Cities Index.
Agenda, first session

Calimesa City Council
March 4, 2024

Document
Agenda, first session
Meeting
March 4, 2024
Body
Calimesa City Council
Pages
344
Original file
22.1 MB
Text extracted from the city's file for reading and search. Open the original on www.calimesa.gov. That file is the official record.
Page 13 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Plumbing Permit Fees
Minimum Permit Fee Each $77 $173 67% $116 50% User Fee
Plan Check Fee Hourly $154 $161 100% $161 5% User Fee
Residential Each New $153 100% $153 User Fee
Commercial Per Sq. Ft. New $0.09 100% $0.09 User Fee
Industrial waste pretreatment interceptor Including trap and vent, except kitchen-type grease interceptors functioning as fixture traps Each $84 $383 50% $191 128% User Fee Plumbing Fixtures, Trap, or Set of Fixtures On One Trap Includes drainage, water piping, and backflow prevention devices Each $58 $64 100% $64 11% User Fee Swimming Pool Drainage Trap and Receptor (Building drain or sewer) Water supply for pool not included Each $84 $191 66% $126 50% User Fee Gas Piping System (1-5 outlets), Alteration, or Retest Each $122 $201 91% $183 50% User Fee Additional outlet over 5 Each $13 $42 50% $21 60% User Fee Gas Presure Regulator (Other than appliance) Each $58 $173 50% $87 50% User Fee Repair or Alteration of Drainage and/or Vent Piping Each $122 $201 91% $183 50% User Fee Water-treating Equipment and/or Water Piping w/o Plumbing Each $122 $201 91% $183 50% User Fee Lawn Sprinkler Systems - One meter (Including Backflow Prevention Devices) Each $122 $201 91% $183 50% User Fee
Atmospheric-type Vacuum Breakers (1-5) Each $122 $139 100% $139 14% User Fee Additional Atmospheric-type Vacuum Breaker over 5 Each $13 $42 50% $21 60% User Fee Public Sewer Connection (House) or Lateral Extension for Future Use Each $122 $241 76% $183 50% User Fee House Sewer Manhole Each $122 $365 50% $183 50% User Fee Connection of House Sewer to Private Sewage Disposal System Each $122 $241 76% $183 50% User Fee Private Sewage Disposal System (Septic tank, seepage pit or pits, and/or drain field) Each $122 $392 50% $196 61% User Fee Cesspool, Overflow Seepage Pit, Percolation Test Pit, Swimming Pool Drywell, or Drain Field Extension or Replacement Each $122 $365 50% $183 50% User Fee Disconnection, Abandonment, Alteration, or Repair of House Sewer or Private Sewage Disposal System Each $122 $365 50% $183 50% User Fee Sewer System Each $122 $365 50% $183 50% User Fee
Backflow Protective Device (Other than atmospheric-type vacuum breakers)
2" and smaller Each $122 $110 100% $110 -10% User Fee
Over 2" Each $122 $139 100% $139 14% User Fee
Each Building Drain Installed (w/o accompanying plumbing) Each $122 $139 100% $139 14% User Fee Swimming Pool Equipment (Including gasoline - private or commercial) Each $276 $312 100% $312 13% User Fee
Other inspections and fees for which a permit is required but no fee is set forth herein Hourly $353 $173 100% $173 -51% User Fee Install / Alter / Repair water piping and or water treating equipment Each New $312 100% $312 User Fee Water Heater (Storage)
New Installation (Incl. new electrical circuit, water and/or gas lines) Each $122 $372 50% $186 53% User Fee Replacement (same type/same location) Each $122 $193 95% $183 50% User Fee Relocation (Incl. new electrical circuit and rerouting water and/or gas lines) Each $122 $399 50% $199 63% User Fee

Page 317 of 344 ends
Page 14 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Tankless Water Heater
New Installation (Incl. new electrical circuit, water and/or gas lines) Each $122 $372 50% $186 53% User Fee Replacement (same type/same location) Each $122 $193 95% $183 50% User Fee Relocation (Incl. new electrical circuit and rerouting water and/or gas lines) Each $122 $385 50% $193 58% User Fee
Mechanical Permit Fees
Minimum Permit Fee Each $77 $173 67% $116 50% User Fee
Plan Check Fee Hourly $154 $161 100% $161 5% User Fee
Residential Each New $135 100% $135 User Fee
Commercial Per Sq. Ft. New $0.09 100% $0.09 User Fee
Mechanical Unit Fee Schedule
Forced-air or Gravity-Type Furnace or Burner Installation or Relocation (Including attached ducts and vents, up to 100,000 btu/h) Residential Each $199 $193 100% $193 -3% User Fee
Commercial Each $199 $415 72% $299 50% User Fee
Forced-air or Gravity-Type Furnace or Burner Installation or Relocation (Including attached ducts and vents, over 100,000 btu/h) Each $199 $415 72% $299 50% User Fee Floor Furnace Installation or Relocation (Including Vent) Each $199 $234 100% $234 18% User Fee Suspended Heater, Recessed Wall heater, or Floor-Mounted Unit Heater Installation or Relocation Each $199 $193 100% $193 -3% User Fee Appliance Vent Installation or Relocation (not included in an appliance permit suspended heater, recessed wall heater, or floor-mounted unit heater) Each $122 $193 95% $183 50% User Fee
Heating Appliance, Refrigeration Unit, Cooling Unit, Absorption Unit, and Controls Repair, Alteration, or Addition Each $122 $193 95% $183 50% User Fee Boiler or Compressor Installation or Relocation (Up to 3HP) or Absorption Unit Installation or Relocation (Up to 100,000btu/h) Each $122 $246 74% $183 50% User Fee Boiler or Compressor Installation or Relocation (3-15HP) or Absorption Unit Installation or Relocation (100,000-500,000btu/h) Each $122 $274 67% $183 50% User Fee Boiler or Compressor Installation or Relocation (15-30HP) or Absorption Unit Installation or Relocation (500,000-1,000,000btu/h) Each $199 $326 56% $183 -8% User Fee Boiler or Compressor Installation or Relocation (>50HP) or Absorption Unit Installation or Relocation (>1,750,000btu/h) Each $154 $452 51% $231 50% User Fee Air-handling Unit including ducts attached thereto (Up to 10,000 Cubic Feet/Minute) Each $154 $372 62% $231 50% User Fee
Air-handling Unit including ducts attached thereto (>10,000 Cubic Feet/Minute) Each $154 $468 50% $234 52% User Fee
Evaporative Cooler (Other than Portable Type) Each $154 $192 100% $192 25% User Fee Ventilation Connected to a Single Duct Each $122 $193 95% $183 50% User Fee Ventilation System not a portion of any Heating or A/C System Authorized by Permit Each $122 $193 95% $183 50% User Fee Type 1 Commercial Hood installation ( including ducts) Each $122 $468 50% $234 92% User Fee Type 2 Hood installation ( including ducts) Each $122 $233 79% $183 50% User Fee Commercial or Industrial-type Incinerator Installation or Relocation Each $122 $468 50% $234 92% User Fee

Page 318 of 344 ends
Page 15 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Appliance or Equipment Regulated by Ordinance but Not Classed in Other Appliance Categories Each $122 $221 83% $183 50% User Fee Whole House Fan Each New $201 100% $201 User Fee
Other Inspections and Fees
For inspections outside of normal business hours, re- inspection fees assessed under Section 305 (g), inspections for which no fees are specifically indicated, and additional plan review for changes, additions or revisions to approve plans, there shall be a minimum charge of the greater of two hours or the actual cost to the City including supervision, overhead, hourly wages and fringe benefits of the employees involved. Hourly $353 $388 100% $388 10% User Fee Abatement of Dangerous Buildings
Abatement Activities - Inspection time, preparing reports, clerical support, rehabilitation meetings, court appearances Actual Cost User Fee Abatement Activities - Boarding up structures, property clean up, demolition of structures, rehabilitation of structures Actual Cost User Fee Other Building Fees
Business License Inspection Fee - Special inspection required of new business openings without other inspections to the premises. Not inclusive of City Clerk Business License Fee. Each $122 $134 100% $134 10% User Fee Accessibility Inspection Each New $217 100% $217 User Fee Pre-Alteration / Change of Use Inspection Per Hour New $166 100% $166 User Fee Reinspection Per Hour $199 $166 100% $166 -16% User Fee Inspection Investigations Each New $367 100% $367 User Fee Inspections Outside of Normal Business Hours Per Hour New $224 100% $224 User Fee Unclassified Inspections Each New $166 100% $166 User Fee Progress or Partial Inspection Each New $139 100% $139 User Fee Recheck Each New $184 100% $184 User Fee
Reactivation of Expired Building Permit Each New $102 100% $102 User Fee Time Extension Each New $49 100% $49 User Fee
Duplicate Job Card Each New $45 100% $45 User Fee
Appeals Board Hearing Each $507 $593 100% $593 17% User Fee Building Permit Zoning Review Each 100% $0 User Fee
Residential (SFR) Each $45 $269 50% $135 199% User Fee
Commercial / MF / Industrial Each $45 $673 50% $337 648% User Fee Surcharges
General Plan Maintenance Fee % of Valuation 0.142% 0.670% 100% 0.670% 372% Surcharge Technology Fee % of Permit Fee New 5.00% 100% 5.00% Surcharge State Surcharges
California Building Standards Commission Per $25,000 $1 $1 100% $1 0% SB1473 SMIP Fee - Residential Per $1,000 $0.13 $0.13 100% $0.13 0% PRC § 2705 SMIP Fee - Commercial Per $1,000 $0.28 $0.28 100% $0.28 0% PRC § 2705 Actual Cost
Actual Cost

Page 319 of 344 ends
Page 16 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Landscape Fees
Landscape (Plan Review)
Industrial
Up to 25,000 SF Each New $1,471 100% $1,471 User Fee
25,001 - 50,000 SF Each New $2,207 100% $2,207 User Fee 50,001 - 75000 SF Each New $3,678 100% $3,678 User Fee
75,001 SF+ Deposit
1 New $5,000 100% $5,000 Deposit
Retail / Commercial
Up to 10,000 SF Each New $1,766 100% $1,766 User Fee
10,001 - 25,000 SF Each New $3,237 100% $3,237 User Fee 25,001 - 75,000 SF Each New $4,414 100% $4,414 User Fee 75,001 SF+ Deposit
1 New $5,000 100% $5,000 Deposit
Tract Residential
Models Each New $2,648 100% $2,648 User Fee
Street Scape Deposit
1 New $3,000 100% $3,000 Deposit
Production 100%
Up to 15 Lots Each New $2,648 100% $2,648
15 - 50 Lots Each New $3,531 100% $3,531 User Fee
51 - 100 Lots Each New $4,708 100% $4,708 User Fee
100 -200 Lots Each New $5,885 100% $5,885 User Fee
201+ Lots Deposit
1 New $7,500 100% $7,500 Deposit
Multi-Family Residential
Up to 25,000 SF Each New $3,678 100% $3,678 User Fee
25,001 - 75,000 SF Each New $5,517 100% $5,517 User Fee 75,001 - 100,000 SF Each New $7,356 100% $7,356 User Fee 100,000+ SF Deposit
1 New $10,000 100% $10,000 Deposit
Park / Trails / Open Spaces
Up to 2 Acres Each New $5,885 100% $5,885 User Fee
2 - 7 Acres Each New $8,828 100% $8,828 User Fee
7 - 20 Acres Each New $11,035 100% $11,035 User Fee
20+ Acres Deposit
1 New $15,000 100% $15,000 Deposit
Other Fees
Re-Review Fee Per Hour New $235 100% $235 User Fee
Landscape (Inspection)
Industrial
Up to 25,000 SF Each New $942 100% $942 User Fee
25,001 - 50,000 SF Each New $1,412 100% $1,412 User Fee 50,001 - 75000 SF Each New $1,883 100% $1,883 User Fee
75,001 SF+ Deposit
1 New $2,500 100% $2,500 Deposit
Retail / Commercial
Up to 10,000 SF Each New $942 100% $942 User Fee
10,001 - 25,000 SF Each New $1,883 100% $1,883 User Fee 25,001 - 75,000 SF Each New $2,825 100% $2,825 User Fee 75,001 SF+ Deposit
1 New $4,000 100% $4,000 Deposit

Page 320 of 344 ends
Page 17 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Tract Residential
Models Each New $942 100% $942 User Fee
Street Scape Deposit1 New $3,883 100% $3,883 Deposit
Production
Each Production Phase Per 5 Lots New $942 100% $942 User Fee Multi-Family Residential
Up to 25,000 SF Each New $942 100% $942 User Fee
25,001 - 75,000 SF Each New $1,883 100% $1,883 User Fee 75,001 - 100,000 SF Each New $2,825 100% $2,825 User Fee 100,000+ SF Deposit1 New $4,000 100% $4,000 Deposit
Park / Trails / Open Spaces
Up to 2 Acres Each New $942 100% $942 User Fee
2 - 7 Acres Each New $1,883 100% $1,883 User Fee
7 - 20 Acres Each New $2,825 100% $2,825 User Fee
20+ Acres Deposit1 New $5,000 100% $5,000 Deposit
Other Fees
Re-Inspection Fee Per Hour New $235 100% $235 User Fee
Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 74% 18.6% 86% Deposit 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.

Page 321 of 344 ends
Page 18 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Planning
Multiple Application Fee Deposit1
User Fee or Deposit
Annexations Deposit1$25,000 $32,986 100% $33,000 32% Deposit Appeal to Planning Commission Each $3,500 $1,873 100% $1,873 -46% User Fee Appeal to City Council Each $3,500 $1,873 100% $1,873 -46% User Fee Appeal of Extension of Time Each $1,900 $1,873 100% $1,873 -1% User Fee Zoning Information Letter / Zoning Compliance Letter
Basic Each $245 $394 100% $394 61% User Fee
Tentative / Vesting Maps (Parcel or Tract) Deposit1$1,300 $4,123 99% $4,100 215% Deposit Certificate of Documents Actual Cost User Fee
Change of Zone or Zoning Text Amendment Deposit1$17,000 $16,493 100% $16,500 -3% Deposit Conditional Use Permit (New) Deposit1$10,400 $13,194 100% $13,200 27% Deposit Conditional Use Permit for ABC License (New or Revised) Deposit1$4,900 $4,123 99% $4,100 -16% Deposit Conditional Use Permit for Personal Services Deposit1 New $1,649 97% $1,600 Deposit Development Agreements
Development & Disposition Agreement Deposit1$14,500 $16,493 100% $16,500 14% Deposit Development Agreement Periodic Review Deposit1 New $1,649 97% $1,600 Deposit Development Agreement Modification Deposit1 New $6,597 100% $6,600 Deposit Development Plan Review
Major Deposit1$18,900 $28,038 100% $28,000 48% Deposit
Minor Deposit1$830 $3,299 100% $3,300 298% Deposit
Environmental Assessment Actual Cost User Fee
Reimbursement Agreement Deposit1 New $1,155 95% $1,100 Deposit Extension of Time - All Each $4,700 $522 100% $522 -89% User Fee General Plan Amendment Deposit1$16,900 $32,986 100% $33,000 95% Deposit Business License Review Each $171 $197 100% $197 15% User Fee Preliminary Application Review Deposit1$4,430 $3,299 100% $3,300 -26% Deposit Minor Modifications Each New $313 100% $313 User Fee
Accessory Dwelling Unit / Junior Accessory Dwelling Unit Covenant Review Each $246 $320 100% $320 30% User Fee
Sign Permits
Master Sign Program or Sign Requiring a Hearing (No fee w/ DPR Application) Deposit1
$4,000 $4,123 99% $4,100 3% Deposit
Sign Permit Each $365 $313 100% $313 -14% User Fee
Temporary Each $230 $209 100% $209 -9% User Fee
Similar Use Determination Each $1,240 $825 100% $825 -33% User Fee Specific Plan Deposit1 New $18,967 100% $19,000 Deposit Specific Plan Amendment Deposit1$12,300 $12,370 100% $12,400 1% Deposit Surface Mining and Reclamation Act (SMARA) Review:

SMARA Review Actual Cost User Fee
SMARA Review Inspection Actual Cost User Fee
Actual Cost
Total Cost or Deposit of Highest Application Cost +
50% of each Add'l Application
Actual Cost + Admin Fee
Actual Cost
Actual Cost

Page 322 of 344 ends
Page 19 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
SMARA Periodic Review Actual Cost User Fee
Temporary Use Permit
Real Estate Office in Approved Development Project Each $780 $955 100% $955 22% User Fee Off-site Construction yard w/ Approved Development Project Each $780 $955 100% $955 22% User Fee Trailer, coach, or mobile home as temporary residence w/ Approved Residential Building Permit Each $780 $955 100% $955 22% User Fee Holiday Sales Lot (30 day max) Each $220 $955 50% $477 117% User Fee Outdoor Display and Sales (4 days or less; no more than 2/calendar year) Each $410 $955 64% $615 50% User Fee
Temporary Event
Commercial Fairs, Festivals, Concerts, Farmers Market, or Other Similar Events Each $1,980 $522 100% $522 -74% User Fee Mature Non-Oak Tree Removal Application Each $480 $673 100% $673 40% User Fee Oak Trees
Oak Tree Pruning Permit Each $480 $673 100% $673 40% User Fee Oak Tree Removal / Encroachment Permit Each $480 $673 100% $673 40% User Fee Oak Tree Preservation & Replacement Permit Each $480 $673 100% $673 40% User Fee Variance Deposit1$8,200 $8,246 99% $8,200 0% Deposit
Fence Permit Each New $269 100% $269 User Fee
Short Term Rentals Each New $603 100% $603 User Fee
Food Trucks Each New $362 100% $362 User Fee
Sidewalk Vendor Permit Each New $404 100% $404 User Fee Nonconforming Structure/Use Determination Deposit1 New $1,319 99% $1,300 Deposit Reasonable Accomodation Review Each New $673 100% $673 User Fee Residential Density Bonus Deposit1 New $1,649 97% $1,600 Deposit Inclusionary Housing Plan Review Deposit1 New $2,474 101% $2,500 Deposit Addressing
Infill Each New $209 100% $209 User Fee
Tract Deposit1 New $3,299 100% $3,300 Deposit
Commercial Deposit1 New $3,299 100% $3,300 Deposit
Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 74% 18.6% 86% Admin Fee Surcharges
Technology Fee % of Permit Fee New 5.00% 100% 5.00% Surcharge 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.

Public Works
Residential
Single Family Precise Grading Plan Check
1 Sheet Base $1,215 $1,276 100% $1,276 5% User Fee
Each Additional Sheet Per Add'l Sheet $705 $809 100% $809 15% User Fee Additional Project Coordination & Meetings Actual Cost User Fee Additional Engineering Plan Check Hourly $175 $171 100% $171 -2% User Fee Public Works Inspection Hourly $123 $132 100% $132 8% User Fee Each Additional Hour Each Add'l Hour $125 $132 100% $132 6% User Fee As-Built Plans and Revisions Hourly $170 $171 100% $171 1% User Fee Commercial (applications for lots larger than 5,000 square feet) Public Improvement Plan Check Initial Deposit New $6,329 100% $6,300 Deposit Actual Cost
Actual Cost

Page 323 of 344 ends
Page 20 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Public Improvement Inspection Initial Deposit New $12,657 100% $12,600 Deposit Grading Plan Check and Inspection Initial Deposit New $15,821 100% $15,800 Deposit Precise Grading Plan Check - Commercial Initial Deposit New $5,537 99% $5,500 Deposit Map Plan Check Initial Deposit New $9,493 100% $9,500 Deposit Survey Monument Inspection Initial Deposit New $633 103% $650 Deposit Additional Project Coordination & Meetings Actual Cost User Fee Additional Engineering Plan Check Hourly $175 $171 100% $171 -2% User Fee Public Works Inspection Hourly $123 $132 100% $132 8% User Fee Each Additional Hour Each Add'l Hour $125 $132 100% $132 6% User Fee As-Built Plans and Revisions Hourly $170 $171 100% $171 1% User Fee Hydrology Report Review Hourly $159 $171 100% $171 8% User Fee Soils Report Review Actual Cost User Fee
CC&R Review Actual Cost User Fee
Bond Agreement Processing Hourly $125 $124 100% $124 0% User Fee Traffic Study Review Actual Cost User Fee
SWPPP Review Each $2,185 $2,179 100% $2,179 0% User Fee WQMP Review Each $2,185 $2,179 100% $2,179 0% User Fee
Certificate of Correction Each $655 $1,369 72% $983 50% User Fee Dedications/Easement/Grant Deeds Each $655 $1,369 72% $983 50% User Fee Quit Claim Deeds Each $655 $1,369 72% $983 50% User Fee Legal Description Review Actual Cost User Fee
Street Vacation/Abandonment Each $655 $1,961 50% $983 50% User Fee Lot Line Adjustment / Lot Merger
Base (2 lots) Base $1,115 $2,240 75% $1,674 50% User Fee Each Additional Lot up to 2 lots Each Add'l Lot $60 $638 50% $319 432% User Fee Centerline Tie Sheets
1 Sheet Base $125 $685 50% $342 174% User Fee
Each Additional Sheet Per Add'l Sheet $40 $342 50% $171 328% User Fee Encroachment Permits
Permit Issuance Each $45 $93 73% $68 50% User Fee
Residential Driveway Permit
First Driveway Base $305 $657 70% $458 50% User Fee
Each Additional Driveway Each Add'l Driveway $120 $132 100% $132 10% User Fee Commercial Driveway Permit Initial Deposit New $949 100% $950 Deposit Curb/Gutter/Sidewalk Review & Inspection
Individual Single-Family Dwelling Each $120 $739 50% $370 208% User Fee Lane Closure
Lane Closure - First Day Each New $541 100% $541 User Fee Lane Closure - Additional Day at Same Location Each New $132 100% $132 User Fee Underground Utilities
Trenching 0-100 LF Each New $265 100% $265 User Fee
Trenching 101-1,000 LF Each New $529 100% $529 User Fee Trenching 1,0001+ LF Each New $1,058 100% $1,058 User Fee All Other Encroachments Not Listed Deposit1 New $1,266 95% $1,200 Deposit Actual Cost
Actual Cost
Actual Cost
Actual Cost
Actual Cost

Page 324 of 344 ends
Page 21 of 22 ends

Master Fee Schedule City of Calimesa, CA
Fee Name Unit Current Fee Full Cost
% of Full
Cost Proposed Fee % Difference Regulations
Moving Permit (Overweight and Over Dimension Single-Trip) Annual Each $90 $90 100% $90 0%
Cal. Code Regs. tit. 21 §
1411.3 (a)
Per-Trip Each $16 $16 100% $16 0%
Cal. Code Regs. tit. 21 §
1411.3 (a)
Time Extension for Previously Issued Permit Each $120 $62 100% $62 -48% User Fee Administrative Cost Recovery added onto each deposit-based fee % of Deposit 10% 25% 74% 18.6% 86% Admin Fee Surcharges
Technology Fee % of Permit Fee New 5.00% 5.00% Surcharge 1 Deposits are for minimum anticipated level of work. Additional funds / deposits may be required based on complexity of project.

Page 325 of 344 ends
Page 22 of 22 ends

Attachment 7B

Page 326 of 344 ends
Page 327 of 344 ends
Page 328 of 344 ends
Page 329 of 344 ends
Page 330 of 344 ends
Page 331 of 344 ends
Page 332 of 344 ends
Page 333 of 344 ends
Page 334 of 344 ends
Page 335 of 344 ends
Page 336 of 344 ends
Page 337 of 344 ends
Page 338 of 344 ends
Page 339 of 344 ends
Page 340 of 344 ends
Page 341 of 344 ends
Page 342 of 344 ends
Page 343 of 344 ends
Page 344 of 344 ends
← All documents from this meeting