Cities Index.
Agenda

California City City Council
March 24, 2026

Document
Agenda
Meeting
March 24, 2026
Body
California City City Council
Pages
5
Original file
25.7 MB
Text extracted from the city's file for reading and search. Open the original on californiacity.granicus.com. That file is the official record.

CITY OF CALIFORNIA CITY
March 24, 2026
Marquette Hawkins
MAYOR
Jim Creighton

MAYOR PRO TEM
Della Clark
Ronald Smith

COUNCIL MEMBERS
Sean Grayson

INTERIM CITY

MANAGER
AGENDA

CITY COUNCIL/ HOUSING AUTHORITY/ SUCCESSOR AGENCY
REGULAR MEETING TUESDAY, MARCH 24, 2026 @ 5:00 PM

COUNCIL CHAMBERS
21000 HACIENDA BLVD., CALIFORNIA CITY, CA 93505 &

VIA ZOOM
If you need special assistance to participate in this meeting, contact the City Clerk at (760) 373-7140 or via email at [email protected]. We request a 24-hour notification prior to the meeting in order for the City to make reasonable arrangements to ensure accessibility. (28 CFR 35.102-35.104 American Disabilities Act Title II) Zoom instructions and notes:

Web Link: https://us06web.zoom.us/j/87988480756
Meeting ID: 879 8848 0756
Passcode: 288834

1. Public can dial into the Zoom line:
a. One tap mobile: +16694449171,87254527178# US
b. Dial the following number: +1 564 217 2000 US

2. Comments
a. Public must join Zoom Webinar to comment
b. Keep your mic on Mute until you are requested to speak c. Use the “Raise your Hand” button to request to speak or, d. Send a chat request to the City Clerk for a request to speak, and the City Clerk will unmute you.
e. When requested to speak, state your name for the record f. Re-mute when your time to speak has ended

CITY OF CALIFORNIA CITY
March 24, 2026
The public is urged to listen to the meeting in a quiet place to avoid background noise. We also request public to MUTE your audio device when not commenting to avoid disruption during meeting.
**Please take this time to turn off your cell phones ** CLOSED SESSION 4:00 PM

CALL TO ORDER

ROLL CALL
Councilmembers: Clark, Smith, Mayor Pro Tem Creighton, Mayor Hawkins

ADOPT THE AGENDA

PUBLIC COMMENT
Members of the public are welcome to address the City Council ONLY on those items listed on the Closed Session agenda. Each member of the public will be given (3) three minutes to speak

CLOSED SESSION
CS 1. PUBLIC EMPLOYMENT
Government Code Section 54957
Title: Interim City Manager.

CS 2. CONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATION Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2):

One case.

CS 3. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION Government Code Section 54956.9(d)(1)
One case: Michael J. Ellison v. City of California City, (Case No. BCV-24-104203)

REPORT OUT OF CLOSED SESSION

CITY COUNCIL CONVENES TO REGULAR MEETING
REGULAR MEETING 5:00 PM

CALL TO ORDER

PLEDGE OF ALLEGIANCE / INVOCATION
ROLL CALL –
Councilmembers: Clark, Smith, Mayor Pro Tem Creighton, Mayor Hawkins

CITY OF CALIFORNIA CITY
March 24, 2026

DEPARTMENT REPORTS
Finance City Clerk
Police Department City Manager
Code Enforcement Treasurer
Planning

CITY CLERK REPORTS/RECEIVED COMMUNICATIONS
J.M. Powers – March 16, 2026

CIVIC/COMMUNITY/ORGANIZATION ANNOUNCEMENTS

PUBLIC BUSINESS FROM THE FLOOR / PUBLIC COMMENT
This portion of the meeting is reserved for the public to address the City Council on any matter NOT on this agenda and over which the City Council has jurisdiction. Please state your name for the record and limit your comments to (3) three minutes. The City Council will receive the comments but cannot engage in back-and- forth discussion with the public or make any decision. The City Council can direct staff to bring the item back to a future agenda for discussion.

CONSENT CALENDAR

WAIVER OF FULL READING OF RESOLUTIONS AND ORDINANCES
Consideration to waive full-text reading of all Resolutions and Ordinances by single motion made at the start of each meeting, subject to the ability of the City Council / Agency to read the full text of selected resolutions and ordinances when the item is addressed by subsequent motion. All items on the consent calendar are considered routine, and non-controversial and will be approved by (1) one motion if no member of the council, staff, or public wishesto comment or ask questions. Public comments are to be limited to (3) three minutes. Roll call vote required.

CC 1. Approve City Check Register dated 03/06/26 – 03/19/26 CC 2. Approve Minutes for 03/10/2026 Regular Meeting
CC 3. Staff Report: Joe Barragan, Public Works Director ` Subject: A Resolution No. 26-3222 to Declare the Listed Vehicles and Mobile Property as Surplus Property and Authorize the Disposition of the Surplus Property in Accordance with the California City Municipal Code
Recommendation: Staff recommends that the City Council declare all items in Exhibit A as surplus so these items can be auctioned off or disposed of properly CC 4. Staff Report: Sean Grayson, Interim City Manager
` Subject: A Resolution No. 26-3223 Approving a License Agreement for Use of a Portion of the Mable Davis Senior Center, California City, California by Kern County Aging and Adult Services for the Senior Food Program
Recommendation: It is recommended that the City Council adopt the resolution approving the license agreement
CC 5. Staff Report: Sean Grayson, Interim City Manager
` Subject: Authorization to Release a Request for Proposals (RFP) for Comprehensive Review and Evaluation of Citywide User Fees (Fee Study) and Cost Allocation Plan Recommendation: It is recommended that the City Council authorize the release of the RFP CC 6. Staff Report: Sean Grayson, Interim City Manager
` Subject: Second Reading and Adoption of Ordinance No. 26-831: An Ordinance of the City Council

CITY OF CALIFORNIA CITY
March 24, 2026
of the City of California City, California, Adding Chapter 9 to Title 7 of the City’s Municipal Code Relating to the Skate Park in the City
Recommendation: Staff recommends that the City Council conduct a second reading of the Ordinance and adopt an Ordinance of the City Council of the City of California City, California, Adding Chapter 9 to Title 7 of the City’s Municipal Code Relating to the Skate Park in the City.

CONTINUED BUSINESS
CB 1. Staff Report: Sean Grayson, Interim City Manager
` Subject: Consideration of an Update on SDI Committee Requests and City Responses Recommendation: Staff recommends that the City Council have a discussion, take public comments, and provide directions to the City Manager on how to proceed in relation to the SDI Committee requests CB 2. Staff Report: Sean Grayson, Interim City Manager
` Subject: Consideration of City-Initiated Zone Text Amendment (ZTA) to Allow “Farmers Markets” as a Land Use Within the C-2 (Community Commercial) Zoning District or Amendment of the Temporary Uses Article of the Zoning Code to Allow Expanded Use of Farmers Markets by Temporary Use Permit
Recommendation: Staff recommends that the City Council provide formal direction to prepare a Zoning Text Amendment (ZTA) to allow and regulate “Farmers Market” in the manner best suited for applicants and the City
CB 3. Staff Report: Sean Grayson, Interim City Manager & Kenny Cooper, Finance Manager ` Subject: Approval of a Contract with Brown Armstrong Accountancy Corporation for Professional Auditing Services for Fiscal Years 2024-25 Through 2026-27 in an Annual Amount Not-To-Exceed $45,980
Recommendation: It is recommended that the City Council approve a contract with Brown Armstrong Accountancy Corporation for Professional Auditing Services for fiscal years 2024-25 through 2026-27 and authorize the City Manager to execute a contract

NEW BUSINESS
NB 1. Staff Report: Joe Barragan, Public Works Director ` Subject: Options to Address the Placement of Makeshift Memorials on City Property and Opportunities for Alternate Honoring of Community Members Recommendation: Staff recommends that the City Council have a discussion, take public comments, and provide directions to the City Manager on how to proceed in relation to monuments.

NB 2. Staff Report: Joe Barragan, Public Works Director ` Subject: A Resolution No. 26-3224 Approving the BHT Task Order for Phase I of the Rancho Tract Water Replacement Project
Recommendation: Staff recommends that the City Council adopt a Resolution of the City Council of the City of California City, approving BHT the task order for Phase 1 of the Rancho Tract Water Replacement Project, and authorize the Interim City Manager to sign the BHT Task Order in the amount of $74,425 for Phase I engineering of the Rancho Tracts Water Replacement Project.

NB 3. Staff Report: Joe Barragan, Public Works Director ` Subject: A Resolution No. 26-3225 of the City Council of the City of California City, Authorizing the Purchase of a New Front Loader from Clairemont Equipment for $255,336.96 Recommendation: Staff recommends that the City Council approve the resolution authorizing the purchase of a new front loader from Clairemont Equipment for $255,336.96.

CITY OF CALIFORNIA CITY
March 24, 2026
COUNCILMEMBER COMMENTS, AGENDA REQUESTS, AND AB1234 REPORTS This portion of the meeting is reserved for council members to present information, announcements, and items that have come to their attention. The Brown Act precludes Council, staff, or public discussion. Short staff responses are appropriate. The Council will take no formal action. A Council member may request the City Clerk to calendar an item for consideration at a future meeting or refer an item to staff.

ADJOURNMENT
AFFIDAVIT OF POSTING- March 19, 2026
I, John Paul Maier, Deputy City Manager / City Clerk for the City of California City, California, DO HEREBY CERTIFY that the foregoing notice was posted on all official City bulletin boards and the City’s website at least 72 hours prior to the meeting in compliance with the provisions of the Brown Act.

DR-FIN

COUNCIL AGENDA ITEM
March 24, 2026
TO: Honorable Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Kenny Cooper, Finance Manager
SUBJECT: FIN MONTHLY DEPARTMENT REPORT

1 DR-PD

COUNCIL AGENDA ITEM
March 24, 2026
TO: Honorable Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Shannon Hayes, Acting Director of Public Safety
SUBJECT: PD MONTHLY DEPARTMENT REPORT
February 2026 Stats

0 0 0 0 0
2022 2023 2024 2025 2026

MURDER - FEBRUARY
10 5 5 10 8
2022 2023 2024 2025 2026

TOTAL VIOLENT

CRIMES - FEBRUARY
11 12
17 10 11
2022 2023 2024 2025 2026

TOTAL PROPERTY

CRIMES - FEBRUARY
21 17 22 20 19
0 5
10 15
20 25
2022 2023 2024 2025 2026
TOTAL PART 1 CRIMES
Total Violent and Property Crimes Reported 2022 - 2026
February Part 1 Crimes - as of 3/9/2026
2 0 0 2 2
5 6 6
4 0
JANUARY 2026 PART 1

CRIMES BY AREA
0 0 1
5 2
7 1 3 0
FEBRUARY 2026 PART 1

CRIMES BY AREA
JANUARY 2026 vs FEBRUARY 2026, DOWN BY 24%
Part 1 Crimes January 2026 – 25
Part 1 Crimes February 2026 – 19
FEBRUARY 2026 – PATROL STATISTICS
Total Incidents (February): 1,170 Total Arrests (February): 19 Felony Arrests:14 Misd. Arrests: 5
Total Incidents (2026): 2,384 Total Arrests (2026): 41 Felony Arrests: 24 Misd. Arrests: 17
Calls for Service (February): 994 Calls for Service (2026): 1,988 Citations Issued (February): 9 Citations Issued (2026): 23 1 DR-CE

COUNCIL AGENDA ITEM
March 24, 2026
TO: Honorable Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Shannon Hayes, Acting Director of Public Safety
SUBJECT: CODE ENFORCEMENT MONTHLY DEPARTMENT REPORT
2

Page 1 of 5 ends

CITY COUNCIL

AGENDA ITEM

PLANNING DEPARTMENT REPORT
March 24, 2026
TO: The Honourable City Council
FROM: Anu Doravari, City Planner
Key Updates
• The revised Housing Element has been released for an additional 30-day public review period following City Council direction.
• Planning staff continues to process active development applications; several projects are pending applicant resubmittals.
• Staff is prioritizing Housing Element compliance and time-sensitive applications to meet statutory deadlines.
• Multiple applications have been identified as dormant due to lack of applicant activity.

Recently Approved Projects
Project Code /
Reference
Project
Name Project Type Location Current Status
SPR 26-01
(Major)
Blue Street
Holdings LLC
Cannabis/Industrial
Existing Facility Curtis Place
Director’s Hearing
completed; project
approved on March
13, 2026.

SPR 25-09
(Minor) CoreCivic, Inc. Correctional Facility Virginia Boulevard SPR approved on
February 26, 2026.

Active Projects
Project Code /
Reference
Project
Name Project Type Location Current Status
CUP 22-03 & SPR
22-36 (Major) RV Park Multi-Family Housing
South of Mendiburu
Road and west of
Yerba Boulevard
CEQA
Documents
Revision.

SPR 25-01 (Major)
6-Unit
Apartment
Complex
Multi-Family
Housing
83rd Street and
Catalpa Avenue
Site plan
revisions
ongoing.

SPR & CUP 26-02 West Mojave
Renewables
Photovoltaic
Solar/Industry
Northwest of Neuralia
& Washburn
Under staff
review
DR

Page 2 of 5 ends

Pending Applicant Action
Project Code
/ Reference Project Name Project Type Location Current Status SPR 25-16
(Major)
6-Unit
Apartment
Complex
MultiFamily
Housing
Catalpa &
82nd Street
Staff comments issued;
revised site plan pending.

SPR 25-17
(Major)
Cutting Edge
Investments
MultiFamily
Housing
North of
CCB &
Conklin
Blvd
Staff comments issued;
revised site plan pending.

SPR Major KK Park LLC Cannabis/
Industry Yerba Blvd
Application incomplete –
pending applicant submission of
CEQA documentation. Payment
not received.

SPR Major Apothio LLC
Agriculture/
Hemp/
Industry
Northwest
of Neuralia
&
Washburn
Application incomplete –
pending applicant submission of
CEQA documentation. Payment
not received.

Dormant Projects
The following projects are currently inactive due to lack of applicant response or resubmittal.

No staff resources are being allocated until action is received.

Project
Code /
Reference
Project
Name
Project
Type Location Current Status
SPR 25-05
(Major) IWVGA Pipeline Pipeline / Infrastructure
Approximately
50-mile
replacement
Dormant; CEQA
documentation remains
outstanding and no
recent applicant activity
has occurred.

SPR 25-10
(Major)
SCE Substation
Expansion
Public Utility
Infrastructure
Existing
substation site
Dormant; no recent
applicant response
following issuance of
initial Engineering
conditions.

CUP 25-03
(Major)
Emergency
Communication
Tower
Public
Infrastructure Galileo Hill
Dormant; no recent
activity or resubmittals
from the applicant.

Page 3 of 5 ends

Housing Element Update
• The revised Housing Element has been made available for a 30-day public review period. • Staff will present the document as a discussion item at the April 7 th Planning Commission
meeting to receive additional feedback
• The revised Housing Element draft document can be accessed here:
https://www.californiacity-ca.gov/CC/index.php.

Financial Report – January, February and March 2026
Summary of Planning activity and revenue for the current reporting period:

Page 4 of 5 ends
Page 5 of 5 ends

DR – CITY CLERK
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: John Paul Maier, MBA, MMC, Deputy City Manager / City Clerk SUBJECT: City Clerk’s Report
The City Clerk Department has produced the following activity statistics, reflecting its ongoing administrative and legislative support functions:

1. Resolutions Processed: Eight resolutions were reviewed, finalized, and processed, demonstrating the department’s continued role in supporting City Council actions and ensuring proper documentation of official decisions.

2. Ordinances Codified: A total of eight ordinances were transmitted to Municode for codification, ensuring that the City’s municipal code remains current, accurate, and accessible to the public.

3. Public Records Act Requests: The department responded to 12 Public Records Act requests, with three requests fully completed. This reflects the City Clerk’s commitment to transparency, compliance, and timely public access to information.

4. Special Event Permits Issued: Two special event permits were issued, facilitating community engagement while ensuring that all events met regulatory and safety requirements.

5. Business Licenses Processed: 10 business licenses were processed, supporting local economic activity and ensuring compliance with municipal licensing requirements.

6. Notice of Vacancy: One notice of vacancy for three seats on the Parks and Recreation Commission was sent to the Mojave Desert News.

7. Special Election Update: The Nomination Period ended on March 6, 2026, with two candidates filing for the City Council vacancy. Shawn Bradley and Isaac Barcelona qualified to be on the ballot for the June 2, 2026, Special Election. Candidate Forms are available for review in the City Clerk’s Office and were transmitted to the Kern County Election’s Office.

These statistics highlight the City Clerk Department’s essential role in maintaining legislative records, promoting transparency, and providing efficient administrative services to the public and other City departments.

DR - CITY MANAGER
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
SUBJECT: City Manager’s Report
March 10, 2026 City Council Meeting AB1234, Questions and Comments Follow-Up:

At the March 10, 2026, City Council meeting, there were questions and direction provided by the City Council. Below, please find the answers and responses to be shared with the City Council and the community
The following is an update on information, questions, or requests that came from agendized items:
• Direction was provided to use streets funds if possible, for the purchase of the crack sealer trailer that was approved for purchase at the meeting o There are not appropriated but unencumbered funds in either of the streets accounts for the purchase of the crack sealer trailer. The crack sealer trailer will be purchased using EIR funds and staff will request a transfer from the streets fund to the fund holding the EIR funds as part of the fiscal year 2026/27 budget development process.
• Direction was provided during the Joint SDI City Council item to bring additional information back to the City Council
o Team members from the City Attorney's Office and the City Manager have compiled a list of questions and items to address from the meeting. The responses and information will be provided as the information is available beginning with an item on the March 24, 2026, City Council agenda.
• Missing sign at Kenniston Street and California City Boulevard o The sign is the City's responsibility, not Caltrans as it may have been suggested.

The City is ordering signs soon and will include this one in the order. The sign will be installed along with other signs after they are received. • Credit card reader at the golf course.
o The golf course does not process credit cards currently. We will be working to address this either with our staff moving into next fiscal year or as part of the lease transition to a management company if directed by the City Council.

DR - CITY MANAGER
4898-7406-7085 v1
• Water meter replacement request.
o Staff has reached out to the commenter that had the request and will work on identifying the cause of the issue.
• City branding and using OHV as a theme to support economic development. o The City Clerk will be coordinating future social media planning with the Mayor (PIO) and integrating existing social media
• Cannabis final notice language in Cannabis Department Report. o The actual title of the letter that was sent last week was, "Notice of Noncompliance of Expired Temporary Occupancy Certificates" matching the next step after a final notice.

The following is an update on information, questions, or requests that came from AB1234 reports:

Councilmember Clark
• Library Re-Grand Opening Ceremony.
o No action from staff.
• Match the landscaping of the library to City Hall.
o We will include this in the planning for the new City Hall sign construction. We have also identified a possible project in partnership with Kern County to provide an ADA path of travel sidewalk from the Library to City Hall. • Clean up at Rite Aid.
o No action from staff.

Councilmember Smith
• Water usage in dollars on an annual basis at parks.
o We have water meters for all the various city facilities. We will find the total amount on an annual basis and report it out on the April 14, 2026, City Manager Department report.
• Annual revenue from park facilities and buildings.
o This number is very low due to the limited use of facilities by paying customers versus much higher use by non-paying customers. We will find the total amount on an annual basis and report it out on the April 14, 2026, City Manager Department report.
• Risk management, deductible to match insurance coverage for rentals. o We will work with our insurance broker on this and to identify the correct process to implement the requirements.

DR - CITY MANAGER
4898-7406-7085 v1
• Code enforcement for future issues like those that were at Rite-Aid before the cleanup. o The City’s municipal code is being reviewed as it relates to this request. The City has a registration program for Abandoned, Accessible and Distressed Real Property but it is applicable only to those in foreclosure not for sale like the former Rite-Aid.

The City can still enforce nuisances but we will look into improving our code to make an easier enforcement and compliance mechanism for properties like this one that need to be maintained.

Vice Mayor Creighton
• North side of fire station, no parking signs still there, did we put them there? o That parcel is owned by the Successor Agency to Redevelopment. The fire department placed the signs on the wooden fence along the border of the fire station property, but the City does not have appeared to have placed the no parking signs along the edges and interior of the lot. It is public property and not posted by the City, so the existing signs are not enforceable.
• Dr. Smith regarding airport and aviation-related uses. o The City Manager has a meeting coming up to discuss how the airport district (Mojave Air and Space Port) might be part of our process to reenvision the use of our airport, and/or contract out the operations of the facility. • Kiln at the Strata Center and the need for a permit from the air pollution district. o Staff followed up on this need. The kiln would likely need additional permitted venting in order to comply with this requirement. Since the City would be the permit holder, it would be a challenge to allow use of the kiln when City staff are not present. This item will need additional work before returning for consideration by the City Council.
• Monument sign at City Hall, where is the $17,000, where are the designs? o There was a donation of $5,000 for the sign and $12,000 for Balsitis Park at the same time. The City Clerk will be reaching out to the winner of the sign competition to reengage in conversation. What the art would be placed on (wood, block wall, etc.) has not been determined. We will work to scale the piece to size, determine how it will be placed, and how the landscape recommendations from Councilmember Clark might be included in the process.

Mayor Hawkins
• Reminder about makeshift monuments.
o Options for the City Council to consider memorial options including mechanisms to remove existing unapproved memorials will be before the City Council on March 24, 2026.
• Report on hangers and leasing at the airport.
o We will find the information and report it out on the April 14, 2026, City Manager Department report.

DR - CITY MANAGER
4898-7406-7085 v1
• Maya Angelou quote.
o No action from staff.

COUNCIL AGENDA ITEM
February 2026 Report
TO: Honorable Mayor and City Council
SUBJECT: TREASURER MONTHLY DEPARTMENT REPORT
Balance on Net Balance on Percent
1/31/2026 Transactions 2/28/2026 of Total
Bank of the Sierra -- General Checking $ 1,989,496 $ 1,001,469 $ 2,990,965 18.71% Bank of the Sierra -- Cannibas Checking $ 336,494 $ 311,096 $ 647,590 4.05% Sub-Total Operating Accounts $ 2,325,990 $ 1,312,566 $ 3,638,555 Balance on Net Balance on Percent
1/31/2026 Transactions 2/28/2026 of Total
Local Agency Investment Fund (122) $ 6,560,599 $ - $ 6,560,599 41.05% Kern County Investment Fund (9153) $ 4,757,157 $ - $ 4,757,157 29.77% Multi-Bank Securities (CD Manager) $ 1,025,634 $ (232) $ 1,025,403 6.42% Sub-Total Investment Accounts $ 12,343,391 $ (232) $ 12,343,159 Total City Operating Funds $ 14,669,380 $ 1,312,334 $ 15,981,714 100.00% Checking & CD Accounts 1/31/2026 Net Transactions 2/28/2026 Housing Corp. -- Bank of the Sierra, Checking $ 2,101,971 $ (8,010) $ 2,093,961 72.51% Housing Corp. -- Bank of the Sierra, CD 7653 $ 115,934 $ 290 $ 116,224 4.02% Housing Corp. -- Bank of the Sierra, CD 7654 $ 145,012 $ 363 $ 145,374 5.03% Housing Corp. -- Bank of the Sierra, CD 6574 $ 265,501 $ 664 $ 266,165 9.22% Housing Corp. -- Bank of the Sierra, CD 6582 $ 265,501 $ 664 $ 266,165 9.22% Total Housing Corporation Funds $ 2,893,919 $ (6,030) $ 2,887,889 100.00% Checking & CD Investment Accounts 1/31/2026 Net Transactions 1/31/2026 SDI -- Bank of the Sierra, Checking 6370 $ 240,054 $ (87,628) $ 152,426 0.16% SDI -- Bank of the Sierra CD 2389 $ 271,015 $ 678 $ 271,693 0.28% SDI -- US Bank Investments *$ 94,399,565 $ 664,998 $ 95,064,563 99.56% Total SDI Agency Funds $ 94,910,634 $ 578,048 $ 95,488,682 100.00% Checking & Investment Accounts 1/31/2026 Net Transactions 1/31/2026 Successor -- Bank of the Sierra, Checking 8870 $ 722,055 $ (440,656) $ 281,400 18.55% RDA/Successor -- US Bank Investments $ 862,083 $ 373,156 $ 1,235,239 81.45% Total Successor Agency Funds $ 1,584,138 $ (67,500) $ 1,516,638 100.00% Restricted SDI Accounts
Note: Interest earned from the SDI CD is directly deposited into the SDI checking account monthly.

Restricted RDA/Successor Agency Accounts
Restricted Housing Corporation Accounts
FROM: Keith Middleton, City Treasurer
The values presented in this report are extracted from End of Month bank and investments statements.

The General Funds investment portfolio consists of funds for operations, Capital Improvement Projects (CIP), water rate stabilization, administration replacements and reserves.

General Operating Accounts
General Investment Accounts
1 of 2
February 2026 Report

INVESTMENT POLICY
1/31/2026 2/28/2026
Beginning Market Value 94,071,553 94,399,565
Ending Market Value 94,399,565 95,064,563
328,012 664,998
1/31/2026 2/28/2026
Beginning Market Value - -
Ending Market Value - -
- -
1/31/2026 2/28/2026
Beginning Market Value 0 0
Ending Market Value 0 93,156
- 93,156
1/31/2026 2/28/2026
Beginning Market Value 0 0
Ending Market Value 0 280,000
- 280,000
1/31/2026 2/28/2026
Beginning Market Value 862,082 862,082
Ending Market Value 862,082 862,082
- -
Total RDA/Successor Investment Assets 862,083 1,235,239 Total "US Bank" Investment Assets 95,261,648 96,299,802 Market Value Summary - SUCCESSOR AGENCY Proj Area TAX RESERVE Investment Results (Acct. Number 211146003)
Market Value Summary - REDEVELOPEMENT AGENCY PROJ AREA TAX Investment Results (Acct. Number 211146000)
Market Value Summary - SUCCESSOR AGENCY Proj Area TAX INTEREST Investment Results (Acct. Number 211146001)
Market Value Summary - SUCCESSOR AGENCY Proj Area TAX PRINCIPAL Investment Results (Acct. Number 211146002)
RDA/Successor Agency Accounts
California City, California 93505

TREASURER'S MONTHLY REPORT OF INVESTMENT
The Treasurer shall invest the City's monies as permitted in the Citie's approved investment policy and approval of both the City Manager and Finance Director. The Treasurer shall consider current and projected cash needs in making such investments.

US Bank
SDI Account
Market Value Summary - CUSTODIAN ACCOUNT
Investment Results (Acct. Number 104388-010)
US Bank
2 of 2

NOTICE OF VACANCY

CALIFORNIA CITY PARKS AND RECREATION COMMISSION
NOTICE IS HEREBY GIVEN that there are three (3) vacancies on the California City Parks and Recreation Commission. The vacancies are for the terms that run from May 1, 2026, to April 30, 2028.

Interested residents in the City of California City are invited to apply for the vacant seats on the California City Parks and Recreation Commission.

Applications will be accepted from March 23, 2026, at 9:00 am to April 23, 2026, at 5:00 p.m. and are available in the City Clerk’s office located at City Hall, 21000 Hacienda Blvd., California City, CA 93505, and online at: https://www.californiacity-ca.gov/CC/images/ Appointment_Application.pdf. Applications must be submitted to the City Clerk in person, by mail, or via e-mail to [email protected] prior to the deadline of April 23, 2026, at 5:00 pm. A schedule for interviews will be established, and qualified applicants will be notified via email with details.

DATED: March 18, 2026
John Paul Maier, MBA, MMC, Deputy City Manager/City Clerk CC 1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Honorable Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Kenny Cooper, Finance Manager
SUBJECT: Approve City Check Register dated 03/06/2026-03/19/2026 BACKGROUND/ DISCUSSION:

The following checks have been prepared by the Finance Department. The items are provided to the Mayor and City Council for review and approval.

RECOMMENDATION:

Staff recommends the City Council discuss and approve the attached check register.

CITY OF CALIFORNIA CITY
March 10, 2026
Marquette Hawkins
MAYOR
Jim Creighton

MAYOR PRO TEM
Della Clark
Ronald Smith

COUNCIL MEMBERS
Sean Grayson

INTERIM CITY

MANAGER

MINUTES

CITY COUNCIL/ HOUSING AUTHORITY/ SUCCESSOR AGENCY
REGULAR MEETING TUESDAY MARCH 10, 2026 @ 5:00 PM

COUNCIL CHAMBERS
21000 HACIENDA BLVD., CALIFORNIA CITY, CA 93505 &

VIA ZOOM

CITY COUNCIL & SDI COMMITTEE
SPECIAL JOINT MEETING @ 5:00 PM OR THEREAFTER
If you need special assistance to participate in this meeting, contact the City Clerk at (760) 373-7140 or via email at [email protected]. We request a 24-hour notification prior to the meeting in order for the City to make reasonable arrangements to ensure accessibility. (28 CFR 35.102-35.104 American Disabilities Act Title II) Zoom instructions and notes:

Web Link: https://us06web.zoom.us/j/87988480756
Meeting ID: 879 8848 0756
Passcode: 288834

1. Public can dial into the Zoom line:
a. One tap mobile: +16694449171,87254527178# US
b. Dial the following number: +1 564 217 2000 US

2. Comments
a. Public must join Zoom Webinar to comment
b. Keep your mic on Mute until you are requested to speak c. Use the “Raise your Hand” button to request to speak or, d. Send a chat request to the City Clerk for a request to speak, and the City Clerk will unmute you.
e. When requested to speak, state your name for the record f. Re-mute when your time to speak has ended

CITY OF CALIFORNIA CITY
March 10, 2026
The public is urged to listen to the meeting in a quiet place to avoid background noise. We also request public to MUTE your audio device when not commenting to avoid disruption during meeting.
**Please take this time to turn off your cell phones ** CLOSED SESSION 4:00 PM
CALL TO ORDER:

MAYOR HAWKINS CALLED THE MEETING TO ORDER AT 4:00 P.M.

ROLL CALL
Councilmembers: Clark, Smith, Mayor Pro Tem Creighton, Mayor Hawkins

ALL PRESENT

ADOPT THE AGENDA
MOTION TO ADOPT THE AGENDA WITH THE REMOVAL OF CB 2 MADE BY MAYOR PRO TEM CREIGHTON, SECOND BY COUNCILMEMBER CLARK, CARRIED 4-0.

PUBLIC COMMENT
MAYOR HAWKINS CALLED FOR PUBLIC COMMENT. NO ONE SPOKE.

CLOSED SESSION
CS 1. CONFERENCE WITH LEGAL COUNSEL—EXISTING LITIGATION Government Code Section 54956.9(d)(1)
Two cases:

Hightower v. City of California City (Case No. BCV-24-103947) Pardue, Lafon v. City of California City
CS 2. CONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATION Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2):

One case.

CS 3. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Government Code Section 54957
Title: Interim City Manager

REPORT OUT OF CLOSED SESSION

CITY ATTORNEY PONTO REPORTED OUT- DIRECTION WAS GIVEN, AND COUNSEL WAS RECEIVED, AND THERE WERE NO FURTHER REPORTABLE ACTIONS.

CITY COUNCIL CONVENES TO REGULAR MEETING
REGULAR MEETING 5:00 PM

CITY OF CALIFORNIA CITY
March 10, 2026

CALL TO ORDER
MAYOR HAWKINS CALLED THE MEETING AT 5:02 P.M.

PLEDGE OF ALLEGIANCE / INVOCATION

MAYOR HAWKINS LED THE PLEDGE OF ALLEGIANCE, AND PASTOR MARK GOODELL PROVIDED THE INVOCATION.

ROLL CALL –
Councilmembers: Clark, Smith, Mayor Pro Tem Creighton, Mayor Hawkins

ALL PRESENT

DEPARTMENT REPORTS
Parks and Recreation
OHV
Housing
Cannabis

CITY CLERK REPORTS/RECEIVED COMMUNICATIONS
J.M. Powers – March 1, 2026

CIVIC/COMMUNITY/ORGANIZATION ANNOUNCEMENTS
MAYOR HAWKINS ASKED FOR CIVIC ANNOUNCEMENTS. SHAUNA ROYTEN SPOKE.

PUBLIC HEARINGS
PH 1. Public Hearing for Use of Community Development Block Grant (CDBG) Fiscal Year 2026/27 Funds A. Open Public Hearing
B. Staff Report: Joe Barragan, Public Works Director
C. Public Comment
D. Close Public Hearing
E. Discussion
F. Recommended Action: Staff recommends that the City Council

1. Conduct Public Hearing to solicit public input for the use of the CDBG funds

2. Close the public hearing.

3. Recommend one project to be submitted by staff with the CDBG application

4. Take other actions as desired
MAYOR HAWKINS OPENED THE PUBLIC HEARING AT 5:13 P.M.

MAYOR HAWKINS ASKED FOR PUBLIC COMMENT. TERRY LUCY, MICHAEL EDMINSTON,

MARK GOODELL, DWAYNE VASQUEZ, AL HUDSON,
MAYOR HAWKINS CLOSED THE PUBLIC HEARING AT 5:28 P.M.

MOTION TO ADOPT STAFF RECOMMENDATION ACTION MADE BY COUNCILMEMBER SMITH, SECOND BY MAYOR PRO TEM CREIGHTON, CARRIED 4-0, AND TO DIRECT STAFF TO PRIORITIZE THE SENIOR CENTER AS THE PRIMARY PROJECT.

MAYOR PRO TEM CREIGHTON REQUESTED TO AMEND THE MOTION TO INCLUDE A

DIRECTION TO STAFF TO USE ANY REMAINING FUNDS TOWARD THE POCKET PARK LOCATED AT THE MOBILE HOME PARK, AND THAT STAFF COORDINATES WITH MR. EDMINSTON TO PRIORITIZE THE WORK ORDER AT THE SENIOR CENTER. COUNCIL MEMBER SMITH AGREED TO THE AMENDMENT.

CITY OF CALIFORNIA CITY
March 10, 2026

MOTION TO ADOPT STAFF RECOMMENDATION ACTION MADE BY COUNCILMEMBER SMITH, SECOND BY MAYOR PRO TEM CREIGHTON, CARRIED 4-0, AND TO DIRECT STAFF TO PRIORITIZE THE SENIOR CENTER AS THE PRIMARY PROJECT, AS AMENDED.

PH 2. A Public Hearing to 1) Adopt a Resolution of the City Council of the City of California City Adopting the First Amendment to the Annual Budget for Fiscal Year 2025/26; 2) Adopt a Resolution of the City Council of the City of California City Adopting and Amended Citywide Master Fee Schedule; and 3) Authorize the Filling of the Existing Budgeted and Funded Dial-A-Ride Dispatcher/Driver Position
A. Open Public Hearing
B. Staff Report: Sean Grayson, Interim City Manager
C. Public Comment
D. Close Public Hearing
E. Discussion
F. Recommended Action: Staff recommends that the City Council

1. Conduct Public Hearing for Adoption of Resolution 26-3218 and Resolution 26-3217

2. Close the public hearing.

3. Adopt Resolution 26-3218, Resolution 26-3217, and authorize filing a position

4. Take other actions as desired
MAYOR HAWKINS OPENED THE PUBLIC HEARING AT 6:02 P.M.

MAYOR HAWKINS ASKED FOR PUBLIC COMMENT. THE FOLLOWING RESIDENTS SPOKE: J.M.

POWERS, AL HUDSON, INISHIA WHITE, JOHN FISHER, AND DUANE VASQUEZ.

MAYOR HAWKINS CLOSED THE PUBLIC HEARING AT 6:15 P.M.

MOTION BY COUNCILMEMBER SMITH, SECOND BY MAYOR PRO TEM CREIGHTON, CARRIED 4-0, TO ADOPT RESOLUTION 26-3217.

MAYOR HAWKINS OPENED THE PUBLIC HEARING AT 6:19 P.M.

MAYOR HAWKINS ASKED FOR PUBLIC COMMENT. THE FOLLOWING RESIDENTS SPOKE: JOHN FISHER.

MAYOR HAWKINS CLOSED THE PUBLIC HEARING AT 6:23 P.M.

MOTION BY COUNCILMEMBER CLARK, SECOND BY COUNCIL MEMBER SMITH, CARRIED 4-0, TO ADOPT RESOLUTION 26-3218, AS AMENDED TO UPDATE THE DEPOSIT FEE FOR PARKS FROM $50 TO $100 AND A STRIKETHROUGH ON THE RESOLUTION IN A SECTION THAT IS WRITTEN LAGUNA HILLS, UPDATING TO THE TEXT TO CALIFORNIA CITY.

MAYOR HAWKINS CALLED A RECESS AT 6:31 P.M.

MAYOR HAWKINS RECONVENED THE MEETING AT 6:43 P.M.

PH 3. A Public Hearing for Introduction and First Reading of Ordinance No. 26-831: An Ordinance of the City Council of the City of California City, California, Adding Chapter 9 to Title 7 of the City’s Municipal Code Relating to the Skate Park in the City
A. Open Public Hearing
B. Staff Report: Sean Grayson, Interim City Manager
C. Public Comment
D. Close Public Hearing
E. Discussion

CITY OF CALIFORNIA CITY
March 10, 2026
F. Recommended Action: Staff recommends that the City Council

1. Conduct Public Hearing for Introduction and first reading of Ordinance 26-831

2. Close the public hearing.

3. Hold first reading of Ordinance 26-831, waive reading of ordinance in its entirety, read by title only and schedule a second reading and adoption of ordinance on March 24, 2026

4. Take other actions as desired.

MAYOR HAWKINS OPENED THE PUBLIC HEARING AT 6:44 P.M.

MAYOR HAWKINS ASKED FOR PUBLIC COMMENT. NO ONE SPOKE.

MAYOR HAWKINS CLOSED THE PUBLIC HEARING AT 6:46 P.M.

MOTION BY MAYOR PRO TEM CREIGHTON, SECOND BY COUNCILMEMBER CLARK, CARRIED 4-0, TO APPROVE AND HOLD FIRST READING OF ORDINANCE 26-831, WAIVE READING OF

ORDINANCE IN ITS ENTIRETY, READ BY TITLE ONLY, AND SCHEDULE A SECOND READING AND ADOPTION OF ORDINANCE ON MARCH 24, 2026.

MAYOR HAWKINS NOTED THAT ITEM CB 1. WOULD BE TAKEN BEFORE THE CONSENT CALENDAR.

CONSENT CALENDAR
MOTION BY COUNCILMEMBER SMITH, SECOND BY COUNCILMEMBER CLARK, CARRIED 4-0, TO APPROVE THE CONSENT CALENDAR, WITH THE REMOVAL OF ITEMS CC 3. AND CC 5. FOR SEPARATE CONSIDERATION.

CC 1. Approve City Check Register dated 02/20/2026-03/05/2026 CC 2. Approve Minutes for 2/10/2026 and 2/24/2026 Regular Meetings CC 3. Staff Report: Joe Barragan, Public Works Director ` Subject: Approve the Purchase New Crack-Sealer Trailer to Support the Street Reconstruction and Transformation Initiative (SRTI)
Recommendation: Staff recommends that the City Council approve Resolution No. 26-3219 to authorize the Interim City Manager to purchase the new Crack-Sealer Trailer from Crafco with the use of ERI funds to support the SRTI initiative
ANONYMOUS, JM POWERS, AL HUDSON, ERIC SOTO, “L,” AND ANONYMOUS SPOKE.

MOTION BY COUNCILMEMBER SMITH, SECOND BY COUNCILMEMBER CLARK, CARRIED 4-0, TO ADOPT RESOLUTION 26-3219 OF THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY, CALIFORNIA, AUTHORIZING THE INTERIM CITY MANAGER TO PURCHASE THE NEW CRACKSEALER TRAILER FROM CRAFCO WITH THE USE OF ERI FUNDS TO SUPPORT THE SRTI INITIATIVE.

CC. 4. Staff Report: Joe Barragan, Public Works Director ` Subject: Adopt Resolution 26-3216 to Accept the Bid from Cornerstone Environmental Contractors, Incorporated for the Underground Storage Tanks Removal at the Municipal Airport, with a Total Contract Sum of $258,602, (Including a 10% Contingency, Soils Sampling and Project Management Costs), and Authorize the City Manager to Execute any Related Documents Recommendation: Staff recommends that the City Council approve the resolution to accept the bid from Cornerstone Environmental Contractors Inc. in the amount of $187,861.00 for the removal of underground storage tanks at the Municipal Airport; authorize the contingency and project management costs; and grant the City Manager authority to execute any related documents CC 5. Staff Report: Sean Grayson, Interim City Manager

CITY OF CALIFORNIA CITY
March 10, 2026
` Subject: Approval of an Agreement with Textron to Lease Twenty (20) New E-Z-GO Golf Carts for Five (5) Years in Annual Amount of $31,145.44 for Use at the City Owned Tierra Del Sol Golf Course
Recommendation: Staff recommends that the City Council approve the agreement with Textron EZ-GO and authorize the Interim City Manager to execute any related contracts or agreements MOTION BY COUNCILMEMBER SMITH, SECOND BY COUNCILMEMBER CLARK, CARRIED 4-0,

TO APPROVE THE AGREEMENT WITH TEXTRON EZ-GO AND AUTHORIZE THE INTERIM CITY

MANAGER TO EXECUTE ANY RELATED CONTRACTS OR AGREEMENTS, AS AMENDED, DIRECTING STAFF TO LEASE 10 GOLF CARTS, AND THE LEASE AGREEMENT SHOULD BE ABSORBED BY THE LESSEE.

CC 6. Staff Report: Joe Barragan, Public Works Director ` Subject: Approval of a Contract for Transportation Services with Transdev Services, Inc. to Provide Staffing Continuity for Dial-A-Ride Operations s Recommendation: Staff recommends that the City Council approve the proposed Resolution authorizing the use of temporary drivers for Dial-A-Ride (DAR) services and authorizing the Interim City Manager to execute an agreement between the City and Transdev Services, Inc.

CC 7. Staff Report: Sean Grayson, Interim City Manager
` Subject: Approve a Contract for Managed IT Services with Technic Business Solutions and Authorize the City Manager to Execute and Related Documents Recommendation: Staff recommends that the City Council approve the contract with Technic Business Solutions and authorize the City Manager to execute any related documents to facilitate the transition from the current vendor
CC 8. Staff Report: Inge Elmes, OHV Manager
` Subject: Authorize a Letter of Support to be Generated from the City of California City Regarding the Large-Scale Closure of OHV Routes in the West Mojave WEMO Area Recommendation: Staff recommends that a Letter of Support be issued by the City in support of keeping WEMO OHV routes open

CONTINUED BUSINESS

SPECIAL JOINT MEETING OF THE CITY COUNCIL AND THE SDI COMMITTEE CB 1. Staff Report: Sean Grayson, Interim City Manager
` Subject: Presentation to the Joint Meeting of the City Council and the SDI Committee on SDI Related Matters
Recommendation: Staff recommend that the City Council participate in the discussion with the SDI Committee and provide any needed direction to staff
THE FOLLOWING RESIDENTS SPOKE: ANONYMOUS, J.M. POWERS, AL HUDSON, DUANE VASQUEZ, AND ADMIN (ZOOM CALLER).

MOTION BY MAYOR HAWKINS, SECOND BY COUNCILMEMBER SMITH, CARRIED 4-0, TO

DIRECT THE CITY MANAGER AND CITY ATTORNEY TO REVIEW THE QUESTIONS RAISED BY

THE SDI COMMITTEE AND MEMBERS OF THE PUBLIC FROM THE SPECIAL JOINT MEETING OF THE SDI COMMITTEE, ADDING SPECIFIC REVIEW OF THE QUESTIONS RAISED ABOUT THE $1.3 MILLION IN BONDS.

MOTION BY COUNCILMEMBER SMITH, SECOND BY COUNCIL MEMBER CLARK, CARRIED 4-0,

TO DIRECT THE CITY MANAGER AND CITY ATTORNEY TO ENSURE THAT THE SDI

COMMITTEE AND THE MATTERS OF THE SDI COMMITTEE REFLECT THE CALIFORNIA CITY MUNICIPAL CODE.

CITY OF CALIFORNIA CITY
March 10, 2026

REGULAR MEETING RESUMES
CB 2. Staff Report: Sean Grayson, Interim City Manager
` Subject: Consideration of City Initiated Zone Text Amendment (ZTA) to Allow “Farmers Markets” as a Land Use Within the C-2 (Community Commercial) Zoning District or Amendment of the Temporary Uses Article of the Zoning Code to Allow Expanded Use of Farmers Markets by Temporary Use Permit
Recommendation: Staff recommends that the City Council provide formal direction to prepare a Zoning Text Amendment (ZTA) to allow and regulate “Farmers Market” in the manner best suited for applicants and the City
THIS ITEM WAS REMOVED FROM THE AGENDA.

NEW BUSINESS
NB 1. Staff Report: Inge Elmes, OHV Manager
` Subject: Adopt A Resolution of the City Council of the City of California City Authorizing the Application for the Purchase or Lease of Public Lands From the Bureau of Land Management Under the Recreation and Public Purposes Act
Recommendation: Staff recommends that the City Council adopt Resolution No. 26-3221.

MOTION BY COUNCIL CLARK, SECOND BY MAYOR PRO TEM CREIGHTON, CARRIED 4-0, TO RESOLUTION NO. 26-3221.

PUBLIC BUSINESS FROM THE FLOOR / PUBLIC COMMENT
This portion of the meeting is reserved for the public to address the City Council on any matter NOT on this agenda and over which the City Council has jurisdiction. Please state your name for the record and limit your comments to (3) three minutes. The City Council will receive the comments but cannot engage in back-and- forth discussion with the public or make any decision. The City Council can direct staff to bring the item back to a future agenda for discussion.

COUNCILMEMBER COMMENTS, AGENDA REQUESTS, AND AB1234 REPORTS This portion of the meeting is reserved for council members to present information, announcements, and items that have come to their attention. The Brown Act precludes Council, staff, or public discussion. Short staff responses are appropriate. The Council will take no formal action. A Council member may request the City Clerk to calendar an item for consideration at a future meeting or refer an item to staff.

ADJOURNMENT
MAYOR HAWKINS ADJOURNED THE MEETING AT 9:20 P.M.

AFFIDAVIT OF POSTING- March 5, 2026
I, John Paul Maier, Deputy City Manager / City Clerk for the City of California City, California, DO HEREBY CERTIFY that the foregoing notice was posted on all official City bulletin boards and the City’s website at least 72 hours prior to the meeting in compliance with the provisions of the Brown Act.

CC 3

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Joe Barragan, Public Works Director
SUBJECT: A Resolution to Declare the Listed Vehicles and Mobile Property as Surplus Property and Authorize the Disposition of the Surplus Property in Accordance with the California City Municipal Code
BACKGROUND/ DISCUSSION:

According to Section 3-2.403 of the City of California City (“City”) Municipal Code, the City Council shall determine whether personal property of an estimated value of more than $250.00 is surplus to City needs. Surplus Property is defined as “the condition which exists when real or personal property is no longer needed for City purposes.” All the listed property in Exhibit A of the attached Resolution would be costly for the City to repair or convert to an emission standard acceptable to the Eastern Kern Air Pollution Control Board.

Due to these costs, these items are not usable for the City. Should the City Council agree that all items in Exhibit A are surplus, the City would then auction off all the items through a Public Auction or use other means to achieve the highest cost of recovery for the greatest number of items.

FISCAL IMPACT:

Revenue generated from the sale of any of the vehicles or equipment will be allocated to the department of origin budget with the amounts to be determined on actual sales.

RECOMMENDATION:

Staff recommends that the City Council declare all items in Exhibit A as surplus so these items can be auctioned off or disposed of properly.

ATTACHMENTS:

1. Resolution with Exhibit A
4926-0576-1945 v1 Page 1 of 2
RESOLUTION NO. 26-3222

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CALIFORNIA CITY, CALIFORNIA, DECLARING THE LISTED

PROPERTY AS SURPLUS AND AUTHORIZING DISPOSITION OF THE

LISTED PROPERTY IN ACCORDANCE WITH THE CITY OF

CALIFORNIA CITY MUNICIPAL CODE
The City Council of the City of California City (hereafter referred to as the “City”) does resolve as follows:

WHEREAS, the City of California City (“City”) has been storing equipment that is obsolete in the City Public Works yard; and
WHEREAS, the City’s Public Works department needs to clear out this equipment to provide much-needed space at the Public Works yard; and WHEREAS, at Exhibit A is a list of the equipment to be declared as surplus property as defined in California City Municipal Code Section 3-2.402; and WHEREAS, the City has and will follow the procedures for the sale of surplus property are found in Title 3, Chapter 2, Article 4 of the City of California City Municipal Code and as provided for in this resolution.

NOW, THEREFORE BE IT RESOLVED, DETERMINED, AND ORDERED BY THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY, CALIFORNIA, AS FOLLOWS:

SECTION 1: The above recitals are true and correct.

SECTION 2: The City Council does hereby declare the listed property (at Exhibit A attached hereto) as surplus and authorizes the City Manager or thier designee to auction off or dispose of the listed property in accordance with the City of California City Municipal Code.

SECTION 3: City Clerk shall certify to the passage and adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this ___ day of _________________ 2026. __________________________
Marquette Hawkins
Mayor
4926-0576-1945 v1 Page 2 of 2
ATTEST: APPROVED AS TO FORM:
___________________________ __________________________
John Paul Maier Victor M. Ponto,
City Clerk City Attorney

CERTIFICATION
I, John Paul Maier, City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the ____ of ______________ 2026, by the following vote, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this ____day of _________, 2026. __________________________
John Paul Maier
City Clerk
ID Year Vehicle Description License VIN Mileage
3006 2014 2014 Chevrolet Tahoe 1478451 1GNLC2E05ER177212 118,052 3007 2014 2014 Chevrolet Tahoe 1478452 1GNLC2E05ER177002 159,753 3009 2017 2017 Chevrolet Tahoe 1516209 1GNSKDEC8HR205903 108,383 3010 2017 2017 Chevrolet Tahoe 1516210 1GNSKDEC2HR206254 111,618 3011 2017 2017 Chevrolet Tahoe 1516211 1GNSKDEC6HR205916 103,399 3012 2017 2017 Chevrolet Tahoe 1516212 1GNSKDEC0HR204938 91,093 309 2008 2008 Ford Crown Vic 1311404 2FAFP71V78X180024 174,057 310 2011 2011 Ford Crown Vic 1376927 2FABP7BV3BX175973 232,976 314 2006 2006 Ford Crown Vic 1223485 2FAHP71W46X107546 182,386 321 2011 2011 Ford F150 1376840 1FTFW1EF9BKD86923 118,835 322 2011 2011 Ford F150 1376841 1FTFW1EF0BKD88924 134,377 327 2011 2011 Ford Crown Vic 1390882 2FABP7BV8BX180294 121,704 328 2011 2011 Ford Crown Vic 1390881 2FABP7BV2BX180355 163,938 384 2006 2006 Ford Expedition 1297553 1FMPU16526LA47044 109,500 ID Year Vehicle Description License VIN Mileage
122 2010 Eldor BU E450 Passenger Bus 1304767 1FDFE4FS2ADA78958 138,000 123 2010 Eldor BU E450 Passenger Bus 1304768 1FDFE4FS4ADA78959 120,000 131 2005 Chevy Colorado 1476172 1GCDT196X58253423 154,863 154 2008 Ford Crown Vic 1311405 2FAFP71V58X180023
200 2008 Aztec Utility Trailer 1353384 1A9BU08178U715246 59 202 1998 Ford Expedition 1006174 1FMPU18L6WLA69463 232,507 203 2006 Ford F250 1230943 1FTNF20Y16EB58638 277,902
204 2001 Dodge Dakota PU 1501447 1B7GGZ6X21567897 102,581 205 2003 Ford PU 350 1501445 1FDSF31S13ED67310 137,039
208 N/A Arc Welder SE328649 726723 2,000
209 N/A ESSIK CEMENT MIXER LZ SE330766 6296814
210 N/A 2 AxleTrailer 4BN7635 EA607283
214 1990 WALK BEHIND CONCRETE SAW N/A 9001507 100
215 2001 Ford Motor Ranger 1480539 1FTZR15E21TA83373 121,241 219 1990 CASE Forklift 586E No Plate S/N JJG0068346 2,277 222 1991 CASE Backhoe 580K No Plate S/N JJG0030389
223 2004 CASE Backhoe 580M No Plate N4C303670 7,827
224 1997 CASE Backhoe 580L No Plate JJG0235891 7,405
225 1989 CASE SL-2 RAMMER (Compactor) No Plate 841240110 226 1989 CASE Vibra-Plate No Plate S/N 840220245
229 2015 160GLC John Deere Tractor No Plate 1,232
231 2005 Chev/Colorado PU 1476712 1GCDT196X58253423 154,863 238 1999 Ford F250 1011899 1FDXF46FF3XEA66230-D 277,289 242 2003 Ford Crown Victoria 1139852 2FAFP71W73X152175 163,380 244 2000 Ford F150 1104417 1FTRF17WXYKB13735 250,061
246 1995 Ford Crane F800 1139819 1FDPF80C5SVA68799 22,470 251 2006 Ditch Witch Trencher No Plate CMWRT40XT60001475 89 253 2012 GMC Terrain 1413391 2GKALMEK4C6383504 32,251
Yale Forklift N543672/GLC040AFNUAF083
263 Club Cart
264 2000 Ford Ranger 1700835 1FTYR10V54PB14265
405 1977 AERIO SPRAY RIG 323267 SPC200A
411 2004 Ford F350 SD 1410400 1FDSF34L04EB73650 161,641 418 1987 Trailer 323052 11796
425 2008 Kasi Infra-red Trailer truck mounted asphalt reclaimer 1321861 1K9AR142786C172183 426 2008 Kaufman Trailer 1321848 5SHFH35378B000539
428 2008 Int'l Dump Truck 1291198 1HTWHAAT68J640417 29,841 429 1990 Broyhill SE319766 M-TP150RH
California City Vehicle Surplus List

EXHIBIT A
California City Police Department List
California City Public Works Department List

Page 1 of 2 ends

ID Year Vehicle Description License VIN Mileage
434 1988 Air Compressor CE-11916 463
435 1989 CASE SKIP LOADER 621 JAK0020679 7,736
438 1989 Eager B BT22--5TD 327552 112AAH205KL033609
440 1985 Champion-Grader SE316686 710A15718124172 4,025 441 1990 Groundhog Drill 3034-1
443 1993 MB Street Striper 245 50159 608
444 1993 Vermeer 1250Brush Chip 1VRC14132P1003559 43
447 1995 Ford F800 Dump Truck 1001345 1FDPF80C6SVA68794-D 6,581 448 1999 Freight 32G-Freightliner (Sweeeper) 1051161 1FV67FAA3XHA442407 4,103 451 Sealer N/A Not Required
470 1991 Trailer 915657 6CAUSO811MT087356
473 1996 Ford F250 1480538 2FTHF25H1TCA64220 366,557
474 1995 Champ Grader S/N X025646 6,292
475 2004 SM-250-Sweepmaster S/N 29979-012 1,235
476 2000 Freightliner 32G w/ Truck 9B55769 1FUWHLBA8YHB96014 211,817 477 2008 Crafco Crack Sealer CRAFCO 1C9SY101381418116 569 478 1985 DICO Cone Trailer 4BJ9168 10DAU12S8FA006362
484 2003 KIA Sorento 1164083 KNDJC733035080949
485 Concrete Saw
487 2022 Ford 03284R3 !FDF2A62NEF66883
California City Public Works Department List (Continued)

Page 2 of 2 ends

CC 4
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
SUBJECT: Adoption of a Resolution Approving a License Agreement for Use of a Portion of the Mable Davis Senior Center, California City, California by Kern County Aging and Adult Services for the Senior Food Program
BACKGROUND/ DISCUSSION:

Kern County Aging and Adult had a license agreement with the City of California City for the use of a portion of the Mable Davis Senior Center for their Senior Food Program beginning in February 2019. The term of the agreement was (6) months. The original purpose was to have the California City location to supplement the Rosamond location (Hummel Hall) as it was undergoing renovations. It has since been determined that the California City site should continue to operate in addition to the Rosamond location. The County was allowed to use the Senior Center location past the expiration of the term of the agreement as a “hold over” tenant to continue providing the senior nutrition congregate meals.

The County reports that they served 455 seniors in 2025 with an average of 37 seniors who visited the facility for the program each month.

The County has requested an updated agreement. A draft agreement is attached as is a resolution to approve the agreement and authorize the City Manager to sign the agreement substantially in the form attached to the resolution and approved as to form by the City Attorney.

FISCAL IMPACT:

None with this action. The City continues to be responsible for the cost of utilities.

RECOMMENDATION:

It is recommended that the City Council adopt the resolution approving the license agreement.

ATTACHMENTS:

Resolution 26-32XX
License Agreement Draft
RESOLUTION 26-3223

Page 1 ends

RESOLUTION APPROVING A LICENSE AGREEMENT FOR

USE OF A PORTION OF THE MABLE DAVIS SENIOR CENTER

CALIFORNIA CITY, CALIFORNIA
WHEREAS, The City has provided the Kern County Aging and Adult Services space to provide their Senior Food Program at the Mable Davis Senior Center since 2019; and WHEREAS, The agreement is now expired and the County continues to provide their services under a “hold over” provision; and
WHEREAS, The City wishes the County to continue to provide this lifeline service to the community; and
WHEREAS, The new license agreement attached as Exhibit “A” to this resolution updates the now expired agreement and allows for the continued operations of the program.

NOW, THEREFORE BE IT RESOLVED, DETERMINED, AND ORDERED BY THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY, CALIFORNIA AS FOLLOWS:

SECTION 1: The attached License Agreement for Use of a Portion of the Mable Davis Senior Center by the Kern County Aging and Adult Services is approved.

SECTION 2: The City Manager is authorized to sign the agreement substantially in the form attached in Appendix “A” and approved as to form by the City Attorney.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 24th day of March 2026.
__________________________
Marquette E. Hawkins, Mayor
RESOLUTION 26-3223

Page 2 ends

ATTEST: APPROVED AS TO FORM:
___________________________ __________________________
John Paul Maier, City Clerk Victor M. Ponto, City Attorney [THIS SPACE INTENTIONALLY LEFT BLANK]

CERTIFICATION
I, John Paul Maier, City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 26th of March 2026, by the following vote, to wit:

RESOLUTION 26-3223

Page 3 ends

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this 24th day of March 2026. __________________________
John Paul Maier, City Clerk

APPENDIX A
License Agreement
4918-9220-2904 v4

LICENSE AGREEMENT

FOR USE OF A PORTION OF THE MABLE DAVIS SENIOR CENTER

CALIFORNIA CITY, CALIFORNIA
(County of Kern – City of California City)
4918-9220-2904 v4 i
Table of Contents
RECITALS ..................................................................................................................................... 1 LICENSE........................................................................................................................................ 1

1. Premises........................................................................................................................... 1 a. Third Party Users............................................................................................................ 1 b. Holidays.......................................................................................................................... 2

2. Term................................................................................................................................. 2

3. Rent.................................................................................................................................. 2

4. Purpose............................................................................................................................. 2

5. Utilities............................................................................................................................. 2

6. Ingress/Egress.................................................................................................................. 3

7. Furniture, Fixtures and Equipment .................................................................................. 3

8. Maintenance..................................................................................................................... 3

9. Damage or Destruction of Premises ................................................................................ 3

10. Indemnification................................................................................................................ 3

11. Liability Insurance ........................................................................................................... 4 a. City’s Maintenance of Insurance .................................................................................... 4 b. County’s Maintenance of Insurance ............................................................................... 4

12. Notices ............................................................................................................................. 4

13. Conflict of Interest ........................................................................................................... 5

14. Authority to Bind County ................................................................................................ 5

15. Modifications of License ................................................................................................. 5

16. Enforcement of Remedies................................................................................................ 5

17. Incorporation of Prior Agreements.................................................................................. 5

18. Severability ...................................................................................................................... 5

19. Venue ............................................................................................................................... 6

20. No Third Party Beneficiaries........................................................................................... 6

21. Authorization ................................................................................................................... 6

22. Captions........................................................................................................................... 6

23. Time of Essence............................................................................................................... 6 Exhibit “A” – Premises................................................................................................................ 7 4918-9220-2904 v4 Page 1 of 7

LICENSE AGREEMENT

FOR USE OF A PORTION OF THE MABLE DAVIS SENIOR CENTER

CALIFORNIA CITY, CALIFORNIA
(County of Kern – City of California City)
This License (“License”) is executed at Bakersfield, California on __________________, 2026 (“Execution Date”) by and between the COUNTY OF KERN (“County”) and the CITY OF CALIFORNIA CITY (“City”), both political subdivisions of the State of California. County and City are referred to individually as a “Party” and collectively as the “Parties.” RECITALS:

A. City owns real property commonly known and referred to as the Mable Davis Senior Center, located at 10221 Heather Avenue in California City, County of Kern, State of California (“Center”).

B. The County’s Aging and Adult Services Department provides many services to the County’s population including the residents of California City.

C. County, through its Aging and Adult Services Department has utilized a portion of the Center since 2019 to operate a senior nutrition program for senior citizens in the East Kern area (“Program”).

D. City desires to allow the County to continue to use the Center at very minimal cost in exchange for providing City residents meals consistent with the Program.

E. The Parties desire to continue the Program out of the Center for the benefit of the general public through the execution of this License.

LICENSE:

1. Premises: City grants County, its agents, officers, employees, contractors and volunteers permission to utilize the Mable Davis Senior Center, located at 10221 Heather Avenue in California City, County of Kern, State of California, depicted on the attached Exhibit “A” (“Premises”), to operate the Program. At a minimum, County shall have access to the Premises between the hours of 6:30am and 2:00pm, Monday through Friday. County shall have exclusive control over those portions of the Center as identified by internal signage as the “dining room” and “kitchen” during the hours identified. In the event that the County chooses not to utilize the Premises during the hours specified, County shall notify the City as soon as practicable. a. Parking - County shall have the non-exclusive right to parking in the City’s parking lot adjacent to the Center for Program staff’s personal vehicles during Program hours, and for one hour before and one hour after Program hours. Use of the parking lot 4918-9220-2904 v4 Page 2 of 7
during any other time requires prior City approval. .
b. Third Party Users – As it pertains to the non-exclusive portions of the Center as depicted at Exhibit “B,” City may allow use of these non-exclusive portions of the Premises to other parties and hold those third-party users responsible for leaving the Premises and all equipment, appliances, and supplies in the same condition as existed prior to that party’s use. County shall not provide cleanup or janitorial services for non-Program third-party uses. City shall be liable for any losses, liabilities, charges, damages, claims, liens, causes of action, awards, judgments, costs and expenses that may result from nonProgram third- party use of the Premises. c. Unavailability – In the event that the City cannot make the Premises available for the County’s use as described herein, the City shall provide the County notice of such unavailability as soon as practicable and if possible a minimum thirty (30) days notice. City may also provide County with a calendar or list of days when the Premises are unavailable, prior to the start of a new calendar year.

2. Term: The initial term of this License (“Term”) shall commence on the Execution Date and terminate three (3) years thereafter, with annual options to extend for a total of five (5) years upon mutual agreement of both parties, unless sooner terminated as provided in this License.

3. License Fee: As and for consideration, County and City agree that only a minimal monetary License Fee shall be due or payable for the County’s possession, occupancy, and use of the Premises. The monthly License Fee shall be one dollar ($1.00) (“License Fee”) for the entire Term of this Agreement. No recurring License Fee payments shall be required, and County’s use of the Premises shall be provided for a cost of one dollar ($1).

Each month of occupancy shall be in consideration solely for the County’s right to possess, occupy, and use the Premises for the applicable period for services as described herein. In the event County occupies the Premises for a partial month at any time, no prorated License Fee shall be due.

4. Purpose: The Premises shall be used for the purpose of conducting business of the County and its assigns and/or subtenants to, use to prepare, serve and/or distribute meals to senior citizens. County shall not use or permit the Premises to be used for any other purpose without the prior written consent of City. County shall not do or permit any act or thing to be done upon the Premises that constitutes a nuisance or which may disturb or interfere with any activities or use at Central Park, neighboring properties or the quiet enjoyment of City.

5. Utilities: City shall pay, during the Term, and during any extension or holdover, for all utilities used by County in connection with its operations on the Premises. The term “utilities” for the purposes of this License shall include, without limitation, gas, electricity, water, 4918-9220-2904 v4 Page 3 of 7
sewer, trash and refuse service, and telephone and internet service.

6. Ingress/Egress: County, its agents, officers, employees, invitees, and clients shall have a reasonable right of way over real property owned and controlled by City for ingress to and egress from the Premises for pedestrian and vehicular traffic.

7. Furniture, Fixtures and Equipment: City shall make available for County’s use, those tables, chairs, and other equipment presently located at the Premises. County staff shall be responsible for setting up tables and chairs provided by the City, and returning the Premises to the same condition as prior to setup when leaving the Premises. Upon prior approval by City, County may provide storage cabinets for County use and may remove the cabinets at any time. County shall not remove City’s property from the Premises.

8. Maintenance: City shall be responsible for all interior and exterior maintenance of the Premises, including janitorial service. City shall also be responsible for maintaining all common and parking areas to include landscaping and sprinkler systems.

9. Damage or Destruction of Premises: County shall restore all City property damaged or destroyed as a result of County’s activities on the Premises in connection with this License to such condition as existed prior to the Execution Date.

10. Indemnification:
a. City Indemnification: Upon request of County, City shall indemnify and defend County, its governing board, commissions, elected and appointed officials, employees, agents, and authorized representatives (collectively, “Indemnified Parties”), and each of them, from and against any and all actions, lawsuits, proceedings, damages, losses, causes of action, costs, expenses, claims, and fines (“Claims”), including fees and costs of County Counsel and outside counsel retained by County, costs of County staff time, investigation, expert and consultant fees and costs, and damages, including liability for personal injuries or death or property damage, and workers’ compensation claims or suits arising from or connected with any services performed under this License on behalf of City by any person or entity or arising out of or in any way connected with the acts or omissions of City, its employees, agents, independent contractors, or invitees. b. County Indemnification: Upon request of City, County shall indemnify and defend City, its council, commissions, elected and appointed officials, employees, agents, and authorized representatives (collectively, “Indemnified Parties”), and each of them, from and against any and all actions, lawsuits, proceedings, damages, losses, causes of action, costs, expenses, claims, and fines (“Claims”), including fees and costs of 4918-9220-2904 v4 Page 4 of 7
City Attorney’s Office and outside counsel retained by City, costs of City staff time, investigation, expert and consultant fees and costs, and damages, including liability for personal injuries or death or property damage, and workers’ compensation claims or suits arising from or connected with any performance under this License on behalf of County by any person or entity or arising out of or in any way connected with the acts or omissions of County, its employees, agents, independent contractors, or invitees.

11. Liability Insurance:
a. City’s Maintenance of Insurance – City shall obtain and maintain in full force during the term of this License a policy of bodily and property damage liability insurance insuring the Indemnified Parties against liability arising out of the use, occupancy, installation, maintenance, or repair of the Premises in an amount equal to the policy limits, which shall not be less than $1,000,000 per occurrence. City shall file with the County's General Services Department, a certificate of insurance evidencing the insurance required by this License. If City shall fail to furnish evidence thereof to County or let such insurance lapse, County may immediately terminate this License. b. County’s Maintenance of Insurance – County shall maintain in effect during the Term and any extensions thereof, its General Liability Program under which it shall have a retention and such excess insurance in an amount not less than $2,000,000 in the aggregate with combined liability for personal injury and property damage. County shall maintain in effect throughout the Term and any extensions thereof, its Worker’s Compensation and Employer’s Liability under which it shall have a retention and such excess insurance in an amount not less than $1,250,000. All exposures, including contractual liability, arising out of the County’s operations on the Premises or use and maintenance of the Premises are covered by the County’s self-insurance program undertaken pursuant to California Government Code Section 990. Upon request, County shall provide a letter of self-insurance from County’s Risk Manager evidencing the same.

Notwithstanding anything to the contrary, City acknowledges that County’s self-insurance program is deemed to satisfy all insurance requirements as set forth herein.

12. Notices: All notices herein provided to be given, or which may be given, by either Party to the other shall be deemed to have been fully given when made in writing and three (3) days after deposited with the United States Postal Service, Registered or Certified, postage prepaid and addressed as follows:

To City: City of California City
Attn: Sean Grayson
21000 Hacienda Blvd.

California City, CA 93505
4918-9220-2904 v4 Page 5 of 7
To County: County of Kern
Property Management
1115 Truxtun Avenue, 3rd Floor
Bakersfield, CA 93301
and
Aging & Adult Services
5357 Truxtun Avenue
Bakersfield, CA 93309
The address to which the notices shall be mailed may be changed by providing written notice to the other Party. Nothing contained herein shall preclude providing notice by personal service.

13. Conflict of Interest: The Parties to this License have read and are aware of the provisions of Section 1090, et seq. and Section 87100, et seq. of the Government Code relating to conflict of interest of public officers and employees. The Parties agree that they have no actual knowledge of any financial or economic interest of any public officer or employee of County or City relating to this License. The Parties hereto shall comply with the requirements of Government Code Section 87100, et seq. during the term of this License.

14. Authority to Bind County: It is understood that Licensee, in its performance of any and all duties under this License, except as otherwise provided in this License, has no authority to bind County to any Licenses or undertakings with a third party.

15. Modifications of License: This License may be modified in writing only, signed by the Parties in interest at the time of the modification.

16. Enforcement of Remedies: No right or remedy herein conferred on or reserved to County or City is exclusive of any other right or remedy herein or by law or equity provided or permitted, but each shall be cumulative of every other right or remedy given hereunder or now or hereafter existing by law or in equity or by statute or otherwise, and may be enforced concurrently from time to time.

17. Incorporation of Prior Agreements: This License contains all agreements of the Parties with respect to any matter mentioned herein. No prior License or understanding pertaining to any matter contained in this License shall be effective. This License may be modified in writing only, signed by the Parties in interest at the time of the modification.

18. Severability: Should any part, term, portion or provision of this License be decided finally to be in conflict with any law of the United States or the State of California, or otherwise be unenforceable or ineffectual, the validity of the remaining parts, terms, portions, or 4918-9220-2904 v4 Page 6 of 7
provisions shall be deemed severable and shall not be affected thereby, provided such remaining portions or provisions can be construed in substance to constitute the License which the Parties intended to enter into in the first instance.

19. Venue: This License has been entered into and will be performed within the State of California. Accordingly, the Parties hereto agree that the provisions of this License will be construed pursuant to the laws of the State of California. If any legal action is instituted by any Party to this License regarding the terms, conditions and/or performance of this License, venue shall be in the Superior Court of the County of Kern.

20. No Third Party Beneficiaries: It is expressly understood and agreed that the enforcement of these terms and conditions and all rights of action relating to such enforcement, shall be strictly reserved to the Parties. Nothing contained in this License shall give or allow any claim or right of action whatsoever by any other third person. It is the express intention of the Parties that any such person or entity, other than the Parties, receiving services or benefits under this License shall be deemed an incidental beneficiary only.

21. Authorization: The individuals executing this License on behalf of County and on behalf of City represent and warrant that they are duly authorized to execute this License on behalf of County or City, and that County and City are bound by its terms and conditions.

22. Captions: Section headings in this License are used solely for convenience and shall be wholly disregarded in the construction of this License.

23. Time of Essence: Time is of the essence of each and all the terms and provisions of this License.

The remainder of this page has been intentionally left blank. 4918-9220-2904 v4 Page 7 of 7
The Parties have executed this License on the Execution Date.

COUNTY OF KERN
Department of Aging & Adult Services
By________________________________
Jeremy Oliver, Director

COUNTY OF KERN
General Services Department
By________________________________
Michelle Burns- Lusich,
Chief General Services Officer
“County”

APPROVED AS TO FORM
Office of the County Counsel
By________________________________
Joshua H. Rudnick, Deputy

CITY OF CALIFORNIA CITY
By _______________________________
Sean Grayson, City Manager
“City”

APPROVED AS TO FORM
City Attorney’s Office
By________________________________
Victor Ponto, City Attorney
4918-9220-2904 v4
Exhibit “A” – Premises
CC 5
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
SUBJECT: Authorization to Release a Request for Proposals (RFP) for Comprehensive Review and Evaluation of Citywide User Fees (Fee Study) and Cost Allocation Plan
BACKGROUND/ DISCUSSION:

One of the actions identified in the City’s Fiscal Distress Action Plan includes updating all fees to ensure that the City is receiving an appropriate recovery of costs to provide fee-based services.

Most of the City’s fees have not been updated in more than five years. Some of the City’s fees were created without a nexus study or fee study to analyze the City’s cost to provide the services related to the fees and comparative analysis of comparable city fees. The City requires an appropriate study to move forward with updating all fees. This will be accomplished by a fee study for fees charged to customers and a cost allocation plan for the internal cost attributed across departments. The City has awarded a contract for water and wastewater fee analysis which requires a different approach and legal compliance procedure. This fee study and cost allocation plan will not overlap but will be complimentary to the water and wastewater fee development.

With the City Council’s approval, attached Request for Proposals (RFP) for Comprehensive Review and Evaluation of Citywide User Fees (Fee Study) and Cost Allocation Plan will be released. In addition to the City’s routine distribution activities, City staff anticipates posting the RFP on two professional association web pages, the California Society of Municipal Finance Officers (CSMFO) and the California Association of Public Procurement Officials, Inc. (CAPPO).

The RFP contemplates the following timeline:

Issue RFP: March 25, 2026
Response/Due Date: April 27, 2026
RFP Award: May 12, 2026 City Council Meeting
FISCAL IMPACT:

None with this action. The award of the RFP will have a cost that will be allocated at the time of the award being presented to the City Council for approval.

CC 5
4898-7406-7085 v1
RECOMMENDATION:

It is recommended that the City Council authorize the release of the RFP.

ATTACHMENTS:

Request for Proposals (RFP) for Comprehensive Review and Evaluation of Citywide User Fees (Fee Study) and Cost Allocation Plan
City of California City
Request for Proposals
for
Comprehensive Review and Evaluation of Citywide User Fees (Fee Study) and Cost Allocation Plan
Issue Date: March 25, 2026
Response Due Date/Time: April 27, 2026 5:00 pm (PST)
Sean Grayson
Interim City Manager
(760) 373-7170
[email protected]
City of California City
21000 Hacienda Blvd
California City, CA 93505

CITY OF CALIFORNIA CITY

REQUEST FOR PROPOSALS

FEE STUDY AND COST ALLOCATION PLAN

TABLE OF CONTENTS
I. Introduction................................................................................................................................................................. 3 A. General Information ............................................................................................................................................... 3 B. Term of Engagement .............................................................................................................................................. 3 II. Nature of Service Required........................................................................................................................................ 4 A. Scope of Work to be Performed ............................................................................................................................. 4 B. Working Papers Retention...................................................................................................................................... 6 III. Description of Government........................................................................................................................................ 6 A. Background Information ........................................................................................................................................ 6 B. Fund Structure ........................................................................................................................................................ 7 C. Accounting Computer Systems.............................................................................................................................. 7 IV. Time Requirements..................................................................................................................................................... 7 A. Proposal Calendar................................................................................................................................................... 7 B. Date Cost Study May Commence .......................................................................................................................... 7 C. Questions and Answers .......................................................................................................................................... 7 D. Submission of Reports............................................................................................................................................ 8 V. Proposal Requirements............................................................................................................................................... 8 A. Submission of Proposal .......................................................................................................................................... 8 B. Minimum Content of Proposal ............................................................................................................................... 8 C. Contents of Technical Proposal.............................................................................................................................. 8 D. Compensation and Fees.......................................................................................................................................... 9 VI. Evaluation Procedures.............................................................................................................................................. 10 E. Review of Proposals............................................................................................................................................. 10 F. Evaluation Criteria................................................................................................................................................ 10 VII. Contacts ..................................................................................................................................................................... 10 Attachments A (Consulting Services Agreement).................................................................................................. 11 3 CITY OF CALIFORNIA CITY

REQUEST FOR PROPOSALS

FEE STUDY AND COST ALLOCATION PLAN
I. INTRODUCTION
A. General Information
The City of California City is requesting proposals from qualified professional firms experienced in cost recovery to review and evaluate the City of California City’s citywide user fees (User Study) and prepare a Full Cost Allocation Plan.

There is no expressed or implied obligation for the City of California City to reimburse responding firms for any expenses incurred in preparing proposals in response to this request.

Materials submitted by respondents are subject to public inspection under the California Public Records Act (Government Code Sec. 6250 et seq.), unless exempt.

To be considered, respondents must submit their responses via email only to: Sean Grayson, Interim City Manager at [email protected], by 5:00 P.M. on April 27, 2026.

The City reserves the right to reject any or all proposals submitted.

During the evaluation process, the City of California City reserves the right, where it may serve the City’s best interest, to request additional information or clarification from proposers, or to allow corrections of errors or omissions. At the discretion of the City of California City, firms submitting proposals may be requested to make oral presentations as part of the evaluation process.

The City of California City reserves the right to retain all proposals submitted regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the firm of the conditions contained in the request for proposals, unless clearly and specifically noted in the proposal submitted and confirmed in the contract between the City of California City and the firm selected.

It is anticipated the selection of the firm will be completed and a contract will be executed between both parties by May 13, 2026. The City reserves the right to reject any or all proposals, to waive any non-material irregularities or information in any proposal, and to accept or reject any times or combination of items.

B. Term of Engagement
It is the intent of the City of California City to contract for a comprehensive review and evaluation of citywide user fees and for the preparation of a Full Cost Allocation Plan. 4 II. NATURE OF SERVICES REQUIRED (This Section II shall comprise the scope of services for Attachment A of the attachment Consulting ServicesAgreement) A. Scope of the Work to be Performed

1. User Fee Study
Consultant shall meet with City staff to refine the project scope, purpose, uses and goals of the City’s User Study to ensure that the study will be both accurate and appropriate to the City’s needs.

The Consultant shall review the project schedule and answer any questions pertaining to the successful development of the study. The Consultant shall meet with staff and conduct interviews as needed to gain an understanding of the City’s processes and operations.

The Consultant shall review the City’s existing fees, rates, and charges. The Consultant shall meet with staff and conduct interviews as needed to gain an understanding of the City’s processes and operations.

The Consultant shall identify the total cost of providing each City service at the appropriate activity level and in a manner that is consistent with all applicable laws, statutes, rules, and regulations governing the collection of fees, rates, and charges by public entities.

The Consultant shall compare service costs with existing recovery levels. This should include any service areas where the City is currently charging for services as well as areas where perhaps the City should charge, in light of the City’s practices, or the practices of similar or neighboring cities.

The Consultant shall recommend potential new fees and charges for services that the City currently provides but does not have any fees and/or charges established.

Recommendations should be based on practices by surrounding cities that may charge for similar services, industry best practices, or the Consultant’s professional opinion.

The Consultant shall recommend appropriate fees and charges based on the firm’s analysis together with the appropriate subsidy percentage for those fees where full cost recovery may be unrealistic ( e. g. community recreation).

The Consultant shall prepare a report that identifies each fee service, its full cost, and recommended and current cost recovery levels. The report should also identify the direct cost and the overhead cost for each service.

The Consultant shall provide a computer-based model for adjusting these fees and charges for the City’s current and future needs and provide the City with an electronic copy of the final comprehensive study, including related schedules and cost documentation in Excel format that can be edited and updated by City staff to accommodate changes in the organization or changes in costs. The Consultant will provide training to enable staff to update fees on an annual or as needed basis.

The Consultant may be asked to prepare and deliver a presentation to the City Council 5 and/or the City Finance Management Subcommittee to facilitate their understanding of the cost plan and its implications for the City.

The Consultant shall prepare a final fee study report and provide ten (10) bound copies, one unbound copy and a single PDF file of the plan.

Although the fee study does not include Development Impact Fees (AB1600 fees) or fees for water or wastewater, the City is or may be engaged with other consultants for those fees and the Consultant shall communicate with any other consultants to avoid overlapping work.

2. Cost Allocation Plan
Consultant shall meet with City staff to refine the project scope, purpose, uses and goals of the City’s Cost Allocation Plan to ensure that it will be both accurate and appropriate to the City’s needs.

The Consultant shall review the project schedule and answer any questions pertaining to the successful development of the plan. The Consultant shall meet with staff and conduct interviews as needed to gain an understanding of the City’s processes and operations.

The Consultant shall review the City’s existing cost allocation methods within budgets and for various grants. The Consultant shall meet with staff and conduct interviews as needed to gain an understanding of the City’s processes and operations.

The Consultant shall identify the total cost of providing each City service at the appropriate activity level and in a manner that is consistent with all applicable laws, statutes, rules, and regulations governing the collection of fees, rates, and charges by public entities.

The Consultant shall prepare a report that identifies the basis for the model used for cost allocation.

Provide the City with an electronic copy of the final Cost Allocation Plan, including related schedules and cost documentation in Excel format that can be edited and updated by City staff to accommodate changes in the organization or changes in costs. The requirements of the electronic model shall allow for the following:
1) The addition or removal of direct and overhead costs so that the Plan can be developed from a simple plan to a progressively more inclusive plan, as the City continues to grow; 2) The addition of hypothetical service area information for future service enhancements and the ability to calculate the estimated costs for providing the service under consideration;
3) The ability to calculate a full burdened hourly rate of a position that includes salary, benefits, and applicable overhead including OPEB and debt obligations; 4) The ability to document changes in the City’s authorized personnel, including personnel additions, salary schedule changes, and step changes for current personnel; 6 5) The ability to include an option for an annual inflator based on benefit increases for personnel such as CalPERS, insurance premiums, cafeteria, and other payroll taxes; 6) The ability to include an option for annual inflator based on contracted services rate increases;
6) Provide training to staff in order to facilitate the annual update to fees. 7) The Consultant may be asked to prepare and deliver a presentation to the City Council and/or the City Finance Management Subcommittee to facilitate their understanding of the cost plan and its implications for the City.

The Consultant shall prepare a final fee study report and provide ten (10) bound copies, one unbound copy and a single PDF file of the plan.

B. Working Papers Retention
All working papers and reports must be retained at the consultant’s expense for a minimum of seven (7) years, unless the firm is notified in writing by the City of California City of the need to extend the retention period. The consultant may be required to make working papers or electronic files available to the City of California City or any government agencies included in the audit of federal grants.

III. DESCRIPTION OF THE GOVERNMENT
A. Background Information
California City was incorporated on December 10, 1965. The City is located in the northern Antelope Valley in Kern County, California. It is 100 miles (160 km) north of the city of Los Angeles. Covering 203.63 square miles (527.4 km2), California City has the third-largest land area of any city in the state of California (behind San Diego and Los Angeles), and is the largest city in California, by land area, that is not a county seat. It is the 43rd-largest city in the United States by land area.

California City operates under a Council/Manager form of government, with a Mayor directly elected by the voters and four elected Councilmembers, collectively known as the Council. The Council is responsible for setting policy for the City and for adopting an annual budget. The Council Member with the most seniority is designated as the Mayor Pro Tem to serve in the Mayor’s absence. Day-to-day responsibilities are overseen by a City Manager, reporting to the Mayor and City Council. The City Manager is responsible for appointing and supervising the heads of all City departments, with the advice and consent of the Council, with the exception of the City Treasurer, which is an elected position, and the City Attorney, who is appointed by the Council directly.

The City of California City has a population of 14,973 as of the 2020 census. The City’s annual operating budget is approximately $10 million, the City’s special revenue fund budget is approximately $11 million, and the total annual budget for the six enterprise funds is approximately $9 million.
7 The City’s operations are organized into 14 functions: Administration, City Clerk, Finance, Human Resources, Building and Planning, Housing, Police, Public Works, Parks & Recreation, OHV, Cannabis Management, Water, and Wastewater (Sewer) with 60 budgeted full-time and 11 part-time positions. Fire services are contracted with the Kern County. The accounting and financial reporting aspects of the City are centralized within the Finance department. The Finance Department is currently headed by the City Manager utilizing a contract Finance Director provided by Price Paige & Company. Internal staffing of the department consists of a Finance Manager, Accounting Technician III, and a Payroll Clerk, in addition to the elected City Treasurer, who is also responsible for the treasury function.

B. Fund Structure
The City maintains a total of 20 funds, including the general fund, 6 enterprise funds (Water, Sewer, Airport, Dial-A-Ride, Airport Capital Projects, and Water Capital Improvement), one capital projects fund and 12 special revenue funds. The City adopts an annual appropriated budget for all funds.

C. Accounting Computer Systems
The City utilizes Caselle software as its accounting system, which is hosted virtually. Caselle modules implemented include accounts receivable, accounts payable, general ledger, utility billing, and bank reconciliation. Infrastructure assets are maintained via an Excel spreadsheet.

Payroll is performed by staff using Caselle time keeping. Information Technology (IT) is contracted with the Technic IT.

IV. TIME REQUIREMENTS
A. Proposal Calendar
The following is a list of key dates up to, and including, the date proposals are to be submitted:

Date Activity
March 25, 2026 Request for Proposal Issued
April 10, 2026 Questions due
April 13, 2026 Responses to questions posted on RFP page April 27, 2026 Due date for proposals by 5:00 p.m.

April 28-May 5, 2026 Staff review
May 12, 2026 Contract awarded by City Council
B. Date Cost Study May Commence
Cost Study planning, including necessary planning, documentation of systems of fund structure and operations, and staff interview schedules are anticipated as appropriate after contract is executed. Study may commence no later than three weeks after City Council approval of contract.

C. Questions and Answers
The City will accept questions until the scheduled date and time on the RFP Proposal 8 Calander. Responses to all questions received will be posted on the City’s RFP postings webpage on the scheduled date.

D. Submission of Reports
The Consultant shall provide all drafts and recommendations to the Interim City Manager and assigned finance staff. The Consultant should be available for any meetings that may be necessary to discuss the draft and/or work methodologies.

V. PROPOSAL REQUIREMENTS
A. Submission of Proposal
For a proposal to be considered, the Proposal shall be received via email only by the Finance Department of the City of California City by 5:00 p.m. on April 27, 2026.

The Proposal should be addressed as follows:

City of California City
Sean Grayson, Interim City Manager
[email protected]
B. Minimum Content of Proposal
The Proposal should include the technical proposal and costs and fees.

C. Contents of the Technical Proposal
The purpose of the Technical Proposal is to demonstrate the qualifications, competence and capacity of the firm seeking to undertake the User Study and Full Cost Allocation Plan project for the City of California City in conformity with the requirements of this request for proposal.

The Technical Proposal should describe the Firm’s experience with public agencies that are similar in size and scope. Emphasis should be placed on assignments undertaken within the past three years and on engagements undertaken by the personnel to be assigned to the California City site.

The proposal should be prepared simply and economically, providing a straightforward concise description of the proposer’s capabilities to satisfy the requirements of this request for proposals. While additional data may be presented, the following subjects must be included:

1. Company name and address

2. Letter of transmittal signed by an individual authorized to bind the respondent, stating that the respondent has read and will comply with all terms and conditions of the RFP.

3. General Information about the primary contact who would be able to answer questions about the proposal; include name, title, telephone number and e-mail address of the 9 individual.

4. Describe the firm’s history and organizational structure. Include the size of the firm, location of offices, years in the business, organizational chart, name(s) of owner(s) and principal parties, and number and position titles ofstaff.

5. Include the names of the personnel assigned to the User Study and Full Cost Allocation Plan project, their resumes, and the projects completed in the last three years.

6. What is the primary business of the parent company and/or affiliates?

7. Which office of your organization will have primary responsibility for managing the user fee study?

8. What is the firm’s experience conducting user fee studies and cost allocation plans?

9. Schedule of Work Plan
The Proposal should provide a schedule for completion of the work that will meet the City’s requirements. This schedule should identify anticipated time frames for completion of each major phase of the engagement and should include any assumptions regarding turnaround time for staff review of information and documents.

10. References
The Proposal should provide three references of the firm’s most representative projects, inclusive of:
a. Name of Public Agency
b. Name, Title, and Telephone Number of Contact Person
c. Size of General Fund Budget
d. Brief description of the reports prepared by the firm D. Compensation and Fees
Compensation and fees should include all pricing information relative to performing the fee study engagement as described in this Request for Proposal. The total all-inclusive maximum price is to contain all direct and indirect costs, including all out-of-pocket reimbursable expenses.

The City will not be responsible for expenses incurred in preparing and submitting the response to the RFP.

Fee quotes should be detailed by specific service. Outline billing and payment expectations, including timing and method of payment.
10 City of California City will require the engaged firm to provide Certificates of Insurance evidencing required coverage types and minimum limits. The City of California City also requires that Consultants conducting business within city limits to apply for a City of California City Business License.

VI. EVALUATION PROCEDURES
A. Review of Proposals
City staff representing various departments will review the responses to the RFP.

B. Evaluation Criteria
The final selection will be the firm which, in the City’s opinion, is the most responsive and responsible in meeting the City’s requirements in providing the service. The City maintains the sole and exclusive right to evaluate the merits of the proposals received.

Firms will be objectively evaluated based on their responses to the project scope outlined in this RFP. The written proposal should clearly demonstrate how the firm could best satisfy the requirements of the City of California City.

Proposals will be evaluated based on the followingcriteria:
• Thoroughness and understanding of the tasks to be completed • Background and experience in organizational analysis
evaluation
• Schedule of services and completion date
• Responsiveness to requirements of this RFP
• Recent public sector experience, preferably in a municipal setting, conducting similar studies
• Costs
VII. CONTACTS

1. Inquiries concerning the Request for Proposals may be made to:

Sean Grayons, Interim City Manager
21000 Hacienda Blvd.

California City, CA 93505
(760) 373-7170
[email protected]
11 Attachment A – Consulting Services Agreement
12 THIS PAGE INTENTIONALLY LEFT BLANK
Consulting Services Agreement between
City of California City and Page 1 of 12
[EFFECTIVE DATE]
$( )

CONSULTING SERVICES AGREEMENT

BETWEEN THE CITY OF CALIFORNIA CITY AND
[NAME OF CONSULTANT]
THIS Agreement (“Agreement”) for consulting services is made by and between the City of California City (“City”) and , a California [corporation] [limited liability company] (“Consultant”) (together referred to as the “Parties”) as of , 20 (the “Effective Date”).

Section 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Work attached as Exhibit A, and incorporated herein, at the time and place and in the manner specified therein.

1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on or the date the
Consultant completes the services specified in Exhibit A, whichever occurs first, unless the term of the Agreement is otherwise terminated or extended, as referenced herein.

1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement according to the standards observed by a competent practitioner of the profession in which Consultant is engaged.

1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, requests in writing the reassignment of any such persons to ensure Consultant performs services in accordance with the Standard of Performance, Consultant shall, immediately upon receiving City’s request, reassign such persons.

1.4 Time. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to meet the standard of performance provided herein above and to satisfy Consultant’s obligations hereunder.

Section 2. COMPENSATION. City hereby agrees to pay Consultant a sum not to exceed , as set forth in Exhibit B, attached hereto and incorporated herein for services to be performed and reimbursable expenses incurred under this Agreement. This dollar amount is not a guarantee that the City will pay that full amount to the Consultant, but is merely a limit of potential City expenditures under this Agreement.

Consulting Services Agreement between
City of California City and Page 2 of 12
[EFFECTIVE DATE]
Consultant and City acknowledge and agree that compensation paid by City to Consultant under this Agreement is based upon Consultant’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant.

Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. City therefore has no responsibility for such contributions beyond compensation required under this Agreement.

2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information, unless waived by the City Manager, or his or her designee:
 Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.;
 The beginning and ending dates of the billing period;  A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion;
 At City’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense;  The total number of hours of work performed under the Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing services hereunder;
 The Consultant’s signature.

2.2 Monthly Payment. City shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall pay undisputed invoices that comply with the above requirements within 30 days from the receipt of the invoice.

2.3 Final Payment. Consultant shall submit its final invoice within 60 days of completing its services. Consultant’s failure to submit its final invoice within this 60 day period shall constitute Consultant’s waiver of any further billings to, or payments from, City.

2.4 Reimbursable Expenses. Reimbursable expenses, if any, are specified in Exhibit B and included in the total compensation referenced inSection Consulting Services Agreement between
City of California City and Page 3 of 12
[EFFECTIVE DATE]

2. Expenses not listed in Exhibit B are not chargeable to, or reimbursable by, City.

2.5 Payment of Taxes. Consultant is solely responsible for the payment of all federal, state and local taxes, including employment taxes, incurred under this Agreement.

2.6 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of a written authorization from the City Manager, or his or her designee.

Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement
Section 4. INSURANCE REQUIREMENTS. Before beginning any services under this Agreement, Consultant, at its own cost and expense, shall procure the types and amounts of insurance specified herein and maintain that insurance throughout the term of this Agreement.

The cost of such insurance shall be included in the Consultant’s bid or proposal. Consultant shall be fully responsible for the acts and omissions of its subcontractors or other agents.

4.1 Workers’ Compensation. Consultant shall, at its sole cost and expense, maintain Statutory Workers’ Compensation Insurance and Employer’s Liability Insurance for any and all persons employed directly or indirectly by Consultant in the amount required by applicable law. The requirement to maintain Statutory Workers’ Compensation and Employer’s Liability Insurance may be waived by the City upon written verification that Consultant is a sole proprietor and does not have any employees and will not have any employees during the term of this Agreement.

4.2 Commercial General and Automobile Liability Insurance.

4.2.1 General requirements. Consultant, at its own cost and expense, shall maintain commercial general and automobile liability insurance for the term of this Agreement in an amount not lessthan
$2,000,000 per occurrence and $4,000,000 aggregate, combined single limit coverage for risks associated with the work contemplated by this Agreement.

4.2.2 Minimum scope of coverage. Commercial general coverage shall be at least as broad as Insurance Services Office Commercial General Liability occurrence form CG 0001 (most recent edition) covering comprehensive General Liability on an “occurrence” basis.

Consulting Services Agreement between
City of California City and Page 4 of 12
[EFFECTIVE DATE]
Automobile coverage shall be at least as broad as Insurance Services Office Automobile Liability form CA 0001 (most recent edition) covering any auto (Code 1), or if Consultant has no owned autos, hired (code 8) and non-owned autos (Code 9). No endorsement shall be attached limiting the coverage.

4.2.3 Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy:
a. The Commercial General and Automobile Liability Insurance shall cover on an occurrence basis.
b. City, its officers, officials, employees, agents, and volunteers shall be covered as additional insureds for liability arising out of work or operations on behalf of the Consultant, including materials, parts, or equipment furnished in connection with such work or operations; or automobiles owned, leased, hired, or borrowed by the Consultant. Coverage can be provided in the form of an endorsement to the Consultant’s insurance at least as broad as CG 20 10 11 85, or both CG 20 10 10 01 and CG 20 37 10 01. c. For any claims related to this Agreement or the work hereunder, the Consultant’s insurance covered shall be primary insurance as respects the City, its officers, officials, employees, agents, and volunteers. Any insurance or self- insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess of the Consultant’s insurance and non-contributing. d. The policy shall cover inter-insured suits and include a “separation of Insureds” or “severability” clause which treats each insured separately.
e. Consultant agrees to give at least 30 days prior written notice to City before coverage is canceled or modified as to scope or amount.

4.3 Professional Liability Insurance.

4.3.1 General requirements. Consultant, at its own cost and expense, shall maintain for the period covered by this Agreement professional liability insurance for licensed professionals performing work pursuant to this Agreement in an amount not less than
Consulting Services Agreement between
City of California City and Page 5 of 12
[EFFECTIVE DATE]
$1,000,000 per occurrence or claim covering the Consultant’s errors and omissions.

4.3.2 Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form:
a. The retroactive date of the policy must be shown and must be before the date of the Agreement.
b. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement or the work.
c. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a retroactive date that precedes the date of this Agreement, Consultant must purchase an extended period coverage for a minimum offive
(5) years after completion of work under this Agreement. d. A copy of the claim reporting requirements must be submitted to the City for review prior to the commencement of any work under this Agreement.

4.4 All Policies Requirements.

4.4.1 Submittal Requirements. Consultant shall submit the following to City prior to beginning services:
a. Certificate of Liability Insurance in the amounts specified in this Agreement; and
b. Additional Insured Endorsement as required for the General Commercial and Automobile Liability Polices.

4.4.2 Acceptability of Insurers. All insurance required by this Agreement is to be placed with insurers with a Bests' rating of no less than A:VII.

4.4.3 Deductibles and Self-Insured Retentions. Insurance obtained by the Consultant shall have a self-insured retention or deductible of no more than $100,000.

4.4.4 Wasting Policies. No policy required herein shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense).

Consulting Services Agreement between
City of California City and Page 6 of 12
[EFFECTIVE DATE]

4.4.5 Waiver of Subrogation. Consultant hereby agrees to waive subrogation which any insurer or contractor may require from Consultant by virtue of the payment of any loss. Consultant agrees to obtain any endorsements that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Consultant, its employees, agents, and subcontractors.

4.4.6 Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein, and Consultant shall ensure that City, its officers, officials, employees, agents, and volunteers are covered as additional insured on all coverages.

4.4.7 Excess Insurance. If Consultant maintains higher insurance limits than the minimums specified herein, City shall be entitled to coverage for the higher limits maintained by the Consultant.

4.5 Remedies. In addition to any other remedies City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: 1) obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement; 2) order Consultant to stop work under this Agreement and withhold any payment that becomes due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof; and/or 3) terminate this Agreement.

Section 5. INDEMNIFICATION AND CONSULTANT’S RESPONSIBILITIES.

5.1 General Requirement. To the fullest extent permitted by law, Consultant shall indemnify, defend with counsel acceptable to City, and hold harmless City and its officers, officials, employees, agents and volunteers (collectively, “Indemnitees”) from and against any and all liability, loss, damage, claims, expenses, and costs, including without limitation, attorney’s fees, costs and fees of litigation, (collectively, “Liability”) of every nature arising out of or in connection with Consultant’s performance of the services under this Agreement, or its failure to comply with any of its obligations contained in this Agreement, or its failure to comply with any
Consulting Services Agreement between
City of California City and Page 7 of 12
[EFFECTIVE DATE]
applicable law or regulation, except such Liability caused by the sole negligence or willful misconduct of City.

Acceptance by City of insurance certificates and endorsements required under this Agreement does not relieve Consultant from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply to any damage or claims for damages whether or not such insurance policies shall be determined to apply.

5.2 PERS Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Section 6. STATUS OF CONSULTANT.

6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of City.

6.2 Consultant Not an Agent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever.

Section 7. LEGAL REQUIREMENTS.

7.1 Governing Law. The laws of the State of California shall govern this Agreement.

7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws applicable to the performance of the work hereunder.

Consultant shall also, to the extent required by the California Labor Code, pay not less than the latest prevailing wage rates as determined by the California Department of Industrial Relations.

7.3 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have, and Consulting Services Agreement between
City of California City and Page 8 of 12
[EFFECTIVE DATE]
will maintain at their sole cost and expense, all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid business licenses from City.

7.4 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, genetic information, marital status, sex, sexual orientation, gender or gender identity, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or applicant for any services or programs provided by Consultant under this Agreement. Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Consultant thereby.

Section 8. TERMINATION AND MODIFICATION.

8.1 Termination. Upon ten days’ prior written notice, City may cancel this Agreement at any time and without cause upon such written notification to Consultant. In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; City, however, may condition payment of such compensation upon Consultant delivering to City any or all documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the City in connection with this Agreement.

8.2 Amendments. The parties may amend this Agreement only by a writing signed by the parties hereto.

8.3 Assignment and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant’s unique personal competence, experience, and specialized personal knowledge. Moreover, a substantial inducement to City for entering into this Agreement was and is the professional reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the City Manager, or his or her designee. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the Consulting Services Agreement between
City of California City and Page 9 of 12
[EFFECTIVE DATE]
subcontractors noted in the proposal, without prior written approval of the City Manager, or his or her designee.

8.4 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant, including but not limited to the provisions of Section 5, shall survive the termination of this Agreement.

8.5 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, City’s remedies shall include, but not be limited to, the following:

8.5.1 Immediately terminate the Agreement;

8.5.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement;

8.5.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or

8.5.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 if Consultant had completed the work.

8.5.5 The remedies mentioned in this Agreement are not exclusive of any other right, power or remedy permitted by law. The City’s failure or delay in exercising any remedy shall not constitute a waiver of such remedy or preclude the further exercise of City’s rights.

Section 9. KEEPING AND STATUS OF RECORDS.

9.1 Records Created as Part of Consultant’s Performance. All final versions of reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the City. Consultant hereby agrees to deliver those documents to the City upon termination of the Agreement, and the City may use, reuse or otherwise dispose of the documents without Consultant’s permission. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily Consulting Services Agreement between
City of California City and Page 10 of 12
[EFFECTIVE DATE]
suitable for any future or other use. City and Consultant agree that, until final approval by City, all data, plans, specifications, reports and other documents are confidential drafts and will not be released to third parties by Consultant without prior written approval of City.

9.2 Consultant’s Books and Records. Consultant shall maintain any and all records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of 3 years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement. All such records shall be maintained in accordance with generally accepted accounting principles and shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the City. Pursuant to Government Code Section 8546.7, the Agreement may be subject to the examination and audit of the State Auditor for a period of 3 years after final payment under theAgreement.

Section 10 MISCELLANEOUS PROVISIONS.

10.1 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

10.2 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in Kern County or in the United States District Court for the Southern District ofCalifornia.

10.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of thisAgreement.

10.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.

10.5 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties.

Consulting Services Agreement between
City of California City and Page 11 of 12
[EFFECTIVE DATE]

10.6 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of City or whose business, regardless of location, would place Consultant in a “conflict of interest,” as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq.

Consultant shall not employ any City official in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq.

10.7 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials.

10.8 Notices. Any notice, demand, request, consent or approval that either party is required to give the other pursuant to this Agreement, shall be in writing and may be given by either (i) personal service, or (ii) certified United States mail, postage prepaid, return receipt requested. Notice shall be effective upon personal delivery or delivery to the addresses specified below, as reflected on the receipt of delivery or return receipt, as applicable.

Consultant :

City: City of California
21000 Hacienda Blvd.

California City, CA 93505
ATTN: City Manager

10.9 Professional Seal. Where applicable in the determination of the City Manager, or his or her designee, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled “Seal and Signature of Registered Professional with report/design responsibility.”

10.10 Integration. This Agreement, including the scope of work attached hereto and incorporated herein as Exhibits A and B represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral.

Consulting Services Agreement between
City of California City and Page 12 of 12
[EFFECTIVE DATE]
To the extent there are any inconsistences between this Agreement, the Exhibits, and Consultant’s proposal, the Agreement shall control To the extent there are any inconsistences between the Exhibits and the Consultant’s Proposal, the Exhibits shall control.

Exhibit A Scope of Services
Exhibit B Compensation Schedule

10.11 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.

10.12 Construction of Agreement. Each party hereto has had an equivalent opportunity to participate in the drafting of the agreement and/or to consult with legal counsel. Therefore, the usual construction of an agreement against the drafting party shall not apply hereto.

10.13 No Third Party Beneficiaries. This Agreement is made solely for the benefit of the parties hereto, with no intent to benefit any third parties.

The Parties have executed this Agreement as of the Effective Date.

CITY OF CALIFORNIA CITY CONSULTANT
Sean Grayson, Interim City Manager [NAME, TITLE]
Attest:

John Paul Maier, City Clerk
Approved as to Form:

Victor Ponto, City Attorney
Consulting Services Agreement between
City of California City and Page 1 of 3
[EFFECTIVE DATE]

EXHIBIT A

SCOPE OF SERVICES
Consulting Services Agreement between
City of California City and Page 2 of 3
[EFFECTIVE DATE]

EXHIBIT B

COMPENSATION SCHEDULE
Consulting Services Agreement between
City of California City and Page 3 of 3
[EFFECTIVE DATE]
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

CONSULTANT
2784980.1
By:

Title:

CC 6

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Christy Lopez, Assistant City Attorney
SUBJECT: Second Reading and Adoption of Ordinance No. 26-831: An Ordinance of the City Council of the City of California City, California, Adding Chapter 9 to Title 7 of the City’s Municipal Code Relating to the Skate Park in the City
BACKGROUND/ DISCUSSION:

On October 14, 2025, the City Council adopted Ordinance 24-820 that added a new Chapter 6 (Skateparks) of Title 7 of the California City Municipal Code regulating skate park activities. The City Council desires to regulate use of the Skatepark in light of the public’s increased demand for outdoor recreational spaces in the City and the City’s desire to limit its liability associated with the public’s use of the Skatepark.

Assembly Bill 1146 (Jones 2015) extended the provisions of existing qualified immunity law to skateboarding (Government Code section 831.7) by defining skateboarding as a “hazardous recreational activity”. The City is not generally liable for injuries occurring during participation in such hazardous activities unless the City is negligent in some way, for example, in maintaining the Skatepark.

In order to better address the needs of the City the proposed Ordinance 26-831 repeals the previously established Chapter 6 of Title 7 and creates Chapter 9 of Title 7 regulating skatepark activities in conformance with the government code protections.

The new Chapter 9 of Title 7 of the California City Municipal Code includes the following areas:
7-9.010 - Purpose.

The purpose of this chapter is to provide regulations governing the conduct of the City’s public skate park facility users and to insulate the City from liability associated with potential injury arising from skate park users’ participation in an inherently hazardous recreational activity.
7-9.020 - Definitions.

Definitions relevant to the chapter are included.

CC 6
7-9.030 - Prohibited Conduct.

A listing of the activities that shall be unlawful for any person to engage in the following at a public skate park facility are included.
7-9.040 - Signage and Posting Requirements.

Information on the placement of signs is included
7-9.050 - Other Rules and Regulations.

Information on other rules and regulations is included. 7-9.060 - Violations and Penalties.

Information on violations and penalties is included.

On March 10, 2026, the City Council conducted a public hearing, held first reading of Ordinance 26-831, waived reading of ordinance in its entirety, read by title only and scheduled a second reading and adoption of ordinance on March 24, 2026.

FISCAL IMPACT:

There is no fiscal impact with this action.

RECOMMENDATION:

Staff recommends that the City Council conduct second reading of the Ordinance and adopt it.

ATTACHMENTS:

Ordinance 26-831
4883-8719-3087 v3
ORDINANCE NO. 26-831

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
CALIFORNIA CITY, CALIFORNIA, ADDING CHAPTER 9 TO
TITLE 7 OF THE CITY’S MUNICIPAL CODE RELATING TO

THE SKATE PARK IN THE CITY
WHEREAS, the City has a skatepark (“Skate Park”) in the City of California City (“City”) for the purpose of skateboarding and other forms of recreation using nonmotorized, wheeled devices; and WHEREAS, skateboarding and other forms of recreation using non-motorized, wheeled devices are inherently hazardous recreational activities; and WHEREAS, Assembly Bill 1146 (Jones 2015), extended the provisions of existing qualified immunity law to skateboarding (Government Code section 831.7) by defining skateboarding as a “hazardous recreational activity”. The City is not generally liable for injuries occurring during participation in such hazardous activities unless the City is negligent in some way, for example, in maintaining the Skate Park; and WHEREAS, the City Council desires to repeal to the previously adopted Ordinance number 24-820; and
WHEREAS, the City desires to adopt and publish updated regulations and guidelines for the use of the Skate Park to apprise the public of risks associated with use of the Skate Park; and
WHEREAS, the City desires to adopt and publish permanent regulations and guidelines for the use of the Skate Park to limit its liability associated with the public’s use of the Skate Park.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY DOES HEREBY ORDAIN AS FOLLOWS:

SECTION 1. FINDINGS.

The City Council finds that the above Recitals are true and correct and are incorporated herein by reference.

SECTION 2. CALIFORNIA CITY MUNICIPAL CODE TITLE 7 AMENDMENT.

A new Chapter 9 (Skate Parks) of Title 7 of the California City Municipal Code is hereby established to read in its entirety as follows:

CHAPTER 9. SKATE PARKS.
7-9.010 - Purpose.
4883-8719-3087 v3
The purpose of this chapter is to provide regulations governing the conduct of the City’s public skate park facility users and to insulate the City from liability associated with potential injury arising from skate park users’ participation in an inherently hazardous recreational activity.
7-9.020 - Definitions.

For the purpose of carrying out the purpose of this chapter, words, phrases, and terms used herein shall have their ordinary meaning, unless otherwise indicated as follows:
“Department” means the City of California City’s Department of Parks and Recreation.
“Director” means the Director of Parks and Recreation, or their designee. “Other wheeled recreational device” means nonmotorized bicycles, scooters, inline skates, roller skates, or wheelchairs being used for recreational purposes. “Public skate park facility” means any public facility or structure that is designed for, owned, operated, and maintained by the City, for use of skateboards and other wheeled recreational devices and which has been designated as a “public skate park facility” by resolution of the City Council.
“Skateboard” means any platform of any composition or size to which two or more wheels are attached and which is intended to be ridden or propelled by one person standing or kneeling upon such platform and containing no steering apparatus. “Skate activity” means the use of a skateboard or other wheeled recreational device.
“Skater” means any person engaged in a skate activity.
7-9.030 - Prohibited Conduct.

It shall be unlawful for any person to engage in the following activities at a public skate park facility:
(a) No person shall be allowed to perform any skate activity at times other than those established by the director.
(b) No person shall use a public skate park facility for uses other than skate activity.
(c) No person shall use or enter the fenced area of a public skate park facility unless they wear proper safety equipment, including a helmet, elbow pads, and kneepads. All such safety equipment must be functional and protective, properly sized, and designed for its intended use at the public skate park facility. 4883-8719-3087 v3
(d) No person shall ride or use any items other than skateboards or other wheeled recreational devices.
(e) No person, other than a skater, is permitted within the skating surface of any public skate park facility, except that spectators may sit or stand in areas designated for that purpose.
(f) No person shall ride or use any skateboard or other wheeled recreational device in a reckless manner or with willful disregard for the safety of persons or property, or cause anyone with such items to be ridden or used in such a reckless manner.
(g) No person shall place, affix or utilize any obstacles or other materials within a public skate park facility that are not affixed thereto by the department. (h) No person shall conduct organized activities, events, or competitions in any public skate park facility without the prior written approval from the director. (i) A public skate park facility shall not be used if a hazardous condition exists, including but not limited to, inclement weather conditions and significant cracks, breaks or other irregularities in the skating surface of a public skate park facility. (j) No person shall litter in a public skate park facility. All persons using a public skate park facility must place any trash, cans, bottles, papers, or waste of any kind they create or bring to a public skate park facility in refuse containers provided by the City. If no refuse container is provided by the City, each person shall be responsible for removing and disposing of such items in an appropriate manner. (k) No person shall possess or use alcohol or drugs in the public skate park facility.
(l) No person shall use a public skate park facility while under the influence of alcohol or drugs that would impair the person's judgment or motor skills. (m) No person shall allow or cause glass containers of any kind to be brought into any public skate park facility.
(n) No person shall allow or cause graffiti or tagging in or around any part of the public skate park facility.
(o) No person shall allow or cause any animal of any kind to be brought into a public skate park facility unless the animal is a trained service animal. (p) No person shall use the skate park that is under the age of 12 without a guardian of 18 years of age or older.
7-9.040 - Signage and Posting Requirements.
4883-8719-3087 v3
In order to provide reasonable notice to the public, the director shall place and post signs in one or more conspicuous and visible area(s) of the public skate park facility, designating the facility, structure or area as a public skate park, specifying the rules and regulations established pursuant to this chapter. 7-9.050 - Other Rules and Regulations.

The City reserves the right to eject anyone from the public skate park facility at any time for any reason. The director may set forth any other rules and regulations for the use of a public skate park facility which they deem appropriate, provided that signs describing such rules and regulations are placed and posted pursuant to this chapter.
7-9.060 - Violations and Penalties.
(a) Any violation of this chapter may be punishable as either a misdemeanor or an infraction at the discretion of the issuing officer or prosecuting attorney. (b) Repeat violators (i.e., having three or more violations) may be suspended or prohibited from using the public skate park facility. (c) Repeat violations of this chapter may also constitute a public nuisance and may be abated by the City through civil process by means of restraining order, preliminary or permanent injunction or in any other manner provided by law for the abatement of such nuisances.

SECTION 3. REPEAL OF ORDINANCE 24-820
The City Council hereby repeals Ordinance 24-820 in its entirety.

SECTION 4. CEQA FINDINGS.

The City Council finds that the Ordinance is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines, as it is not a “project” and has no potential to result in a direct or reasonably foreseeable indirect physical change to the environment. (Cal. Code Regs., tit.14, § 15378, subd. (a).) Further, this Urgency Ordinance is exempt from CEQA as there is no possibility that it or its implementation would have a significant negative effect on the environment. (Cal. Code Regs., tit.14, § 15061, subd. (b)(3).)
SECTION 5. CLERICAL ERRORS.

The City Council directs the City Clerk to correct any clerical errors found in this Ordinance including, but not limited to, typographical errors, irregular numbering and incorrect section references.

SECTION 6. SEVERABILITY.

Should any section, subsection, clause, or provision of this Ordinance for any reason be held to be invalid or unconstitutional, such invalidity or unconstitutionality shall not affect 4883-8719-3087 v3
the validity or constitutionality of the remaining portions of this Ordinance; it being hereby expressly declared that this Ordinance, and each section, subsection, sentence, clause, and phrase hereof would have been prepared, proposed, approved, and ratified irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid, unenforceable, or unconstitutional.

SECTION 7. EFFECTIVE DATE.

In accordance with California Government Code section 36937, this Ordinance shall take effect and be in force thirty (30) days from passage and adoption.

SECTION 8. PUBLICATION.

The City Clerk shall certify to the passage and adoption of this Ordinance and shall cause this ordinance to be published and posted as required by law.

INTRODUCED at the regular meeting of the City Council on the ___ day of _____________, 2026, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS
ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

PASSED, APPROVED AND ADOPTED at the regular meeting of the City Council on the ___ day of _____________, 2026, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS
ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

Marquette E. Hawkins, Mayor
4883-8719-3087 v3
ATTEST:

John Paul Maier, City Clerk
CB 1
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
SUBJECT: Consideration of an Update on SDI Committee Requests and City Responses
BACKGROUND/ DISCUSSION:

On March 10, 2026, the City Council hosted a joint session of the SDI Committee (Committee) and the City Council on one of the City Council agenda items at their regular meeting. There were a number of questions provided and direction from the City Council to work on the requests and bring the information back to the City Council and share it with the Committee. The questions from the meeting are captured below:

From the Staff Report:

1. Provide financial reports up to date.

2. Identify the fund manager.

3. Identify who has signature authority to access the SDI.

4. Provide information on all relevant officials have gotten their surety bonding.

5. Clarify whether there was unauthorized investment activity and explain why there was a poor return on investments.

6. Identify who provides financial oversight over SDI fund investments.

7. Regarding SDI Expenditures:
a. Has there been inappropriate billing of City matters to the SDI fund? b. Explain where the “missing” $1.3million.
c. How can the City repay the outstanding city loan obligations (appears to be referencing the $20M in promissory notes invested into the RDA)? d. Is the SDI related in anyway to the fire station property? (I believe you may have answered this to the County, but we may need documentation of this if it exists/is available).
e. Concerns relating to “audit language”—not clear what is meant as it wasn’t explained in the presentation or in the PowerPoint.
f. They have questions about potential destruction of public records (or failure to produce). If they are destroyed and/or cannot be found, then we should probably state as much.
g. What can be done to move the SDI fund to an independent 3rd party (e.g., a receiver)?
CB 1
4898-7406-7085 v1
From the PowerPoint:

1. Want to see quarterly reporting on the financials with US Bank Investments.

2. Clarify the variances between treasurer’s and finance department’s reported financials.

3. Clarify why the fund did not make any money in the last 4 years.

4. Clarify why the outstanding $20 million loan (to the city) has not been addressed.

5. Clarify where the $1.3 million went

6. Explain the trade activity, why there is no MOU with a 3rd party intermediary, bonds that were sold prior to maturity, and city’s failure to identify a fund manager.

From the Public Discussion:

1. Who can the SDI direct questions to about SDI and its investments?

2. Who is authorized to make investments?

3. Where did the $1.3 million go? Ms. Cordes brought up a 2019 audit finding that Leann Weible apparently told her that addressed/resolved the $1.3 million.

4. What caused the fund to go from $89 million (2020) to $81 million?

5. Who were the decision makers?

6. How to reach a conclusion on the audit?

7. Explanation on why public records requests went unanswered.

8. If approximately $20 million is owed from City to SDI, why can’t the City do a payment plan?

9. Why did the former council disregard everything that was asked about SDI?

10. Why did it take so long for the SDI Committee to get a meeting and item? CM Smith asked for this several times.

11. Where did the $1.3 million go?

12. Why were bond shorted?
The City Council directed the City Manager to return with a staff report at a future meeting to provide a process to ensure compliance with the Municipal code and to address the questions from the meeting.

Actions Taken and Records Produced
Since the March 10, 2026, meeting an additional 202 records of trades made by the City have been sent to the committee and the forensic auditor. Staff and the City Attorney’s Office have made demands for additional records from third parties to be produced for the committee.

It is anticipated that the a number of the questions from the meeting will be addressed or answered in future SDI Update reports. With the two initial request questions: Where did the $1.3 million go? Why were bond shorted? And others planned to be addressed on the April 14, 2026 City Council agenda.

Process Moving Forward
There are several requirements of the City within the municipal code that have deadlines or annual completion dates. The City will utilize the following process to comply with the municipal code requirements, specifically the time based requirements of Title 9, Chapter 6, Article 3. SDI FUND EXPENDITURES.

CB 1
4898-7406-7085 v1
By April 14, 2025 – Engage the SDI Committee to determine best timing for the scheduling of committee meeting and future joint meetings.

April 28, 2026 - An item presenting SDI Improvement Projects proposed for fiscal year 2026/27 will come before the City Council on April 28, 2026. The proposed projects from staff and any proposed project received at the meeting or otherwise from an SDI Lot Owner will be sent to the SDI Committee by the City Manager after the meeting. This will meet the requirement of Sec. 9-

6.302(b) which states:

On or before May 1st of each year, the City Engineer shall submit a list of proposed SDI Improvements to the SDI Advisory Committee and City Manager. A SDI Lot Owner may also propose an SDI Improvement by submitting a description of the project.

April 29, 2026 or after – the SDI Committee will be requested to convene with the City Manager and any requested City staff to evaluate the recommendations proposed by staff or and SDI Lot Owner and transmitted. This will meet the requirement of Sec. 9-6.302(c) which states:

The SDI Advisory Committee and the City Manager shall evaluate the report of the City Engineer and make recommendations to the City Council concerning the construction of the SDI Improvements as part of the annual budget process.

May 19, 2026 (tentative) – A Special City Council meeting will be held to conduct a budget workshop where the recommendations from the SDI Committee will be included.

June 2026 – The SDI committee will be requested to convene as part of the Investment Review Committee to review SDI investments held by the City (presuming the SDI Fund has not been moved to an independent public fiduciary). This will meet the requirement of Sec. 3-2.504(b) which states:

The City Manager, Finance Director and City Treasurer (hereinafter collectively "investment review committee") shall review all investments held by the City semi-annually on or about January 1 and July 1 of each year.

This will also meet the requirement of Sec. 3-1.208(b) which states:

The City Manager, Finance Director and SDI Advisory Committee (hereinafter collectively Investment Review Committee) shall review this investment policy annually on or about July 1st of each year and recommend changes as necessary to meet the above stated investment goals. The City Council shall consider any such recommendations made by the Investment Review Committee at a public meeting.

July 7, 2026 – Staff will request and support the Treasurer in providing 1) a quarterly report on SDI investments; and 2) a Statement of Investment Policy to be recommended by the Treasurer and adopted by the City Council. This will meet the requirement of Sec. 3-2.504(a) which states:

The Treasurer shall present quarterly reports on investments to the City Manager and Council.

This will also meet the requirement of Sec. 3-1.208(a) which states:

The Treasurer shall present quarterly reports on cash flow and the investments of the money in the SDI Fund to the SDI Advisory Committee, City Manager and the City Council.

This will also meet the requirement of Sec. 3-2.504(c) which states:

The Treasurer shall annually recommend a statement of investment policy. The Council shall consider the Treasurer's recommendation at a public meeting.

CB 1
4898-7406-7085 v1
October 2026 – Staff will request and support the Treasurer in providing a quarterly report on SDI investments.

January 2027 – Staff will request and support the Treasurer in providing a quarterly report on SDI investments.

January 2027 – The Investment Review Committee will meet to review investments held by the City (presuming the SDI Fund has not been moved to an independent public fiduciary).

April 2027 – Staff will request and support the Treasurer in providing a quarterly report on SDI investments.

The schedule will be repeated in future years to accomplish the required timely actions of the City.

FISCAL IMPACT:

None with this action.

RECOMMENDATION:

Staff recommends that the City Council have a discussion, take public comments, and provide directions to the City Manager on how to proceed in relation to the SDI Committee requests.

ATTACHMENTS:

None.

CB 2

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Anu Doravari, City Planner
SUBJECT: Consideration of City-Initiated Zone Text Amendment (ZTA) to Allow “Farmers Markets” as a Land Use Within the C-2 (Community Commercial) Zoning District or Amendment of
the Temporary Uses Article of the Zoning Code to Allow
Expanded Use of Farmers Markets by Temporary Use Permit BACKGROUND/ DISCUSSION:

On November 17, 2025, the City Council considered a proposal for the City to initiate a Zone Text Amendment (ZTA) to allow “Farmers Market” as a land use within the C-2 (Community Commercial) zoning district. The intent was to allow for the existing farmers market within the community and future potential farmers markets to be able to operate in conformance with the City’s municipal code. The City Council’s direction from the previous meeting was to bring the item back for consideration with information on the cost to the City once the City’s financial situation had been established. The anticipated cost of ZTA is estimated to be $3000, inclusive of legal fees, contract fees for the City Planner, public hearing notices for the Planning Commission and the City Council, and related staff work. This is similar in cost to other community benefit ordinance changes initiated by the City, including the skate park ordinance update.

The proposed ZTA would:
• Define “Farmers Market” as a specific land use within the Zoning Code; • Establish operational standards addressing site layout, hours of operation, signage, waste management, and public safety; and
• Provide flexibility for both temporary and recurring markets while maintaining neighborhood compatibility and regulatory oversight.

In the alternative, the Temporary Uses article of the Zoning Code could be amended to allow for the expanded use of farmers markets via temporary use permit as currently allowed.

Staff would work with the existing farmers market team and other temporary use permit applicants to refine the best approach to address the needs of the applicants and the needs of the City. If directed, staff will coordinate with the City Attorney’s Office to ensure the proposed regulations are consistent with the California Retail Food Code, applicable CEQA requirements and other applicable state and county regulations.

CB 2
If council provides direction to staff to initiate, the following steps will be taken:
• Staff will bring the draft ZTA to the Planning Commission in April 2026 for a public hearing and recommendation.
• Following the Planning Commission’s recommendation, the ZTA will be scheduled for City Council consideration and adoption in early May 2026. • Until the ZTA is adopted, any farmers market operations will remain subject to existing Temporary Use Permit regulations.

FISCAL IMPACT:

There is no fiscal impact with this action. The cost of implementing a ZTA, if directed, would come funded through the exiting Planning budget for fiscal year 2025/26.

RECOMMENDATION:

Staff recommends that the City Council provide formal direction to prepare a Zoning Text Amendment (ZTA) to allow and regulate “Farmers Market” in the manner best suited for applicants and the City.

ATTACHMENTS:

None.

CB 3
4898-7406-7085 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Sean Grayson, Interim City Manager
Kenny Cooper, Finance Manager
SUBJECT: Approval of a Contract with Brown Armstrong Accountancy Corporation for Professional Auditing Services for Fiscal Years 2024-25 Through 2026-27 in an Annual Amount Not-ToExceed $45,980 BACKGROUND/ DISCUSSION:

Each year, the City undergoes a complete audit of its financial transactions and activities by an outside independent audit firm. The function of the independent audit is to provide an annual review of all City funds and financial transactions in accordance with generally accepted auditing standards, as established by the Auditing Standards Board of the American Institute of Certified Public Accountants (AICPA); Government Auditing Standards established by the Comptroller General of the United States; the Single Audit Act of 1984 and the Single Audit Act Amendments of 1996; and the U.S. Office of Management and Budget 2 CFR Part 200 Subpart F (Audit Requirements). Following the audit, the independent auditor issues an “opinion letter” and other reports to the City’s management, addressing the fair presentation of financial position of the financial statements, matters involving internal controls over financial reporting, and compliance with applicable laws, regulations, contracts, and grants. Independent auditors perform a review of internal controls of all significant accounting procedures, report their observations concerning any significant deficiencies, and make recommendations to correct the identified weaknesses in a “management letter” issued to the City Council.

Government Code section 12410.6(b) indicates that a local agency shall not employ a public accounting firm to provide audit services to a local agency if the lead audit partner or coordinating audit partner having primary responsibility for the audit, or the audit partner responsible for reviewing the audit, has performed audit services for that local agency for six consecutive fiscal years. Bryant L. Jolley, Certified Public Accountants, has completed the last six fiscal year audits for the City of California City.

On February 10, 2026, the City Council authorized the release of a Request for Proposals (RFP) for audit services and appointed an Audit Ad Hoc Committee made up of Mayor Hawkins and Mayor Pro Tem Creighton. .

CB 3
4898-7406-7085 v1
The City received four submissions in response to the RFP by the response deadline of March 13, 2026:
• Brown Armstrong Accountancy Corporation
• Vasquez & Company LLP
• LSL
• Badawi & Associates
The Ad Hoc Committee met with staff to review the applications. There was a consensus that Brown Armstrong Accountancy Corporation was the highest scoring applicant using the criteria established in the RFP of Expertise and Experience; Audit Approach; and Cost.

The cost for Brown Armstrong Accountancy Corporation to provide the required and optional audit services is shown in the table below by year:

FISCAL IMPACT:

The cost of required and optional audit services will be $45,980 annually for the three-year contract period to be paid for from Fund #10-4141-310, Finance: Professional Services RECOMMENDATION:

It is recommended that the City Council approve a contract with Brown Armstrong Accountancy Corporation for Professional Auditing Services for fiscal years 2024-25 through 2026-27 and authorize the City Manager to execute a contract.

ATTACHMENTS:

Brown Armstrong Accountancy Corporation Technical Bid
Brown Armstrong Accountancy Corporation Dollar Cost Bid

NB 2

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Joe Barragan, Public Works Director
SUBJECT: Options to Address the Placement of Makeshift Memorials and Opportunities for Alternate Honoring of Community Members BACKGROUND/ DISCUSSION:

On September 17, 2025, the City Manager reached out to the Acting Director of Public Safety and the Public Works Director to ask about “makeshift memorials” in town. There had been multiple complaints about some of the memorials in town. There have been subsequent requests from the Mayor and City Council to bring forward options to respectfully address these memorials.

The City’s Municipal Code does not contain any ordinance or information specifically about memorials. Memorials on City property are not allowed unless an appropriate encroachment permit is obtained if in the right-of-way or a planning and building permit is obtained for city owned parcels. No such permits have been requested or issued. The regulation of memorials on private property would be determined on a case-by-case basis based upon the zoning of the parcel, the size and materials of the memorial, and how or if the specifics of the memorial are regulated by the municipal code or relevant building code. No such permits have been requested or issued.

Many, if not all, of the existing monuments are non-conforming to existing codes and would be subject to removal action. As requested, staff provides the following four options for the City Council to consider as a way to honor the intent of the memorials while also regulating them in the interest of the entire community. City Staff discussed this topic and came up with ideas for regulating memorials to reduce complaints from the public.

Options for an Alternate Method of Honoring Community Members The following three options are examples of ways the City could provide an alternate method to honor the intent of the memorials in conjunction with their removal.

1. The City Council could request the Parks and Recreation Commission to take public input and make a recommendation to the City Council as to an area within a City park where temporary memorials could be permitted or where a purpose-made memorial could be personalized.

NB 2

2. The City Council could direct that a memorial bench program be developed for the City.

The benches would all be the same so that they look uniform throughout the community, but the benches would be engraved to be unique to the individual for whom they are dedicated. Community members would pay for the bench and for it to be installed. This would allow the bench to be in the City easement or right-of-way with a permit and would likely be closer to the location intended to be memorialized.

3. The City Council, instead of allowing memorials in town, could build a monument like the California City Kiosk, which would be for memorials. Friends and Family would be able to make a small donation, a plaque would be made, and staff would place it on the monument. The monument could be built with volunteers and donations.

Options Should the City Council Direct the Regulation and Permitting of Existing Memorials

1. The City Council could request that the Planning Commission make a finding that would categorize memorials as: “Signs” as defined in the City Municipal Code (Code).

Sec. 9-4.205. - Sign. "Sign" means a name, figure, character, outline, spectacle, display, delineation, announcement, advertising, billboard, signboard, device, appliance, or other thing of similar nature to attract attention outdoors, including parts comprising the same, and the background and support or anchorage.

Most memorials would be defined as “Monument Signs”
Sec. 9-4.202. – Monument Sign. "Monument Sign" means a sign having the ground as the primary support or a sign having a ground foundation running the length of the sign.

If the City decides to accept memorials as signs, then Staff would proceed in the following way:
a. All memorials would fall under Title 9, Chapter 4 – Signs. b. Memorials would be allowed on private property with a Building Permit. A lease agreement with the property owner would be required.
c. If a memorial was attached to a fence or wall, a special permit would be required by the Planning Director.
d. Temporary memorials could be allowed with a Building permit and approval from the Planning Director. The duration of the memorial would need to be clear. e. If the Planning Director denies an application for a memorial, the applicant could appeal to the Planning Commission.

2. The City Council could direct staff to amend the municipal code to specifically regulate memorials. This option could take any form that was safe and legal to develop.

The options provided are not exhaustive and staff is interested in input from the community and direction from the City Council for next steps.

FISCAL IMPACT:

There is no fiscal impact with this staff report and the request for direction from the City Council. Any action undertaken would have a specific cost that would be presented when approved.

NB 2
RECOMMENDATION:

Staff recommends that the City Council have a discussion, take public comments, and provide directions to the City Manager on how to proceed in relation to monuments.

ATTACHMENTS:

None.

NB 2
4937-5035-1768 v1

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Joe Barragan, Public Works Director
SUBJECT: Adopt a Resolution Approving the BHT Task Order for Phase I of the Rancho Tract Water Replacement Project
BACKGROUND/ DISCUSSION:

The Upper Rancho Water Replacement Project is supported by $1,000,000 in grant funding awarded to the City through the Fiscal Year 2024 Community Project Funding. It is administered by the United States Environmental Protection Agency (EPA). The project will replace approximately 6,558 linear feet of aging steel water mains in the Upper Rancho neighborhood.

The project includes installing new 8-inch waterlines, 10 valve gates with boxes and hangers, 10 fire hydrants with associated laterals and fittings, six short service laterals, and replacing one Rancho booster pump. These improvements are designed to enhance system reliability, improve water pressure, reduce water loss, and strengthen fire protection capabilities.

The $1,000,000 grant fund is solely for construction, with no funds allocated toward contractual services (engineering design and construction management), Project Management and Controls, Personnel, Fringe Benefits, Travel, Equipment, Supplies, Direct Costs (contingency), or Indirect Costs. The project will be implemented in three phases: (1) completion of 100% design plans and environmental documentation; (2) construction and installation of the new water infrastructure; and (3) project management, compliance reporting, and grant closeout.

BHT is already under contract with the City and, consistent with this contract, has provided the City with a Task Order to design and manage this project. If the Task Order is approved, BHT will be able to begin the project.

FISCAL IMPACT:

Funding in the amount of $74,425 for the task order will come from the 2025-26 Fiscal Budget GL# 95-7005-753.

RECOMMENDATION:

Staff recommends that the City Council adopt a Resolution of the City Council of the City of California City, approving BHT the task order for Phase 1 of the Rancho Tract Water Replacement Project and authorize the Interim City Manager to sign the BHT Task Order in the amount of $74,425 for Phase I engineering of the Rancho Tracts Water Replacement Project.

NB 2
4937-5035-1768 v1
ATTACHMENTS:

1. Resolution 26-32XX

2. Task Order
4927-9509-9032 v1 Page 1 of 2
RESOLUTION NO. 26-3224

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CALIFORNIA CITY APPROVING BHT THE TASK ORDER FOR PHASE
1 OF THE RANCHO TRACT WATER REPLACEMENT PROJECT
The City Council of the City of California City (hereafter referred to as the “City”) does resolve as follows:

WHEREAS, the Upper Rancho Water Replacement Project is supported by $1,000,000 in grant funding awarded to the City through Fiscal Year 2024 Community Project Funding and is administered by the United States Environmental Protection Agency (EPA); and
WHEREAS, the project will replace approximately 6,558 linear feet of aging steel water mains in the Upper Rancho neighborhood; and
WHEREAS, the project includes installation of new 8-inch waterlines, 10 valve gates with boxes and hangers, 10 fire hydrants with associated laterals and fittings, six short service laterals, and replacement of one Rancho booster pump; and WHEREAS, these improvements are designed to enhance system reliability, improve water pressure, reduce water loss, and strengthen fire protection capabilities; and
WHEREAS, the $1,000,000 grant funding is solely for construction, with no funds allocated toward services identified in the task order, including engineering design and construction management.

NOW, THEREFORE BE IT RESOLVED, DETERMINED, AND ORDERED BY THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY, CALIFORNIA, AS FOLLOWS:

SECTION 1: The above recitals are true and correct.

SECTION 2: The City Council authorizes the Interim City Manager to sign the BHT Task Order in the amount of $74,425 so the City can start Phase 1 of the Rancho Tracts Water Replacement Project.

SECTION 3: City Clerk shall certify to the passage and adoption of this Resolution.. 4927-9509-9032 v1 Page 2 of 2
PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this 24th day of March 2026.
__________________________
Marquette Hawkins
Mayor
ATTEST: APPROVED AS TO FORM:
___________________________ __________________________
John Paul Maier Victor M. Ponto,
Deputy City Manager / City Clerk City Attorney

CERTIFICATION
I, John Paul Maier, City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the 24th of March 2026, by the following vote, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this 24th day of March, 2026. __________________________
John Paul Maier
Deputy City Manger / City Clerk
Staff Estimated
Hours Rate / hr. Total
Sr. Civil Engineer 20 175.00 $ 3,500.00 $
Sr. Proj. Manager 5 165.00 $ 825.00 $
Assist. Proj. Manager 8 115.00 $ 920.00 $
Clerical 16 70.00 $ 1,120.00 $
2-man Crew 30 340.00 $ 10,200.00 $
Sr. Proj. Manager 8 165.00 $ 1,320.00 $
Assist. Proj. Manager 10 115.00 $ 1,150.00 $
Sr. Civil Engineer 110 175.00 $ 19,250.00 $
Sr. Proj. Manager 90 165.00 $ 14,850.00 $
Assist. Proj. Manager 50 115.00 $ 5,750.00 $
Clerical 10 70.00 $ 700.00 $
Sr. Civil Engineer 6 $ 1,050.00 175.00 $
Sr. Proj. Manager 6 $ 990.00 165.00 $
Assist. Proj. Manager 4 $ 460.00 115.00 $
Clerical 2 $ 140.00 70.00 $
Sr. Civil Engineer 10 $ 1,750.00 175.00 $
Assist. Proj. Manager 8 $ 920.00 115.00 $
Clerical 2 $ 140.00 70.00 $
Sr. Civil Engineer 16 175.00 $ 2,800.00 $
Assist. Proj. Manager 6 $ 690.00 115.00 $
Clerical 2 70.00 $ 140.00 $
Sr. Civil Engineer 24 175.00 $ 4,200.00 $
Assist. Proj. Manager 8 115.00 $ 920.00 $
Clerical 4 70.00 $ 280.00 $
600 0.60 $ 360.00 $
Grand Total= 74,425.00 $
NOTES:
•AdverƟsement and Processing Costs by City
•The work as described for this task order shall be completed by May 31, 2026. This Ɵmeline may be extended The signatures below shall serve as an authorization to proceed on Task Order from the City and is acknowledged by Consultant. *Construction Inspection / administration by separate Task Order.

BHT Engineering, Inc. City of California City
Juan M. Pantoja, Principal Engineer Sean Grayson- Acting City Manager Date: 2/11/2026 Date:
*This total estimated time is considered a maximum amount based on scope of work and expected course of construction. Scope of work / course of construction changes could reflect changes in time. Additional cost of time and materials, which BHT Engineering, Inc. would work with the City.

February 10, 2026

FOR PRELIMINARY ENGINEERING
RANCHO TRACTS WATER REPLACEMENT PROJECT PHASE 1
FEDERAL #: to be determined

TASK ORDER
BHT Engineering, Inc. will perform Preliminary Engineering design services as outline in Contract Agreement for General Engineer Services dated September 9, 2025 fee schedule
Topographic Field Survey: Prevailing Wage
Prepare Project Plans, Specifications, Estimates, Bid Preparation Utility Coordination

SCOPE OF WORK
Construction Phase Authorization
Progress Invoicing
Bidding and Award of Project
Project Administration, Meetings and Coordination
Mileage: 150 miles round trip x 4 times
Coordinate with City Staff for project’s concept and direction. Schedule meetings, managing the project schedule, preparing and distributing minutes, field reviews, tracking action items for the City, and preparing all submissions for the City to submit to grant witter as and EPA. Internal coordination meetings to ensure team members are current in project goals and criteria, as well as apprised of any project adjustments. This task includes project setup, coordination, budget/schedule monitoring, and invoicing.

Perform data records search to determine existing right-of-way. Review aerial photos, perform utility survey and prepare findings and Basic topographic mapping.

Coordinate with City Staff for the advertisement and award of the project. Assist City in all aspects of the bidding process: including respond to RFIs, prepare addendums, attend and conduct pre-bid meeting, attend the bid opening, review bid results and qualify lowest responsible bidder, and make recommendations for awarding the construction contract. The advertising costs are to be paid by the City directly to the advertising newspaper and are not included in this proposal. City Staff will be responsible for log in, open and retain received bids.

Prepare and submit progress invoices to EPA as required to obtain reimbursement for the City’s expenditures. It is anticipated that two (2) progress invoices will be prepared for this phase.

Perform field engineering surveying necessary for preliminary engineering, design, cost estimates.

Perform preliminary and final project design: water mains replacement design plans, etc. The design team will prepare the project plans, specifications, and cost estimate. Technical specifications will conform toAWWA standard specification.

Prepare and send letters to request as built information from utility facility owners and provide notification of upcoming work, for locates and utility adjustments.

Prepare and submit the Request for Authorization to Proceed with Construction package to EPA.

NB 3

COUNCIL AGENDA ITEM
March 24, 2026
TO: Mayor and City Council
FROM: Joe Barragan, Public Works Director
SUBJECT: A Resolution of the City Council of the City of California City, Authorizing the Purchase of a New Front Loader from Clairemont Equipment for $255,336.96
BACKGROUND/ DISCUSSION:

The Public Works Department has received three quotes to purchase a front loader for the Cleanup Crew Department. This purchase will be completed with Illegal Dumping Funds. A bid process was used by staff to obtain at least three quotes from qualified bidders following the regulations in the City Municipal Code Section 3-3.109.(b)(2)(iii).

When the City submitted the documents to the County for the use of the Illegal Dumping Funds, the City specifically stated that the funds would be used to purchase equipment to eradicate illegal dumping in California City. The County approved the use of these funds for that purpose. In the approved Fiscal Year Budget for 2025-26, in GL# 27-4413-740, there is $250,000 for the purchase of a front loader. The remaining But the fund has enough balance to cover the purchase The Clean-up Crew needs a front loader to remove the trash and debris that is illegally dumped in town. The Clean-up crew was borrowing the Street Department’s Front Loader, but that piece of equipment no longer works and needs a new engine. Staff recommends that the City Council approve the purchase through Clairemont Equipment since their quote was the least expensive.

FISCAL IMPACT:

This purchase is Grant-funded from Illegal Dumping Funds GL# 27-4413-740. Purchase of Equipment with a FY25-26 Budget of $250,000. The remainder of $5,336.96 will be paid from the same fund which has a balance over $600,000 as of February 28, 2026.

RECOMMENDATION:

Staff recommends that the City Council approve the resolution authorizing the purchase of a new front loader from Clairemont Equipment for $255,336.96.

ATTACHMENTS:

1. ResolutionQuotes
4927-8342-9785 v1 Page 1 of 2
RESOLUTION NO. 26-3225

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CALIFORNIA CITY APPROVING THE PURCHASE OF A NEW FRONT
LOADER
The City Council of the City of California City (hereafter referred to as the “City”) does resolve as follows:

WHEREAS, an informal bid process was used by staff to obtain at least three quotes from qualified bidders following the regulations in the City Municipal Code Section 3-3.109.(b)(2)(iii); and
WHEREAS, when the City submitted the documents to the County for the use of the Illegal Dumping Funds, the City specifically stated that the funds would be used to purchase equipment to eradicate illegal dumping in California City; and WHEREAS, the County approved the use of these funds for that purpose; and WHEREAS, the Clean-up Crew needs a front loader to remove the trash and debris that is illegally dumped in town.

NOW, THEREFORE BE IT RESOLVED, DETERMINED, AND ORDERED BY THE CITY COUNCIL OF THE CITY OF CALIFORNIA CITY, CALIFORNIA, AS FOLLOWS:

SECTION 1: The above recitals are true and correct.

SECTION 2: The City Council hereby approves the purchase of a new front loader from Clairemont Equipment for $255,336.96 and authorizes the City Manager to execute the related purchase agreement.

SECTION 2: City Clerk shall certify to the passage and adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of California City, this ___ day of _________________ 2026. __________________________
Marquette Hawkins
Mayor
ATTEST: APPROVED AS TO FORM:
___________________________ __________________________
John Paul Maier Victor M. Ponto,
City Clerk City Attorney
4927-8342-9785 v1 Page 2 of 2

CERTIFICATION
I, John Paul Maier, City Clerk of the City of California City, California, hereby certify that the foregoing resolution was duly adopted at a meeting of the City Council of said City at its meeting held on the ____ of ______________ 2026, by the following vote, to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of California City, California, this ____day of _________, 2026. __________________________
John Paul Maier
City Clerk

SERVING SOUTHERN CALIFORNIA SINCE 1970
WA320-8
Prepared for:

Joe D. Barragan
Prepared by:

Terry Rose
[email protected]
912-257-0068
Quotation Number: trose-0046
01-19-2026
Proposal for:

CITY OF CALIFORNIA CITY
SERVING SOUTHERN CALIFORNIA SINCE 1970
Quote #:trose-0046
March 18, 2026
Joe D. Barragan
Public Work Director

CITY OF CALIFORNIA CITY

Dear Joe,
We are pleased to present to you the following detailed specification and pricing information regarding the following:
2026 Komatsu WA320-8 OrderFactory Order Stock: N.I.S 0
Thank you for the opportunity to present this quote for Clairemont Equipment products and services. We look forward to discussing further details on the information enclosed. This quote is good for 30 days and is contingent upon prior sale.

Please sign this quote if it is inclusive of all items discussed. This is not a sales agreement, it merely reflects all items discussed and agreed upon. Thank you again for allowing Clairemont Equipment to assist you with your equipment needs.

Sincerely,
Terry Rose
Executive Vice President
912-257-0068
[email protected]
SERVING SOUTHERN CALIFORNIA SINCE 1970

CONFIGURATION
WA320-8 KOMATSU WHEEL LOADER

STANDARD BOOM

COUNTERWEIGHT ADDITIONAL

ENGINE INTAKE, STD

BKT CYL, STD

KOMATSU HYD QUICK COUPLER
(X4) TIRE ONLY 20.5R25 XHA L3 MICHELIN
4 RIMS 20.5 R25 FOR TIRE ONLY
WA320 GP COULER BKT 3.25YD
2-SPOOLS VALVE, STANDARD
Key Machine Specifications
Engine: Komatsu SAA6D107E-3, Tier 4 Final
Gross Power: 170 HP
Net Power: 165 HP
Hydrostatic Transmission with 4 Speed F/R
ROPS/FOPS Pressurized Cab
7-inch Color LCD Monitor
Heated Air Suspension Seat
Rear View Monitor
Air Conditioning
KOMTRAX Remote Monitoring
Komatsu CARE Complimentary Maintenance

ATTACHMENTS
96" FORKS WITH 60 INCH CARRIAGE

AMOUNT TO FINANCE
Taxable Amount $235,877.10
Sales Tax 8.25% $19,459.86
Subtotal $255,336.96
Sale Price $235,877.10
Total Amount $255,336.96

OPTIONAL ITEMS (NOT INCLUDED IN PRICING)
Machine comes standard with factory scheduled maintenance for the first 3 years/2,000 hours
POWERTRAIN PLUS HOURS: 4000 MONTHS: 48 $5,175.15
POWERTRAIN PLUS HOURS: 3000 MONTHS: 36 $3,829.97
SERVING SOUTHERN CALIFORNIA SINCE 1970

CONDITIONS
This sales quote is good for 15 days and is governed by the sales agreement terms and conditions here: Clairemont Terms & Conditions. The terms and conditions are in effect upon the customer’s signature and date below, or the Customer’s signature with all materials incorporated by reference on the sales agreement. Due to potential changes in tariff regulations, a tariff-related surcharge may be applied.

Signature: ___________________________________
Print: _______________________________________
Date: ___________________
SERVING SOUTHERN CALIFORNIA SINCE 1970
Machine Specifications - Komatsu WA320-8
(The Machine Specifications listed below may differ from what is on the unit presented in this document.

Where differences may occur, the “Price & Configuration” section presents the accurate description of the unit offered) Standard Equipment for Base Machine
Engine and related items: Equipment Management Monitoring System (EMMS) Air cleaner, dry-type, two stage, radial sealed Monitor: Multi-fuction, 7 inch, LCD, color high-resolution Engine shut-off system, electric with key Warning Message System with Descriptions Engine, Komatsu SAA6D107E-3, 6 cylinder, turbocharged, air to Gauges air after cooled, cooled EGR, direct injection Tier 4 Final emissions
• DEF Level
certified, diesel • Engine water temperature
Gross HP: 170HP (127kW) / 2100 RPM (SAE J1995) • ECO
Net HP: 165HP (123kW) / 2100 RPM (SAEJ1349) ISO / 9249 • Fuel level Max HP: 173HP (129kW) / 1900 RPM (ISO 14396) • HST oil temperature Exhaust pipe, curved • Speedometer / Tachometer
Fan, auto-reversing, hydraulic-driven Pilot Lights
KDPF - After-Treatment Assembly Consisting of KDOC and KCSF • Auxiliary steering (opt) Komatsu Auto Idle Shutdown • Brake oil pressure
SCR - Selective Catalytic Reduction aftertreatment with • Central warning DEF tank and heated lines • Cooling fan reverse
Starting aid, intake manifold preheater • DEF Level
Electrical system: • Directional indicator
Alternator, 90 ampere, 24 volt • ECSS
Back-up alarm • Engine pre heater
Batteries, 2 x 12 volt (92 Ah) (680 CCA) • Head lamp high beam Battery disconnect switch • HST Emergency pump drive
Horn, electric • KDPF restriction indicator
Lights • Komtrax message
• Back-up light, rear, LED • Parking brake warning
• Stop and tail, LED • Quick coupler lock release (opt) • Turn signal, (2 front, 2 rear) with hazard switch • Remote Boom & Bucket Positioner • Working lights, halogen (2 front, high low • Seat belt caution beam with indicator, fender mount, 2 rear grill mount • Steering oil pressure SERVING SOUTHERN CALIFORNIA SINCE 1970
• Working lights, halogen (2 front) • Traction level
outside of cab mount • Transmission speed range
Sealed DT electrical connectors • Turn signal
Starting motor, 5.5 kW direct electric, 24 V • Work equipment lock warning Power Train and Controls: Special arrangements:

Differentials, torque proportioning, inboard planetary Ambient Temperature Range, -20°C (-4°F) Parking brake, wet multiple disc through +45°C (+113°F) at maximum standard elevation Service brakes, hydraulic, wet multiple disc, axle by axle (inboard) of 2,300 meters (7,546 ft.) Transmission, hydrostatic, 1 pump, 2 motors, full auto Other Standard Equipment:
shift with speed range control Boom kick-out, automatic, in-cab adjustable Transmission control Bucket and lift cylinders
• F/R: steering column / loader control lever selectable Bucket positioner, automatic, in-cab adjustable, 3 position • Max speed control: electric, 4 speed F/R Centralized grease banks • Traction control: electric, 3 mode Counterweight, standard and additional Operator environment: Electronically Controlled Suspension System (ECSS) Cab, (ROPS/FOPS) (installed), includes; adjustable arm Fenders, front & partial rear rests, adjustable work equipment levers, cigarette lighter/ Hand rails, front, LH & RH ashtray, dome light, electrically heated rear window, air KOMTRAX, Level 5 conditioner / heater / defroster / pressurizer, floor mat, Lifting eyes front (intermittent) and rear wiper/washer, rearview mirrors Parallel loader linkage and standard lift boom '(2 outside, 2 inside), right hand and left hand door access Provision for Quick Coupler (mount points for piping, with steps and sunvisor harness for cab switch)
Hydraulic control, 2 spool (boom/bucket), multi-function mono lever
Rims for 20.5-25 tires (4 each)
control, with integrated transmission F/R switch and includes Vandalism Protection:
integrated third spool proportional switch (3 spool is optional) • Caplock & cover for fuel tank & hydraulic tank Monitor, 7 inch, LCD, color • Padlocks
Radio, AM/FM with speakers and auxiliary jack • Battery boxes Rear view monitor • Engine hood side panels & rear grill, lockable Seat, heated air suspension type, reclining with armrests (fabric) • Radiator cap cover (bolted) Seat belt, 3" width, retractable • Transfer case oil filler cover Steering wheel, tiltable, telescopic Voltage converter (12 volt, 5 amp x 2) SERVING SOUTHERN CALIFORNIA SINCE 1970
Komatsu Care - Complimentary Maintenance Program
Komatsu CARE comes standard on all eligible Tier 4 construction equipment. When you own and operate a piece of Komatsu Tier 4 construction equipment, you can expect more than a high-tech, hard-working machine. You can also expect a strong commitment from Komatsu and Clairemont Equipment to deliver an ownership experience that’s second to none.

We call it Komatsu CARE — a complete service and advanced product support solution that Komatsu provides our customers for the life of the machine. Komatsu CARE features our exclusive complimentary scheduled maintenance program: Every Komatsu Tier 4 Interim construction equipment machine comes standard with Komatsu Care complimentary factory scheduled maintenance for the first 3 years/2,000 hours (whichever occurs first). Eligible Komatsu Tier 4 construction machine comes standard with factory scheduled maintenance for the first 3 years/2,000 hours. Machines with one KDPF assembly are eligible for one Complimentary KDPF exchange during the first 5 years or 4,500 hours (whichever occurs first) from machine Fist-in-Dirt Date. Machines with two KDPF assemblies are eligible for one Complimentary exchange of both KDPF assemblies during the first 5 years of 4,500 hours (whichever occurs first) from machine Fist-in-Dirt Date. SCR maintenance service for the first 5 years/ 4,500 hours, whichever occurs first, are also included under Komatsu CARE.

Komatsu Care Plus, Komatsu Care Plus II and Komatsu Care Plus III are also available. (Based on model. Exclusions apply.) SERVING SOUTHERN CALIFORNIA SINCE 1970
KOMTRAX – Remote Monitoring System
KOMTRAX is Komatsu’s state of the art wireless monitoring system. You can monitor essential information, updated, and transmitted on a regular basis, about your Komatsu machines directly on your computer, smartphone or tablet. Komtrax is standard equipment on most new Komatsu machines. Free monitoring services are offered to the original owner and are transferable under most circumstances if necessary. This program allows you to locate equipment on large jobsites or around your territory, monitor machine movement, determine which operators are more efficient in which situations, track fuel consumption, identify operator use and habits, and chart daily hours of operation. With operational reports you can see how many hours your machine spent in various modes of operation such as digging, traveling, hydraulic relief, power mode, economy mode, lifting mode, and more.

KOMTRAX Plus from Komatsu is an advanced remote monitoring system for mining equipment. KOMTRAX Plus has the unique ability to retain a history of normal system operating parameters. Because every machine establishes its own norms, deviations from these norms can alert you to the need to be proactive thus avoiding expensive down time and after failure repairs. Another KOMTRAX Plus feature is Pay Load Meter (PLM). PLM is standard on mining and quarry sized haul trucks.

PLM provides carry weight, haul cycles and haul cycle details. PLM data is designed to help increase production. KOMTRAX Plus and PLM's comprehensive data sets are all designed to help you prolong machine life, improve efficiencies, and increase production.

Invoice # 001-0
Date 3/4/2026
Time 11:07 AM
PO #: 721G WHL
LDR
Document #: 001-7122
Due Date: 4/10/2026
Salesman: Dennis Monahan
Ship Via:

Terms: Net 10th
CITY OF CALIFORNIA CITY (6514)
21000 HACIENDA BLVD
CALIFORNIA CITY CA 93505-2293
Contact: JOE BARRIGAN @ 760.373.7162
Ship To:

Wholegood Sales Order
Reprint

REVISED QUOTE
Item Number Sales Extended Back Drop
Description Qty Price Amount Disc Subtotal Tax Amount Order Ship EQUIPMENT QUOTE:

CASE 721G WHEEL LOADER 1.00 $259,584.30 $259,584.30 $259,584.30 $21,415.70 $281,000.00 721G Z-BAR WHEEL LOADER, TIER 4 FINAL
2026 CASE 721G WHEEL LOADER
S/N: NZHE19066 (#3258)
ENGINE MODEL: FPT F4HFE613T
ENGINE YEAR: 2026
HORSE POWER: 195-GROSS/179-NET

DIESEL OXIDATION CATALYST
ENGINE FAMILY: KFPXL06.7SOB
782440 CAB w/HEATER & A/C
734057 3" SEAT BELT
424225 5-SPEED TRANSMISSION
734073 CLOTH HEATED AIR SUSPENSION SEAT
782774 HEADREST
782114 AM/FM BLUETOOTH STEREO RADIO
734152 ENHANCED CAB COMFORT
734154 ENHANCED VISIBILTY PACKAGE
782777 OPERATOR'S CONVENIENCE PACKAGE
782441 STANDARD HYDRAULIC STEERING
734054 3-SPOOL VALVE - JOYSTICK & LEVER
482931 HEAVY DEBRIS COOLING SYSTEM
424235 HEAVY DUTY AXLES
782510 STD. FENDERS w/LH & RH STEPS
734068 LED LIGHT PACKAGE 2F/2R
782108 4-CORNER AMBER STROBE
424223 EJECTOR TYPE PRE-CLEANER
726013 REMOTE JUMP START
482105 ENGLISH LITERATURE
424911 LOCKING HYDRAULICS
482059 HEAVY COUNTERWEIGHT
782203 R/L EXTERIOR REAR VIEW MIRRORS
424244 3.5 CU/YD 106" GP BUCKET #92147608
424250 FULL LENGTH BOLT-ON CUTTING EDGE
782503 AUTO RIDE CONTROL
782897 REAR FRAME SIDE COVERS
482599 MICHELIN BRAND
9420440 20.5R25 L3 Radial (3-pc rim)
461742 TELEMATICS SERVICE - 5YR ADVANCED SUBSCRIPTION
461680 CASE SITEWATCH - TELEMATICS
Printed:3/4/2026 7:27 AM

Page 1 of 2 ends

Invoice # 001-0
Date 3/4/2026
Time 11:07 AM
PO #: 721G WHL
LDR
Document #: 001-7122
Due Date: 4/10/2026
Salesman: Dennis Monahan
Ship Via:

Terms: Net 10th
CITY OF CALIFORNIA CITY (6514)
21000 HACIENDA BLVD
CALIFORNIA CITY CA 93505-2293
Contact: JOE BARRIGAN @ 760.373.7162
Ship To:

Wholegood Sales Order
Reprint

REVISED QUOTE
Item Number Sales Extended Back Drop
Description Qty Price Amount Disc Subtotal Tax Amount Order Ship WARRANTY: 3-YEAR/3000 HOURS w/FULL COVERAGE AND 2-YEAR/2,000-HOUR EXTENDED LIMITED ENGINE WARRANTY INCLUDES: DELIVERY TO CUSTOMER LOCATION - CALIFORNIA CITY, CA Cash Check/Check# CC/CC Type On Acct. Mfg Credit CIT Deposit Other $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Summary of Charges
$259,584.30 Taxable
$0.00 Non-Taxable
$259,584.30 Subtotal
$21,415.70 Sales Tax
$281,000.00 Total
$0.00 Amount Tendered
$0.00 Change Due
This offer to sell is good for a period of thirty days or less, if specified. Once accepted, it forms a binding sales agreement. There is no cooling-off period. Should you accept this offer in writing by executing this Wholegoood Sales Order. where indicated below, and later decide to cancel your purchase, Sequoia will make a good faith effort to cancel the order to purchase with the manufacturer. However, should Sequoia not be able to cancel the order with the manufacturer, then your deposit is only refundable after the subject equipment is sold to a third party. All costs incurred by Sequoia in connection with this equipment/transaction will be accounted for and deducted from your deposit once the subject equipment is sold to a third party. Any remaining funds from the deposit will then be returned to you.

Exempt Tax Cert #:

Customer Signature Date Expiration Date:

Printed:3/4/2026 7:27 AM

Page 2 of 2 ends

WA320-8
Wheel loader Tier 4 Final engine
Photos in this brochure may include optional equipment
Net horsepower
165 HP @ 2,100 rpm
(123 kW @ 2,100 rpm)
Operating weight
34,128-34,987 lbs.
(15,480-15,870 kg)
Bucket capacity

3.0-4.2 yd3
(2.3-3.2 m3)
2 WA320-8
Walk-around
Efficiency Reliability Productivity
• Quick acceleration
• Dynamic braking
• Variable speed traction control
• Low range creeping mode
• HST coasting mode
High production with low fuel consumption
Bucket capacity

3.0-4.2 yd3
(2.3-3.2 m3)
Net horsepower
165 HP @ 2,100 rpm
(123 kW @ 2,100 rpm)
Operating weight
34,128-34,987 lbs.
(15,480-15,870 kg)
Komatsu SmartLoader Logic
helps reduce fuel consumption
without decreasing production.

Proven, fourth-generation hydrostatic transmission:
3 WA320-8
All comparisons are made with respect to the prior Komatsu model unless otherwise specifically stated.

Energy saving guidance:
• Six operator guidance messages
• Enhanced ecology gauge
Komatsu Auto Idle Shutdown helps reduce idle time and
operating costs.

Remote boom positioner can set kickout.

Versatile parallel Z-bar (PZ) linkage for parallel lift.

Variable displacement piston pumps with closed-center load sensing system (CLSS) help reduce fuel consumption.

Komtrax equipped machines send location, SMR and operation maps to a secure website or smartphone via wireless technology.

Machines also relay error codes, cautions, maintenance items and fuel and DEF levels.

Operator identification system tracks machine operation for up to 100 operators.

A powerful Komatsu SAA6D107E-3 engine provides a net output of 165 HP (123 kW) with up to 3% improved fuel consumption. This engine is EPA Tier 4 Final emissions certified.

Variable geometry turbocharger (VGT) is hydraulically
actuated to provide optimum air flow under all speed and load conditions. This Tier 4 Final version has improved performance.

Komatsu Diesel Particulate Filter (KDPF) and selective catalytic reduction (SCR) systems reduce particulate matter and nitrogen oxides while providing automatic regeneration that does not interfere with daily operation.

Ample cooling capacity
• Auto-reversing fan is standard
• Wider core coolers
Fluid neutral or better
Combined fuel and diesel exhaust fluid (DEF) consumption is equal to or less than the WA320-7 fuel consumption.

Spacious cab provides the operator with improved comfort and visibility.

New high-resolution monitor panel:
• Enhanced and intuitive onboard diagnostics
• Integrated with Komtrax Level 5
• Integrated with Komatsu Tier 4 Final technology
Rearview monitoring system is standard.

New high capacity air suspension seat with heat is standard. 4 WA320-8
Komatsu new engine technologies
New Tier 4 Final engine
The Komatsu SAA6D107E-3 engine is EPA Tier 4 Final
emissions certified, promotes reduced fuel consumption
and provides exceptional performance. Based on
Komatsu proprietary technologies developed over many
years, this diesel engine reduces nitrogen oxides by more than 80% compared to Tier 4 Interim levels.

Performance features
Advanced electronic control system
Manage your engine parameters more effectively with
an improved electronic control system. Fine-tune your
airflow rate, EGR gas flow rate, fuel injection
parameters and aftertreatment function for an efficient and optimized performance. Get enhanced diagnostics
through the monitor panel and track your maintenance
information via Komtrax.

Variable geometry turbocharger
(VGT) system
Designed to improve engine performance and
efficiency, the VGT features proven hydraulic
technology for precise, responsive control in a wide
range of conditions. The VGT also provides precise
exhaust temperature control for efficient KDPF
regeneration. The Tier 4 Final version has a smaller
impeller to promote improved performance.

Heavy-duty cooled exhaust gas
recirculation (EGR) system
Reduce nitrogen oxide emissions and enhance fuel
efficiency with the heavy-duty cooled exhaust gas
recirculation (EGR) system. This system recirculates a
portion of exhaust gas into the air intake and lowers
combustion temperatures
to help reduce thermal
stress and protect the
engine. Combining this
system with SGR technology
allows for lower EGR gas
flow while still meeting Tier
4 Final emission standards.

New engine technologies
Heavy-duty after treatment system
This new system combines a Komatsu Diesel
Particulate Filter (KDPF) and Selective Catalytic
Reduction (SCR). The SCR NOx reduction system
injects the precise amount of Diesel Exhaust Fluid
(DEF) to break down nitrogen oxide into non-toxic
water vapor (H2O) and nitrogen gas (N2).

KDPF
VGT
SCR
KCCV
Cooled EGR
DPF DEF mixing tube
Clean exhaust
Ammonia oxidation catalyst
Secondary selective reduction
catalyst for NOx
Primary selective reduction catalyst for NOx
Variable geometry
turbo charger EGR valve
EGR cooler Air cooler
5 WA320-8
Komatsu
SmartLoader
Logic
Engineered
to optimize your
machine‘s performance,
Komatsu SmartLoader Logic automatically
adjusts your engine torque to match the application.

Get more torque for higher digging in V-shape loading
and less torque when driving with an empty bucket. This system functions automatically for a smooth operation
to help promote minimized fuel consumption and
enhanced productivity.

Hydrostatic transmission (HST)
Easily adapt to a variety of mining tasks with this wheel loader’s HST. Getting precise speed and directional
control enables the operator to handle different
materials effectively and navigate tight, confined areas.

Auto-shifting provides a smooth operation and allows
operators to work efficiently and productively.

Creep mode
Creep mode limits the travel speed in the first speed
range while still allowing for full hydraulic flow.

Heavy-duty, high-pressure common
rail fuel injection system
This system is designed to deliver fuel precisely and
efficiently to the engine’s combustion chambers at
extremely high pressures to help decrease particulate
matter (PM) emissions and nitrogen oxide. With
efficient combustion, this system also helps promote
a reduction in fuel
consumption.

Variable traction control system
Maneuver confidently through challenging terrain with this wheel loader‘s variable traction control system. S-mode helps reduce tire spin in slippery or snowy conditions.

Auto-mode
automatically
optimizes the
tractive effort for
various working
conditions. Max
traction provides
100% tractive
effort.

Engine Piston pump
Low speed
piston
motor
High speed
piston
motor
Transfer case
To differentials
Closed-center load sensing system (CLSS)
Get optimized machine performance and enhanced
fuel efficiency with a one-pump, two-motor system
that utilizes a CLSS pump designed to help minimize
hydraulic loss.

Komatsu Auto Idle Shutdown
Designed to enhance the efficiency of your wheel
loader, the Komatsu Auto Idle Shutdown turns off the
engine after a specified period of inactivity. Less idling means fewer emissions, which helps conserve natural
resources and contributes to a cleaner and more
sustainable working environment.

ECU
Common rail
Injector
Supply
pump
S-mode
Improve tire slip ratio on snowy or
slippery road conditions
Auto
Tractive effort is automatically
adjusted in this range
New HST transmission coasting mode
Get precise control over the wheel loader’s speed and
power with the ability to simulate the operation of a
torque converter-style transmission. The operator can
choose between three selectable settings (default,
medium and soft) to help optimize performance.
6 WA320-8
Operator environment
Tiltable/telescopic steering wheel
Adjust the steering wheel to a position that
best suits your ergonomic
needs. The two-spoke
tilt/telescope steering
wheel allows operators
to optimize their view of
the work area, the bucket
or attachment and their
surroundings.

Low-noise design
Operator’s ear noise level: 68 dbA
Dynamic noise level (outside): 105 dbA
Minimize operator fatigue and
help promote operator alertness
and productivity with a spacious
ROPS/FOPS cab that features
Komatsu’s unique viscous
mounts. The low-noise engine,
hydraulic drive fan and hydraulic
pumps are mounted with rubber cushions
to help provide a quiet, low-vibration,
comfortable operating environment.

Increased cab storage area
The WA320-8 cab
features a storage
box on each side of
the cab to allow the
operator to store
items such as a
beverage or lunch.

New operator seat
Work comfortably and stay productive with
a heated, air-suspension seat designed to
provide support on rough
roads and dampen machine
vibrations. The angle of the
armrest is fully adjustable for
optimum operator comfort.

A secondary forwardneutral-reverse switch is
incorporated into the
standard Multi-Function
Monolever.
7 WA320-8
Engine shutdown secondary switch
In case of an emergency, operators have a quick and
accessible secondary shutdown switch when accessing
the key switch is not possible.

AUX
input jack
12 V
outlets
Machine monitor
Standard rearview monitoring system
Promote safe operation with a clear view of the area
behind the wheel loader from a dedicated full-color
monitor on the right side of the cab. Always have the
monitor on or only when the loader is in reverse.

Guidelines provide the operator with visual cues for the width of the loader.

Auxiliary input (MP3 jack)
and 12V outlets
Stay connected with a
conveniently located auxiliary
input (MP3 jack) and two 12-volt
outlets on the cab’s rear wall.

Color rearview monitor
Multiswitch panel
Multifunction audio
Stay connected with an AM/FM radio and Bluetooth
wireless technology with microphone for hands-free
operation.
8 WA320-8
Easy access Remote boom positioner
Easily enter and exit the cab on an inclined ladder with wide steps and well-placed handholds. The door latch
is accessible from the ground level.

Electronically controlled suspension
system (ECSS)
Get a smooth, comfortable ride during your load and
carry operations with this wheel loader’s ECSS. An
accumulator absorbs the shock in the boom arm to
help stabilize the machine, promoting reduced operator
fatigue and mitigating material spillage. Ride control is speed-sensitive, and you can adjust the activation
speed in the monitor panel.

Multi-Function Monolever
Get enhanced hydraulic control of your third spool
attachments and streamline your tasks with a single lever.

The Multi-Function Monolever with electronic pilot control includes a forward-neutral-reverse switch for quick and easy travel. Set attachments to continual or proportional control via the monitor panel, allowing the operator to manage the boom, bucket and attachment with one hand.

Attachment selector switch
Remote boom positioner
Operators can stay out of harm’s way by conveniently
setting the upper boom limit from the cab.

Attachment selector switch
Easily switch between different attachments such as
buckets, forks or grapples to handle various materials and tasks. Coupler-equipped machines that use buckets and
forks require a different flat level setting when switching between attachments. The attachment selector switch
informs the loader which flat level to use.

Working environment
9 WA320-8
New high-resolution LCD monitor panel
Stay informed of the machine’s settings and
conditions with a 7-inch color LCD monitor panel that
displays operational information, ecology guidance and
maintenance records. Information such as traction
mode, coolant temp, oil levels and fuel levels are easy to read.

Visual user menu
Navigate the user menu quickly from the switch panel
with easy-to-understand, intuitive icons for easier
machine operation.

Operator identification function
Set preferences and performance settings for
individual operators with operator identification (ID)
codes. Identify areas for efficiency enhancement and
performance
optimization
by tracking
and managing
machine data
through
Komtrax by job
or machine.

Monitor panel with troubleshooting function
Quickly identify issues and take appropriate action with feedback from a centrally arranged monitor panel featuring a troubleshooting function. The monitor simplifies start-up inspection and warns the operator with a lamp and buzzer if any abnormalities occur. There are four levels of warnings, which the operator must acknowledge and clear. There are also indications
for oil and filter
replacement
times.
1 LCD unit
2 LED unit
3 Engine tachometer
4 Speedometer
5 Ecology gauge
6 Air conditioner display
7 Traction level
1 Energy saving guidance
2 Machine settings
3 Aftertreatment devices
regeneration
1 Air conditioner switches / Numeral key pad 2 Function switches 8 Engine coolant temperature gauge
9 Fuel gauge
10 HST oil temperature gauge
11 Variable speed display
12 Message pilot lamp
13 Pilot lamps
14 DEF level gauge
Machine monitor
Switch panel
Menu switch
1 2 3 4 5 6 7
1 8
10 12 13
11 1
2 14
5 6 7
9 2 3
4 Information and communication technology
4 SCR information
5 Maintenance
6 Monitor setting
7 Mail check
10 WA320-8
Side-opening gull-wing engine doors
Simplify maintenance with large, gull-wing engine doors that open and close easily with gas-assisted struts.

Quick access to the engine, components and service
points helps reduce
downtime and
increase productivity.

Large steps on each
side of the frame
also enhance
accessibility.

Swing-out cooling fan and wide
core radiator
The cooling fan swings out for easier cleaning.

The coolers feature wide-spaced cooling fins to
reduce clogging.

Auto-reversing fan
Maintain optimal operating temperatures with a
hydraulically driven engine cooling fan that can be set to reverse automatically during operation. Operators
can control the
fan reverse mode
and timing
through the
monitor.

Diesel emission fluid
(DEF) tank
Easily access the DEF tank
behind the right-hand side ladder.

An external sight gauge helps
prevent overflow and spillage
while refilling.

Battery disconnect switch
A standard battery disconnect
switch allows a technician to
disconnect the power supply to
lock out before servicing the
machine. The switch is located on
the right side of the machine.

Maintenance features
11 WA320-8
Maintenance time caution lamp display
When the time before required maintenance dips
below 30 hours*, the maintenance time monitor
appears. Pressing the menu switch displays the
maintenance screen.
*The setting can be changed within the range of 10 and 200 hours Supports DEF level and refill timing
The DEF level gauge is displayed continuously on
the monitor panel. In addition, when the refill
timing is reached, the DEF-low-level icon appears
to alert the operator.

Maintenance screen
DEF level gauge DEF low level guidance
Inside air filter Outside air filter
DEF tank
DEF pump
SCR
DEF injector
DPF
DEF mixing tube
Engine oil dipstick Fuel filter Engine oil fill
Engine compartment
The design of the WA320-8 engine compartment makes
it easy to service. Access to filters, dipsticks and oil fill locations are at the ground level to simplify maintenance.

Cabin air filter
Replace the inside and outside cabin air filters quickly and conveniently without the need for tools. The outside filter is located behind a lockable door for security.

Rear full fenders (optional)
Get easy access to the engine compartment and
simplify maintenance with rear fenders that open upward and use gas-assist struts,
requiring low lift force. Easyto-open rear fenders swing up with gull-wing doors to
give the technician
convenient access to the
engine compartment.
12 WA320-8
My Komatsu, our comprehensive portal, analyzes
telematics data from your on-machine technology —
Komtrax and Komtrax Plus, or from other OEMs — and
displays it on easy-to-read dashboards. Now you can
get the powerful analytics you need to manage your
costs and enhance your fleet’s efficiency without a
complicated process or expensive third-party solutions.

Get the most out of your fleet
with My Komatsu
We’ve designed a portal that makes it easy to collect,
visualize and monitor data for both Komatsu machines
and other OEM machines. My Komatsu also gives
you one easy source for accessing manuals and
purchasing parts for your machines.
• Quickly collect, view and manage intuitive data
displays in one location
• Help keep costs under control
• Benchmark machine
performance and track
fuel consumption
• Monitor for theft
and unauthorized use
• Receive timely
maintenance alerts
Data
Telematics data is generated
by on-machine technology.

Connection
Choose how you want to connect and
view your data. Go to multiple systems,
send to a third party or easily connect
it all through My Komatsu.

Storage
Telematics data flows into data
storage. ISO 15143-3 (AEMP 2.0)
facilitates the extraction and raw
data to your choice of databases.

Analytics
My Komatsu connects
telematics data from Komatsu
and non-Komatsu equipment
and creates powerful analytics
dashboard views.
mykomatsu.komatsu
Take a step toward a digital transformation of your
job sites with Komatsu’s suite of Smart Construction
solutions, where advanced automation and integrated
technologies intersect to help you:
• Track costs of labor, machines and materials
• Receive real-time insights straight from the field
• Enhance workflow with fully integrated data
• Visualize your data for actionable results
• Quickly map your job site
• Attract and retain talent
Connect your machines to Smart
Construction to optimize your job sites
Your projects depend on robust data that is easily
shared, replicated, updated and — most important of
all — correct.

Not sure where to begin? Komatsu-certified solution
experts are available on the phone, online or at your
job site to help you navigate and thrive along your
digitalization journey.
komatsu.com/smart-construction
Komatsu helps you bring it all together
13 WA320-8
Komatsu Care Complimentary
Complimentary maintenance
Our complimentary scheduled maintenance program
for the first three years or 2,000 hours, whichever
occurs first.

Komatsu Care Plus
Extended maintenance
A continuation of the Komatsu Care program. Along with
regularly scheduled maintenance and national distributor coverage, you get a variety of added benefits.

Komatsu Care Plus II
Extended maintenance and repair
Everything in the Komatsu Care Plus program bundled with comprehensive repair coverage for qualifying repairs.

Komatsu Care Plus III
Extended maintenance, repair and consumables
A comprehensive program that simplifies your
equipment’s total cost of ownership with a fixed cost
per hour for qualifying repairs and replacements.

Komatsu Care Advantage Warranty
Extended warranty
Protect your equipment in the event a covered
component fails due to a defect in material or
workmanship. Repairs are performed by Komatsutrained experts using Komatsu genuine parts. komatsu.com/maintenance-repair
Komatsu maintenance and
repair programs
Get the service and repairs you need your way. Komatsu
offers a tiered maintenance and repair program that
simplifies the upkeep of your machine to help control
operating costs and get the most from your equipment.

Manage your active coverage programs through the
My Komatsu customer interface and take advantage of
attractive financing options.
• Solutions that fit your needs and ease your mind
• Fixed maintenance and repair costs for the life
of the contract
• National coverage
Komatsu Financial
Financial services built for your business success.
komatsu.com/financing
Komatsu Genuine Parts
Engineered to help extend the life of your Komatsu
machine. Now available on the My Komatsu parts store.
komatsu.com/parts
Komatsu training
Comprehensive training support — virtually, at our
facility or where most convenient.
komatsu.com/training
14 WA320-8
Specifications
Engine
Model Komatsu SAA6D107E-3*
Type Water-cooled, 4-cycle
Aspiration Variable geometry turbocharged,
aftercooled, cooled EGR
Number of cylinders 6
Bore 4.21” 107 mm
Stroke 4.88” 124 mm
Piston displacement 408 in3 6.69 L
Horsepower
SAE J1995 (gross) 170 HP 127 kW
ISO 9249/SAE J1349 (net) 165 HP 123 kW
Rated rpm 1,850 rpm
Max power - ISO 14396 169 HP (126 kW) @ 1,900 rpm
Fan drive method for
radiator cooling
Hydraulic
Fuel system Direct injection
Lubrication system
Method Gear pump, force-lubrication
Filter Full-flow type
Air cleaner Dry type with double elements and
dust evacuator, plus dust indicator
*U.S. EPA Tier 4 Final emission certified
Steering system
Type Articulated type, fully-hydraulic
power steering
Steering angle 38.5-degree each direction
(40-degree to max end stop)
Minimum turning radius at the
center of outside tire 17’7” 5,380 mm
Hydraulic system
Steering system
Hydraulic pump Piston pump, in common
with loader control
Capacity 47.6 gpm (180 L/min) at rated rpm
Relief valve setting 3,000 psi (20.7 MPa 210 kgf/cm2)
Hydraulic cylinders
Type Double-acting, piston type
Number of cylinders 2
Bore x stroke 2.76 x 17.8” (70 x 453 mm)
Loader control
Hydraulic pump Piston pump, in common
with steering system
Capacity 47.6 gpm (180 L/min) at rated rpm
Relief valve setting 3,000 psi (20.6 MPa 210 kgf/cm2)
Hydraulic cylinders
Type Double-acting, piston type
Number of cylinders - bore x stroke
Lift cylinder (2) 4.7 x 28.7” (120 x 729 mm)
Bucket cylinder (1) 5.9 x 22” (150 x 558 mm)
Control valve Two-spool type
Control positions
Boom Raise, hold, lower, and float
Bucket Tilt-back, hold, and dump
Hydraulic cycle time (rated load in bucket)
Raise 6.3 sec
Dump 1.9 sec
Lower (empty) 3.5 sec
Service refill capacities
Cooling system 9.3 gal 35.1 L
Fuel tank 64.7 gal 245 L
Engine 6.1 gal 23 L
Hydraulic system 24.3 gal 92 L
Axle front 7.1 gal 27 L
Axle rear 7.5 gal 28.5 L
Transfer case 1.5 gal 5.8 L
DEF tank 3.7 gal 14 L
Axles and final drives
Drive system Four-wheel drive
Front Fixed, semi-floating
Rear Center-pin support, semi floating,
24-degree total oscillation
Reduction gear Spiral bevel gear
Differential gear Torque proportioning
Final reduction gear Planetary gear, single reduction Bucket selection guide Transmission
Type Hydrostatic (one pump, two motors) with
speed range select
Speed Forward Reverse
1st 0.6-8.1 mph 1.0-13.0 km/h 0.6-8.1 mph 1.0-13.0 km/h 2nd 8.1 mph 13.0 km/h 8.1 mph 13.0 km/h
3rd 11.6 mph 18.7 km/h 11.6 mph 18.7 km/h
4th 23.6 mph 38.0 km/h 23.6 mph 38.0 km/h
Measured with 20.5-R25 tires
Brakes
Service brakes Hydraulically actuated, wet disc brakes
actuate on four wheels
Parking brakes Wet, multi-disc brake on transfer output shaft Secondary brakes Parking brake is commonly used
E

I, J, K
A
C
M
H F G
B
L
45°
I
D
15 WA320-8
E

I, J, K
A
C
M
H F G
B
L
45°
Q
S
T
U
R
P
I
D
O
Tread 6’9” (2,050 mm)
Width over tires 8’6” (2,590 mm)
A Wheelbase 9’11” (3,030 mm)
B Hinge pin height, Standard boom 13’2” (4,005 mm)
max. height High lift boom 14’11” (4,545 mm)
C Hinge pin height, Standard boom 1’9” (545 mm)
carry position High-lift boom 2’4” (705 mm)
D Ground clearance 1’5” (425 mm)
E Hitch height 3’7” (1,085 mm)
F Overall height, top of the stack 10’0” (3,040 mm)
G Overall height, ROPS cab 10’6” (3,200 mm)
Measured with 20.5-R25(L3) tires, ROPS/FOPS cab
*At the end of tooth or B.O.C.E.
** Bucket shown for comparison purposes. Please contact local Komatsu Distributor for availability.

All dimensions, weights, and performance values based on SAE J732c and J742b standards. Static tipping load and operating weight shown include lubricant, coolant, full fuel tank, ROPS cab and operator. Machine stability and operating weight affected by tire size and attachments.

General purpose
bucket w/pin on
Light material
bucket w/pin on
Excavating bucket
w/pin on
General purpose bucket
w/ quick coupler
General purpose
bucket w/ pin on**
B.O.C.E. B.O.C.E. B.O.C.E. B.O.C.E. B.O.C.E.

Bucket capacity: heaped 3.7 yd3 (2.8 m3
) 4.2 yd3 (3.2 m3) 3.0 yd3 (2.3 m3) 3.27 yd3 (2.5 m3) 3.0 yd3 (2.3 m3) struck 3.1 yd3 (2.4 m3
) 3.7 yd3 (2.8 m3) 2.5 yd3 (1.9 m3) 2.75 yd3 (2.1 m3) 2.5 yd3 (1.9 m3) Bucket width 9’0” (2,740 mm) 9’0” (2,740 mm) 9’0” (2,740 mm) 9’0” (2,740 mm) 9’0” (2,740 mm) Bucket weight 2,932 lbs. (1,330 kg) 3,186 lbs. (1,445 kg) 3,020 lbs. (1,370 kg) 2,690 lbs. (1,220 kg) 2,767 lbs. (1,255 kg) H Dumping clearance, max. height and 45-degree dump angle* 9’5” (2,880 mm) 9’0” (2,745 mm) 9’9” (2,965 mm) 9’3” (2,825 mm) 11’7” (3,525 mm) I Reach at max. height and 45-degree dump angle* 3’3” (1,000 mm) 3’8” (1,110 mm) 2’9” (840 mm) 3’11” (1,200 mm) 3’3” (980 mm) J Reach at 2130 mm 7' clearance and 45-degree dump angle* 5’3” (1,595 mm) 5’4” (1,620 mm) 5’1” (1,540 mm) 5’11” (1,805 mm) 6’9” (2,060 mm) K Reach with arm horizontal and bucket level* 8’2” (2,500 mm) 8’9” (2,665 mm) 7’9” (2,350 mm) 8’9” (2,680 mm) 9’3” (2,825 mm) L Operating height (fully raised) 17’8” (5,375 mm) 17’11” (5,465 mm) 17’0” (5,175 mm) 17’7” (5,365 mm) 19’2” (5,845 mm) M Overall length (bucket on ground) 25’3” (7,690 mm) 25’9” (7,855 mm) 24’9” (7,540 mm) 25’6” (7,780 mm) 26’8” (8,125 mm) Loader clearance circle (bucket at carry, outside corner of bucket) 41’5” (12,620 mm) 41’9” (12,715 mm) 41’0” (12,500 mm) 41’5” (12,625 mm) 42’8” (13,010 mm) Digging depth: 0 degrees 6.5” (165 mm) 6.5” (165 mm) 6.5” (165 mm) 3” (65 mm) 11” (270 mm) 10 degrees 1’3” (375 mm) 1’4” (410 mm) 1’2” (350 mm) 1’0” (310 mm) 1’6” (460 mm) Static tipping load: straight 25,353 lbs. (11,500 kg) 25,155 lbs. (11,410 kg) 25,320 lbs. (11,485 kg) 24,956 lb (11,320 kg) 20,227 lbs. (9,175 kg) 40-degree full turn 21,561 lbs. (9,780 kg) 21,319 lbs. (9,670 kg) 21,484 lbs. (9,745 kg) 21,120 lb (9,580 kg) 16,998 lbs. (7,710 kg) Breakout force 36,310 lbs. 162 kN 31,151 lb s.139 kN 41,601 lbs. 185 kN 32,915 lb 146 kN 44,287 lbs. 197 kN (16,470 kgf) (14,130 kgf) (18,870 kgf) (14,930 kgf) (20,088 kgf) Operating weight 34,128 lbs. (15,480 kg) 34,392 lbs. (15,600 kg) 34,216 lbs. (15,520 kg) 34,899 lb (15,830 kg) 34,568 lbs. (15,680 kg) Bucket
Operating load per SAE J1197 (Feb. 1991), 50% of static tipping load.

Static tipping load and operating weight shown include lubricant, coolant, full fuel tank, ROPS cab and operator. Machine stability and operating weight affected by tire size and attachments.

Fork Fork with quick coupler
O Fork tine length 5’0” (1,524 mm)
P Ground to top of tine at maximum lift 12’7” (3,855 mm) Q Reach at maximum lift 2’9” (840 mm)
R Ground to top of tine - boom and tine level 6’0” (1,845mm) S Reach - boom and tine level 5’8” (1,730 mm)
T Reach - tine level on ground 3’6” (1,066 mm)
U Overall length - tine level on ground 27’6” (8,375 mm) Static tipping load fork level,
tine center
straight boom level 18,850 lbs. (8,550 kg)
40-degree full turn boom 16,402 lbs. (7,440 kg)
Operating weight 33,378 lbs. (15,140 kg)
Product designs, specifications and/or data in this document are provided for informational purposes only and are not warranties of any kind. Product designs and/or specifications may be changed at any time without notice. The only warranties that apply to sales of products and services are Komatsu’s standard written warranties, which will be furnished upon request.

Komatsu and other trademarks and service marks used herein are the property of Komatsu Ltd. or its subsidiaries, or the respective owners or licensees. © 2023 Komatsu Ltd. or one of its subsidiaries. All rights reserved. EN-WA320-8-BR0-1223-V5 Two-spool valve for boom and bucket control • Alternator, 24V/90 A • Automatic hydraulic-driven fan with automatic reverse rotation • Back-up alarm • Batteries (2) 12V/92 Ah, 680 CCA • Battery disconnect • Boom kick-out, in-cab adjustable • Bucket positioner • Color, rearview camera and monitor • Counterweight, standard and additional • Electronically controlled suspension system (ECSS) • Engine, Komatsu SAA6D107E-3 diesel • Engine shut-off system, electric • Equipment Management Monitoring System (EMMS) Lights (central warning, brake oil pressure, engine oil pressure, parking brake, cooling fan reverse, KDPF restriction, seat belt caution, Komtrax message)
Gauges (DEF level, engine water temperature, ecology, fuel level, HST oil temperature, speedometer/tachometer), variable speed display •
Front fenders • Fuel pre-filter with water separator • Horn, electric • Hydrostatic transmission • Komatsu SmartLoader Logic • Komatsu Auto Idle Shutdown • Komtrax Level 5 • Lift cylinders and bucket cylinder • LED Lights Back-up light
Stop and tail light
Turn signal lamps, front (2) and rear (2) with hazard switch Working lights, front cab mount (2)
Working lights, front fender mount (2)
Working lights, rear grill mount (2)
•
Loader linkage with standard lift arm • Multi-Function Monolever (MFML) • Parking brake, electric • Radiator, wider core • Radiator mask, swing up • Rearview mirrors, outside (2) inside (2) • Rims for 20.5R25 tires • ROPS/FOPS cab, level 2 • DC 12V electrical outlets (2) • Ashtray • Auto air conditioner • Cigarette lighter, 24V • Color LCD/TFT multi-monitor • Cup holder • Floor mat • Operator seat, reclining, air suspension type, heated • Bluetooth AM/FM radio with microphone and auxiliary input jack • Rear defroster, electric • Seatbelt, two-point retractable, 3” (76 mm) width • Space for lunch box • Steering wheel, tilt and telescopic • Sun visor, front window • Windshield washer and wiper, front with intermittent • Windshield washer and wiper, rear • Service brakes, wet disc type • Starting motor, 5,500 W (5.5 kW) • Transmission speed ranges, four forward and four reverse • Vandalism protection kit, padlocks for battery box (2) • Parking brake, electric • Radiator, wider core • Radiator mask, swing up • Rear view mirrors, outside (2) inside (2) • Rims for 20.5-R25 tires • Auxiliary steering (SAE) Cutting edge (bolt-on type)
Engine oil and coolant heater
Guarding package
Limited slip differential (F&R)
Lube system
Quick coupler
Rear full fenders
Three-spool valve (will utilize integrated proportional control switch included in the multi-function mono-lever) and piping
Standard and optional equipment
standard • optional
Tires or attachments
Change in
operating weight
Change in tipping load Width over tires Ground clearance Change in vertical dimensions Straight Full turn
kg lbs. kg lbs. kg lbs. mm ft. in mm ft. in mm ft. in

20.5-25-12PR (L2) -165 -364 -105 -231 -95 -209 2585 8'6" 425 1'5" 0 0 Remove additional
counterweight -250 -551 -440 -970 -380 -838 0 0 0 0 0 0 Weight changes
komatsu.com

← All documents from this meeting