CITY OF CALIFORNIA CITY SEPTEMBER 9, 2025
1 NOTICE OF AMENDED
REGULAR MEETING AGENDA
CITY COUNCIL/ HOUSING AUTHORITY/ SUCCESSOR AGENCY
REGULAR MEETING
TUESDAY SEPTEMBER 9, 2025 @ 5:00PM
COUNCIL CHAMBERS & VIA ZOOM
21000 HACIENDA BLVD., CALIFORNIA CITY, CA 93505
If you need special assistance to participate in this meeting, contact the City Clerk at (760) 373-7140 or via email at [email protected]. We request a 24-hour notification prior to the meeting in order for the City to make reasonable arrangements to ensure accessibility. (28 CFR 35.102-35.104 American Disabilities Act Title II) AMENDMENT:
Corrections made to NB 1.
1. Removal of Resolution 25-3163
2. Corrections made to Staff Report
3. Correction made to Subject Title
4. Correction made to Recommendation
Previous Subject Title: Consideration of Resolutions Calling a Special Election for Filling Up To Two (2) Vacancies
Previous Recommendation:
1.Adopt
2.Or adopt resolutions calling for a special municipal election to fill two (2) vacancies on the City Council and authorize the City Clerk as follows:
1.Resolution calling the Special Election to fill the two vacancies to be held on June 2, 2026;and
2.Resolution requesting that this Special Election be consolidated with the Statewide Primary Election being held by the County on June 2, 2026; and
3.Resolution concerning procedures for candidate statements; and
4.Resolution concerning procedures in the case of a tie vote; and Marquette Hawkins
MAYOR
Michael Hurles
Ronald Smith
COUNCIL MEMBERS
Christopher Lopez
CITY MANAGER
CITY OF CALIFORNIA CITY SEPTEMBER 9, 2025
2 5.Authorize the City Clerk to finalize and make such modifications to these Resolutions as maybe required by Kern County and applicable law, subject to the City Attorney’s approval as to form.
Corrected Subject Title: Consideration of Resolutions calling a Special Election for filling up to two vacancies or the Appointment of up to two council members to fill vacancies on the city council
Corrected Recommendation:
1. Motion to appoint up to two (2) Councilmembers; or
2. Adopt resolutions calling for a special municipal election to fill two (2) vacancies on the City Council and authorize the City Clerk as follows:
1. Resolution calling the Special Election to fill the two vacancies to be held on June 2, 2026; and
2. Resolution requesting that this Special Election be consolidated with the Statewide Primary Election being held by the County on June 2, 2026; and
3. Resolution concerning procedures for candidate statements; and
4. Resolution concerning procedures in the case of a tie vote; and
5. Authorize the City Clerk to finalize and make such modifications to these Resolutions as may be required by Kern County and applicable law, subject to the City Attorney’s approval as to form.
AFFIDAVIT OF POSTING— September 6, 2025
I, Leanndrea Weible, Acting City Clerk for the City of California City, California, DO HEREBY CERTIFY that the foregoing notice was posted on all official City bulletin boards and the City’s website at least 72 hours prior to the meeting in compliance with the provisions of the Brown Act.
Leanndrea Weible
Leanndrea Weible, Acting City Clerk
CITY OF CALIFORNIA CITY
SEPTEMBER 9, 2025
Marquette Hawkins
MAYOR
Michael Hurles
Ronald Smith
COUNCIL MEMBERS
Christopher Lopez
CITY MANAGER
AGENDA
CITY COUNCIL/ HOUSING AUTHORITY/ SUCCESSOR AGENCY
REGULAR MEETING TUESDAY SEPTEMBER 9, 2025 @ 5:00 PM
COUNCIL CHAMBERS & VIA ZOOM
21000 HACIENDA BLVD., CALIFORNIA CITY, CA 93505
If you need special assistance to participate in this meeting, contact the City Clerk at (760) 373-7140 or via email at [email protected]. We request a 24- hour notification prior to the meeting in order for the City to make reasonable arrangements to ensure accessibility. (28 CFR 35.102-35.104 American Disabilities Act Title II)
Zoom instructions and notes:
Web Link: https://us06web.zoom.us/j/86418884282
Meeting ID: 864 1888 4282
1. Public can dial into the Zoom line:
a. One tap mobile: +16694449171,87254527178# US
b. Dial the following number: +1 564 217 2000 US
2. Comments
a. Public must join Zoom meeting to comment
b. Keep your mic on Mute until you are requested tospeak c. Use the “Raise your Hand” button to request to speak or, d. Send a chat request to City Clerk for request to speak e. When requested to speak state your name for the record f. Re-mute when your time to speak has ended
CITY OF CALIFORNIA CITY
SEPTEMBER 9, 2025
Public is urged to listen to the meeting in a quiet place, to avoid background noise. We also request public to MUTE your audio device when not commenting to avoid disruption during meeting.
**Please take this time to turn off your cell phones **
CALL TO ORDER
ROLL CALL
Councilmembers: Hurles, Smith, Mayor Hawkins
ADOPT THE AGENDA
PUBLIC COMMENT
Members of the public are welcome to address the City Council ONLY on those items listed on the Closed Session agenda. Each member of the public will be given (3) three minutes to speak
CLOSED SESSION
CS 1. Conference with Legal Counsel – Anticipated Litigation, Significant exposure to litigation pursuant to § 54956.9(b) Number of Matters- One (1)
CS 2. Conference with Legal Counsel –Existing litigation pursuant to § 54956.9 Claimant: Justin Vincent, Case No. BCV-25-102867
CS 3. Conference with Labor Negotiators pursuant to §54957.6 Employee Organization: Miscellaneous, Police and Fire Unions
REPORT OUT OF CLOSED SESSION
CITY COUNCIL CONVENES TO REGULAR MEETING
REGULAR MEETING 5:00PM
CALL TO ORDER
PLEDGE OF ALLIGANCE / INVOCATION
ROLL CALL –
Councilmembers: Hurles, Smith, Mayor Hawkins
CLOSED SESSION 4:00PM
CITY OF CALIFORNIA CITY
SEPTEMBER 9, 2025
DEPARTMENT REPORTS
PARK
OHV
HOUSING
CITY CLERK REPORTS/RECEIVED COMMUNICATIONS
JM POWERS- DATED:
AUGUST 1, 2025- Council Should Establish A Policy Identifying Essential Vs. Non-Essential City Services AUGUST 2, 2025- City Financials Perils Persist With The 2025/26 Budget AUGUST 3, 2025- City’s High Legal Litigation And Settlement Costs Burden Low Income Families AUGUST 30, 2025- Part 1, Water Enterprise Cash Grew To $11m In Just Over 4 Years And Why SEPTEMBER 1, 2025- Part 3, Water Rates Are At Risk Of Ballooning Due To City Mis-management
CIVIC/COMMUNITY/ORGANIZATION ANNOUNCEMENTS
PRESENTATIONS
PUBLIC BUSINESS FROM THE FLOOR / PUBLIC COMMENT
This portion of the meeting is reserved for the public to address the City Council on any matter NOT on this agenda and over which the City Council has jurisdiction. Please state your name for the record and limit your comments to (3) three minutes. The City Council will receive the comments but cannot engage in back-and- forth discussion with the public or make any decision. The City Council can direct staff to bring the item back to a future agenda for discussion.
CONSENT CALENDAR
WAIVER OF FULL READING OF RESOLUTIONS AND ORDINANCES
Consideration to waive full-text reading of all Resolutions and Ordinances by single motion made at the start of each meeting, subject to the ability of the City Council / Agency to read the full text of selected resolutions and ordinances when the item is addressed by subsequent motion. All items on the consent calendar are considered routine, and non-controversial and will be approved by (1) one motion if no member of the council, staff, or public wishes to comment or ask questions. Public comments are to be limited to (3) three minutes. Roll call vote required.
CC 1. Approve City Check Registers dated 7/18/25-8/7/25, 8/8/25-8/21/25 and 8/22/25-9/4/25
CITY OF CALIFORNIA CITY
SEPTEMBER 9, 2025
NEW BUSINESS
NB 1. Staff Report: Christy Marie Lopez, Assistant Attorney Subject
Consideration of Resolutions calling a Special Election for filling up to two vacancies or the Appointment of up to two council members to fill vacancies on the city council
Recommendation:
1. Adopt
2. Or adopt resolutions calling for a special municipal election to fill two (2) vacancies on the City Council and authorize the City Clerk as follows:
1. Resolution calling the Special Election to fill the two vacancies to be held on June 2, 2026; and
2. Resolution requesting that this Special Election be consolidated with the Statewide Primary Election being held by the County on June 2, 2026; and
3. Resolution concerning procedures for candidate statements; and
4. Resolution concerning procedures in the case of a tie vote; and
5. Authorize the City Clerk to finalize and make such modifications to these Resolutions as may be required by Kern County and applicable law, subject to the City Attorney’s approval as to form.
NB 2. Staff Report: Christoper Lopez, City Manager- Joe Barragan, Public Works Director Subject: A Resolution Of The City Council Of The City Of California City Authorizing The City Manager To Execute The Contract With BHT Engineering, Inc. For On-Call Professional Engineering Services For Local, State, And Federally Funded Projects Recommendation: Adopt the Resolution Of The Mayor and City Council Of The City Of California City Authorizing The City Manager To Execute The Contract With BHT Engineering, Inc. For OnCall Professional Engineering NB 3. Staff Report: Christopher Lopez, City Manager
Subject: Discuss and Provide Direction Regarding the City’s Financial Issues Recommendation: Provide Direction on Beginning the Neutral Evaluation Process NB 4. Subject: Discussion and Direction regarding $5,000.00grant received from African American Mayor’s Association
COUNCILMEMBER COMMENTS, AGENDA REQUESTS, AND AB1234 REPORTS This portion of the meeting is reserved for council members to present information, announcements, and items that have come to their attention. The Brown Act precludes Council, staff, or public discussion. Short staff responses are appropriate. The Council will take no formal action. A Council member may request the City Clerk to calendar an item for consideration at a future meeting or refer an item tostaff.
ADJOURNMENT
CITY OF CALIFORNIA CITY
SEPTEMBER 9, 2025
AFFIDAVIT OF POSTING-September 5, 2025
I, Leanndrea Weible, Acting City Clerk for the City of California City, California, DO HEREBY CERTIFY that the foregoing notice was posted on all official City bulletin boards and the City’s website at least 72 hours prior to the meeting in compliance with the provisions of the Brown Act.
DR-PARK
COUNCIL AGENDAITEM
September 9, 2025
TO: Honorable Mayor and City Council
FROM: Christopher Lopez, City Manager
Leanndrea Weible, Park Coordinator
SUBJECT: Park and Recreation Monthly DepartmentReport
CURRENTLY:
Sunday Mornings Holy Scriptures Church Service is held in the Arts and Community Building Wednesdays the Strata Center is used for Zumba Classes from 5-6pm.
Tuesday – Saturday the pool is open. Below is the scheduled hours of operation • Monday-CLOSED
• Tuesday- 3:30pm-6:30pm / Water Aerobics 2pm-3pm
• Wednesday- 3:30pm-6:30pm
• Thursday- 3:30pm-6:30pm / Water Aerobics 2pm-3pm
• Friday- 1:00-6:00pm
• Saturday 11:00am-6:00pm
• Sunday-CLOSED
UPCOMING:
Next Regular Parks and Rec commission Meeting is scheduled for 9/15/2025 @ 5:30pm in the City Council Chambers located at City Hall
21000 Hacienda Blvd
California City, CA 93505.
***REMINDERS***
• Anyone interested in volunteering at the park can pick up a Volunteer application at City Hall.
• If you have a talent or know someone who does and want to share it with others, please contact the Park Coordinator (760) 373-3530
DR-OHV
COUNCIL AGENDA ITEM
September 9, 2025
TO: Honorable Mayor and City Council
FROM: Christopher Lopez, City Manager
Inge Elmes, OHV Manager
SUBJECT: OHV MONTHLY DEPARTMENT REPORT
Events
Labor Day Holiday weekend brought out a fair number of visitors considering the temperature was still too hot. A total of 28 RV groups were visible during the weekend. Borax Bill Park Campground RV spots were fully rented to OHV enthusiasts. The next major holiday weekend will be Columbus Day, which brings out a substantial increase in visitors, weather dependent.
Operations
Staff is focusing on preparing for new grant cycle which begins this month.
Manager Updates
The main focus is closing out G24 grant cycle and preparing for the new permit and grant season.
Finance Report
For the month of August, OHV sales totaled $3,703.00. These numbers are actuals and reflect only amounts received within each month. Please refer to Monthly Permit Sales report for FYtotals. *Not all proceeds are deposited in the same month.
**OHV sales are deposited to specific OHV Permit Program GL revenue codes #29-3992 through #29-3998. Please refer to the financial statement for details. ***Some merchandise was purchased by staff at a discounted rate. All sales for merchandise are allocated to GL revenue code 29-3691.
Attachment
OHV Permit Program Sales Spreadsheet
August MONTHLY OHV PROGRAM SALES FY 25/26
SALES 2025 Totals QTY CASH CHECK CREDIT CARD PAYPAL TOTALS YTDTOTALS Single Permits (Prorated) $10 0 $0 $0 $0 $0
Single Permits 30 $240 $0 $210 $45 $495 1,275.00
$15
Small Family (Prorated) $40 0 $0 $0 $0 $0
Small Family $60 7 $180 $0 $240 $60 $480 1,14.00
Large Family (Prorated) $80 0 $0 $0 $0 $0
Large Family $100 1 $100 $0 $0 $100 500.00
OHV 4 Pack (Prorated) $35 0 $0 $0 $0 $0
OHV 4 Pack $50 4 $100 $0 $100 $200 550
RV Pass (Prorated) $15 0 $0 $0 $0 $0
RV Pass $30 4 $60 $0 $60 $120 240.00
Si ngl e Dump Pass $5 2 $5 $0 $5 $10 15
Single Water Pass $5 2 $10 $0 $0 $10 25
Additional Permits (Prorated) $5 0 $0 $0 $0 $0
Additional Permits $10 0 $0 $0 $0 $0
Free Free 6 $0 $0 $0 $0
Residents Permits Free 13 $0 $0 $0 $0
Paypal Fees - $4 $4 3 $0 $0 $0 $12 $12 $44
Holiday Week Day - Power $25 2 $50 $0 $0 $50 100
Holiday Week Day - Water $15 2 $30 $0 $0 $30 60
Non-Holiday Weekday-Power $15 31 $75 $0 $390 $465 615.00 Non-Holiday Weekday-Water $10 16 $40 $0 $120 $160 180.00 Holiday Weekend - Power $40 5 $200 $0 $0 $200 280
Holiday Weekend - Water $20 6 $120 $0 $0 $120 160
Non-Holiday Weekend-Power $25 17 $100 $0 $325 $425 500.00 Non-Holiay Weekend-Water $15 11 $60 $0 $105 $165 165
Shower Tokens $0.50 254 $75 $0 $52 $127 266.00
Transient Lodging $150 0 $0 $0 $0 $0
Vendor Fees $1 0 $0 $0 $0 $0
Special Event Fees $5 0 $0 $0 $0 $0
Map Sales $3 2 $6 $0 ' $0 $6 12
Donations $1 1 $15 $0 $0 $15 15
Hoodies $40 3 $0 $0 $120 $120 120.00
Short Sleeve Shirts $20 10 $0 $0 $120 $120 150.00
Long Sleeve Shirts $30 2 $30 $0 $30 $60 90.00
Caps $20 3 $40 $0 $20 $60 90.00
Bucket Hats $20 2 $0 $0 $60 $60 80.00
Visors $15 0 $0 $0 $0 $0
Beenies $15 2 $15 $0 $15 $30 30.00
Tumblers $25 1 $0 $0 $25 $25 25.00
Magnets $5 2 $0 $0 $10 $10 10.0
Ornaments $10 2 $0 $0 $20 $20 20.00
Stickers $3 1 $0 $0 $3 $3 3.0
Coffee Mugs $15 0 $0 $0 $0 $0
Shot Glasses $10 0 $0 $0 $0 $0
Wine Glasses $15 0 $0 $0 $0 $0
Pint Glasses $20 0 $0 $0 $0 $0
Coasters Cork $5 2 $5 $0 $0 $5 5.00
Coasters Slate $10 0 -$0 $0 $0 $0
Keychain $10 0 $0 $0 $0 $0
Postcards $1 0 $0 $0 $0 $0
MONTHLY TOTALS $1,55 $0 $2,030 $117 $3,703 $6,765.00
DR-HOUSING
COUNCIL AGENDA ITEM
September 9, 2025
TO: Honorable Mayor and City Council
FROM: Christopher Lopez, City Manager
Nicole Jarmon- Housing Manager
SUBJECT: HOUSING MONTHLY DEPARTMENT REPORT
BACKGROUND/ DISCUSSION
Desert Jade
Currently 91 apartments have been filled.
The waitlist currently has 66 applicants.
Desert Jade has two vacancies and is undergoing repairs.
Three units have become vacant as of September.
August 26, we had our monthly food giveaway
Sept 17th will be Desert Jade 2nd annual BBQ.
Legends
Currently has 6 apartments and 6 houses filled.
Waitlist is combined with Desert Jade
Acting City Clerk V\/eible August 1, 2025
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
Re: Council Should Establish Policy Identifying Essential vs. Non-Essential City Services Include this letter into the record for the upcoming city council meeting and distribute to city council members, city manager, and finance director; place this topic on the agenda to discuss at the next city council meeting.
Cal City is in a financial weak position. Cities in similar predicament are urged by the State Auditor to de-scope their budgets to cover only essential services and those nonessential services that do not add to the structural deficit. The Council has not defined city essential services, nor has levels of service been established for available revenue.
The CA State Auditor has repeatedly cautioned fiscally endangered municipalities to establish policies defining Essential versus Non-Essential Services. The Council should work with the city manager to delineate levels of service costs versus forecasted revenue available to achieve a structurally balanced budget. There is wide agreement that essential municipal services include public safety, infrastructure sustainability and perhaps as a gray area public transport. Utilities also deemed essential would include access to reliable electrical power, natural gas/propane, and communication services; normally provided by commercial firms.
Within the context of municipal essential services, it is straightforward to establish boundaries of critical functions applied to Cal City departments, excluding those services already provided by contractors.
• Public Safety (law enforcement, fire protection, and emergency medicalservices) • Infrastructure (water, sewer, streets)
• Municipal management and support functions of public safety and infrastructure • Public Transportation (Dial-A-Ride, maybe)
Municipal services that fall outside the scope of essential services; thus, are nonessential are shown in the table below. There are least eight candidates for services suspension or curtailment.
• Airport
• Parks & Recreation
• Tierra Del Soi Golf Course
,rovements
• Aspen Mall Landscaping & Lighting
• Off-Highway Vehicle (OHV)Program
• City-Managed Housing Corporation
• Cannabis Industry Oversight
Among the eight identified non-essential services, some are self-sustaining from revenue vs. expense aspects, which should lower their vulnerability to suspension or curtailment. The city is experiencing growing financial distress, but past and current councils have been unwilling to "draw the cut line." The Council should take immediate action to define essential services and receive the city manager's recommendation as to which non-essential services to cut or retain due to their revenue vs. expense expectations andj b y _wh levels of service.
Cc: Each Council Member, City Manager Lopez, M
Acting City Clerk Weible
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
August 2, 2025
Re: City Financial Perils Persist With the 2025/26 Budget Include this letter into the record for the upcoming city council meeting and distribute to city council members, city manager, and finance director; place this topic on the agenda to discuss at the next city council meeting.
The City's debt has exceeded ($61M). The 2025/26 approved budget was not provisioned to address the city's growing debt. Bad estimations from the 2024/25 budget will carryover to the 2025/26 budget; monthly cash flow forecasts are now essential to watch.
The City's financial position is growing worse by the month. There are three major debts facing the city: 1) operating and capital improvements cumulative debt has exceeded ($20M), 2) PERS Unfunded Liability is ($20.1M) as of the end of June 2024 [Source: June 2024 Annual Audit page 41, Note Bb.], and 3) Successor Agency Trust (Fund 75) owes ($20.7M) to the SDI Fund 72. The total of this debt now approaches ($61M).
The city's existing cash-on-hand and forecast revenue for 2025/26 is insufficient to cover the projected increase in debt. Without prompt action on the part of the City Manager, debt will continue to race skyward. There were no provisions in the 2025/26 budget to control debt growth; the budget instead contained a structural deficient. The council should not have approved the 2025/26 budget with these inherent deficiencies. As each month progresses, it will be harder to reverse the debt direction.
There is expectation for a "miracle to occur" by the Mid-Year Budget Review. But, the city has not held a Mid-Year Budget Review in 5-6 years. In concert with the companion letter dated August 1, 2025, the Council should, as policy, identify what city services are essential and choose which services are non-essential, both self-sustaining and non-self-sustaining. Some non-essential services/departments should be targeted for suspension or curtailment.
Beginning July 2025, the city endures ($61M) in debt with weak prospects to reduce this debt over time, it may already be too late. An important starting point is to get budget estimations under control. The very late 2024/25 budget (approved March 25, 2025) will likely have over $5M in end of FY revenue estimation errors and $5.5M in end of FY expense estimation errors. Total estimation errors at the GL-level are on track to exceed $20M. This large magnitude of estimation errors highly distorts and inflates the planned budget and taints the formulation of future year budgets.
Regrettably, the city has chosen not to follow recommended best practices and guidance from GFOA and GAAP to prepare effective and executable budgets. The City Manager has a responsibility to ensure the budget is conducted with transparency in the best interests of the public and city employees. The City Manager has been urged often to prepare monthly cash flowestimatesforthe2025/26budgetyearinorderto -ct
tobettermanagecitydebt. '
osweak fiscal activity and
. ers
Cc: Each Council Member, City Manager Lopez, Ml2f_.P4, All Stakeholders Acting City Clerk Weible
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
August 3, 2025
i
' {if
I
I
-
Re: City's High Legal, Litigation, and Settlement Costs Burden Low Income Families Include this letter into the record for the upcoming city council meeting and distribute to city council members, city manager, and finance director; place this topic on the agenda to discuss at the next city council meeting.
Thecity's high annual costof legalservices & litigation isover $300/household,which is more than twice the cost of Measure A & C parcel taxes. The 2024 Kern County Grand Jury report made 5 recommendations to reduce city legalcosts;fewweremet.
The city's legal, litigation, and settlement costs have achieved a new 5-year average highof$1.45Mperyear. This translates intoaper-household costof$307per year. This twice the annual cost of the city's prior parcel taxes. The 2024 Kern County Grand Jury (KCGJ) Report identified five recommendations #9, #10, #11, #13 & #14 associated with the city's high legal and litigation costs; most recommendationswere NOT MET by the city.
Total City Legal & Settlement Costs by Fiscal Year
!Source: End of Year Financial Statements from Finance Dept.I !!J
; $2,000,000
E
Council Members
I McGuire
Lessenevltch
Parris
I Johnson/R.Smith
Stump/W. Smith
I
I
•
I
.
I
...
I
Council Members
O' Laughlln I
Lessenevltch
K.Kullkoff I
Macedonio I Creighton
I
COUJ'!Cil Mem .l!
K. Kullkoff I Smith
Macedonio/Cooper I
Creighton I M. Kulikoff
- I
.
I
Council
M9mbers
Hawkins
M. Kullkoff
Smith
Hurles
Hightower
CD
en
olS
$1,600,000 I
I
I
I I
I - I ...-
.,
ii $1,200,000
0) .3
I
I _,_ -
- , -
I'll
:I
C
C
-4:
!
0 $800,000
$400,000 -
$0
>--- '---
1---
, ,
I---
1---
,-...
,-...
"OJ "OJ " ,. '(l,'1, a:,# - ,t,
r:,"-'o ff; v
"'
Fiscal Years
Legalandlitigationcostswerehighestinfiscalyear2023/24,whichpeakedafterthe KCGJ visit and their 5 recommendations. The city experienced the second highest legal and litigation costs in 2024/25. The real victims of these high legal costs are 500/o of the city's population that are lowincome. Litigation is mainly vom individuals and entities that possess sufficient money to seek out legal challenges. (.h ers
Cc: Each Councli Member, City Manager Lopez, MON, All aJ(ehol ers . di'(
Acting City Clerk Weible Aug 30,2025
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
Re: Part 1, Water Enterprise Cash Grew to $11M in Just Over Four Years and Why Include this letter into the record for the upcoming city council meeting and distribute to city council members, city manager, and financedirector; place this topicon the agenda to discuss at the next city council meeting.
Water customers endured a huge water rate increase spanning five years and raised $11M in cash for water main replacement. Rather than using the revenue for capital improvements, cash was kept in the Water Enterprise Fund unused, violating Prop218.
The City Council approved a 126% Water Rate increase in Nov 2014. The Water Fund cash amount grew from less than $500K to over $11M in just over four years as shown in the chart below. Instead of using the acquired revenue for intended purposes, Public Works decided to stockpile the money and not apply it for water main replacement. The 2014 Water Rate Study's elevated rates were based on replacing aging water mains at a pace of 5.8 miles per year at a cost of $1.35M per year; the revenue was not used as intended, violating Prop 218.
Water O&M and CIP Cash-on-Hand
,,
C
I
C
9 .c
(/)
C'II
0 s
'-
J
$12,000,000
s10,ooo,ooo
$8,000,000
$6,000,000
$4,000,000
$2,000,000
2014/15- 2020/21
D WaterCash
Rate IllegalRates
Rollback by Public
Urged, But Works No
Denied Rate Study
$0
.... 'o 'b o., o>
f:::, f:::,...._<d f:::,...._'o f:::, f:::, f:::,...._0:, Rate Study Overdue
In April 2019, with excessive cash-on-hand, the public convinced the City Manager to payoff a long-term USDA loan for prior capital improvement, this saved the Water Fund over · $3M. Public Works was urged to rollback water rates in 2019, but did not. Rather than rolling back rat . Public Works introduced revised water rates in July & August 2020 without a Rate Study. The results of those 2020 ratesare shown in thecompaflm j,etter dated Aug 31, 2025.
Cc: Each Council Member, City Manager Lopez, MON,
f
Acting City Clerk Weible Aug 30,2025
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
Re: Part 1, Water Enterprise Cash Grew to $11M in Just Over Four Years and Why Include this letter into the record for the upcoming city council meeting and distribute to city council members. city manager, and finance director; place this topic on the agenda to discuss atthe next city council meeting.
Water customers endured a huge water rate increase spanning five years and raised $11M in cash for water main replacement. Rather than using the revenue for capital improvements, cash was kept in the Water Enterprise Fund unused, violating Prop218.
The City Council approved a 126% Water Rate increase in Nov 2014. The Water Fund cash amount grew from less than $500K to over $11M in just over four years as shown in the chart below. Instead of using the acquired revenue for intended purposes, Public Works decided to stockpile the money and not apply it for water main replacement. The 2014 Water Rate Study's elevated rates were based on replacing aging water mains at a pace of 5.8 miles per year at a cost of $1.35M per year; the revenue was not used as intended, violating Prop 218.
Water O&M and CIP Cash-on-Hand
$12,000,000
'ti
;
C
i! $10,000,000
9 C
2014/15 - 2020/21
D WaterCash
Illegal Rates
by Public
Works No
Rate Study
.c
...
!
s
{!.
$8,000,000
$6,000,000
$4,000,000
$2,000,000 +- - ---1
$0
.... (o t 'b o., ....
.... .._(o ..._o., Rate Study
. Overdue
In April 2019, with excessive cash-on-hand, the public convinced the City Manager to payoff a long-term USDA loan for prior capital improvement, this saved the Water Fund over $3M. Public Works was urged to rollback water rates in 2019, but did not. Rather than rolling back rates, Public Works introduced revised water rates in July & August 2020 without a Rate Study. The results of those 2020 rates are shown in the compa op ) r dated Aug 31, 2025.
Cc: Each Council Member, City Manager Lopez, MDN, All
I
8 Acting City Clerk Weible Sept 1, 2025
California City Hall, 21000 Hacienda Blvd
California City, CA 93505-2259
Acting City Clerk Weible,
Re: Part 3, Water Rates are at Risks of Ballooning Due to City Mismanagement Include this letter into the record for the upcoming city council meeting and distribute to city council members, city manager, and finance director; place this topic on the agenda to discuss at the next city council meeting.
Consequence of ($4.44M) in Water Fund cash decline foretells of a large impending water rate increase when a new Water Rate Study is accomplished and approved. The city's mismanagement of the ailing water infrastructure is very costly to water ratepayers.
The last council-approved Water Rate Study occurred in Nov 2014, over 10 years ago.
As identified in Parts 1 & 2 letters dated Aug 30 & 31, 2025, the city's water rates violate Prop 218, codified in the CA Constitution Article 13C&D. Furthermore, Public Works has failed to comply with the frequency of water rate studies per CA Gov Code §53756(a), a 5-year ratesetting interval, and per CA Gov Code §54999.7(c), a 10-year maximum interval when the water supplier serves public schools.
In 2020, Public Works contracted for a Water Rate Study scheduled for completion by July 2021. However, the Study was not delivered until Sept 2023, 26 months late and at a cost of $67K. This 2023 Water Rate Study is NOT council-approved, NOT in effect, and contains a large number of errors, omissions, and discrepancies. Further, many of the assumptions and initial conditions used in the 2023 Water Rate Study are no longer valid. Because the Water Fund cash balance is ($4.44M) lower now than in 2020, the next council-approved water rate study is highly likely to substantially increase water rates due to avoidable cash loss.
Public Works has regularly and publicly stated in City Council Meetings "the water mains have failed." Yet, minimal water main replacement has occurred. At least 170 miles of aged steel water mains have not yet been replaced despite $40M in revenue collected from water rates and Water Standby Fees since 1993. Public Works has missed opportunities for receiving well over $20M in State Grants and Low Cost Loans for water infrastructure. The 2022 Kern County Grand Jury Report, Finding #4 stated, "Ca/ City's water line replacement program can only be described as derelict and incompetent.,,
Residents and businesses are the victims of city mismanagement of the water system and infrastructure. Prop 218 was passed in 1996, but the city ignored their requirement to pay for use of potable water services until 2014, for 18 years- back then there were two city 18-hole golf courses. Then in 2020, Public Works highly discounted potable water rates for the golf course, (see Part 2 companion letter dated Aug 31, 2025) violating Prop 218.
Reasons the aforementioned 2023 Water Rate Study has been shelved, besides the errors, omissions, and discrepancies, is due to two specific causes. First, the 2023 Study, page 2, states, "invalidated the Prop 218 compliant cost of service allocation," cites the 2020 water rates (which exist now) violate Prop 218. Second, the 2023 Rate Study eliminates the non-compliant "temporary acre-feet rate," which would the.p force the golf course to finally pay actual proportional cost of services for potable water.
Cc: Each Council Member, City Manager Lopez, M
CC 1
COUNCIL AGENDA ITEM
September 09, 2025
TO: Honorable Mayor and City Council
FROM: Christopher Lopez, City Manager
Kenny Cooper, Finance Manager
SUBJECT: Approve City Check Registers dated 7/18/25-8/7/25, 8/8/25-8/21/25 and 8/22/25-9/4/25
BACKGROUND/ DISCUSSION:
The following checks have been prepared by the Finance Department. The items are provided to the Mayor and City Council for review and approval.
RECOMMENDATION:
Staff recommends the City Council discuss and approve the attached check register.
California City Check Register - City Council Meeting
Check Issue Dates: 7/18/2025 - 8/7/2025
Page: 1
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name 115422 Elizabeth Davis Lifeguard Certification Tra ining 5 07/22/2025 0722-EDOl 900.00 900.00 104562130 Recruiting Total 115422: 900.00
115423 661 Communications Transfer Cradelpoints & UPS Batte 07/06/2025 2001 1,009.14 1,009.14 104212270 Bldg Operation/Mai 115423 661 Communicat ions ASSET #624 - INSTALL LAPTOP A 07/11/2025 2007 95.00 95.00 606000752 Community Benefit Total 115423: 1,104.14
115424 AT&T Wireless 06/01-06/30/25 06/30/2025 287281248059 875.51 875.51 104155286 Communications Ma 115424 AT&T Wireless 06/03-07/02/25 07/02/2025 287306780425 963.38 963.38 184217284 Telephone - Land Total 115424: 1,838.89
115425 Frontier 07/19-08/18/25 07/19/2025 081503-5 0719 3,619.14 3,619.14 535310284 Telephone - Land Total 115425: 3,619.14
08/06/2025 115426 Hughes Network System 07 / 29 -08/ 29/ 25 07/29/2025 B1433780695 152.63 152.63 294219286 Communications Ma Total 115426: 152.63
08/06/2025 115427 ODP Business Solutions Office Supplies 07/14/2025 425793950001 469.81 469.81 104212241 Office Supplies Total 115427: 469.81
08/06/2025 115428 SoCalGas 06/11-07/11/25 07/17/2025 17373816911-0 510.84 510.84 535310282 Gas Total 115428: 510.84
115429 Southern California Edis 05/08 - 07 /09/25 07/14/2025 071425 94,505.34 94,505.34 717111281 Electricity Total 115429 : 94,505.34
115430 Charter Communication 06/01-06/30/25 07/01/2025 127516201070 3,987.00 3,987.00 184212286 Communications Ma 115430 Charter Communication 06/01-06/30/25 07/01/2025 170622401070 1,091.26 1,091.26 184212286 Commun ic ations Ma Total 115430: 5,078.26
115432 US Bank Equipment Fina 07 /13-08/13/25 Copiers 07/20/2025 560342230 770.06 770.06 515115242 Office Equip Lease E Total 115432 : 770.06
CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 2
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name 08/07/2025 115433 Agile Occupational Medi Physical Exam 07/15/2025 EM048731 585.00 585.00 104222130 Recruiting 08/07/2025 115433 Agile Occupational Medi Physical Exam 07/23/2025 EM049317 585.00 585.00 294219130 Recruiting Total 115433 : 1,170 .00
08/07/2025 115434 Alexander Enterprises, I 07 /01-07/31/25 07/24/2025 4300 4,316.15 4,316.15 515115630 Contracts Total 115434: 4,316.15
08/07/2025 115435 All American Uniforms Kimbrel Uniforms Reserve 07/24/2025 102 072425 804.09 804.09 104212140 Uniforms/Safety Eq Total 115435: 804.09
08/07/2025 115436 AVNI Enterprises I nc. Unit 535 08/04/2025 1875 88.04 88.04 194222254 Veh Operation/Main Total 115436: 88.04
08/07/2025 115437 Bakersfield Well & Pump Purging & Sampling of Monitor We 07/15/2025 RB25239 584 .55 584.55 515115256 Equipment Operatio 08/07/2025 115437 Bakersfield Well & Pump Purging & Sampling of Monitor We 03/20/2025 RB2569 12,535.28 12,535.28 515115256 Equipment Operatio Total 115437 : 13,119.83
08/07/2025 115438 BHT Engineering, Inc Job #25400- General Engineering 06/30/2025 CC25-101 2,802.50 2,802.50 104170315 Engineering 08/07/2025 115438 BHT Engineering, I nc Job #25402- Indian Wells Water P 06/30/2025 CC25-102 4,665.00 4,665.00 104170315 Engineering 08/07/2025 115438 BHT En gineerin g, Inc Job #22400.32- KUDU Solar SPR 2 06/30/2025 CC25-103 4,405.00 4,405.00 104170315 Engineering Total 115438: 11,872.50
08/07/2025 115439 Black Box Safety, Inc. VEST - KIMBREL, T 07/28/2025 SQ-100559 1,364.77 1,364.77 104212451 Armory/Safety Equi Total 115439: 1,364.77
08/07/2025 115440 Bound Tree Medical Medical Supplies 03/31/2025 85716819 834.62 834.62 194222480 Chemicals/EMS Med 08/07/2025 115440 Bound Tree Medical Medical Supplies 07/11/2025 85840804 1,068.91 1,068.91 104222480 Chemicals/Ems Med 08/07/2025 115440 Bound Tree Medical Medical Supplies 07/15/2025 85844384 55.10 55.10 104222480 Chemicals/Ems Med 08/07/2025 115440 Bound Tree Medical Medical Supplies 07/17/2025 85847560 347.82 347.82 104222480 Chemicals/Ems Med 08/07/2025 115440 Bound Tree Medical Medical Supplies 07/28/2025 85858741 256 .16 256 .16 104222480 Chemicals/Ems Med 08/07/2025 115440 Bound Tree Medical Medical Supplies 08/01/2025 85865954 151.32 151.32 104222480 Chemicals/Ems Med Total 115440: 2,713.93
08/07/2025 115441 Burke Williams & Sorens 05/01-05/31/25 06/06/2025 343940-343962 81,092.39 81,092.39 104155311 Legal Services 08/07/2025 115441 Burke Williams & Sorens 06/01-06/30/25 07/10/2025 346103-346125 86,659.50 86,659.50 104155311 Legal Services CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 3
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name Total 115441 : 167,751.89
08/07/2025 115442 Ace City Hardware SUPPLIES 04/24/2024 12973 38.60 38.60 194222270 Bldg Operation/Mai 08/07/2025 115442 Ace City Hardware SUPPLIES 04/05/2025 15474 86.32 86.32 194222270 Bldg Operation/Mai 08/07/2025 115442 Ace City Hardware SUPPLIES 06/18/2025 15863 14.52 14.52 194222270 Bldg Operation/Mai 08/07/2025 115442 Ace City Hardware SUPPLIES 06/26/2025 15905 85.02 85.02 194222270 Bldg Operation/Mai Total 115442 : 224.46
08/07/2025 115443 Cal City TV & Appliance s Propane 07/09/2025 690 169.30 169.30 274411285 Propane 08/07/2025 115443 Cal City TV & Appliances Propane 07/24/2025 693 162.31 162.31 274411285 Propane Total 115443 : 331.61
08/07/2025 115444 County of Kern 07 /01/25-06/30/26 PW YARD AN 06/12/2025 IN0506499 723.00 723.00 515115610 Licenses & Permits Total 115444: 723.00
08/07/2025 115445 Dennis Automotive Check and replace fan 07/14/2025 24145 356.16 356.16 515115254 Veh Operation/Main Total 115445: 356.16
08/07/2025 115446 Department of Justice 06/01-06/30/25 06/30/2025 828836 164.00 164.00 184213620 Livescan Fees Total 115446 : 164.00
08/07/2025 115447 Department ofTranspor 10/01/24-12/31/24 Signals & Lig 03/24/2025 SL250652 217.00 217.00 274411450 Speci al Depart Supp Total 115447: 217.00
08/07/2025 115448 Rivera, Armando Water Service Application Refund 06/23/2025 2.000176658 120.00 120.00 513715 Turn On Fees Total 115448: 120.00
08/07/2025 115449 ALBERTO CERDA Refund Water Standby Fee 07/31/2025 07312025 42.38 42.38 953726 Water Standby Char Total 115449 : 42.38
08/07/2025 115450 Diamond Ford Unit 141 PANEL RACK 07/08/2025 601832Xl 187.46 187.46 545410254 Veh Operation/Main Total 115450: 187.46
CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 4
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name 08/07/2025 115451 Eastern Kern APCD Permit Renewal 06/04/2025 30001 152.00 152.00 274411610 Licenses & Permits Total 115451: 152.00
08/07/2025 115452 Entenmann-Rovin Comp Dome Badge 01/28/2025 185801-IN 149.13 149.13 184212451 Armory /Safety Equi 08/07/2025 115452 Entenmann-Rovin Comp Dome Badge 03/06/2025 186750-IN 1,218.83 1,218.83 606000752 Community Benefit Total 115452 : 1,367.96
08/07/2025 115453 Expert Garage Doors and PW Gate Repair 07/20/2025 1131 49.00 49.00 105117270 Bldg Operation/Mai Total 115453: 49.00
08/07/2025 115454 Ferguson Ent - DBA Palla Dia Kit 07/09/2025 291821 2,450 .61 2,450.61 515115269 Inventory Total 115454: 2,450.61
08/07/2025 115455 Guardian Gear ASSET#619 -Ballistic Helmets& 04/14/2025 1787 530.93 530.93 606000752 Community Benefit Total 115455: 530.93
08/07/2025 115456 )MPOffice Technologies Postage labels 07/22/2025 INST467473 56.00 56.00 104155245 Postage and Shippin Total 115456: 56.00
08/07/2025 115457 Karl's Hardware-Rosaro SUPPLIES 07/23/2025 27179 11.90 11.90 274413450 Special Depart Supp 08/07/2025 115457 Karl's Hardware-Rosaro Chainsaw 07/16/2025 289879 1,058.43 1,058.43 274413256 Equipment Operatio Total 115457 : 1,070.33
08/07/2025 115458 Karls Hardware-Mojave WATERPARTS-BORAX BILL 08/02/2025 9103 41.12 41.12 164253270 Bldg Operation/Mai Total 115458: 41.12
08/07/2025 115459 Kern Auto Parts Inc. Bal o/c per Brandy 02/28/2025 193-13313 76.40 76.40 104561270 Bldg Operation/Mai Total 115459: 76.40
08/07/2025 115460 Kern County Fire Dept 04/01-06/30/25 07/30/2025 26-000039 22,774.17 22,774.17 194222310 Professional Service Total 115460: 22,774.17
08/07/2025 115461 Law Offices of Angel Ho I 06/01-06/30/25 07/06/2025 2507-02 3,547.18 3,547.18 104155311 Legal Services CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 5
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name Total 115461 : 3,547.18
08/07/2025 115462 Liebert Cassidy Whitmor 06/01-06/30/25 06/30/2025 299174 319.00 319.00 104155311 Legal Services 08/07/2025 115462 Liebert Cassidy Whitmor 06/01-06/30/25 06/30/2025 299175 8,177.00 8,177.00 104155311 Legal Services Total 115462 : 8,496.00
08/07/2025 115463 Linde Gas & Equipment I Medical Oxygen 07/22/2025 51005358 150.07 150.07 104222480 Chemicals/Ems Med Total 115463 : 150.07
08/07/2025 115464 Mary Valenti, PhD Psych Pre-Employment Screening 07/25/2025 072525 500.00 500.00 104212130 Recruiting Total 115464 : 500.00
08/07/2025 115465 Myers, Vella P Notary 07/28/25 07/28/2025 494053 15.00 15.00 104155311 Legal Services Total 115465: 15.00
08/07/2025 115466 One Hundred Designs OHV Signs 08/01/2025 5290 74.77 74.77 294219450 Special Depart Supp Total 115466 : 74.77
08/07/2025 115467 O'Reilly Auto Parts Unit266 07/16/2025 6127-272218 162.94 162.94 515115254 Veh Operation/Main 08/07/2025 115467 O'Reilly Auto Parts Unit486 07/16/2025 6127-272219 184.94 184.94 274411254 Veh Operation/Main 08/07/2025 115467 O'Reilly Auto Parts Unit 259 07/17/2025 6127-272380 316.76 316.76 525213254 Veh Operation/Main 08/07/2025 115467 O'Reilly Auto Parts Unit 101 07/21/2025 6127-272962 430.07 430.07 274411254 Veh Operation/Main Total 115467 : 1,094.71
08/07/2025 115468 Pace Analytical Services WWTB Lab Sampling 07/08/2025 2527B520386 275.00 275 .00 525213314 Lab Sampling Total 115468: 275.00
08/07/2025 115469 Palma, Rene Pool Repair & Maint 07/30/2025 INVOOlO 1,640.00 1,640.00 104562270 Bldg Operation/Mai Total 115469: 1,640.00
08/07/2025 115470 Price Paige & Company C Bank recs YR ended 6.30.25 06/30/2025 36443 9,360.00 9,360.00 104141310 Professional Service Total 115470: 9,360.00
CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 6
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name 08/07/2025 115471 Primo Brands 06/11-0710/25 AC8710114250 07/12/2025 05G871011425 349.85 349.85 104155241 Office Supplies Total 115471: 349.85
08/07/2025 115472 Public Opinion Strategie July 2025 07/02/2025 INV-010551 15,000.00 15,000.00 104155310 Professional Service Total 115472: 15,000.00
08/07/2025 115473 Quadient Finance USA, I 07 /01-07/31/25 07/24/2025 7900 0440 8134 1,900.00 1,900.00 104155245 Postage and Shippin Total 115473: 1,900.00
08/07/2025 115474 Renewell Fleet Services Unit 535 - Seat Belt 07/15/2025 6829 576.27 576.27 104222254 Veh Operation/Main Total 115474: 576.27
08/07/2025 115475 S.C. Friends Tire Inc. Unit#542 07/15/2025 49719 40.00 40.00 104222254 Veh Operation/Main Total 115475 : 40.00
08/07/2025 115476 Smith, Blain Uniform Allowance 25/26 07/01/2025 UNIFORM 0701 1,400.00 1,400.00 104222140 Uniforms/Safety Eq Total 115476: 1,400.00
08/07/2025 115477 State Controller's Office 07 /01/24-06/30/25 Annual Stree 03/12/2025 FAUD-0000463 3,200.00 3,200.00 274411630 Contracts Total 115477: 3,200.00
08/07/2025 115478 StradlingYocca Carlson 06/01-06/30/25 07/15/2025 421828 69.50 69.50 104155311 Legal Services Total 115478: 69.50
08/07/2025 115479 Tech 45 Airport Manage July 2025 Final 08/01/2025 2007 5,242.38 5,242.38 535310310 Professional Service Total 115479: 5,242.38
08/07/2025 115480 The Hiller Companies LL 2024 ANNUAL FIRE EXT INSPECT! 05/29/2024 515577 439.36 439.36 194222630 Contracts 08/07/2025 115480 The Hiller Companies LL 2024 ANNUAL FIRE EXT INSPECT! 05/31/2024 516481 104.00 104.00 194222630 Contracts Total 115480: 543.36
08/07/2025 115481 Titan Empire 04/11/25 04/11/2025 25037 995.00 995.00 184212130 Recruiting CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 7
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name Total 115481: 995.00
w
Cf;l)
tr.'
nD:
J
:
D.
f.
6: 1,490.00
08/07/2025 115482 Turbo Data Systems Citat ion Processing Services 06/30/2025 46070 490.48 490.48 194216310 Professional Service Total 115482: 490.48
08/07/2025 115483 Van Dermyden Makus La May 2025 06/10/2025 34179A 52.57 52.57 104155311 Legal Services 08/07/2025 115483 Van Dermyden Makus La June 2025 07/08/2025 34464 9,582.63 9,582.63 104155311 Legal Services Total 115483: 9,635.20
08/07/2025 115484 Vestis 07/ 08-07/16/25 Pants Service 07/15/2025 2601738579 86.34 86.34 294219451 Armory/Safety Equi 08/07/2025 115484 Vestis 07/16-07/24/25 Pants Service 07/22/2025 2601740458 86.34 86.34 294219451 Ar mory /Safety Equi Total 115484: 172.68
08/07/2025 115485 Walkup Investigations July 2025 07/17/2025 2025-25 750.00 750.00 104155310 Professional Service Total 115485: 750.00
08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/17/2025 2507202 215 .00 215.00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/17/2025 2507264 320.00 320.00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/17/2025 2507265 185.00 185.00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/17/2025 2507366 320.00 320.00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/17/2025 2507367 215 .00 215 .00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Water Testing 07/24/2025 2507412 185.00 185.00 515115314 Lab Sampling 08/07/2025 115486 Zalco Laboratories Inc Wate r Testing 07/24/2025 2507413 50.00 50.00 515115314 Lab Sampling 1 Total 11548 115487 Primo Brands Borax bill & OHV 4/ 5-8/ 4/ 25 05/08/2025 05E871011926 81.53 81.53 294219241 Office Supplies 115487 Primo Brands Borax bill & OHV 4/5-8/4/25 06/06/2025 05F871011926 112.92 112 .92 294219241 Office Supplies 115487 Primo Brands Borax bill & OHV 4/5-8/4/25 07/08/2025 05G871011926 17.10 17 .10 294219241 Office Supplies 115487 Primo Brands Borax bill & OHV 4/ 5-8 /4/ 25 08/06/2025 05H871011926 90.10 90.10 294219241 Office Supplies Total 115487: 301.65
08/07/2025 202500146 Alexander's Contract Ser 07/28-07/31/25 Meter Reads 07/28/2025 202507280081 7,022.34 7,022.34 515115630 Contracts Tota l202500146 : 7,022.34
08/07/2025 202500147 Amazon Capital Services BRAKE PAD 10/05/2024 11M6-J FL3- 4C9 58.98 58.98 104441450 Special Depart Supp CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 8
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name 08/07/2025 202500147 Amazon Capital Se rvices VOLTAGE BOOST 01/14/2025 14Fl-X3X9-Y7W 55.72 55.72 104441270 Bldg Operation/Mai 08/07/2025 202500147 Amazon Capital Services SUPPLIES 04/17/2025 14LC-DJVJ-9HYL 74.76 74.76 525213241 Office Supplies 08/07/2025 202500147 Amazon Capital Services Unit 484 DOOR MIRROR 07/21/2025 17PG- 7DL6 -GRP 44.06 44.06 274411254 Veh Operation/Main 08/07/2025 202500147 Amazon Capital Services SUPPLIES 03/20/2025 1PM1- 9DC1 -C6 62.45 62.45 105117241 Office Supplies 08/07/2025 202500147 Amazon Capital Services SUPPLIES 07/22/2025 1R3P-1QVK-WN 638.96 638 .96 105117241 Office Supplies 08/07/2025 202500147 Amazon Capital Services Power relay for well 07/21/2025 1TCP-LN13-C16 53.79 53.79 515115256 Equipment Operatio 08/07/2025 202500147 Amazon Capital Services SUPPLIES 06/28/2025 1V67-JVGD-TV3 56.44 56.44 545410270 Bldg Operation/Mai 08/07/2025 202500147 Amazon Capit al Services SUPPLIES 07/18/2025 ICA4R-WNQF-M 30.84 30.84 104155270 Bldg Operation/Mai Total 202500147 : 1,076.00
Total 202500148 : 55.63
Total 202500149: 1,435.50
Total 202500150: 180.00
Total 202500151: 375.00
08/07/2025 202500152 LightGabler 06/01-06/30/25 07/08/2025 92427 910.00 910.00 104155311 Legal Services 08/07/2025 202500152 LightGabler 06/01-06/30/25 07/08/2025 92429 175.00 175.00 104155311 Legal Services 08/07/2025 202500152 LightGabler 06/01-06/30/25 07/08/2025 92430 140.00 140.00 104155311 Legal Services Total 202500152 : 1,225 .00
Total 202500153: 156.92
Total 202500154: 33.75
08/07/2025 202500155 M unicipal Emergency Sv Pro Lock 05/07/2025 S02114703 1,073.63 1,073.63 104222254 Veh Operation/Main 08/07/2025 202500148 Barragan, Jose Reimbursement 07/16/2025 071625 55.63 55.63 545410270 Bldg Operation/Mai 08/07/2025 202500149 Best Best & Krieger 06/01-06/30/25 07/23/2025 1035090 1,435.50 1,435.50 104155311 Le gal Services 08/07/2025 202500150 Diamond Finis h Mobile Mobile Car Wash 07/19/2025 164 180.00 180.00 104212254 Veh Operation/Main 08/07/2025 202500151 Highway Glass Inc Unit 900 - Windshield replacemt 07/07/2025 13077 375.00 375.00 274413254 Veh Operation/Main 08/07/2025 202500153 Mediwaste Disposal 08/01-08/31/25 08/01/2025 135419 156.92 156.92 104222480 Chemica ls/ Ems Med 08/07/2025 202500154 Middleton, Keith 07 /01-07/31/25 07/31/2025 073125 33.75 33.75 104143230 Travel/Lodging/Reg CaliforniaCity Check Register - City Council Meeting
Check Iss ue Dates : 7/18/2025 - 8/7/2025
Page : 9
Aug 07, 2025 11:59AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name Total 202500155: 1,073.63
08/07/2025 202500156 RSI Petroleum Fuel 03/31/2025 1087528 542.56 542.56 194222255 RSI Fuel 08/07/2025 202500156 RSI Petroleum 07/01-07/15/25 07/15/2025 1088097 1,982.24 1,982.24 104217254 Veh Operation/Main 08/07/2025 202500156 RSI Petroleum 07/01-07/15/25 07/15/2025 1088131 122.91 122.91 104216255 RSI Fuel 08/07/2025 202500156 RSI Petroleum PWOIL 07/15/2025 416114 3,286.47 3,286.47 515115255 RSI Fuel 08/07/2025 202500156 RSI Petroleum Fuel 07/01/2025 44731 2,968.11 2,968.11 104222255 RSI Fuel Total 202500156: 8,902.29
Total 202500157: 992.58
08/07/2025 202500158 Stroh MD, John Jay 07/15-08/15/25 07/22/2025 72225 2,000.00 2,000.00 104212630 Contracts Total 202500158: 2,000 .00
08/07/2025 202500159 Thugs to Bugs Pest Contr 06/01-06/30/25 06/20/2024 58084 40.00 40.00 535310630 Contracts 08/07/2025 202500159 Thugs to Bugs Pest Contr 06/01-06/30/25 06/20/2025 58085 170.00 170.00 164253630 Contracts 08/07/2025 202500159 Thugs to Bugs Pest Contr 06/01-06/30/25 06/20/2025 58086 115.00 115.00 164253630 Contracts 08/07/2025 202500159 Thugs to Bugs Pest Contr 06/01-06/30/25 06/20/2025 58087 190.00 190.00 184212630 Contracts 08/07/2025 202500159 Thugs to Bugs Pest Contr 06/01-06/30/25 06/20/2025 58340 1,140.00 1,140.00 525213630 Contracts Total 202500159: 1,655.00
Grand Totals: 436,577.64
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAILABILITY OF FUNDS:
Finance Department
08/07/2025 202500157 Staples Advantage Office Supplies 07/25/2025 7006170600 992.58 992.58 515115241 Office Supplies California City Check Register
- City Council Meeting
Check Issue Dates: 7/18/2025 - 8/7/2025
Page: 10
Aug 07, 2025 11:59AM
Report Crit er ia:
Report type: Invoice detail
Vendor.Vendor Number= {<>} 1039
Bank.Bank Number= 1
California City Check Register - US Bank Corporate Credit Card Check Issue Dates: 7/18/2025 - 8/7/2025
Page: 1
Aug 07, 2025 12:04PM
GL Check Check Description I nvoic e Invoice Check GLAccount GL Account Name Period Iss ue Date Number Payee Number Amount Amount
C
C
otal PW 4576 062525: 5,101.68
5,101.68
Grand Totals: 5,101.68
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAILABILITY OF FUNDS:
08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 59.04 59.04 51-5115-451 Armory/Safety Equip & Su 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 257.39 257.39 51-5115-256 Equipment Operation/Mai 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 100.00 100.00 51-5115-630 Contracts 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 1,982.00 1,982.00 10-5117-230 Travel/Lodging/Reg l) 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 200.00 200.00 10-5117-230 Travel/Lodging/Reg 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 880.00 880.00 10-5117-230 Travel/Lodging/Reg l) 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 408.41 408.41 51-5115-270 Bldg Operation/Maint 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 165.48 165.48 51-5115-451 Armory/Safety Equip & Su 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 118.08 118.08 27-4411-256 Equipment Operation/Mai 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 627.60 627.60 27-4411-256 Equipment Operation/Mai 08/25 08/06/2025 115431 US Bank Corporate Payment 062525 PW 4576 062525 303.68 303.68 27-4413-450 Special Depart Supp CaliforniaCity Check Register - Housing with GL
Check Issue Dates : 7/18/2025 - 8/7/2025
Page: 1
Aug 07, 2025 12:03PM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name t
08/06/2025 9632 Charter Communication 07/01-07/31/25 07/09/2025 010861007092 45.00 45.00 744632284 Telephone - Land 08/06/2025 9632 Charter Communication 07/01-07/31/25 07/07/2025 010866907072 176.24 176.24 744632284 Telephone - Land Total 9632: 221.24
08/06/2025 9633 SoCalGas Housing Gas 06/11-07 /11/25 07/15/2025 071525 266.52 266.52 744632282 Gas I 08/06/2025
Ct: Total 9634:
Total 9635:
08/07/2025
Total9636:
08/07/2025
Total 9637:
08/07/2025
Total 9638:
266.52
9634 Southern California Edis 06/09 - 07/09/25 07/15/2025 700409109062 16.06 16.06 744632281 Electricity 9634 Southern California Edis 06/09 - 07/09 /25 07/10/2025 700631250479 28.80 28.80 744632281 Electricity
44.86 9635 WM Corporate Services I 07 /01-07/31/25 08/01/2025 3967762-4808- 1,682.42 1,682.42 744632630 Contracts 1,682.42
9636 Chiavarolli, John 07 /01-07/31/25 Janitorial Servic 07/31/2025 073125 200.00 200.00 744632310 Professional Servi es 200.00
9637 City Of Cal City-General 06/14-07/13/25 Water/Sewer 07/31/2025 073125 2,290 .00 2,290.00 744632288 Sewer Services 2,290.00
9638 Garcia, Mario 07/01-07/31/25 On Call Manager 07/31/2025 073125 400.00 400.00 744632310 Professional Servi es 400.00
08/07/2025 9639
Total 9639:
Miranda, Luciano 08/01-08/31/25- Maintenance 08/04/2025 080325 2,750.00 2,750.00 2,750.00
744632310 Professional Servic es
08/07/2025 148000298
Total 148000298:
Adams, James 07/01-07/31/25 On Call Manager 07/31/2025 073125 400.00 400.00 400.00
744632310 Professional Servic es
08/07/2025 148000299
Total 148000299:
08/07/2025 148000300
Andrasevits, Barbara A
Racer Rob's Plumbing
Rehab Cleaning #84
Replace Pipe Lines 21473
07/31/2025
07/10/2025
073125
7163
275.00
485.00
275.00
275.00
485.00
744632730
744632270
Improvements
Bldg Operation/M in
CaliforniaCity Check Register - Housing with GL
Check Issue Dates : 7/18/2025 - 8/7/2025
Page: 2
Aug 07, 2025 12:03PM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccount GL Account Name Total 148000300: 485.00
08/07/2025 148000301 Thugs to Bugs Pest Contr 07/01-07/31/25 Total 148000301:
08/01/2025 0051-0058 080 890.00 890.00 744632630 Contracts 890.00
Grand Totals: 9,905.04
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAILABILITY OF FUNDS:
Report Criteria:
Report type: Invoice detail
Bank.Bank Number= 148
City of California City
Report Criteria:
Check .Check issue date= 07/18/2025-08/07/2025
Demand Register - City Council Meeting Page: 1
Aug 06, 2025 12:38PM
Check Date Check# Payee Description Source ID Amount Check$ GL Account 08/07/2025 501577 Adan Steven Velasquez Final Bill Deposit Refunded 107116.02 10.00 10.00 5102090 Total 501577: 10.00
08/07/2025 501578 Aspen Homes II Inc. Final Bill Deposit Refunded 107410.01 24.00 24.00 5102090 Total 501578 : 24.00
08/07/2025 501579 B & R Rental Properties LLC Final Bill Deposit Refunded 106268.06 51.00 51.00 5102090 Total 501579: 51.00
08/07/2025 501580 Big West Corp Final Bill Deposit Refunded 103914.17 4.00 4.00 5102090 Total 501580 : 4.00
08/07/2025 501581 Carmen Munoz Final Bill Deposit Refunded 106589.05 2.00 2.00 5102090 Total 501581:
08/07/2025 501582 Cathy Kim Yip
Total 501582:
Final Bill Deposit Refunded 102071.07
2.00 14.00
14.00 14.00 5102090
08/07/2025 501583 Christopher Brien Final Bill Deposit Refunded 103972.09 36.00 36.00 5102090 Total 501583 : 36.00
08/07/2025 501584 Dennis Gootrad Final Bill Deposit Refunded 105010.16 60.00 60.00 5102090 Total 501584 : 60.00
08/07/2025 501585 Esquivel , Valerie & Ramos, Fernando Final Bill Deposit Refunded 105394.06 36.00 36.00 5102090 Total 501585: 36.00
08/07 /2025 501586 Feliciano Rosales Final Bill Deposit Refunded 106958.04 50.00 50.00 5102090 Total 501586: 50.00
08/07/2025 501587 Fernandez, Concepcion Final Bill Deposit Refunded 100611.08 1 .00 1.00 5102090 Total 501587 : 1.00
08/07/2025 501588 Heller, Jerry Final Bill Deposit Refunded 107434.01 19.00 19.00 5102090 Total 501588: HlOO
Finance Approval By: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date:
City ofCalifornia City Demand Register - City Council Meeting Check Date Check# Payee Description Source ID Amount Check$ GL Account Page:2
Aug 06, 2025 12:38PM
08/07/2025 501589 J Moreno Construction/Moreno, Juvenal Total 501589:
08/07/2025 501590 Jacueline & Mario Fimbres
Total 501590:
Final Bill DepositRefunded
Final Bill DepositRefunded
107436.01
106942.03
15.00 15.00
9.33 9.33
15.00 5102090
9.33 5102090
08/07/2025 501591 Lancaster-Kellerman, Karen & Johnathan Final Bill Deposit Refunded 101495.03 32.00 32.00 5102090 Total 501591: 32.00
08/07/2025 501592 Leon Megan Final Bill Deposit Refunded 104094.08 53.00 53.00 5102090 Total 501592: 53.00
08/07/2025 501593 Mamayan Realty Final Bill Deposit Refunded 101650.06 14.00 14.00 5102090 Total 501593: 14.00
08/07/2025 501594 Matthew Senger Final Bill Deposit Refunded 104520.10 5.00 5.00 5102090 Total 501594: 5.00
08/07/2025 501595 Meister & Meister Final Bill Deposit Refunded 102063.02 23.00 23.00 5102090 Total 501595: 23.00
08/07/2025 501596 Meister, Joshua Final Bill Deposit Refunded 107446.01 30.00 30.00 5102090 Total 501596: 30.00
08/07/2025 501597 Michael Montano Final Bill Deposit Refunded 106579.03 44.33 44.33 5102090 Total 501597 : 44.33
08/07/2025 501598 Miguel Lopez Guarda Final Bill Deposit Refunded 102351.02 16.00 16.00 5102090 Total 501598: 16.00
08/07/2025 501599 Ochoa, Antonio Final Bill Deposit Refunded 100940.05 45.00 45.00 5102090 Total 501599: 45.00
08/07/2025 501600 Pimentel, Alexis Final Bill Deposit Refunded 101449.02 30.00 30.00 5102090 Total 501600 : 30.00
08/07/2025 501601 Reginald Diaz Final Bill Deposit Refunded 101074.11 37.00 37.00 5102090 FinanceApprovalBy: _ Date:
City ofCalifornia City Demand Register - City Council Meeting Check Date Check # Payee Description Source ID Amount Check$ GL Account Total 501601: 37.00
Page:3
Aug 06, 2025 12:38PM
08/07/2025 501602 SAMANTHA GUERRERO
Total 501602:
08/07/2025 501603 Santandrea, Ashley & Hugo
Total 501603:
Final Bill Deposit Refunded
Final Bill Deposit Refunded
106272.06 21.00 21.00 5102090
21.00 106129.09 32.00 32.00 5102090
32.00 08/07/2025 501604 Steven Colin Final Bill Deposit Refunded 106215.10 39.67 39.67 5102090 Total 501604 : 39.67
08/07/2025 501605 Thearathana Bun Final Bill Deposit Refunded 106651.06 70.00 70.00 5102090 Total 501605:
08/07/2025 501606 Thearathana Bun
Total 501606 :
08/07/2025 501607 Waldomero Marroquin
Refund Credit Balance
Final Bill Deposit Refunded
70.00 106651.06 35.00 35.00 0101075
35.00 100827.04 50.00 50.00 5102090
Total 501607: 50.00
Grand Totals: 908.33
California City Check Register - City Council Meeting Page: 1 Check Issue Dates: 8/8/2025 - 8/21/2025 Aug 21, 2025 11:32AM C he ck # Payee Description Invoice Date Invoice# Invoice$ Check$ GL Account GL Account Name 115488 County of Kern 07/01/25-06/30/26 AIR ANNUAL 06/12/2025 IN0506408 2,313.00 2,313.00 535310610 Licenses & Permits Total 115488: 2,313.00
115489 Petty Cash - Finance Petty Cash Replenish Pool & Marin 08/12/2025 081225 67.00 67.00 103995 Cash Variance Total 115489: 67.00
115491 Verizon Business 07/10-08/09/25 08/10/2025 61646865 28.30 28.30 104215284 Telephone - Land Total 115491: 28.30
08/21/2025 115492 Agile Occupational Medi Physical Exam 08/04/2025 EM049840 195.00 195.00 104212130 Recruiting 08/21/2025 115492 Agile Occupational Medi Physical Exam 08/13/2025 EM050427 390.00 390.00 104562130 Recruiting Total 115492 : 585.00
08/21/2025 115493 Amber Chemical, I nc. Hypochlorite Solution 07/17/2025 0385666-IN 3,932.64 3,932.64 515115480 Chemicals/EMS Med 08/21/2025 115493 Amber Chemical, Inc. Hypochlorite Solution 07/29/2025 0385876-IN 1,990.56 1,990.56 515115480 Chemicals/EMS Med Total 115493 : 5,923.20
08/21/2025 115494 ANM Construction & Eng Job #23412- Splash Pad 05/23/2025 17724-05 440,310.75 440,310.75 104561750 ARPA Project 08/21/2025 115494 ANM Construction & Eng Job #23412- Splash Pad 06/19/2025 17724-06 22,420.00 22,420.00 104561750 ARPA Project 08/21/2025 115494 ANM Construction & Eng Job #23412- Splash Pad 07/21/2025 17724-07 112,880.90 112,880 .90 104561750 ARPA Project Total 115494 : 575,611.65
08/21/2025 115495 Borden, Chris 04/01-06/30/25 CC BSCC Prop 64 08/13/2025 Q9 081325 2,500.00 2,500.00 394224310 Professional Service Total 115495: 2,500.00
08/21/2025 115496 Bound Tree Medical Medical Supplies 08/07/2025 85873309 110.67 110.67 104222480 Chemicals/Ems Med 08/21/2025 115496 Bound Tree Medical Medical Supplies 08/13/2025 85880577 74.17 74.17 104222480 Chemicals/Ems Med Total 115496: 184.84
08/21/2025 115497 BSK Associates Well Lab Samples 08/11/2025 BI01943 114.00 114.00 515115314 Lab Sampling 08/21/2025 115497 BSK Associates Well Lab Samples 08/11/2025 B!Ol944 114.00 114.00 515115314 Lab Sampling Total 115497: 228.00
08/21/2025 115498 Ace City Hardware 080425 08/04/2025 10080 080425 48.24 48.24 104212270 Bldg Operation/Mai California City Check rtegister - City Council Meetrng
Check !ssue Dates: 8/A/2025 - 8/21/2025
Page: 2
Aug21,2025 11:32AM
Check Date Check Payee Description Invoice Date Invoice lnvo1cc $ Check$ 08/21/2025
00/
08/
115498 Ace City Hardware TDSGolfCourse 08/07/2025 16127 167.15 167.15 OA --- 104212210 5ubscr/Bnoks/Dues
08/21/2025
Total 115500:
115500 Consolidated Electrical 120V RELAY 07/14/2025 3978-1067054 4':J.76 49.76 515115450 Special Depa1"t Supp --
-tci.76
08/21/2025 115501 Cutting Edge Supply Unit AOO Grader Blades 07/31/2025 76885 08/21/2025 115501 Cutting Edge Supply Unit 800 Grader lllades 07/31/2025 76886 Total 115501:
08/21/2025
Total 115502:
08/21/2025
Total115503:
Ofl/21/2025
Total 115504:
OB/21/2025
Total 11.'i505:
08/21/2025
Total 115506:
JJB/21/2025
Total 115507:
115502 DennisAutomotive
115507 Jacob Wu!fT
BRAKES
Overpayment Refund
07/24/2025 24170
08/06/2025 06032025-1049
---
---
372.00
---
--
---
18.00 18.00 0101075 Utilities CashClearin
18.00 GL Account GI.Account Name
4045fi6256 Equipment OpcraLi"
104155270 Bldg Operation/Mai
104222254 Veh Operation/Main
21/2025 1154g3 Ace City Hardware Past due invoice 07/07/2025 30000 0707202 40.39 40.39 21/2025 115498 AceCity Hardware UNIT 535D!ESELFLlJlD 08/05/2025 A6351Cj/2 934.24 934.24 Total 115498: 1
-
,1
-
9 -
0.02 21/2025 115499 California Police Chiefs A 07/Ol/25-0li/30/26 Dues 07/01/2025 12202 170.00 170.00 Total 115499: 170.00
-
115503 Department of Justice 06/01-06/30/25 06/30/2025 829057 32.00 32,00
32.00 294219130 Recruiling
115504 Department ofTranspor 04/01-06/30/25 Signals &Lightin 07/19/2025 SL251282 154.68 --
154.68 2744llfi30 Contracts
154.68
115505 So Cal Realto1·s Platinum 081325 REF 7840 Eucal dup tlepo 08/14/2025 2.000178493 120.00 120.00 120.00
S13715 Turn On Fees
115506 ASAP HEATING & AIR 072825 REFUND 07/28/2025 J.00017061789 120.00 ---
120.00
120.00
513715 Turn On Fees
795.57 795.57 294219256 Equipment Operat10
530.38 530.38 294219256 Equipment Operatio
372.00
1,325.95
372.00 525213254 Yeh Operation/Milin
California City Check Register - City Council Meeting P;igc: J Check Issue Dates: B/8/2025 - 8/21/2025 Aug 21, 2025 11:32AM Check Date Check II Payee Description lnvoice D:ite Invoice II Invoice$ Chcc:k $ GL Account GL Account Name 309.00
--- 309.00 104222210 Su bscr/Books/Dues
08/21/2025 115509 FedEx WWTP Sample Mailing 07/11/2025 8-921-14867 146.42 146.42 525213245 Postage and Shi ppi n Oll/21/2025 115509 Fe,IF.x WWTP Sample Mailing 07/18/2025 8-927-44173 73.44 73.44 525213245 Postage and Sllippin 08/21/2025 115509 FedEx WWTP Sarnµle Mailing 07/25/2025 8-934·74083 513.23 58.23 5252B245 Postage anct Shippin 08/21/2025 115509 FedEx WWTP s mp\e Mailing 08/01/2025 B-941-90130 59.57 59.57 525213245 Postage and Shippi n Total 115509: B7.66
08/21/2025 115510 Fergu on Ent - D!JA Po Ila Inventory 07/10/2025 0291820 2,946.13 2,'H6.B 5J511S269 Inventory 08/21/2025 115510 Ferguson Ent - DBA Polla lnventory 07/16/2025 0292221 846.24 846.24 -- 515115269 Inventory Total 115510, 3,792.37
08/21/2025 115511 f-erguson Waterworks Inventory 06/26/2025 005383B 1,536.07 1,536.07 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks Inventory 06/30/2025 0054899 4,833 .85 4,833.85 515115269 Inventory OA/21/2025 11ss11 Ferguson Waterworks Inventory 07/17/2025 0054901 264.17 264.17 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks Inventory 07/17/2025 0056383 253.6] 2S3.63 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks Inventory 07/16/2025 0056402 649.50 619.50 5151152Ci9 Inventory 00/21/2025 115511 Fe1·guson Waterworks Inventory 07/29/2025 0056564 5,039.32 5,039.32 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks lnvento11' 07/31/202S 0056564-1 580 .09 580.09 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks Inventory 07/21/2025 0056830 325.l 9 325.19 515115269 Inventory 08/21/2025 115511 Ferguson Waterworks Dump station water parts 07/29/2025 56564 5,039.32 5,039.32 164251270 mdg Opt'ration/ Mai 08/21/2025 115511 Ferguson Water.vorks Dump station water parts 07/31/2025 56564-1 S80.09 580.09 164251270 Bldg Operation/Mai Total 11551le 19,101.23
115512 Granite Construction Co Cold Mix Asphalt 07/24/2025 2999454 10,620.89 10,620.89 274411450 Special Dt>part Supp Total 115512: 10,620.89
115513 Home Depot Credit Servi Building Supplies 07/03/2025 7901619 3,176.06 3,176,06 164253270 Ell<lg Operation/Mai 115513 Home Depot Credit Servi Building Supplies 07/03/2025 7901620 56659 566.59 164253270 Bldg Operation/Mai 115513 Home Di,pol Credit Servi Building Supplies 07/03/2025 790162.1 125.48 125.18 164253270 Bldg Operation/Mai --- 3,868.13
115514 Karl's Hardware-Rosam Echo TRIMMER 07/30/2025 27355 292.26 292.26 274413256 Equipment Operatio 115514 Kal"l's Jlardwan:,-Rosam WATER PARTS·BORAX 131LL 08/06/2025 9rn1;2 W.27 30.27 164253270 Bldg Operation/Mai 08/21/2025 115508 Eastern Kern APCD 08/2025-26 Permil Renewal 08/14/2025 8142025 Total 115508: 309.00
---
-
California City Check Register - CityCoundl Meeting Page; 4 Check Issue Dates: 8/8/2025 - 8/21/2025 Aug 21, 2025 11:32AM Check Date Check H Payee Description Invoice Date Invoice# Invoice$ Check$ GL Account GL Account Name ---
Total 115514: 322.53
08/21/202S 115515 Mission Uniform Servin! PD Linen Service 07/03/2025 524159302 97.51 97.51 104212270 Bldg Operation/Mai 08/21/2025 115515 Mission Uniform Service PD Linen Service 07/10/2025 521197319 70.58 70.58 101212270 Bldg Operation/Mai 08/21/2025 115515 Mission Uniform Servic,:, PD Linen Service 07/17/2025 524237748 97.Sl Y7.51 104212270 Bldg Operation/Mai 08/21/2025 115515 Mission Uniform Service PD Linen Service 07/24/2025 524281327 711.SR 70.58 104212270 Bldg Operation/Mai 08/21/202.5 115515 Mission Uniform Service PD Linen Service 07/31/2025 521323291 105.07 105.o7 101212270 Bldg Op!:'ration/Mai OB/21/2025 115515 Mission Uniform Service PD Linen Servin' 118/07/2025 524364283 80.711 B0.70 101212270 Bldg Operatim1/Mai Total 115515: 521.95
/21/2025 115516 Mojave Public Utility Dis Wonder Acres 07/31/2025 006090-000731 4,194.83 4,194.83 515115604 Purchase Water :::, Total 115516: 4,194.83
---
--
/21/2025 115517 ODP Business Solutions Office/Builiding Supplies 07/23/2025 429121139001 246.11 246.41 104212241 Office Supplies /21/2025 115517 ODP Business Solutions Orfice/Builiding Supplies 07/23/2025 42913672001 144.13 144.U 104212270 Bldg Operation/Mai /21/2025 11S517 OD P Business Solutions Office/Builiding Supplies 07/23/2025 42'H37:l86001 34.59 34-.59 104212270 Bldg Operation/Mai /21/2025 115517 0 DP Business Solutions Building Supplies 08/05/2025 42%62477001 89.94- B9,94 104222270 Bldg Operation/Mai /21/2025 115517 ODP Susi ness Solutions Safety initi tive 08/06/2025 4333546B3001 196.76 1%.76 104222451 Armory /Safety Equi /21/2025 115517 OIJP IJusiness Solutions Office/Builiding Supplies 07/31/2025 433595956001 !37.fll 137.81 104212241 Office Supplies Total 115517: B49.64
08/21/2025 115518 O'Reilly Auto Parts Unit 261 06/03/2025 6127-U,6092 217.26 217.26 515115254 Veh Operation/Main 08/21/2025 I15518 O'Reilly Auto Parts Unit 250 06/03/2025 6127-266093 97.43 Y7.43 SJ 5115254 Veh Operation/Main 08/21/2025 11551B O'Reilly Auto Parts A/C KITS 06/16/2025 6127-267959 lH.23 134.23 104411450 Special f) part Sllpp 08/21/2025 115518 O'Reilly Auto Parts PLUID 07/02/2025 6127-270201 196,B6 196.86 104441450 Special Depart Snpp 08/21/2025 115518 O'Reilly Aulo Parts FUEL CAP 07/23/2025 6127-273242 19.32 19,32 104141450 Special Depart Supp 08/21/2025 115518 O'Reilly Auto Parts FLUID 07/24/2025 6127-273372 292.24 292.21 104441450 Special Depart Supp 08/21/2025 11551 B O'Reilly Auto Parts BATTERY 07/2B/2025 6127-273926 207.66 207.66 104441254 Veh Operation/Main 08/21/2025 115518 O'Reilly /luto Parts Unit 322 08/05/2025 6127-275098 268.89 268.89 525213254 Veh Operation/Main 08/21/202.5 115518 O'Reilly Auto Parts Unit 207 08/06/2025 6127-275269 71.16 71.16 515115254 Yeh Operation/Main OB/21/2025 115518 O'Reilly Auto Parts Unit209 08/06/2025 6127-275270 124,01 124.04 515115254 Veh Operation/Main Total 115518
--- 1,629.09
08/21/2025 115519 Pace Analytical Services Water Testing 05/20/2025 252785174% 275.00 275.00 525213314 Lab Sampling 08/21/2025 115519 Pace Analytical Services Water Testing 07/30/2025 2527B520387 2,193.20 2,193.20 S25213314 Lab Sampling OB/21/2025 115519 Pace i\nalytical Services Water Testing 07/30/2025 25278520457 275.00 275.00 525213314 Lab Sampling OB/21/2025 115519 Pace Ana!ytica1 Services Water Testing 07/30/2025 2527B520458 1,263.80 1,263.80 525213314 Lab SJmpling 08/21/2025 115519 Pact? Analytical Services Water Testing 07/31/2025 2527B520611 275.00 275.00 525213314 Lab Sampling California City Check Register• City Council Mt'etmg Page: 5 Check l%w! Dates: 8/8/2025-8/21/2025 Aug21,2025 11:32AM Chl'ck Date Check# Payee De criplion Invoice Date Invoice# l11voiceS Check$ GL Acrnunt GLAccountName 08/21/2025 115519 Pa t' Analytical Services
08/21/2025 11551') Pace Ana!ytk31 Services
08/21/2025 115519 Pace Analytical Services
08/21/2025 115519 Pace /\nalytirnl Services
08/21/2025 115519 Pac<' Analytical Service,
08/21/2025 115519 Pace Analytical Services
08/21/2025 115519 Pace Analytical Services
Oll/21/2025 115519 Pace Aoalytical Services
118/21/2025 115519 Pace Analytic ! Services
08/21/2025 115519 Pace Analytical Serv1c •s
Total 11551'.1:
08/21/2025 115520 Perry, Diane
Tolal 115520:
08/21/2025 115521 Preferred Towmg
Total 115521:
08/21/2025 115522 Rohen Daniels
Total 115522:
08/21/2025 115523 S.C. Friends Tire Inc.
08/21/2025 115523 S,C. Friends Tire Inc.
08/21/2025 115523 S,C. Frieods Tire Jnc.
08/21/2025 115523 S.C. Friends Tire lnc.
08/21/2025 115523 S.C. l'ri,;,nds Tire !nc.
Ofl/21/2025 115523 S,r:. Friends Tire Inc.
Total 115523:
08/21/2025
llS/21 /2025
08/21/2025 115521 Sequma Equipment Com
Total 115524:
08/21/2025 115525 Transtlmon Risk & Alter
Equipment Operatio
Equipment Operatio
l
Water Testing 07/31/2025 25278520691 275.00 275.00 525213314 Lab Sampling Water Testing 07/31/2025 25278520695 655.40 655.40 525213311 Lab Sampling Water Testing 07/31/2025 25278520904 275.00 275.00 525213314 Lab Sampling Water Tcsling 07/31/2025 252785210Yl 275.00 275,00 525213314 Lab Sampl111g Water Tesung 07/3)/2025 25278521120 275.00 275,00 525213314 Lab SJmpling Water Testing 07/31/2025 25278521220 275.00 275.00 525213314 L.ib Sampling Wat rTesting 07/31/2025 25278521359 275.00 275.00 525213314 Lab Sampling Water Testiog 117/31/2025 25278521454 275.00 275.00 525213314 Lab Sampling Water Testing 07/31/2025 25278521713 275.00 275.00 525213314 Lab Sampling Water Testing 07/31/2025 25278521729 275,00 275.00 525213314 Lah Sampling 7,412.40
FIXTURE 08/08/2025 llElMB 000825 40.14 40.H 104217270 Didi: Operation/Mai
40.14 TOW 08/05/2025 76fi6 160.00 160.00 515115254 Veh Operation/Main 160.00
Aug 2025 08/14/2025 814:15 600,00 600,00 404566630 Contracts 600.00
llnit 260 07/18/2025 49740 20.00 20.00 515115254 Veh Operation/Main Unit 207 07/29/2025 49801 15.00 15.00 515115254 Veh Operation/Main Unit 207 07 /1.9/2025 4'.1802 783.04 783.04 515115254 Wh Oper:itio11/Main Unit 207 07/30/202S 49806 783,04 783.04 515115254 Veh Operation/Main f.ANNON FLAT 07/31/2025 49808 55.00 55,00 525213256 Equipment Operatio Unit 322 08/05/2025 19840 580.46 580.46 525213254 Veh Operat1011/Main 2,236.54
115524 Sequoia Eguipment Com Unit113 Ofi/12/2025 001-128240 7,010.71 7,010.71 274411256 115524 Sequoia Equipment Com Unil 235 06/12/2025 001-12B241 7,083.42 7,083.42 515115256 IJACKHOE 6/10·7/08/25 07/28/2025 001-3318 3,455.20 3,455.20 515115240 Equipment Renta 17,549.33
07/01-07/31/25 08/01/2025 213800-202507 75.00 75.00 104216630 Other Contracts ---
Total 115529: 1,295.00
---
( Iifornia City (heck Register - City Council Meeting Page: 6 Check Issue Dat<:'5: 8/B/2025 - 8/21/2025 Aug 21, 2025 l132AM Check Date Check It Payee Description Invoice Date Invoice II Invoice$ Checks GL Account GL Account Name -
Total 115525:
01:1/21/2025 115526 Turbn Data Systems Citation Proci-ssi ng Services 07/31/2025 46:::!04 281.66
75.()[J
281.66 104216310 Professional Service
Total 115526: 2B1.66
115527 USA Bluebook DPD Dispenser and CHLORINE 07/0g/2025 INV007til 131 768.10 768.10 515115450 Special Depart Supp 115527 USA Bluebook D PD Dispenser and CHLORl NE 07/16/2025 !NV00768714 632.10 632.10 515115450 Special Depart Supp --- 1,400.20
1/2025 11.5528 Verizon Wirel!:'ss 06/27-07/26/25 07/26/2025 61lgS83560 2,763.11 2,763.11 545410284 Telephone - Land /21/2025 115528 Verizon Wireless 06/27-07/26/25 07/26/2025 6119583561 23.11 23.11 105117286 Communications Ma /21/2025 115528 Verizon Wireles 06/27-07/26/25 07/26/2025 6119583562 313.79 313.79 515t15284 Telephone - L 11<l /21/2025 115528 Verizon Wireless 06/27-07/26/25 07/26/2025 6119583563 810,03 --
08/21/2025 115529
08/21/2025 115529
08/21/2025 115529
08/21/2025 115529
OB/21/2025 115529
08/21/2025 I15529
- .
810.03 104222286 Communiratians Ma
3,910.04
08/21/2025 202500160 Ai respring Inc 7/01-7/31/25 08/01/2025 19909%80 3,802.96 -- 3,802.96 5353102B4 Telephone - Land
Total 202500160: 3,802.9fi
---
Za lea La baratories !nc Water Testing 06/18/2025 2506234 115.on 145.00 S15115314 Lah Sampling Zalco Laboratories Inc Water Testing 08/01/2025 2507411 215 .00 215.00 515115314 Lab Sampling Zako Lahoratorie Inc Water Testing 08/01/2025 2507438 320.00 320.00 51S115314 L.ih Sampling Zalco Laboratories Inc Water Testing 07/30/2025 2507562 185.00 185.00 515115314 Lab Sampling Z,dco Laboratories Inc Water Testing 08/01/2025 2507632 215.00 215,00 515115314 Lab Samp!it1g Zalcn Laboratories Inc Water Testing OB/07/2025 2508017 215.00 215.00 515115314 Lab Sampling 08/21/2025 202500H,1 Amawn Capital Services PURCH/\SES 07/16/2025 117F-XJD7-X1P1 601.20 ---
601.20 545410254 Veh Operation/Main
08/21/2025 202500161 Amazon Capital Services PURCHASES 07/28/2025 11KG·4DFQ-gN 216.41 216.41 545410241 Office Supplies 08/21/2025 202500161 Amazon Capital Services PURCHASES 07/14/2025 14QH•Y1PF-61F 287.B8 287.8B 2744112S4 Veh Operation/Main 08/21/2025 202500161 Amazon Capital Services PURCHASES 07/29/2025 l697-FCKQ-4X3 88.16 llB.16 51.5115241 Office Supplies 08/21/2025 202500161 Amazon C;,pilal Services PURCH/\SES 07/13/2025 1C74-LHNC-DV 190.85 1')0.BS 10S117241 Office Supplies 08/21/2025 202500161 Ama·1.on Capital Services PURCH/\SES 07/18/2025 10D7-MHWT-L 66.26 66,26 104155270 131dg Op<nation/Mai 08/21/2025 202500161 Amazon Capital Services PURCHASES 07/24/2025 1F6G· R XLQ-CY3 91.34 'Jl.34 105117241 Office Supplies U8/21/2025 202500161 Arr awn Capital Services PURCHASES 06/30/2025 1G7G-RC/Q-!'JY 257.36 257.36 515115270 Bldg Operation/Mai 08/21/2025 202500161 Amazon Capital Services PURCHASF.S 07/30/2025 1GDM-RX3D-HN 105.14 105.44 104441257 Hand Tools 08/21/2025 202500161 Amazon Capital Services PURCHASES 07/17/2025 1GF9-K7PY·CKX 226.46 226.46 545410270 Bldg Operation/Mai 08/21/2025 202500161 Amazon Capital Services PURCHASES 07/28/2025 lGKR·PGKC-HW 22.64 22.64 104441270 Bldg OperJtion/Mai -
California City Check Register - City Council Meeting Page : 7 Check Issue Dat\"s: fl/R /2025- 8/ 21/2025 Aug 21. 2025 11:32/\M Che ck Date Check II Payee Description Invoice Date Invoice# Invoice$ Check S GI.Account GL An:ount Name 08/21/,(025 202500161 Arna.ton Capital S!'rvices PURCllASF:S 07/15/2025 JJQV-D'JGL-llXC 36.53 36.53 545110241 Office Supplies os; 21;, io2s 202500161 Amazon Capital Services PURCH!\SES 07/29/2025 ljYX-4WXD-6KG 1 92 .49 192.49 105117270 Bldg Operation/Mai 08/ 21 / 2025 202500161 Amazon Capital Services PURCHASES 07/30/2025 1KP9-PDFL7-HJ 155.86 155.86 274413254 Yeh Operation/Main 08/ 21/ 2 025 202500161 Amazon Capital Services "PURCH!\SES 07/17/2025 1VN4·1 LN6-7F 238.12 238.12 S15115270 Bldg Operation/Mai 08/ 21/ :1025 202500161 Amazon Capital Services PURCHASES Ofl/04/202S 1W7C-RY7D·7Q 112,66 112.66 515115241 Office Supplies 08 / 21 / 2025 202500161 Amazon Capital Services PURCHASES 07/17/2025 1WHM-TP4X-CT 259 .79 259.79 515115270 Bldg Operatiun/Mai 08/ 21/ 2025 202500161 Amazon Capital Services PURCHASES 08/04/2025 l Y3M -R 7Y4-7 9 25.':!7 25.97 105117241 Office Supplies 08/ 21/ W:15 202500161 Amazon Capital Services PURCH!\SES 06/30/2025 1Y6R·QW7N-F7 31.77 31.77 515115270 Bldg Dperation/Mai 08/ 21/ :!02S 202500161 Arn ar.<J n Capital Services PURCHASES 07/10/2025 1YDl·Q7RJ-6QN 318.24 -- 3 lfl,24 27Hl1256 Equipment Operatio
Total 202500161 : 3,525.43
08/21/2025 202500162 AWP $;,foty Aluminum Signs 07/10/:1025 12020770 672.4 7 672.47 274411411 Street Signs Ofl/21/2025 202500162 AWP Safety Aluminum Signs 07 /10/202S 12020771 672.47 672.47 271411411 Str et Signs 08/21/2025 202500163 Diamond Finish Mobil 8/2/2511 UNITS 08/02/2025 165 16 5.00 165.00 104212254 Veh Operation/Main 08/21/2025 20:0500164 Famcon Pipe & Supply In DIAMOND BLADE 07/15/202S 5100159423.00 167.14 167.14 515115257 Hand Tools 08/21/20:CS 202500164 F;imcon Pipe & Supply In Inventory 08/05/2025 S100160467.00 5,019.B2 5,019,82 515115269 Inventory 08/21/20:15 202500165 Grainger, Inc Janitorial Supplie 08/04/2025 9595187320 185.<17 185.97 294219244 )anitoi-ial Supplies 08/21/ZOZS 202500165 Gr ainger, lnr Ianitorial Su µplies 08/05/2025 9595634701 66.44 66.44 294219244 JaniLnrial Supµlies 08/21/2025 202500166 Jones Chemicals Corp In Disinfection Chemicals 07/31/2025 ':175063 9,530.40 ':l,53 0.40 525213480 Chemicals/EMS Med 08/21/2025 202S00166 jones Chemica ls Corp ln Deposit Refund 07/31/2025 975072 3,000.00- 3,000.00- 5252134B0 Chemicals/EMS Med 08/21/2025 202S00167 M&S Security Services Code Change 07/10/2025 12%55 20.00 20.00 104155630 Contr;icts 08/21/2025 202500168 Municipal Emergency Sv Custom Pro Locks Opening Kits 07/30/2025 !N2310514 607,36 607.36 104222451 Armory /Safety Eq ui 08/21/2025 202S00162
Total 20250016:C:
Total 202500163:
Total 2025001 64:
Total 202500165:
AWP S fety Signs Ofl/ 04/ 2025 12020860 672.47
--
---
672.47
2,017.41
165.00
S,186 .96
252.41
274411411 Street Signs
Total 202500166:
Total 202S00167:
--- 6,530.40
20.00 C.i.llfornia City Check Register -City Council Meet111g Page: 8 Check Issue Dates: 8/8/2025 - 8/21/2025 Aug21,2025 11:32AM Check Date Check It Payee Description Invoice Date lnvoic II lnvoa;e $ Check$ GL Account GL Account Name Total 202500168: 607.36
08/21/2025 202500169 NAPAAuto Parts OHV Fleet Supplies/Pans 07/01/2025 19895 476,79 476,79 294219270 Bldg Operation/Mm Total 202500169: 476.79
08/21/2025 202500170 PS! Water Technologies I Brine Pump 07/17/2025 INV000882'l 5,965.64 5,%5,64 515115256 Equipment Operatio Tutal 202500170: 5,965.64
08/21/2025
08/21/2025
08/21/2025
OA/21/2025
Total 202500171:
IJB/21/2025 202500172
Total 202500172:
08/21/2025 202500173
08/21/2025 202S00173
08/21/202S 202500173
08/21/2025 202500173
104217255 RSI Fuel
294219255 RS!Fuel
RS! Fuel
RSI Fuel
08/21/202S 202500173 Thugs to Bugs Pest Corllr July 2025 07/2S/2025 58763 1,140.00 1,140.00 525213630 Contracts Total 202500173: 1,655.00
08/21/2015 202500174 Underground SvAlert N 07 /0 l/25-06/30/26 Undergroun 07/21/2025 2025112502 2,528.62 2.528.62 515115210 Subscr/13ooks/Dues Total 202500174: 2,528.62
Grand Totals: 709,029.26
202500171 RSI Petroleum fuel073125 07/31/2025 1088176 2,099.22 2,099.22 202500171 RSI Petroleum Fuel 073125 07/31/2025 1088189 478.64 478.64 202500171 RS! Petroleum Fuel 073125 07/31/21)25 1088203 113.62 113.62 104222255 202500171 RSI Petroleum Flle\073125 07/31/2025 1088203A 102.77 102.77 104216255 2,794.25
Stroh MD, John Jay O<J/15-10/15/25 08/19/2025 8192025 2,000.00 2,000.00 104212630 Contracts 2,000.00
Thugs to !lugs Pest C:ontr July 2025 07/25/2025 58621 190.00 190,00 104212630 Contracts Thugs to !lugs Pest Contr July 2025 07/25/2025 58622 115.00 115,00 164253630 Contracts Thugs to Bugs Pe t Contr july 2025 07/25/2025 58623 170.00 170.00 164253630 Contracts Thugs to Bugs Pest Comr July 2025 07/25/2025 58fi24 40.00 40.00 535310630 Cm1tracts Dated: Y/ V I ,' -7 -7
California City Check Register - City Council Meeting
Check Issue Dates: 8/8/2025 - 8/21/202.5
Page: 9
Aug 21, 2025 11:32AM
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAILABILITY OF FUNDS:
Report Criteria:
Report type: Invoice detail
Ven dor.Ve ndor Number={<>} 1039
!lank.Bank Number= 1
California City Check Register - US Hank Corporate Credit Card Check Issue Dates: 8/8/2025 - 8/21/2025
Page: 1
Aug 21, 2025 11:34AM
GL Check Check Description Invoice Invoice Check GL Account Pe
Total ADMIN 4250 072525: 3,344,18
08/25 08/15/2025 115490 US lfank Corporate Payment 072525 FD 0753 072525 32.49 32.49 10-4222-210 Subscr/Books/Dues 08/25 08/15/2025 115190 US Bank Corporate Payment 072525 FD 0753 072525 146.02 146,02 10-4222-211 Office Supplies 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 Fl) O 753 072525 1,064.62 1,064.62 10-4222-254 Veh Operation/Maint 08/25 08/15/2025 115190 US Bank Corporate Payment 072525 FD 0753 072525 1.153.61 1,153.61 10·4222-270 Bldg Operiltion/Maint 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 FD 0753 072525 106.54 106.54 10-1222-451 Armory/Safoty Equip & Su Total FD 0753 072525:
--- 2,503.28
08/25 08/15/2025 115490 US Bank Corporate Payment 072525 FD 7568 072525 19.99 19.99 10-4222-210 Subsrr/Books/Due 08/25 0$/15/2025 115490 US Dank Corporate Payment 072.52.5 FD 7568 072525 605.83 605.83 10-4222-254 Veh Operation/Main! 08/25 08/15/2025 115490 US Bank Corporate P;iyment 072525 FD 7568 072525 316.87 316.87 10-4222-270 Bldg Operation/Maint Total FD 756B 072525: 942.69
08/25 08/15/2025 115490 US Bank Corporate Payment 072525 FIN 4397 072525 239.22 239.22 10-4155·250 Other/Office Equipment Total FIN 1397 072525 : 239.22
08/25 08/15/2025 1154•90 US Bank Corpa rate Payment 072525 FIN 6456 072525 200.00 200.00 10·4155-210 Subscr/Books/Dues Total F!N 6456 072525: 200.00
08/25 08/15/2025 115490 US Bank Corporate Payment 07252.S OHV 2335 072525 449.36 449.36 29-4219-250 Other/Office Equipment GL Account Name
iod Issue Oate Number Payee NLm1her Amount Amuunt
- 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 ') ADM IN 4250 072S2 309.00 309.00 51-5115-230 Travel/Lodging/Reg 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 ADMlN 4250 07252 154.50 154.50 52-5213-230 Travel/Lodging/neg 08/25 08/15/2025 115490 US Bank Corporate Payment 072S2S Al)MIN 4250 07252 154.50 151.50 27-4411-230 Travel/Lodging/ Reg 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 AD)J!IN 4250 07252 154.50 154.50 l 0-4131-230 Travel/Lodging/neg 08/25 08/1S/2025 115490 US Bank Corporate Payment 072525 ADMIN 4250 07252 154.50 154.50 10-1222-230 Trave I/Lodging/Reg 08/25 08/15/2025 115190 US B:mk f.orporat Payment 072525 ADMIN 4250 07252 154.5() 154.SO 10-5117-230 Travel/Lodging/Reg 08/25 08/15/2025 115490 US Rank Corporate Payment 072525 ADM!N 4250 07252 154.50 151.50 10-4145-230 Travel/ Lodging/Reg 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 ADM IN 4250 07252 77.25 77.25 10-4212-230 Travel/Lodgi ng/Rcg 08/25 08/15/2025 115490 \JS Hank Corporate Payment 07252S ADM IN 4250 07252 77.25 77.2S 10·4222·230 Tr,wel/Lodging/Reg 08/25 08/15/2025 11.5490 US Bank Corporate Payment 072525 ADMIN 4250 07252 154.50 154.50 29-4219-230 Travel/Lodging/Reg 08/25 08/15/2025 11S190 US !lank Corporate Payment 07252S ADMIN 1250 07252 300.00 300.00 10-4131-230 Travel/Lodging/Reg 08/25 08/15/2025 115490 US 13ank Corporate Payment 072525 ADMlN 4250 07252 300.00 300.00 10-4145-230 Travel/Lodging/Reg 08/25 08/15/2025 1154')0 US Bank Corporate Payment 072525 ADMJN 4250 07252 300.00 300.00 10-5117-230 Travel/Lodging/Reg 08/25 08/15/202S 115490 US Dank Corporate Payment 072525 ADM!N 12S0 07252 107.43 107.13 10-4145-235 F.ntertainment/Spec-ial Eve 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 ADMIN 4250 07252 418.00 418.00 10-4132-230 Travel/Lodging/Reg 08/25 08/15/2025 115490 US Bank Corporate Payment 072525 ADMlN 4250 07252 373.75 373.75 10-4155-210 Subscr/Books/Dues Che ck Register - US [lankCorporate Credit Card
Check Issue Dates: 8/8/2025 - 8/21/2025
California City Page: 2
Aug 21, 2025 11:34AM
---
Dated: - ,, V •J r :,,.................. ,,
GL
Period
Check Check
Issue Date Number Payee
Descri ptinn Invoice Invoice Check GLAccount GL Account Name Number Amount Amount ---
6B0.40
Total PD 8321 072525 :
Total 11549\l:
Grand Tota ls :
---
491.86
---
9,460.26
--
9,460.26
I HEREBY CERTIFY AS TO THE ACCURACY OF THF. DEMANDS AND AVAILAl:lll,JTY OF FUNDS:
08/ 25 08/15/2025 115490 US Bank Corporate Payment 072525 OHV 2335 072525 19.00 19.00 29 -4 219-450 Special Depart Su pp 08/ 25 08/15/2025 115490 US IJank Corporate Payment 072525 OHV :.!335 072525 260,75 260.75 16-4253-270 Bldg Operation/1,.faint 08/ 2S 08/15/2025 115490 US Bank Corporale Payment 072525 OHV 2335 072525 61.57 61.57 29 -4219-270 Bldg Operation/M int 08/ 25 OB/15/2025 l 15490 US Bank Corporate Payment 072525 OHV 2335 072525 267.9S 267,95 29-4219·241 Office Supplies TotalOHV 2335 072525: 1,058.63
08/ 2S OB/15/2025 115490 \JS Bank Corporate Payment 072525 PD 4156 072525 680.40 l 0-4212-45I Armory/Safety Equip & Su Total PD 4156 072525: 680.40
08/ 25 08/15/2025 1 I5490 !JS Bank Corporate Payment 072525 PD 8321 072525 487.20 487 .20 10 -421 2-451 Armory/Safety Equip & Su 08/ 2S 08/15/2025 115490 US Bank Corporate Payment 072525 PD 8321072525 37.SO 37 .50 10-4212-630 Contracts 08/25 08/15/2025 115490 IJS Bank Corporate Payment 072525 PD 8321 072525 37.50 37.50 10-4216 -630 Olher Contracts 08/ 25 OB/15/2025 115490 \JS 13ank Corporate Payment 072525 PD 8321 072525 ,70.34 -70.34 10-4212-270 Bldg Operation/Maint California City Check Register - Housing with GL
Check Issue Dates: 8/8/2025 - 8/21/202S
Page: 1
Aug 21, 2025 11:36AM
Total % 41:
Tota l 9642:
Total 9643:
Check# Payee Description Invoice D.ite Invoice II Invoice$ Check S GL Account GL AccountName 08/ 12/ 2025 Bradley James Poe DJ Washer/D1yer repairs 07/07/2025 1179 ,750.00- 1.750,00- 744632310 Profcssio nal Services Total 9624:
--- 1,750.00-
9640 US Bank Corporate Paym 072525 07/25/2025 DJ 29S3 072525 &.270.71 6,270.71 714632730 Improvements Total 9640: --- 6,270.71
9641 Brad[py James Poe DJ Washer/Dryer repairs 07/07/2025 1179 I.7SO.OO 1,750.00 711632310 ProfessionaIServices --- 1,750 .00
9642 Ace City Hardware 07/07-07/30/25 SUPPLlES 08/04/2025 30009 080425 264.60 264.60 744632270 Bldg Operation/Maint 261.60
9643 Charter Communiution 07/01-07/31/25 08/01/2025 5022080125 5,557.1 ! 5,557.11 744632286 CommLinicalions Maint 5,557.11
---
08/ 21/ 2025 'l647 Verizon Wireless 06/27-07/26/25 07/26/2025 6l 19S83SM 100.82 100.82 744632286 Communicatiuns Mainl 9644 Lancaster Flooring, Inc Rehab Apt 1127- Replaced Carret OB/08/2025 107917 1,804.9 9 ---
1,804.99 744632730 lmprnvements
Tota l 9644: 1,804.99
08/ 21 / 202 .5 9645 Primo Brands 07/05-08/04/25 08/06/2025 05HB71022849 311.76 311.76 744632241 Offic • Supplies Total 9645: 311.76
08/ 21/ 2025 9646 Southern California Edis Ju ly 2025 08/01/2025 700074866260 73B. 28 738.28 744632281 Electricity 08/ 21/ 2025 9646 Southern C;;liforn ia Edis /uly 202S 08/01/2025 700355482513 93.75 93.75 744632281 Electricity 08/21/2025 9646 Southern California Edis July 2025 08/01/2025 700408298811 12.04 12.04 744632281 Electricity 08/ 21/ 2025 9646 Southern California Edis July 2025 08/13/2025 700409109062 13.56 13.56 714632281 Electricity 08/ 21/ 2025 9646 Southern California Edis July 2025 OA/01/2025 700409297305 11.56 11.56 744632281 Electricity 08 / 21 / 2 025 9616 Southern Ca hforni a Edis July 2025 08/01/2025 700409537074 149.51 149 .51 744632281 Electricity 08/ 21/ 2025 9646 Southern California Edis July 2025 OB/01/2025 700410808380 11l.8B 111.88 744632281 Electricity 08/ 21/ 2025 9646 Southern California Edis July 2025 08/01/2025 700501711023 9B.6 0 98.60 744632281 Electricity 08/ 21 / 2025 9646 Southern California Edis July 2025 08/01/2025 700524713056 61.28 61.28 744632281 Electricity 08/ 21 / 2025 9646 Southern California Edis July :W2S 08/08/2025 700630829440 114.12 114.12 744632281 Electricity 08/ 21/ 2025 9646 Soutl1ern California Edis July 2025 08/08/2025 700631250479 27.17 27.17 744632281 Electricity Tot;,19646: 1,431.75
Check Register - llousi n with GL
Check Issue Dates: 8/8/202S - 8/21/202S
California City Page, 2
Aug 21, 2025 11:36AM
7 Check Date Check It Payee Description Invoice Date Invoice It Invoice$ Check$ Gt Account GL Account Name 0_. 19647
08/21/2025 148000302 RSI Petroleum
Total 148000302;
08/21/2025 148000303 Trulio, Anthony
Total 148000303:
Fuel 073125
JULY 2025
07/31/2025 1088227
07/31/2025 073125
84.11 1,100.00
100.82
84.11 7446322S5 RS! Fuel
84.11 1,100.00 744632310 Professional Services
1,100.00
Grand Totals: 16,925.85
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAII.ABILlTY OF FIIN"DS:
Dated: ........,, .._ +--- -r- ----,<'-- - - - - - -
Finance De partment ,f'/ ,tr rk'f'.C- ---
Report Criteria:
Report type: 1nvoi ce detail
Bank.Bank Numher = 148
California City Check Register - SDI
Check Issue Dates: 8/8/2025 - 8/21/2025
Page:
Aug 21, 2025 11:38AM
Report Criteria:
Report type: Invoice detail
Bank.Bank number= 2
111 Check
Nlllissue Date
Check
Number
Description Invoice Date Invoice
Number
Invoice
Amount
Check
Amount
Invoice GL Account Invoice GL Accou
Payee
1383 US Bank SDI Admin Fee 04/01-06/30/25 07/25/2025 7829090 6,806.10 6,806.10 72-7211-630 Contracts 6,806.10
1384 Verizon Wireless 06/27-07/26/25 07/26/2025 6119583560A 62.88 62.88 72-7211-284 Telephone - Land D. Total 1384: 62.88
Grand Totals: 6,868.98
Dated:
Finance
fl)
U)
I
California City Check Register - City Council Meet ing Page: 1 Check Issue Dates: 8/22/2025 - 9/4/2025 Sep 04, 2025 10:33AM w CheckDate Check # Payee Description Invoice Date Invoice # Invoice$ Check$ GLAccount GL Account Name ::iii /27/2025 115530 AT&T Wireless 07/ 01-07/31/25 07/31/2025 287281248095 875.51 875.51 104155286 Comm unicat io ns Ma 104217284 Telephone - Land
104155281 Electric ity
::,
-
Total 115532: 5,078.26
184212286 Communications Ma
184212286 Commun ications Ma
535310282 Gas
515115630 Cont racts
104212140 Uniforms/ Safety Eq
606000752 Community Benefit
515115314 Lab Sampling
09/03/2025 115534 Frontier 08/19-09/18/25 08/19/2025 081503-508192 3,618.64 3,618.64 535310284 Telephone - Land 104217270 Bldg Operation/ Mai
Total 115534: 3,618.64
09/03/2025 115535 ODP Business Solutions Buildin g Supplies 08/05/2025 432932279001 330.58 330.58 Total 115535: 330.58
09/03/2025 115536 SoCalGas 07/1125-08/12/25 08/18/2025 17373816911-0 501.90 501.90 Total 115536: 501.90
09/04/2025 115537 AES! Arrow Engineering KERNCOUNTYWATERSTANDBY 08/10/2025 25706853125 1,605.00 1,605.00 Total 115537: 1,605.00
09/04/2025 115538 All American Uniforms Uniform-Zaragoza 08/11/2025 103 759.90 759.90 Total 115538: 759.90
09/04/2025 115539 Amador Meza Asset #611 T-BAR CEILING 08/25/2025 25-3006 4,300.00 4,300.00 Total 115539: 4,300.00
09/04/2025 115541 BSK Associates Well Lab Samples 08/ 25/ 2025 BI02059 114.00 114.00 U} 08/27/2025 115530 AT&T Wireless 07/03-08/02/25 08/02/2025 287306780425 963.38 963.38 en Tota l115530: 1,838.89
i 08/27/2025 115531 Southern California Edis July 2025 08/08/2025 80825 71,978.12 71,978.12 Total 115531: 71,978.12
'
08/27/2025 115532 Charter Communication 06/01-06/30/25 07/01/2025 127516201080 3,987.00 3, 87.00 08/27/2025 115532 Charter Communication 06/01-06/30/25 07/01/2025 1706224010 80 1,091.26 1, 91.26 09/ 04/ 2025 115540 BAVCO Grant funded RV dump Station Bae 08/25/2025 351007 1,639.72 1,639.72 164251270 Bldg Operation/Mai Total 115540: 1,639.72
California City Check Register - City Council Meet ing Page: 2 Check Issue Dates: 8/22/2025 - 9/4/2025 Sep 04, 2025 10:33AM Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Chec k $ GL Account GL Account Name Total 115541: 114.00
09/04/2025
Total 115542:
09/04/2025
09/04/2025
09/04/2025
09/04/2025
09/04/2025
Total115543:
09/04/2025
Total 115544:
09/04/2025
Total115545:
09/04/2025
Total 115546:
09/04/2025
Total 115547:
09/04/2025
Total 115548:
09/04/2025 11554
09/ 0 4/ 2025 11 5549
Total 115549:
09/04/2025 1155
115542 B urke Williams & Sorens services thru 7/31/25 08/06/2025 347583-347603 80,010.10 80,010.10 104155311 Legal Services 80,010.10
115543 Ace City Hardware BUILDING OPERATION SUPPLIES 08/04/2025 10022080425 80.66 80.66 164253270 Bldg Operation/ Mai 115543 Ace City Hardware SUPPLIES 08/24/2025 300010804202 536.21 536.21 515115450 Special De pa rt Supp 115543 Ace City Hardware SUPPLIES 08/04/2025 300020804202 709.64 709.64 104561270 Bldg Opera t ion/ Mai 115543 Ace City Hardware SUPPLIES 08/04/2025 300040804202 14.45 14.45 104441270 Bldg Operation / Mai 115543 Ace City Hardware hardware supplies 06/30/2025 30008-080425 348.73 348.73 535310270 Bldg Operation/Mai 1,689.69
115544 Cal City TV & Appliances Propane 08/07/2025 695 151.78 151.78 274411285 Propane 151.78
115545 Capitol Advocacy Partne Services for July 2025 08/01/2025 2025CAP187 4,308.08 4,308.08 104155310 Professional Service 4,308.08
115546 Caselle , Inc 09/01-09/30/25 08/01/2025 INV-09807 2,918.00 2,918 .00 104155630 Contracts 2,918.00
115547 Core & Main LP Grant Funded RV Dump Station W 08/15/2025 X245604 379.96 379.96 164251270 Bldg Operation/Mai 379.96
115548 County of Kern CALCITY WWTPANNUALENVlR 06/12/2025 IN0506500 9,172.00 , 9 172.00 525213610 Licenses & Permits 9,172.00
9 Dennis Automotive FUEL PUMP 08/07/2025 24204 379.93 379.93 515115254 Veh Operation / Mai n Dennis Automotive spa rk plugs 08/ 19/ 2025 24228 480.00 480.00 515115254 Veh Operation/Main 859.93
0 Steve Collins Const, Inc Final Bill Deposit Refunded 12/ 23 09/ 03 / 2025 107342.01 1,428.33 1.428.33 5102090 Customer De pos its 09/04/2025 115552 DigiTech Inc. OHV Building R302 Came ra/ Alar 08/25/2025 20128 09/ 04/ 2025 115552 DigiTech Inc. OHV Building R302 Camera/ Alar 08/25/2025 20129 09/04/2025 115552 DigiTech Inc. Asset #605 Network Bridge 08/25/2025 20130 1,755.00 1,755.00 294219740 Purchase ofEquipm
1,404.00 1,404.00 294219740 Purchase of Equipm
2,700.00 2,700.00 606000752 Commu nity Benefit
California City Check Register - City Council Meet ing Page: 3 Check Issue Dates : 8/22/2025 - 9/4/2025 Sep 04, 2025 10:33AM Check Date Check# Payee Descriptio n Invoice Date Invoice# Invoice $ Check$ GLAccount GL Account Name Total 115550: 1,428.33
09/ 04/ 2025 115551 H.E.Aaron Development Closing out the account 09/03/2025 090325 9,654.40 9,654.40 104170310 Professiona lService Total 115551: 9,654.40
Total 115552: 5,859.00
09/04/2025 115553 Expert Garage Doors and TDS Gate Repair 08/25/2025 082525 2,100.00 2,100.00 404566630 Contracts Total 115553: 2,100.00
09/04/2025
09/04/2025
Total 115554:
Postage and Shippin
Postage and Shippin
Total 115555: 3,368.54
09/04/2025 115556 Guzman, Je nnifer CRVRecyclingCampaign 08/02/2025 2014981 249.92 249 .92 105117230 Travel/ Lodging/ Reg Total 115556: 249.92
09/ 04/ 2025 115557 Karl's Hardware-Rosam maintenance building supplies 08/21/2025 9467 5.40 5.40 294219270 Bldg Operat ion/ Mai Total 115557: 5.40
09/04/2025 115558 Kern Count y LAFCOFY25-26 08/21/2025 082125 6,688.00 6,688.00 104155630 Contracts Professional Service
09/04/2025 115559 LAV Consulting & Engine TOPOGRAPHIC SURVEY 08/18/2025 1081-02 2,400.00 2,400.00 104170310 Profess ional Service 3,217.19 3,217.19 515115269 Inventory
151.35 151.35 515115269 Inventory
09/04/2025 115555 Ferguson Waterworks # Inventory 08/07/2025 0057323 09/04/2025 115555 Fergus on Waterworks # In ventory 08/13/2025 0058472 115554 FedEx WWTP Sample Mailing 08/08/2025 8-949-55268 73.75 73.75 525213245 115554 FedEx WWTP Sample Mailing 08/15/2025 8-956-04632 87.63 87.63 525213245 161.38
Total 115558: 6,688.00
09/04/2025 115559 LAV Consulting & Engine FEMA VIOLATIONCASE 211 2 1 WI 07/ 08/ 2025 1081-01 11.500.00 11,500.00 104170310 California City Check Register • City Council Meeting Page: 4 Che c k Issu e Dates : 8/22/2025 •9/4/2025 Sep 04, 2025 10:33AM Check Date Check# Payee Description Invoice Date In voice # Invoice$ Check $ GLAccount GL Account Name Total 115559: 13,900.00
09/04/2025 115560 Martin,Paris,and Mullins PD· Background Investigation 07/06/2025 2025-44 1,600.00 1,600.00 1042121 30 Recru iting 09/04/2025 115560 Martin,Paris,and Mullins PD- Background Investigation 07/17/2025 2025-48 2,000.00 2,000.00 104212130 Recruiting Total 115560: 3,600.00
09/04/2025 115561 Mission Uniform Service PD Linen Service 08/14/2025 524406432 106.05 106.05 104212270 Bld g Ope rat io n/ Mai 09/ 04/ 202 5 115561 Mission Uniform Service PD Linen Service 08/21/2025 524447199 78.14 78.14 104212270 Bldg Operation/Mai Total 115561: 184.19
09/04/2025 115562 O'Reilly Auto Parts Unit 250-DOOR HANDLE 08 / 07/ 2025 6127-275368 40.93 40.93 515115254 Veh Operation/Main 09/04/2025 115562 O'Reilly Auto Parts 55 GAL MOTOR OIL 08/11/2025 6127-275887 757.74 757.74 104441450 Special Depa rt Supp 09/ 04/ 2025 115562 O' Reilly Auto Parts Unit 102 CORE CHARGECOMPRES 08/12/2025 6127-276020 359.50 359.50 515115254 Veh Ope ration/ Main 09/04/2025 115562 O'Reilly Auto Parts Unit 207 BLWR MTR 08/12/2025 6127-276035 22.42 22.42 515115254 Veh Operatio n/ Ma in 09/04/2025 115562 O'Reilly Auto Parts Unit 209 SPARK PLUG AND COP B 08/13/2025 6127-276168 120.89 120.89 515115254 Veh Operatio n/ Ma in 09/04/2025 115562 O'Reilly Auto Parts BATTERY- UNIT901 08/13/2025 6127-276169 246.28 246.28 274413254 Veh Operation / Ma in 09/ 04/ 2025 115562 O'Reilly Auto Parts Unit 102 FAN ASSEMBLY 08/14/2025 6127-276360 75.01 75.01 515115254 Veh Operation/Main 09/04/2025 115562 O'Reilly Auto Parts BLOWER MOTOR UNIT 207 08/15/2025 6127276454 78.06 78.06 515115254 Veh Operat ion / Main 09/04/2025 115562 O'Reilly Auto Parts Hydra u lic oil 08/20/2025 6127-277262 811.86 811.86 104441450 Special Depart Supp 09/04/2025 115562 O'Reilly Auto Parts batterygenerator 08/25/2025 6127-277918 551.96 551.96 525213256 Equipm en t Opera tio 09/04/2025 115562 O'Reilly Auto Parts Unit 322 SPEED SENSOR 08/07/2025 6127-5275370 36.26 36.26 525213 254 Veh Operation/Main Total 115562: 3,100.91
09/04/2025 115563 Pace Analytical Services WWTB Lab Samplin g 08/15/2025 2527B520544 797.70 797.70 525213314 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/ 15/ 2025 2527B521251 1,017.00 1,017.00 525213314 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/06/2025 2527B521922 275.00 275.00 52521331 4 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/06/2025 2527B521968 275.00 275.00 525213314 Lab Samp ling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/06/2025 2527B521969 275.00 275.00 525213314 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/15/2025 2527B522077 275.00 275.00 525213314 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/15/2025 2527B522083 275.00 275.00 525213314 Lab Sampling 09/04/2025 115563 Pace Analytical Services WWTB Lab Sampling 08/ 15/ 2025 2527B522242 275.00 275,00 525213314 Lab Sampling Total 115563: 3,464.70
09/ 04/ 2025 115564 Price Paige & Company C Audit Prep FYE 6 .30 .25 07/31/2025 36573 12,756.00 12,756.00 104141310 Professional Service Total 115564: 12,756.00
09/04/2025 115565 Primo Brands office drinking water 07/12/2025 05G871033985 122.70 122.70 525213241 Office Supplies California City Check Register - City Council Meeting
Check Issue Dates: 8/22/2025 - 9/4/2025
Page; 5
Sep 04, 2025 10:33AM
Check Date Check# Payee Description Invoice Date Invoice# Invoice$ Check$ GLAccou nt GL Account Name 09/04/2025 115565 Primo Brands 07/11-08/10/25 08/13/2025 05H871011425 171.27 171.27 104155241 Office Supplies Total 115565: 293.97
09/04/2025 115566 Quadient Leasing USA, I 9/10-12/09/25POSTAGELEASE 08/09/2025 Q1972433 674.61 674.61 104155242 Office Equip Lease E Total 115566: 674.61
09/04/2025 115567 Rivera, Miguel Per Die mMileage 8/18-8/20/25 08/14/2025 7044 394.97 394.97 104212230 Travel/ Lodging / Reg Total 115567: 394.97
404566630 Contracts
404566630 Contracts
09/04/2025 115569 Sequoia Equipment Com HYDRAULIC TUBE 08/14/2025 BAK-23150 307 .15 307 .15 515115240 Equip ment Rental 09/04/2025 115569 Sequoia Equipment Com Unit 480 starter 08/20/2025 BAK-23186 709.04 709.04 515115256 Equipment Operatio Total 115569: 1,016.19
09/04/2025 115570 Stivers, Timothy Per Diem & Mileage: 9/1 4-9 /19 / 2 08/18/2025 TRAVEL A 473.00 473.00 104212230 Travel/ Lodg ing/ Reg Tota l 115570: 473.00
09/04/2025 115571 Technic Business Solutio 05/ 13-08/ 12/ 25 Copier Coverage 08/ 13/ 2025 C01 7-IN64656 880.17 880.17 515115242 Office EquipLease E Total 115571: 880.17
09/04/2025 115572 The Hiller Companies LL 2025 annual fire ext insp 08/20/2025 673232 405.00 405.00 104212630 Cont racts 09/ 04/ 2025 115572 The Hiller Com panies LL Fire extinguisher maint 08/ 21/ 2025 673807 425.00 425.00 104155630 Contracts Total 115572: 830.00
Total 115573: 6,741.00
Total 115574: 713.13
Armory/Safety Equi
Office Equip Lease E
09/04/2025 115568 Robert Daniels Aug 2025 08/ 22/ 2025 082225 1,250.00 1,250.00 09/ 04/ 2025 115568 Robert Daniels Aug 2025 08/27/2025 082725 3,800.00 3,800.00 Total 115568: 5,050.00
09/04/2025 115573 Troy Industries, Inc. 3-swat rifles 07/14/2025 133564 6,741.00 6,741.00 104212451 09/04/2025 115574 US Bank Eq uipm ent Fina 08/13-09/13/25Copiers 08/20/2025 562573089 713.13 713.13 515115242 w
w
California City
Check Date Check#
09/04/2025 115575
09/04/2025 115575
09/04/2025 115575
Tota l 115575:
Check Register - City Council Meeting
Check Issue Dates: 8/22/2025 - 9/4/2025
Page: 6
Sep04, 2025 10:33AM
09/04/2025 115576
Total 115576:
09/04/2025 115577
09/04/2025
09/04/2025
09/04/2025
09/04/2025
Walkup Investigations July 2025 08/02/2025 2025-26 5,000.00 5,000.00 104155310 Professional Service 5,000.00
Walters Wholesale Elect Asset #611T-Bar and Klin 08/11/2025 S128380709.00 547.66 547.66 606000752 Community Benefit :) Total115577:
= r:::26/2025 202500175
- Total 202500175:
I
Airesp ring Inc 7/ 01-7/31/25 08/01/2025 199099686 76.79 76.79 535310284 Telephone - Land
76.79 Amazon Capital Services Safety Gloves 08/03/2025 1YLT-6QXW-YJH 162.99 162.99 274413451 Armory/ Safety Equi 09i04/2025 202500176
Total 202500176: 162.99
09/04/2025
09/04/2025
09/04/2025
Total 202500177: , 1 981.11
09/04/2025 202500178 Capital Indus tr ial Medic 8/ 18 / 25-medicalsupplies 08/18/2025 223301 57.73 57.73 104212480 Chemicals/EMS Med Total 202500178: 57.73
09/ 04/ 2025 202500179 Classi c Lock &Keys KEYSERVICEFORBORAXBILLPA 08/ 20/ 2 025 82025 65.00 65.00 294219270 BldgOperat ion/ Mai Total 202500179: 65.00
09/04/2025 202500180 Diamond Finish Mobile Mobile CarWash 08/16/2025 166 180.00 180.00 104212254 Veh Operation/Main D:
a.
202500177 AWP Safety Aluminum Signs 08/15/2025 12020914 999.45 999.45 274411411 Street Signs 202500177 AWP Safety Alu minum Signs 08/15/2025 12020915 361.09 361.09 274411411 Street Signs 202500177 AWP Safety Aluminum Signs 08/15/2025 12020916 620.57 620.57 274411411 Street Signs Payee Description Invoic e Date In voice # Invoice $ Check$ GLAccount GLAccount Name Vestis PANTS PERMOU 07 /29/2025-08/ 07/29/2025 2601742285 86.34 86.34 294219451 Armory/Safety Equi Vest is PANTS PER MOU 07 /29/2025-08/ 08/12/2025 2601745956 86.34 86.34 294219451 Armory/Safety Equi Vestis 08/12/2025-08/19/2025 Pants S 08/19/2025 2601747768 86.34 86.34 294219451 Armory/Safety Equi 259.02
115577 Walters Wholesale Ele ct Asse t #611T-Bar and Klin 08/12/2025 S128380709.00 5.11 5.11 606000752 Commu nity Benefit 115577 Walters Wholesale Elect Asset #611T-Bar and Klin 08/12/2025 S128380709.00 1,928.01 1,928.01 606000752 Community Benefit 115577 Walters Wholesale Elect T-Bar and Klin 08/11/2025 S128417318.00 858.11 858.11 104561270 Bldg Operation/ Mai 115577 Walters Wholesale Elect T-Bar and Klin 08/12/2025 S128417318.00 287.20 287.20 104561270 Bldg Opera t ion/ Mai 3,626.09
California City Check Register - City Council Meeting
Check Issue Dates: 8/22/2025 - 9/4/2025
Page: 7
Sep04, 2025 10:33AM
Check Date Check# Payee Description Invoic e Date In voice # Invoice $ Check$ GLAccount GLAccount Name Total 202500180: 180.00
09/04/2025
09/04/2025
Total 202500181: 27,623.06
515115630 Contracts
535310630 Contra cts
09/04/2025 202500182 Famcon Pipe & Supply In Inventory 08/11/2025 S100161447.00 1,044.61 1,044.61 515115269 Inventory 09/04/2025
09/04/2025
09/04/2025
09/ 04/ 2025
Total 202500182: 16,515.71
09/ 04/ 2025 202500183 PNC Equipment Finance, 09/01-09/30/25 08/04/2025 2314184 2,863.00 2,863.00 Total 202500183: 2,863.00
09/ 04/ 2025 202500184 PSI Water Technologies I Brine Pump 08/25/2025 INV0008943 2,142.10 2,142.10 Total 202500184: 2,142.10
09/ 04/ 2025
09/04/2025
09/04/2025
09/ 04 / 2025
09/04/2025
Total 202500185: 9,667.84
515115269 Inventory
515115269 Inventory
515115269 Inventory
515115269 Inventory
404566240 Equip ment Rental
515115256 Equip ment Operatio
09/04/2025 202500186 StaplesAdvantage Supplies 08/25/2025 7006595341 2,085.20 2,085.20 104155250 Other/Office Equip Total 202500186: 2,085.20
09/04/2025 202500187 Stewart, Salvador CR25-0533 -REPLACEPANTS 08/16/2025 REIMBURSEME 103.31 103.31 104212451 Armo ry/ Safety Equi Total 202500187: 103.31
Grand Totals: 34,7 251.31
202500181 DiamondIT August 2025 IT Services 08/01/2025 38414 24,299.06 24,299.06 202500181 DiamondlT August 2025 M365 08/01/2025 38425MS 3,324.00 3,32 4.00 202500182 Famcon Pipe & Supply In Inventory 08/ 12/ 2025 5100161586.00 8,120.92 8,120.' 2 202500182 Famcon Pipe & Supply In In ventory 08/12/2025 S100161600.00 1,920.36 1,920.36 202500182 Famcon Pipe & Supply In In ventory 08/12/2025 S100161686.00 173.20 173.20 202500182 Famcon Pipe & Supply In Inventory 08/21/2025 S100162151.00 5,256.62 5,256.62 202500185 RSI Petroleum Fuel Services 08/20/2025 417631 1,523.34 1,523.34 404566255 RSIFuel 202500185 RSI Petroleum Fuel073125 09/02/2025 CUST#003019 3,875.53 3,875.53 104222255 RSI Fuel 202500185 RSI Petroleum Fuel073125 09/02/2025 CUST #0 03029 552.78 552.78 104168255 RSI Fuel 202500185 RSI Petroleum Fuel Services 09/02/2025 CUST #003182 2,685.40 2,685.40 525213255 RSI Fuel 202500185 RSI Petroleum Fuel Services 09/02/2025 CUST #003191 1,030.79 1,030.79 104131255 RSIFuel California City Check Register - City Council Meeting
Check Issue Dates: 8/22/2025 - 9/4/2025
Page: 8
Sep04, 2025 10:33AM
Check Date Check# Payee Description Invoic e Date In voice # Invoice $ Check$ GLAccount GLAccount Name I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDS AND AVAILABILITY OF FUNDS:
Report Criteria:
Report type: Invoice detail
Vendor.Vendor Number={<>} 1039
Bank.Bank Number= 1
California City Check Register - US Bank Corporate Credit Card Check Issue Dates: 8/22/2025 - 9/4/2025
Page: 1
Sep 04, 2025 10:50AM
GL Acco unt Name
a.
Total PW 4576 072525: 9,674.21
Total 115533: 9,674.21
Grand Totals: 9,674.21
I HEREBY CERTIFY AS TO THE ACCURACY OF THE DEMANDSAND AVAILABILITY OF FUNDS:
08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 1,654.02 1,654.02 71-7111-270 Bldg Operation/ Maint 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 1,700.00 1,700.00 10-4168-210 Subscr / Books / Du es 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 61.05 61.05 51-5115-269 Inve ntory 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 324.00 324.00 10-4168-230 Travel/ Lodging/ Reg 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 311.44 311.44 51-5115-269 Inventory 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 457 6 072525 118.08 118.08 51-5115-451 Armory/ Safety Equip & Su 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 47.61 47.61 51-5115-269 Inventory 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 759.98 759.98 10-4168-230 Travel/ Lodg ing/ Reg 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 557.16 557.16 10-4168-230 Travel/ Lodging/ Reg 08/25 08/27/2025 115533 US Ba nk Corporate Payment 072525 PW 4576 072525 319.59 319.59 10-4168-230 Travel/ Lodging/ Reg 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 376.12 376.12 51-5115-269 Inventory 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 755.59 755.59 10-4441-450 Special Depart Supp 08/25 08/27/2025 115533 US Bank Cor porate Payment 072525 PW 4576 072525 1,529.33 1,529.33 51-5115-269 Inventory 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 455.52 455.52 27-4411-450 Special De part Supp 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 -755.59 -755.59 10-4441-450 Special De part Supp 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 118.08 118.08 51-5115-451 Armory/ Safety Equip & Su 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 608.67 608.67 51-5115-270 Bldg Ope rat ion/ Mai nt 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 122.38 122.38 10-5117 -210 Subscr/ Books / Dues 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 83.80 83.80 10-4155-270 Bldg Opera t ion/ Maint 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 393.30 393.30 27-4411 -254 Veh Operatio n/ Ma int 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 59.04 59.04 51-5115-451 Armo ry/ Safety Equip & Su 08/25 08/27/2025 115533 US Bank Corporate Payment 072525 PW 4576 072525 75.04 75.04 71-7111-270 Bldg Ope ra tio n/ Maint GL Check Check Description Invoice Invoice Check GLAccount Period Issue Date Number Payee Number Amount Amou nt
California City Check Register - Housing with GL
Check Issue Dates: 8/22/2025 - 9/4/2025
Page: 1
Sep 04, 2025 10:45AM
:
w
:,
Check Date Check# Payee Description Invoice Date Invoice# Invoic e $ Check$ GLAccount GLAccount Name 10861008092 45.00
10866908072 176.24
e
I
ILi
Total 9648:
Total 9649:
00705827665 0 10.30
01331396257 0 .16
03431396005 0 93.78
124641271200 11.98
15402977019 0 13.64
15825589029 0 11.98
18568166963 0 48.44
09/04/2025 148000304 DiamondlT August 2025 M365 08/01/2025 38425MS 36.00 Total 148000304:
Grand Totals:
I HEREBY CERTIFY AS TO THE ACCURACY OFTHE DEMANDS AND AVAILABILITY OF FUNDS:
45.00 744632284 Telephone - Land
176.24 744632284 Telephone - Land
221.24
10.30 744632282 Gas
.16 744632282 Gas
93.78 744632282 Gas
11.98 744632282 Gas
13.64 744632282 Gas
11.98 744632282 Gas
48.44 744632282 Gas
190.28
36.00 744632630 Contracts
36.00 447.52
08/27/2025 9648 Charter Communication 08/09-09/08/25 08/09/2025 0 08/27/2025 9648 Charter Communication 08/07-09/06/25 08/07/2025 0 n09/03/2025 9649 SoCalGas Housing Gas 07 /11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07/11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07 /11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07/11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07/11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07/11-08/12/25 08/14/2025 09/03/2025 9649 SoCalGas Housing Gas 07 /11-08/12/25 08/14/2025 City of California City
Report Criteria:
Check.Check issue date= 08/22/2025-09/04/2025
Demand Register- CityCouncil Meeting Page:1
Sep04, 202510:22AM
Check Date Check # Payee Description Source ID Amount Check$ GLAccount 09/04/2025 501608 ALEXIS CLAY Final Bill Deposit Refunded 101693.05 65.00 65.00 5102090 Total 501608: 65.00
09/04/2025 501609 Avina, Rogelio Final BillDeposit Refunded 107475.01 18.00 18.00 5102090 Total 501609: 18.00
09/04/2025 501610 Brock Peachee Final BillDeposit Refunded 106191.05 48.00 48.00 5102090 Total 501610: 48.00
09/04/2025 501611 Cathy Kirn Yip Final BillDeposit Refunded 102948.22 70.00 70.00 5102090 Total 501611: 70.00
09/04/2025 501612 Ethan Weaver Final BillDeposit Refunded 102872.07 70.00 70.00 5102090 Total 501612: 70.00
09/04/2025 501613 Ethan Weaver Refund Credit Balance 102872.07 4.00 4.00 0101075 Total 501613: 4.00
09/04/2025 501614 Hughes, Robert Final BillDeposit Refunded 105525.06 28.00 28.00 5102090 Total 501614: 28.00
09/04/2025 501615 JESVI ZAMORA-ZUNIGA RefundCredit Balance 100655.08 42.00 42.00 0101075 Total 501615: 42.00
09/04/2025 501616 Joshua Meister Final Bill Deposit Refunded 107259 .03 40.00 40.00 5102090 Total 501616: 40.00
09/04/2025 501617 Joshua Meister Final BillDeposit Refunded 103798.08 15.00 15.00 5102090 Total 501617: 15.00
09/04/2025 501618 KYLE STENGEL Final Bill Deposit Refunded 105548.17 16.00 16.00 5102090 Total 501618: 16.00
09/04/2025 501619 Leonardo Martin Final Bill Deposit Refunded 103799.10 55.00 55.00 5102090 Total 501619: !i!i 00
Finance Approval By: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date:
Cityof California City Demand Register- CityCouncil Meeting Page:2 Sep04, 202510:22AM
Check Date Check # Payee Description Source ID Amount Check$ GLAccount 09/04/2025 501620 MichaelKulikoff
Total 501620:
Final BillDeposit Refunded 101900.02 45.00 45.00 5102090
45.00 09/04/2025 501621 Rosa Gamboa Final BillDeposit Refunded 101362.08 35.00 35.00 5102090 Total 501621: 35.00
09/04/2025 501622 Seth Stern Final BillDeposit Refunded 102385.08 24.00 24.00 5102090 Total 501622: 24.00
09/04/2025 501623 Shirley Davis Final BillDeposit Refunded 105607.08 32.00 32.00 5102090 Total 501623: 32.00
09/04/2025 501624 Vincent Ramos Lopez, Carlos Ramos Lop Final Bill Deposit Refunded 102469.02 48.00 48.00 5102090 Total 501624: 48.00
09/04/2025 501625 Zachary Thorton Final BillDeposit Refunded 102715.03 68.00 68.00 5102090 Total 501625: 68.00
09/04/2025 501626 Zheng, Curtis Final BillDeposit Refunded 106342.05 39.00 39.00 5102090 Total 501626:
Grand Totals:
39.00 762.00
Date --------"z/21/c}o_r-
NB 1
4903-3092-5397 v2
COUNCIL AGENDA ITEM
September 9, 2025
TO: Honorable Mayor and Members of the City Council
FROM: Christy Marie Lopez, Assistant City Attorney
SUBJECT: Consideration of Resolutions Calling a Special Election For Filling Up To Two (2) Vacancies, or in the alternative, Consider the Appointment of Up To Two (2) Councilmembers to Fill Vacancies on the City Council
BACKGROUND
Councilmember Michael Kulikoff and Mayor Pro Tem Jesse Hightower were elected to serve a four (4) year term as City Councilmembers ("Councilmembers") in the November 2022 and 2024 general elections, respectively. At the July 8, 2025 Council Meeting, Councilmember Michael Kulikoff resigned, and on July 10, 2025 Mayor Pro Tem Jesse Hightower resigned. Due to the resignations, there are two vacancies on the City Council. Per the Government Code, the City Council must fill the vacancy either by appointment or by calling a special election within 60 days of the vacancies.
DISCUSSION
California Government Code Section 36512 describes the actions to be taken in connection with a vacancy in an office. It states that if a vacancy occurs in an elective office, the council shall, within 60 days from the commencement of the vacancy, either fill the vacancy by appointment or call a special election to fill the vacancy. Based on the dates of resignation identified above, the Council must act by September 6, 2025 to fill former Councilmember Kulikoff’s seat and by September 8, 2025 to fill former Mayor Pro Tem Hightower’s seat.
It should be noted that Government Code Section 36512 provides that in the event that City opts to fill the vacancies by special election, the “person elected to fill a vacancy holds office for the unexpired term of the former incumbent.” (Government Code Section 36512(b)(1).) Councilmember Kulikoff’s term would have expired in November of 2026 and former Mayor ProTem Jesse Hightower’s term would have expired in November of 2028.
If the council fills the vacancy by appointment, and the vacancy occurs within the first half of the term and at least 130 days prior to the next general election, the person shall hold office until the next general election, where the position will be up for election NB 1
4903-3092-5397 v2
again and filled for the remainder of the term. Therefore, the person appointed to fill former Mayor Pro Tem Hightower’s seat will hold the office until the certification of the results from the election in November 2028 and the person appointed to fill former Councilmember Kulikoff’s seat, will hold the office until certification of results from the election in November 2026. Should the council desire to appoint councilmembers, a proposed resolution is attached.
If the City Council desires to call a special election to fill the vacancies, it is recommended that the City Council adopt the following proposed resolutions: (1) Resolution calling the Special Election, to fill the two vacancies, to be held on June 2, 2026; (2) Resolution requesting that this Special Election be consolidated with the Statewide Primary Election being held by the County on June 2, 2026; (3) Resolution concerning procedures for candidate statements; and (4) Resolution concerning procedures in the case of a tie vote.
RECOMMENDATION
1. Motion to appoint up to two (2) Councilmembers; or
2. Adopt resolutions calling for a special municipal election to fill two (2) vacancies on the City Council and authorize the City Clerk as follows:
1. Resolution calling the Special Election to fill the two vacancies to be held on June 2, 2026; and
2. Resolution requesting that this Special Election be consolidated with the Statewide Primary Election being held by the County on June 2, 2026; and
3. Resolution concerning procedures for candidate statements; and
4. Resolution concerning procedures in the case of a tie vote; and
5. Authorize the City Clerk to finalize and make such modifications to these Resolutions as may be required by Kern County and applicable law, subject to the City Attorney’s approval as to form.
FISCAL IMPACT
In the event that a special election is called, costs will be incurred. Many factors impact the cost of elections, including voting systems, ballot printing costs, ballot postage, and voter information guide typesetting, printing and postage fees. The approximate costs for a special election to fill the vacancies that is consolidated with the Statewide Primary Election held by the County on June 2, 2026 is approximately $50,000 including printing costs.
ENVIRONMENTAL REVIEW
The adoption of the proposed resolutions are exempt from the California Environmental Quality Act (“CEQA”) because it does not qualify as a “project” pursuant to Public Resource Code section NB 1
4903-3092-5397 v2
21065 and CEQA Guidelines Sections 15320, 15378 and 15061(b)(3) since it can be seen with certainty that there is no possibility that the City’s action would cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.
ATTACHMENTS:
1. Resolution 2025-3159
2. Resolution 2025-3160
3. Resolution 2025-3161
4. Resolution 2025-3162
4901-1738-4549 v3
RESOLUTION NO. 25-3159
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CALIFORNIA CITY, CALLING FOR THE HOLDING OF
A SPECIAL MUNICIPAL ELECTION TO BE HELD ON
TUESDAY, JUNE 2, 2026, FOR THE ELECTION OF TWO
(2) MEMBERS OF THE CITY COUNCIL AS REQUIRED BY
THE PROVISIONS OF THE LAWS OF THE STATE OF
CALIFORNIA RELATING TO GENERAL LAW CITIES
WHEREAS, on July 8, 2025 Councilmember Michael Kulikoff resigned, and on July 10, 2025 Mayor ProTem Jesse Hightower resigned resulting in two (2) vacancies on the City Council; and
WHEREAS, former Councilmember Kulikoff’s term would have expired on January 4, 2027 and former Mayor ProTem Jesse Hightower’s term would have expired on January 8, 2029; and
WHEREAS, Government Code Section 36512 provides that the City Council must fill such vacancies by either appointment or special election; and WHEREAS, the terms of each elected Councilmember seat is governed by Government Code Section 36512, which provides that “a person elected to fill a vacancy holds office for the unexpired term of the former incumbent”; and WHEREAS, the City Council now desires to fill such appointments by a special election; and
WHEREAS, under the provisions of the laws relating to general law cities in the State of California, a Special Municipal Election shall be held on Tuesday, June 2, 2026, for the election of two (2) City Councilmembers.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CALIFORNIA
CITY, CALIFORNIA, DOES RESOLVE, DECLARE AND DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. That pursuant to the requirements of the laws of the State of California relating to General Law cities, there is called and ordered to be held in the City of California City, California, on Tuesday, June 2, 2026, a Special Municipal Election for the purpose of electing certain members of the City Council as follows:
One (1) Member of the City Council, in which vacancy was created by the resignation of Michael Kulkoff, for the term of office that ends on January 4, 2027.
One (1) Member of the City Council, in which vacancy was created by the resignation of Jesse Hightower, for the term of office that ends on January 8, 2029. 4901-1738-4549 v3
SECTION 2. That the ballots to be used at the election shall be in form and content as required by law.
SECTION 3. That the City Clerk is authorized, instructed, and directed to coordinate with the Kern County Registrar of Voters to procure and furnish any and all official ballots, notices, printed matter and all supplies, equipment and paraphernalia that may be necessary in order to properly and lawfully conduct the election.
SECTION 4. That the vote center locations and hours of operations, ballot drop box locations and hours of operations, vote-by-mail procedures and timing, the election officers, and all other persons and procedures for this Special Municipal Election shall be the same as those utilized by the County of Kern and in compliance with the Elections Code of the State of California. That the polls for the election shall open at seven (7) o'clock a.m. of the day of the election and shall remain open continuously from that time until eight (8) o'clock p.m. of the same day when the polls shall be closed pursuant to Election Code §10242, except provided in §14401 of the Elections Code of the State of California.
SECTION 5. That in all particulars not recited in this resolution, the election shall be held and conducted as provided by law for holding of municipal elections.
SECTION 6. That notice of the time and place of holding the election is given and the City Clerk is authorized, instructed, and directed to give further additional notice of the election, in time, from, and manner as required by law.
SECTION 7. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of originalresolutions.
SECTION 8. The City Council authorized the City Clerk to administer said election and all reasonable and actual election expenses shall be paid by the City upon presentation of a properly submitted bill.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 9th day of September 2025.
Marquette E. Hawkins,
Mayor
4901-1738-4549 v3
ATTEST:
Leanndrea Weible
Acting City Clerk
APPROVED AS TO FORM:
Victor M. Ponto,
City Attorney
4901-1738-4549 v3
CERTIFICATION
I, Leanndrea Weible, Acting City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 9th of September 2025, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City,California, this day of September 2025.
Leandrea Weible
Acting City Clerk
4928-4617-5333 v2
RESOLUTION NO. 25-3160
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CALIFORNIA CITY, REQUESTING THE BOARD OF
SUPERVISORS OF THE COUNTY OF KERN TO
CONSOLIDATE A SPECIAL ELECTION TO BE HELD ON
TUESDAY, JUNE 2, 2026, WITH THE STATEWIDE
PRIMARY ELECTION TO BE HELD ON THAT DATE
PURSUANT TO ELECTIONS CODE §10403
WHEREAS, a Special Municipal Election is to be held in the City of California City, California, (the "City") on Tuesday, June 2, 2026, for the purpose of electing two (2) members of the City Council, with one term expiring on January 4, 2027 and the other term expiring in January 8, 2029, in order to fill two vacancies pursuant to Government Code Section 36512; and
WHEREAS, it is desirable that the Special Election be consolidated with the Statewide Primary Election to be held on the same date and that within the City, the precincts, polling places, and election officers of the two elections be the same, and that the Kern County Registrar of Voters canvass the returns of the Special Municipal Election, and that the election be held in all respects as if there were only one election; and
WHEREAS, all necessary expenses in performing these consolidated election services shall be paid by the City of California City.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CALIFORNIA
CITY, CALIFORNIA, DOES RESOLVE, DECLARE AND DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. That pursuant to the requirements of Section 10403 of the Elections Code, the Board of Supervisors of the County of Kern ("Board of Supervisors") is hereby requested to consent and agree to the consolidation of the City’s Special Municipal Election with the Statewide Primary Election on Tuesday, June 2, 2026, for the purpose of electing two (2) members of the City Council with one term expiring in January 4, 2027 and the other term expiring in January 8, 2029.
SECTION 2. That the Kern County Registrar of Voters is authorized to canvass the returns of the Special Municipal Election. The election shall be held in all respects as if there were only one election, and only one form of ballot shall be used. The election will be held and conducted in accordance with the provisions of law regulating statewide elections.
SECTION 3. That the Board of Supervisors is requested to issue instructions to the Kern County Registrar of Voters to take any and all steps necessary for the holding of the consolidated election.
4928-4617-5333 v2
SECTION 4. That the City of California City recognizes that additional costs will be incurred by the County by reason of this consolidation and agrees to reimburse the County for any costs related to this election upon presentation to the City of an invoice therefor.
SECTION 5. That the City Clerk is hereby directed to file a certified copy of this resolution with the Board of Supervisors and the Kern County Registrar of Voters.
SECTION 6. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 9th day of September 2025.
Marquette E. Hawkins,
Mayor
ATTEST:
Leanndrea Weible
Acting City Clerk
APPROVED AS TO FORM:
Victor M. Ponto,
City Attorney
4928-4617-5333 v2
CERTIFICATION
I, Leandrea Weible, Acting City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 9th of September 2025, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this 9th day of September 2025.
Leandrea Weible
Acting City Clerk
4921-5405-0917 v2
RESOLUTION NO. 25-3161
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CALIFORNIA CITY, ADOPTING REGULATIONS FOR
CANDIDATES FOR ELECTIVE OFFICE PERTAINING TO
CANDIDATES’ STATEMENTS SUBMITTED TO THE
VOTERS AT A SPECIAL MUNICIPAL ELECTION TO BE
HELD ON TUESDAY, JUNE 2, 2026
WHEREAS, a Special Municipal Election is to be held in the City of California City, California, (the "City") on Tuesday, June 2, 2026, for the purpose of electing two (2) members of the City Council, with one term expiring on January 4, 2027 and the other term expiring in January 8, 2029, in order to fill two vacancies pursuant to Government Code Section 36512; and
WHEREAS, Section13307 of the Elections Code of the State of California provides that the governing body of any local agency adopt regulations pertaining to materials prepared by any candidate for a municipal election, including costs of the candidates' statement.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CALIFORNIA
CITY, CALIFORNIA, DOES RESOLVE, DECLARE AND DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. GENERAL PROVISIONS: that pursuant to Section13307 of the Elections Code of the State of California, each candidate for elective office to be voted for at an election to be held in the City of California City on June 2, 2026, may prepare a candidate's statement on an appropriate form provided by the City Clerk. The statement may include the name, age and occupation of the candidate and a brief description of no more than two hundred (200) words of the candidate's education and qualifications expressed by the candidate themself. The statement shall not include party affiliation of the candidate, nor membership or activity in partisan political organizations. The statement shall be filed in typewritten form in the office of the City Clerk, at the time the candidate's nomination papers are filed. The statement may be withdrawn, but not changed, during the period for filing nomination papers and until 5:00 p.m. of the next working day after the close of the nomination period.
SECTION 2. FOREIGN LANGUAGE POLICY
A. Pursuant to the Federal Voting Rights Act, candidates' statements will be translated into all languages required by the County of Kern. The County is required to translate candidate's statements into the following languages:
Spanish.
B. The County will print and mail voter information guides, sample ballots, and candidates' statements to all voters in English and Spanish. The County will make the voter information guides, sample ballots, and candidates' 4921-5405-0917 v2
statements in the required languages available at all polling places, on the County's website, and in the Elections Official's Office.
SECTION 3. PAYMENT
A. Translations:
1. The candidate shall be required to pay for the cost of translation of the candidates' statement into any required foreign language as specified in (A) and (B) of Section 2 above pursuant to Federal and/or State Law.
B. Printing:
1. The candidate shall be required to pay for the cost of printing candidates' statement in English in the main voterpamphlet.
2. The candidate shall be required to pay for the cost of printing the candidates' statement in a foreign language as required in (A) of Section 2 above, in the main voter pamphlet.
3. The candidate shall be required to pay for the cost of printing the candidates' statement in a foreign language as required by (A) of Section 2 above, in the facsimile pamphlet.
The City Clerk shall estimate the total cost of printing, handling, translating, and mailing the Candidate's Statements filed pursuant to this section, including costs incurred as a result of complying with the Voting Rights Act of 1965 as amended, and require each candidate filing a statement to pay, in advance to the local agency, their estimated prorata share as a condition of having his or her statement included in the voter's pamphlet.
In the event the estimated payment is required, the estimate is just an approximation of the actual cost that varies from one election to another election and may be significantly more or less than the estimate, depending on the actual number of candidates filing statements. Accordingly, the City Clerk is not bound by the estimate and may, on a prorata basis, bill the candidate for additional actual expense or refund any excess paid depending on the final actual costs. In the event of underpayment, the Clerk may require the candidate to pay the balance of the cost incurred. In the event of overpayment, the Clerk shall prorate the excess amount among the candidates and refund the excess amount paid within thirty (30) days of the election.
SECTION 4. No candidate will be permitted to include additional material in the voter information guide and sample ballot package, as applicable.
SECTION 5. That the City Clerk shall provide each candidate, or the candidate's representative, with a copy of this resolution at the time nomination papers are issued.
SECTION 6. That all previous resolutions establishing Council policy on payment for candidates' statements are repealed.
4921-5405-0917 v2
SECTION 7. That this resolution shall apply only to the election to be held on June 2, 2026, and shall then be repealed.
SECTION 8. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 9th day of September 2025.
Marquette E. Hawkins,
Mayor
ATTEST:
Leanndrea Weible
Acting City Clerk
APPROVED AS TO FORM:
Victor M. Ponto,
City Attorney
[THIS SPACE INTENTIONALLY LEFT BLANK]
4921-5405-0917 v2
CERTIFICATION
I, Leanndrea Weible, Acting City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 9th of September 2025, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this 9th day of September 2025.
Leanndrea Weible,
Acting City Clerk
4914-8499-4149 v2
RESOLUTION NO. 25-3162
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CALIFORNIA CITY, PROVIDING FOR A PROCEDURE
FOR DETERMINING, BY LOT, A TIE AMONG
CANDIDATES AT THE JUNE 2, 2026, SPECIAL
MUNICIPAL ELECTION IN ACCORDANCE WITH
ELECTIONS CODE §15651 AND RESCINDINGPREVIOUS
RESOLUTIONS RELATED THERETO
WHEREAS, a Special Municipal Election is to be held in the City of California City, California, (the "City") on Tuesday, June 2, 2026, for the purpose of electing two (2) members of the City Council, with one term expiring on January 4, 2027 and the other term expiring in January 8, 2029, in order to fill two vacancies pursuant to Government Code Section 36512; and
WHEREAS, Section15651 of the Elections Code of the State of California authorizes the City Council to determine the means and manner in which a tie vote is to be resolved in the event that two or more persons receive an equal and the highest number of votes ("tie votes") for an office to be voted upon in the City.
WHEREAS, Section15651 of the Elections Code of the State of California provides that the tie vote shall be resolved in one of the following ways:
a) By Lot: The City Clerk, serving as the Elections Official pursuant to Elections Code § 320, or their designee, shall summon the candidates who have received the tie votes, whether upon the canvass of the returns or upon recount by a court, to appear before the City Council at a time to be designated by the City Council.
The City Clerk shall at that time and place resolve the tie votes by lot (definedbelow). b) By Special Election: The legislative body may resolve a tie vote by conducting a special runoff election involving those candidates who receive an equal number of votes. A special runoff election shall be held only if the legislative body adopts provisions of Section 15651 (b) of the Elections Code prior to conducting the election resulting in the tie vote. All future elections conducted by said legislative body shall be resolved likewise, unless the legislative body later repeals the order for the conduct of a special runoff election.
WHEREAS, the City Council of the City of California City ("City Council") desires that any tie vote resulting from the June 2, 2026 General Municipal Election be resolved by lot.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CALIFORNIA
CITY, CALIFORNIA, DOES RESOLVE, DECLARE AND DETERMINE AND ORDER AS FOLLOWS:
SECTION 1. That pursuant to Section 15651 of the Elections Code of the State of California, if any two or more persons receive an equal and the highest number of 4914-8499-4149 v2
votes for an office to be voted for within the City of California City (the "City"), the tie votes shall be resolved by lot. "By lot" means, by deciding the matter through implementing a method of chance, in order to afford each candidates receiving tie votes a fair opportunity at election.
SECTION 2. That the City Council has the authority to resolve tie votes by lot, by implementing various methods of chance, including, but not limited to, a coin toss, generation of random number, or drawing of names. In the interest of maintaining decorum, fairness, and transparency, the method implemented for resolving tie votes in the June 2, 2026, Special Municipal Election shall be the drawing of names, in accordance with the following procedure:
A. In the event of a tie vote, the City Council, in accordance with Elections Code Section 15651(a), shall set a date and time and place and summon the candidates who have received the tie votes to appear and will determine the tie by lot as provided herein.
B. The City Clerk shall type the name of each candidate who has tied for a particular office on a separate, but identical piece of paper, which shall be folded and deposited into a container and mixed so that the pieces of paper become indistinguishable.
C. The City Clerk, or their designee, shall then draw from the container one piece of paper for the particular office to be filled by the candidates who have tied.
D. The candidate(s) whose name(s) appear(s) upon the drawn piece(s) of paper shall be deemed elected.
E. This process shall be repeated for each particular office to be filled at the June 2, 2026, Special Municipal Election.
SECTION 3. That this resolution shall apply only to the election to be held on Tuesday, June 2, 2026, and shall be repealed upon the City Council's declaration of election results.
SECTION 4. That previous resolutions calling for a special runoff election are hereby repealed.
SECTION 5. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 9th day of September 2025.
4914-8499-4149 v2
Marquette E. Hawkins,
Mayor
ATTEST: APPROVED AS TO FORM:
Leanndrea Weible
Acting City Clerk
Victor M. Ponto,
City Attorney
4914-8499-4149 v2
CERTIFICATION
I, Leanndrea Weible , Acting City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 9th of September 2025, by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this 9th day of September 2025.
Leanndrea Weible
Acting City Clerk
NB 2
COUNCIL AGENDA ITEM
September 9, 2025
TO:
FROM:
Honorable Mayor and City Council
Christopher Lopez, City Manager
Joe Barragan, Public Works Director
SUBJECT: A Resolution Of The City Council Of The City Of California City Authorizing The City Manager To Execute The Contract With BHT Engineering, Inc. For On-Call Professional Engineering Services for Local, State, And Federally Funded Projects BACKGROUND: City Staff created and advertised an RFQ for On-Call Professional Engineering Services to comply with State and Federal Regulations. Only two firms submitted their qualifications, BHT and DPSI. Of the two qualifications submitted, only one was responsive (BHT). DPSI was marked as “non-responsive” due to a lack of required content in their submission.
BHT contract expired 6/30/2025, BHT had been the City’s Engineer for the last six years. So currently the City does not have a contract with an Engineering Firm. BHT has done a great job for the City over the last six years and since they were the one responsive firm to submit their qualififcations, staff would like the City Council to authorizes the City Manager to enter into a contract with BHT until 06/30/2030.
RECOMMENDATION: The City Council approve and authorize the City Manager to sign a new agreement with BHT with an expiration date of 06-30-2030.
ATTACHMENTS:
1. Proposed Contract
2. BHTs Qualifications Packet
3. Proof of Publication
4. Resolution
FISCAL IMPACT:
Contract / Agreement Fees will vary per project.
Fees are charged on a per-project basis, and no projects are started until a signed task order before any work begins.
ENVIRONMENTAL ACTION:
N/A
CITY OF CALIFORNIA CITY
PROFESSIONAL CONSULTANT SERVICES AGREEMENT
1. PARTIES AND DATE.
This Agreement is made and entered into this Month day of Day, 2025, by and between the City of California City, a municipal corporation, organized under the laws of the State of California, with its principal place of business at 21000 Hacienda Blvd., California City, CA 93505 ("City") and BHT ENGINEERING, INC., a Civil Engineering, Building Design & Construction Management Corporation in the state of California, with its principal place of business at 218 South H Street, Suite 203; Bakersfield, CA 93304 ("Consultant"). City and Consultant are sometimes individually referred to herein as "Party" and collectively as "Parties."
2. RECITALS.
2.1 Consultant.
Consultant desires to perform and assume responsibility for the provision of certain professional On-Call Professional Engineering Services for activities associated with Local, Federal, and State funded projects consulting services required by the City on the terms and conditions set forth in this Agreement. Consultant represents that it is experienced in providing professional On-Call Professional Engineering Services for activities associated with Local, Federal, and State funded projects consulting services to public clients, is licensed in the State of California, and is familiar with the plans of City.
2.2 Project.
City desires to engage Consultant to render On-Call Professional Engineering Services for activities associated with Local, Federal, and State funded projects ("Project") as set forth in this Agreement.
3. TERMS.
3.1 Scope of Services and Term.
3.1.1 General Scope of Services. Consultant promises and agrees to furnish to the City
all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional On-Call Professional Engineering Services for activities associated with Local, Federal, and State funded projects consulting services necessary for the Project ("Services").
The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. Additionally, the Consultant acknowledges that Consultant will be executing a contract, substantially similar to the contract at Exhibit “D,” and Consultant hereby agrees that it will comply with all legal requirements, including all Federal requirements, applicable to the Services as identified in said contract.
1 OMLO: October 2018
2 OMLO: October 2018
3.1.2 Term. The term of this Agreement shall be from Month day of XX, 2025 to June 30, 2030, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines.
3.2 Responsibilities of Consultant.
3.2.1 Independent Contractor; Control and Payment of Subordinates.
The Services shall
be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee. Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Neither City, nor any of its officials, officers, directors, employees or agents shall have control over the conduct of Consultant or any of Consultant's officers, employees, or agents, except as set forth in this Agreement. Consultantshall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.
3.2.2 Schedule of Services. Consultant shall perform the Services expeditiously, within
the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "B" attached hereto and incorporated herein by reference. Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall respond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.
3.2.3 Conformance to Applicable Requirements. All work prepared by Consultant shall
be subject to the approval of City.
3.2.4 Substitution of Key Personnel. Consultant has represented toCity that certain key
personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City. The key personnel for performance of this Agreement are as follows: Juan M.
Pantoja, Ramon H. Pantoja, and Miguel H. Pantoja.
3 OMLO: October 2018
3.2.5 City's Representative. The City hereby designates Joe Barragan, Public Works Director, or his/her designee, to act as its representative in all matters pertaining to the administration and performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for review and approval of all products submitted by Consultant but not the authority to enlarge the Scope of Work or change the total compensation due to Consultant under this Agreement. The City Manager shall be authorized to act on City's behalf and to execute all necessary documents which enlarge the Scope of Work or change the Consultant's total compensation subject to the provisions contained in Section 3.3 of this Agreement.
Consultant shall not accept direction or orders from any person other than the City Manager, City's Representative or his/her designee.
3.2.6 Consultant's Representative. Consultant hereby designates Juan M. Pantoja CEO, or his/her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative"). Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his/her best skill and attention, and shall be responsible for all means, methods, techniques, sequences, and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.
3.2.7 Coordination of Services. Consultant agrees to work closelywith City staff in the
performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.
3.2.8 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subconsultants shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subconsultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub-consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.
3.2.9 Laws and Regulations. Consultant shall keep itself fully informed of and in
4 OMLO: October 2018
compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If Consultant performs any work knowing it to be contrary to such laws, rules and regulations, Consultant shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify and hold City, its officials, directors, officers, employees, agents, and volunteers free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.
3.2.10 Insurance.
3.2.10.1 Time for Compliance. Consultant shall not
commence work under this Agreement until it has providedevidence satisfactory to the City that it has secured all insurance required under thissection. In addition, Consultant shall not allow any subconsultant to commence workon any subcontract until it has provided evidence satisfactory to the Citythat the subconsultant has secured all insurance required under thissection.
3.2.10.2 Types of Insurance Required. As a condition
precedent to the
effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations under such Agreement, shall procure and maintain in full force and effect during the term of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so. (A) Commercial General Liability:
Commercial General Liability Insurance which affords coverageat least as broad as Insurance Services Office "occurrence" form CG 0001,or the exact equivalent, with limits of not less than $1,000,000per occurrence and no less than $2,000,000 in the general aggregate. Defensecosts shall be paid in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting coverage for contractualliability; (2) excluding coverage for claims or suits by one insuredagainst another (cross-liability); or (3) containing any other exclusion(s) contrary tothe terms or purposes of thisAgreement.
(B) Automobile Liability Insurance:
Automobile Liability Insurance
with coverage at least as broad as Insurance Services Office Form CA 0001 covering "Any Auto" (Code 1), or if Consultant has no owned autos, “Hired Auto” (Code 8) and “Non-Owned Auto” (Code 9), or the exact equivalent, covering bodily injury and property damage for all activities with limits of not lessthan $1,000,000 combined limit for each occurrence
(C) Workers'
Compensation/Employer’s Liability: Workers'
Compensation Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease. If Consultant has no employees 5 OMLO: October 2018
or agents, Consultant shall not be required to maintain Workers’ Compensation Insurance. However, in the event that Consultant hires employees or agents during the term of this Agreement, Consultant shall obtain and maintain Workers’ Compensation/Employer’s Liability Insurance in accordance with thissection. (D) Professional Liability (Errors &
Omissions): Professional Liability insurance or Errors& Omissions insurance appropriate to Consultant’s profession with limits ofnot less than $1,000,000. Covered professional services shallspecifically include all work to be performed under the Agreement and deleteany exclusions that may potentially affect the work to be performed (for example, any exclusions relating to lead, asbestos, pollution,testing, underground storage tanks, laboratory analysis, soil work, etc.). If coverageis written on a claims-made basis, the retroactive date shall precedethe effective date of the initial Agreement and continuous coverage willbe maintained or an extended reporting period will be exercised for a period ofat least three (3) years from termination or expiration of thisAgreement.
3.2.10.3 Insurance Endorsements. Required insurance
policies shall contain the
following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability
[INSERT "and Pollution Liability"; OTHERWISE, ALWAYS DELETE]:
(1) Additional Insured: The City, its officials, officers, employees, agents, and volunteers shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement.
Additional Insured Endorsements shall not (1) be restricted to "ongoing operations"; (2) exclude "contractual liability"; (3) restrict coverage to "sole" liability of Consultant; or (4) contain any other exclusions contrary to the terms or purposes of this Agreement. For all policies of Commercial General Liability insurance, Consultant shall provide endorsements in the form of ISO CG 20 10 10 01 and 20 37 10 01 (or endorsements providing the exact same coverage) to effectuate this requirement. (2) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Automobile Liability:
(1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (C) Workers' Compensation:
(1) Cancellation: Required insurance policies shall not be 6 OMLO: October 2018
canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (2) Waiver of Subrogation: A waiver of subrogation stating that the insurer waives all rights of subrogation against the City, its officials, officers, employees, agents, and volunteers.
(D) Professional Liability (Errors&
Omissions):
(1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (2) Contractual Liability Exclusion Deleted: This insurance shall include contractual liability applicable to this Agreement. The policy must “pay on behalf of” the insured and include a provision establishing the insurer’s duty to defend.
3.2.10.4 Primary and Non-Contributing Insurance. All
policies of Commercial General Liability and AutomobileLiability insurance shall be primary and any other insurance, deductible, orself-insurance maintained by the City, its officials, officers, employees, agents, or volunteersshall not contribute with this primary insurance. Policies shall contain or be endorsedto contain such provisions.
3.2.10.5 Waiver of Subrogation. All policies of
Commercial General Liability and Automobile Liability insuranceshall contain or be endorsed to waive subrogation against the City, itsofficials, officers, employees, agents, and volunteers or shall specifically allow Consultantor others providing insurance evidence in compliance with these specificationsto waive their right of recovery prior to a loss. Consultant hereby grants to City awaiver of any right to subrogation which any insurer of said Consultant mayacquire against the City by virtue of the payment of any loss under suchinsurance. Consultant agrees to obtain any endorsement that may be necessary to effect thiswaiver of subrogation, but this provision applies regardless of whether or not theCity has received a waiver of subrogation endorsement from the insurer.Consultant shall require similar written express waivers and insurance clauses from each ofits subconsultants.
3.2.10.6 Deductibles and Self-Insured Retentions. Any
deductible or self-insured
retention must be approved in writing by the City and shall protect the City, its officials, officers, employees, agents, and volunteers in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.
3.2.10.7 Evidence of Insurance. The Consultant,
concurrently with the execution
of the Agreement, and as a condition precedent to the effectiveness thereof, shall deliver either certified copies of the required policies, or original certificates on forms approved by the City, together with all 7 OMLO: October 2018
endorsements affecting each policy. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15 days) prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City.
If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Consultant shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.
3.2.10.8 Failure to Maintain Coverage. In the event any policy of insurance
required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement effective upon notice.
3.2.10.9 Acceptability of Insurers. Each such policy shall be from a company or
companies with a current A.M. Best's rating of no less than A:VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
3.2.10.10 Enforcement of Agreement Provisions
(non estoppel). Consultant
acknowledges and agrees that actual or alleged failure on the part of the City to inform Consultant of noncompliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.
3.2.10.11Requirements Not Limiting.
Requirement of specific coverage or
minimum limits contained herein are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. If the Consultant maintains higher limits than the minimums contained herein, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
3.2.10.12 Claims Made Policies. If any of the
required policies provide
coverage on a claims-made basis:
(A) The Retroactive Date must be
shown and must be before the
effective date of the Agreement or the beginning of work under this Agreement. (B) Such insurance must be
maintained and evidence of insurance
must be provided for at least five (5) years after completion of all services under this Agreement. 8 OMLO: October 2018
(C) If coverage is canceled or nonrenewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the effective date of the Agreement, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of all services under this Agreement.
3.2.10.13 Special Risks or Circumstances. City
reserves the right to modify
these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
3.2.10.14 Insurance for Subconsultants.
Consultant shall include all
subconsultants engaged in any work for Consultant relating to this Agreement as additional insureds under the Consultant's policies, or the Consultant shall be responsible for causing subconsultants to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City, its officials, officers, employees, agents, and volunteers as additional insureds to the subconsultant's policies. All policies of Commercial General Liability insurance provided by Consultant’s subconsultants performing work relating to this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO CG 20 38 04 13 or an endorsement providing equivalent coverage. Consultant shall not allow any subconsultant to commence work on any subcontract relating to this Agreement until it has received satisfactory evidence of subconsultant’s compliance with all insurance requirements under this Agreement, to the extent applicable.
The Consultant shall provide satisfactory evidence of compliance with this section upon request of the City.
3.2.11 Safety. Consultant shall execute and maintain its work so as to avoid injury or
damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions, where applicable, shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subconsultants, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safetymeasures.
3.2.12 Water Quality Management and Compliance.
3.2.12.1 Storm Water Management. Storm, surface,
nuisance, or other waters may
be encountered at various times during the Services. Consultant hereby acknowledges that it has investigated the risk arising from such waters, and assumes any and all risks and liabilities arising therefrom.
3.2.12.2 Compliance with Water Quality Laws,
Ordinances and Regulations. Consultant shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local,state and federal laws, rules and regulations that may impact, or be implicated by the 9 OMLO: October 2018
performance of the Services including, without limitation, all applicable provisions of the City’s ordinances regulating water quality and storm water; the Federal Water Pollution Control Act (33 U.S.C. § 1251, et seq.);the California Porter-Cologne Water Quality Control Act (Water Code § 13000 et seq.); and any and all regulations, policies, or permits issued pursuant to any suchauthority.
Consultant shall additionally comply with the lawful requirements ofthe City, and any other water district, municipality, drainage district, or otherlocal agency with jurisdiction over the location where the Services are tobe conducted, regulating water quality and storm waterdischarges.
3.2.12.3 Standard of Care. Consultant warrants that all employees and
subcontractors shall have sufficient skill and experience to perform the work assigned to them without impacting water quality in violation of the laws, regulations and policies described in Section 3.2.12.2 of this Agreement. Consultant further warrants that it, its employees and subcontractors have or will receive adequate training, as determined by the City, regarding these requirements as they may relate to the Services.
3.2.12.4 Liability for Non-compliance.
(A) Indemnity: Failure to comply
with laws, regulations, and
ordinances listed in Section 3.2.12.2 of this Agreement is a violation of federal and state law.
Notwithstanding any other indemnity contained in this Agreement, Consultant agrees to indemnify and hold harmless the City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which the City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the laws, regulations, and ordinances listed above, arising out of or in connection with the Services, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers. (B) Defense: City reserves the right
to defend any enforcement action
or civil action brought against the City for Consultant’s failure to comply with any applicable water quality law, regulation, or policy. Consultant hereby agrees to be bound by, and to reimburse the City for the costs associated with, any settlement reached between the City and the relevant enforcement entity. (C) Damages: City may seek
damages from Consultant for delay in
completing the Services caused by Consultant’s failure to comply with the laws, regulations and policies described in Section 3.2.12.2 of this Agreement, or any other relevant water quality law, regulation, or policy.
3.3 Fees and Payments.
3.3.1 Compensation. Consultant shall receive compensation, including authorized
10 OMLO: October 2018
3.3.2 3.3.1 (A) For Federal and State funded projects subject to Caltrans oversight, the amount payable by the City for all Task Order Contracts must not exceed a cumulative maximum total value of Nine Hundred Eighty-Nine Thousand Dollars ($989,000). It is understood and agreed that there is no guarantee, either expressed or implied, that this dollar amount will be authorized under this contract through Task Orders.
reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "C" attached hereto and incorporated herein by reference. The total compensation shall not exceed the amount on the signed Task Order that relates to the specific project without written approval of the City Council or City Manager as applicable. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in thisAgreement.
Payment of Compensation. Consultant shall submit to City a monthly invoice
which indicates work completed and hours of Services rendered by Consultant. The invoice shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the invoice. City shall, within 30 days of receiving such invoice, review the invoice and pay all non-disputed and approved charges thereon. If the City disputes any of Consultant's fees, the City shall give written notice to Consultant within thirty (30) days of receipt of an invoice of any disputed fees set forth therein.
Reimbursement for Expenses. Consultant shall not be reimbursed for any
expenses unless authorized in writing by City, or included in Exhibit "C" of this Agreement.
3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City.
3.3.5 Rate Increases. In the event that this Agreement is renewed pursuant to Section 3.1.2, the rate set forth in Exhibit “C” may be adjusted each year at the time of renewal as set forth in Exhibit “C.”
3.4 California Labor Code Provisions.
3.4.1 Prevailing Wage Law. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall obtain a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement from the website of the
3.3.3 11 OMLO: October 2018
Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov/dlsr/. In the alternative, Consultant may view a copy of the prevailing rates of per diem wages at the City. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the project site. Consultant shall defend, indemnify and hold the City, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
3.4.2 Registration. If the services are being performed as part of an applicable “public
works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, theConsultant and all subconsultants must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of the project and require the same of any subconsultants. This project may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations.
It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements.
3.5 Accounting Records.
3.5.1 Maintenance and Inspection. Consultant shall maintain complete and accurate
records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.
3.6 General Provisions.
3.6.1 Termination of Agreement.
3.6.1.1 Grounds for Termination. City may, by written
notice to Consultant,
terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation. Consultant may not terminate this Agreement except for cause.
3.6.1.2 Effect of Termination. If this Agreement is
terminated as provided
herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such document and other information within fifteen (15) days of the request.
12 OMLO: October 2018
3.6.1.3 Additional Services. In the event this
Agreement is terminated in whole
or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.
3.6.1.4 Delivery of Notices. All noticespermitted or
required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties mayprovide in writing for this purpose:
Consultant: BHT ENGINEERING, INC.
218 South H Street
Suite 203
Bakersfield, CA 93304
ATTN: Juan M. Pantoja CEO
City: City of California City
21000 Hacienda Blvd.
California City, California 93505
ATTN: Joe Barragan, Public Works Director
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address.
Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
3.6.2 Ownership of Materials and Confidentiality.
3.6.2.1 Documents & Data; Licensing of Intellectual
Property. This Agreement
creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents & Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk.
3.6.2.2 Confidentiality. All ideas,memoranda,
specifications, plans, procedures,
drawings, descriptions, computer program data, input record data, written information, and other Documents & Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services 13 OMLO: October 2018
or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.
3.6.2.3 Confidential Information. The Cityshall refrain from releasing Consultant’s proprietary information("Proprietary Information") unless the City's legal counsel determines that the release ofthe Proprietary Information is required by the California Public Records Act orother applicable state or federal law, or order of a court of competent jurisdiction, inwhich case the City shall notify Consultant of its intention to releaseProprietary Information.
Consultant shall have five (5) working days after receipt of the ReleaseNotice to give City written notice of Consultant's objection to the City'srelease of Proprietary Information. Consultant shall indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. Cityshall not release the Proprietary Information after receipt of the ObjectionNotice unless either: (1) Consultant fails to fully indemnify, defend (with City's choice of legal counsel), and hold City harmless from any legal action brought tocompel such release; and/or (2) a final and non-appealable order by a courtof competent jurisdiction requires that City release such information.
3.6.3 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and
shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.
3.6.4 Attorney's Fees. If either party commences an action against the other party, either
legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorney's fees and all other costs of such action.
3.6.5 Indemnification.
3.6.5.1 Scope of Indemnity. To the fullest extent
permitted by law, Consultant shall defend (with counsel reasonablyapproved by the City), indemnify and hold the City, its officials, officers,employees, agents and volunteers free and harmless from any and all claims, demands,causes of action, suits, actions, proceedings, costs, expenses, liability,judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims’)in any manner arising out of, pertaining to, or incident to any alleged acts,errors or omissions, or willful misconduct of Consultant, its officials,officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation 14 OMLO: October 2018
the payment of all consequential damages, expert witness fees andattorneys’fees and other related costs and expenses. Notwithstanding the foregoing,to the extent Consultant’s services are subject to Civil Code Section 2782.8,the above indemnity shall be limited, to the extent required by Civil CodeSection 2782.8, to Claims that arise out of, pertain to, or relate to the negligence,recklessness, or willful misconduct of the Consultant. Consultant's obligation toindemnify shall not be restricted to insurance proceeds, if any, received by the City, itsofficials, officers, employees, agents or volunteers.
3.6.5.2 Additional Indemnity Obligations. To the fullest extent permitted by
law, Consultant shall defend, with counsel of City’s choosing and at Consultant’s own cost, expense and risk, any and all claims, suits, actions or other proceedings of every kind covered by Section 3.6.5.1 that may be brought or instituted against City or its directors, officials, officers, employees, volunteers and agents. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors, officials, officers, employees, volunteers and agents as part of any such claim, suit, action or other proceeding. Consultant shall also reimburse City for the cost of any settlement paid by City or its directors, officials, officers, employees, agents or volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City's attorney's fees and costs, including expert witness fees. Consultant shall reimburse City and its directors, officials, officers, employees, agents, and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials officers, employees, agents, or volunteers.
3.6.6 Entire Agreement. This Agreement contains the entireAgreement of the parties
with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.
3.6.7 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Kern County.
3.6.8 Time of Essence. Time is of the essence for each and every provision of this Agreement.
3.6.9 City's Right to Employ Other Consultants. City reserves right to employ other
consultants in connection with this Project.
successors and
assigns of the parties.
or transfer,
3.6.10 Successors and Assigns. This Agreement shall be binding on the
3.6.11 Assignment or Transfer. Consultant shall not assign, hypothecate, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer. 15 OMLO: October 2018
3.6.12 Construction; References; Captions. Since the Parties or their agents have
participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subconsultants of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.
3.6.13 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.
3.6.14 Waiver. No waiver of any default shall constitute a waiver of any other default or
breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.
3.6.15 No Third-Party Beneficiaries. There are no intended third party beneficiaries of
any right or obligation assumed by the Parties.
3.6.16 Invalidity; Severability. If any portion of this Agreement is declared invalid,
illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.
3.6.17 Prohibited Interests. Consultant maintains and warrants that ithas not employed
nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
3.6.18 Equal Opportunity Employment. Consultant represents that it is an equal
opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such nondiscrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City's Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted. 16 OMLO: October 2018
3.6.19 Labor Certification. By its signature hereunder, Consultant certifies that it is aware
of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.
3.6.20 Authority to Enter Agreement. Consultant has all requisite power and authority to
conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.
3.6.21 Counterparts. This Agreement may be signed in counterparts, each of which shall
constitute an original.
3.7 Subcontracting.
3.7.1 Prior Approval Required. Consultant shall not subcontract any portion of the work
required by this Agreement, except as expressly stated herein, without prior written approval of City.
Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.
CITY OFCALIFORNIA CITY BHT ENGINEERING, INC.
By: By:
Christopher Lopez Juan M. Pantoja, CEO
City Manager
ATTEST:
By:
Ramon Pantoja, CFE
By:
City Clerk
APPROVED AS TO FORM:
17 OMLO: October 2018
By:
Victor Ponto
City Attorney
EXHIBIT "A"
City c• Ca om1a Ciiy - RFQ !ro On-Call Professional Eng_ill ee.ring Services
4. SCOPE OF WORK/SERVICES
The proposed scope of work detailed belowis based Oll a iypical Fec!erat!State funded roadway project under Caltrans Local Assis ance oversight. Please note 1hat the exact scope of work 1s unknown at trus -time and will vruy between projects_ However, typical pro essional engineering servicesfor projects mightjncludebot not be limitedto the folowingfJeflefal scope:
A. PROJECT MANAGEMENT
BHTEngineering, In.c..will beresponsilile for projectmanagement activmes throughout thelife of the contract and the scope of activities inch.1des but is oot Jirnitedto, coordinating and being responsrble fo r -scheduling meetingrs managcng the project schedu le, preparing and distributing n· nutes, field revie ws. tracking action items for the Gty and consultant sub-contractors, and preparing all submissionsfor the City to subm it to CaltransLocal Assistance andforoth agencies
1. pes;an Phase Author(Uuon
BHT Engineering,I 1c.. wiU prepare and submit the Request or Authorization to Pror.eed with Preliminary Engineering package using pfocedures outlined in C'Ji.3f)ter 3 of the Caltrnns Local Assistance Procedures Manual.
Deliverables:
• Request forAuthorizationtoProceed with Preliminary Engineenng packag"' (Exhibit:3-A with appli·c..ble-attachments)
2. Progress Invoicing
BHT Engineering, Inc. will prepare and submti progress invoices per Chapter 5 of the Caltrans Local Assistance Procedures Manua.l These progress invoices are required to obtain reimbursement for the City's expenditures on local federal-aid and state funded projects_ TheinVoic,epreparation willbe coordinated w#:htheCityManagerlPublicWorks Directorfor!heir ce!1ificafion and signature. It is atiticlpated that City Staff will provide the project team w;th an executedProgramSupplement Agreement andcopies.of payment checl<s orincurredcosts in order to prepare the progress 1nv·oces. It is -anticr?3ted that two {2) progress invoices will be prepar:ed per phase_
Deliv erables:
• Progress lnvoice {2} per phase (PDF)
May 9, 2025 P e12
May 29, 2025 Page 13
Cityof Ca[lfornfa City - RFQ for On-CalJP rofessional Engi:neering Services B. PRELIMINA RYENGINEERING
Preliminary Engineering includesbut is not limited to, preliminary design and other activities and analyses, such as environmental assessments, topographic surveys, metes and bounds surveys, geotechnical investigatoi ns,hydrologic analysi,shydrauilc analysis, utility engineering, traffic studies, financial plans, revenue estimates, hazardous materials assessment,sgeneral estimates of the typesandquanttiies ofmaterials,andother work needed to establishparameters for the finaldesign.
This task will include project management for internal team coordination needs andcoordination with City Staff throughout the duration onthe project. Theproject team willconduct internal coordination meetings at each phase of the design process to ensure teammembersarecurrent in projectgoals and criteria, as wel as apprised of any project adjusmt coordination, budgeVschedule monitoring,and invoicing.
ents. This task includes project setup,
BHT Engineering,Inc. will coordinate with City Staff (City Manager, Public Works Director, and/or Street Superintendent), for initial project's concept and direction. It is anticpi ated that the City will gather and provide pertni ent record informaiton as available and provide this information to the project team (e.g. Design E-76, records plans).
1. Environmental Compliance - NEPA
BHTEngineering,Inc. will prepare the Caltrans Exhibit6-A PreliminaryEnvironmental Study (PES) fom1, in accordance withChapter 6 of theCaltranslocalAssistanceProcedures Manual. ThePES form will be submitted to theCaltransDistrict l ocal AssistanceEngineer in District 9 for review and approval. BHT Engineering, Inc. team will besupported by Sapphos Environmental, Inc. to prepare technical studies, if any, identifiedin theCaltransapproved PES fom1. Sapphos Environmental, Inc. is familiar with the CaliforniaCity region and has wide-ranging experience and a broad working knowledge of the requirementsassociated with regulatory compliance related to the protection of biological resources in Kem County, CA, as specfiied by the National Environmetnal Policy Act (NEPA), the California Environmental Quality Act (CEQA), the Federal and State Endangered Species Acts (ESAs), the MigratoryBird Treaty Act, Sections 401 and 404 of the CleanWater Act, and Section 2081 of the State Fish and Game Code, as well as local policei s and regual tions pertinent to the specfiicchallenges of natural resourcesin localareas.
If needed, BHTEngineering, Inc. willarrange andattend a Field Reviewmeeting at the job site with CaltransandCityrepresentativestoidentifythelimits andscope of work of the specificproject. BHT May 29, 2025 Page 14
C ity of Ca fifornfa City- RFQ for On-Can Professional Engineering Services Engineering, Inc. will keep both a hard copy and electronic files for this project to meet Caltrans reporting requirements.
Deli verables:
• Completed PES Form and technical studies to complete NEPA document and/or CEQA document.(PortableDocumentFormat(PDF))
2. Surveys andMapping
BHT Engineering, Inc. will provide data collection, and field engineering surveying necessary for preliminary engineering, design, cost estmi ates, and the level of environmental clearance. BHT Engineering's Survey Crew under supervision of Mr. Juan Pantoja, will conduct the topographic/site surveys.
BHTEngineering, Inc. team will be supportedby Wiley D. Hughes Surveying, Inc. to conductLand Surveying services (right of way surveys, boundary surveys, etc.) if any and as necessary by the specificproject's scope for Federal/Statefunded projects. Right of way will be establishedusing recordmapsonfilewiththeCountySurveyor'sOfficeandPreliminaryTrtleReports,suppliedbythe City, for potentially affected parcels. We are assuming that suffci ient monuments shownon existing Kem County recordedsurvey maps exist and that no material discrepancies are discovered. If sufficientmonumentsdo not exist,additionalfieldandoffice surveymay needto be perfom1edand this is not includedhereni .
Following completion of design efforts a Right of Way certification will be provided for City's signature.
Deli verables:
• Topographic survey base mapwith electronic file inAutoCAD2024 (or newer) format. • Right of Way Certificationfor City's signature - CaltransExhibit 13-Aor 13-8 asappropriate.
3. Preliminary Engineering Studies - Geotechnica/ Analysis The BHT Engineering, Inc. team will be supported by BSK Associates (BSK) ancVor Soils Engineering, Inc. (SEI) for geotechnical engineering services, as needed, on federally or statefunded projects. Assignments will be given to BSK and/or SEI based on availability, project requirements, and complexity.
May 29, 2025 Page 15
Cityof California City - RFQ forOn-CaUProfessional EngineeringServioes Foundedin 1966,BSKAssociates has been in businessfor 54yearsandis a 100 percent employeeowned Calffomia S-corporation that provdi es construction observation/materials testing/special inspection, consulting engineering, and analytical laboratory services.BSK currently employs a staff of approximately 200 with offices and laboratories throughout California, Oregon and Washington.
Soils Engineering, Inc. (SEI) geotechnical and materials division for geotechnical engineering, construction observaiton/materials testing/special inspection, and analytical laboratory services as needed. SEI has almost 60 years of experience in providing geotechnical and geological engineering, environmental assessments, and testni g andsurveyingservicesto private,government and industrial clients throughout California. Mr. On Man Lau, M.Sc., P.E., G.E. will be the Project Manager for this contract
The nwnberand depth of borings will bedetem1ined based onspecific project needs. Soil samples will be collected and tested as necessary to assess corrosion potential and R-Value. Our consultant(s) will provide the team with a pavement structural section basedon the R-Value across a range of Tl values. The team will seek input from the City regarding therequired Tl for the project.
ThePreliminaryGeotechnical Reportwill include recommendations forpavement structural sections, infiltration rates-b asedonUSGSsoil mappin or stom1water improvements (as necessary), and concrete specifications in respoose to soil corrosvi ity. A draft reportwill be preparedforCityreview.
Comments will be addressedas appropriateand a Final reportwill be prepared.
Deli verables:
• DraftandFinal PreliminaryGeotechnical Report(PDF)
4. Utili tv Coordination
Utility 'A' letters serve to request as built information from utility facility owners and provide notification of upcon ng work. Using the USA North design inquiry tool BHT Engineering, Inc. will obtain a list of utility ownerswithin the area. We willthen prepare and distribute an 'A' letterrequest to obtain as-built information. Given the potential for utility relocations and/ or adjusbnents, it is important to begin outreachto UtilityCompaniesduringthe preliminarystages of design.
If the as-built informationprovidedby theUtility Companiesis notsatisfactoryor clear, wewillresolve reasonable uncertainties with the Utility Company and the City and may recommend pot holing to clearly identify the horizootal and/ or vertical location of their facilities. Pleasenote that pot holingof utilityfacilitiesisnot currentlyincludedin ourscope of work.
Cityof Cal:lfornia City - RFQ forOn-Cao Professional Engineering Service s Between the Preliminary and Draft Final (90%) PS&E deliverables, we willsend out 'B' Letters, also known asa Notice toOwners, informingaffected utility owners that wehave identifieda conflictwith the locationof their utility facilities and request potholingas needed. We will coordinate and attend a field meeting to meet withaffected utility companies if needed to go over the proposedproject and discuss potentialrelocationstrategies.
During the Draft Final (90%) PS&E design phase, we will send the affected Utility Companies a 'C' Letter, also known as the Final Notice (to relocate). While BHT Engineernig, Inc. will distribute the final 'C' letterand continue to coordinate relocations as needed, it is anticipated that affected utility facilityowners willprovideutilityagreemenls to the City fortheir reviewand action Deliverables:
• ABC Utilityletters(PDF)
5. Preliminary Design • Plans and Estimate
The project team will prepare concept and preliminary plan layouts and present the layouts to the City for review. Thesepreliminary design drawings can be submittedto regulatory orfunding bodies forapprovals, asneeded.
Plan sheets will represent proposed roadway geometric design, demolition, asphalt and base improvements, drainage,grading, curb,gutter,sidewalks, crossgutters, ADA access ramps, street signage, street striping/marking,selectricalimprovement,slandscaping, irrigation, andintersection improvements, etc.
Preliminary plan sheets may include:
• Layout Sheets(PDF)
• Construction Details(PDF)
Aplanning levelcost estimatewillaccompany the preliminary plans. Following the submittal of the prelin nary plans BHT Engineering, Inc. anticipates the City will submit one (1) set of combined reviewcomments.
Deli verables:
• PreilminaryDesignPlans(PDF)
• Planning Level Cost Estimate(PDF)
May29,2025 Page16
Cityof Cal:lfornia City - RFQ for On-Call ProfessionalEngineeringServices May29,2025 Page 17
6. DesignPhase
Fol
llowingthe City's review of the preliminary plans we anticipate receiving one (1) set of combined written comments from the City. The design team will then begin to prepare the project plans, specifications, and cost estimate. Technical specifci ationsprepared by BHT Engineering, Inc. will confom1toCaltrans2024standard specification format andreferto2024CaltransStandardPlans and current City Development Standards, as appropriat.e The project team will ensure that mitigation measures presented as commitments in environmental documents, and that conditions and restrictions associated with regulatory permits, are incorporated into appropriate contract document,splans, specifications andestimatesprior to proceeding with construction activities.
Quanttiiesand bid prices willbe prepared and calculated following thecompletion of site layout and design. The Draft Final Engineer's Cost Estimate and bid sheet will be delivered to the City for budgeting purposes. Unit priceswill be developed usingrelevantas-bid data.
Draft Final (90%) PS&E Submin al
Theprojectteam willfurtherdevelop the preliminary design and projectplansheetstoa 90%review level. It is anticipated that revisions tothe design concepts will be minorin natureat this stage. The plans willincorporaterelevant City, State, and Federalstandards whereapplicable. The planswill furtheridentify specific projectneeds andrecommendsolutionstomeet those needs.
Deli verables:
• DraftFinalPlans (PDF)
• Draft FinalTechnicalSpecifications(PDF,Word)
• Draft Final Engineer's CostEstimate (PDF, Excel)
Final PS&E Subminal
Incorporating minor edits requested by the City we will finalize, stamp, and sign the final plans, technicalspecifications, and Engineer'sCostEstimateanddeliverthem tothe Cityforbudgetingand bidding.
Deliverables:
• FinalPlans(PDF)
• Final Technical Specifications(PDF, Word)
• Final Engineer's Cost Estimate(PDF,Excel)
Cityof Callforn.ia C ity - RFQ forOn-Can Professional Engineering Services May 29, 2025 Page 18
7. Permits
BHTEngineering, Inc.will incorporate pem1it conditions and restrictionsinto the final design. Pennits could include but are notlimited to: Army Corpsof Engineers Section 404 NationwidePennit Section 404 Individual Penni! ; NEPA/404 Integration MOU, Section 10 Penni! ; Regional Water Quality Control Board Section 401 Water Quality Certification and National Pollution Discharge Pem t; California Department of Fish and Wildlife Streambed Alteration Agreement. Typical mitigation includes hay bales, silt fencing, dust control, riprap, soil stabilization matting,slope dra in, turbidity barrier, etc.
Because the scope of worl< is unknown at this time, the actual pennits, if any, required is unknown as well, therefore the costs associated with the pem1it application and processing are not included in this proposal. Thepem1it feesandcostsare to be paid by the City directly to theregulatoryagency and are not included in this proposal.
Deliverables:
• Pemlit Application, as appropriate (PDF)
8. Construction PhaseAuthorization
BHT Engineering, Inc. will prepa re and submit the Request for Authorization to Proceed with Cons truction package using procedures outlined in Chapter 3 of the Caltrans Local Assistance Procedures Manual.
Federal Authorization to Proceed with construction must be received prior to advertisni g. Projects advertised for a construction contract prior to federal authorization are not eligible for federal reimbursement.
Deliverables:
• Requestfor Authorization to Proceed with Construction package (Exhibit 3-A with app licable attachments)
9. Bidding and Award of Pro;ect
Upon receipt of an Authorization to Proceed for Construc tion (E-76) by Caltrans District 9, BHT Engineering, Inc. will coordinate with City Staff for the advertisement and award of the project. A minimum advertising periodof three weeks is required for all federal-aid projects.
Cityof Cal:lfornia City - RFQ forOn-Cao Professional Engineering Services May 29, 2025 Page19
The advertisni g costs are to be paid by the City directly to the advertising newspaper and are not included in this proposal.
BHTEngineering,Inc. willprovideelectroniccopiestoPlanRooms toincreaseprojectexposure and compettiion. It is anticpi atedthata minimumof 3 plan roomswill be contacted.
During the advertising period,BHT Engineering,Inc. will assist the City in all aspects of the bidding process with construction and engineering finns, including but not limited to respondto request for information,prepare addendums, attend andconductpre-bid meeting, attend thebid opening, review bid results and qualify lowest responsible bidder, and make recommendtaions for awarding the construction contract
It is anticipatedthatCityStaff will be responsible tologin, openandretain receivedbids.
Deliverables:
• BiddingPackage(PDFCopies)
• Bid Analysis/Summary,recommendationforaward(PDF)
C. CONSTRUCTION ENGINEERING
Construction EngineeringI ContractAdministration is thecomprisedactions takenafter a contract is awarded to obtain and document compliance with contract requirements, such as timely delivery, properconstruction, disputeresolution,acceptance, payment,andclosingof contract.Theseactions may includetechnicaladministrativeandmanagerial support.
Federal statutes requirethat the City mustprovide a fulltime employeeof the City whois accountable for the project. This individual is the person in responsible chargeof the project. It is anticipated that the Public Works Director willbethePerson in ResponsibleCharge.
Mr. Juan M. Pantoja from BHT Engineering, Inc. will act as the Resident Engineer (RE) for the project. TheRE is empowered toadministerthe construction contract. The RE will be supported by qualified staff to assist theREin, but not limitedto, constructionsurveys, soils andfoundation tests, measurement and computation of quantities, testing of construction materials, checking shop drawings, and preparation of progress payments and reports. Additional RE responsibilities include thepreparationof "As-Buil"t drawings, filing of documentation,andother inspecitonandstaff services necessary to assure that the construction is being performed in accordance with the project plans and specifications, state andfederal laws,and with CaltransLocalAssistanceProceclures Manual.
City of Ca[lfornfa City - RFQ for On-CaUProfessionalEngineeringServices May 29,2025 Page 20
The Resident Engineer for the project, will perfom1 Contract Administration in accordance with Chapter 16, of the Caltrans l ocal Assistance Procedures Manual. This task will include project management for internal team coordination needs and coordni ation with City Staff throughout the duration on the project. This task includes project construction file setup, coordination, budgeVschedule nlOllnoring, andinvoicing
1. Award Package
Per the Caltrans l ocal AssistanceManual, prior to subn tting the first invoice for the construciton phase, and within sixty (60) days of contract award, the administering agency must forward the Award Package to the CaltransDistrict9.
BHT Engineering, Inc. will prepareand submn the Award Package to District 9, per Chapter 15 of the Caltrans l ocal Assistance Procedures Manual.
Deli verables:
• AwardPackage (3 hardcopies, PDF)
2. Pre-Construction Conference
BHT Engineering, Inc. will coordinateand arrange a pre-construction conference/meeting at City offices with City Staff and the construction Contractor. The size, duration, and complexity of the project will be considered when determining who else to invite to thepre-construction meeting. The purpose of this meetni g is to discussimportant contract issues, submittals, as wel as sanctions for non-compliance with local, state,andfederal requirements.
Required Tepics:
• Safety
• Equal Employment Opporut nity
• Labor Compliance
• Subcontractni g(includingrequiredsubmittal of the Exhibit 16-B: SubcontractingRequest) • DBE
• NEPA, Pem1its andEnvironmental MitigationCornmnment requirements • Potential Trafficor Pedestrian HandlingIssues
Recommended Topics:
Cityof Callforn.ia C ity - RFQ forOn-Can Professional Engineering Services May 29,2025 Page21
• ProgressSchedule
• WorkPlans
• Quality Control/QualityAssurance
• Materials RequiringCertificatesof Compliance
• Materials RequiringBuy AmericaCertfiicates
• Contract Training (Apprentice)Goals
• Change OrderProcess
• Dispute Process
• Potential UtilityConflicts
Deli verables:
• Attendance, agenda, and meeting notes for a pre-constructionmeeting.(PDF)
3. ConstructionSurveys/Staking
Construction stakes must be set under the responsible charge of a licensed land surveyor or civil engineer. BHT Engineering's Survey Crew will conduct construction staking. The construciot n staking will provide the necessary control stakes to estabilsh the lines and grades required for the completion of the work. Note that working stakesused by the Contractor in actually perfomling the work are the Contractor'sresponsibility and are to be set by the Contractor's forces based on furnished controlstakes.
Stakesset that arereferencedtoCaliforniaCoordinate System (CSS) coordinates must beset under the responsible chargea personauthorizedtopractice land surveying in the Stateof California. BHT Engineering, Inc. team will be supported by Wiley D. Hughes Surveying, Inc. to conduct Land Surveying services if any and as necessary by the specific project's scope for FederaVState and Local funded projects.
The followingare some of the typical responsibilities of the Survey Crew:
• Attendthepre-constructionmeetingwiththe RE and theContractortodiscussprojectcontrol, amount of constructionstakes,and any detailsbefore constructionstarts. • Begins staking within 2 business days of receipt of a completed Request for Construciton Staking formfrom the Contracto.r
• Checks the conformity of planned lines and grades with existing conditions atpavement · conforms",curbandgutterjoins,inletsand outlets of drainagefacilities,etc.; advisesthe RE of any problems; makesminoradjustmentsto linesand gradesunderthedirectionofthe RE.
CityofCa[lforn.i.l City - RFQ forOn-CatJP rofessionalEngineeringServices May 29,2025 Page22
• Advises the RE ofany discovereddesign issuesregarding linesandgrades and recordsthe issuesin dailysurvey partyreports.
• Verifiesthat all staking is clearly written andreadily visible.
Restaking
Note that it is anticipated that the project's standard specifications will require the Contractor to:
"Preserve stakes and marks placed by the City's representative. If the stakes or marks are destroyed, the City's representative replaces themat its earilest convenienceand deducts the cost fromthe Contractor'sfinal payment."
Deli verables:
• ConstructionStakingper project specfiications
• Cut Sheets (PDF)
4. Proiect Records
BHT Engineering, Inc., as the RE will maintain a complete and organized project filing system in compliance to Chapter 16 of the CaltransLocal AssistanceProceduresManual. Aseparate record file for each federa-laid project will be maintained. The project file will contain all data pertni ent to the work andto the requirements of the specifci ations. In general, project records must support the adequacy of the field supervision, inspection and testing; conformance to contract specifications; and payments to the contractor.
During the construction phase, Caltrans Construction Oversight Engineers periodically perform reviewsand inspectionof the City's projectfiles for compliance with federal and state requirements.
Organizationand content of the project file is one indicator of the effectiveand efficient management of the project by theRE. It alsominimizesresources necessary for conductingprocess reviews.
Availability of Recordsfor Review or Audit
BHT Engineering, Inc., will keep all contract documentation and backup records available for inspection by Caltrans and FHWA at any time for a minimum of three years after the final project closeout. Use of a uniform project record-keepingsystem,together withdiligent maintenanceof the system, greatly facilitatesa process review and minimizes negative findings. Good records of all construction activities clearly demonstrates to those concemedthat project supervision and control were attainedon theproject.
Deliverables:
Cityof CaliforniaCity - RFQ forOn-Cal) Professional Engineering Services May 29,2025 Page 23
• ProjectRecords (hardcopies, PDF)
5. Tracking Contract Time
Contracttimeisthemaximumtimeallowedinthecontractforcompletionolallworkcontainedinthe contract documents. The RE will maintaina written record of contract time, often called the Weekly Statement of Working Days (WSWD).The RE will be responsibleforreviewingthe contracttime requirements, detennining the controlilng operatio,ndetem1iningif eachday is a workingday or nonworkingday, and supportingtimeextensions.
TheRE willpreparethe WSWD as soonas possible andnolaterthan theendof the followingweek, forward the original statementto thecontractor andretain a copy in the project file.
Deli verables:
• Exhibit 16-A Weekly Statement of WorkingDays (PDF)
6. Engineer's Daily Reports
BHT Engineering, Inc., will write daily reports to document the work in progress. These daily reports may be written by theconstruction inspecto,rtheAssistant RE and/or the RE, as project andstaffing needs dictate. The daily report will document what work was performe,dwhere and how it was perfom-.ed, and who perfom-.ed it The reportwillalso document significant events or conversations, andactivities perfonned to ensure contract compliance. The daily reports will bekept current and in the projectfiles.
Deli verables:
• Engineer'sDaily Reports(PDF)
7. Check Certified Payrolls
BHT Engineering, Inc., will reviewpayrolls to verify that eachlaborerormechanic has been paid not less than the prevali
ii nghourly wage applicable for the classifictaionof work performed as specified in the contract All reviewed/checkedpayrolls willbefiledin the project records.
The project team will cross check Daily Reports, Interviews, Payrolls and Wage Rates in order to detennine ContractorandSubcontractor compliance.
Deliverables:
• CheckedCertifiedPayrolls (PDF)
May 29, 2025 Page24
cos,
Cityof California City - RFQ for On-Cao Professional Engineering Services
8. Employee Interviews
BHTEngineering, Inc., will conduct employeeinterviews, as required by Caltrans Local Assistance Procedures Manual. The project team will interviewa minimumof two employees per contract, per month, includingat least one interview from the prime contractor and each subcontractor until such time as the contract is accepted or all employees on the project have been interviewed. The employeeinterviewswill occurduringwor1< hours onthe job site; at times thatminimizedisruptiooto thecontractor's operation. All interviewswillbe filedin the project records.
The projectteam will cross check Daily Reports, Interviews, Payrolls and Wage Rates in order to determine Contractor andSubcontractorcompliance.
Deliverables:
• Employee Interviews(PDF)
9. Disadvantaged Business Enterprises {DBE/
The RE has the responsibility of enforcingthe DBE provisions of the contract. BHT Engineering, Inc. will review the DBE provisionsof the contract and Exhibit 15-G: Construction Contract DBE Commibnent withthecontractor and inspection staff. The RE/Inspector willverify theDBE performs a commercially useful function and will ensure submittal of Exhibit 16-Z1: Monthly DBE Trucking Verificaiton,ifrequired. Atthecompletionof the work the RE willobtain andverify Exhibit 17-F: Final Report of DBE and First Tier Subcontractors, compare the Final Report- Utilization of DBE to the DBE Commitment fom1, and withhold paymentif DBEcomn tmentswere not mel Deli verables:
• Exhibit 17-F: Final Report of DBE andFirst TierSubcontracot rs(PDF)
10. Change Orders
A change order is a legallybinding document used to make changes to the original construction contract. Change Orders are negotiated agreements with the contractor that affect the t i me, design orspecifci ation requiremetns, or acombinationof the four.
When a Change Order is initiatedBHT Engineering,Inc., acting as the RE will investigateproposed contract change order(s) and submit background informatioo to the City for a decision, if justified, BHTEngineering, Inc. will prepare necessarydrawings anddocuments for City approval. Before the May 29,2025 Page25
Cityof CaliforniaCity - RFQ forOn-Call Professional Engineering Services Change Order is executed by the City, BHT Engineering, Inc. will negotiate/discuss with the Contractor elementsof the change, including the method of compensation andthe effecton contract time. All change orderswill be filed in the project records.
Deli verabl es:
• Change Order(s)(PDF)
11. Quality AssuranceProgram
A Quality Assurance Program (OAP) is a program that will ensure the materials and workmanship incorporated into each construction project confonm to the r equirementsof the contract plans and specifications includingapproved changes. Themain elementsof a OAP are an acceptance program and an independent assurance program. It is anticipated that the City has an adopted and current OAP.
BHT Engineering, Inc. acting as the RE will ensure the correct materials test methods are used as specified in the contract and that field personnel who perfonm those tests for compliance with the specifications are certifiedto conduct the test method indicatedby the contract.
Materi als and soi ls testing
Material inspection, testing and sampling costs are eligible to be charged to the construction engineering phase of the project. BHT Engineering, Inc. team will be supportedby BSK Associates and/or Soils Engineering, Inc. for materials and soils testing in accordance with the project specifications and the City's OAP, as needed for Federal/Stateandl ocal funded projects. Both BSK and SEI are Caltrans Accredited l aborat0<ies and possess current certificate of qualification and maintains their laboratorytesting equipment in accordance with recognized national calibration standards.
Our Consultant(s) will conduct tests and will submn test results to the RE in a timely manner.
Rec0<ds of all samples andtests will be keptin the project files. Upon c0<nplet ion of the project, the RE will completeExhibn17-G:Materials Certificate.
Deliverables:
• Test Data andSummarylogs (PDF)
• Exhibit 17-G: Materials Certificate (PDF)
12.Progress Pay Estimates and fl.a·vments
City o• Cal'ifomi a City - RFQ On.-Ca ll Pro fes.s i ooal Engmeerfng Ser.<ices Progress paymef'lts are compensaiton to the prime c.ontraoto:r for the value of work completed during -a covered period. Contract languagegenerruly ralls for progress payments to be made at leastranee each monlh as file work progresses. The p:rogress payment is based on an es,trmate prepared by lhe engineer. Each estimate reflects the total eonlract item work completed during the pay period, dmnge order bills submitted, materials on hand, deductioM , and withholds. BHT Engineering, Inc. aotrng as the RE, will preprue progress pay estimates andsubmit them to the Contractor.
Contract Item Qm.Ft11tity Cafcu!atio:11 Sheets
BHf Engineering, Inc. acting as the IR!E, .i ll prepare C:Ontr.mt Item Que'llntity Calculation sheets to support an.d document item payments made to lhe rontra.ctor each rnonlhi. A separa.le q'Ua .nlity calculation sheet will be preprued for each cootract item being paid for each p ress payment Quantity Caloulat n Sha:;ts will be filed in U-te project records_ Oe:liv em bles :
• Progress Payments PDF}
• Cm1traot Item Ommlity Calculation Sheets PDF)
13.Project Close Out
FollOV!lin g Chapter Hof the CaJtrans Lowd AssistanceProcedures. Man ual,BHTEngineering,ln.c. will prepare and s1Jhmit to Cal"lrans th:e finru rejport documents Which oolleciively constitutethe Final Report of Expenditures... This reportpro'llides key in formation requir1ed to initiate timely project d osure and payment. The R po:rt of Expenditures must be submitted wiihin six:m on ths of project completion or completion. of the lasI federally-reimbursable phase if no Federal fi.mds are uti'lized for Construction. The Final Report of Expendirures must be signed by the :Pli blie employee in responsible charge of ttieproject.
Oe:fivernbles:
• Fi.nail Report of Expend itures(PDF)
Mlay29,20Q5 Page26
EXHIBIT "B"
SCHEDULE OF SERVICES
Services are listed in Exhibit A. Services will only be provided when a Task Order is signed by a representative from the City who is authorized to do so.
EXHIBIT "C"
COMPENSATION
BHT ENGINEERfN Gl IN C. C ii En gmec ri ng, Bu [fdin g Desigo & Con lruction Monu m nt DBE firm 10" 6277
218 . "H" S t ree t, te.203
B ker field, CA 93304
(66 558-4641
Ef'FECTIVE - July 2026
CITY OF CAUFORN IA CITY
SCHEDULE Of HOURLY BllllNG RATES
"ate
Principol E gi neer/E 91 eering Adm i i s ro to r $ 10.00 per our Sen io r Civil Eng ine er 75.00 per our
Sen ior Project onager 16, 5 00 pe our
Assis,a P oject anager $115.00 per our
S0 nior CAD Desig ner 5,00 per ur
dministra ive A istont/Cle{ic 70.00 per OU
Field Work - Pre va iling Wage Rate s
Resident Engineer 175.00 per ou
Con truction I ns ec or
2-Person s rve Crew
l 65.00 par
340.00 pe
o r
our
-Pe rson Survey Crew 0, 0 00 per our
Milea g e
Ma ericls and Copies Re qu· ed or t' e
Execution of the Wo
$ 0.75 pe 1ile
At Cost ( o Ma rk-up )
t Fee+ 5%
NOTE: These fees subject to 50 .• surcharge for aoy work performed during overtime hours.
Pen onn:el
City of California City
Proposal
RFQ for On‐Call Professional Engineering Services for
Federal and State Funded Projects
May 29, 2025
BHT ENGINEERING, INC.
Civil Engineering, Building Design & Construction Management BHT ENGINEERING, INC. 218 S. “H” Street, Ste. 201 Bakersfield, CA93304 Civil Engineering, Building Design & Construction Management (661) 558-4641 May 29, 2025
City of California City
Joe D. Barragan – Public Works Director 21000
Hacienda Blvd.
California City, CA 93505
Re: RFQ for On-Call Professional Engineering Services for Federal and State Funded Projects Dear Mr. Barragan,
This presentation is submitted in response to your Request for Qualifications (RFQ) for On-Call Professional Engineering Services for federally and state-funded projects. BHT Engineering, Inc. understands that the primary objective of this RFQ is to select a qualified engineering firm to provide on-call or as-needed professional engineering services for the City of California City’s federal and state-funded projects. The required services include, but are not limited to, CEQA/NEPA coordination and compliance documentation, program and project management, construction management and engineering, feasibility studies, preliminary engineering, design, surveying, mapping, landscape architecture, and architectural services. Additionally, the firm will provide incidental services necessary for the development and implementation of federal-aid and state-funded projects, as well as representation of the City during federal and state audits.
BHT Engineering, Inc., a California corporation, was founded in 2018 as an engineering firm specializing in consulting services for municipal clients in Kern County. The company is led by three brothers, who together bring over 55 years of combined experience. Our firm provides a comprehensive range of services, including civil engineering, surveying, construction management, architecture, planning, and public works. With our expertise, experience, and depth of resources, we can respond swiftly to work requests, delivering cost-effective solutions and high-quality products that maximize value for our clients.
The project team has a proven history of collaborating closely with local, state, and federal agencies to successfully complete engineering and public works improvement projects. Our team has delivered numerous projects under FHWA, FAA, FEMA, USDA, CDBG, state, and local programs for the cities of McFarland, Taft, Maricopa, Ridgecrest, Wasco, and California City.
Organizational references are provided for your review.
Sincerely,
1. COVER LETTER
TABLE OF CONTENTS
2. ORGANIZATION AND APPROACH .............................................................................1 A. Firm Background ........................................................................................................1 B. Project Manager .........................................................................................................1 C. Proposed Subconsultants...........................................................................................1 D. Organization Chart/ Project Team ........................................................................................... 3 E. Project and Management Approach ...........................................................................3
3. QUALIFICATIONS & EXPERIENCE............................................................................4 A. Familiarity with State & Federal Procedures...............................................................5 B. Response Time / Resources.......................................................................................6 C. Local, State And Federal AidGrant Applications/Programs........................................7 D. Street Improvement Projects ......................................................................................7 E. Comparable Projects ..................................................................................................8
4. SCOPE OF WORK/SERVICES ................................................................................. 11 A. PROJECT MANAGEMENT....................................................................................1 2 1. Design Phase Authorization
...............................................................................1 2
2. Progress Invoicing
..............................................................................................1 2 B. PRELIMINARY ENGINEERING.............................................................................1 3 Juan M. Pantoja, P.E. C64740
Principal/CEO, BHT Engineering, Inc.
(661) 558-4641, [email protected]
DBE Firm ID: 46277
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025
City of California City – RFQ for On-Call Professional Engineering Services
1. Environmental Compliance – NEPA
...................................................................1 3
2. Surveys and Mapping
.........................................................................................1 4
3. Preliminary Engineering Studies – Geotechnical Analysis .................................1 4
4. Utility Coordination
.............................................................................................1 5
5. Preliminary Design - Plans andEstimate
...........................................................1 6
6. Design Phase
.....................................................................................................1 7
7. Permits
...............................................................................................................1 8
8. Construction Phase Authorization
......................................................................1 8
9. Bidding and Award of Project
.............................................................................1 8 C. CONSTRUCTION ENGINEERING....................................................................... 1 9 1. Award Package
..................................................................................................2 0
2. Pre-Construction Conference
.............................................................................2 0
3. Construction Surveys/Staking
............................................................................21
4. Project Records .................................................................................................. 22 5. Tracking Contract Time
......................................................................................2 3
6. Engineer’s Daily Reports
....................................................................................2 3
7. Check Certified Payrolls
.....................................................................................2 3
8. Employee Interviews
..........................................................................................2 4
9. Disadvantaged Business Enterprises (DBE)
......................................................2 4
10. Change Orders...............................................................................................2 4
11. Quality Assurance Program ...........................................................................2 5 12. Progress Pay Estimates and Payments ..........................................................2 6 13. Project Close Out........................................................................................... 2 6 5. CERTIFICATES INSURANCE ................................................................................ 27 6. CONFLICT OF INTEREST ...................................................................................... 27 7. LITIGATION..................................................................................................................... 27
8. CONTRACT AGREEMENT ..................................................................................... 27 9. FEDERAL-AID PROVISIONS (DBE) ...................................................................... 28 APPENDIXES
STAFF RESUMES
REFERENCES
ATTACHMENTS
ATTACHMENT A – Exhibit 10-O1 – Consultant Proposal DBE Commitment ATTACHMENT B – Exhibit 15-H – DBE Information - Good Faith Effort ATTACHMENT C – Exhibit 10-Q - Disclosure of Lobbying Activities ATTACHMENT D – Signed copy of Proposer’s ACKNOWLEDGEMENT of the draft contract
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 1
2. ORGANIZATION AND APPROACH
A. Firm Background
BHT Engineering, Inc., founded in Bakersfield, has been a California corporation since 2018, formed through a partnership between three brothers. Juan M. Pantoja serves as the Principal Civil Engineer and CEO, Ramon H. Pantoja as the Financial Officer, and Miguel H. Pantoja as the Secretary.
BHT Engineering, Inc. provides on-call and as-needed technical staff support for its clients, offering expertise in civil engineering, surveying, construction management, architecture, planning, and public works. With extensive experience and deep resources, the company responds swiftly to work requests, delivering cost-effective solutions and high-quality products that maximize clientvalue.
Our team of dedicated professionals brings a wealth of knowledge, experience, and commitment to every project. We efficiently manage each undertaking, ensuring alignment with the project’s scope, budget, and schedule, while consistently producing and delivering quality results.
Currently, BHT Engineering, Inc. performs responsibilities of City / Transportation Engineer for the City of McFarland, the City of Taft and the City of Wasco and for the City of California City.
B. Project Manager
Mr. Juan M. Pantoja is a Registered Civil Engineer Lic. No 64740. Mr. Pantoja will act as the Project Manager for this contract and is authorized to negotiate contract terms and make binding agreements.
C. Proposed Subconsultants
Environmental Consultant
BHT Engineering, Inc. team will be supported by Sapphos Environmental, Inc. for environmental consultant services – as needed.
x Sapphos Environmental, Inc. is familiar with the California City region and has wide-ranging experience and a broad working knowledge of the requirements associated with regulatory compliance related to the protection of biological resources in Kern County, CA, as specified by the National Environmental Policy Act (NEPA), the California Environmental Quality Act (CEQA), the Federal and State Endangered Species Acts (ESAs), the Migratory Bird Treaty Act, Sections 401 and 404 of the Clean Water Act, and Section 2081 of the State Fish and City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 2
Game Code, as well as local policies and regulations pertinent to the specific challenges of natural resources in local areas.
Geotechnical Services
BHT Engineering, Inc. team will be supported by BSK Associates (BSK) and/or Soils Engineering, Inc. (SEI) for Geotechnical engineering and Materials Testing services as needed for Federal/State funded projects.
x BSK provides geotechnical engineering, environmental consulting, construction observation/materials testing/special inspection, and analytical laboratory services for clients with projects ranging in size from small to complex, in both natural and built environments.
BSK is 100 percent employee-owned and has grown to a staff of more than 200 with offices, laboratories, and sample drop-off locations throughout California (Livermore, Rancho Cordova, Fresno, San Bernardino, and Bakersfield). Mr. Adam Terronez, PE, GE will be the Project Manager for this contract.
x Soils Engineering, Inc. (SEI) geotechnical and materials division for geotechnical engineering, construction observation/materials testing/special inspection, and analytical laboratory services as needed. SEI has almost 60 years of experience in providing geotechnical and geological engineering, environmental assessments, and testing and surveying services to private, government and industrial clients throughout California. Mr.
On Man Lau, M.Sc., P.E., G.E. will be the Project Manager for this contract.
Land Surveying Services
BHT Engineering, Inc. team will be supported by Wiley D. Hughes Surveying, Inc. to conduct Land Surveying services (right of way surveys, boundary surveys, Construction Layout, Topographic Mapping, Boundary/Cadastral Surveys, Highway and Road Surveys, and Legal Descriptions, etc.) if any and as necessary by the specific project’s scope.
x Wiley D. Hughes Surveying, Inc. is a full-service professional firm which specializes in the discipline of land planning, and land surveying. The work experience of Wiley D. Hughes allows us to expedite many aspects of development projects. The principal, Wiley D. Hughes, P.L.S. #3779, has over 54 years of experience in virtually every type of field surveying. Wiley D. Hughes Surveying, Inc. is a fully staffed office consisting of licensed land surveyors, experienced computer operators, and experienced Design Specialist. . Mr. Wiley D. Hughes, P.L.S. will be the Project Manager for this contract.
City of California City – RFQ for On-Call Professional Engineering Services D. Organization Chart/ Project Team
The following organization chart reflects our proposed key team members that will work on the assigned projects. Full resumes for BHT Engineering, Inc. team members are included in the Appendix.
* Note: Personnel performing field work, will be invoiced at prevailing wage rate per attached fee schedule. As required by Senate Bill # 1999.
E. Project and Management Approach
BHT Engineering, Inc. is led by Principal Engineer Juan M. Pantoja, who directly supervises all phases of field surveys, design, plan preparation, and construction management for federally and state-funded projects, municipal public works, airports, industrial and commercial developments, and May 29, 2025 Page 3
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 4
private ventures. Mr. Pantoja oversees a team of engineering professionals—refer to the Organization Chart on page 3 for details.
Professional Civil Engineer, Juan Pantoja and Senior Project Managers, Ramon Pantoja and Miguel Pantoja are assigned local, federally and state funded projects based on the project’s need and complexity. They are responsible and perform every aspect of the project including Federal Highway Administration (FHWA), Federal Aviation Administration (FAA), Federal Emergency Management Agency (FEMA), United State Department of Agriculture (USDA), Community Development Block Grant (CDBG) program applications, project topographic field survey, project design, environmental review and documentation, preparation of plans and specifications, cost estimates, budgets, construction management/inspection, and preparation of invoices and closeout of the project. They must coordinate and communicate with owners, contractors, other engineering professionals, government and private regulatory agencies for project approval to coordinate design and project alternatives.
BHT Engineering, Inc. personnel use the Caltrans Local Assistance Procedures Manual (LAPM), Caltrans Standard Specifications and Standard Plans, the Subdivision Construction Standards and Engineer’s Design Manual, FAA Advisory Circulars and the Subdivision Map Act, for improvement development plans and specifications on a daily basis.
BHT Engineering, Inc.’s team of working professionals offers the highest level of experience, knowledge and commitment in providing engineering services. Our purpose is to manage each project we undertake efficiently, with respect to the project’s work scope, budget and schedule; ultimately producing and delivering quality work product for that project.
3. QUALIFICATIONS & EXPERIENCE
BHT Engineering, Inc. provides on-call and as-needed technical staff support for its clients. The firm possesses a comprehensive skill set for managing projects through various stages of federal and state funding processes, ensuring smooth execution and compliance—from grant awards to final project closeout.
With strong computer, engineering, and surveying expertise, BHT Engineering, Inc. is structured to handle topographic surveys, design, project management, field construction management, and construction inspection functions full-time, utilizing advanced data processing and communication systems. Our team is dedicated to Municipal City Engineering and Public Works Improvement City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 5
Projects, bringing extensive experience in preliminary design, final design, bidding, construction phase management, inspection, and project closeout.
On a routine basis, our personnel prepare comprehensive and well-organized daily reports, negotiate change orders, review construction schedules, and resolve design-related issues. They also manage monthly billing, extra work bills, and submittals while maintaining office records in accordance with the Caltrans filing system. Additionally, they monitor projects for labor and DBE compliance, prepare progress reports, and oversee project billing invoices. With a meticulous approach, our team accurately interprets project plans, specifications, construction survey staking, and field notes to ensure successful project completion—both financially and physically.
A. Familiarity with State & Federal Procedures
Extensive Working Knowledge of Federal and State Policies and Procedures x Regional Surface Transportation Program (RSTP) x Congestion Mitigation and Air Quality (CMAQ) x Community Development Block Grant (CDBG) x Active Transportation Program (ATP) x SB1 Road Repair and Accountability Act of 2017 x TDA Article 3 x Kern Council of Governments (KCOG) x Highway Safety Improvement Program (HSIP) x California Department of Transportation (Caltrans) x Federal Aviation Administration (FAA) x Federal Highway Administration (FHWA) x Federal Emergency Management Agency (FEMA) x Public Transportation Modernization, Improvement, and Service Enhancement Account (PTMISEA) BHT Engineering, Inc. has extensive knowledge of regulations governing federal, state, county, and local funds. This expertise is crucial in executing projects funded by federal and state programs, which require specialized permitting and reporting compliance.
We actively maintain strong communication with local, state, and federal agencies to secure project funding assistance, fostering productive working relationships with federal and state personnel, particularly within Caltrans Districts 6 and 9 and the Kern Council of Governments. Additionally, we have significant experience managing projects within Caltrans right-of-way, fully understanding their environmental and design procedures and requirements.
The evolving local and national economic landscape has heightened the need to secure financial aid for local development, infrastructure upgrades, and new construction. Recognizing this demand, BHT Engineering, Inc. remains vigilant in identifying and pursuing funding opportunities. Our team prepared the 2023 RSTP Call for Projects Application for the Cities of Taft and California City, as well as the 2023 CMAQ Call for Projects for the City of California City.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 6
Our success in grant applications and funding programs stems from our ability to communicate efficiently with key government personnel, ensuring all applications are thorough, complete, and supported by necessary documentation.
BHT has assisted cities at various project stages with:
x FTIP programming
x Request for authorization to proceed with preliminary engineering x Request for environmental approval
x Right-of-way certification
x Request for authorization to proceed with
construction x Award submittal x Progress
invoice
x Final report of expenditures
Samples of Caltrans/federal documentation BHT has completed include: x Field review
x Request for authorization and data
sheets x Finance letters
x Preliminary environmental study
(PES) x Local programs agreement
checklist x Detail estimate and
summary
x Plan, specification, and estimate certification
x Resident engineer's construction contract administration checklist x Local agency contract award checklist x Federal report of expenditures letter and checklist x Materialscertificate x Local agency final inspection form
B. Response Time / Resources
BHT Engineering, Inc. uses state-of-the art software for design and analysis of civil engineering projects such as roadways, sanitary sewer and storm drain lines. The company uses the latest versions of AutoCAD Civil 3D and mapping design systems. Spectra GPS and Trimble Total Station equipment is used exclusively for field survey, and the powerful companion software allows unparalleled flexibility in developing data exchange formats and data collection tools. We are constantly upgrading our software to remain on the cutting edge of new technology. We have a full complement of computers, word processing capabilities and electronic field equipment. These are used with HP printers and large format plotters.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 7
BHT Engineering, Inc. responds quickly to the needs of our Clients. The engineering needs of the City would receive the same high priority that is given to other cities. We are able to be responsive by using advanced computer and communication systems discussed earlier. We can work as much or as little as demand dictates. Our primary reason for success has been to respond quickly with action to get the job done. BHT Engineering, Inc. has the expertise, experience and depth of resources to respond quickly to any work requests. We deliver cost-effective solutions in quality products that provide maximum value to our clients.
Organization Chart presented on page 3 reflects our proposed key team members that will be working with the City. Full resumes for BHT Engineering, Inc. team members are included in the Appendix.
C. Local, State And Federal Aid GrantApplications/Programs BHT Engineering, Inc. is available for all projects and additional services as needed by the City. We have been very active in communicating well with Local, State and Federal Agencies on a continuing basis to obtain project-funding assistance. This has involved extensive communications and working relationships with Federal and State personnel, particularly Caltrans District 6 and District 9, and Kern County Community Development Block Grant Programs. BHT Engineering, Inc. has also worked closely worked closely with the local Kern Council of Governments, Caltrans, and the Federal Highway Administration in the design and construction of road improvementprojects.
The local and national economic climate for the past few years have placed an ever increasing need to acquire all project financial aid available for local development as well as infrastructure update and new construction. Identifying and obtaining project funding is a full-time job. BHT Engineering, Inc. has long identified the need for a constant awareness of funding options and exercises these options continually. Recently, BHT Engineering, Inc. prepared the 2023 RSTP Call for Projects Application for the Cities of Taft, and California City and the 2023 CMAQ Call for Projects for the City of California City. BHT Engineering, Inc. success with respect to the Grant Applications/Programs is a result of our ability to communicate quickly with key government personnel to ensure all applications are complete and to supply information as needed.
D. Street Improvement Projects
BHT Engineering, Inc. performs responsibilities of City / Transportation Engineer for the City of McFarland, the City of Taft the City of California City and the City of Wasco. Our company has City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 8
knowledge and understanding to provide and accomplish Street Improvement Projects for arterial and collector roads funded by State and Federal Regional Surface Transportation Program (RSTP) and Congestion Mitigation and Air Quality (CMAQ) funds administered by the Kern Council of Governments (KCOG). The Regional Surface Transportation Program (RSTP) is the primary funding source for many of these road projects. Additional State and Federal funding programs of (TEA) Transportation Enhancement Act, (HSIP) Highway Safety Improvement Program, (RTIP) Regional Transportation Enhancement Act, (CDBG) Community Development Block Grant, and Proposition SB1 were and are being utilized. All of these projects include improvements compliant with the American Disabilities Act (ADA) for sidewalks, curb ramps, and drive approaches. BHT Engineering, Inc. typically provides special detailed drawings for ADA improvements and works with the contractor in the field to ensure requirements are met. Often State funded projects require approval from the Division of the State Architect (DSA) and BHT Engineering Inc. has experience in this process and has successfully gained DSA approval on past projects. BHT Engineering, Inc. utilizes different types of street project designs of hot surface recycle and cold recycle in addition to new construction, slurry seal, and total reconstruction.
E. Comparable Projects
The following are comparable projects the Project Team of BHT Engineering, Inc. has completed.
Mendiburu Road Construction – CML – 5399-(031)
Project Objective, Description, and Outcome: The Project Team provided Preliminary Engineering and Construction Engineering services for the road construction of a one-mile segment of Mendiburu Road, extending from Hacienda Blvd. to Neuralia Rd. in California City. The project scope included the new roadway construction, installation of hot mix asphalt pavement over a cement-treated subbase, and the construction of a cast-in-place triple box culvert. Additional improvements included curb and gutter installation, cross gutters, shoulder grading, traffic striping, pavement markings, and roadside signage. To enhance safety and accessibility, the project incorporated dedicated bike lanes to accommodate students commuting to and from the local high school. Construction was successfully completed in February 2024.
Funding Source: Federal (CML) and Local funds
Owner: City of California City
Contact: Joe D. Barragan; (760) 373-7297
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
City of California City – RFQ for On-Call Professional Engineering Services Project Manager: Juan M. Pantoja; (661) 558-4641
Contract Amount: PE: $36,990; CE: $373,500
Date of Contract: PE: 3/18/21; CE: 6/30/23
Date of Completion: PE: January 2023; CE: Summer 2024 – Close-out in progress HSIP Cycle 10 - Pedestrian Safety Improvements - Various Locations – HSIPSL – 5343-(018) Project Objective/Description/Outcome: The Project Team provided Preliminary Engineering and Construction Engineering services to enhance pedestrian safety at multiple locations throughout the City of McFarland. The project scope included the removal and replacement of curbs, gutters, sidewalks, and a curb ramp. Additional improvements involved the installation of warning signs and upgrading pavement markings to high-visibility standards, ensuring greater safety for pedestrians.
Construction was successfully completed in November 2024.
Funding Source: State (HSIP) and Local funds
Owner: City of McFarland
Contact: Adam Cabrera; (661) 869-5106
Project Team Role: Preliminary Engineering (Survey, CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Close-out) Materials testing by subconsultant – SEI
Project Manager: Juan M. Pantoja; (661) 558-4641
Contract Amount: PE: $50,056; CE: $32,870.00
Date of Contract: PE: 7/29/21; CE: 8/07/24
Date of Completion: PE: April 2024; CE: Spring 2025 – Close-out in progress May 29, 2025 Page 9
City of California City – RFQ for On-Call Professional Engineering Services 10th Street Rehabilitation – STPL – 5193-(043)
Project Objective/Description/Outcome: The Project Team provided Preliminary Engineering and Construction Engineering services for the reconstruction of a 1,630-foot segment of 10th Street, spanning from A Street to the Rails to Trails Bike Path in the City of Taft.
The project scope included roadway surface reconstruction, installation of a hot mix asphalt pavement overlay, and the placement of traffic striping, pavement markings, and roadside signage.
Given its proximity to the Rails to Trails Walk/Bike Path—a well-utilized community facility—this project enhances accessibility and safety for users. Construction was successfully completed in April 2023.
Funding Source: Federal (STPL) and Local funds
Owner: City of Taft
Contact: Craig Jones; (661) 763-1222
Project Team Role: Preliminary Engineering (Survey, CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
May 29, 2025 Page 10
City of California City – RFQ for On-Call Professional Engineering Services Project Manager: Juan M. Pantoja; (661) 558-4641
Contract Amount: PE: $32,482; CE: $39,910
Date of Contract: PE: 2/25/21; CE: 11/16/22
Date of Completion: PE: July 2022; CE: March 2024 – Close-out in progress
4. SCOPE OF WORK/SERVICES
The proposed scope of work detailed below is based on a typical Federal/State funded roadway project under Caltrans Local Assistance oversight. Please note that the exact scope of work is unknown at this time and will vary between projects. However, typical professional engineering services for projects might include but not be limited to the following general scope:
A. PROJECT MANAGEMENT
BHT Engineering, Inc. will be responsible for project management activities throughout the life of the contract and the scope of activities includes but is not limited to, coordinating and being responsible for scheduling meetings, managing the project schedule, preparing and distributing minutes, field reviews, tracking action items for the City and consultant sub-contractors, and preparing all submissions for the City to submit to Caltrans Local Assistance and/or otheragencies.
1. Design Phase Authorization
BHT Engineering, Inc. will prepare and submit the Request for Authorization to Proceed with Preliminary Engineering package using procedures outlined in Chapter 3 of the Caltrans Local Assistance Procedures Manual.
Deliverables:
May 29, 2025 Page 11
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 12
x Request for Authorization to Proceed with Preliminary Engineering package (Exhibit 3-A with applicable attachments)
2. Progress Invoicing
BHT Engineering, Inc. will prepare and submit progress invoices per Chapter 5 of the Caltrans Local Assistance Procedures Manual. These progress invoices are required to obtain reimbursement for the City’s expenditures on local federal-aid and state funded projects.
The invoice preparation will be coordinated with the City Manager/Public Works Director for their certification and signature. It is anticipated that City Staff will provide the project team with an executed Program Supplement Agreement and copies of payment checks for incurred costs in order to prepare the progress invoices. It is anticipated that two (2) progress invoices will be prepared per phase.
Deliverables:
x Progress Invoice (2) per phase (PDF)
B. PRELIMINARY ENGINEERING
Preliminary Engineering includes but is not limited to, preliminary design and other activities and analyses, such as environmental assessments, topographic surveys, metes and bounds surveys, geotechnical investigations, hydrologic analysis, hydraulic analysis, utility engineering, traffic studies, financial plans, revenue estimates, hazardous materials assessments, general estimates of the types and quantities of materials, and other work needed to establish parameters for the finaldesign.
This task will include project management for internal team coordination needs and coordination with City Staff throughout the duration on the project. The project team will conduct internal coordination meetings at each phase of the design process to ensure team members are current in project goals and criteria, as well as apprised of any project adjustments. This task includes project setup, coordination, budget/schedule monitoring, and invoicing.
BHT Engineering, Inc. will coordinate with City Staff (City Manager, Public Works Director, and/or Street Superintendent), for initial project’s concept and direction. It is anticipated that the City will gather and provide pertinent record information as available and provide this information to the project team (e.g. Design E-76, records plans).
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 13
1. Environmental Compliance – NEPA
BHT Engineering, Inc. will prepare the Caltrans Exhibit 6-A Preliminary Environmental Study (PES) form, in accordance with Chapter 6 of the Caltrans Local Assistance Procedures Manual. The PES form will be submitted to the Caltrans District Local Assistance Engineer in District 9 for review and approval. BHT Engineering, Inc. team will be supported by Sapphos Environmental, Inc. to prepare technical studies, if any, identified in the Caltrans approved PES form. Sapphos Environmental, Inc. is familiar with the California City region and has wide-ranging experience and a broad working knowledge of the requirements associated with regulatory compliance related to the protection of biological resources in Kern County, CA, as specified by the National Environmental Policy Act (NEPA), the California Environmental Quality Act (CEQA), the Federal and State Endangered Species Acts (ESAs), the Migratory Bird Treaty Act, Sections 401 and 404 of the Clean Water Act, and Section 2081 of the State Fish and Game Code, as well as local policies and regulations pertinent to the specific challenges of natural resources in local areas.
If needed, BHT Engineering, Inc. will arrange and attend a Field Review meeting at the job site with Caltrans and City representatives to identify the limits and scope of work of the specific project. BHT Engineering, Inc. will keep both a hard copy and electronic files for this project to meet Caltrans reporting requirements.
Deliverables:
x Completed PES Form and technical studies to complete NEPA document and/or CEQA document. (Portable Document Format (PDF))
2. Surveys and Mapping
BHT Engineering, Inc. will provide data collection, and field engineering surveying necessary for preliminary engineering, design, cost estimates, and the level of environmental clearance. BHT Engineering’s Survey Crew under supervision of Mr. Juan Pantoja, will conduct the topographic/site surveys.
BHT Engineering, Inc. team will be supported by Wiley D. Hughes Surveying, Inc. to conduct Land Surveying services (right of way surveys, boundary surveys, etc.) if any and as necessary by the specific project’s scope for Federal/State funded projects. Right of way will be established using record maps on file with the County Surveyor’s Office and Preliminary Title Reports, supplied by the City, for potentially affected parcels. We are assuming that sufficient monuments shown on existing Kern County recorded survey maps exist and that no material discrepancies are discovered. If City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 14
sufficient monuments do not exist, additional field and office survey may need to be performed and this is not included herein.
Following completion of design efforts a Right of Way certification will be provided for City’s signature.
Deliverables:
x Topographic survey base map with electronic file in AutoCAD 2024 (or newer) format. x Right of Way Certification for City’s signature – Caltrans Exhibit 13-A or 13-B asappropriate.
3. Preliminary Engineering Studies – Geotechnical Analysis The BHT Engineering, Inc. team will be supported by BSK Associates (BSK) and/or Soils Engineering, Inc. (SEI) for geotechnical engineering services, as needed, on federally or statefunded projects. Assignments will be given to BSK and/or SEI based on availability, project requirements, and complexity.
Founded in 1966, BSK Associates has been in business for 54 years and is a 100 percent employeeowned California S-corporation that provides construction observation/materials testing/special inspection, consulting engineering, and analytical laboratory services. BSK currently employs a staff of approximately 200 with offices and laboratories throughout California, Oregon and Washington.
Soils Engineering, Inc. (SEI) geotechnical and materials division for geotechnical engineering, construction observation/materials testing/special inspection, and analytical laboratory services as needed. SEI has almost 60 years of experience in providing geotechnical and geological engineering, environmental assessments, and testing and surveying services to private, government and industrial clients throughout California. Mr. On Man Lau, M.Sc., P.E., G.E. will be the Project Manager for this contract.
The number and depth of borings will be determined based on specific project needs. Soil samples will be collected and tested as necessary to assess corrosion potential and R-Value. Our consultant(s) will provide the team with a pavement structural section based on the R-Value across a range of TI values. The team will seek input from the City regarding the required TI for the project.
The Preliminary Geotechnical Report will include recommendations for pavement structural sections, infiltration rates—based on USGS soil mapping—for stormwater improvements (as necessary), and concrete specifications in response to soil corrosivity. A draft report will be prepared forCityreview.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 15
Comments will be addressed as appropriate and a Final report will be prepared.
Deliverables:
x Draft and Final Preliminary Geotechnical Report (PDF)
4. Utility Coordination
Utility ‘A’ letters serve to request as built information from utility facility owners and provide notification of upcoming work. Using the USA North design inquiry tool BHT Engineering, Inc. will obtain a list of utility owners within the area. We will then prepare and distribute an 'A' letter request to obtain asbuilt information. Given the potential for utility relocations and/ or adjustments, it is important to begin outreach to Utility Companies during the preliminary stages of design.
If the as-built information provided by the Utility Companies is not satisfactory or clear, we will resolve reasonable uncertainties with the Utility Company and the City and may recommend pot holing to clearly identify the horizontal and/ or vertical location of their facilities. Please note that pot holing of utility facilities is not currently included in our scope of work.
Between the Preliminary and Draft Final (90%) PS&E deliverables, we will send out 'B' Letters, also known as a Notice to Owners, informing affected utility owners that we have identified a conflict with the location of their utility facilities and request potholing as needed. We will coordinate and attend a field meeting to meet with affected utility companies if needed to go over the proposed project and discuss potential relocation strategies.
During the Draft Final (90%) PS&E design phase, we will send the affected Utility Companies a 'C' Letter, also known as the Final Notice (to relocate). While BHT Engineering, Inc. will distribute the final 'C' letter and continue to coordinate relocations as needed, it is anticipated that affected utility facility owners will provide utility agreements to the City for their review and action Deliverables:
x ABC Utility letters (PDF)
5. Preliminary Design - Plans and Estimate
The project team will prepare concept and preliminary plan layouts and present the layouts to the City for review. These preliminary design drawings can be submitted to regulatory or funding bodies for approvals, as needed.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 16
Plan sheets will represent proposed roadway geometric design, demolition, asphalt and base improvements, drainage, grading, curb, gutter, sidewalks, cross gutters, ADA access ramps, street signage, street striping/markings, electrical improvements, landscaping, irrigation, and intersection improvements, etc.
Preliminary plan sheets may include:
x Layout Sheets (PDF) x
Construction Details (PDF)
A planning level cost estimate will accompany the preliminary plans. Following the submittal of the preliminary plans BHT Engineering, Inc. anticipates the City will submit one (1) set of combined review comments.
Deliverables: x Preliminary Design Plans
(PDF) x Planning Level Cost
Estimate (PDF)
6. Design Phase
Following the City's review of the preliminary plans we anticipate receiving one (1) set of combined written comments from the City. The design team will then begin to prepare the project plans, specifications, and cost estimate. Technical specifications prepared by BHT Engineering, Inc. will conform to Caltrans 2024 standard specification format and refer to 2024 Caltrans Standard Plans and current City Development Standards, as appropriate. The project team will ensure that mitigation measures presented as commitments in environmental documents, and that conditions and restrictions associated with regulatory permits, are incorporated into appropriate contract documents, plans, specifications and estimates prior to proceeding with construction activities.
Quantities and bid prices will be prepared and calculated following the completion of site layout and design. The Draft Final Engineer's Cost Estimate and bid sheet will be delivered to the City for budgeting purposes. Unit prices will be developed using relevant as-bid data.
Draft Final (90%) PS&E Submittal
The project team will further develop the preliminary design and project plan sheets to a 90% review level. It is anticipated that revisions to the design concepts will be minor in nature at this stage. The City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 17
plans will incorporate relevant City, State, and Federal standards where applicable. The plans will further identify specific project needs and recommend solutions to meet those needs.
Deliverables: x Draft Final
Plans (PDF)
x Draft Final Technical Specifications (PDF, Word)
x Draft Final Engineer’s Cost Estimate (PDF,
Excel)
Final PS&E Submittal
Incorporating minor edits requested by the City we will finalize, stamp, and sign the final plans, technical specifications, and Engineer's Cost Estimate and deliver them to the City for budgeting and bidding.
Deliverables:
x Final Plans (PDF)
x Final Technical Specifications (PDF,
Word) x Final Engineer’s Cost Estimate
(PDF, Excel)
7. Permits
BHT Engineering, Inc. will incorporate permit conditions and restrictions into the final design. Permits could include but are not limited to: Army Corps of Engineers Section 404 Nationwide Permit; Section 404 Individual Permit; NEPA/404 Integration MOU, Section 10 Permit; Regional Water Quality Control Board Section 401 Water Quality Certification and National Pollution Discharge Permit; California Department of Fish and Wildlife Streambed Alteration Agreement. Typical mitigation includes hay bales, silt fencing, dust control, riprap, soil stabilization matting, slope drain, turbidity barrier, etc.
Because the scope of work is unknown at this time, the actual permits, if any, required is unknown as well, therefore the costs associated with the permit application and processing are not included in this proposal. The permit fees and costs are to be paid by the City directly to the regulatory agency and are not included in this proposal.
Deliverables:
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 18
x Permit Application, as appropriate (PDF)
8. Construction Phase Authorization
BHT Engineering, Inc. will prepare and submit the Request for Authorization to Proceed with Construction package using procedures outlined in Chapter 3 of the Caltrans Local Assistance Procedures Manual.
Federal Authorization to Proceed with construction must be received prior to advertising. Projects advertised for a construction contract prior to federal authorization are not eligible for federal reimbursement.
Deliverables:
x Request for Authorization to Proceed with Construction package (Exhibit 3-A with applicable attachments)
9. Bidding and Award of Project
Upon receipt of an Authorization to Proceed for Construction (E-76) by Caltrans District 9, BHT Engineering, Inc. will coordinate with City Staff for the advertisement and award of the project. A minimum advertising period of three weeks is required for all federal-aid projects.
The advertising costs are to be paid by the City directly to the advertising newspaper and are not included in this proposal.
BHT Engineering, Inc. will provide electronic copies to Plan Rooms to increase project exposure and competition. It is anticipated that a minimum of 3 plan rooms will be contacted.
During the advertising period, BHT Engineering, Inc. will assist the City in all aspects of the bidding process with construction and engineering firms, including but not limited to respond to request for information, prepare addendums, attend and conduct pre-bid meeting, attend the bid opening, review bid results and qualify lowest responsible bidder, and make recommendations for awarding the construction contract.
It is anticipated that City Staff will be responsible to log in, open and retain received bids.
Deliverables:
x Bidding Package (PDF Copies)
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 19
x Bid Analysis/Summary, recommendation for award (PDF)
C. CONSTRUCTION ENGINEERING
Construction Engineering / Contract Administration is the comprised actions taken after a contract is awarded to obtain and document compliance with contract requirements, such as timely delivery, proper construction, dispute resolution, acceptance, payment, and closing of contract. These actions may include technical administrative and managerial support.
Federal statutes require that the City must provide a full time employee of the City who is accountable for the project. This individual is the person in responsible charge of the project. It is anticipated that the Public Works Director will be the Person in Responsible Charge.
Mr. Juan M. Pantoja from BHT Engineering, Inc. will act as the Resident Engineer (RE) for the project.
The RE is empowered to administer the construction contract. The RE will be supported by qualified staff to assist the RE in, but not limited to, construction surveys, soils and foundation tests, measurement and computation of quantities, testing of construction materials, checking shop drawings, and preparation of progress payments and reports. Additional RE responsibilities include the preparation of “As-Built” drawings, filing of documentation, and other inspection and staff services necessary to assure that the construction is being performed in accordance with the project plans and specifications, state and federal laws, and with Caltrans Local Assistance Procedures Manual.
The Resident Engineer for the project, will perform Contract Administration in accordance with Chapter 16, of the Caltrans Local Assistance Procedures Manual. This task will include project management for internal team coordination needs and coordination with City Staff throughout the duration on the project. This task includes project construction file setup, coordination, budget/schedule monitoring, and invoicing
1. Award Package
Per the Caltrans Local Assistance Manual, prior to submitting the first invoice for the construction phase, and within sixty (60) days of contract award, the administering agency must forward the Award Package to the Caltrans District 9.
BHT Engineering, Inc. will prepare and submit the Award Package to District 9, per Chapter 15 of the Caltrans Local Assistance Procedures Manual.
Deliverables:
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 20
x Award Package (3 hard copies, PDF)
2. Pre-Construction Conference
BHT Engineering, Inc. will coordinate and arrange a pre-construction conference/meeting at City offices with City Staff and the construction Contractor. The size, duration, and complexity of the project will be considered when determining who else to invite to the pre-construction meeting. The purpose of this meeting is to discuss important contract issues, submittals, as well as sanctions for non-compliance with local, state, and federal requirements.
Required Topics: x
Safety
x Equal Employment
Opportunity x Labor
Compliance
x Subcontracting (including required submittal of the Exhibit 16-B: SubcontractingRequest) x DBE
x NEPA, Permits and Environmental Mitigation Commitmentrequirements x Potential Traffic or Pedestrian Handling Issues
Recommended Topics:
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 21
x
Progress Schedule
x Work Plans
x Quality Control/Quality Assurance x Materials
Requiring Certificates of Compliance x Materials
Requiring Buy AmericaCertificates x Contract
Training (Apprentice) Goals x Change Order
Process x Dispute Process x Potential Utility
Conflicts
Deliverables:
x Attendance, agenda, and meeting notes for a pre-construction meeting.(PDF)
3. Construction Surveys/Staking
Construction stakes must be set under the responsible charge of a licensed land surveyor or civil engineer. BHT Engineering’s Survey Crew will conduct construction staking. The construction staking will provide the necessary control stakes to establish the lines and grades required for the completion of the work. Note that working stakes used by the Contractor in actually performing the work are the Contractor’s responsibility and are to be set by the Contractor’s forces based on furnished control stakes.
Stakes set that are referenced to California Coordinate System (CSS) coordinates must be set under the responsible charge a person authorized to practice land surveying in the State of California.
BHT Engineering, Inc. team will be supported by Wiley D. Hughes Surveying, Inc. to conduct Land Surveying services if any and as necessary by the specific project’s scope for Federal/State and Local funded projects.
The following are some of the typical responsibilities of the Survey Crew:
x Attend the pre-construction meeting with the RE and the Contractor to discuss project control, amount of construction stakes, and any details before construction starts. x Begins staking within 2 business days of receipt of a completed Request for Construction Staking form from the Contractor.
x Checks the conformity of planned lines and grades with existing conditions at pavement “conforms”, curb and gutter joins, inlets and outlets of drainage facilities, etc.; advises the City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 22
x
RE of any problems; makes minor adjustments to lines and grades under the direction of the RE.
Advises the RE of any discovered design issues regarding lines and grades and records the issues in daily survey party reports.
x Verifies that all staking is clearly written and readily visible.
Restaking
Note that it is anticipated that the project’s standard specifications will require the Contractor to:
“Preserve stakes and marks placed by the City’s representative. If the stakes or marks are destroyed, the City’s representative replaces them at its earliest convenience and deducts the cost from the Contractor’s final payment.”
Deliverables:
x Construction Staking per project specifications x
Cut Sheets (PDF)
4. Project Records
BHT Engineering, Inc., as the RE will maintain a complete and organized project filing system in compliance to Chapter 16 of the Caltrans Local Assistance Procedures Manual. A separate record file for each federal-aid project will be maintained. The project file will contain all data pertinent to the work and to the requirements of the specifications. In general, project records must support the adequacy of the field supervision, inspection and testing; conformance to contract specifications; and payments to the contractor.
During the construction phase, Caltrans Construction Oversight Engineers periodically perform reviews and inspection of the City’s project files for compliance with federal and state requirements.
Organization and content of the project file is one indicator of the effective and efficient management of the project by the RE. It also minimizes resources necessary for conducting processreviews.
Availability of Records for Review or Audit
BHT Engineering, Inc., will keep all contract documentation and backup records available for inspection by Caltrans and FHWA at any time for a minimum of three years after the final project close out. Use of a uniform project record-keeping system, together with diligent maintenance of the system, greatly facilitates a process review and minimizes negative findings. Good records of City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 23
x
all construction activities clearly demonstrates to those concerned that project supervision and control were attained on the project.
Deliverables:
Project Records (hard copies, PDF)
5. Tracking Contract Time
Contract time is the maximum time allowed in the contract for completion of all work contained in the contract documents. The RE will maintain a written record of contract time, often called the Weekly Statement of Working Days (WSWD). The RE will be responsible for reviewing the contract time requirements, determining the controlling operation, determining if each day is a working day or nonworking day, and supporting time extensions.
The RE will prepare the WSWD as soon as possible and no later than the end of the following week, forward the original statement to the contractor and retain a copy in the projectfile.
Deliverables:
x Exhibit 16-A: Weekly Statement of Working Days (PDF)
6. Engineer’s Daily Reports
BHT Engineering, Inc., will write daily reports to document the work in progress. These daily reports may be written by the construction inspector, the Assistant RE and/or the RE, as project and staffing needs dictate. The daily report will document what work was performed, where and how it was performed, and who performed it. The report will also document significant events or conversations, and activities performed to ensure contract compliance. The daily reports will be kept current and in the project files.
Deliverables:
x Engineer’s Daily Reports (PDF)
7. Check Certified Payrolls
BHT Engineering, Inc., will review payrolls to verify that each laborer or mechanic has been paid not less than the prevailing hourly wage applicable for the classification of work performed as specified in the contract. All reviewed/checked payrolls will be filed in the project records.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 24
x
The project team will cross check Daily Reports, Interviews, Payrolls and Wage Rates in order to determine Contractor and Subcontractor compliance.
Deliverables:
x Checked Certified Payrolls (PDF)
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 25
8. Employee Interviews
BHT Engineering, Inc., will conduct employee interviews, as required by Caltrans Local Assistance Procedures Manual. The project team will interview a minimum of two employees per contract, per month, including at least one interview from the prime contractor and each subcontractor until such time as the contract is accepted or all employees on the project have been interviewed. The employee interviews will occur during work hours on the job site; at times that minimize disruption to the contractor’s operation. All interviews will be filed in the project records.
The project team will cross check Daily Reports, Interviews, Payrolls and Wage Rates in order to determine Contractor and Subcontractor compliance.
Deliverables:
x Employee Interviews (PDF)
9. Disadvantaged Business Enterprises (DBE)
The RE has the responsibility of enforcing the DBE provisions of the contract. BHT Engineering, Inc. will review the DBE provisions of the contract and Exhibit 15-G: Construction Contract DBE Commitment with the contractor and inspection staff. The RE/Inspector will verify the DBE performs a commercially useful function and will ensure submittal of Exhibit 16-Z1: Monthly DBE Trucking Verification, if required. At the completion of the work the RE will obtain and verify Exhibit 17-F:
Final Report of DBE and First Tier Subcontractors, compare the Final Report – Utilization of DBE to the DBE Commitment form, and withhold payment if DBE commitments were not met.
Deliverables:
x Exhibit 17-F: Final Report of DBE and First Tier Subcontractors (PDF)
10. Change Orders
A change order is a legally binding document used to make changes to the original construction contract. Change Orders are negotiated agreements with the contractor that affect the cost, time, design or specification requirements, or a combination of the four.
When a Change Order is initiated BHT Engineering, Inc., acting as the RE will investigate proposed contract change order(s) and submit background information to the City for a decision, if justified, BHT Engineering, Inc. will prepare necessary drawings and documents for City approval. Before City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 26
the Change Order is executed by the City, BHT Engineering, Inc. will negotiate/discuss with the Contractor elements of the change, including the method of compensation and the effect on contract time. All change orders will be filed in the projectrecords.
Deliverables:
x Change Order(s) (PDF)
11. Quality Assurance Program
A Quality Assurance Program (QAP) is a program that will ensure the materials and workmanship incorporated into each construction project conform to the requirements of the contract plans and specifications including approved changes. The main elements of a QAP are an acceptance program and an independent assurance program. It is anticipated that the City has an adopted and current QAP.
BHT Engineering, Inc. acting as the RE will ensure the correct materials test methods are used as specified in the contract and that field personnel who perform those tests for compliance with the specifications are certified to conduct the test method indicated by the contract.
Materials and soils testing
Material inspection, testing and sampling costs are eligible to be charged to the construction engineering phase of the project. BHT Engineering, Inc. team will be supported by BSK Associates and/or Soils Engineering, Inc. for materials and soils testing in accordance with the project specifications and the City’s QAP, as needed for Federal/State and Local funded projects. Both BSK and SEI are Caltrans Accredited Laboratories and possess current certificate of qualification and maintains their laboratory testing equipment in accordance with recognized national calibration standards.
Our Consultant(s) will conduct tests and will submit test results to the RE in a timely manner.
Records of all samples and tests will be kept in the project files. Upon completion of the project, the RE will complete Exhibit 17-G: Materials Certificate.
Deliverables:
x Test Data and Summary Logs (PDF) x
Exhibit 17-G: Materials Certificate(PDF)
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 27
12. Progress Pay Estimates and Payments
Progress payments are compensation to the prime contractor for the value of work completed during a covered period. Contract language generally calls for progress payments to be made at least once each month as the work progresses. The progress payment is based on an estimate prepared by the engineer. Each estimate reflects the total contract item work completed during the pay period, change order bills submitted, materials on hand, deductions, and withholds. BHT Engineering, Inc. acting as the RE, will prepare progress pay estimates and submit them to the Contractor.
Contract Item Quantity Calculation Sheets
BHT Engineering, Inc. acting as the RE, will prepare Contract Item Quantity Calculation sheets to support and document item payments made to the contractor each month. A separate quantity calculation sheet will be prepared for each contract item being paid for each progress payment.
Quantity Calculation Sheets will be filed in the project records.
Deliverables:
x Progress Payments (PDF)
x Contract Item Quantity Calculation Sheets (PDF)
13. Project Close Out
Following Chapter 17 of the Caltrans Local Assistance Procedures Manual, BHT Engineering, Inc. will prepare and submit to Caltrans the final report documents which collectively constitute the Final Report of Expenditures. This report provides key information required to initiate timely project closure and payment. The Report of Expenditures must be submitted within six months of project completion or completion of the last federally-reimbursable phase if no Federal funds are utilized for Construction. The Final Report of Expenditures must be signed by the public employee in responsible charge of the project.
Deliverables: x Final Report of
Expenditures (PDF)
5. CERTIFICATES INSURANCE
BHT Engineering, Inc. maintains the following insurance coverage and will produce a Certificate of Insurance at the City’s request.
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 28
x General Liability: $2,000,000 aggregate, $1,000,00 per occurrence x Professional Liability: $2,000,000 aggregate, $2,000,00 per occurrence x Automobile: $1,000,000 x Worker’s Compensation Insurance Juan M. Pantoja – Principal/CEO, BHT Engineering, Inc.
6. CONFLICT OF INTEREST
BHT Engineering, Inc. does not have any conflict of interest with the City of California City on this RFQ.
7. LITIGATION
In March 2022, a complaint was filed against BHT Engineering, Inc. in the Kern County Superior Court. On March 7, 2023, BHT was granted a Demurrer without leave to amend, resulting in a judgment in favor of BHT Engineering, Inc. and against the Plaintiffs. The charges do not and will not affect BHT Engineering, Inc.’s ability to perform under this contract.
The Plaintiffs’ cause of action against BHT—alleging a dangerous condition of public property and wrongful death—was dismissed on the grounds that it failed to state facts sufficient to constitute a cause of action against BHT under Code of Civil Procedure Section 430.10(e). Specifically, the Plaintiffs did not provide sufficient facts to establish that BHT qualifies as a public entity.
Additional information on this matter can be provided upon request.
8. CONTRACT AGREEMENT
BHT Engineering, Inc. has reviewed Attachment 2 – Sample Consultant Agreement and hereby states that we accept said contract if our firm is selected for awarding a contract for the services as described in said RFQ.
The Proposal’s terms shall remain in effect for ninety (90) days following the date proposal submittals are due.
9. FEDERAL-AID PROVISIONS (DBE)
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 29
BHT Engineering, Inc., understands, per Exhibit 10-I – Notice to Proposers DBE Information, that the City has established a DBE goal of 15% for this Contract.
BHT Engineering Inc., is a DBE firm ID# 46277 and will provide Preliminary Engineering and Construction Engineering services.
See attached Exhibit 10-O1 – Consultant Proposal DBE Commitment.
Also, attached is Exhibit 10-Q - Disclosure of Lobbying Activities.
APPENDIX 1 – STAFF RESUMES
City of California City – RFQ for On-Call Professional Engineering Services May 29, 2025 Page 30
BHT ENGINEERING, INC.
Civil Engineering, Building Design & Construction Management RESUME Role:
Senior Civil Engineer /
Principal-In-Charge
Registration:
Registered Civil Engineer,
State of California RCE 64740
Education:
Bachelor of Science - Civil
Engineering, May 1998
California State University,
Fresno
Experience:
BHT Engineering, Inc.,
December 2018 to Present
Helt Engineering, Inc.,
1998 to January 2019
Twining Laboratories, Inc.,
1996 to 1998
RELEVANT EXPERIENCE:
Juan M. Pantoja, PE
Principal / CEO
Mr. Pantoja currently works as a Principal/Senior Civil Engineer at BHT Engineering, Inc. Mr. Pantoja has successfully worked in a variety of Federal/State funded and municipal public works. Mr.
Pantoja is familiar with various FHWA and Caltrans’ project development requirements and procedures, regarding project funding application, environmental review and documentation, project design, preparation of plans and specifications, construction cost estimates, construction inspection, preparation of invoices, and closeout of these projects. Mr. Pantoja works with clients, contractors, and governmental and private regulatory agencies for project approval and to answer questions regarding design and project alternatives. Mr. Pantoja coordinates with other engineering professionals to get a quality project within time and budget. Mr.
Pantoja works in the preparation of and has taken to final approval, grading and drainage plans, street reconstruction projects, traffic signal plans, technical studies, such as traffic studies, drainage studies, pavement management system reports, project study reports, preliminary environmental assessment reports, mitigated negative declarations. Mr. Pantoja performs required calculations for earthwork volumes, pipe sizing and drainage facility design. He oversees field construction surveying and staking activities and acts as a Job Site Engineer/Inspector for various construction projects.
Mr. Pantoja is also proficient with AutoCAD Civil 3D, Excel, Word and Adobe Acrobat among various other software packages.
10th Street Rehabilitation – STPL – 5193-(043). Taft, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction of a 1,630-feet segment of 10th Street from A St. to Rails to Trails Bike Path in the City of Taft. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement overlay; installing traffic stripes, pavement markings, and roadside signs. The Rails to Trails Walk/Bike Path runs adjacent of the project, making it a major hub location for users of this popular community facility. Construction of the project was completed in April 2023.
Funding Source: Federal (STPL) and Local funds
Owner: City of Taft
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Juan M. Pantoja, PE RESUME
Mendiburu Road Construction – CML – 5399-(031). City of California City, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road construction of a 1-mile segment of Mendiburu road from Hacienda Blvd. to Neuralia Rd. in the City of California City. The project scope included new construction of a roadway, installation of hot mix asphalt pavement, over cement treated subbase; construction of a cast-in-place triple box culvert, install curb & gutters, cross gutters; shoulder grading, installing traffic stripes, pavement markings, and roadside signs.. The project included installation of bike lanes to accommodate students traveling to and from the local High School.
Construction of the project was completed in February 2024.
Funding Source: Federal (CMAQ) and Local fundsOwner:
City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Hacienda Blvd. Rehabilitation – STPL – 5399-(030). City of California City, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction of a ¼ mile segment of Hacienda Blvd. from California City Blvd. to Eucalyptus Ave. in the City of California City. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement, over cement treated subbase; reconstruction of one ADA ramp and cross gutter; installing traffic stripes, pavement markings, and roadside signs. The project included installation of bike lanes to accommodate students traveling to and from schools located at the intersection of Hacienda Blvd. and Redwood Blvd.
Funding Source: Federal (STPL) and Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Hacienda Blvd. Rehabilitation – STPL – 5399-(028). City of California City, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction of a ¼ mile segment of Hacienda Blvd. from So. Loop Blvd. to Eucalyptus Ave. in the City of California City. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement, over cement treated subbase; reconstruction of one ADA ramp and cross gutter; installing traffic stripes, pavement markings, and roadside signs. The project included installation of bike lanes to accommodate students traveling to and from schools located at the intersection of Hacienda Blvd. and Redwood Blvd.
Funding Source: Federal (STPL) and Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Hacienda Blvd. Rehabilitation – STPL – 5399-(021). City of California City, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction of a ¼ mile segment of Hacienda Blvd. from Manzanita Ave. to South Loop Blvd. in the City of California City. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement, over cement treated subbase; construction of new curb & gutter, concrete valley gutters; installing traffic stripes, pavement markings, and roadside signs. The project included installation of bike lanes to accommodate students traveling to and from schools located at the intersection of Hacienda Blvd. and Redwood Blvd. There is a drainage culvert under a segment of this road located near So. Loop Blvd. The new curb & gutters were designed to direct drainage to an existing inlet in order to improved flooding issues in this location.
Juan M. Pantoja, PE RESUME
Funding Source: Federal (STPL) and Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) 6th Street Rehabilitation – STPL – 5193-(042). Taft, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road road reconstruction of 6th Street from Main St. to Center St. in the City of Taft. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement overlay, re-construction of curb & gutters, ADA compliant curb ramps; installing traffic stripes, pavement markings, and roadside signs.
Funding Source: Federal (STPL) and Local funds
Owner: City of Taft
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Kern St. Safety Improvements – 1st St. to Hillard St. HSIPL – 5193 (040). Taft, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering for one Safety pedestrian improvement project in the City of Taft. The project scope included installation of fourteen (14) Pedestrian Crossing flashing LED solar-powered signs; two (2) School Crossing flashing LED solar-powered signs; two (2) solar-powered Radar Speed Feed Back Signs, re-paint existing pedestrian crosswalks and pavement markings, and installation of roadside signs. Kern St. is within Caltrans Right-of-Way, SR 33; Mr.
Pantoja prepared a Caltrans Encroachment Permit Application and successfully coordinated with Caltrans Dist. 6 Staff for approval of the Encroachment Permit.
Funding Source: Federal (HSIP) and Local funds
Owner: City of Taft
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) 6th Street Rehabilitation – STPL – 5193-(039). Taft, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction and widening of a 475 feet segment of 6th Street from Main St. to Supply Row in the City of Taft. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement overlay, construction of new curb & gutter, ADA compliant curb ramps; installing traffic stripes, pavement markings, and roadside signs. The project included striping for on-street parking. The Rails to Trails Walk/Bike Path runs thru the middle of the project, making it a major hub location for users of this popular community facility. Construction of the project was completed in December 26, 2017.
Funding Source: Federal (STPL) and Local funds
Owner: City of Taft
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) TDA Article 3 – 5th St & Rails to Trails Connection Project. Taft, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering for one pedestrian improvement project in the City of Taft. The project scope included installation of red stamped concrete cross walk, retrofit curb ramps, install pavement markings, roadside signs and solar LED bollards.
Funding Source: County (TDAArticle 3) and Local funds
Owner: City of Taft
Project Team Role: Preliminary Engineering (Survey, CEQA Environmental Clearance, Design,Bidding); Juan M. Pantoja, PE RESUME
Construction Engineering (Inspection, Materials testing, Close-out) Intersection Signalization - E. Sherwood Ave. & Marshall St. - Disaster Recovery Initiative No. 10-Dri6787.
McFarland, CA
Project Manager/ Engineer: Provided Preliminary Engineering for one State CDBG funded project in the City of McFarland. The project scope included installation of a traffic signal and lighting system; reconstruction of existing roadway surface, curb and gutters, curb ramps; installing and removing traffic stripes, pavement markings, and roadside signs.
Funding Source: State CDBG (DRI) and Local funds
Owner: City of McFarland
Project Team Role: Preliminary Engineering (Survey, Design, Bidding). 5th Street Reconstruction – from F St. to Peters St. – RSTPL – 5287 (019) – Wasco, CA Project Engineer: Provided Preliminary Engineering and Construction Engineering services for the road reconstruction of a 1 mile segment of 5th Street in the City of Wasco. The project scope included reconstruction of existing roadway surface, installation of hot mix asphalt pavement, over aggregate base; construction of new curb
& gutter, concrete valley gutters; ADA curb ramps; installing traffic stripes, pavement markings, and roadside signs. F Street is SR 43 and is within Caltrans Right-of-Way; Mr. Pantoja prepared a Caltrans Encroachment Permit Application and successfully coordinated with Caltrans Dist. 6 Staff for approval of the Encroachment Permit.
Funding Source: Federal (STPL) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Intersection Signalization – State Route 46 & Griffith Ave. - STPLNHSR – 5287 (012) – Wasco, CA Project Manager/ Engineer: Provided Preliminary Engineering and Construction Engineering for one Safe Routes to School funded project in the City of Wasco. The project scope included installation of a traffic signal and lighting system; storm drain improvements, reconstruction of existing roadway surface, curb and gutters, curb ramps; installing and removing traffic stripes, pavement markings, and roadside signs. SR 46 is within Caltrans Right-ofWay; Mr. Pantoja prepared a Caltrans Encroachment Permit Application and successfully coordinated with Caltrans Dist. 6 Staff for approval of the Encroachment Permit.
Funding Source: Federal (SR2S) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQAEnvironmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) Block Wall & Landscaping Improvements at Annin Ave. Wasco, CA Project Engineer: Provided Preliminary Engineering and Construction Engineering for a local funded project in the City of Wasco. The project scope included site grading and construction of new block wall along the east side of Annin Avenue from Gromer Road south approximately 1230 feet and the installation of irrigation system and landscaping improvements.
Funding Source: Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
Juan M. Pantoja, PE RESUME
W. Kern Ave. Elementary SR2S Connectivity - ATPSB1L 5343 (013). McFarland, CA Project Manager/ Engineer: Provided Preliminary Engineering for one ADA pedestrian improvement project in the City of McFarland. The project scope included reconstruction of existing non-ADA compliant curb ramps and commercial/residential drive approaches, installation of street lights, Solar Powered Flashing LED Stop Signs,
Solar Powered Radar Speed Feedback Sign, Solar Powered In-Roadway Crosswalk System, Pavement Striping/Markings. The project included preparation of Plans and Specifications to comply with the Division of State Architect (DSA) requirements. Mr. Pantoja met with DSA Staff at the Los Angeles office for project construction documents review and approval.
Funding Source: Federal (ATP & SB1) and Local funds
Owner: City of McFarland
Project Team Role: Preliminary Engineering (Survey, Design, Bidding).
East Side Taxiways Rehabilitation – AIP No. 3-06-0641-018-2017. City of California City, CA Project Engineer: Provided Preliminary Engineering and Construction Engineering services for the reconstruction and widening of 3,400 ft. long airport taxiways. The project scope included full reconstruction of existing taxiways surface, installation of crushed aggregate base, hot mix asphalt per Marshall Method, material testing, striping and markings per FAA design standards. Construction of the project was completed in January 12, 2018.
Funding Source: FAA, Caltrans Division of Aeronautics and Local funds Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out) CDBG Project – Balsitic Park. City of California City, CA Project Engineer: Provided Preliminary Engineering (Architectural Services) and Construction Engineering services for renovation improvements to bring Park restrooms into compliance with current Americans with Disabilities Act (ADA) code requirements. Kern County Planning and Natural Resources Department approved the allocation of CDBG funds for this purpose. Project is located at 7241 Landis Drive within the southeast corner of Balsitis Park.
The project scope included construction of new parking lot, installation of hot mix asphalt, construction of new curb & gutter, ADA compliant curb ramps; parking lot striping. The project included the installation of a premanufactured restroom building. Construction of the project was completed in September 25, 2018 and is currently in the Close-out phase.
Funding Source: CDBG and Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
BHT ENGINEERING, INC.
Civil Engineering, Building Design & Construction Management RESUME Role:
Senior Project Manager /
Chief Financial Officer
Education:
Bachelor of Science –
Industrial Engineering, June
1992
Queretaro State University,
Queretaro, Mexico
P.E. obtained in 1995 from
Mexican License Board
Bakersfield College 1999 –
2006. Electrical DesignIndustrial Technology
Bakersfield, Ca
Experience:
BHT Engineering, Inc.,
December 2018 to Present
Helt Engineering, Inc.,
2002 to Jan. 2019
Raymond Professional
Group
2000–2001
RELEVANT EXPERIENCE:
Ramon H. Pantoja
Senior Project Manager / CFO
As a Senior Project Manager at BHT Engineering, Inc. Mr. Pantoja is involved in the design and construction of Federal/State funded and public works, including road/highway construction projects and private sector projects including, building remodeling and design, residential/commercial subdivision. Mr. Pantoja has successfully worked in a variety of municipal public works. He is responsible for project design, preparation of plans and specifications, construction cost estimates, and construction management. Mr. Pantoja is familiar with various Caltrans’ and FAA project development requirements and procedures. He works with clients, contractors, and governmental and private regulatory agencies for project approval and to answer questions regarding design and project alternatives. Mr. Pantoja oversees field construction surveying and staking activities and acts as a Job Site Inspector for various construction projects. Mr. Pantoja is also proficient with AutoCAD Civil 3D, Excel and Word, among various other software packages.
Mr. Pantoja previously worked as an Electrical Designer II for Raymond Professional Group, in Bakersfield, CA. As an Electrical Designer, Mr. Pantoja prepared preliminary and detailed electrical drawings for a variety of projects relating to the construction and installation of electric and electronic equipment. Mr. Pantoja has experience in the drafting of complex electrical wiring diagrams, electrical schematics, piping and instrument diagrams and other professionally acceptable diagrams. Mr. Pantoja has knowledge of City, State and National codes and Regulations, as well as Engineering/Architectural/Construction industry standards, in order to prepare and deliver construction documents.
CMAQ Transit Transfer Station. Wasco, CA
Project Manager: Provided Preliminary Engineering and Construction Engineering for a CMAQ project in the City of Wasco. The project scope included the construction a new building, landscaping and site lighting, this building became a landmark of the City of Wasco. Adjacent parking lot was later added with local funding.
Funding Source: Federal (CMAQ) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
CDBG Barker Park Lighting Improvements Project. Wasco, CA Project Manager: Provided Preliminary Engineering and Construction Engineering for a CDBG project in the City of Wasco. The project scope included the installation of pole mounted lighting throughout the park and related improvements.
Funding Source: County CDBG
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
Ramon H. Pantoja RESUME
RSTP H Street Reconstruction Project. Wasco, CA
Project Manager: Provided Preliminary Engineering and Construction Engineering for a RSTP funded project in the City of Wasco. The project scope included the re-construction of H Street from 6th St to J St. ADA ramps were not required at that time.
Funding Source: Federal (STPL) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
Block Wall & Landscaping Improvements at Annin Ave. Wasco, CA Project Manager: Provided Preliminary Engineering and Construction Engineering for a local funded project in the City of Wasco. The project scope included site grading and construction of new block wall along the east side of Annin Avenue from Gromer Road south approximately 1230 feet and the installation of irrigation system and landscaping improvements.
Funding Source: Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
WWTP Diesel tank and metal workshop building. Wasco, CA Project Manager: Provided Preliminary Engineering and Construction Engineering for a local funded project for the installation of a new diesel tank at the Wastewater Treatment Plant. The project scope included site grading, foundations, piping and electrical power and control runs.
Funding Source: Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
Water Wells Improvements. Wasco, CA
Project Manager: Provided Preliminary Engineering and Construction Engineering for a local funded project for the design and installation new VFD at various water wells. The project scope included equipment demolition, foundations, electrical power and control runs.
Funding Source: Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
CMAQ New CNG Station and Upgrade Project. Wasco, CA
Project Manager: Provided Construction Engineering for a CMAQ project in the City of Wasco. The project scope included the construction a new CNG Station with one compressor and fast fill dispenser, and site lighting. The next year applied and secure CMAQ funding to install an additional compressor, block wall and fencing.
Landscaping was added with local funding.
Funding Source: Federal (CMAQ) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
Ramon H. Pantoja RESUME
FAA East Side Taxiways Rehabilitation – AIP No. 3-06-0641-018-2017. City of California City, CA Project Manager: Provided Preliminary Engineering and Construction Engineering services for the reconstruction and widening of 3,400 ft. long airport taxiways. The project scope included full reconstruction of existing taxiways surface, installation of crushed aggregate base, hot mix asphalt per Marshall Method, material testing, striping and markings per FAA design standards. Construction of the project was completed in January 12, 2018.
Funding Source: FAA, Caltrans Division of Aeronautics and Local funds Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Grant Close-out) USDA Water Mains Replacement Project. City of California City, CA Project Manager: Provided Preliminary Engineering and Construction Engineering services for the construction of 21 miles of new water main lines in the northeast part of the City.
Funding Source: Federal (USDA)
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Grant Close-out) PTMISEA Park and Ride Project. City of California City, CA Project Manager: Filled application to secure funding, Provided Preliminary Engineering and Construction Engineering services for the construction of a new Transit Transfer Station, building design, parking lot and related improvements.
Funding Source: State (PTMISEA)
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, NEPA/CEQA Environmental Clearance, Design, Bidding); Construction Engineering (Inspection, Materials testing, Grant Close-out) CDBG #16.04.4 Second St. lighting project. McFarland, CA Project Manager: Provided Preliminary Engineering and Construction Engineering for a CDBG project for streetscape on Second Street. The project scope included the construction of ornamental poles lighting, irrigation and landscaping, ADA driveways, ADAramps and related improvements.
Funding Source: County CDBG
Owner: City of McFarland
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Materials testing, Grant Close-out)
TDA Article 3 Heather Ave. ADA Improvements Project. City of California City, CA Project Manager: Provided Preliminary Engineering and Construction Engineering for a TDA Article 3 funded project for the construction of ADA curb ramps, residential and commercial driveways, striping and signage, and related improvements.
Funding Source: TDA Article 3
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, Design, Specs, Bidding); Construction Engineering (Inspection, Grant Close-out)
BHT ENGINEERING, INC.
Civil Engineering, Building Design & Construction Management RESUME Miguel Pantoja Jr.
Role:
Senior Project Manager /
Secretary
Education:
Bachelor of Art - Architecture
1999
California State Polytechnic
University, Pomona
Associate in ScienceArchitecture 1995
Bakersfield College,
Bakersfield CA
Experience:
BHT Engineering, Inc.,
December 2018 to Present
Helt Engineering, Inc.,
2012 to Jan. 2019
OrdizMelby Architects Inc.,
2003–2005
Addington Partnership,
1988 - 2003
RELEVANT EXPERIENCE:
Senior Project Manager / Secretary
As a Sr. Project Manager at BHT Engineering, Inc. Mr. Pantoja is involved in all design phases, as well as, construction management of Federal/State funded and public works and private sector projects.
His responsibilities include Institutional, Education, Residential, and Commercial building design. Mr. Pantoja has successfully worked in a variety of municipal public works, like the City of Taft Transit Station; City of Wasco Transit Station; City of Wasco Administration Building Remodel; City of McFarland City Hall Remodel; California City Westway Station, etc. He is responsible for project design, preparation of construction documents, specifications, construction cost estimates, and construction administration. Mr. Pantoja is proficient with AutoCAD Civil 3D, ArchiCAD, and DataCAD, among various other software packages. Mr. Pantoja has a vast knowledge of the ADAStandards.
Mr. Pantoja previously worked as an Intern Architect for OrdizMelby Architects Inc., in Bakersfield, CA. As a project manager/job captain, Mr. Pantoja assisted Project Architects during all design phases, including construction administration. He coordinated work in progress/projects with consultants and owners; Created red marks for draftsmen and review their work. Review/take projects to DSA and local agencies for final project approval. As an ArchiCAD Core member, developed strategies, training material, and office graphic standards and procedures to switch from DataCAD into ArchiCAD; trained and tutored production personal in the use of ArchiCAD (BIM) software. Mr. Pantoja has knowledge of City, State, and National building codes and regulations, Construction Industry Standards, as well as manufactures’ catalogs and specifications, in order to prepare and deliver construction documents.
CMAQ Transit Transfer Station. Wasco, CA
Project Manager: Provided Architectural and Construction Engineering for a CMAQ project in the City of Wasco.
The project scope included the construction a new building, landscaping and site lighting, this building became a landmark of the City of Wasco. Adjacent parking lot was later added with localfunding.
Funding Source: Federal (CMAQ) and Local funds
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Planning and Design) City Hall Remodel Project. Wasco, CA
Project Manager: Provided Architectural and Construction Engineering for a project in the City of Wasco. The project scope included the interior and exterior remodel of the City Hall Building, Installation of Pre-Manufactured building, landscaping and site lighting.
Funding Source: Local Funding
Owner: City of Wasco
Project Team Role: Preliminary Engineering (Design and Construction Administration) Miguel Pantoja Jr. RESUME
City Hall Remodel Project. McFarland, CA
Project Manager: Provided Architectural and Construction Engineering for a project in the City of McFarland. The project scope included the interior remodel of the City Hall Building.
Funding Source: Local Funding
Owner: City of McFarland
Project Team Role: Preliminary Engineering (Design and Construction Administration) New Animal Shelter Building. McFarland, CA
Project Manager: Provided Architectural and Construction Engineering services for the Planning and Design of a New Animal Shelter Building, Parking Lot, and Related Site Improvements. Project Currently Under Construction.
Funding Source: Federal (USDA)
Owner: City of McFarland
Project Team Role: Preliminary Engineering (Planning, Design, and Construction Administration) CDBG Project – Balsitic Park. City of California City, CA Project Manager: Provided Preliminary Engineering (Architectural Services) and Construction Engineering services for renovation improvements to bring Park restrooms into compliance with current Americans with Disabilities Act (ADA) code requirements. Kern County Planning and Natural Resources Department approved the allocation of CDBG funds for this purpose. Project is located at 7241 Landis Drive within the southeast corner of Balsitis Park.
The project scope included construction of new parking lot, installation of hot mix asphalt, construction of new curb & gutter, ADA compliant curb ramps; parking lot striping. The project included the installation of a premanufactured restroom building. Construction of the project was completed in September 25, 2018.
Funding Source: County CDBG and Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, Design, Bidding); Construction Engineering (Inspection, Materials testing, Close-out)
PTMISEA Park and Ride Project, City of California City, CA Project Manager: Provided Architectural and Construction Engineering services for the Design and construction of a New Transit Transfer Station Building, Parking Lot, and Related Site Improvements.
Funding Source: PTMISEA
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, Design); Construction Engineering (Inspection, Materials testing, Close-out)
Community Pool House Building, City of California City, CA Project Manager: Provided Architectural and Construction Engineering services for the Planning and Design of a New Community Pool Building, Parking Lot, and Related Site Improvements.
Funding Source: Local funds
APPENDIX 2 – REFERENCES
[email protected]
Owner: City of California City
Project Team Role: Preliminary Engineering (Survey, Planning, Design, Bidding) New Fire Station Building, City of California City, CA
Project Manager: Provided Architectural and Construction Engineering services for the Design and construction of a new Fire Station Building, Parking Lot, and Related Site Improvements.
Funding Source: Local funds
Owner: City of California City
Project Team Role: Preliminary Engineering (Planning & Design); Construction Administration (Review and Approve Construction Submittals, RFI’s)
City of California City – RFQ for On-Call Professional Engineering Services Craig Jones – City Manager
CITY OF TAFT
209 E. Kern Street
Taft, CA 93268
Phone: (661) 763-3144
Kameron Arnold, P.E. – City Engineer
CITY OF WASCO
746 8th St.
Wasco, CA 93280 Phone:
(661) 758-7204
Yerlys Hernandez – Public Works Director
CITY OF McFARLAND 401
W. Kern Ave.
McFarland, CA 93250 Phone:
(661) 792-3091
[email protected]
[email protected]
g
ATTACHMENT A
EXHIBIT 10-O1 – Consultant Proposal DBE Commitment
May 29, 2025
City of California City – RFQ for On-Call Professional Engineering Services