AGENDA
ITEM
9 AGENDA
CALEXICO California ITEM

WHERE CALIFORNIA AND MEXICO MEET
9 CITY COUNCIL

AGENDA STAFF REPORT
DATE: November 5, 2025
TO: Mayor and City Council
APPROVED BY: Benjamin A. Martinez, City Manager
REVIEWED BY: Karla Chaparro, Finance Director Je
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Authorize Public Works Director/City Engineer to Sign Change Order No. 3 with Rove Engineering, Inc. in the Amount of $40,004.40 for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

SECEESEESEESE2ESS2E2SSSSSS=:

Recommendation:

Authorize Public Works Director/City Engineer to Sign Change Order No. 3 with Rove Engineering, Inc. in the Amount of $40,004.40 for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

Background:

The City of Calexico Public Works Department received a grant from California Department of Transportation (Caltrans) for FY 2024-2025 in the amount of $937,915.00 ($230,000.00 - Federal Grant and $707.915.00 - Local Match) for Federal Project No. CML-5168036) Sidewalk Improvements for the following locations:

1. Grant Street between Pierce Avenue and Emilia Drive.

2. Calexico Street between Adler Avenue to Kloke Avenue.

3. Van de Graaf between Cole Boulevard and Calexico 10 theaters.

The project consists of the removal of existing parkway, subgrade, asphalt, and concrete, trimming and/or removal of existing trees, removal of fencing and roadway signs, procurement of concrete, construction of sidewalk, curb and gutter, driveways, curb ramps, and adjustment of existing utility lids to grade. Additional asphalt patching as needed.

On March 5, 2025, the City Council of the City of Calexico approved the following:
a) Award Bid Proposal from Rove Engineering, Inc. in the Amount of $647,289.00. b) Authorize Acting City Manager to Sign a Construction Agreement between the City of Calexico and Rove Engineering, Inc. in the Amount of $647,289.00 for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML- 5168(036).
c) Authorize Acting City Manager to Approve Any Future Change Orders Not-to-Exceed $64,728.90 (10% of Rove Engineering, Inc. Base Bid + Alternate Bid) as Per City Ordinance No. 1218.

Below please find the list of change orders that have been approved as of September 11, 2025:
# Description Amount
Change Order No. 1
1 Suspension of Work $0.00
Change Order No. 2

2.1 Cross Gutter at Calexico St and Adler Rd $18,978.00

2.2 Remove/Replace Spandrel Van de Graaff Ave $14,575.00

2.3 Repair Catch Basin (Kloke Rd and Grant St) $11,637.50

2.3 Repair Catch Basin (Emilia Dr and Grant St) $7,380.00 Total $52,570.50
Discussion and Analysis:

On April 26, 2025, Rove Engineering, Inc. (contractor) began construction of the City's Sidewalk Improvement Project. During construction, it was noticed that a drainage issue was ongoing along Grant St between Pierce Ave and Emilia Dr., especially during rain events. As part of this project the flowline along the new curb and gutter corrected drainage issues along sidewalks and most of the road surface. However, there is a section approximately 10 foot wide by 150 feet long where Grant St asphalt surface is 6 to 7 inches higher than the new lip of gutter. Rove Engineering, Inc. (contractor) and Nicklaus Engineering, Inc. (construction management) are proposing a transition between the existing road surface and the lip of gutter which will require the removal of the asphalt layer, correction of slope transition, and installation of new asphalt material. The cost of said transition is $40,004.40 to cover labor, materials, and equipment needed to perform this additional work. City staff is recommending that the City Council of the City of Calexico authorize the Public Works Director/City Engineer to sign Change Order No. 3 with Rove Engineering, Inc. in the amount of $40,004.40 for Sidewalk Improvements (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

Fiscal Impact:
/ Capital improvement Program Budgeted Item for FY 2025-2026 Revenue
Fund No. 412-91-917 (Federal Grant) $230,000.00
Fund No. 233-91-917 (Measure "D") $373,863.90
2 Fund No. 234-91-917 (Article 3) 5136,000.00
Total $739,863.90
Expenditure(s)
Original Contract $647,289.00
Change Order No. 1 $0.00
Change Order No. 2 $52,570.50
Change Order No. 3 $40,004.40
Total |$739,863.90
Coordinated With:

City Manager's Office.

Finance Department.

Public Works Department.

Attachments):

1. Rove Engineering, Inc. Change Order No. 3.

ATTACHMENT NO. 1

CITY OF CALEXICO

PUBLIC WORKS DEPARTMENT
CHANGE ORDER NO. 3
Name of Project: Sidewalk Improvement Project
AAR Federal Project No. CML-5168(036)
CALEXICO Name of Contractor: Rove Engineering, Inc.

CALITORHIR
Date: November 5, 2025
Titu assus de Tastes
# Description Price Price Time
Increase Decrease Extension
1 Half lane slope correction to match new gutter $ 40,004.40 Sub-Total $ 40,004.40
Total $ 40,004.40
Contract Amount $ 699,859.50
Total Contract Amount (Contract, CO No. 1, CO, 2
and CO No. 3) $ 739,863.90
Jesus Villegas, Public Works Director/City Engineer
City of Calexico, 608 Heber Avenue, Calexico, California Phillip A. Ramirez, P.E., Project Engineer
Nicklaus Engineering, Inc., 1461 Main St, El Centro, California Frank Duffy, Project Manager
Rove Engineering, Inc., P.O. Box 2108, El Centro, California ROVE Engineering-PROPOSAL
Rove Engineering Date Prepared: 10/13/2025 0:00
ROVE
P.O. Box 2108 Last Revision Date: 10/16/20250:00
ENGINEERING El Centro, CA 92021
Project Name: City of Calexico Developer: City of Calexico Municipality: Address: Grant Street Calexico CA
Project Type: Date: 10/13/2025
Soils Prepared By Frank Duffy
Plans Title Chief Operating Officer
Author E Mail [email protected]
Regarding:

Gentlemen, our firm proposes to complete the following items of work in connection with the project referenced above. All work will be performed per field evaluations and Engineer direction
Rates
Description Qty Unit Unit Price Total Cost Comments
1 1480 SF $ 27.03 $ 40,004.40
Half Lane slope correction to match new gutter
$
Total $ 40,004.40
Inclusions: Exclusions:

Work to be completed as per Philip Ramirez email sent on 10/10/2025. Engineering, Testing, Permits, Survey, Certifications, compaction reports Rove will grind approximately 10'wice and 140 long to correct the grade Fees of any kind (unless caused by contractor) Striping Markings break after the new curb and gutter slope correction. Decorative stone/Media/weed filter at basins for Landscape Dewatering or Processing of Saturated Soils
Manufacturer start-up and commissioning services are excluded Over Excavation beyond the specified depth listed above Removal of Material that cannot be productively ripped with a Caterpillar D6 Uilties in conflict with Subgrade prep shall be done by others.

Excavation or repairs and Disposal of any Debris or restoration Submitted This Date: 10/16/2025 Rove Engineering Inc
Frank Duffy
PROPOSAL VALID FOR 15 DAYS ROVE COO
760-604-4299
ENGINEERING License # 1046101
Expiration-10/31/2024
P.O. Box 2108
El Centro, CA 92244
[email protected]