AGENDA
ITEM
11 AGENDA
CALEXICO California ITEM
WHERE CALIFORNIA AND MEXICO MEET
1/
CITY COUNCIL
AGENDA STAFF REPORT
DATE: February 19, 2025
TO: Mayor and City Council
APPROVED BY: Juan Contreras, Acting City Manager JAc
REVIEWED BY: Karla Chaparro, Finance Director W
PREPARED BY: Lilliana Falomir, Public Works Manager - Administrative Tal SUBJECT: Authorize Acting City Manager to Sign Agreement of Professional Services Between the City of Calexico and Nicklaus Engineering, Inc. in the Amount of $97,902.06 for Construction Management, Geotechnical and Inspection Services for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036). =====
Recommendation:
It is recommended that the City Council of the City of Calexico approve the following:
1. Authorize Acting City Manager to Sign Agreement of Professional Services Between the City of Calexico and Nicklaus Engineering, Inc. in the Amount of $97,902.06 for Construction Management, Geotechnical and Inspection Services for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No.
CML-5168(036).
Background:
The City of Calexico Public Works Department received a grant from California Department of Transportation (Caltrans) for FY 2024-2025 in the amount of $937,915.00 ($230,000.00 - Federal Grant and $707.915.00 - Local Match) for Federal Project No. CML-5168036) Sidewalk Improvements for the following locations:
1. Grant Street between Pierce Avenue and Emilia Drive.
2. Calexico Street between Adler Avenue to Kloke Avenue.
3. Van de Graaf between Cole Boulevard and Calexico 10 theaters.
The project consists of the removal of existing parkway, subgrade, asphalt, and concrete, trimming and/or removal of existing trees, removal of fencing and roadway signs, procurement of concrete, construction of sidewalk, curb, gutter, driveways, and curb ramps, and adjustment of existing utility lids to grade. Figure 1 below shows the project three (3) locations.
TOWNCENTER IND. NORTH END
VAN DE -
GRAAFF AVE
(SHT. 5)
KENNEDY EL DORADO ZONE
LAS CASITAS
WEST CORE GRANT ST
(SHT. 3)
EAST CORE LAS BRISAS
CALEXICO ST
(SHT. 4)
AIRPORT ZONE DOWNTOWN
Figure 01: City Map
On October 2, 2024, the City Council of the City of Calexico approved bid documents for Sidewalk Improvement (Grant St., Calexico St. and Van de Graff Ave.) Federal Project No.
CML-5168(036) and authorized the Public Works Department to send the project out to bid.
Discussion and Analysis:
On October 10, 2024, the Public Works Department began requesting proposals from qualified and experienced construction management, geotechnical and field inspection professionals to provide Construction Management, Geotechnical and Inspection Services for Sidewalk 2 Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML- 5168(036).
On November 8, 2024, the Office of the City Clerk received the following RFP's:
# Company Total
1. Nicklaus Engineering, Inc. $97,902.06
2. Engineering Resources of Southern California, Inc. (ERSC) $122,088.55 Public Works staff has reviewed the proposals received and recommends that the City Council of the City of Calexico authorize Acting City Manager to sign Agreement of Professional Services between the City of Calexico and Nicklaus Engineering, Inc. in the amount of $97,902.06 for Construction Management, Geotechnical and Inspection Services for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML- 5168(036).
Fiscal Impact:
Capital Improvement Program for FY 2024-2025
Measure D - Fund No. 233-91-917-56002-000 $97,902.06
Total $97,902.06
Coordinated With:
City Manager's Office.
Office of the City Clerk.
Finance Department.
Public Works Department.
Attachments):
1. Agreement of Professional Services between the City of Calexico and Nicklaus Engineering, Inc.
2. ERSC Proposal.
3. Request for Proposals for Construction Management, Geotechnical and Inspection Services for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).
3 ATTACHMENT NO. 1
AGREEMENT FOR PROFESSIONAL SERVICES
This Agreement is made and entered into as of the 19* day of February, 2025, by and between the City of Calexico ("City") and Nicklaus Engineering, Inc. ("Consultant").
RECITALS
A. Consultant is specially trained, experienced and competent to perform the special services which will be required by this Agreement; and
B. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.
AGREEMENT
Scope of Services. The Consultant shall furnish the following services in a professional manner. Consultant shall perform the services described on Exhibit A which is attached hereto and incorporated herein by reference. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A, subject to the direction of the City through its staff that it may provide from time to time.
Time of Performance. The services of Consultant are to commence upon execution of this Agreement and shall continue until all authorized work is approved by the City. All such work shall be completed no later than December 31, 2025. Time is of the essence for every provision of this agreement that states a time for performance and for every deadline imposed by the City.
Compensation. Compensation to be paid to Consultant shall be as set forth in Exhibit B, which is attached hereto and incorporated herein by reference. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment.
4. Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than 30 days after approval of the monthly invoice by City staff.
Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request.
6 Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and shall not act as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights.
Interest of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by and during this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant:
a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and
possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).)
8. Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise.
Indemnity. Consultant agrees to indemnify, including the cost to defend, the City, and its officers, agents and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this contract. This indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, damage or expense arising from the sole negligence, 2 willful misconduct or defects in design by the City or its agents, servants, or independent contractors who are directly responsible to the City, or the active negligence of the City.
To the fullest extent permitted by law, the Consultant shall (1) immediately defend and (2) indemnify the City, and its councilmembers, officers, agents, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, or its employees, agents, or subcontractors. Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys' fees; court costs; and costs of alternative dispute resolution. The Consultant's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then Consultant's indemnification obligation shall be reduced in proportion to the established comparative liability.
(b) The duty to defend is a separate and distinct obligation from Consultant's duty to indemnify. Consultant shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, agents, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend under this section. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys' fees and defense costs in proportion to the established comparative liability of the indemnified party. (c) The review, acceptance or approval of the City's work or work product by any indemnified party shall not affect, relieve or reduce the City's indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
10. Insurance Requirements.
a. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. 3 i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. This provision shall not apply if Consultant has no employees performing work under this Agreement. If the Consultant has no employees for the purposes of this Agreement, Consultant shall sign the "Certificate of Exemption from Workers' Compensation Insurance" which is attached hereto as Exhibit C.
i. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.
ili. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
iv. Errors and Omissions Liability. Consultant shall maintain errors and omissions liability insurance for all work performed under this Agreement in an amount of not less than one million dollars ($1,000,000).
b. Policy Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A: VII and shall be endorsed with the following specific language:
i. The City of Calexico, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work or operations.
4 ii. This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it.
iii. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.
iv. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers.
V. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City.
C. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance and Endorsements. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement.
11. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations.
12. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall obtain a City of Calexico Business License.
13. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Imperial, California. 5 14. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent prepaid, first class mail. Any such notice, demand, etc. shall be addressed to the other party at the address set forth herein below. Either party may change its address by notifying the other party of the change of address. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Calexico, City Manager
608 Heber Ave.
Calexico, CA 92231
If to Consultant: Nicklaus Engineering, Inc.
461 Main Street
El Centro, CA 92243
15. Consultant's Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement. b. Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement.
c. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so.
Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement.
d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above named officers, require that custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted 6 to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest.
16. Entire Agreement. This Agreement constitutes the complete and exclusive statement of Agreement between the City and Consultant. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Agreement.
17. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney.
18. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder.
19. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart.
20. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law.
21. Termination. This Agreement may be terminated by the City immediately for cause or oy either party without cause upon fifteen days' written notice of termination. Upon termination. Consultant shall be entitled to compensation for services performed up to th effective date of termination.
***SIGNATURES ON FOLLOWING PAGE***
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above.
7 CITY OF CALEXICO: CONSULTANT:
Juan Contreras
Acting City Manager
APPROVED AS TO FORM: ATTEST:
Carlos Campos Veronica L. Alvarado
City Attorney City Clerk
November 8, 2024
City of Calexico
Request for Proposal for
CONSTRUCTION MANAGEMENT,
GEOTECHNICAL AND INSPECTION SERVICES
Sidewalk Improvement Project
on Grant Street between Pierce Avenue & Emilia
Drive, Calexico Street between Adler Avenue &
Kloke Avenue, Van de Graaff Avenue between Cole
Boulevard and Calexico 10 Theaters
Federal Project No.: CML-5168(036)
CALEXICO
NICKLAUS
ENGINEERING. INC.
& teaming partners
• gafcon
SIERRA
1461 Main Street, El Centro, CA 92243 www.neiaw.com
Table of Contents
Cover Letter 3
Summary of Qualifications and Experience 5
Qualifications and Resumes 7
Specific Experience 12
Analysis of Effort/Methodology 20
Exhibits 24
EXHIBIT - DIR Proof of Registration - consultant and sub-consultant EXHIBIT 10-01 DBE Commitment
Cost 81 Fees (included in a separate sealed envelope)
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 2 NICKLAUS Civil • Architecture • Environmental Engineering & Consulting Industrial Hygiene • Geotech
ENGINEERING. INC. 8(a) | DBE | WOSB | SBE
November 8, 2024
City of Calexico
608 Heber Avenue
Calexico, CA 92231
REFERENCE: CONSTRUCTION MANAGEMENT, GEOTECHNICAL, AND INSPECTION SERVICES FOR
SIDEWALK IMPROVEMENTS ON GRANT STREET CALEXICO STREET, VAN DE GRAAFF AVE., AND CALEXICO 10 THEATERS; FEDERAL PROJECT NO. CML-5168(036) Dear Selection Committee:
Please accept the following as our formal submittal for the RFP for Construction Management, Geotechnical, and Inspection Services for Sidewalk Improvements on Grant Street Calexico Street, Van de Graaff Ave., and Calexico 10 Theaters; Federal Project No. CML-5168(036). We respectfully submit our qualifications herein, and we are excited about the possibility of working with the City of Calexico on this vital sidewalk improvments project.
Nicklaus is a 100% woman-owned small business (WOSB) with over four decades of working locally in civil engineering and construction management and is also a certified DBE firm through Caltrans (CUCP certification No. 42404). Nicklaus has faithfully serviced the Imperial County area and the municipalities within for decades, providing quality, local, and professional construction management services for many Architectural and Engineering projects. Our technical competence and responsiveness have been measured at every level by nearly all the current local municipal personnel on some of the most challenging projects. We want to ensure the City of Calexico that we will bring the same enthusiasm and technical expertise to this contract as we've done for all the others.
On the following pages, we have provided our approach to executing the requested services and our work history on both similar and challenging Construction Management projects. We understand the scope of services and importance of this project, and our key personnel and team members have the requisite experience to assist the City of Calexico with successfully completing this project. In addition, both our proposed Resident Engineer and Alternate Resident Engineer are long-time Calexico residents, living within minutes of the job site.
Nicklaus has also carefully selected Sierra Material Testing & Inspection as our QA materials testing consultant and Gafcon as our labor compliance consultant. Both teaming firms are widely respected within the industry, and Nicklaus will appropriately utilize their resources to help ensure that the demand of this contract is met at every level to complete each task on time and within budget. 1461 Main Street, El Centro, CA 92243
www.neiaw.com
NICKLAUS Civil • Architecture • Environmental Engineering & Consulting Industrial Hygiene • Geotech
ENGINEERING. INC. 8(a) I DBE | WOSB I SBE
Nicklaus Engineering, Inc. (DIR #1000034189) is registered with the California Department of Industrial Relation. Our sub-consultants are Sierra Material Testing & Inspection, Inc. (DIR #1000006908) and Gafcon, a 3rd party consulting agency - N A. Proof of registration for Nicklaus and Sierra can be found on page 23.
The key individuals authorized to respond to this RFP are:
Stacy Gutierrez, PE CIH, President/CEO Antonio Alvarez PE, Vice President Registered Engineer (Environmental): AZ #36702 Registered Engineer (Civil): C.A. # C79509 (928) 344-8374; ext. 435 (928) 246-1616
1851 W. 24th Street, Suite 101, Yuma, AZ 85364 1461 Main Street, El Centro, CA 92243 [email protected] [email protected]
Our offer is valid for 90 days. Please do not hesitate to contact me with questions regarding our written proposal, firm, or team members.
Sincerely,
NICKLAUS ENGINEERING, INC.
Antonio Alvarez, PE
Vice President
1461 Main Street, El Centro, CA 92243
www.neiaw.com
Summary of Qualifications and Experience
Subconsultants
NICKLAUS is a multi-discipline corporation Our subconsultants are listed below with a brief founded in 1977 as a civil engineering and survey description of their services provided:
firm that assists its clients in responsible and SIERRA MATERIAL TESTING & INSPECTION, professional infrastructure development through INC. (Sierra) is a privately owned California SIERRA corporation. Sierra is a highly qualified, local a practical solutions approach. Nicklaus has rooted
itself as a reliable Disadvantaged Business Enterprise geotechnical engineering firm that provides (DBE) and Woman Owned Small Business (WOSB), geotechnical engineering and materials testing and providing full-service engineering and architectural services inspection services in the Imperial Valley. Sierra is staffed to both the private and public sectors in Imperial County, by local engineers and technicians who have provided the Yuma County, and across the United States. Nicklaus requested services for over 15 years to clients, private provided more than $27M in consulting services for local, consultants, and developers working in the Imperial Valley. state, and federal clients in 2023, and we are currently providing or recently provided Construction Management gatcon Over the past 35 years, Gafcon has evolved from a Southern California-
and/or Construction Inspection Services for the City of El born-and-bred construction and project management firm
Centro, Imperial County, the United States Army Corps of Engineers, the US Air Force, Yuma International Airport, and focused on supporting the local community's public works US Customs and Border Protection on construction projects to delivering award-winning labor compliance services on projects and programs worldwide. Gafcon was projects valued from local-level projects less than $1M to one of the first state-approved labor compliance programs national-level projects over $100M. Our local presence has (ID No. 2003.0053). Today, they offer that same
allowed us to build upon our knowledge of the unique
and conditions in the City of Calexico (City) and commitment, having contributed their labor compliance issues
assemble a team that brings exceptional expertise in expertise for more than $5B in construction projects, resident engineering/construction management, labor including those for public agency clients such as the inspection services. Our proposed County of San Diego, County of San Bernardino, City of San compliance, and
Resident Engineer and Alt. Resident Engineer live in Marcos, City of Santa Monica, and the San Bernardino Calexico, within walking distance of the proposed project. County Transit Authority (SBCTA). Gafcon's in-depth knowledge of the labor compliance industry and its
Firm Location business issues gives them a unique combination of Our local office is at 1461 Main Street in El Centro, CA. practical experience and intellectual acumen that they In addition, our corporate office will support our local office deliver to every project. from 1851 W. 24th Street in Yuma, AZ.
Qualifications and work experience for the following
Owner
key staff members begin on page Z of this proposal:
As the owner of Nicklaus, Ms. Stacy Gutierrez has a
vested interest in the success of this project. She is a ORGANIZATIONAL CHART registered professional engineer (Environmental) and
Certified Industrial Hygienist with over 20 years of design Phillip Ramirez, PE Resident Engineer and construction experience. Ms. Gutierrez was born and raised in the City of El Centro, CA, and has a vested interest Antonio Alvarez, PE Alternate Resident Engineer in the development of the Imperial Valley.
Karla Be, CQM Construction Inspector
Location Of Anticipated Work
The majority of the work will be completed at the project Luis Lopez, CQM Alt. Construction Inspector site. We will support the project from our local and
corporate offices. Nicklaus has 122 employees, including Materials Testing Alex Rojas (Sierra MT&.1)
Consultant
registered civil and environmental engineers, civil
designers, construction managers and inspectors, Labor Compliance architects, environmental professionals, geotechnical Italia Gray (Gafcon) Consultant laboratory technicians, and other technical and
administrative support staff.
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvement Project • 5 ENGINEERING. INE.
Summary of Qualifications and Experience
Phillip Ramirez, PE, will be the full-time resident Specific experience and qualifications for specific engineer for this project. With ten years of experience, experience and qualifications begin on page 12 of Phillip will be the single point of contact and coordinate this proposal:
all work efforts. Below is our organizational chart BOMBAY BEACH TOWNSITE ROADWAY IMP describing how work will flow on each project. 1. Resident Engineering & Construction Inspection Imperial County, CA
HAWK STREET IMPROVEMENTS PROJECT
CLIENT REFERENCES Resident Engineering & Construction
2. Below, we have listed three client references most Inspection Heber, CA familiar with our project performance. We have also ORCHARD ROAD IMPROVEMENTS PROJECT completed projects with a similar scope of work as the 3. Resident Engineering & Construction City of Calexico's. Inspection Holtville, CA
John Gay, PE HEBER TOWNSITE ROAD IMP'S. PROJECT
4. Resident Engineering & Construction
Director of Public Works
Inspection Heber, CA
Imperial County Department of Public Works PICACHO ROAD OVERLAY PH: (442) 265-1818 5. Resident Engineering & Construction Inspection Winterhaven, CA
Abraham Campos, PE PITZER ROAD IMPROVEMENTS
City Engineer/Public Works Director 6. Resident Engineering & Construction City of El Centro Department of Public Works Inspection Heber, CA PH: (760) 337-5182 CRUICKSHANK ROAD ILLEGAL DISPOSAL SITE
7. Resident Engineering & Construction
Jade Padilla, Program Manager Inspection Imperial County, CA Imperial County Workforce and Economic Development HOLTVILLE-Ninth STREET SIDEWALK IMPROV.
PH: (442) 265-1104 8. Resident Engineering & Construction Inspection Niland, CA
NICKLAUS
BEE
CALEXICO ENGINEERING. INC.
CITY OF
CALEXICO
RESIDENT ENGINEER CONSTRUCTION INSPECTOR
Phillip Ramires, PE Karla Be MATERIALS TESTING
CONSULTANT
RESIDENT ENGINEER CONSTRUCTION INSPECTOR SIERRA Alex Rojas
ALTERNATE ALTERNATE
LABOR COMPLIANCE
Antonio Alvarex, PE Luis Lopez CONSULTANT
Italia Grey
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvement Project • 6 ENGINETRING. INT.
Summary of Qualifications and Experience - Resumes
Phillip A Ramirez, PE
EDUCATION Resident Engineer
B.S. Structural Engineering Mir. Ramirez is a resident of Calexico and has worked for various public agencies, University of California spanning more than 10 years' of combined experience working on both private and San Diego public-funded construction projects. Mr. Ramirez's primary function as a resident engineer is to oversee the day-to-day operations of the civil, geotechnical, and
PROFESSIONAL
inspection staff. His responsibilities include coordination between the contractor and the
REGISTRATIONS
respective design disciplines and stakeholders from the Notice to Proceed into Civil Engineering
construction and through to the Notice of Completion. Mr. Ramirez's experience working
QSD/QSP
CA #C91488 on resident engineer projects includes RFI review, submittal review, change order review, quantity takeoff verification, progress payment review, labor compliance coordination, RELEVANT TRAINING evaluation and documentation of as-builts, observation, weekly progress meetings; CALTRANS Resident contract administration services as required to sufficiently warrant the construction has Engineer Academy been accomplished in accordance with the plans, specifications, and codes; project records administration; and discipline(s) coordination.
PROFESSIONAL
AFFILIATIONS RELEVANT EXPERIENCE:
ASCE American Society of NILAND MAIN STREET IMPROVEMENTS | NILAND, CA Civil Engineers Project consisted of rehabilitating the north side of Main Street between Highway 111 and Memphis Ave. Project included installing a new pavement section, curb and gutter, driveways, and pedestrian facilities. The project also required extensive potholing and utility company coordination. Served as Assistant Resident Engineer, which includes site inspections and documentation during the construction phase to verify compliance with the contract documents. Responsible for reviewing and processing pay applications and change orders, leads meetings, and coordinates submittals and RFl reviews.
WESTERN AVENUE IMPROVEMENTS | BRAWLEY, CA
Project included installing a roadway paving section, streetlights, water main line, storm drain main line, manholes, catch basins, pipelining of raw water channel, and pedestrian facilities (sidewalks and ramps). Served as the Resident Engineer as part of the ay applications and change orders, leading the weekly meetings, and coordinatin ubmittals and RFI reviews
SEELEY PUBLIC SAFETY FACILITY | SEELEY, CA
The project involved constructing a 4,735 sf County Public Safety Facility comprised of an apparatus bay, fire station, and cooling center. The fire station was complete with offices, living quarters, restrooms, server room, and space for two fire trucks. Served as Resident Engineer, which included site inspections and documentation during the construction phase to verify compliance with the contract documents. He also reviews and processes pay applications and change orders, leads meetings, and coordinates NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 7 ENGINTERING. INC.
Summary of Qualifications and Experience - Resumes
EDUCATION Antonio Alvarez, PE
B.S., Civil Engineering Resident Engineer Alternate
San Diego State University
Mr. Alvarez is a Calexico resident, a former member of the United States Navy, and PROFESSIONAL has over 19 years of civil and geotechnical engineering experience. His experience REGISTRATIONS spans horizontal A/E design services, including pre-design assessments, feasibility and Civil Engineering concept studies, investigations, soil engineering and seismic analysis, surveying and CA #C79509 mapping, site design, value engineering, cost estimating, construction management AZ #51919
and inspections, record drawings, and post-design review. His responsibilities include coordination between the contractor and the respective design disciplines and
RELEVANT TRAINING
CALTRANS Resident stakeholders from the Notice to Proceed into construction and through to the Notice Engineer Academy of Completion. Mr. Alvarez's experience working on Construction Management projects includes RFI management, submittal management, change order management, US Army Corps of quantity takeoff verification, progress payment review, labor compliance coordination, Engineers-Construction evaluation and documentation of as-builts, observation, weekly progress meetings, Quality Management for contract administration services as required to sufficiently warrant the construction has Contractors (CQM) been accomplished in accordance with the plans, specifications, and codes; project records administration; and discipline(s) coordination.
Radiation Safety Officer
Training RELEVANT EXPERIENCE:
BOMBAY BEACH TOWNSITE IMPROVEMENTS | IMPERIAL COUNTY, CA Nuclear Gauge Radiation The project included improving the Bombay Beach community's 5.88 miles of asphalt Safety Training roadways. improvements included asphaltic concrete and Asphalt Rubber Aggregate Membrane (ARAM) overlays and installing a Type 2 slurry seal coat over the open- ACI Field Technician Level 1 graded ARAM surface. Additionally, the project included raising utility covers to pavement grade, installing new stormwater swales, and new traffic striping on the newly ACI Concrete Strength paved roadways. Served as the Resident Engineer under an existing On-Call Contract Testing Technician with Imperial County.
PROFESSIONAL HEBER TOWNSITE ROADWAY IMPROVEMENTS | HEBER, CA AFFILIATIONS The project included reconstructing various roadways within Heber Townsite, including Society of American asphalt concrete, ARAM, slurry seal, and dig-out repairs. Served as the Resident Engineer under an existing On-Call Contract with imperial County. Coordinated the Military Engineers (SAME) preconstruction activities, oversaw the full-time construction inspections, and coordinated progress meetings with the GC. Provided all closeout documents, including American Society of As-Builts, daily and weekly reports, labor compliance closeout, approval of pay Civil Engineers (ASCE) applications, submittals, RFls, and other pertinent project information.
American Society of CRUICKSHANK ROAD ILLEGAL DISPOSAL SITE CLOSURE (CRIDS) | EL Professional Engineers CENTRO, CA
(ASPE) The project included the remediation of impacted waste from CRIDS, including 182,000 tons of non-hazardous waste and 21,000 tons of hazardous waste. Served as the Arizona Airports Association Resident Engineer and helped navigate numerous challenges throughout the project. (AZAA) Aided Imperial County and the City of El Centro in limiting potential exposure issues within reason. Reviewed all documents and submittals and maintained communication between all stakeholders on this project.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 8 ENGINTERING. INc.
Summary of Qualifications and Experience - Resumes
Karla Be, CQM
Construction Inspector
Mrs. Be is a graduate of the Autonomous University of Baja California, Mexicali, Mexico,
EDUCATION
with seven years of general construction and design experience. Her experience includes Bachelors of Architecture
Universidad Autonoma de enforcing building codes, quality control inspections, and construction inspections, BC (JABC) preparing cost estimates, preparing change orders, building design, and site designs.
Mrs. Be primary function as a construction inspector is to perform detailed inspections RELEVANT TRAINING in general construction, such as road improvements, highway improvements, buildings, US Army Corps of and facilities under construction or alteration. She records daily activities in construction Engineers-Construction and assists in making and checking measurements, levels, and layouts. Ms. Be produces Quality Management for daily reports, as-builts closeout binders, project records, and warranties to be in place at Contractors (COM) project completion.
EM 385-1-1 Certified RELEVANT EXPERIENCE:
NILAND MAIN ST. IMPROVEMENT | NILAND, CA
OSHA-40-hour The project involves rehabilitating and demolishing the existing asphalt pavement and HAZWOPER installing a new pavement section, curb and gutter, driveways, and sidewalks along Main Street. Mrs. Be is providing site inspections and documenting work progress during OSHA 30-Otreach construction to verify compliance with the contract documents. She also generates daily Trainning Program-
construction reports, leads weekly meetings, and coordinates submittals and RFl reviews.
CPR, Basic First Aid HERITAGE TRACK HOME HOMES | IMPERIAL, CA The project was a new residential area, including horizontal construction of new roads, UP Property Access sidewalks, curbs and gutters, ADA ramps, and wet and dry utilities. The utilities included Training a sewer force main, pump station, water, gas, electrical, poles, and spectrum service.
Vertical construction consisted of building 58 track homes. Vertical construction also included the installation of stucco, insulation, fire sprinklers, electrical fixtures and panels, rywall, paint, cabinets, and flooring. Mrs. Be was the PM assistant and oversaw th lesign and permitting process. She was a construction inspector and quality contro during construction, coordinating with local entities such as IID, SoCal Gas, Spectrum, and the City of Imperial.
gth ST IMPROVEMENTS | HOLTVILLE, CA
The project involves of the addition of shoulder lane to an existing street, grinding 1,5" of existing asphalt paving, installing a new pavement section, curb and gutter, driveways, and sidewalks along gth street between Ash ave and Oak Ave. Mrs. Be is providing site inspections and documenting work progress during construction to verify compliance with the contract documents. She also generates daily reports, leads weekly meetings, and coordinates submittals and RFI reviews.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 9 ENGINEERING. INC.
Summary of Qualifications and Experience - Resumes
Luis Lopez
EDUCATION Alt. Construction Inspector
Architecture licenciate
Universidad Autonoma de Mr. Lopez has over 20 years experience in construction. Throughout his professional Baja California career he has gained experience and participated in various industrial, commercial, Postgrade course and housing projects in which he has worked in the design and construction phases.
Universidad Politecnica de
Madrid As a designer he has always been concerned with developing a conceptual language that responds to the user needs, without leaving aside the adaptation to Other courses: the natural and social environment where the project is developed, to achieve this • Urban Development he uses a methodology that ranges from site analysis, diagrams of functionality, Pragram Port of Entry
Mexicali III sketches, models, rendering, even construction documents. • Bioclimatic Architecture and As a builder he has worked as a project manager, construction manager, site passive systems for energy resident, site supervisor, and on-site inspector performing tasks such as personnel saving management, quantification and acquisition of materials, supervision, and • Simulation of a thermal coordination of contractors, monitoring and progress of work, review and payment behavior of a building and of work performed estimates, among other tasks. its application to
automation He also worked for the municipal government in the city of Mexicali in which he participated in different urban infrastructure projects such as supervising the installation of utilities such as sewage and drainage lines, water lines, public lighting, PROFESSIONAL restoration of parks and public spaces.
CERTIFICATIONS
Architecture Licenciate
Mexico Profesional RELEVANT EXPERIENCE:
ID#3213564 SEELEY FIRE STATION & COOLING CENTER | SEELEY, CA RELEVANT TRAINING This project consisted of a one-story 4,735 square-foot pre-engineering metal building. The Seeley Fire Station is comprised of an apparatus bay to OSHA 30 HOURS accommodate two fire trucks, a fire station with offices, lockers, a washroom, 40 HOUR EM-385-1-1 restrooms, living quarters, a server room, and an 850-square-foot cooling center.
PROFESSIONAL
AFFILIATIONS The project site includes a PCC driveway entrance, asphalt concrete parking Architects College of Baja lots, and an asphalt concrete fire truck access roadway. The site also hac California (Former member) lighting and three interconnected native earth retention basins Served as an on-site inspector, which included quality control inspections in compliance with plans and specifications, also the generation and log of buits linion ch studio and posuconitar, ion proceders, RIS, and as- NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Cole Bivd • 10 ENGINTERING. INC.
Summary of Qualifications and Experience - Resumes
Alex Rojas
EDUCATION SIERRA
Geotechnical Consultant
B.S., Civil Engineering
Universidad Autonoma de Baja Mr. Rojas has extensive experience as a general contractor and owner's California representative providing construction/project management, resident engineering, and field inspection services for land development water and wastewater projects, including pipelines, pump stations, treatment facilities, reservoirs, and roadway construction. Mr. Rojas has constructed projects in the United States and Mexico.
RELEVANT EXPERIENCE:
HEBER TOWNSITE IMPROVEMENTS FOR VARIOUS ROADS | HEBER, CA Funding for the project was $4.8M for construction-related activities. Improvements include new sidewalks, curb and gutter, ADA pedestrian ramps, cross gutters, djustment of water valves, striping, signage, and street pavement structure. This he largest street improvement project for Imperial Count BOMBAY BEACH TOWNSITE IMPROVEMENTS | BOMBAY BEACH, CA
The project was to improve the Bombay Beach Road System, which consisted of 5.88 miles of asphalt cement paved roadways. As a consultant, Mr. Rojas coordinated the geotechnical and materials testing performed as per specifications.
Italia Gray gafcon
EDUCATION
Imperial Valley College, Labor Compliance Analyst Consultant Imperial, CA
Ms. Gray has extensive experience in all areas of contract compliance monitoring, PROFESSIONAL auditing, and the enforcement of applicable rules and regulations for state and AFFILIATIONS federally funded projects. She is especially adept at dealing with contractors and Coalition for Adequate School subcontractors in resolving tough compliance issues in a quick and efficient manner.
Housing (CASH) Italia has participated in and facilitated various public works and labor compliance Community College Facility
Coalition California (CCFC) training classes sponsored by the DIR, DOL, DAS and other labor organizations Southern Calfiornia throughout the state.
Development Forum (SCDF)
RELEVANT EXPERIENCE:
BOMBAY BEACH SHOULDER BACKING PROJECT | BOMBAY BEACH, CA The project was an infrastructure improvement initiative focused on enhancing the road shoulders for safety and durability. The project involved preparing the shoulders to accommodate Class 2 Aggregate Base (AB) material, which was then placed and compacted to a thickness of up to 4 inches, covering an average width of 4 feet. After the placement and compaction of the material, the final step involved watering and sweeping the street to ensure a clean finish and to remove any loose material, thereby completing the road improvement process.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 11 ENGINtERING. IKC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 1. Bombay Beach Townsite Roadway
Imperial County Department of
Improvements Project
Public Works (ICDPW)
CONTACT PERSON: Imperial County, CA
Veronica Atondo, PE, Deputy
The Bombay Beach Townsite
Director of Public Works
Roadway Improvements project
(442) 265-1818
[email protected]. ca.us included improving 5.88 miles of asphalt roadways in the Bombay
SCOPE ELEMENTS: Beach community. Improvements
/ Pre-Construction Coordination included asphaltic concrete and / Construction Management Asphalt Rubber Aggregate
/ On-Site Inspections Membrane (ARAM) overlays,
/ Daily and Weekly Inspection followed by installing a Type 2 slurry Reporting seal coat over the open-graded
/ Weekly Meetings ARAM surface.
/ Submittal Reviews
/ Payment Application Reviews Additionally, the project included / RFI Reviews raising utility covers to pavement
/ Change Order Reviews grade, installing new stormwater / Labor Compliance swales, and new traffic striping on the / Materials Testing Data Review newly paved roadways.
/ Pre-Final and Final Inspection
• As-Built Coordination and Imperial County Department of Project Closeout Public Works hired Nicklaus to
provide Resident Engineering and
Paving and slurry seal operations at Bombay
CONTRACT VALUE: Construction Inspection services. Beach Townsite. $140,625 Nicklaus was responsible for
coordinating and managing pre-construction activities, which include CONSTRUCTION VALUE: ranging a pre-construction meeting with representatives from Imperial $2,726,309 County, the General Contractor, the quality assurance materials testing company, the Engineer of Record, and the labor compliance consultant Vicklaus also provided full-time construction inspection services durin construction, including daily and weekly reporting to Imperial County and holding weekly safety and progress meetings with the General Contractor.
During construction, Nicklaus managed all RFls, submittals, pay applications, change orders, pre-final and final walkthroughs, and final close-out documentation.
Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 12
NICKLAUS
ENGINTERING, IN
Summary of Qualifications and Experience - Specific Experience CLIENT:
2. Hawk Street Improvements
Imperial County Department
of Public Works Heber, CA
CONTACT PERSON: Nicklaus received a Task
Veronica Atondo, PE, Deputy Order to provide
Director of Public Works Resident Engineering
(442) 265-1818 and Construction
[email protected]. Inspection Services for
ca.us the Hawk Street
Improvements Project
SCOPE ELEMENTS: under an existing On-
/ Preconstruction Meeting Call contract with
/ Weekly Meetings Imperial County. The Nicklaus discovered the existing roadway section was not as General Contractor's described in the construction documents, leading to project • Schedule Management quantity underruns.
• Cost Control (GC) scope of work for
/ Submittal Management the Hawk Street Improvement Project included reconstructing the roadway • Change Order Management with 2" of conventional Asphalt Concrete (AC) cap over 1" of AC leveling course, • Request for Information dig-outs, crack cleaning and filling, construction signs, paint striping and Management signage. The length of the road improvements covered approximately 0.29 / Quality Control miles.
/ Daily Inspection
Nicklaus performed pre-construction activities, including coordinating and / Observe Construction
managing pre-construction meetings with representatives from Imperial Materials & Methods
County, GC Quality Control Material Testing Consultant, Engineer of Record, / Permit & Environmental
and Heber Public Utilities District. Construction services included full-time Compliance
construction inspection, daily and weekly reporting to Imperial County, and / Progress Payment
weekly safety and progress meetings with the GC. Nicklaus discovered that the Management
existing roadway section was not as described in the construction documents, / Monthly Status Report
/ Project Close-out leading to project quantity underruns and cost analysis. Additionally, as dig- out operations began, Nicklaus discovered the existing roadway section was CONTRACT VALUE: not as described in the construction documents, leading to project quantity underruns. Nicklaus documented measurements with the GC and used the $32,219
daily reports to help avoid potential conflicts with the Contractor's payment CONSTRUCTION VALUE: requests. Nicklaus identified additional areas with failed subgrade, marked the areas for removal while maintaining the overall quantity underruns, and $285,539
provided pre-final and final walkthrough services with Imperial County and the GC, noting all punch list items. Nicklaus worked with the GC and Imperial County to close the project post-construction, including reviewing and approving the final pay application, retention pay application, As-Builts, closeout documents, and final report.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 13 ENGINEERING. İNC.
Summary of Qualifications and Experience - Specific Experience CLIENT: 3. Orchard Road Improvements Project
City of Holtville
Holtville, CA
CONTACT PERSON:
Nick Wells, City Manager The City of Holtville hired Nicklaus (760) 356-2831 to perform Resident Engineer (RE)
[email protected] and Construction Inspection (CI) services. These services included
SCOPE ELEMENTS: Pre-Construction, Construction
Administration, and Post
• Construction Management
• On-Site Inspections Construction services.
• Weekly Meetings
/ Submittal Reviews Construction included demolition
/ Payment Application Reviews of existing asphalt pavement, / RFI Reviews asphalt rubber hot mix pavement,
/ Change Order Reviews and Class 2 Base installation along / Labor Compliance Orchard Road between the north
• Materials Testing Data end of the Alamo River Bridge and Review 4th Street. The scope of work also
/ Pre-Final and Final included the installation of curb Inspection and gutter, sidewalk, and storm
/ As-Built Coordination & drainage improvements.
Project Closeout
Pre-construction activities
CONTRACT VALUE: included coordinating and
Work included the installation of curb and gutter,
$74,482 managing the pre-construction sidewalk, and storm drainage improvement. meeting with representatives
CONSTRUCTION VALUE: from the City of Holtville, the General Contractor, the Labor Compliance $367,100 Consultant, and the Engineer of Record.
Construction services included full-time construction inspections, daily and weekly reporting to the City of Holtville, and weekly safety and progress meetings with the General Contractor.
Post-construction included Nicklaus providing the City of Holtville with all closeout documents, including As-Builts, daily and weekly reports, labor compliance closeout, approved pay applications, submittals, RFls, and other pertinent project information.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 14
ENGINEERING, INE
Summary of Qualifications and Experience - Specific Experience CLIENT: 4. Heber Townsite Road Improvements
Imperial County Department of
Heber, CA
Public Works
CONTACT PERSON: Nicklaus received a Task
Veronica Atondo, PE, Deputy Order to provide Resident
Director of Public Works Engineering and
(442) 265-1818 Construction Inspection
[email protected]. Services for the Heber
ca.us Roadway Improvements
Project under an existing On-
SCOPE ELEMENTS:
Call contract with Imperial
/ Construction Management
County.
/ On-Site Inspections
• Weekly Meetings
The General Contractor's (GC)
/ Submittal Reviews
scope of work for the project
/ Payment Application Reviews included reconstructing The size of road improvements covered approximately / RFI Reviews 62,000 square yards. All the work for the project various roadways within followed the Caltrans Standard Specifications, the / Change Order Reviews project specifications, and the special provisions..
Heber with improvements
• Labor Compliance that included a 1.25-inch
/ Materials Testing Data Review asphalt concrete leveling course, Asphalt Rubber Aggregate Membrane / Pre-Final and Final Inspection
(ARAM), type 2 slurry seal coat, dig-out repairs for localized pavement failure / As-Built Coordination and
areas and 2-inch skin patch. The area road improvements covered Project Closeout approximately 62,000 square yards. All the work for the project followed the CONTRACT VALUE: Caltrans Standard Specifications, the project specifications, and the special $74,496 provisions.
CONSTRUCTION VALUE: Nicklaus performed pre-construction activities, including coordinating and $7,401,091 managing the pre-construction meeting with representatives from Imperial County, GC, Quality Control Material Testing Consultant, Engineer of Record, and Heber Public Utilities District. Construction services included full-time construction inspections, daily and weekly reporting to Imperial County, and weekly safety and progress meetings with the GC.
Before construction services began, Nicklaus identified additional locations requiring dig-outs, coordinating with the Contractor and Imperial County to nsure the Time and Material Allocation covered the necessary improvement:
n addition, Nicklaus provided Imperial County with all closeout document including As-Builts, daily and weekly reports, labor compliance closeout, approved pay applications, submittals, RFls, and other pertinent project information post-construction.
Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 15
NICKLAUS
ENGINEERING. INc.
Summary of Qualifications and Experience - Specific Experience CLIENT: 5. Picacho Road Improvements
Imperial County Department of
Public Works Winterhaven, CA
CONTACT PERSON: Nicklaus received a Task Order to
Veronica Atondo, PE, Deputy provide Resident Engineering and Director of Public Works Construction Inspection Services for (442) 265-1818 the Picacho Road Overlay Project under
[email protected]. ca.us an existing On-Call contract with Imperial County. The General
SCOPE ELEMENTS: Contractor's (GC) scope of work for the / Construction Management Picacho Road Overlay Project included / On-Site Inspections reconstructing the roadway with 2" of / Weekly Meetings conventional Asphalt Concrete (AC) cap / Submittal Reviews over 1" of AC leveling course.
/ Payment Application Reviews Additionally, the project included Project included reconstructing the roadway with 2" of conventional Asphalt Concrete
/ RFI Reviews survey and construction staking, Class Il (AC) cap over 1" of AC leveling course. / Change Order Reviews base shoulder backing, Portland
/ Labor Compliance cement concrete pavement, dig-outs, crack cleaning and filling, utility Moterials Testing Data Review adjustments, lane striping, and traffic signage. All work for the project followed / Pre-Final and Final Inspection Caltrans Standard Specifications, project specifications, and special provisions. / As-Built Coordination & Project Nicklaus also reviewed and approved the traffic control and erosion and Closeout sediment control plans.
PROFESSIONAL FEE: Pre-construction activities included coordinating and managing the pre- $71,841 construction meeting with representatives from Imperial County, the General Contractor, the materials testing consultant, the Engineer of Record, and the CONSTRUCTION VALUE: labor compliance consultant. Construction services included full-time $597,042 construction inspection, including daily and weekly reporting to Imperial County and weekly safety and progress meetings with the GC. Nicklaus worked with Imperial County on preserving an existing vehicular bridge along Picacho Road.
Due to age and deterioration, Imperial County imposed load limit restrictions, and Nicklaus worked with the GC to find and track alternate routes for truck transit. Additionally, Nicklaus provided expertise to Imperial County to address change orders, contractor questions, quantity discrepancies, and problem resolution. Nicklaus also reviewed and approved the traffic control plans for the different phases of the project. Being in a busy part of the Town of Winterhaven, traffic had to be minimally disrupted. Finally, post-construction, Nicklaus worked with the GC and Imperial County to close the project, including reviewing and approving the final pay application, retention pay application, As-Builts, closeout documents, and final report.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 16 ENGINTERING. INE.
Summary of Qualifications and Experience - Specific Experience CLIENT:
). Pitzer Road Improvements
Imperial County Department of
Public Works Heber, CA
CONTACT PERSON: Nicklaus was selected to provide
Veronica Atondo, PE, Deputy Resident Engineer & Construction Director of Public Works Inspection Services for the Imperial (442) 265-1818 County Department of Public Works
[email protected]. ca.us on the Pitzer Road Improvements project.
SCOPE ELEMENTS:
/ Preconstruction Meeting The project involved approximately / Weekly Meetings one mile of road improvements,
• Schedule Management including road excavation and
/ Cost Control earthwork, Class 2 Aggregate Base,
v Submittal Management asphalt paving, concrete, sidewalks, • Change Order Management curb, gutter, pedestrian ramps, storm / Request for Information drains, signage, and related
Management appurtenances.
/ Quality Control
• Daily Inspection Nicklaus' On-Site Inspector was
/ Observe Construction responsible for monitoring the
Materials & Methods contractor's work performance and
/ Permit & Environmental ensuring compliance with codes and Compliance construction documents. The
The project involved approximately one mile
/ Progress Payment inspector drafted daily inspection of road improvements.
Management reports and maintained a daily
• Monthly Status Report photo catalog of construction activities. The reports and photographs were / Project Close-out communicated daily to the Resident Engineer, the General Contractor, and the County of Imperial Representative.
CONTRACT VALUE:
$29,860
The Resident Engineer prepared notices, agendas, and meeting minutes. The Resident Engineer tracked the construction progress by evaluating and CONSTRUCTION VALUE:
updating the project schedule and weekly reports. The Resident Engineer also $335,178 reviewed Contractor pay applications, change orders, RFls, and submittals; and scheduled materials testing and other required testing for the project per the contract documents.
Also, Nicklaus provided Imperial County with a project close-out report and all construction-related documents in binder and digital forms.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 17 NGINEERING. INC
Summary of Qualifications and Experience - Specific Experience CLIENT: 7 Clean Closure of Cruickshank Road
Imperial County Department
of Public Works Illegal Disposal Site; County Project No. 5680SW CONTACT PERSON: El Centro, CA, and Imperial County, CA
John A. Gay, PE, Director
of Public Works The site was previously
(442) 265-1818 impacted with waste,
[email protected]. ca.us generally composed of
broken glass, tile, bricks,
SCOPE ELEMENTS: concrete, tires, and metallic
/ Constructability Review waste. Nicklaus was
/ Preconstruction Meeting contracted to provide
/ Weekly Meetings Resident Engineer and
/ Schedule Management Construction Inspection The Cruickshank Road lilegal Disposal Site (CRIDS) is a / Cost Control former illegal disposal area consisting of approximately Services for the site 9 acres owned by Imperial County and 34 acres owned v Submittal Management remediation. Services by the City of El Centro. • Change Order Management included the following:
/ Request for Information • Client consultation and facilitation of the pre-construction meeting Management • Continuous on-site inspection during construction / Quality Control • Facilitation of weekly contractor meetings / Daily Inspection • Review and approval of payment applications / Observe Construction • Review and logging of change orders, submittals, RFls, and material testing data
Materials & Methods
• Labor Compliance
/ Permit & Environmental • Coordination of the pre-final and final inspections Compliance • Completion of a project summary report with closeout documents. / Progress Payment
Nicklaus played a significant role in pre-construction activities, including Management
/ Monthly Status Report reviewing and commenting on the Contractor's submitted Work Plan. During / Project Close-out the review, it was apparent to Nicklaus that the Contractor's interpretation of the Contract Documents varied from the designer's intent. Our experts in CONTRACT VALUE: regulatory compliance and environmental remediation helped untangle the $446,477 differences and guide both the Contractor and Stakeholders to a tangible agreement that is in keeping with the intention of the contract and acceptable CONSTRUCTION VALUE: to the regulatory agencies. Nicklaus consulted with the Imperial County $7,986,762 Departmen and publish one hange during thei negotiations cith the developing a testing program agreeable to the City of El Centro, Imperial County, Local Enforcement Agency (LEA), and the Designer of Record. In addition, Nicklaus worked closely with the LEA to ensure they were on board with the proposed contractor plan and that strict adherence to Imperial County Air Pollution Control District rules was met.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 18 ENGINEERING. INE
Summary of Qualifications and Experience - Specific Experience CLIENT:
8 Holtville Ninth Street Sidewalk Improvements
City of Holtville
Holtville, CA
CONTACT PERSON:
Nick Wells, City Manager
(760) 356-4574 Nicklaus was awarded the City
[email protected] of Holtville East Ninth Street
Improvements contract to
SCOPE ELEMENTS: provide full-time Resident
/ Constructability Review Engineering, Construction
/ Preconstruction Meeting Management, and Inspection
/ Weekly Meetings Services for the construction of
/ Schedule Management a new PCC sidewalk along the
/ Cost Control North side of the street.
/ Submittal Management
Nicklaus performed pre-
/ Change Order Management
/ Request for Information construction activities, including coordinating and managing
Management
pre-construction meetings with
/ Quality Control
/ Daily Inspection representatives from the City of
Holtville.
/ Observe Construction
Materials & Methods Construction services included
/ Permit & Environmental full-time construction
Compliance inspection, daily and weekly Construction services included full-time construction inspection, daily and weekly reporting
/ Progress Payment reporting to the City, and
to the Cily, and weekly sofety and progress
Management weekly safety and progress meetings with the GC.. / Monthly Status Report meetings with the GC
• Project Close-out
Nicklaus oversaw the installation of a 6-inch P.C.C. curb and gutter along the CONTRACT VALUE: new interior sidewalk edge and new asphalt rubber hot mix (ARHM) pavement $56,143 and checked the native subbase grades, subgrade elevations, and finish grade elevations before the installation of subgrade and finished grade materials to CONSTRUCTION VALUE: ensure the proper depth of materials were installed. $338,128 Nicklaus communicated daily with the City, the Contractor, Geotechnical Consultants, the Labor Standards Compliance Officer, affected utility companies, Imperial Irrigation District representatives, the Caltrans/FHWA representative, and other parties involved with the construction and additionally kept a daily activity log. Additionally, Nicklaus was responsible for processing, monitoring, coordinating, and completing the submittal review process with the Contractor.
NICKLAUS Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 19
ENGINEERING, INC
Analysis of Effort/Methodology
contract compliance, which the Resident Engineer will
Nicklaus fully understands the review. The On-Site Inspector will also ensure the City of Calexico's scope of work Contractor promotes job site safety, noting as-built conditions, and conducting labor interviews.
for construction management,
geotechnical, and construction The Resident Engineer will supervise the construction administration through daily
inspection services. communication with the On-Site Inspector and weekly progress meetings with the Contractor and
Nicklaus plans to approach this construction City.
management and geotechnical engineering services
project with a California-licensed civil engineer who will The Resident Engineer will receive and review the act as the resident engineer and an experienced field Contractor payment applications, any change orders, personnel member who will serve as the on-site RFls, submittals, materials testing results, and certified construction inspector. Construction Management payroll. The Resident Engineer and On-Site services will be supplemented by two sub-consultants for Construction Inspector will participate in the pre-final Labor Compliance and Quality Assurance Materials walkthrough, developing a punch list to distribute to the Testing. Contractor and City. Additionally, the On-Site Inspector will monitor the completion of the pre-final punch list Pre-construction Services: items and coordinate the final inspection with the Before construction begins, the Resident Engineer and Resident Engineer, City, and General Contractor. After On-Site Inspector will review and familiarize themselves construction, Nicklaus will coordinate the As-Built Plans with the Contract Documents, General Conditions, with the City and conduct the project closeout. The Supplementary Conditions, Special Conditions, Technical project closeout typically includes a project summary Specifications, Construction Plans, and Addendums. Next, report submitted in two (2) sets in hard copies (three-ring Nicklaus will meet with City representatives to discuss binders) and digital format (PDF) on one USB thumb drive the required submittal documents and the project as a portable document. schedule. Nicklaus will also discuss the pre-construction meeting and formulate an agenda for the conference at Approach:
this meeting. It is anticipated that Nicklaus will conduct the pre-construction meeting with a reviewed and Organize and manage the Pre-construction approved agenda. Finally, Nicklaus will prepare the pre- Meeting. construction meeting minutes for record and deliver them Nicklaus routinely provides these services, providing an to the City's Project Administrator and the Contractor agenda to our client for comment at least 48 hours in within 48 hours. advance. Typical items addressed during the pre- construction meeting include:
Construction Services:
• Key Project Personnel Contact Information
The On-Site Construction Inspector will begin full-time inspection services as construction begins. The On-Site • Project Overview Construction Inspector will draft inspection reports and • Review of Contract Documents, Plans, take a daily photo catalog of construction activities. The Specifications, and Addendums • Review of the Construction Schedule
reports and photographs will be communicated to the
Resident Engineer, the Contractor, and the City. In • Labor Compliance addition, the On-Site Construction Inspector will begin • Mobilization and Staging Areas coordinating all material testing required for the project • Possible Phasing and Work Hours as outlined in the contract documents and the approved • Progress Meeting Requirements • Subcontractors
QAP. Test results will be part of the daily submittals for • General Safety Requirements
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvemet Project • 20 ENGINEERING. INE.
Analysis of Effort/Methodology
• Traffic Control Our Weekly Reports will include, but not be limited to:
• Existing Utilities • Project Name, Report Number, and Date • Outside Agency Coordination Requirements • General Breakdown of Daily Work Activities along • Permit Requirements with Weather Conditions
• Submittal Requirements • Tracking of Working Days, Non-Working Days, and • Contract Change Orders and Extra Work Bill Working Days with No Work on Controlling Activity Requirements
• Change Order Time Adjustments
• Materials Testing Requirements • Tracking of Contract Days • Progress Payment Requirements
• Controlling Activities
• As-Builts
• General Discussion and Questions
The Resident Engineer will sign each weekly report.
Verify that the Contractor's work is completed Provide Quality Assurance support. according to plans and specifications. Nicklaus has an AMRL/CCRL/USACE-certified materials Nicklaus understands this is the root of Construction testing laboratory at our corporate office in Yuma. Many Management. Ensuring the Contractor completes work as of our staff are trained to use Nuclear Gauges and carry contracted starts before work begins, with careful ACI certifications. We will draw from decades of examination of the project construction documents experience working with testing and materials inspections before mobilization. to help ensure the project is appropriately tested following the QAP for both QA and QC testing.
Nicklaus has an extensive portfolio of untangling complex Coordinate construction activity between the projects before the contractor steps foot on the site. As evidenced in our attached project descriptions, we are various agencies and the General Contractor. familiar with overlay and asphaltic concrete construction We understand that construction projects can be tricky, projects. As the project progresses, our Resident Engineer and keeping open and constant communication with the and on-site inspector will fully engage in construction various agencies is essential. Each appropriate agency will activities with the Contractor, ensuring the project is be invited to the pre-construction meeting, and a weekly completed as contracted. Our on-site inspector will progress meeting will be established. Each agency will provide detailed daily reports, and our Resident Engineer have an open invitation to the weekly progress meetings, will provide weekly summary reports. and we will send out invites and updates as the project progresses.
Our daily reports will include, but not be limited to:
Verify quantities with the General Contractor and
• Project Name, Report Number, and Date complete Quantity Calculation sheets. • Shift Hours Start and Stop
• Location and Description of Operations Nicklaus has completed many Resident Engineering and • Weather Conditions Description Construction Management projects requiring quantity • List of Numbered Equipment On-Site calculations to accept payment applications. • Description of Labor and Names Our team will prepare a spreadsheet that includes all the • Hours vs. Bid Item No. for Labor and Equipment proposal items, units, unit costs, bid set quantities, and • Tracking of Idle or Down Equipment and Labor bid set costs. Our on-site inspector will update this • Detailed Description of Work Activities spreadsheet daily to include material quantities placed at • Photo Catalog with Descriptions the job site.
Coordinate construction progress meetings
Each Daily Report will be signed by the Construction
Inspector and initialed by the Resident Engineer after during construction. review. Over the years, we have found that coordinating and managing weekly progress meetings better serves each
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvemet Project • 21 ENGINEERING. INE.
Analysis of Effort/Methodology
project. Weekly progress meetings will be an essential Contract, ensuring stormwater compliance for facilities part of this project. The weekly progress meetings' day, within the California, Arizona, and Nevada Areas of time, and location will be established at the pre- Responsibility for the Navy. Monitoring of the erosion construction meeting. In general, the weekly progress control by the Contractor will be included in our daily meetings will include the following: reporting.
• Project Name, Meeting Number, and Date Provide troubleshooting support to assist in • Review of Old Business
finding solutions to any issues between the
• Contractor Discussion on Work Activities
• On-Site Inspector Discussion on Work Activities parties. • Review of Schedule & Discussion of 2-week look It is understood that occasionally, it is necessary to help ahead. field engineer problems and coordinate troubleshooting • Existing and Proposed Utility Coordination efforts between multiple parties. The Resident Engineer's • Project Safety: Discuss Safety Meetings, Unsafe role is to clarify the issue and manage a cost-effective Acts, Accidents, Near Misses, and Action Items. solution between the Contractor, Engineer of Record, and • Review of the Status of RFls as a Action tems the Owner. We understand the importance of juggling the • Review of the Status of Submittals schedule impacts and the budget equally. Most recently, • Review of the Status of Change Orders we navigated significant troubleshooting efforts for the • Review of the Status of Pay Applications Cruickshank Road Illegal Disposal Site and Winterhaven • General Discussion Public Safety Facility projects, each having issues requiring stop-work orders. We recently helped Imperial Provide labor compliance services to ensure County restart the Niland Main Street Improvements project, which encountered unforeseen gas line location workers employed by the General Contractor and Aerially Deposited Lead issues, providing field and subcontractors are hired and paid in engineering support and coordination. compliance with all applicable State and
Federal laws. Track and expedite review and approvals of Nicklaus has teamed with Gafcon to provide these RFls and change order requests. services for this contract. They have provided similar local Submittals, RFls, and Change Orders will be tracked using services on various projects for Nicklaus and others, and spreadsheets and appropriately numbered as received. we have a trusted relationship with them. We will Each document will be dated upon receipt, the date sent coordinate appropriate times for Gafcon to conduct labor to the Engineer of Record (if necessary), the date received interviews, and we will provide them with each daily from the Engineer of Record, and the date returned to the report upon completion of the report. Labor Compliance Contractor. As previously discussed, Nicklaus is prepared will consist of the following: to use Procure to help expedite and streamline the • Ensure Contractor Eligibility project.
• Monitor Certified Payroll Reports
• Conduct On-Site Interviews Review the construction schedule. • Provide Progress Payment Review Assistance Typically, we would receive a construction schedule at the • Identify Violations pre-construction meeting to discuss it with all pertinent • Provide Monthly Reporting stakeholders. We will review the Contractor's project • Maintain Labor Compliance schedule before construction mobilization, and we will require two-week look-ahead schedules from the
Verify that all erosion control is set up and Contractor at each progress meeting so that any maintained throughout the project. scheduling conflicts can be identified early to avoid Nicklaus has worked on projects larger and smaller than construction delays. In addition, we will track the 1 acre and has staffed QSD and QSPs. Nicklaus is the sole controlling activity, ensuring that our weekly reports holder of the current NAVFAC SW $100M Stormwater identify the Contractor's progress.
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvemet Project • 22 ENGINEERING. INT.
Analysis of Effort/Methodology
Evaluate and present all change order Coordinate all owner and post-completion proposals to the City for review. activities.
Nicklaus will review and validate change orders before Typically, Nicklaus provides all closeout documentation in proposals are sent to the City. Over the past few years a binder and digital form. This includes all pertinent alone, we have reviewed and processed hundreds of project information, including those listed above, daily change orders ranging from no-cost change orders to and weekly reports, fully executed payment applications change orders worth over a million dollars. Each change and change orders, all tickets and certifications, materials order will include a detailed description of the change's testing reports, approved submittals, responses to RFl's, reason, cause, and breakdown, including any cost or time directives, and general correspondence. adjustment. It will also include a cost and time adjustment analysis to verify the Contractor's request. Sample Project Timeline.
This project's construction phase is estimated to take
Review submittals. 60 working days. Our team will begin familiarizing itself Nicklaus is prepared to review project submittals or with the project plans and specifications two weeks coordinate with the Engineer of Record as per the City's before our pre-construction meeting. We will also direction. We will return submittals to the Contractor prepare and conduct weekly progress meetings promptly to prevent construction delays, and we will throughout the project. Lastly, a project summary report prepare a submittal register for the Contractor to ensure will be delivered to the City approximately three weeks we receive all required submittals on time and in good after completion. order.
Participation.
Receive and process payment requisitions for Nicklaus will ask that the City participate in the pre- the owner's review. construction and weekly progress meetings conducted Nicklaus commonly receives and provides properly throughout this project. completed payment applications for the owner's review Deliverables. and acceptance. Typically, each application is provided on Nicklaus will deliver all previously mentioned closeout the required form, with the contractor's invoice,
documentation in a binder and digital form. Daily and
conditional waiver and release form, quantity calculations, weekly reports and material quantity calculations, test and material tickets.
results, and delivery slips will also be promptly delivered to the City's Project Administrator.
Evaluate all claims and prepare a written
response. Over the years, we have developed an understanding of If there is a claim or audit on the project, Nicklaus is managing the construction of various projects. We have prepared to review submitted claims and provide a tackled small shoulder backing projects, multi-million- detailed written response backed by our daily and weekly dollar rigid pavement and drainage improvement reports. projects, complex remediation projects, and various vertical and horizontal construction projects.
Manage the completion of the punch list.
Nicklaus performs a pre-final walkthrough with the
contractor and client for all CM projects. All deficiencies We are ready and excited are noted, and Nicklaus develops a punch list within 48 hours, depending on the complexity of the list. Upon about this opportunity to completing the punch list, Nicklaus coordinates a final provide these services to walkthrough for project closeout. the City of Calexico.
NICKLAUS Calexico CM, Geotechnical, & Inspection Services - Sidewalk Improvemel Project • 23 ENGINEERING. INE.
AL 013
Industrial Relations
STATE OF CALIFORNIA
APPLICATION FOR
PUBLIC WORKS CONTRACTOR REGISTRATION
Registration Information
Type: Public Works
Period: 07/01/2024 06/30/2027
Contractor Information
Contractor Name: Nicklaus Engineering Inc
Trade Name:
License Type Number: 1000034189
Contractor Physical Address
Physical Business Country: United States of America Physical Business City/ El Centro Province:
Physical Business Address: 1461 Main Street Physical Business State: CA Physical Business Postal 92243
Code:
Contractor Mailing Address
Mailing Country: United States of America Mailing City /Province: Yuma Malling Address: 1851 W. 24th St., Ste. 101 Mailing State: AZ Mailing Postal Code: 85364
Contact Info
Daytime Phone: Daytime Phone Ext.:
Mobile Phone: Business Email: [email protected]
Applicant's Email: [email protected]
Registration Services:: Page 1 of 2 5/15/20249:16:28 AM Workers' Compensation
Professional Employer Organization (PEO)
Do you lease employees through Professional Employer Organization? No Workers' Compensation Overview
Carrier: A.T.P. and Associates Inception Date: 09/15/2023 Policyholder Name: Nicklaus Engineering, Inc. Expiration Date: September 15, 2024 Policy Number: WCB238439-03
Certification
Yes I certify that I do not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award Yes I certify that the contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works.
Yes I certify that one of the following is true: (1) I am licensed by the Contractors State License Board (CLB) in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code; or (2) my business or trade is not subject to licensing by the CSLB.
I understand refunds are not authorized
I, Dorian Gibson, the undersigned, am, Nicklaus Engineering Inc with the authority to act for and on behalf of the above named contractor. I certify under penalty of perjury that all of the above information provided is true and correct. I further acknowledge that any untruthful information provided in this application could result in the certification being canceled.
I certify this on: 9:11 AM
Legal Entity Information
Legal Entity Type: Corporation
Name: Nicklaus Engineering Inc
Registration Services:: Page 2 of 2
CA DIR Proof of Registration
DIR Registrations:
SIERRA MATERIAL TESTING & INSPECTION (Exp. 2027-06-30)
CEov
DiR Departmentol eCPR Public Search Public Works Support Contractors Projects Services Your information - Alejandro Rojas Industrial Relations
DIR Services Portal
What can we heip you find today?
Improving working conditions In California since 1927
Y Associated Accounts
Account Status
SIERRA MATERIAL TESTING & INSPECTION, IN Registration valid from 2024-07-08 to 2027-06- 30 Sierra MTI DIR Approved
Welcome, Alejandro Rojas
Sierra MTI 1000006908
GAFCON
N/A - Gafcon is a 3rd party consulting agency.
NICKLAU Calexico CM, Geotechnical & Inspection Services - Sidewalk Improvement Project • 26 AGINTERING. IN
Local Assistance Procedures Manual Exhibit 10-01
Consultant Proposal DBE Commitment
EXHIBIT 10-01 CONSULTANT PROPOSAL DBE COMMITMENT
1. Local Agency: City of Calexico 2. Contract DBE Goal: 5%
3. Project Description: Sidewalk Improvement Project
4. Project Location: Calexico, CA
5. Consultan's Name: Nicklaus Engineering, Inc. 6. Prime Certified DE:
8. DBE
7. Description of upiervice, or Materials Certification 9. DBE Contact Information 10. DBE % Number
Provide Constriction Management, Geotechnical 42404 Antonio Alvarez, PE/[email protected] 56.10 and Inspection Services for Sidewalk Impr.
Local Agency to Complete this Section
17. Local Agency Contract Number: 56.10
11. TOTAL CLAIMED DBE PARTICIPATION
18. Federal-Aid Project Number:
Consultant's Ranking after Evaluation:
IMPORTANT: Identify all DBE firms being claimed for credit.
Local Agency certifies that all DBE certifications are valid and information on regardless of tier. Written confirmation of each listed DBE is this form is complete and accurate.
11/08/2024
21. Local Agency Representative's Signature 22. Date 12. Préparer's Signature 13. Date Antonio Alvarez, PE 928) 246-1616
23. Local Agency Representative's Name 24. Phone 14. Preparer's Name 15. Phone Vice President
25. Local Agency Representative's Tile 16. Preparer's Title DISTRIBUTION: Original - Included with consultant's proposal to local agency.
ADA Notice: 5860 or wil eird and oration, his en a selle in lead female reformation cal 410) 6548410 or TOD (019) 659.
LPP 18-01 Page 1 of 2
January 2019
EXHIBIT B
SCHEDULE OF CHARGES
10 Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
ExHIBIT 10-H1 COST PROPOSAL Page 1 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGNEERING AND ENVIRONMENTAL STUDIES)
Note: Mark-ups are Not Allowed • Prime Consultant • Subconsultant 2nd Tier Subconsultant Consultant_ Nicklaus Engineering, Inc.
Project No. CML-5168 (036) Contract No. N/A Date 11/07/2024
DIRECT LABOR
Classification/Title Name Hours Actual Hourly Rate Total Resident Engineer Phillip Ramirez / Antonio Alvarez 100.00 $ 69.71 $6,971.00 Construction Inspector Karla Be / Luis Lopez 480.00 $ 28.06 $ 13,468.80 Administrative Assist. Kylee Canez 52.00 $ 22.10 $ 1,149.20 $0.00
LABOR COSTS
a) Subtotal Direct Labor Costs $ 21,589.00
b) Anticipated Salary Increases (see page 2 for calculation) c) TOTAL DIRECT LABOR COSTS (a) + (b)] $ 21,589.00
INDIRECT COSTS
d) Fringe Benefits (Rate: 36.15% ) e) Total Fringe Benefits [(c) x (d)] $ 7,804.42 f) Overhead (Rate: 73.53% ) g) Overhead [(c) x (f] $ 15,874.39 General and Administrative (Rate: 11.54% i) Gen & Admin [(c) x (h)] $2,491.37 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 26,170.19
FIXED FEE k) TOTAL FIXED FEE [(c) + (i)] x fixed fee 15.00% 1 $ 7,163.88 L) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total
Mileage Costs $ 0.00
Equipment Rental and Supplies $ 0.00
Permit Fees $ 0.00
Plan Sheets $0.00
(Test $ 0.00
1) TOTAL OTHER DIRECT COSTS $0.00
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: Gafcon $ 6,979.00
Subconsultant 2: Sierra Materials Testing & Inspection, Inc. $ 36,000.00 Subconsultant 3:
Subconsultant 4:
m) TOTAL SUBCONSULTANTS' COSTS $ 42,979.00
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)+(m)] $ 42,979.00 TOTAL COST [(c) + (i) + (k) + (n)] $ 97.902.06
January 2020
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Total Hours per Avg 5 Year
Subtotal per Cast Cost Proposal Hourly Contract
Proposal Rate Duration
$250,000.00 500 = $50.00 Year 1 Avg
Hourly Rate
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation
Year 1 $50.00 2% = $51.00 Year 2 Avg Hourly Rate
Year 2 $51.00 2% $52.02 Year 3 Avg Hourly Rate
Year 3 $52.02 : 2% $53.06 Year 4 Avg Hourly Rate
Year 4 $53.06 2% $54.12 Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate % each year by total hours Estimated% Completed Total Hours per Cost Total Hours per Each Year Proposal Year
Year 1 20.0% 5000 1000 Estimated Hours Year 1
Year 2 40,0% 5000 2000 Estimated Hours Year 2
Year 3 15.0% 5000 = 750 Estimated Hours Year 3
Year 4 15.0% 5000 750 Estimated Hours Year 4
Year 5 10,0% 5000 500 Estimated Hours Year 5
Total 100% Total 5000
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours Cost per
(calculated above) (calculated above) Year
Year 1 $50.00 1000 $50,000.00 Estimated Hours Year 1
Year 2 $51.00 *...• 2000 $102,000.00 Estimated Hours Year 2 Year 3 $52.02 750 $39,015.00 Estimated Hours Year 3
Year 4 $53.06 750 $39,795.30 Estimated Hours Year 4
Year 5 $54.12 $27,060.80 Estimated Hours Year 5
Total Direct Labor Cost with Escalation = $257,871.10
Direct Labor Subtotal before Escalation = $250,000.00
Estimated total of Direct Labor Salary Transfer to Page 1 $7,871.10
NOTES:
(i.e. $250,000x2% x 5yrs= $25,000 is not an acceptable methodology)
4. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted Calculations for anticipated salary escalation must be provided
January 2020
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
ExHIBIT 10-H1 CosT PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, cerlify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)
All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.
Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifying:
Name: Antonio Alvarez Vice President
Title *:
Digitally signed by Antonio Alvarez
Signature : Antonio Alvarez Dale: 2024.11.07 16:15:00-0700 Date of Certification (mm/dd/yyyy): 11/07/2024 Email: [email protected] Phone Number: 928-246-1616
Address: 1461 Main Street El Centro, CA 92243
*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
No bacon, and Quany Assurance Materials resting sense lara Mat at resting apers, lance
January 2020
Local Assistance Procedures Manual EXHIBIT 10-H11
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
ACTUAL COST-PLUS-RIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark-ups are Not Allowed • Prime Consultant EJ Subconsultant • 2nd Tier Subconsultant Consultant Gafcon PM-CM LLC
Project No. Contract No. Date.
DIRECT LABOR
Classification/Title Name Hours Actual Hourly Rate Total (Project Manager)* Italia Gray 60 $ 95.00 $ 5,700.00
(Sr. Civil Engineer) $ $
(Envir. Scientist) $ $
(Inspector** $ $
LABOR COSTS
a) Subtotal Direct Labor Costs $ 2,538
b) Anticipated Salary Increases (see page 2 for calculation) $ 76 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 2,614
INDIRECT COSTS
d) Fringe Benefits (Rate: 22 %) e) Total Fringe Benefits [(c) x (d)] $ 575 Overhead (Rate: 135 %) g) Overhead [(c) x (f)] $ 3,529
h) General and Administrative (Rate: 10 %) i) Gen & Admin [(c)x (h)] $ 261 j) TOTAL INDIRECT COSTS [(c) + (g) + (i)] $ 4,365
FIXED FEE k) TOTAL FIXED FEE [(c) + (I x fixed fee 100 %] $ 6,979 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Cost Total
Mileage Costs $ $
Equipment Rental and Supplies $
Permit Fees $
Plan Sheets $
Test
I) TOTAL OTHER DIRECT COSTS $
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: $
Subconsultant 2: $
Subconsultant 3:
Subconsultant 4: $
m) TOTAL SUBCONSULTANTS' COSTS
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)*(m)] $ TOTAL COST [(c) + (i) + (k) + (n)] $
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans.
3. Anticipated salary increases calculation (page 2) must accompany
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
ACTUAL. COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for Ist year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Total Hours per Avg 5 Year
Subtotal per Cost Cost Proposal Hourly Contract
Proposal Rate Duration
$250,000.00 5000 = $50.00 Year 1 Avg
Hourly Rate
2. Calculate hourly rate for all years (Inerease the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation
Year 1 $50.00 + 2% = $51.00 Year 2 Avg Hourly Rate
Year 2 $51.00 + 2% = $52.02 Year 3 Avg Hourly Rate
Year 3 $52.02 + 2% = $53.06 Year 4 Avg Hourly Rate
Year 4 $53.06 + 2% = $54.12 Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate% each year by total hours Estimated% Completed Total Hours per Cost Total Hours per Each Year Proposal Year
Year 1 20.0% * 5000 = 1000 Estimated Hours Year 1
Year 2 40.0% * 5000 = 2000 Estimated Hours Year 2
Year 3 15.0% * 5000 750 Estimated Hours Year 3
Year 4 15.0% * 5000 = 750 Estimated Hours Year 4
Year 5 10.0% * 5000 = 500 Estimated Hours Year 5
Total 100% Total 5000
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours Avg Hourly Rate Estimated hours Cost per
(calculated above) (calculated above) Year
Year 1 $50.00 * 1000 = $50,000.00 Estimated Hours Year 1 Year 2 $51.00 * 2000 = $102,000.00 Estimated Hours Year 2 Year 3 $52.02 * 750 $39,015.00 Estimated Hours Year 3
Year 4 $53.06 * 750 $39,795.30 Estimated Hours Year 4
Year 5 $54.12 500 $27,060.80 Estimated Hours Year 5
Total Direct Labor Cost with Escalation $257,871.10
Direct Labor Subtotal before Escalation $250,000.00
Estimated total of Direct Labor Salary Transfer to Page 1 Increase $7,871.10
NOTES:
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
2. 3.
4.
January 2018
Local Assistance Procedures Manual EXHIBIT 10-HI
Cost Proposal
ExHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposals) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifving:
Name: _ Title + Director of Labor Relations
Lotte fooler
Signature : Date of Certification (mm/dd/yyyy): 11/08/2024 [email protected] 858-875-0051
Email: Phone Number:
10301 Meanley Drive, Suite 225, San Diego, CA 92131
Address:
*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
Labor compliance monitoring
January 2018
Local Assistance Procedures Maunal EXHBIT 10-H3
Cost Proposal
EXHIBIT 10-H3 COST PROPOSAL Page 1 052
COST PER UNIT OF WORK CONTRACTS
(GEOTECHNICAL AND MATERIAL TESTING)
Note: Mark-ups are Not Allowed • Prime Consultant • Subconsultant • 2nd Tier Subconsultant Sierra Material Testing & Inspection
Consultant
CML-5168(036) , N/A Date Oct 29, 2024
Project No. Contract No.
Unit/Item of Work:
(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study) Include as many Items as necessary.
DIRECT LABOR Hours Billing Hourly Rate ($) Total ($)
30 130 3,900
Professional (Classification)*
Sub-professional/Technical** 240 115 27,600
EQUIPMENT 1 (with Operator)
EQUIPMENT 2 (with Operator)
Consultant's Other Direct Costs (ODC) - Itemize:
Description of Item Quantity Unit Unit Cost Total
ODC Example: Travel/Mileage Costs $
ODC Example: Mobilization/De-mobilization $
ODC Example: Supplies/Consumables $
ODC Example: Report
ODC (List more ODCs as applicable) $ $
Subconsultant 1: Laboratory Testing by Sierra Material Testing & Inspection, INC. $4,500 Subconsultant 2: $
Subconsultant 3: $
Subconsultant 4: $
Subconsultant 5: $
Note: Attach additional pages if necessary.
TOTAL COST PER UNIT OF WORK $36,000
2. (Commercial, Private or Public).
3. Mobilization/De-mobilization is based on site location and number and frequency of tests/items.
4. 5.
6.
January 2018
EXHBIT 10-H3
Local Assistance Procedures Manual
Cost Proposal
EXHIBIT 10-H3 COST PROPOSAL Page 2 of2
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposals) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
13. Generally Accepted Accounting Principles (GAAP)
14. Terms and conditions of the contract
15. Title 23 United States Code Section 112 - Letting of Contracts
16. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
17. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Adininistration of Engineering and Design Related Service
18. 48 Code of Federal Regulation Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requireinents. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Prime Consultant or Subconsultant Certifving:
Alex Rojas President
Name: Title*:
Signature : Date of Certification (mm/dd/yyyy):
Email: [email protected] Phone Number: 760-337-2067
1003 industry way, suite A, El Centro, California
Address:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
- Quality Control Services
- Laboratory testing on subgrade soils/sands for concrete improvements - Laboratory testing on sampled concrete
- Sampling & testing of concrete during placement.
January 2018
EXHIBIT C
CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE I hereby certify that in the performance of the work for which this Agreement is entered into, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of the State of California.
Executed on this day of 2025, at
California.
Consultant
TECHNICAL PROPOSAL
Construction Management,
Geotechnical & Inspection
Services for Sidewalk
Improvement Project Federal
Pröject No: CML 5168(036)
ERSC DIR # 1000017460
Submitted: November 8, 2024
ERSC
Engineering Resources of Southern California
ERSC 1861 W. Redlands Blyd. | Redlands, CA 92373
(909) 890-1255 | [email protected] | www.erscinc.com
November 8, 2024 Local Office:
77-564 Country Club Dr., Suite 128
Office of the City Clerk, City Hall Redlands, CA 92373
City of Calexico (909) 890-1255, [email protected]
608 Heber Avenue
Calexico, CA 92231 Evaluation Period Contact:
RE: TECHNICAL PROPOSAL - RFP for Construction Management, Geotechnical, and Ben Booth, PE Inspection Services Project Manager
(909) 890-1255 x116
[email protected]
Dear Members of the Selection Committee,
Engineering Resources of Southern California (ERS) is pleased to have the opportunity to submit our proposal to the City of Calexico (City) as a qualified, experienced consultant to provide Construction Management and Inspection Services for the Sidewalk Improvement Project - Federal Project No. CML-5168(036) (Project). Based on our review of the RFP and years of experience providing 1 similar services to local cities and agencies, we thoroughly understand the City's requirements and unique development setting.
Understanding
The City's Project aims to improve active transportation and accessible pedestrian connectivity within three locations in the City by constructing infill sidewalk, curb, and gutter. The work includes removal of existing parkway, subgrade, asphalt, and concrete; trimming and/or removal of existing trees; removal of fencing and roadway signs; construction of sidewalk, curb, gutter, drive approaches, and curb ramps; and adjustment of existing utility lids to grade. As with any Capital Improvement Project, the City is seeking professional construction management and inspection services during the construction of the improvements to ensure the safe construction of the project while adhering to all plans, specifications, funding requirements, and City requirements.
ERSC is ready and able to provide these services to the City. Our proposal highlights our expertise in the above, our knowledge of local procedures, and the challenges in delivering outstanding service to the City's staff, constituents, and stakeholders.
ERSC's Team
Ben Booth, PE, Engineer V - Project Manager/Construction Manager Ben will serve as Project and Construction Manager during the course of the agreement with the City. He has served ERSC and Southern California municipalities directly and indirectly over the past seven years and has been responsible for numerous similar efforts in both capacities. He is well-versed in City procedures and can start immediately on this project. He will guide ERS's inspection team in the field, interface high-level issues with contractors, and maintain contact between Calexico and ERS's team.
Mark Alvarez, Construction Inspector - Inspector
Mark joined ERSC with 33 years of experience in the construction industry, having spent a career with local paving contractors as a foreman and superintendent overseeing various paving, street, and traffic construction projects throughout Southern California.
Since joining ERSC, he has been responsible for the inspection of complex tract development grading and paving efforts, traffic signal improvements, and pedestrian improvements. Most recently, Mark has provided inspection services during the construction of transportation, traffic, and public facilities in the Inland Empire City of Banning.
Aragon Geotechnical, Inc. (AGI) will serve as geotechnical engineer during the project, providing material testing, inspection, and recommendations. AGI is a certified DBE and will assist in fulfilling the requirements of the funding sources while providing professional services for soil compaction, paving, concrete construction and materials testing.
Calexico's Engineering Resource
ERSC was founded in 1996 to provide engineering services to the public sector. For 28 years, the firm has delivered Plan Checking, Civil Engineering Design, Surveying, and CM/Inspection Services to numerous Cities throughout Southern California. Being local to the Inland Empire, ERSC maintains working relationships and valuable experience in differing design criteria and various departments of the region's diverse public agencies.
ERSC understands that the City wants to select the firm that best fits its goals. In selecting ERSC, Calexico will benefit from the following:
• Experience - ERSC's role in identical inspection responsibilities throughout numerous Southern California communities. Our CM/ Inspection Team has completed hundreds of projects for cities and agencies with over 60 years of combined experience. • Proximity - ERSC will house the public works inspector local to the project site for the duration of the project. This will allow for timely routine inspections, and the City will have an ERSC team member accessible in the field or at City Hall. • Familiarity -Our team has served local agencies in numerous past assignments. Our experience in the region is far-reaching and lends our team a unique perspective from which to approach inspection services for the City.
We look forward to working with the City and thank you for the opportunity to submit a proposal. If you have any questions or require additional information, please contact Ben Booth at [email protected] or (909) 890-1255 ext. 116. I am authorized to respond to the RFP and to bind the firm in an agreement. This proposal is valid for a term of 180 days from the date of submittal.
Respectfully submitted
Bun Be
Craig Brudin, QSP Ben Booth, PE
Director of Operations Project Manager
Table of Contents
Firm Qualifications & Experience
Proposed Project Team
18 Project Understanding & Approach
24 Exhibits
ERSC
Firm
Qualifications &
Experience
ERSC
ERSC Firm Qualifications & Experience
Executive Summary Civil Site Design
Survey & Geospatial
Engineering Resources of Southern California, Inc. (ERSC) was formed in 1996 with the asset purchase of NBS/Lowry, Inc. Since formation, ERSC has been committed to serving Special Districts, Regional Agencies, and Municipalities in Southern California's public Construction Services Municipal Services
sector. Our team provides a comprehensive set of professional services and solutions for
ERSC CORE
the life of any potential project.
DISCIPLINES
ERSC Reliability
Transportation
Our 28-year service record is a testimony to the quality of services we provide. Many of our clients continue to seek our services, and have done so since our first year of business. ERSC has also developed significant financial resources and organizational Drainage & Flood Control Water Resources
efficiencies that allow us to consistently exceed client expectations.
Our Locations
San Bernardino County Project Contact Corporate Officers (Headquarters) Ben Booth, PE John M. Brudin, PE • President 1861 W. Redlands Bivd. Project Manager Moe Ahmadi, PE - Vice President Redlands, CA 92373 Phone: (909) 890-1255 Trent Brudin, PE - Secretary Southwest Riverside County Fax: (909) 890-0995 Craig Brudin - Treasurer 41593 Winchester Rd., Ste. 200 [email protected]
Temecula, CA 92590
Vital Information ERSC Insurance Coverage Levels
Coachella Valley
77-564 Country Club Dr. CA Corporation Professional & $1.Om Per Occurrence:
28 Years in Business General Liability $2.0m Aggregate
Palm Desert, CA 92211
40 Employees $1.0m Combined Single Limit
FEIN: 33-0718153
CA DIR: 1000017460 Worker's Comp Maintained as Required by Law ERSC Professionals
The strength behind ERSC is our qualified and experienced engineers, designers, construction observation personnel, and administrative support staff. We excel at matching the exceptional skills, technical abilities, character, and attitude of our team members to the needs of our clients. ERSC staff works daily to create client partnerships and transform projects from the broadest level of general scope to final planning, design, implementation, and construction resolution.
Many ERSC professionals have experience as municipal and public agency employees and can approach your project with first-hand knowledge of agency culture and how any agency envisions the planning and processing of a well-executed project.
ERSC in Construction Management and Inspection
Our staff have been performing both On-Call and Project Specific CM and Inspection Services for public agencies since our founding.
Our team is particularly structured to assist public agencies in administrating their own CIP projects and supporting developer-funded Infrastructure to be accepted by public agencies. Our firm and project team currently support the City of Banning, Eastern Municipal Water District, West Valley Water District, and the City of Loma Linda in identical assignments.
ERSC and our team members have multiple decades of experience in pavement, sidewalk and transportation improvements.
Litigation
ERSC has not filed any claims or had any claims filed against the firm in the last 5 years and is not involved in any pending litigation that may affect its ability to provide its proposed solution or ongoing support of its services. Nor has it been disciplined in the last five (5) years as a Consultant by any government body or professional association.
Safety
Ensuring project safety is paramount and overriding. In 28 years of business, ERSC has not suffered a workplace injury, and we intend to hold contractors to the same standards by adhering to contractor and City injury and illness prevention programs where appropriate and applicable Cal/OSHA standards, rules, regulations, and orders.
Funding Sources
ERS's staff are expert in guiding projects with federal, state, and other grant funding sources. Our staff have recently and are currently managing, designing, or providing construction inspection for projects funded through ARPA, CDBG, OGALS, SRTS, FHWA, and other sources. With our team's expertise, we will be ready to start and deliever this project with all boxes checked to ensure satisfaction of the City and agencies overseeing funding.
ERSC Firm Qualifications & Experience
Similar Project Experience
BER 2 CITY OF HIGHLAND, CA
OTPABE 35, 1907
5TH ST/GREENSPOT RD BIKEWAY IMPROVEMENTS | Project Term: 2013-19 | Contract Value: $143,860
ERSC was retained by the City of Highland to engineering and construction services for the City's widening of 5th Street/Greenspot road and bikeway improvements. As the City completed the new Greenspot Bridge over the Santa Ana River, it was necessary to widen the road and the old iron bridge would be access-restricted to bicycle and pedestrian Carlos Zamano, P.E.,
City Manager
(909) 864-8732 Upon completion 5th Street/Greenspot Road would be widened to accommodate 2 [email protected] travel lanes in each direction with a painted center median and bike lanes. Total length of the widening was approximately 6,000LF.
Octavio Duran Jr., PE
Public Works Director/City Engineer At Santa Ana Canyon Road, the Bikeway would be taken out of the Greenspot Road (909) 864-6861 x221 alignment and onto a new trail system. This trail would include a fully signed and striped [email protected] ike/pedestrian trail that followed the previous alignment of Greenspot Road. This trai ERSC Project Team: ncludes the historic Iron Bridge at Santa Ana Canyon Road. As a part of the projec Ben Booth, PE Mark Alvarez ERSC designed the trail, signing/striping, and 30 way finding signs/access points along Craig Brudin, QSP Saul Lopez the alignment.
Cooly Smith Ralph Martinez
TIPPECANOE PAVEMENT REHABILITATION | Project Term: 2021 | Contract Value:
$150,535
ERSC provided professional engineering and construction services related to Cooperative City/County Pavement Rehabilitation Project, str20003 pavement rehabilitation of five treet reaches covering four streets. For Tippecanoe Avenue, existing AC and nativ naterial was pulverized in place, a portion of the pulverized material removed, cemen added to the remaining pulverized material, followed by placement of HMA and RHMA for the reach from 3rd to 6th.
SECTOR E PAVEMENT REHABILITATION | Project Term: 2020-21 | Contract Value: $203,595 ERSC was retained by the City of Highland to provide engineering and construction services related to the City's proposed Pavement Management Program, Sector E, Pavement Rehabilitation, str20001. The City has proposed rehabilitation of 15 streets in Sector E, located in the southeast portion of the City in an effort to complete implementation of its comprehensive 5-Year Pavement Management Program (PMP). The project is funded with SB-1, local Measure I, and RAC grant funds.
he scope of work included design for features and/or replacements not yet identined n uantified to protect the pavement investment from drainage damage and assure AD 1 ERSC will conduct site visits to assess condition/location of the drainage related issues and of ADA compliance issues concerning damaged or missing ramps. To further assist ve will contract with a subconsultant geotechnical firm for a visual inspection of a treets and additional subsurface investigation for the single arterial, Greenspot Roac Project Term: 2018-22 | Contract Value: $95,442
ERSC was retained by the City of Highland to provide engineering and constructior adminstered by the County of San Bernardino Development and Housing Deptment.
Specification documents included applicable federal requirements. 3 ERSC Firm Qualifications & Experience
ON-CALL CONSTRUCTION INSPECTION SERVICES | Project Term: 2000 - Present | Contract HOTHER PA, DUS Value: $4M
Under an on-call professional services agreement with the City of Highland, ERSC provides contract inspection services for the construction of public works and privately funded improvements, including street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements. Representative projects are provided below:
• Lankershim Avenue Street • Greenspot Road "S" Curve
Improvements Realignment
• Sterling Avenue Improvements • 2016-2021 PMP Project, Sectors B, C, • Highland Basin Drainage D & E str 17005A
Improvements • Victoria Avenue Pavement
2012 Sidewalk and Handicap Ramp Maintenance- Rehabilitation Project - Repairs str17002
City Hall ADA Improvements • Pavement Management Program - Victoria Avenue Improvements at 5th Sector D, Proj. str19001 Street • West Highland Bikeways Project,
• 2012 Community Development Block str14001, and Pavement Rehab Grant Project • Sector E Pavement Rehabilitation
• Bledsoe Creek Outlet Reconstruction • CDBG Pavement Improvement Olive Street Improvements Projects, ola16001 ola17001
• City-Wide Redevelopment Agency • Boulder Avenue Emergency Pavement Sidewalks Repair str18004
• Article III Sidewalk - Palm Avenue • 5th St-Greenspot Road Bikeway Traffic Signals - Various Improvements
City-Wide Sidewalk Projects • Tr. 18893 "Mediterra", Greenspot Rd Miscellaneous Sidewalk Repairs improvements
5th Street Bike Lane, Signing and • Natural Parkland Trails Project Striping Improvements
NATURAL PARKLAND TRAILS PROJECT | Project Term: 2024 - Ongoing| Contract Value (to date): $191,000
ERSC was contracted to provide Construction Management and Inspection Services (Services) inclusive of contract administration and public works inspection for the federally funded Recreational Trails Program (RTP) Natural Parkland Trails Project, City Project No. tra20001, Federal Project No. RT-36-013. The Project is federally funded by the Federal Highway Administration (FHWA) through the Department of Parks and Recreation - Recreational Trails Program (RTP). Work includes trailhead improvements, accessible parking and path of travel to the trailhead on Base Line, restoration of existing trails, drainage culvert improvements, and educational area improvements. The work includes construction of stabilized earthen walkway trails, trail grading, excavation, removal of PCC and AC, construction of ADA parking improvements, vehicular maintenance access driveway and turnaround improvements, curb and gutter, sidewalk, retaining wall:
drainage culvert improvements, education site furnishings, signing/striping, and tra guide ropes and signs..
CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES, CITY
& South Gate: OF SOUTH GATE, CA
Project Term: 2015-22 | Contract Value: $325,556
Chakemco Street Improvements
Arturo Cervantes, PE, Asst. City Manager/ ERSC was contracted by the City of South Gate to provide construction managemen Director of Public Works and inspection services for the project designed to improve Chakemco Street by adding (323) 563-9567 sidewalks, curbs, gutters, ADA ramps, drive approaches, landscaping, irrigation, new [email protected] treet pavement, striping, lighting, and miscellaneous additions to improve the overa ERSC Project Team: destrian mobility and safety. ERSC inspectors are acting as an extension of City staf Reza Toorzani, PE
Mark Alvarez
South Gate Park Infrastructure Improvements (Area 5 Picnic Area, City Project No. 488- The project included conversion of an existing Roller Hockey rink into a group picnic area.
The park improvements were located near the northwest corner of South Gate Park, near ERSC Firm Qualifications & Experience
the intersection of Southern Avenue and Hildreth Avenue, at the roller court facility. Work included construction/installation of concrete fatwork, decomposed granite paving, seat wall, tree planters, landscaping, picnic structures, and park furniture. Work also included drinking fountain and water service improvements, lighting, and all removals necessary in the conversion of a Roller Rink to a picnic area
Citywide Sidewalk Improvement, Phase Ill City Project No. S27-ST The project removed and replaced sidewalk, curb, gutter, driveway approaches, and ADA ramps. The work took place primarily in the Western Portion of the City. Approximately 23,000 square feet of sidewalk, 500 feet of curb and gutter, and 1,300 feet of curb were removed and replaced. The project was a HUD Activity and therefore included strict adherence to federal reporting. The project also required special attention to communication with afected residents and the public due to the removal of driveway approaches, ADA ramps, and sidewalk.
ADA Sidewalk Improvements at Hollydale Park, City Project No. 535-PRK The project included earthwork and grading, construction of a decomposed granite walking trail, concrete sidewalk, and concrete ADA ramps. The work was completed in Hollydale Park near Century Bld. This project was a HUD Activity and therefore included strict adherence to federal reporting.
Citywide Sidewalk Improvements, Phase IV City Project No. 542-ST The project removed and reconstructed sidewalk, curb, gutter, driveway approaches, and ADA ramps
CITY OF BURBANK CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES, CITY
OF BURBANK, CA
Project Term: 2019 - Ongoing | Contract Value (to date): $470,000 SR 134 Arterial Improvements
The City of Burbank contracted ERSC to supervise work and provide coordination between the Contractor, the City, other agencies, consultants, utility companies, the public, adjacent property owners and other stakeholders for the installation of various Vikki Davtian traffic signal equipment and appurtenances as well as coordination with Burbank Water Principal Engineer-Traffic and Power for overhead wiring considerations, signing and striping, ramp, sidewalk (818) 238-3922 construction and related ITS equipment. ERSC's CM/RE will also participate in public [email protected] communications, if required by the City, to help identify and mitigate potential public ERSC Project Team: nuisances and inconveniences resulting from various construction activities.
Joanna Rembis, PE Bid Schedule 1462 Construction Services Mark Korando
Mark Alvarez ERSC provided full time inspection and construction management service to the City during the construction phases of the project. This project was funded by Los Angeles County Proposition C and Local Transportation funds. The project will reconstruct 6 traffic signals (cabinet, poles, conduit, pull boxes, boxes, and wiring), remove and replace poles at 8 traffic signals, and install LED lighting and loop detector conduit at 29 traffic
ON-CALL INSPECTION SERVICES, CITY OF BANNING, CA
Cly of Project Term: 2018 - Ongoing | Contract Value (to date): $3,045,000
BANNING
ERSC provides plan check and inspection services of CIP and development projects in the City of Banning. The scope of construction inspection services includes oversight of INDLESS street, sewer, water, grading, and storm drain projects and their related activities.
Since 2018 ERSC has completed over 430 individual assignments in the City. This is Nate Smith, PE, Deputy Director of Public inclusive of the 4,000 unit Atwell development, for which ERSC has reviewed all grading Works/City Engineer and improvement plans as well as all supporting special studies related to the project. 951-922-3182 Currently ERSC staffs 4 full-time inspectors supporting the City's activities. [email protected] ERSC Inspectors have overseen the following in the City of Banning:
• In-Tract water, sewer, storm drain and TM37390 PA8A, 8B, PA24 Park street improvements for the following: TM37390-2 PA7
ERSC Project Team: TM38398-5 PAS TM37390-1 PA6, PA22 Park, PA23 Craig Brudin, QSP, QSD TM37389-3 PA10 Open Space, PA25 Open Space Joanna Rembis, PE
Cooly Smith TM3736S PA4 TM 37389-2 PA11
Mark Alvarez TM37474 РA3 TM37389-2 PA11
Ralph Martinez TM37298-3 PA1B TM37389-1 PA 1-5
Saul Lopez TM37298 PA2A TM37289-3
Tracy Meeks
TM37298-2 PA1A TM37298-1
5 ERSC Firm Qualifications & Experience
Offsite Improvements related to the following:
City of TM37298-1 Apex Street at Wilson Street
ANN NG Highland Home Road at Wilson Street
Highland Home Road at Meadowline Way
TM37389-1 Offsite 18"-12" Water and 12" Sewer
NOLESS Highland Home Road Retention / BMP Basins and Energy Dissipators ORPORTUNIE TM37389-1 Offsite 18" Water in Highland Home Road and 8" Non-Potable TM37388 Offsite 8" Non-Potable Water and 8" Sewer
CIP Oversight for the following:
Foothill West Zone 18" Transmission Line
Mountain North Water 18" Transmission Line
24" Non-potable Pipeline NP-1 discharge pipeline
16" Non-Potable Pipeline Segments B & D
HIGHLAND HOME TRAFFIC SIGNAL IMPROVEMENTS, CITY OF
BANNING, CA
Project Term: 2023 | Contract Value: $50,000
ERS's team provided inspection services during the construction of new Traffic Signals OPPORTUN and related improvements in the City of Banning. Highland Home Road located at the southwestern entry to Tripointe Homes' Atwell project is a new arterial street supporting Nate Smith, PE, Deputy Director of Public the new residents of the residential development. A traffic signal was necessary at the Works/City Engineer intersection at Wilson Street, a major arterial. ERS inspectors provided inspection 951-922-3182 throughout the construction of the Traffic Signal and its related improvments including [email protected] widening of Wilson, ADA/Pedestrian Improvements, Signing and Striping, and landscape improvements.
ERSC Project Team:
Cooly Smith Mark Alvarez
Craig Brudin, QSP
TRANSPORTATION ENGINEERING SERVICES, CITY OF COLTON, CA Rancho Ave. A & N Street Intersection Improvements | Project Term: 2020 - Ongoing| Contract Value (to date): $37,200
ERSC is currently providing traffic and civil engineering services to the City of Colton to improve safety at the Rancho Avenue and N Street intersection. The City initiated this project to address safety concerns following a series of accidents resulting in private Victor Ortiz, PE, City Engineer property damage and injuries. The project site does not currently meet the CAMUTC (909) 514-4210 warrants for traffic signal installation, so other measures are being designed by ERSC. [email protected] The new intersection will include reduced lanes from 2 to 1 approaching the intersection, signing/striping improvements, permanent delineators, and a CalTrans High Tension ERSC Project Team:
John M. Brudin, PE EIT arrier System. ERSC also provided services for design survey, pavement reconstructio Trent Brudin, PE Katherine Hernandez ised median, ADA, and curb and gutter improvement Stephania Hernandez,
EASTON STREET SIDEWALK IMPROVEMENTS, CITY OF RIALTO, CA Project Term: 2020-24 | Contract Value: $73,498
from the southeast corner of Easton Street and Acacia Avenue to approximately 250 feet Vince Girón, Engineering Manager south.
909-820-8045
[email protected]
ERSC Project Team:
Lori Askew Stephania Hernandez, EIT
Ben Booth, PE Jazz Goodie
Katherine Hernandez
6 Proposed
Project Team
ERSC
ERSC Proposed Project Team
Project Team
ERSC has selected our project team based on experience with the type of work proposed. The team presented below includes our project manager/construction manager, construction inspector, NDES Inspector/Assistant Construction Manager, a project engineer, and the added support of our 40 local professionals. We understand that a continuous point of contact allows for efficient communication between parties throughout the project. ERSC certifies that staff included herein will be available during the duration of the project.
Ben Booth, PE - Project Manager/Construction Manager
Ben will serve as Project and Construction Manager during the course of the agreement with the City. Ben has served ERSC directly and indirectly over the past 7 years, responsible for numerous similar efforts including construction management, design project management, and plan checking for various southern california agencies. He is well-versed in municipal procedures and able to start immediately on this project.
Ben will guide ERS's inspection team in the field, interface high-level issues with contractors, and maintain contact between Calexico and ERSC's team.
Mark Alvarez - Construction
Inspector
Mark joined ERSC with 33 years of
experience having spent a career with TERSC Bon Booth, PE local paving contractors as a foreman and Project Manager/ superintendent in oversight of various Construction Manager paving, street, and traffic construction
projects throughout Southern California.
Project Team
Since joining ERSC, he has been
responsible for the inspection of complex
tract development grading and paving
efforts, traffic signal improvements, and
pedestrian improvements. Most recently, Mark Alvarez Craig Brudin, QSP Zoey Dunmire Mark has provided inspection services Construction Inspector Assistant Construction Manager Construction Management Support during the construction of transportation,
traffic, and public facilities in the City of Subconsultants Banning.
QSP - Assistant • Aragon Geotechnical
Craig Brudin, Geotechnical Engineering
Construction Manager Additional ERSC Team
Craig is Director of Operations at ERSC
and oversees field operations of the firm John M. Brudin, PE Robert Righetti Shima Aghaei Cooly Smith including CM, Inspection, and Surveying President Principal Engineer Engineer III Chief Inspector efforts. Craig is currently responsible for Moe Ahmadi, PE Robert Ollerton, PLS Issac Gomez Tracy Meek Vice President Principal Surveyor Engineer IV r. Construction Inspecto the oversight of CM/Inspection Services Erik T. Howard, PE, PLS Wade Weaver, PLS Mina Bishara Ralph Martinez for multi-million dollar efforts for a wide Sr. Principol Engineer Principal Surveyor Engineer V Sr. Construction Inspector range of clients throughout Southern Trent Brudin, PE, QSD Stephania Hernandez, EIT Steve Wilson Breven Nescher 122 Engineering Manager Engineer IV Sr. Engineering Associate Sr. Construction inspector California. Craig is also a QSP and will
provide support to Mr. Booth as Assistant Reza Toorzani, PE atherine Hernand John Ward ark Koran Principal Engineer gineer Sr. Engineering Associate Sr. Construction Inspec Construction Manager. Dale Roberson
Ruben Ibarra, PE Travis Moffott, EIT Paul Duffell
Zoey Dunmire - Construciton Principol Engineer Engineer Il Engineering Associate V St. Construction Inspector Management Support Erwin Fogerson, PE Nathan Shea, EIT Jazz Goodie Sr. Principal Engineer Engineer I Engineering Associate III Zoey will assist with various construction Jeff Wall, PE Marcus Popa, EIT loseph Wilkin Steve Allen administration tasks including but not Sr. Principal Engineer Engineer / ingineering Associote I Sr. Construction Inspector limited to labor compliance checks, issance Lori Askew Gabriela Rodriguez of statement of working days, preparing Principal Engineer Engineering Aide / meeting agendas and minutes, submittal
logs, etc.
Subconsultant - Aragon Geotechnical
Aragon Geotechnical will serve as geotechnical engineer during the project providing material testing, inspection, and recommendations during the project. Aragon is a certified DBE and will assist in fulfilling the requirements of the funding sources while providing professional services during subgrade preparation, concrete construction, and paving operations.
Ben Booth, PE | Engineer V
CA, Professional Engineer No.92625 Similar Project Experience:
Natural Parkland Trails Project, City of Highland, CA - Construction Manager responsible Education for contract administration, progress meetings, material/RFI submittals, correspondence, labor compliance, and progress payment review. ERSC was contracted to provide BS, Civil Engineering, Arizona State University, Construction Management and Inspection Services (Services) inclusive of contract Tempe, AZ administration and public works inspection for the federally funded Recreational Trails Program (RTP) Natural Parkland Trails Project, City Project No. tra20001, Federal Project Areas of Expertise No. RT-36-013. The Project is federally funded by the Federal Highway Administration (FHWA) through the Department of Parks and Recreation - Recreational Trails Program Pavement Rehabilitation Services (RTP). Work includes trailhead improvements, accessible parking and path of travel to Active Transportation Services the trailhead on Base Line, restoration of existing trails, drainage culvert improvements, Drainage and Flood Control and educational area improvements. The work includes construction of stabilized Land Development Services earthen walkway trails, trail grading, excavation, removal of PCC and AC, construction of ADA parking improvements, vehicular maintenance access driveway and turnaround improvements, curb and gutter, sidewalk, retaining walls, drainage culvert improvements, education site furnishings, signing/striping, and trail guide ropes and signs. The ERSC team Mr. Booth has a broad base of experience in is supported by Aragon Geotechnical for geotechnical and materials testing services. various disciplines, such as transportation, Sector D Pavement Rehab Design and Construction Management Services, City of site development, pavement rehabilitation, Highland, CA - Project Engineer and Assistant Construction Manager responsible for grading and drainage, and construction contract administration, progress meetings, material/RFI submittals, correspondence, services. Mr. Booth graduated from Arizona labor compliance, and progress payment review. Work included pavement rehabilitation State University and interned with notable and ADA ramp and needed drainage repairs. Rehabilitation of the streets included overlay companies such as Schuler Constructors, with removal and replacement or dig outs of severely distressed areas. Provision for PACE, and HDR during his undergraduate removal and replacement of soft and/or wet areas where encountered was also included studies. He worked for CASC Engineering, in the specifications and bid schedule. where he served as a survey chairman FY 2016/17 and FY 17/18 CDBG Pavement Rehab Design and Construction Management and design engineer. Mr. Booth recently
Services, City of Highland, CA - Project Engineer and Assistant Construction Manager served the City of Highland as a senior
civil engineer, managing various capital responsible for contract administration, progress meetings, material/RFl submittals, correspondence, labor compliance, and progress payment review. The project included improvement projects, overseeing the
City's engineering consultants, assisting site inspection and preparation of construction documents for rehabilitation and repair with land development entitlements, and of pavement on six streets. Rehabilitation included repair of severely distressed areas by removal and replacement, crack repair/seal and bump grind, edge repair, header cut and managing the Engineering plan check
cold planing, repair of drainage issues that would compromise new paving, repair of soft process. Projects recently undertaken
by Mr. or wet subgrade, and HMA overlay.
Booth involving the design and
construction services include the following Sectors B, C, D, and E Pavement Projects Design and Construction Management Services, significant assignments. City of Highland, CA - Project Engineer and Assistant Construction Manager responsible for contract administration, progress meetings, material/RFl submittals, correspondence, labor compliance, and progress payment review. The projects included pavement preventative maintenance by bump grind, crack seal, slurry seal, and scrub seal of collector and local streets throughout the City and maintenance of City parking lots RWQCB Section 401 for improvements within the channel.
Elder Creek Hydrology Analysis and Feasibility Study, City of Highland, Highland, CA - Project Engineer for the preparation of a drainage feasibility study report for Elder Creek Storm Drain Facilities at Greenspot Road. The report was prepared to determine the tributary flows to Elder Creek Channel near Greenspot Road, and provide storm drair PW 19-11 Bike Lane and Trail Program, ATP Funded, Temecula Creek South Side Trail, City of Temecula, CA - Project Engineer responsible for concept development, design Ben Booth, PE | Engineer V
recommendations, and special study drafting throughout the assignment. Under an on-call engineering agreement, ERSC completed preliminary and final engineering services necessary to provide project scoping and final design. Project tasks include hydrology review and channel hydraulics modeling, bike trail plan and profile design, specifications, estimates, WQMP preparation, and environmental and geotechnical services. ERSC and our subconsultants coordinate with various permitting agencies such as RCFC&WCD, CDFW, and RWQCB Section 401 for trail improvements within the Temecula Creek Channel. 10 Mark Alvarez| Construction Inspector
OSHA 30 Similar Project Experience:
TWIC Exp. 01/29/2022 BS 1428 - SR-134 Corridor Arterial Signal Improvements, City of Burbank, CA - Provided Advanced First Aid and CPR
inspection/observation for the modification of seven traffic signal systems and Traffic Signal Inspector IMSA appurtenances as well as coordination with Burbank Water and Power for overhead wiring City Inspection/Public Works Certificate, considerations. Signing and striping, sidewalk construction and related ITS equipment University of California Riverside
installation are a part of the project. As our Lead Inspector he provided coordination between the Contractor, the City, other agencies, consultants, utility companies, the Areas of Expertise public, adjacent property owners and other stakeholders.
Natural Parkland Trails Project, City of Highland, CA - Inspector responsible for daily Foreman project oversight for conformance to contract documents, agency requirements, permit Superintendent compliance, and job safety. ERSC was contracted to provide Construction Management Quality Control Inspection and Inspection Services (Services) inclusive of contract administration and public Heavy Equipment Operator works inspection for the federally funded Recreational Trails Program (RTP) Natural Parkland Trails Project, City Project No. tra20001, Federal Project No. RT-36-013. The Project is federally funded by the Federal Highway Administration (FHWA) through the Department of Parks and Recreation - Recreational Trails Program (RTP). Work includes trailhead improvements, accessible parking and path of travel to the trailhead on Base Mr. Alvarez joined the ERSC team in 2019 and
has since been the prime construction inspector Line, restoration of existing trails, drainage culvert improvements, and educational area improvements. The work includes construction of stabilized earthen walkway trails, trail for the City of Burbank and Banning. Mr. Alvarez
has been in the construction field for 33 years, grading, excavation, removal of PCC and AC, construction of ADA parking improvements, vehicular maintenance access driveway and turnaround improvements, curb and gutter, bringing insight from hundreds of public works
projects as a foreman, superintendent and sidewalk, retaining walls, drainage culvert improvements, education site furnishings, signing/striping, and trail guide ropes and signs. The ERSC team is supported by Aragon inspector.
Geotechnical for geotechnical and materials testing services.
Other inspection assignments have included
and Atwell - PA23 Open Space Grading and Recreation Improvements City of Banning, CA - construction management, supervision
inspection of various street and underground Inspector responsible for daily project oversight for conformance to contract documents, improvements within public right-of-ways, agency requirements, permit compliance, and job safety during the construction of underground facilities, mass grading operations, Open Space improvements for the southwestern planning areas of Tripoint Homes' water, sewer and storm drain facilities, pile Atwell project in the City of Banning. The project included extensive grading, trail foundations and bridge work, lighting and improvements, landscape features, and private ponds over a seven acre area. The electrical equipment as well as landscaping and main features to be constructed were the private ponds doubling as retention basins. irrigation work when needed. Pedestrian improvements were also built around the ponds to allow for a trail throughout the area. ERSC was also resonsible for supervision of the grading, testing, and drainage improvements.
On-Call Construction Inspection Services, City of Banning, Banning, CA - Sr. Construction Inspector in oversight of construction activities for street, sewer, water, grading, and storm drain projects and their related improvements in the City of Banning. Since 2018 ERSC has completed over 430 individual assignments in the City. This is inclusive of the 4,000-unit Atwell development, for which ERSC has been in oversight all grading and improvement construction activities related to the project. Mark was responsible for inspection of the following in the City of Banning:
In-Tract Sewer, Water, Storm Drain, and Street Improvements for:
TM38398-5 PA5 TM37298-2 PA1A
TM37389-3 PA10 TM37390 PA8A, 8B, PA24 Park
TM37365 PA4 TM37390-2 PA7
TM37474 PA3 • TM37390-1 PA6, PA22 Park, PA23
TM37298-3 PA1B Open Space, PA25 Open Space
TM37298 PA2A • TM 37389-2 PA11
Signing, Striping, and Traffic Signal Improvements for:
TM37298-1 Apex Street at Wilson St.
: Highland Home Rd. at Meadowline Way
for daily project oversight for conformance to contract documents, agency requirements, permit compliance, and job safety. ERS's team provided inspection services during arterial. ERSC inspectors provided inspection throughout the construction of the Traffic Mark Alvarez Construction Inspector
Signal and its related improvments including widening of Wilson, ADA/Pedestrian Improvements, Signing and Striping, and landscape improvements.
On-Call Construction Inspection, City of Highland, CA - Senior Construction Inspector as part of an on-call professional services agreement with the City of Highland. ERSC provides contract inspection services for the construction of public works and privately funded improvements, including street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included site review for compliance with City standards and traffic control requirements.
Hardy & Harper, Inc. - Public Works Foreman/Superintendent accountable for all Trades and Subcontractors on city contracted street rehabilitation projects. Including Asphalt Paving and quantities, Traffic Control, Concrete quantities, Demolition, Trucking and Dump sites, Quality Control Inspection throughout Company.
Matich Corporation - Public Works Foreman responsible for street rehabilitation projects. Grading, Paving, Traffic Control, Material Quantities and the supervision of all operators, equipment, laborers and tools throughout city projects.
Veolia Transportation Maintenance & Infrastructure Inc. - Metrolink project Perris Valley Line. Foreman responsible for all finish elevations of new main line. Also operated all railroad heavy equipment.
C.C. Myers, Inc. - Foreman / Superintendent, S57 Freeway Project. Responsible for managing all Grading and Paving operations on work site. Worked with Project Managers and Caltrans Inspectors on schedules and material quantities as needed.
Panorama General Engineering - Foreman / Superintendent responsible for grading, paving and public works projects. Worked as a heavy equipment operator. Managed and scheduled subcontractors and material on job sites. 12 Craig Brudin, QSP| Sr. Engineering Associate
Similar Project Experience:
Natural Parkland Trails Project, City of Highland, CA - Assistant Construction Manager supporting contract administration, progress meetings, material/RFl submittals, correspondence, labor compliance, and progress payment review. ERS was contracted to provide Construction Management and Inspection Services (Services) inclusive of contract administration and public works inspection for the federally funded Recreational Trails Program (RTP) Natural Parkland Trails Project, City Project No. tra20001, Federal Project No. RT-36-013. The Project is federally funded by the Federal Highway Administration (FHWA) through the Department of Parks and Recreation - Recreational Trails Program (RTP). Work includes trailhead improvements, accessible parking and CA, QSP No. 26269
path of travel to the trailhead on Base Line, restoration of existing trails, drainage culvert CESSWI No. 4852 improvements, and educational area improvements. The work includes construction of stabilized earthen walkway trails, trail grading, excavation, removal of PCC and AC, Education
construction of ADA parking improvements, vehicular maintenance access driveway and turnaround improvements, curb and gutter, sidewalk, retaining walls, drainage culvert BS, Environmental Policy & Management
improvements, education site furnishings, signing/striping, and trail guide ropes and BA, Business Managerial Studies
signs. The ERS team is supported by Aragon Geotechnical for geotechnical and materials testing services.
Affiliations On-Call Plan Check and Construction Inspection Services, City of Highland - Project Engineer responsible for review of maps, legal documents, improvement plans, and CASQA grading plans during an on-call professional services agreement with the City of Highland. ERSC provides contract plan check and inspection services for the construction of public works and privately funded improvements, including site improvements, street improvements, paving, sidewalk, curb, gutter, grading, and earthwork. Work also included Areas of Expertise
site review for compliance with City standards and traffic control requirements. ERSC also provides plan checking services for all parcel and tract maps, as well as hydrology review.
Erosion and Sediment Control
Water Quality On-Call Plan Check and Inspection Services, City of Banning - Project Manager responsible Improvement Plan Check for day-to-day project guidance, team oversight, client contact, as well as schedule and Land Survey budget management throughout the plan check of residential and CIP projects. Plan Construction Management and Inspection check services include review of maps, street, sewer, water, grading and storm drain projects, as well as review of construction drawings to assure compliance with City, State and Federal regulations. ERSC also provides conditions of approvals for City projects, as Mr. Brudin serves ERSCs clients requiring On-Call Construction Inspection Services, Elsinore Valley Municipal Water District, CM/Inspection, Land Survey, and water Lake Elsinore, CA - Project Manager responsible for day-to-day project guidance, team quality and environmental compliance oversight, client contact, as well as schedule and budget management. Under an On- services. Craig spent years of his career Call agreement with Elsinore Valley Municipal Water District ERSC provides construction under the employment of prominent inspection services for developer funded and CIP projects through the District service engineering firms where he gained insight area. ERSC inspectors are responsible for oversight of construction for various water to the full spectrum of environmental and system improvements including pipelines, reservoirs, lift stations, booster stations, storm water compliance requirements and service connections, and related infrastructure and improvements. practices. He has been in oversight of ERS's CARB Consolidation Project, Riverside, CA - Project Manager and QSP inspector during inspection team in the field for numerous the ground up construction of the California Air Resources Board testing facility in local agencies during construction of water, Riverside, CA. Craig was responsible for all inspections, reporting, recommendations, wastewater, transportation, drainage, and training, and annual report filing during the course of the project. public facilities.Craig is well versed in the
Rio S.T.E.A.M Academy, Oxnard, CA - Project Manager and QSP Inspector during all installation requirements, long term cost
phases of the construction of the Rio School District's STEAM school in Oxnard, CA. effectiveness, and challenges of erosion
and sediment control BMPs. His experience Craig directed installation of all erosion controls for the 10-acre site including Fiber Roll, and checking erosion Inlet Protections, and Plate-only stabilized enter. Craig also directed the maintenance designing pian
of controls throughout the project to ensure compliance with the state's CGP and local control plans has provided with and all-
encompassing knowledge of the SWPPP requirements. Craig was also responsible for performing all QSP inspections for the project throughout all phases including weekly inspections and all rain event inspections. requirements as well as the challenges
associated in meeting plan goals. MSJC Sports Facilities Improvements, San Jacinto, CA- Project Manager and QSP Inspector during all phases of the Mount San Jacinto College's Sports Facilities Improvements. The project included installation, maintenance, and removal of all structural BMPs for the project. Fiber Roll, Silt Fencing, Inlet Protection, and traditional Rock-Plate stabilized entrances were included.
Soboba Horseshoe Development, San Jacinto, CA - Project Manager and QSP Inspector 13 Craig Brudin, QSP | Sr. Engineering Associate
during all phases of the Soboba Band of Luiseno indians Horseshoe Development Improvements. The NDES portion of the project included installation, maintenance, and removal of all structural BMPs for the project. Fiber Roll, Silt Fencing, Inlet Protection, and 30" Transmission Mainline Improvements on Highland Ave., West Valley Water District, Rialto, CA - Construction Manager responsible for contract administration, progress meetings, material/RFI submittals, correspondence, labor compliance, and progress payment review during this improvement project which involves the construction of a new waterline and associated appurtenances in Highland Avenue between Oakdale Avenue and Pepper Avenue in the City of Rialto. Construction includes installation of approximately 3,700lf of CML&C water line. The proximity to Interstate 210 will require interfacing with CalTrans and coordination with the agency's procedures. 14 Zoey Dunmire | Engineer l
Education Similar Project Experience:
5th Street, Greenspot Road, & Orange Street Pavement Rehabilitation Project City of MS, Mechanical Engineering, University of Highland, CA - Project Designer responsible for preparation of project documents and California San Diego completion of computer aided design throughout all phases of the assignment. ERSC was BS, Environmental Engineering, University of contracted to provide professional engineering services for a pavement rehabilitation California San Diego project slated to improve five street segments. Rehabilitation efforts include Cold In-Place Recycling (CIR) and 1.5" grind and overlay with Petromat, and additional scope includes assessing pavement failures, settled pavement, ponding areas, raised and damaged Areas of Expertise sidewalk panels, and deficient curb and gutter and shoulder areas.
Natural Parkland Trails Project, City of Highland, CA - Project Designer supporting the MATLAB Construction Manager and responsible for preparation of project documents and Autodesk Fusion 360 completion of computer aided design throughout all phases of the assignment. ERSC SolidWorks was contracted to provide Construction Management and Inspection Services (Services) AutoCAD
inclusive of contract administration and public works inspection for the federally funded 3D Printing Recreational Trails Program (RTP) Natural Parkland Trails Project, City Project No. tra20001, Arduino
Federal Project No. RT-36-013. The Project is federally funded by the Federal Highway Administration (FHWA) through the Department of Parks and Recreation - Recreational Trails Program (RTP). Work includes trailhead improvements, accessible parking and path of travel to the trailhead on Base Line, restoration of existing trails, drainage culvert Zoey joined ERSC in 2023 after a collegiate improvements, and educational area improvements. The work includes construction tenure in which she earned both of stabilized earthen walkway trails, trail grading, excavation, removal of PCC and AC, undergraduate and graduate engineering construction of ADA parking improvements, vehicular maintenance access driveway and degrees. She is now a part of our design turnaround improvements, curb and gutter, sidewalk, retaining walls, drainage culvert team, expand her engineering toolkit by improvements, education site furnishings, signing/striping, and trail guide ropes and performing various engineering tasks such signs. The ERSC team is supported by Aragon Geotechnical for geotechnical and materials as AutoCAD drafting, utility calculations, testing services.
Excel calculations, and spreadsheets.
Overland Drive Widening, City of Temecula, CA - Project Designer responsible for preparation of project documents and completion of computer aided design throughout all phases of the assignment. ERSC was contracted to provide professional engineering services for the widening of Overland Drive from Jefferson Avenue to Commerce Center Drive. The project included mapping and an evaluation of the effects of a roadway widening, coordination with the Rancho California and Eastern Municipal Water Districts for relocation and adjustment of water and sewer facilities, as well as various power and communications companies for the relocation of dry utilities impacted by the project (pad mount transformers, underground vaults, and service pedestals). The project also included the installation of a new traffic signal and striping modifications, installation of new street lighting, and preparation of legal descriptions and plats in support of the right- of-way acquisition effort.
PS&E for Sewer Collection System & Lift Stations, Soboba Band of Luiseño Indians, San Jacinto, CA - Project Designer responsible for preparation of project documents and completion of computer aided design throughout all phases of the assignment. ERSC was contracted for the preparation of Plans, Specifications, and Cost Estimates (PS&E) for gravity sewer system and lift stations within Soboba Band of Luiseño Indians (SBLI) Reservation. Our work focuses on the development of alignment and preparation of construction plans for an alternative which collects the wastewater flows from the reservation to be conveyed to the EMWD sewer system for treatment.
PS&E for the Soboba MDP Line J & J-1, Soboba Band of Luiseño Indians, San Jacinto, CA - Project Designer responsible for preparation of project documents and completion of computer aided design throughout all phases of the assignment. ERSC was contracted for the preparation of Plans, Specifications, and Cost Estimates (PS&E) for the design anc construction of the MDP Line J and J-1 that would avoid/minimize adverse impacts on the existing and planned residential developments within the project location. Our scope included field reconnaissance, utility research, design survey, hydrology analysis, hydraulic analysis, geotechnical investigation, preparation of construction plans, specifications, cost estimates, coordination and processing, and post-design bidding support services.
RV Booster Station Rehabilitation, Pechanga Band of Indians, Temecula, CA - Project Designer responsible for preparation of project documents and completion of computer aided design throughout all phases of the assignment. ERSC was contracted to provide professional engineering services for upgrading a booster station that was originally 15 Zoey Dunmire | Engineer l
constructed in 2000 at an RV resort. The design will include replacing pumps, motors, valves, and electronic equipment and relocating the electrical equipment to the adjacent electrical room. Our work includes project management and coordination, research and preliminary layout, specifications and plans, and bidding phase assistance.
Public Works Yard Restroom, City of Chino Hills, CA - Project Designer responsible for preparation of project documents and completion of computer aided design throughout all phases of the assignment. ERSC was contracted to provide engineering services for the preparation of construction drawings related to installation of a new staff restroom building at the City Yard Facility. Improvements include the installation of a prefabricated restroom adjacent to an existing storage building, necessary utility connections including water, sewer and electricity, construction of a concrete pad to house the restroom, and necessary asphalt pavement reconstruction to meet ADA requirements.
16 Aragon Geotechnical, Inc. Geotechnical Engineering
C. FERNANDO ARAGÓN, M.S., P.E., G.E.
AGI CIVIL ENGINEER, GEOTECHNICAL ENGINEER
EDUCATION
Loyola Marymount University of Los Angeles, B.S., Civil Engineering University of California, Berkeley, M.S., Civil Engineering with emphasis in Geo Engineering
PROFESSIONAL REGISTRATIONS
Registered Civil Engineer, California, No. 72277 [Exp. 6/30/24] Registered Geotechnical Engineer, California, No. 2994 [Exp. 6/30/24] • California Department of Transportation, Certificate of Proficiency, Expires: 9/2022
Governor's Office of Emergency Services - Disaster Services Worker - Volunteer
PROFESSIONAL AFFILIATIONS AND HONORS
• American Society of Civil Engineers
ASTM International - Participating Member
• Member of Tau Beta Pi National Engineering Honor Society • Member of Chi Epsilon National Civil Engineering Honor Society • Association ot Drilled Shatt Contractors (ADSC), The International Association of Foundation Drilling, 2004-2005 graduate student scholarship recipient • University of California at Berkeley, 2004-2005 graduate fellowship
PROFESSIONAL HISTORY
1997-Present: Aragón Geotechnical Inc., Riverside, California; Soils Technician (Laboratory and Field) to Engineering Assistant, Staff Engineer, Project Engineer to President.
5/2002-8/2002: Kiewit Pacific Company, Santa Fe Springs, California; Engineering Field Intern.
1996-1997: Aragón Geotechnical Consultants, Inc., Riverside and Lake Arrowhead, California; Engineering Assistant; Soils • Technician (Laboratory and Field.)
17 Project
Understanding &
Approach
ERSC
ERSC Project Understanding & Approach
Project Understanding
The City of Calexico is seeking qualified and experienced construction management, geotechnical, and field inspection professionals to provide Construction Management, Geotechnical, and Inspection Services for Sidewalk Improvement Project Federal Project No.
CML-5168(036). ERSC understands that the City requires a detailed, competent construction management and inspection team to successfully deliver a functional and sustainable sidewalk project that improves the quality of life for residents, businesses, and visitors.
Our goal is to facilitate cost-effective and long-lasting projects in accordance with local, state, and federal regulations.
Construction Management and Inspection are ERSC specialties. If selected, our team will manage and inspect the construction in accordance with Caltrans Local Assistance Procedures such that the Project is fully compliant and eligible to secure Fund 412 Federal The Project consists of sidewalk construction in three locations within the City's jurisdiction, as shown in the figure below. The work includes removal of existing parkway, subgrade, asphalt, and concrete; trimming and/or removal of existing trees; removal of fencing and roadway signs; construction of sidewalk, curb, gutter, drive approaches, and curb ramps; and adjustment of existing utility lids to grade. These three locations are described as follows:
1. Grant Street (between Plerce Avenue and east of Emilia Drive) - Infill sidewalk and reconstruction of drive approaches and curb ramps to provide an accessible pedestrian path of travel within a neighborhood next to Rio Vista Park, Rodriguez Park, Mains Elementary School, and Vincent Memorial High School.
2. Calexico Street (between Alder Avenue and Kloke Avenue) - New curb, gutter, sidewalk, and curb ramp on the south side of Calexico Street. The proposed curb ramp terminates adjacent to a Class I paved pedestrian/bike path entrance at the intersection of Kloke Road and Calexico. It is assumed the City seeks continuity between the Project's accessible sidewalk and this trail entrance.
3. Van de Graaff Avenue (between Cole Boulevard and Calexico 10 Theaters) - Infill sidewalk and reconstruction of deficient curb and gutter and curb ramp to provide a continuous accessible route from the signalized intersection of Cole Blvd and Van de Graaff to the Calexico 10 Theaters.
The project includes two bid schedules: a base bid schedule and an alternate bid schedule. It is assumed the City will proceed with both bid schedules if the awarded bid is within its construction budget. The project duration is expected to be 60 working days.
Inspection Services
ERSC's inspectors will be present during
work on City facilities while providing
a comprehensive approach to our NORTH END
services. As such, our team also consists TOWNCENTER IND of inspection professionals equally
experienced in the construction of public
VAN DE +l
infrastructure, paving, grading, traffic GRAAFF AVE
control, transportation, environmental (SHT. 6)
requirements, safety, and many other
facets required during a complete project.
Project Approach
At ERSC, our approach to construction
KENNEDY
management and inspection prioritizes
safeguarding the City's interests while
minimizing the burden on its staff. Acting as
an extension of the City's team, we ensure LAS CASITAS
that projects adhere strictly to contract
requirements and current standards. Our
inspectors are engaged directly in the
field, emphasizing thorough inspection
over remote oversight. This hands-on WEST CORE GRANT ST (SHT. 3)
involvement supports project compliance EASTICORE
and timely issue resolution and promotes
productive collaboration with contractors.
Contract Documents CALEXICO ST
Solid working knowledge of the project / (SHT. 4)
documents and Caltrans Local Assistance
Procedures guides our inspection team, AIRPORT ZONE DOWNTOWN ensuring that the project is consistent
with the contract document requirements,
labor compliance, DBE/minority utilization
19 ERSC Project Understanding & Approach
goals, Buy America Requirements, and other federal requirements within the designated construction sequence. Our proactive approach dictates addressing potential issues promptly, often before they necessitate formal Requests for Information (RFls), and reviewing all RFls and submittals swiftly to prevent project delays.
Safety
Safety remains paramount, as evidenced by our impeccable safety record. We maintain rigorous standards by enforcing compliance with Injury and Iliness Prevention Programs, trench and excavation protections, traffic control guidelines, confined space requirements, and Cal/OSHA regulations. To ensure ongoing transparency, we hold regular reviews with the City, attend all pre-construction and progress meetings, and provide detailed field reports documenting materials, labor, and daily progress. This diligent record-keeping helps ensure accurate payments and minimizes change orders.
In the event that an issue arises outside of ERS's control, the project is protected. ERS maintains Professional Liability Coverage for $5mm/$5mm, surpassing the industry standard of $2mm/$1mm.
Schedule
ERSC commits to timely project completion through continuous schedule monitoring and structured updates. The City will stay abreast of all project statuses with the added benefit of clear communication to eliminate surprises and resolve potential issues early.
Scope of Work
ERSC regularly conducts construction management and inspection for a diverse range of improvement projects on behalf of local agencies. To showcase our thorough CM approach, we've outlined the tasks performed on any assignment and provided a list of typical inspection items for some commonly encountered projects.
Construction Management
ERSC's selected inspector will perform observation and inspection during the entirety of the project. • Review all project plans, specifications, addenda, prospective bidders Q&A, and Caltrans Local Assistance Procedures prior to the pre-construction meeting to identify potential constructability or contractual issues. • Attend pre-construction meeting with the City, utility purveyors, and stakeholders. Prepare an agenda and meeting minutes with action items.
• Log, review, and approve material submittals, shop drawings, traffic control plans, etc. • Review the project schedule and construction progress on a weekly basis. ERSC will prepare and deliver a weekly statement of working days to the contractor. Major project milestones will be continuously monitored, and the schedule will be modified as necessary to account for weather delays or other unforeseen circumstances. • Conduct bi-weekly construction progress meetings with the City and contractor. Meeting agendas and minutes will be prepared for each meeting. The City will be kept informed each week of the project status. With the project's construction contract duration of 60 working days, ERSC assumes a total of 6 bi-weekly progress meetings. • Review and make recommendations regarding construction change orders, contractors' claims, and monthly progress payments.
Negotiate contract change orders on behalf of the City prior to City's acceptance. Coordinate RFls with the design engineer and City Engineer.
• Keeping contract files in different categories (progress payments, change orders, Rls, general correspondence, labor compliance, etc.). The granting agency will use these files to audit the work. • Verify that the contractor's payroll labor rates are consistent with the applicable wage determinations. • Verify that the contractor's work is completed according to plans and specifications. • ERSC's Inspector will maintain detailed daily reports for work items. Inspection reports will include weather, traffic control measures, labor, equipment, materials, quantities, correspondence, and issues observed. The inspection reports will also integrate the daily project photos. Additionally, the reports will include any tickets from material delivery to ensure accurate cost accounting. • Once the work is complete, ERSC will prepare a punchlist for construction items needing correction. Once items are corrected, ERSC will prepare a Recommendation for Acceptance of Work letter for the City's records. • Provide the City with a complete set of redlined record drawings for the City's records in PDF format. • Coordinate project closeout activities, including Notice of Completion, release of retention, warranty walk, delivery of archived documents, and assisting with staff reports for the Project's Notice of Completion, as needed.
Construction Inspection
ERSC's public works inspector will perform observation and inspection during the entirety of the project. • ERSC's Inspector will maintain detailed daily reports for all work items in accordance with Caltrans LAPM Exhibit 16-C. Inspection reports will include weather, traffic control measures, labor compliance, equipment, materials, quantities, correspondence, and Issues observed. The inspection reports will also integrate the daily project photos. Additionally, the reports will include any tickets from material delivery to ensure accurate cost accounting when payment is requested. These reports will be submitted to the City ERSC Project Understanding & Approach
at the end of each week.
The Inspector will monitor the contractor's daily labor force for compliance with state and federal labor laws. The inspector will perform employee interviews to verify the contractor and subcontractors pay correct wages as determined by Davis Bacon or by the State Department of Industrial Relations.
• Geotechnical inspections for compaction and materials testing in accordance with the City's Quality Assurance Program (QAP), contract specifications, and guidelines.
• The inspector will attend the Pre-Construction Meeting and meet bi-weekly with City staff and the Contractor to update the project status and schedule.
• Prior to commencing construction, ERSC will take video and digital photos of the project site indicating the original status of the work sites. As part of the inspection, photographs will be taken to document the work areas prior to, during, and at the end of each work day.
• Observe installation of pedestrian facilities and ensure ADA compliance/public safety measures are per construction documents.
Monitor the Contractor's "Best Management Practices" (BMP) and document any construction stormwater quality deficiencies. If any deficiencies arise, the inspector will make recommendations to the City and contractor to improve BMP efficacy and upkeep of the project site.
• Verify that traffic control, lane/road closures, flagging, and layout are per construction drawings. • Review site layout and verify USA markings to avoid conflicts with existing utilities. • Upon completion of work, a full inspection will be conducted, and a punch list of deficiencies will be generated and distributed to the Contractor and City. As part of the punch list, ERSC's Inspector will issue a schedule to complete the items included. ERSC will re-inspect the repair or re-work and provide recommendations for acceptance when full compliance is achieved.
ERS's inspector will maintain a set of record drawings that reflect conditions encountered and constructed in the field. These drawings will be submitted to the construction manager upon substantial project completion. • The Inspector's tablet will be equipped with a digital set of plans and specifications for easy access in the field. • Monitor site safety continuously during the project. Site safety, labor safety, and public safety are all considerations during construction project inspections.
Geotechnical Services and Materials Testing
AGI will focus its efforts on the Geotechnical and Materials Testing portion of the Project. Field and laboratory testing is based on Caltrans requirements for federally funded projects. AGI's scope of materials testing services for this Project includes:
1. Observations and materials testing of roadway subgrade and aggregate base materials.
2. Observations and materials testing of PCC and underlying soils for curb and gutter, curb ramps, and sidewalks.
3. Laboratory testing for native and aggregate base materials (soil maximum density-optimum moisture determinations, stability, and asphalt concrete maximum density determinations).
4. Preparation of daily field reports, laboratory test results, and a final materials test report signed by a California-licensed engineer.
Project-Specific Duties and Tasks
The following technical duties will be performed as needed on the different facilities under construction as project needs dictate:
• ERSC attended the City's non-mandatory pre-bid meeting on Tuesday, November 5th. It was noted that the City specifically requires the Contractor to provide submittals for review and approval 1 week from contract execution. ERSC would ensure the contractor meets the City's time-sensitive schedule.
• The contract documents indicate there are sections of gutter that do not have a proper drainage slope. Consequently, the contractor's surveyor must survey these areas to provide a positive flow profile so the street can drain by gravity. ERSC will review the surveyed elevations and provide curb and gutter reconstruction limits for the City Engineer to review and approve before replacement of curb and gutter.
• The Inspector will perform one employee labor compliance interview per week per trade in accordance with CEM-2504. Once completed, the interviews will be given to the City for review. • Verify and document job site posting of wage rate information and labor compliance posters. • Routinely monitor that contractor-submitted payroll certification is uploaded to the Project's DIR number and compare against the prevailing wage determination set forth by the contract documents. • The contract specifications indicate there is an alternative bid schedule that may add additional work items and quantities to the project. ERSC can manage the quantities and payments of the alternative bid schedules separate from the base bid if the City • Review the Project's area of disturbance to erosible subgrade to determine if a City needs to obtain coverage under the 2022 Construction General Permit (2022 CGP) and have the contractor prepare and implement a Stormwater Pollution Prevgtion Plan ERSC Project Understanding & Approach
(SWPPP). ERSC's preliminary measurements indicate the Project's impacts are well under 1 acre of disturbance. Eliminating this work from the Project's scope can save time and money for the City. However, the City can still choose to have the contractor implement a SWPPP if not required under the 2022 CGP.
• Verify all improvements are within City right-of-way. The project plan set offers little detail to the City's right-of-way relative to the project's improvements. If the contractor needs access to private property, the City/contractor will need to obtain permission from the owner to temporarily enter the property.
Assumptions and Exclusions
The following assumptions are made in the development of this proposal and fee:
1. Estimated hours of work are based on the construction duration of 60 working days. Contract administration and inspection time incurred after the 60 working days would be considered above and beyond the scope of this proposal.
2. This proposal estimates one (1) pre-construction meeting, 6 bi-week construction meetings, and one (1) project close-out meeting with ERSC's construction manager and inspector.
3. The City will coordinate and transact with Caltrans Local Assistance District 11 Office for contract administration and project submittals.
4. Exclusion of SWPPP or WQMP preparation as well as QSD/QSP inspection services.
5. Exclusion of public outreach services and inquiries for permission to enter private property of local residents and businesses. 22 Construetion Management, Geotechnical, and Inspection Services for Sidewalk Improvement Project Task Name Start Finish Predecessors ter 2. 2025
Cer 1.2025
Mar _MAL
Construction Management, Geotechnical and Inspection Services for 123 days Wed 12/4/24 Wed 5/7/25 Sidewalk Improvement Project
Pre Construction 24 days Wed 12/4/24 Mon 1/6/25
Council Award 1 day Wed 12/4/24 Wed 12/4/24
Contract and Notice to Proceed 1 day Thu 12/S/24 Thu 12/5/24 Pre Construction Meeting 1 day Fri 12/6/24 Fri 12/6/24
Pre Construction Submittal Review 11 days Mon 12/23/24 Mon 1/6/25 Issue NTP to Contractor 1 day Mon 1/6/25 Mon 1/6/25
Construction 60 days Mon 1/6/25 Fri 3/28/25
Working Days, PPEs, Daily Reports, CCOs, RFls, etc. 60 days Mon 1/6/25 Fri 3/28/25 Construction Inspection 60 days Mon 1/6/25 Fri 3/28/25
11 Labor Compliance 60 days Mon 1/6/25 Fri 3/28/25
12 Bi-Weekly Meetings 60 days Mon 1/6/25 Fri 3/28/25
CalTrans Progress Report and Payment Requests 60 days Mon 1/6/25 Fri 3/28/25 Final Punchlist/Final PPE 60 days Mon 1/6/25 Fri 3/28/25 Post Construction 23 days Mon 4/7/25 Wed 5/7/25
Post Construction Meeting, Final walk-through 1 day Mon 4/7/25 Mon 4/7/25 17 Obtain contractor markups, prepare as-built drawings 11 days Mon 4/7/25 Mon 4/21/25 18 Submit Caltrans documents/Project Admin package to City 1 day Fri 4/25/25 Fri 4/25/25 19 City Notice of Completion/Retention Release 1 day Wed 5/7/25 Wed 5/7/25 26 27
28 32
33 34
36 Page
Exhibits
ERSC
Industrial Relations
STATE OF CALIFORNIA
APPLICATION FOR
PUBLIC WORKS CONTRACTOR REGISTRATION
Registration Information
Type: Public Works
Period: 07/01/2024 06/30/2025
Contractor Information
Contractor Name: ENGINEERING RESOURCES OF SOUTHERN CA INC Trade Name:
License Type Number: 1000017460
Contractor Physical Address
Physical Business Country: United States of America Physical Business City/ REDLANDS Province:
Physical Business Address: 1861 W. REDLANDS BLVD. Physical Business State: CA Physical Business Postal 92373
Code:
Contractor Mailing Address
Mailing Country: United States of America Mailing City /Province: REDLANDS Mailing Address: 1861 W. REDLANDS BLVD. Malling State: CA Malling Postal Code: 92373
Contact Info
Daytime Phone: Daytime Phone Ext.:
Mobile Phone: Business Email: [email protected]
Applicant's Email: [email protected]
Registration Services:: Page 1 of 2 6/3/2024 1:31:15 PM Workers' Compensation
Professional Employer Organization (PEO)
Do you lease employees through Professional Employer Organization? Yes PEO Name: HR Advisors
Street address: 27285 Las Rambles, Suite 150
City, State, Zip: Mission Viejo, CA 92691
PEO Email Address:
PEO Phone Numbers: 949/497-8329 Ext 110
Workers' Compensation Overview
Carrier: CAVIGNAC AND ASSOCIATES Inception Date: 09/01/2014 Policyholder Name: Engineering Resources of Expiration Date: September 1, 2024 Southern CA, Inc.
Policy Number: 72WEGGG6371
Certification
Yes I certify that I do not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award Yes I certify that the contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works.
Yes I certify that one of the following is true: (1) I am licensed by the Contractors State License Board (CSLB) in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code; or (2) my business or trade is not subject to licensing by the CSLB.
I understand refunds are not authorized
I, John M Brudin, the undersigned, am, ENGINEERING RESOURCES OF SOUTHERN CA INC with the authority to act for and on behalf of the above named contractor. I certify under penalty of perjury that all of the above information provided is true and correct. I further acknowledge that any untruthful information provided in this application could result in the certification being canceled.
I certify this on: 1:27 PM
Legal Entity Information
Legal Entity Type: Corporation
Name: ENGINEERING RESOURCES OF SOUTHERN CA INC
Registration Services:: Page 2 of 2
CA
DER see Callion eCPR Public Search Public Works Support Contractors • Projects Register Log in Department o
LEST. 1927) Industrial Relations
Home > Seotracter > ARAGON GEOTECHNICAL INC
ARAGON GEOTECHNICAL INC
Contractor
Contractor business email Contractor dba name
[email protected] ARAGON GEOTECHNICAL.INC
Contractor c ation eff date Contractor entity number
2024-07-01 43980978
Contractor first name Contractor ID
Bonnie 1000008509
Contractor mailing city Contractor last name
| RIVERSIDE Shaffer
Contractor mailing state Contractor mailing address2
CA
Contractor mailing zip Contractor physical address1
92504 16801 VAN BUREN BIVD BLDG B
Contractor physical city Contractor physical address2
RIVERSIDE
Contractor physical state Contractor source
CA PWCR
Contractor physical zip Contractor wc cert date
92504 2023-12-09
Contractor certify date Contractor wc exp date
/ 2024-06-13 2024-12-09
Contractor company type Contractor wc policy number
Corporation 57 WEG BC1EOS
Contractor craft legacy Contractor we selection
Consultant; Inspector Field Soils Materi Insured by carrier Contractor craft snow Contractor legal entity name
ARAGON GEOTECHNICAL INC
Contractor c ation exp date Contractor mailing address1 2027-06-30 16801 VAN BUREN BLVD BLDG B
Contractor date deactivated Contractor we carrier
Aragon Geotechnical Inc
• Checked
Iermus.& Privacy Disclaimer Nondiscrimination Accessibility Copyright 2024 State of California
Conditions Palicy Notice
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date 11/08/2024 PE/CE
Federal-aid Project No(s). CML-5168(036) Bid Opening Date 11/08/2024 CON The City of Calexico established a Disadvantaged Business Enterprise (DBE) goal of 5% for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal.
Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the ollowing information even if the Exhibit 10-01: Consultant Proposal DBE Commitments or Exhibit 15-G Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This forn protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that bidder made a mathematical error.
The following items are listed in the Section entitled "Submission of DBE Commitment" of the Special Provisions, please attach additional sheets as needed:
A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):
Publications Dates of Advertisement
N/A
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):
Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates Aragon Geotechnical, inc. 10/16/2024 10/23/2024
May 2020
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.
Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
-
Geotechnical and No 24.22
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:
Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:
N/A
Names, addresses and phone numbers of firms selected for the work above:
1 Aragon Geotechnical, Inc.
16801 Van Buren Blvd.
Riverside, CA 92504
(951) 776-0345
E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was Direct e-mail communication.
May 2020
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the BE subcontractor purchases or leases from the prime contractor or its affiliate:
N/A
G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):
Name of Agency/Organization. Method/Date of Contact Results N/A
H. Any additional data to support a demonstration of good faith efforts:
ERSC contacted Aragon Geotechnical directly as we knew it to be a DBE firm with a reliable service record, including previous successful partnerships with our team, that could readily meet the DBE goal established by the City.
May 2020
This email record serves as ERS's good faith effort documentation that ERSC teamed with Aragon Geotechnical Inc., a registered DBE, to meet the City's DBE goal for the construction management and inspection consultant
From Craig Brudin <[email protected]>
Date Tue 11/5/2024 9:18 AM
Ben Booth <[email protected]>
Cc Amanda Walker <[email protected]>
Craig Brudin, QSP, Director of Operations
(909) 890-1255, ext. 102
Engineering Resources of Southern California, Inc.
From: Craig Brudin
Sent: Wednesday, October 23, 2024 1:50 PM
To: 'Fernando Aragon' <[email protected]>
Cc: Ben Booth <[email protected]>
Subject: RE: Calexico RFP - CMIS
Fernando,
ERSC will submit on this RFP, would you send me a proposal for the geotechnical scope? Craig Brudin, QSP, Director of Operations
(909) 890-1255, ext. 102
Engineering Resources of Southern California, Inc.
From: Fernando Aragon <[email protected]>
Sent: Wednesday, October 16, 2024 11:32 AM
To: Craig Brudin <[email protected]>
Cc: Ben Booth <[email protected]>
Subject: RE: Calexico RFP - CMIS
This sender is trusted.
We absolutely do! We are also a DBE if you need us to do that. Let us know if you want to pursue it and we can look at getting you a proposal.
Fernando
From: Craig Brudin <[email protected]>
Sent: Wednesday, October 16, 2024 11:25 AM
To: Fernando Aragon < [email protected]>
Cc: Ben Booth <[email protected]>
Subject: Calexico RFP - CMIS
Hey there Fernando,
Do you service the Imperial Valley? I am looking at an RFP in Calexico and need Testing.
Would you let me know if this is something you could handle out there? ERSC Craig Brudin, QSP, Director of Operations
(909) 890-1255, ext. 102
Redlands | Teme cula | Palm Desert
Were hiring! Click here to join our team!
Trusted partners in developing comprehensive and sustainable engineering solutions that enable communities to thrive.
Local Assistance Procedures Manual Exhibit 10-01
Consultant Proposal DBE Commitment
EXHIBIT 10-01 CONSULTANT PROPOSAL DBE COMMITMENT
1. Local Agency: City of Calexico _ 2. Contract DBE Goal: 5%
3. Project Description: Sidewalk Improvement Project - Federal Projeet No. CML-5168(036)
4. Project Location: Grant St (Pierce Ave-Emilia Dr), Calexico St (Adler Avc-Kloke Avc) & Van de Graaff Ave (Cole Blvd-Calexico 10 Theel
5. Consultant's Name: Aragon Gotechnical Inc. 6. Prime Certified DBE:
7. Description of Work, Service, or Materials 9. DBE Contact Information 10. DBE% Supplied
Geotechnical and materials testing 45365 C. Fernando Aragon, PE 24.22 [email protected]
Local Agency to Complete this Section
17. Local Agency Contract Number:
11. TOTAL CLAIMED DBE PARTICIPATION 24.22%
18. Federal-Aid Project Number:
Consultant's Ranking after Evaluation:
IMPORTANT: Identify all DBE firms being claimed for credit, Local Agency certifies that all DBE certifications are valid and information on regardless of tier. Written confirmation of each listed DBE is this form is complete and accurate required.
11/06/2024
21. Local Agency Representative's Signature 22. Date 12. Preparer's Signature 13. Date Craig Brudin, QSP 909-890-1255 x116
23, Local Agency Representative's Name 24. Phone 14. Preparer's Name 15. Phone Director of Opcrations
25. Local Agency Representative's Title 16. Preparer's Title DISTRIBUTION: Original - Included with consultant's proposal to local agency.
ADA Notice: For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654- 3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.
LPP 18-01 Page 1 of 2
January 2019
Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
ExHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year quarter_
C. loan insurance date of last report
4. Name and Address of Reporting EntA Reporting Entity in No. 4 is Subawardee, or Name and Address of Prime:
Prime Subawardee
ERSC HASNOT
CFDA Number, if applicable
Action Numer, if nown
PANY
Name and Address individuals Performing Servie.
(including address if different from No. 10)
(last name, first name, MI)
OBBYING
12. Amount of Paym
FEACTIVELES
b. in-kill; specify: tature
f. other, specify
Brief Description of Services Performed or to be performed and Date(s) of Service, including officers), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheets) if necessary)
16. Continuation Sheets) attached: Yes No 7
Signature:
Print Name:
Title:
Telephone No.: Date:
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Fonn L.L.L Rev. 04-28-06
Distribution: Orig- Local Agency Project Files
LPP 13-01 May 8, 2013
ERSC
Engineering Resources of Southern California
ATTACHMENT NO. 3
CITY OF CALEXICO
1/12
IE AN
CHLENILU
Request for Proposals
Construction Management, Geotechnical and
Inspection Services for
Sidewalk Improvement Project
On Grant Street between Pierce Avenue & Emilia
Drive, Calexico Street between Adler Avenue & Kloke
Avenue, Van de Graaff Ave between Cole Boulevard
and Calexico 10 Theaters
Federal Project No.: CML-5168(036)
Public Works Department
608 Heber Avenue
Calexico, CA 92231
760/768-2160
www.calexico.ca.gov
October 10, 2024
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
Introduction and Background
II Project Posting and Scheduling
IV
V Notification of Consultant Registration
Requirements (Where Required)
VI 7
VII Selection Process 10
VIII Tentative Schedule 10
IX Inquiries 11
Submittal Deadline 11
EXHIBITS
A - Sample Proposal Evaluation Form
B- Sample Consultant Agreement and Insurance Requirements For all Federally Funded Projects the following additional items shall also be considered part of the contract:
Caltrans Local Assistance Procedures Manual (LAPM) forms can be found in digital format at:
https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms C- Bidder/Proposer Disadvantaged Business Enterprise (DBE) Program Requirements • Exhibit 9-B: Local Agency DBE Annual Submittal Form
• Exhibit 10-I: Notice to Proposers Disadvantages Business Enterprise Information Exhibit 15-H: DBE Information - Good Faith Efforts
• Exhibit 10-O1: Consultant Proposal DBE Commitment
• Exhibit 10-H: Sample Cost Proposal Example 1(10H must be submitted in separate sealed envelope
• Exhibit 10-Q: Disclosure of Lobbying Activities
D- Required Certification by Consultant and City after Contract Execution Exhibit 10-02: Local Agency Proposer DBE Information (Consultant Contract) Exhibit 17-F: Final Report - Utilization of DBEs
Exhibit 17-O: DBE Certification Status Change
2 I. INTRODUCTION AND BACKGROUND
The City of Calexico is requesting proposals from qualified and experienced construction management, geotechnical field inspection professionals to provide Construction Management, Geotechnical and Inspection Services for Sidewalk Improvement Project Federal Project No. CML-5168(036). The services are anticipated to be full time for the duration of the construction work, which will be completed by private contract secured through the public bidding process.
The purpose of the Request for Proposals (RFP) is to provide the City of Calexico with the assurance that this City administered project is constructed in substantial compliance with the plans and specifications and that all local, state, and federal provisions (where applicable) which may be required due to the specific funding requirements are adhered to. An important objective is to maintain a level of high quality Construction Management, Geotechnical and Inspection Services through appropriate documentation and workflow methodology in the most cost-effective manner possible.
The contract will be regulated according to the provisions of all federal, state and local laws and ordinances that are applicable. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1774. All Service Providers and sub- consultants) shall pay all workers not less than the general prevailing rate of per diem wages and Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are available on the Internet at: http://www.dir.ca.gov. All Service Providers and sub-consultants) shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code.
This City of Calexico has a Disadvantage Business Enterprise (DBE) goat of five percent (5%).
Services that are partially funded with Federal funds are subject to Part 26, Title 49, Code of Federal Regulations entitled "Participation by Disadvantaged Business Enterprises (DBE) in the Department of Transportation Financial Assistance program." Caltrans DBE program information can be found here: http://www.dot.ca.gov/hq/LocalPrograms/DBE_CRLC.html.
The project shall consists of the removal of existing parkway, subgrade, asphalt, and concrete, trimming and/or removal of existing trees, removal of fencing and roadway signs, procurement of concrete, construction of sidewalk, curb, gutter, driveways, and curb ramps, and adjustment of existing utility lids to grade.
Il. PROJECT POSTING AND SCHEDULING
This RFP is being distributed over the internet and is posted at the City's website at the following address: https://www.calexico.ca.gov/bidsandrfps. Consultants wishing to propose in response to this RFP must obtain this document from our website. Due to the fact that anyone can download 3 the RFP and the City has no method for tracking the distribution, the City is not able to maintain a list of potential consultants and/or proposers and cannot provide individual notification of amendments or addendums to this RFP.
The City will therefore post any addendums to the RFP on the above mentioned website. All consultants shall refer to the website to verify all addendums that have been issued and that they have acknowledged all such addendums in their proposal.
Il. SCOPE OF WORK
Provide Construction Management, Geotechnical and Inspection Services during construction.
This will require providing one qualified individual to observe the construction phase to determine, in general, whether there is compliance with the bidding documents. This includes:
• Attend pre-construction meeting with the City.
• Verify contractor's work is being completed according to plans and specifications. (Work shall include inspecting all aspects of the grading, paving, concrete, street lighting and all other portions of construction shown on the plans/specifications). • Review and recommendation regarding submittals, shop drawings and product substitutions.
• Review and make recommendations regarding construction change orders, contractors' claims and payments.
• Observe and report on construction operations and keep track of progress. • Keeping Contract files in different categories (payments, change orders, RFl's, general correspondence, labor compliance, etc.). These files will be used by the granting agency to audit the work.
• Provide geotechnical engineering services and survey services necessary or the required scope of work.
• Confirm all geotechnical inspections are being completed according to the City approved Quality Assurance Program (QAP), and contract specifications and guidelines. • Prepare daily reports and weekly reports per Exhibit 16-C of the LAPM. These reports shall be submitted to the City for review at the end of each work week. • Labor compliance. Making sure the contractor and subcontractors pay correct wages as determined by Davis Bacon or by the State Department of Industrial Relations, as well as performing the employee interviews.
4 • Assist the City in the Reporting of Suspected Violations of the Prevailing Wage Law to the Labor Commissioner
• Perform employee interviews per CEM-2504. One per week per trade. Once completed, the interviews will be given to the Resident Engineer (City) for review. • Forms Collection, Review and Verifications:
Department of Apprenticeship Standards (DAS) Form 140
Department of Apprenticeship Standards (DAS) Form 142
California Apprentice Council Training Fund Contribution (CAC-2) Fringe Benefits Statement (FBS) Form
Other forms as necessary
• Keep City staff fully advised as to the progress of the work on a weekly basis. • Coordinate inspections with geotech, which includes: production plant testing, onsite material testing, compaction testing, concrete cylinder testing and assist in processing submittals for mix designs for asphalt and concrete. Verifying that asphalt is in accordance to approved mix designs and is installed according to plans and specifications. Verifying imported base material meets contract plan and specifications. Verifying that the pulverized asphalt meets the contract plans and specifications. • Verify that all erosion control is set up and maintained throughout the duration of the project.
• Coordinate final inspection and preparation of punch list and close-out of Project.
IV. AUDITS AND INVESTIGATIONS
All proposed Architectural and Engineering contracts and supporting documents are subject to audit or review by Caltrans, Audits and Investigations (A&I), other state audit organizations, or the tederal government. Not all proposed contracts will be audited or reviewed; they will be selected n a risk-based approach. Whether a proposed contract or consultant is selected for audit review through A&l's risk-based approach is dictated by the dollar thresholds of the proposed contract, and other risk factors.
Dollar thresholds for audits or reviews are stratified as follows:
Less than $150K - no audit or review is required, but is optional; Between $150K and $IM;
Between $IM and $3.5M;
$3.5M and above
5 Proposed Documents Conformance Audit/Review If Audited or Contract Required Letter Performed? Reviewed will
Amount Required? Cognizant Letter
of Approval be
Issued?
Small Purchase None No Audit/review N/A
Procedure optional
Less than $150K
Case 1. Certification by No May be selected If Indirect Cost Between $150K Consultants for Audit or Rate (ICR)
and $IM (Exhibit 10-K) Review. Audit is
performed.
Case 2. Between Proposed Yes May be selected Yes
$1M and $3.5M contract, for ICR Audit.
certifications,
Case 3. Proposed Yes May be selected Yes
$3.5M or greater contract, for Review of
certifications, CPA's work
Internal Control papers of audited
Questionnaire,
etc.
AND
CPA Audited
NOTIFICATION OF CONSULTANT REGISTRATION REQUIREMENTS
WHERE REQUATION
Pursuant to the requirements of California Labor Code section 1771.1, all consultants and sub- consultants that wish to engage in public work through a public works contract must be registered with the Department of Industrial Relations (DIR).
Beginning March 1, 2015, no consultant or sub-consultant may be listed on a bid proposal for a public works project unless registered with DIR.
Beginning April 1, 2015, no consultant or sub-consultant may be awarded a contract for public work on a public works project unless registered with the DIR, pursuant to Labor Code section 1725.5
All consultants, including sub-consultants listed in the proposal must be registered with the DIR at the time proposals are due, and must submit proof of registration with the proposal. Any proposals received listing unregistered consultants and/or sub-consultants will be deemed non- responsive.
6 NOTE: DIR number is to be specified on the cover page of the consultant proposal. Proof of registration for consultant and sub-consultant shall also be submitted as an exhibit of the proposal.
Application and renewal are completed online with a non-refundable fee of $400. Read the Public Works Reforms (SB 854) Fact Sheet for requirements. Instructions for completing the form and additional information can be found on the DIR website.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
SOURCES OF INFORMATION
INFORMATION WEBSITE
Department of Industrial Relations (Public http://www.dir.ca.gov/Public- Works) Works/PublicWorks.html
SB 854 Fact Sheet https://www.dir.ca.gov/Public-
Works/PublicWorksSB854.html
Senate Bill 854 Compliance http://www.dir.ca.gov/Public- Works/SB854.html
Public Works Contractor (PWC) Registration https://www.dir.ca.gov/Public- Works/Contractor-Registration.html
Classifications and Minimum Labor Rates http://www.dir.ca.gov/OPRL/Pwd/ VI. SUBMITTAL REQUIREMENTS
Proposal should be typed, organized and concise, yet comprehensive.
General Requirements
Provide a cover letter.
2. State the interpretation of the work to be performed. State a positive commitment to perform the work in the required manner and time frame; include a basic summary; and demonstrate an understanding of the project. Provide a statement that the offer is valid for at least a ninety (90) day period.
3. Provide the names) of the primary and/or alternate individuals authorized to respond to this RFP. Include titles, addresses, e-mail, and phone numbers.
4. The Consultant is representing itself as a qualified professional in Construction Management and Inspection Services. Therefore, it is acceptable to submit recommendations and comments for consideration on format, process, schedule, and additional content of projects. The City will consider comments and recommendations; however is not required to select any of the recommendations or comments. 7 5. Expensive bindings, colored displays, promotional materials, etc., are neither necessary nor desired. Emphasis should be concentrated on conformance to the RFP instructions, responsiveness to the RFP requirements, and on completeness and clarity of content.
6. If any subcontractors are utilized, the lead Consultant must submit a description of the firm, the portion of work to be done, and cost of each subcontractor. All subcontracts exceeding $25,000 in cost shall contain all required provisions of the prime contract.
7. Provide information about the Consultant's use of Disadvantaged Business Enterprises (DBEs). Consultant must give consideration to DBE firms as specified in 23 CFR 177.5(b), 49 CFR Part 26, and in Exhibit 10-1, Notice to Bidders/Proposer Disadvantaged Business Enterprise information, elsewhere in this RFP. The provisions of 49 CFR, Part 26 require that a local agency receiving federal-aid funds comply with the Disadvantaged Business Enterprise (DBE) program, and that DBE firms have the opportunity to participate in the projects (see Chapter 9, "Civil Rights and Disadvantaged Business Enterprises", of the LAPM including any updates). Such steps include the considering of DBE firms by the proposing consultants. When feasible, organize the project schedule and task requirements to encourage participation in the contract by DBE firms. Local agencies should be fully aware of all of the subcontracting opportunities in their consultant contracts.
The consultant shall ensure that certified DBE firms have the opportunity to participate in the performance of the contract and will be able to demonstrate a good faith effort (good faith effort documentation must be included with proposal).
Table of Contents
Include a table of contents with identification of each section and page number.
Summary of Qualifications and Experience
1. State whether the firm is local, regional, national or international.
2. Identify the owners) of the firm and legal status (sole proprietor, corporation, etc.) Give the location of the office from which work is anticipated to be done and the number of employees of the company.
Identify the qualifications and resumes of all individuals who will be associated with this service. Include professional registrations and affiliations.
Summarize specific experiences and qualification for similar and related projects, both federally funded and locally funded. Describe the services previously performed such as studies, reports, etc. List at least three (3) references with telephone numbers and email contact addresses (if available).
8 Analysis of Effort/Methodology
Describe the approach for how the work will be performed. The proposal shall indicate any specific techniques or methodology to be utilized.
The proposal shall include a sample project timeline with specific tasks envisioned for this project, including staffing.
3. Indicate what participation, data and products will be requested from the City.
4. Indicate deliverables to be provided and when.
Cost and Fees
Cost Proposals (Caltrans LAPM Exhibit 10H Example 1) must be submitted with the proposal in a separate sealed and clearly marked envelope (include project title and submitting firm). Cost proposals shall take into account the following:
1. Develop costs and fees for the services requested. Submit a not to exceed fee proposal based on anticipated fully burdened hourly rates.
2. When preparing cost and fees consider the scope of work involving project kick off and review of available documentation, material submittals, project documentation and prepare a lump sum fixed fee breakdown based on anticipated staff and hours. Costs should be organized for full time hourly rates. Such hourly rates should be fully burdened or loaded, including full compensation for all overhead and profit. Billing rates shall include provision for normal office costs, including but not limited to office rental, utilities, insurance, cell phone or radio, equipment, normal supplies and materials, in-house reproduction services, and local travel costs. As much as possible, a fixed fee lump sum breakdown by phase of the construction based on billable hours is desirable for preconstruction and post construction.
Breakdown shall include preconstruction services and construction services (Request for information/clarification). No subcontractors shall be utilized without prior authorization by the City and modification to submitted DBE subcontractor's list or goal is discouraged and may lead to project funding issues.
4. LAPM Exhibit 10-H Example 1 must be submitted as the cost proposal. Executable copies of Exhibit 10-H and all other updated LAPM forms can be found here:
http://www.dot.ca.gov/hq/LocalPrograms/lam/forms/lapmforms.htm.
An individual Exhibit 10-H Example 1 is required for each sub-consultant. The combination of all 10-H forms submitted (prime and sub consultants) must equal the cost proposal for this project.
The Project has a base bid and a base bid plus alternate bid. Consultants are required to submit two 10-H forms to cover both scenarios.
Insurance Requirements
Prior to execution of the agreement with the City, the successful firm must provide evidence of surance coverages as noted in the sample contract and insurance requirements exhibit he successful firm will be required to maintain the required coverages, at its sole cost ar expense, throughout the entire term and any subsequent modification terms of the contract.
Insurance requirements noted in sample contract. Insurance requirements may be adjusted once the final cost and fees proposal is reviewed.
Caltrans Federal Forms Requirement
Caltrans forms and exhibits listed in the table of contents section are required for this project.
Failure to submit the required forms at the required intervals will render a bid non-responsive.
Failure to submit the required forms at any of the intervals may result in loss of federal funding on the project and may leave the successful firm in an actionable position.
VII. SELECTION PROCESS
The City of Calexico will utilize a one-step selection process. The City reserves the right to include an oral interview process component. If an oral interview is considered, selected firms will be notified.
Proposals will be reviewed by an evaluation committee. The evaluation committee's assessment and recommendations shall be forwarded to the City Managers for review. The City Manager shall provide a report of the committee's evaluation and recommendations, along with his recommendation, for the selection of a firm to the City Council for final review and approval to enter into negotiations for an agreement.
Additionally, the City reserves the right to reject any and all proposals submitted and/or request additional information for clarification.
VIII. TENTATIVE SCHEDULE
Request for Proposal Issued October 10, 2024
Consultant Proposals Due November 8, 2024 at 2:00p.m.
Consultant Interviews (TBD) Week of November 18, 2024
Consultant Selection and Negotiations Week of November 25, 2024 City Council Approval of Contract December 4, 2024
Project Completion June 25, 2025
10 IX. INQUIRIES
Pre-submittal procedural or technical inquires may be directed to Lilliana Falomir, Public Works Manager via email at [email protected].
X. SUBMITTAL DEADLINE
Consultant must submit five (5) copies of their proposal with original Consultant signature. The proposal must be formatted in accordance with the instructions of this RFP. Promotional material may be attached, but are not necessary and will not be considered as meeting any of the requirements of this RFP. Proposals must be enclosed in a sealed envelope or package, clearly marked "RFP for Construction Management, Geotechnical and Inspection Services" and delivered on or before 2:00p.m. on November 8, 2024 to:
Office of the City Clerk
City Hall
City of Calexico
608 Heber Avenue
Calexico, CA 92231
Late, emailed or facsimile proposals will not be accepted. It is the proposer's responsibility to assure that its proposal is delivered and received at the location specified herein, on or before the date and hour set. Proposals received after the date and time specified will not be considered. 11 EXHIBIT A
12 SAMPLE OF PROPOSAL EVALUATION FORM
Firm:
Evaluator:
Date:
1 Technical Approach (35 Points) Points Awarded
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
construction management and construction inspection work 2 Project Management (30 Points) Points Awarded
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures using LAPM for local
4 agency advertised projects (25 Points)
Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points)
Total Score
Comments:
13 EXHIBIT B
14 AGREEMENT FOR PROFESSIONAL SERVICES
This Agreement is made and entered into as of the day of , 2024, by and between the City of Calexico ("City") and ("Consultant").
RECITALS
A. Consultant is specially trained, experienced and competent to perform the special services which will be required by this Agreement; and
B. Consultant possesses the skill, experience, ability, background, certification and knowledge to provide the services described in this Agreement on the terms and conditions described herein.
AGREEMENT
Scope of Services. The Consultant shall furnish the following services in a professional manner. Consultant shall perform the services described on Exhibit A which is attached hereto and incorporated herein by reference. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A, subject to the direction of the City through its staff that it may provide from time to time. ri Time of Performance. The services of Consultant are to commence upon execution of this Agreement and shall continue until all authorized work is approved by the City. All such work shall be completed no later than June 30, 2025. Time is of the essence for every provision of this agreement that states a time for performance and for every deadline imposed by the City.
Compensation. Compensation to be paid to Consultant shall be as set forth in Exhibit B, which is attached hereto and incorporated herein by reference. Payment by City under this Agreement shall not be deemed a waiver of defects, even if such defects were known to the City at the time of payment.
4. Method of Payment. Consultant shall submit monthly billings to City describing the work performed during the preceding month. Consultant's bills shall include a brief description of the services performed, the date the services were performed, the number of hours spent and by whom, and a description of any reimbursable expenditures. City shall pay Consultant no later than 30 days after approval of the monthly invoice by City staff.
Ownership of Documents. All plans, studies, documents and other writings prepared by and for Consultant, its officers, employees and agents and subcontractors in the course of implementing this Agreement, except working notes and internal documents, shall 15 become the property of the City upon payment to Consultant for such work, and the City shall have the sole right to use such materials in its discretion without further compensation to Consultant or to any other party. Consultant shall, at Consultant's expense, provide such reports, plans, studies, documents and other writings to City upon written request.
6 Independent Contractor. It is understood that Consultant, in the performance of the work and services agreed to be performed, shall act as and be an independent contractor and shall not act as an agent or employee of the City. Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights.
Interest of Consultant. Consultant (including principals, associates and professional employees) covenants and represents that it does not now have any investment or interest in real property and shall not acquire any interest, direct or indirect, in the area covered by and during this Agreement or any other source of income, interest in real property or investment which would be affected in any manner or degree by the performance of Consultant's services hereunder. Consultant further covenants and represents that in the performance of its duties hereunder no person having any such interest shall perform any services under this Agreement.
Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant:
a. will conduct research and arrive at conclusions with respect to his/her rendition of information, advice, recommendation or counsel independent of the control and direction of the City or of any City official, other than normal agreement monitoring; and
b. possesses no authority with respect to any City decision beyond rendition of information, advice, recommendation or counsel. (FPPC Reg. 18700(a)(2).) Professional Ability of Consultant. City has relied upon the professional training and ability of Consultant to perform the services hereunder as a material inducement to enter into this Agreement. Consultant shall therefore provide properly skilled professional and technical personnel to perform all services under this Agreement. All work performed by Consultant under this Agreement shall be in accordance with applicable legal requirements and shall meet the standard of quality ordinarily to be expected of competent professionals in Consultant's field of expertise.
9. Indemnity. Consultant agrees to indemnify, including the cost to defend, the City, and its officers, agents and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this contract. This indemnity does not apply to liability for damages for death or bodily injury to persons, 16 injury to property, or other loss, damage or expense arising from the sole negligence, willful misconduct or defects in design by the City or its agents, servants, or independent contractors who are directly responsible to the City, or the active negligence of the City.
To the fullest extent permitted by law, the Consultant shall (1) immediately defend and (2) indemnify the City, and its councilmembers, officers, agents, and employees from and against all liabilities regardless of nature or type that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, or its employees, agents, or subcontractors. Liabilities subject to the duties to defend and indemnify include, without limitation, all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys' fees; court costs; and costs of alternative dispute resolution. The Consultant's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then Consultant's indemnification obligation shall be reduced in proportion to the established comparative liability.
(b) The duty to defend is a separate and distinct obligation from Consultant's duty to indemnify. Consultant shall be obligated to defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, agents, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend under this section. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys fees and defense costs in proportion to the established comparative liability of the indemnified party. (c) The review, acceptance or approval of the City's work or work product by any indemnified party shall not affect, relieve or reduce the City's indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.
10. Insurance Requirements.
a. Consultant, at Consultant's own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies. 17 i. Workers' Compensation Coverage. Consultant shall maintain Workers' Compensation Insurance and Employer's Liability Insurance for his/her employees in accordance with the laws of the State of California. In addition, Consultant shall require each subcontractor to similarly maintain Workers' Compensation Insurance and Employer's Liability Insurance in accordance with the laws of the State of California for all of the subcontractor's employees. Any notice of cancellation or non-renewal of all Workers' Compensation policies must be received by the City at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against City, its officers, agents, employees and volunteers for losses arising from work performed by Consultant for City. This provision shall not apply if Consultant has no employees performing work under this Agreement. If the Consultant has no employees for the purposes of this Agreement, Consultant shall sign the "Certificate of Exemption from Workers' Compensation Insurance" which is attached hereto as Exhibit C.
i. General Liability Coverage. Consultant shall maintain commercial general liability insurance in an amount not less than one million dollars ($1,000,000) per occurrence for bodily injury, personal injury and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit iii. Automobile Liability Coverage. Consultant shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the Consultant arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
iv. Errors and Omissions Liability. Consultant shall maintain errors and omissions liability insurance for all work performed under this Agreement in an amount of not less than one million dollars ($1,000,000).
b. Policy Endorsements. Each general liability and automobile liability insurance policy shall be with insurers possessing a Best's rating of no less than A:VII and shall be endorsed with the following specific language:
i. The City of Calexico, its elected or appointed officers, officials, employees, agents and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work or operations.
18 This policy shall be considered primary insurance as respects the City, its elected or appointed officers, officials, employees, agents and volunteers.
Any insurance maintained by the City, including any self-insured retention the City may have, shall be considered excess insurance only and shall not contribute with it.
ili. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.
iv. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents or volunteers.
V. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the City.
C. Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the City's option, Consultant shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
d. Certificates of Insurance and Endorsements. Consultant shall provide certificates of insurance with original endorsements to City as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the City on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the City at all times during the term of this Agreement.
11. Compliance with Laws. Consultant shall use the standard of care in its profession to comply with all applicable federal, state and local laws, codes, ordinances and regulations.
12. Licenses. Consultant represents and warrants to City that it has all licenses, permits, qualifications, insurance and approvals of whatsoever nature which are legally required of Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement, any licenses, permits, insurance and approvals which are legally required of Consultant to practice its profession. Consultant shall obtain a City of Calexico Business License.
19 13. Controlling Law Venue. This Agreement and all matters relating to it shall be governed by the laws of the State of California and any action brought relating to this Agreement shall be held exclusively in a state court in the County of Imperial, California.
14. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent prepaid, first class mail. Any such notice, demand, etc. shall be addressed to the other party at the address set forth herein below. Either party may change its address by notifying the other party of the change of address. Notice shall be deemed communicated within 48 hours from the time of mailing if mailed as provided in this section.
If to City: City of Calexico, City Manager
608 Heber Ave.
Calexico, CA 92231
If to Consultant:
15. Consultant's Books and Records.
a. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant to this Agreement.
Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement.
c. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Auditor or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at City Hall when it is practical to do so.
Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement.
d. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above named officers, require that 20 custody of the records be given to the City and that the records and documents be maintained in City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor-in-interest.
16. Entire Agreement. This Agreement constitutes the complete and exclusive statement of Agreement between the City and Consultant. All prior written and oral communications, including correspondence, drafts, memoranda, and representations, are superseded in total by this Agreement.
17. Amendments. This Agreement may be modified or amended only by a written document executed by both Consultant and City and approved as to form by the City Attorney.
18. Waiver. No failure on the part of either party to exercise any right or remedy hereunder shall operate as a waiver of any other right or remedy that party may have hereunder.
19. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties hereto. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart.
20. Assignment and Subcontracting. The parties recognize that a substantial inducement to City for entering into this Agreement is the professional reputation, experience and competence of Consultant. Assignments of any or all rights, duties or obligations of the Consultant under this Agreement will be permitted only with the express consent of the City. Consultant shall not subcontract any portion of the work to be performed under this Agreement without the written authorization of the City. If City consents to such subcontract, Consultant shall be fully responsible to City for all acts or omissions of the subcontractor. Nothing in this Agreement shall create any contractual relationship between City and subcontractor nor shall it create any obligation on the part of the City to pay or to see to the payment of any monies due to any such subcontractor other than as otherwise is required by law.
21. Termination. This Agreement may be terminated by the City immediately for cause or by either party without cause upon fifteen days' written notice of termination. Upon termination, Consultant shall be entitled to compensation for services performed up to the effective date of termination.
***SIGNATURES ON FOLLOWING PAGE***
21 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first written above.
CITY OF CALEXICO: CONSULTANT:
Juan Contreras, Acting City Manager
City Manager
APPROVED AS TO FORM: ATTEST:
Carlos Campos Veronica L. Alvarado
City Attorney City Clerk
22 EXHIBIT A
SCOPE OF SERVICES
(proposal dated
23 EXHIBIT B
SCHEDULE OF CHARGES
24 EXHIBIT C
CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE I hereby certify that in the performance of the work for which this Agreement is entered into, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of the State of California.
Executed on this day of , 2024, at
California.
Consultant
25 EXHIBIT C
26 STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION Page 1 of 3
LOCAL PUBLIC AGENCY DBE ANNUAL SUBMITTAL FORM
DOT LAPM 9-B (NEW 09/2023)
TO: CALTRANS DISTRICT 11
District Local Assistance Engineer
The information for LAPM 9-B presented herein is in accordance with Title 49 of the Code of Federal Regulations (CR), Part 26, and the State of California Department of Transportation (Caltrans) Disadvantaged Business Enterprise (DBE) Program Plan.
The City/Dormy Region of Calexico
submits our annual 9-B information for the Federal Fiscal Year 2024 / 2025, beginning on October 1 and ending on September 30 Disadvantaged Business Enterprise Liaison Officer (BELO) Lilliana Falomir, Public Works Manager - Administrative City of Calexico
608 Heber Avenue, Calexico, CA 92231
Telephone: 760/768-2160
Fax: 760/768-0992
Email: [email protected]
Planned Race-neutral Measures
1. Arranging solicitations, time for the presentation of bids, quantities, specifications, and delivery schedule in ways that facilities DBE, and other small businesses, participation (e.g., unbundling large contracts to make them more accessible to small businesses, requiring or encouraging prime contractors to subcontract portions of work that they might otherwise perform with their own forces);
2. Providing assistance in overcoming limitations such as inability to obtain bonding or financing (e.g., by such means as simplifying the bonding process, reducing bonding requirements, eliminating the impact of surety costs from bids, and providing services to help DBEs, and other small businesses, obtain bonding and financing);
3. Providing technical assistance and other services;
4. Carrying out information and communication programs on contracting procedure and specific contract opportunities (e.g., ensuring the inclusion of DBEs, and other small businesses, on recipient mailing lists of bidders; ensuring the dissemination to bidders on prime contracts of lists of potential subcontractors; provision of information in language other than English. Where appropriate);
5. Implementing a supportive services program to develop and improve immediate and long-term business management, record keeping, and financial and accounting capability for DBEs and other small businesses;
6. Providing services to help DBEs and other small businesses, improve long-term development, increase opportunities to participate in a variety of type of work, handle increasingly significant projects, and achieve eventual self-sufficiency;
7. Establishing a program to assist new, start-up firms, particularly in fields in which DBE participation has historically been low;
8. Ensuring distribution of your DBE directory, through print and electronic means, to the widest feasible universe of potential prime contractors; and
9. Assisting DBEs and other small businesses to develop their capability to utilize emerging technology and conduct business through electronic media.
Prompt Pay.
49 CFR 26.29(b) requires one of three methods be used in federal-aid contracts to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. Attached is a listing of the three methods. On the attachment, please designate which prompt payment provision the Local Public Agency will use ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at Forms. [email protected].
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION Page 2 of 3
LOCAL PUBLIC AGENCY DBE ANNUAL SUBMITTAL FORM
DOT LAPM 9-B (NEW 09/2023)
Prompt Pay Enforcement Mechanism
49 CFR 26.29(d) requires providing appropriate means to enforce prompt payment. These means may include appropriate penalties for failure to comply with the terms and conditions of the contract. The means may also provide that any delay or postponement of payment among the parties may take place only for good cause with the Local Public Agency's prior written approval.
BE subcontractors, non-DBE subcontractors and supplies are contacted to ensure that they have been paid for the work performed prior t he issuance of a progress payment to the prime contractor. Payment is withheld from the prime contractor until all DBE subcontractors, non DBE subcontractors and suppliers have been paid for their work/materials supplied 05/30/2024
Signature Date
Lilliana Falomir, Public Works Manager - Administrative (760) 768-2160 Print Name and Title Phone Number
ADMINISTERING AGENCY
(Authorized Governing Body Representative)
Berjamin guerrero Jr. 7/2/2024
(Signature of Caltrans District Local Assistance Engineer) Date Distribution: (1) Original - DLAE
(2) Signed copy by the DLAE - Local Public Agency
ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284.
TTY 711, in writing at Forms Management Unit, 1120N Street, MS-89, Sacramento, CA 95814, or by email at [email protected].
STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION Page 3 of 3
LOCAL PUBLIC AGENCY DBE ANNUAL SUBMITTAL FORM
DOT LAPM 9-B (NEW 09/2023)
Prompt Payment of Withheld Funds to Subcontractors
(Attachment)
Federal regulation (49 CFR 26.29(b)) requires one of the following three methods be used in federal-aid contracts to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor.
Please check the box of the method chosen by the Local Public Agency to ensure prompt and full payment of any retainage.
A&E CON Method 1:
• No retainage will be held by the agency from progress payments due to the prime contractor. Prime contractors and subcontractors are prohibited from holding retainage from subcontractors. Any delay or postponement of payment may take place only for good cause and with the agency's prior written approval. Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code for construction contracts, and Section 3321 of the California Civil Code for consultant contracts. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/ or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
A&E CON Method 2:
No retainage will be held by the agency from progress payments due to the prime contractor. Any retainage kept by the prime contractor or by a subcontractor must be paid in full to the earning subcontractor in seven (7) days for construction contracts and fifteen (15) days for consultant contracts after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment may take place only for good cause and with the agency's prior written approval. Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code for construction contracts, and Section 3321 of the California Civil Code for consultant contracts.
This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
A&E CON Method 3:
X The agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the agency of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7) days for construction contracts and fifteen (15) days for consultant contracts after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the agency. Any delay or postponement of payment may take place only for good cause and with the agency's prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code for construction contracts, and Section 3321 of the California Civil Code for consultant contracts. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.
ADA Notice This document is available in alternative accessible formats. For more information, please contact the Forms Management Unit at (279) 234-2284, TTY 711, in writing at Forms Management Unit, 1120 N Street, MS-89, Sacramento, CA 95814, or by email at Forms. Management. [email protected].
Local Assistance Procedures Manual EXHBIT 10-1
Notice to Proposers DBE Information
EXHIBIT 10-I NOTICE TO PROPOSERS DBE INFORMATION
(Federally funded projects only)
The Agency has established a DBE goal for this Contract of 0.00%
1. TERMS AS USED IN THIS DOCUMENT
• The term "Disadvantaged Business Enterprise" or "DBE" means a for-profit small business concern owned and controlled by a socially and economically disadvantaged person(s) as defined in Title 49, Code of Federal Regulations (CFR), Part 26.5
• The term "Agreement" also means "Contract."
Agency also means the local entity entering into this contract with the Contractor or Consultant. • The term "Small Business" or "SB" is as defined in 49 CFR 26.65.
2. AUTHORITY AND RESPONSIBILITY
A. DBEs and other small businesses are strongly encouraged to participate in the performance of Contracts financed in whole or in part with federal funds (See 49 CFR 26, "Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs").
The Consultant must ensure that DBEs and other small businesses have the opportunity to participate in the performance of the work that is the subject of this solicitation and should take all necessary and reasonable steps for this assurance. The proposer must not discriminate on the basis of race, color, national origin, or sex in the award and performance of subcontracts.
Proposers are encouraged to use services offered by financial institutions owned and controlled by DBEs.
3. SUBMISSION OF DBE INFORMATION
If there is a DBE goal on the contract, Exhibit 10-01 Consultant Proposal DBE Commitment must be included in the Proposal. In order for a proposer to be considered responsible and responsive, the proposer must make good faith efforts to meet the goal established for the contract. If the goal is not met, the proposer must document adequate good faith efforts. All DBE participation will be counted towards meeting the contract goal; therefore, all DBE participation shall be collected and reported.
Exhibit 10-O2 Consultant Contract DBE Information must be included in best qualified consultant's executed consultant contract. Even if no DBE participation will be reported, the successful proposer must execute and return the form.
4. DBE PARTICIPATION GENERAL INFORMATION
It is the proposer's responsibility to be fully informed regarding the requirements of 49 CFR, Part 26, and the Department's DBE program developed pursuant to the regulations. Particular attention is directed to the following:
A. A DBE must be a small business firm defined pursuant to 13 CFR 121 and be certified through the California Unified Certification Program (CUCP).
B. A certified DBE may participate as a prime consultant, subconsultant, joint venture partner, as a vendor of material or supplies, or as a trucking company.
C. A DBE proposer not proposing as a joint venture with a non-DBE, will be required to document one or a combination of the following:
1. The proposer is a DBE and will meet the goal by performing work with its own forces.
2. The proposer will meet the goal through work performed by DBE subconsultants, suppliers or trucking companies.
3. The proposer, prior to proposing, made adequate good faith efforts to meet the goal.
January 2020
Local Assistance Procedures Manual EXHBIT 10-|
Notice to Proposers DBE Information
D. A DBE joint venture partner must be responsible for specific contract items of work or clearly defined portions thereof. Responsibility means actually performing, managing, and supervising the work with its own forces. The DBE joint venture partner must share in the capital contribution, control, management, risks and profits of the joint venture commensurate with its ownership interest.
E. A DBE must perform a commercially useful function pursuant to 49 CFR 26.55, that is, a DBE firm must be responsible for the execution of a distinct element of the work and must carry out its responsibility by actually performing, managing and supervising the work.
F. The proposer shall list only one subconsultant for each portion of work as defined in their proposal and all DBE subconsultants should be listed in the bid/cost proposal list of subconsultants.
G. A prime consultant who is a certified DBE is eligible to claim all of the work in the Contract toward the DBE participation except that portion of the work to be performed by non-DBE subconsultants.
5. RESOURCES
A. The CUCP database includes the certified DBEs from all certifying agencies participating in the CUCP.
If you believe a firm is certified that cannot be located on the database, please contact the Caltrans Office of Certification toll free number 1-866-810-6346 for assistance.
B. Access the CUCP database from the Department of Transportation, Office of Civil Rights website
1. Click on the link titled Disadvantaged Business Enterprise;
2. Click on Search for a DBE Firm link;
3. Click on Access to the DBE Query Form located on the first line in the center of the page.
Searches can be performed by one or more criteria. Follow instructions on the screen.
6. MATERIALS OR SUPPLIES PURCHASED FROM DBES COUNT TOWARDS THE DBE GOAL UNDER THE FOLLOWING CONDITIONS:
A. If the materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies. A DBE manufacturer is a firm that operates or maintains a factory, or establishment that produces on the premises the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.
B. If the materials or supplies purchased from a DBE regular dealer, count 60 percent of the cost of the materials or supplies. A DBE regular dealer is a firm that owns, operates or maintains a store, warehouse, or other establishment in which the materials, supplies, articles or equipment of the general character described by the specifications and required under the Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. To be a DBE regular dealer, the firm must be an established, regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question. A person may be a DBE regular dealer in such bulk items as petroleum products, steel, cement, gravel, stone or asphalt without owning, operating or maintaining a place of business provided in this section.
C. If the person both owns and operates distribution equipment for the products, any supplementing of regular dealers' own distribution equipment shall be, by a long-term lease agreement and not an ad hoc or Agreement-by-Agreement basis. Packagers, brokers, manufacturers' representatives, or other persons who arrange or expedite transactions are not DBE regular dealers within the meaning of this section.
D. Materials or supplies purchased from a DBE, which is neither a manufacturer nor a regular dealer, will be limited to the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, or fees or transportation charges for the delivery of materials or supplies required on the job site, provided the fees are reasonable and not excessive as compared with fees charged for
January 2020
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date PE/CE
Federal-aid Project No(s). Bid Opening Date CON
The established a Disadvantaged Business Enterprise (DBE) goal of _% for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal.
Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.
The following items are listed in the Section entitled "Submission of DBE Commitment" of the Special Provisions, please attach additional sheets as needed:
A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):
Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):
Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates
May 2020
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.
Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:
Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:
Names, addresses and phone numbers of firms selected for the work above:
E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:
May 2020
Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested BEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:
G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):
Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:
May 2020
Local Assistance Procedures Manual
Consultant Proposal DBE Coibit 10-ent
EXHIBIT 10-01 CONSULTANT PROPOSAL DBE COMMITMENT
1. Local Agency: 2. Contract DBE Goal:
3. Project Description:
4. Project Location:
5. Consultant's Name: 6. Prime Certified DBE:
8. DBE
7. Description or upiervice, or Materials certification 9. DBE Contact Information 10. DBE % Number
Local Agency to Complete this Section
17. Local Agency Contract Number:
11. TOTAL CLAIMED DBE PARTICIPATION
18. Federal-Aid Project Number:
19. Proposed Contract Execution Date:
20. Consultant's Ranking after Evaluation:
IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Written confirmation of each listed DBE is Local Agency certifies that all DBE certifications are valid and information on required. this form is complete and accurate
21. Local Agency Representative's Signature 22. Date 12. Preparer's Signature 13. Date
23. Local Agency Representative's Name 24. Phone 14. Preparer's Name 15. Phone
25. Local Agency Representative's Title 16. Preparer's Title DISTRIBUTION: Original - Included with consultant's proposal to local agency.
ADA Notice: Forior wal i is any liais grien, 2 svel in are forma, a amation cal 916) 654-6410 or TD (816) 654- LPP 18-01 Page 1 of 2
January 2019
Local Assistance Procedures Manual Exhibit 10-01
Consultant Proposal DBE Commitment
INSTRUCTIONS - CONSULTANT PROPOSAL DBE COMMITMENT
CONSULTANT SECTION
1. Local Agency - Enter the name of the local or regional agency that is funding the contract.
2. Contract DBE Goal - Enter the contract DBE goal percentage as it appears on the project advertisement.
3. Project Location - Enter the project location as it appears on the project advertisement.
4. Project Description - Enter the project description as it appears on the project advertisement (Bridge Rehab, Seismic Rehab, Overlay, Widening, etc.).
5. Consultant's Name - Enter the consultant's firm name.
6. Prime Certified DBE - Check box if prime contractor is a certified DBE.
7. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime consultant's own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.
8. DBE Certification Number - Enter the DBE's Certification Identification Number. All DBEs must be certified on the date bids are opened
9. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted consultants.
Also, enter the prime consultant's name and phone number, if the prime is a DBE.
10. DBE % - Percent participation of work to be performed or service provided by a DBE. Include the prime consultant if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation.
11. Total Claimed DBE Participation % - Enter the total DBE participation claimed. If the total % claimed is less than item "Contract DBE Goal," an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information - Good Faith Efforts of the LAPM).
12. Preparer's Signature - The person completing the DBE commitment form on behalf of the consultant's firm must sign their name.
13. Date - Enter the date the DBE commitment form is signed by the consultant's preparer.
14. Preparer's Name - Enter the name of the person preparing and signing the consultant's DBE commitment form.
15. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form.
16. Preparer's Title - Enter the position/title of the person signing the consultant's DBE commitment form.
LOCAL AGENCY SECTION
17. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
18. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
19. Proposed Contract Execution Date - Enter the proposed contract execution date.
20. Consultant's Ranking after Evaluation - Enter consultant's ranking after all submittals/consultants are evaluated. Use this as a quick comparison for evaluating most qualified consultant.
21. Local Agency Representative's Signature - The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Consultant Section of this form is complete and accurate.
22. Date - Enter the date the DBE commitment form is signed by the Local Agency Representative.
23. Local Agency Representative's Name - Enter the name of the Local Agency Representative certifying the consultant's DBE commitment form.
24. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form.
25. Local Agency Representative Title - Enter the position/title of the Local Agency Representative certifying the consultant's DBE commitment form.
LPP 18-01 Page 2 of 2
January 2019
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)
Note: Mark-ups are Not Allowed • Prime Consultant • Subconsultant • 2nd Tier Subconsultant Consultant
Project No. Contract No. Date_
DIRECT LABOR
Classification/Title Name Hours Actual Hourly Rate Total (Project Manager)*
(Sr. Civil Engineer) $ $
(Envir. Scientist) $ $
(Inspector**
LABOR COSTS
a) Subtotal Direct Labor Costs $
b) Anticipated Salary Increases (see page 2 for calculation) c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $
INDIRECT COSTS
d) Fringe Benefits (Rate: e) Total Fringe Benefits [(c) x (d)] $ Overhead (Rate: %) g) Overhead [(c) x (f] S
h) General and Administrative (Rate: %) i) Gen & Admin [(c)x (h)] S j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $
FIXED FEE k) TOTAL FIXED FEE [(c) + (i)] x fixed fee %] S 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total
Mileage Costs S
Equipment Rental and Supplies
Permit Fees
Plan Sheets
Test
D) TOTAL OTHER DIRECT COSTS S
m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1:
Subconsultant 2:
Subconsultant 3:
Subconsultant 4: S
m) TOTAL SUBCONSULTANTS' COSTS S
n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)+(m)] S TOTAL COST [(c) + (i) + (k) + (n)] $
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans.
3. Anticipated salary increases calculation (page 2) must accompany.
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3
ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES)
1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Total Hours per Avg 5 Year
Subtotal per Cost Cost Proposal Hourly Contract
Proposal Rate Duration
$250,000.00 5000 = $50.00 Year 1 Avs
lourly Rate
2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation
Year 1 $50.00 2% = $51.00 Year 2 Avg Hourly Rate
Year 2 $51.00 ++++ 2% = $52.02 Year 3 Avg Hourly Rate
Year 3 $52.02 2% = $53.06 Year 4 Avg Hourly Rate
Year 4 $53.06 2% $54.12 Year 5 Avg Hourly Rate
3. Calculate estimated hours per year (Multiply estimate% each year by total hours Estimated% Completed Total Hours per Cost Total Hours per Each Year Proposal Year
Year 1 20.0% * 5000 = 1000 Estimated Hours Year 1
Year 2 40.0% * 5000 = 2000 Estimated Hours Year 2
Year 3 15.0% * 5000 = 750 Estimated Hours Year 3
Year 4 15.0% * 5000 = 750 Estimated Hours Year 4
Year 5 10.0% * 5000 = 500 Estimated Hours Year 5
Total 100% Total = 5000
4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours Cost per
(calculated above) (calculated above) Year
Year 1 $50.00 * 1000 $50,000.00 Estimated Hours Year 1
Year 2 $51.00 * 2000 $102,000.00 Estimated Hours Year 2 Year 3 $52.02 * 750 $39,015.00 Estimated Hours Year 3
Year 4 $53.06 * 750 $39,795.30 Estimated Hours Year 4
Year 5 $54.12 500 $27,060.80 Estimated Hours Year 5
Total Direct Labor Cost with Escalation $257,871.10
Direct Labor Subtotal before Escalation $250,000.00
Estimated total of Direct Labor Salary Transfer to Page 1 Increase $7,871.10
NOTES:
1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year.
2. 3.
4.
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposals) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
1. Generally Accepted Accounting Principles (GAAP)
2. Terms and conditions of the contract
3. Title 23 United States Code Section 112 - Letting of Contracts
4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s).
Prime Consultant or Subconsultant Certifving:
Name: Title*:
Signature : Date of Certification (mm/dd/yyyy):_
Email: Phone Number:
Address:
*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
EXHIBIT 10-H2 COST PROPOSAL Page 1 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
Note: Mark-ups are Not Allowed
Consultant • Prime Consultant • Subconsultant • 2nd Tier Subconsultant Project No. Contract No. Participation Amount S Date
For Combined Rate
Fringe Benefit % + General & Administrative % Combined ICR% For Home Office Rate
Fringe Benefit % + General &Administrative % Home Office ICR% For Field Office Rate
Fringe Benefit % + General &Administrative % ... Field Office ICR% Fee %
BILLING INFORMATION CALCULATION INFORMATION
Name/Job Title/Classification' Hourly Billing Rates? Effective Date of Hourly Rate Actual or Avg % or $ Hourly Range - Straight' OT(1.5x) OT(2x) From To Hourly Rate? Increase for Classifications Only John Doe - Project Manager * $0.00 $0.00 $0.00 01/01/2016 12/31/2016 $0.00 Not Applicable Civil Engineer II $0.00 $0.00 $0.00 01/01/2017 12/31/2017 $0.00 0.0% $0.00 $0.00 $0.00 01/01/2018 12/31/2018 $0.00 0.0%
Sue Jones - Construction $0.00 $0.00 $0.00 01/01/2016 12/31/2016 $0.00 Not Applicable Engineer/Inspector $0.00 $0.00 $0.00 01/01/2017 12/31/2017 $0.00 0.0% Engineer I $0.00 $0.00 $0.00 01/01/2018 12/31/2018 $0.00 0.0% Buddy Black - Claims Engineer $0.00 $0.00 $0.00 01/01/2016 12/31/2016 $0.00 Not Applicable Engineer III S0.00 $0.00 $0.00 01/01/2017 12/31/2017 $0.00 0.0% $0.00 $0.00 $0.00 01/01/2018 12/31/2018 $0.00 0.0%
Land Surveyor ** $0.00 S0.00 01/01/2016 12/31/2016 $0.00 500 - 500 $0.00 $0.00 01/01/2017 12/31/2017 $0.00 00%. S00 - 500
$0.00 01/01/201 $0.00 500 - 500
Technician $0.00 01/01/201 50000-
$0.00 01/01/2017
$0.00 $0.00 $0.00 01/01/2018 $0.00
(Add pages as necessary)
January 201:
Local Assistance Procedures Manual XHIBIT 10-H
ost Propos:
NOTES:
1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.
2. The cost proposal format shall not be amended.
3. Billing rate = actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and stablished by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement
4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.
EXHIBIT 10-H2 COST PROPOSAL Page 2 of 3
SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)
Consultant • Prime Consultant • Subconsultant
Project No. Contract No. Date
SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Description of Item Quantity Unit Cost Total
Mileage Costs $ $
Equipment Rental and Supplies $
Permit Fees
Plan Sheets GA CA CA
Test $
Vehicle $ $
Subconsultant 1: $
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
Subconsultant 5: $
Note: Add additional pages if necessary.
NOTES:
List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.
Proposed ODC items should be consistently billed regardless of client and contract type.
3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.
Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).
Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost.
Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules.
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H2
Cost Proposal
7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.
8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.
9. Ahead popal sal ges if necess no. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.
11. Subconsultants must provide their own cost proposals.
January 2018
Local Assistance Procedures Manual EXHIBIT 10-H1
Cost Proposal
EXHIBIT 10-H2 CosT PROPOSAL Page 3 of 3
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
7. Generally Accepted Accounting Principles (GAAP)
8. Terms and conditions of the contract
9. Title 23 United States Code Section 112 - Letting of Contracts
10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
11. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
12. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Prime Consultant or Subconsultant Certifying:
Name: _ Title *:
Signature : Date of Certification (mm/dd/yyyy):
Email: Phone Number:
Address:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
January 2018
Local Assistance Procedures Manual EXHBIT 10-H3
Cost Proposal
EXHIBIT 10-H3 COST PROPOSAL Page 1 of2
COST PER UNIT OF WORK CONTRACTS
(GEOTECHNICAL AND MATERIAL TESTING)
Note: Mark-ups are Not Allowed • Prime Consultant • Subconsultant • 2nd Tier Subconsultant Consultant
Project No. Contract No. Date
Unit/Item of Work:
(Example: Log of Test Boring for Soils Report, or ADI Testing for Hazardous Waste Material Study) Include as many Items as necessary.
DIRECT LABOR Hours Billing Hourly Rate (S) Total (S)
Professional (Classification)*
Sub-professional/Technical**
EQUIPMENT 1 (with Operator)
EQUIPMENT 2 (with Operator)
Consultant's Other Direct Costs (ODC) - Itemize:
Description of Item Quantity Unit Unit Cost Total
ODC Example: Travel/Mileage Costs $
ODC Example: Mobilization/De-mobilization $
ODC Example: Supplies/Consumables S
ODC Example: Report S
ODC (List more ODCs as applicable) $
Subconsultant 1: S
Subconsultant 2:
Subconsultant 3:
Subconsultant 4:
Subconsultant 5:
Note: Attach additional pages if necessary.
TOTAL COST PER UNIT OF WORK $_
NOTES:
1. 2.
(Commercial, Private or Public).
Mobilization/De-mobilization is based on site location and number and frequency of tests/items.
DC items shall be based on actual costs and supported by historical data and other documentatio
5. DC items that would be considered "tools of the trade" are not reimbursabl
6. Billing Hourly Rates must be actual, allowable, and reasonable.
January 2018
Local Assistance Procedures Manual EXHBIT 10-H3
Cost Proposal
EXHIBIT 10-H3 COST PROPOSAL Page 2 of 2
Certification of Direct Costs:
I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposals) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:
13. Generally Accepted Accounting Principles (GAAP)
14. Terms and conditions of the contract
15. Title 23 United States Code Section 112 - Letting of Contracts
16. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures
17. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service
18. 48 Code of Federal Regulation Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.
Prime Consultant or Subconsultant Certifying:
Name: Title*:
Signature : Date of Certification (mm/dd/yyyy):
Email: Phone Number:
Address:
* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.
List services the consultant is providing under the proposed contract:
January 2018
Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
ExHIIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
loan guarante year quarter.
loan insuranc date of last report
4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee Enter Name and Address of Prime:
Prime Subawardee
Tier _, if known
Congressional District, if known Congressional District, if known
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable
8. Federal Action Number, if known: 9. Award Amount, if known:
10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI (including address if different from No. 10) (last name, first name, MI)
(attach Continuation Sheets) if necessary)
12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) actual planned a. retainer
b. one-time fee
13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
B
b. in-kind; specify: nature e deferred
Value_ f. other, specify
(attach Continuation Sheets) if necessary)
16. Continuation Sheets) attached: Yes No
17. 31 US C. Seton 382. This his sure obeying by nee
Signature:
Print Name:
Telephone No.: Date:
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files
LPP 13-01 May 8, 2013
Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
INSTRUCTIONS FOR COMPLETING EXHIBIT 10-O DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime federal recipient at the initiation or receipt of covered federal action or a material change to previous filing pursuant to title 31 U.S.C. Section 1352.
The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or someone i over deal ation And an employee of a Member of Congress in connection with a covered federal action. Attach a continuation sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.
1. Identify the type of covered federal action for which lobbying activity is or has been secured to influence, the outcome of a covered federal action.
2. Identify the status of the covered federal action.
3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered federal action.
4. Enter the full name, address, city, state, and zip code of the reporting entity. Include Congressional District if known. Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to:
subcontracts, subgrants, and contract awards under grants.
5. If the organization filing the report in Item 4 checks "Subawardee" then enter the full name, address, city, state, and zip code of the prime federal recipient. Include Congressional District, if known.
6. Enter the name of the federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.
Enter the federal program name or description for the covered federal action (item 1). Ifknown, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.
Enter the most appropriate federal identifying number available for the federal action identification in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the federal agency. Include prefixes, e.g., "RFP-DE-90-001."
9. For a covered federal action where there has been an award or loan commitment by the Federal agency, enter the federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.
10. Enter the full name, address, city, state, and zip code of the lobbying entity engaged by the reporting entity identified in Item 4 to influence the covered federal action.
11. Enter the full names of the individual(s) performing services and include full address if different from 10(a). Enter Last Name, First Name and Middle Initial (MI).
12. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (Item 4) to the lobbing entit (Item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.
13. Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.
14. Check all boxes that apply. If other, specify nature.
15. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with federal officials. Identify the federal officers) or employees) contacted or the officers) employee(s) or Members) of Congress that were contacted.
16. Check whether or not a continuation sheets) is attached.
17. The certifying official shall sign and date the form, and print his/her name title and telephone number.
Public reporting burden for this collection of information is estimated to average 30-minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503. SF- LLL-Instructions Rev. 06-04
LPP 13-01 May 8, 2013
EXHIBIT D
27 Local Assistance Procedures Manual Exhibit 10-02
Consultant Contract DBE Commitment
EXHIBIT 10-02 CONSULTANT CONTRACT DBE COMMITMENT
1. Local Agency: 2. Contract DBE Goal:
3. Project Description:
4. Project Location:
5. Consultant's Name: 6. Prime Certified DBE: • 7. Total Contract Award Amount:
8. Total Dollar Amount for ALL Subconsultants: 9. Total Number of ALL Subconsultants:
11. DBE 13. DBE
10. Description or Wup. Savice, or Materials Certificatior 12. DBE Contact Information Dollar Number Amount
Local Agency to Complete this Section
$
20. Local Agency Contract
Armher 14. TOTAL CLAIMED DBE PARTICIPATION
21. Federal-Aid Project Number:
22. Contract Execution
Nate
cal Agency certifies that all DBE certifications are valid and information IMPORTANT: Identify all DBE firms being claimed for credit 's form is complete and accura regardless of tier. Written confirmation of each listed DBE is required.
23. Local Agency Representative's Signature 24. Date 15. Preparer's Signature 16. Date
25. Local Agency Representative's Name 26. Phone 17. Preparer's Name 18. Phone
27. Local Agency Representative's Title 19. Preparer's Title DISTRIBUTION: 1. Original - Local Agency
2 ection Caly result in de olga is stance at ties ta Falre to submit to DLE within 30 days of contrac ADA Notice: 5080 or vial ecords an ombian i do, 120 Set, lein 9, Sara no, A 85 amation cal (816) 6546410 or TOD (916) 654-
July 23, 2015
Local Assistance Procedures Manual Exhibit 10-02
Consultant Contract DBE Commitment
INSTRUCTIONS - CONSULTANT CONTRACT DBE COMMITMENT
CONSULTANT SECTION
1. Local Agency - Enter the name of the local or regional agency that is funding the contract.
2. Contract DBE Goal - Enter the contract DBE goal percentage as it appears on the project advertisement.
3. Project Description - Enter the project description as it appears on the project advertisement (Bridge Rehab, Seismic Rehab, Overlay, Widening, etc.
4. Project Location - Enter the project location as it appears on the project advertisement.
5. Consultant's Name - Enter the consultant's firm name.
6. Prime Certified DBE - Check box if prime contractor is a certified DBE.
7. Total Contract Award Amount - Enter the total contract award dollar amount for the prime consultant.
8. Total Dollar Amount for ALL Subconsultants - Enter the total dollar amount for all subcontracted consultants.
SUM = (DBEs + all Non-DBEs). Do not include the prime consultant information in this count.
9. Total number of ALL subconsultants - Enter the total number of all subcontracted consultants. SUM = (DBEs + all Non-DBEs). Do not include the prime consultant information in this count.
10. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime consultant's own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.
11. DBE Certification Number - Enter the DBE's Certification Identification Number. All DBEs must be certified on the date bids are opened.
12. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted consultants.
Also, enter the prime consultant's name and phone number, if the prime is a DBE.
13. DBE Dollar Amount - Enter the subcontracted dollar amount of the work to be performed or service to be provided. Include the prime consultant if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation.
14. Total Claimed DBE Participation - S: Enter the total dollar amounts entered in the "DBE Dollar Amount" column. %: Enter the total DBE participation claimed ("Total Participation Dollars Claimed" divided by item "Total Contract A ward Amount"). If the total % claimed is less than item "Contract DBE Goal," an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information - Good Faith Efforts of the LAPM).
15. Preparer's Signature - The person completing the DBE commitment form on behalf of the consultant's firm must sign their name.
16. Date - Enter the date the DBE commitment form is signed by the consultant's preparer.
17. Preparer's Name - Enter the name of the person preparing and signing the consultant's DBE commitment form.
18. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form.
19. Preparer's Title - Enter the position/title of the person signing the consultant's DBE commitment form.
LOCAL AGENCY SECTION
20. Local Agency Contract Number - Enter the Local Agency contract number or identifier.
21. Federal-Aid Project Number - Enter the Federal-Aid Project Number.
22. Contract Execution Date - Enter the date the contract was executed.
23. Local Agency Representative's Signature - The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Consultant Section of this form is complete and accurate.
24. Date - Enter the date the DBE commitment form is signed by the Local Agency Representative.
25. Local Agency Representative's Name - Enter the name of the Local Agency Representative certifying the consultant's DBE commitment form.
26. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form.
27. Local Agency Representative Title - Enter the position/title of the Local Agency Representative certifying the consultant's DBE commitment form.