Cities Index.
Agenda, first session

Calistoga City Council
August 1, 2023

Document
Agenda, first session
Meeting
August 1, 2023
Body
Calistoga City Council
Pages
701
Original file
27.1 MB
Text extracted from the city's file for reading and search. Open the original on calistoga.civicweb.net. That file is the official record.

City of Calistoga
2023 – 2031 Housing Element 33 Initial Study/Mitigated Negative Declaration Nesting birds
Sites identified in the Housing Element contain individual trees specimens that may have the potential to provide nesting habitat for raptors and passerines which are protected under the California Fish and Game Code (Sections 3503, 3503.5, 3513), and the Federal Migratory Bird Treaty Act. Since most birds can fly out of harm’s way, future development of sites would not be expected to harm adult birds. Nonetheless, nesting birds are susceptible to disturbance that harms eggs or young birds, defined as a “take”. Activities associated with future development of sites identified in the Housing Element could include removal of trees as well as ground-disturbing construction activities that may result in impacts to nesting birds, if present onsite or in the immediate vicinity. To provide protection to nesting birds, their eggs, and their young, future development of sites identified in the Housing Element shall be required to comply with Mitigation Measure BIO-2 which restricts the timing of construction activities to occur outside of the bird nesting season or if the bird nesting season cannot be avoided requires pre-construction nesting bird surveys and controls to protect active nests, if present. With implementation of measure BIO-2, impacts to nesting birds will be less than significant.

Special-status bats
In addition to nesting birds, trees may provide suitable roosting habitat for special status bats, including the pallid bat, which is listed at the state level as a species of special concern and is therefore provided protection pursuant to CEQA Guidelines Section 15380(2)(A). In the event that special status bats are present on sites identified for future housing development, construction activities could result in potentially significant impacts through disturbance and habitat removal. To avoid potential impacts, future development of sites identified in the Housing Element shall comply with Mitigation Measure BIO-3, which requires completion of pre-construction bat surveys. If bats are identified, measure BIO-3 provides that removal and exclusion be conducted by a qualified biologist in conjunction with the CDFW. With implementation of BIO-3, potential impacts to special status bats will be less than significant.

5.4(c) (Adverse Effects to Jurisdictional Waters) Less Than Significant with Mitigation: Given that the proposed project does not involve physical development, the presence or absence of federally protected wetlands, including but not limited to, marsh, vernal pools, or coastal wetlands, on sites identified in the 2023 – 2031 Housing Element are not known. To ensure future development does not result in adverse impacts to jurisdictional waters, upon submittal of a site-specific development proposal, a biological assessment identifying any federally protected wetlands shall be prepared, consistent with Mitigation Measure BIO-1.

Future development has the potential to directly or indirect effect regulated water ways under Sections 401 and 404 of the Clean Water Act and 1600 of the Fish and Game Code if not properly controlled. As such Mitigation Measure BIO-4, provides for avoidance measures and best management practices, to be implemented during construction and at operation as warranted, and Mitigation Measure BIO-5 provides for compensatory requirements at a 2:1 replacement ratio including compliance with Section 401 of the Clean Water Act, acquisition of a 401 Water Quality Certification issued by the Regional Water Quality Control Board (RWQCB) and/or Section 1602 of the Fish and Game Code, through acquisition of a Lake or Streambed Alteration Agreement. With implementation of measures BIO-1, BIO-4, and BIO-5, potential impacts to jurisdictional waters from future residential development anticipated by the Housing Element Update will be reduced to less than significant.

5.4(d) (Adverse Effect to Wildlife Movement) Less Than Significant Impact with Mitigation: Given the undeveloped nature of sites identified for future development as well as adjacent, undeveloped open space, it is possible that development under the Housing Element could result in adverse impacts to wildlife movement through the introduction of structures, fences, and other improvements impassible by wildlife.

Consistent with Mitigation Measure BIO-1, site specific biological assessments shall identify the suitability of sites to serve as movement corridors and shall identify measures to offset potential impacts, as necessary.

Item #8.2.

Page 277 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 34 Initial Study/Mitigated Negative Declaration With implementation of measure BIO-1, future development of sites identified in the Housing Element will have a less than significant impact to wildlife corridors and species movements.

5.4(e) (Conflict with Local Ordinances) Less Than Significant with Mitigation: The City of Calistoga’s Tree Ordinance (Chapter 19.01 of the Municipal Code) contains provisions to preserve and protect native and nonnative trees. Development of sites identified in the Housing Element may require removal of trees to accommodate buildings, infrastructure, landscaping, and other associated site improvements. To ensure that future development of sites identified in the Housing Element conform to Section 19.01.040 of the City’s Municipal Code, Mitigation Measure BIO-6, which requires the planting of appropriately sized replacement trees or in lieu fees to offset the removal of protected trees, shall be implemented. Implementation of BIO-6 will ensure that future development of sites identified in the Housing Element complies with the City’s Tree Ordinance and potential impacts will be less than significant.

Furthermore, consistent with Section 19.01.040 (E) of the city’s Municipal Code, future development of sites identified in the Housing Element shall comply with Mitigation Measure BIO-7, which requires development of a Tree Protection Plan including installation of temporary protective fencing surrounding protected trees adjacent to the project boundaries prior to the start of any on-site work; specifications for root cutting, tree trimming, trenching and irrigation; and prohibits certain disturbances to protected trees. With implementation of measures BIO-6 and BIO-7 potential impacts from future residential development anticipated by the proposed Housing Element update, due to a conflict with the city’s Tree Ordinance will be reduced to less than significant.

5.4(f) (Conflicts with Habitat Conservation Plans) No Impact: No Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state Habitat Conservation Plan exists for the City of Calistoga. Therefore, future development under the 2023 – 2031 Housing Element will not conflict with the provisions of an adopted Habitat Conservation Plan or any other Natural Community Conservation Plan approved by a local, regional or state body.

Mitigation Measure(s):

BIO-1: Consistent with General Plan (OSC) Policy P1.2-3, prior to approval of site-specific development of housing opportunity sites identified in the 2023 – 2031 Housing Element, biological and wetland assessments shall be prepared to determine the presence or absence of populations of special-status species, sensitive natural communities, and wetland resources. Given the proximity of known occurrences of the Calistoga popcorn flower and blue grass, an assessment of the presence or absence of these species and an analysis of potential on and off site impacts shall be provided. At a minimum, biological and wetland assessments shall:
• Be conducted by qualified specialists in botany, wildlife biology, and wetland ecology. • Include detailed field surveys conducted during the appropriate time of the year to permit detection of sensitive resources.
• Provide a recommended plan to avoid, reduce, or offset impacts to biological resources, as necessary. Where determined necessary by the qualified professional, plans shall include wildlife preservation management plans, including adequate mitigation for loss of wildlife habitat components that are critical to maintenance of special-status and other important species.

BIO-2: Unless otherwise recommended in site-specific biological assessments prepared for future development of sites identified in the Housing Element, to avoid impacts to birds protected under the Migratory Bird Treaty Act and Fish and Game Code (Section 3514), construction activities, including the removal of trees, should occur outside of the bird-nesting season between September 1st and January 31st. If work occurs between February 1st and August 31st, a pre-construction bird nesting survey shall be conducted within seven and up to 15 days prior to tree removal. The bird nesting Item #8.2.

Page 278 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 35 Initial Study/Mitigated Negative Declaration survey shall include an examination of all trees onsite and within 300 feet and 500 feet for raptors, of the identified limits of work, which may include offsite trees or structures.

If nesting birds are identified, then a qualified ornithologist or biologist shall establish a temporary protective construction buffer around the nest(s), conduct a survey to establish behavioral baseline of birds using each nest, and conduct monitoring to ensure it is not disturbed. The nest buffer will be staked or fenced to establish a construction exclusion perimeter and shall be adjusted by a qualified biologist as needed to avoid disturbance. The buffer shall be of sufficient size to protect the nesting site from construction-related disturbance. Typically, adequate nesting buffers are 50 feet from the nest site or nest tree dripline for small birds and up to 300 feet for sensitive raptors. Upon completion of nesting surveys, if nesting birds are identified a qualified ornithologist/biologist shall prescribe adequate nesting buffers to protect the nesting birds from harm while the project is being constructed. If continuous monitoring is not feasible, conservative no-disturbance buffer(s) should be established, with the buffer distance based on the tolerance level of the nesting species.

No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1st unless determined by a qualified ornithologist/biologist responsible for monitoring nesting behavior that the young have left the nest and have attained sufficient flight skills to avoid construction zones, or that the nesting cycle is otherwise completed.

The biologist/ornithologist conducting the surveys shall provide the City of Calistoga with a report detailing the results of the survey and any recommendations required for establishment of protective buffers, if tree removal occurs between February 1st and August 31st.

BIO-3: Unless otherwise recommended in site-specific biological assessments prepared for future development of sites identified in the Housing Element, to avoid impacts to roosting pallid bats or other special-status bat species, tree removal shall only be conducted during seasonal periods of bat activity, between August 31 and October 15, when bats would be able to fly and feed independently, and between March 1 and April 1 to avoid hibernating bats, and prior to the formation of maternity colonies. A biologist with at least two years of experience surveying for bats, shall conduct a preconstruction survey of all trees that would be impacted within 14 days prior to removal or commencement of site improvement activities. If no special-status bats are found during the surveys, then the biologist shall provide a memo summarizing the results of the survey to the City, and construction activities may commence. If bat roosts are found, then a plan shall be developed for removal and exclusion, in conjunction with the CDFW.

If building removal must occur outside the seasonal activity periods (i.e., between October 16 and the end of February, or between April 2 and August 30), then a qualified biologist, shall conduct preconstruction surveys within 14 days of tree removal, and determine if there are young present (i.e., the biologist will determine if there are maternal roosts). If a maternity site is found, impacts to the maternity site shall be avoided by establishment of a fenced, non-disturbance buffer until the young have reached independence (i.e., are flying and feeding on their own) as determined by a qualified biologist. The size of the buffer zone shall be determined by a qualified biologist at the time of the surveys. If the qualified biologist finds evidence of roosting bats but not a maternity site with young, then a plan shall be developed for removal and exclusion, in conjunction with the CDFW. The biologist shall provide the City with a report detailing the results of the survey and any recommendations, as warranted, required for establishment of protective buffers for bat roosts, if identified.

BIO-4: Indirect impacts to adjacent, offsite waters of the U.S./State shall be minimized to the maximum extent practicable by the use of best management practices (BMPs) that are installed prior to earth-work to protect waters of the U.S./State outside of the designated work areas to ensure that there are no Item #8.2.

Page 279 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 36 Initial Study/Mitigated Negative Declaration inadvertent impacts to waters of the U.S./State, and to downstream receiving waters within the watershed. These practices shall include installing orange construction fencing, silt fencing, wildlife friendly hay wattles (that is, no monofilament netting), gravel wattles, and other protective measures between project activities and preserved offsite waters of the U.S./State.

If deemed necessary as determined through preparation of biological assessments for individual housing sites, orange construction fencing and other appropriate BMPs shall be installed along the top of bank. Prior to the commencing construction activities, a biological monitor shall inspect installation of BMPs to ensure that offsite waters are protected. BMPs shall thereafter be routinely inspected by the construction manager to ensure BMPs remain in place throughout construction of individual sites. Upon completion of project construction all orange fencing shall be removed along with any temporary BMPs.

BIO-5: Direct impacts to waters of the U.S./State shall be avoided to the maximum extent practicable through Project Design. Where avoidance is infeasible to accommodate housing, direct impacts shall be minimized and Project Applicants shall satisfy compensatory mitigation requirements at a minimum 2:1 ratio for impacted waters or as otherwise directed by agencies, and in compliance with Section 401 of the Clean Water Act, through acquisition of a 401 Water Quality Certification issued by the RWQCB and/or Section 1602 of the Fish and Game Code, through acquisition of a Lake or Streambed Alteration Agreement. Evidence that the Project Applicant has secured all required authorization from agencies shall be submitted to the City prior to issuance of any grading or building permit.

BIO-6: Trees proposed for removal as part of future development of sites identified in the Housing Element Update shall require the planting of appropriately sized trees as demonstrated in a landscape plan submitted with plans for building permit. Tree removal and replacement shall conform with the City of Calistoga’s Tree Ordinance. If onsite planting is not feasible, payment of an in-lieu fee, may be permitted. All requirements and restrictions contained in Chapter 19.01 of the City’s Municipal Code shall be complied with, including the incorporation of replacement trees for those trees to be removed, protection of trees to remain, as well as incorporation of any recommendations of the project arborist including those set forth in the Tree Protection Plan.

BIO-7: Prior to issuance of a grading permit for future development of sites identified in the Housing Element Update, a Tree Protection Plan prepared by a qualified arborist in accordance with

19.01.040E of the City’s municipal code shall be submitted. The Protection Plan shall identify locations for the installation of temporary protective fencing surrounding protected trees adjacent to the project boundaries and shall specify restrictions for root cutting, tree trimming, trenching, irrigation, parking, staging of construction equipment, and other activities that might cause harm to protected trees.

Item #8.2.

Page 280 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 37 Initial Study/Mitigated Negative Declaration

5.5. CULTURAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less Than
Significant
Impact
No Impact
a) Cause a substantial adverse change in
the significance of a historical resource
pursuant to § 15064.5?
b) Cause a substantial adverse change in
the significance of an archaeological
resource pursuant to § 15064.5?
c) Disturb any human remains, including
those interred outside of formal
cemeteries?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; and Silverado Terrace Planning Commission Staff Report, January 27, 2021.

Cultural Resources Setting
Historically, the City of Calistoga and the greater Napa Valley supported one of the largest concentrations of Native Americans in the Bay Area. European settlement of Calistoga began in 1857, when Samuel Brannan purchased land within the Hot Springs Township at the north end of the Napa Valley with the intent of capitalizing on the area’s mineral waters and natural hot springs by establishing a resort based around the area’s natural geothermal resources. Brannan’s Hot Springs Resort opened in 1862, and featured guest cottages, bathing pools, landscaped parks, stables, a skating rink, a dance pavilion, and an observatory. To make it easier for guests to visit, Brannan encouraged, and partially funded, the extension of the Napa Valley Railroad north to Calistoga, which was completed in the spring of 1867. The extension of the railroad to Calistoga catalyzed growth and encouraged further settlement. In 1876 Calistoga was incorporated as a City within Napa County. The City of Calistoga contains cultural resources that contribute to the understanding of the region's history and prehistory and influence the community’s identity.

Historic Resources
Historic resources include historic structures, sites and areas that played important roles in local history.

Older buildings may hold historic value in their design attributes that provide insight into architectural styles and values of the past. The city recognizes these historic and potential historic resources as worthy of preservation both for their aesthetic and cultural value.

In 1978, a countywide inventory identified 115 properties in Calistoga with potential historic significance.

Three potential historic districts were identified within the city limits including the Foothill, Hot Springs, and Lake districts. As part of the General Plan Update, a cultural resources inventory was completed in May 2000 and identified approximately 150 properties that are potentially significant resources within the city limits.

Figure 16 of the General Plan EIR shows locations of historical resources within the planning area. None of the housing sites identified in the 2023 – 2031 Housing Element are listed as parcels containing a primary resource, significant resource, nor are any of the sites within a potential historic district boundary.

The Silverado Site, an approved pipeline project referred to as Silverado Terrace, is located at 1506 Grant Street and is identified in the General Plan EIR as a primary historic resource that is likely to be significant and Item #8.2.

Page 281 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 38 Initial Study/Mitigated Negative Declaration eligible for listing on the National Register of Historic Places (NRHP). As noted in the Planning Commission Staff Report dated January 27, 2021, an evaluation of the historical and architectural significance found that the warehouse building was the former Brannan Stable building and was associated with the 19th century Brannan Hot Springs Resort, however building alterations over the years resulted in an inability for the building to convey its significant historical associations. Furthermore, the evaluation found that the building lacks integrity of setting, feeling, association, design, materials, and workmanship to convey architectural or historical significance under the California Register of Historical Resources (CRHR) criteria. The redwood construction material was identified as the only remaining significant resource and the project was conditioned to salvage the material per recommendations contained in the Historical and Architectural Significance report.

Archaeological Resources
In addition to historic resources, in May 2000, a request for a records search within the Planning Area was filed with the Northwest Information Center (NWIC) at Sonoma State University (SSU), which contains documentation of all previous archaeological surveys conducted in the area. The records search identified 50 prior surveys, accounting for approximately 5 to 10 percent of the Planning Area. The types of cultural resources which have been discovered in the Planning Area include remnants of Native American villages and campsites and other evidence of habitation such as large, small, and ashy middens, and lithic and obsidian scatter. Potential prehistoric resources include chert or obsidian flakes, projectile points, mortars and pestles, and dark friable soil containing shell and bone dietary debris, heat-affected rock, and human burials. Within the Planning Area, prehistoric archaeological sites are generally located along seasonal and/or perennial watercourses, at or near vegetation ecotones, and at the base of foothills. Due to the undeveloped nature of sites identified in the 2023 – 2031 Housing Element as well as the proximity to the Napa River, there is a possibility that buried archaeological resources could be encountered during construction activities associated with future development of housing sites.

Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies intended to protect cultural resources. Those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Objective CI-3.4: Preserve and protect cultural resources other than historic buildings, including Native American sacred places, burial sites, archaeological resources, fossils and other paleontological resources, historic landscapes, and other culturally significant sites and objects. • Policy P.3.4-1 As part of the development review process, assessment shall be required by appropriate professionals regarding the presence of archaeological and paleontological resources and the potential for adverse impacts on these resources. • Policy P.3.4-2 Any archaeological or paleontological resources on private property shall be either preserved on their sites or adequately documented and conserved as a condition of removal.

Cultural Resources Impact Discussion

5.5(a) (Historic Resources) Less Than Significant Impact: Adoption of the 2023 – 2031 Housing Element would not result in physical development, but rather will facilitate future development of these sites. As discussed previously, none of the housing sites identified in the proposed Housing Element Update are listed as parcels containing potentially significant historic resources nor are any of the sites within a potential historic district boundary. Though the Silverado Site, an approved pipeline project referred to as Silverado Terrace, is identified in the General Plan EIR as a primary historic resource that is likely to be significant and eligible for listing on the NRHP, an analysis of the building found that the former Brannan Stable building associated with the 19th century Brannan Hot Springs Resort, had been altered over the years and was Item #8.2.

Page 282 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 39 Initial Study/Mitigated Negative Declaration therefore not able to convey its significant historical associations. Based on the lack of existing historic resources on sites identified in the proposed Housing Element Update impacts to historic resources resulting from adoption and implementation of the 2023 – 2031 Housing Element will be less than significant.

5.5(b) (Archaeological Resources) Less Than Significant with Mitigation: Adoption of the proposed Housing Element Update will facilitate future development of undeveloped sites that have been identified to accommodate residential development in the city. Though physical development will not occur as a direct result of adoption of the Housing Element, future development of these sites is reasonably foreseeable. Based on the undeveloped condition of sites identified in the Housing Element, there is a potential that unrecorded prehistoric era archaeological deposits may be encountered during ground-disturbing activities including grading, trenching, and digging. Consistent with adopted General Plan policies, site-specific development proposals shall comply with Mitigation Measure CUL-1, which requires an assessment of archaeological resources by a qualified professional, including potential adverse impacts to cultural resources and recommendations to avoid or reduce such impacts. Furthermore, CUL-1 requires that any archaeological resources identified shall either be preserved in place or adequately documented, cataloged, and recorded.

With implementation of measure CUL-1 potential impacts due to a change in the significance of archeological resources if present on identified Housing Element site will be reduced to less than significant.

5.5(c) (Discovery of Human Remains) Less Than Significant with Mitigation: As stated in the General Plan EIR, it is likely that the Planning Area contains undiscovered human burial sites. Furthermore, due to the undeveloped condition of sites identified in the proposed Housing Element Update, there is a possibility that human remains could be discovered during ground-disturbing activities. Consistent with California Health and Safety Code Section 7050.5, future development of sites identified in the Housing Element shall comply with Mitigation Measure CUL-2, which identifies procedures to follow in the event that human remains are discovered. With implementation of CUL-2, Section 7050.5 of the California Health and Safety Code, and Sections 5097.94, 5097.98 and 5097.99 of the California Public Resources Code, as required under state law, potential impacts resulting from accidental discovery of Native American remains associated with future housing development will be less than significant.

Mitigation Measure(s):

CUL-1: Upon submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element, an assessment of archaeological resources, tribal cultural resources, potential adverse impacts, and recommendations to avoid or reduce impacts, including but not limited to preservation on site or documentation and conservation shall be prepared by a qualified professional for review and acceptance by the City.

If recommended through the site-specific assessment, a professional archaeologist shall be onsite during initial ground disturbing activities to monitor potential uncovering of undiscovered archeological and tribal resources. The archaeologist shall have the authority to temporarily halt work upon discovery of potentially significant resources and earthwork within 100 feet of the discovery shall be immediately stopped until the archeologist inspects the resource, assess significance, consults with tribes and related parties, and provides recommendations on treatment of the discovery. The City shall be notified of any such discoveries and the Project applicant shall implement the recommendations of the archaeologist.

CUL-2 In the event that human remains are encountered during development of sites identified in the Housing Element, all work must stop, and the County Coroner shall be immediately notified of the discovery. If the County coroner determines that remains are, or are believed to be Native American, then the Native American Heritage Commission must be contacted by the Coroner so that a “Most Likely Descendant” (MLD) can be designated to provide further recommendations regarding Item #8.2.

Page 283 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 40 Initial Study/Mitigated Negative Declaration treatment of the remains. A Secretary of Interior-qualified Archaeologist shall evaluate the historical significance of the discovery, the potential for additional human remains to be present, and to provide further recommendations for treatment of the resource in accordance with the MLD recommendations. Native American human remains, funerary objects, and object of cultural patrimony shall be handled consistent with the requirement of the Native American Graves Protection and Repatriation Act.

Item #8.2.

Page 284 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 41 Initial Study/Mitigated Negative Declaration

5.6. Energy
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less than
Significant
Impact
No
Impact
a) Result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary
consumption of energy, or wasteful use of energy
resources, during project construction or operation?
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; California Energy Commission; California Department of Conservation-CalGEM; and Marin Clean Energy.

Energy Setting
Energy resources include electricity, natural gas, and other fuels. The production of electricity requires the consumption or conversion of energy resources, including water, wind, oil, gas, coal, solar, geothermal, and nuclear resources, into energy. Energy production and energy use both result in the depletion of nonrenewable resources (e.g., oil, natural gas, coal, etc.) and emission of pollutants.

California Energy Consumption
According to the California Energy Commission (CEC), total system electric generation for California in 2020 was 272,576 gigawatt-hours (GWh)2. California’s non-CO2 emitting electric generation categories (nuclear, large hydroelectric, and renewable generation) accounted for approximately 52 percent of total in-state generation for 2020. In-state electric generation contributed was 190,193 GWh, or approximately 70 percent, to the state’s total system energy.

According to the CEC, approximately 45 percent of the natural gas burned in California was used for electricity generation, totaling 90,691 GWh or 3.09 billion therms. The remainder of natural gas consumed was in the residential (21 percent), industrial (25 percent), and commercial (9 percent) sectors. Natural gas is used to generate electricity for cooking and heating, and also serves as an alternative transportation fuel.3 The California Energy Commission (CEC) has developed an energy efficiency action plan to be updated every three years. The latest plan, the 2019 California Energy Efficiency Action Plan, contains three goals for driving energy efficiency: doubling energy efficiency savings by 2030, removing and reducing barriers to energy efficiency in low-income and disadvantaged communities, and reducing greenhouse gas emissions from the building sector. Per the Plan, the state contains approximately nine million single-family residences, of which nearly half were constructed before 1970 and about 80 percent before 1990.4 Due to existing infrastructure being constructed prior to the approved energy standards, there are opportunities to increase energy efficiency through building envelope and other weatherization measures. However, implementation of retrofits presents challenges such as lack of available financing, and consumer awareness and motivation. 2 California Energy Commission, Total System Electric Generation (2020) https://www.energy.ca.gov/data-reports/energyalmanac/california-electricity-data/2020-total-system-electric-generation, accessed November 24, 2021. 3 California Energy Commission, Supply and Demand of Natural Gas in California, https://www.energy.ca.gov/data-reports/energyalmanac/californias-natural-gas-market/supply-and-demand-natural-gas-california, accessed November 24, 2021. 4 California Energy Commission, 2019 California Energy Efficiency Action Plan. https://www.energy.ca.gov/programs-andtopics/programs/energy-efficiency-existing-buildings Item #8.2.

Page 285 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 42 Initial Study/Mitigated Negative Declaration Energy consumption in new development is regulated through the California’s Energy Code (CEC), Title 24, Part 6 and 11 of the California Code of Regulations. The CEC updates Building Energy Efficiency Standards every three years. The 2019 Building Energy Efficiency Standards became effective as of January 1, 2020. On August 11, 2021, the CEC adopted the 2022 Energy Code. If approved for inclusion in the California Building Standards Code, the 2022 Energy Code will go into effect on January 1, 2023. New construction is required to comply with energy efficiency standards in effect through the current building code.

City of Calistoga Energy Sources
Households, businesses, industry, public service systems and other operators within the City of Calistoga rely on a variety of energy resources (fuels, photovoltaic, natural gas, oil, coal, etc.) to provide energy for lighting, cooking, heating and cooling, and to operate vehicles.

The City’s energy resources are produced and conveyed by Pacific Gas and Electric (PG&E). Marin Clean Energy (MCE) also serves the City of Calistoga and offers customers the choice of having 50% to 100% of electricity supplied from renewable sources, such as wind, bioenergy, and hydroelectric. While MCE provides electric generation, PG&E continues to deliver the electricity through its facilities, and handles maintenance, repairs, and billing services.

Geothermal Resources
The City of Calistoga is located on an active geothermal reservoir. Some uses in the city utilize geothermal waters for the heating of hot springs, spas, pools, greenhouses, and a few private residences. Heat from geothermal waters is used as an alternative to other energy resources.

Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies intended to improve and enhance energy efficiency in the city, those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Objective H-8.1: Reduce energy demand in new and existing housing through conservation and efficiency. • Policy P8.1-1 Promote the use of energy conservation features in the design of new and remodeled residential structures.
• Policy P8.1-2 Encourage sustainable design and construction practices in new residential development projects.

Energy Impact Discussion

5.6 (a) (Wasteful, Inefficient, Unnecessary Consumption of Energy) Less than Significant Impact with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not result in physical construction, development of sites identified for future development of housing will involve the use of energy during construction and at operation.

Construction
Site preparation, grading, paving, and building construction will consume energy in the form of gasoline and diesel fuel through the operation of heavy off-road equipment, trucks, and worker vehicles. However, consumption of fuels would be temporary and would cease upon the completion of construction. As stated in Section 5.3 Air Quality, the City of Calistoga will impose BAAQMD best management practices through Mitigation Measure AQ-1, which will minimize energy use during construction by limiting idling times and requiring that all construction equipment be maintained and properly tuned in accordance with manufacturer’s specifications. Construction activities will be limited in scale and duration and as such Item #8.2.

Page 286 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 43 Initial Study/Mitigated Negative Declaration implementation of the Housing Element (e.g., construction of residential uses on identified housing sites) will not result in inefficient, wasteful, and unnecessary consumption of energy during construction. Therefore, construction-related energy impacts related to wasteful, inefficient, and unnecessary energy consumption will be less than significant.

Operation
Operational energy use associated with residential development consists of energy consumption for lighting, electronics, heating, air conditioning, cooking, refrigeration, and energy consumption related to conveyance and treatment of water and wastewater, and fuel consumption associated with vehicular use. The California Energy Commission (CEC) updates the Energy Code every three years. In August 2021, the CEC adopted the 2022 Energy Code, which was approved by the California Building Standards Commission for inclusion into the California Building Standards Code in December 2021. The 2022 Energy Code encourages efficient electric heat pumps, establishes electric-ready requirements for new homes, and expands solar photovoltaic and battery storage standards. The 2022 Energy Code goes into effect on January 1, 2023, therefore, building permits submitted for sites identified in the Housing Element will be required to comply with the energy requirements established by the 2022 Building Code or latest adopted Building Code.

In addition, energy efficiency will be achieved through landscape design that will comply with the State Water Efficient Landscape Ordinance requirements. Landscaping plans submitted for site-specific development will be required to adhere to California’s model water efficient landscape regulations that include droughtresistant, low water usage species, and irrigation system requirements. Water conservation efforts achieve energy efficiency by minimizing water use and the corresponding energy demand required for water treatment and conveyance.

While development of sites identified in the 2023 – 2031 Housing Element will result in increased energy consumption compared to existing conditions, site-specific development proposals will be required to incorporate energy efficiency standards in compliance with the building code in effect at the time, which will minimize energy consumption. Furthermore, these sites have been anticipated to support housing by the City of Calistoga in the General Plan and EIR and prior Housing Elements. Therefore, operation of residential uses facilitated by implementation of the Housing Element will not result in the wasteful, inefficient, and unnecessary consumption of energy and impacts will be less than significant.

5.6 (b) (Conflict with State or Local Plan) Less than Significant Impact: In December 2007, the CEC prepared the State Alternative Fuels Plan in partnership with the California Air Resources Board (CARB) and other state, federal, and local agencies. The plan presents strategies and actions California must take to increase the use of alternative non-petroleum fuels in a manner that minimizes costs to California and maximizes the economic benefits of in-state production. The plan assesses various alternative fuels and develops fuel portfolios to meet California’s goals to reduce petroleum consumption, increase alternative fuels use, reduce greenhouse gas emissions, and increase in-state production of biofuels without causing a significant degradation of public health and environmental quality.

Development of sites identified in the 2023 – 2031 Housing Element will be required to implement the latest state plans and requirements for energy efficiency in new construction. Residential development facilitated by adoption of the Housing Element will install energy conservation features as required by California Building Code, including the Green Building Standards Code and Energy Efficiency Code. As such, implementation of the Housing Element will not conflict with or obstruct implementation of state or local plans for renewable energy or energy efficiency, including the State Alternative Fuels Plan. Therefore, impacts associated with adoption and implementation of the 2023 – 2031 Housing Element will be less than significant.

Mitigation Measure(s): None Required.

Item #8.2.

Page 287 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 44 Initial Study/Mitigated Negative Declaration

5.7. GEOLOGY AND SOILS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Less Than
Significant
Impact
No Impact
a) Directly or indirectly cause potential
substantial adverse effects, including the risk
of loss, injury, or death involving:
i. Rupture of a known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault
Zoning Map issued by the State
Geologist for the area or based on
other substantial evidence of a known
fault? Refer to Division of Mines and
Geology Publication 42.
ii. Strong Seismic ground shaking?
iii. Seismic-related ground failure,
including liquefaction?
iv. Landslides?
b) Result in substantial soil erosion or the loss
of topsoil?
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable as
a result of the project, and potentially result
in on or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in
California Building Code, creating substantial
direct or indirect risks to life or property?
e) Have soils incapable of adequately
supporting the use of septic tanks or
alternative waste water disposal systems
where sewers are not available for the
disposal of waste water?
f) Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; and MTC/ABAG Hazard Viewer Map, Probabilistic Earthquake Shaking Hazard, Earthquake Liquefaction Susceptibility.

Item #8.2.

Page 288 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 45 Initial Study/Mitigated Negative Declaration Geology and Soils Setting
The Napa Valley, in which Calistoga is located, lies within the east-central portion of the Coast Ranges geomorphic province, a region characterized by northwest-trending valleys and mountain ranges. This alignment of valleys and ridges has developed in response to folding and faulting along the San Andreas fault system, which includes several faults east and west of Calistoga. The Calistoga Planning Area, is located near the center of the broad alluvial plain that occupies the floor of the Napa Valley.

The San Andreas fault system is 44 miles wide and extends throughout much of the North Bay Area. Active faults nearest to Calistoga include Maacama (5 miles west), Rodgers Creek (9 miles west), Healdsburg (11 miles west), Collayayomi (12 miles north), Hunting Creek – Berryessa (13 miles east), West Napa (7 miles south), San Andreas (30 miles west), and Green Valley (18 miles southeast). The nearest Alquist-Priolo fault zone in the project vicinity is the Maacama Alquist-Priolo fault zone located approximately 5.5 miles to the west. No active faults or Alquist-Priolo fault zones directly traverse the City including any of the sites identified in the 2023 – 2031 Housing Element.

Unlike many nearby communities, Calistoga has experienced only minor effects from recent major earthquakes, including the 7.1 magnitude Loma Prieta earthquake in 1989, 5.2 magnitude earthquake centered nearby in Yountville in 2000, and the 6.0 magnitude South Napa earthquake in 2014 which occurred along the West Napa Fault.

According to the MTC/ABAG Hazard Viewer Map, Probabilistic Earthquake Shaking Hazard, developed in conjunction with the United States Geological Survey (USGS) and the California Geological Survey (CGS), the City of Calistoga and surrounding areas are subject to very strong and severe shaking in the event of an earthquake occurring along regionally active faults. The probabilistic shaking scenario represents a composite shaking hazard for the Bay Area based on the probability of many different possible earthquake scenarios.

The data presented represents a 10 percent in 50-year map, meaning the shaking level has a 10 percent chance of being exceeded over the next 50 years. In addition to seismic shaking hazards, liquefaction induced by seismic events is moderate in many areas of the city with the exception of areas along the Napa River and other water features, where susceptibility is identified as very high. Sites identified in the 2023 – 2031 Housing Element are located in areas with moderate susceptibility to seismically induced liquefaction.

Bedrock in the Calistoga area consists of Sonoma Volcanics, dating from the Pliocene era of two to seven million years ago. These rocks are mainly interbedded sediment, tuff, and rhyolite. Alluvial deposits ranging from two million years old to less than 11,000 years old blanket the Napa Valley floor. These unconsolidated sediments consist of interbedded sand, silt, clay, and gravel deposited by the Napa River and its tributaries.

Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies intended to improve and enhance safety of new development with regard to geologic hazards, those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Objective SAF-1.1: Enforce measures related to site preparation and building construction that protect life and property from seismic hazards.
• Policy P1. All construction in Calistoga shall conform with the California Building Code, which specifies requirements for seismic design, foundations, and drainage.

Objective SAF-1.2: Regulate new land development to prevent the creation of new geologic hazards.

Item #8.2.

Page 289 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 46 Initial Study/Mitigated Negative Declaration • Policy P2. In areas with significant identified geological hazards, development shall be sited and designed to minimize exposure to damage resulting from geological hazards and to minimize the aggravation of off-site geological hazards.

Geology and Soils Impact Discussion

5.7(a.i) (Fault Zones) No Impact: Fault rupture occurs when the ground surface fractures as a result of fault movement during an earthquake and almost always follows preexisting fault traces, which are zones of weakness. In a seismically active region such as Northern California, there is a possibility for future faulting.

However, historical occurrences of surface faulting have generally closely followed the trace of active faults (i.e., faults experiencing surface rupture in the past 11,000 years). Given that no active faults or Alquist-Priolo fault zones directly traverse the City of Calistoga, including sites identified in the 2023 – 2031 Housing Element, there would be no impact due to fault rupture.

5.7(a. ii) (Ground-Shaking) Less Than Significant Impact with Mitigation: Based on the proximity of the city to the Maacama Fault and Rodgers Creek Fault, both of which are active faults, development within Calistoga is susceptible to very strong and severe shaking associated with seismic events occurring along these active faults. As such, development of sites identified in the 2023 – 2031 Housing Element has the potential to expose people or structures to substantial adverse effects resulting from earthquake shaking and related ground failure. The resulting vibrations would likely cause primary damage to the proposed building and improvements as well as secondary effects including ground failures in loose alluvium or poorly compacted fill. Both primary and secondary effects pose a potential risk of loss of life or property.

The intensity of earthquake motion depends on the characteristics of the generating fault, distance to the fault, earthquake magnitude and duration, and site-specific geologic conditions. Since no physical development is proposed at this time, no site-specific soils investigations have been prepared for sites identified in the Housing Element. Upon submittal of site-specific development proposals, a design level geotechnical analysis will be required in compliance with Mitigation Measure GEO-1. Conformance with standards set forth in site-specific analyses, the Building Code of Regulations, Title 24, Part 2 (the California Building Code 3.7-20 Chapter 3: Setting, Impacts, and Mitigation Measures [CBC]) and the California Public Resources Code, Division 2, Chapter 7.8 (the Seismic Hazards Mapping Act) are required to address risks associated with seismic shaking. Design specifications in the CBC ensure that structures and improvements associated with development do not expose people or structures to substantial adverse effects, including the risk of loss, injury, or death as a result of seismic activity or liquefaction. With implementation of measure GEO-1 and compliance with applicable standards and codes, impacts associated with ground shaking and ground failure adversely impacted future housing development will be less than significant.

5.7 (a. iii) (Seismic-Related Ground Failure/Liquefaction) Less Than Significant with Mitigation:

Liquefaction is a phenomenon associated with fine-grained, loosely-packed sands and gravels subjected to ground shaking as a result of seismic activity. Liquefaction can lead to total and/or differential settlement and is largely dependent upon the intensity of ground shaking and response of soils underlying the site. As discussed previously, sites identified in the 2023 – 2031 Housing Element are located in areas with moderate susceptibility to seismically induced liquefaction.

Upon submittal of a building permit application for site-specific development, compliance with Mitigation Measure GEO-1 shall be required, which requires preparation of a site-specific geotechnical investigation to identify site-specific geotechnical conditions, including soil composition, identification of expansive soils, risks of liquefaction, and conclusions and recommendations addressing grading procedures, soil stabilization, and foundation design. In addition to recommendations provided in the site-specific analyses, the foundation and structural design for future development will be required to meet the latest CBC regulations as well as state and local standards for seismic safety. With implementation of Measure GEO-1 and compliance with state and Item #8.2.

Page 290 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 47 Initial Study/Mitigated Negative Declaration local standards, potential impacts from future housing development including the risk of loss, injury, or death involving seismic-related ground failure and liquefaction will be less than significant.

5.7(a. iv) (Landslide) Less than Significant Impact: The risk of landslide is dictated by several factors including precipitation, soil type, steepness of slope, vegetation, seismic conditions, and level of human disturbance. When certain conditions are present, landslides can be triggered as a result of seismic activity.

Landslides have been known to occur within Napa County but are typically confined to slopes steeper than 15% and occur in areas underlain by geologic units that have demonstrated stability problems. Sites identified in the Housing Element for future development are relatively flat and are classified by the California Geological Survey as having very low landslide potential. Therefore, impacts due to loss of structures or life from landslides occurring on sites identified in the proposed Housing Element Update will be less than significant.

5.7(b) (Soil Erosion) Less Than Significant Impact with Mitigation: Construction associated with future development of sites identified in the proposed Housing Element may include tree removal and grading to achieve a uniform distribution of soil across individual sites. These ground disturbing activities have the potential to result in soil erosion or the loss of topsoil if not properly controlled.

Soil erosion will be controlled through implementation of best management practices (BMPs) and adherence to a Storm Water Pollution Prevention Plan (SWPPP) throughout site preparation and construction activities, as further discussed in Section 5.9 Hydrology/Water Quality. Furthermore, Mitigation Measure GEO-2, requires submittal of an erosion control plan identifying measures to be implemented during construction, establishes controls for grading activity during the rainy season, and requires compliance with the City’s Erosion Control requirements set forth in Chapter 19-08 of the City Code. Implementation of GEO-2, as part of the future housing development review process, will avoid potentially significant adverse effects from erosion and loss of topsoil and will ensure that impacts are less than significant.

5.7(c) (Unstable Geologic Unit) Less Than Significant Impact: Lateral spreading, lurching, and associated ground failure can occur during strong ground shaking on certain soil substrate typically on slopes. Lurching generally occurs along the tops of slopes where stiff soils are underlain by soft deposits or along steep channel banks whereas lateral spreading generally occurs where liquefiable deposits flow towards a “free face,” such as channel banks, during an earthquake. Sites identified for development in the proposed Housing Element are generally flat and lack steep channel banks and slopes. Therefore, potential impacts related to lateral spreading, lurching, and associated ground failure from future housing development on identified sites will be less than significant.

5.7(d) (Expansive Soils) Less than Significant Impact with Mitigation: Expansive soils are naturally occurring and often found in low-lying regions and valley flood plains. Expansive soils, such as clay, tend to swell with increases in soil moisture and shrink as the soil moisture decreases. Changes in soil moisture content can compromise the integrity of foundations, retaining walls, and slab–on-grade improvements as a result of differential movements (settlement or heave). Mitigation Measure GEO-1 requires preparation of site-specific, design level geotechnical investigations prior to development of sites identified in the proposed Housing Element as well as implementation of recommendations established as part of the site-specific investigations. Compliance with Measure GEO-1 will ensure that potential direct or indirect impacts to life or property due to the presence of expansive soils are minimized through design and soil treatment procedures and impacts resulting from implementation of the 2023 – 2031 Housing Element will be less than significant.

5.7(e) (Septic Tanks) No Impact: Sites identified for housing development in the 2023 – 2031 Housing Element are within incorporated city limits where adequate wastewater disposal systems are available.

Though sites identified for development are currently vacant, future development will install new sewer laterals that connect to the existing disposal system. Therefore, septic tanks or alternative wastewater treatment facilities will not be introduced as part of future development of sites identified in the Housing Item #8.2.

Page 291 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 48 Initial Study/Mitigated Negative Declaration Element and there would be no impacts resulting from soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems.

5.7(f) (Paleontological Resource): Less than Significant Impact with Mitigation: The Calistoga General Plan does not identify the presence of any paleontological or unique geological resources within the city.

Nevertheless, the potential remains for the inadvertent discovery of buried paleontological resources. As such, Mitigation Measure GEO-3, which sets forth procedures to follow in the event that paleontological resources are discovered during construction activities, shall be implemented. With implementation of measure GEO-3, potential impacts to paleontological resources from future housing development as identified in the proposed Housing Element Update will be less than significant.

Mitigation Measure(s):

GEO-1: Prior to the issuance of a building permit, for development proposals on housing opportunity sites identified in the 2023 – 2031 Housing Element, a design level geotechnical investigation shall be prepared. The investigation shall include an analysis of site-specific geotechnical conditions including soil composition, expansive soils, and groundwater, as well as a discussion of seismic risks including liquefaction and landslides. Based on the site-specific analysis, the investigation shall provide detailed conclusions and recommendations addressing grading procedures, soil stabilization, foundation design, and any other recommendations for addressing site-specific geotechnical conditions. Final grading, construction, and building plans shall demonstrate that recommendations set forth in the geotechnical investigations have been incorporated into the design of the project and to the satisfaction of the City of Calistoga.

GEO-2: Prior to issuance of a grading permit for development of sites identified in the 2023 – 2031 Housing Element, an erosion control plan along with grading and drainage plans shall be submitted to the City’s Planning and Building Department. All earthwork, grading, trenching, backfilling, and compaction operations shall be conducted in accordance with the City of Calistoga’s Stormwater Runoff Pollution Control Ordinance contained in Chapter 19.05 of the Calistoga Municipal Code. The erosion control plan shall detail erosion control measures such as site watering, sediment capture, equipment staging, and other erosion control measures to be implemented during construction activities.

GEO-3: If paleontological resources, including individual fossils or assemblages of fossils, are encountered during construction activities, all ground disturbing activities shall halt and a qualified paleontologist shall be procured to evaluate the discovery and provide recommendations.

Item #8.2.

Page 292 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 49 Initial Study/Mitigated Negative Declaration

5.8. GREENHOUSE GAS EMISSIONS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Generate greenhouse gas emissions,
either directly or indirectly, that may have a
significant impact on the environment?
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; BAAQMD 2017 Bay Area Clean Air Plan; BAAQMD Justification Report: CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects and Plans, April 2022.; Calistoga Climate Action Plan, April 1, 2014.

Greenhouse Gas Setting
Greenhouse gases (GHGs) are generated from natural geological and biological processes and through human activities including the combustion of fossil fuels and industrial and agricultural processes. GHGs include carbon dioxide (CO2), nitrous oxide (N2O), methane (CH3), chlorofluorocarbons, hydrofluorocarbons and perfluorocarbons.

While GHGs are emitted locally, they have global implications. GHGs trap heat in the atmosphere, which warms up the surface of the Earth. This concept is known as global warming and is contributing to climate change. Changing climatic conditions pose several potential adverse impacts including sea level rise, increased risk of wildfires, degraded ecological systems, deteriorated public health, and decreased water supplies.

To address GHGs at the State level, the California legislature passed the California Global Warming Solutions Act in 2006 (Assembly Bill 32), which requires that statewide GHG emissions be reduced to 1990 levels by 2020. Executive Order S-3-05 provides the California Environmental Protection Agency with the regulatory authority to coordinate the State’s effort to achieve GHG reduction targets. S-3-05 goes beyond AB 32 and calls for an 80 percent reduction below 1990 levels by 2050. SB 32 and Executive Order B-30-15 extended the goals of AB 32, setting GHG reduction target at 40 percent of 1990 levels by 2030. Senate Bill 375 has also been adopted, which seeks to curb GHGs by reducing urban sprawl and vehicle miles traveled.

As previously discussed in Section 5.3 Air Quality, the Air District Board of Directors adopted the proposed CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects in April 2022. In determining significance of a project’s impacts under CEQA, the updated guidelines state that a project would be considered to have a less than significant impact related to GHG emissions so long as it contributes its fair share toward achieving long-term climate goals including achieving carbon neutrality by 2045. As detailed in the Guidelines document, determining a project’s fair share analysis should focus on design elements that will help to achieve carbon neutrality by 2045. GHG emissions from the land use sector are primarily generated from building energy use and transportation, and as such these areas need to be evaluated to ensure that the project can and will be carbon neutral. With respect to building energy use, replacing natural gas with electric power, and eliminating inefficient or wasteful energy usage can help to achieve GHG reductions as it supports California’s transition away from fossil fuel–based energy sources and reduces the Item #8.2.

Page 293 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 50 Initial Study/Mitigated Negative Declaration project’s building energy GHG emissions to zero, becoming 100 percent carbon free. With regard to transportation related GHG emissions, projects need to be designed to reduce project-generated VMT to the recommended 15-percent reduction below existing as well as provide sufficient electric vehicle (EV) charging infrastructure to support the shift to EVs.

As with the previous CEQA Guidelines, the updated Guidelines do not include thresholds of significance for construction related GHG impacts as impacts from construction represent a nominal portion of a project’s lifetime GHG emissions. Thresholds for land use projects are designed to address operational GHG emissions which represent the majority of project related GHG emissions. As such, project’s that incorporate design elements that contribute a fair share toward achieving long-term climate goals, or project’s that are consistent with a locally adopted GHG reduction strategy can be determined to have a less than significant GHG impact.

Calistoga Climate Action Plan
The City of Calistoga Climate Action Plan (CAP), adopted by the City Council on April 1, 2014, seeks to mitigate greenhouse gas (GHG) emissions actions implementable by at the local level. The CAP identifies various mitigation measures within four different topic areas including transportation, energy efficiency and renewable energy, carbon sequestration, and community engagement and advocacy. Measures set forth in the CAP that are applicable to the 2023 – 2031 Housing Element include:
• Measure T-7 A: Promote housing types that are desirable to local workers. • Measure T-12 A: Support the installation of electric vehicle charging stations. • Measure EE-1 B: Discourage the use of decorative exterior lighting. • Measure EE-2 A: Enforce the State’s water-efficient landscape standards for new and rehabilitated landscaping.
• Measure CS-1 A: Protect existing trees to the maximum feasible extent. • Measure CS-1 B: Require the replacement of trees that are removed by development projects. • Measure CS-1 C: Require the planting of street trees as part of development projects, and plant and replace removed trees along streets.

In addition to the city’s adopted CAP, in 2021 the City Council adopted three resolutions aimed at addressing climate change. Resolution 2021-025, adopted on April 20, 2021approved entering into a cooperative Joint Powers Agreement to fund and administer the Napa Countywide Climate Action Program. Resolution 2021- 063, adopted on August 3, 2021, declared a climate emergency with a stated goal of achieving net zero climate pollution by 2030.

Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies intended to improve reduce GHG emissions associated with new development, those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Objective H-8.1: Reduce energy demand in new and existing housing through conservation and efficiency. • Policy P8.1-1 Promote the use of energy conservation features in the design of new and remodeled residential structures.
• Policy P8.1-2 Encourage sustainable design and construction practices in new residential development projects.

Greenhouse Gas Emissions Impacts Discussion

5.8(a-b) (Significant GHG Emissions and Conflict with GHG Plan) Less Than Significant Impact with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not directly result in physical Item #8.2.

Page 294 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 51 Initial Study/Mitigated Negative Declaration development, it is reasonably foreseeable that housing development will result from adoption of the Housing Element. GHG emissions will be generated during construction and operation of sites identified in the Housing Element. Construction will result in short-term GHG emissions from heavy-duty construction equipment, worker trips, and material delivery and hauling. GHG emissions generated during operation will primarily result from vehicular emissions associated with travel to and from the project site.

Construction
As discussed in Section 5.3 Air Quality, there is no established threshold for construction related GHG emissions as these represent a minimal part of overall emissions. However, BAAQMD has established construction BMPs to reduce GHG emissions during construction. Future development that will occur under the 2023 – 2031 Housing Element shall be required to implement Mitigation Measure AQ-1, which would minimize GHG emission during construction. With implementation of measure AQ-1, impacts resulting from GHG emissions during construction activities of future housing development as anticipated by the Housing Element will be less than significant.

Operation
As stated above, the recently adopted BAAQMD thresholds for land use projects are designed to address operational GHG emissions by incorporating design elements that contribute a fair share toward achieving long-term climate goals. As stated in the Justification Report, a land use project would be considered to contribute its fair share if it would serve California’s need for housing and related infrastructure in a manner that supports the state’s goals of achieving carbon neutrality by 2045. The city’s adopted CAP does not contain projected emissions beyond 2020 and therefore, cannot be relied upon to conclude that development of housing under the 2023 – 2031 Housing Element will have a less than significant impact resulting from GHG emissions. As discussed in Section 5.3 Air Quality, consistent with the recently adopted BAAQMD Thresholds, future development under the 2023 – 2031 Housing Element will be required to comply with Mitigation Measure AQ-2, which requires that future development of housing sites meet the performance standards in the Justification Report, including demonstrating that new development will not include natural gas appliances or natural gas plumbing, will demonstrate energy efficiency, achieve a 15 percent reduction in projectgenerated vehicle miles traveled (VMT) below the existing VMT per capita, and will comply with off-street electric vehicle requirements. Incorporation of the BAAQMD thresholds as contained in measure AQ-2, will ensure that operational GHG emissions resulting from implementation of the 2023 – 2031 Housing Element will be reduced to less than significant.

Mitigation Measure(s): Implementation of AQ-1 and AQ-2.

Item #8.2.

Page 295 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 52 Initial Study/Mitigated Negative Declaration

5.9. HAZARDS/HAZARDOUS MATERIALS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Create a significant hazard to the public or
environment through the routine transport, use,
or disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable
upset and accident conditions involving the
release of hazardous materials into the
environment?
c) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile of
an existing or proposed school?
d) Be located on a site that is included on a list
of hazardous materials sites compiled pursuant
to Government Code Section 65962.5 and, as a
result, would create a significant hazard to the
public or the environment?
e) For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport of
public use airport, would the project result in a
safety hazard or excessive noise for people
residing or working in the project site?
f) Impair implementation of or physically
interfere with an adopted emergency response
plan or emergency evacuation plan?
g) Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury or
death involving wildland fires?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; EnviroStor and GeoTracker Databases; and Napa County Operational Area Hazard Mitigation Plan, August 2020.

Hazardous Material Setting
The California Department of Toxic Substances Control (DTSC) defines a hazardous material as: “a substance or combination of substances that, because of its quantity, concentration or physical, chemical, or infectious characteristics, may either: 1) cause, or significantly contribute to an increase in mortality or an increase in serious, irreversible, or incapacitating illness; or 2) pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.” Regulations governing the use, management, handling, transportation and disposal of hazardous Item #8.2.

Page 296 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 53 Initial Study/Mitigated Negative Declaration waste and materials are administered by Federal, State and local governmental agencies. Pursuant to the Planning and Zoning Law, DTSC maintains a hazardous waste and substances site list, also known as the “Cortese List.”
Title 22 of the California Code of Regulations (CCR), Division 4.5 Environmental Health Standards for the Management of Hazardous Waste, defines hazardous and special waste, identifies federal and state hazardous waste criteria, and regulates the storage, transportation, and disposal of waste. Title 22 was created to regulate the hazardous wastes generated by factories or similar sources, but soil excavated during construction may also be regulated.

Title 23 of the CCR, Division 3 State Water Resources Control Board (SWRCB) and Regional Water Quality Control Board (RWQCB), Chapter 16 California Underground Storage Tank Regulations, contains design, construction, and monitoring requirements for new underground storage tanks.

Hazardous waste management in Calistoga is administered by the Napa County Department of Environmental Management (DEM) through the Certified Uniform Program Agency (CUPA). The CUPA program oversees five hazardous materials programs: Hazardous Materials Management Plans (HMMP) program, California Accidental Release Prevention (CalARP) program, underground storage tank (UST) programs, aboveground storage tank (AST) programs, and hazardous waste generation and disposal.

The California Department of Industrial Relations, Division of Occupational Safety and Health (DOSH) (formerly known as Cal/OSHA) is charged with enforcement of state regulation and the supervision of workplaces in California that are not under direct federal jurisdiction. State worker health and safety regulation applicable to construction workers include training requirements for hazardous waste operation and emergency response.

The 2002 Brownfields Amendments to the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requires an evaluation be performed by an environmental professional to assess a property’s liability for hazardous substances. Federal Code 40 CFR § 312.21 requires the environmental professional’s opinion to identify conditions that indicate the presence of hazardous substances on, at, in or to the subject property and identify information gaps that limit a comprehensive assessment of the extent of substance release.

A review of GeoTraker, the State Water Boards’ data management system for sites that impact or may impact water quality, and in particular groundwater, demonstrates that none of the sites identified in the 2023 – 2031 Housing Element are located on a cleanup site. Similarly, EnviroStor, DTSCs data management system for sites with known contamination does not identify any of the sites as cleanup sites. Though housing sites are located within close proximity of Leaking Underground Storage Tank (LUST) cleanup sites as shown on GeoTraker, all cases are identified as closed, with no further action needed. Similarly, EnviroStor lists one Military Evaluation site within close proximity to sites identified in the Housing Element, however, the case is closed and no further action is needed.

Applicable General Plan Objectives and Policies
Objective SAF-4.1 Minimize Calistoga residents’ exposure to the harmful effects of hazardous materials and waste.

Hazards/Hazardous Materials Impact Discussion

5.9(a, b) (Routine Transport, Upset and Accidental Release) Less Than Significant Impact with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not directly result in physical development, the reasonably foreseeable development of sites identified for future development of housing will result in excavation and grading activities that could expose construction workers and the public to Item #8.2.

Page 297 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 54 Initial Study/Mitigated Negative Declaration unknown hazardous materials present in soil or groundwater. As such, site-specific development proposals for sites identified in the Housing Element shall comply with Mitigation Measure HAZ-1, which requires submittal of a Phase I Environmental Site Assessment (ESA), prepared in accordance with the latest ASTM protocol, and that site remediation demonstrating compliance with appropriate environmental screening levels (ESL) as established by the RWQCB be completed for contamination prior to the issuance of occupancy.

In addition to potentially hazardous materials present in soil or groundwater, construction activities associated with development of sites identified in the Housing Element will result in the temporary presence of potentially hazardous materials including, but not limited to fuels and lubricants, paints, solvents, insulation, electrical wiring, and other construction-related materials. Although these potentially hazardous materials may be present onsite during future construction of individual housing sites, handling of such materials will be required to comply with all existing federal, state, and local safety regulations governing the transportation, use, handling, storage, and disposal of potentially hazardous materials. Additionally, prior to commencing with site preparation, a Storm Water Pollution Prevention Plan (SWPPP) that identifies Best Management Practices (BMPs) will be prepared and implemented during all construction activities in accordance with the City’s Municipal Code Chapter 19.05 Stormwater and Runoff Pollution Control requirements as further discussed in Section 5.10 Hydrology and Water Quality. BMPs include measures to prevent spills and require onsite materials for cleanup. Furthermore, compliance with all federal and state regulations as overseen by Napa County’s CUPA will also be required. With implementation of measure HAZ1 as well as compliance with applicable regulations, impacts resulting from routine transport, use, or disposal of hazardous materials during future construction of sites identified in the Housing Element will be less than significant.

Operation of residential uses facilitated through adoption of the 2023 – 2031 Housing Element may include storage and use of certain chemicals typical of household uses. These may include cleaning solvents for household maintenance, fuels and chemicals for automobile maintenance, and pesticides for landscaping purposes. These household chemicals are routinely used by residential properties and would not present a significant hazard. Therefore, use of household products at operation will be less than significant.

5.8(c) (Emit or Handle Hazardous Materials Within ¼ Mile of School) Less Than Significant Impact:

Calistoga Junior/Senior High School is located within one-quarter mile of housing sites C, D, and E, and Palisades High School is located within one-quarter mile of housing sites B, C, D, and E. Development resulting from implementation of the 2023 – 2031 Housing Element includes residential uses, which are not associated with production, storage, and handling of hazardous materials and waste at operation. During future construction of sites identified in the Housing Element, hazardous materials such as paints, fuels, solvents, and other construction materials may be present on a temporary basis. As previously discussed, compliance with all existing federal, state, and local safety regulations governing the transportation, use, handling, storage, and disposal of potentially hazardous materials will be required. There are no activities associated with the anticipated development under the proposed Housing Element that would pose a threat to schools from the release or handling of hazardous materials. Therefore, impacts related to the emission or handling of hazardous materials within a quarter mile of a school would be less than significant.

5.9(d) (Existing Hazardous Material Sites) Less Than Significant Impact: The California Environmental Protection Agency (CAL-EPA) annually updates the California Hazardous Waste and Substances Site List (also known as the “Cortese List”). A review of GeoTraker demonstrates that none of the sites identified in the 2023 – 2031 Housing Element are located on a cleanup site. Similarly, a review of EnviroStor, shows that none of the sites identified in the Housing Element are listed as cleanup sites. Though housing sites are located within close proximity of LUST cleanup sites, all cases are closed and no further action is needed. Similarly, one Military Evaluation site is located within proximity to sites identified in the Housing Element, however, the Item #8.2.

Page 298 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 55 Initial Study/Mitigated Negative Declaration case is closed and no further action is needed. Therefore, impacts associated with existing hazardous materials sites will be less than significant.

5.9(e) (Airport Land Use Plans) No Impact: None of the sites identified for future development in the 2023 – 2031 Housing Element are located within the boundaries of an airport land use plan or in proximity to a private airstrip. Sites F and G are located near the former Gliderport property, which is no longer operational as an airstrip. The nearest operational airport is the Angwin Airport, Virgil O. Parrett Field, located well over two miles from the City of Calistoga. Therefore, impacts associated with airport-related hazards will be less than significant.

5.9(f) (Impair Emergency Response Plan) Less than Significant Impact: Implementation of the 2023 – 2031 Housing Element would not impair implementation of, or physically interfere with, an adopted emergency response plan or emergency evacuation plan. California has developed an emergency response plan to coordinate emergency services by federal, state, and local governments, including responding to hazardous materials incidents. The State Office of Emergency Services employs a Hazardous Materials Division, which enforces multiple programs that address hazardous materials. Napa County has prepared the Concept of Operations Base Plan (CONPLAN), which establishes the Napa County Health and Human Services Agency emergency organization and provides for coordination of planning efforts using emergency and incident management systems. CONPLAN establishes the policies and procedures for coordinating medical, communication, and recovery operations during events that may overwhelm the day-to-day agency resources, including major natural hazard events and hazardous materials releases. There are no aspects of the 2023 – 2031 Housing Element that will interfere with adopted emergency or evacuation plans.

Furthermore, upon submittal of site-specific development proposals, plans will be reviewed by the City of Calistoga to ensure consistency with adopted emergency response requirements. Therefore, impacts resulting from a conflict with emergency response will be less than significant.

5.9(h) (Wildland Fire Hazards) Less Than Significant Impact: Wildland fires are of concern particularly in areas of expansive native vegetation, brush, woodland, or grassland. As shown in Figure 2-5 of the Napa County Operational Area Hazard Mitigation Plan all sites identified in the 2023 – 2031 Housing Element are located outside of areas designated as having moderate, high, and very high wildfire risk. Housing Element sites are within city limits and surrounded by existing roadways, residential, commercial, and industrial uses, associated parking, and undeveloped land.

The City of Calistoga Fire Department is responsible for protecting life, property, and the environment from fire within the city. The Fire Department responds to calls including structural, wildland, and other fires. The city operates one fire station, located at 1113 Washington Street, which is within one mile of all housing sites, allowing for timely response in the event of a fire. Development of sites identified in the Housing Element will not increase risk of exposure due to wildland fire hazards. Therefore, impacts related to the exposure of people or structures to a significant risk of loss, injury or death involving wildland fires will be less than significant.

Mitigation Measure(s):

HAZ-1: Upon submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element, the results of a Phase I Environmental Site Assessment (ESA), prepared in accordance with the latest ASTM protocol for such assessments shall be provided. If the Phase I ESA indicates evidence that site contamination requiring cleanup exists, a Phase II ESA shall be completed to fully characterize the nature and extent of such contamination, and the scope of required clean up procedures. Furthermore, in the event that contamination is identified site remediation demonstrating compliance with appropriate environmental screening levels (ESL) as established by the RWQCB shall be completed prior to the City issuance of occupancy.

Item #8.2.

Page 299 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 56 Initial Study/Mitigated Negative Declaration

5.10. HYDROLOGY AND WATER QUALITY
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No
Impact
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge such
that the project may impede sustainable groundwater
management of the basin?
c) Substantially alter the existing drainage pattern on the site or area, including through the alteration of the course of a stream or river, or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or offsite; ii. substantially increase the rate or amount of
surface runoff in a manner which would result in
flooding on- or offsite;
iii. create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted runoff;
or
iv. impede or redirect flood flows?
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; California Dam Breach Inundation Maps, CA Department of Water Resources Division of Safety of Dams, Accessed July 7, 2022; BASMAA Post-Construction Manual: Design Guidance For Stormwater Treatment And Control For Projects In Marin, Sonoma, Napa, And Solano Counties, January 2019; and Napa Valley Subbasin Groundwater Sustainability Plan, January 2022.

Hydrology and Water Quality Setting
The entirety of the City of Calistoga is located within the Napa River watershed, which encompasses an area of approximately 426 square miles. The Napa River watershed is contained by Mt. St. Helena to the north, the Mayacamas Mountains to the west, Howell Mountain, Atlas Peak, and Mt. George to the east, and the NapaItem #8.2.

Page 300 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 57 Initial Study/Mitigated Negative Declaration Sonoma Marsh to the south. The Napa River travels through the center of the watershed on the valley floor, draining numerous tributaries along 55 miles from the headwaters of Mt. St. Helena to the San Pablo Bay.

Flooding
The Napa County Flood Control and Water District (District) manages flood control facilities throughout the County. The District is responsible for structural repairs to culverts and spillways, grading and reshaping channels, and debris removal to maintain hydraulic capacity of all waterways. The City of Calistoga Planning and Building Director regulates flooding under Title 18 (Floodplain Management) of the Municipal Code.

The Federal Emergency Management Agency’s (FEMA’s) National Flood Insurance Program is intended to encourage State and local governments to adopt responsible floodplain management programs and flood measures. As part of the program, FEMA defines floodplain and floodway boundaries that are shown on the Flood Insurance Rate Maps (FIRMs). Sites identified in the 2023 – 2031 Housing Element are located in FEMA Zone X, Other Areas, as delineated on map 06055C0229E. Areas designated Zone X, Other Areas are considered to be outside the 100- and 500-year floodplain, representing minimal flood hazard risk.

Water Quality
Surface water quality is regulated by the San Francisco Bay RWQCB (Region 2) via the Water Quality Control Plan for the San Francisco Bay Region (Basin Plan). The RWQCB is responsible for implementing Section 401 of the Clean Water Act through the issuance of a Clean Water Certification when development includes potential impacts to jurisdictional areas such as creeks, wetlands, or other Waters of the State.

Dischargers whose projects disturb one or more acres of soil, or whose projects disturb less than one acre, but are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity, Construction General Permit Order 2009-0009-DWQ from the State Water Resources Control Board.5 Construction activity subject to this permit includes clearing, grading, and disturbances to the ground such as stockpiling, or excavation. The Construction General Permit requires development of a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP includes specifications for Best Management Practices (BMPs) to be implemented during construction activities to control potential discharge of pollutants from the construction area. Additionally, a SWPPP describes measures to prevent pollutants in runoff during project operation and includes a plan for inspection and maintenance of the project facilities to ensure proper operation and maintenance continues throughout the life of the project. All sites identified in the 2023 – 2031 Housing Element, with the exception of site G, are greater than one acre and are therefore subject to the requirements of Construction General Permit Order 2009-0009-DWQ.

Groundwater
Calistoga is situated above the Napa Valley Subbasin as identified by the California Department of Water Resources Bulletin 118 Groundwater Basins published in 2018. The State of California adopted the Sustainable Groundwater Management Act (SGMA) in 2014 which called for the creation of local Groundwater Sustainability Agencies (GSAs), who are charged with development and implementation of Groundwater Sustainability Plans to address long-term management of healthy and functioning groundwater resources. In 2019, the Napa County Groundwater Sustainability Agency was formed from representative government agencies to assess baseline conditions, define sustainability for the basin, and to develop a groundwater sustainability plan.
5 State Water Resources Control Board, Construction General Permit Order 2009-0009-DWQ, as amended by Order 2010-0014-DWQ, and order 2012-00060DWQ NPDES General Permit No. CAS000002. http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml, Accessed February 10, 2020.

Item #8.2.

Page 301 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 58 Initial Study/Mitigated Negative Declaration On January 11, 2022, the Napa County GSA adopted the Groundwater Sustainability Plan and on January 31, 2022, the Plan was submitted to the Department of Water Resources (DWR) for review and comment. DWR has 20 days to review the plan, prior to opening a 75-day public comment period. Following close of the public comment period, DWR has two years to review the Plan and determine whether it meets the requirements of SGMA. As shown on Department of Water Resources Sustainable Groundwater Management Act (SGMA) Portal, the public comment period closed on April 30, 2022, and the Plan is currently under review. As stated in the Plan, the primary sustainability goal is to protect and enhance groundwater quantity and quality for all beneficial uses and users of groundwater and interconnected surface water in the Napa Valley Subbasin both now and in the future.

Stormwater Runoff
The City’s Stormwater Runoff Pollution Control Ordinance (Chapter 19.05 of the Municipal Code) regulates stormwater runoff. Sections 19.05.090 (C) through (E) of the Municipal Code address development and redevelopment activities, stormwater control plan requirements, and ground disturbing activities. Low Impact Development (LID) requirements establish limitations on the stormwater runoff generated from development sites. New development is required to mimic pre-developed conditions, protect water quality, and retain runoff from impervious surfaces onsite and discharge in a manner consistent with historic flow rates.

Applicable General Plan Objectives and Policies
The City of Calistoga General Plan identifies goals, objectives, and policies intended to limit impacts of development on hydrology and flooding, particularly addressing areas located within or adjacent to a designated floodplain (e.g., areas adjacent to the Napa River) or areas at risk of being flooded in the event of dam failure. As shown in Figure 19 (Floodway and Flood Boundary), and Figure 20 (Projected Kimball Dam Inundation Area) of the General Plan EIR, housing sites identified in the 2023 – 2031 Housing Element are not located on sites subject to flooding.

Hydrology and Water Quality Impact Discussion

5.10(a) (Violations of Water Quality Standards) Less Than Significant with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not directly result in physical development, construction activities associated with future development of vacant sites identified for housing development have the potential to result in runoff containing sediment and other pollutants that could degrade water quality if not properly controlled. Sources of potential pollution associated with construction include fuel, grease, oil and other fluids, concrete, sediment, and litter. These pollutants have the potential to result in impacts due to chemical contamination from the use of construction equipment and materials that could pose a hazard to the environment or degrade water quality if not properly managed. Additionally, if not properly designed, stormwater runoff at operation also has the potential to violate water quality standards.

Construction
To ensure that proper controls and treatment are in place to prevent runoff of stormwater, future development of sites identified in the Housing Element, with the exception of site G, which is less than one acre, will be required to adhere to NPDES requirements including preparation and implementation of a SWPPP and compliance with the RWQCB Waste Discharge Requirements. The purpose of the SWPPP is to identify potential sediment sources and other pollutants and prescribe BMPs to ensure that potential adverse erosion, siltation, and contamination impacts would not occur during construction activities. Mitigation Measure HYDRO-1, set forth below requires preparation and implementation of a SWPPP during all construction activities. BMPs identified in measure HYDRO-1 are designed to protect water quality from potential contaminants in stormwater runoff emanating from construction sites.

Item #8.2.

Page 302 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 59 Initial Study/Mitigated Negative Declaration The RWQCB has adopted water quality objectives in its Stormwater Quality Management Plan, which is designed to ensure that stormwater achieves compliance with receiving water limitations. The city has adopted a Stormwater Runoff Pollution Control ordinance (Chapter 19.05 of the City’s Municipal Code) to ensure new development complies with the Stormwater Quality Management Plan. Consistent with the Municipal Code, the project is subject to Mitigation Measure GEO-2, described above, which requires implementation of an Erosion and Sediment Control Plan. With implementation of measures HYDRO-1 and GEO-2, potential violations of water quality standards associated with construction activities of sites identified in the Housing Element will be less than significant.

Operation
Development of sites identified in the 2023 – 2031 Housing Element will contribute typical, urban, nonpointsource pollutants to the stormwater system at operation. With the exception of site G, which is less than oneacre, future development of sites identified in the Housing Element shall comply with Mitigation Measure HYDRO-2, which requires preparation of a stormwater control plan consistent with the most recent BASMAA Post-Construction Manual. With implementation of measure HYDRO-2, potential impacts to water quality resulting from ongoing operation of housing sites identified in the 2023 – 2031 Housing Element will be less than significant.

5.10(b) (Groundwater Supply and Recharge) Less Than Significant Impact with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not result in direct physical development, adoption will facilitate future development at the identified sites, all of which are currently undeveloped. Future development of sites identified in the Housing Element will be served by the city’s potable water system and water demands associated with residential development will be met through municipal water supplies and recycled water program, both of which are provided by the City of Calistoga. Neither the municipal water nor recycled water systems use groundwater as a source of water. As such, impacts resulting from use of the groundwater supply will be less than significant.

As stated previously, sites identified for development in the proposed Housing Element are currently undeveloped. There is a potential that the introduction of impervious surfaces could impact groundwater recharge. However, as set forth in Mitigation Measure HYDRO-2, plans for development of sites A, B, C, D, E, and F will be required to prepare a stormwater control plan. Consistent with the BASMAA Post-Construction Manual, stormwater control plans are required to implement Low Impact Development (LID) strategies, which aims to mimic pre-development conditions including recharge to groundwater. With implementation of measure HYDRO-2, impacts to groundwater recharge from future housing development on site identified in the House Element Update will be less than significant.

5.10(ci-iii) (Drainage Pattern, Runoff and Storm Drain Capacity) Less Than Significant Impact with Mitigation: Adoption of the 2023 – 2031 Housing Element will not directly result in physical development of housing, but rather will facilitate future development of sites identified in the Housing Element. As discussed above, sites identified in the Housing Element are currently undeveloped and as such, future development has the potential to change existing drainage patterns resulting from increased impervious surfaces.

However, as set forth in Mitigation Measure HYDRO-2, upon submittal of site-specific development proposals for sites identified in the Housing Element, stormwater control plans that mimic existing drainage patterns will be required. As required by the City of Calistoga, and as set forth in the BASMAA PostConstruction Manual, stormwater control plans will be required to demonstrate that post-construction peak flows match pre-development peak flows for the 100-year, 24-hour storm event.

The general direction and pattern of drainage following future development of sites identified in the 2023 – 2031 Housing Element will be required to match pre-development conditions. While future development of these housing sites will introduce new impervious surfaces, implementation of stormwater control plans Item #8.2.

Page 303 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 60 Initial Study/Mitigated Negative Declaration requiring review and approval by the city, as required by HYDRO-2, will ensure that future development under the Housing Element will not substantially alter existing drainage patterns such that on- or off-site erosion, siltation, or flooding would occur. Additionally, stormwater control plans will be required to demonstrate that runoff resulting from development of sites identified in the Housing Element will not exceed the capacity of stormwater drainage systems, contribute sources of polluted runoff, or impede or redirect flood flows. With implementation of measure HYDRO-2, impacts to the drainage pattern, storm drain system, and storm drain capacity will be less than significant.

5.9(d) (Flood Hazard, Seiche, Tsunami, Mudflow) No Impact: Sites identified in the 2023 – 2031 Housing Element are located in FEMA Zone X, Other Areas, as delineated on map 06055C0229E, which are defined as areas outside the 100- and 500-year floodplain, representing minimal flood hazard risks. As such, future development facilitated by adoption of the Housing Element will not construct housing within a 100-year flood and therefore there will be no impact resulting from location within a flood hazard zone that could risk release of pollutants due to inundation.

Sites identified in the 2023 – 2031 Housing Element are not located within areas that could be affected by seiche, tsunami, or mudflow. Furthermore, according to the California Department of Conservation, no portion of the City of Calistoga is within a tsunami inundation area.6 Therefore, there will be no impact resulting from location within a seiche, tsunami, or mudflow zone that could risk release of pollutants due to inundation.

The failure of Kimball Creek dam risks temporary inundation within the City of Calistoga. However, as shown in Figure 20 (Projected Kimball Dam Inundation Area) of the General Plan EIR, housing sites identified in the 2023 – 2031 Housing Element are not located on sites subject to flooding as a result of dam failure and therefore there will be no impact resulting from location within a dam inundation zone that could risk release of pollutants due to inundation.

5.10(e) (Conflict with Water Quality or Groundwater Plan) Less Than Significant Impact with Mitigation:

Implementation of the 2023 – 2031 Housing Element will not conflict with a water quality control plan. As described above, implementation of SWPPPs and erosion control plans will prevent water quality impacts throughout all stages of construction. Additionally, all sites except one will be required to submit and implement a stormwater control plan that identifies LID strategies intended to minimize runoff, reduce sedimentation, and protect water quality throughout operation of sites identified in the Housing Element.

Therefore, impacts due to a conflict with a water quality control plan will be less than significant.

As previously stated, the Napa County GSA adopted the Groundwater Sustainability Plan on January 11, 2022.

The Plan is currently under review with the Department of Water Resources (DWR). Development of sites identified in the Housing Element are currently undeveloped and do not contain impervious surfaces. The introduction of impervious surfaces has the potential to impact groundwater recharge, and thereby could result in a conflict with the Groundwater Sustainability Plan. However, Mitigation Measure HYDRO-2, requires submittal of stormwater control plans demonstrating that future development of sites identified in the Housing Element will mimic pre-development conditions including recharge to groundwater. With implementation of measure HYDRO-2, impacts to resulting from a conflict with the Napa Valley Subbasin Groundwater Sustainability Plan will be less than significant.

Mitigation Measure(s):

HYDRO-1: In accordance with the National Pollution Discharge Elimination System regulation, upon submittal of plans (Building Permit) for development of sites A, B, C, D, E, and F of the 2023 – 6 California Department of Conservation, Napa County Tsunami Inundation USGS 24K Quads, https://www.conservation.ca.gov/cgs/tsunami/maps/napa, Accessed July 7, 2022 Item #8.2.

Page 304 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 61 Initial Study/Mitigated Negative Declaration 2031 Housing Element, a Storm Water Pollution Prevention Plan (SWPPP) shall be submitted for review and approval by the city. The SWPPP shall address erosion and sediment controls, proper storage of fuels, temporary erosion control measures such as fiber rolls, staked straw bales, geofabric, and sandbags, identification, and cleanup of hazardous materials. Sediment shall be retained onsite by a system of sediment basins, traps, or other appropriate measures. A Notice of Intent, fees, and other documentation shall be filed with the Regional Water Quality Control Board.

HYDRO-2: Upon submittal of plans (Building Permit) for development of sites A, B, C, D, E, and F of the 2023 – 2031 Housing Element, a stormwater control plan shall be submitted for review and approval by the city. The approved permanent and operational runoff pollutant source control BMPs shall be incorporated into construction plans and documents and implemented during construction and after project completion. The project’s stormwater treatment and flow-control facilities shall be maintained in perpetuity.

Item #8.2.

Page 305 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 62 Initial Study/Mitigated Negative Declaration

5.11. LAND USE AND PLANNING
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Physically divide an established
community?
b) Cause a significant environmental
impact due to a conflict with any land use
plan, policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR.

Land Use and Planning Setting
The City of Calistoga covers a total of approximately 2.6 square miles. As shown in Table LU-2 of the 2015 Land Use Element of the General Plan, land uses in the city are comprised primarily of single-family residential (37%), and agricultural uses (21%). Sites identified in the 2023 – 2031 Housing Element are located along Lincoln Avenue between Grant Street to the South and Silverado Trail to the north and along Washington Street between Earl Street to the east and Anna Street to the west.

SITES ARE LOCATED WITHIN INCORPORATED CITY LIMITS ARE THEREFORE SUBJECT TO REGULATIONS CONTAINED IN THE CITY OF CALISTOGA GENERAL PLAN AND ZONING ORDINANCE. AS SHOWN IN FIGURE 4: 6TH CYCLE SITES LAND USE, SITES ARE DESIGNATED COMMUNITY COMMERCIAL, HIGH DENSITY RESIDENTIAL, AND LIGHT INDUSTRIAL. CORRESPONDING ZONING DESIGNATIONS ARE SHOWN IN FIGURE 5: 6

TH CYCLE SITES ZONING
Figure 6 and include Community Commercial (CC), Multifamily Residential (R3), and Industrial (I). As shown in Error! Reference source not found., sites A, B, C, D, and F of the 2023 – 2031 Housing Element were p reviously identified in the 2014 Housing Element of the General Plan (see Figure H-4 of the General Plan).

As discussed in 5.1 Aesthetics, Site D is located within the Downvalley Silverado Trail Entry Corridor Overlay Area, which is intended to provide a unique opportunity for community identity. Similarly, the city has established Character Area Overlay’s which are applied to areas that play an integral role in the quality of life and economic vitality in the city. Approved pipeline projects and sites A, B, C, D, and E are located within the Resort Character Area Overlay, and sites F and G are located within the Lower Washington Character Area Overlay.

Item #8.2.

Page 306 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 63 Initial Study/Mitigated Negative Declaration To the south of approved pipeline projects as well as sites A through E is the Stevenson/Grant subarea of the Downtown Character Area Overlay. West of sites F and G is the Historic District subarea of the Downtown Character Area Overlay. This Character Area encompasses the City’s commercial core and identifies several considerations for connectivity including pedestrian connections and enhanced access to the Napa River. The Historic District Subarea is characterized by transitional storefront buildings and restored historic structures and the Stevenson/Grant subarea is characterized as a transitional area between the historic downtown and the Resort Character Area.

Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies related to land use, those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Land Use Element
Objective LU 1.4: Develop and phase new housing at a rate that can be absorbed by public infrastructure and in a manner that fits within Calistoga’s small-town identity. • Policy P1.4-1 On average, Calistoga’s annual residential growth rate shall be no more that 1.35% of the number of residents in Calistoga the previous year. This rate may be exceeded in a single year provided that the growth rate is not exceeded when combining up to five years growth; average annual growth in the five-year period shall not exceed 1.35% as measured through the adopted residential growth allocation procedures. High priority shall be given to affordable housing and infill development and the development of land with necessary public infrastructure in place. • Policy P1.4-2 Development that meets performance standards for growth consistent with community character shall be given a high priority, including affordable housing, mixed-use projects, infill development and second units.
• Policy P1.4-3 Generally, no more than ten market-rate units may be built in a single subdivision in any given year. Exceptions may be allowed for subdivisions that provide benefits to the city.

Objective LU 2.1: Ensure that an adequate amount of land is designated in the General Plan to permit desired development in Calistoga, while also preserving Calistoga’s small-town character. • Policy P2.1-1 All new development in the city shall comply with the policies of the individual land use Designations in Section C of this Land Use Element.
• Policy P2.1-2 All new development on sites with overlay designations shall follow the overlay designation regulations in Section D of this Land Use Element to ensure that their development is in harmony with the surrounding environment.

Objective LU 3.1: Prevent development from occurring where the location or the physical or biological characteristics of the site would make the land use inappropriate. • Policy P3.1-1 New development shall be focused within the existing developed areas, and not at the city’s periphery.
• Policy P3.1-2 New development shall be designed so as to not adversely impact adjacent uses, particular those of lower intensities.
• Policy P3.1-3 The approval of all development projects shall be coordinated with the provision of infrastructure and public services required to meet the needs of the development.

Item #8.2.

Page 307 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 64 Initial Study/Mitigated Negative Declaration Objective LU 3.2 Ensure that new development complements Calistoga’s small town rural character and minimizes impacts on the environment.
• Policy P3.2-1 New development shall be designed to respect and enhance Calistoga’s small-town rural Character and the natural environment.
• Policy P3.2-2 The use of “green construction” and land development techniques shall be encouraged as a means to reduce the environmental impacts of construction activity.

Community Identity Element
Objective CI-1.1: Reinforce locally distinctive patterns of development, landscape and culture, such as small buildings, mixed use, walkability, architectural diversity, neighborhoods of single-family homes on small lots, vineyards and agricultural lands.
• P1.1-1 New development should be sensitive to surrounding architecture, landscaping, character and scale of existing buildings.
• P1.1-2 New development should use exterior materials that have traditionally been used in Calistoga. • P1.1-3 New buildings shall have heights that avoid obtrusive breaks in the natural skyline. • P1.1-4 New developments should provide accessible public and semi-public areas and efficient and inviting pedestrian and bicycle connections to existing Calistoga streets. • P1.1-8 The considerations specified for each Character Area and Gateway overlay designation and each Entry Corridor overlay designation in the Land Use Element shall be followed.

Objective CI-1.3: Maintain the urban design quality of existing residential neighborhoods, and replicate this quality in new residential development.
• P.1.3-1 All residential development shall protect the character of established neighborhoods in which the development is located.
• P.1.3-6 Multi-family structures and non-residential uses located adjacent to single-family properties shall incorporate adequate screening into project design to prevent view intrusion. • P.1.3-7 In new residential developments, the use of traditional site design and architectural elements such as a grid street layout, narrower streets, street trees, traditional house designs, reduced setbacks, and garages to the rear or sides of properties, shall be considered.

Land Use and Planning Impact Discussion

5.10(a) (Divide an Established Community) Less Than Significant Impact: Division of an established community typically occurs when a new physical feature, such as an interstate, railroad, or similar feature physically transects an area, thereby removing mobility and access within an established community. The division of an established community can also occur through the removal of an existing road or pathway, which would reduce or remove access between a community and outlying areas.

Adoption of the 2023 – 2031 Housing Element will facilitate development of vacant sites for housing within city limits along Lincoln Avenue, Fair Way Extension, and Washington Street. Development of sites identified in the Housing Element will not physically divide an established community. Rather future development, including on- and off-site improvements will be consistent with the existing and planned development patterns in Calistoga including surrounding residential development. Therefore, adoption and Item #8.2.

Page 308 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 65 Initial Study/Mitigated Negative Declaration implementation of the 2023 – 2031 Housing Element will have a less than significant impact due to the physical division of an established community.

5.10(b) (Land Use Plan, Policy, Regulation Conflict) Less Than Significant Impact: As discussed in detail throughout this document, the 2023 – 2031 Housing Element is consistent with the Calistoga General Plan, Zoning Ordinance, Active Transportation Plan, Climate Action Plan, and other applicable planning documents.

Adoption of the proposed Housing Element will not involve density increases to the existing land use designations or zoning allowance of housing opportunity sites. The housing element includes a program to allow reuse sites (with 20% or more affordable units) to be developed with ministerial review. This program is slated for implementation within three years of adoption and certification of the housing element.

The 2023 – 2031 Housing Element includes nine housing sites (two of which are approved pipeline projects) that have been identified to accommodate housing development to meet the City’s RHNA allocation. As previously stated, adoption of the Housing Element will not result in direct housing construction but will facilitate future housing development. Future housing development facilitated by the Housing Element will occur as market conditions allow and at individual property owner discretion. Upon submittal of site-specific development proposals, compliance with mitigation measures set forth herein will be required. Mitigation measures have been identified to ensure consistency with applicable federal, state, regional, and local policies and regulations including those intended to avoid or mitigate environmental impacts. Furthermore, the Housing Element is required to comply with applicable State Housing laws. As such, adoption and implementation of the 2023 – 2031 Housing Element will be consistent with applicable land use and planning policies at the federal, state, regional, and local levels, including consistency with the General Plan. Future housing development facilitated by the 2023 – 2031 Housing Element will therefore be consistent with all applicable land use and planning policies and regulations intended to minimize environmental effects and impacts will be less than significant.

Mitigation Measure(s): None Required.

Item #8.2.

Page 309 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 66 Initial Study/Mitigated Negative Declaration

5.12. MINERAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Result in the loss of availability of a
known mineral resource that would be of
value to the region and the residents of the
state?
b) Result in the loss of availability of a
locally-important mineral resource
recovery site delineated on a local general
plan, specific plan or other land use plan?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; Mineral Lands Classification map, Division of Mine Reclamation, California Department of Conservation; Direct Use of Geothermal Water at the Solage Calistoga Resort, Napa County, prepared by Poux et. al., and published in California Geothermal Resource Council Transactions, Vol. 36, 2012; Well Finder, California Department of Conservation, Geologic Energy Management Division.

Mineral Resources Setting
The California Surface Mining and Reclamation Act of 1975 (SMARA) identifies mineral resources within California and requires the classification of mineral resources based on their relative value for extraction.

According to the Mineral Lands Classification map by the Division of Mine Reclamation, California Department of Conservation there are no mineral resources in or around the sites identified in the 2023 – 2031 Housing Element.

Geothermal resources underlie the City of Calistoga and are used in the spa and mineral water industries, including the direct use of geothermal waters, use of geothermal waters for heating as an alternative to traditional energy, and by a few private residences. The geothermal aquifer underlying the City has a relatively low temperature, in the range of approximately 200 to 210° F, which makes it most suitable for direct-use projects such as heating of buildings, greenhouses, spas, and other facilities.

The City’s Geothermal Element relies upon a 1986 study by the California Energy Commission and concludes that geothermal resources in the City have an expected life of approximately 100 years. However, a 2012 publication, Direct Use of Geothermal Water at the Solage Calistoga Resort, concludes that a deeper reservoir is present and therefore estimates an increase in the size and longevity of Calistoga’s geothermal reservoir as compared to conclusions in the General Plan.
7 As shown on the Department of Conservation’s Well Finder, CalGEM GIS, there are several geothermal wells within the City of Calistoga. On and near sites identified in the 2023 – 2031 Housing Element, there are active, idle, and other low temperature geothermal wells.8 7 Direct Use of Geothermal Water at the Solage Calistoga Resort, Napa County, prepared by Poux et. al., and published in California Geothermal Resource Council Transactions, Vol. 36, 2012. 8 Well Finder, California Department of Conservation, Geologic Energy Management Division https://maps.conservation.ca.gov/doggr/wellfinder/#openModal/-122.57446/38.58224/17, accessed July 7, 2022 Item #8.2.

Page 310 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 67 Initial Study/Mitigated Negative Declaration Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies related to geothermal resources.

Adoption of the proposed Housing Element Update and reasonably foreseeable development that would occur consistent under the Housing Element would be limited to residential uses.

Geothermal Element
Objective G 1.2: Ensure the longevity of geothermal resources.

Policy P3. New geothermal uses shall be approved only if they will not have an adverse impact on the longevity of the geothermal resources, biotic resources, waterways, the sewage treatment plant, and ability to dispose of the treated effluent.

Mineral Resources Impact Discussion

5.12(a-b) (Mineral Resources or Resource Plans) Less Than Significant Impact: Other than known geothermal resources, sites identified in the 2023 – 2031 Housing Element have not been delineated as locallyimportant mineral resource recovery sites on any plans. Adoption of the 2023 – 2031 Housing Element will facilitate construction of housing, which is not typically associated with use of geothermal waters on a large scale. However, in the event that future development of sites identified in the Housing Element propose to utilize geothermal waters, a conditional use permit from the City of Calistoga will be required as well as authorization from the County of Napa, Department of Environmental Management through a well permit and from the California Department of Conservation- Geologic Energy Management Division (CalGEM, formerly Division of Oil, Gas, and Geothermal Resources).

Geothermal well permitting is outside the City of Calistoga’s jurisdiction and is regulated by the County of Napa and CalGem. If future development of sites identified in the Housing Element propose installation and use of geothermal wells, Mitigation Measure GEOTHERMAL-1 shall be implemented. GEOTHERMAL-1 requires that as part of the review process for future housing development it must be demonstrated that all permitting provisions imposed by Napa County and CalGem have been implemented and that annual maintenance and reporting logs of well production and reinjection data be made available to the city upon request. With implementation of GEOTHERMAL-1, potential impacts associated with the use of geothermal resources will be less than significant.

Mitigation Measure(s):

GEOTHERMAL-1 In the event that future development of housing opportunity sites identified in the Housing Element propose use of geothermal waters, all applicable extraction and reinjection well permits shall be obtained from Napa County and CalGem and approved permits shall be submitted to the City of Calistoga. Geothermal wells shall be operated in full compliance with all permits from the County and CalGem including ongoing monitoring, maintenance, and reporting. Upon request, geothermal well records shall be made available to the City. Ongoing coordination with the City of Calistoga shall be required to support long-term protection and preservation of geothermal resource, which may include participating in events, workshops or studies relating to geothermal resources, and sharing information on geothermal use.

Item #8.2.

Page 311 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 68 Initial Study/Mitigated Negative Declaration

5.13. NOISE
Would the project result in:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Generation of a substantial temporary
or permanent increase in ambient noise
levels in the vicinity of the project in
excess of standards established in the
local general plan or noise ordinance, or
applicable standards of other agencies?
b) Generation of excessive groundborne
vibration or groundborne noise levels?
c) For a project located within the vicinity
of a private airstrip or an airport land use
plan or, where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would the
project expose people residing or working
in the project site to excessive noise
levels?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; and Transit Noise and Vibration Impact Assessment Manual, prepared by the Federal Transit Administration, September 2018.

Noise Setting
Noise is generally defined as unwanted sound. It is characterized by various parameters that include the rate of oscillation of sound waves (frequency), the speed of propagation, and the pressure level or energy content (amplitude). The sound pressure level is the most common descriptor used to characterize the loudness of an ambient (existing) sound level. The decibel (dB) scale is used to quantify sound intensity, but given that the human ear is not equally sensitive to all frequencies in the entire spectrum, noise measurements are weighted more heavily for frequencies to which humans are sensitive in a process called “A-weighting,” written as “dBA” and referred to as “A-weighted decibels”. In general, human sound perception is such that a change in sound level of 1 dB cannot typically be perceived by the human ear, a change of 3 dB is just noticeable, a change of 5 dB is clearly noticeable, and a change of 10 dB is perceived as doubling the sound level.

The primary source of community noise in Calistoga is vehicular traffic on the roadway network. Traffic noise exists in varying degrees throughout the community. Other localized sources of noise include light industry, agricultural operations, agricultural wind turbines, and events at the Napa County Fairgrounds. Noise from intermittent localized sources such as lawnmowers and leaf blowers has also been expressed as a concern.

In Calistoga, the ambient noise environment is particularly important given the interest in retaining the smalltown character of the community, and because of the community’s reputation as a destination for rest and relaxation.

Section 8.20.025 of the Calistoga Municipal Code limits professional construction activities within the city to 7:00 a.m. to 7:00 p.m. Monday through Saturday. As shown in Figure N-4 Land Use Compatibility Guidelines for Noise Exposure, residential, hotel, and motel land uses are considered normally acceptable in areas with Item #8.2.

Page 312 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 69 Initial Study/Mitigated Negative Declaration exterior noise levels of up to 60 dBA and conditionally acceptable in areas with exterior noise levels of up to 75 dBA. These land uses are considered unacceptable in areas with exterior noise level above 75 dBA.

Both long- and short-term noise measurements were conducted in May 2000 to quantify representative noise levels throughout the city. As shown in Figure 22 of the General Plan EIR, measurements L1, L2, S3, S5, and S6 are within close proximity of sites identified in the 2023 – 2031 Housing Element. A summary of the location and results of noise measurements are discussed briefly below:
• L1 - Highway 29 North of the Silverado Trail Turnoff. Conducted 40 feet from the roadway centerline. At this distance, the measured noise level was 68 dBA. Vehicular traffic on Highway 29 was the only significant source of noise affecting measurements at this location. This location experienced higher noise levels as compared to the remainder of the city. Residential properties near Highway 29 are exposed to increased noise levels.
• L2 - Maggie Street. In this residential area noise sources included distant construction noise, animals, and the occasional sounds of children playing, dogs barking, birds, and horses. The measured noise level was 46 dBA, which represents a relatively quiet ambient noise environment. • S3 - Silverado Trail near Silver Rose Inn. The average noise level at this location was 65 dBA and noise was primarily associated with infrequent, by high speed vehicles. • S5 - Lincoln Avenue at Gliderport Plaza. The average noise level at this location was 62 dBA and noise was primarily associated with slow moving traffic and downtown activity. • S6 - Grant Street at North Oak Street. The average noise level at this location was 55 dBA and noise was primarily associated with traffic.

Though the gliderport has been non-operational since 1999, the city’s General Plan contains policies and actions intended to avoid exposing future residents to elevated noise levels associated with operation of an airport in the future, in the event that aviation uses are reestablished at this location.

Applicable General Plan Objectives and Policies
Objective N-1.3: Ensure noise exposure compatibility between neighboring land uses. • Policy P1.3-1 New development near or around the gliderport shall be permitted and designed with consideration for avoiding exposure of new uses to unacceptable noise levels from aircraft operation.

Objective N-1.4: Minimize the potential for new development projects to create unacceptable noise levels at sensitive receptors such as residential areas, hospitals, convalescent homes and schools. • Policy P1.4-1 New residential projects shall be required to meet the following noise level standards:
▪ A maximum of 45 dB for interior noise level.
▪ A maximum of 60 dB for exterior noise level, especially when outdoor activities are important components of a project (e.g., multi-family housing).
• Policy P1.4-2 A noise study, including field noise measurement, shall be required for any proposed project which would:
▪ Place a potentially intrusive noise source near an existing noise sensitive receptor, or ▪ Place a noise-sensitive land use near an existing potentially intrusive noise source. • Policy P1.4-3 New development projects shall not be approved unless they are generally consistent with the Noise Compatibility Guidelines contained in Figure N-5.

Item #8.2.

Page 313 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 70 Initial Study/Mitigated Negative Declaration Noise Impact Discussion

5.13(a) (Noise Standards, Temporary or Permanent Noise Increase) Less Than Significant Impact with Mitigation: Adoption of the 2023 – 2031 Housing Element will not result in physical development, but rather will facilitate development of housing at sites identified in the Housing Element. Construction and operation of residential land uses at sites identified in the Housing Element could result in increases in the ambient noise environment during construction and at operation.

Construction
Future construction of sites identified in the Housing Element will result in temporary and intermittent noise increases in the vicinity as a result of construction activities including site preparation and grading and associated use of heavy equipment, truck traffic for material delivery, and off-haul of materials. Construction noise associated with future development of sites identified in the Housing Element will be perceptible to established uses in the project vicinity including businesses and residents along Lincoln Avenue, View Road, Arch Way, Fair Way Extension, and Washington Street.

Noise impacts resulting from construction depend on the noise levels generated by construction equipment, timing and duration of noise generating activities, and the distance between construction noise sources and noise sensitive receptors. Construction noise impacts primarily occur when construction activities take place during noise-sensitive times of day (early morning, evening, or nighttime hours), occur in areas immediately adjoining noise sensitive land uses, or when construction durations last over extended periods of time. The highest noise levels typically associated with construction activities are generated during excavation, grading, and foundation construction. Once construction occurs in the interior portion of buildings, noise is less perceptible at off-site locations.

Construction-related noise impacts are temporary in nature and will cease once construction of individual sites identified in the Housing Element is complete. Construction activities will be subject to Section 8.20.025 of the City’s Municipal Code, which prohibits construction activity on Sundays and during evening hours from 7:00 p.m. to 7:00 a.m. on weekdays and Saturdays.

Given the proximity of sites identified in the Housing Element to existing sensitive receptors, including existing residences, upon submittal of site-specific development plans, a noise study shall be prepared and submitted to the City of Calistoga pursuant to Mitigation Measures NOI-1. Consistent with measure NOI-1, noise studies prepared for individual sites shall provide ambient noise measurements and site-specific recommendations to reduce noise impacts during construction. With implementation of Measure NOI-1 temporary construction noise impacts associated with development under the proposed Housing Element will be less than significant.

Operation
At operation, sites identified in the 2023 – 2031 Housing Element will generate noise levels typical of residential uses and are expected to be compatible with existing residential, commercial, industrial, and open space uses in the surrounding areas. Noise related to residential uses typically includes outdoor activities, operation of HVAC and mechanical equipment, landscaping maintenance equipment, and vehicular traffic.

Future development of sites identified in the Housing Element will be required to comply with the density ranges set forth in the General Plan and as provided under the State Density Bonus Law. Furthermore, as required by Measure NOI-1, noise impacts resulting from operation of residential uses on sites identified in the Housing Element must be evaluated and recommendations to reduce noise impacts provided, if deemed necessary. With implementation of Measure NOI-1, operation of residential uses and impacts associated with an increase in ambient noise as a result of development under the Housing Element will be less than significant.

Item #8.2.

Page 314 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 71 Initial Study/Mitigated Negative Declaration

5.13(b) (Groundborne Vibration and Noise) Less Than Significant Impact with Mitigation: Though adoption of the 2023 – 2031 Housing Element will not result directly in physical development, as the Housing Element is a policy document, future housing development facilitated by adoption of the Housing Element may result in operation of heavy construction equipment, such as impact devices (e.g. pavement breakers), that create seismic waves and result in ground vibration. Vibration from operation of this equipment can result in effects ranging from annoyance of people to damage of structures. Varying geology and distance will result in different vibration levels containing different frequencies and displacements. In all cases, vibration amplitudes decrease with increasing distance.

Perceptible groundborne vibration is generally limited to areas within a few hundred feet of construction activities. As seismic waves travel outward from a vibration source, they excite the particles of rock and soil through which they pass and cause them to oscillate. The rate or velocity (in inches per second) at which these particles move is the commonly accepted descriptor of the vibration amplitude, referred to as the peak particle velocity (PPV). Since no physical construction will occur as a result of adoption of the Housing Element, construction activities, including the type of equipment used for site-specific development is not known at this time. As such, consistent with Mitigation Measure NOI-1, noise studies prepared for site-specific development shall also include an analysis of vibration impacts during construction, and shall include recommendations to reduce potential impacts, if any. Impacts shall be compared to Caltrans’ significance criteria for groundborne vibration which is 0.5 in/sec PPV for structurally sound building, 0.3 in/sec PPV for older residential buildings, and 0.25 in/sec PPV for historic buildings. With implementation of NOI-1, future development at sites identified in the Housing Element will not expose people or structures to excessive groundborne vibration and impacts from groundborne vibration and noise will be reduced less than significant.

At operation there are no activities proposed by the project that are expected to generate perceptible groundborne vibration or noise. Therefore, impacts at operation will be less than significant.

5.13(c) (Airport Noise) No Impact: The former Gliderport property is no longer operational for aircraft use and therefore does not generate noise associated with operation of an airport. Sites identified for development in the 2023 – 2031 Housing Element are not located within an airport land use plan area, nor are they within two miles of a public airport or private airstrip. Future residents on sites identified in the Housing Element will not be exposed to excessive noise levels generated by nearby airport uses as there are no such uses in the vicinity of these sites. Therefore, there will be no impacts associated with excessive noise exposure resulting from airport noise.

Mitigation Measure(s):

NOI-1: Consistent with General Plan (N) Policy P1.4-2, prior to approval of site-specific development of housing opportunity sites identified in the 2023 – 2031 Housing Element, a noise study, including field measurements shall be submitted to the City of Calistoga for review and acceptance. The noise study shall include an analysis of impacts associated with construction and operation, a discussion of groundborne vibration impacts during construction using the thresholds published by Caltrans, and recommendations to reduce noise impacts shall be included in the noise study and incorporated into final plans for site-specific developments.

Item #8.2.

Page 315 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 72 Initial Study/Mitigated Negative Declaration

5.14. POPULATION AND HOUSING
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Induce substantial unplanned growth in
an area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension
of roads or other infrastructure)?
b) Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; City of Calistoga 2014 Housing Element Update; Housing Element Site Inventory Guidebook, Department of Housing and Community Development, June 10, 2020; United States Census Bureau, QuickFacts, City of Calistoga; Nonresidential Development Housing Linkage Fee Nexus Study, prepared by Economic & Planning Systems, Inc. July 1, 2014.

Population and Housing Setting
According to the U.S. Census Bureau 2020 Decennial Census, the City of Calistoga has 2,392 housing units and a population of 5,228 people. The current 2014 Housing Element identifies a need for 27 residential units to meet the City’s Regional Housing Needs Allocation (RHNA) by 2022. The Housing Element Development Site Inventory (in the 5th cycle) identified opportunity sites within the city with a total development potential of approximately 426 units. As previously stated, the RHNA for the 5th Cycle Housing Element was 27 housing units comprised of 6 very low, 2 low, 4 moderate, and 15 above moderate-income units. Through 2020, the city met and exceeded the RHNA based on built and entitled housing projects.

To fulfill the 2023-2031 RHNA requirements, the 6th Cycle Housing Element must accommodate a minimum of 119 housing units, comprised of 31 very low, 19 low, 19 moderate, and 50 above moderate-income units.

In addition to the 119 units allocated by the State, the Housing Element includes a 30% buffer, as recommended by HCD. Two approved pipeline projects include 128 units that have been counted towards the city’s RHNA for the 2023-2031 planning period. Silverado Terrace, which comprises 50 units, includes 8 affordable to low-income households and 42 above moderate units. Lincoln Avenue site, comprises of 78 units, inclusive of 24 very low, 37 low, 16 moderate, and 1 above-moderate income units. As detailed in the Housing Element Site Inventory Guidebook, published by the Department of Housing and Community Development, Housing Elements may estimate the number of accessory dwelling units (ADUs) that will be constructed during the housing cycle and count them toward the total RHNA. Following the methodology and guidance provided by HCD, the 2023 – 2031 Housing Element estimates a total of 24 ADUs will be constructed during the 6th Cycle, inclusive of 7 very low, 7 low, 7 moderate, and 3 above moderate-income units.

No density increases are proposed as part of the housing element update. No additional units would result beyond what is already allowed in the General Plan and Zoning Ordinance.

Item #8.2.

Page 316 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 73 Initial Study/Mitigated Negative Declaration Applicable General Plan Objectives and Policies
The City of Calistoga’s General Plan sets forth goals, objectives, and policies related to population and housing, those particularly relevant to the 2023 -2031 Housing Element Update include the following:

Objective LU 1.4 Develop and phase new housing at a rate that can be absorbed by public infrastructure and in a manner that fits within Calistoga’s small-town identity. • Policy P1.4-2 Development that meets performance standards for growth consistent with community character shall be given a high priority, including affordable housing, mixed-use projects, infill development and second units.

Population and Housing Impact Discussion

5.14(a) (Substantial Growth) Less Than Significant: Adoption of the 2023 – 2031 Housing Element will facilitate housing development at sites, previously identified to support housing, will not result in an increase in population. As detailed in the Development Impact Fee Study prepared for the City of Calistoga by Economic & Planning Systems, Inc. in 2014, the city is expected to grow to a population of approximately 6,200 people by 2040 and assumes construction of up to 305 dwelling units during the period.

No growth beyond what is anticipated by the General Plan and Zoning Ordinance will result. As such, adoption and implementation of the 2023 – 2031 Housing Element will not substantially induce population growth and impacts will be less than significant.

5.14(b-c) (Substantial Housing or Person Displacement) No Impact: Sites identified in the 2023 – 2031 Housing Element are currently undeveloped and as such there are no residences that would be demolished as a result of future development at these sites. Therefore, adoption and implementation of the Housing Element will not displace residents or existing housing that would require construction of replacement housing elsewhere. Therefore, no impacts would occur due to the displacement of housing or people as a result of the 2023 – 2031 Housing Element.

Mitigation Measure(s): None Required.

Item #8.2.

Page 317 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 74 Initial Study/Mitigated Negative Declaration

5.15. PUBLIC SERVICES
Would the Project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
Would the project result in substantial adverse
physical impacts associated with the provision
of new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable service
ratios, response times or other performance
objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
Sources: City of Calistoga General Plan, as amended; and 2003 General Plan EIR; City of Calistoga Fire Department Website; and Calistoga Joint Unified School District website.

Public Services Setting
The City of Calistoga is well served by established public services including fire and police protection, schools, and recreational amenities.

The Calistoga Fire station is located at 1113 Washington Street and the Police station is located at 1235 Washington Street. According to information provided on the City of Calistoga’s Fire Department webpage, Fire Department personnel respond to approximately 1,000 emergencies annually within a 96 square mile area inclusive of the City of Calistoga, Napa, and Sonoma Counties. As detailed in the General Plan EIR, the Fire Department is staffed by one full-time fire chief, two full-time firefighters, and up to 30 on-call firefighters.

Within city limits, the Fire Department maintains one to four minute response times. The Calistoga Police Department is staffed by eleven sworn officers including one chief, one lieutenant, two sergeants, six patrol officers and one investigator. Additionally, the Department has thirteen non-sworn positions, including four full-time and two part-time dispatchers, five parking enforcement officers, one juvenile division officer and one policing technician. Within city limits, the Police Department maintains response times of approximately two minutes.

According to information contained on the Calistoga Joint Unified School District’s website, the District serves approximately 860 students from Calistoga and the surrounding area.9 The school district is comprised of Calistoga Elementary School, Calistoga Junior/Senior High, and Palisades High School. 9 Calistoga Joint Unified School District, https://www.calistogaschools.org/about_us/about_the_district, Accessed January 10, 2020.

Item #8.2.

Page 318 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 75 Initial Study/Mitigated Negative Declaration The city’s Parks and Recreation Department operates, manages, and maintains city-owned indoor and outdoor recreational facilities. City-owned recreational facilities include opportunities for passive and active recreation and include Fireman’s Park, Heather Oak Park, Little League Field, Pioneer Park, Logvy Community Park, Monhoff Center, and Myrtle Street pocket park. Other recreational facilities include Napa County Fairgrounds, Calistoga Elementary School, and Calistoga High School.

To offset the cost of improving or expanding City services to accommodate the demand generated by new development, the City charges one-time impact fees on new development. Impact fees are used to finance public service improvements and pay for new development's fair share of the costs necessary to maintain acceptable services. New development is also required to pay school impact fees to the local school district to assist with ongoing maintenance and expansion of facilities.

Applicable General Plan Objectives and Policies
Objective SER-1.2 Promote coordination between land use planning and fire protection. • Policy P2. New development projects shall pay a fair and equitable amount to offset the costs for expanded fire services they require.
• Policy A1. Ensure through the development process that roadways are adequate in terms of width, radius and grade to facilitate access by City fire-fighting apparatus, while considering maintenance of Calistoga’s small-town character.

Objective SER-1.3 Maintain and enforce fire protection codes.

Objective SER-2.1 Plan for ongoing management and development of law enforcement services.

Objective SER-2.2 Promote coordination between land use planning and law enforcement. • Policy P1. Major land use development proposals shall be reviewed for site design criteria and other law enforcement concerns.
• Policy P3. New developments shall pay a fair and equitable amount to offset police service expansion that they require.

Objective SER-4.1 Develop new school facilities to serve Calistoga’s current and future population. • Policy P4. The City will not approve a development project on any of the indicated school sites in Figure
SER-2 without first ensuring that adequate school sites will be available in the City.

Objective OSC-4.1 Provide a comprehensive system of parks and recreation facilities in Calistoga. • Policy P4.1-3 Develop parks at a ratio that meets or exceeds the current standard of three acres per thousand population in new areas of Calistoga as the City grows. • Policy P4.1-4 Require developers to provide land or in lieu fees for parks, as governed by the terms of the Quimby Act.

Public Services Impact Discussion

5.15(a-b) (Fire & Police Protection) Less Than Significant Impact: Fire and police protection are provided by the City’s Fire and Police Departments, located in downtown Calistoga in proximity to housing opportunity sites identified in the 2023 – 2031 Housing Element. Future development facilitated by adoption of the Housing Element will not necessitate a significant increase in demand for fire or police services as the number of new dwellings and residents is consistent with the development potential anticipated by the General Plan.

Item #8.2.

Page 319 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 76 Initial Study/Mitigated Negative Declaration Fire protection measures are required to be integrated into the design of all buildings pursuant to Chapter

15.36 of the Calistoga Municipal Code. Furthermore, new buildings will be constructed in accordance with the latest building and fire code standards and permit applications for future development of sites identified in the Housing Element will be reviewed by the city’s fire and building departments to ensure buildings are designed such that firefighting, emergency equipment, and personnel access is not obstructed, as required by the Fire Code. City regulations require the payment of a one-time public safety impact fee to maintain acceptable levels of service related to fire suppression and law enforcement facilities. Given that the proposed Housing Element is consistent with the General Plan, and that future housing development is required to comply with the General Plan, applicable codes and regulations, and subject to impact fees for fire and police services, potential impacts to fire and police services resulting from adoption and implementation of the 2023 – 2031 Housing Element will be less than significant.

5.15(c-d) (Schools & Parks) Less Than Significant Impact: Adoption of the 2023 – 2031 Housing Element will not result in physical development of housing, but rather will facilitate future residential development at sites identified in the Housing Element which could result in impacts to schools and parks. Housing opportunity sites identified in the Housing Element are currently zoned Community Commercial (CC) and Multifamily Residential/Office (R3), both of which allow residential development and have been anticipated by the General Plan.

As noted in the General Plan EIR, enrollment capacity of schools in the City of Calistoga was anticipated to be exceeded by 2004. To address impacts resulting from new development exceeding enrollment capacity, the General Plan identifies three sites of 20 acres or more to accommodate future school sites and pursuant to Objective SER-4.1, Policy P4, the City must only approve development on potential school sites only after ensuring that adequate school sites will be available elsewhere. None of the sites identified in the Housing Element are located on potential school sites. Furthermore, residential development, including development facilitated by the Housing Element is required to pay school impact fees to provide funding for expansion or development of new facilities. With payment of impact fees, impacts to schools resulting from adoption and implementation of the 2023 - 2031 Housing Element will be less than significant.

As detailed in the General Plan EIR, the City of Calistoga maintains a parkland ratio of 2.73 acres per 1,000 residents without the Napa County Fairgrounds and school recreational facilities, and a ratio of 17.36 acres per 1,000 residents when including these facilities. Pursuant to General Plan Policy P4.1-4, future development of sites identified in the Housing Element will be required to provide land or in lieu fees for parks, as governed by the terms of the Quimby Act. Compliance with the General Plan will ensure that potential impacts to parks as a result of adoption and implementation of the Housing Element will be less than significant.

5.15(e) (Other Public Facilities) Less Than Significant Impact: As previously stated, development anticipated by the 2023 – 2031 Housing Element is consistent with development anticipated by the General Plan. Development of housing opportunity sites will occur on an individual basis at the discretion of property owners. It is not anticipated that adoption and implementation of the proposed Housing Element would induce a demand requiring the expansion of other public services. Therefore, impacts will be less than significant.

Mitigation Measure(s): None Required.

Item #8.2.

Page 320 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 77 Initial Study/Mitigated Negative Declaration

5.16. RECREATION
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No
Impact
a) Would the project increase the use of
existing neighborhood and regional parks or
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on the
environment?
Sources: City of Calistoga General Plan, as amended; and 2003 General Plan EIR.

Recreation Setting
Calistoga provides approximately fourteen acres of city-owned land dedicated to recreational activities at seven locations within city limits, including Fireman’s Park, Heather Oak Park, Little League Field, Logvy Community Park, Monhoff Center, Myrtle Street pocket park, and Pioneer Park. Approximately seventy-six acres of recreational facilities which are owned by other public agencies are also available within the city limits, including the Napa County Fairgrounds, Calistoga Elementary School, and Calistoga High School. As shown in Figure 5-5 of the Housing Element, sites identified in the 2023 – 2031 Housing Element are within a 15-minute walking distance of existing parks.

Applicable General Plan Objectives and Policies
Objective OSC-4.1 Provide a comprehensive system of parks and recreation facilities in Calistoga. • Policy P4.1-3 Develop parks at a ratio that meets or exceeds the current standard of three acres per thousand population in new areas of Calistoga as the City grows. • Policy P4.1-4 Require developers to provide land or in lieu fees for parks, as governed by the terms of the Quimby Act.

Recreation Impact Discussion

5.16(a) (Deterioration of Parks) Less Than Significant Impact: As described in Section 5.14 Population and Housing, adoption, and implementation of the 2023 – 2031 Housing Element is within growth anticipated in the General Plan and will not induce substantial population growth in the city. Additionally, as stated in Section

5.15 Public Services, future development of housing opportunity sites identified in the Housing Element will be required to pay a recreational development impact fee, used to offset costs for maintenance and expansion of recreational facilities, prior to issuance of individual building permits. Based on the growth being within the range of development anticipated by the General Plan, as well as the requirement for future development to pay its fair share of impact fees, impacts resulting from the substantial deterioration of parks from adoption and implementation of the Housing Element will be less than significant.

Item #8.2.

Page 321 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 78 Initial Study/Mitigated Negative Declaration

5.16(b) (Additional Recreational Facilities) Less Than Significant Impact: Adoption of the 2023 – 2031 Housing Element will not result directly in physical construction but will rather facilitate future residential development in the city. At the time that site-specific development proposals are submitted, compliance with all mitigation measures provided herein will be required, including any construction of recreational facilities in conjunction with residential development. Therefore, adoption and implementation of the Housing Element will have a less than significant impact due to the construction or expansion of additional recreational facilities.

Mitigation Measure(s): None Required.

Item #8.2.

Page 322 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 79 Initial Study/Mitigated Negative Declaration

5.17. TRANSPORTATION AND CIRCULATION
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No
Impact
a) Conflict with a program, plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle and
pedestrian facilities?
b) Would the project conflict or be inconsistent
with CEQA Guidelines section 15064.3,
subdivision (b)?
c) Substantially increase hazards due to a
geometric design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses
(e.g., farm equipment)?
d) Result in inadequate emergency access?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR; Calistoga Active Transportation Plan, October 2014; Napa Countywide Transportation Plan – Vision 2040 Moving Napa Forward, Napa County Transportation & Planning Agency, September 2015; Napa Countywide Bicycle Plan, prepared by Napa Valley Transportation Authority, September 2019; Technical Advisory on Evaluating Transportation Impacts in CEQA, prepared by the Governor’s Office of Planning and Research, December 2018.

Transportation and Circulation Setting
The Circulation Element of the General Plan regulates the city’s transportation system with the stated goal of creating and maintaining a transportation network that provides safe, comfortable, and convenient travel, for all users, including pedestrians, bicyclists, persons with disabilities, seniors, children, users and operators of public transportation, motorists, and movers of commercial goods.

Level of service (LOS) has historically been used as a standard measure of traffic service. However, pursuant to SB 743 a LOS deficiency is no longer considered a potential environmental impact. The General Plan establishes a goal of maintaining LOS ‘D’ or better at all intersection (CIR Policy P1.2-2) and LOS ‘C’ or better for state highways, with the exception of the downtown area where LOS ‘D’ is acceptable (CIR Policy P1.2-1).

Pursuant to SB 743, the Office of Planning and Research (OPR) was charged with identifying an alternative metric to LOS for evaluating environmental impacts from transportation. In December 2018 OPR released the Technical Advisory on Evaluating Transportation Impacts in CEQA, which provides technical recommendation regarding assessment of vehicle miles traveled (VMT), as an alternate to LOS, thresholds of significance for VMTs, and mitigation measures. To date, neither the City of Calistoga nor the Napa Valley Transportation Authority (NVTA) have adopted VMT thresholds.

CEQA Guidelines section 15064.3 subdivision (b) describes specific considerations for evaluating a project’s transportation impact using a vehicle miles traveled metric. This metric refers to the amount and distance of automobile travel attributable to a project.

Item #8.2.

Page 323 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 80 Initial Study/Mitigated Negative Declaration Calistoga Active Transportation Plan
Bicycle and Pedestrian Facilities
The Calistoga Active Transportation Plan, adopted on October 21, 2014, through Resolution No. 2014-089 is intended to identify local improvements and implementation strategies that will encourage more people to walk and bicycle in Calistoga’s Planning Area. The Active Transportation Plan identifies improvements to support walking and bicycling, serves as a resource for coordinating local actions and regional projects, and documents existing and proposed facilities within Calistoga and throughout the Planning Area.

According to the Active Transportation Plan a Class I multi-use path is proposed along Lincoln Avenue adjacent to sites A, B, C, D, E, and the approved Lincoln Avenue and Silverado Terrace pipeline project sites. Additionally, a Class I multi-use path is proposed along the Fair Way extension, adjacent to sites F and G. The Napa Valley Vine Trail Coalition has been working to develop a continuous 47-mile, Class I multi-use trail from Vallejo to Calistoga. Within city limits, the proposed Napa Valley Vine Trail’s northern terminus is located at the intersection of Silverado Trail and Lincoln Avenue, adjacent to site A of the Housing Element. The proposed trail alignment continues south along Lincoln Avenue where it connects to the Fair Way Extension, adjacent to sites F and G, and extends east to the regional route to Vallejo.

Existing facilities within the vicinity of sites identified in the Housing Element include a Class III bicycle route on Washington Street between Berry Street to the west and the Little League Field to the east, a Class II bike lane on Silverado Trail from Lincoln Avenue to the west and extending east beyond city limits, and a Class I multi-use path on Washington Street from the Little League Field to the west and extending east beyond city limits.

In general, a network of sidewalks, crosswalks, pedestrian signals, and curb ramps provide access for pedestrians within the vicinity of sites identified in the Housing Element. Gaps, obstacles, and barriers also exist. However, these areas are planned for improvement as detailed in Figure 9 of the Calistoga Active Transportation Plan. As mentioned previously, Class I multi-use paths are proposed along Lincoln Avenue and Fair Way Extension, adjacent to identified sites. Additionally, sidewalks are proposed along View Road and Arch Way, adjacent to sites A, B, and C.

Public Transit
Napa Valley Transit provides transit service Monday through Saturday in the City of Calistoga, following a fixed route along SR 29 with transit stops in Downtown Calistoga and on Brannan Street. Service is not provided north of Brannan Street and operates from approximately 6:00 AM to 8:00 PM with about one-hour headways.

Public transit service is available throughout Napa County. The primary transit service in Napa County is provided by VINE, a fixed-route bus service providing service to Calistoga, St. Helena, Napa, American Canyon, Yountville, and parts of unincorporated Napa County. Two routes pass through Calistoga along SR 29: the Up Valley Connector (route 10) and the Up Valley Connect Express (10x). Route 10 provides service through Calistoga along Lincoln Avenue to Napa, including stops in St. Helena, Rutherford, and Oakville, running seven days a week, all day. Route 10x provides weekday express service to Napa’s Soscol Gateway Transit Center.

Lake Transit provides regional service throughout Lake County and stops in Calistoga at the Trail Depot. Lake Transit Route 3 provides loop service to destination throughout the Clearlake area and operates daily with approximately 3-hour headways between 6:00 a.m. and 6:00 p.m.

Item #8.2.

Page 324 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 81 Initial Study/Mitigated Negative Declaration Napa Countywide Transportation Plan
The Napa Countywide Transportation Plan – Vision 2040 Moving Napa Forward, is a 25-year plan that serves as the vision for transportation throughout Napa County, with goals and objectives that apply to all modes of transportation. Vision 2040 Moving Napa Forward establishes six goals: serve the transportation needs of the entire community regardless of age, income, or ability; improve system safety in order to support all modes and serve all users; use taxpayer dollars efficiently; support Napa County’s economic vitality; minimize the energy and other resources required to move people and goods; and prioritize the maintenance and rehabilitation of the existing system.

Applicable General Plan Objectives and Policies
Objective CIR-1.2 Maintain acceptable Levels of Service on all of Calistoga’s streets. • Policy P1.2-1. The City shall seek to maintain LOS C or better for all state highways with the exception of the downtown area, and LOS D or better for all other streets. • Policy P1.2-2. The City shall seek to maintain peak hour LOS D or better at all intersection. • Policy P1.2-3. Since Lincoln Avenue is Calistoga’s main street and serves pedestrian and commercial purposes as much as it does motorized vehicles, it is inappropriate to establish any LOS standard for Lincoln Avenue between Foothill Boulevard and Wappo Avenue. Instead, the City shall evaluate traffic on Lincoln Avenue on an on-going basis, seeking to balance vehicular, parking, bicycle, and pedestrian needs. This exclusion is not applicable to intersections on Lincoln.

Objective CIR-1.3 Coordinate the provision of circulation facilities with new development. • Policy P1.3-1. New development shall be designed to the extent possible with streets that continue the city's existing grid pattern, which allows through traffic and provides multiple connections to arterial streets.
• Policy P1.3-2. New development shall provide sidewalks as needed to close gaps in the city's active transportation network. These gap closures may include off-site locations if the closure improves pedestrian connectivity from the new development to schools or other activity centers. • Policy P1.3-3. New development shall provide bicycle improvements called for in the Active Transportation Plan.

Transportation and Circulation Impact Discussion

5.17(a) (Conflicts with Plans, Policies, Ordinances) Less Than Significant Impact with Mitigation:

Adoption of the 2023 – 2031 Housing Element will not result in direct housing construction but will facilitate and provide a policy framework for future housing development on housing sites previously identified in the General Plan to support housing. None of the objectives, policies, or actions contained in the Housing Element conflict with plans or other regulations that address the circulation system. Future site-specific development will be reviewed on a case-by-case basis to verify consistency with applicable regulations that address the circulation system.

To ensure future site-specific development complies with General Plan Objective CIR-1.2, Policies P1.2-1, P1.2- 2, and P1.2-3, a traffic impact study evaluating future development’s impact on the circulation system shall be required as set forth in Mitigation Measure TRAN-1. The traffic study shall discuss the project’s consistency with General Plan (CIR) Policies P1.3-1 (streets that continue the existing grid pattern), P1.3-2 (provide sidewalks), and P1.3-3 (bicycle improvements in the Active Transportation Plan).

Item #8.2.

Page 325 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 82 Initial Study/Mitigated Negative Declaration Future development of sites identified in the 2023 – 2031 Housing Element will also be subject to payment of impact fees pursuant to General Plan (CIR) Policy P1.1-1, which will ensure that adequate funds are provided to upgrade and maintain the existing circulation network.

With implementation of measure TRAN-1 and compliance with applicable General Plan policies related to impact fees, impacts resulting from a conflict with plans, policies, and ordinances will be less than significant.

5.17(b) (Conflict with 15064.3(b) VMT) Less Than Significant Impact with Mitigation: Although, the City of Calistoga has not adopted local VMT thresholds, draft countywide screening maps indicate that new residential uses within city limits would screen out from the need for further VMT analysis. Until local VMT guidelines are adopted, the city is following guidance offered by OPR in the Technical Advisory on Evaluating Transportation Impacts. Screening map information prepared by NVTA showing VMT per capita of locations within the County in comparison to the County average VMT was obtained by W-Trans for a Focused Traffic Study prepared for the 2008 Grant Street Project (SCH 2022020140). As shown on the preliminary screening map, sites identified in the 2023 – 2031 Housing Element are located within areas where per capita VMT is 50 to 85 percent of the countywide average vehicle miles per capita per day. Following OPR’s Technical Advisory, residential developments at sites identified in the Housing Element would be expected to have a less than significant impact as they are located in areas where average daily per capita VMT is at least 15 percent below the countywide average. Furthermore, the Housing Element includes provisions to provide affordable housing onsite, which reduces the per capita VMT generation. However, since site-specific development proposals, including affordability mix is not known at this time, upon submittal of a site-specific development proposal, compliance with Mitigation Measure TRAN-1 shall be required. TRAN-1 requires submittal of a traffic study at the request of the City Engineer, which shall include a discussion of VMT, including whether specific development proposals screen out from the need for further analysis. With implementation of measure TRAN-1, adoption, and implementation of the 2023 – 2031 Housing Element will not conflict with CEQA Guidelines section 15064.3(b) and impacts will be less than significant.

5.17(c) (Geometric Design Feature Hazard) Less Than Significant Impact with Mitigation: Adoption of the 2023 – 2031 Housing Element will not result in physical construction, but rather will facilitate future development of housing opportunity sites identified in the Housing Element. Pursuant to Mitigation Measure TRAN-1, site-specific development proposals for sites identified in the Housing Element shall be accompanied by a traffic study at the request of the City Engineer. In addition to providing a discussion of consistency with adopted General Plan policies related to operation, street patterns, provisions for bicycle and pedestrian facilities, and VMT, the traffic study shall also include a discussion of site design and any geometric design feature hazards including sight distance at existing and proposed driveways. Site-specific development proposals and traffic studies will be subject to review and approval by the city’s Fire and Public Works Departments who will review site plans for compliance with regulations contained in Chapter 16.16 (Design and Improvement Standards) of the Calistoga Municipal Code. With implementation of measure TRAN-1 as well as compliance with applicable municipal code regulations, future development of sites identified in the Housing Element will not result in geometric design feature hazards and impacts will be less than significant.

5.17(d) (Emergency Access) Less Than Significant Impact: Future development of housing opportunity sites identified in the Housing Element will be subject to review by the Calistoga Public Works Department and Fire Department, who will identify potential deficiencies in emergency access and provide recommendations to ensure emergency access is adequate and complies with applicable regulations. Additionally, prior to any work within a right-of-way as part of future construction of sites identified in the Housing Element, including any temporary lane closures, review of the proposed scope of work and approval of an encroachment permit by the Calistoga Public Works Department will be required. Compliance with applicable regulations will ensure Item #8.2.

Page 326 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 83 Initial Study/Mitigated Negative Declaration future development of sites identified in the Housing Element will provide adequate emergency vehicle access during construction and at operation and impacts will be less than significant.

Mitigation Measure(s):

TRAN-1: Submittal of site-specific development proposals for housing sites identified in the 2023 – 2031 Housing Element shall be accompanied by a traffic/transportation study at the request of the City Engineer. The study shall be provided to the City for review and acceptance and shall include a discussion of the developments consistency with General Plan (CIR) Policies P1.2-1, P1.2-2, P1.2-3, P1.3-1, P1.3-2, P1.3-3 as well as a discussion of vehicle miles travelled (VMT), including opportunities for screening out from the need for further analysis, a discussion of site design with regard to potential design hazards and emergency access, and other pertinent transportation information as requested by the City Engineer. Recommendations from the traffic study shall be imposed as project conditions of approvals.

Item #8.2.

Page 327 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 84 Initial Study/Mitigated Negative Declaration

5.18. TRIBAL CULTURAL RESOURCES
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Would the project cause a substantial
adverse change in the significance of a tribal
cultural resource, defined in Public
Resources Code section 21074 as either a
site, feature, place, cultural landscape that is
geographically defined in terms of the size
and scope of the landscape, sacred place, or
object with cultural value to a California
Native American tribe, and that is:
i. Listed or eligible for listing in the
California Register of Historical
Resources, or in a local register of
historical resources as defined in Public
Resources Code section 5020.1(k), or
ii. A resource determined by the lead
agency, in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in
subdivision (c) of Public Resources Code
Section 5024.1. In applying the criteria
set forth in subdivision (c) of Public
Resource Code Section 5024.1, the lead
agency shall consider the significance of
the resource to a California Native
American tribe.

Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR.

Tribal Cultural Resources Setting
Public Resources Code (PRC) Section 21074, identifies tribal cultural resources as:

1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources; or
b. Included in a local register of historical resources as defined in PRC Section 5020.1(k).

2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in PRC Section 5024.1(c). In applying the criteria set forth in PRC Section 5024.1(c), the lead agency shall consider the significance of the resource to a California Native American tribe.

Item #8.2.

Page 328 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 85 Initial Study/Mitigated Negative Declaration

3. A cultural landscape that meets the criteria of PRC Section 21074(a) to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.

4. A historical resource described in PRC Section 21084.1, a unique archaeological resource as defined in PRC Section 21083.2(g), or a “non-unique archaeological resource” as defined in PRC Section 21083.2(h), if it conforms with the criteria of PRC Section 21074(a).

In accordance with Public Resources Code (PRC) Section 21084.2, lead agencies are required to consider Tribal Cultural Resources (TCR) including a site feature, place, cultural landscape, sacred place, or object, of cultural value to the tribe and is listed on the California Register of Historic Resources (CRHR) or a local register, or the Lead agency, at its discretion, chooses to treat resources as such. In accordance with Assembly Bill (AB) 52 (PRC Section 21080.3.1(b)(1)), the Mishewal Wappo Tribe of Alexander Valley, in a letter dated June 26, 2015, stated that its tribe was traditionally and culturally affiliated with a geographic area within the City of Calistoga’s area of jurisdiction, and requested formal notice of and information on projects for which the City of Calistoga serves as a lead agency under CEQA.

In accordance with Assembly Bill 52 and Senate Bill (SB) 18, which requires lead agencies to contact, and consult with California Native American tribes prior to amending or adopting a general plan, the City of Calistoga provided written formal notification to the Mishewal Wappo Tribe of Alexander Valley on February 23, 2022, which included a brief description of the proposed project and its location, relevant project information, the City of Calistoga contact information, and a notification that the Mishewal Wappo Tribe of Alexander Valley has 90 days to request consultation. No response from the Tribe has been received as of July 18, 2022.

Applicable General Plan Objectives and Policies
Objective CI-3.4: Preserve and protect cultural resources other than historic buildings, including Native American sacred places, burial sites, archaeological resources, fossils and other paleontological resources, historic landscapes, and other culturally significant sites and objects. • Policy P.3.4-1 As part of the development review process, assessment shall be required by appropriate professionals regarding the presence of archaeological and paleontological resources and the potential for adverse impacts on these resources. • Policy P.3.4-2 Any archaeological or paleontological resources on private property shall be either preserved on their sites or adequately documented and conserved as a condition of removal.

Tribal Cultural Resources Impact Discussion

5.18(a.i - ii) (Listed or Eligible for Listing; Significant Resource) Less Than Significant Impact with Mitigation: Adoption of the proposed Housing Element will facilitate future development of undeveloped housing opportunity sites that have been identified to accommodate residential development in the city. As described above, the City of Calistoga carried out notification to the Mishewal Wappo Tribe of Alexander Valley in accordance with AB 52 and SB 18. Although the Tribe did not request consultation, based on the undeveloped condition of sites identified in the Housing Element, there is a potential that unrecorded resources may be encountered during ground-disturbing activities including potentially significant tribal cultural resources. Development of these sites have the potential to result in impacts to tribal cultural resources if encountered during construction. Consistent with adopted General Plan policies, site-specific development proposals shall comply with Mitigation Measure TCUL-1, which requires preparation of an assessment of archaeological resources by a qualified professional. With implementation of measure TCUL-1 impacts due to a change in the significance of tribal cultural resources will be reduced to less than significant.

Mitigation Measure(s):

Item #8.2.

Page 329 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 86 Initial Study/Mitigated Negative Declaration TCUL-1: Implement Mitigation Measure CUL-1 above.

5.19. UTILITIES AND SERVICE SYSTEMS
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Require or result in the relocation or
construction of new or expanded water, or
wastewater treatment, or storm water
drainage, electric power, natural gas, or
telecommunication facilities, the construction
or relocation of which could cause significant
environmental effects?
b) Have sufficient water supplies available to
serve the project and reasonably foreseeable
future development during normal, dry and
multiple dry years?
c) Result in a determination by the wastewater
treatment provider which serves or may serve
the project that it has adequate capacity to
serve the project’s projected demand in
addition to the provider’s existing
commitments?
d) Generate solid waste in excess of State or
local standards, or in excess of the capacity of
local infrastructure, or otherwise impair the
attainment of solid waste reduction goals?
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
Sources: City of Calistoga General Plan, as amended; 2003 General Plan EIR.

Utilities and Service Systems Setting
Sites identified in the Housing Element are located within the City of Calistoga adjacent to developed land in areas where utility infrastructure currently exists. Water supply and distribution, wastewater collection and treatment, recycled water treatment and distribution, and storm drainage facilities are provided by the City of Calistoga. Solid waste services are provided by Upper Valley Disposal and Recycling, and electrical and natural gas are provided by Pacific Gas and Electric (PG&E) or Marin Clean Energy.

Potable Water Supplies
The city acquires potable water from two main sources including the Kimball Reservoir and through the North Bay Aqueduct connection pipeline via the City of Napa. The city’s water system includes storage tanks with a capacity of 2.5 million gallons, 30 miles of distribution and 20 miles of transmission mains. The city’s water system includes storage tanks with a capacity of 2.5 million gallons, 40 miles of water mains, and two pump Item #8.2.

Page 330 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 87 Initial Study/Mitigated Negative Declaration stations. According to the General Plan Infrastructure Element (2020), the City’s remaining estimated municipal water availability ranges between 465 to 504 acre feet per year. There is sufficient water supply to accommodate current and planned demand through 2035.

Wastewater and Recycled Water
Wastewater generated in the City of Calistoga is conveyed for processing at the City of Calistoga’s Dunaweal Wastewater Treatment Plant (WWTP), a 0.84 million gallon per day (mgd) average dry weather flow activated sludge tertiary treatment plant. Some tertiary treated effluent may be discharged to the Napa River from October 1st through May 15th (per NPDES Permit No. CA0037966, Order 00-1312). During the remainder of the year, effluent is distributed for recycled water use or stored for future use in effluent storage ponds.

According to the General Plan Infrastructure Element (2020), the City’s remaining treatment capacity in 2019 was approximately 232 afy and is projected to be 140 afy in 2035. There is sufficient wastewater treatment capacity to accommodate current and projected demand through 2035.

Storm Drainage
Within the City of Calistoga, storm drains convey runoff from impervious surfaces such as streets, sidewalks, and buildings to gutters that drain to creeks, the Napa River, and ultimately to the San Pablo Bay. This water is untreated and can carry contaminants such as solvents, oils, fuels, and sediment. As described in 5.10 Hydrology, the City’s Stormwater Ordinance establishes the standard requirements and controls on the storm drain system to which all existing and proposed development must comply.

Solid Waste
Solid waste (debris, construction waste, recyclable materials, and green waste/compost) generated in the City of Calistoga is collected by Upper Valley Disposal and Recycling and delivered to the Clover Flat Landfill for disposal. The landfill is permitted to receive 600 tons per day and as of July 2020 had a remaining capacity of 2,240,000 cubic yards.10
Applicable General Plan Objectives and Policies
Objective I-1.2 Promote water conservation and the use of recycled water in order to maximize the availability of the city’s water supply.
• Action A1.2-1 Continue to implement the State Water Efficient Landscape Ordinance for projects involving new or substantially rehabilitated landscaping.

Objective I-1.3 Encourage coordination between land use planning and water facilities and service. • Policy P1.3-1 The approval of new development shall be conditional on the availability of sufficient water for the project.
• Policy P1.3-3 Structures with plumbing that are located within city limits shall connect to the water system, unless topography, distance from the public water system, or other factors indicate a need for an exemption.

Objective I-1.3 Promote coordination between land use planning and wastewater treatment and conveyance.
10 CalRecycle Clover Flat Resource Recovery Park, https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/2681?siteID=2015, Accessed July 2022.

Item #8.2.

Page 331 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 88 Initial Study/Mitigated Negative Declaration • Policy P3.1-3 New development shall only be approved if there is sufficient capacity in the wastewater collection system, unless topography, distance from the public water system or other factors indicate a need for an exemption.

Objective I-5.3 Ensure coordination among land use planning, site design and stormwater control. • Policy P5.3-1 The approval of new development shall be conditional on the extension of necessary stormwater infrastructure.
• Policy P5.3-2 New development shall be required to incorporate appropriate measures to minimize the impacts of stormwater runoff as specified in federal, state and regional regulations. • Action A5.3-1 Require new development to install appropriate on- and off-site storm drainage improvements.
• Action A5.3-2 Require through the permit review process that post-construction peak runoff does not exceed pre-construction levels.
• Action A5.3-3 Require development to install bio-retention or other BASMAA-approved devices.

Utilities and Service Systems Impact Discussion

5.19(a) (Relocation/Expansion of Utilities) Less Than Significant Impact with Mitigation: Housing Opportunity sites identified in the 2023 – 2031 Housing Element are currently well served by water, wastewater, electricity, natural gas, and telecommunication facilities. Future development under the Housing Element will increase utility demands relative to existing conditions. As previously discussed, the number of units and resulting population under the Housing Element have been anticipated by the General Plan and are within the available capacity of utilities and service systems. New residential uses facilitated by adoption of the Housing Element will connect to existing utility lines in adjacent rights-of-way and will install new utility pipelines, connections, laterals, and associated equipment onsite and offsite including potable and recycled water pipelines, sanitary sewer and storm drain infrastructure. New electric power, natural gas, and telecommunication lines will be connected to existing facilities in the immediate vicinity of sites identified in the Housing Element.

As stated previously, the Dunaweal Wastewater Treatment Plant has sufficient wastewater treatment capacity to accommodate current and projected demand through 2035. Development under the Housing Element extends to 2031 and is within development and demands for service anticipated by the General Plan.

Therefore, there is sufficient wastewater treatment capacity to accommodate development of residential uses under the 2023 – 2031 Housing Element and adoption of the Housing Element will not cause or exceed wastewater treatment requirements set forth by the Regional Water Quality Control Board, nor is it expected to necessitate the expansion or construction of water or wastewater treatment facilities.

Existing water supplies, facilities, and infrastructure are sufficient to meet the demands of new residential development anticipated under the 2023 – 2031 Housing Element without the need for expansion or new construction of water supply facilities. Water demand of future development under the Housing Element will be limited through efficient irrigation of landscaping, compliance with California’s Model Water Efficient landscape regulation, and water-efficient fixtures and appliances indoors, consistent with requirements established by the CalGreen Building Code. Landscaping introduced by site-specific developments will be irrigated using Calistoga’s tertiary treated water, as available. Based on available infrastructure capacity and compliance with applicable codes and regulations intended to reduce demand on the city’s water infrastructure, impacts associated with adoption and implementation of the Housing Element will have a less than significant impact related to the adequacy or capacity of water supply facilities and wastewater treatment facilities.

Item #8.2.

Page 332 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 89 Initial Study/Mitigated Negative Declaration Consistent with Mitigation Measure HYDRO-2, upon submittal of plans for development of housing opportunity sites A, B, C, D, E, and F of the 2023 – 2031 Housing Element, a stormwater control plan, which includes storm drainage infrastructure to accommodate the increase in impervious surfaces that would result from site-specific development will be required. Onsite improvements proposed in stormwater control plans will be required to demonstrate compliance with the BASMAA Post-Construction Manual including demonstrating that new development will result in no net-increase in flows emanating from individual sites.

With implementation of measure HYDRO-2, adoption and implementation of the Housing Element will have a less than significant impact related to the adequacy or capacity of stormwater facilities.

5.19(b) (Sufficient Water Supplies) Less Than Significant Impact with Mitigation: During future construction of sites identified in the Housing Element, water will be required primarily for dust suppression and soil compaction. Construction water volumes will be minimal and will not require new or expanded water supplies or entitlements.

At operation future housing development identified in the 2023 – 2031 Housing Element will generate water demand for indoor and outdoor uses and will rely on both potable and recycled water supplies to meet demands. Future development of sites identified in the Housing Element will increase water demand relative to existing conditions. Under below normal year (90 percent) conditions the City’s water supply ranges from approximately 399-438 afy in 2020 and is Projected to range from 362 to 401 in 2035. As of 2019, the City of Calistoga’s annual water demand was 656 afy with a firm yield supply of 1,249-1,288 afy.

In accordance with General Plan policy 1.3-1, upon submittal of site-specific development proposals for sites identified in the Housing Element, the capacity of the City’s water storage, supply, and/or distribution system shall be reviewed and considered relative to the calculated water demand generated by future housing projects. Mitigation Measure UTIL-1 specifies that a water use report be submitted to the city demonstrating that adequate water supplies are available to accommodate the proposed development. Based on development under the Housing Element previously being anticipated by the General Plan, water demand of sites identified in the Housing Element will be consistent with the City’s overall water demand. With implementation of measure UTIL-1, impacts to water supplies as a result of adoption and implementation of the Housing Element will be less than significant.

5.19(c) (Sufficient Wastewater Treatment) Less Than Significant Impact with Mitigation: As described above in 5.19(a), wastewater generated by future development at sites identified in the Housing Element will be conveyed to the City’s Dunaweal Waste Water Treatment Plant (WWTP), which has sufficient operating capacity to process effluent generated by residential developments at these sites. Discharge will not exceed wastewater treatment requirements set forth by the Regional Water Quality Control Board.

In accordance with General Plan (I) Policy 3.1-3, upon submittal of site-specific development proposals for sites identified in the Housing Element, the capacity of the City’s wastewater treatment system shall be reviewed and considered relative to the calculated discharge generated by future housing projects.

Mitigation Measure UTIL-2 specifies that a Wastewater Generation Report be submitted to the city demonstrating that adequate wastewater treatment and conveyance capacity is available to accommodate the proposed development.

As such, adoption and implementation of the 2023 – 2031 Housing Element will not require or result in the construction or expansion of new wastewater treatment facilities. Therefore, impacts to the wastewater treatment system will be less than significant.

5.19 (d, e) (Solid Waste Generation/Compliance with Solid Waste Management) Less Than Significant Impact: Future construction facilitated by adoption of the 2023 – 2031 Housing Element will generate solid waste. Consistent with Cal Green Mandatory Measures, and as a standard requirement for building permits, Item #8.2.

Page 333 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 90 Initial Study/Mitigated Negative Declaration at least 65 percent of nonhazardous construction and demolition waste will be required to be recycled or salvaged and preparation of a Construction Waste Management Plan that documents the diversion of materials as required by CalGreen will also be required. Accordingly, impacts associated with construction waste will be less than significant.

Future operation of residential uses at sites identified in the Housing Element will generate solid waste including debris, recyclables, and compostables. The city is under contract with Upper Valley Disposal & Recycling for hauling, sorting, and disposal of waste. Solid waste is collected and transferred to landfill sites with remaining capacity. Although the waste stream generated by operation of residential uses at sites identified in the Housing Element will increase during construction and operation, it is not expected to exceed landfill capacity and is not expected to result in violations of federal, state, and local statutes and regulations related to solid waste. Therefore, disposal of solid waste resulting from construction and operation of sites identified in the 2023 – 2031 Housing Element will be less than significant.

Mitigation Measure(s):

UTIL-1: Submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element shall be accompanied by a Water Use Generation Report.

The report shall be provided to the City for review and acceptance and shall include the calculated water demand of the project and other pertinent information as requested by the City Engineer.

UTIL-2: Submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element shall be accompanied by a Wastewater Generation Report.

The report shall be provided to the City for review and acceptance and shall include the calculated wastewater generation of the project and other pertinent information as requested by the City Engineer.

Item #8.2.

Page 334 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 91 Initial Study/Mitigated Negative Declaration

5.20. WILDFIRE
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less than
Significant
Impact
No
Impact
If located in or near state responsibility areas or
lands classified as very high fire hazard severity
zones, would the project:
a) Substantially impair an adopted emergency
response plan or emergency evacuation plan?
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose
project occupants to pollutant concentrations
from a wildfire or the uncontrolled spread of a
wildfire?
c) Require the installation or maintenance of
associated infrastructure (such as roads, fuel
breaks, emergency water sources, power lines or
other utilities) that may exacerbate fire risk or
that may result in temporary or ongoing impacts
to the environment?
d) Expose people or structures to significant risks,
including downslope or downstream flooding or
landslides, as a result of runoff, post-fire slope
instability, or drainage changes?
Sources: City of Calistoga General Plan, as amended and 2003 General Plan EIR; Napa County Operational Area Hazard Mitigation Plan, August 2020; Calistoga Very High Fire Hazard Severity Zones in Calistoga Local Responsibility Area, produced by CalFire, September 23, 2008.

Wildfire Setting
Calistoga is susceptible to wildland fires due to the steep topography, abundant fuel load, and climatic conditions, primarily in the region southwest of Highway 128/SR 29/Foothill Boulevard, which is designated as a Very High Fire Hazard Severity Zone (VHFHSZ) within the Local Responsible Area (LRA) by CAL FIRE. In October 2017, the Tubbs Fire (Central LNU Complex) burned as close as 1.5 miles west of city limits, and in 2019, the Kincade Fire burned as close as 6 miles. Residents were exposed to secondary effects of these fire events including smoke and air pollution. Smoke generated by wildfire consists of visible and invisible emissions that contain particulate matter (soot, tar, water vapor, and minerals) and gases (carbon monoxide, carbon dioxide, nitrogen oxides). Public health impacts associated with wildfire include difficulty breathing, odor, and reduction in visibility.

Item #8.2.

Page 335 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 92 Initial Study/Mitigated Negative Declaration Sites identified in the 2023 – 2031 Housing Element are located within city limits and surrounded by roadways, developed land uses, and vacant grasslands. As shown in Figure 2-5 of the Napa County Operational Area Hazard Mitigation Plan all sites are located outside of areas designated as having moderate, high, and very high wildfire risk. Sites located at the northern portion of the city are located proximate to areas designated as having moderate and high wildfire risk.

Applicable General Plan Objectives and Policies
Objective SAF-3.1 Plan new developments with wildland fire hazards in mind. • Action A1. Enforce wildland fire control measures required by the Fire Code Wildfire Impact Discussion

5.20(a) (Impair Emergency Plans) Less Than Significant Impact: Adoption of the 2023 – 2031 Housing Element will not result in physical development, but rather will facilitate future development of housing opportunity sites identified in the Housing Element, all of which are within incorporated city limits on sites zoned for residential use. Sites are within one mile of the Calistoga Fire Department, which will allow for short response times. Furthermore, site-specific designs will be reviewed by the city’s Fire Department to ensure safe and efficient ingress and egress for emergency vehicles is provided. In the event of a wildfire, development facilitated by the 2023 – 2031 Housing Element is not expected to substantially impair an adopted emergency response plan or emergency evacuation plan, and impacts will be less than significant.

57.20(b-d) (Wildfire Risk Exacerbation, Infrastructure Contributing to Wildfire Risk, Exposure to Wildfire-Related Risks) Less Than Significant Impact: Housing opportunity sites identified for future development in the Housing Element are located outside of areas designated as having moderate, high, and very high wildfire risk, however, sites located at the northern portion of the city (A, B, D) are located proximate to areas designated as having moderate and high wildfire risk. These sites identified in the Housing Element are relatively flat and are not subject to risks associated with flooding, landslides or slope instability. New buildings and structures introduced to sites identified in the Housing Element will be constructed in compliance with the latest California Building Code and Fire Code, which contains standards for building materials, systems, and assemblies used in the exterior design and construction of new buildings. There are no factors, such as steep slopes, prevailing winds, or the installation/maintenance of new infrastructure, that would exacerbate fire risk or expose occupants of future residential developments to the uncontrolled spread of a wildfire, pollutant concentrations from wildfire, post-fire slope instability, or post-fire flooding. Therefore, impacts will be less than significant.

Mitigation Measure(s): None Required.

Item #8.2.

Page 336 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 93 Initial Study/Mitigated Negative Declaration

5.21. MANDATORY FINDINGS OF SIGNIFICANCE (CAL. PUB. RES. CODE §15065) A focused or full environmental impact report for a project may be required where the project has a significant effect on the environment in any of the following conditions:

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate
a plant or animal community, substantially
reduce the number or restrict the range of
a rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively considerable”
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects, and
the effects of probable future projects)?
c) Does the project have environmental
effects, which will cause substantial adverse
effects on human beings, either directly or
indirectly?
Mandatory Findings Discussion

5.21(a) (Degrade the Environment): Less Than Significant Impact: The proposed Housing Element Update is consistent with the General Plan, goals, policies and programs of the City. As a policy document, the Housing Element Update guides future housing development activities and does not in and of itself result in physical development. Future development of housing as anticipated by the proposed Housing Element has the potential to result in environmental impacts associated with construction and operation as described herein.

However, compliance with City General Plan policies, municipal code requirements, uniformly applies development standards, and implementation of mitigation measures set forth herein will ensure that implementation of the proposed Housing Element results in less than significant impacts due to degradation of the environment. As such, the project will not degrade the quality of the environment, reduce habitat, or adversely affect cultural resources.

Item #8.2.

Page 337 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 94 Initial Study/Mitigated Negative Declaration

5.21(b) (Cumulatively Affect the Environment) Less Than Significant Impact:

Implementation of the proposed Housing Element, in combination with past, present, and future development in the City would not result in long-term cumulative impacts. Cumulative long-term impacts from development within the City were identified and analyzed in the City’s General Plan EIR, which anticipated housing at the level proposed by the 2023 – 2031 Housing Element. Future housing development will be subject to General Plan policies, state and federal regulations, uniformly applied development standards, and mitigation measures, which ensure that potential cumulative adverse effects to the environment are reduced to less than significant.

5.21(c) (Substantial Adverse Effect on Humans) Less Than Significant Impact: The proposed Housing Element, as a policy document would have no effect on humans. Development of housing and occupancy as by future residents has the potential to result in direct and indirect effects on humans if not properly controlled. With implementation of mitigation measures set forth herein, potential impacts to humans from the future development of housing as identified in the proposed Housing Element will be reduced to less than significant levels. Therefore, the project will have less than significant impacts due to substantial adverse environmental effects.

Mitigation Measure(s): None Required.

Item #8.2.

Page 338 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 95 Initial Study/Mitigated Negative Declaration

6. REFERENCE DOCUMENTS
The following information sources were referenced in the preparation of this initial study/ mitigated negative declaration and are available for review online or at the Planning & Building Department, City of Calistoga, 1232 Washington Street, Calistoga:

1. BASMAA Post-Construction Manual, Design Guidance for Stormwater Treatment and Control for Projects in Marin, Sonoma, Napa, and Solano Counties, January 2019

2. Bay Area Clean Air Plan, prepared by the Bay Area Air Quality Management District, April 2017.

3. BAAQMD Justification Report: CEQA Thresholds for Evaluating the Significance of Climate Impacts from Land Use Projects and Plans, April 2022

4. California Department of Conservation Farmland Mapping and Monitoring Program (FMMP).

5. California Department of Conservation, Farmland of Local Importance Definitions, http://www.conservation.ca.gov/dlrp/fmmp/Documents/Farmland_of_Local_Importance_2016.pdf

6. California Energy Commission, 2017 Integrated Energy Policy Report, https://www.energy.ca.gov/2017_energypolicy/

7. California Energy Commission, Final Adopted State Alternative Fuels Plan, Adopted December 2007, https://ww2.energy.ca.gov/2007publications/CEC-600-2007-011/CEC-600-2007-011-CMF.PDF/

8. California Energy Commission, Supply and Demand of Natural Gas in California, http://www.energy.ca.gov/almanac/naturalgas_data/overview.htm

9. California Energy Commission, Total System Electric Generation (2018), https://ww2.energy.ca.gov/almanac/electricity_data/total_system_power.html

10. California Regional Water Quality Control Board San Francisco Bay Region Municipal Regional Stormwater NPDES Permit, Order No. R2-2015-0030, NPDES Permit No. CA0025054, October 8, 2015, https://www.waterboards.ca.gov/northcoast/board_decisions/adopted_orders/pdf/2015/151008_00 30_phaseIpermitrenewal.pdf

11. California Scenic Highway Mapping System, http://www.dot.ca.gov

12. City of Calistoga Climate Action Plan, adopted by the Calistoga City Council April 1, 2014.

13. City of Calistoga Active Transportation Plan, adopted October 21, 2014 (City Council Resolution 2014- 089).

14. City of Calistoga Municipal Code. https://www.codepublishing.com/CA/Calistoga/

15. City of Calistoga 2003 General Plan Update and as amended, including 2012 Community Identity Element, 2014 Circulation Element, 2014 Housing Element, 2014 Public Safety Element, and 2020 Infrastructure Element.

16. City of Calistoga 2003 General Plan Update Draft Environmental Impact Report, prepared by Design, Community and Environment, May 2003.

17. City of Calistoga 2003 General Plan Update Final Environmental Impact Report (SCH #2003012009), prepared by Design, Community and Environment, September 10, 2003.

18. Direct Use of Geothermal Water at the Solage Calistoga Resort, prepared by Poux, et al., 2012.

19. Nonresidential Development Housing Linkage Fee Nexus Study, prepared by Economic & Planning Systems, Inc., July 1, 2014.

Item #8.2.

Page 339 of 701 ends

City of Calistoga
2023 – 2031 Housing Element 96 Initial Study/Mitigated Negative Declaration

20. State Water Resources Control Board, Construction General Permit Order 2009-0009-DWQ, http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml

21. Technical Advisory on Evaluating Transportation Impact in CEQA, prepared by Office of Planning and Research, November 2017.

22. The Calistoga Popcorn Flower: Population Abundance and Plant Metrics with Recommendations, prepared by Aimee C. Wyrick, Associate Professor, and Angelo Maniego, Research Technician, 2013.

23. The Calistoga Popcorn Flower in 2013 and 2014, prepared by Aimee C. Wyrick, Associate Professor, and Angelo Maniego, Research Technician, 2013.

24. The Calistoga Popcorn Flower: Research Update, prepared by Aimee C. Wyrick, Associate Professor, February 2017.

25. The Influence of Precipitation and Soil Content on the Distribution and Population Status of the Calistoga Popcorn Flower, prepared by Aimee C. Wyrick, Associate Professor, et al., July 2018.

26. The Veranda Hotel at Indian Springs, Environmental Checklist, Initial Study and Mitigated Negative Declaration, July 27, 2020 (SCH No. 2020070509)

27. Transit Noise and Vibration Impact Assessment Manual, Federal Transit Administration, prepared by John A. Volpe National Transportation Systems Center, September 2018.

28. Napa County Operational Area Hazard Mitigation Plan, August 2020

29. Napa Valley Subbasin Groundwater Sustainability Plan, January 2022

30. Vision 2040 Moving Napa Forward, prepared by the Napa County Transportation and Planning Agency, September 16, 2015.

31. Upper Valley Disposal and Recycling webpage accessed July 2020. http://www.uvds.com/#clover

32. Ultimate Geometrics for Future Signalization (Lincoln Avenue/Fair Way), prepared by BKF Engineers, February 2020.

33. Well Finder, California Department of Conservation, Geologic Energy Management Division.

34. 2008 Grant Street Project Environmental Checklist, Initial Study and Mitigated Negative Declaration, Appendix K, Focused Traffic Study, Page 5 SNABM TAZ VMT 2015.

Item #8.2.

Page 340 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Monitoring and Reporting Program
2023 – 2031 Calistoga Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification

AESTHETICS
AES-1: Future development of housing opportunity sites and development of objective design standards shall be
consistent with entry corridor and character area
requirements outlined in the General Plan.

Downvalley Silverado Trail Entry Corridor Overlay
Area (site D)
• Setbacks shall be wide in order to preserve rural
characteristics and shall be landscaped with trees,
vineyards and/or native vegetation. These setbacks
shall not be deducted from the calculation of net
density (i.e., the same amount of development is
permitted, shifted elsewhere on the property).
• Existing orchards and stands of mature trees shall be maintained or replaced with similar vegetation.
• Unique natural features shall be preserved and
remain visible.
• The appearance of historic buildings visible from
public streets shall be preserved.
• Parking areas shall be screened from Silverado Trail.

Resort Character Area Overlay
Silverado Trail Section:
• Development shall be clustered to retain sensitive
Incorporate into
project design and
print on
construction
documents
Submit checklist
detailing
compliance with
entry corridor and
character area
design regulations
Calistoga Planning
and Building
Department
Prior to issuance
of grading or
building permits
Item #8.2.

Page 341 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
resources, scenic vistas, and open spaces.
• Outdoor lighting shall be designed to preserve and
protect the nighttime environment in accordance with
the following International Dark Sky Association model
ordinance objectives:
o Provide the minimum lighting level necessary
for night-time safety, utility, security,
productivity, enjoyment, and commerce.
o Minimize adverse offsite impacts such as sky
glow, light overspill and obtrusive light.
o Conserve energy and resources to the greatest
extent possible.

Lincoln Avenue (sites A, B, C, D, E):
• Landscaping shall be provided along Lincoln Avenue.
• Development along the common property line of
housing site C shall consider areas in the rear where
the height shall be limited to one-story. Privacy
screening shall also be considered.
• Pathway alignments shall be provided along Lincoln
Avenue.
• Parking lots shall be screened from public view and
landscaped with heavy shade tree planting.
• Utilities on Lincoln Avenue shall be placed
underground.
• Outdoor lighting shall be designed to preserve and
protect the nighttime environment in accordance with
the following International Dark Sky Association model
ordinance objectives:
o Provide the minimum lighting level necessary
for night-time safety, utility, security,
productivity, enjoyment, and commerce.
o Minimize adverse offsite impacts such as sky
Item #8.2.

Page 342 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
glow, light overspill and obtrusive light.
o Conserve energy and resources to the greatest
extent possible.

Lower Washington Character Area Overlay (sites F, G)
• Architecture shall feature materials such as brick,
sheet metal, stucco and true wood vertical siding.
• Development shall be designed with orientation
towards Fair Way extension.
• Development along Washington Street shall provide
for streetscape improvements, including installation of street trees and traffic calming elements.
• All overhead utilities shall be placed underground.
• Outdoor lighting shall be designed to preserve and
protect the nighttime environment in accordance with
the International Dark Sky Association model
ordinance objectives.
o Provide the minimum lighting level necessary
for night-time safety, utility, security,
productivity, enjoyment, and commerce.
o Minimize adverse offsite impacts such as sky
glow, light overspill and obtrusive light.
o Conserve energy and resources to the greatest
extent possible.

Silverado Trail Gateway (site A)
• Development of the site shall be setback from the
street edge and shall include meandering, landscaped
pathways

AIR QUALITY
AQ-1: During all construction activities associated with future Incorporate into project design and
Calistoga Planning
and Building
Prior to issuance
of grading or
Item #8.2.

Page 343 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
development facilitated by the 2023 – 2031 Housing
Element, the contractor shall implement the latest
BAAQMD recommended Best Management Practices
(BMPs) to control for fugitive dust and exhaust as follows:

1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.

2. All haul trucks transporting soil, sand, or other loose material shall be covered.

3. All visible mud and dirt track-out onto adjacent public roads shall be removed using wet power vacuum street
sweepers at least once per day. The use of dry power
sweeping is prohibited.

4. All vehicle speeds on unpaved roads shall be limited to 15 mph.

5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as practicable. Building pads shall be laid as soon as practicable after grading unless seeding or soil binders are used.

6. Idling times shall be minimized either by shutting
equipment off when not in use or reducing the maximum
idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points.

7. All construction equipment shall be maintained and
properly tuned in accordance with manufacturer’s
specifications. All equipment shall be checked by a
certified mechanic and determined to be running in
print on
construction
documents
On-site
observation
Department
Project Applicant
Contractor
building permits
Ongoing
throughout
construction
activities
Item #8.2.

Page 344 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
proper working condition prior to operation.

A publicly-visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints shall be posted on the project site prior to the initiation of construction activities. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.

AQ-2: Consistent with the April 2022 CEQA Thresholds for Land Use Projects, site-specific development proposals for sites identified in the 2023 – 2031 Housing Element shall
demonstrate compliance with the following:

1. New residential buildings shall not include natural gas appliances or natural gas plumbing.

2. New residential buildings shall demonstrate energy
efficiency.

3. New residential development projects shall achieve a 15 percent reduction in project-generated vehicle miles
traveled (VMT) below the existing VMT per capita, or as otherwise required by locally adopted Senate Bill 743 VMT reduction targets.

4. New residential development projects shall comply with off-street electric vehicle requirements in the most
recently adopted version of CALGreen Tier 2.

Incorporate into
project design and
print on
construction
documents
On-site
observation
Calistoga Planning
and Building
Department
Project Applicant
Qualified Traffic
Engineer
Contractor
Prior to issuance
of grading or
building permits
Ongoing
throughout
construction
activities
AQ-3: Prior to commencing construction activities on sites identified for residential development in the 2023 – 2031 Housing Element, the applicant/contractor shall prepare a Health Risk Assessment and develop a plan
Prepare and
submit a project
and site-specific
Health Risk
Assessment to the
Calistoga Planning
and Building
Department
Project Applicant
Prior to issuance
of grading or
building permits
Ongoing
throughout
Item #8.2.

Page 345 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
demonstrating the following:

Single Sources- During construction achieve a <10 per
one million excess cancer risk, <1.0 hazard index, and <

0.3 incremental annual PM2.5.

Combined Sources- At operation achieve a <100 per one
million excess cancer risk, <10.0 hazard index, and < 0.8 incremental annual PM2.5.

Reducing emissions from off-road equipment used to
construct the project is an effective way to achieve a
substantial fleet-wide average reduction in diesel
particulate matter exhaust emissions up to 75% or
greater. One feasible plan to achieve the performance
standard would include:

1. Construction equipment staging shall occur as far as possible from existing sensitive receptors (away from the property lines proximate to residences).

2. All diesel-powered off-road equipment larger than 25 horsepower and operating at the site for more than two
days continuously shall, at a minimum, meet U.S. EPA
particulate matter emissions standards for Tier 4 or
alternatively, Tier 3 engines that include CARD certified Level 3 Diesel Particulate Filters. Use of engines that are electrically powered or use non-diesel fuels would meet this standard.

3. The simultaneous occurrence of excavation, grading, and ground-disturbing construction activities on the same area at any one time shall be limited. Activities shall be phased to reduce the amount of disturbed surfaces at any one
time.

City’s Planning and
Building
Department
Incorporate
recommendations
into project design
and print on
construction
documents
Contractor
Qualified Air
Quality Specialist
construction
activities
Item #8.2.

Page 346 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification

BIOLOGICAL RESOURCES
BIO-1: Implement the following:
a) Consistent with General Plan (OSC) Policy P1.2-3, prior to approval of site-specific development of housing
opportunity sites identified in the 2023 – 2031 Housing Element, biological and wetland assessments shall be
prepared to determine the presence or absence of
populations of special-status species, sensitive natural communities, and wetland resources. Given the proximity of known occurrences of the Calistoga popcorn flower and blue grass, an assessment of the presence or absence of these species and an analysis of potential on and off site impacts shall be provided. At a minimum, biological and wetland assessments shall:
• Be conducted by qualified specialists in botany,
wildlife biology, and wetland ecology.
• Include detailed field surveys conducted during the
appropriate time of the year to permit detection of
sensitive resources.
• Provide a recommended plan to avoid, reduce, or
offset impacts to biological resources, as necessary.

Where determined necessary by the qualified
professional, plans shall include wildlife preservation management plans, including adequate mitigation for
loss of wildlife habitat components that are critical to maintenance of special-status and other important
species.
b) A Qualified Biologist shall conduct botanical surveys during the appropriate identification period and
conditions for all special-status plants that have the
Prepare and
submit a project
and site-specific
Biological
Resources
Assessment
Prepare and
submit a project
and site-specific
Wetland
Assessment
Incorporate
avoidance and/or
protection
recommendations
into project design
and print on
construction
documents
Calistoga Planning
and Building
Department
Project Applicant
Qualified Biologist
CDFW
Prior to issuance
of grading or
building permits
Item #8.2.

Page 347 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
potential to occur on or adjacent to the Project sites
where they may be directly or indirectly impacted, prior to the start of construction. Surveys shall be conducted
following CDFW’s Protocol for Surveying and Evaluating
Impacts to Special-Status Native Plant Populations and
Sensitive Natural Communities
(https://wildlife.ca.gov/Conservation/SurveyProtocols#3 77281280-plants). Survey reports shall be submitted to
CDFW for written approval prior to the start of
construction. Multiple years of surveys and visits to
nearby reference populations may be necessary based on
weather events such as drought or other environmental
variations in the local ecology and habitats. The qualified botanist shall be knowledgeable about plant taxonomy,
familiar with plants of the region, and have experience conducting botanical field surveys according to vetted
protocols.

If Calistoga popcorn flower or Napa blue grass are
discovered on or adjacent to the Project site or potential habitat that may foster populations thereof, the Project shall be redesigned to avoid direct and indirect impacts to these species in consultation with CDFW. If any other
special-status plant species are discovered, the Project shall avoid direct and indirect impacts to all individuals and prepare and implement a CDFW-approved avoidance
plan prior to Project activities. Alternatively, if other CESA listed plants are detected and cannot be avoided, the
Project shall obtain a CESA ITP from CDFW prior to
commencing Project activities. If special status plants will be impacted the Project shall provide mitigation prior to Project start in a form accepted in writing by CDFW which may include on-site restoration pursuant to a restoration Item #8.2.

Page 348 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
plan prepared by the Project and approved by CDFW, offsite habitat preservation at a minimum 3:1 mitigation to impact ratio based on acreage or number of plants as
appropriate, or a higher ratio if required by CDFW, unless otherwise approved in writing by CDFW.
c) A qualified wildlife biologist shall conduct visual surveys of areas planned for ground disturbance, including but
not limited to, installation of water main, new roads, leach fields, and building sites, and within a 100-foot buffer of ground-disturbing activities. Surveys shall be conducted to coincide with the blooming period of locally common
nectar sources such as vetch (Vicia spp.) and California poppy (Eschscholzia californica) during the flight season for the western and obscure bumble bee (generally late
February through late June). Between two and four evenly spaced surveys shall be conducted for the highest
detection probability, including surveys in early spring (late March/early April) and early summer (late June/July).

Surveys shall take place when temperatures are above
60°F, preferably on sunny days with low wind speeds (e.g., less than 8 miles per hour) and at least 2 hours after
sunrise and 3 hours before sunset. On warm days (e.g.,
over 85°F), bumble bees will be more active in the
mornings and evenings.

The qualified biologist shall conduct transect surveys
following the Streamlined Bee Monitoring Protocol for
Assessing Pollinator Habitat
(https://www.xerces.org/sites/default/files/2018-05/14- 021_01_XercesSoc_StreamlinedBee-Monitoring
Protocol_web.pdf), focusing on detection of foraging
bumble bees and underground nests using visual aids
Item #8.2.

Page 349 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
such as binoculars. If western or obscure bumble bee
nests are identified within the ground disturbance area or 100-foot buffer area, a plan to protect bumble bee nests and individuals shall be developed and implemented in
consultation with CDFW. The plan shall include, but not be limited to:
1) specifications for construction timing and sequencing requirements (e.g., avoidance of raking, mowing, tilling, or other ground disturbance until late March to protect
overwintering queens);
2) preconstruction surveys conducted within 30 days and consistent with any current available protocol standards prior to the start of ground-disturbing activities to identify active nests;
3) establishment of appropriate no-disturbance buffers
for nest sites and construction monitoring by a qualified biologist to ensure compliance with buffers;
4) restrictions associated with construction practices, equipment, or materials that may harm bumble bees (e.g., avoidance of pesticides/herbicides, measures to minimize the spread of invasive plant species); and
5) prescription of an appropriate restoration seed mix
targeted for the bumble bees, including native plant
species known to be visited by native bumble bee species and containing a mix of flowering plant species with
continual floral availability through the entire active season for bumble bees (March to October).

BIO-2: Unless otherwise recommended in site-specific biological assessments prepared for future development of sites
identified in the Housing Element, to avoid impacts to
birds protected under the Migratory Bird Treaty Act and Fish and Game Code (Section 3514), construction
Conduct site and
project-specific
pre-construction
nesting bird
surveys when
construction
Calistoga Planning
and Building
Department
Project Applicant
Prior to issuance
of grading or tree
removal permits
Item #8.2.

Page 350 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
activities, including the removal of trees, should occur outside of the bird-nesting season between September 1st and January 31st. If work occurs between February 1st and August 31st, a pre-construction bird nesting survey shall be conducted within seven and up to 15 days prior to tree
removal. The bird nesting survey shall include an
examination of all trees onsite and within 300 feet and 500 feet for raptors, of the identified limits of work, which may include offsite trees or structures.

If nesting birds are identified, then a qualified
ornithologist or biologist shall establish a temporary
protective construction buffer around the nest(s), conduct a survey to establish behavioral baseline of birds using each nest, and conduct monitoring to ensure it is not
disturbed. The nest buffer will be staked or fenced to
establish a construction exclusion perimeter and shall be adjusted by a qualified biologist as needed to avoid
disturbance. The buffer shall be of sufficient size to
protect the nesting site from construction-related
disturbance. Typically, adequate nesting buffers are 50 feet from the nest site or nest tree dripline for small birds and up to 300 feet for sensitive raptors. Upon completion of nesting surveys, if nesting birds are identified a
qualified ornithologist/biologist shall prescribe adequate nesting buffers to protect the nesting birds from harm
while the project is being constructed. If continuous
monitoring is not feasible, conservative no-disturbance buffer(s) should be established, with the buffer distance based on the tolerance level of the nesting species.

No construction or earth-moving activity shall occur within any established nest protection buffer prior to September 1st unless determined by a qualified ornithologist/biologist activities will occur
between Feb 1 –
Aug 31
Submit survey
results to the City’s
Planning and
Building
Department
If deemed
necessary,
establish buffer
protection zone
Qualified Biologist
Item #8.2.

Page 351 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
responsible for monitoring nesting behavior that the
young have left the nest and have attained sufficient flight skills to avoid construction zones, or that the nesting cycle is otherwise completed.

The biologist/ornithologist conducting the surveys shall provide the City of Calistoga with a report detailing the results of the survey and any recommendations required
for establishment of protective buffers, if tree removal occurs between February 1st and August 31st.

BIO-3: Unless otherwise recommended in site-specific biological assessments prepared for future development of sites
identified in the Housing Element, to avoid impacts to
roosting pallid bats or other special-status bat species, tree removal shall only be conducted during seasonal
periods of bat activity, between August 31 and October 15, when bats would be able to fly and feed independently,
and between March 1 and April 1 to avoid hibernating
bats, and prior to the formation of maternity colonies. A biologist with at least two years of experience surveying for bats, shall conduct a pre-construction survey of all trees that would be impacted within 14 days prior to
removal or commencement of site improvement activities.

If no special-status bats are found during the surveys, then the biologist shall provide a memo summarizing the results of the survey to the City, and construction activities may commence. If bat roosts are found, then a plan shall be developed for removal and exclusion, in conjunction
with the CDFW.

If building removal must occur outside the seasonal
activity periods (i.e., between October 16 and the end of February, or between April 2 and August 30), then a
Conduct site and
project-specific
pre-construction
bat surveys
Submit survey
results to the City’s
Planning and
Building
Department
If deemed
necessary, work
with CDFW to
prepare a removal
and exclusion plan
Calistoga Planning
and Building
Department
Project Applicant
Qualified Biologist
CDFW
Prior to issuance
of grading or tree
removal permits
Item #8.2.

Page 352 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
qualified biologist, shall conduct pre-construction surveys within 14 days of tree removal, and determine if there are young present (i.e., the biologist will determine if there are maternal roosts). If a maternity site is found, impacts to the maternity site shall be avoided by establishment of a fenced, non-disturbance buffer until the young have
reached independence (i.e., are flying and feeding on their own) as determined by a qualified biologist. The size of the buffer zone shall be determined by a qualified
biologist at the time of the surveys. If the qualified
biologist finds evidence of roosting bats but not a
maternity site with young, then a plan shall be developed for removal and exclusion, in conjunction with the CDFW.

The biologist shall provide the City with a report detailing the results of the survey and any recommendations, as
warranted, required for establishment of protective
buffers for bat roosts, if identified.

BIO-4: Indirect impacts to adjacent, offsite waters of the U.S./State shall be minimized to the maximum extent
practicable by the use of best management practices
(BMPs) that are installed prior to earth-work to protect waters of the U.S./State outside of the designated work areas to ensure that there are no inadvertent impacts to waters of the U.S./State, and to downstream receiving
waters within the watershed. These practices shall include installing orange construction fencing, silt fencing, wildlife friendly hay wattles (that is, no monofilament netting), gravel wattles, and other protective measures between
project activities and preserved offsite waters of the
U.S./State.

If deemed necessary as determined through preparation
Incorporate
standard BMPs
and other
recommendations
into project design
and print on
construction
documents
Calistoga Planning
and Building
Department
Project Applicant
Contractor
Qualified Biologist
Prior to issuance
of grading or
building permits
Ongoing
monitoring
throughout
construction
activities
Item #8.2.

Page 353 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
of biological assessments for individual housing sites, orange construction fencing and other appropriate BMPs
shall be installed along the top of bank. Prior to the
commencing construction activities, a biological monitor shall inspect installation of BMPs to ensure that offsite waters are protected. BMPs shall thereafter be routinely inspected by the construction manager to ensure BMPs
remain in place throughout construction of individual
sites. Upon completion of project construction all orange fencing shall be removed along with any temporary BMPs.

BIO-5: Direct impacts to waters of the U.S./State shall be avoided to the maximum extent practicable through Project
Design. Where avoidance is infeasible to accommodate
housing, direct impacts shall be minimized and Project
Applicants shall satisfy compensatory mitigation
requirements at a minimum 2:1 ratio for impacted waters or as otherwise directed by agencies, and in compliance with Section 401 of the Clean Water Act, through
acquisition of a 401 Water Quality Certification issued by the RWQCB and/or Section 1602 of the Fish and Game
Code, through acquisition of a Lake or Streambed
Alteration Agreement. Evidence that the Project Applicant has secured all required authorization from agencies shall be submitted to the City prior to issuance of any grading or building permit.

Incorporate
avoidance
recommendations
into project design
and print on
construction
documents
Where design
cannot avoid sitespecific impacts,
provide
compensatory
mitigation and
obtain 401 Water
Quality Certificate
and/or 1602 Lake
and Streambed
Alterative
Agreement, as
applicable
Submit permit
Calistoga Planning
and Building
Department
Project Applicant
Contractor
Qualified Biologist
CDFW
RWQCB
USFWS
Prior to issuance
of grading or
building permits
Item #8.2.

Page 354 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
authorizations to
the City’s Planning
and Building
Department
BIO-6: Trees proposed for removal as part of future development of sites identified in the Housing Element Update shall require the planting of appropriately sized trees as
demonstrated in a landscape plan submitted with plans
for building permit. Tree removal and replacement shall conform with the City of Calistoga’s Tree Ordinance. If onsite planting is not feasible, payment of an in-lieu fee, may be permitted. All requirements and restrictions
contained in Chapter 19.01 of the City’s Municipal Code shall be complied with, including the incorporation of
replacement trees for those trees to be removed,
protection of trees to remain, as well as incorporation of any recommendations of the project arborist including
those set forth in the Tree Protection Plan.

Submit site and
project-specific
arborist report
Incorporate into
project design and
print on
construction
documents
Where not
incorporated into
project design, pay
applicable in-lieu
fee
Calistoga Planning
and Building
Department
Project Applicant
Contractor
Project Arborist
Prior to issuance
of grading or
building permits
BIO-7: Prior to issuance of a grading permit for future development of sites identified in the Housing Element
Update, a Tree Protection Plan prepared by a qualified
arborist in accordance with 19.01.040E of the City’s
municipal code shall be submitted. The Protection Plan
shall identify locations for the installation of temporary protective fencing surrounding protected trees
adjacent to the project boundaries and shall specify
restrictions for root cutting, tree trimming, trenching, irrigation, parking, staging of construction equipment, and other activities that might cause harm to protected trees.

Submit site and
project-specific
tree protection
plan
Incorporate
arborist
recommendations
into project design
and print on
construction
documents.

Calistoga Planning
and Building
Department
Project Applicant
Qualified Arborist
Prior to issuance
of a grading
permits
Item #8.2.

Page 355 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification

CULTURAL RESOURCES
CUL-1: Upon submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element, an assessment of archaeological
resources, tribal cultural resources, potential adverse impacts, and recommendations to avoid or reduce
impacts, including but not limited to preservation on site or documentation and conservation shall be prepared by
a qualified professional for review and acceptance by the City.

If recommended through the site-specific assessment, a
professional archaeologist shall be onsite during initial ground disturbing activities to monitor potential
uncovering of undiscovered archeological and tribal
resources. The archaeologist shall have the authority to temporarily halt work upon discovery of potentially
significant resources and earthwork within 100 feet of the discovery shall be immediately stopped until the
archeologist inspects the resource, assess significance, consults with tribes and related parties, and provides
recommendations on treatment of the discovery. The City shall be notified of any such discoveries and the Project applicant shall implement the recommendations of the
archaeologist.

Submit site and
project-specific
Cultural Resources
Report
Incorporate
avoidance and/or
protection
recommendations
into project design
and print on
construction
documents.

Calistoga Planning
and Building
Department
Project Applicant
Contractor
Qualified
Archaeologist
Prior to issuance
of a grading or
building permits
During ground
disturbing
activities
CUL-2 In the event that human remains are encountered during development of sites identified in the Housing Element, all work must stop, and the County Coroner shall be
immediately notified of the discovery. If the County
coroner determines that remains are, or are believed to be Native American, then the Native American Heritage
Incorporate into
project design and
print on
construction
documents
On-site
Calistoga Planning
and Building
Department
Project Applicant
Contractor
Prior to issuance
of grading permits
During ground
disturbing
activities
Item #8.2.

Page 356 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
Commission must be contacted by the Coroner so that a
“Most Likely Descendant” (MLD) can be designated to
provide further recommendations regarding treatment of
the remains. A Secretary of Interior-qualified
Archaeologist shall evaluate the historical significance of the discovery, the potential for additional human remains to be present, and to provide further recommendations
for treatment of the resource in accordance with the MLD recommendations. Native American human remains,
funerary objects, and object of cultural patrimony shall be handled consistent with the requirement of the Native
American Graves Protection and Repatriation Act.
observation Qualified
Archaeologist
NAHC
MLD
County Coroner

GEOLOGY AND SOILS
GEO-1: Prior to the issuance of a building permit, for development proposals on housing opportunity sites identified in the 2023 – 2031 Housing Element, a design level geotechnical investigation shall be prepared. The investigation shall include an analysis of site-specific geotechnical conditions including soil composition, expansive soils, and
groundwater, as well as a discussion of seismic risks
including liquefaction and landslides. Based on the sitespecific analysis, the investigation shall provide detailed conclusions and recommendations addressing grading
procedures, soil stabilization, foundation design, and any other recommendations for addressing site-specific
geotechnical conditions. Final grading, construction, and building plans shall demonstrate that recommendations
set forth in the geotechnical investigations have been
incorporated into the design of the project and to the
satisfaction of the City of Calistoga.

Submit site and
project-specific
geotechnical
investigation
Incorporate
geotechnical
recommendations
into project design
and print on
construction
documents
Calistoga Public
Works
Department/ City
Engineer
Calistoga Planning
and Building
Department
Project Applicant
Geotechnical
Consultant
Prior to issuance
of grading or
building permits
Item #8.2.

Page 357 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
GEO-2: Prior to issuance of a grading permit for development of sites identified in the 2023 – 2031 Housing Element, an erosion control plan along with grading and drainage
plans shall be submitted to the City’s Planning and
Building Department. All earthwork, grading, trenching, backfilling, and compaction operations shall be conducted in accordance with the City of Calistoga’s Stormwater
Runoff Pollution Control Ordinance contained in Chapter

19.05 of the Calistoga Municipal Code. The erosion control plan shall detail erosion control measures such as site watering, sediment capture, equipment staging, and other erosion control measures to be implemented during
construction activities.

Incorporate into
project design and
print on
construction
documents
Calistoga Public
Works
Department/ City
Engineer
Project Applicant
Registered civil
engineer
Prior to issuance
of a grading permit
Ongoing
throughout
construction
activities
GEO-3: If paleontological resources, including individual fossils or assemblages of fossils, are encountered during
construction activities, all ground disturbing activities shall halt and a qualified paleontologist shall be procured to evaluate the discovery and provide recommendations.

Incorporate into
project design and
print on
construction
documents
On-site
observation
Calistoga Planning
and Building
Department
Project Applicant
Contractor
Qualified
Paleontologist
Ongoing
throughout
construction
activities

GREENHOUSE GAS EMISSIONS
Implement Mitigation Measures AQ-1 and AQ-2 See AQ-1 - AQ-2 See AQ-1 - AQ-2 See AQ-1 - AQ-2

HAZARDS AND HAZARDOUS MATERIALS
HAZ-1: Upon submittal of site-specific development proposals for housing opportunity sites identified in the 2023 – 2031 Housing Element, the results of a Phase I Environmental Site Assessment (ESA), prepared in accordance with the
Submit site and
project-specific
Phase I ESA
If determined by
Calistoga Planning
and Building
Department
Calistoga Fire
Prior to issuance
of grading or
building permits
Item #8.2.

Page 358 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
latest ASTM protocol for such assessments shall be
provided. If the Phase I ESA indicates evidence that site contamination requiring cleanup exists, a Phase II ESA
shall be completed to fully characterize the nature and extent of such contamination, and the scope of required clean up procedures. Furthermore, in the event that
contamination is identified site remediation
demonstrating compliance with appropriate
environmental screening levels (ESL) as established by the RWQCB shall be completed prior to the City issuance of
occupancy.
the Phase I ESA,
prepare site and
project-specific
Phase II ESA
Incorporate
recommendations
of the Phase I
and/or Phase II
ESA into project
design and print
on construction
documents
Department
Project Applicant
Contractor
RWQCB

HYDROLOGY AND WATER QUALITY
HYDRO-1: In accordance with the National Pollution Discharge Elimination System regulation, upon submittal of
plans (Building Permit) for development of sites A, B,
C, D, E, and F of the 2023 – 2031 Housing Element, a
Storm Water Pollution Prevention Plan (SWPPP) shall
be submitted for review and approval by the city.

The SWPPP shall address erosion and sediment
controls, proper storage of fuels, temporary erosion
control measures such as fiber rolls, staked straw
bales, geofabric, and sandbags, identification, and
cleanup of hazardous materials. Sediment shall be
retained onsite by a system of sediment basins,
traps, or other appropriate measures. A Notice of
Intent, fees, and other documentation shall be filed
with the Regional Water Quality Control Board.

Prepare and
submit site and
project-specific
SWPPP for review
and acceptance by
the city and
RWQCB
Incorporate into
project design and
print on
construction
documents
Calistoga Planning
and Building
Department
Calistoga Public
Works Department
RWQCB
Project Applicant
Prior to issuance
of grading or
building permits
Ongoing
throughout
construction
activities
HYDRO-2: Upon submittal of plans (Building Permit) for Prepare and submit site and
Calistoga Public Prior to issuance
of grading or
Item #8.2.

Page 359 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
development of sites A, B, C, D, E, and F of the 2023
– 2031 Housing Element, a stormwater control plan
shall be submitted for review and approval by the
city. The approved permanent and operational
runoff pollutant source control BMPs shall be
incorporated into construction plans and documents
and implemented during construction and after
project completion. The project’s stormwater
treatment and flow-control facilities shall be
maintained in perpetuity.
project-specific
stormwater
control plan for
review and
acceptance by the
City’s Public Works
Department
Incorporate
stormwater
control measures
into project design
and print on
construction
documents
Prepare
Construction
Monitoring Report
that documents
periodic
inspections during
grading to ensure
measures are in
place
Works Department
Project Applicant
Contractor
building permits
Ongoing
throughout
construction
activities

MINERALS
GEOTHERMAL-1 In the event that future development of
housing opportunity sites identified in the
Housing Element propose use of
geothermal waters, all applicable
extraction and reinjection well permits
shall be obtained from Napa County and
Submit statement
regarding projectspecific proposal
to use geothermal
waters
If use of
Calistoga Planning
and Building
Department
Calistoga Public
Works Department
Prior to issuance
of grading or
building permits
Item #8.2.

Page 360 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
CalGem and approved permits shall be
submitted to the City of Calistoga.

Geothermal wells shall be operated in full
compliance with all permits from the
County and CalGem including ongoing
monitoring, maintenance, and reporting.

Upon request, geothermal well records
shall be made available to the City.

Ongoing coordination with the City of
Calistoga shall be required to support
long-term protection and preservation of
geothermal resource, which may include
participating in events, workshops or
studies relating to geothermal resources,
and sharing information on geothermal
use.
geothermal waters
is proposed,
submit copies of
permits to the city
Ongoing
observation and
maintenance
Project Applicant
Napa County
CalGem
NOISE
NOI-1: Consistent with General Plan (N) Policy P1.4-2, prior to approval of site-specific development of housing
opportunity sites identified in the 2023 – 2031 Housing Element, a noise study, including field measurements
shall be submitted to the City of Calistoga for review and acceptance. The noise study shall include an analysis of impacts associated with construction and operation, a
discussion of groundborne vibration impacts during
construction using the thresholds published by Caltrans, and recommendations to reduce noise impacts shall be
included in the noise study and incorporated into final plans for site-specific developments.

Submit site and
project-specific
Noise Study
Incorporate
recommendations
of Noise Study into
project design and
print on
construction
documents.

Calistoga Planning
and Building
Department
Project Applicant
Qualified
Acoustical
Specialist
Prior to issuance
of grading or
building permits

TRANSPORTATION
Item #8.2.

Page 361 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
TRAN-1: Submittal of site-specific development proposals for housing sites identified in the 2023 – 2031
Housing Element shall be accompanied by a
traffic/transportation study at the request of the
City Engineer. The study shall be provided to the
City for review and acceptance and shall include a
discussion of the developments consistency with
General Plan (CIR) Policies P1.2-1, P1.2-2, P1.2-3,
P1.3-1, P1.3-2, P1.3-3 as well as a discussion of
vehicle miles travelled (VMT), including
opportunities for screening out from the need for
further analysis, a discussion of site design with
regard to potential design hazards and emergency
access, and other pertinent transportation
information as requested by the City Engineer.

Recommendations from the traffic study shall be
imposed as project conditions of approvals.

Submit site and
project-specific
Transportation
Study
Incorporate
recommendations
of Transportation
Study into project
design and print
on construction
documents.

Calistoga Planning
and Building
Department
Project Applicant
Qualified
Transportation
Engineer
Prior to issuance
of grading or
building permits

TRIBAL CULTURAL RESOURCES
TCUL-1: Implement Mitigation Measure CUL-1 above.

See CUL-1 See CUL-1 See CUL-1

UTILITIES AND SERVICE SYSTEMS
UTIL-1: Submittal of site-specific development proposals for housing opportunity sites identified in the 2023
– 2031 Housing Element shall be accompanied by
a Water Use Generation Report. The report shall
be provided to the City for review and acceptance
and shall include the calculated water demand of
the project and other pertinent information as
requested by the City Engineer.

Submit projectspecific Water Use
Generation Report
for review and
acceptance by the
City Engineer
Calistoga Public
Works Department
Project Applicant
Qualified Engineer
Prior to issuance
of grading or
building permits
Item #8.2.

Page 362 of 701 ends

Final MMRP 3.28.23
2023 – 2031 Housing Element
Mitigation Measure Implementing
Procedure
Monitoring
Responsibility
Monitoring
Schedule Verification
UTIL-2: Submittal of site-specific development proposals for housing opportunity sites identified in the 2023
– 2031 Housing Element shall be accompanied by
a Wastewater Generation Report. The report shall
be provided to the City for review and acceptance
and shall include the calculated wastewater
generation of the project and other pertinent
information as requested by the City Engineer.

Submit projectspecific
Wastewater
Generation Report
for review and
acceptance by the
City Engineer
Calistoga Public
Works Department
Project Applicant
Qualified Engineer
Prior to issuance
of grading or
building permits
Item #8.2.

Page 363 of 701 ends
Page 2 ends

ATTACHMENT 2
RESOLUTION NO. 2023-XXX

A RESOLUTIONOFTHECITYCOUNCILOFTHECITYOFCALISTOGA ADOPTING A

GENERAL PLAN AMENDMENT TO UPDATE THE HOUSING ELEMENT OF THE GENERAL PLAN FOR THE PERIOD OF 2023-2031 AND AFFIRMATIVELY

FURTHER FAIR HOUSING, AND COMPLY WITH STATE HOUSING ELEMENT LAW WHEREAS, the California Government Code Section 65302 mandates that each city shall include a Housing Element in its General Plan, and that the Housing Element be updated periodically to reflect current conditions and legal requirements and set forth goals, policies and programs for the preservation, improvement and development of housing for all economic segments of the community and housing for persons with special needs; and WHEREAS, State Housing Element Law (Government Code Sections 65580 et seq.) requires that the City Council adopt a Housing Element for the eight-year period 2023-2031 to accommodate the City of Calistoga regional housing need allocation ("RHNA") of 119 housing units, comprised of 31 very-low income units, 19 low-income units, 19 moderateincome units, and 50 above moderate-income units; and WHEREAS, the City of Calistoga has prepared Housing Element Update 2023-2031 ("Housing Element") in compliance with State Housing Element Law, which is attached as Attachment 3 to the accompanying Staff Report; and
WHEREAS, as provided in Government Code Section 65350 et. seq., the Housing Element constitutes a General Plan Amendment; and
WHEREAS, pursuant to the California Environmental Quality Act ("CEQA") an Initial Study was completed. On the basis of the initial study, City staff for the City of Calistoga, acting a Lead Agency, determined that there was no substantial evidence that the project could have a significant effect on the environment, as mitigated; as result, City staff prepared a Mitigated Negative Declaration for the project pursuant to CEQA; the City Council has adopted Resolution 2023-XXX adopting the Mitigated Negative Declaration; and WHEREAS, as provided in Government Code Sections 65352 - 65352.5, the City of Calistoga referred the Housing Element to all California Native American tribes on the contact list provided by the Native American Heritage Commission and to other entities listed and the Federated Indians of Mishewal Wappo of Alexander Valley ("Tribe") requested consultation; and
WHEREAS, the City of Calistoga held one meeting with the Tribe to discuss the Housing Element and offered additional engagement opportunities at key points during the development of the Housing Element which helped inform the process; and WHEREAS, the Housing Element must be adopted to comply with State law, accommodate the RHNA, affirmatively further fair housing, and facilitate and encourage a variety of housing types for all income levels, including multifamily housing (Gov. Code Sections 65583.2 and 65583(c)); and
WHEREAS, the City conducted extensive community outreach over the last 24 months including 12 public workshops before the Planning Commission and City Council, a bilingual community housing priorities survey which received 314 total responses, a Item #8.2.

Page 364 of 701 ends
Page 3 ends

stakeholder workshop that included developers, community-based organizations, and health and human services, and robust outreach through the City's social media channels; and
WHEREAS, in accordance with Government Code Section 65585(b), on November 15, 2022, the City posted the draft Housing Element and requested public comment for a 30-day review period, and on December 30, 2022, after responding to public comments, the City submitted the draft Housing Element to the State Department of Housing and Community Development (HCD) for its review; and
WHEREAS, in August 2022 and February 2023, HCD provided comments to the City regarding the adequacy of the draft Housing Element, and based upon this, the City revised the draft Housing Element to include the additional information and data that was requested; and WHEREAS, on May 17, 2023, the City published the final draft of the Housing Element and requested public comment on the final draft; and
WHEREAS, City staff reviewed HCD’s findings on the Housing Element and revised the draft Housing Element to incorporate requested changes; and WHEREAS, on May 24, 2023, the Planning Commission conducted a duly and properly noticed public hearing, reviewed the Housing Element and all pertinent maps, documents and exhibits, including HCD's findings, the City's response to HCD's findings, the staff report and all attachments, and oral and written public comments; recommended adoption of the Mitigated Negative Declaration and determined the Housing Element to be consistent with State law and the General Plan of the Calistoga; and
WHEREAS, the City Council and held a duly noticed public hearing on June 20, 2023 and continued review of the Initial Study/Mitigated Negative Declaration and 2023 Housing Element Update to a public hearing on July 18, 2023; and WHEREAS, on July 18, 2023 the City Council reviewed and considered the information contained in the staff report and attachments, the Mitigated Negative Declaration, the draft 2023-2031 Housing Element and related materials, which are incorporated herein by reference; and at the hearing, all interested persons were given an opportunity to be heard; the City Council received and considered the staff report and all the information, evidence, and testimony presented in connection with this project, and continued the item to August 1, 2023; and
WHEREAS, on August 1, 2023 the City Council reviewed and considered the information contained in the staff report and attachments, the Mitigated Negative Declaration, the draft 2023-2031 Housing Element and related materials, which are incorporated herein by reference; and at the hearing, all interested persons were given an opportunity to be heard; the City Council received and considered the staff report and all the information, evidence, and testimony presented in connection with this project.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Calistoga as follows:

1. The above recitations are true and correct and are incorporated by reference into this action.

2. The City Council finds and determines that adoption of the Housing Element Update will not have a significant effect on the environment and that an Initial Study/Mitigated Negative Declaration has been prepared and adopted for the project.

Item #8.2.

Page 365 of 701 ends
Page 4 ends

4. The City Council of the City of Calistoga hereby: rescinds the current Housing Element (Chapter 6 of the General Plan document); and adopts the General Plan Amendment to adopt proposed 2023-2031 Housing Element.

5. The Planning & Building Director is directed to transmit the adopted Housing Element to the California Department of Housing and Community Development for review pursuant to Government Code Section 65585(g). The Planning & Building Director, in consultation with the City Attorney, is further directed and authorized to make all non-substantive changes to the Housing Element to make it internally consistent or to address any non-substantive changes or amendments requested by the Department to achieve certification.

PASSED, APPROVED, AND ADOPTED this 1st day of August 2023. I,

YUDIANA GALVAN, INTERIM CITY CLERK OF THE CITY OF CALISTOGA, HEREBY CERTIFY the foregoing resolution was introduced and passed at a regular meeting of the Calistoga City Council by the following roll call vote:

AYES:

NOES:

ABSTAIN:

ABSENT
ATTEST: APPROVED:

Yudiana Galvan, Interim City Clerk Donald Williams, Mayor

3. In accordance with state law, the City Council hereby finds as follows:
a. The Housing Element Update is internally consistent with the Calistoga General Plan.
b. As required by Government Code Section 65585(e), the City Council has considered the findings made by the Department of Housing and Community Development included in the Department's letter to the City of Calistoga dated February 28, 2023 consistent with Government Code Section 65585(e), and the Housing Element has been amended in response to the findings of the Department, as set forth in Attachment 2 to the staff report, to substantially comply with the requirements of State Housing Element Law as interpreted by HCD.
c. The Housing Element substantially complies with State Housing Element Law, as provided in Government Code 65580 et seq. and contains all provisions required by State Housing Element Law, as shown in Exhibit A to this Resolution, incorporated herein by this reference.

Item #8.2.

Page 366 of 701 ends
Page 5 ends

EXHIBIT A TO RESOLUTION 2023-XXX

CONFORMANCE OF HOUSING ELEMENT WITH STATE LAW REQUIREMENTS, ARTICLE 10.6 [65580 - 65589.11]

GOVERNMENT CODE PROVISION HOUSING ELEMENT COMPLIANCE
Section 65583
The housing element shall consist of an
identification and analysis of existing
and projected housing needs and a
statement of goals, policies, quantified
objectives, financial resources, and
scheduled programs for the
preservation, improvement, and
development of housing.

Chapter 4: Special Needs Housing Analysis
Chapter 8: Quantified Objectives
Chapter 8: Housing Assistance Programs
Chapter 8: Goals, Policies and Programs
The housing element shall identify
adequate sites for housing, including
rental housing, factory- built housing,
mobilehomes, and emergency shelters,
and shall make adequate provision for
the existing and projected needs of all
economic segments of the community.

Chapter 5: Housing Sites
Chapter 4: Provisions for a Variety of
Housing Types
The element shall contain all of the
following:
(a) An assessment of housing needs and
an inventory of resources and constraints
relevant to the meeting of these needs.

The assessment and inventory shall
include all of the following:

Chapter 4: Special Needs
Housing Analysis
Item #8.2.

Page 367 of 701 ends
Page 6 ends

(a)(l) An analysis of population and
employment trends and documentation
of projections
Chapter 6: Population Characteristics and
Trends Chapter 4: Housing Needs
Assessment
(a)(l) A quantification of the locality's
existing and projected housing needs for
all income levels, including extremely
low income households, as defined in
subdivision (b) of Section 50105 and
Section 50106 of the Health and Safety
Code. These existing and projected
needs shall include the locality's share
of the regional housing need in
accordance with Section 65584. Local
agencies shall calculatethe subset of
very low income households allotted
under
Chapter 6: Regional Housing Needs
Chapter 6: Household Incomes
and Housing Affordability
Chapter 4: Housing Needs Assessment
Chapter 4: Extremely Low-Income
Housing
Section 65584 that qualify as extremely
low income households. The local
agency may either use available census
data to calculate the percentage of very
low income households that qualify as
extremely low income households or
presume that 50 percent of the very low
income households qualify as extremely
low income households. The number of
extremely low income households and
very low income households shall equal
the jurisdiction's allocation of very low
income households pursuant to Section
65584.
(a)(2) An analysis and documentation of
household characteristics, including
level of payment compared to ability to
pay,
Chapter 6: Household Incomes
and Housing Affordability
Chapter 6: Characteristics of Housing
Stock
Chapter 4: Housing Needs Assessment
Item #8.2.

Page 368 of 701 ends
Page 7 ends

(a)(2) housing characteristics,
including overcrowding, and
Chapter 6: Population Characteristics
and Trends
Chapter 6: Household Incomes
and Housing Affordability
Chapter 6: Characteristics of Housing
Stock
Chapter 3: Disproportionate
Housing Needs Chapter 4:

Housing Needs Assessment
(a)(2) housing stock condition. Chapter 6: Characteristics of Housing Stock
Chapter 6: Characteristics of
Housing Stock Chapter 4:

Housing Needs Assessment
(a)(3) An inventory of land suitable and
available for residential development,
including vacant sites and sites having
realistic and demonstrated potential for
redevelopment during the planning
period to meet the locality's housing
need for a designated income level,
and an analysis of the relationship of
zoning and public facilities and services
to these sites, and an analysis of the
Chapter 5: Housing Sites
Item #8.2.

Page 369 of 701 ends
Page 8 ends

relationship of the sites identified in
the land inventory to the jurisdiction's
duty to affirmatively further fair
housing. Note: Please see Section
65583.2 regarding the land
inventory.
[Note that AB 2339 (Chapter 654,
Statutes of 2022) amended Section
65583(a)(4). It does not apply to ABAGarea housing elements unless the first draft of the housing element is
submitted to ABAG after January 31,
2023 or a draft is submitted after April
1, 2023. Therefore the sections below
include the statutory provisions of
Section 65583(a)(4) effective in 2022.

Jurisdictions adopting their housing
element after January 1, 2023 should
describe why AB 2339 is not
applicable to them.]
The City's first draft of the Housing
Element was submitted to the HCD in
2022.

The City has addressed the
requirements in the Housing Element.
(a)(4)(A) The identification of a zone or
zones where emergency shelters are
allowed as a permitted use without a
conditional use or other discretionary
permit. The identified zone or zones shall
include sufficient capacity to
accommodate the need for emergency
shelter identified in paragraph (7), except
that each local government shall identify
a zone or zones that can accommodate at
least one year-round emergency shelter.

Chapter 4: Provisions for a Variety of
Housing Types
(a)(4)(A) If the local government cannot
identify a zone or zones with sufficient
capacity, the local government shall
include a program to amend its zoning
ordinance to meet the requirements of
this paragraph within one year of the
adoption of the housing element. The
local government may identify additional
zones where emergency shelters are
Not applicable
Item #8.2.

Page 370 of 701 ends
Page 9 ends

permitted with a conditional use permit.
(a)(4)(A) The local government shall also
demonstrate that existing or proposed
permit processing, development, and
management standards are objective and
encourage and facilitate the development
of, or conversion to, emergency shelters.

Chapter 4: Provisions for a Variety of
Housing Types
Item #8.2.

Page 371 of 701 ends
Page 10 ends

(a)(4)(A) Emergency shelters may only
be subject to those development and
management standards that apply to
residential or commercial development
within the same zone except that a local
government may apply written, objective
standards that include all of the
following:
(i) The maximum number of beds or
persons permitted to be served
nightly by the facility.
(ii) Sufficient parking to accommodate
all staff working in the emergency
shelter, provided that the standards do
not require more parking for emergency
shelters than other residential or
commercial uses within the same zone.
(iii) The size and location of exterior
and interior onsite waiting and client
intake ar eas.
(iv) The provision of onsite
management.
(v) The proximity to other emergency
shelters, provided that emergency
shelters are not required to be more
than 300 feet apart.
(vi) The length of stay.
(vii) Lighting.
(viii) Security during hours that the
emergency shelter is in operation.

Chapter 4: Provisions for a Variety of
Housing Types
(a)(4)(B) The permit processing,
development, and management
standards applied under this paragraph
shall not be deemed to be discretionary
acts within the meaning of the California
Environmental Quality Act (Division 13
(commencing with Section 21000) of the
Public Resources Code).

Chapter 4: Provisions for a Variety of
Housing Types
Item #8.2.

Page 372 of 701 ends
Page 11 ends

(a)(4)(C) A local government that can
demonstrate to the satisfaction of the
department the existence of one or
more emergency shelters either within
its jurisdiction or pursuant to a
multijurisdictional agreement that can
accommodate that jurisdiction's need
Chapter 4: Provisions for a Variety of
Housing Types
Item #8.2.

Page 373 of 701 ends
Page 12 ends

for emergency shelter identified in
paragraph (7) may comply with the zoning
requirements of subparagraph (A) by
identifying a zone or zones where new
emergency shelters are allowed with a
conditional use permit.
(a)(4)(D) A local government with an
existing ordinance or ordinances that
comply with this paragraph shall not be
required to take additional action to
identify zones for emergency shelters.

The housing element must only describe
how existing ordinances, policies, and
standards are consistent with the
requirements of this paragraph.

Chapter 4: Provisions for a Variety of
Housing Types
(a)(5) An analysis of potential and actual
governmental constraints upon the
maintenance, improvement, or
development of housing for all income
levels, including the types of housing
identified in paragraph (1) of subdivision
(c), and [Note: The types of housing
identified in Section 65583(c}(l)
include multifamily rental housing,
factory-built housing, mobilehomes,
housing for agricultural employees,
supportive housing, single-room
occupancy units, emergency shelters,
and transitional housing.]
Chapter 4: Provisions for a Variety of
Housing Types
Chapter 6: Housing Constraints
(a)(5) for persons with disabilities as
identified in the analysis pursuant to
paragraph (7),
Chapter 8: Housing for People with
Disabilities
(a)(5) including land use controls, Chapter 8: Development Standards (a)(5) building codes and their
enforcement,
Chapter 8: Building Codes and
Enforcements
Item #8.2.

Page 374 of 701 ends
Page 13 ends

(a)(5) site improvements, Chapter 8: Subdivision Standards (a)(5) fees and other exactions required of
developers,
Chapter 8: Development and Permitting
Fees
(a)(5) local processing and permit
procedures,
Chapter 8: Local Processing and
Permitting Procedures
(a)(5) and any locally adopted ordinances
that directly impact the cost and supply of
residential development.

Chapter 8: Locally Adopted Ordinances
Item #8.2.

Page 375 of 701 ends
Page 14 ends

(a)(5) The analysis shall also demonstrate
local efforts to remove governmental
constraints that hinder the locality from
meeting its share of the regional housing
need in accordance with Section 65584
Chapter 8: Potential Governmental
Constraints
(a)(5) and from meeting the need for
housing for persons with disabilities,
supportive housing, transitional housing,
and emergency shelters identified
pursuant to paragraph (7).

Chapter 8: Potential Governmental
Constraints
(a)(6) An analysis of potential and actual
nongovernmental constraints upon the
maintenance, improvement, or
development of housing for all income
levels, including the availability of
financing,
Chapter 8: Nongovernmental Constraints
(a)(6) the price of land, Chapter 8: Land Costs
(a)(6) the cost of construction, Chapter 8: Construction Costs (a)(6) the requests to develop housing at
densities below those anticipated in the
analysis required by subdivision (c) of
Section 65583.2,
Chapter 8: Development Trends
(a)(6) and the length of time between
receiving approval for a housing
development and submittal of an
application for building permits for that
housing development that hinder the
construction of a locality's share of the
regional housing need in accordance
with Section 65584.

Chapter 8: Development Trends
Item #8.2.

Page 376 of 701 ends
Page 15 ends

(a)(6) The analysis shall also
demonstrate local efforts to remove
nongovernmental constraints that create
a gap between the locality's planning for
the development of housing for all
income levels and the construction of
that housing.

Chapter 8: Nongovernmental Constraints
(a)(7) An analysis of any special housing
needs, such as those of the
Chapter 4: Housing Needs Analysis
(a)(7) elderly; Chapter 4: Housing Needs Analysis
Item #8.2.

Page 377 of 701 ends
Page 16 ends

(a)(7) persons with disabilities, including a
developmental disability, as defined in
Section 4512 of the Welfare and
Institutions Code;
Chapter 4: Housing Needs Analysis
(a)(7) large families; Chapter 4: Housing Needs Analysis (a)(7) farmworkers; Chapter 4: Housing Needs Analysis
(a)(7) families with female heads of
households;
Chapter 4: Housing Needs Analysis
(a)(7) and families and persons in need of
emergency shelter.

Chapter 4: Housing Needs Analysis
(a)(7) The need for emergency shelter
shall be assessed based on the capacity
necessary to accommodate the most
recent homeless point- in-time count
conducted before the start of the planning
period, the need for emergency shelter
based on number of beds available on a
year- round and seasonal basis, the
number of shelter beds that go unused on
an average monthly basis within a oneyear period, and the percentage of those in emergency shelters that move to
permanent housing solutions.

Chapter 4: Housing Needs Analysis
(a)(7) The need for emergency shelter
may be reduced by the number of
supportive housing units that are
identified in an adopted 10-year plan to
end chronic homelessness and that are
either vacant or for which funding has
been identified to allow construction
during the planning period.

Not required
Item #8.2.

Page 378 of 701 ends
Page 17 ends

(a)(7) An analysis of special housing
needs by a city or county may include an
analysis of the need for frequent user
coordinated care housing services.

Not required
(a)(8) An analysis of opportunities for
energy conservation with respect to
residential development. Cities and
counties are encouraged to include
weatherization and energy efficiency
improvements as part of publicly
subsidized housing rehabilitation
projects. This may include energy
efficiency measures that encompass the
Chapter 7: Opportunities for Energy
Conservation in Residential Development
Item #8.2.

Page 379 of 701 ends
Page 18 ends

building envelope, its heating and cooling
systems, and its electrical system.
(a)(9) An analysis of existing assisted
housing developments that are eligible to
change from low-income housing uses
during the next 10 years due to
termination of subsidy contracts,
mortgage prepayment, or expiration of
restrictions on use. "Assisted housing
developments," for the purpose of this
section, shall mean multifamily rental
housing that receives governmental
assistance under federal programs listed
in subdivision (a) of Section 65863.10,
state and local multifamily revenue bond
programs, local redevelopment
programs, the federal Community
Development Block Grant Program, or
local in-lieu fees. "Assisted housing
developments" shall also include
multifamily rental units that were
developed pursuant to a local
inclusionary housing program or used to
qualify for a density bonus pursuant to
Section 65915.

Chapter 4: Conversion Risk of
Assisted Housing Developments
(a)(9)(A) The analysis shall include a
listing of each development by project
name and address, the type of
governmental assistance received, the
earliest possible date of change from lowincome use, and the total number of elderly and nonelderly units that could be
lost from the locality's low-income
housing stock in each year during the 10-
year period. For purposes of state and
federally funded projects, the analysis
required by this subparagraph need only
contain information available on a
statewide basis.

Chapter 4: Conversion Risk of
Assisted Housing Developments
Item #8.2.

Page 380 of 701 ends
Page 19 ends

(a)(9)(B) The analysis shall estimate the
total cost of producing new rental
housing that is comparable in size and
rent levels, to replace the units that could
change from low-income use, and an
estimated cost of preserving the assisted
housing developments. This cost
analysis for replacement housing may be
done aggregately for each five-year
period and does not have to contain a
project-by-project cost estimate.

Chapter 4: Conversion Risk of
Assisted Housing Developments
Item #8.2.

Page 381 of 701 ends
Page 20 ends

(a)(9)(C) The analysis shall identify public
and private nonprofit corporations known
to the local government that have legal
and managerial capacity to acquire and
manage these housing developments.

Chapter 4: Conversion Risk of
Assisted Housing Developments
(a)(9)(D) The analysis shall identify and
consider the use of all federal, state, and
local financing and subsidy programs
that can be used to preserve, for lower
income households, the assisted
housing developments, identified in this
paragraph, including, but not limited to,
federal Community Development Block
Grant Program funds, tax increment
funds received by a redevelopment
agency of the community, and
administrative fees received by a
housing authority operating within the co
mmunit y. In considering the use of these
financing and subsidy programs, the
analysis shall identify the amounts of
funds under each available program that
have not been legally obligated for other
purposes and that could be available for
use in preserving assisted housing
developments.

Chapter 4: Conversion Risk of
Assisted Housing Developments
Chapter 4: Housing Assistance Programs
(b) (1) A statement of the community's
goals, quantified objectives, and policies
relative to affirmatively furthering fair
housing and to the maintenance,
preservation, improvement, and
development of housing.

Chapter 8: Quantified Objectives
Item #8.2.

Page 382 of 701 ends
Page 21 ends

(2) It is recognized that the total housing
needs identified pursuant to subdivision
(a) may exceed available resources and
the community's ability to satisfy this
need within the content of the general
plan requirements outlined in Article 5
(commencing with Section 65300).

Under these circumstances, the
quantified objectives need not be
identical to the total housing needs. The
quantified objectives shall establish the
maximum number of housing units by
income category, including extremely
low income, that can be constructed,
rehabilitated, and conserved over a fiveyear time period.

Chapter 8: Quantified Objectives
Item #8.2.

Page 383 of 701 ends
Page 22 ends

(c) A program that sets forth a schedule
of actions during the planning period,
each with a timeline for implementation,
that may recognize that certain
programs are ongoing, such that there
will be beneficial impacts of the
programs within the planning period, that
the local government is undertaking or
intends to undertake to implement the
policies and achieve the goals and
objectives of the housing element
Chapter 8: Programs
(c) through the administration of land use
and development controls,
Chapter 8: Programs
(c) the provision of regulatory concessions
and incentives,
Chapter 8: Programs
(c) the utilization of appropriate federal
and state financing and subsidy programs
when available,
Chapter 8: Programs
(c) and the utilization of moneys in a
low- and moderate-income housing
fund of an agency if the locality has
established a redevelopment project
area pursuant to the Community
Redevelopment Law (Division 24
(commencing with Section 33000) of
the Health and Safety Code).

N/A
In order to make adequate provision for
the housing needs of all economic
segments of the community, the
program shall do all of the following:

Chapter 8: Programs
Item #8.2.

Page 384 of 701 ends
Page 23 ends

(c)(l) Identify actions that will be taken to
make sites available during the planning
period with appropriate zoning and
development standards and with
services and facilities to accommodate
that portion of the city's or county's share
of the regional housing need for each
income level that could not be
accommodated on sites identified in the
inventory completed pursuant to
paragraph (3) of subdivision (a) without
rezoning, and to comply with the
requirements of Section 65584.09.

Chapter 8: Programs
Item #8.2.

Page 385 of 701 ends
Page 24 ends

(c)(l) Sites shall be identified as needed to
affirmatively further fair housing
Chapter 8: Programs
Chapter 5: Housing Sites
(c)(l) and to facilitate and encourage the
development of a variety of types of
housing for all income levels, including
multifamily rental housing,
Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) factory-built housing, Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) mobilehomes, Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) housing for agricultural employees, Chapter 8: Programs Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) supportive housing, Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) single-room occupancy units, Chapter 8: Programs Item #8.2.

Page 386 of 701 ends
Page 25 ends

Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) emergency shelters, Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l) and transitional housing. Chapter 8: Programs
Chapter 4: Provisions for a Variety of
Housing Types
(c)(l)(A) Where the inventory of sites,
pursuant to paragraph (3) of subdivision
(a), does not identify adequate sites to
accommodate the need for groups of all
household income levels pursuant to
Section 65584, rezoning of those sites,
including adoption of minimum density
and development standards, for
jurisdictions with an eight-year housing
element planning period pursuant to
Section 65588, shall be completed no
Chapter 8: Programs
Item #8.2.

Page 387 of 701 ends
Page 26 ends

later than three years after either the
date the housing element is adopted
pursuant to subdivision (f) of Section
65585 or the date that is 90 days after
receipt of comments from the
department pursuant to subdivision (b)
of Section 65585, whichever is earlier,
unless the deadline is extended
pursuant to subdivision (f).

Notwithstanding the foregoing, for a
local government that fails to adopt a
housing element that the department
has found to be in substantial
compliance with this article within 120
days of the statutory deadline in Section
65588 for adoption of the housing
element, rezoning of those sites,
including adoption of minimum density
and development standards, shall be
completed no later than one year from
the statutory deadline inSection 65588
for adoption of the housing element.
(c)(l)(B) Where the inventory of sites,
pursuant to paragraph (3) of subdivision
(a), does not identify adequate sites to
accommodate the need for groups of all
household income levels pursuant to
Section 65584, the program shall
identify sites that can be developed for
housing within the planning period
pursuant to subdivision (h) of Section
65583.2. The identification of sites shall
include all components specified in
Section 65583.2. Note: Please see
Section 65583.2 regarding the land
inventory and conformance with
subdivision (h).

Chapter 8: Programs
Item #8.2.

Page 388 of 701 ends
← All documents from this meeting