AGENDA
ITEM
12 AGENDA
CALEXICO California ITEM
WHERE CALITORNIA AND MEXICO MEET
12 CITY COUNCIL
AGENDA STAFF REPORT
DATE: June 3, 2026
TO: Mayor and City Council
APPROVED BY: Benjamin A. Martinez, City Manager
REVIEWED BY: Karta Chaparro, Finance Director Je
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer SUBJECT: Adopt a Resolution of the City Council of the City of Calexico Adopting a List of Projects for Fiscal Year 2026-2027 Funded by SB 1: The Road Repair and Accountability Act of 2017.
Recommendation:
Adopt a Resolution of the City Council of the City of Calexico Adopting a List of Projects for Fiscal Year 2026-2027 Funded by SB 1: The Road Repair and Accountability Act of 2017.
Background:
On April 28, 2017 the Governor signed Senate Bill (SB) 1 (Beall, Chapter 5, Statutes of 2017), which is known as the Road Repair and Accountability Act of 2017. To address basic road maintenance, rehabilitation and critical safety needs on both the state highway and local streets and road system, SB 1: increases per gallon fuel excise taxes; increases diesel fuel sales taxes and vehicle registration fees; and provides for inflationary adjustments to tax rates in future years.
Effective November 1, 2017, the State Controller (Controller) deposits various portions of this new funding into the newly created Road Maintenance and Rehabilitation Account (RMRA). A percentage of this new RMRA funding will be apportioned by formula to eligible cities and counties pursuant to Streets and Highways Code (SHC) Section 2032(h) for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system.
Discussion & Analysis:
In order to meet one (1) of the requirements of RMRA annual reporting which is due July 1, 2026, City staff recommends that the City Council of the City of Calexico adopt the attached resolution for tunding under RMRA for Fiscal Year 2026-2027.
The Fiscal Year 2026-2027 list of projects planned to be funded with Road Maintenance and Rehabilitation Account revenues include:
a) Public Works Staffing
The project will consist of salaries and benefits of Public Works Department - Street Division staff that will repair various road, streets, curbs, gutters and sidewalks within City limits of the City of Calexico.
Location: Various locations within City limits.
Estimated Project Schedule: Start (10/2023) Completion: (09/2027) Estimated Useful Life 1-5 years.
b) Purchase of Aggregate/Asphalt Material for Miscellaneous Repairs The project will consist of purchasing aggregate/asphalt material for miscellaneous repairs at various locations within City limits of the City of Calexico.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 5-10 years.
c) Miscellaneous Concrete/ADA Curb Repair
The project will consist of removing and replacing damaged concrete and non- compliant curb ramps in accordance with current ADA Standards at various locations within City limits of the City of Calexico.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 20-30 years.
Pothole Patching and Road Repairs
The project will consist of pothole patching and road repairs at various locations within City limits of the City of Calexico.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 5-10 years.
e) Scaroni Road Improvement Project
The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
Location: Scaroni Road between SR-98 and Cole Blvd
2 Estimated Project Schedule: Start (10/2019) Completion: (09/2028) Estimated Useful Life 10-20 years.
f) Second Street (New River) Bridge Widening
The project will consist of widening and improving Second Street bridge.
Location: Second Street (New River) Bridge.
Estimated Project Schedule: Start (10/2019) Completion: (09/2028) Estimated Useful Life 20-30 years.
g) Weakley Road Improvement Project
The project will consist of installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
Location: Weakley Road between Portico Bivd. and Scaroni St.
Estimated Project Schedule: Start (10/2020) Completion: (09/2027) Estimated Useful Life 10-20 years.
h) Second Street (All American Canal) Bridge Improvements The project will consist of improving and/or reconstructing Second Street (All American Canal) bridge foundation, abutment, girder and bridge railing.
Location: Second Street (All American Canal) bridge
Estimated Project Schedule: Start (10/2022) Completion: (09/2028) Estimated Useful Life 20-30 years.
1) Purchase of One (1) Heavy-Duty Truck and Two (2) Medium Trucks for Street Division The project will consist of purchasing one (1) service truck and two (2) medium trucks for operation and maintenance in Streets Division.
Location: Various locations within City limits.
Estimated Project Schedule: Start (10/2022) Completion: (09/2027) Estimated Useful Life 5-10 years.
j) Furnishing Power for Street or Road Lighting and Traffic Control Devices The project will consist of road maintenance by furnishing for street or road lighting and traffic control devices.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2022) Completion: (09/2027) Estimated Useful Life 1-5 years.
k) Cole Boulevard between Scaroni Road and Railroad Crossing The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
3 Location: Cole Boulevard between Scaroni Road and Railroad Crossing Estimated Project Schedule: Start (10/2026) Completion: (09/2028) Estimated Useful Life 10-20 years.
Beach Avenue between 2nd Street and E. Belcher Street
The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
Location: Gole Boulevard between Scaroni Road and Railroad Crossing Estimated Project Schedule: Start (10/2026) Completion: (09/2028) Estimated Useful Life 10-20 years.
Please note that it is estimated that the City of Calexico will be receiving $1,127,504.00 for Fiscal Year 2026-2027.
Fiscal Impact:
Budgeted Item for Fiscal Year 2026-2027
Estimated Revenue $1,127,504.00
(Estimate provided by League of Cities and California State Association of Counties) Coordinated With:
City Manager's Office.
Finance Department.
Public Works Department.
Attachments):
Resolution of the City Council of the City of Calexico Adopting a List of Projects for Fiscal Year 2026-2027 Funded by SB 1: The Road Repair and Accountability Act of 2017.
2. Local Streets and Roads - Projected Revenues FY 2026-2027. 4 ATTACHMENT NO. 1
RESOLUTION NO. 2026-_
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALEXICO ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-2027 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1(SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Calexico are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of Calexico must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1 by resolution, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City of Calexico, will receive and estimated $1,127,504.00 in RMRA funding in Fiscal Year 2026-2027 from SB 1; and
WHEREAS, this is the tenth year in which the City of Calexico is receiving SB 1 funding and will enable the City of Calexico to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1 ; and WHEREAS, the City of Calexico used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding fiom SB 1 will help the City of Calexico maintain and rehabilitate two (2) streets/roads throughout the City of Calexico this year and hundreds of similar projects into the future; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that he City of Calexico's streets and roads are in an at-risk condition and this revenue will help u ncrease the overall quality of our road system and over the next decade will bring our streets and roads into an excellent condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
Resolution No. 2026-_
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CALEXICO HEREBY RESOLVES AS FOLLOWS:
The foregoing recitals are true and correct.
The following previously proposed and adopted projects may utilize fiscal year 2026-2027 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Public Works Staffing
The project will consist of salaries and benefits of Public Works Department - Street Division staff that will repair various road, streets, curbs, gutters and sidewalks within City limits of the City of Calexico.
Location: Various locations within City limits.
Estimated Project Schedule: Start (10/2023) Completion: (09/2027) Estimated Useful Life 1-5 years.
b) Purchase of Aggregate/Asphalt Material for Miscellaneous Repairs The project will consist of purchasing aggregate/asphalt material for miscellaneous repairs at various locations within City limits of the City of Calexico.
Location: Various locations within City limits.
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 5-10 years.
Miscellaneous Concrete/ADA Curb Repair
The project will consist of removing and replacing damaged concrete and non- compliant curb ramps in accordance with current ADA Standards at various locations within City limits of the City of Calexico.
Location: Please see Exhibit A.
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 20-30 years.
d) Pothole Patching and Road Repairs
The project will consist of pothole patching and road repairs at various locations within City limits of the City of Calexico.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2021) Completion: (09/2027) Estimated Useful Life 5-10 years.
e) Scaroni Road Improvement Project
The project will consist of grinding of existing asphalt concrete pavement, angelato encorare ion grade aspare be bot mix, in asan ulber Resolution No. 2026-
conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
Location: Scaroni Road between SR-98 and Cole Blyd.
Estimated Project Schedule: Start (10/2019) Completion: (09/2028) Estimated Useful Life 10-20 years.
f) Second Street (New River) Bridge Widening
The project will consist of widening and improving Second Street bridge.
Location: Second Street (New River) Bridge.
Estimated Project Schedule: Start (10/2019) Completion: (09/2028) Estimated Useful Life 20-30 years.
g) Weakley Road Improvement Project
The project will consist of installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control.
Location: Weakley Road between Portico Blvd. and Scaroni St.
Estimated Project Schedule: Start (10/2020) Completion: (09/2027) Estimated Useful Life 10-20 years.
Second Street (All American Canal) Bridge Improvements
The project will consist of improving and/or reconstructing Second Street (All American Canal) bridge foundation, abutment, girder and bridge railing.
Location: Second Street (All American Canal) bridge
Estimated Project Schedule: Start (10/2022) Completion: (09/2028) Estimated Useful Life 20-30 years.
Purchase of One (1) Heavy-Duty Truck and Two (2) Medium Trucks for Street Division
The project will consist of purchasing one (1) service truck and two (2) medium trucks for operation and maintenance in Streets Division.
Location: Various locations within City limits.
Estimated Project Schedule: Start (10/2022) Completion: (09/2027) Estimated Useful Life 5-10 years.
j) Furnishing Power for Street or Road Lighting and Traffic Control Devices The project will consist of road maintenance by furnishing for street or road lighting and traffic control devices.
Location: Please see Exhibit A
Estimated Project Schedule: Start (10/2022) Completion: (09/2027) Estimated Useful Life 1-5 years.
k) Cole Boulevard between Scaroni Road and Railroad Crossing Resolution No. 2026-_
The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surtace course, slurry seal, installation of curb, gutter and sidewalk, trattic striping, utility adjustments and trathe control.
Location: Cole Boulevard between Scaroni Road and Railroad Crossing Estimated Project Schedule: Start (10/2026) Completion: (09/2028) Estimated Useful Life 10-20 years.
1) Beach Avenue between 2nd Street and E. Belcher Street The project will consist of grinding of existing asphalt concrete pavement, installation of conventional asphalt concrete leveling course, asphalt-rubber:
aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control Location: Cole Boulevard between Scaroni Road and Railroad Crossing Estimated Project Schedule: Start (10/2026) Completion: (09/2028) Estimated Useful Life 10-20 years.
PASSED, APPROVED AND ADOPTED this 3d day of June, 2026.
Victor Legaspi, Mayor
Attest:
Veronica L, Alvarado, City Clerk
Approved as to Form:
Laura Estrada, City Attorney
State of California
County of Imperial ) SS.
City of Calexico
Resolution No. 2026-_
I, Veronica L. Alvarado, City Clerk of the City of Calexico, California, do hereby certify that the above and foregoing Resolution No. 2026- was duly passed, approved and adopted by the City Council at its regular meeting held on the 3rd of June, 2026, by the following vote, to-wit:
AYES:
NOES:
ABSENT:
Veronica L. Alvarado, City Clerk
CITY OF CALEXICO
EXHIBIT A
PROJECT C, DANDJ
STREET FROM TO
Kloke Avenue Bridge All American Canal
Highway 111 International Border Cole Road
Highway 111 Second Street Cole Road
Highway 98 Cesar Chavez Boulevard Highway 111
Cole Boulevard Van De Graff M.L. King Avenue
Second Street Highway 111 Cesar Chavez Boulevard
Second Street Calexico Int'l Airport Cesar Chavez Boulevard Cesar Chavez Boulevard Second Street Highway 98
Weakly Street Estrada Boulevard Scaroni Avenue
Various Locations
Cole Boulevard Bowker Road
Andrade Avenue Cole Boulevard Jasper Road
Sunset Avenue Central Main Canal Jasper Road
Yourman Road Central Main Canal Jasper Road
Imperial Avenue West Central Main Canal Jasper Road
Sherman Street Harold Avenue Railroad Tracks
Sherman Street Pierce Avenue Emilia Drive
V.V. Williams Avenue All American Canal Highway 98
De Las Flores Street Eady Avenue Kloke Avenue
Sixth Street Emerson Avenue Railroad Tracks
Third Street Heber Avenue Encinas Avenue
Fourth Street Blair Avenue Encinas Avenue
Sixth Street Imperial Avenue Heber Avenue
Seventh Street Imperial Avenue Blair Avenue
Sherman Street Rockwood Avenue Blair Avenue
Eight Street Imperial Avenue Rockwood Avenue
Temple Court Imperial Avenue Rockwood Avenue
Rosemont Street Rockwood Avenue Blair Avenue
Ninth Street Imperial Avenue Rockwood Avenue
Ethel Street Heber Avenue Blair Avenue
Maiden Lane Imperial Avenue Paulin Avenue
Tenth Street Imperial Avenue Rockwood Avenue
Pauline Avenue Fifth Street Highway 98
West City Limits & All
Second Street Calexico Int'l Airport American Canal
Beach Street Elmer Belcher Street Fifth Street
Beach Street Fifth Street Second Street
Encanto Drive Elmer Belcher Street Eight Street
Encanto Drive (cul de sac) Eight Street Eight Street
Encanto Terrace Elmer Belcher Street Eight Street
Dool Avenue Elmer Belcher Street Seventh Street
1 CITY OF CALEXICO
EXHIBIT A
PROJECT C, DANDJ
STREET FROM TO
Dool Avenue Fifth Street Second Street
Fifth Street Emerson Avenue Andrade Avenue
Sixth Street Encinas Avenue Andrade Avenue
Holdridge Street De Leon Avenue Andrade Avenue
Camilia Street Andrade Avenue Cul-de-sac East
E. Hashem Avenue 100' N of Holdridge Cul-de-sac South
Margarita Street E. Hashem Avenue Cul-de-sac West
Margarita Street E. Hashem Avenue Cul-de-sac East
lasmine Street E. Hashem Avenue Cul-de-sac West
Jasmine Street E. Hashem Avenue Cul-de-sac East
Obeliscos Street Iris Avenue Cul-de-sac West
Obeliscos Street Iris Avenue Cul-de-sac East
Pauline Avenue Second Street Fifth Avenue
Heber Avenue First Street Fourth Street
Giles Avenue Second Street Sherman Street
Heffernan Avenue Border Fifth Avenue
Paseo de los Virreyes Paseo del Conquistador Camino Real Paseo de los Reyes Paseo de su Alteza Paseo de los Virreyes Paseo de su Majestad Paseo de su Alteza Paseo de los Virreyes Paseo del Conquistado Paseo de su Alteza Andrade Avenue Paseo del Emperador Seventh Street Paseo de su Alteza
Arroyo Avenue Rancho Elegante Drive Second Street
Camino del Rio Andrade Avenue Paseo de su Alteza
Milpitas Drive Paseo de su Alteza Cul-de-sac West
Rio Hondo Milpitas Drive Camino del Rio
Santiago Drive Cul-de-sac East
Colorado Drive De Leon Avenue Cul-de-sac East
Plata Drive Cul-de-sac East
Brave Drive Cul-de-sac East
De Leon Avenue Harrington Street Cul-de-sac South
Fiesta Avenue Harrington Street Holdridge Street
Holdridge Street Rancho Frontera De Leon Avenue
Rancho Frontera Harrington Street Highway 98
Rancho Frontera All American Canal Cole Boulevard
Granero Avenue Zapata Street Rioseco Street
Santa Ana Street Coyote Avenue Rancho Frontera
Descanso Drive Santa Ana Street Cul-de-sac North
Coyote Avenue Cabana Street Cul-de-sac South
Yourman Road Cole Boulevard S. Moreno Street
. Portico Boulevard Cole Boulevard Robinson Boulevard
Enterprise Boulevard Cole Boulevard Robinson Boulevard
Portico Court Portico Boulevard Cul-de-sac East
2 CITY OF CALEXICO
EXHIBIT A
PROJECT C, DANDJ
STREET FROM TO
Amada Court Rosas Street Cul-de-sac South
Dalila Court Rosas Street Cul-de-sac South
E. Hashem Avenue Sapphire Street Cul-de-sac South
Garnet Street Iris Avenue Cul-de-sac East
Feldspar Avenue Sapphire Street Garnet Street
Paseo Camino Real Andrade Avenue Paseo de su Alteza
Paseo Camino Real Paeso de su Alteza G. Anaya
Sixth Street Encinas Avenue Dool Avenue
First Street Andrade Avenue Paulin Avenue
Second Street Andrade Avenue Imperial Avenue
Grant Street Cesar Chavez Blvd Kloke Avenue
M. Acuna Avenue Wozencraft Street Grant Street
A&V Thielman Avenue Wozencraft Street Grant Street
R&D Platero Avenue Sherman Street Grant Street
Matallana Court Sherman Street Cul-de-sac North
Linholm Avenue Wozencraft Street Sherman Street
Wozencraft Street Linholm Avenue M. Acuna Avenue
Sherman Street Linholm Avenue M. Acuna Avenue
Third Street Encinas Avenue Andrade Avenue
Fourth Street Encinas Avenue Andrade Avenue
Rancho Frontera
Frontera Drive Avenue Primavera Court
Primavera Court Cul-de-sac South Posada Court
Holdridge Street De Leon Avenue Subdivision Limits
Posada Court Plaza Drive Primavera Court
Plaza Drive Holdridge Street Posada Court
Fieseta Avenue Holdridge Street Cul-de-sac South
De Leon Avenue Plata Drive Harrington Street
Bravo Drive De Leon Avenue Cul-de-sac East
Harrington Street Andrade Avenue Rancho Frontera Avenue Brown Court Harrington Street Cul-de-sac North
Jean Robinson Court Harrington Street Cul-de-sac North
Rancho Frontera
Vereda Drive Avenue Cul-de-sac East
Rancho Frontera
Porton Drive Avenue Cul-de-sac East
Cabana Street Coyote Avenue Andrade Avenue
Banda Avenue Cabana Street Cul-de-sac South
Coyote Avenue Alameda Street Cabana Street
Enramada Drive Santa Ana Street Cul-de-Sac North
Alameda Street Granero Avenue Coyote Avenue
Granero Avenue Alameda Street E. Zapata Street
Bowker Road Highway 98 Cole Boulevard
3 CITY OF CALEXICO
EXHIBIT A
PROJECT C, DANDJ
STREET FROM TO
Kloke Avenue Highway 98 All American Canal
Rockwood Avenue First Street Seventh Street
Rockwood Avenue Fifth Street Highway 98
Saphire Street Andrade Avenue Subdivision Limits
Andrade Avenue All American Canal Cole Boulevard
Andrade Avenue Cole Boulevard Spud Moreno Street
Spud Moreno Street Andrade Avenue La Jolla Palms Boulevard F. Torres Street La Jolla Palms Boulevard M. Llanos Court M. Llanos Court F. Torres Street F. Herrera Street
F. Herrera Street M. Lianos Court H. Najera Avenue
Zuniga Court F. Torres Street Cul-de-sac South
El Berro G. Figueroa Avenue M. Llanos Court
G. Figueroa Avenue Playa Del Norte F. Herrera Street
Soledad Del Norte Cul-de-sac East
Del Norte Spud Moreno Street Playa Del Norte
Playa Del Norte Del Norte Vaho
Vaho Playa Del Norte Paseo Del Ocaso
Villa Barranca G. Figueroa Avenue Cul-de-sac East
Paso Del Ocaso Del Norte Andrade Avenue
Cesar Chavez Blvd. Second Street Highway 98
Las Haciendas Drive Centinela Drive Sam Ellis Street
Centinela Drive Las Haciendas Drive Sam Ellis Street
Sierra Nevada Drive Las Haciendas Drive Sam Ellis Street Las Haciendas Avenue Las Haciendas Drive Sam Ellis Street River Drive Las Haciendas Drive Sam Ellis Street
Sam Ellis Street Kloke Road Subdivision Limits
Villa Grande Street Kloke Road Subdivision Limits
Mendoza Street F. Chavez Street Cul-de-sac West
F. Chavez Street Grant Street Subdivision Limits
Thieleman Avenue Grant Street Subdivision Limits
Fouth Street Heber Avenue Blair Avenue
Renaud Court Encinas Avenue West to end of Street
Zapata Street Andrade Avenue G. Cleveland Avenue
Yturralde Street Zapata Street J.B. Rodriguez Street
Villanueva Court Zapata Street Cul-de-Sac
E. Medina Street Zapata Street J.B. Rodriguez Street
J.M. Grijalva Street Zapata Street J.B. Rodriguez Street F. Pedroza Court J.M. Grijalva Street Cul-de-sac
J.B. Rodriguez Street Yturralde Street J.M. Grijalva Street Bair Avenue Sherman Street E. First Street
Nosotros Street David Navarro Street West to end of Street Mary Avenue E. Seventh Street E. First Street
4 CITY OF CALEXICO
EXHIBIT A
PROJECT C, D ANDJ
STREET FROM TO
Grant Street Imperial Avenue Railroad Tracks
Town Center Parkway Cole Boulevard Cul-de-Sac north
Franklee Boufevard Town Center Parkway Sunset Boulevard Robinson Boulevard Town Center Parkway Scaroni Road
Sunset Boulevard Cole Boulevard Central Main Canal
Roosevelt Street George Avenue Harold Avenue
Harlod Avenue Highway 98 McKinley Street
Heller Court Cul-de-Sac west David Navarro Avenue
Calexico Street Linholm Avenue Kloke Avenue
Sunset Street David Navarro Avenue Kloke Avenue
M. Knechel Avenue Sam Ellis Street J.M. Ostrey Street
Sam Ellis Street Rodeo Avenue V.V. Williams Avenue
G. Burt Avenue Sam Ellis Street F. Necochea Street
F. Necochea Street G. Burt Avenue V.V. Williams Avenue
J.M. Ostrey Street M. Knechel Avenue V.V. Williams Avenue M.C. Garcia Avenue J.M. Ostrey Street M. B. Martinez Street C. Quiroz Street Rodeo Avenue V.V. Williams Avenue
M. B. Martinez Street Eady Avenue V.V. Williams Avenue
Bowser Avenue M. B. Martinez Street De Las Flores Street De Las Flores Street Eady Avenue V.V. Williams Avenue
Lacy Avenue De Las Flore Street Canal Street
West Palm Street Eady Avenue Lacy Avenue
Canal Street Eady Avenue V.V. Williams Avenue
Eady Avenue M. B. Martinez Street Canal Street
G. Anaya Avenue Second Street Cul-de-Sac
C. Nogales Street G. Anaya Avenue Paramo Avenue
Paramo Avenue . Nogales Street T. Boman Street
O. Ybarra Avenue C. Nogales Street T. Boman Street
T. Boman Street O. Ybarra Avenue E. Rivera Avenue
Fifth Street G. Anaya Avenue E. Rivera Avenue
1. Steppling Avenue Fifth Street Dr. Amalia Street
Dr. Amalia Street J.A. Rodney Avenue • J. Steppling Avenue Camino del Rio Paseo de su Alteza E. Rivera Avenue
J.A. Rodney Avenue Dr. Amalia Street Cul-de-Sac
Second Street Andrade Avenue E. Rivera Avenue
Scaroni Road All American Canal Central Main Canal
Rockwood Avenue Highway 98 All American Canal
Turquoise Street Cul-de-sac Diamond Way
Rubi Court Cul-de-Sac Saphire Street
Emerald Way Turquoise Street Saphire Street
Topaz Court Cul-de-Sac Saphire Street
Zircon Court Turquoise Street Cul-de-Sac
5 CITY OF CALEXICO
EXHIBIT A
PROJECT C, D ANDJ
STREET TO
Diamond Way Turquoise Street Saphire Street
Amethyst Way Turquoise Street Saphire Street
Opal Court Saphire Street
Turquoise Street Amethyst Way Feldspar Avenue
Peridot Court Turquoise Street Cul-de-Sac
Agate Court Cul-de-Sac Saphire Street
Feldspar Avenue Turquoise Street Saphire Street
Palm Drive Imperial Avenue East Cul-de-Sac
Paulin Avenue Highway 98 Las Flores Drive
Las Flores Drive Imperial Avenue East Imperial Avenue East Avendia de Oro Highway 98 Calle De Oro
Calle de Oro West Calle de Oro Fast Harrington Street
Calle de Oro East Calle de Oro West Harrington Street
Armendariz Court Calle de Oro West Cul-de-Sac
Dunbar Court Calle de Oro West Cul-de-Sac
Gonzalez Court Calle de Oro West Cul-de-Sac
Harlan Court Calle de Oro West Cul-de-Sac
Hosea Court Calle de Oro East Cul-de-Sac
Kemp Court Calle de Oro East Cul-de-Sac
Sobke Court Calle de Oro East Cul-de-Sac
Ward Court Calle de Oro East Cul-de-Sac
Harrington Street Calle de Oro West Calle de Oro East
Holdridge Street Calle de Oro West Calle de Oro East
L. Porter Court McMillin Street Cul-de-Sac
J.P. Villa Court Sereno Drive Cul-de-Sac
A. Monge Court Sereno Drive Cul-de-Sac
Sereno Drive E. Rivera Avenue
McMillin Street E. Rivera Avenue
I. Romero Court A. Cota Street
A. Cota Street I. Romero Court
D. Patino Street LM Legaspi Avenue
LM Legaspi Avenue Paseo Camino Real
Paseo Camino Real E. Rivera Avenue
D. Hinojosa E. Rivera Avenue
A. Cordero Avenue P. Montejano Street
P. Montejano Street A. Cordero Avenue H. Ramos Avenue
H. Ramos Avenue P. Montejano Street P. Rashid Street
A. Aceves Street Doctor Ajalat Avenue E. Rivera Avenue
Doctor Ajalat Avenue A. Aceves Street P. Rashid Street
P. Rashid Street Anaya Avenue H. Ramos Avenue
Seventh Street Paseo de su Alteza E. Rivera Avenue
Santa Fe Drive Andrade Avenue Paseo de su Alteza
6 CITY OF CALEXICO
EXHIBIT A
PROJECT C, D ANDJ
STREET FROM TO
J.R. Villa Court Paseo de su Alteza Cul-de-Sac
Paseo de su Alteza Santa Fe Drive Paseo Camino Real
West Fifth Street Pierce Avenue Cesar Chavez Boulevard
Pierce Avenue Sheridan Street Seventh Street
Lincoln Street D. Navarro Avenue Cesar Chavez Boulevard Emilia Drive ( Eady Avenue Grant Street
Sherman Street Cul-de-sac Emilia Drive
Eady Avenue Highway 98 Emilia Drive
Lee Avenue Highway 98 Lincoln Street
Lacy Avenue Highway 98 Mckinley Street
McKinley Street Cul-de-Sac Lacy Avenue
Calexico Street Kloke Avenue Adler Street
Nosotro Street Cul-de-Sac Adler Street
Salvador Guilin Street Cul-de-Sac Adler Street
Matilde Gomez Court Lincoln Street Cul-de-Sac
Contreras Court Lincoln Street Cul-de-Sac
Tina Padilla Court Lincoln Street Cul-de-Sac
Brandenburg Court Lincoln Street Cul-de-Sac
D. Navarro Avenue Grant Street Highway 98
W.L. Moreno Street Cul-de-Sac Kloke Avenue
Mercado Street W.L. Moreno Street Cul-de-Sac
H. Fritsch Street W.L. Moreno Street Cul-de-Sac
Luna Court W.L. Moreno Street Cul-de-Sac
Rainbow Avenue Sunlight Street Horizon Street
Sunset Street Rainbow Avenue Kloke Avenue
Valley Street Rainbow Avenue D. Navarro Avenue
Skyline Street Rainbow Avenue D. Navarro Avenue
Desert View Street Rainbow Avenue D. Navarro Avenue
Horizon Street Rainbow Avenue D. Navarro Avenue
Sunlight Street Rainbow Avenue Sunset Street
Rain Path Avenue Rainbow Avenue Sunset Street
•D. Navarro Avenue Rainbow Avenue Sunset Street
Sunshine Court Rainbow Avenue Cul-de-Sac
Higuera Avenue Sheridan Street Mckinley Street
Adler Avenue Lincoln Street Highway 98
Sheridan Street Kloke Avenue Adler Street
Kincaid Street Imperial Avenue East Rockwood Avenue
Halcon Court CN Perry Cul-de-Sac
Imperial Avenue East Palm Drive All American Canal
Elmer Belcher Street Encinas Avenue Andrade Avenue
Eigth Street Dool Avenue Andrade Avenue
Cole Boulevard Railroad Crossing Highway 111
Cole Boulevard Highway 111 Highway 98
CITY OF CALEXICO
EXHIBIT A
PROJECT C, D AND J
STREET FROM TO
Third Street Imperial Avenue Heber Avenue
8 ATTACHMENT NO. 2
Local Streets and Roads - Projected Revenues
Based on State Dept of Finance statewide r 2025-26 2026-27 Estimated May 2026 Hwy Users Tax Road Mintnc TOTAL Hwy Users Tax Road Mninc TOTAL Account Rehab Acct Account Rehab Acct
HUMBOLDT COUNTY
ARCATA 549,414 500,291 1,049,705 562,437 534,617 1,097,054 BLUE LAKE 40,085 31,727 71,812 40.910 33,904 74,815
EUREKA 778,204 710,166 1,488,370 796,691 758,891 1,555,582 FERNDALE 45,462 36,704 82,166 46.417 39,222 85,639
FORTUNA 364,302 329,912 694,214 372,890 352,547 725,437 RIO DELL 102,252 89,258 191,510 104,575 95,382 199,957
TRINIDAD™ 14,535 8,083 22,618 14,745 8,638 23,383
County of Humboldt 6,203,480 6,843,875 13,047,356 6.352.310 7,313,444 13,665,755 Total Cities & County: Humboldt 8,097,733 8,550,016 16,647,749 8.290,976 9,136,645 17,427,621
IMPERIAL COUNTY
BRAWLEY 823,385 762,298 1.585,683 842,980 814.601 1.657.581 CALEXICO 1,135,514 1,055,111. 2,190,625 2,290,140
"CALIPATRIA 190,187 172.038 362,226
EL CENTRO 1.302,061 1.211,352 2,513.413 2287,652
"HOLTVILLE 166,359 149,685 316,043
IMPERIAL 651,571 602,056 1,253,627
WESTMORLAND 7310.337
64.291 54,871 119,162
County of Imperial 10,627,817 12.932,031 23,559,848
Total Cities & County: Imperial 14,961,185 16,939,443 31,900,628
INYO COUNTY
BISHOP 115,059 101.501 108,465 226,157
County of Inyo 3,612,388 4,273,455 300,030 4,566,663 8,247,366 Total City & County: Inyo 3,727,448 4,374,956 8,102,404 3,798,395 4.675.128 8,473,523 May 2026 CaliforniaCityFinance.com