AGENDA STAFF REPORT
DATE: April 15, 2026
TO: Mayor and City Council
APPROVED BY: Benjamin A. Martinez, City Manager
REVIEWED BY: Karla Chaparro, Finance Director Ye
PREPARED BY: Michael Coyne, Planning & Building Director U SUBJECT: Adoption of a Resolution Approving a Temporary Fee Schedule for Planning Applications, Building Permits, and Encroachment Permits until June 30, 2029 ======================================================== Recommendation:
Adopt a Resolution Approving a Temporary Fee Schedule for Planning Applications, Building Permits, and Encroachment Permits until June 30, 2029.
Background:
Pursuant to Council direction, Staff has prepared an updated planning and building fee schedule with fees that are more affordable to the typical Calexico resident and/or business owner. Numerous City planning and building fees are high when compared to other jurisdictions in the Imperial Valley. The proposed building fee schedule targets common building permits requested by the public including permits for windows, doors, water heaters, air conditioners, fences, meter upgrades, solar panels, and re-roofs. Many residents and businesses have expressed their dissatisfaction with the high cost these permits and many may be discouraged from obtaining such permits due to the cost and, as such, may be completing unpermitted work that may be unsafe due to a lack of compliance with the building code One of the intended outcomes of the proposed reduction to building permit fees is that the increased affordability will result in less unpermitted work and increased permit activity. The proposed planning ano building fee schedule closely parallels past temporary fee reductions adopted in 2021 and revised in 2022 (Attachment No. 1).
The proposed temporary fee schedule would expire on June 30, 2029, absent any Council action to rescind or supersede the schedule. Staff intends to pursue the preparation of a comprehensive user fee study by a qualified third-party consultant specializing in these studies within this three-year period. The last comprehensive user fee study was completed in 2009, upon which the currently adopted planning and building fees are based, and may not reflect processing efficiencies and project streamlining that have been implemented since then. If a comprehensive user fee study is completed before this three- year period and the City Council adopts the fees recommended by this study, such fees would supersede this temporary fee schedule.
Discussion and Analysis:
In addition to incentivizing permitted work, the intent of the updated fee schedule is also to support economic development, which is a strategic goal of the City Council. The proposed planning fees will make development applications more affordable and competitive with surrounding cities and may encourage business and residential development in the City. As provided in a report to the City Council on May 21, 2025, most of the City's planning fees are higher when compared to other jurisdictions in the region (Attachment No. 2). The updated fees may also help drive away the stigma that the City is not business friendly, and, as such, would help with positive branding efforts for the City, which is central to any city's economic development efforts.
Some of the proposed building permit fee reductions are based on how fees are calculated, with several fees resulting in a reduction due to a change in the assessment to a per permit or project unit basis rather than on a quantity or size, such as a square or linear feet. Some fee reductions are based on a change to the absolute value of the fee. In addition, a selection of fee reductions are based on the elimination of an additional plan check fee. In the case of solar permits, fees would be reduced in accordance with the fee limits placed on photovoltaic systems by Assembly Bill 1124 (AB 1124). AB 1124 limits the fees that local jurisdictions can charge for the review of either a residential solar energy system or a commercial solar energy system. For residential solar energy systems, local jurisdictions may not charge a fee of more than $450 plus $15 per kilowatt for each kilowatt above 15-kilowatt hours. For commercial solar energy systems, jurisdictions have a cap of up to $1,000 for systems up to 50 kilowatts plus $7 per kilowatt between 51 kilowatts and 250 kilowatts, plus $5 per kilowatt for each kilowatt above 250 kilowatts.
These updated fees would be easier to calculate by staff as many would be calculated on a per permit basis rather than by square footage or linear feet, thus reducing the amount of time expended by staff on processing permits.
Although considered an engineering fee, a reduction in encroachment permit fees is also proposed with The existing encroachment fees are the highest in the region and are often criticized as excessive by residents, businesses and utilities. The proposed encroachment fee schedule would more closely align with the fees charged by surrounding jurisdictions, while still ensuring full cost recovery.
The temporary fee schedule will be effective upon adoption of the attached resolution. Such fees would not be retroactive, meaning that the adoption and implementation of the temporary fee schedule will not entitle any person who has already paid fees prior to adoption of the temporary fee schedule to receive a refund, credit or reimbursement of such payment.
Fiscal Impact:
Each permit fee proposed for reduction has been individually evaluated, with estimates on average times expended in processing each type of permit, which for building permits include anticipated plan check reviews by planning and building staff and inspections by the building inspector. The proposed fees reflect these anticipated staff times at fully-burdened rates, with the goal of ensuring full cost recovery on a cumulative basis. Revenues from building permits will be tracked on a biannual basis as part of the mid-year budget review with trends reported to the City Council. At this time, the full financial impact of the fee reductions is unknown, especially if there is an uptick in building permit activity as a result of the reduced fees. However, if a significant detrimental impact to the budget is determined as a result of this temporary reduction in fees, these fees could be rescinded by resolution of the City Council. In such a scenario, fees would revert to the currently adopted fee amounts.
Coordinated With: Planning & Building Staff
Jesus Villegas, Public Works Director
Attachments):
1. Previously Approved Temporary Fee Schedule
2. Fee Comparison Table
3. Resolution
4. Proposed Temporary Fee Schedule
ATTACHMENT NO. 1
CITY OF CALEXICO
PROPOSED REVISED MISCELLANEOUS BUILDING PERMIT FEE SCHEDULE (based on adopted Maximus Study standard hourly rate and avenge number of inspections required)
CALEXICO
"EXHIBIT A"
CURRENTLY
WORK ITEM UNIT RECOMMENDED FEE CURRENT UNIT
ADOPTED FEE
STANDARD HOURLY RATE $205.100 $228.99 HOUR
Administrative Fees
Permit Issuance Si.:. $38.17 each
Duplicate/ Replacement Job Card/ Permit 534.35 $68.70 each Addendams Revisions to already approsed Balding Plans 12 Ongonal Building Permut Fee NA Preimunan Develepment Review Meeting S550 Gil
heres not sperited To be desenced by the Ciry Manager and Pencing and Buldny Serace Director Acoustical Review/ T-Bar
New Single Family Home or Duplex
Addition or Alterarion to Single Family Home or Duplex
Multi- Family/ Commercial
Address Assignment/ Verification
Antenna/ Telecommunications Facility
BEBB BOBBED IN TERES
Radio
Cellular/ Mobile, free-standing.
Cellular/ Mobile, attached to a building
Arbor/ Trellis
Awning/ Canopy (supported by building)
Balcony Addition
Carport
Certifications
Special Inspector Certification Application
Materials Testing Lab Certification
Chimney, new Building Permit Fee
Chimney, repair Building Permit Fee
Close existing openings
Interior Wall Building Permit Fee each
Exterior Wall Building Permit Fee each
Commercial Coach Building Permit Fee each
Prints- Submitals vie email one for Planning and Burlding Seruces Deparment X 1l letter Size each pare S1 per shreet page INA
x 17 Poster Size cach pace 53.010 per sheet page NA
Covered Porch each
Deck (wood) each
Deck Railing cach
Demolition each
Disabled Access Compliance Inspection (walkways) each
Door
New Door (non-structural)
New Door (Structural shear wall/ masonry)
Fence Te ar ep 8 58 38 вза 1 88 7в8в 388 3388 в 80388 888 Non- masonry (wood, viny), chain-link, wrought-iron fencing or similar) S412.18 Masonry (CMU, block, brick or similar) $583.93
Fireplace
Masonry/ Pre-Fabricated/ Metal
Flagpole
Foundation Repair
Carage (detached)
Wood framed
Masonry
Inspections
Supplemental Inspection fee, regular business hours
Inspections outside normal business hours (2-hour minimum charge) Insulation of existing walls
Lighting Pole
First pole
Each additional pole
Modular Structures
Onsite Improvements
(Partition- Commercial interior
Additional commercial partition
Partition- Residential interior
| Additional residential partition
Patio Cover/ Porch
Wood framed
Metal framed or other
Pergola
closed, wood frame
closed, metal frame
Enclosed, other frame
Photovoltaic/ Solar Panel System
Residential $68.70 to $389.29 each
Commercial/ Industrial ] S68.70 to $389.29|
Pile Foundation
Cast in place concrete, first 10 piles up to 10
dditional Piles (increments of 10)
iven (steel, pre-stressed concrete)
¡ Additional Piles (increments of 10)
Pian Check
Residential/ Minor Commercial TIs- Initial Submittal Pian Check Deposit Fee S50000 New Commercial/Industrial- Initial Submittal Plan Check Deposit Fee $100.00 Pian Check. Fee for New Residential or New Residential Additions Fife of Building PereitFer Plar: Check: Fee for Commercial: Industrial Projects amit 65% of Building Pennat Fee Supplemental Pian Check. Applicant Mudaications-approved plans Te the criena building permittee Supplemental Plan Check: Applicant Modifications• not anproved $50 00 mr: pard Remodel/ Additions- Plan Check Fee 40% of Building Permit Fee Residential-Attached/ Detached Addition (covered & enclosed space) Residential- Interior remodel
Commercial/ Industrial- Tenant Improvements/ Code Compliance Commercial/ Industrial- Addition
Water/ Fire Damage
Re-Roof Plan Check Fee for Re-Roof 50% of Balding Permut Fee Pian Check Fee for Re-Roof 50% of Buldn Residential
Multi- Family
Commercial/ Industrial
Retaining Wall (Concrete or Masonry)
Standard
Special Design, 3-10' high
Special Design, over 10' high
Gravity/ Crib Wall, 0-10' high
Gravity/ Crib Wall, over 10' high
Roof Structure Replacement
Sauna/ Steam
Siding
Stone or brick veneer, interior or exterior
Other siding
Signs-
Directional, first sign
Additional directional sign
Ground/ Roof projecting signs
Rework of any existing ground sign- Plus Plan Check Fee Other signs Banners
New wall/ awning sign, non-electric- Plus Plan Check Fec w wall/ awning sign, electric-Plus Plan Check Fee
emporary Sign Permit 58102]
Sign re-face
Skylight
Non-structural/ less than 10 sf
Structural/ over 10 sf
Stairs
First stairway
Additional stairway
Storage Racks
Additional 100 If
over 8' high
Additional 100 lf
Storage Structure
Up to 300 sf $115.00
Over 300 sf $229.00
Chech Fee 4%% 1 fee 40%e of Boilding Permit Fee
Residential- Gunite
Commercial Pool
Bay Window $34.35
Plan Chech. Fee Regured
2. ir handler
ed $17134
Evaporative cooler
Make-up Air system
Vent fan, single-duct S171.74
Vent syster not a portion of HVAC system authorized by a permit S171.74 chaust hood and duct, residential or commercial $171.74 efrigerator Condenser S171.74
Walk-in box/ refrigerator coil $171.74
Other appliance or equipment not listed $171.74
Plumbing/ Gas Permit Fees- Stand Alone $34.35
Stand alone plumbing plan check $228.99
Gas outlet $114.50
Plumbing fixture system or traps including water, drainage, piping, backflow S114.50 Building sewer $366.36
Grease trap $114.50
Backflow preventer $114.50
Roof drain- rainwater system $114.50
511450
Watc: heater- Not Schiece to l'lan Crcel. Fer
Lawn sprinkler system
Water pipe repair or replacement
Drain-vent repair/ alterations
Drinking Fountain
Solar water heater system
Graywater system
Medical gas system
Electrical Permit Fees-Stand Alone $34.35
Stand alone plumbing plan check
Swimming pool single- phase service
Swimming pool three- phase service
Outdoor events, 15 to 20 amp, first 10 cicuits
Outdoor events, 15 to 20 amp, additional 90 cicuits
Outdoor events, 15 to 20 amp, over 100 cicuits
Outdoor events, 25 to 40 amp circuits
Outdoor events, 50-175 amp circuits
Outdoor events, 200 amp or larger circuits
Temporary Power Pole/ Temporary Power
Generator Installation
Electrical Inspection required by IID for power release Residential addittion, remodel, or accessory struture lighting fixtures, outlets, receptacles or other electrical devices
Pole or platform mounted lighting fixtures
Residential Appliances: Fixed residential appliances or receptacle outlets for the same including wall mounted electrical ovens, cooking tops, electric renges, food waste grinders, shwashers.
on-residential appliances including medical and dental devices, food, beverage, and ice cream cabinets, iluminated show cases, drinking fountains, vending machines, laundry not specified machines, or other similar.
Residential electrical vehicle (EV) charging circuit/station $228.99 not specified comercial or andasteal electrical velaste dEVi charang seatt not specified Power apparatus: Antennas, motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, heat pums, cooking or baking up to & including 1 (each) equiment, and other power apparatus
Power apparatus: Antennas, motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, heat purs, cooking or baking over 1 and not over 10 (each) equiment, and other power apparatus
Power apparatus: Antennas, motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, heat pums, cooking or baking eleventh to fifieth $381.65 over 10 and not over 50 (each) equiment, and other power apparatus
Power apparatus: Antennes, motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, heat pums, cooking or baking fifty-first to hundreth over 50 and not over 100 (each) equiment, and other power apparatus
wer apparatus: Antennas, motors, generators, transformers, rectifiers, synchronc over one hundred over 100 (each)
equiment, and other power apparatus
Electrical Commercial Tenant Improvements including but not limited to all switches, circuit breakers, contactors, thermostats, relays, emergency fixtures & exit signs, and other directly related control equipment.
New signs, outline lighting, or marquees supplied from one branch circuit or additional circuits within the same sign, outline lighting or marquee Resedental electical seroie up to 200 amg. new or replacemen S330 00 Mule-famls or small-scale commercial electrical servie up to 10w amp. new or stin 00) replacement
Medium-Jaree scale commerced or industral electrical serve new or replacement 557500) Switch gear, new or replacement 576.33
PLANNING / ZONING FEE SCHEDULE FEE COST
ANNEXATION REQUEST REVIEW $18,021.00
APPEALS TO PLANNING COMMISSION $5,600.00 $765.00
APPEALS TO CTY COUNCIL $867.00
CONDITIONAL USE PERMIT (MAJOR) Commercial $6,551.00 $2,060.00 CONDITIONAL USE PERMIT (MINOR) Residential/ Industrial $3,354.00 $1,825.00 CONDOMINIUM CONVERSION $3,973.00
DEVELOPMENT REVIEW COMMITTEE FOR CARPORTS
DEVELOPMENT AGREEMENT REVIEW 'DESIGN REVIEW' (PRC) $5,810.00 $795.00 DEVELOPMENT AGREEMENT AND/OR CFD REVIEW $11,783.00 $8,000.00
ENVIRONMENTAL CLEARANCE - EIR/MND PREPARATION
(+10% ADMIN FEE $7,000.00
$47,985.00
ENVIRONMENTAL CLEARANCE - STAFF PREPARED IS & NEGATIVE
$8,265.00 $5,000.00
DECLARATION
FARM LABOR RECRUITMENT $135.00
GENERAL PLAN AMENDMENT 22,595.00 $3,000.00
INITIAL STUDY (EAC) $474.00
HOME OCCUPNACY PERMIT/ZONING CONSISTENCY $274.00 $265.00 LANDSCAPE & IRRIGATION PLAN REVIEW $770.00
LANDSCAPE & IRRIGATION PLAN REVIEW (LESS 5 ACRES) 3RD PARTY CONSUL $892.00
LOT LINE ADJUSTMENT/CERT. OF COMPLIANCE (ADMIN REVIEW) $1,890.00 REVISED TENTATIVE PARCEL MAP (MINOR LESS 4 LOTS) (A) $2,500.00 REVISED TENTATIVE SUBDIVISION MAP (MAJOR 5 LOTS) (UA) $5,000.00 $2,500.00 RESEARCH REQUEST $863.00
SITE PLAN REVIEW (MINISTERIAL PROJECTS) $216.00
SPECIFIC PLAN AMENDMENT (UA) $22,595.00 $7,220.00
SPECIFIC PLAN REVIEW (UA) $11,783.00 $2,650.00
TEMPORARY USE PERMIT $135.00
TEMPORARY SIGN PERMIT $45.00
TENTATIVE PARCEL MAP (MINOR SUBDIVISION LESS 4 LOTS) (UA) $10,274.00 $2,000.00 TENTATIVE SUBDIVISION MAP (MAJOR SUBDIVISION OVER 5 LOTS) (UA) $22,839.00 $4,000.00
TIME EXTENSION FOR DEVELOPMENT REVIEW, CUP, ETC., $3,089.00 $1,295.00 TIME EXTENSION FOR TPM & TTM $3,089.00 $1,500.00
VARIANCE (MAJOR/MINOR) - VALUATION $100,00 (UA) $9,583.00 $2,060.00 ZONE CHANGE $8,397.00
ZONING TEXT AMENDMENT (UA) $9,583.00 $7,220.00
ZONING VERIFICATION & INFORMATION/LETTER $863.00
Proposed Adjustments for Temporary Fee Schedule are found in red letters. The fees in black letters without a redline through them will still be imposed and utilized.
ATTACHMENT NO. 2
Planning Application and Encroachment
Permit Fee Comparison Table
User Fee Calexico Brawley [Calipatria TEl Centro THoltville Imperial City Imperial County
PLANNING
Annexation Request $ 18,021.00$6,630.00 15,500.00 $ 15,500.00 $ 6,228.00 Appeal $ 5,600.00 $ 200.00 150.00 1,412.00 $ 120.00 530.00 1,000.00 CUP Major $ 18,717.00 $ 2,000.00 5,350.00 $ 3,177.00 $ 5,300.00 1,673.00 $ 15,000.01 CUP Minor $ 9,583.00 $ 1,000.00 1,250.00 $ 1,405.00 $ 1,250.00 1,673.00 $ 4,500.00 Condo Conversion $ 3,972.00 $ 5,300.00 $ 5,300.00
EIR/MND $ 47,985.00 | $ 3,500.00 15,500.00 6,119.00 $ 15,500.00 923.00 $ 7,500.00 IS/ND $ 381000 8 0000 S 8,264.00$1,200.00 1,300.00 8190000 923.00 $ 3,500.00 Development Review $ 500.00 $ 300.00 643.00
Development Agreement $ 11,783.00 $ 1,500.00 $ 3,765.00 3,228.00 $ 2,000.00 General Plan Amendment $ 22,595.00 $ 2,100.00 5,500.00 $ 4,118.00 $ 3:5000 6,048.00 $ 15,000.00 Home Occupation License cs co 784.00 75.00 235.00 250.00 Landscape Plan Review 770.00
$ 892.00
$ 432.00 $ 600.00 500.00 824.00 300.00 $ 643.00 $ 1,000.00 Specific Plan Amendment $ 22,595.00 $ 2,100.00 $ 10,649.00 6,048.00 Specific Plan Review $ 11,783.00 $ 4,000.00 $ 6,048.00 1,500.00 Temporary Use Permit $ 135.00 $ 150.00 $ 213.00 $ 431.00 Tentative Parcel Map $ 10,274.00 $ 1,000.00 $ 5,500.00 $ 2,236.00 5,550.00 $ 5,934.00 S 7,500.00 Tentative Subdivision Map $ 22,839.00 $ 2,500.00 10,500.00 $ 5,295.00 $ 15,800.00 $ 15,000.00 Time Extension $ 3,089.00 $ 200.00 200.00 $ 1,294.00 $ 115.00 $ Variance $ 9,583.00 : 800.00 $ 1,300.00 $ 1,177.00 $ 1,300.00 $ Zone Change $ 8,397.00 $2,000.00 5,500.00 $ 3,295.00 $ 5,500.00 Lot Line Adjustment $ 1,889.00 $ 300.00| $ 1,175.00 $ 824.00 $ 1,175.00 835.00 Zoning Text Amendment 9,583.00 $ 2,589.00
Zoning Verification 863.00 $ 321.00 $ 235.00 $ 250.00
ENGINEERING
Encroachment Permit Residential 960.00 75.00 $ 312.00 S 75.00 S 508.00 s 85.00 Encroachment Permit Commercial 1,628.00 100.00 $ 312.00 $ 75.00 s 1,208.00 $ 85.00 Encroachment Permit Utility 3,367.00 $ 500.00 S 312.00 S 75.00$ 1,208.00 S 85.00 ATTACHMENT NO. 3
RESOLUTION NO. 2026-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALEXICO, CALIFORNIA,
APPROVING A TEMPORARY FEE SCHEDULE FOR PLANNING APPLICATIONS,
BUILDING PERMITS, AND ENCROACHMENT PERMITS
UNTIL JUNE 30, 2029
WHEREAS, the City Council of the City of Calexico conducted a meeting concerning processing fees for planning applications, building permits, and encroachment permits; and WHEREAS, staff has prepared a temporary fee schedule reflecting reduced fees for planning applications, building permits, and encroachment permits; and WHEREAS, a reduction in such fees supports the Council's strategic goal of economic development, and
WHEREAS, a reduction in building permit fees makes such permits more affordable and accessible to Calexico residents and businesses, where residents and businesses are more likely to apply for such permits, leading to more permitted and inspected work that meets codes and standards, thus supporting the public health, safety, and welfare; and WHEREAS, the fees in the temporary fee schedule do not exceed the reasonable cost of providing services; and
WHEREAS, the adoption and implementation of the temporary fee schedule is not retroactive and does not entitle any person who has already paid fees prior to adoption of the temporary fee schedule to receive a refund, credit or reimbursement of such payment; and
WHEREAS, staff intends to pursue the preparation of a comprehensive user fee study by a qualified third-party firm within the three-year period the temporary fee schedule would be in effect that reflects current practices, workflows, and processes; and WHEREAS, this resolution shall become effective immediately upon adoption by the City Council and end or be extended or superseded by June 30, 2029; and BE IT RESOLVED by the City Council, staff is directed to implement and utilize the Temporary Fee Schedule for Planning Applications, Building Permits, and Encroachment Permits as shown in Exhibit A.
PASSED, ADOPTED, AND APPROVED at a regular meeting of the City Council of the City of Calexico, California on the 15'h day of April 2026, by the following vote:
Victor Legaspi, Mayor
ATTEST:
Veronica Luna-Alvarado, City Clerk
APPROVED AS TO FORM:
Laura Estrada, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) sS
CITY OF CALEXICO
1, Veronica Luna-Alvarado, City Clerk of the City of Calexico, California, do hereby certify that the foregoing resolution was adopted at a regular meeting of the City Council of the City of Calexico held on the 15th day of April 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Veronica Luna-Alvarado, City Clerk
ATTACHMENT NO. 4
EXHIBIT A
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
WORK ITEM UNIT RECOMMENDED FEE CURRENTLY CURRENT UNIT
ADOPTED FEE
Administrative Fees
Permit Issuance each $0.00 $38.17 each
Duplicate/ Replacement Job Card/ Permit each $25.00 $68.70| each Application Meeting n/a $0.00 $103.05 hour
Address Assignment/ Verification per parcel $0.00 $103.05 hour Antenna/ Telecommunications Facility
Radio each $332.04 $332.04 each
Cellular/ Mobile, free-standing each $503.78 $503.78 each Cellular/ Mobile, attached to a building each $446.53 $446.53 each Arbor/ Trellis each $103.05 $103.05| each
Awning/ Canopy (supported by building), residential each $183.19 $389.29| each Awning/ Canopy (supported by building), commercial/industrial up to 300 sf $183.19 not specified not specified Balcony Addition each $446.53 $446.53
Carport, residential each $183.19 $503.78 each
Carport, commercial up to 300sf $183.19 not specified| not specified Certifications
Special Inspector Certification Application each $68.70 $68.70| each Materials Testing Lab Certification each $68.70 $68.70| each Chimney, new Building Permit Fee each $412.18 $412.18 each Chimney, repair Building Permit Fee each $354.94 $354.94|| each Close existing openings
Interior Wall Building Permit Fee each $263.34 $263.34 each Exterior Wall Building Permit Fee each $320.59 $320.59 each Commercial Coach Building Permit Fee each $217.54 $217.54 each Copies/ Prints- Records
Sales of Copies- 8.5"x11" (waived if less than $5.00) per sheet $0.25 not specified not specified Sales of Copies- 11"x17" (waived if less than $5.00) per sheet $0.50 not specified not specified Sales of Copies- Plotter (24"x36" or larger; e.g. Zoning Map) per sheet $10.00 not specified not specified Copies/ Prints- Plan Set Duplication for Building Permit Sales of Copies- 8.5"x11" (waived if less than $5.00) per sheet $1.00 not specified not specified Sales of Copies- 11"x17" (waived if less than $5.00) per sheet $2.00 not specified not specified Sales of Copies- Plotter (24"x36" or larger) per sheet $15.00 not specified not specified Covered Porch each $183.19 $183.19 each
Deck (wood) each $148.84 $148.84 each
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
WORK ITEM CURRENTLY
UNIT RECOMMENDED FEE CURRENT UNIT
ADOPTED FEE
Deck Railing each $148.84 $148.84 each
Demolition each $45.80 $45.80 each
Disabled Access Compliance Inspection (walkways) each $103.00 $103.00 per hour Door
New Door (non-structural) first $148.84 $148.84| each
Each Additional Door (non-structural) each $30.00
New Door (Structural shear wall/ masonry) first $251.89/ $251.89 each Each Additional Door (Structural shear wall/ masonry) each $60.00| Fence
Non- masonry (wood, vinyl, chain-link, wrought-iron fencing or similar) up to 500 lf $152.00 $152.00 up to 100 If Masonry (CMU, block, brick or similar) up to 500 If $304.00 $304.00 up to 100 If Fireplace
Masonry/ Pre-Fabricated/ Metal each $412.181 $412.18 each Flagpole each $354.94 $354.94 each
Foundation Repair each $354.94 $354.94 each
Garage
Wood framed each $583.93 $583.93 each
Masonry each $927.41 $927.41 each
Inspections
Supplemental Inspection fee, regular business hours each $114.50 $114.50 per each 1/2 hour Inspections outside normal business hours (2-hour minimum charge) each $457.98 $457.98 each Remote Video Inspections (optional, if requested by applicant) per each 1/2 hour $60.00| not specified not specified Insulation of existing walls each $206.09 $206.09 each
Lighting Pole
First Pole each $274.792 $274.79 each
Each additional pole each $171.74 $171.74 each
Modular Structures each $103.05 $103.05 each
Onsite Improvements each $755.67| $755.67 each
Partition- Commercial interior per project $332.04 $332.04 up to 30 If Additional commercial partition n/a $320.59 $320.59 each 30 If Partition- Residential interior per project $297.69 $297.69 up to 30 If Additional residential partition n/a $412.18 $412.18 each 30 If Patio/ Porch
Wood framed, residential each $183.19 $354.94 up to 300 sf Wood framed, commercial/industrial up to 300 sf $183.19 $355.94 up to 300 sf
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
CURRENTLY CURRENT UNIT
WORK ITEM UNIT RECOMMENDED FEE ADOPTED FEE
each $183.19| $469.43 up to 300 sf
Metal framed or other, residential
up to 300 sf $183.19 $470.43 up to 300 sf
Metal framed or other, commercial/industrial
each $183.19 not specified not specified
Pergola, residential not specified
up to 300 sf $183.19 not specified
Pergola, commercial/industrial
up to 300 sf $412.18 $412.18 up to 300sf
Enclosed, wood frame
up to 300 sf $469.43 $469.43 up to 300 sf
Enclosed, metal frame $641.18 up to 300 sf
up to 300 sf $641.18
Enclosed, other frame
Photovoltaic/ Solar Panel System (fee all inclusive)
up to 5 kw $150.00 $389.29 each
Residential (AB 1124) Up to 5 kW Systems $389.29
5.1 kw to 10 kw $300.00 each
Residential (AB 1124) From 5.1 to 15 kW Systems
10.1 kw to 15 kw $450.00 $389.29 each
Residential (AB 1124) from 10.1 to 15 kW Systems
each additional w $15.00 $389.29 each
Residential (AB 1124) Systems Greater than 15 kw
up to 10 kw $300.00 $389.29 each
Commercial/ Industrial (AB 1124) Up to 10 kW Systems
Commercial/ Industrial (AB 1124) from 10.1 to 50 kW Systems each additional w $15.00 $389.29 each each additional w $5.00| $389.29 each
Commercial/ Industrial (AB 1124) Systems Greater than 50 kW Pile Foundation
up to 10 $526.68 $526.68 up to 10
Cast in place concrete, first 10 piles
each 10 $228.99 $228.99 each 10
Additional Piles (increments of 10)
up to 10 $526.68 $526.68 up to 10
Driven (steel, pre-stressed concrete) $641.18 each 10
Additional Piles (increments of 10) each 10 $641.18
Plan Check Fee
Plan Check Fee per building permit $228.99 $228.99| per hour Stand Alone Miscellaneous/MEP Plan Check Fee w/Planning Review per building permit $110.00 $228.99 per hour Stand Alone Miscellaneous/MEP Plan Check Fee w/out Planning Review per building permit $60.00 $228.99 per hour $50.00 $228.99 per hour
Stand Alone Miscellaneous/MEP Plan Check w/only Planning Review per building permit Supplemental Plan Check Fee/ Applicant Modifications- Approved Plans each 1/2 the original building permit fee $114.50 per each 1/2 hour Supplemental Plan Check Feel Applicant Modifications- Not Approved each $50.00 per page not specified not specified Residential-Attached/ Detached Addition (covered & enclosed space) per structure $220.00 $526.68 up to 300 sf per project $220.00 $354.94 up to 300 sf
Residential- Interior remodel
per project $330.00 $446.53 each
Commercial/ Industrial- Tenant Improvements/ Code Compliance Commercial/ Industrial- Addition ber structure $275.00 $389.29 each each $220.00 $332.04 each
Water/ Fire Damage
Re-Roof
each $148.84 $148.84 up to 1000 sf
Residential up to 1000 sf
up to 2,000 sf $206.09 $206.09
Multi- Family
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
WORK ITEM UNIT RECOMMENDED FEE CURRENTLY CURRENT UNIT
ADOPTED FEE
Commercial/ Industrial up to 2,000 sf $240.44 $240.44 up to 1000 sf Retaining Wall (Concrete or Masonry)- special inspector Standard up to 50 lf $412.18 $412.18 up to 50lf
Special Design, 3-10' high up to 50 If $583.93 $583.93 up to 50lf Special Design, over 10' high up to 50 If $870.17 $870.17 up to 50lf Gravity/ Crib Wall 0-10' high up to 50 lf $870.17 $870.17| up to 50lf [Gravity/ Crib Wall over 10' high up to 50 lf $984.66 $984.66 up to 50lf Roof Structure Replacement per structure $332.04 $332.04 each 100 sf Sauna/ Steam each $297.69 $297.69 each
Siding
[Stone, brick veneer or other, interior or exterior per project $354.94 $354.94 up to 400 sf Other siding per project $297.69 $297.69 up to 400 sf
Signs
Directional, first sign first $103.05| $103.05 each
Additional directional sign each $68.70 $68.70 each
Ground/ Roof projecting signs each $297.69 $297.69 each Rework of any existing ground sign each $297.69| $297.69 each Other signs/ Banners each $45.00 $68.70 each
New wall/ awning sign, non-electric each $60.00 $240.44| each New wall/ awning sign, electric each $120.00 $240.44 each Temporary Sign Permit each $45.00| not specified not specified Sign re-face no permit required n/al not specified not specified Skylight
Non-structural/ less than 10 sf each $240.44 $240.44 each Structural/ over 10sf each $354.94 $354.94| each
Stairs
First stairway first $297.69 $297.69 first flight
Additional stairway each $263.34 $263.34| per flight
Storage Racks
over 8' high per building permit $377.84 $377.84 first 100 If Additional 100 If n/a $114.50 $114,50 each 100 If
Storage Structure (Shed)
Up to 300 sf each $120.00 not specified | not specified Over 300 sf each $229.00| not specified not specified
Stucco Applications/ Drywall per project $114.50 $114.50 each 100 If
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
CURRENTLY CURRENT UNIT
WORK ITEM UNIT RECOMMENDED FEE ADOPTED FEE
Swimming pool/ Spa
Residential- Vinyl-lined each $412.18| $412.18 up to 800 sf Residential- Fiberglass each $412.18 $412.18 each
Residential- Gunite each $412.18 $755.67 up to 800 sf
Commercial Pool- Special Inspector each $1,019.01 $1,019.01 up to 800 sf Spa or hot Tub (Pre-fabricated) each $469.43 $469.43 each project $446.53 $446.53 each
Trash enclosure- Plus Plan check fee each $641.18 $915.96 not specified Window or Sliding Glass Door
New or replacement, non-structural each $140.00| $194.64 each Each additional window each $60.00 $195.64 each
New or replacement, structural (shear wall/ masonry) each $200.00| $332.04 each each $60.00
=ach additional window
each $297.69 $297.69 each
Bay Window
Mechanical Permits Fees- Stand Alone
up to 2 units $120.00 $171.74 each
A/C Unit, replacement including any duct work (no plan check) A/C Unit, new including mini-splits and any duct work (Planning plan check required up to 2 units $120.00 $171.74 each each $171.74 $171.74 each
Furnace (FAU Floor)
Heater- No Plan Check Fee required each $171.74 $171.74 each Appliance vent/ chimney (only) each $171.74 $171.74 each Refrigeration compressor- No Plan Check Fee required each $171.74 $171.74| each Boiler- No Plan Check Fee required each $171,74 $171.74 each Heat pump- No Plan Check Fee required each $171.74 $171.74 each Air handler each $171.74 $171.74 each
Duct work- No Plan Check Fee required each $171.74 $171.74 each Evaporative cooler each $171.74 $171.74 each
Make-up Air system each $171.74 $171.74 each
Moisture Exhaust Duct (dryer) each $171.74 $171.74 each each $171.74 $171.74| each
Vent fan, single-duct
Exhaust hood and duct, residential or commercial each $171.74 $171.741 each Refrigerator Condenser each $171.74 $171.74 each
Walk-in box/ refrigerator coil each $171.74 $171.74 each Other appliance or equipment not listed each $171.74 $171.74 each Plumbing/ Gas Permit Fees- Stand Alone
Gas outlet each $114.50 $114.50 each
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
CURRENTLY CURRENT UNIT
WORK ITEM UNIT RECOMMENDED FEE ADOPTED FEE
Plumbing fixture system or traps including water, drainage, piping, backflow system $114.50 $114.50 each Building sewer per line $366.36 $366.36 each
Grease trap each $114.50| $114.50 each
Backflow preventer each $114.50| $114.50 each
Roof drain- rainwater system system $114.50| $114.50 each fixture Water heater- Not subject to Plan Check Fee each $114.50 $114.50 each Water pipe repair or replacement per project $76.33 $76.33 not specified Drain-vent repair/ alterations each $76.33| $76.33 not specified Drinking Fountain each $76.33| $76.33 not specified
Solar water heater system per system $114.50 $114.50 not specified Graywater system per system $114.50 $114.50 per hour
Medical gas system- Special Inspector per system $114.50 $114.50 per outlet Electrical Permit Fees- Stand Alone
Swimming pool single- phase service each $381.65 $381.65 per 100 amps Swimming pool three-phase service each $114.50 $114.50| per 100 amps Temporary Power Pole/ Temporary Power each $76.33| $76.33 each Generator Installation each $76.33 $76.33 per kW
Electrical Inspection required by IID for power release per panel/riser $76.00 $76.00 per meter Pole or platform mounted lighting fixtures each $38.15] $38.15| not specified Residential Appliances: Fixed residential appliances or receptacle outlets for the same including wall mounted electrical ovens, cooking tops, electric ranges, food $171.74 not specified waste grinders, dishwashers.
Non-residential appliances including medical and dental devices, food, beverage, and ice cream cabinets, iluminated show cases, drinking fountains, vending $381.65 not specified machines, laundry machines, or other similar.
Residential electrical vehicle (EV) charging station per building permit $140.00 not specified not specified Commercial or industrial electrical vehicle (EV) charging station per building permit $228.99| not specified not specified Power apparatus: Antennas, motors, generators, transformers, rectifiers, up to & including 1 first $171.74 $171.74 (each)
pums, cooking or baking equiment, and other power apparatus Power apparatus: Antennas, motors, generators, transformers, rectifiers, over 1 and not over synchronous converters, capacitors, industrial heating, air conditioners, heat second to tenth $286.24 $286.24 10 (each) pums, cooking or baking equiment, and other power apparatus Power apparatus: Antennas, motors, generators, transformers, rectifiers, $381.65 over 10 and not over synchronous converters, capacitors, industrial heating, air conditioners, heat eleventh to fiftieth $381.65 50 (each) pums, cooking or baking equiment, and other power apparatus
MISCELLANEOUS BUILING PERMIT FEES
Modifications are shown in red
RECOMMENDED FEE CURRENTLY CURRENT UNIT
UNIT ADOPTED FEE
Power apparatus: Antennas, motors, generators, transformers, rectifiers, $477.07 over 50 and not over synchronous converters, capacitors, industrial heating, air conditioners, heat fifty-first to hundreth $477.07 100 (each) pums, cooking or baking equiment, and other power apparatus Power apparatus: Antennas, motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, heat over one hundred $572.48 $572.48 over 100 (each) pums, cooking or baking equiment, and other power apparatus Electrical Commercial Tenant Improvements including but not limited to all switches, circuit breakers, contactors, thermostats, relays, emergency fixtures & per project $572.48 $572.48 not specified exit signs, and other directly related control equipment.
New signs, outline lighting, or marquees supplied from one branch circuit or per project $60.00 $114.50 each additional circuits within the same sign, outline lighting or marquee Residential electrical service up to 200 amp, new or replacement per panel $229.00 $229.00| per meter Multi-family or commercial electrical service up to 1000 amp, new or replacement per panel $382.00 $382.00 per meter Medium- large scale commercial or industrial electrical service, new or $382.00 $382.00 per meter per panel
replacement
Switch gear, new or replacement each $76.33| $76.33 not specified
PLANNING APPLICATIONS
Modifications are shown in red
RECOMMENDED CURRENTLY
APPLICATION/ REQUEST FEE ADOPTED FEE
Annexation Request Review/Sphere of Influence Amendment $ 10,000.00 $ 18,021.00 Appeals to Planning Commission $ 867.00 $ 5,600.00
Appeals to City Council $ 867.00 $ 867.00
Conditional Use Permit (Major) - Commercial $ 2,500.00 $ 6,551.00 Conditional Use Permit (Minor) - Residential/Industrial $ 2,200.00 $ 3,354.00 Condominium Conversion $ 3,973.00 $ 3,973.00
Development Agreement and/ or CFD Review $ 9,500.00 $ 11,783.00 Development Review "Design Review" $ 950.00 $ 5,810.00
Environmental Clearance -EIR/MND Preparation (+10% administrative fee) $ 8,400.00 $ 47,985.00 Environmental Clearance: Staff prepared IS. & Negative Declaration $ 6,000.00 $ 8,265.00 135.00 $ 135.00
Farm Labor Recruitment
General Plan Amendment (UA) 3,600.00 $ 22,595.00
Home Occupation Permit/ Zoning Consistency $ 274.00 $ 274.00 Landscape & Irrigation Plan Review $ 770.00 $ 770.00
Landscape & Irrigation Plan Rview (> 5 acres) 3rd Party Consultant 892.00 $ 892.00 Lot Line Adjustment/Cert of Compliance (Administrative Review) $ 1,890.00 $ 1,890.00 Revised Tentative Parcel Map (Minor < 4 lots) (UA) $ 2,500.00 $ 2,500.00 Revised Tentative Subdivision Map (Major > 5 lots) (UA) $ 2,500.00 $ 5,000.00 Research Request $ 863.00 863.00
Site Plan Review (Ministerial Projects) - Preliminary Application $ 216.00 216.00 Specific Plan Amendment (UA) $ 8,600.00 22,595.00
Specific Plan Review (UA) 3,200.00 $ 11,783.00
Temporary Use Permit $ 135.00 135.00
Temporary Sign Permit $ 45.00 45.00
Tentative Parcel Map (Minor Subdivision <4 Icits) (UA) $ 2,400.00 10,274.00 Tentative Subdivision Map (Major Subdivision > 5 lots) (UA) $ 4,800.00 22,839.00 Time Extension for Development Review, CUP, etc., $ 1,500.00 3,089.00 Time Extension for TPM & TTM 1,800.00 3,089.00
Variance (Major/Minor) $ 2,500.00 9,583.00
Variance (Minor) 867.00 9,583.00
Zone Change & Pre-Zone $ 8,397.00 $ 8,397.00
Zoning Text Amendment (UA) $ 8,600.00 9,583.00
$ 863.00 $ 863.00
Zoning Verification & information/Letter
ENCROACHMENT PERMITS
RECOMMENDED CURRENTLY
ENCROACHMENT PERMIT TYPE FEE ADOPTED FEE
Utility 500.00 $ 3,366.81
Residential 500.00 $ 960.46
Commercial & Industrial $ 900.00 $ 1,627.52