DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 60
The annual cost to the City for updating their general plan is roughly $124,000. The three most common methodologies for assessing a General Plan Maintenance fee are:
1. Percentage of Building Permit Fee: This means that the general plan maintenance fee is assessed as a percentage of the total building permit fee assessed to a project.
2. Percentage of Valuation: This means that the fee is assessed based upon the total project valuation. Even if the City doesn’t utilize valuation for calculating fees, it still has to collect that information for SMIP and state surcharges and can utilize it to determine the proportionate General Plan impact.
3. Cost Per Square Foot: This means that the fee is assessed based upon the total potential square footage based upon which it would be assessed.
The project team calculated the full cost of the General Plan Fee based upon all three methodologies. The following table shows this calculation:
Table 24: General Plan Maintenance Fee Calculation
Category
Building
Permit Fee Valuation Sq. Ft.
Total Annual Cost $123,901 $123,901 $123,901
General Plan Fee Basis $561,656 $18,491,608 207,219
General Plan Maintenance Fee 22% 0.67% $0.60
The calculated General Plan Maintenance Fee is either 22% of the Building Permit Fee,
0.67% of Building Valuation or $0.60 per square foot. The City has the ability to choose one option of the above to charge as its General Plan Maintenance Fee.
The City of Calimesa currently charges the General Plan Maintenance Fee as 0.142% of valuation, which represents a cost recovery level of 21% (based on the 0.67% valuation methodology).
As part of this analysis, the project team conducted a comparative survey of other local jurisdictions and their assessment of the General Plan Maintenance Fee. Like other comparative efforts, the survey below simply shows the fees charged by the jurisdiction and does not include the basis upon which the other jurisdictions calculated or developed their fee. The following table shows the results of this comparative analysis:
Table 25: General Plan Maintenance Fee – Comparative Survey Jurisdiction Fee Amount
Beaumont
Residential: $50 per DU
Comm / Ind: $0.05 per sq. ft.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 61
Jurisdiction Fee Amount
Loma Linda 10% of Building Permit
Redlands
$0.10 per sq. ft. of New Construction or
Additions > 50% of Existing Floor Area
San Jacinto
Residential: $150 per DU
Comm / Ind: $0.06 per sq. ft.
As the table indicates the current fee charged by jurisdictions varies based upon project type and / or building permit. There are no surveyed jurisdictions that charge the fee as percentage of valuation. The full cost calculated for the City is higher than all the other jurisdictions surveyed. However, similar to other comparative analyses, this only reflects the fee being charged, not necessarily the full cost of those services.
As the City is moving away from valuation, the best option for the City would be to charge the General Plan Maintenance fee as a percentage of the building permit fee. This best captures the level of long-range planning effort needed depending upon the proportional impact of the building projects.
2 Technology Surcharge Fee
A Technology Fee allows the City to support the costs associated with the City’s permitting system, staff time for managing the systems, acquiring the system, mobile devices used for permitting, etc. The City currently assesses this fee as 3.29% of the permit fees.
The project team used knowledge from previous fee studies for cities similar to Calimesa as a way to estimate annual permit-related technology costs. The costs included in this estimate are the capital costs for a permitting system annualized over 25 years, as well as the annual licensing and maintenance cost paid to maintain the permitting system.
The following table shows by cost category the annual cost:
Table 26: Technology Surcharge Fee Cost Components
Cost Category Initial Cost Years Annual Cost
Software System $1,000,000 25 $40,000
Annual Licensing & Maint. $25,000 1 $25,000
Total $65,000
Based upon the items needed to provided development-related services, the annual technology-related costs are approximately $65,000 for the City of Calimesa.
The City currently assesses this fee as 0.043% of the permit valuation and is only applicable on Building Permits. By assessing the fee on valuation, it excludes the other development-related activities that may be part of the City’s future permitting system.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 62
Additionally, the most defensible methodology for assessing the fee is based proportionately on the percentage of the permit fee, as the greater the permit fee, the greater the Technology Fee as there is more software utilization and storage space for larger projects.
Therefore, the project team took the total Technology Annual Cost and divided it by the annual fee-related cost associated with Building, Planning, Engineering, and Fire. The following table shows this calculation:
Table 27: Technology Fee Calculation
Category Amount
Total Technology Annual Cost $65,000
Total Projected Development Annual Cost $1,221,368
Technology Fee as % of Permit Fee 5%
Based upon this calculation, the City’s full cost Technology fee would be 5% of the permit fee. Therefore, if a permit fee was $100, the Technology fee collected would be $5; whereas if a permit fee was $1,000; the Technology fee collected would be $50. This type of structure enables the Technology fee to be more proportionately distributed based upon the projects and their impact upon the system.
As part of this analysis, the project team conducted a comparative survey of other local jurisdictions and their assessment of a Technology Fee. Like other comparative efforts, the survey below simply shows the fees charged by the jurisdiction and does not include the basis upon which the other jurisdictions calculated or developed their fee. The following table shows the results of this comparative analysis:
Table 28: Technology Fee – Comparative Survey
Jurisdiction Fee Amount
Banning 2.5% of Permit Fees
Beaumont 3.29% of Permit Fees
Hemet 5% of Permit Fees
Redlands 2% of Permit Fees
San Jacinto 1% of Permit Fees (Max $50)
Of the surveyed jurisdictions, all charge their technology fee as a percentage of the permit fee and do not utilize valuation as the basis. The City of Hemet at 5% most closely matches the City’s full cost calculated at 5%.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 63
3 Surcharge Funds
It is a best practice to collect and account for General Plan Maintenance and Technology surcharges in separate accounts. The City of Calimesa already follows this best practice and should continue to collect these fees separately to help fund future activities.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 64
13. Cost Recovery Considerations
The following sections provide guidance regarding how and where to increase fees, determining annual update factors, and developing cost recovery policies and procedures.
1 Fee Adjustments
This study has documented and outlined on a fee-by-fee basis where the City is under and over collecting for its fee-related services. City and Department management will now need to review the results of the study and adjust fees in accordance with Departmental and City philosophies and policies. The following dot points outline the major options the City has in adjusting its fees.
• Over-Collection: Upon review of the fees that were shown to be over-collecting for costs of services provided, the City should reduce the current fee to be in line with the full cost of providing the service.
• Full Cost Recovery: For fees that show an under-collection for costs of services provided, the City may decide to increase the fee to full cost recovery immediately. • Phased Increase: For fees with significantly low-cost recovery levels, or which would have a significant impact on the community, the City could choose to increase fees gradually over a set period of time.
The City will need to review the results of the fee study and associated cost recovery levels and determine how best to adjust fees. While decisions regarding fees that currently show an over-recovery are fairly straight forward, the following subsections, provide further detail on why and how the City should consider either implementing Full Cost Recovery or a Phased Increase approach to adjusting its fees. 1 Full Cost Recovery
Based on the permit or review type, the City may wish to increase the fee to cover the full cost of providing services. Certain permits may be close to cost recovery already, and an increase to full cost may not be significant. Other permits may have a more significant increase associated with full cost recovery.
Increasing fees associated with permits and services that are already close to full cost recovery can potentially bring a Department’s overall cost recovery level higher. Often,
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 65
these minimal increases can provide necessary revenue to counterbalance fees which are unable to be increased.
The City should consider increasing fees for permits for which services are rarely engaged to full cost recovery. These services often require specific expertise and can involve more complex research and review due to their infrequent nature. As such, setting these fees at full cost recovery will ensure that when the permit or review is requested, the City is recovering the full cost of its services.
2 Phased Increases
Depending on current cost recovery levels some current fees may need to be increased significantly in order to comply with established or proposed cost recovery policies. Due to the type of permit or review, or the amount by which a fee needs to be increased, it may be best for the City to use a phased approach to reaching their cost recovery goals.
As an example, you may have a current fee of $200 with a full cost of $1,000, representing 20% cost recovery. If the current policy is 80% cost recovery, the current fee would need to increase by $600, bringing the fee to $800, in order to be in compliance. Assuming this particular service is something the City provides quite often, and affects various members of the community, an instant increase of $600 may not be feasible. Therefore, the City could take a phased approach, whereby it increases the fee annually over a set period until cost recovery is achieved.
Raising fees over a set period of time not only allows the City to monitor and control the impact to applicants, but also ensure that applicants have time to adjust to significant increases. Continuing with the example laid out above, the City could increase the fee by $150 for the next four years, spreading out the increase. Depending on the desired overall increase, and the impact to applicants, the City could choose to vary the number of years by which it chooses to increase fees. However, the project team recommends that the City not phase increases for periods greater than five years, as that is the maximum window for which a comprehensive fee assessment should be completed. 2 Annual Adjustments
Conducting a comprehensive analysis of fee-related services and costs annually would be quite cumbersome and costly. The general rule of thumb for comprehensive fee analyses is between three and five years. This allows for jurisdictions to ensure they account for organizational changes such as staffing levels and merit increases, as well as process efficiencies, code or rule changes, or technology improvements.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 66
Developing annual update mechanisms allow jurisdictions to maintain current levels of cost recovery, while accounting for increases in staffing or expenditures related to permit services. The two most common types of update mechanisms are Consumer Price Index (CPI) and Cost of Living Adjustment (COLA) factors. The following points provide further detail on each of these mechanisms.
• COLA / Personnel Cost Factor: Jurisdictions often provide their staff with annual salary adjustments to account for increases in local cost of living. These increases are not tied to merit or seniority, but rather meant to offset rising costs associated with housing, gas, and other livability factors. Sometimes these factors vary depending on the bargaining group of a specific employee. Generally, these factors are around two or three percent annually.
• CPI Factor: A common method of increasing fees or cost is to look at regional cost indicators, such as the Consumer Price Index. These factors are calculated by the Bureau of Labor Statistics, put out at various intervals within a year, and are specific to states and regions.
The City of Calimesa should review its current options internally (COLA) as well as externally (CPI) to determine which option better reflects the goals of the Department and the City. If choosing a CPI factor, the City should outline which CPI should be used, including specific region, and adoption date. If choosing an internal factor, again, the City should be sure to specify which factor if multiple exist. 3 Policies and Procedures
This study has identified areas where the City is under-collecting the cost associated with providing services. This known funding gap is therefore being subsidized by other City revenue sources.
Development of cost recovery policies and procedures will serve to ensure that current and future decision makers understand how and why fees were determined and set, as well as provide a road map for ensuring consistency when moving forward. The following subsections outline typical cost recovery levels and discuss the benefits associated with developing target cost recovery goals and procedures for achieving and increasing cost recovery.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 67
1 Typical Cost Recovery
The Matrix Consulting Group has extensive experience in analyzing local government operations across the United States and has calculated typical cost recovery ranges. The following table outlines these cost recovery ranges by major service area.
Table 29: Typical Cost Recovery Ranges by Major Service Area Service Areas Typical Cost Recovery Ranges
City Clerk 20-40%
Finance 20-40%
Fire 50-80%
Building 80-100%
Planning 50-80%
Public Works 70-100%
Information presented in the table above is based on the Matrix Consulting Group’s experience in analyzing local governments’ operations across the United States and within California and reflects typical cost recovery ranges observed by local adopting authorities. The following graph depicts how Calimesa compares to industry cost recovery range standards.
Public Works and Building are the only two departments within their typical cost recovery ranges. Finance and Fire are lower and City Clerk and Planning are higher. Overall, 100%
0%
96%
103%
96%
43%
0%
20%
40%
60%
80%
100%
120%
City Clerk
Finance
Public Works
Planning
Building
Fire
Cost Recovery %
Current Revenue Cost Recovery vs. Typical Revenue Cost Recovery Typical Cost Recovery Current Cost Recovery
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 68
addressing the proposed modifications within each department and evaluating increases or decreases to fees where appropriate will result in aligning these departments within typical cost recovery ranges.
2 Development of Cost Recovery Policies and Procedures
The City should review the current cost recovery levels and adopt a formal policy regarding cost recovery. This policy can be general in nature and can apply broadly to the City as a whole, or to each department and division specifically. A department specific cost recovery policy would allow the City to better control the cost recovery associated with different types of services being provided and the community benefit received.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 69
Appendix – Comparative Survey
As part of the Cost of Services (User Fee) study for the City of Calimesa, Matrix Consulting Group conducted a comparative survey of user fees. The City identified eight jurisdictions to be included in the comparative survey: Banning, Beaumont, Canyon Lake, Hemet, Loma Linda, Redlands, San Jacinto, and Yucaipa.
While this report will provide the City with a reasonable estimate and understanding of the true costs of providing services, many jurisdictions also wish to consider the local “market rates” for services as a means for assessing what types of changes in fee levels their community can bear. However, a comparative survey does not provide adequate information regarding the relationship of a jurisdiction’s cost to its fees.
The following sections detail various factors to consider when reviewing comparative survey results, as well as graphical comparisons of current fees and total calculated costs for various permits issued or services provided by the City. 1 Economic Factors
To provide additional context to the comparative survey information, the project team collected economic factors for the jurisdictions included. Three important economic factors to consider when comparing fees across multiple jurisdictions are: population, budget, and workforce size. As these factors impact how and when fees are administered. As a jurisdiction with a smaller population may choose to not charge a fee, likewise, a smaller workforce size may inhibit their ability to administer a fee. The following tables rank each jurisdiction from smallest to largest for each of these economic factors:
Table 30: Ranking of Jurisdictions by Population
Jurisdiction 2020 Census Population
Calimesa 10,026
Canyon Lake 11,082
Loma Linda 24,791
Banning 29,505
Beaumont 53,036
San Jacinto 53,898
Yucaipa 54,542
Redlands 73,168
Hemet 89,833
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 70
Table 31: Ranking of Jurisdictions by Budget
Jurisdiction FY23/24 Budget
Canyon Lake $12,454,923
Calimesa $29,821,953
Yucaipa $48,922,365
Loma Linda $60,119,900
Redlands $111,190,283
Hemet $123,643,716
Banning $130,678,937
San Jacinto $153,853,540
Beaumont $169,239,753
Table 32: Ranking of Jurisdictions by Workforce Size
Jurisdiction FY23-24 FTE
Canyon Lake 32
Calimesa 36
Yucaipa 83
San Jacinto 83
Loma Linda 97
Banning 195
Redlands 561
Hemet N/A
Beaumont N/A
Overall, the City of Calimesa is on the lowest end for each economic factor when compared to surveyed jurisdictions. Canyon Lake has the closest comparable economic factors, followed by the City of Yucaipa.
2 Recency Factor
While the above comparative information can provide some perspective when paralleling Calimesa’s fees with surveyed jurisdictions, other key factors to consider are when a jurisdiction’s fee schedule was last updated and when the last comprehensive analysis was undertaken. The following tables detail when each surveyed jurisdiction last conducted a fee analysis and when they last updated their fee schedule.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 71
Table 33: Last Fee Study
Jurisdiction Response
Loma Linda 2016
Canyon Lake 2018
Yucaipa 2018
Banning 2019
Hemet 2021
Beaumont 2023
Redlands 10+ Years9
San Jacinto N/A
Table 34: Last Fee Schedule Update
Jurisdiction Response
Redlands 2019
San Jacinto 2020
Canyon Lake 2022
Banning 2022
Loma Linda 2023
Yucaipa 2023
Hemet 2023
Beaumont 2023
Five of the eight jurisdictions surveyed have completed fee studies in the last five years.
With the exception of Redlands and San Jacinto, all other jurisdictions have updated their fee schedules with a CPI or other growth factor within the last two years.
It is important to note that even though jurisdictions may have conducted fee studies, fees are not always adopted at full cost recovery. The comparative results only show the adopted fee for the surveyed jurisdictions not necessarily the full cost associated with the comparable service.
3 Additional Factors
Along with keeping the statistics outlined in the previous sections in mind, the following issues should also be noted regarding the use of market surveys in the setting of fees for service:
9 The City of Redlands is currently undergoing a fee study and is looking to adopt new fees and the study next year.
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 72
• Each jurisdiction and its fees are different, and many are not based on the actual cost of providing services as various policy decision may subsidize services. • The same “fee” with the same name may include more or less steps or subactivities. In addition, jurisdictions provide varying levels of service and have varying levels of costs associated with providing services such as staffing levels, salary levels, indirect overhead costs, etc.
In addition to the issues noted, market surveys can also run the risk of creating a confusing excess of data that will obscure rather than clarify policy issues. Because each jurisdiction is different, the Matrix Consulting Group recommends that the information contained in the market comparison of fees be used as a secondary decision-making tool, rather than a tool for establishing an acceptable price point for services. 4 Comparative Survey Results
As part of this study, the project team conducted a survey of how the City’s current user fees and calculated full cost compare to other similarly sized and regionally located jurisdictions. The following subsections provide a comparative look at several fee-related services provided by the City.
1 Business License – New and In-Town
Finance proposed the addition of a Business License application fee for business in-town looking to acquire a new business license. Through this study, the project team calculated the full cost of the application to be $148. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
$-
$50
$100
$150
$200
Calimesa - Full
Cost
Beaumont Canyon Lake Loma Linda Redlands Yucaipa
Business License - New and In-Town
Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 73
With the exception of Canyon Lake which charges $151 for a new business license application, the calculated full cost at $148 is the highest; and both are above the jurisdictional average of $91. Hemet and San Jacinto charge their fee differently. Hemet charges an application fee ranging from $19 to $254, depending on the type of business applying for the license. San Jacinto charges an annual fee based on the number of fulltime employees which is then added to an $80 base fee. 2 SFR Fire Sprinkler Plan Review & Inspection: 10 Heads, New Fire proposed the addition of a fee to plan review and inspect a new, 10 head, fire sprinkler system at a single-family residence. Through this study, the project team calculated the full cost of the plan review ($433) and inspection ($351) to be $784. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
The calculated full cost is above the jurisdictional average of $509, and in line with the fee charged by the City of Yucaipa ($709). Loma Linda and Hemet charge the most at $975 and $920, respectively. Loma Linda and Yucaipa charge a single fee for plan check and inspection.
3 Above Ground Storage Tank Plan Review & Inspection
Fire proposed a fee to plan review and inspect an aboveground storage tank. Through this study, the project team calculated the full cost of the plan review ($433) and inspection ($562) to be $995. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
$-
$200
$400
$600
$800
$1,000
$1,200
Calimesa - Full
Cost
Beaumont Canyon Lake Hemet Loma Linda Redlands Yucaipa
SFR Fire Sprinkler Plan Review & Inspection: 10 Heads, New Plan Check Inspection Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 74
The calculated full cost at $995 is the highest fee charged. While the full cost calculated is above the jurisdictional average of $524 it does align with the fee charged by the City of Yucaipa ($958). Additionally, Hemet and Yucaipa all charge a single fee for plan check and inspection.
4 Fire Alarm System Plan Check & Inspection: 11 Devices, New Fire proposed a fee to plan review and inspect a new, 11 device, fire alarm system.
Through this study, the project team calculated the full cost of the plan review ($649) and inspection ($702) to be $1,352. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
The calculated full cost at $1,352 is the highest fee, followed by Yucaipa ($1,042), Loma Linda ($965), and Hemet ($782); and all are above the jurisdictional average of $779.
Additionally, Loma Linda and Yucaipa all charge a single fee for plan check and inspection.
$-
$200
$400
$600
$800
$1,000
$1,200
Calimesa - Full Cost Beaumont Canyon Lake Hemet Redlands Yucaipa Aboveground Storage Tank Plan Review & Inspection
Plan Check Inspection Average
$-
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
Calimesa - Full
Cost
Beaumont Canyon Lake Hemet Loma Linda Redlands Yucaipa
Fire Alarm System Plan Check & Inspection: 11 Devices, New Plan Check Inspection Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 75
5 Annual Operation Permit – Industrial Oven
Fire proposed a fee to cover the annual operation permit for industrial ovens. Through this study, the project team calculated the full cost of this fee to be $211. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
The calculated full cost ($211) is slightly under the jurisdictional average of $220 and is in line with Loma Linda at $205 and Redlands at $231. Canyon Lake at $394 charges the most for this fee and Beaumont at $150 charges the least. 6 Alternate Materials and Methods Request Review – 4 Hours Fire proposed the addition of a fee to cover an hourly review of alternate materials and methods. Through this study, the project team calculated the full cost of this fee to be $288. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
Only two other surveyed jurisdictions offer this service, and both are more than the calculated full cost ($288). Hemet charges $807, while Beaumont charges $600. $-
$100
$200
$300
$400
$500
Calimesa - Full Cost Beaumont Canyon Lake Hemet Loma Linda Redlands Yucaipa Annual Operation Permit - Industrial Oven
Fee Average
$100
$300
$500
$700
$900
Calimesa - Full Cost Beaumont Hemet
Alternate Materials and Methods Request Review - 4 Hours Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 76
7 Business License / Occupancy Inspection
Fire proposed a fee to cover a business license / occupancy inspection. Through this study, the project team calculated the full cost of this fee to be $140. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
Only three other surveyed jurisdictions offer this service, and all exceed the calculated full cost ($140). Hemet charges the most at $255, followed by Canyon Lake at $237 and Loma Linda at $195.
8 Residential New Construction Plan Check & Inspection: 2,000 sq. ft. Valued at $125,000
For a New Single Family Residential Construction Project that is 2,000 square feet and valued at $125,000, the City of Calimesa currently charges $3,655. The project team calculated the full cost of the plan review ($1,526) and inspection ($2,348) to be $3,847.
The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
The dark blue represents plan check, while the light blue represents inspection. $-
$50
$100
$150
$200
$250
$300
Calimesa - Full Cost Canyon Lake Hemet Loma Linda
Business License / Occupancy Inspection
Fee Average
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
$4,500
$5,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
Residential New Construction Plan Check & Inspection: 2,000 sq. ft.
Valued at $125,000
Plan Check Inspection Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 77
Both the current fee ($3,655) and calculated full cost ($3,874) are slightly above the jurisdictional average of $3,322 and aligns with the fees charged by Banning ($3,453) and Beaumont ($3,534). At $4,713, Redlands charges the most followed by Yucaipa ($4,706) and Hemet ($4,507).
9 Residential Re-Roof less than 2:12 pitch: 2,500 sq. ft. Valued at $5,000 For a 2,500 square foot residential re-roof less than 2:12 pitch valued at $5,000, the City of Calimesa currently charges $283. The project team calculated the full cost of this service to be $525. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
The calculated full cost is the highest at $525, followed by Hemet at $460 and Redlands at $383. All three are above the jurisdictional average of $306. 10 Water Heater Storage – Replacement (same type / same location) - Residential Budling currently charges a fee of $84 for a residential water heater replacement.
Through this study, the project team calculated the full cost of this service to be $193.
The following graph shows how Calimesa’s current fee and full cost compares to surveyed jurisdictions.
$-
$100
$200
$300
$400
$500
$600
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
Residential Re-Roof less than 2:12 pitch: 2,500 sq. ft. Valued at $5,000 Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 78
The City’s current fee ($84) is the lowest, while the full cost calculated ($193) is more aligned with surveyed jurisdictions and only slightly above the jurisdictional average of $172. Yucaipa ($196) and Redlands ($192) charge the closest rates to the calculated full cost.
11 B – Professional Office TI: 3,000 sq. ft. Valued at $250,000 For a B-Professional Office tenant improvement that is 3,000 square feet and valued at $250,000, the City of Calimesa currently charges $5,057. The project team calculated the full cost of the plan review ($1,175) and inspection ($1,678) to be $2,853. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
The calculated full cost ($2,853) is closest to what Banning charges at $1,499 and well below the jurisdictional average of $5,400. The highest fee at $7,704 is charged by Beaumont; however, they assess their fee based on valuation rather than square footage. $-
$50
$100
$150
$200
$250
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
Water Heater Storage - Replacement (same type/same location) - Residential
Fee Average
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
B - Professional Office TI: 3,000 sq. ft. Valued at $250,000 Plan Check Inspection Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 79
12 A-2 Occupancy – Assembly – Food & Drink Restaurant, Night Club, Bar TI:
10,000 sq. ft. Valued at $100,000
For an A-2 Occupancy Assembly tenant improvement that is 10,000 square feet and valued at $100,000, the City of Calimesa currently charges $2,810. The project team calculated the full cost of the plan review ($1,904) and inspection ($2,720) to be $4,624.
The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions.
The dark blue represents plan check, while the light blue represents inspection.
The current fee ($2,810) and the full cost calculated ($4,624) are both below the jurisdictional average of $6,143. Hemet charges the most at $11,129, followed by Yucaipa ($8,345) and Redlands ($7,004).
13 M Occupancy New Construction: 6,500 sq. ft. Valued at $915,000 For an M new construction that is 6,500 square feet and valued at $915,000, the City of Calimesa currently charges $13,572. The project team calculated the full cost of the plan review ($3,552) and inspection ($5,074) to be $8,626. The following graph shows how Calimesa’s full cost compares to surveyed jurisdictions. The dark blue represents plan check, while the light blue represents inspection.
$-
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
A-2 Occupancy - Assembly—Food & Drink Restaurant, Night Club, Bar TI:
10,000 sq. ft. valued at $100,000
Plan Check Inspection Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 80
The calculated full cost ($8,626) is closest to what Beaumont charges at $10,748 and is below the jurisdictional average of $10,551. The highest fee at $20,663 is charged by Canyon Lake; however, they assess their fee based on valuation rather than square footage.
14 Appeal to Planning Commission
Planning charges a deposit of $3,500 for an appeal to the Planning Commission. Through this study, the project team calculated the full cost of this service to be $1,873 as a flat fee. The following graph shows how Calimesa’s current fee and full cost compares to surveyed jurisdictions.
The City’s current deposit ($3,500) is the second highest fee charged behind San Jacinto which charges $3,750. The full cost calculated ($1,873) falls below the jurisdictional average of $2,178 and aligns with Banning’s fee of $1,895. $-
$5,000
$10,000
$15,000
$20,000
$25,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Redlands Yucaipa
M Occupancy New Construction: 6,500 sq. ft. valued at $915,000 Plan Check Inspection Average
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Loma Linda Redlands San Jacinto Yucaipa Appeal to Planning Commission
Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 81
15 Zoning Letter
Planning charges a fee of $245 for a zoning letter. Through this study, the project team calculated the full cost of this service to be $394. The following graph shows how Calimesa’s current fee and full cost compares to surveyed jurisdictions.
The City’s current fee ($245) falls below the jurisdictional average of $255 and aligns with fees charged by Hemet ($299) and Beaumont ($225). The full cost calculated ($394) aligns with the fee charged by Redlands at $384 and is lower than Loma Linda and Hemet. 16 Sign Permit
Planning charges a fee of $365 for a sign permit. Through this study, the project team calculated the full cost of this service to be $313. The following graph shows how Calimesa’s current fee and full cost compares to surveyed jurisdictions.
The City’s current fee ($365) and full cost calculated ($313) align with the jurisdictional average of $354 and aligns with fees charged by Beaumont ($375). Redlands charges the highest fee at $681, and Yucaipa charges the least at $129. $-
$100
$200
$300
$400
$500
$600
$700
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Loma Linda Redlands San Jacinto Yucaipa Zoning Letter
Fee Average
$-
$100
$200
$300
$400
$500
$600
$700
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Loma Linda Redlands San Jacinto Yucaipa Sign Permit
Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 82
17 Conditional Use Permit
Planning charges a $10,400 deposit for a conditional use permit. Through this study, the project team recommended the deposit increase to $16,500. The following graph shows how Calimesa’s current and recommended deposit compare to surveyed jurisdictions.
The City’s current deposit ($10,400) and recommended deposit ($16,500) are both significantly above the jurisdictional average of $6,503. At $13,000, San Jacinto is the only jurisdiction which charges close to the Calimesa’s current and recommended deposit.
18 Residential Driveway Permit: First Driveway
Public Works charges a flat fee of $305 for a residential driveway permit. Through this study, the project team calculated the full cost of this service to be $657. The following graph shows how Calimesa’s current fee and full cost calculated compared to surveyed jurisdictions.
The City’s current fee ($305) and full cost calculated ($657) are both above the jurisdictional average of $202 and most closely align with the fee charged in Redlands ($468).
$-
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
$14,000
$16,000
$18,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Canyon Lake Hemet Loma Linda Redlands San Jacinto Yucaipa Conditional Use Permit
Deposit Average
$-
$100
$200
$300
$400
$500
$600
$700
Calimesa - Current Fee Calimesa - Full Cost Banning Hemet Loma Linda Redlands Yucaipa Residential Driveway Permit: First Driveway
Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 83
19 Public Improvement Plan Check and Inspection: 5 pages Valued at $250,000 Public Works currently charges a deposit for Public Improvement and Plan Check based upon the scope of the project, an initial deposit amount of $20,900 is being proposed through this study. The following graph shows how Calimesa’s proposed deposit compares to surveyed jurisdictions.
The City’s proposed deposit of $20,900 closest to Hemet’s deposit of $20,375 and both are above the jurisdictional average of $15,831. Banning and Beaumont both charge the inspection portion of their fee based on engineer estimate, rather than a set deposit. 20 Street Vacation / Abandonment
Public Works charge a fee of $655 for street vacation / abandonment. Through this study, the project team calculated the full cost of this service to be $1,961. The following graph shows how Calimesa’s current fee and full cost calculated compared to surveyed jurisdictions.
The City’s current fee ($655) and full cost calculated ($1,961) are both below the jurisdictional average of $3,063. The fees charged by Banning ($1,170) and Redlands ($1,124) are closest to the full cost calculated. Additionally, Beaumont ($2,000) and Loma Linda ($5,000) charge deposits rather than flat fees for this service. $-
$5,000
$10,000
$15,000
$20,000
$25,000
Calimesa - Full Cost Banning Beaumont Canyon Lake Hemet Loma Linda Public Improvement Plan Check & Inspection: 5 pages Valued at $250,000 Fee Average
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
Calimesa -
Current Fee
Calimesa - Full
Cost
Banning Beaumont Hemet Loma Linda Redlands
Street Vacation / Abandonment
Fee Average
DRAFT Cost of Services (User Fee) Study Report City of Calimesa, CA Matrix Consulting Group 84
5 Summary
A majority of the fees surveyed are generally below or in alignment with other comparable jurisdictions. It is important to note that the results of this survey only show the fees adopted by council, not the cost recovery policy decisions for departments or a jurisdiction. As such, the results of this survey should be used as a secondary decisionmaking tool.
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations City Clerk
Copies of Media
CDs Per CD $1 $2 $2 100% User Fee
Photocopies
California Public Records Act Copy Request Per Page $0.20 $0.20 $0.20 0% GOV § 6253(b) Documents Listed in the Political Reform Act Per Page $0.10 $0.10 $0.10 0% GOV § 6253(b) Rent Stabilization Program Application Fee Each $1,661 $2,466 $2,466 48% User Fee Mobile Home Rent Control
Per Month / Per Regulated
Space / Per Park $3.59 $3.59 $3.59 0% User Fee
Property Liens Each $115 $141 $141 23% User Fee
Finance
Insufficient Funds
First Check Each $25 $25 $25 0% CIV § 1719(a)
Subsequent Checks Each $35 $35 $35 0% CIV § 1719(a)
Copies - City Budget
Grayscale Per Page $0.10 $0.10 $0.10 0% GOV § 6253(b)
Color Per Page $0.20 $0.20 $0.20 0% GOV § 6253(b)
Credit Card Convenience Fee Per Transaction 2.50% 5.14% 5.14% 106% Pass-Through Business Licenses
Business License Tax
Business License Tax Each $24 / $48 $24 $24 0% Tax
Street Vendor Each $15 $15 $15 0% Tax
CASp Each $4 $4 $4 0% State Tax
Business License Modification
Change of Ownership Each $10 $15 $15 54% User Fee
Change of Address Each $10 $15 $15 54% User Fee
Duplicate Business License Each New $9 $9 User Fee
Attachment 1E
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Fire
Construction Permits
Fire Sprinkler Systems
Commercial/Industrial NFPA 13 Fire Sprinkler System - Modifications Plan Review
Per Building, system, or
plan type New $288 $288 User Fee
Inspection, 1-5 fire sprinkler heads Per System New $140 $140 User Fee Inspection, 6-20 fire sprinkler heads Per System New $281 $281 User Fee Inspection, 21-50 fire sprinkler heads Per System New $351 $351 User Fee Inspection, 51-100 fire sprinkler heads Per System New $421 $421 User Fee Inspection, 101-350 fire sprinkler heads Per System New $562 $562 User Fee Inspection, >350 fire sprinkler heads Per System New $632 $632 User Fee Inspection, >350 fire sprinkler heads Per addl. 100 Head New $140 $140 User Fee Commercial/Industrial NFPA 13 Fire Sprinkler System - New System Plan Review
Per Building, system, or
plan type New $721 $721 User Fee
Inspection, 1-20 fire sprinkler heads Per System New $281 $281 User Fee Inspection, 21-50 fire sprinkler heads Per System New $351 $351 User Fee Inspection, 51-100 fire sprinkler heads Per System New $492 $492 User Fee Inspection, 101-350 fire sprinkler heads Per System New $562 $562 User Fee Inspection, >350 fire sprinkler heads Per System New $632 $632 User Fee Inspection, >350 fire sprinkler heads Per addl. 100 Head New $140 $140 User Fee Commercial Fire Pump
Plan Review Per Pump New $865 $865 User Fee
Inspection Per Pump New $983 $983 User Fee
Single/Two-Family Residential - NFPA 13D Fire Sprinkler Plan Review Per system or plan type New $433 $433 User Fee Plan Review, Modification Per system or plan type New $288 $288 User Fee Inspection, 1-20 fire sprinkler heads Per system New $351 $351 User Fee Inspection, 21-30 fire sprinkler heads Per system New $421 $421 User Fee Inspection, 31-40 fire sprinkler heads Per system New $562 $562 User Fee Inspection, 41-50 fire sprinkler heads Per system New $702 $702 User Fee Inspection, >50 fire sprinkler heads Per system New $773 $773 User Fee Inspection, tract homes Per system New $562 $562 User Fee Inspection, modifications to existing system Per system New $211 $211 User Fee Bucket or pump test Each New $140 $140 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Multi-Family Residential Fire Sprinkler, NFPA 13R
Plan Review Per system or plan type New $764 $764 User Fee Plan Review, Modification Per system or plan type New $288 $288 User Fee Inspection, 1-50 fire sprinkler heads Per system New $562 $562 User Fee Inspection, 51-100 fire sprinkler heads Per system New $632 $632 User Fee Inspection, >100 fire sprinkler heads Per system New $1,054 $1,054 User Fee Inspections, modification to existing system Per system New $702 $702 User Fee Private Underground Fire Line
Plan Review Each New $649 $649 User Fee
Inspection Each New $702 $702 User Fee
In-Rack Sprinklers
Plan Review Each New $577 $577 User Fee
Inspection, 1-10 sprinkler heads Per system New $351 $351 User Fee Inspection, 11-20 sprinkler heads Per system New $492 $492 User Fee Inspection, 21-30 sprinkler heads Per system New $702 $702 User Fee Inspection, >30 sprinkler heads Per system New $913 $913 User Fee Pre-Engineered Systems/Equipment
Plan Review Per building or system New $505 $505 User Fee Inspection, Spray/Dipping/Powder Coating Booths Per booth New $492 $492 User Fee Inspection, Industrial Ovens Per system New $211 $211 User Fee Inspection, Vapor Recovery Per system New $211 $211 User Fee Inspection, Refrigeration Per system New $492 $492 User Fee Inspection, Dust Collection Per system New $492 $492 User Fee Inspection, Hood and Duct Extinguishing System Per system New $421 $421 User Fee Inspection, Gas System Per system New $492 $492 User Fee Inspection, Smoke Control System Per system New $773 $773 User Fee Inspection, Battery System Per system New $351 $351 User Fee Inspection, Special Extinguishing System Per system New $632 $632 User Fee Inspection, Commercial Solar Power Generating Station Per system New $351 $351 User Fee Inspection, Commercial Structure-Mounted Photovoltaic System Per system New $351 $351 User Fee Inspection, Emergency Responder Radio Coverage System Per system New $632 $632 User Fee Inspection, Generators Per system New $351 $351 User Fee Inspection, plant oil extraction Per system New $211 $211 User Fee High-Piled Combustible Storage
Plan Review Per building New $505 $505 User Fee
Inspection, 500-10,000 sq. ft. Each New $351 $351 User Fee Inspection, 10,001-50,000 sq. ft. Each New $492 $492 User Fee Inspection, 50,001-100,000 sq. ft. Each New $632 $632 User Fee Inspection Each add'l 100,000 sq. ft. New $281 $281 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Hose Rack/Standpipe Systems
Plan Review Per building or system New $649 $649 User Fee Inspection Each New $562 $562 User Fee
Fire Alarm - New System
Plan Review, Waterflow Monitoring System Per system or plan type New $433 $433 User Fee Plan Review, Manual/Automatic Fire Alarm System Per system or plan type New $649 $649 User Fee Plan review, local alarm bell Per system or plan type New $144 $144 User Fee Inspection, 1-10 devices Per system New $562 $562 User Fee Inspection, 11-50 devices Per system New $702 $702 User Fee Inspection, 51-100 devices Per system New $983 $983 User Fee Inspection, >100 devices
Each add'l 100 devices, per
system New $140 $140 User Fee
Inspection, local alarm bell Per system New $211 $211 User Fee Fire Alarm System Modifications (all types)
Plan Review Per building or system New $433 $433 User Fee Inspection, 1-10 devices Per system New $351 $351 User Fee Inspection, 11-50 devices Per system New $492 $492 User Fee Inspection, 51-100 devices Per system New $562 $562 User Fee Inspection, >100 devices
Each add'l 100 devices, per
system New $140 $140 User Fee
Plan review, fire alarm control panel or communicator upgrade Each New $288 $288 User Fee Inspection, fire alarm control panel or communicator upgrade Each New $281 $281 User Fee Aboveground Storage Tank
Plan Review Per tank New $433 $433 User Fee
Inspection Per tank New $562 $562 User Fee
Single-Family Residential Construction Projects (FLSR)
Plan Review Per building or plan type New $288 $288 User Fee Inspection, New Construction Each New $211 $211 User Fee Inspection, Addition Each New $140 $140 User Fee
Multi-Family Residential Construction Projects
Plan Review Per building or plan type New $649 $649 User Fee Inspection, 1-10,000 sq. ft. Per building New $562 $562 User Fee Inspection, 10,001-25,000 sq. ft. Per building New $702 $702 User Fee Inspection, 25,001-50,000 sq. ft. Per building New $773 $773 User Fee Inspection, >50,000 sq. ft.
Each add'l 10,000 sq. ft.
per building New $70 $70 User Fee
Commercial/Industrial New Construction Projects
Plan review Per building or plan type New $649 $649 User Fee Inspection, 1-10,000 sq. ft. Per building New $351 $351 User Fee Inspection, 10,001-50,000 sq. ft. Per building New $702 $702 User Fee Inspection, 50,001-100,000 sq. ft. Per building New $843 $843 User Fee Inspection, 100,001-500,000 sq. ft. Per building New $913 $913 User Fee Inspection, 500,001-1,000,000 sq. ft. Per building New $1,054 $1,054 User Fee Inspection >1,000,000 sq. ft.
Each add'l 100,000 sq. ft.
per building New $421 $421 User Fee
Inspection, Misc. construction projects Per building New $140 $140 User Fee Commercial Tenant Improvements
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Plan Review Per building New $433 $433 User Fee
Inspection, 1-10,000 sq. ft. Per building New $281 $281 User Fee Inspection, 10,001-50,000 sq. ft. Per building New $632 $632 User Fee Inspection, 50,001-100,000 sq. ft. Per building New $702 $702 User Fee Inspection, >100,000 sq. ft.
Each add'l 100,000 sq. ft.
per building New $211 $211 User Fee
Inspection, Misc. tenant improvement projects Per building New $140 $140 User Fee Other Misc. Development Plan Review and Inspection Fees Hazardous Material Review Per hour New $144 $144 User Fee Technical Analysis/Opinion Report Review Per hour New $144 $144 User Fee Alternate Materials and Methods Request Review Per hour New $144 $144 User Fee Revision of a previous approved plan or As-Builts Each New $288 $288 User Fee Plan re-submittal; each subsequent submittal after 2nd Per hour New $144 $144 User Fee Miscellaneous Plan Check Per hour New $144 $144 User Fee Re-Inspection
Each inspection after 2nd
failed inspection New $144 $144 User Fee
Annual Operations Permits
Low Hazard
Cellulose Nitrate Film Per permit New $140 $140 User Fee Open Flames and Candles Per permit New $140 $140 User Fee Places of Assembly 50-299 Occupants Per permit New $140 $140 User Fee Waste Handling and Wrecking Yards Per permit New $140 $140 User Fee Medium Hazard
Combustible Fibers Per permit New $211 $211 User Fee
Covered and Open Mall Buildings Per permit New $211 $211 User Fee Dry Cleaning Per permit New $211 $211 User Fee
Fixed Hood & Duct Extinguishing Systems Per permit New $211 $211 User Fee Flammable and Combustible Liquids Mobile Fueling Per permit New $211 $211 User Fee Industrial Ovens Per permit New $211 $211 User Fee
Liquid or Gas Fuel Equipment in Assembly Buildings Per permit New $211 $211 User Fee Lumber Yards and Woodworking Per permit New $211 $211 User Fee Miscellaneous Combustible Storage Per permit New $211 $211 User Fee Motor Vehicle Fuel Dispensing Facilities Per permit New $211 $211 User Fee Pyroxylin Plastics Per permit New $211 $211 User Fee
Places of Assembly 300-999 Occupants Per permit New $211 $211 User Fee Production Facilities Per permit New $211 $211 User Fee Refrigeration Equipment Per permit New $211 $211 User Fee Rooftop Heliports Per permit New $211 $211 User Fee
Storage of Scrap Tires and Tire Byproducts Per permit New $211 $211 User Fee Waste Handling Per permit New $211 $211 User Fee
Wood, Manure, and Organic Product Storage Per permit New $211 $211 User Fee High Hazard
Aerosol Products Per permit New $281 $281 User Fee
Aviation Facilities Per permit New $281 $281 User Fee
Battery Systems Per permit New $281 $281 User Fee
Combustible Dust Producing Operations Per permit New $281 $281 User Fee Compresses Gases Per permit New $281 $281 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Cryogenic Fluids Per permit New $281 $281 User Fee
Cutting and Welding Per permit New $281 $281 User Fee
Explosives Per permit New $281 $281 User Fee
Flammable and Combustible Liquids Storage and Use Per permit New $281 $281 User Fee High-Piled Combustible Storage Per permit New $281 $281 User Fee Hot Works Operations Per permit New $281 $281 User Fee
HPM Facilities Per permit New $281 $281 User Fee
Liquefied Petroleum Gas Per permit New $281 $281 User Fee Magnesium Per permit New $281 $281 User Fee
Organic Coatings Per permit New $281 $281 User Fee
Pallet Yards Per permit New $281 $281 User Fee
Places of Assembly >1,000 Occupants Per permit New $281 $281 User Fee Plan Extraction Systems Per permit New $281 $281 User Fee Repair Garages Per permit New $281 $281 User Fee
Spraying or Dipping Per permit New $281 $281 User Fee
Tire Rebuilding Plants Per permit New $281 $281 User Fee Occupancies Requiring Mandated Inspections
State Fire Marshal Regulated Occupancies
Organized Camps - Group C Occupancy Each New $281 $281 User Fee Day Care Facility - Group E Occupancy - 7 or more clients (not requiring assistance) Each New $281 $281 User Fee
Private and Public Schools - Group E Occupancy Each New $562 $562 User Fee Health Care Facilities/Nursing Homes/Detox Centers - Group I-2 Occupancy Each New $421 $421 User Fee
Detention Facility - Group I-3 Occupancy Each New $421 $421 User Fee Day Care Facility - Group I-4 Occupancy - 7 or more clients (requiring assistance) Each New $281 $281 User Fee
Multi-Family Housing - Group R-1/R-2 Occupancy -
Hotel/Motel/Apartments
3 dwelling units Base New $140.49 $140.49 User Fee
4-15 Dwelling Units Base New $140.49 $140.49 User Fee
4-15 Dwelling Units Per Unit New $2.93 $2.93 User Fee
16-49 Dwelling Units Base New $175.61 $175.61 User Fee
16-49 Dwelling Units Per Unit New $0.82 $0.82 User Fee
50-99 Dwelling Units Base New $210.73 $210.73 User Fee
50-99 Dwelling Units Per Unit New $1.43 $1.43 User Fee
100-199 Dwelling Units Base New $280.97 $280.97 User Fee 100-199 Dwelling Units Per Unit New $0.70 $0.70 User Fee 200-499 Dwelling Units Base New $351.21 $351.21 User Fee 200-499 Dwelling Units Per Unit New $1.76 $1.76 User Fee 500+ Dwelling Units Base New $702.43 $702.43 User Fee
500+ Dwelling Units Per Unit New $0.88 $0.88 User Fee
Residential Care Facility - Group R-2.1 Occupancy Each New $281 $281 User Fee Family Day Care (Large & Small) - Group R-3 Occupancy Each New $140 $140 User Fee Residential Care Facility - Group R-3.1 Occupancy Each New $140 $140 User Fee Residential Care Facility - Group R-4 Occupancy Each New $281 $281 User Fee High Rise Each New $281 $281 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations State Fire Marshal Regulated Occupancies – Day Care, Health Care, Detention Facilities, and High Rises Each Add'l Hour after 2hrs New $140 $140 User Fee Other Required or Mandated Inspections
General Field Inspection Per Inspection New $140 $140 User Fee Business License/Occupancy Inspection Per Inspection New $140 $140 User Fee Defensible Space Inspection Per Inspection New $140 $140 User Fee Fuel Modification Inspection Per Permit New $2,304 $2,304 User Fee Surcharge
Technology Fee % of Permit Fee New 5.00% 5.00% Surcharge Cost Recovery
Employee Classification Hourly Rates
Fire Chief Per hour New $146 $146 Cost Recovery
Fire Marshal Per hour New $114 $114 Cost Recovery
Battalion Chief Per hour New $107 $107 Cost Recovery
Captain Per hour New $104 $104 Cost Recovery
Apparatus Engineer Per hour New $99 $99 Cost Recovery
Fire Fighter EMT Per hour New $90 $90 Cost Recovery
Fire Fighter Paramedic Per hour New $93 $93 Cost Recovery Equipment Rates (Does not include staffing)
Engine Per hour New $165 $165 Cost Recovery
Incident Command Post Per hour New $69 $69 Cost Recovery Heavy Rescue Per hour New $124 $124 Cost Recovery
Light Rescue / Utility Vehicle Per hour New $73 $73 Cost Recovery Water Tender Per hour New $103 $103 Cost Recovery
Aerial Ladder (Quint) Per hour New $261 $261 Cost Recovery Administrative Penalties - False or Nuisance Fire Alarms First Response Each New $387 $387 Penalty
Second Response Per response New $773 $773 Penalty
Third Response Per response New $1,160 $1,160 Penalty
Four or More Responses Per response New $1,547 $1,547 Penalty EMS
First Responder Fee Each New $290 $290 User Fee
Code Enforcement
Abandoned and/or Foreclosed Property Registration
Mailed In Each $150 $297 $297 98% User Fee
Field Inspection Discovery Each $150 $416 $416 178% User Fee Business License Occupancy Inspection Each $80 $238 $238 197% User Fee Site Investigation Fee Per Hour New $119 $119 User Fee
Weed Abatement Per Hour New $119 $119 User Fee
Property Liens Each $115 $260 $260 126% User Fee
Abandoned Vehicles Each New $178 $178 User Fee
Building
Plan Check
SFR % of Permit Fee 65% 65% 65% 0% User Fee
Commercial / Multi-Family / Industrial % of Permit Fee 65% 70% 70% 8% User Fee Master Plan Check - Repeat Unit % of Plan Check 25% 25% 25% 0% User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Plan Check Revisions and/or Deferred Submittals Hourly
City Cost +
20% Admin $161 $161 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Building Permits - Residential (Square Footage Based) - New Construction 1-500 sq. ft. Base $1,830 $1,683 $1,683 -8% User Fee
501-999 sq ft Base $1,830 $1,683 $1,683 -8% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $67 $67 User Fee 1000-1999 sq ft Base $1,830 $2,015 $2,015 10% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $33 $33 -14% User Fee 2000-2999 sq ft Base $2,215 $2,348 $2,348 6% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $42 $42 8% User Fee 3000-3600 sq ft Base $2,600 $2,764 $2,764 6% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $42 $42 8% User Fee 3601+ sq ft Base $2,831 $3,013 $3,013 6% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $49 $21 $21 -57% User Fee Building Permits - Residential (Square Footage Based) - Addition 1-500 sq. ft. Base $733 $1,267 $1,267 73% User Fee
501-999 sq ft Base $1,042 $1,267 $1,267 22% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $122 $150 $150 23% User Fee 1000-1999 sq ft Base $1,775 $2,015 $2,015 14% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $62 $33 $33 -46% User Fee 2000-2999 sq ft Base $2,391 $2,348 $2,348 -2% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $42 $42 8% User Fee 3000-3600 sq ft Base $2,776 $2,764 $2,764 0% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $42 $42 8% User Fee 3601+ sq ft Base $3,007 $3,013 $3,013 0% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $21 $21 -46% User Fee Building Permits - Residential (Square Footage Based) - Remodel 1-500 sq. ft. Base New $1,683 $1,683 User Fee
501-999 sq ft Base New $1,683 $1,683 User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $67 $67 User Fee 1000-1999 sq ft Base New $2,015 $2,015 User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $33 $33 User Fee 2000-2999 sq ft Base New $2,348 $2,348 User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $42 $42 User Fee 3000-3600 sq ft Base New $2,764 $2,764 User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $42 $42 User Fee 3601+ sq ft Base New $3,013 $3,013 User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. New $21 $21 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Garages and Workshops (Detached or Additions)
1-400 sq. ft. Base $462 $602 $602 30% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $1 $30 $30 2314% User Fee 401-1000 sq ft Base $539 $643 $643 19% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $45 $53 $53 18% User Fee 1001-2000 sq ft Base $887 $963 $963 9% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $43 $47 $47 10% User Fee 2001+ sq ft Base $1,313 $1,433 $1,433 9% User Fee
Each Additional 100 sq. ft. or fraction there of Per Add'l 100 sq. ft. $39 $24 $24 -39% User Fee Modular Home Inspections
Plan Check Each $353 $181 $181 -49% User Fee
Set Down Each $1,240 $553 $553 -55% User Fee
Single Lot / SFR Grading
Plan Check Each $308 $262 $262 -15% User Fee
Single Family Lot Grading Each $385 $418 $418 9% User Fee Miscellaneous Building Fees
Minimum Permit Fee Each $77 $173 $173 125% User Fee
Foundation Repair - Single Family Residential Each New $329 $329 User Fee Siding Repair and Replacement Each New $193 $193 User Fee Seismic Retrofit - Brace and Bolt -Single Family Residential Each New $300 $300 User Fee Stucco Repair / Replacement Each New $275 $275 User Fee Chimney Repair Each New $274 $274 User Fee
Fireplace Each New $385 $385 User Fee
Awnings
Single-Family First One New $246 $246 User Fee
Multi-Family / Commercial First One New $301 $301 User Fee Each Additional Awnings Each Additional New $28 $28 User Fee Bathroom / Kitchen Remodel
Single-Family (Direct Replacement Non-Structural) Each New $549 $549 User Fee Multi-Family (Direct Replacement, Non-Structural) Each New $549 $549 User Fee Cell Sites
New Tower Each New $1,014 $1,014 User Fee
New Tower w/ Equipment Shelter Each New $1,261 $1,261 User Fee Tower Modification Each New $394 $394 User Fee
Cell Site Modification Each New $559 $559 User Fee
Doors, windows, skylights, Sliding Glass Door - Structural Structural
Single-Family First One New $220 $220 User Fee
Multi-Family/Commercial First One New $220 $220 User Fee Each Additional Doors, windows, skylights, Sliding Glass Door Each Additional New $28 $28 User Fee Non-Structural
Single-Family First One New $192 $192 User Fee
Multi-Family/Commercial First One New $192 $192 User Fee Each Additional Doors, windows, skylights, Sliding Glass Door Each Additional New $28 $28 User Fee Patio / Carport / Deck / Balcony
ICBO Pre-engineered Patio Cover Each $254 $372 $372 46% User Fee Aluminium / Metal Custom Design Each $254 $493 $493 94% User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Wood City Standard Each $254 $427 $427 68% User Fee
Wood Engineered Design Each $254 $493 $493 94% User Fee Pile Foundation
Cast in Place Concrete (first 10 piles) up to 10 New $438 $438 User Fee Additional Piles (increments of 10) each 10 New $75 $75 User Fee Driven (steel, pre-stressed concrete) up to 10 New $412 $412 User Fee Additional Piles (increments of 10) each 10 New $75 $75 User Fee Product Review per hour New $135 $135 User Fee
Re-roof (Each Structure)
Residential (Up to 3,000 Sq. Ft.)
Less than 2:12 pitch Base $238 $525 $525 121% User Fee
Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $110 $110 User Fee Greater than 2:12 pitch Base $238 $275 $275 16% User Fee Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $55 $55 User Fee Multi-Family (Up to 3,000 Sq. Ft.)
Less than 2:12 pitch Base $238 $525 $525 121% User Fee
Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $110 $110 User Fee Greater than 2:12 pitch Base $238 $275 $275 16% User Fee Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $55 $55 User Fee Commercial (Up to 3,000 Sq. Ft.)
Less than 2:12 pitch Base $238 $581 $581 144% User Fee
Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $110 $110 User Fee Greater than 2:12 pitch Base $238 $332 $332 40% User Fee Each Additional 500 sq. ft. or fraction thereof Each Addl 500 Sq. Ft. New $55 $55 User Fee Walls (Freestanding Masonry or Concrete)
Garden Block Walls - City Standard up to 6'H Up to 50 lf $97 $440 $440 353% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf $97 $55 $55 -44% User Fee Freestanding Walls - Engineered Design up to 6 H' Up to 50 lf New $513 $513 User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $55 $55 User Fee Freestanding Walls - Engineered Design over 6'H Up to 50 lf New $566 $566 User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $110 $110 User Fee Pilasters
Masonry Pilasters - City Standard up to 6 H' 1st One New $233 $233 User Fee Each Additional Each Additional New $42 $42 User Fee
Retaining Wall (concrete or masonry)
City Standard (up to 50 lf) Up to 50 lf $101 $427 $427 323% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $55 $55 User Fee Engineered Design, up to 6' high (up to 50 lf) Up to 50 lf $101 $485 $485 381% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $42 $42 User Fee Engineered Design, over 6' high (up to 50 lf) Up to 50 lf $101 $705 $705 598% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $83 $83 User Fee Gravity Wall, 0-10' high (up to 50 lf) Up to 50 lf $101 $609 $609 503% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $55 $55 User Fee Gravity/Crib Wall, over 10' high (up to 50 lf) Up to 50 lf $101 $675 $675 568% User Fee Each Additional 50 lf or fraction thereof Each Addl 50 lf New $83 $83 User Fee Fences Non-Masonry
Over 6 ft. in height up to 100 lf New $343 $343 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Each addl 50 lf or fraction thereof each Addl 50 lf New $42 $42 User Fee Pre-Fabricated/Metal up to 100 lf New $315 $315 User Fee Each addl 50 lf or fraction thereof each Addl 50 lf New $42 $42 User Fee Sign Permit Fees
Directional Each New $264 $264 User Fee
Ground/Roof/Projecting Signs Each New $264 $264 User Fee Rework of any existing Ground Sign Each New $182 $182 User Fee Other Sign Each New $264 $264 User Fee
Wall/Awning Sign, Non-Electric Each New $251 $251 User Fee Wall, Electric Each $276 $264 $264 -4% User Fee
Each additional of same design, same project and installed at same time Each Additional $154 $138 $138 -10% User Fee
Monument 1st one New $511 $511 User Fee
Each additional of same design, same project and installed at same time Each Additional New $278 $278 User Fee
Pole Sign 1st one New $551 $551 User Fee
Each additional of same design, same project and installed at same time Each Additional New $278 $278 User Fee
Storage Racks
0-8' high (up to 100 lf) First 100 lf New $291 $291 User Fee Each additional 100 lf Each Addl 100 LF New $42 $42 User Fee Over 8' high (up to 100 lf) First 100 lf New $466 $466 User Fee Each additional 100 lf Each Addl 100 LF New $75 $75 User Fee Swimming Pool Permit Fees
Inground Each $353 $689 $689 95% User Fee
Aboveground Each New $385 $385 User Fee
Slide / Grotto - Accessory Addition Each New $385 $385 User Fee Spa or Hot Tub (Pre-fabricated) Each $507 $412 $412 -19% User Fee Storage Tanks
Underground Each New $430 $430 User Fee
Aboveground Each New $291 $291 User Fee
Trash Enclosures
Custom Design Up to 100 Linear Feet Each New $442 $442 User Fee Custom Design Over 100 Linear Feet Each New $471 $471 User Fee City Standard Design Each New $362 $362 User Fee
Solar and Photovoltaic
PV Solar Permits
Residential Plan Check
15 kw or less Base New $161 $161 User Fee
15kw + base fee Base New $161 $161 User Fee
Residential Inspection
15 kw or less Base New $289 $289 User Fee
15kw + base fee Base New $289 $289 User Fee
Each add kw above 15kw Each Addl KW New $15 $15 User Fee Commercial Plan Check
50 kw or less Base New $242 $242 User Fee
50kw-250kw Base New $242 $242 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations 250+ kw Base New $323 $323 User Fee
Commercial Inspection
50 kw or less Base New $758 $758 User Fee
50kw-250kw Base New $758 $758 User Fee
Per kw above 50 kw Each Addl KW New $7 $7 User Fee
250+ kw Base New $2,077 $2,077 User Fee
Per kw above 250kw Each Addl KW New $5 $5 User Fee
Solar Thermal
Residential Plan Check
10 kWth or less Base New $161 $161 User Fee
10+ kWth Base New $161 $161 User Fee
Residential Inspection
10 kWth or less Base New $289 $289 User Fee
10+ kWth Base New $289 $289 User Fee
Per kWth above 10 kWth Each Addl KW New $15 $15 User Fee Commercial Plan Check
30 kWth or less Base New $242 $242 User Fee
30 kWth - 260 kWth Base New $242 $242 User Fee
260+ kWth Base New $323 $323 User Fee
Commercial Inspection
30 kWth or less Base New $758 $758 User Fee
30 kWth - 260 kWth Base New $758 $758 User Fee
Per kWth above 30 kWth Each Addl KW New $7 $7 User Fee
260+ kWth Base New $2,287 $2,287 User Fee
Per kWth above 260 kWth Each Addl KW New $5 $5 User Fee Energy Storage Systems (ESS)
Single-Family System (Up to 3 Batteries) Per System New $236 $236 User Fee Multi-Family / Commercial System (Up to 3 Batteries) Per System New $291 $291 User Fee Each Additional 1-3 Batteries Each Addl 3 Batteries New $55 $55 User Fee MEP Fees
Electrical Permit Fees
Minimum Permit Fee Each $77 $173 $173 125% User Fee
Plan Check Hourly $154 $161 $161 5% User Fee
Rewiring (Single Family Residential Only) Each New $385 $385 User Fee Meter Pedestal Each New $233 $233 User Fee
Electrical System Fee Schedule
Residential Each $308 $361 $361 17% User Fee
Commercial
Base 1-500 sq. ft. Each $308 $483 $483 57% User Fee
501-5,000 sq. ft. (Base amount plus) Per Additional Sq. Ft. New $0.02 $0.02 User Fee 5001+ sq. ft. (Total for 5,000 sq. ft. plus Per Additional Sq. Ft. New $0.01 $0.01 User Fee Temporary Events
Electrical generators and electrically-driven rides Each $84 $246 $246 193% User Fee Mechanically-driven rides and walk-through attractions w/ lighting Each $84 $246 $246 193% User Fee Area and booth lighting Each $84 $173 $173 106% User Fee Permanently installed rides, booths, and attractions Each $84 $246 $246 193% User Fee Temporary Power Service
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Temporary metered service poles or pedestals and appurtenances Each $177 $246 $246 39% User Fee Temporary support poles (Additional 6 Poles) Each $13 $55 $55 322% User Fee Electrical Unit Fee Schedule
Receptacles, switches, lighting outlets (first 20) Each $122 $147 $147 20% User Fee Each Additional 1 - 10 Units Each $13 $55 $55 322% User Fee Lighting fixtures, sockets, or other lamp-holding devices (first 20) Each $122 $147 $147 20% User Fee Each Additional 1 - 10 Units Each $13 $55 $55 322% User Fee Pole of platform lighting fixtures Each $122 $254 $254 108% User Fee Theatrical-type lighting fixtures or assemblies Each $122 $254 $254 108% User Fee Fixed residential appliances not exceeding 1HP & Solar Each $122 $173 $173 42% User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Commercial Appliances
Self-contained factory-wired appliances not exceeding 1HP rating (Including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains and vending machines; laundry machines; and other types of equipment (each)) Each $84 $246 $246 193% User Fee Power Apparatus - Motors, generators, rectifiers, converters, capacitors and industrial heating and air conditioners, heat, pumps, cooking or baking equipment, and other apparatus as follows:
Up to and including 1 Base $122 $274 $274 124% User Fee Over 1 not over 10 Each Additional $77 $83 $83 8% User Fee Over 10 not over 50 Each Additional $154 $125 $125 -19% User Fee Over 50 not over 100 Each Additional $154 $166 $166 8% User Fee Over 100 Each Additional $154 $249 $249 62% User Fee
Miscellaneous Apparatus, Conduits, and Conductors Each $353 $139 $139 -61% User Fee Electrical Apparatus Each $353 $173 $173 -51% User Fee
Bus Ways - (Trolly and Plug-in Type) Each $122 $139 $139 14% User Fee Electrical Services
600v or less; 225 amps or less - Commercial Each $199 $233 $233 17% User Fee 600v or less; 225 amps or less - Residential Each $100 $233 $233 134% User Fee 600v or less; 226-1000 amps - Commercial Each $199 $332 $332 67% User Fee 600v or less; 226-1000 amps - Residential Each $100 $332 $332 233% User Fee 600v or less; 1000+ amps - Commercial Each $199 $471 $471 137% User Fee 600v or less; 1000+ amps - Residential Each $100 $332 $332 233% User Fee Miscellaneous conduits and conductors Hourly $199 $166 $166 -16% User Fee Other inspections and fees for which a permit is required but no fee is set forth herein Hourly $353 $166 $166 -53% User Fee
EV Charging Station
Residential Each New $218 $218 User Fee
Commercial Per Station New $418 $418 User Fee
Back-up Generator
Residential Natural Gas Generator Each New $273 $273 User Fee Commercial Natural Gas or Diesel Generator Each New $526 $526 User Fee Plumbing Permit Fees
Minimum Permit Fee Each $77 $173 $173 125% User Fee
Plan Check Fee Hourly $154 $161 $161 5% User Fee
Residential Each New $153 $153 User Fee
Commercial Per Sq. Ft. New $0.09 $0.09 User Fee
Industrial waste pretreatment interceptor Including trap and vent, except kitchen-type grease interceptors functioning as fixture traps Each $84 $383 $383 356% User Fee Plumbing Fixtures, Trap, or Set of Fixtures On One Trap Includes drainage, water piping, and backflow prevention devices Each $58 $64 $64 11% User Fee Swimming Pool Drainage Trap and Receptor (Building drain or sewer) Water supply for pool not included Each $84 $191 $191 127% User Fee Gas Piping System (1-5 outlets), Alteration, or Retest Each $122 $201 $201 65% User Fee Additional outlet over 5 Each $13 $42 $42 220% User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Gas Presure Regulator (Other than appliance) Each $58 $173 $173 198% User Fee Repair or Alteration of Drainage and/or Vent Piping Each $122 $201 $201 65% User Fee Water-treating Equipment and/or Water Piping w/o Plumbing Each $122 $201 $201 65% User Fee Lawn Sprinkler Systems - One meter (Including Backflow Prevention Devices) Each $122 $201 $201 65% User Fee
Atmospheric-type Vacuum Breakers (1-5) Each $122 $139 $139 14% User Fee Additional Atmospheric-type Vacuum Breaker over 5 Each $13 $42 $42 220% User Fee Public Sewer Connection (House) or Lateral Extension for Future Use Each $122 $241 $241 98% User Fee House Sewer Manhole Each $122 $365 $365 199% User Fee
Connection of House Sewer to Private Sewage Disposal System Each $122 $241 $241 98% User Fee Private Sewage Disposal System (Septic tank, seepage pit or pits, and/o Each $122 $392 $392 222% User Fee Cesspool, Overflow Seepage Pit, Percolation Test Pit, Swimming Pool Drywell, or Drain Field Extension or Replacement Each $122 $365 $365 199% User Fee Disconnection, Abandonment, Alteration, or Repair of House Sewer or Private Sewage Disposal System Each $122 $365 $365 199% User Fee Sewer System Each $122 $365 $365 199% User Fee
Backflow Protective Device (Other than atmospheric-type vacuum breakers)
2" and smaller Each $122 $110 $110 -10% User Fee
Over 2" Each $122 $139 $139 14% User Fee
Each Building Drain Installed (w/o accompanying plumbing) Each $122 $139 $139 14% User Fee Swimming Pool Equipment (Including gasoline - private or commercial) Each $276 $312 $312 13% User Fee
Other inspections and fees for which a permit is required but no fee is set forth herein Hourly $353 $173 $173 -51% User Fee
Install / Alter / Repair water piping and or water treating equipment Each New $312 $312 User Fee Water Heater (Storage)
New Installation (Incl. new electrical circuit, water and/or gas lines) Each $122 $372 $372 205% User Fee Replacement (same type/same location) Each $122 $193 $193 58% User Fee Relocation (Incl. new electrical circuit and rerouting water and/or gas lines) Each $122 $399 $399 227% User Fee
Tankless Water Heater
New Installation (Incl. new electrical circuit, water and/or gas lines) Each $122 $372 $372 205% User Fee Replacement (same type/same location) Each $122 $193 $193 58% User Fee Relocation (Incl. new electrical circuit and rerouting water and/or gas lines) Each $122 $385 $385 216% User Fee
Mechanical Permit Fees
Minimum Permit Fee Each $77 $173 $173 125% User Fee
Plan Check Fee Hourly $154 $161 $161 5% User Fee
Residential Each New $135 $135 User Fee
Commercial Per Sq. Ft. New $0.09 $0.09 User Fee
Mechanical Unit Fee Schedule
Forced-air or Gravity-Type Furnace or Burner Installation or Relocation (Including attached ducts and vents, up to 100,000 btu/h) Residential Each $199 $193 $193 -3% User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Commercial Each $199 $415 $415 108% User Fee
Forced-air or Gravity-Type Furnace or Burner Installation or Relocation (Including attached ducts and vents, over 100,000 btu/h) Each $199 $415 $415 109% User Fee Floor Furnace Installation or Relocation (Including Vent) Each $199 $234 $234 18% User Fee Suspended Heater, Recessed Wall heater, or Floor-Mounted Unit Heater Installation or Relocation Each $199 $193 $193 -3% User Fee Appliance Vent Installation or Relocation (not included in an appliance permit suspended heater, recessed wall heater, or floor-mounted unit heater) Each $122 $193 $193 58% User Fee
Heating Appliance, Refrigeration Unit, Cooling Unit, Absorption Unit, and Controls Repair, Alteration, or Addition Each $122 $193 $193 58% User Fee Boiler or Compressor Installation or Relocation (Up to 3HP) or Absorption Unit Installation or Relocation (Up to 100,000btu/h) Each $122 $246 $246 102% User Fee Boiler or Compressor Installation or Relocation (3-15HP) or Absorption Unit Installation or Relocation (100,000-500,000btu/h) Each $122 $274 $274 124% User Fee Boiler or Compressor Installation or Relocation (15-30HP) or Absorption Unit Installation or Relocation (500,000-1,000,000btu/h) Each $199 $326 $326 64% User Fee Boiler or Compressor Installation or Relocation (>50HP) or Absorption Unit Installation or Relocation (>1,750,000btu/h) Each $154 $452 $452 194% User Fee Air-handling Unit including ducts attached thereto (Up to 10,000 Cubic Feet/Minute) Each $154 $372 $372 142% User Fee
Air-handling Unit including ducts attached thereto (>10,000 Cubic Feet/Minute) Each $154 $468 $468 204% User Fee
Evaporative Cooler (Other than Portable Type) Each $154 $192 $192 25% User Fee Ventilation Connected to a Single Duct Each $122 $193 $193 58% User Fee Ventilation System not a portion of any Heating or A/C System Authorized by Permit Each $122 $193 $193 58% User Fee
Type 1 Commercial Hood installation ( including ducts) Each $122 $468 $468 283% User Fee Type 2 Hood installation ( including ducts) Each $122 $233 $233 91% User Fee Commercial or Industrial-type Incinerator Installation or Relocation Each $122 $468 $468 283% User Fee Appliance or Equipment Regulated by Ordinance but Not Classed in Other Appliance Categories Each $122 $221 $221 81% User Fee Whole House Fan Each New $201 $201 User Fee
Other Inspections and Fees
For inspections outside of normal business hours, re- inspection fees assessed under Section 305 (g), inspections for which no fees are specifically indicated, and additional plan review for changes, additions or revisions to approve plans, there shall be a minimum charge of the greater of two hours or the actual cost to the City including supervision, overhead, hourly wages and fringe benefits of the employees involved. Hourly $353 $388 $388 10% User Fee Abatement of Dangerous Buildings
Abatement Activities - Inspection time, preparing reports, clerical support, rehabilitation meetings, court appearances Actual Cost User Fee Abatement Activities - Boarding up structures, property clean up, demolition of structures, rehabilitation of structures Actual Cost Actual Cost User Fee Actual Cost
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Other Building Fees
Business License Inspection Fee - Special inspection required of new business openings without other inspections to the premises. Not inclusive of City Clerk Business License Fee. Each $122 $134 $134 10% User Fee Accessibility Inspection Each New $217 $217 User Fee
Pre-Alteration / Change of Use Inspection Per Hour New $166 $166 User Fee Reinspection Per Hour $199 $166 $166 -16% User Fee
Inspection Investigations Each New $367 $367 User Fee
Inspections Outside of Normal Business Hours Per Hour New $224 $224 User Fee Unclassified Inspections Each New $166 $166 User Fee
Progress or Partial Inspection Each New $139 $139 User Fee Recheck Each New $184 $184 User Fee
Reactivation of Expired Building Permit Each New $102 $102 User Fee Time Extension Each New $49 $49 User Fee
Duplicate Job Card Each New $45 $45 User Fee
Appeals Board Hearing Each $507 $593 $593 17% User Fee
Building Permit Zoning Review Each User Fee
Residential (SFR) Each $45 $269 $269 499% User Fee
Commercial / MF / Industrial Each $45 $673 $673 1396% User Fee Surcharges
General Plan Maintenance Fee % of Valuation 0.142% 0.670% 0.670% 372% Surcharge Technology Fee % of Permit Fee New 5.00% 5.00% Surcharge State Surcharges
California Building Standards Commission Per $25,000 $1 $1 $1 0% SB1473 SMIP Fee - Residential Per $1,000 $0.13 $0.13 $0.13 0% PRC § 2705 SMIP Fee - Commercial Per $1,000 $0.28 $0.28 $0.28 0% PRC § 2705 Landscape Fees
Landscape (Plan Review)
Industrial
Up to 25,000 SF Each New $1,471 $1,471 User Fee
25,001 - 50,000 SF Each New $2,207 $2,207 User Fee
50,001 - 75000 SF Each New $3,678 $3,678 User Fee
75,001 SF+ Deposit1 New $5,000 $5,000 Deposit
Retail / Commercial
Up to 10,000 SF Each New $1,766 $1,766 User Fee
10,001 - 25,000 SF Each New $3,237 $3,237 User Fee
25,001 - 75,000 SF Each New $4,414 $4,414 User Fee
75,001 SF+ Deposit1 New $5,000 $5,000 Deposit
Tract Residential
Models Each New $2,648 $2,648 User Fee
Street Scape Deposit1 New $3,000 $3,000 Deposit
Production
Up to 15 Lots Each New $2,648 $2,648
15 - 50 Lots Each New $3,531 $3,531 User Fee
51 - 100 Lots Each New $4,708 $4,708 User Fee
100 -200 Lots Each New $5,885 $5,885 User Fee
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations 201+ Lots Deposit1 New $7,500 $7,500 Deposit
Multi-Family Residential
Up to 25,000 SF Each New $3,678 $3,678 User Fee
25,001 - 75,000 SF Each New $5,517 $5,517 User Fee
75,001 - 100,000 SF Each New $7,356 $7,356 User Fee
100,000+ SF Deposit1 New $10,000 $10,000 Deposit
Park / Trails / Open Spaces
Up to 2 Acres Each New $5,885 $5,885 User Fee
2 - 7 Acres Each New $8,828 $8,828 User Fee
7 - 20 Acres Each New $11,035 $11,035 User Fee
20+ Acres Deposit1 New $15,000 $15,000 Deposit
Other Fees
Re-Review Fee Per Hour New $235 $235 User Fee
Landscape (Inspection)
Industrial
Up to 25,000 SF Each New $942 $942 User Fee
25,001 - 50,000 SF Each New $1,412 $1,412 User Fee
50,001 - 75000 SF Each New $1,883 $1,883 User Fee
75,001 SF+ Deposit1 New $2,500 $2,500 Deposit
Retail / Commercial
Up to 10,000 SF Each New $942 $942 User Fee
10,001 - 25,000 SF Each New $1,883 $1,883 User Fee
25,001 - 75,000 SF Each New $2,825 $2,825 User Fee
75,001 SF+ Deposit1 New $4,000 $4,000 Deposit
Tract Residential
Models Each New $942 $942 User Fee
Street Scape Deposit1 New $3,883 $3,883 Deposit
Production
Each Production Phase Per 5 Lots New $942 $942 User Fee Multi-Family Residential
Up to 25,000 SF Each New $942 $942 User Fee
25,001 - 75,000 SF Each New $1,883 $1,883 User Fee
75,001 - 100,000 SF Each New $2,825 $2,825 User Fee
100,000+ SF Deposit1 New $4,000 $4,000 Deposit
Park / Trails / Open Spaces
Up to 2 Acres Each New $942 $942 User Fee
2 - 7 Acres Each New $1,883 $1,883 User Fee
7 - 20 Acres Each New $2,825 $2,825 User Fee
20+ Acres Deposit1 New $5,000 $5,000 Deposit
Other Fees
Re-Inspection Fee Per Hour New $235 $235 User Fee
Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 25% 150% Deposit 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Planning
Multiple Application Fee Deposit1 User Fee
Annexations Deposit1 $25,000 $32,986 $30,000 20% Deposit Appeal to Planning Commission Each $3,500 $1,873 $1,873 -46% User Fee Appeal to City Council Each $3,500 $1,873 $1,873 -46% User Fee Appeal of Extension of Time Each $1,900 $1,873 $1,873 -1% User Fee Zoning Information Letter / Zoning Compliance Letter
Basic Each $245 $394 $394 61% User Fee
Tentative / Vesting Maps (Parcel or Tract) Deposit1 $1,300 $4,123 $5,000 285% Deposit Certificate of Documents Actual Cost User Fee
Change of Zone or Zoning Text Amendment Deposit1 $17,000 $16,493 $17,000 0% Deposit Conditional Use Permit (New) Deposit1 $10,400 $13,194 $15,000 44% Deposit Conditional Use Permit for ABC License (New or Revised) Deposit1 $4,900 $4,123 $5,000 2% Deposit Conditional Use Permit for Personal Services Deposit1 New $1,649 $2,000 Deposit Development Agreements
Development & Disposition Agreement Deposit1 $14,500 $16,493 $17,000 17% Deposit Development Agreement Periodic Review Deposit1 New $1,649 $2,000 Deposit Development Agreement Modification Deposit1 New $6,597 $7,500 Deposit Development Plan Review
Major Deposit1 $18,900 $28,038 $25,000 32% Deposit
Minor Deposit1 $830 $3,299 $3,000 261% Deposit
Environmental Assessment Actual Cost User Fee
Reimbursement Agreement Deposit1 New $1,155 $2,000 Deposit Extension of Time - All Each $4,700 $522 $522 -89% User Fee General Plan Amendment Deposit1 $16,900 $32,986 $35,000 107% Deposit Business License Review Each $171 $197 $197 15% User Fee Preliminary Application Review Deposit1 $4,430 $3,299 $4,500 2% Deposit Minor Modifications Each New $313 $313 User Fee
Accessory Dwelling Unit / Junior Accessory Dwelling Unit Covenant Review Each $246 $320 $320 30% User Fee
Sign Permits
Master Sign Program or Sign Requiring a Hearing (No fee w/ DPR Application) Deposit1 $4,000 $4,123 $4,500 13% Deposit
Sign Permit Each $365 $313 $313 -14% User Fee
Temporary Each $230 $209 $209 -9% User Fee
Similar Use Determination Each $1,240 $825 $825 -33% User Fee Specific Plan Deposit1 New $18,967 $20,000 Deposit
Specific Plan Amendment Deposit1 $12,300 $12,370 $12,500 2% Deposit Surface Mining and Reclamation Act (SMARA) Review:
SMARA Review Actual Cost User Fee
SMARA Review Inspection Actual Cost User Fee
Actual Cost
Total Cost or Deposit of Highest
Application Cost + 50% of each Add'l
Application
Actual Cost + Admin Fee
Actual Cost
Actual Cost
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations SMARA Periodic Review Actual Cost User Fee
Temporary Use Permit
Real Estate Office in Approved Development Project Each $780 $955 $955 22% User Fee Off-site Construction yard w/ Approved Development Project Each $780 $955 $955 22% User Fee Trailer, coach, or mobile home as temporary residence w/ Approved Residential Building Permit Each $780 $955 $955 22% User Fee Holiday Sales Lot (30 day max) Each $220 $955 $955 334% User Fee Outdoor Display and Sales (4 days or less; no more than 2/calendar year) Each $410 $955 $955 133% User Fee
Temporary Event
Commercial Fairs, Festivals, Concerts, Farmers Market, or Other Similar Events Each $1,980 $522 $522 -74% User Fee
Mature Non-Oak Tree Removal Application Each $480 $673 $673 40% User Fee Oak Trees
Oak Tree Pruning Permit Each $480 $673 $673 40% User Fee Oak Tree Removal / Encroachment Permit Each $480 $673 $673 40% User Fee Oak Tree Preservation & Replacement Permit Each $480 $673 $673 40% User Fee Variance Deposit1 $8,200 $8,246 $10,000 22% Deposit
Fence Permit Each New $269 $269 User Fee
Short Term Rentals Each New $603 $603 User Fee
Food Trucks Each New $362 $362 User Fee
Sidewalk Vendor Permit Each New $404 $404 User Fee
Nonconforming Structure/Use Determination Deposit1 New $1,319 $1,500 Deposit Reasonable Accomodation Review Each New $673 $673 User Fee Residential Density Bonus Deposit1 New $1,649 $1,500 Deposit Inclusionary Housing Plan Review Deposit1 New $2,474 $2,500 Deposit Addressing
Infill Each New $209 $209 User Fee
Tract Deposit1 New $3,299 $3,000 Deposit
Commercial Deposit1 New $3,299 $3,000 Deposit
Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 25% 150% Admin Fee Surcharges
Technology Fee % of Permit Fee New 5.00% 5.00% Surcharge 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.
Public Works
Residential
Single Family Precise Grading Plan Check
1 Sheet Base $1,215 $1,276 $1,276 5% User Fee
Each Additional Sheet Per Add'l Sheet $705 $809 $809 15% User Fee Additional Project Coordination & Meetings Actual Cost User Fee Additional Engineering Plan Check Hourly $175 $171 $171 -2% User Fee Public Works Inspection Hourly $123 $132 $132 8% User Fee Each Additional Hour Each Add'l Hour $125 $132 $132 6% User Fee As-Built Plans and Revisions Hourly $170 $171 $171 1% User Fee Commercial (applications for lots larger than 5,000 square feet) Public Improvement Plan Check Initial Deposit New $6,329 $6,500 Deposit Actual Cost
Actual Cost
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Public Improvement Inspection Initial Deposit New $12,657 $12,500 Deposit Grading Plan Check and Inspection Initial Deposit New $15,821 $17,000 Deposit Precise Grading Plan Check - Commercial Initial Deposit New $5,537 $5,500 Deposit Map Plan Check Initial Deposit New $9,493 $10,000 Deposit Survey Monument Inspection Initial Deposit New $633 $1,000 Deposit Additional Project Coordination & Meetings Actual Cost User Fee Additional Engineering Plan Check Hourly $175 $171 $171 -2% User Fee Public Works Inspection Hourly $123 $132 $132 8% User Fee Each Additional Hour Each Add'l Hour $125 $132 $132 6% User Fee As-Built Plans and Revisions Hourly $170 $171 $171 1% User Fee Hydrology Report Review Hourly $159 $171 $171 8% User Fee Soils Report Review Actual Cost User Fee
CC&R Review Actual Cost User Fee
Bond Agreement Processing Hourly $125 $124 $124 0% User Fee Traffic Study Review Actual Cost User Fee
SWPPP Review Each $2,185 $2,179 $2,179 0% User Fee
WQMP Review Each $2,185 $2,179 $2,179 0% User Fee
Certificate of Correction Each $655 $1,369 $1,369 109% User Fee Dedications/Easement/Grant Deeds Each $655 $1,369 $1,369 109% User Fee Quit Claim Deeds Each $655 $1,369 $1,369 109% User Fee
Legal Description Review Actual Cost User Fee
Street Vacation/Abandonment Each $655 $1,961 $1,961 199% User Fee Lot Line Adjustment / Lot Merger
Base (2 lots) Base $1,115 $2,240 $2,240 101% User Fee
Each Additional Lot up to 2 lots Each Add'l Lot $60 $638 $638 963% User Fee Centerline Tie Sheets
1 Sheet Base $125 $685 $685 448% User Fee
Each Additional Sheet Per Add'l Sheet $40 $342 $342 756% User Fee Encroachment Permits
Permit Issuance Each $45 $93 $93 107% User Fee
Residential Driveway Permit
First Driveway Base $305 $657 $657 116% User Fee
Each Additional Driveway Each Add'l Driveway $120 $132 $132 10% User Fee Commercial Driveway Permit Initial Deposit New $949 $1,000 Deposit Curb/Gutter/Sidewalk Review & Inspection
Individual Single-Family Dwelling Each $120 $739 $739 516% User Fee Lane Closure
Lane Closure - First Day Each New $541 $541 User Fee
Lane Closure - Additional Day at Same Location Each New $132 $132 User Fee Underground Utilities
Trenching 0-100 LF Each New $265 $265 User Fee
Trenching 101-1,000 LF Each New $529 $529 User Fee
Trenching 1,0001+ LF Each New $1,058 $1,058 User Fee
All Other Encroachments Not Listed Deposit1 New $1,266 $1,500 Deposit Moving Permit (Overweight and Over Dimension Single-Trip) Annual Each $90 $90 $90 0%
Cal. Code Regs. tit. 21 §
1411.3 (a)
Actual Cost
Actual Cost
Actual Cost
Actual Cost
Actual Cost
Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost Proposed Fee % Difference Regulations Per-Trip Each $16 $16 $16 0%
Cal. Code Regs. tit. 21 §
1411.3 (a)
Time Extension for Previously Issued Permit Each $120 $62 $62 -48% User Fee Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 25% 150% Admin Fee Surcharges
Technology Fee % of Permit Fee New 5.00% 5.00% Surcharge 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.