AGENDA
ITEM
27 AGENDA
CALEXICO California ITEM

WHERE CALIFORNIA AND MEXICO MEET
27 CITY COUNCIL

AGENDA STAFF REPORT
DATE: September 16, 2026
TO: Mayor and City Council
Berjamin A. Martinez, City Manager Bond
APPROVED BY:

PREPARED BY: Fernando Williams, Associate Civil Engineer SUBJECT: Receive Update Report and Provide Direction to Staff Regarding Hearthstone Second Road Entrance Project
=====-
Recommendation:

Receive update report by City Staff and provide direction for the next steps in the implementation of Hearthstone Second Entrance Project.

Background:

The La Jolla Palms Subdivision Units 1 and 2 consist of 244 dwelling units with Meadows Road as the only access street connecting directly to Cole Boulevard. Several challenges arise due to the subdivision's only entrance/exit, however, two of the main concerns are as follows:

1. Traffic congestion during peak hours

2. Lack of a secondary access road as required by emergency responders (Fire Department, Police Department, Emergency Medical Services). Hence the need to provide a potential solution for the implementation of a second entrance to the subdivision.

Discussion and Analysis:

The possible options for a second entrance to La Jolla Palms Subdivision (Hearthstone) are as follows:

1. Extend La Jolla Palms Boulevard to the south to connect with Cole Boulevard

2. Extend Spud Moreno Street to the west to connect to Rockwood Avenue/Yourman Road The obstacle to Option #1 is the Imperial Irrigation District's (IID) Beech Canal which would have to be underground or crossed over with a bridge. This option would be very costly and time-consuming and may also not be possible. Extensive consultation with IID would be required to see if this option is viable.

Option #2 would only entail the extension of Spud Moreno Street, including construction of a new road, services and all necessary appurtenances. Based on recorded documents, an existing Right-of-Way

Page 1 of 6 ends

was found connecting Spud Moreno Street to Rockwood Avenue/Yourman Road. On August 5, 2026, LC Engineering Consultants, Inc. (LCEC) was issued a task order for the preliminary engineering and cost estimate for the second entrance of La Jolla Palms Subdivision (Hearthstone). LC Engineering is an approved vendor on the City's On-Call Engineering List.

LCEC provided three (3) different alternatives for the construction of a second entrance to La Jolla Palms Subdivision (Hearthstone), as follows:

1. Alternative #1 consists of a four-way undivided street, curb and gutter, and sidewalks, using all of the existing Right-of-Way, as well as water and storm drain infrastructure.

2. Alternative #2 consists of a two-way undivided street with a parkway/bike lane in each direction, Class Il Base shoulders and drainage swales.

3. Alternative #3 consists of a two-way undivided street with Class I! Base shoulders and drainage swales.

All the alternatives consider street lighting.

No funding is currently allocated for development of the Hearthstone Second Entrance Project. However, the City Council may consider using Fund No. 233 - Measure D as a potential funding source, as summarized below:

FY 2026-2027 Annual Activity
Revenue(s)
Fund No. 233 - Measure D $19,541,324.00
Total $19,541,324.00
Expenditure(s)
Fund No. 233 - Measure D $9,922,443.00
Total $9,922,443.00
Ending Fund Balance $9,618,881.00
FY 27-28 Future Allocation Request $8,287,192.00
Proposed Ending Fund Balance $1,331,689.00
For FY 2026-27, the City allocated $7,992,885.00 from Fund No. 233-90-956 for the Street Overlay Project. If the City Council elects to use a portion of these funds for the Hearthstone Second Entrance Project, City staff would need to reduce the Street Overlay Project scope of work, including the number of streets scheduled for pavement improvements.

Fiscal Impact:

There is no fiscal impact associated with receiving this update report and providing direction to staff. Any future funding allocation for project design or construction would return to the City Council for consideration and approval.

Coordinated With:
2 • Public Works Department
Attachments):
• Attachment 1: Spud Moreno Street Improvements Site Plan (all alternatives). • Attachment 2: Spud Moreno Street Improvements Cost Estimates (all alternatives). • Attachment 3: Fund No. 233 Budget dated June 30, 2026. 3 ATTACHMENT 1
4 CITY OF CALEXICO

SPUD MORENO STREET IMPROVEMENTS

FROM YOURMAN ROAD TO LA JOLLA PALMS BOULEVARD

R/W R/W

SPUD MORENO STREET - ULTIMATE TYPICAL CROSS SECTION A-A' SPUD VORENO STREET ULTIMATE TYPICAL CROSS SECTION B-B ULTIMATE CONDITION - FOUR (4)

TRAVEL LANES
PARCEL. + RENU

LA JOLLA PALAS BLVD
SPUD MORENO STREET: FONCEETUAL DESIGN
TYS ST:

CONCEPTUAL DESIGNE /

LENNER COASULTANNAC EPUD MORENO STREET
IMFROYEMENT PLANE 1°
FOR FLANCHECK REMEN PURPONE ONEN - f..- ETCURLAN RA. TO LA JOLLA PALMET ILDU INCE NO. C7001-09
LOT 1 DETAIL DOC 2004043194
FM 11/20
EXHIBIL B BOOK 2379 PACE 118*

YOURMAN ROAD

SPUD MORENO STREET
PARCEL
PARCE 4
g-1

SPUD MORENO STREET CONCEPTUAL DESIGN

STA TO STA
PARCEL 1 REMANDER
FM_ 9-1 *M 23/1
FM 23/10

PARCEL REMAINDER SPUD MORENO STREET
PM 9- FM 23/

LA JOLLA
SPUD MORENO STREET CONCEPTUAL. DESIGN PALMS BLVD.

STA TO STA
CONDITION "A" - TWO (2) TRAVEL LANES
CONDITION "B" - TWO (2) TRAVEL LANES

PLUS BIKE LANES/PARKWAYS
R/# R/N
Yulf
NORTH
SPUD MORENO STREET INTERIN CONDITION "A" CROSS SECTION SPUD MORENO STREET INTER/ CONDITION "E" CROSS SECTION

REVOKE CHONLER OF RECORE CONCEPTLAL DESIGNA SHEET

ACENONEERING CONTULIAMNSAIC
BATE • DATE 2 нут
0 183/11 BUNCHORN BE SETT I 30041-00
ATTACHMENT 2
5 LC ENGINEERING CONSULTANTS INC.

CIVIL ENGINEERING • LAND SURVEYING • CONSTRUCTION MANAGEMENT SERVICES

CITY OF CALEXICO

LA JOLLA PALMS - SPUD MORENO IMPROVEMENTS

ULTIMATE CONSTRUCTION COST ESTIMATE

FOR OFF-SITE IMPROVEMENTS
Date: September 1, 2026

ITEM UNIT QUANTITY UNIT PRICE TOTAL
Water
12" DIA. PVC PIPE L.F. 3,700.00 $65.00 $240,500.00
12" WATER VALVE EA. 15 $3,200.00 $48,000.00
6" FIRE HYDRANT ASSEMBLY EA. $8,500.00 $102,000.00
$390,500.00
Storm Drain
24" DIA. PVC STORM DRAIN L.F. 3000 $80.00 $240,000.00
SD MANHOLE EA. 10 $8,500.00 $85,000.00
SD CATCH BASIN EA. 12 $6,500.00 $78,000.00
$403,000.00
Curb & Sidewalk
6 CURB & GUTTER L.F. 7400 $28.00 $207,200.00
SIDEWALK SQ.FT. 37000 $7.50 $277,500.00
$484,700.00
Electrical
STREET LIGHTS EA. 14 $7,500.00 $105,000.00
UNDERGROUND ELECTRIC EA. $2,000.00 $28,000.00
$133,000.00
Earthwork
CUT CYD 10700 $10.00 $107,000.00
FILL CYD $2.25
IMPORT CYD 10700 $10.00 $107,000.00
$214,000.00
A.C. Pavement
4" AC/18" CL II BASE/12" SUBGRADE SF 236000 $6.50 $1,534,000.00 $1,534,000.00
Miscellaneous
MOBILIZATION L.S. $50,000.00 $50,000.00
EROSION CONTROL L.S. $7,500.00 $7,500.00
INSTALL SIGNAGE AND TRAFFIC CONTROL L.S. 1 $7,500.00 $7,500.00 STREET STRIPING L.S. 1 $18,500.00 $18,500.00
STAKING L.S. + r $25,000.00 $25,000.00
ENGINEERING L.S. $75,000.00 $75,000.00
CONSTRUCTION MANAGEMENT-INSPECTIONS L.S. $121,000.00 $121,000.00 SOIL TESTING L.S. $10,000.00 $10,000.00
$314,500.00
SUB-TOTAL $3,473,700.00
10% Contingency 13320000
TOTAL
ULTIMATE CONSTRUCTION TOTAL =
$3,821,070.00

PROFESSIONAL
151938 CORRALES
No. 55432
EXP. 12-31-26

SHE CIVIL OUT
Since the engineer has no control over the cost of labor, materials, or equipment, or over the contractor's melhods of www.lcec-inc.com 1065 Stale Sireel [email protected]
tel 760.353.8110 El Centro CA g2243 /nx 760.352.6408
LC ENGINEERING CONSULTANTS INC.

CIVIL ENGINEERING - LAND SURVEYING • CONSTRUCTION MANAGEMENT SERVICES

CITY OF CALEXICO

LA JOLLA PALMS - SPUD MORENO IMPROVEMENTS
CONDITION "A" CONSTRUCTION COST ESTIMATE

FOR OFF-SITE IMPROVEMENTS
Date: September 1, 2026

ITEM UNIT QUANTITY UNIT PRICE TOTAL
Water
12" DIA. PVC PIPE L.F. $65.00
12" WATER VALVE EA. $3,200.00
6" FIRE HYDRANT ASSEMBLY EA. $8,500.00
Storm Drain
24" DIA, PVC STORM DRAIN L.F. $80.00
SD MANHOLE EA. $8,500.00
SD CATCH BASIN EA. $6,500.00
Curb & Sidewalk
6" CURB & GUTTER L.F. $28.00
SIDEWALK SQ.FT. $7.50
Electrical
STREET LIGHTS EA. $7,500.00 $105,000.00
UNDERGROUND ELECTRIC EA. $2,000.00 $28,000.00
$133,000.00
Earthwork
CUT CYD 10700 $10.00 $107,000.00
FILL CYD $2.25
IMPORT CYD 10700 $10.00 $107,000.00
$214,000.00
A.C. Pavement
4" AC/18" CL II BASE/12" SUBGRADE SF 144205 $6.50 $937,332.50 12" CL II BASE SF $6.50
$937,332,50
Miscellaneous
MOBILIZATION L.S. $50,000.00 $50,000.00
EROSION CONTROL L.S. $7,500.00 $7,500.00
INSTALL SIGNAGE AND TRAFFIC CONTROL L.S. $7,500,00 $7,500.00 STREET STRIPING L.S. $18,500.00 $18,500.00
ENGINEERING LS $75,000.00 $75,000.00
CONST. MANAGEMENT-INSPECTIONS LS $103,000.00 $103,000.00 STAKING L.S. $25,000.00 $25,000.00
SOIL TESTING L.S. $10,000.00 $10,000.00
$296,500.00
SUB-TOTAL $1,580,832.50
10% Contingency 158,083.25
TOTAL $1,738,915.75
CONDITION "A" TOTAL =
$1,738,915.75

PROFESSIONAL
GORRALE®
REC
No. 55432
EXP. 12-31-26

SATE C CIVI
Since the engineer has no control over the cost of labor, materials, or equipment, or over the contractor's methods of determining prices, or over competitive bidding or market conditions, our opinions of probable project cost or constructior cost provided for herein are to be made on the basis of our experience and qualifications and represent our best jugemen as design professionals familiar with the construction industry, but the engineer cannot, and does not guarantee that proposals, bids, or the construction cost will not vary from opinions of probable cost prepared by the firm. www.lcec-inc.com 1065 State Street [email protected]
tel 760.353,8110 El Centro CA 92243 /ax 760.352.6408
LC ENGINEERING CONSULTANTS INC.

CIVIL ENGINEERING • LAND SURVEYING • CONSTRUCTION MANAGEMENT SERVICES

CITY OF CALEXICO

LA JOLLA PALMS - SPUD MORENO IMPROVEMENTS
CONDITION "B" CONSTRUCTION COST ESTIMATE]

FOR OFF-SITE IMPROVEMENTS
Date: September 1, 2026

ITEM UNIT QUANTITY UNIT PRICE TOTAL
Water
12" DIA. PVC PIPE L.F. $65.00
12" WATER VALVE EA. $3,200.00
6" FIRE HYDRANT ASSEMBLY EA. $8,500.00
Storm Drain
24" DIA. PVC STORM DRAIN L.F. $80,00
SD MANHOLE EA. $8,500.00
SD CATCH BASIN EA. $6,500.00
Curb & Sidewalk
6" CURB & GUTTER L.F. $28.00
SIDEWALK SQ.FT. $7.50
Electrical
STREET LIGHTS EA. 14 $7,500.00 $105,000.00
UNDERGROUND ELECTRIC EA. 14 $2,000.00 $28,000.00
$133,000.00
Earthwork
CUT CYD 10700 $10.00 $107,000.00
FILL CYD $2.25
IMPORT CYD 10700 $10.00 $107,000.00
$214,000.00
A.C. Pavement
4" AC/18" CL II BASE/12" SUBGRADE SF 100950 $6.50 $656,175.00 12" CL I| BASE SF 43255 $1.50 $64,882.50
$721,057.50
Miscellaneous
MOBILIZATION L.S. $50,000.00 $50,000.00
EROSION CONTROL L.S. $7,500.00 $7,500.00
INSTALL SIGNAGE AND TRAFFIC CONTROL L.S. $7,500.00 $7,500.00 STREET STRIPING L.S. $18,500.00 $18,500.00
STAKING L.S. $25,000.00 $25,000.00
ENGINEERING L.S. $75,000.00 $75,000.00
CONST. MAMAGEMENT - INSPECTION L.S. $103,000.00 $103,000.00 SOIL TESTING L.S. $10,000.00 $10,000.00
$296,500.00
SUB-TOTAL $1,364,557.50
10% Contingency 136,455.75
TOTAL $1,501,013.25
CONDITION "B" TOTAL =
$1,501,013.25

PROFESSIONAT
CARLOS
No. 55432
EXP, 12-31-26

SATE C OF CALIFORNIA
Since the engineer has no control over the cost of labor, malerials, or equipment, or over the contractor's methods of determining prices, or over competitive bldding or market conditions, our opinions of probable project cost or construction cost provided for herein are to be made on the basis of our experience and qualifications and represent our best jugement as design professionals familiar with the construction Industry, but the engineer cannot, and does not guarantee that proposals, bids, or the construction cost will not vary from opinions of probable cost prepared by the firm. www.lcec-lne.com 1065 Slale Street [email protected]
tel 760.353.8110 El Centro CA g2243 Sax 760.352.6408
ATTACHMENT 3
9 City of Calexico
2026-27 Budget
LER Public Works
CALEXICO Local Transportation Authority/Measure D
Fund #233
Purpose of Fund
Measure D is a retall transaction and use tax of.5% enacted in July 1989 pursuant to the provisions of the Public Utilities Code for local streets and roads and state highways within Imperial County. The Imperial County Local Transportatlon Authority was created to administer the program. The revenue generated provides funding for transportation Improvements. The dlstribution of funds Is based on an allocation of a sum of $75,000 to each Local Agency annually and the remaining revenues to be distributed based on population. The priorities fo expenditures of these funds are to repair and rehabilitate existing roadways, reduce congestlon and Improve safety, and to provide fo constructlon of needed facilities. Expenditures must be In accordance with the approved plan or amended plan as submitted to the 2023-24 2024-25 2025-26 2026-27
Actual Actual Projected Budget Notes
Beginning Fund Balance $ 12,484,975 $ 15,375,402 $ 16,719,475 $ 17,836,324 Annual Activity
Revenues
Local Transportation Sales Tax 2,421,523 2,182,436 1,907,000 1,605,000 Investment Income 616,323 652,046 100,000 100,000
3,037,846 2,834,482 2,007,000 1,705,000
Expenditures
Operations
216 Traffic Control 150,000 150,000 150,000 153,000
Capltal Outlay
946 Downtown Street Improv (3,065) 400,000
956 Composite Layer Overlay 24,000 94,017 7,992,885
-
91-903 Paving Alleyway Prolect - 436,558
91-916 Cole Blvd. (ML King/Bowker) 484 1,316,409 92,120 91-917 Sidewalk Grant St., Calexico, 554,014 :

Van de Graaf
91-943 Cole Blvd between Scaron Rd - 518,000
and Rallroad Tracks
91-953 Beach Avenue between 2nd 391,000
Street and E. Belcher Street
91-954 Cole Blvd between Bowker Road 31,000
and SR-98
147,419 1,490,409 890,151 9,922,443
Net Annual Activity 2,890,427 1,344,073 1,116,849 (8,217,443) Ending Fund Balance $ 15,375,402 $ 16,719,475 $ 17,836,324 $ 9,618,881 Balance Sheet 5-Year CIP Program
Cash/Due from Other Funds $ 15,375,402฿ $ 16,726,812 2027-28 8,287,192 Current Payables (7,337) 2028-29 2,000,000
Available Fund Balance $ 15,375,402 $ 16,719,475 2029-30 2,000,000 2030-31 2,000,000
14,287,192