Beginning April 1, 2015, no consultant or sub-consultant may be awarded a contract for public work on a public works project unless registered with the DIR, pursuant to Labor Code section 1725.5
All consultants, including sub-consultants listed in the proposal must be registered with the DIR at the time proposals are due, and must submit proof of registration with the proposal. Any proposals received listing unregistered consultants and/or sub-consultants will be deemed non- responsive.
5 NOTE: DIR number is to be specified on the cover page of the consultant proposal. Proof of registration for consultant and sub-consultant shall also be submitted as an exhibit of the proposal.
Application and renewal are completed online with a non-refundable fee of $400. Read the Public Works Reforms (SB 854) Fact Sheet for requirements. Instructions for completing the form and additional information can be found on the DIR website.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
SOURCES OF INFORMATION
INFORMATION WEBSITE
Department of Industrial Relations (Public http://www.dir.ca.gov/Public- Works) Works/PublicWorks.html
SB 854 Fact Sheet https://www.dir.ca.gov/Public-
Works/PublicWorksSB854.html
Senate Bill 854 Compliance http://www.dir.ca.gov/Public- Works/SB854.html
Public Works Contractor (PWC) Registration https://www.dir.ca.gov/Public- Works/Contractor-Registration.html
Classifications and Minimum Labor Rates http://www.dir.ca.gov/OPRL/Pwd/ V. SUBMITTAL REQUIREMENTS
Proposal should be typed, organized and concise, yet comprehensive.
General Requirements
1. Provide a cover letter.
State the interpretation of the work to be performed. State a positive commitment to perform the work in the required manner and time frame; include a basic summary; and demonstrate an understanding of the project. Provide a statement that the offer is valid for at least a ninety (90) day period.
Provide the name(s) of the primary and/or alternate individuals authorized to respond to this RFP. Include titles, addresses, e-mail, and phone numbers.
The Consultant is representing itself as a qualified professional in Construction Management, Geotechnical and Inspection Services. Therefore, it is acceptable to submit recommendations and comments for consideration on format, process, schedule, and 6 additional content of projects. The City will consider comments and recommendations; however is not required to select any of the recommendations or comments.
5. Expensive bindings, colored displays, promotional materials, etc., are neither necessary nor desired. Emphasis should be concentrated on conformance to the RFP instructions, responsiveness to the REP requirements, and on completeness and clarity of content.
If any subcontractors are utilized, the lead Consultant must submit a description of the firm, the portion of work to be done, and cost of each subcontractor. All subcontracts exceeding $25,000 in cost shall contain all required provisions of the prime contract.
Proof of registration for consultant and sub-consultant shall also be submitted as an exhibit of the proposal.
Table of Contents
Include a table of contents with identification of each section and page number.
Summary of Qualifications and Experience
State whether the firm is local, regional, national or international.
Identify the owner(s) of the firm and legal status (sole proprietor, corporation, etc.) Give the location of the office from which work is anticipated to be done and the number of employees of the company.
Identify the qualifications and resumes of all individuals who will be associated with this service. Include professional registrations and affiliations.
5. Summarize specific experiences and qualification for similar and related projects, both federally funded and locally funded. Describe the services previously performed such as studies, reports, etc. List at least three (3) references with telephone numbers and emai contact addresses (if available).
Analysis of Effort/Methodology
Describe the approach for how the work will be performed. The proposal shall indicate any specific techniques or methodology to be utilized.
The proposal shall include a sample project timeline with specific tasks envisioned for this project, including staffing.
Indicate what participation, data and products will be requested from the City.
Indicate deliverables to be provided and when.
Cost and Fees
Cost Proposals must be submitted with the proposal in a separate sealed and clearly marked envelope (include project title and submitting firm). Cost proposals shall take into account the following:
Develop costs and fees for the services requested. Submit a not to exceed fee proposal based on anticipated fully burdened hourly rates.
When preparing cost and fees consider the scope of work involving project kick off and review of available documentation, material submittals, project documentation and prepare a lump sum fixed fee breakdown based on anticipated staff and hours. Costs should be organized for full time hourly rates. Such hourly rates should be fully burdened or loaded, including full compensation for all overhead and profit. Billing rates shall include provision for normal office costs, including but not limited to office rental, utilities, insurance, cell phone or radio, equipment, normal supplies and materials, in-house reproduction services, and local travel costs. As much as possible, a fixed fee lump sum breakdown by phase of the construction based on billable hours is desirable for preconstruction and post construction.
Breakdown shall include preconstruction services and construction services (Request for information/clarification). No subcontractors shall be utilized without prior authorization by the City and modification to submitted DBE subcontractor's list or goal is discouraged and may lead to project funding issues.
Insurance Requirements
Prior to execution of the agreement with the City, the successful firm must provide evidence of insurance coverages as noted in the sample contract and insurance requirements exhibit.
The successful firm will be required to maintain the required coverages, at its sole cost and expense, throughout the entire term and any subsequent modification terms of the contract.
Insurance requirements noted in sample contract. Insurance requirements may be adjusted once the final cost and fees proposal is reviewed.
VI. SELECTION PROCESS
The City of Calexico will utilize a one-step selection process. The City reserves the right to include an oral interview process component. If an oral interview is considered, selected firms will be notified.
Proposals will be reviewed by an evaluation committee. The evaluation committee's assessment and recommendations shall be forwarded to the City Managers for review. The City Manager shall 8 provide a report of the committee's evaluation and recommendations, along with his recommendation, for the selection of a firm to the City Council for final review and approval to enter into negotiations for an agreement.
Additionally, the City reserves the right to reject any and all proposals submitted and/or request additional information for clarification.
VII. TENTATIVE SCHEDULE
Request for Proposal Issued February 22, 2024
Consultant Proposals Due March 14, 2024
Consultant Selection and Negotiations Week of March 18, 2024 City Council Approval of Contract April 3, 2024
Project Completion TBD
VIII. INQUIRIES
Pre-submittal procedural or technical inquires may be directed to Lilliana Falomir, Public Works Manager via email at [email protected].
IX. SUBMITTAL DEADLINE
Consultant must submit five (5) copies of their proposal with original Consultant signature. The proposal must be formatted in accordance with the instructions of this RFP. Promotional material may be attached, but are not necessary and will not be considered as meeting any of the requirements of this RFP. Proposals must be enclosed in a sealed envelope or package, clearly marked "RFP for Construction Management, Geotechnical and Inspection Services for Adrian C.
Cordova Memorial Park - Phase I" and delivered on or before 2:00p.m. on March 14, 2024 to:
Office of the City Clerk
City Hall
City of Calexico
608 Heber Avenue
Calexico, CA 92231
Late, emailed or facsimile proposals will not be accepted. It is the proposer's responsibility to assure that its proposal is delivered and received at the location specified herein, on or before the date and hour set. Proposals received after the date and time specified will not be considered. 9 EXHIBIT A
10 SAMPLE OF PROPOSAL EVALUATION FORM
Firm:
Evaluator:
Date:
1 Technical Approach (35 Points) Points Awarded
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
construction management, geotechnical and construction
inspection work
2 Project Management (30 Points) Points Awarded
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures using LAPM for local
4 agency advertised projects (25 Points)
Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points)
Total Score
Comments:
11 EXHIBIT B
12 AGREEMENT FOR PROFESSIONAL SERVICES
This Agreement is made and entered into as of the day of 2024, by and between the City of Calexico ("City") and ("'Consultant'").
RECITALS
A. Consultant is specially trained, experienced and competent to perform the special services which will be required by this Agreement; and
B. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.
AGREEMENT
Scope of Services. The Consultant shall furnish the following services in a professional manner. Consultant shall perform the services described on Exhibit A which is attached hereto and incorporated herein by reference. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A, subject to the direction of the City through its staff that it may provide from time to time.
2. Time of Performance. The services of Consultant are to commence upon execution of this Agreement and shall continue until all authorized work is approved by the City. All such work shall be completed no later than December 31, 2024. Time is of the essence for every provision of this agreement that states a time for performance and for every deadline imposed by the City.
Compensation. Compensation to be paid to Consultant shall be as set forth in Exhibit B, which is attached hereto and incorporated herein by reference. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment.
Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than 30 days after approval of the monthly invoice by City
5. Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall 13 become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request.
6 Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and shall not act as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights.
7. Interest of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by and during this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant:
a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and
b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).)
8. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise.
Indemnity. Consultant agrees to indemnify, including the cost to defend, the City, and its officers, agents and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this contract. This indemnity does not apply to liability for damages for death or bodily injury to persons, 14 injury to property, or other loss, damage or expense arising from the sole negligence, willful misconduct or defects in design by the City or its agents, servants, or independent contractors who are directly responsible to the City, or the active negligence of the City.
To the fullest extent permitted by law, the Consultant shall (1) immediately defend and (2) indemnify the City, and its councilmembers, officers, agents, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to tie neigence, rectator, abitics the negligence, recklessness, or willful misconduct of the Consultant, or its employees, agents, or subcontractors. Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys' fees; court costs; and costs of alternative dispute resolution. The Consultant's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then Consultant's indemnification obligation shall be reduced in proportion to the established comparative liability.
(b) The duty to defend is a separate and distinct obligation from Consultant's duty to indemnify. Consultant shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, agents, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend under this section. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys' fees and defense costs in proportion to the established comparative liability of the indemnified party. (c) The review, acceptance or approval of the City's work or work product by any indemnified party shall not affect, relieve or reduce the City's indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
10. Insurance Requirements.
a. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. 15 i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. This provision shall not apply if Consultant has no employees performing work under this Agreement. If the Consultant has no employees for the purposes of this Agreement, Consultant shall sign the "Certificate of Exemption from Workers' Compensation Insurance" which is attached hereto as Exhibit C.
i. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, cither the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.
iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
iv. Errors and Omissions Liability. Consultant shall maintain errors and omissions liability insurance for all work performed under this Agreement in an amount of not less than one million dollars ($1,000,000).
b. Policy Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A: VII and shall be endorsed with the following specific language:
i. The City of Calexico, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work or operations.
16 il. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it.
iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.
iv. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers.
V. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City.
c. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance and Endorsements. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement.
11. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations.
12. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall obtain a City of Calexico Business License.
17 13. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Imperial, California.
14. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent prepaid, first class mail. Any such notice, demand, etc. shall be addressed to the other party at the address set forth herein below. Either party may change its address by notifying the other party of the change of address. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Calexico, City Manager
608 Heber Ave.
Calexico, CA 92231
If to Consultant:
15. Consultant's Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement.
Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for thy longer period required by lay, from the date of termination or completion of C. Any records or documents required to be maintained pursuant to this Agreement hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so.
Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement.
d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above named officers, require that 18 custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest.
16. Entire Agreement. This Agreement constitutes the complete and exclusive statement of Agreement between the City and Consultant. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Agreement.
17. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney.
18. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder.
19. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart.
20. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law.
21. Termination. This Agreement may be terminated by the City immediately for cause or by either party without cause upon fifteen days' written notice of termination. Upon termination, Consultant shall be entitled to compensation for services performed up to the effective date of termination.
***SIGNATURES ON FOLLOWING PAGE***
19 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above.
CITY OF CALEXICO: CONSULTANT:
Esperanza Colio Warren
City Manager
APPROVED AS TO FORM: ATTEST:
Carlos Campos Veronica L. Alvarado
City Attorney City Clerk
20 EXHIBIT A
SCOPE OF SERVICES
(proposal dated
21 EXHIBIT B