AGENDA STAFF REPORT
DATE: June 3, 2026
TO: Mayor and City Council
APPROVED BY: Benjamin A. Martinez, City Manager (u
PREPARED BY: Jesus Villegas, Public Works Director/City Engineer JuP SUBJECT: Authorize Public Works Director/City Engineer to Sign and File Notice of Completion for Scaroni Road Pavement Rehabilitation State Project No.
LPPSB1L-5168(034).
Recommendation:
Authorize Public Works Director/City Engineer to Sign and File Notice of Completion for Scaroni Road Pavement Rehabilitation State Project No. LPPSB1L-5168(034).
Background:
The City of Calexico Public Works Department received a grant from California Department of Transportation (Caltrans) for FY 2023-2024 in the amount of $942.000.00 ($471,000.00 - State Grant and $471,000.00 - Local Match) for the Project No. LPPSB1L-5168(034) - Scaroni Road between Cole Boulevard and Jasper Road. The construction work consisted of survey monument preservation, milling existing asphalt concrete pavement to a depth of 2", installation of a stress absorbing membrane interlayer (SAMI) with 3/8" aggregate over the milled surface, placement of 2" asphaltic concrete overlay surfacing over the SAMI, traffic striping and markings, sewer manhole rehabilitation, and traffic control.
On November 6, 2024, the City Council of the City of Calexico approved bid documentation for Scaroni Road Pavement Rehabilitation State Project No. LPPSB1L-5168(034) and authorized the Public Works Department to send the project out to bid.
On May 7, 2025, the City. Council of the City of Calexico approved the following:
a) Award Bid Proposal from Rove Engineering, Inc. in the Amount of $731,770.00 for Scaroni Road Pavement Rehabilitation State Project No. LPPSB1L-5168(034). b) Authorize Interim City Manager to Sign Construction Agreement between the City of Calexico and Rove Engineering, Inc. in the Amount of $731,770.00 for Scaroni Road Pavement Rehabilitation State Project No. LPPSB1L-5168(034). c) Authorize Interim City Manager to Approve Any Future Change Orders Not-to-Exceed $73,177.00 (10% of Rove Engineering, Inc. Base Bid) as Per City Ordinance No. 1218. d) Adopt Budget Amendment Resolution for Fund No. 412 - State Grant.
On September 3, 2025, the City Council authorized the City Manager to sign Change Order No. 1 with Rove Engineering, Inc. in the amount of $88,776.00 for the removal and replacement of four (4) 48" diameter sewer manholes on Scaroni Road.
On December 17, 2025, the City Council authorized the City Manager to sign Change Order No. 2 With Rove Engineering, Inc. in the amount of $191,308.50 for the removal of 8 inch of the existing asphalt, pulverization and treatment for its use as base, followed by the installation of a 4 inch layer of ¾ inch HMA Pavement Mix.
On January 21, 2026, the City Council authorized the Public Works Director/City Engineer to sign Change Order No. 3 with Rove Engineering, Inc. in the amount of $39,888.00 for installation of thermoplastic striping and additional shoulder backing material to support the pavement edge.
In addition, $62, 186.60 of the 10% contingency was utilized as balancing Change Order No. 4 to reflect actual final bid quantities and eliminated items of work.
Discussion and Analysis:
On April 30, 2026, Rove Engineering, Inc. completed the construction of Scaroni Road Pavement Rehabilitation. The total construction cost of said project is $1,113,929.10. City staff is recommending that the City Council of the City of Calexico authorize the Public Works Director/City Engineer to sign and file Notice of Completion for Scaroni Road Pavement Rehabilitation State Project No. LPPSB1L-5168(034).
Fiscal Impact:
No fiscal impact at this time.
Coordinated With:
City Manager's Office.
Public Works Department.
Attachments):
1. Notice of Completion for Scaroni Road Pavement Rehabilitation State Project No.
LPPSB1L-5168(034).
2. Before and After Construction Pictures.
2 ATTACHMENT NO. 1
RECORDING REQUESTED BY:
City of Calexico
AND WHEN RECORDED MAIL TO:
City of Calexico
Office of the City Clerk
508 Heber Avenue
alexico, California 92231
SPACE ABOVE THIS LINE FOR RECORDER'S USE
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion.
Notice is hereby given that:
1 here inter feed is dyner or corporate officer of the owner of the interest or estate stated below in the property
2. The full name of the osner is City of Calexico
3. The full address of the owner is 608 Heber Avenue, Calexico, California 92231
4. The nature of the interest or estate of the owner is:
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are
NAMES ADDRESSES
None
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work or improvements herein referred to
NAMES ADDRESSES
None
7. A work of improvement on the property hereinafter described was completed on_04/30/26. The work done was survey monument preservation, milling existing asphalt concrete pavement to a depth of 2", installation of a stress absorbing membrane interlayer (SAMI) with 3/8" aggregate over the milled surface, placement of 2" asphaltic concrete overlay surfacing over the SAMI, traffic striping and markings, sewer manhole rehabilitation, and traffic control
8. The name of the contractor, if any, for such work of improvement was Rove Engineering, Inc., P.O Box 2108, EI Centro, CA 92243 _05/07/25
(Date of Contract)
9. The property on which said work of improvement was completed is in the City of_ Calexico County of_Imperial State of _ _California _ and is described as follows:
Scaroni Road Pavement Rehabilitation State Project No. LPPSBIL-5168(034) The street address of said property is Scaroni Road between Cole Boulevard and Jasper Road.
Dated _June 3, 2026
Jesus Villegas Peimbert, Public Works Director/City Engineer City of Calexico
VERIFICATION
I, the undersigned, say: I am the Public Works Director/City Engineer, the declarant of the foregoing Notice of Completion; I have read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 3, 2026, at Calexico, California
Jesus Villegas Peimbert, Public Works Director/City Engineer City of Calexico
ATTACHMENT NO. 2
CALEXICO California
WHERE CALIFORNIA AND MEXICO MEET
Scaroni Road Pavement Rehabilitation
State Project No. LPPSB1L-5168(034)
BEFORE CONSTRUCTION PICTURES
CALEXICO California
AND MEXICO MEET
Scaroni Road Pavement Rehabilitation
State Project No. LPPSB1L-5168(034)
AFTER CONSTRUCTION PICTURES