AGENDA
ITEM
10 AGENDA
CALEXICO California ITEM

WHERE CALIFORNIA AND MEXICO MEET
10 CITY COUNCIL

AGENDA STAFF REPORT
DATE: September 3, 2025
TO: Mayor and City Council
APPROVED BY: Benjamin Martinez, City Manager
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Authorize City Manager to Sign and File Notice of Completion for Cole Boulevard between M.L. King Avenue and Bowker Road Rehabilitation Federal-Aid Project No. STPL-5168(035).
====: ======= =assasses:

Recommendation:

Authorize City Manager to sign and file Notice of Completion for Cole Boulevard between M.L.

King Avenue and Bowker Road Rehabilitation Federal-Aid Project No. STPL-5168(035).

Background:

On July 25, 2024, the City Council of the City of Calexico approved the following:
a) Award Bid Proposal from Rove Engineering, Inc. in the amount of $2,398,458.00. • Authorize the City Manager to Sign a Construction Agreement between the City of Calexico and Rove Engineering, Inc. in the amount of $2,398,458.00 for Cole Boulevard between M.L. King Avenue and Bowker Road Rehabilitation Federal-Aid Project No.

STPL-5168(035)
c) Authorize City Manager to Approve Any Future Change Orders Not-to-Exceed $239,845.80 (10% of Rove Engineering, Inc. Base Bid) as Per City Ordinance No. 1218.

Discussion and Analysis:

On May 29, 2025, Rove Engineering, Inc. completed the construction of Cole Boulevard between M.L. King Avenue and Bowker Road. The total construction cost of said project is $2,377,603.70. City staff is recommending that the City Council of the City of Calexico authorize the City Manager to sign and file Notice of Completion for Cole Boulevard between M.L. King Avenue and Bowker Road Rehabilitation Federal-Aid Project No. STPL-5168(035).

Fiscal Impact:

No fiscal impact at this time.

Coordinated With:

City Manager's Office.

Finance Department.

Public Works Department.

Attachments):

1. Notice of Completion for Cole Boulevard between M.L. King Avenue and Bowker Road Rehabilitation Federal-Aid Project No. STPL-5168(035).

2. Before and After Construction Pictures.

ATTACHMENT NO. 1
RECORDING REQUESTED BY:

City of Calexico
AND WHEN RECORDED MAIL TO:

City of Calexico
Office of the City Clerk
608 Heber Avenue
Calexico, California 92231

SPACE ABOVE THIS LINE FOR RECORDER'S USE

NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion.

Notice is hereby given that:

1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:

2. The full name of the owner is City of Calexico

3. The full address of the owner is 608 Heber Avenue, Calexico, California 92231

4. The nature of the interest or estate of the owner is:

5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are

NAMES ADDRESSES
None

6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to

NAMES ADDRESSES
None

7. A work of improvement on the property hereinafter described was completed on_May 29, 2025. The work done was grinding of the existing asphalt pavement and overlaying with System 3 Overlay (ARHM-GG on ARAM over Leveling Course), removal and replacement of existing concrete sidewalk, handicap ramp, curb and gutter. and driveways approaches. placement of pavement markings and traffic striping per CAMUTCD (crosswalk, legends, or words), and adjustment of existing utility lids to grade.

8. The name of the contractor, if any, for such work of improvement was Rove Engineering. Inc., P.O Box 2108, EI Centro, CA 92243
July 25, 2024
(Date of Contract)

9. The property on which said work of improvement was completed is in the City of_Calexico County of_Imperial → and is described as follows:

Cole Boulevard between M.L. King Ave and Bowker Rd.

The street address of said property is Cole Boulevard between M.L. King and Bowker Rd., Calexico, CA 92231 Dated 09/03/2025
Benjamin Martinez, City Manager
City of Calexico

VERIFICATION
I, the undersigned, say: 1 am the City Manager, the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.

Executed on September 3, 2025, at Calexico, California
Benjamin Martinez, City Manager
City of Calexico
ATTACHMENT NO. 2

NICKLAUS
High Quality, Client-Focused Solutions
ENGINEERING. INC. 8(a) | DBE | WOSB | SBE
Existing Concrete Ramp at G Cleveland Avenue Sidewalk east of Clinton Avenue Existing Concrete Ramp at Andrade Avenue Manhole west of Bowker Road

NICKLAUS
High Quality, Client-Focused Solutions
ENGINEERING, INC. 8(a) 1 DBE | WOSB | SBE
Fatigue Cracking on Asphalt Existing Asphalt on Cole Boulevard Existing Asphalt on Cole Boulevard Existing Asphalt on Cole Boulevard (6)

NICKLAUS
High Qualicy, Client-Focused Solutions
ENGINEERING, INC. 8(a) | DBE | WOSB | SBE
New Ruberrized Asphalt with Traffic Striping New Raised Pavement Markers New Concrete ADA Ramp New Reinforced Concrete Panels