AGENDA
ITEM
18 AGENDA
CALEXICO California ITEM

WHERE GALIFORNIA AND MEXICO MEET
18 CITY COUNCIL

AGENDA STAFF REPORT
DATE: March 18, 2026
TO: Mayor and City Council
APPROVED BY: Benjamin Martinez, City Manager
Lous viles, Puli Works reconcily Engineer fue Jue
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Authorize Public Works Director/City Engineer to Sign and File Notice of Completion for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

Recommendation:

Authorize Public Works Director/City Engineer to Sign and File Notice of Completion for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No.

CML-5168(036).

Background:

On March 5, 2025, the City Council of the City of Calexico approved the following:
a) Award Bid Proposal from Rove Engineering, Inc. in the Amount of $647,289.00.

Authorize Acting City Manager to Sign a Construction Agreement between the City of Calexico and Rove Engineering, Inc. in the Amount of $647,289.00 for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No.

CML-5168(036).

Authorize Acting City Manager to Approve Any Future Change Orders Not-to-Exceed $64,728.90 (10% of Rove Engineering, Inc. Base Bid + Alternate Bid) as Per City Ordinance No. 1218.

Discussion and Analysis:

On November 17, 2025, Rove Engineering, Inc. completed the construction of Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.). The total construction cost of said project is $649,940.09. City staff is recommending that the City Council of the City of Calexico authorize the Public Works Director/City Engineer to sign and file Notice of Completion for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

Fiscal Impact:

No fiscal impact at this time.

Coordinated With:

City Manager's Office.

Public Works Department.

Attachment(s):

1. Notice of Completion for Sidewalk Improvement (Grant St., Calexico St. and Van de Graaff Ave.) Federal Project No. CML-5168(036).

2. Before and After Construction Pictures.
2 ATTACHMENT NO. 1
RECORDING REQUESTED BY:

City of Calexico
AND WHEN RECORDED MAIL TO:

City of Calexico
Office of the City Clerk
608 Heber Avenue
Calexico, California 92231

SPACE ABOVE THIS LINE FOR RECORDER'S USE

NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion.

Notice is he underiven t is owner or corporate officer of the owner of the interest or estate stated below in the property ereinafter described

2. The full name of the owner i City of Calexico,

3. 608 Heber Avenue, Calexico, California 92231

4. The nature of the interest or estate of the owner is:

In fee

5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are

NAMES ADDRESSES
None

6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to

NAMES ADDRESSES
None

7. A work of improvement on the property hereinafter described was completed on November 17, 2025. The work done was removal of existing parkway, subgrade, asphalt, and concrete, trimming and/or removal of existing trees, removal of fencing and roadway signs, procurement of concrete, construction of sidewalk, curb, gutter, driveways, and curb ramps, and adjustment of existing utility lids to grade

8. The name of the contractor, if any, for such work of improvement was Rove Engineering, Inc., P.O Box 2108, El Centro, CA 92243
March 5, 2026
(Date of Contract)

9. The property on which said work of improvement was completed is in the City of_Calexico Imperial _, and is described as follows:

The street address of said property is Grant St., Calexico St. and Van de Graaff Ave.

Dated_03/18/2026
Jesus Villegas Peimbert, Public Works Director/City Engineer City of Calexico

VERIFICATION
I, the undersigned, say: I am the Public Works Director/City Engineer, the declarant of the foregoing Notice of Coolio. eclaran sa platic of Comp thin a doregor the cout ats horrect the same is true to my own Executed on March 18, 2026, at Calexico, California
Jesus Villegas Peimbert, Public Works Director/City Engineer City of Calexico
ATTACHMENT NO. 2

CITY OF CALEXICO

PUBLIC WORKS DEPARTMENT

SIDEWALK IMPROVEMENT (GRANT ST, CALEXICO ST, AND VAN DE GRAAFF AVE) FEDERAL PROJECT NO. CML-5168(036)
Pictures before:
25 CITY OF CALEXICO

PUBLIC WORKS DEPARTMENT

SIDEWALK IMPROVEMENT (GRANT ST, CALEXICO ST, AND VAN DE GRAAFF AVE) FEDERAL PROJECT NO. CML-5168(036)

CITY OF CALEXICO

PUBLIC WORKS DEPARTMENT

SIDEWALK IMPROVEMENT (GRANT ST, CALEXICO ST, AND VAN DE GRAFF AVE) FEDERAL PROJECT NO. CML-5168(036)
Pictures after:
(SPEED
LINIT
25 CITY OF CALEXICO

PUBLIC WORKS DEPARTMENT

SIDEWALK IMPROVEMENT (GRANT ST, CALEXICO ST, AND VAN DE GRAFF AVE) FEDERAL PROJECT NO. CML-5168(036)