Michael Assadourian has over 33 years of experience covering electrical and control systems engineering, design, construction, and project management for water and wastewater treatment plants, pump stations, emergency power generation systems, waler conveyance facilities, petrochemical plants, and refineries. He has in-depth knowledge of power distribution and LICENSE/CERTIFICATION lighting systems, both NEMA and IEC standards-based; motor controls and varlable frequency Electrical Engineer, CA #E14390 drives; coordination with power & utility companies; and SCADA and radio/microwave systems.
His work experience Includes P&ID development, electrical system condition assessment, ETAP analysis, load flow and short-circuit analysis, and protective device coordination studies. He has EDUCATION extensive experience in retrofitting existing facilities with new power and controls and resolving MS, Industrial and Systems construction-related problems. Michael has provided a wide variety of construction support Engineering & Management, services including equipment & shop drawings review, processing of Ris, resolving construction University of Southern California Issues, and electrical system commissioning and start-up. Michael's experience includes electrical system designs for several Moulton Niguel Water District projects. " BS. Electrical Engineering,
University of Southern California EXPERIENCE
Water Treatment Plant Chlorine Conversion Project, City of El Centro, CA. Project electrical and control engineer for conversion of gaseous chlorine disinfection system to 12.5% bulk liquid sodium hypochlorite disinfection system. The project included modifications of an existing chlorine ton-cylinder storage bullding Into a 12.5% sodium hypochlorite storage building. The project also Included the replacement of existing chlorinators to peristaltic chemical feed pump skids and associated electrical systems and controls, new chemical injection piping to two injection polnts (le. two clarifiers inlet pipes and a clearwell), existing building structure modifications and modifications to electrical, control and SCADA system.
2017-18 Reservo nement Systems acement, Moutton Niguel Water District. Project Electrical and Controls Engineer for conversion of onsite hypochlorite generation systems to 12.5% bulk liquid sodium hypochlorite and 19% ammonia for chloramine disinfection at three water reservoir sites in the MNWD service area, (1) 4 MG Crown Valley Reservolr, (2) 2 MG Highlands Reservolr, (3) 2.5 MG Marguerite Reservolr, (4) 4 MG Moulton Peak Reservoir, and (5) 5 MG Pacifie Park Reservor. Each disinfection facility contains new bulk sodium hypochlorite and ammonla storage and feeding systems and includes a masonry block chemical storage building with separate rooms for each chemical, ventilation and split system AC units for the chemical rooms, storage tanks, chemical pumps and piping, reservoir mixers, analyzers and dosage control, chemical leak detection systems, sample and drain piping, electrical, process morittoring and control via SCADA, shower/eyewash stations, and site utilities.
2016-17 P Niguel Water District. Project
Electrical and Controls Engineer for the conversion of onsite hypochlorite generation systems to 12.5% bulk liquid sodium hypochlorite and 19% ammonia for chloramine disinfection at three water reservoir sites in the MNWD service area. Each disinfection facility contains new bulk sodium hypochlorite and ammonia storage and feeding systems and Includes a masonry block chemical storage bullding with separate rooms for each chemical, ventilation and split system AC units for the chemical rooms, storage tanks, chemical pumps and piping, reservol mixers, analyzers and dosage control, chemical leak detection systems, sample and drain piping, electrical, process monitoring and control via SCADA, shower/eyewash stations, and site utilitles. One of the LEE+RO
MATED IHTERSIRUCEORE ENGINTERS
City of Calexico
Chlorine Conversion Project - Gaseous Chorne Feed System lo Liquid Hypoclilorite Feed System Michael Assadourian PE reservoir sites requires temporary power during construction to maintain operation of the existing Electrical and I&C Engineer disinfection facility.
Treatment Plant and Electrical System improvernents (FY2013 Southside Piant improvemenis), J. B. Latham Wastewater Trealment Plant, South Orange County Wastewater Authority.
Electrical and Controls Engineer for this $7.5 million project. The Southside Plant Improvements Project consists of four Individual components; (1) replacement of the Plant No. 2 power supply:
(2) construction of an Enhanced Primary Coagulation System (chemical feed system) for Plant No.2; (3) mechanical rehabllitation of the thirteen (13) rectangular secondary clariflers; and (4) Implementation of structural and seismic improvements.
RP-5 Flow Egoalization and Effluent Monitoring Project, Inland Empire Utilities Agency (lEUA).
Electrical Engineer for this project. RP-5 produces Title 22 recycled water with a current capacity of 10 mgd. The project is comprised of several components, Including use of recycled water to match the capacity of the Recycled Water Pump Station by Implementing an automated system that will bypass peak flows into the equalization basin, providing a new flow metering system at the Inlet of the chlorine contact basin to better control chemical usage and allow for more accurate dosing of chlorine, replacement of the sodium hypochlorite pumping system and a redesign of the existing sodium bisulfite pumps, and a shade structure to cover the sodium bisulfite pumps.
Automatic Transfer J. B. Latham Treatment Plant, South Orange County Wastewater A Dana Point. Electrical Engineer for assessment and design of ATS that did not meet the arc flash maintenance boundaries - regular ATS Inspection and testing cannot be performed without Internally accessing the ATS where 480 VAC 3 PH bus bars are extended from the main service to the metering section. Performed field Investigation and designed new ATS system equlpped with external controls and testing capabilities.
Collection System Pumping Plants Rehabilitation and Generator Replacement Project (TOS 21 CIP 7181. 7182, 7183, 7186), Bureau of Engineering, City of Los Angeles, Lead Electrical Engineer for the construction phase for the rehabilitation of four City of Los Angeles pumping plants located in Terminal Island. This $6.9 million Includes the removal and replacement of the existing pumps, suction and discharge piping and valves, VFDs, emergency generators, and ATS. All existing generators are being replaced with Tier 4 Compliant generators. During the pre-design phase of this project, performed an extensive condition assessment which also identified several other areas within each pumping plant in need of modifications, such as ventilation systems, wet well corroslon, structural defects, and NFPA electrical code violations.
Electrical Impro odition of Standby Generator, Plant No. 10 (WRP 10), Coac Water District (CVWD), Palm Desert. Electrical Engineer for addition of a 1,750 kW slandby generator; Installation of 2,000A circuit breakers in the blower building; Installation of a new Switchgear M1-B complete with new ATS; eliminate the three motor circuit breakers and motor feeder circults from M-1 to the blower building; and addition of utility feeder circuits from Switchgear M-1 to new M-1B using newly Installed condults and pull boxes to power three new 540-hp aeration blowers on utility power. The total construction cost was $2,5 million.
Hyperion Secondary Elliuent Pump Station (HSEPS) Expansion Projeci at Hyperion Treatment Plant (HTP), West Basin Municipal Water District, Carson. Electrical Design Engineer for a $14.7 million capacity expansion project (from 70 to 90 MGD). Project Includes two new 20 MGD pumps (190 feet of TH), each driven by 800 HP, 4,160V motor and FD. Work Includes extensive electrical system rellability improvements and expansion of existing electrical system inciuding addition of a new 3,000 kW emergency generator and fuel storage system. The original project envisioned to bring a second power feeder from the lADWP for rellability improvements. After in-depth analysis, a new emergency generator is selected over the secondary feeder.
LEE+ RO
WATCH BAEPASTHNCTURE CAGEATESS
Page E lee-so.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to tiquid Hypochlorite Feed System
JAMES GINGRICH, PE, SE
STRUCTURAL ENGINEER
James Gingrich is a Callfornia registered structural engineer with more than 37 years of structural analysis, engineering, design, constructability analysis, value engineering, project coordination and construction management experience. He has been the structural project manager, QA/QC revlewer, and lead structural engineer for planning, investigation and condition assessment.
LICENSE CERTIFICATION preparation of preliminary & final design, seismic analysis and upgrading, and construction phase Civil Engineer, CA #C34701, engineering services for a wide variety of concrete and steel structures for water conveyance and Structural Engineer, CA #53023 pumping facilities, water storage, treatment and distribution facility projects for Metropolitan Water District (MWD) of Southern Californla. His experlence and expertise include rehabilitation & retrofit engineering & designs for existing facilities. His representative experience includes lead designer EDUCATION for the Lake Matthew Outlet Facilties, Colorado River Aqueduct Pumping Plant Seismic Upgrades, BS, Civil Engineering, and Oxidation Retrofit (Ozone Disinfection) Projects for MWD's Mllis, Jensen, Weymouth, Skinner, California State and Diemer Water Treatment Plants.
Polytechnic University,
Pomona EXPERIENCE
Graduate courses in 2017-18 Reservoir Management Systems Replacement. Moulton Niguel Water District. Lead Structural Dynamics & structural engineer for conversion of onsite hypochlorite generation systems to 12.5% bull liquid Advanced Structural Analysis, sodlum hypochlorite and 19% ammonia for chloramine disinfection at three water reservoir sites in Cal State University, Los Angeles the MNWD service area, (1) 4 MG Crown Valley Reservoir, (2) 2 MG Highlands Reservolr, (3) 2.5 MG Marguerite Reservoir, (4) 4 MG Moulton Peak Reservoir, and (5) 5 MG Pacific Park Reservoir. Each disinfection facility contains new bulk sodium hypochlorite and ammonia storage and feeding systems and includes a masonry block chemical storage bullding with separate rooms for each chemical, ventilation and split system AC units for the chemical rooms, storage tanks, chemical pumps and piping, reservoir mixers, analyzers and dosage control, chemical leak detection systems, sample and drain piping, electrical, process montoring and control via SCADA, shower/ eyewash stations, and site utilities.
Oxidation Retrofit Projects (ORPs) at Five Water Treatment Plants, Metropolitan Water District of Southern California. Lead structural engineer responsible for structural analysis and preparation of structural drawings & specifications and construction phase engineering for the $850 million ORP projects at 520 mgd Weymouth, 750 mgd Jensen, 220 mgd Mills, 630 mgd Skinner, and 300 mgd capacity Diemer Water Treatment Plant. Also, served as lead OA/QC structural engineer • for structural designs produced by outside consultents during preilminary design and provided Structural QA/AC reviews for final design.
Piano, Trabuco Ridge, and Las Flores Reservoir Chloramine Boosting System, Santa Margarita Water District (SMWD), CA. Structural Engineer for implementing permanent reservoir chloramine boosting (RCB) systems at three of Its reservoir sites - Plano, Trabuco Ridge, and Las Flores - to ensure consistent domestic water quality. Previously, temporary trailer-based systems were used at Plano and Trabuco Ridge, but these are now being replaced with permanent installations, while Las Flores is recelving a new system. Each site features different tank configurations, including steel and partially buried concrete tanks. LEE + RO provided comprehensive design services for the project, which include constructing CMU bulldings to house the RCB systems, Installing chem- ical storage tanks, feed pumps, analyzers, control panels, and electrical and safely systems. The design also incorporates double containment piping with leak detection, submersible mixers, and site-specific enhancements such as a retaining wall at Plano, a booster pump at Trabuco Ridge, and a sample water recirculation system at Las Flores. These upgrades alm to provide fully func- tonal, safe, and efficient RCB systems tallored to each site's unique requirements.
Retune Page 7 lee-to.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to tiquid Hypochionte Feed Systen JAMES GINGRICH PE SE Talega Zone 1 and Estado Reservoir Managenient Systems Installation, Santa Margarita Water Structural Engineer District, CA. Structural Engineer provided engineering and design services for the conversion of on-site hypochlorite generation syslems and liquid ammonia systems to bulk liquid sodium hypo- chlorite and ammonia chloramine disinfection systems at two (2) different water reservoir sites in the SMWD service area: (1) 6 MG Talega Zone 1 Reservoir, and (2) 1.3 MS Estado Reservoir. SMWD performed extensive pllot testing of disinfection systems and decided to change to 12.5% sodium hypochlorite and 38% ammonlum sulfate. Engineering services provided by LEE + RO include de- signs for construction of new bulk sodium hypochlorife and ammonium sulfate systems, including all equipment, double-walled chemical storage tanks, pumps, analyzers and controllers, connect- ed piping, valves, electrical and Instrumentation. The Estado Reservoir facility is not equipped with an RMS bullding and a new RMS bullding will be constructed. Both reservoir sites will require a sodium hypochlorte tank farm including double-wail storage tank, canopy structure, chemical fili station, etc. The design Includes all components necessary for complete and operational reservoir management systems. The existing Tank Shark mixer at the Estado Reservoir will be replaced with a new PAX mixer.
Filter Building and Filter Complex Seismic Upgrades, Weymouth Water Treatment Plant, Metropolitan Water District of Southern California. Lead structural engineer for preliminary and final design of a large seismic upgrade project for the filter bulldings and filter complex at the 520 mgd capacity Weymouth Water Treatment Plant in the City of La Verne. In 2016 recelved the American Concrete Institute Excellence in Concrete Construction Awards (First Piace Award in Repair and Restoration Category at Southern Callfornia Chapter and Second Place at the National Convention)
Phase 4 Plant Expansion, Skinner Water Treatment Plant, Metropolitan Water District of Southern California. Served as lead structural engineer responsible for the preparation of Module 7 structural construction drawings, calculations and specifications. The phase 4 plant expansion project included addition of 110 mgd Module No. 7 (clariflers and filters), a 34 mgd capacity Washwater Reclamation Plant No. 3, new and consolidated chemical tank farms and feed systems, sludge handling facilities expansion, new water pumping stations; and related work. take Mathews Outlet Facilities Metropolitan Water District of-Southern Califomla. Lead structural engineer responsibie for the preparation of structural construction drawings, calculations and specifications. Performed the finite element dynamic structural analysis of the new outlet tower structure.
Development of Structural Destan Manual Structural Engineering Guidelines, Water District of Southern Califomia. Lead efforts for the development, preparation and maintenance of Metropolitan's Structural Design Manual, standard structural detalls, master structural specifications, and standards such as the structural portions of the standard Preliminary Design Report, and submittal review procedures.
Lake Peris Dam and Outlet Facilities, Department of Water Resources (DWR), State of California Participated on the value engineering team evaluating proposed remediation measures and developed alternative. options for the seismic rehabilitation of the Lake Penis dam and outlet tower.
Seismic Retrofit of Colorado River Aqueduct (CRA) Pumping Plant Buildings, Metropolitan Water District of Southern California. Served as project manager and lead structural engineer for the seismic retrofit of the pump house buildings at the Hinds, Eagle Mt, Iron Mt, Gene and Intake pumping plants. Developed seismic retrofit concepts, and prepared construction drawings Including calculations and specifications for construction and Metropolitan forces work. • Selmic Retrofit of Colorado River Aqueduct (CRA) Discharge Pipelines, Metropolitan Water District of Southern California. Served as project manager and lead structural engineer for the seismic retrofit of the delivery pipelines (penslocks) at the Hinds, Eagle Mi, Iron Mt, Gene and intake pumping plants. Developed retrofit concepts and prepared construction drawings, calculations and specifications for construction and Metropolitan forces work. Performed the finite element dynamic structural analysis of the pipelines.
LEE+RO
MATES INFRLSTSUTEORE ECINEERS
Rosina Page 8 lee-ro.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to Liquid Hypochlorite Feed System
RAMESH BACHUVALA, EIT
SITE CIVIL / UTILITY RESEARCH
Ramesh Bachuvala has over 24 years of experience in planning, design, and construction of municipal water and wastewater infrastructure, Including water mains, booster pump stations, flow controi facilities, storm drains, sewers, force mains, lift stations, and related grading and other site preparation work. He served as a project engineer, senior civil designer and oversees the work of CAD designers in the preparation of construction plans. Ramesh has extensive experience LICENSE/CERTIFICATION in preparing design plans for pipeline construction and street Improvements within the public Engineer-In-Training #143515 right-of-way. Areas of his expertise include utility search and coordination with utility companles; hydraullc and hydrology analysis; pipeline plan and proflies, WOMP/SWPPP reports; traffic control design; and ROW and easement analysis and coordination.
EDUCATION
MS, Geographical Info. Systems, EXPERIENCE
FH-University of Karisruhe Germany 2017-18 Reservoir Management Systems Replacement, Moulton Niguel Water District. Civil Engineer for conversion of onsite hypochlorite generation systems to 12.5% bulk liquid sodium BS, Civil Engineering, hypochlorite and 19% ammonia for chloramine disinfection at three water reservoir sites in the Osmania University.
MNWD service area, (1) 4 MG Crown Valley Reservoir, (2) 2 MG Highlands Reservoir, (3) 2,5 MG India
Marguerite Reservoir, (4) 4 MG Moulton Peak Reservoir, and (5) 5 MG Pacific Park Reservoir. Each disinfection facility contalns new bulk sodium hypochlorite and ammonia storage and feeding systems and includes a masonry block chemical storage bullding with separate rooms for each chemical, ventilation and split system AC units for the chemical rooms, storage lanks, chemical pumps and piping, reservoir mixers, analyzers and dosage control, chemical leak detection systems, sample and drain piping, electrical, process monitoring and control via SCADA, shower/ eyewash stations, and site utilities. Site modifications for the Highlands and Marguerite chemical building include grading of the slope, protection of existing tree, modification of chain link fence, and a retaining wall.
District 2 Water Main Replacement Project, City of Pomona, CA. Civil Engineer for preparation of construction drawings and traffic control plans for the replacement of 16,000 LF of existing water mains of various sizes with 8-inch ductile iron pipe in the streets of downtown Pomona. Project design consisted of replacement of existing water lines, connection to and relocation of existing meters, replacement of fire hydrants, connections to existing water system at street intersections, and pavement repair/upgrade. Duties also included coordination with surveyor for preparation of base map, utility verification and potholing, utility company coordination and review.
Stagecoach Park Reclaimed Water Line, City of Corona. Senior Civil Engineer - Designer for - preparation of construction and traffic control plans for a 12-inch dia. reclaimed waterline, 7,500 feet long. The alignment extended from the Intersection of Bluff Street and River Road In Norco, southeast along River Road to Corydon Street, then southwest along Corydon Street to Stagecoach Road. The pipeline was constructed utilizing standard cut and cover construction. Additionally, there were tie-over connection from the City's existing potable water system to the new reclaimed water pipeline at Stagecoach Park. Coordinated with the surveyor for preparation of the base map, outside agencies for utility verification, and potholing.
Access Road Improvements for San Diego Gas and Electric (SOG&E), CA. As a Civil Designer, Ramesh's responsibilities included grading designs for access roads and earthen pads for each of 273 high voltage electrical towers for SDG&E. The designs required balancing cut and fili quantities due to steep terrain of some sections of the project and helicopter pads where an access point was not a practical approach.
LEE+RO
MATE INTEASTOUCTURY FUCINEERS
Resum Page 9 lee-ro.comt
City of Calexico
Chlorine Conversion Project - Gaseous Chorine Feed System to Liquid Hypochlorite Feed Systern RAMESH BACUVALA. EIT Glen Ivy Pipeline Relocation Project, City of Corona. Project Civil Engineer for relocation design Site Civil/ Utility Research of two segments of existing 18-inch Glen Ivy Pipeline to accommodate widening of Temescal Canyon Road for Riverside County. His duties included preparation of construction drawings and traffic control plans.
Districi 1 and 5 Water Main Replacement Projeci, Cily of Pomona. Project Civil Engineer for the preparation of construction drawings and traffic control plans for replacement of 5,500 LF of existing ductile iron water mains of sizes belween 6- to 10-Inch dia. in Gordon Street and Bonita Avenue. Project consisted of replacement and abandonment of existing water mains, connection to existing water meters, replacement of fire hydrant assemblies, connections to existing water mains at several street intersections, new waterline crossing over the Thomson Creek Channel, and pavement repair/repaving.
Brookhtiest Street/Parilamen nue Sewer Improvements, Garden Grove Sanitary District, Garden Grove. Civil Engineer for the preparation of construction drawings and traffic control plans for 6,500 LF of 12 to 18 inch replacement sewer on Brookhurst Street and Parliament Avenue. The project also Included a double barrel inverted siphon which required Jacking and boring under the existing Anaheim. Barber City Channel. Other project components included surveying for preparation of the base map and geotechnical investigations for preparation of the geotechnical report.
Edwards Varsity Water Main Replacement Projeci, City of Huntington Beach. Project Engineer for engineering, design and construction support services for replacement of approximately 3,150 LF of potable water pipelines, service laterals, and appurtenances. The project is in the residential community immediately northwest of the intersection of Edwards and Varsity Streets. The project Is to replace 8-in. and 6-In. asbestos cement pipe (ACP) with AWWA C9D0 PVC pipe. Construction documents prepared fully described the best management practices (BMPs). Project issues Included removal and disposal to AC pipe, community outreach and public relations, traffic control during construction and minimizing water service disruption.
Oktrid 4 Phase 1) Waler Replacement Project, City of Pomona. Civil Engineer for the preparation of construction drawings and traffic control plans for the replacement of 10,500 LF of 4-and 6-Inch water main with 8-inch ductile Iron pipe on several residential areas within the City of Pomona. Project design consisted of replacement and abandonment of existing water lines, connection to existing water meters, replacement of fire hydrant assemblies, connections to existing water system at several street Intersections, and pavement repair/upgrade.
Distret 1 and 2 W ement Project, City of Pomona. Civil Engineer for the preparation of construction drawings and traffic control plans for replacement of 7,500 LF of existing 6-Inch water main with 8-inch ductile iron pipe on White Avenue, Project design consisted of replacement and abandonment of existing water lines, connection to existing water meters, replacement of fire hydrant assemblies, connections to existing water system at several street Intersections, and pavement repalr/upgrade.
Rehabilitation of Well 22/Boosler Pumping Facility. Cily of Garden Grove. Clvil Engineer for preparation of Preliminary Design Report which Included proposed replacement engines, pump hydraulic testing, sizing of replacement pumps, sizing of new alr conditioning unit, and miscellaneous improvements.
Mead Valley Elementary Lifi Station, Val Verde Unified School District. Perfs. Civil Engineer for preparation of plans for the lift station which included two submersible pumps, associated piping, valves, flow meter, electrical and control equipment. Design components included a 10- foot diameter wet well, prepackaged ozone odor control system, and emergency generator set.
Design was revlewed by Western Municipal Water District for conformance to their lift station design standards and guidelines.
LEE+RO : :
WASTE INTERSTRUTHOSE ENGINEES
Risener Page 10 lee-po.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to Liquid Hypochlorite Feed System JOHN T. YOUNG,PE
TECHNICAL ADVISOR & QA/QC
John Young has 40 years of mechanical design experience, In the Last twenty-five years John worked with Metropolitan Water District of Southern Callfornia (MWD).Project Design Manager for varlous CIP projects Including Water Treatment Plant Oxidation Retrofit Projects, Solids Handling and Water Reclamation, and Improvements projects, domestic water system improvements LICENSE/CERTIFICATION projects, and large size valves (silde gates, roller gates, fixed cone valves) replacement projects.
Mechanical Engineer CA, # MO26419
EXPERIENCE
EDUCATION
BS, Mechanical Engineering, Sodium Hypochlorite Storage and Feed Systems for the Copper Basin Reservoir and Lake University of California At Los Mathews' Reservoir and Forebay, Metropolitan Water District of Southern California. Design Angeles Manager and mechanical engineer for the sodium hypochlorite storage and feed systems for the MWD Copper Basin Reservoir and Lake Mathews' Reservoir and Forebay.
Copper Basin and Gene Wash Dam Discharge Valve Replacement Project, Metropolitan Water District of Souther California. Design Manager and lead mechanical engineer for the MWD Copper Basin and Gene Wash Dam Discharge Valve (42" dia. and 54" dia. fixed cone valves) Replacement Project. The valves exceeded their service life and were leaking due to wor seals and bolts.
The valves were replaced with modern designed fixed cone valves. As the project manager, John led the design team (consisting of civil, structural, mechanical, electrical, geotechnical, hydraulics and controls engineers) in collaboration with Plant Operation in addressing the operational, construction and scheduling issues. In the development of the feasibility study, preliminary design report, and final design, regulatory agencles such as Callfornla Division of Safety of Dam, Cal OSHA and Cal EPA were conferred for requirements and decisions. The key project issues were how to transport the valves to the dams (long narrow steep roads with loose footing) and position the valves at the outlets without damaging the dam walls (design of floating platforms for cranes, valves and diving equipment under the worst wind condition), how to replace the valves without draining the dams (deep dive (over 100 feet) requirements) and how to test the valves (releasing approximately 6,000 cfs) without damaging the surrounding infrastructure, habitat, and waterways to the Colorado River.
Diemer and Weymouth Chlorine Containment Projects Water Districi of Southern Califomnia. Provided technical supervision for the Diemer and Weymouth Chlorine Contalment Projects.
Jensen Oxidation Retrofit Project, Metropolitan Water District of Southern California. Design Manager for the Jensen Oxidation Retrofit Project.
Sodium Hypochlorite Storage and Feed Systems for the Copper Basin Reservoir and Lake Mathews Reservoir and Forebay, Metropolitan Water District of Southern California. Design Manager and mechanical engineer for the sodium hypochlorite storage and feed systems for the MWD Copper Basin Reservoir and Lake Mathews' Reservoir and Forebay.
San Diego Canal Radial Gates Replacement, Metropolitan Water District of Southein California.
Design manager and lead mechanical Engineer provided engineering design services for the replacement of two radial gates along the San Diego Canal. The new radlal gate systems, Including - radial gates, actuators, controls, electrical panels, and temporary or permanent roadway and civil facilities, needed to complete the work without unplanned impacts to the operations. The new gate systems consisted of stainless-steel gates, new actuators, trunnion, seal plates, instrumentation, and electrical panels. In additjon, the site of gate VO-8 required improvements to the road leading to the laydown area.
Remo Page 11 leo-ro.com
City of Calexico
Chlorine Conversion Projecl - Goseous Chlorine Feed System to Liquid Hypocharte Feed System JOHN T YOUNG PE Wastewater Treatment Plant Upgrades and Expansion, Public Works and Utilities, City of Colton.
Technical Advisor & OA/OC Technical Revlewer for HVAC system design of the treatment plant. LEE + RO Is currently providing the engineering services for the design of Colton WWTP Upgrades and Expansion and will also provide construction phase engineering services for the $50M WWTP upgrades and expansion project. Major process improvements Include: influent pump station, influent sewer realignment, six new slide gates for the headworks and three for the grit chamber, two new oxidation ditches and secondary clarifiers, WAS/ RAS/Scum pump station, DAF unit, rotary drum thickener, polymer feed system, sludge circulation pumps, spiral heat exchanger with gas boiler, plantwide MCC replacement, SCADA system, yard piping, and an anaerobic digester with mixing system, digester gas cleaners, spiral heat exchanger, hot water pumps, and sludge recirculation system with a natural gas boiler and flare. The project is at the 90% design stage.
Metropolitan Wa trict of Soulhern California Design Manager and mechanical engineer for the preliminary design reports for the Mills and Jensen finished water reservoir cover and liner replacement project. The reports studles the following area of concern:
• Enhancing mixing in the reservoirs
Analyzed the type of material for the cover and liner
Improving the existing rainwater removal system
Improving the underdrain systems
• Updating the leakage detection/monitoring system
Mills Water Treatment Piant Electrical System Improvement : Stage 1 Project, Metropolitan Water District of Souther California. Mechanical Engineer for the Mills plant electrical system rellability Improvement project. This project Increased the rellability of the Mills plant electrical had to bring generators) on the line, or the plant would experience a total black out. This project provided a second source of utility power and upgraded the whole plant power system to a dual source redundant system.
Mills Water Treatment Electrical Improvements Stage 2, Metropolitan Water District of Souther California Mechanical Engineer for the Stage 2 Mills Water Trealment Plant Electrical Improvements Project. This project includes two components, Stage 1 and Stage 2. Stage 1 comprised of 480 Volt Upgrades that included 480 V equipment replacement with ATS switches for the critical facilities.
Stage 2 is comprised of 4 kV Upgrades that Include replacement of equipment and providing dual feeders. The Stage 1 component construction is nearing completion. The Stage 2 component Is the next to be Implemented and Includes the following elements and will be reviewed and Incorporated in the repackaged documents. All the 4.16kV breakers require separate lockout relay (86), amber Indicating light, and 3 separate test switches. Remote control panei for breakers will add the amber lights for all the breaker and will include the surface mounted RTAC. Revisions to all one-line diagrams, front elevations, arrangements, and schematics for items 1 and 2. Add generator control switchgear specification. Add transfer flow charts and breaker operation scenarios for all 416kV breakers for normal and emergency switchgears. This is approximately 26 sheets.
Revise generator control panels to control the generators, emergency switchgears, and normal switchgears for multiple generators, dual emergency feeds to normal switchgears, dual utility feeds, emergency transfer, and remote breaker control capability. Check the manhole locations Oust completed) next to the switchgear bullding to verify the bullding expansion design. Building may need redesign or the relocation manhole. Incorporate the MWD Design Support drawings requirement for Phase 1 as-bullt drawings and Phase 2 repackage drawings. Revise Spec. Section 01100 to expand the shutdown sequence to add the above items and request contractor to survey existing equipment for all connections prior to any work.
LEE+RO
WATER INERASTEUCGUET ERSENTERS
Recum Page 12 loe-ro.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to Liquld Hypochlorite Feed Systeni
CHARLES RO, PE
PRINCIPAL-IN-CHARGE
Charles Ro has 24 years of highly diversifled water and wastewater facility design and construction management experience. He has served as Principal-in-Charge, project manager, project engineer, construction manager and construction Inspector for treatment plants, pump stations, storage reservoirs, and water mains and sewer projects. Charles has meaningful design experience with LICENSE CERTIFICATION anaerobic digestion, gas handling, soilds dewatering, pump stations, and odor control facilities.
Civil Engineer, CA #C80535 •Charles also has construction management and inspection experience with freatment plants, sewers and recycled water pipeline projects. Charles' field experience working on a variely of water and wastewater infrastructure projects lends a broad perspective on design and construction EDUCATION projects. Charles also serves as Principal-in-Charge of many LEE + RO projects.
BS, Civil Engineering.
California State University. EXPERIENCE
Los Angeles
Reservoir Management System at Zilnik Reservoir Project W.O 2484, Laguna Beach County Water District, CA. Principal-in-Charge provided engineering services include designs for AWARDS/MERITS demolition of the existing disinfection system, as well as designs for construction of new 12.5% Newhope - Placentia Trunk Sewer buik sodium hypochlorite and 19% ammonia systems, including all equipment, connected piping Replacement. Phase A. Orange foundations, containment and separation of chemicals, masonry block bullding, electrical, County Sanitation District: APWA Instrumentation, HVAC and safety shower/eyewash stations (SS/EW). The design will include Project of the Year 2019 all components necessary for complete and operational reservoir management systems. Site modifications and Improvements will include the relocation of existing utilities in conflict, grading, Chemical System Plant No. 2, Orange Couty Sanitation District, CA. Principal- In-Charge for the Sodlum Bisulfite Staton and Antonic Polymer Station rehabilitation at Orange County Sanitation District's Plant No.2. For the Sodium Bisulfite Staton (SBS), design services were to rehabilitate the existing SBS with new equipment that Is sized for the demand and can provide chemical dosing to multiple use points for increased operational flexibility. Improvements include new chemical feed pumps, storage tanks, new piping and heat tracing for chemical piping, instrumentation and controls, as well as structural rehabilitation for concrete repairs. For the Anionic Polymer Station (APS), design services were to rehabilitate the existing APS with new electrical and Instrumentation equlpment upgrades to ensure a consistent quallty of coagulant for Plant No, 2's chemically enhanced primary treatment (CEPT). Improvements for the APS consist of Installation of new pneumatically actuated valves for the antonic polymer batching system, new control motor starter panels, and a new RIO cabinet.
al Beach Pumoing Station ment, Orange County Sanitation District, CA. Principal-In- Charge forthis new $97 million, 34 MGD capacity pump station. The new pump station will be located on the same sile as the existing 50-year-old pump station. The site layout is tightly constrained by the Naval Weapons Station Seal Beach and large arterial roads, and the existing pump station must reman operational throughout construction. The team provided preliminary design and final design services that Included, demolition, civil, mechanical, structural, architectural, HVAC, electrical, instrumentation & control system design, site Improvements, underground vaults, a new gravity collection sewer, and force main segments, odor control, facilties for drainage, paving, landscaping and Irrigation, perimeter walls and security, and other utilities. In addition, temporary facilities are required to maintaln operation of the existing pump station during construction. The project is currently in construction.
Wastewater Treat i Plant (WWITP) Upgrading and Expan ion. Department of Public Works, City of Calexico, CA. Principak-in-Charge for the upgrading of the City of Calexico's WWTP by Increasing the capacity to treat current and future flow demands, as well as meet any potential Resume - Page 13 lee-ro.com
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Food System to Liquid Hypochlorite Feed Systent CHARLES ROPE regulatory requirements, specifically regarding ammonia concentrations in the effluent. The Principal-In-Charge existing liquid treatment capacitles are 2.5 MGD for Plant 1 and 1.8 MD for Plant 2. The upgraded WWTP will be capable of treating an average dry weather flow of 5.8 MGD and peak wet weather flow of 11.6 MGD, Additionally, the upgraded WWTP will be capable of producing an effluent with low ammonla concentration (less than 5 mg/L) In compliance with future potential regulatory requirements. The upgrades to the WWT consist of a new packaged septage recelving station, improvements to the existing headworks, a new influent metering structure, a new vortex grit removal system, a new influent pump station, three new aeration basins and appurtenances, new aeration blowers and blower building, Iwo new secondary clarifiers, new RAS, WAS, and Scum Pump Stations, replacement of the existing Calgon UV System with a Trojan UV 4000 System, a new rotary drum sludge thickener facility, conversion of an existing primary clarifier to plant water storage and distribution system, and a new water distribution system and hydrants, a new plant stormwater drainage system, a new electrical buildings and electrical power distribution systems, a new PL/SCADA system, new piping for conveyance of wastewater, mixed liquor, secondary effluent, sludges and utility water, and miscellaneous site improvements including paved roads for access to main process units.
Wastewater Trealment Plant Upgrading and Expansion, Department of Public Works, Cily of Colion, CA. Principal-in-Charge for the upgrade and expansion of the City of Colton's wastewater treatment plant (WWTP). The City of Colton (City) owns and operates the WWTP under a NDES Permit Issued by the California Reglonal Water Quality Control Board (RV/QCB). The permitted plant capacity is 10.4 mllion gallons per day (MGD). Services include preparing a revised water balance, technical engineering support for the preparation of an EIR for a treatment facility expansion, development of a Joint Powers Authority to manage wastewater effluent disposal, and preparation of an updated Wastewater Master Plan focusing on future water reclamation as well as treatment needs to meet current growth within the City service area. Axel assisted in control schematics, condult run layout, pull box design, grounding system, scum pump and secondary clarifier system.
Wells V206/V207 and Saugus Wells S3 & S4 Groundwater PFAS Treatment Project, Santa Clarita Valley Whier Agency, CA. Principal-in-Charge for the design of prefiltration units and IX PFAS groundwater treatment systems, including system disinfection. To facilitate the transfer of water from the V206 / V207 wells to the designated treatment facility, a 3,100 LF 20-inch product water transmission pipeline is required. To support the conveyance of water from V206 / V207 and maihtain sufficient pressure through the distribution system, upgrades will be made to the electrical systems, wellhead pumps and wells V206 / V207 piping. To supplement these enhancements, a comprehensive hydraulic analysis will be conducted.
Reclamation Plant 1 (RP-I) Digester Gas Flare ement Project, Inland Empire Ulilities Agency. Chino, CA. Project Manager engineering & design of three new waste gas flares for the disposal of blogas generated by a 60 mgd treatment plant. RP-1 has seven digesters are operated as phased thermophilic digestion. Multi-stage digestion produces acid and methane phase gases. Low quallty acid phase gas is flared at all times. This $7 million project is to replace aging candlestick flares with three new clean enclosed burners. The new flares will combust up to the full flow of blogas (eg. 1,000 cfm). The digester gas handling system and flares will be designed to meet the latest SCAQMD emission limits of NOx, CO, and PM10. Visited other POTW flares, revlewed avallable flares for SCAQMD compliance, and other flare design considerations including gas dryers.
Mills Water Treatment Plant, Chemical Systems Upgrades, Modules 1 & 2 Rehabitation and Single Point Injection Facility Upgrades, Metropolitan Water District of Southern California, Riverside, CA. Project Engineer for preliminary design and final design for chemical systems upgrade project, Modules 1& 2 rehabilitation project and the single point injection project to enable the Mills plant to operate at 326 mgd capacity. The chemical systems Include new feed pumps and feed pump controls and control valves for injection of chemicals ahead of the modules or fliters.
Modules 1 & 2 were Inactive for number of years and required complete new instrumentation and controls. The single point injection would enhance operational flexibllty and reduce O&M costs.
DIR Registration Appendix B
APPENDIX B
Proof of DIR
Registration
LEE+RO
WATER INFRASTRUCTORE ENGINEERS
City of Calexico
Chlorine Conversion Project - Gaseous Chlorine Feed System to Liquid Hypochlorite Feed System Appendix B. Proof of DIR Registration
1000015613 LEE & RO. INC.
Customer Account Lookup
PWCR Legal Entity Name
1000015613 LEE & RO. INC.
Contractor Status Doing Business As (DBA)
DIR Approved LEE + RO, INC.
CSLB Business Structure
- None -
BusIness Phone President
6269123391 Charles Ro
Ext Email
[email protected]
Registration Start Date Registration End Date
2025-07-01 2026-06-30
Crafts
•General Engineering
Address
Malling Address Physical Address
1199S FULLERTON ROAD
Mailing Address - City Physical Address - City
CITY OF INDUSTRY
Malling Address - State Physical Address - State
CA
Malling Address • Zip = Registration Dates
91748 Contractor Registration Start Date Registration End Date A Registration Status 1000015613-LEE&ROINC 2015-03-17 2015-06-30 Expired
Malling Address: Country
1000015613:LEE.&RO.INC 2015-08-04 2016-06-30 Expired
United States
3000015613:LEE6.RO.INC. 2016-07-14 2017-06-30 Expired
1000015613- LEE&RO.INC. 2017-05.18 2018-06-30 Explred
2000015613-LEE&RO.INC. 2018-06-18 2019-06-30 Expired
1000015613-LEEARO.INC 2019-07-30 2020-06-30 Explred
1000015413-LEE GRO,INC. 2020-07-02 2021•06-30 Expired
1000015613- LEE & RO. INC 2021-07-19 2022-06-30 Expired 1000015613-LEE&RO. INC. 2022-07-19 2023-06-30 Expired
100001561A: LEE & ROINC 2023-07-05 2024-06-30 Expired
1000015613-TEE& RO INCI 2024-07-02 2025-08-30 Explred
5000015613-LEE & RO, INC. 2025-07-01 2026-06-30 Active
leo-10.com
ATTACHMENT 3
SCORING SHEETS AND SCORING MATRIX.
SAMPLE OF PROPOSAL EVALUATION FORM
Firm: ARDURRA GOOP, INC.
Evaluator: JESUS VILLEGAS PRIMBERT
Date: 2021/05/11
1 Technical Approach (35 Points) Points Awarded 30
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded 24
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded 3
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points) 21
Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points) 4
Total Score 82
Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: LEE TRO, INC.
Evaluator: JESUS VIVEGAS PEIMBENT
Date: 2026/05/11
1 Technical Approach (35 Points) Points Awarded 33
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded 25
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded 5
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points) 23
Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points) 4
Total Score 90
Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: Ardurra Inc.
Evaluator: Jose L Saldana I Su 1 La
Date: May 12, 2026
1 Technical Approach (35 Points) Points Awarded
30 Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded
3 Familiarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points)
19 Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points)
4 Total Score
77 Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: • Lee & Ro Inc
Evaluator: Jose L Saldana
Date: May 12, 2026
1 Technical Approach (35 Points) Points Awarded
33 Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded
26 Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded
5 Famillarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points)
22 Overall quality of proposal, including qualifications and Points Awarded thoroughness (5 Points)
5 Total Score
Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: ARDURRA
Evaluator: Jose AlvARAdo
Date: 5-12-20
1 Technical Approach (35 Points) Points Awarded
3|
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded 25
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
Reference (5 Points) Points Awarded 3
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points) 23
Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points)
4 Total Score
- 84
Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: LEE+ RO INC.
Evaluator: JosE AlVARAdO
Date: 5-12-26
1 Technical Approach (35 Points) Points Awarded
35 Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded 28
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
Reference (5 Points) Points Awarded 3
Familiarity and/or specific experience with local, state Points Awarded and federal project procedures, environmental and
4 permitting (25 Points)
27 Overall quality of proposal, including qualifications and Points Awarded 5 thoroughness (5 Points)
4 Total Score
94 Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: Ardurra, Inc.
Fernando Lamar Williams Fernando Williams
Evaluator:
Date: 05/12/2026
1 Technical Approach (35 Points) Points Awarded 28
Responsiveness & understanding of work to be done, (i.e. cope of work). Specific experience with similar
ngineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded 3
Familiarity and/or specific experience with local, state Points Awarded 22 and federal project procedures, environmental and
permitting (25 Points)
Overall quality of proposal, including qualifications and Points Awarded 4 5 thoroughness (5 Points)
Total Score 81
Comments:
11 SAMPLE OF PROPOSAL EVALUATION FORM
Firm: LEE + RO, Inc.
Fernando Lamar Williams Fernando Williams
Evaluator:
Date: 05/12/2026
Technical Approach (35 Points) Points Awarded 32
Responsiveness & understanding of work to be done, (i.e. scope of work). Specific experience with similar
engineering design for chlorine conversion projects
2 Project Management (30 Points) Points Awarded 24
Capacity to perform the scope of work and the ability to conclude in a timely manner. Quality of staff based on
recent experience
3 Reference (5 Points) Points Awarded 5
Familiarity and/or specific experience with local, state Points Awarded 23 and federal project procedures, environmental and
4 permitting (25 Points)
Overall quality of proposal, including qualifications and Points Awarded 4 5 thoroughness (5 Points)
Total Score 88
Comments:
11 CALEXICO California
WHERE CALIFORNIA AND MEXICO MEET
Proposal Evaluation Summary
RFP 2026-300 - Engineering Design Services Chlorine Conversion Project Scoring Matrix
Reviewers
Public Works Water System Water Treatment
Item Company Director Plant Lead Associate Civil Engineer Total scoring Supervisor
Jesus Villegas Jose Saldaña Operator Fernando Williams
Peimbert Jose Alvarado
A Ardurra, Inc. 82 77 86 81 326
B Lee + Ro, Inc. 90 91 94 88 363
Interviewer Scoring 172 180
168 169
Summary=
SHEET 1 OF 1