AGENDA
ITEM
13 AGENDA
CALEXICO California ITEM

WHERE CALIFORNIA AND MEXICO MEET
13 CITY COUNCIL

AGENDA STAFF REPORT
DATE: September 17, 2025
TO: Mayor and City Council
APPROVED BY: Benjamin Martinez, City Manager '
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Authorize Public Works Director/City Engineer to Sign and File Notice of Completion for New River Improvement Project - Calexico Reach.

Recommendation:

Authorize Public Works Director/City Engineer to sign and file Notice of Completion for New River Improvement Project - Calexico Reach.

Background:

On February 15, 2023, the City Council of the City of Calexico awarded Mountain Cascade, Inc. the bid for construction services of the New River Improvement Project - Cálexico Reach in the amount of $40,690,908.04. The project consists of three primary construction components:

Trash screen and diversion structure for the New River downstream from the International Boundary with Mexico.

2. Calexico to address the public health threat that New River water quality poses to the southern area of the city.

A pump-back system to take treated wastewater from the existing Calexico Wastewater Treatment Plant (WWTP) and discharge it into the New River channel at a point near the proposed river diversion and encasement structure.

As of September 3, 2025, ten (10) change orders were approved, bringing Mountain Cascade, Inc. final contract total to $43,326,478.91.

Discussion and Analysis:

On August 21, 2025, Mountain Cascade, Inc. substantially completed the construction of the New River Improvement Project - Calexico Reach. Upon receiving all Project deliverables, City staff is recommending that the City Council of the City of Calexico deem the Project complete as of September 17, 2025 and authorize the Public Works Director/City Engineer to sign and file Notice of Completion for New River Improvement Project - Calexico Reach.

Fiscal Impact:

No fiscal impact at this time.

Coordinated With:

City Manager's Office.

Public Works Department.

Attachments):

1. Notice of Completion for New River Improvement Project - Calexico Reach.

2. Before and After Construction Pictures.
2 ATTACHMENT NO. 1
RECORDING REQUESTED BY:

City of Calexico
AND WHEN RECORDED MAIL TO:

City of Calexico
Office of the City Clerk
608 Heber Avenue
Calexico, California 92231

SPACE ABOVE THIS LINE FOR RECORDER'S USE

NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion.

Notice is hereby given that:

1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described:

2. The full name of the owner is City of Calexico

3. The full address of the owner is 608 Heber Avenue, Calexico, California 92231

4. The nature of the interest or estate of the owner is:

In fee

5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are

NAMES ADDRESSES
None

6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to

NAMES ADDRESSES
None

7. A work of improvement on the property hereinafter described was completed on September 17, 2025. The work done was building a Trash Screen and Diversion Structure for the New River just north of the US-Mexico International Boundary in Calexico, installing a 72-in pipe that would divert the day-today flow for approximately

1.5 miles, and building a pumping station to take up to 5.0 million gallons per day of treated wastewater from the City of Calexico Wastewater Treatment Plant and pump them via a 16-in forcemain into the River channel just downstream from the Diversion Structure.

8. The name of the contractor, if any, for such work of improvement was Mountain Cascade, Inc. 555 Exchange Court, Livermore, CA 94550
February 15, 2023
(Date of Contract)

9. The property on which said work of improvement was completed is in the City of_Calexico County of Imperial , State of California and is described as follows:

New River Improvement Project - Calexico Reach
The street address of said property is New River from International Border to City limits.

Dated 09/17/2025
Jesus Villegas, Public Works Director/Cit Engineer
City of Calexico

VERIFICATION
I, the undersigned, say: I am the Public Works Director/City Engineer, the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.

Executed on September 17, 2025, at Calexico, California Jesus Villegas, Public Works Director/Cit Engineer
City of Calexico
ATTACHMENT NO. 2
9/11/2025
New River Improvement Project
Calexico Reach
Calexico Reach Project Elements
(ENERGY BYPASS PUMP STATION

DISSIPATER E ENCASEMENT
-BYPASS

ENCASEMENT
2:1 SLOPE

STABILIZATION AREA TRASH SCREENT

DIVERSION STRUCTURE

PUMP-BACK SYSTEM O STREET
16" FORCEMAIN

LIMITS OF

DISTURBANCE
LEGEND:

I PROPOSED TRENCH SPOIL LOCATION

I FILL AREA
2 9/11/2025
Trash Screen and Diversion
Structure
3 Before - South View from 2nd Street
Security Screen
New River
(Upstream 2nd Street)
2 9/11/2025
Arter - South View from
2nd Street
5 After - Trash Screen & Diversion Structure
9/11/2025
Pump Station Site
7 Before - Pump Station Site After - Pump Station
9/11/2025
72-in Pipe and Energy
Dissipater
9 Installation of 72-in Pipe
(Bypass Encasement)
South East Elevation
02957/(T + 324020.25 H115*304840/125511 A 11h
South West Elevation East Elevation
0467E (T) • 32402566°1L 115*30 6182V/ / A1 (T) # 32402400°N, 115*3036.34W +324h 4 011 10 9/11/2025
Before - Area of Energy Dissipater (SE View)
All-American Canal Syphon
New River
Approx. Location of
Energy Dissipater
11 After - Energy Dissipater
Calexico, CA, United States
WSccond Si, Calerko Gran Purs, Calaico,
Lat 02 670522, Long -115 525756
0321202507.50 AI GMT-07.00
Note: Capfured by GPS Mop Camer
Calexico, CA, Unlted Statos
W Sword St. Calko Guan Purs Calexico
025 07 50 AM GMT 07.00
12 9/11/2025
Bluff Area
Erosion and Drainage Control
13 Before - Bluff Area After - Biuff Area
14 9/11/2025
After - Stabilized Bluff Area
tri te te