Cities Index.
CC_Agenda_09-03-2025_Item_12

Calexico City Council
September 3, 2025

Document
CC_Agenda_09-03-2025_Item_12
Meeting
September 3, 2025
Body
Calexico City Council
Original file
6.0 MB
Text extracted from the city's file for reading and search. Open the original on www.calexico.ca.gov. That file is the official record.

AGENDA
ITEM
12 AGENDA
CALEXICO California ITEM

WHERE CALIFORNIA AND MEXICO MEET
12 CITY COUNCIL

AGENDA STAFF REPORT
DATE: September 3, 2025
TO: Mayor and City Council
APPROVED BY: Benjamin Martinez, City Manager
REVIEWED BY: Karla Chaparo, Finance Director Je
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Authorize City Manager to Issue Purchase Order to Veolia WTS Services USA, Inc. in the Amount of $603,235.00 for the Rental of Three (3) Mobile Clarifiers During the Rehabilitation of Clarifier "B" and "C" Project at Water Treatment Plant.
==:==sm:

Recommendation:

It is recommended that the City Council of the City of Calexico approve the following:

1. Authorize City Manager to Issue Purchase Order to Veolia WTS Services, USA, Inc. in the amount of $603,235.00 for the rental of three (3) mobile clarifiers during the Rehabilitation of Clarifier "B" and "C" Project at Water Treatment Plant.

Background:

On June 4, 2025, the City Council of the City of Calexico authorized the Interim City Manager to sign Master Services Agreement with Utility Services Co., Inc. for the Rehabilitation of Clarifier "B" and "C" at the Water Treatment Plant.

Clarifiers are integral to both drinking water treatment facilities and wastewater treatment plants.

Clarifiers play a vital role in maintaining public health by effectively removing pathogens and pollutants from raw water sources. Clarifiers suspend solids and turbidity, clarifiers facilitate the action of downstream treatment processes such as filtration and disinfection, ensuring The City of Calexico Water Treatment Plant currently has two (2) clarifiers:
• Clarifier "B"
• 4.2 Million Gallons per Day (MGD)
• 55-foot diameter clarifier
• Built in 1968
• Clarifier "C"
• 10.0 Million Gallon per Day (MGD)
• 80-foot diameter clarifier.
• Built in 1998 and rebuild in 2010 due to April 4, 2010 earthquake Discussion and Analysis:

Utility Services Co., Inc. is ready to begin working on Clarifier "B." Once Clarifier "B" is complete and operational, Utility Services Co., Inc. will begin working on Clarifier "C." Since Clarifier "B" has a capacity of 4.2 million gallons per day (MGD) and Clarifier "C" has a capacity of 10 MGD, the City will need to rent three (3) mobile clarifiers to meet the City's current water demand. City staff obtained a price quote from Veolia WTS Services USA, Inc in order to provide an additional 3.456 MGD during construction.

After reviewing Veolia WTS Services USA, Inc. proposal, City staff is recommending to proceed with issuing a purchase order in the amount of $603,235.00 for the rental of three (3) mobile clarifiers for the Water Treatment Plant.

Fiscal Impact:

Capital Improvement Program Budgeted Item for FY 2025-2026 Fund No. 516-91-942-56003-000 $603,235.00
Total $603,235.00
Coordinated With:

City Manager's Office.

Finance Department.

Public Works Department.

Attachments):

1. Veolia WTS Services USA, Inc. Proposal.
2 ATTACHMENT NO. 1

OVEOLIA
City of Calexico
Attention : Jose Alvarado & Jose Saldana
545 PIERCE AVE
CALEXICO, CA 92231-2119
06/02/2025
Reference: Proposal #582992: Temporary Clarifier Project Dear Calexico team,
Veolia Water Technologies & Solutions is pleased to provide the City of Calexico with the attached UPDATED proposal for your temporary water treatment needs in Calexico, CA. In developing this quotation, Veolia has visited your site and discussed various options available to meet your project and business needs. Per our meeting on May 28th, 2025, this revised proposal outlines the option that best meets your objectives.

As a leader in water treatment, Veolia has a proven track record of successfully addressing a wide range of treatment challenges and delivering solutions to our clients. After reviewing your requirements, we are confident that our proposed equipment will address your treatment needs during rehabilitation of Clarifier C in your plant.

The objectives of this updated proposal are to: :

1. Confirm Veolia's capacity to meet City of Calexico's water treatment requirements for both quality and quantity.

2. Define equipment needs and confirm asset availability

3. Provide detailed cost breakdown for the 3-month project scope.

4. Highlight Veolia's expertise and proven track record for project success.

We greatly appreciate your consideration of Veolia for this project. Our measure of success is how well we deliver solutions that help our customers meet their business objectives. We hope to have the opportunity to demonstrate this with the City of Calexico.

I will be calling you to discuss our proposal and provide any additional information that may help your evaluation. Until then, please contact me if you have any questions.

Yours sincerely,
Quint
Heidy Arriola
Regional Account Manager - So. CA
(626) 298-5834
CC: Ally Hermans
Unless expressly agreed otherwise in writing, all our proposals, sales and order confirmation are subject to our terms and conditions of sale.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 1 of 34 @VEOLIA
Proposal for

CITY OF CALEXICO
Mobile Clarifier
Calexico, CA United States
Proposal #582992AKH REV4
Submitted to:

City of Calexico
Attention: Jose Alvarado & Jose Saldana
545 Pierce Ave
Calexico, CA 92231-2119
Submitted by:

Veolia WTS Services USA, Inc.

Presented By:

Heidy Arriola
Veolia WTS - Mobile Group
[email protected]
Regional Account Manager - So. CA
626-298-5834
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 2 of 34 @VEOLIA
Confidential and Proprietary Information
Vealia submits the information contained in this document for evaluation by Customer only. Customer agrees not to reveal its contents except to those in Customer's organization necessary for evaluation.

Copies of this document may not be made without the prior written consent of Veolia Management. If the preceding is not acceptable to Customer, this document shall be returned to Veolia.

Validity
This proposal is valid for Thirly (30) days from proposal date. In absence of additional proposals pricing will be subject to Price Modification clause one year from proposal date.

Trademark Notification
The following are trademarks of Water Technologies and Solution and may be registered in one or more countries:
+100, ABMel, Absolute.Z, Absolule.Za, AccuSensor, AccuTrak, AccuTrak PLUS, AciNow, Acufeed, ALGAECAP, AminCycle, Apogee, APPLICATIONS ATLAS, AquaFloc, AquaMax, Aquamite, Aquaplex, AquaSel, Aquatrex, Argo Analyzer, AutoSDI.

BENCHMARK, Betz, BetzDearborn, BEV Rile, BioHealth, BioMate, BioPlus, BIOSCAN, Bio-Trol, Butaclean, Certified Plus, CheckPoint, ChemFeed, ChemSensor, ChemSure, CHEX, CleanBlade, CLOROMAT, CoalPlus, COMP-METER, COMP-RATE, COMS (Crude Overhead Monitoring System), Continuum, CopperTrol, CorrShield, CorTrol, Custom Clean, Custom Flo, Cyto3, DalaGuard, DataPlus, DataPro, De:Odor, DELTAFLOW, DEOX, DeposiTrol, Desal, Dianodic, Dimetallic, Dispatch Restore, Durasan, DuraSlick, Durasolv, Duratherm, DusTreat, E-Cell, E-Cellerator, ELECTROMAT, Embreak, EndCor, EXACT, FACT-FINDER, Feedwater First, Ferrameen, Ferroquest, FilterMate, Fleet View, FloGard, Flotrex, Flotronics, FoamTrol, FoodPro, ForeSight, ForeSight, FRONTIER, FS CLEAN FLOW, FuelSolv, Full-Fit, G.T.M., GenGard, VeoliaWaterSource, Glegg, Heat-Rate Pro, High Flow Z, HPC, HPD Process, HyperSperse, Hypure, Hytrex, InfoCalc, InfoScan, InfoTrac, InnovOx, InSight, IONICS, IONICS EDR 2020, IPER (Integrated Pump & Energy Recovery), Service, ISR (Integrated Solutions for Refining), JelCleer, KlarAid, Kleen, LayUp, Leak Trac, Leakwise, LEAPmbr, LEAPprimary, Leaming Source, LOGIX, LoSALT, M-PAK, MACarrier, Mace, Max-Amine, MegaFlo, Membrex, MemChem, Memtrex, MerCURxE, MetClear, MiniWizard, MK-3, MOBILEFLOW, MobileRO, Modular Pro, Module Trac, MonitAll, Monitor, Monitor Plus, Monsal, MP-MBR, MULTIFLOW, Muni.Z, NEWater, NGC (Next Generation Cassette).

Novus, NTBC (Non Thermal Brine Concentrator), OptiGuard, OptiSperse, OptiTherm, Osmo, Osmo PRO, Osmo Titan, Osmonics, Paceselter, PaceSeller, Petrolo, Petromeen, pHlimPLUS, PICOPORE, PlantGuard, PolyFloc, PowerTreat, Predator, PRO E-Cell.

Pro Elite, ProCare, Procera, ProChem, Proof Not Promises, ProPAK, ProShield, ProSolv, ProSweet, Purtrex, QSO (Quality System Optimization), QuickShip, RCC, RE:Sep, Rec-Oil, Recurrent, RediFeed, ReNEW, Renewell, Return on Environment, RMS (Rackless Modular System), ROSave.Z, SalesEdge, ScaleTrol, SeaPAK, SeaPRO, SeaSMART, Seasoft, SeaTECH, Selex, Sensicore, Sentinel, Sepa, Sevenbore, Shield, SIDTECH, SIEVERS, SmartScan, SoliSep, SolSet, Solus, Spec-Aid, Spectrus, SPLASH, Steamate, SteriSafe, Styrex, SUCROSOFT, SUCROTEST, Super Westchar, SuperStar, TFM (Thin Film Membrane), Therminator, Thermoflo, Titan RO, TLC, Tonkaflo, TraveLab, Trend, TruAir, TrueSense, TurboFlo, Turboline, Ultrafilic, UsedtoUseful, Vape-Sorber, VeriFeed, VersaFlo, Versamate, VICI (Virtual Intelligent Communication Interface), V-Star, WasteWizard, WATER FOR THE WORLD, Water Island, Water-Energy Nexus Game, WaterGenie, WaterNODE, WaterNOW, WaterPOINT, WellPro.Z. XPleat.

YieldUp, Z-BOX, Z-MOD, Z-PAK, Z-POD, ZCore, ZeeBlok, ZeeLung, ZeeWeed, ZENON, and Z.Plex.

Veolia Confidential and Proprietary Information
Proposal for the Cily of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 3 of 34 • VEOLIA

1. Executive Summary
This document provides commercial and technical details for the water treatment equipment proposed by Veolia Water Technologies & Solutions for the City of Calexico temporary clarifier project at the City of Calexico Water Treatment Plant. During communication with plant personnel regarding this project, several needs were identified.

These include selecting a vendor who can:
• Provide rapid deployable equipment with reliable treated water qualities for temporary water treatment during rehabilitation of existing plant equipment.

Veolia Water Technologies is offering mobile UF equipment which will allow City of Calexico redundant treatment to Clarifier B while Clarifier C is shut down for rehabilitation. The Veolia owned equipment can produce up to 1M gallons per day per unit typical clarified water characteristics. The Veolia system proposed includes the following components.

Mobile UF equipment, using Veolia's popular ZeeWeed membranes, depending on availability of equipment upon order. Equipment will be assigned upon receipt of purchase order.
6" to 10" (influent) & 6" to 14" (effluent) connections based on equipment used.
• Up to 800 gpm max flow per unit.

Below is a summary of expected costs based on a 3 unit scope with a 3 month rental timeline
Three (3) MPAK80 Ultra Filtration Units: $603,235
Produce up to 2,400 GPM (Gallons per Minute), 3.456 MGD (Million Gallons per Day). [800 gpm per unit]

1. Equipment Prep Charges: $55,785
Three (3) MPAK Units: $55,785 ($18,595 * 3)

2. Service Charges for 3 months: $468,450
a. Three (3) MPAK Units: $328,050 per month ($36,450 * 3 units * 3 months) b. Three (3) Pump Skids: $70,200 per month ($7,800 *3 units * 3 months)

3. Labor ($250/hr): $49,000
a. 40 hrs for installation supervision & startup
b. 40 hrs for equipment commissioning & training
c. 96 hrs (8hrs per week, for 12 weekly visits. (Could be less depending on system usage)
d. 20 hrs for system decommissioning
Freight (Estimating 1500 miles for 3 units): $30,000
Once the City of Calexico places an order, Veolia will assist with interconnecting piping design based on the space requirements and general site needs. A site kick-off meeting will be required before work begins.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 4 of 34

QVEOLIA
In conclusion, Veolia presents an opportunity to achieve your project goals. With a well-planned approach, expertise of a dedicated team with appropriate resources, we are confident in the successful implementation of your project. We look forward to discussing this proposal in detail and your support in moving this initiative forward.

Veolia Confidential and Proprietary Information
Proposal for the Cily of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 5 of 34 • VEOLIA
Technical & Engineering Details

2.1 Basis of Design
This proposal is offered based on the following water design values from Surface Water to be used for Drinking Water.

2.2 Influent Water Qualify
The design solution proposed is based on the values below. All values are as mg/l as ion unless otherwise stated.

Cations Anions Other
Total Hardness, as 320 Alkalinity, "P", as <2.0 Specific Conductance, 1170 at 25°C, uS/cm
Calcium Total 200 Alkalinity, "M", as 150 Total Dissolved Solids N/R hardness as CaCO3, (TDS)
ppm
Magnesium Total 120 Chloride 130 pH, standard units 8.2 hardness as CaCo3,
ppm
Sodium 110 Sulfur, Total, as S04 290 Total Suspended
Solids
Potassium 5.2 Nitrate, as NO3 <10 Turbidity, NTU 6.5
Ammonia, as NH3 N/R Reactive Silica, Total, 7.9 Silt Density Index N/R as Si02 (SDI15)
Barium, Total 0.13 Colloidal Silica, Total, N/R Total Organic Carbon 2.5 as SiO2 (TOC), as C
Strontium, Total 1.2 Phosphate, Total, as <0.15 Dissolved Organic NIR PO4 Carbon (DOC)
Copper, Total <0.01 Phosphate, Total N/R Color, TCU 3
Inorganic, as PO4
Aluminum, Total 0.09 Phosphate, Ortho-, as <2.0 Total Chlorine N/R PO4
Manganese, Total 0.005 Fluoride 1.1 Free Chlorine N/R
Iron, Total 0.08 Carbon Dioxide N/R
Iron, Dissolved N/R Fats, Oil and Grease N/R

BTEX N/R
Source of Test and Date 03-20-2024, Laboratory
Analysis
Feed Water Source Surface Water
Notes:

2. Parander on aked with an a harisk have been ast med. il ase sonin these vites.

3. BTEX = benzene, toluene, ethyl benzene, and xylene.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 6 of 34 VEOLIA

2.3 Influent Water Flow Data
Flow rate, pressure and temperature required at inlet to the equipment.

Mobile UF (MPAK-80)
Minimum Maximum
400 890
Inlet Flow Rate (gpm)
Pressure (psi) * 15 90
Temperature ("F) 40 90
Pretreatment used (if any) | N/A (Surface Water)
* Pressure must be measured under flowing conditions at the inlet to the Veolia equipment.

2.4 Product Water Qualiiy and Flow Data
The following performance parameters are expected upon equipment start-up, based on the data listed in the influent quality table and design sections above.

Maximum Flow Rate per unit, gpm / Up to 800 GPM
The Veolia system should have similar effluent quality TSS as the customer's clarifier system with proper system operation at a maximum flow of 800 gpm, and influent quality consistent with the defined influent window.

TOC associated with TSS may be removed through the Veolia system. The Veolia system will not use powdered activated carbon (PAC) to remove additional TOC.

2.5 Influent Water Variability
In the event that the influent water exceeds the specifications used in engineering this proposal or the water source changes, the ability of the water treatment system to produce the designed treated water quality and/or quantity may be impaired. If influent water is provided to the system, which does not meet the specifications shown above, and the equipment therefore does not meet the listed product water characteristics, the total value of the contract shall be paid in full as described in this proposal. Veolia shall endeavor to restore the full product water quality as soon as possible after the influent conditions have been restored. Any additional costs incurred by Veolia resulting from a change in influent conditions, including, but not limited to any repair and replacement of damaged equipment and any additional costs incurred, shall be fully reimbursed to Veolia.

Certain chemicals and system components proposed for use in this application are certified to NSF/ANSI/CAN standards - references are available upon request.

The proposed systems) are not NSF certified but certain wetted components may be. Veolia WTS will guarantee meeting treated water quality as specified in Section 2.4 only, provided that the fluent water quality meets the specifications provided in Section 2.2. It is the Customer sponsibility to determine whether the treated water is of adequate quality for their intended us Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 7 of 34 • VEOLIA

2.6 Operational Basis
Percentage | 90-95%
Down time for routine maintenance such as membrane cleaning, cartridge filter change outs, and pump maintenance must be allowed. All planned maintenance outages will be discussed with the site. They will be scheduled to have minimal impact on site requirements.

2.7 Wastewater Streams
The following streams are waste lines that will derive from the proposed equipment. The customer must dispose of all these streams and provide the required connections to drain as specified in Customer Scope of Supply section. Connection details of each line can be found in the Veolia Scope of Supply section where the specification for each supplied unit is detailed.

Mobile UF (MPAK-80)
Waste Line Flow Rate, apm or Volume, gal Additional Comments UF Backwash Reject 630gpm, for 1.5 minutes every Gravity drain, no back pressure 15 minutes per each unit. on this line
UF CIP reject ~2,500 gallons per unit, Up to 1,000 ppm of free chlorine intermittent (estimated Up to 2,000 ppm of citric acid
downtime 45 minutes per train,
per cleaning)
UF Preservative Solution Up to ~5,000 gallons 0% glycerin solution. For mor formation please see section
Preservative Chemicals
UF Initial Rinse ~5,0000 - 8,000 gallons Each unit must be initially rinsed with potable water at startup to
meet water quality
UF Final Drain Up to ~5,000 gallons Each unit must be fully drained before returning equipment to
Veolia Serve Center

2.8 Chemical Consumption Estimation
Containment for chemicals must be provided by the customer, a quotation to provide them can be pranges ty nient water qual required. These volumes are an estimation only and will ay with Mobile UF (MPAK-80)
Chemical onsumption Estimat
50% Citric Acid
- 20 gallons 500 mgl, my thy recovel
10-12% Sodium Hypochlorite - 2-3 gallons @ 500 mg/L, daily maintenance - 20 gal @500 mg/L, monthly recovery
Vealia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 8 of 34 @VEOLIA

2.9 Preservative Chemicals
Prior to shipment, the UF modules are filled with a preservative solution of 50% glycerin that protects the membrane fibers until they are ready for use. After the modules have been installed, this solution must be completely flushed from the modules before production can begin. The flushing procedure will create a byproduct permeate with a high TOC content that is unsuitable for normal discharge into the environment (example: down a drain connected to a municipal sewer system). As a result, when flushing a newly installed module, direct all permeate to a suitable container that can then be sent for proper UF membranes that are to be taken offline for longer than two days must be preserved in order to prevent biological growth within the modules. For storage periods of up to approximately 1 week, filling the modules with water containing sodium hypochlorite at a minimum residual concentration of 1-2 mg/L is adequate (modules have a maximum chlorine tolerance of 1,000 mg/L). For storage periods longer than 1 week, a residual sodium hypochlorite concentration of 15 mg/L. is required.

2.10 Equipment Availability
Veolia requires a two (2) week period notice from a technically and commercially clean order acceptance in order to prepare the equipment proposed in the Veolia Scope of Supply section prior to dispatching it to the Customer site. We will however endeavor to expedite this. For best projection of equipment availability in the fall/winter months, a purchase order now is recommended to secure equipment.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 9 of 34 @ VEOLIA

3. Commercial Offer

3.1 Pricing Table
Pricing for the proposed equipment, consumables, and / or services is summarized in the table below, All pricing is based on the operating conditions and influent water analysis that are detailed in the Technical & Engineering Details section of this proposal. See Pricing Notes below for pricing clarification.

Qty Description Price Units
Equipment Preparation Charge
1 Mobile Hollow Fiber System (Mobile $18,595.00 Per Each System Ordered M-PAK-80) *Freight not included
Equipment Service Charge(s)-Begins when equipment arrives on Site (or during transit *see note 12) 8, Ends when equipment is released from Site
1 Mobile Hollow Fiber System (Mobile $36,450.00 Per Month / Per System M-PAK-30)
1 Feed Forwarding Pump Skid (800GPM, $7,800.00 Per Month / Per Pump Skid 25psi) w/ Clean Water History *Freight not included
Minimum Order / Term
Minimum Order: Same as Equipment Preparation Charge for one (1) Mobile System + One (1) Month of
Equipment Service Charges
Minimum Term: 3 (Three) Months Minimum
Consumables-Please refer to Section 2.8 for estimated dosages Citric Acid for UF Cleanings INCLUDED w/ Mobile Hollow Fiber System Sodium Hypochlorite for UF Cleanings INCLUDED w/ Mobile Hollow Fiber System UF Sanitization Chemicals if needed at CUSTOMER TO SUPPLY or Cost + 25% startup (chemicals must be approved by
Veolia)
Acditional Equipment
Mechanical Installation (Piping, Hoses, CUSTOMER TO SUPPLY Connections, etc.)
Electrical Installation (Power, Wiring, CUSTOMER TO SUPPLY Connections, etc.)
Any additional hoses, fittings, etc. Cost + 25%
Field Service on Site
FSR Coverage-required for startup & $250.00 Per Hour / Per Person installation supervision, training &
commissioning, weekly visits, and
decommissioning
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 10 of 34

LOVEOLIA
**We expect the following labor hours: *2-week notice required for - One week (40 hrs) for installation arrival of any on-Site FSR supervision & startup support personnel*
- One week (40 hrs) for equipment
commissioning & training *Rate includes prevailing
- 40 hrs (8hrs per week) for weekly visits. wage payments* *Could be less depending on system usage*
- 20 hrs for system decommissioning
Actual support hours to be determined by
Veolia and City of Calexico - all hours will
be billable to the City of Calexico*
Freight Each Way-Delivery & Removal Costs
- Freight charges - delivery and removal $5.90 Per mile, per tractor, round trip (Veolia driver) +Fuel
Surcharge
"Refer to Appx D for Surcharge Index*
Contract Hauler Cost + 25%
Optional Items
Qty Description Unit Price Extended Price
1 Fire hose, 2 1/2" NST, 50' sections (3109224) $200.00 $200.00 TBD Anxillary Equipment Cost + 25%

3.2 Pricing Notes

1. No credit for partially used or unused units. Exclusive of equipment service, FSR, and freight

2. Additional freight charges, including, but not limited to, expedited freight, shipment during public holidays or any special circumstances shall be charged at extra.

3. All prices quoted are in USD.

4. The customer will pay all applicable local, state, provincial, or federal taxes and duties

3. The equipment delivery date, start date, and date of commencement of operations are to b negotiated

6. Commercial terms and conditions shall be in accordance with Veolia's Standard Terms and Conditions of Contract.

7. This proposal and the rates provided herein are subject to final site, environmental, and financial due diligence by Veolia.

8. This proposal supersedes all previous proposals and correspondence.

9. Equipment Service Charges to commence on actual delivery date at site.

10. The FSR coverage rate is to be billed for hours on site. Additional charges shall apply for standby FSR due to customer delays.

11. Tractors must travel both ways for both delivery and pickup of equipment. Therefore, freight will be charged for both the outbound and return trip for the delivery of the equipment. and for both the outbound and return trips for the pickup of the equipment.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 11 of 34 @ VEOLIA

12. The Equipment Service Charges for the Mobile Clarifier (Actiflo) begin during equipment transit time from Veolia to the Customer's Site in Calexico, CA. All other equipment service charges (for the mobile UF system and the pump skid) begin when each piece of equipment arrives on Site.

13. Clarifier Ballast Media consumption required over the minimum period on site is expected to be equal to or less than 2,500lbs. The price above includes shipping to Calexico, CA. Any additional ballast media needed for the system, may also be purchased, at Cost +25%.

14. Certain chemicals and system components proposed for use in this application are certified to NSF/ANSI/CAN standards - references are available upon request.

The proposed systems) are not NSF certified but certain wetted components may be. Veolia WTS will guarantee meeting treated water quality as specified in Section 2.4 only, provided that the influent water quality meets the specifications provided in Section 2.2. It is the Customer's responsibility to determine whether the treated water is of adequate quality for their intended use.

15. PRICE MODIFICATION.

Veolia WTS Services USA, Inc, shall adjust the service rates at each annual anniversary date. The anniversary date shall be based on project start date. The prices shall be adjusted by the greater of: (i) 3%; or (ii) a combination of two BIS indices in which 50% of the payment amount shall be adjusted by an amount equal to the percentage increase of the Index for Chemicals and Allied Products (WPU06) plus 50% of the payment amount shall be adjusted by an amount equal to the percentage increase of the Index for Total Private Average Hourly Earnings of Production - Workers Not Seasonally Adjusted (CEU0500000008) (both indexes as reported by the US Dept. of Labor - Bureau of Labor Statistics).

All calculations shall be made using the most recent annual index values as reported by the US Dept. of Labor-Bureau of Labor Statistics at http://data.bls.gov/cgi-bin/surveymost?wp.

Veolia WTS Services USA, Inc. retains the right to implement reasonable surcharges, or to adjust the service rates as applicable in the event of extraordinary cost increases for materials, parts, chemicals, etc. used in performance of the services. Customer shall adjust, or modify, the Purchase Order in a manner that adequately funds Veolia WTS Services USA, Inc.'s continuous provision of authorized services as adjusted in accordance with these terms.

3.3 Field Service Coverage
The FSR(s) will work on site in accordance with local working time regulations. The FSR will manage their time such that they can respond to required callouts within their allowable working time. If however they are unable to complete all the required tasks within the allocated time then additional FSR cover may be required at a cost to CITY OF CALEXICO.

3.4 Term and Service Period
This Agreement shall enter into effect on TBD and shall continue in full force and effect until the Equipment leaves the Site (the "Term" of this Agreement).

This Agreement may be renewed prior to the expiration of the above stated Service Period by mutual agreement between the parties. Upon such renewal, all references made to the Service Period shall be deemed to include both the in the foregoing referred to initial Service Period as well as any renewal Service Periods as a whole. Notice for renewal shall be given in writing by Customer not less than seven (7) days prior to the expiration of the ongoing Service Period, otherwise the Service Period shall automatically terminate and the Equipment be returned to Veolia in accordance with the terms and conditions of this Agreement.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 12 of 34 ) VEOLIA

3.5 Invoicing and Payment Terms
Payment terms are net 30 days from date of invoice.

3.6 Conditional Offering
Customer understands that this proposal has been issued based upon the information provided by customer, and currently available to, Veolia at the time of proposal issuance. Any changes or discrepancies in site conditions (including but not limited to system influent water characteristics, changes in environmental, health, and safely (EH&S) conditions, and/or newly discovered EH&S concerns), Customer financial standing, Customer requirements, or any other relevant change, or discrepancy in, the factual basis upon which this proposal was created, may lead to changes in the offering, including but not limited to changes in pricing, warranties, quoted specifications, or terms and conditions. Veolia's offering in the proposal is conditioned upon verification of Customer's EH&S conditions, financial standings, and

3.7 Insight Data Transmission
Veolia equipment may be outfitted with InSight, a Knowledge Management Solution, for the collection of performance data from select equipment. This data enables our customers to achieve success and overcome operational challenges including avoiding operational interruptions, reducing operating and maintenance costs including chemicals and energy, and optimizing operator efficiency. In the event Veolia's equipment is outfitted with InSight, data transmission will occur wirelessly, requiring no communication wires, allowing quick setup and transmission of valuable operational data.

Veolia Confidential and Proprietary Information
Proposal for the Cily of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 13 of 34 → VEOLIA
Veolia Scope of Supply
The proposed treatment system consists of options for the Mobile Clarification System, described in this section.

4.1.1 Mobile Hollow Fiber System
Model MPAK, Mobile M-PAK 80
Configuration Two trains
Performance Data
Estimated Product Flow Up to 800gpm
Feed Flow 850 gpm max, 400 gpm min. Fed via hardpipe or non-collapsible hose
Backwash Waste Volume 630 gpm max (intermittent)
Design Recovery 90% to 95%
Design Temperature Range 35-90°F
Installation and Utility Requirements
Feed Water Connection 8 inch flange, 316 SS, 15-90 psi
Product Water Connection 8 inch flange, 316 SS, 30 psi
Backwash Connection 6 inch flange, 316 SS, Atmosphere
Filter Reject Connection
CIP Reject Connection 6 inch flange, 316 SS, 15 psi
Module Rack Drain Connection 6 inch flange, 316 SS, Gravity drain Permeate Tank Drain Connection 4 inch flange, 316 SS, Gravity Inlet Pressure Relief Connection
Air Requirement 80-120 psi, 10 scfm @ 80 psi
Air Connection 0.5 inch FPT optional factory air, MPAK has an internal Air Compressor.

Inlet Water Pressure 15 to 90 psi
Power 460V/3ph/60Hz/260 Amps
Dimensions (LxWxH) 53'L x 8.5 W x 13.5' H (trailer)
Shipping Weight Estimate 31,100 Ibs
Operating Weight Estimate 61,600 Ibs
Features Included
Online raw water turbidity meter
Online Filtrate (permeate) turbidity meter
Automatic raw water strainers included
Note: Backwash connection is a gravity drain - no back pressure can be present Order entry information
SAP Description UE.M-PAK80
Prep Part Number BMS1000930
Rental Part Number BMS1000487
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 14 of 34 (eVEOLIA

5. Customer Scope of Supply
All delivery or services not specified in the Velia Scope of Supply are included in the Customer Scope of Supply.

5.1 Safely and Environmental
• First aid and emergency medical response
Eyewash and safety showers in the water treatment area
Chemical spill response
Security and fire protection systems per local codes
Environmental use and discharge permits for all chemicals/waste water streams at the customer facility either listed in this document or proposed for use at a later date • Any special permits required for Veolia or Customer employees to perform work related to the water treatment system at the facility
• All site testing, including soil, ground and surface water, air emissions, etc. • Disposal of all solid and liquid waste from the Veolia System The Customer will identify and inform Veolia personnel of any hazards present in the work place that could impact the delivery of Veolia's scope of supply and agrees to work with Veolia to remove, monitor, and control the hazards to a practical level.

The Customer will provide training to Veolia's personnel on all relevant and standard company operating procedures and practices for performing work on site. Such training programs may include, but are not limited to, general environmental health and safety (EHS), HAZOP, fire protection, drug testing, incident notice, site conduct, standard first aid, chemical receiving, electrical safety, etc. Customer will provide a certificate of training for Veolia personnel. This program will be fully documented, training materials will be provided, and attendance list will be kept.

5.2 Jobsite and Installation Review
• Review of Veolia supplied equipment drawings and specifications • Overall plant design, detail drawings of all termination points where Veolia equipment or materials tie into equipment or materials supplied by others
All easements, licenses and permits required by governmental or regulatory authorities in connection with the supply, erection and operation of the system • All applicable civil design and works, including any building, site preparation, grading, excavations, foundations, and trenches and accessories
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 15 of 34 @ VEOLIA
All electrical labor and supplies leading up to and from the jobsite and between equipment, including power supplies and cables, control cables, fittings, conduit, supports, cable trays, wire and hardware, and air conditioned panels as required for installation and ongoing operations • All labor and supplies leading up to and from the jobsite and between equipment, including fittings, conduit, supports, cable trays, wire and hardware required to appropriately ground / earth the equipment as required for installation and ongoing operations • All mechanical labor and supplies leading up to and from the jobsite including connecting and interconnecting piping, heat tracing or winterization of equipment (if required), fittings, conduit, pipe supports, and hardware as required for installation and ongoing operations All instrumentation, control and automatic pneumatic valves including, but not limited to, air / sample line tubing, fittings, conduit, supports, isolating valves leading up to jobsite and between Veolia-supplied skids and hardware as required for installation and ongoing operations Loading, unloading, lifting, positioning and transportation of the equipment and materials required for Veolia to perform the duties outlined in the Veolia Scope of Supply to the jobsite and/or warehouse
All access structures (scaffolding) and mechanical lifting equipment (cranes, forklifts, and scissor lifts)
• Providing a suitable site/shelter for the placement of the proposed equipment, either inside appropriate housing, or outdoors. Note: electrical equipment, including the PLC, may require air-conditioned rooms to prevent overheating of sensitive electronic equipment, depending on climatic conditions.

Storage of cassette / membranes / stacks on site. These must be stored in a sheltered area, protected from freezing, direct sunlight or extreme heat, and sealed as shipped until ready for use. Storage should be in a dark, dry, level area, out of direct sunlight, and at a temperature of 5-30°C (39-86°F). It is recommended that the cassettes / membranes / stacks not be stored longer than necessary prior to installation. Coordinate with Velia for appropriate shipment times. Maximum storage duration of a cassette / membrane / stack is 8 / 12 / 3 months from the date of shipment. If these timescales are exceeded Veolia can provide instruction to extend the storage period.

Bulk chemical storage and tanks, including secondary containment in accordance with local codes
Timely disposal of unused chemicals
• Receiving, off-loading, logging, and storing all chemicals and materials in accordance with Manufacturer's recommendation that are shipped to the site Compressed, oil and grease free instrument air for pneumatic valves and instruments • Equipment anchor bolts if required.
• Telephone/fax/ modem access for Veolia staff while on site if required. • Laboratory services, operating and maintenance personnel during equipment check out, start-up and operation if required.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 16 of 34 © VEOLIA
Any customer supplied hosing, interconnections, pipework must be suitable for operating pressures of up to 10 bar (145 psi). For the MPAK, the feed line must be hard pipe or non-collapsible hose.

U Pressure relief valving upstream of Velia equipment to stop pressure spikes (water hammer) from closing / stopping of downstream valves / pumps. Veolia can supply this if requested.

5.3 Start-Up, Commissioning, and De-Commissioning
• Verification of removal of all residual debris from construction Provide an uninterrupted influent water and electrical supply to Veolia for approximately 2 days in order to allow the commissioning of the supplied equipment Supply raw materials, chemicals and utilities during start-up and operation Telephone / fax / modem access for Veolia staff while on site if required.

Laboratory services, operating and maintenance personnel during equipment checkout, start-up and operation
Provide an uninterrupted influent water and electrical supply to Veolia for approximately 2 days in order to allow the decommissioning of the supplied equipment • Provide compressed air and electricity in order to power site tools during installation assembly

5.4 Facility Management
• Warehouse storage space and facilities, as are available at the site, and are reasonably appropriate to store parts, consumables, tools, etc. in accordance with manufacturers' recommendations. Such warehouse storage space will be a segregated area, secured and protected from adverse climate as may be reasonably required. Customer will be responsible for risk of loss of Veolia's parts while in storage at the site. Customer will maintain Veolia's parts stored at the site free and clear of any and all liens of Customer and Customer's lenders, bondholders, contractors, and other creditors of any nature.

Free access and egress of the facility for all authorized work for Veolia staff • Workshop facilities with standard workshop tools and equipment, as is reasonably appropriate, that are necessary to meet the repair and maintenance requirements of the system. Such equipment includes, but is not limited to, benches, vices, drill press, electric saws, hand tools, power tools, pneumatic tools, etc.

All access structures (scaffolding) and mechanical lifting equipment (cranes, forklifts, and scissor lifts)
Provide a location with suitable load bearing at Customer's facilities required for the Equipment and the operation thereof in its usual and customary manner and in such a way as to permit Veolia to furnish the Service
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valic until 07/02/2025 Page 17 of 34 @VEOLIA
Adequate illumination and emergency lighting for all areas in which Veolia staff will be executing the scope of supply
Equipment for movement of chemical drums, totes, and resin, as is reasonable All site utilities such as raw water at appropriate pressure and flow rate, instrument quality air, potable water, and power required for operation of the proposed equipment included in this scope of supply as specified by Veolia in this Agreement
Secure office space adjacent to the work area at the site with access to typical office equipment and amenities
Provision of welfare facilities, such as clean toilets, washing facilities, drinking water, canteen, restrooms, etc.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 18 of 34 • VEOLIA
Appendix A. Acceptance
A.1 Howto place an order
To ensure accurate and prompt order entry, product delivery, billing and accounts receivable processing. please ensure your Purchase Order contains the following information:

1. Legal Entity: Please identify Veolia WTS Services USA, Inc. as the 'Seller' on any Purchase Order(s).

Legal Entity: Veolia WTS Services USA, Inc.
4545 Patent Road
Norfolk, VA 23502
USA

2. Submit: Veolia requires a hard copy of the PO with full customer and order details - by postal mail, e-mail, or fax. Communicate your PO to our central order processing department at:

E-Mail: [email protected]
Fax: (757) 855-9631
Postal Mail: Veolia WTS Services USA, Inc.
4545 Patent Road
Norfolk, VA 23502
USA

3. Details: Ensure your Purchase Order contains the following information:

Proposal Number: Please reference the Proposal # 582992AKH REV4, dated 06/02/2025 in any purchase orders.
b. Quantity with units of measure (UOM) needs to be stated for each item listed in the PO.

Unit Price and / or Total Price need to be stated alongside the information so that the Purchase Order can be cross checked against any proposal detail. d. Delivery Location (Ship-to Address): Please clearly define the delivery location. e. Delivery Date: Please include your requested delivery date in your PO. Upon receipt of the PO the requested delivery date will be reviewed, if that date is achievable based upon current factory loading it will be confirmed back to you via the confirmation information indicated on your PO, if the requested delivery date is not achievable a representative will contact you to discuss how to proceed. If a delivery date is not included in your PO the next available production capacity will be utilized and confirmed back to you.

Execute: Please sign and date below and include this page with your purchase order. Upon acceptance of the PO, Veolia will sign and date this page and return it to CITY OF CALEXICO.

For: For:

City of Calexico Veolia WTS Services USA, Inc.

Name: Name:

Signature: Signature:

Date: Date:

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 19 of 34 •VEOLIA
Invoicing and remittance

6.1 Preferred invoice delivery method
To ensure prompt invoice handling, please indicate your preference:

Receive invoices by Postal Mail Service
• Upload invoices to portal or send via email
For Postal Mail submission, please provide all of this information:

Name of Recipient
Job Title of Recipient
Telephone Number of
Recipient
Email Address of Recipient
Company
Operations Specific Site Name
Address Line 1
Address Line 2
City
State
Zip Code
For Portal Upload or Email submission, please provide all of this information:

Instructions For Portal Upload, please attach instructions Web Link Address
Contand Job Tile of Help
Email Address of Help Contact
Telephone Number of Help
Contact

6.2 invoice processing
Please provide all information requested below.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bricge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 20 of 34 2) VEOLIA
Operation Lead, Engineer, Buyer who specified product and approves invoice for payment Person's Full Name
Person's Title
City
Email Address
Telephone Number
Accounts Payable Administrative Contact
Person's Full Name
Person's Title
City
Email Address
Telephone Number
Person who "codes" or "links" invoice to PO, department, or category Person's Full Name
Person's Title
City
Email Address
Telephone Number
6,3 Remittance of payments
In an effort to continuously serve you better, Veolia would like to request your assistance for the following.

Checks - please include all remittance details for payment, including invoice numbers and amounts, to the following lockbox:

Veolia WTS Services USA, Inc.

Boston, MA 02241-8930
EFT - please send all remittance details for payments, including invoice numbers and amounts, to vtc. [email protected] and include customer name and remit to total in the email subject line.

Additionally, please inform us at vtc. [email protected] for any of the following important changes:
• Name, address, or contact information changes for your business • Tax status changes, along with any relevant supporting forms Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 21 of 34 @ VEOLIA
• Changes to how invoices are received, including location, method, and instructions

6.4 Future purchase orders
Please do not change payment terms on any future purchase orders. Please reflect the payment terms outlined in the contact / proposal signed by the two parties. Altered payment terms will not be honored.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 22 of 34 @VEOLIA
Appendix B. Definitions
As used in this Agreement the terms below shall have the meanings as described below.

B.1 General Definitions
Agreement shall mean the terms and conditions contained in this Proposal, including its Attachments as a whole
Delivery and The rate specified, usually cost per mile, to deliver Removal Charge and remove the Veolia unit from the Customer's location. For either delivery or removal, the cost is
computed based upon the distance from the Veolia
service center to the Customer's location and the
same mileage from the Customer's location to the
Veolia service center (round trip).

Effluent Water shall mean the treated water delivered from the Equipment to Customer's storage tank or point of
use, resulting from the treatment of Influent Water
under the terms and conditions of this Agreement
Equipment shall mean the mobile treatment equipment as
further detailed in the Veolia Scope of Supply
section of this proposal
Field Service An employee of Veolia who has been professionally Representative trained to operate and maintain Veolia's equipment.

This employee is also able to provide a wide array
of analytical services with Veolia supplied
instruments
Influent Water shall mean Customer's influent water or fluids to be provided by Customer at the inlet of the Equipment,
and subject to treatment under the terms and
conditions of this Agreement
Minimum A minimum fee, per unit delivered, generally
Processing Charge exclusive of Field Service Representative, service, and delivery and removal charges, that applies
when the processing charge is expressed as a cost
per 1,000 gallons or other unit of volume. The
minimum covers mobilization and preparation of the
unit and is charged only when gallons processed
times the processing charge yield less than the
stated minimum.

Mobilization Charges Price charged for the supply of project specific equipment required for the operation of the water
treatment plant.

Preparation Charge A fee charged for labor and materials to prepare equipment to meet specific Customer requirements.

May also be identified as a Set-up Charge.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 23 of 34 © VEOLIA
Processing Charge A fee charged for the processing of a fluid through equipment supplied by Veolia. This fee may be
expressed as a cost per unit of volume, cost per
unit delivered, or cost per day, week, or month.

Service Center A location where Veolia provides services including resin regeneration, fleet storage, analytical services, sales support and technical support.

Service Charge A fee imposed, usually hourly, daily or monthly, for the use of Veolia's fluid treatment equipment.

Service Charges commence upon arrival at
customer's site unless otherwise specified.

Services shall mean the overall services to be provided by Veolia, as consisting of the deployment and
provision of the Equipment and corresponding
processing services relating to the treatment of
Influent Water as further detailed in the Veolia
Scope of Supply section
Site shall mean Customers premises at

CITY OF CALEXICO
CALEXICO, CA United States
Surcharge A temporary fee charged to recover unusual
increase in cost of production or distribution
materials. The fee is based on a sliding scale
index.

Unit/System/ Generally referred to as a piece or array of fluid Equipment treatment equipment, which may be of either mobile or fixed-base design.

Waste Water shall mean the waste generated from the
Equipment to Customer's drain resulting from the
treatment of influent water.

B.2 Field Service Representative Charges
Per Hour When required or requested by the Customer, Veolia will bill the Customer for all hours worked by the Field Service Representative while on-site at the
Customer's location. Unless otherwise specified, a
minimum of eight (8) hours per 24-hour day will be
charged while the Field Service Representative is
engaged by the Customer, whether the Field Service
Representative is required to report to the Customer's
location, or remain in the local area on stand-by. A
daily log sheet is provided by Veolia for the
Customer's use in accounting for hours worked or
charged for. The hourly rate is the same for straight
time, overtime, holidays, or weekends.

Vealia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 24 of 34 • VEOLIA
Appendix C. Conditions of Contract and Warranties
SELLER:

Veolia WTS Services USA, Inc.
4545 Patent Road
Norfolk, VA 23502
USA
BUYER:

CITY OF CALEXICO
545 PIERCE AVE
CALEXICO, CA 92231-2119
As used in the Terms and Conditions, the term "Goods" shall mean materials as outlined in the Veolia Scope of Supply section of this proposal.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 25 of 34 • VEOLIA
attachment 1 - terms and conditions of contract
The terms and conditions herein will be active and applicable until terminated in accordance with Article 11.

Customer may place orders under these terms and conditions at any time during this applicability period. Pricing offered within shall be valid for 30 days. Veolia WTS SERVICES USA, INC., Inc, a Virginia, U.S. corporation ("Veolia WTS Services USA, Inc."), and ("Customer") agree:

1. Veolia WTS Services USA, Inc. SERVICES
When Customer has fully complied with Paragraph 2 below, Veolia WTS Services USA, Inc. shall:

Provide the equipment as listed in the Commercial Offer (the "Equipment") or, at Veolia WTS Services USA, Inc.'s option, other equipment sufficient to meet Customer's requirements, on a priority availability and preferred pricing basis.
• Treat Customer's influent water or other fluids ("Influent Water") to the quality specified in the Influent Water Quality table.
• Use its best efforts, at all times, to provide the Equipment, but shall not be liable for any delays in doing so.

Provide a standard Certificate of Insurance, listing general liability, automobile liability and worker's compensation coverage.

2. CUSTOMER'S RESPONSIBILITIES
As a condition precedent to Veolia WTS Services USA, Inc.'s providing the Service, Customer shall, without cost to Veolia WTS Services USA, Inc. throughout the Agreement term:
a. Provide a location at Customer's facilities, suitable for proper operation of the Equipment. b. Provide piping, fire hoses, fittings, electricity and other specified equipment and services, as required.

Provide Influent Water of the quality described in the Influent Water Quality table, at the pressure and at the flow rale required by Velia WTS Services USA, Inc..
d. Provide reasonable access to and security for the Equipment. e. Provide all necessary utilities to operate the Equipment.

Provide all necessary licenses or permits required for the installation and operation of the Equipment required for the Service.

3. PRICE AND PAYMENT
The price and payment terms for Velia WTS Services USA, Inc.'s Service are set forth in the Commercial Offer section. Any supplemental cost incurred by Veolia WTS Services USA, Inc. in the performance of any ol Customer's responsibilities under Paragraph 3 of this Agreement shall be reimbursed. Payment shall be made in full in U.S. Dollars within thirty (30) days of the invoice date. If Customer disputes any portion of an invoice, it shall notify Veolia WTS Services USA, Inc. in writing with specificity and pay the undisputed portion within 30 days. In the event of an undisputed late payment, late payment charges will be added in accordance with state law.

Customer may be held in default of this agreement if any invoiced amounts are undisputed and unpaid after 30 days beyond their original due date, and late payment charges will be applied. Purchaser agrees that Purchaser shall adjust the value and/or duration of the Purchase Order in a manner that adequately funds the Veolia WTS Services USA, Inc.'s continuous provision of all Purchaser authorized services.

Prices do not include sales, use, gross receipts, excise, value-added, services, penalty, addition to tax, interest, or assessment related thereto or any similar transaction or consumption taxes (collectively, "Taxes"). Veolia WTS Services USA, Inc. shall collect or seek reimbursement for any such Taxes imposed with respect to this Agreement, or services performed hereunder by Velia WTS Services USA, Inc. or Velia WTS Services USA, Inc.'s subcontractors, from Customer. Customer shall pay any such Taxes that may be levied on or assessed against Customer or Veolia WTS Services USA, Inc. and Veolia WTS Services USA, Inc.'s subcontractors and, if Veolia WTS Services USA, Inc. pays any such Taxes, reimburse Velia WTS Services USA, Inc.. Each party shall be responsible for any personal properly or real estate taxes on properly that the party owns or leases, for franchise and privilege taxes on its business, and for taxes based on its net income or gross receipts. Customer shall furnish Velia WTS Services USA, Inc. with evidence of tax exemption acceptable to taxing authorities if applicable.

Notwithstanding any existing agreement, Veolia reserves the right to increase billing amounts based on increases in the price of base components for the chemicals listed in this Quotation, where the increase in price of such base components is due to increased global demand, limited supply, temporary product shortages, allocation of supply, Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 26 of 34

O) VEOLIA
or other such similar inflationary pressures. Such price changes may be reversed as the inflationary pressures change. Upon request, Veolia will provide documentation in support of such price increases.

4. WATER QUALITY WARRANTY
Effluent Water quality shall meet or exceed the specifications in the Effluent Water Quality table. Any Effluent Water not meeting these specifications shall, at Veolia WTS Services USA, Inc.'s option, be replaced or reprocessed at no additional cost to Customer, unless the failure is caused by the acts or omissions of Customer, including but not limited to Customer's failure to provide the required Influent Water.

Veolia WTS Services USA, Inc, warrants only that the Equipment is capable of processing the Influent Water, described in the Influent Water Quality table to meet the specifications for Effluent Water in the Effluent Water Quality table. Veolia WTS Services USA, Inc. does not warrant the USE of the Effluent Water and, accordingly, such replacement or reprocessing shall be the Customer's sole and exclusive remedy. Velia WTS Services USA, Inc. further warrants that Services will be performed in a good and workmanlike manner and will comply in all material respects with the requirements set forth in this Agreement. Customer shall notify Velia WTS Services USA, Inc. of any warranty claim within thirty (30) days of the claimed item's delivery, and Customer's sole remedy shall be to have deficient services corrected or re-performed and to have defective products repaired or replaced.

Effluent Water processed for Customer is not intended, or suitable, for human consumption.

Velia WTS SERVICES USA, INC. EXPRESSLY DISCLAIMS LIABILITY FOR INCIDENTAL AND/OR

CONSEQUENTIAL DAMAGES INCLUDING, WITHOUT LIMITATION, LOST PROFITS RELATED TO BREACH OF

WARRANTY, COSTS OF ACCESS TO THE EQUIPMENT FOR REPAIR/REPLACEMENT, AND DECONTAMINATION. EXCEPT AS EXPRESSLY SET FORTH IN THIS PARAGRAPH, Velia WTS SERVICES USA, INC. MAKES NO WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, WARRANTIES OF MERCHANTABILITY OR OF FITNESS OF USE OR FOR THE PURPOSE INTENDED.

At no time shall Veolia WIS Services USA, Inc. be deemed to have taken title to Product Water, Feedwater, Nonstandard Substances ("Nonstandard Substances" shall mean substances or materials which are not specifically identified in the Influent Water Quality Window of in the Influent Water Quality table set forth herein or which were not or could not be reasonably anticipated by Veolia WTS Services USA, Inc. as being a component of the Influent Feedwater), Hazardous Materials ("Hazardous Materials" shall mean toxic substances, hazardous substances, pollutants, contaminants, regulated wastes, or hazardous wastes as such terms may be defined or classified in any statute or ordinance or regulations promulgated by any national, federal, state, provincial, or local governmental authority), or any other materials or substances processed at the site or treated by Velia WTS Services USA, Inc. pursuant to this Agreement. Veolia WTS Services USA, Inc. does not take responsibility for or provide waste characterization, disposal facility selection, disposal, or payment of sewage or landfill fees.

Customer is responsible for all wastes and waste disposal from the plant. Wastes may include, but are not limited to, water system reject waste, used RO membranes, filters, CIP related wastes and wastewaters, spent media, cartridge filters, equipment and consumables, lube/oil contaminated debris/rags, other maintenance related wastes, lab analysis residuals, and office waste. Customer is required to obtain Veolia WTS Services USA, Inc.'s written approval prior to any changes in reject disposal or use, or waste disposal methods or configuration being made.

LIMITATION OF LIABILITY
NOTWITHSTANDING ANYTHING ELSE IN THIS AGREEMENT, THE TOTAL LIABILITY OF Veolia WTS SERVICES USA, INC., its affiliates and subcontractors and their employees, officers, directors and agents, ON ALL

CLAIMS OF ANY KIND ACCRUING DURING ANY CALENDAR YEAR, WHETHER IN CONTRACT (INCLUDING

LIQUIDATED DAMAGES), WARRANTY, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY, OR

OTHERWISE, ARISING OUT OF THE PERFORMANCE OR BREACH OF THIS AGREEMENT OR THE USE OF

ANY PARTS OR THE PROVISION OF ANY SERVICES, SHALL NOT EXCEED FIFTY PERCENT OF THE AMOUNTS PAID BY CUSTOMER TO Veolia WTS SERVICES USA, INC. IN ANY CALENDAR YEAR, AND IN NO EVENT SHALL THE CUMULATIVE TOTAL LIABILITY OF Veolia WTS SERVICES USA, INC. ION ALL SUCH

CLAIMS OF ANY KIND ARISING FROM OR RELATING TO THIS AGREEMENT, UNTIL THE TIME ALL SUCH LIABILITY ENDS, EXCEED AMOUNTS PAID BY CUSTOMER TO Veolia WTS SERVICES USA, INC. UNDER

IN NO EVENT, WHETHER AS A RESULT OF BREACH OF CONTRACT, WARRANTY, INDEMNITY, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY, OR OTHERWISE, SHALL Velia WTS SERVICES USA, INC.

BE LIABLE FOR LOSS OF PROFIT OR REVENUES, LOSS OF USE OF THE SITE OR ANY ASSOCIATED Vealia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 27 of 34 © VEOLIA

EQUIPMENT OR SYSTEMS, COST OF CAPITAL, COST OF SUBSTITUTE EQUIPMENT, FACILITIES,

SERVICES OR REPLACEMENT POWER, DOWNTIME COSTS, CLAIMS OF CUSTOMER'S CUSTOMERS FOR

SUCH DAMAGES, OR FOR ANY SPECIAL, CONSEQUENTIAL, INCIDENTAL, INDIRECT, PUNITIVE OR EXEMPLARY DAMAGES.

IF Veolia WTS SERVICES USA, INC. FURNISHES CUSTOMER WITH ADVICE OR ASSISTANCE CONCERNING

ANY PRODUCTS, SYSTEMS OR WORK WHICH IS NOT REQUIREDPURSUANT TO THIS AGREEMENT, THE FURNISHING OF SUCH ADVICE OR ASSISTANCE WILL NOT SUBJECT Velia WTS SERVICES USA, INC. TO

ANY LIABILITY, WHETHER IN CONTRACT, WARRANTY, INDEMNITY, TORT (INCLUDING NEGLIGENCE), STRICT LIABILITY OR OTHERWISE.

Veolia WTS Services USA, Inc. shall provide and maintain in full force Commercial General Liability policy with a combined single limit of $2,000,000 for bodily injury and property damage, with an excess liability policy of $3,000,000 additional coverage. The Parties expressly agree that Veolia WTS Services USA, Inc. may self-insure any or all portions of the insurance mentioned in this or any portion of this Agreement.

Veolia WTS Services USA, Inc. (i) shall provide Customer, upon request, with certificates of insurance showing policy coverage and limits for policies required under this Section; (i) shall not terminate the insurance coverage required under this Section without giving thirty (30) days prior written notice to Customer, and the policies shall provide for such written notice; and iii) shall not materially modify the insurance coverage required under this Section without giving thirly (30) days prior written notice to Customer. Site-specific Certificates of Insurance are available upon request for a fixed annual administrative fee of $126 per certificate.

Customer shall provide and maintain in full force Commercial General Liability insurance covering claims for personal injury, including bodily injury or death, and properly damage arising from the performance of Velia WTS Services USA, Inc.'s services hereunder to the extent such claims arise from the negligence or misconduct of Customer, with a $2,000,000 minimum limit per occurrence for combined bodily injury and properly damage and a $5,000,000 minimum annual aggregate limit. Each policy shall name Veolia WTS Services USA, Inc. as additional insured and loss payee.

Customer (i) shall provide Velia WTS Services USA, Inc., upon request with certificates of insurance showing policy coverage and limits for policies required under this Section; (ii) shall not terminate the insurance coverage required of Customer by this Section without giving thirty (30) days prior written notice to Velia WTS Services USA, Inc. and the policies shall provide for such notice; and (iii) shall not materially modify the insurance coverage required of Customer by this Section without Customer giving thirty (30) days prior written notice to Veolia WTS Services USA, Inc..

INDEMNIFICATION
Veolia WTS Services USA, Inc. shall indemnify and hold harmless Customer from claims for physical damage to third party property or injury to persons, including death, to the extent caused by the negligence of Veolia WTS Services USA, Inc. or its officers, agents, employees, and/or assigns while engaged in activities under this Contract. Purchaser shall likewise indemnify and hold harmless Velia WTS Services USA, Inc. from claims for physical damage to third party property or injury to persons, including death, to the extent caused by the negligence of the Customer, its officers, agents, employees, and/or assigns. In the event such damage or injury is caused by the joint or concurrent negligence of Veolia WTS Services USA, Inc. and Customer, the loss shall be borne by each Party in proportion to its negligence. "Third party" shall not include Customer. Customer shall also indemnify and hold harmless Veolia WTS Services USA, Inc. from claims due to Customer's violation of any Environmental, Health, or Safely Law (as subsequently defined); and from claims due to the release of any Hazardous Materials or Nonstandard Substance at, on, to, or from Customer property, unless such substance was brought on to Customer property by Veolia WTS Services USA, Inc. and Veolia WTS Services USA, Inc. caused the release of such substance;
Also, Customer acknowledges that purified water equipment may break and/or leak and that it should be installed only where there is adequate drainage and minimal risk of damage to other property. Veolia WTS Services USA, Inc. therefore shall not be liable to Customer or others for any damages, costs or expenses resulting from breaks in or leakage from equipment that Veolia WTS Services USA, Inc. owns, sells, rents, or services.

9. CONFIDENTIALITY
Any information disclosed by either party in connection with this Agreement and designated in writing, by label, stamp or other written communication by the disclosing party as "confidential" or "proprietary" at the time of disclosure shall be treated as "Confidential Information" subject to this Section. It is agreed that this Agreement Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 28 of 34

OVEOLIA
and all drafts hereof, and all proposals, specifications, recommendations, instructions and all other similar documents, in all such forms as they may be delivered, shall be considered Veolia WTS Services USA, Inc.'s Confidential Information at all times. The recipient party agrees (i) to treat such Confidential Information as confidential and not disclose it to third parties other than Velia WTS Services USA, Inc. Affiliate entities as necessary for performance of this Agreement, (ii) to restrict the use of such Confidential Information to matters relating to the recipient parly's performance of this Agreement, and (iii) to restrict access to such information to employees of the recipient party and Veolia WTS Services USA, Inc.'s Affiliate entities whose access is necessary in the implementation of this Agreement. All copies of written Confidential Information will be returned to the disclosing party upon request (i) except to the extent that an item of such information is designated to be retained by the recipient party pursuant to a specific provision of this Agreement, and (ii) Veolia WTS Services USA, Inc. may retain one copy of Customer Confidential Information until such time as all its liability under this Agreement terminates.

10. SCHEDULE - POSTPONEMENT OF PERFORMANCE
The consequences, direct or indirect, of acts of God, natural disasters, unusually severe weather, fire, terrorism, war (declared or undeclared) epidemics, material shortages, insurrection, act (or omissions) of Customer or Customer's suppliers or agents, any act (or omission) by any governmental authority, strikes, labor disputes, transportation shortages, or failure of supply of raw materials and any causes beyond the reasonable control of the parties to this Agreement shall excuse performance to the extent performance has been prevented by such At the removal of the cause of interruption, performance shall be resumed fully in accordance with this Agreement.

In the event Veolia WTS Services USA, Inc. cannot provide the Service to meet the Customer's requirements Customer may utilize other sources to obtain Service until Velia WTS Services USA, Inc. can meet its obligations under this Agreement. Velia WTS Services USA, Inc. shall not be liable for any difference in the cost.

For emergency service requests for equipment and services, Veolia WTS Services USA, Inc. will respond within a time frame as notified by the Velia WTS Services USA, Inc. Logistics Center at time of order. For non-emergency requests for service personnel, allow five business days notice to most efficiently schedule routine service call Specific requests for expedited non-emergency service such as: 'Same-day Service', 'Next-day Service', or any off-schedule service visits requiring an on-site response in fewer than five days may be subject to an expediting charge of at least four (4) hours billed at overtime labor rates.

Veolia WTS Services USA, Inc.'s failure to provide the Service shall not result in termination of this Agreement.

However, should Customer request the Service and Veolia WTS Services USA, Inc. not be able to provide the Service for a period in excess of 30 days, this Agreement will automatically terminate.

TERMINATION
Either party (the "Non-Defaulting Party") may terminate this Agreement for default if the other Parly (the "Defaulting Party") (i) becomes Insolvent or (ii) the Defaulting Party commits a material breach of this Agreement and fails to cure the breach within ten days (10) days of notice from the Non-Defaulting Parly, or fails to commence to cure the breach and diligently proceed with the cure if it is not possible to cure within ten (10) days of such notice. In addition to the foregoing, Velia WTS Services USA, Inc. may terminate for default in the event of: (i) an event causing Velia WTS Services USA, Inc. to suspend performance of the services which cannot reasonably be cured; (ii) Customer's failure to perform any of its material obligations under this Agreement or any other agreement or order, which failure has a material and adverse effect on Velia WTS Services USA, Inc.; (iii) laws or conditions or changes to such laws or conditions, which make performance by Veolia WTS Services USA, Inc. impossible or impractical or have a material effect on Veolia WTS Services USA, Inc. or performance by Veolia WTS Services USA, Inc. including but not limited to expropriation of all or any portion of the site; or (iv) facts or circumstances which arise, are discovered, or become known to Veolia WTS Services USA, Inc. which actually or potentially result in environmental, financial, labor or security risks that Veolia WTS Services USA, Inc. reasonably deems imprudent or unsuitable, and which were not fully disclosed, for whatever reason, by the Veolia WTS Services USA, Inc.'s reviews conducted to date. Veolia WTS Services USA, Inc. shall have the right to suspend performance upon written notice to Customer in any case where it would have the right to terminate the Agreement Although the equipment will be utilized at the site, Customer acknowledges that Velia WTS Services USA, Inc. shall retain beneficial ownership of the equipment and any other Veolia WTS Services USA, Inc. supplied parts, equipment, inventory, supplies and other assets utilized by Velia WTS Services USA, Inc., or loaned or made available to Customer at the site. Veolia WTS Services USA, Inc. reserves the right to file a UCC-1 security form Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 29 of 34

LOVEOLIA
on all Veolia WTS Services USA, Inc.-owned equipment and products and a mechanic's lien on any labor performed by Velia WTS Services USA, Inc. for the design, fabrication, installation, and maintenance of the system and hereby provides legal notice of its intention to do so if deemed necessary to ensure payment.

Customer shall keep Velia WTS Services USA, Inc.'s equipment free and clear of any liens. Upon expiration or termination of this Agreement Veolia WTS Services USA, Inc. shall have the right to disconnect and remove the equipment, parts or assets installed or utilized by Veolia WTS Services USA, Inc. pursuant to this Agreement.

Customer acknowledges that Veolia WTS Services USA, Inc.'s equipment is designed for specific applications and processes and therefore may not be relocated, modified, altered or changed in any way without the expressed, written consent of the Veolia WTS Services USA, Inc.. Customer is responsible for any loss or damage to Veolia WTS Services USA, Inc.'s equipment including but not limited to, theft, physical damage, operational impairment caused by lack of proper maintenance or operation outside manufacturer's or Veolia WTS Services USA, Inc.'s operating specifications, and deterioration or contamination from exposure to fumes or substances. Customer shall be solely responsible for any and all costs to test, decontaminate or dispose of and replace any of Veolia WTS Services USA, Inc.'s equipment or ion exchange resins contaminated by exposure to any process or application containing any Federal, DOT, or State listed hazardous waste or a characteristic hazardous waste. Upon request Customer shall certify to Velia WTS Services USA, Inc., by means of a completed and signed Resin Process Profile form, the conditions under which all ion exchange resins will be operated.

Customer shall not remove the equipment from Customer's location designated in the Agreement and shall not sublease or lend the equipment or otherwise attempt to transfer or dispose of the equipment or any rights in or to the equipment. Before moving any equipment, Customer must notify and get Veolia WTS Services USA, Inc.'s permission, and in the event of any move, Customer assumes all responsibility for damages caused to equipment or any other property.

13. INTERPRETATION
The parties intend this Agreement, with any attached Exhibits and Addenda, as a final expression of their agreement and a complete and exclusive statement of its terms. No course of previous dealings between the parties and no usage of trade shall be relevant or admissible to supplement, explain or vary any of its terms. No representations, understandings or agreements have been made or relied on in making this Agreement other than those expressly set forth. This Agreement may be modified only by a writing signed by the parties or their duly authorized agents.

Veolia WTS Services USA, Inc. reserves the right to change these Terms and Conditions periodically and such changes shall be conveyed to the Customer in writing in conjunction with the annual Price Modifications. No other changes of these Terms and Conditions shall be of any force or effect unless reduced to writing and signed by duly authorized representatives of each party claimed to be bound thereby. These Terms and Conditions shall prevail over any inconsistent terms and conditions included in Customer's order, and no modification shall be effected by Veolia WTS Services USA, Inc.'s acknowledgement or acceptance of Customer's purchase order forms, which may contain different terms and conditions.

This Agreement shall be governed by and shall be construed according to the internal laws of the Commonwealth of Virginia, applicable to contracts made and to be performed wholly within the Commonwealth of Virginia. In the event of a dispute concerning this Agreement, the complaining party shall notify the other party in writing thereof.

Management level representatives of both parties shall meet at an agreed location to attempt to resolve the dispute in good faith. Should the dispute not be resolved within thirty (30) days after such notice, the complaining part shall seek remedies exclusively through arbitration. The seat of arbitration shall be the federal district court in Philadelphia, PA, and the rules of the arbitration will be the Commercial Arbitration Rules of the Americar Arbitration Association. which are incorporated by reference into this clause assignable without Veolia WTS Services USA, Inc.'s written consent.

Votice of requirements for the Service shall be made by Customer calling Veolia WTS Services USA, Inc.'s 24 our/ day, toll-free number in Norfolk, Virginia (800) 446-8004 or by facsimile transmission to (757) 855-1478. Al ther notices required under this Agreement shall be sent by registered or certified mail, return receipt requested ostage paid. to the address shown below, or at such other address as either party shall desianate in writin

15. SEVERABILITY
Veolia Confidential and Proprielary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 30 of 34 VEOLIA
If any provisions of this Agreement shall be held invalid, illegal or unenforceable, the validity, legality or enforceability of the remaining provisions shall in no way be affected or impaired.

16. SETOFF
Customer shall have no rights to any setoffs, abatements, suspensions, deferments, reductions, claims, counterclaims or defenses of any nature relating to any payments due under this Agreement.

17. Any proposals or price quotations rendered by Veolia WTS Services USA, Inc., may be modified or withdrawn by Velia WTS Services USA, Inc. at any time prior to the bilateral execution of a written contract, and shall automatically expire in 30 days, except as otherwise expressly agreed in writing. Any offer made by Customer shall not be considered as accepted nor the terms thereof binding on Veolia WTS Services USA, Inc. until written confirmation of said offer has been sent by Veolia WTS Services USA, Inc.. Velia WTS Services USA, Inc.'s obligation to provide Services shall be subject to approval of all orders by Veolia WTS Services USA, Inc.'s credit department, and Veolia WTS Services USA, Inc. may require full or partial payment in advance of performance.

Any Services performed or items furnished by Veolia WTS Services USA, Inc. beyond those set forth in the Agreement will be charged at Veolia WTS Services USA, Inc.'s then standard rates.

18. NO NUCLEAR USE
Except as expressly permitted by this Agreement, the Buyer warrants that it shall not use or permit the use of the Equipment in connection with any nuclear installation or activity. Seller shall have no liability whatsoever for any nuclear or other damage, injury or contamination arising in connection with any such use.

Veolia Confidential and Proprietary Information
Proposal for the Cily of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 31 of 34 VEOLIA
Appendix D. Surcharge Table
Fuel Surcharge Index
The Fuel Price Index for each month will be determined by the U.S. price for diesel as reported by the U. epartment of Energy (DOE) on the first Monday of each month. This price can be obtained by calling (202) 586-696 Fuel Price Surcharge per Fuel Price Surcharge per
Index Index Mile
(S/gal) (S/gal)
$2.84$2.89 $ 0.29 83.50/$3055 $ 0.40 $4.16.$4.21 $0.51 |$4.82 $4.87 $ 0.62 $2.90$2.95 $ 0.30 $3.56 $3.61 $ 0.41 $4.22 $4.27 $ 0.52 $4.88$4.93 $ 0.63 $2.96$3.01 $ 0.31 $3.62 $3.67 $ 0.42 $4.28 $4.33 $ 0.53 $4.94 $4.99 $ 0.64 $3.02 $3.07 $ 0.32 $3.68 $3.73 $0.43 $4.34|$4.39 $ 0.54 $5.00$5.05 $ 0.65 $3.08$3.13 $ 0.33 $3.74 $3.79 $ 0.44 $4.40 $4.45 $ 0.55 $5.06 $5.11 $ 0.66 $3.14 $3.19 $ 0.34 $3.80 $3.85 $ 0.45 $4.46 $4.51 $ 0.56 $5.12 $5.17| $ 0.67 $3.20 $3.25 $ 0.35 $3.86 $3.91 $ 0.46 $4.52$4.57 $ 0.57 $5.18$5.23 $ 0.68 $3.26 $3.31 $ 0.36 $3.92 $3.97 $ 0.47 $4.58$4.63 $ 0.58 $5.24 $5.29 $ 0.69 $3.32$3.37 $ 0.37 $3.98 $4.03 $ 0.48 $4.64 $4.69 $ 0.59 $5.30$5.35 $ 0.70 $3.38 $3.43 $ 0.38 $4.04 $4.09 $ 0.49 $4.70$4.75 $0.60 $5.36 $5.41 $0.71 $3.44 $3.49 $ 0.39 $4.10 $4.15 $ 0.50 $4.76.54.81 $ 0.61 $5.42$5.47 $ 0.72 For diesel fuel prices exceeding those in the table, each increase of $0.05 in the cost of diesel fuel will create an increase of $0.01 in the fuel surcharge.

Rev 8/29/2018
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 32 of 34 • VEOLIA
Appendix E. Field Service Support
E.1 customer operated jobs*
When contracting for a Veolia water treatment system without the services of a Veolia Field Service Representative (FSR), the customer will be responsible to verify several parameters upon delivery of the equipment, including but not limited to:

E.2 The equipment is secure and in good working order
The shutdown features and alarms are activated and functioning • Operating parameters are within the specific limits
• And the effluent water quality meets the required specifications After verification of the above parameters and commencement of operation, water quantity and quality issues are the customer's responsibility.

Veolia services include:

Guaranteed effluent water quality upon equipment delivery • 24 hour, 365 day per year technical assistance from Veolia's Logistics and Customer Service departments
• Emergency back-up equipment
• Emergency replacement parts
• Written equipment start-up and operational procedures • Training for the operators
Customer responsibilities include:

Daily operating labor
• Effluent water quality and quantity monitoring
• FSR transportation, labor, and per diem for all service calls • Daily equipment readings
• Transmission of equipment readings to Veolia's Logistics department • Routine maintenance and repair labor
• Replacement media, resin, and membranes (unless due to manufacturing defects) Instrument calibration
Daily housekeeping
• Maintain influent water within the specified parameters • Site access and security
• Site suitable for water treatment equipment
• Emergency first aid
Optional services available: Services of a Veolia FSR, trained in water treatment theory and operation by Veolia, are available at the request of the customer to:

Provide equipment installation assistance and start-up services • Operate and monitor equipment performance to guarantee effluent water quality and quantity • Manage water inventory
Provide repair services
Troubleshoot problems
To increase FSR coverage, schedule service, order equipment, or request technical or field assistance, contact Veolia:

In the US: (757) 855-9000 or US toll-free (800) 446-8004 In the EU: +800 4300 0043
Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 33 of 34 • VEOLIA
In the ANZ: +1800 064 140
For other countries: +44 (0) 1733 394555
Daily readings can be faxed to Veolia's Logistics department:

In the US: (757) 855-1478
In the ANZ: +1800 648 530
For other countries: +44 (0) 1733 390179
* Customer operated applies when the customer has not contracted for scheduled FSR site visits.

Veolia Confidential and Proprietary Information
Proposal for the City of Calexico - Mobile UF Bridge
Proposal # 582992AKH REV4, 06/02/2025. Valid until 07/02/2025 Page 34 of 34 Yearly Mgd. Highest, lowest, and Acre foot
Jan. Feb. October NovemberDecember
Chemical Injections: CITY OF CALEXICO 30 2.84 4.40 4.14 3.40 Powder Activated Carbon Clarifier C Repair Project 31 2.84 4.82 3.00 Alum Total Mgd 101.75 95.83 152.47 126.02 111.14
Polymer Feed Highest 4.14 4.32 5.79 5.08 4.20
Lowest 2.68 2.84 4.24 3.14 3.00
Total Mgd for the year
Acre foot for the year
Clarifier C
Max Capacity
10M GPD
6 MG
Reservoir
Plant Feed
8psi
MM Disinfection
Clarifier B Filters
downstream of MMF
Max Capacity

4.2M GPD by Calexico
Proposed
Treatment 4 MG
Reservoir
during repairs to
Clarifier C
MPAK80 Gravity drain to MMF
MPAK80
MPAK80 WASTE
use Calexico sewer

OVEOLIA
June 2, 2025
City of Calexico
Attn: Public Works Department
608 Heber Ave.

Calexico, CA 92231
RE: Exclusive Rights Declaration - ZeeWeed Membrane Technology To Whom It May Concern:

This letter confirms that Veolia Water Technologies & Solutions (formerly SUEZ Water Technologies & Solutions) maintains exclusive rights to the ZeeWeed ultrafiltration membrane technology. Following the acquisition of SUEZ's water business by Veolia in January 2022, Veolia holds all patents, manufacturing rights, and distribution rights for ZeeWeed membrane products globally.

Specifically:

ZeeWeed is a registered trademark owned exclusively by Veolia : All associated patents for the outside-in hollow fiber uftrafiration membrane technology are owned by Veolia
Veolia is the sole manufacturer of ZeeWeed membrane modules and associated components : Veolia exclusively provides all genuine replacement parts and specialized maintenance services For emergency mobile water treatment applications as required by the City of Calexico, ZeeWeed membrane technology offers unique capabilities including:

Rapid deployment capability
• Proven performance in challenging water conditions
Standardized mobile platforms for immediate operation
• Factory-tested units ready for emergency scenarios
No other company is authorized to manufacture, sell, or distribute genuine ZeeWeed technology or its components.

Sincerely,
Heidy Arriola
Regional Account Manager
Veolia Water Technologies & Solutions
(626) 298-5834
Veolla Water Technologies & Solutions
Head office: 3600 Horizon Blvd. Trevose, PA 19053
www.veolia.com

← All documents from this meeting