Attachment 1 - Project Plans and Specifications

Camarillo City Council
October 23, 2024

Document
Attachment 1 - Project Plans and Specifications
Meeting
October 23, 2024
Body
Camarillo City Council
Pages
11
Original file
24.5 MB
Text extracted from the city's file for reading and search. Open the original on camarillo.primegov.com. That file is the official record.

City of Camarillo GENERAL ELECTRICAL
CH-5067-2 260000-12

B. For floor mounted generators and switchboards / distribution panels, the above values shall be doubled. Design stresses in either case may be increased 1/3 over normal allowable stresses but never beyond yield.

3.05 ADJUSTING AND CLEANING
A. All electrical equipment, including existing equipment not "finish painted" under other sections, shall be touched up where finished surface is marred or damaged.

B. All equipment shall be left in clean condition, with all shipping and otherwise unnecessary labels removed there from.

C. All metal shavings shall be removed, and rust inhibitor applied to minimize oxidation of new steel equipment and boxes.

3.06 IDENTIFICATION
A. Pull boxes, switchboards, panel boards, distribution circuit breakers, disconnect switches, and related electrical enclosures shall be properly identified by means of engraved laminated plastic descriptive nameplates mounted on apparatus using stainless steel screws or permanent epoxy adhesive where set screws are not feasible. Standard adhesives alone are not acceptable. Nameplates shall have white letters with black background. Cardholders in any form are not acceptable.

B. Provide all required safety and identification placards as required by code.

3.07 PAINTING OF EQUIPMENT
A. Factory Applied: Electrical equipment shall have factory-applied painting systems which shall, as a minimum, meet the requirements of NEMA ICS 6 corrosion- resistance test, except equipment specified to meet requirements of ANSI C37.20 shall have a finish as specified in ANSI C37.20.

B. Field Applied: Paint electrical equipment as required to meet safety criteria.

3.08 TESTING
A. General:

1. All inspections and tests shall be in accordance with the International Electrical Testing Association - Acceptance Testing Specifications ATS - 2009 (referred to herein as NETA ATS-2009).

2. Final test and inspection may be conducted in presence of Owner: Tests shall be conducted at the expense of and by the Contractor at a mutually agreed time. Submit written test reports.

3. The electrical installation shall be inspected and tested to ensure safety to building occupants, operating personnel, conformity to code authorities, and final Construction Shop Drawings.

4. Refer to Specification Section 26 32 13 Generator - Diesel for commissioning requirements.

City of Camarillo GENERAL ELECTRICAL
CH-5067-2 260000-13

5. Final Inspection Certificates: Prior to final payment approval, deliver to the Owner, with a copy to the Owner, signed certificates of final inspection by the appropriate inspection authority.

6. Grounding System:
a. All ground connections shall be checked and the entire system shall be checked for continuity. The resistance of the ground system at each site shall be measured using a 3- point fall-of-potential method. The maximum ground resistance shall be three ohms.
b. Ground tests shall meet the requirements of the California Electrical Code, Article 250.

END OF SECTION 260000 – GENERAL ELECTRICAL

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-1

SECTION 260523 – CONTROL-VOLTAGE ELECTRICAL POWER CABLES PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Backboards.

2. Category 5e balanced twisted pair cable.

3. Category 6 balanced twisted pair cable.

4. Category 6a balanced twisted pair cable.

5. Balanced twisted pair cabling hardware.

6. RS-485 cabling.

7. Low-voltage control cabling.

8. Control-circuit conductors.

9. Identification products.

1.02 DEFINITIONS
A. EMI: Electromagnetic interference.

B. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control and signaling power-limited circuits.

C. Plenum: A space forming part of the air distribution system to which one or more air ducts are connected. An air duct is a passageway, other than a plenum, for transporting air to or from heating, ventilating, or air-conditioning equipment.

D. RCDD: Registered Communications Distribution Designer.

1.03 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing agency, RCDD, layout technician, installation supervisor, and field inspector.

B. Source quality-control reports.

C. Field quality-control reports.

1.04 QUALITY ASSURANCE
A. Testing Agency Qualifications: Accredited by NETA.

B. Testing Agency's Field Supervisor: Currently certified by BICSI as an RCDD to supervise on-site testing.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-2

PART 2 - PRODUCTS

2.01 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Flame Travel and Smoke Density in Plenums: As determined by testing identical products according to NFPA 262, by a qualified testing agency. Identify products for installation in plenums with appropriate markings of applicable testing agency.

1. Flame Travel Distance: 60 inches (1520 mm) or less.

2. Peak Optical Smoke Density: 0.5 or less.

3. Average Optical Smoke Density: 0.15 or less.

C. Flame Travel and Smoke Density for Riser Cables in Non- Plenum Building Spaces: As determined by testing identical products according to UL 1666.

D. Flame Travel and Smoke Density for Cables in Non-Riser Applications and Non- Plenum Building Spaces: As determined by testing identical products according to UL 1685.

E. RoHS compliant.

2.02 CATEGORY 5e BALANCED TWISTED PAIR CABLE
A. Description: Four-pair, balanced-twisted pair cable, certified to meet transmission characteristics of Category 5e cable at frequencies up to 100 MHz.

B. Standard: Comply with ICEA S- 90-661, NEMA WC 63.1, and TIA -568-C.2 for Category 5e cables.

C. Conductors: 100-ohm, 24 AWG solid copper.

D. Shielding/Screening: Shielded twisted pairs (FTP)

2.03 CATEGORY 6 BALANCED TWISTED PAIR CABLE
A. Description: Four-pair, balanced-twisted pair cable, with internal spline, certified to meet transmission characteristics of Category 6 cable at frequencies up to 250MHz.

B. Standard: Comply with NEMA WC 66/ICEA S-116-732 and TIA- 568-C.2 for Category 6 cables.

C. Conductors: 100-ohm, 23 AWG solid copper.

D. Shielding/Screening: Shielded twisted pairs (FTP).

2.04 CATEGORY 6a BALANCED TWISTED PAIR CABLE
A. Description: Four-pair, balanced-twisted pair cable, with internal spline, certified to meet transmission characteristics of Category 6a cable at frequencies up to 500MHz.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-3

B. Standard: Comply with TIA-568-C.2 for Category 6a cables.

C. Conductors: 100-ohm, 23 AWG solid copper.

D. Shielding/Screening: Shielded twisted pairs (FTP).

E. Cable Rating: Plenum.

2.05 BALANCED TWISTED PAIR CABLE HARDWARE
A. Description: Hardware designed to connect, splice, and terminate balanced twisted pair copper communications cable.

B. General Requirements for Balanced Twisted Pair Cable Hardware:

1. Comply with TIA -568-C.2, IDC type, with modules designed for punch- down caps or tools.

2. Cables shall be terminated with connecting hardware of same category or higher.

C. Patch Panel: Modular panels housing numbered jack units with IDC -type connectors at each jack location for permanent termination of pair groups of installed cables.

1. Features:
a. Universal T568A and T568B wiring labels.
b. Labeling areas adjacent to conductors.
c. Replaceable connectors.
d. 24 or 48 ports.

2. Construction: 16- gauge steel and mountable on 19-inch (483 mm) equipment racks.

3. Number of Jacks per Field: One for each four -pair cable indicated, plus spares and blank positions adequate to suit specified expansion criteria].

D. Patch Cords: Factory -made, four -pair cables in 48 -inch (1200 -mm) lengths; terminated with an eight-position modular plug at each end.

1. Patch cords shall have bend-relief-compliant boots and color-coded icons to ensure performance. Patch cords shall have latch guards to protect against snagging.

2. Patch cords shall have color-coded boots for circuit identification.

E. Plugs and Plug Assemblies:

1. Male; eight position; color -coded modular telecommunications connector designed for termination of a single four -pair 100- ohm unshielded or shielded balanced twisted pair cable.

2. Comply with IEC 60603-7-1, IEC 60603-7-2, IEC 60603-7-3, IEC 60603-7- 4, and IEC 60603-7.5.

3. Marked to indicate transmission performance.

F. Jacks and Jack Assemblies:

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-4

1. Female; eight position; modular; fixed telecommunications connector designed for termination of a single four -pair 100- ohm unshielded or shielded balanced twisted pair cable.

2. Designed to snap-in to a patch panel or faceplate.

3. Standards:
a. Category 5e, unshielded balanced twisted pair cable shall comply with IEC 60603-7-2.
b. Category 5e, shielded balanced twisted pair cable shall comply with IEC 60603-7-3.
c. Category 6, unshielded balanced twisted pair cable shall comply with IEC 60603-7-4.
d. Category 6, shielded balanced twisted pair cable shall comply with IEC 60603-7.5.
e. Category 6a, unshielded balanced twisted pair cable shall comply with IEC 60603-7-41.
f. Category 6a, shielded balanced twisted pair cable shall comply with IEC 60603-7.51.

4. Marked to indicate transmission performance.

G. Faceplate:

1. Four port, vertical single-gang faceplates designed to mount to single-gang wall boxes.

2. Ten port, vertical double- gang faceplates designed to mount to double- gang wall boxes.

3. Plastic Faceplate: High-impact plastic.

4. Metal Faceplate: Stainless steel.

5. For use with snap -in jacks accommodating any combination of balanced twisted pair, optical fiber, and coaxial work area cords. a. Flush mounting jacks, positioning the cord at a 45-degree angle.

H. Legend:

1. Machine printed, in the field, using adhesive-tape label.

2. Snap-in, clear-label covers and machine-printed paper inserts.

2.06 LOW-VOLTAGE CONTROL CABLE
A. Paired Cable: NFPA 70, Type CMG.

1. Multi-pair, twisted, No. 16 AWG, stranded (19x29) tinned- copper conductors.

2. PVC insulation.

3. Unshielded.

4. PVC jacket.

5. Flame Resistance: Comply with UL 1685.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-5

B. Plenum-Rated, Paired Cable: NFPA 70, Type CMP.

1. Multi-pair, twisted, No. 16 AWG, stranded (19x29) tinned- copper conductors.

2. PVC insulation.

3. Unshielded.

4. PVC jacket.

5. Flame Resistance: Comply with NFPA 262.

2.07 CONTROL-CIRCUIT CONDUCTORS
A. Class 1 Control Circuits: Stranded copper, Type THHN/THWN -2, complying with UL 83 in raceway, or Type THW, complying with UL 83 in raceway, or Type XHHW- 2, complying with UL 44 in raceway , or Type TC, complying with UL 1277 in raceway.

B. Class 2 Control Circuits: Stranded copper, [Type THHN/THWN-2, complying with UL 83 in raceway, or Type XHHW-2, complying with UL 44 in raceway, or power- limited cable, concealed in building finishes , or power-limited tray cable, in cable tray.

C. Class 3 Remote -Control and Signal Circuits: Stranded copper, Type THHN/THWN-2, complying with UL 83 in raceway , or Type XHHW-2, complying with UL 44 in raceway , or power-limited cable, concealed in building finishes , or power-limited tray cable, in cable tray, or Type TW or Type TF, complying with UL 83, in raceway.

D. Class 2 Control Circuits and Class 3 Remote -Control and Signal Circuits That Supply Critical Circuits: Circuit Integrity (CI) cable.

1. Smoke control signaling and control circuits.

2.08 SOURCE QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to evaluate cables.

B. Factory test twisted pair cables according to TIA-568-C.2.

C. Cable will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Test cables on receipt at Project site.

1. Test each pair of twisted pair cable for open and short circuits.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-6

3.02 INSTALLATION OF RACEWAYS AND BOXES
A. Comply with requirements for boxes, conduits, and wireways as supplemented or modified in this Section.

1. Outlet boxes shall be no smaller than 2 inches (50 mm) wide, 3 inches (75 mm) high, and 2-1/2 inches (64 mm) deep.

2. Outlet boxes for cables shall be no smaller than 4 inches (102 mm) square by [1-1/2 inches (38 mm)] [2-1/8 inches (53 mm)] deep with extension ring sized to bring edge of ring to within 1/8 inch (3.1 mm) of the finished wall surface.

3. Flexible metal conduit shall not be used.

B. Comply with TIA -569-D for pull -box sizing and length of conduit and number of bends between pull points.

C. Install manufactured conduit sweeps and long-radius elbows if possible.

D. Raceway Installation in Equipment Rooms:

1. Position conduit ends adjacent to a corner on backboard if a single piece of plywood is installed, or in the corner of the room if multiple sheets of plywood are installed around perimeter walls of the room.

2. Install cable trays to route cables if conduits cannot be located in these positions.

3. Secure conduits to backboard if entering the room from overhead.

4. Extend conduits 3 inches (75 mm) above finished floor.

5. Install metal conduits with grounding bushings and connect with grounding conductor to grounding system.

E. Backboards: Install backboards with 96- inch (2440-mm) dimension vertical. Butt adjacent sheets tightly and form smooth gap-free corners and joints.

3.03 INSTALLATION OF CONDUCTORS AND CABLES
A. Comply with NECA 1.

B. General Requirements for Cabling:

1. Comply with TIA-568-C Series of standards.

2. Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems."

3. Terminate all conductors; no cable shall contain unterminated elements.

Make terminations only at indicated outlets, terminals, and cross -connect and patch panels.

4. Cables may not be spliced and shall be continuous from terminal to terminal. Do not splice cable between termination, tap, or junction points.

5. Cables serving a common system may be grouped in a common raceway.

Install network cabling and control wiring and cable in separate raceway from power wiring. Do not group conductors from different systems or different voltages.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-7

6. Secure and support cables at intervals not exceeding 30 inches (760 mm) and not more than 6 inches (150 mm) from cabinets, boxes, fittings, outlets, racks, frames, and terminals.

7. Bundle, lace, and train conductors to terminal points without exceeding manufacturer's limitations on bending radii, but not less than radii specified in BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems." Install lacing bars and distribution spools.

8. Do not install bruised, kinked, scored, deformed, or abraded cable.

Remove and discard cable if damaged during installation and replace it with new cable.

9. Cold-Weather Installation: Bring cable to room temperature before dereeling. Do not use heat lamps for heating.

10. Pulling Cable: Comply with BICSI ITSIMM, Ch. 5, "Copper Structured Cabling Systems." Monitor cable pull tensions.

11. Support: Do not allow cables to lie on removable ceiling tiles.

12. Secure: Fasten securely in place with hardware specifically designed and installed so as to not damage cables.

13. Provide strain relief.

14. Keep runs short. Allow extra length for connecting to terminals. Do not bend cables in a radius less than 10 times the cable OD. Use sleeves or grommets to protect cables from vibration at points where they pass around sharp corners and through penetrations.

15. Ground wire shall be copper, and grounding methods shall comply with IEEE C2. Demonstrate ground resistance.

C. Balanced Twisted Pair Cable Installation:

1. Comply with TIA-568-C.2.

2. Do not untwist balanced twisted pair cables more than 1/2 inch (12 mm) at the point of termination to maintain cable geometry.

D. Installation of Control-Circuit Conductors:

1. Install wiring in raceways.

2. Use insulated spade lugs for wire and cable connection to screw terminals.

E. Open-Cable Installation:

1. Install cabling with horizontal and vertical cable guides in telecommunications spaces with terminating hardware and interconnection equipment.

2. Suspend copper cable not in a wireway or pathway a minimum of 8 inches (200 mm) above ceilings by cable supports not more than 30 inches (760 mm) apart.

3. Cable shall not be run through or on structural members or in contact with pipes, ducts, or other potentially damaging items. Do not run cables between structural members and corrugated panels.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-8

F. Installation of Cable Routed Exposed under Raised Floors:

1. Install plenum-rated cable only.

2. Install cabling after the flooring system has been installed in raised floor areas.

3. Below each feed point, neatly coil a minimum of 72 inches (1830 mm) of cable in a coil not less than 12 inches (305 mm) in diameter.

G. Separation from EMI Sources:

1. Comply with BICSI TDMM and TIA-569-D recommendations for separating unshielded copper voice and data communications cable from potential EMI sources including electrical power lines and equipment.

2. Separation between open communications cables or cables in nonmetallic raceways and unshielded power conductors and electrical equipment shall be as follows:
a. Electrical Equipment or Circuit Rating Less Than 2 kVA: A minimum of 5 inches (127 mm).
b. Electrical Equipment or Circuit Rating between 2 and 5 kVA: A minimum of 12 inches (305 mm).
c. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 24 inches (600 mm).

3. Separation between communications cables in grounded metallic raceways and unshielded power lines or electrical equipment shall be as follows:
a. Electrical Equipment or Circuit Rating Less Than 2 kVA: A minimum of 2-1/2 inches (64 mm).
b. Electrical Equipment or Circuit Rating between 2 and 5 kVA: A minimum of 6 inches (150 mm).
c. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 12 inches (305 mm).

4. Separation between communications cables in grounded metallic raceways and power lines and electrical equipment located in grounded metallic conduits or enclosures shall be as follows:
a. Electrical Equipment or Circuit Rating Less Than 2 kVA: No requirement.
b. Electrical Equipment or Circuit Rating between 2 and 5 kVA: A minimum of 3 inches (75 mm).
c. Electrical Equipment or Circuit Rating More Than 5 kVA: A minimum of 6 inches (150 mm).

5. Separation between Communications Cables and Electrical Motors and Transformers, 5 kVA or 5 HP and Larger: A minimum of 48 inches (1200 mm).

6. Separation between Communications Cables and Fluorescent Fixtures: A minimum of 5 inches (127 mm).

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-9

3.04 REMOVAL OF CONDUCTORS AND CABLES
A. Remove abandoned conductors and cables. Abandoned conductors and cables are those installed that are not terminated at equipment and are not identified with a tag for future use.

3.05 CONTROL-CIRCUIT CONDUCTORS
A. Minimum Conductor Sizes:

1. Class 1 remote-control and signal circuits; No 14 AWG.

2. Class 2 low-energy, remote-control, and signal circuits; No. 16 AWG.

3. Class 3 low-energy, remote-control, alarm, and signal circuits; No 12 AWG.

3.06 FIRESTOPPING
A. Comply with TIA-569-D, Annex A, "Firestopping."
B. Comply with BICSI TDMM, "Firestopping" Chapter.

3.07 GROUNDING
A. For data communication wiring, comply with TIA -607-B and with BICSI TDMM, "Bonding and Grounding (Earthing)" Chapter.

3.08 IDENTIFICATION
A. Identify data and communications system components, wiring, and cabling according to TIA-606-B; label printers shall use label stocks, laminating adhesives, and inks complying with UL 969.

B. Identify each wire on each end and at each terminal with a number -coded identification tag. Each wire shall have a unique tag.

3.09 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.

B. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

C. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

D. Perform tests and inspections with the assistance of a factory -authorized service representative.

E. Tests and Inspections:

1. Visually inspect cable jacket materials for UL or third- party certification markings. Inspect cabling terminations to confirm color -coding for pin assignments, and inspect cabling connections to confirm compliance with TIA-568-C.1.

City of Camarillo CONTROL-VOLTAGE ELECTRICAL POWER CABLES CH-5067-2 260523-10

2. Visually inspect cable placement, cable termination, grounding and bonding, equipment and patch cords, and labeling of all components.

3. Test cabling for direct -current loop resistance, shorts, opens, intermittent faults, and polarity between conductors. Test operation of shorting bars in connection blocks. Test cables after termination, but not after cross - connection.
a. Test instruments shall meet or exceed applicable requirements in TIA- 568-C.2. Perform tests with a tester that complies with performance requirements in its "Test Instruments (Normative)" Annex, complying with measurement accuracy specified in its "Measurement Accuracy (Informative)" Annex. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.

F. Document data for each measurement. Print data for submittals in a summary report that is formatted using Table 10.1 in BICSI TDMM as a guide or transfer the data from the instrument to the computer, save as text files, print, and submit.

G. End-to-end cabling will be considered defective if it does not pass tests and inspections.

H. Prepare test and inspection reports.

END OF SECTION 260523 - CONTROL-VOLTAGE ELECTRICAL POWER CABLES City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-1

SECTION 262300 – LOW-VOLTAGE SWITCHGEAR
PART 1 - GENERAL

1.01 SUMMARY
A. Section includes metal -enclosed, low- voltage switchgear, circuit breakers and metering and control accessories.

1. Switchgear structure.

2. Requirements for indoor switchgear.

3. Requirements for outdoor switchgear.

4. Circuit breakers.

5. Arc-flash limiting feeder circuit breakers.

6. Zone-selective interlocking.

7. Network protectors.

8. Surge suppression.

9. Control power supply, 120-V ac.

10. Control power supply, 24-V dc.

11. Instrumentation and control.

12. Maintenance tools.

13. Identification.

14. Source quality control.

1.02 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for switchgear.

2. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.

B. Shop Drawings: For low-voltage switchgear.

1. System Power One- Line Diagrams: Depict power sources, feeders, distribution components, and major loads. Include as -built data for low - voltage power switchgear and connections as follows:
a. Frame size of each circuit breaker.
b. Trip rating for each circuit breaker.
c. Conduit and wire size for each feeder.

2. Include plans, elevations, sections, shipping splits, and mounting details.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-2

3. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

4. Wire Termination Diagrams and Schedules: Include diagrams for power, signal, and control wiring. Identify terminals and wiring designations and color-codes to facilitate installation, operation, and maintenance. Indicate recommended types, wire sizes, and circuiting arrangements for field- installed wiring, and show circuit protection features. Differentiate between manufacturer-installed and field-installed wiring.

5. Block Diagram: Show interconnections between components specified in this Section and devices furnished with power distribution system components. Indicate data communication paths and identify networks, data buses, data gateways, concentrators, and other devices used.

Describe characteristics of network and other data communication lines.

6. Indicate short-time and short-circuit current rating of switchgear assembly.

7. Include features, characteristics, ratings, and factory settings of individual overcurrent protective devices and auxiliary components.

1.03 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Floor plans showing dimensioned layout, required working clearances, and required area above and around the low-voltage switchgear where pipe and ducts are prohibited.

B. Qualification Data: For testing agency.

C. Seismic Qualification Data: Certificates, for switchgear, accessories, and components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

D. Product Test Reports: Submit evidence that switchgear is compatible with connected monitoring and control devices and systems.

1. Show interconnecting signal and control wiring, and interface devices to show compatibility of meters.

2. For reporting and billing interfaces and adapters, list network protocols and provide statements from manufacturers that input and output devices comply with interoperability requirements of the protocol.

E. Source quality-control reports.

F. Field quality-control reports.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-3

1.04 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For equipment to include in emergency, operation, and maintenance manuals.

1. Include the following:
a. Time-current curves (on full- size logarithmic paper) of the main secondary breaker and largest secondary feeder device.
b. Lists of spare parts and replacement components recommended for storage at Project site.
c. Detailed instructions covering operation under both normal and abnormal conditions.
d. Hard copies of manufacturer's operating specifications, user's guides for software and hardware, and PDF files on a USB storage device of hard-copy Submittal.

2. Software and Firmware Operational Documentation:
a. Software operating and upgrade manuals.
b. Program Software Backup: On USB media, complete with data files. c. Device address list.
d. Printout of software application and graphic screens.

1.05 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Fuses: One for every three of each type and rating, but no fewer than three of each for the following:
a. Potential transformers.
b. Control power circuits.

B. System Power Riser Diagram: For each switchgear, post on the wall at each location, using non-fugitive ink on high-quality paper.

1.06 QUALITY ASSURANCE
A. Testing Agency Qualifications: Accredited by NETA.

1. Testing Agency's Field Supervisor: Certified by NETA to supervise on-site testing.

1.07 DELIVERY, STORAGE, AND HANDLING
A. Indoor Switchgear Storage: Store in a dry, clean location, placed on a level surface to prevent strain and possible distortion. During the construction period, provide protection against dust, dirt, falling objects, dripping water, water, excessive moisture, and other possible causes of damage to the equipment. Any temporary covering shall not restrict ventilation and may not be removed until the equipment is ready for installation.

B. When provisions for temporary power connection are provided as part of the switchgear assembly, provisions shall be included to prevent energization of City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-4

primary buses or connections by means of backfeed through fuses or control power transformers connected to the primary buses or connections.

C. If outdoor switchgear cannot be installed and energized, temporary power shall be provided for the operation of the space heaters provided to prevent condensation of moisture within the housing.

D. Ventilation openings shall be left open to permit proper air circulation.

PART 2 - PRODUCTS

2.01 SYSTEM DESCRIPTION
A. Description: Metal-enclosed, low-voltage switchgear circuit breakers, accessories and metering components.

1. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

2. Comply with IEEE C37.20.1.

3. Listed and labeled as complying with UL 1558.

4. Listed and labeled for use as service entrance equipment.

2.02 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. CAT.

2. Schneider Electric.

3. Eaton.

4. ABB.

2.03 PERFORMANCE REQUIREMENTS
A. Seismic Performance: Switchgear shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1. The term "withstand" means "the assembly will remain in place without separation of any parts when subjected to the seismic forces specified and the assembly will be fully operational after the seismic event."

2. Component Importance Factor: 1.5.

B. Capacities and Characteristics:

1. Nominal System Voltage: As indicated on plan.

2. Rated Maximum Voltage: As provided by equipment manufacturer for nominal system voltage.

3. Rated Power Frequency: 60 Hz.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-5

4. Rated Continuous Current:
a. Main-Bus Continuous: As indicated on plan.

5. Rated Short-Circuit Withstand Current: As required fault current letter from Utility.

2.04 SWITCHGEAR STRUCTURE
A. Bus isolation barriers shall be arranged to isolate line bus from load bus at main circuit breaker. Extend section barrier between main circuit breakers to the rear of the section.

B. Allow the following circuit -breaker functions to be performed when the compartment door is closed:

1. Operate manual charging system.

2. Open and close the circuit breaker.

3. Examine and adjust the trip unit.

4. Read the breaker nameplate.

C. Install instrument compartments when additional space is required for metering and instrumentation. Allow for routing of instrumentation, control and communications wires, and cables.

D. Switchgear Bus:

1. Use bus bars to connect compartments and vertical sections. Cable connections are not permitted.

2. Main Phase Bus: Uniform capacity the entire length of assembly.

3. Neutral Bus: 100 percent of phase- bus ampacity unless otherwise indicated. Equip bus with pressure -connector terminations for outgoing circuit neutral conductors. Include braces for neutral -bus extensions for busway feeders.

4. Ground Bus: Uniform capacity the entire length of assembly, with pressure connector terminations for feeder and branch -circuit ground conductors, minimum size 1/4 by 2 inches (6 by 50 mm).

5. Vertical Section Bus Size: Comply with IEEE C37.20.1, including allowance for spare circuit breakers and spaces for future circuit breakers.

6. Bus Material and Connections:
a. Phase- and Neutral-Bus Material: Hard -drawn copper of 98 percent minimum conductivity, with copper feeder circuit- breaker line connections.
b. Phase- and Neutral-Bus Material: Silver - or tin-plated, high-strength, electrical-grade aluminum alloy, with copper or tin- plated aluminum circuit-breaker line connections.
c. Phase- and Neutral-Bus Material: Hard -drawn copper of 98 percent minimum conductivity or tin -plated, high- strength, electrical- grade aluminum alloy.
d. Use silver-plated copper or tin-plated aluminum for connecting circuit- breaker line to aluminum bus.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-6

e. Use copper for connecting circuit-breaker line to copper bus. f. Contact Surfaces of Buses: Silver plated.
g. Feeder Circuit -Breaker Load Terminals: Silver -plated copper bus extensions equipped with pressure connectors for outgoing circuit conductors.

7. Neutral Disconnect Link: Bolted, uninsulated, bus, arranged to connect neutral bus to ground bus.

8. Provide for future extensions from either end of main phase, neutral, and ground bus by means of predrilled bolt-holes and connecting links.

E. Auxiliary Compartments: Match and align with basic switchgear assembly. Include the following:

1. Utility metering compartment that complies with utility -company requirements.

2. Bus transition sections.

3. Incoming-line pull sections.

4. Hinged front panels for access to metering, accessory, and blank compartments.

2.05 ADDITIONAL REQUIREMENTS FOR INDOOR SWITCHGEAR
A. Enclosure Rating: Indoor.

B. Enclosure Material: Steel.

C. Enclosure Finish: IEEE C37.20.1, manufacturer's standard gray finish over a rust- inhibiting primer on phosphatizing-treated metal surfaces.

D. Enclosure Rear Panels: Removable and hinged, to allow access to rear interior of switchgear.

2.06 ADDITIONAL REQUIREMENTS FOR OUTDOOR SWITCHGEAR
A. Outdoor Enclosure Rating: UL 1558.

B. Outdoor Enclosure Description: Weatherproof; integral structural-steel base frame with factory-applied asphaltic undercoating
C. Outdoor Enclosure Material: Steel 12-gage, ASTM A 240, Type 304 or 304L stainless steel.

D. Outdoor Enclosure Finish: Factory-applied finish in manufacturer's standard color, including under surfaces treated with corrosion-resistant undercoating.

E. Outdoor Enclosure Finish: Factory -applied, corrosion- resistant finish in manufacturer's standard color that withstands 120 hours of exposure to salt-spray test specified in ASTM B 117, without loss of paint or release of adhesion of the paint primer coat to the metal surface in excess of 1/16 inch (1.6 mm) from the test mark. The scribed test mark and test evaluation shall be conducted according to ASTM D 1654, with a rating of not less than 7 per Table 1 (Procedure A). Cut edges or otherwise damaged surfac es of hot -dip galvanized sheet steel or mill - City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-7

galvanized sheet steel shall be coated with a manufacturer's standard zinc -rich paint.

F. Outdoor Enclosure Finish: Front and rear doors shall be provided with stainless - steel padlockable vault handles with a three- point catch. Bases, frames, and channels of enclosure shall be corrosion resistant, fabricated of ASTM A 240 Type 304 or 304L stainless steel. Base shall include any part of enclosure that is within 3 inches (75 mm) of the concrete pad. Coat enclosure, including bases, shall be ASTM D 1535 light gray No. 61 or No. 49. Coating system shall comply with IEEE C57.12.29 for stainless steel.

G. Features:

1. Comply with locally adopted codes for gravity and wind loads. Structural design and anchorage adequate to resist loads imposed by 125-mph (200- km/h) wind.

2. Sloping, standing-seam type, insulated roof panels.

3. Mount each shipping group on an integral base frame as a complete weatherproof unit.

4. Aisle-Less Construction: Each vertical section shall have the following:
a. Hinged front door with padlocking provisions.
b. Interior light with switch.
c. Weatherproof duplex receptacle.
d. With draft-stop where busway exits the vertical section. e. Vertical Section Space Conditioning: Provide outside-air openings with insect and rodent screens and filters; arranged to permit air circulation while excluding insects, rodents, and exterior dust. Provide thermostatically controlled space heaters operating at one-half or less of rated voltage.

2.07 ISLANDING RELAY
A. Islanding relay shall be compatible with Microgrid Controller and be programmed to match the requirements set forth by the Microgrid Controller vendor.

1. Islanding relay shall be Schweitzer Engineering Laboratories SEL-751 or approved equivalent.

2.08 CIRCUIT BREAKERS
A. With electromechanical or electronic trip devices. Comply with IEEE C37.13, IEEE C37.13a, and UL 1066.

B. Ratings: For continuous, interrupting, and short-time current ratings for each circuit breaker; voltage and frequency ratings same as switchgear. Comply with IEEE C37.16.

C. Operator Display: Located on the face of the circuit breaker.

1. Electrical operation buttons to open and close the circuit breaker. Provide a clear lockable cover over the buttons.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-8

D. Overcurrent Protective Tripping: Microprocessor -based, programmable, time- current shaping adjustments; complete with current transformers and sensors and the following features:

1. Programmable functions independent of each other in both action and adjustment.
a. Long-time setting.
b. Long-time-delay with selectable I2T or I4T curve shaping. c. Short-time setting.
d. Short-time-delay with flat or selectable I2T curve shaping. e. Instantaneous trip.

2. Field-adjustable, time-current characteristics.

3. Current Adjustability: Dial settings and rating plugs on trip units, or sensors on circuit breakers, or a combination of these methods.

4. Three bands, minimum, for long- time- and short -time-delay functions; marked "minimum," "intermediate," and "maximum."

5. Pickup Points:

6. Five minimum, for long- time- and short -time-trip functions. Equip short - time-trip function for switchable I-squared-T operation.

7. Five minimum, for instantaneous-trip functions.

E. Ground-Fault Protection:

1. Ground-fault protection with at least three short -time-delay settings and three trip-time-delay bands; adjustable current pickup.

2. Trip Indication: Labeled, battery -powered lights or mechanical targets on trip device to indicate type of fault.

3. Test Form: Provide each ground -fault relay with information sheets describing system-testing instructions, and with a test form; comply with UL 1558.

F. Undervoltage Trip Devices: Instantaneous, with adjustable pickup voltage.

G. Undervoltage Trip Devices: Adjustable time-delay and pickup voltage.

H. Shunt-Trip Devices.

I. Metering:

1. Accuracy: 1.0 percent of reading, complying with ANSI C12.20.

2. Values shall be rms average over a period of one second. a. Current: Each phase, neutral and three-phase average. b. Voltage: L -L for each phase, L -L three -phase average, L -N each phase, and L-N three-phase average.
c. Active Power (kW): three-phase total.
d. Reactive Power (kVAr): three-phase total.
e. Apparent Power (kVA): three-phase total.
f. Power Factor: three-phase total.
g. Active Energy (kWh): Three-phase total.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-9

J. Auxiliary Contacts:

1. Contacts and switches required for normal circuit -breaker operation, sufficient for interlocking and remote indication of circuit-breaker position.

2.09 ARC-FLASH LIMITING FEEDER CIRCUIT BREAKERS
A. Equip the arc -flash limiting feeder circuit breakers with Arc -Flash Maintenance Setting switch for use as a temporary arc -flash incident energy-reduction device during maintenance activities on that feeder.

1. Provide a manual switch on the compartment door to switch the circuit - breaker short-time tripping characteristics to instantaneous with minimum pickup setting, to reduce the danger from potential arc-flash at downstream equipment.

2. Provide a lock feature for the switch so that it may be locked in either the off or on maintenance-mode position.

2.10 ZONE-SELECTIVE INTERLOCKING
A. Trip units for indicated circuit breakers shall include zone-interlocking capability for the short-time delay and ground-fault delay trip functions for system coordination and arc energy reduction. Zone-interlocking system shall restrain the tripping of an upstream circuit breaker and allow the circuit breaker closest to the fault to trip with no intentional time delay. In the event that the downstream breaker does not trip, the upstream breaker shall trip after the preset time delay.

2.11 SURGE SUPPRESSION
A. Surge Suppression: Factory installed as an integral part of low-voltage switchgear, complying with UL 1449 SPD, Type 1, with the following features and accessories:

1. Integral disconnect switch.

2. Internal thermal protection that disconnects the SPD before damaging internal suppressor components.

3. Indicator light display for protection status.

4. Form-C contacts rated at 5 -A 250-V ac, one NO and one NC, for remote monitoring of protection status.

5. Surge counter.

B. Surge Suppression: Field- mounted surge suppressors complying with Section 264313 "Surge Protection for Low -Voltage Electrical Power Circuits." Include the following features and accessories:

1. Integral disconnect switch.

2. Internal thermal protection that disconnects the SPD before damaging internal suppressor components.

3. Indicator light display for protection status.

4. Form-C contacts rated at 5 -A 250-V ac, one NO and one NC, for remote monitoring of protection status.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-10

5. Surge counter.

2.12 CONTROL POWER SUPPLY, 120-V AC
A. Control Power Transformer: Supply 120-V control circuits through dry-type control power transformers, include secondary disconnect devices.

1. Place transformers larger than 3 kVA in separate compartments at the bottom of the vertical section, including the related primary and secondary fuses.

2. Two control power transformers in separate compartments with necessary interlocking relays; each transformer connected to line side of associated main circuit breaker.
a. Secondary windings connected through relay(s) to control bus to affect an automatic transfer scheme.
b. Secondary windings connected through an internal automatic transfer switch to switchgear control power bus.

3. Control Power Fuses: Primary and secondary fuses provide current-limiting and overload protection.

2.13 CONTROL POWER SUPPLY, 24-V DC
A. System Requirements: Battery shall have number of cells and ampere- hour capacity based on an initial specific gravity of 1.210 at 25 deg C with electrolyte at normal level and minimum ambient temperature of 13 deg C. Cycle battery before shipment to guaran tee rated capacity on installation. Arrange battery to operate ungrounded. Battery system capacity shall be as recommended by switchgear manufacturer to operate the circuit breakers for intended duty.

B. Battery: Vented NiCd, batteries, with battery disconnect and overcurrent protective device.

C. Rack: Two-step rack with electrical connections between battery cells and between rows of cells; include two flexible connectors with bolted-type terminals for output leads.

2.14 INSTRUMENTATION AND CONTROL
A. Power Distribution Equipment shall be web enabled, direct connected to the Local Area Network (LAN) or Intranet.

B. Ethernet Connectivity:

1. Install a multipoint, RS-485 Modbus serial communications network within the switchgear to interconnect all breaker trip units, protective relays, drives, and metering devices equipped with communications.

2. Serial communications network shall be wired to an Ethernet gateway in the switchgear. Gateway shall be web enabled, with integral network port and embedded web server with factory -configured firmware and HTML- formatted web pages for viewing of power monitoring and equipment status information from switchgear devices equipped with digital communication ports.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-11

3. LAN shall consist of a multipoint, RS -485 Modbus serial communication network to interconnect all breaker trip units, protective relays, drives, and metering devices equipped with communications. Serial communication network shall be connected to Ethernet server that functions as a gateway and server.

4. Server Configuration:
a. Initial network parameters set using a standard web browser. Connect via a local operator interface, or an RJ-45 port accessible from front of equipment.
b. Network server shall be factory programmed with embedded HTML - formatted web pages that are user configurable and that provide detailed communication diagnostic information for serial and Ethernet ports as status of RS-485 network; with internal memory management information pages for viewing using a standard web browser. c. Password-protected login, with password administration accessible from the LAN using a standard web browser.
d. Operating Software: Suitable for local access; firewall protected.

5. All serial communications devices within the equipment shall be addressed at the factory and tested.

C. Instrument Transformers: Comply with IEEE C57.13. Instrument transformers may not be used to power space conditioning equipment associated with outdoor switchgear, of for power to convenience receptacles and lighting.

1. Potential Transformers: Secondary voltage rating of 120 V and NEMA C12.11 Accuracy class of 0.3 with burdens of W, X, and Y.

2. Current Transformers: Burden and Accuracy class suitable for connected relays, meters, and instruments.

3. Meters:
a. Instantaneous, rms:
i. Current: Each phase, neutral, and three-phase average. ii. Voltage: L-L for each phase, L-L three-phase average, L-N each phase, and L-N three-phase average.
iii. Active Power (kW): three-phase total.
iv. Reactive Power (kVAr): three-phase total.
v. Apparent Power (kVA): three-phase total.
vi. Power Factor: three-phase total.
b. Energy:
i. Active Energy (kWh): Three-phase total.
c. Demand, Derived from Instantaneous rms Meters:
i. Current: Present and maximum.
ii. Active: Present and maximum.
iii. Reactive: Present and maximum.
iv. Apparent: Present and maximum/
d. Power Quality Measurements:

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-12

i. THD: Current and voltage from measurements simultaneously from the same cycle, as can be calculated from the specified sampling rate.

4. I/O: Two optically isolated digital outputs for KYZ pulsing or control. Output signal characteristics shall be 150 mA at 200 V.
a. KYZ Pulse: Generate standard KYZ pulses for a user- defined increment of metered active energy as follows:
i. User-defined pulse output, associated with kWh.
ii. User-defined pulse output, associated with kVArh.

5. Capacities and Characteristics:
a. Circuit Connections:
i. Voltage: Measurement autoranging, 60- to 400-V ac L-N. Meter impedance shall be 2 Mohms L-L or greater.
ii. Overload Tolerance: 1500-V ac, rms, continuously.
iii. Current: Connect to instrument -grade current transformer with a metering range of 5 mA to 6 A. Overcurrent tolerance of the instrument shall be 10 A continuous, 50 A for 10 seconds once per hour, and 120 A for one second per hour.
iv. Frequency: 45 to 65 Hz.
v. Time: Input from a GPS receiver to synchronize the internal clock of the instrument and to time-synchronize this instrument with the network to a deviation of not greater than 1 ms.

2.15 POWER TRANSFER CONFIGURATIONS
A. The Microgrid Controller and Islanding Relay shall coordinate:

1. Islanding of the main switchgear from the grid using the motor operated main breaker.

2. Isolation of the PV System from the Generator when the generator is operating (utilizing motor operated feeder breakers).

3. Future BESS operation with BESS acting as grid forming source when the system is islanded and grid following when the system is grid nnected

2.16 DIFFERENTIAL GROUND-FAULT PROTECTION
A. Description: Ground-fault protection system for three-phase, four-wire switchgear having multiple sources shall be devised by manufacturer to insure that the main breaker operates properly in normal and emergency conditions. Switchgear shall include additional current transformers, ground-fault relays, interlocks, wiring, and accessories to avoid nuisance tripping of circuit breakers connected to the main bus of the switchgear. Ensure that the following occurs on the main bus:

1. A ground fault at any location in the switchgear shall trip the system.

2. Combination of normal current flow and ground-fault current flow shall trip the system.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-13

3. Circulating currents through the neutral due to multiple grounds and sources external to the immediate low-voltage power sources shall not trip the system.

4. System shall not trip if there is no ground fault, during normal current flow.

5. System shall not trip due to large single-phase currents.

B. Relays: Comply with IEEE C37.90, with test blocks and plugs.

C. Control Wiring:

1. Factory installed, complete with bundling, lacing, and protection.

2. Provide flexible conductors for No. 8 AWG and smaller, for conductors across hinges and for conductors for interconnections between shipping units.

3. Install plugs in control wiring at shipping splits.

2.17 MAINTENANCE TOOLS
A. Description: Furnish tools and miscellaneous items required for circuit-breaker and switchgear test, inspection, maintenance, and operation.

B. Include the following:

1. Portable test set for testing all functions of circuit-breaker, solid-state trip devices without removal from switchgear.

2. Relay and meter test plugs suitable for testing switchgear meters and switchgear class relays.

3. Portable test set for testing all functions of circuit- breaker, solid-state trip devices without removal from switchgear.

4. Racking handle to move circuit breaker manually between connected and disconnected positions.

C. Spare-Fuse Cabinet: Identified and compartmented steel box or cabinet with lockable door.

D. Storage for Manual: Include a rack or holder, near the operating instructions, for a copy of maintenance manual.

2.18 IDENTIFICATION
A. Compartment Nameplates: Preprinted aluminum signs for each compartment, mounted with corrosion-resistant screws.

B. Arc-Flash Warning Labels:

1. Produce a 3.5-by-5-inch (76-by-127-mm) self-adhesive equipment label for each work location included in the analysis.

2. Produce a 3.5-by-5-inch (76-by-127-mm) self-adhesive equipment label for each work location included in the analysis. Labels shall be machine printed, with no field-applied markings.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-14

a. Label shall have an orange header with the wording, "WARNING, ARC-FLASH HAZARD," and shall include the following information taken directly from the arc-flash hazard analysis:
i. Location designation.
ii. Nominal voltage.
iii. Flash protection boundary.
iv. Hazard risk category.
v. Incident energy.
vi. Working distance.
vii. Engineering report number, revision number, and issue date. b. Labels shall be machine printed, with no field-applied markings.

2.19 SOURCE QUALITY CONTROL
A. Testing: Test and inspect low-voltage switchgear according to IEEE C37.20.1.

1. Test the effectiveness of grounding of each metal -case instrument transformer frame or case.

2. Verify that control wiring is correct by verifying continuity. Perform electrical operation of component devices to ensure that they function properly and in the intended sequence.

3. Perform the control wiring insulation tests.

4. Verify correct polarity of the connections between instrument transformers and meters and relays.

B. All serial communications devices within the equipment shall be addressed at the factory and tested to verify reliable communications to the equipment's Ethernet gateway.

C. Low-voltage switchgear assembly will be considered defective if it does not pass tests and inspections.

D. Prepare test and inspection reports.

E. Owner will witness required factory tests. Notify Architect at least 14 days before date of tests and indicate their approximate duration.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Examine areas and space conditions for compliance with requirements for secondary unit substations and other conditions affecting performance of the Work.

B. Examine roughing-in of conduits and grounding systems to verify the following:

1. Wiring entries comply with layout requirements.

2. Entries are within conduit-entry tolerances specified by manufacturer, and no feeders will have to cross the section barriers to reach load or line lugs.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-15

C. Examine walls, floors, roofs, and concrete bases for suitable conditions where switchgear will be installed.

D. Verify that ground connections are in place. Maximum ground resistance shall be five ohms at the switchgear location.

E. On delivery of switchgear and prior to unloading, inspect equipment for damage.

1. Verify that tie rods and chains are undamaged and tight, and that blocking and bracing are tight.

2. Verify that there is no evidence of load shifting in transit, and that readings from transportation shock recorders, if equipped, are within manufacturer's written instructions.

3. Examine switchgear for external damage, including dents or scratches in doors and sill, and termination provisions.

4. Compare switchgear and accessories received with the bill of materials to verify that the shipment is complete. Verify that switchgear and accessories comply with manufacturer's written instructions and Shop Drawings. If the shipment is incomplete or does not comply with Project requirements, notify manufacturer in writing immediately.

5. Unload switchgear, observing packing label warnings and handling instructions.

6. Open compartment doors and inspect components for damage or displaced parts, loose or broken connections, cracked or chipped insulators, bent mounting flanges, dirt or foreign material, and water or moisture.

F. Handling:

1. Handle switchgear, according to manufacturer's written instructions; avoid damage to the enclosure, termination compartments, base, frame, tank, and internal components. Do not subject switchgear to impact, jolting, jarring, or rough handling.

2. Protect switchgear compartments against the entrance of dust, rain, and snow.

3. Transport switchgear upright, to avoid internal stresses on equipment mounting assemblies. Do not tilt or tip switchgear.

4. Use spreaders or a lifting beam to obtain a vertical lift and to protect switchgear from straps bearing against the enclosure. Lifting cable pull angles may not be greater than 15 degrees from vertical.

5. Do not damage structure when handling switchgear.

G. Proceed with installation only after examinations are complete and unsatisfactory conditions have been corrected.

3.02 INSTALLATION
A. Install switchgear on cast-in-place concrete equipment base(s).

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-16

B. Maintain minimum clearances and workspace at equipment according to manufacturer's written instructions and NFPA 70.

3.03 CONNECTIONS
A. Grounding Connections at Exterior Locations:

1. Install tinned bare copper conductors not smaller than No. 4/0 AWG, for ground conductors buried not less than 30 inches (765 mm) below grade interconnecting the grounding electrodes.

2. Bond surge arrester and neutrals directly to the switchgear enclosure and then to the grounding electrode system with bare copper conductors, sized as indicated.

3. Keep lead lengths as short as practicable with no kinks or sharp bends.

4. Make joints in grounding conductors and loops by exothermic weld or compression connector.

5. Fence and equipment connections shall not be smaller than No. 4 AWG.

6. Ground fence at each gate post and corner post and at intervals not exceeding 10 feet (3 m).

7. Bond each gate section to the fence post using 1/8-by-1-inch (3-by-25-mm) flexible braided copper strap and clamps.

B. Terminate all grounding and bonding conductors on a common equipment grounding terminal on the switchgear enclosure. Install supplemental terminal bars, lugs, and bonding jumpers as required to accommodate the number of conductors for termination.

C. Complete switchgear grounding and surge- protector connections prior to making any other electrical connections.

3.04 IDENTIFICATION
A. Install warning signs as required to comply with OSHA 29 CFR 1910.269.

3.05 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.

B. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

C. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

D. Perform tests and inspections with the assistance of a factory -authorized service representative.

E. Tests and Inspections:

1. Comply with provisions of NFPA 70B, "Testing and Test Methods" Chapter and of NETA ATS.

2. After installing switchgear and after electrical circuitry has been energized, test for compliance with requirements.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-17

3. Perform each visual and mechanical inspection and electrical test stated in NETA ATS. Certify compliance with test parameters.

4. Visual and Mechanical Inspection:
a. Verify that fuse and circuit -breaker sizes and types correspond to Drawings and coordination study.
b. Verify that current and voltage transformer ratios correspond to Drawings.
c. Inspect bolted electrical connections for high resistance using one of the following two methods:
i. Use a low-resistance ohmmeter to compare bolted-connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS, Table 100.12. Bolt -torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12.
d. Confirm correct operation and sequencing of electrical and mechanical interlock systems.
i. Attempt closure on locked- open devices. Attempt to open locked-closed devices.
ii. Make key exchange with devices operated in off -normal positions.
e. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
f. Inspect insulators for evidence of physical damage or contaminated surfaces.
g. Verify correct barrier and shutter installation and operation. h. Exercise active components.
i. Inspect mechanical indicating devices for correct operation. j. Verify that filters are in place and that vents are clear. k. Perform visual and mechanical inspection of instrument transformers according to "Instrument Transformer Field Tests" Paragraph. l. Inspect control power transformers.
i. Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
ii. Verify that primary and secondary fuse or circuit-breaker ratings match Drawings.

5. Electrical Tests:
a. Verify operation of space heaters.
b. Perform phasing checks on double -ended or dual-source switchgear to ensure correct bus phasing from each source.

F. Circuit-Breaker Field Tests:

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-18

1. Visual and Mechanical Inspection:
a. Inspect physical and mechanical condition.
b. Inspect anchorage, alignment, and grounding.
c. Verify that all maintenance devices are available for servicing and operating the breaker.
d. Verify the unit is clean.
e. Verify that the arc chutes are intact.
f. Inspect moving and stationary contacts for condition and alignment. g. Verify that primary and secondary contact wipe and other dimensions vital to satisfactory operation of the breaker are correct. h. Perform mechanical operator and contact alignment tests on both the breaker and its operating mechanism according to manufacturer's published data.
i. Verify cell fit and element alignment.
j. Verify racking mechanism operation.
k. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
l. Perform adjustments for final protective -device settings according to coordination study provided by Owner.
m. Record as-found and as-left operation counter readings.

G. Instrument Transformer Field Tests:

1. Visual and Mechanical Inspection:
a. Verify that equipment nameplate data complies with the Contract Documents.
b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements. d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify that the unit is clean.
f. Inspect bolted electrical connections for high resistance using one of the following two methods:
i. Use a low-resistance ohmmeter to compare bolted-connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS, Table 100.12. Bolt -torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12.
g. Verify that required grounding and shorting connections provide contact.
h. Verify correct operation of transformer withdrawal mechanism and grounding operation.
i. Verify correct primary and secondary fuse sizes for voltage transformers.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-19

j. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.

H. Ground-Resistance Test:

1. Visual and Mechanical Inspection:
a. Verify that ground system complies with the Contract Documents and with NFPA 70, Article 250, "Grounding and Bonding."
b. Inspect physical and mechanical condition. Grounding system electrical and mechanical connections shall be free of corrosion. c. Inspect bolted electrical connections for high resistance using one of the following two methods:
i. Use a low-resistance ohmmeter to compare bolted-connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS, Table 100.12. Bolt -torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12.
d. Inspect anchorage.

2. Electrical Tests:
a. Perform fall-of-potential or alternative test according to IEEE 81 on the main grounding electrode or system. Resistance between the main grounding electrode and ground shall be no more than 5 ohms. b. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, system neutral, and derived neutral points. Investigate point -to-point resistance values that exceed 0.5 ohms. Compare equipment nameplate data with the Contract Documents.
c. Inspect physical and mechanical condition.
d. Inspect bolted electrical connections for high resistance using one of the following two methods:
i. Use a low-resistance ohmmeter to compare bolted-connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS, Table 100.12. Bolt -torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12.

I. Metering Devices Field Tests:

1. Visual and Mechanical Inspection:
a. Inspect physical and mechanical condition.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-20

b. Inspect bolted electrical connections for high resistance using one of the following two methods:
i. Use a low-resistance ohmmeter to compare bolted-connection resistance values to values of similar connections. Investigate values that deviate from those of similar bolted connections by more than 50 percent of the lowest value.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data or NETA ATS, Table 100.12. Bolt -torque levels shall be according to manufacturer's published data. In the absence of manufacturer's published data, use NETA ATS, Table 100.12.
c. Inspect cover gasket, cover glass, condition of spiral spring, disk clearance, contacts, and case shorting contacts, as applicable. d. Verify that the unit is clean.
e. Verify freedom of movement, end play, and alignment of rotating disk(s).

2. Electrical Tests:
a. Verify accuracy of meters at all cardinal points. Meter accuracy shall be according to manufacturer's published data.
b. Calibrate meters according to manufacturer's published data.

Calibration results shall be within manufacturer's published tolerances. c. Verify all instrument multipliers. Instrument multipliers shall be according to system design specifications.
d. Verify that current transformer and voltage transformer secondary circuits are intact. Test results shall confirm the integrity of the secondary circuits of current and voltage transformers.

J. Microprocessor-Based Protective Relay Field Tests:

1. Visual and Mechanical Inspection:
a. Record model number, style number, serial number, firmware revision, software revision, and rated control voltage.
b. Verify operation of LEDs, display, and targets.
c. Record passwords for each access level.
d. Clean the front panel and remove foreign material from the case. e. Check tightness of connections.
f. Verify that the frame is grounded according to manufacturer's written instructions.

2. Electrical Tests:
a. Perform insulation-resistance tests from each circuit to the grounded frame according to manufacturer's published data.
b. Apply voltage or current to analog inputs, and verify correct registration of the relay meter functions.
c. Check functional operation of each element used in the protection scheme as follows:
i. ANSI No. 2/62, Timing Relay:

1. Determine time delay.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-21

2. Verify operation of instantaneous contacts.
ii. ANSI No. 24, Volts/Hertz Relay:

1. Determine pickup frequency at rated voltage.

2. Determine pickup frequency at a second voltage level.

3. Determine time delay.
iii. ANSI No. 25, Sync Check Relay:

1. Determine closing zone at rated voltage.

2. Determine maximum voltage differential that permits
closing at zero degrees.

3. Determine set points of live line, live bus, dead line, and dead bus.

4. Determine time delay.

5. Verify control functions of dead bus/live line, dead line/live bus, and dead bus/dead line.
iv. ANSI No. 27, Undervoltage Relay:

1. Determine dropout voltage.

2. Determine time delay.

3. Determine time delay at a second point on the timing curve for inverse time relays.
v. ANSI No. 32, Directional Power Relay:

1. Determine minimum pickup at maximum torque angle.

2. Determine closing zone.

3. Determine maximum torque angle.

4. Determine time delay.

5. Verify time delay at a second point on the timing curve for inverse time relays.

6. Plot the operating characteristic.
vi. ANSI No. 46, Current Balance Relay:

1. Determine pickup of each unit.

2. Determine percent slope.

3. Determine time delay.
vii. ANSI No. 46N, Negative Sequence Current Relay:

1. Determine negative sequence alarm level.

2. Determine negative sequence minimum trip level.

3. Determine maximum time delay.

4. Verify two points on the I-two-squared-T curve.
viii. ANSI No. 47, Phase Sequence or Phase Balance Voltage Relay:

1. Determine positive sequence voltage to close the NO
contact.

2. Determine positive sequence voltage to open the NC
contact (undervoltage trip).

3. Verify negative sequence trip.

4. Determine time delay to close the NO contact with sudden application of 120 percent of pickup.

5. Determine time delay to close the NC contact on removal of voltage when previously set to rated system voltage.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-22

ix. ANSI No. 50, Instantaneous Overcurrent Relay:

1. Determine pickup.

2. Determine dropout.

3. Determine time delay.
x. ANSI No. 51, Time Overcurrent:

1. Determine minimum pickup.

2. Determine time delay at two points on the time current curve.
xi. ANSI No. 64, Ground Detector Relay:

1. Determine maximum impedance to ground causing relay
pickup.
xii. ANSI No. 67, Directional Overcurrent Relay:

1. Determine directional unit minimum pickup at maximum torque angle.

2. Determine closing zone.

3. Determine maximum torque angle.

4. Plot operating characteristics.

5. Determine overcurrent unit pickup.

6. Determine overcurrent unit time delay at two points on the time current curve.
xiii. ANSI No. 87, Differential Relay:

1. Determine operating unit pickup.

2. Determine the operation of each restraint unit.

3. Determine slope.

4. Determine harmonic restraint.

5. Determine instantaneous pickup.

6. Plot operating characteristics for each restraint.
d. Control Verification:
i. Functional Tests:

1. Check operation of all active digital inputs.

2. Check output contacts or SCRs, preferably by operating the controlled device, such as circuit breaker, auxiliary relay, or alarm.

3. Check internal logic functions used in protection scheme.

4. On completion of testing, reset minimum/maximum
recorders, communications statistics, fault counters,
sequence-of-events recorder, and event records.
ii. In-Service Monitoring: After the equipment is initially energized, measure magnitude and phase angle of inputs and verify
expected values.

K. Ground-Fault Protection Field Tests: Evaluate the interconnected system according to switchgear manufacturer's written instructions.

1. Determine the proper location of the sensors around the bus of the circuit to be protected. This determination may be done visually, with knowledge of which bus is involved.

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-23

2. Verify the grounding points of the system to determine that ground paths do not exist that would bypass the sensors. Use high- voltage testers and resistance bridges.

3. Test the installed system for correct response by application of full -scale current into the equipment to duplicate a ground- fault condition, or by equivalent means such as by simulated fault current generated by the following:
a. A coil around the sensors.
b. A separate test winding in the sensors.

4. Record the test results on the test form provided with the instructions provided by manufacturer.
a. 25 percent between identical monoblocks/cells in a fully charged state. b. Perform a load test according to manufacturer's published data or IEEE 1188. Replace units that fail to pass the test.
c. Measure the battery system voltage from positive- to-ground and negative-to-ground. Voltage measured from positive- to-ground shall be equal in magnitude to the voltage measured from negative-to - ground.

3.06 SYSTEM FUNCTION TESTS
A. System function tests shall prove the correct interaction of sensing, processing, and action devices. Perform system function tests after field quality -control tests have been completed and all components have passed specified tests.

1. Develop test parameters and perform tests for the purpose of evaluating performance of integral components and their functioning as a complete unit within design requirements and manufacturer's published data.

2. Verify the correct operation of interlock safety devices for fail-safe functions in addition to design function.

3. Verify the correct operation of sensing devices, alarms, and indicating devices.

B. Switchgear will be considered defective if it does not pass tests and inspections.

C. Prepare test and inspection reports.

3.07 FOLLOW-UP SERVICE
A. Voltage Monitoring and Adjusting: After Substantial Completion, but not more than six months after Final Acceptance, and if requested by Owner, perform the following voltage monitoring:

1. During a period of normal load cycles as evaluated by Owner, perform seven days of three- phase voltage recording at the outgoing section of each piece of switchgear. Use voltmeters with calibration traceable to NIST standards and with a chart speed of not less than 1 inch (25 mm) per hour.

Voltage unbalance greater than 1 percent between phases, or deviation of phase voltage from the nominal value by more than plus or minus 5 percent during the test period, is unacceptable.

2. Corrective Action: If test results are unacceptable, perform the following corrective action, as appropriate:

City of Camarillo LOW-VOLTAGE SWITCHGEAR
CH-5067-2 262300-24

a. Adjust switchgear taps.
b. Prepare written request for voltage adjustment by electric utility.

3. Retests: Repeat monitoring, after corrective action has been performed, until specified results are obtained.

4. Report:
a. Prepare a written report covering monitoring performed and corrective action taken.

B. Infrared Inspection: Perform the survey during periods of maximum possible loading. Remove covers prior to inspection.

1. After Substantial Completion, but not more than 60 days after Final Acceptance, perform infrared inspection of the electrical power connections of switchgear.

2. Instrument: Inspect distribution systems with imaging equipment capable of detecting a minimum temperature difference of 1 deg C at 30 deg C.

3. Record of Infrared Inspection: Prepare a certified report that identifies the testing technician and equipment used and that lists the results as follows:
a. Description of equipment to be tested.
b. Discrepancies.
c. Temperature difference between the area of concern and the reference area.
d. Probable cause of temperature difference.
e. Areas inspected. Identify inaccessible and unobservable areas and equipment.
f. Identify load conditions at time of inspection.
g. Provide photographs and thermograms of the deficient area.

4. Act on inspection results according to recommendations in NETA ATS, Table 100.18. Correct possible and probable deficiencies as soon as Owner's operations permit. Retest until deficiencies are corrected.

3.08 SOFTWARE SERVICE AGREEMENT
A. Technical Support: Beginning at Substantial Completion, service agreement shall include software support for two years.

B. Upgrade Service: At Substantial Completion, update software to latest version.

Install and program software upgrades that become available within two years from date of Substantial Completion. Upgrading software shall include operating system and new or revised licenses for using software.

1. Upgrade Notice: At least 30 days to allow Owner to schedule and access the system and to upgrade computer equipment if necessary.

END OF SECTION 262300 – LOW VOLTAGE SWITCHGEAR

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-1

SECTION 263213 – GENERATOR – DIESEL
PART 1 - GENERAL

1.01 SUMMARY
A. Section includes packaged engine- generator sets for standby power supply with the following features:

1. Fuel system base tank.

2. Outdoor enclosure.

3. Acceptance Testing.

B. The City-furnished engine driven electrical generating systems are located at 283 S. Glen Dr, Camarillo, CA 93010
City Hall City-furnished Generator:

Caterpillar C9 Tier 3 Generator
SN, 200 KW, 277/480 V,
3 Phase, Standby CE16033
Corporation Yard City-furnished Generator:

Caterpillar C9 Tier 3 Generator
SN, 300 KW, 120/208 V,
3 Phase, Standby CE16034
Quinn CAT Contact: Allen Abramovitch (805) 485-2171
C. Contractor shall contact Quinn CAT and coordinate delivery and placement of the generators on the final certified pad.

1.02 RELATED DOCUMENTS
A. Section 01 10 00: Scope of Work
B. Section 26 00 00: General Electrical

1.03 DEFINITIONS
A. EPS: Emergency power supply.

B. EPSS: Emergency power supply system

1.04 ACTION SUBMITTALS
A. Product Data: For each required component provide manufacturer’s standard cut sheet containing technical details, listings and general information illustrating compliance with these specification requirements.

B. Provide the following detailed documentation for review and evaluation:

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-2

1. The manufacturer shall provide copies of following documents for review and evaluation in accordance with general requirements of Division 01 and Division 26:
a. Factory published specification sheet indicating standard and optional accessories, ratings, etc. Weights of all equipment shall be highlighted. b. Manufacturer's catalog cut sheets of all auxiliary components such as battery charger, silencer, exhaust flex, main circuit breaker, etc. c. Dimensional elevation and layout drawings of the generator set, enclosure and transfer switchgear and related accessories. Concrete pad recommendation, layout and stub- up locations of electrical and fuel systems shall be included.
d. Engine mechanical data, including heat rejection, exhaust gas flows, combustion air and ventilation air flows, noise data, etc. Air flow requirements shall be for cooling and combustion air in CFM at 0.8 power factor, with air supply temperature of 95, 80, 70, and 50 °F. e. Fuel consumption in gallons per hour at 0.8 power factor at 0.5, 0.75- and 1.0-times generator capacity.
f. Generator electrical data including resistances, reactances, time constants, temperature and insulation data, thermal damage curve, cooling requirements, excitation ratings, voltage regulation, voltage regulator, efficiencies, waveform distortion and telephone influence factor.
g. Certified trip curves for each circuit breaker.
h. Certified copies of all Type (Design) and Verification Test Reports for prototype units.
i. Interconnect wiring diagram of complete emergency system, including generator, switchgear, day tank, remote pumps, battery charger, and remote alarm indications.
j. Control panel schematics.
k. Calculations indicating acceptable performance of the submitted unit starting and running the specified load.

2. Report of exhaust emissions showing compliance with applicable regulations.

3. Third party certified noise test data on an equal or similar enclosure design.

4. Manufacturers and dealers written warranty.

5. Seismic Qualification Certificates for engine- generator set, accessories, and

1.05 CLOSEOUT SUBMITTALS
A. Submit test report confirming acceptance of all Installation inspections and tests as outlined in Part 3 of this specification.

B. Submit operation and maintenance data based on factory and field- testing, operation, and maintenance of specified product.

C. Submit maintenance manuals and recommended spare parts list required to conform to industry standard maintenance guidelines. Instructions shall include but not be limited to:

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-3

1. Instructions for replacing any renewable components of the system.

2. Instructions for periodic cleaning and adjustment of equipment with a schedule of these functions.

3. A complete list of all equipment and components with information as to the address and telephone number of both the manufacturer and local supplier of each item.

1.06 QUALITY ASSURANCE
A. The system design and installation shall conform to the following standards.

1. All equipment shall be UL listed for its intended purpose, including UL 2200.

2. All applicable NFPA standards, including but not limited to: 70 and 110.

3. California Building Code.

4. Ventura County Air Pollution Control District (VCAPCD)

5. All requirements of the Authority Having Jurisdiction (AHJ) B. The equipment supplier and the Contractor shall demonstrate a minimum five (5) years’ experience in the successful design and installation of standby generation systems similar in size and scope to that required for this project.

1.07 WARRANTY
A. The installer and manufacturer’s warranty shall be for a minimum period of five (5) years from the date of the final acceptance test approval.

1.08 COORDINATION
A. Coordinate sizes and locations of actual equipment provided. Provide sketches to illustrate submitted equipment will fit within the allocated space where the dimensions of the submitted equipment exceed those illustrated on the drawings for the basis of design.

1.09 PRODUCTS
A. General

1. Install City-furnished factory assembled water cooled diesel engine-driven electric generating system rated for standby service. The automatic transfer switch(es) specified in other sections of this specification shall be supplied by the generator set manufacturer to establish and maintain a single source of system responsibility and coordination. Refer to the drawings for service ratings at 60 Hz.

2. The system shall automatically start and accept full rated load within ten (10) seconds of being signaled to start.

3. The supplier shall maintain a full -time in -house parts and service organization so that parts and service are readily available, twenty-four (24) hours/day seven (7) days/week. Qualified, factory trained service personnel shall be available within four (4) hours of notification.

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-4

4. Prototype testing shall certify the acceptable performance of the generating set series. The test shall prove acceptance, as a system, of the design and integration of all components. Proposed system shall be a current factory production model. Prototype testing shall confirm:
a. Fuel consumption at ¼, ½, ¾ and full load.
b. Exhaust emissions.
c. Mechanical and exhaust noise levels.
d. Governor speed regulation at ¼, ½, ¾ and full load.
e. Generator temperature rise in accordance with NEMA MG1-22.40 f. Harmonic analysis, voltage waveform deviation and telephone influence factor.
g. Generator short circuit capacity.
h. Cooling system capacity.

5. Provide manufacturer's load analysis calculation confirming that the generating set submitted is compatible with loads to be applied. a. Generator-Set Performance: Steady -State Voltage Operational Bandwidth: 3% of rated output voltage from no load to full load. b. Transient Voltage Performance: Not more than 20% variation for 50% step-load increase or decrease. Voltage shall recover and remain within the steady-state operating band within three (3) seconds. c. Steady-State Frequency Operational Bandwidth: 0.5% of rated frequency from no load to full load.
d. Steady-State Frequency Stability: When system is operating at any constant load within the rated load, there shall be no random speed variations outside the steady-state operational band and no hunting or surging of speed.
e. Transient Frequency Performance: Less than 5% variation for 50% step-load increase or decrease. Frequency shall recover and remain within the steady-state operating band within five (5) seconds. f. Output Waveform: At no load, harmonic content measured line to line or line to neutral shall not exceed 5% total and 3% for single harmonics. Telephone influence factor, determined according to NEMA MG1, shall not exceed 50%.
g. Sustained Short-Circuit Current: For a three-phase, bolted short circuit at system output terminals, system shall supply a minimum of 250% of rated full-load current for not less than ten (10) seconds and then clear the fault automatically, without damage to generator system components.
h. Below requires ten (10) second maximum start time under specific conditions and includes startup only, not load assumption. i. Start Time: Comply with NFPA 110, Type 10, system requirements.

6. The proposed generator set shall be EPA Tier Certified and in compliance with the Commonwealth of Massachusetts Emission regulations at the time of installation/commissioning. Actual engine emissions values must be in compliance with EPA Tier emissions standards per ISO 8178 – D2 Emissions Cycle at specified EKW/BHP rating. Utilization of the “Transition Program for Equipment Manufacturers” also known at “Flex Credits” to achieve Tier certification is not in compliance with MA Regulation “310 City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-5

CMR 7.02 U Plan Approval and Emission Limitations” and will not be accepted.

7. The manufacturer’s warrantee shall be for a minimum period of five (5) years from the date of initial system start -up and acceptance or 1,500 operating hours, whichever occurs first. The warrantee shall include repair parts, expendables (lubricating oil, filters, antifreeze, etc.), labor and travel expenses necessary for repairs at the job site. The supplier shall provide a trailer mounted portable engine generator with accessories (including interconnection to the electrical distribution system) to provide backup power for any warrantee related system outages that exceed five (5) calendar days.

B. Engine

1. .25% from no load to full load.

2. All fuel piping shall be black iron or flexible fuel hose rated for this service.

Flexible fuel lines rated 300°F and 100 PSI.

3. The engine shall be equipped with a rail -mounted, engine-driven radiator with blower fan and all accessories. The cooling system shall be sized to operate at full load conditions, 110°F ambient air entering the room or enclosure (where an enclosure is specified), and permanent anti -freeze solution of 5 ethylene-glycol-based antifreeze and water with anticorrosion additives as recommended by engine manufacturer to protect equipment to –15°F without derating the unit. Antifreeze shall have a service life of 3000 hours without maintenance. The generator set supplier is responsible for providing a properly sized cooling system based on the installed static pressure restriction.

4. Provide thermostatically-controlled electric-immersion type engine jacket water heater, be sized by the manufacturer to maintain jacket water temperature at 90°F, 208 V, single- phase, 60 HZ mounted, piped and prewired to terminal strip.

5. Lube oil pump shall be mechanically driven positive displacement. Lube oil system shall be piped through an oil cooler and a full flow filter with replaceable cartridge. Filter and Strainer shall be rated to remove 90% of particles 5 micrometers and smaller while passing full flow.

6. Fuel oil pump shall be mechanically driven positive displacement with dual full flow filters and replaceable cartridge. One filter shall be isolated while the other is on-line. Fuel system shall have a manual-priming pump. Fuel piping shall be arranged to prohibit loss of prime with an anti-siphon check valve at the fuel pump suction piping. Filter and Strainer shall be rated to remove 90% of particles 5 micrometers and smaller while passing full flow.

7. Air intake shall be via a heavy duty replaceable dry element filter and "blocked filter" indicator.

8. Provide lubricating oil pressure gauge, water temperature gauge, battery charge rate ammeter and running time meter mounted in common panel with engine controls, alternator controls and alternator instruments.

9. A critical type silencer (25- 34 DBA at 500Hz exhaust noise reduction), companion flanges, and flexible stainless steel exhaust fitting properly City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-6

sized shall be furnished and installed according to the manufacturer's recommendation. Exhaust pipe size shall be sufficient to ensure that exhaust backpressure does not exceed the maximum limitations specified by the engine manufacturer. The silencer shall be mounted so that its weight is not supported by the engine nor will exhaust system growth due to thermal expansion be imposed on the engine. The muffler and all indoor exhaust piping shall be "lagged" by the Contractor to maintain a surface temperature not to exceed 150°F. The insulation shall be installed so that it does not interfere with the functioning of the flexible exhaust fitting.

10. Packaged generator set shall be certified and in compliance with the latest Non-Road, Off-Highway EPA and CARB Emission regulations.

C. Alternator

1. The synchronous generator designed in accordance with NEMA MG 1 and directly connected to the engine flywheel housing with a flex coupling to ensure permanent alignment. The insulation material shall meet NEMA standards for Class H insulation and be fungus resistant. Temperature rise of the rotor and stator shall not exceed NEMA class F (130 ºC rise by resistance over 40°C ambient). Subtransient resistance shall not exceed 12%.

2. The excitation system shall be of brushless construction. The permanent magnet brushless exciter shall be independent of main stator windings, shall consist of a three-phase armature and a three-phase full wave bridge rectifier mounted on the rotor shaft. Surge suppressors shall be included to protect the diodes from voltage spikes. Generator shall have the ability to sustain short circuit current for ten (10) seconds of 300% of rated current to allow protective devices to operate.

3. The automatic voltage regulator (AVR) shall maintain generator output voltage within +/- 0.5% for any constant load between no load and full load.

The regulator shall be three phase sensing, totally solid state design, which includes electronic voltage bui ldup, volts per Hertz regulation, overexcitation protection, loss of sensing protection, temperature compensation, shall limit voltage overshoot on startup, and shall be environmentally sealed. System shall reduce voltage automatically if load demand exceeds engine capacity and remove excitation when generator is overloaded for more than ten (10) seconds. Voltage regulator shall be, volts-per-hertz and include over voltage and under voltage protection. a. Maintain voltage within 20% on one step, full load
b. Maintain frequency within 10% and stabilize at rated frequency within two (2) seconds.

4. Generator Protector: Microprocessor-based unit shall continuously monitor current level in each phase of generator output, integrate generator heating effect over time, and predict when thermal damage of alternator will occur.

When signaled by generator protector or other generator -set protective devices, a shunt-trip device in the generator disconnect switch shall open the switch to disconnect the generator from load circuits. Protector performs the following functions:

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-7

a. Initiates a generator overload alarm when generator has operated at an overload equivalent to 110% of full-rated load for sixty (60) seconds.

Indication for this alarm is integrated with other generator -set malfunction alarms. Contacts shall be available for load shed functions.
b. Under single or three- phase fault conditions, regulates generator to 300% of rated full-load current for up to ten (10) seconds. c. As overcurrent heating effect on the generator approaches the thermal damage point of the unit, protector switches the excitation system off, opens the generator disconnect device, and shuts down the generator set.
d. Senses clearing of a fault by other overcurrent devices and controls recovery of rated voltage to avoid overshoot.

5. The alternator output shall be wired with a circuit breaker. Breaker shall utilize an electronic LSI solid state trip. Unit breaker shall each be housed in a steel NEMA 1 enclosure mounted on a separate support stand vibration isolated from the engine / generator arrangement.

D. V ibration Isolation

1. Provide spring vibration mounts between engine generator set and structural sub-base as recommended by equipment manufacturer. Unit shall be suitable for installation on any level surface.

1.10 FUEL STORAGE tank
A. The storage tank system shall be supplied by the engine generator set supplier and shall include the following:

1. T ank sized for a usable capacity of an uninterrupted period of twelve (12) hours of operation at 100% of rated power output of engine- generator system without being refilled; pressure tested, double walled, U/L Listed.

2. Transfer pump sized greater than the maximum fuel draw of the engine rated fuel consumption at 110% rated capacity output capacity.

3. Rupture basin alarm contact.

4. Low level alarm contact at 25% capacity.

5. High-Level Alarm Sensor: Liquid- level device operates alarm and redundant fuel shutoff contacts at midpoint between overflow level and 100% of normal fuel level.

6. Redundant High-Level Fuel Shutoff: Actuated by high- level alarm sensor in day tank to operate a separate motor control device that disconnects day-tank pump motor. Sensor shall signal solenoid valve, located in fuel suction line between fuel storage tank and day tank, to close. Both actions shall remain in shutoff state until manually reset. Shutoff action shall initiate an alarm signal to control panel but shall not shut down engine- generator set.

7. Float controls.

8. Fuel gauge, dial type.

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-8

9. Piping connections for:
a. Engine supply.
b. Engine return.
c. Vent with vent whistle.
d. Bottom drain.
e. Fuel gauge.
f. Manual fill cap, lockable.

B. Starting

1. A DC electric starting system with positive engagement shall be furnished.

The motor voltage shall be as recommended by the engine manufacturer.

2. Provide batteries as recommended by equipment manufacturer, sized to provide no less than three cranking cycles without recharging. Provide unit mounted battery rack fabricated of metal with acid- resistant finish and thermal insulation, hold down and battery cables.

3. A current limiting automatic -equalizing and float battery charger shall be furnished to recharge batteries. Unit shall comply with UL 1236 and include the following features:
a. Equalizing-charging rate shall be initiated automatically after battery has lost charge until an adjustable equalizing voltage is achieved at battery terminals. Unit shall then be automatically switched to a lower float-charging mode and shall continue to operate in that mode until battery is discharged again.
b. Adjust float and equalize voltages for variations in ambient temperature from minus 40 °F to 140 °F to prevent overcharging at high temperatures and undercharging at low temperatures. c. Maintain constant output voltage regardless of input voltage variations up to plus or minus 10%.
d. Ammeter and Voltmeter shall be flush mounted in door. Meters shall indicate charging rates.
e. Sense abnormally low battery voltage and close contacts providing low battery voltage indication on control and monitoring panel. Sense high battery voltage and loss of ac input or dc output of battery charger.

Either condition shall close contacts that provide a battery -charger malfunction indication at system control and monitoring panel. f. Enclosure and Mounting: NEMA 3R, wall-mounted cabinet.

4. Provide battery blanket heater to maintain battery temperature between 50°F and 90°F.

C. Control Panel

1. Provide a generator set mounted control panel for complete control and monitoring of the engine and generator set functions. Panel shall include automatic start/stop operation, cycle cranking, AC metering (0.5% true RMS accuracy) with phase selector switch, shutdown sensors and alarms with horn and reset, adjustable cool-down timer and emergency stop push- button and engine run time meter (non-resettable).

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-9

2. Critical components shall be environmentally sealed to protect against failure from moisture and dirt. Components shall be housed in a NEMA 3R enclosure with hinged door.

3. The panel itself shall be mounted on a separate support stand isolated from the engine / generator arrangement. Panel / breaker arrangements mounted on the generator set in such a way that access to the AC Generator terminal box is restricted in any way whatsoever are not acceptable.

4. Provide the following readouts:
a. Engine oil pressure
b. Coolant temperature
c. Engine RPM
d. System DC Volts
e. Engine running hours
f. Generator AC volts
g. Generator frequency
h. Generator AC amps

5. Provide the following indications for protection and diagnostics according to NFPA 110 Level 1:
a. Low oil pressure
b. High water temperature
c. Low coolant level
d. Overspeed
e. Overcrank
f. Emergency stop depressed
g. Approaching high coolant temperature
h. Approaching low oil pressure
i. Low coolant temperature
j. Low voltage in battery
k. Control switch not in auto position
l. Low fuel main tank
m. Battery charger AC failure
n. High battery voltage
o. Fuel tank rupture
p. Engine running

6. Diagnostics capabilities shall identifying both system and component level issues. The diagnostic codes shall be maintained in a history log specifying the number of occurrences, and second/minute/hr at which they occur.

7. Provide the following control functions:
a. Terminals located inside the control panel for REMOTE EMERGENCY STOP
b. ON / OFF / AUTO control switch

1.11 REMOTE INTERFACE
A. Where the generator is paired with a microgrid system the generator control system shall be capable of remote control and communicating with an external City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-10

Microgrid Controller. The generator remote control capabilities shall include start/stop operation from an external Microgrid Controller. The generator remote interface shall be capable of providing all the information displayed on the control panel to an external Microgrid Controller via standard communication protocols.

B. Annunciator

1. Provide an annunciator to meet the requirements of NFPA 110, Level 1, installed in enclosure suitable for flush or surface mounting. The annunciator shall provide remote annunciation of all points stated above and shall incorporate ring- back capability so that after silencing the initial alarm, any subsequent alarms will sound the horn.

C. I/O Module

1. Provide remote I/O modules for redundant monitoring of NFPA110, Level 1 alarms by the Owner’s system(s). The remote I/O modules shall interconnect with the ECP on the remote annunciator network wiring.

D. Sound Attenuated Weatherproof Enclosure.

1. Engine generator set, generator control panel, engine starting batteries, accessories and internally mounted exhaust silencer shall be enclosed in factory-assembled, rainproof-weather-protective skid-base enclosure with full floor panel. The enclosure shall have a resulting sound level of less than 71 DBA at fifty (50) feet. The enclosure and generator shall be UL2200 labeled.

2. Enclosure will consist of a roof, fuel tank and rupture basin base, two (2) side walls, and two (2) end walls, of highly corrosion resistant construction made from galvanized steel. Stainless steel flush fitting latches and hinges tested and proven to withstand extreme conditions of corrosion. The sheet steel components shall be pre-tested with zinc phosphate prior to polyester powder coating at 392 °F. Roof bows shall be cambered to aid in rain runoff.

3. An integral fuel tank underframe and rupture basin shall be supplied, consisting of the following:
a. A rupture basin utilizing minimum 7 gauge steel channel perimeter walls and bottom.
b. A U.L. listed (per U.L. 142) above-ground # gallon capacity rectangular tank of minimum 12 gauge steel construction.
c. The tank shall have venting and emergency venting (to roof) per U.L. 142, lockable fill, low level and high level alarm contacts, and an electric analog level gauge.
d. The fill valve shall have an overfill prevention type, equal to the “Stopper” OPW 61f stop.
e. The rupture basin shall have a float contact to indicate tank rupture. f. The entire system shall be leak tested prior to installation.

4. Intake openings shall be screened to prevent the entrance of rodents. The system shall include a cooling and combustion air inlet silencer system, an equipment enclosure section, and a cooling air discharge silencer section.

5. Number of doors on enclosure shall be as required so that all normal maintenance operations, such as lube oil change, filter change, belt adjustment and replacements, hose replacements, access to the control City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-11

panels, etc., may be accomplished without disassembly of any enclosure components. Access doors shall be fabricated of the same material as the enclosure walls. They shall be reinforced for rigidity and set is a welded frame to ensure proper operation. Handles shall be key lockable, all doors keyed alike, and hinges shall be zinc die cast or stainless steel. Fasteners shall be zinc plated or stainless steel. Doors shall be of a lift off design allowing one person to remove door if necessary and/or top hung and supported by gas struts.

6. Battery racks and batteries shall be factory -installed and wired. Exhaust silencer, flexible exhaust connector and condensate drain valve shall be factory-installed.

7. Lube oil and coolant drains shall be extended to the exterior of the enclosure and terminated with drain valves and capped with pipe nipples on flanged connectors. Radiator access shall be through a hinged, lockable cover on enclosure. Cooling fan and char ging alternator shall be fully guarded to prevent injury.

8. Owner shall select finish color of enclosure.

9. No obstructions shall be allowed to the exhaust outlet.

10. Provide a manual stop break -glass station to allow emergency shutdown of the unit. The station shall be integrated into the enclosure and accessible from the exterior, no greater than 6 feet-0 inches AFG.

11. Four-point lifting provisions shall be provided at or near the enclosure base, with capacity suitable for rigging the entire assembly. Quality assurance procedures of the manufacturer shall include regular testing of the lift devices.

12. Air handling shall be as follows:
a. Air will enter the enclosure through removable hood(s) or an integral, baffled plenum.
b. Motor operated damper(s) will be provided, wired to open upon engine startup or loss of power (dampers shall fail open).
c. Radiator discharge will be through a gravity operated damper and into a hood or vertical plenum, as dictated by airflow.

13. The manufacturer shall perform the system integration of all mechanical and electrical components in the enclosure. All devices in the enclosure, including specified generator set accessories, shall be prewired in EMT or galvanized rigid steel conduit with flexible liquidtight metal conduit connections where vibration isolation is necessary.

14. The enclosure shall include:
a. Interior A.C. and D.C. lighting. Switch control for both AC and DC lighting shall be provided at each entry door. D.C. light switches shall be timer types.
b. GFCI protected duplex receptacles for maintenance to limit extension cord lengths to a maximum of fifteen (15) feet.
c. Ventilation fan with thermostat and interlocked to prohibit operation while the generator is running.

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-12

d. All ancillary equipment shall comply with the applicable sections of the electrical specification.
e. Provide a manual stop break -glass station to allow emergency shutdown of the unit. The station shall be integrated into the enclosure and accessible from the
PART 2 - EXECUTION

2.01 I NSTALLATION
A. Placement of the generator shall be the responsibility of the electrical Contractor.

Coordinate placement with the Owner’s Representative and obtain all associated permits and permissions necessary for blockage of public way, interference with parking, etc.

B. Fill all fluid levels (including fuel where applicable) to maximum recommended levels by the manufacturer prior to testing and after testing completed.

2.02 START-UP AND TESTING
A. After installation is complete and normal power is available, the manufacturer's local dealer shall perform the following four (4) hour load test:

1. Verify that the equipment has been properly installed.

2. Check all auxiliary devices for proper operation, including battery charger, jacket water heater(s), generator space heater, all remote annunciator points, etc.

3. Test all alarms and safety shutdown devices for proper operation and annunciation.

4. Check all fluid levels.

5. Start engine and check for exhaust, oil, fuel leaks, vibrations, etc.

6. Verify proper voltage and phase rotation at the transfer switch before connecting to the load.

7. Connect the generator to building load and verify that the generator will start and run all designated loads. Testing shall be performed in accordance with NFPA 110 from a “cold start” condition. Each of the following shall be observed and recorded upon opening of the Normal supply circuit breaker to the ATS:
a. Time delay on start
b. Cranking time until the prime mover starts and runs
c. Time required to reach operating speed
d. Voltage and frequency overshoot
e. Time required to reach steady state conditions with all switches transferred to the emergency position
f. Voltage, frequency and current

8. The system shall be tested under load for a period of two (2) hours. The following readings shall be taken at fifteen (15) minute intervals:

City of Camarillo GENERATOR-DIESEL
CH-5067-2 263213-13

a. Oil pressure
b. Coolant temperature
c. Battery charge rate
d. AC volts
e. AC Amperes- all phases
f. Frequency
g. Kilowatts
h. Kilovolt-amperes
i. Ambient Temperature

9. Allow system to cool for five (5) minutes.

10. The system shall be tested for a period of two (2) hours with the use of a portable resistive/reactive loadbank, or permanent loadbank if installed, at 100% rated load. Load shall be applied upon reaching rated RPM in one step. All data specified above shall be recorded for this segment until completion of the two-hour test.

11. The Generator Distributor shall provide a written test report upon completion of testing. Report shall specifically indicate the successful completion of each item referenced above and submit all recordings in a format similar to NFPA 110 tables.

B. All costs associated with the referenced testing, including fuel consumption, load bank rental, temporary cables from the generator to the load bank, etc. shall be included in the bid price.

2.03 T RAINING
A. Provide a one (1) day of on- site training to instruct the Owner's personnel in the proper operation and maintenance of the equipment. Review operation and maintenance manuals, parts manuals, and emergency service procedures.

END OF SECTION 263213 – GENERATOR DIESEL

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-1

SECTION 263600 – TRANSFER SWITCHES
PART 1 - GENERAL

1.01 SUMMARY
A. Section includes automatic transfer switches rated 600 V and less, including the following:

1. Bypass/isolation switches.

2. Remote annunciator system.

3. Remote annunciator and control system.

1.02 ACTION SUBMITTALS
A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for transfer switches.

2. Include rated capacities, operating characteristics, electrical characteristics, and accessories.

B. Shop Drawings:

1. Include plans, elevations, sections, details showing minimum clearances, conductor entry provisions, gutter space, and installed features and devices.

2. Include material lists for each switch specified.

3. Single-Line Diagram: Show connections between transfer switch, bypass/isolation switch, power sources, and load; and show interlocking provisions for each combined transfer switch and bypass/isolation switch.

4. Riser Diagram: Show interconnection wiring between transfer switches, bypass/isolation switch, annunciators, and control panels.

1.03 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing agency.

B. Seismic Qualification Data: Certificates, for transfer switches, accessories, and components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

C. Field quality-control reports.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-2

1.04 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For each type of product to include in emergency, operation, and maintenance manuals.

1. In addition to items specified in Section 017823 "Operation and Maintenance Data," include the following:
a. Features and operating sequences, both automatic and manual. b. List of all factory settings of relays; provide relay-setting and calibration instructions, including software, where applicable.

1.05 QUALITY ASSURANCE
A. Testing Agency Qualifications:

1. Member company of NETA.
a. Testing Agency's Field Supervisor: Certified by NETA to supervise on- site testing.

1.06 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of transfer switch or transfer switch components that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

PART 2 - PRODUCTS

2.01 PERFORMANCE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NEMA ICS 1.

C. Comply with NFPA 99.

D. Comply with NFPA 110.

E. Comply with UL 1008 unless requirements of these Specifications are stricter.

F. Indicated Current Ratings: Apply as defined in UL 1008 for continuous loading and total system transfer, including tungsten filament lamp loads not exceeding 30 percent of switch ampere rating, unless otherwise indicated.

G. Tested Fault -Current Closing and Short -Circuit Ratings: Adequate for duty imposed by protective devices at installation locations in Project under the fault conditions indicated, based on testing according to UL 1008.

H. Repetitive Accuracy of Solid-State Controls: All settings shall be plus or minus 2 percent or better over an operating temperature range of minus 20 to plus 70 deg C.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-3

I. Resistance to Damage by Voltage Transients: Components shall meet or exceed voltage-surge withstand capability requirements when tested according to IEEE C62.62. Components shall meet or exceed voltage- impulse withstand test of NEMA ICS 1.

J. Electrical Operation: Accomplish by a nonfused, momentarily energized solenoid or electric -motor-operated mechanism. Switches for emergency or standby purposes shall be mechanically and electrically interlocked in both directions to prevent simultaneous connection to both power sources unless closed transition.

K. Neutral Switching: Where four -pole switches are indicated, provide neutral pole switched simultaneously with phase poles.

L. Neutral Terminal: Solid and fully rated unless otherwise indicated.

M. Oversize Neutral: Ampacity and switch rating of neutral path through units indicated for oversize neutral shall be double the nominal rating of circuit in which switch is installed.

N. Heater: Equip switches exposed to outdoor temperatures and humidity, and other units indicated, with an internal heater. Provide thermostat within enclosure to control heater.

O. Battery Charger: For generator starting batteries.

1. Float type, rated 10 A.

2. Ammeter to display charging current.

3. Fused AC inputs and DC outputs.

P. Annunciation, Control, and Programming Interface Components: Devices at transfer switches for communicating with remote programming devices, annunciators, or annunciator and control panels shall have communication capability matched with remote device.

Q. Factory Wiring: Train and bundle factory wiring and label, consistent with Shop Drawings, by color -code or by numbered or lettered wire and cable markers at terminations. Color-coding and wire and cable markers are specified in Section 260553 "Identification for Electrical Systems."

1. Designated Terminals: Pressure type, suitable for types and sizes of field wiring indicated.

2. Power-Terminal Arrangement and Field- Wiring Space: Suitable for top, side, or bottom entrance of feeder conductors as indicated.

3. Control Wiring: Equipped with lugs suitable for connection to terminal strips.

R. Enclosures: General- purpose NEMA 250, Type 1 or Type 3R, complying with NEMA ICS 6 and UL 508, unless otherwise indicated.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-4

2.02 CONTACTOR-TYPE AUTOMATIC TRANSFER SWITCHES
A. City Hall City-furnished automatic transfer switch:

Asco (Automatic Open Transition Transfer Switch)
Model: 7000 Series
7000 Series, Open Transition Transfer Switch
600 Amp
Service voltage / Hz: 480 Volt / 60 Hz
No. of switched poles: 3
Enclosure: Nema 3R (double door)
Neutral configuration: Solid
Service: Three phase, 4 – wire
Number of cables & Lug size: 2, #1/0 AWG to 600 MCM
Includes the following options: 31BG, 44G, 125A
B. Corporation Yard City-furnished automatic transfer switch:

Asco (Automatic Open Transition Transfer Switch)
Model: 7000 Series
7000 Series, Open Transition Transfer Switch
1200 Amp
Service voltage / Hz: 208 Volt / 60 Hz
No. of switched poles: 3
Enclosure: Nema 3R (double door)
Neutral configuration: Solid
Service: Three phase, 4 – wire
Number of cables & Lug size: 4, #1/0 AWG to 600 MCM
Includes the following options: 31BG, 44G, 125A
C. Comply with Level 1 equipment according to NFPA 110.

D. Switch Characteristics: Designed for continuous -duty repetitive transfer of full - rated current between active power sources.

1. Limitation: Switches using molded- case switches or circuit breakers or insulated-case circuit-breaker components are unacceptable.

2. Switch Action: Double throw; mechanically held in both directions.

3. Contacts: Silver composition or silver alloy for load- current switching.

Contactor-style automatic transfer -switch units, rated 600 A and higher, shall have separate arcing contacts.

4. Conductor Connectors: Suitable for use with conductor material and sizes.

5. Material: Tin-plated aluminum.

6. Main and Neutral Lugs: Mechanical type.

7. Ground Lugs and Bus-Configured Terminators: Mechanical type.

8. Ground bar.

9. Connectors shall be marked for conductor size and type according to UL 1008.

E. Automatic Open-Transition Transfer Switches: Interlocked to prevent the load from being closed on both sources at the same time.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-5

1. Sources shall be mechanically and electrically interlocked to prevent closing both sources on the load at the same time.

F. Automatic Delayed-Transition Transfer Switches: Pauses or stops in intermediate position to momentarily disconnect both sources, with transition controlled by programming in the automatic transfer-switch controller. Interlocked to prevent the load from being closed on both sources at the same time.

1. Adjustable Time Delay: For override of normal -source voltage sensing to delay transfer and engine start signals for alternative source. Adjustable from zero to six seconds, and factory set for one second.

2. Sources shall be mechanically and electrically interlocked to prevent closing both sources on the load at the same time.

3. Fully automatic break-before-make operation with center off position.

4. Fully automatic break -before-make operation with transfer when two sources have near zero phase difference.

G. Automatic Closed- Transition Transfer Switches: Connect both sources to load momentarily. Transition is controlled by programming in the automatic transfer - switch controller.

1. Fully automatic make -before-break operation when transferring between two available power sources.

2. Load transfer without interruption, through momentary interconnection of both power sources not exceeding 100 ms.

3. Initiation of No -Interruption Transfer: Controlled by in- phase monitor and sensors confirming both sources are present and acceptable. a. Initiation occurs without active control of generator. b. Automatic transfer-switch controller takes active control of generator to match frequency, phase angle, and voltage.
c. Controls ensure that closed-transition load transfer closure occurs only when the two sources are within plus or minus 5 electrical degrees maximum, and plus or minus 5 percent maximum voltage difference.

4. Failure of power source serving load initiates automatic break-before-make transfer.

H. Electric Switch Operation: Electrically actuated by push buttons designated "Normal Source" and "Alternative Source." Switch shall be capable of transferring load in either direction with either or both sources energized.

I. Signal-Before-Transfer Contacts: A set of normally open/normally closed dry contacts operates in advance of retransfer to normal source. Interval shall be adjustable from 1 to 30 seconds.

J. Digital Communication Interface: Matched to capability of remote annunciator or annunciator and control panel.

K. Automatic Transfer-Switch Controller Features:

1. Controller operates through a period of loss of control power.

2. Undervoltage Sensing for Each Phase of Normal Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-6

from 85 to 100 percent of nominal, and dropout voltage shall be adjustable from 75 to 98 percent of pickup value. Factory set for pickup at 90 percent and dropout at 85 percent.

3. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator. Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at 90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal. Factory set for pickup at 95 percent.

4. Time Delay for Retransfer to Normal Source: Adjustable from zero to 30 minutes, and factory set for 10 minutes. Override shall automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.

5. Test Switch: Simulate normal-source failure.

6. Switch-Position Pilot Lights: Indicate source to which load is connected.

7. Source-Available Indicating Lights: Supervise sources via transfer- switch normal- and emergency-source sensing circuits.
a. Normal Power Supervision: Green light with nameplate engraved "Normal Source Available."
b. Emergency Power Supervision: Red light with nameplate engraved "Emergency Source Available."

8. Unassigned Auxiliary Contacts: Two normally open, single- pole, double- throw contacts for each switch position, rated 10 A at 240-V ac.

9. Transfer Override Switch: Overrides automatic retransfer control so transfer switch will remain connected to emergency power source regardless of condition of normal source. Pilot light indicates override status.

10. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum.

11. Engine Shutdown Contacts: Instantaneous; shall initiate shutdown sequence at remote engine- generator controls after retransfer of load to normal source.

12. Engine Shutdown Contacts: Time delay adjustable from zero to five minutes, and factory set for five minutes. Contacts shall initiate shutdown at remote engine- generator controls after retransfer of load to normal source.

13. Engine-Generator Exerciser: Solid-state, programmable-time switch starts engine generator and transfers load to it from normal source for a preset time, then retransfers and shuts down engine after a preset cool -down period. Initiates exercise cycle at preset intervals adjustable from 7 to 30 days. Running periods shall be adjustable from 10 to 30 minutes. Factory settings shall be for 7-day exercise cycle, 20-minute running period, and 5- minute cool-down period. Exerciser features include the following:
a. Exerciser Transfer Selector Switch: Permits selection of exercise with and without load transfer.
b. Push-button programming control with digital display of settings.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-7

c. Integral battery operation of time switch when normal control power is unavailable.

2.03 TRANSFER SWITCH ACESSORIES
A. Bypass/Isolation Switches:

1. Source Limitations: Same manufacturer as transfer switch in which installed.

2. Comply with requirements for Level 1 equipment according to NFPA 110.

3. Description: Manual type, arranged to select and connect either source of power directly to load, isolating transfer switch from load and from both power sources. Include the following features for each combined automatic transfer switch and bypass/isolation switch:
a. Means to lock bypass/isolation switch in the position that isolates transfer switch with an arrangement that permits complete electrical testing of transfer switch while isolated. Interlocks shall prevent transfer-switch operation, except for testing or maintenance, while automatic transfer switch is isolated.
b. Provide means to make power available to transfer -switch control circuit for testing and maintenance purposes.
c. Drawout Arrangement for Transfer Switch: Provide physical separation from live parts and accessibility for testing and maintenance operations. Transfer switch and bypass/isolation switch shall be in isolated compartments.
d. Transition: Provide closed-transition operation when transferring from main transfer switch to bypass/isolation switch on the same power source.
e. Transition: Refer to transfer switch paragraph.
f. Bypass/Isolation Switch Current, Voltage, Closing, and Short -Circuit Withstand Ratings: Equal to or greater than those of associated automatic transfer switch, and with same phase arrangement and number of poles.
g. Contact temperatures of bypass/isolation switches shall not exceed those of automatic transfer -switch contacts when they are carrying rated load.
h. Manual Control: Constructed so load bypass and transfer -switch isolation can be performed by one person in no more than two operations in 15 seconds or less. Operating handles shall be externally operated.
i. Automatic and Nonautomatic Control: Automatic transfer -switch controller shall also control the bypass/isolation switch. j. Legend: Manufacturer's standard legend for control labels and instruction signs shall describe operating instructions. k. Maintainability: Fabricate to allow convenient removal of major components from front without removing other parts or main power conductors.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-8

4. Interconnection of Bypass/Isolation Switches with Automatic Transfer Switches: Factory-installed copper bus bars; plated at connection points and braced for the indicated available short-circuit current.

B. Remote Annunciator System:

1. Source Limitations: Same manufacturer as transfer switch in which installed.

2. Functional Description: Remote annunciator panel shall annunciate conditions for indicated transfer switches.

3. Annunciation panel display shall include the following indicators:
a. Sources available, as defined by actual pickup and dropout settings of transfer-switch controls.
b. Switch position.
c. Switch in test mode.
d. Failure of communication link.

4. Annunciator Panel: LED-lamp type with audible signal and silencing switch. a. Indicating Lights: Grouped for each transfer switch monitored. b. Label each group, indicating transfer switch it monitors, location of switch, and identity of load it serves.
c. Mounting: Flush, modular, steel cabinet unless otherwise indicated. d. Lamp Test: Push-to-test or lamp-test switch on front panel.

C. Remote Annunciator and Control System:

1. Source Limitations: Same manufacturer as transfer switch in which installed.

2. Include the following functions for indicated transfer switches:
a. Indication of sources available, as defined by actual pickup and dropout settings of transfer-switch controls.
b. Indication of switch position.
c. Indication of switch in test mode.
d. Indication of failure of digital communication link. e. Key-switch or user-code access to control functions of panel. f. Control of switch-test initiation.
g. Control of switch operation in either direction.
h. Control of time-delay bypass for transfer to normal source.

3. Malfunction of annunciator, annunciation and control panel, or communication link shall not affect functions of automatic transfer switch.

In the event of failure of communication link, automatic transfer switch automatically shall revert to standalone, se lf-contained operation.

Automatic transfer-switch sensing, controlling, or operating function shall not depend on remote panel for proper operation.

4. Remote Annunciation and Control Panel: Solid-state components. Include the following features:
a. Controls and indicating lights grouped together for each transfer switch.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-9

b. Label each indicating light control group. Indicate transfer switch it controls, location of switch, and load it serves.
c. Digital Communication Capability: Matched to that of transfer switches supervised.
d. Mounting: Flush, modular, steel cabinet unless otherwise indicated.

2.04 SOURCE QUALITY CONTROL
A. Factory Tests: Test and inspect components, assembled switches, and associated equipment according to UL 1008. Ensure proper operation. Check transfer time and voltage, frequency, and time- delay settings for compliance with specified requirements. Perform dielectric strength test complying with NEMA ICS 1.

B. Prepare test and inspection reports.

1. For each of the tests required by UL 1008, performed on representative devices, for emergency and legally required systems. Include results of test for the following conditions:
a. Overvoltage.
b. Undervoltage.
c. Loss of supply voltage.
d. Reduction of supply voltage.
e. Alternative supply voltage or frequency is at minimum acceptable values.
f. Temperature rise.
g. Dielectric voltage-withstand; before and after short-circuit test. h. Overload.
i. Contact opening.
j. Endurance.
k. Short circuit.
l. Short-time current capability.
m. Receptacle withstand capability.
n. Insulating base and supports damage.

PART 3 - EXECUTION

3.01 INSTALLATION
A. Floor-Mounting Switch: Anchor to floor by bolting.

1. Install transfer switches on cast -in-place concrete equipment base(s).

Comply with requirements for equipment bases and foundations specified in concrete sections.

2. Comply with requirements for seismic control devices specified in Section 260548.16 "Seismic Controls for Electrical Systems."

3. Coordinate size and location of concrete bases. Cast anchor -bolt inserts into bases.

4. Provide workspace and clearances required by NFPA 70.

B. Annunciator and Control Panel Mounting: Flush in wall unless otherwise indicated.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-10

C. Identify components according to Section 260553 "Identification for Electrical Systems."
D. Set field-adjustable intervals and delays, relays, and engine exerciser clock.

E. Comply with NECA 1.

3.02 CONNECTIONS
A. Wiring to Remote Components: Match type and number of cables and conductors to generator sets, control, and communication requirements of transfer switches as recommended by manufacturer. Increase raceway sizes at no additional cost to Owner if necessary to accommodate required wiring.

B. Wiring Method: Install cables in raceways and cable trays except within electrical enclosures. Conceal raceway and cables except in unfinished spaces.

1. Comply with requirements for raceways and boxes specified in Section 260533 "Raceways and Boxes for Electrical Systems."
C. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii.

D. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."
E. Connect wiring according to Section 260519 "Low -Voltage Electrical Power Conductors and Cables."
F. Connect twisted pair cable according to Section 260523 "Control-Voltage Electrical Power Cables."
G. Connect twisted pair cable according to Section 271513 "Communications Copper Horizontal Cabling."
H. Route and brace conductors according to manufacturer's written instructions and Section 260529 "Hangers and Supports for Electrical Systems." Do not obscure manufacturer's markings and labels.

I. Brace and support equipment according to Section 260548.16 "Seismic Controls for Electrical Systems."
J. Final connections to equipment shall be made with liquidtight, flexible metallic conduit no more than 18 inches (457 mm) in length.

3.03 FIELD QUALITY CONTROL
A. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

1. After installing equipment, test for compliance with requirements according to NETA ATS.

2. Visual and Mechanical Inspection:
a. Compare equipment nameplate data with Drawings and
Specifications.
b. Inspect physical and mechanical condition.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-11

c. Inspect anchorage, alignment, grounding, and required clearances. d. Verify that the unit is clean.
e. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
f. Verify that manual transfer warnings are attached and visible. g. Verify tightness of all control connections.
h. Inspect bolted electrical connections for high resistance using one of the following methods, or both:
i. Use of low-resistance ohmmeter.
ii. Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data.
i. Perform manual transfer operation.
j. Verify positive mechanical interlocking between normal and alternate sources.
k. Perform visual and mechanical inspection of surge arresters. l. Inspect control power transformers.
i. Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
ii. Verify that primary and secondary fuse or circuit-breaker ratings match Drawings.
iii. Verify correct functioning of drawout disconnecting contacts, grounding contacts, and interlocks.

3. Electrical Tests:
a. Perform insulation-resistance tests on all control wiring with respect to ground.
b. Perform a contact/pole -resistance test. Compare measured values with manufacturer's acceptable values.
c. Verify settings and operation of control devices.
d. Calibrate and set all relays and timers.
e. Verify phase rotation, phasing, and synchronized operation. f. Perform automatic transfer tests.
g. Verify correct operation and timing of the following functions:
i. Normal source voltage-sensing and frequency-sensing relays. ii. Engine start sequence.
iii. Time delay on transfer.
iv. Alternative source voltage- sensing and frequency -sensing relays.
v. Automatic transfer operation.
vi. Interlocks and limit switch function.
vii. Time delay and retransfer on normal power restoration. viii. Engine cool-down and shutdown feature.

4. Measure insulation resistance phase- to-phase and phase- to-ground with insulation-resistance tester. Include external annunciation and control circuits. Use test voltages and procedure recommended by manufacturer.

Comply with manufacturer's specified minimum resistance.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-12

a. Check for electrical continuity of circuits and for short circuits. b. Inspect for physical damage, proper installation and connection, and integrity of barriers, covers, and safety features.
c. Verify that manual transfer warnings are properly placed. d. Perform manual transfer operation.

5. After energizing circuits, perform each electrical test for transfer switches stated in NETA ATS and demonstrate interlocking sequence and operational function for each switch at least three times. a. Simulate power failures of normal source to automatic transfer switches and retransfer from emergency source with normal source available.
b. Simulate loss of phase- to-ground voltage for each phase of normal source.
c. Verify time-delay settings.
d. Verify pickup and dropout voltages by data readout or inspection of control settings.
e. Test bypass/isolation unit functional modes and related automatic transfer-switch operations.
f. Perform contact -resistance test across main contacts and correct values exceeding 500 microhms and values for one pole deviating by more than 50 percent from other poles.
g. Verify proper sequence and correct timing of automatic engine starting, transfer time delay, retransfer time delay on restoration of normal power, and engine cool-down and shutdown.

6. Ground-Fault Tests: Coordinate with testing of ground -fault protective devices for power delivery from both sources.
a. Verify grounding connections and locations and ratings of sensors.

B. Coordinate tests with tests of generator and run them concurrently.

C. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation and contact resistances and time delays. Attach a label or tag to each tested component indicating satisfactory completion of tests.

D. Transfer switches will be considered defective if they do not pass tests and inspections.

E. Remove and replace malfunctioning units and retest as specified above.

F. Prepare test and inspection reports.

G. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each switch. Remove all access panels so joints and connections are accessible to portable scanner.

1. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.

2. Record of Infrared Scanning: Prepare a certified report that identifies switches checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.

City of Camarillo TRANSFER SWITCHES
CH-5067-2 263600-13

3.04 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain transfer switches and related equipment.

B. Training shall include testing ground -fault protective devices and instructions to determine when the ground-fault system shall be retested. Include instructions on where ground-fault sensors are located and how to avoid negating the ground-fault protection scheme during testing and circuit modifications.

C. Coordinate this training with that for generator equipment.

END OF SECTION 263600 – TRANSFER SWITCHES

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-1

SECTION 263713 – MICROGRID CONTROLLER
PART 1 - GENERAL

1.01 SUMMARY
A. This scope of work includes construction, commissioning and operation of a complete energy system as described here and elsewhere in the Contract and Design Documents.

B. In this document, "Owner" shall refer to owner of the site where project will be located, regardless of system ownership, and include any representative of the site owner, such as independent engineers, consultants or inspectors. "Contract" refers to the design- bid-build and/or construction contract and any associated design-bid-build design documents, inclusive of requirements outlined in the request for proposals (RFP). "Contractor" refers to the entity performing the work, inclusive of Engineer(s) and Architect(s) of Record for design-bid-build contracts if required for alternate design proposal.

C. The Microgrid Controller shall be grid connected and “behind-the-meter”.

D. The Microgrid Controller shall meet all applicable codes, utility interconnection requirements and the specified requirements including anti islanding, high and low voltage and/or frequency ride- through, and power quality as well as operational requirements regarding real and reactive power import and export. The microgrid as an entity and the Microgrid Controller shall satisfy these requirements.

E. The Microgrid Controller shall be capable of managing non -dispatchable generation such as solar PV as well as dispatchable generation such as BESS, generators, and other DER at necessary setpoints to supply power to the microgrid.

F. The Microgrid Controller shall manage the transition from grid connected to islanded state for both planned and unplanned islanding. Black start and blinkless transfer capability should be coordinated with the Owner prior to material procurement and rough in.

1.02 CODES AND REFERENCES
A. The design and installation shall conform to all requirements as defined by the applicable codes, laws, rules, regulations and standards of applicable code enforcing authorities (latest edition unless otherwise noted). The following are key standards that shall be followed. The Engineer or Architect of Record and Contractor shall ensure all applicable codes are followed:

1. ASTM International (ASTM) (www.astm.org)

2. American National Standards Institute (ANSI), including:

ANSI C37, Surge withstand capabilities
ANSI C57, Transformer standards

3. California Building Code (CBC), with State of California Amendments

4. California Building Standards Code, Title 24, including:

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-2

a. Part 3, California Electrical Code (CEC)
b. Part 6, California Energy Code
c. Part 9, California Fire Code, CFC (including Section 608) d. Part 11, California Green Building Standards Code

5. California Dept. of Industrial Relations, General Industry Safety Orders Section 5185

6. California Office of the State Fire Marshall

7. California Public Utilities Commission, including:

Tariff Rule 21
Self-Generation Incentive Program Requirements

8. Institute of Electrical and Electronics Engineers (IEEE), including:
a. IEEE 1547, Standard for Interconnecting Distributed Resources with Electrical Power Systems
b. IEEE 2030.7-9, Microgrid Controller standards
c. IEEE P2030.8/D9, Testing of Microgrid Controllers

9. International Electrical Testing Association (NETA)

10. International Fire Code

11. Local Fire Jurisdiction Requirements

12. National Electrical Manufacturers Association (NEMA)

13. National Fire Protection Association (NFPA), including:
a. NFPA 70, National Electrical Code
b. NFPA 704, Standard System for the Identification of the Hazards of Materials for Emergency Response
c. NFPA 791, Recommended Practice and Procedures for Unlabeled Electrical Equipment Evaluation

14. Owner Specifications and Requirements

15. Underwriters Laboratory (UL), including:
a. UL 1741/1741-SA, Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Systems
b. UL 9540, Standard for Energy Storage Systems and Equipment c. UL 2900, Standard for Software Cybersecurity for Network - Connectable Products

16. Utility company standards and requirements

1.03 DEFINITIONS
A. AHJ – Authorities Having Jurisdiction
B. BESS – Battery Energy Storage System
C. BMS – Battery Management System
D. BTM – “Behind-the-Meter”: The energy user’s side of the utility meter.

E. CT – Current Transformer
City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-3

F. DAS – Data Acquisition System
G. DER – Distributed Energy Resources
H. EMS – Energy Management System
I. HMI – Human Machine Interface
J. LAN – Local Area Network
K. MSDS – Material Safety Data Sheet
L. OPR – Owner’s Project Requirements
M. OSHA – Occupational Safety and Health Administration (refers to both OSHA and Cal- OSHA)
N. PCC – Point of Common Coupling
O. PCS – Power Conversion System
P. PLC – Programmable Logic Controller
Q. POI – Point of Interconnection
R. PT – Potential Transformer
S. SCADA- Supervisory Control and Data Acquisition System T. SGIP – Self Generation Incentive Program
U. SOC – State of Charge or Energy: Nominal Energy Remaining / Nominal Full Pack Energy Available
V. UPS – Uninterruptible Power Supply

1.04 WORK INCLUDED
A. The work shall include the scheduling, materials, labor, equipment, installation, testing, commissioning, software, and incidentals necessary to install complete, turnkey, utility -interconnected Microgrid Controller in conformity with applicable codes, eligible incentive programs, and professionally recognized standards.

B. Submit for review and comment of all O&M manuals, and miscellaneous documentation required to provide a complete installation. Provide all as- built documentation including calculations, software, design drawings, equipment drawings required for the Microgrid Controller.

C. Provide and maintain a Schedule for all fabrication, procurement, installation, and testing activities for the project.

D. Microgrid Controller equipment shall include all associated control and communication interface systems equipment necessary to support the intended operation of the Microgrid and to allow for interconnection with the utility. Microgrid Controllers shall consist of all enclosures/skids, pads, fencing, underground conduits, conductors, inverters, switchgear, controls, transformers, protection relays, utility metering, IT/communication equipment, breakers, disconnects, cabling and associated relaying.

E. The Microgrid Controller shall be designed to provide automatic, unattended operation of the Microgrid.

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-4

F. The Microgrid shall be utility grid connected on the Owner-side of the utility meter (behind-the-meter). The Contractor shall be responsible for all required utility company coordination, applications, inspections, and final approval for the complete interconnection of the Microgrid with the utility company grid, including bi-directional utility meters at each location.

G. The Contractor shall ensure adequate clearance and equipment space within the allotted areas and existing building and site conditions. All equipment and sizes / clearances shall be coordinated with the Owner and the Architect prior to rough - in.

H. The Contractor shall provide for the disconnection, disposition, and proper disposal of all existing equipment to be replaced.

1.05 DESIGN PROCEDURE AND REQUIREMENTS
A. The Microgrid Controller shall support the following Grid Connected functions:

1. Off Grid Preparation - Off Grid Preparation prepares the system to transition to Island mode due to an impending grid outage. Off Grid Preparation is triggered with either advanced notice of an announced rolling blackout, announced Public Safety Power Shutoff (PSPS), weather forecasts looking at high wind speeds, and encroaching major storms.

When the event is detected, the Microgrid Controller evaluates the energy required for the standby loads and prepares the energy assets (including the Generator) for the loss of the grid power.

B. The Microgrid Controller shall support the following islanded functions:

1. Islanding and Generator Control – When electricity from the grid is not available, the Microgrid Controller communicates to the relays to open the motor-operated main breaker to the facility. The microgrid controller opens the motor-operated circuit breakers connected to the PV. The Microgrid Controller dispatches the Generator and closes the motor -operated Generator breaker. Once the grid is back in service, the Microgrid Controller synchronizes the genset to the grid, communicates to the relays to open the Generator Breaker and close the main breaker to the facility.

Prior to Microgrid Controller procurement: Verify Microgrid Controller is compatible with and can interface with Generator controller.

2. Future Resiliency Function – The Microgrid Controller shall accommodate the addition of a future BESS system. When electricity from the grid is not available, the Microgrid Controller communicates to the relays to open the main breaker to the facility, and transition the BESS to grid-forming mode.

Once the internal grid is established and stable, the primary functions are related to maintaining stability of the islanded electrical network, managing the balance between generation supply (Solar PV, generator , and BESS) and load demand, and to maintain electrical safety and protection of the standby loads. When the solar PV system is generating energy, it should serve the designated standby loads and charge the BESS with any energy not required by standby loads. If there is solar PV energy not required by the standby loads and the BESS is approaching 100% State of Charge (SOC), the BESS/Microgrid Controller should begin to curtail or shut down the PV system. The BESS/Microgrid Controller should restore the PV City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-5

system to and operational mode if the BESS can be charged and the solar PV system can operate. If the BESS reaches a low state of charge threshold and the PV system is not capable of replenishing the BESS the genset should be dispatched to supply standby loads and charge the BESS. Once the grid is back in service, the controls synchronize the inverters to the grid, communicate to the relays to close the main breaker to the facility or PV & BESS point of common coupling and transition the BESS back to grid-following mode.

1.06 ACTION SUBMITTALS
A. The Microgrid Controller and BESS shall support the following Grid Connected functions:

1.07 INFORMATIONAL SUBMITTALS
A. Testing Plans and Reports

1. The Contractor shall ensure factory testing is performed on the Microgrid Control System. Where appropriate, tests should conform to those contained in ANSI, NEMA, ASME, NEC, ASTM and IEEE standards and guides. Where standards are not suitable or applicable, other common industry procedures and mutually acceptable methods shall be used.

2. Where a microgrid is included in the Project scope, the tests shall demonstrate that when the utility grid goes down, the microgrid system is capable of automatically islanding from the utility connection using a protection relay paired with a motor operated circuit breaker. Tests shall also demonstrate that when the utility grid comes back up, the microgrid system is capable of automatically synchronizing and reconnecting with and operating in parallel with the utility connection.

3. Certified reports of all tests shall be furnished to the Owner for review and shall indicate that there are no exceptions noted and that the tests meet the bridging document and design requirements.

1.08 CLOSEOUT SUBMITTALS
A. The Contractor shall submit a Commissioning Plan and conduct commissioning per the manufacturer’s recommendations and the standards identified in this specification. The Contractor shall work cooperatively with Owner/Owner’s representative to develop a formal commissioning plan to demonstrate the Microgrid performs to the project requirements.

B. Overall System Tests - The Contractor shall demonstrate that the Microgrid Control System integrates and coordinates as intended at the factory and on site. At a minimum, the contractor shall demonstrate that all control and management systems, including but not limited to, overall site controls, PV System, and Generator interact as intended in grid connected, islanded mode and transitions between grid connected and islanded mode. The contractor shall support any testing required by the utility.

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-6

1.09 MAINTENANCE AND MATERIAL SUBMITTALS
A. Instruction Books

1. No later than fifteen (15) calendar days from the date of commissioning, the Contractor shall furnish digital (PDF format) detailed instruction books for the Microgrid Controller furnished for the Project. These books shall contain all illustrations, assembly drawings, outline drawings, wiring diagrams, replacement parts list that includes part number identification, a list of recommended spare parts, and instructions necessary for storing, installing, operating and maintaining the equipment. The illustrated parts shall be numbered for identification. All information contained therein shall apply specifically to the equipment furnished and shall not include instructions that are not applicable.

1.10 QUALITY ASSURANCE
A. All equipment shall be listed to Underwriters’ Laboratories (UL) standards 1973, 1741, 9540, 9540a, and that is applicable to authorities having jurisdiction (AHJ).

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

C. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the International Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.

D. Installer Qualifications – The installing contractor shall be familiar with the equipment to be installed and have the necessary training to install the equipment.

If specific state contracting qualifications are required for installation of Microgrid systems, the installing contractor shall comply with those requirements.

1.11 DELIVERY, STORAGE, AND HANDLING
A. All materials shall be delivered new, undamaged and without defects.

B. All equipment shall be handled with care so as not to damage the delivered products. All equipment shall be installed in new and neat condition.

C. Appropriate Personal Protective Equipment (PPE) shall be worn when handling the equipment.

1.12 WARRANTY
A. All equipment furnished under this Section shall be warranted by the Contractor and the equipment manufacturer(s) for a minimum period of Term.

B. Warranty shall include all parts and expenses to perform necessary work, inclusive of regular software updates over the warranty period sufficient to meet the operational and functional intent of the system.

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-7

PART 2 - PRODUCTS

2.01 SUMMARY
A. MANUFACTURER QUALIFICATIONS: Manufacturers shall provide equipment that meets all current industry, utility company, and incentive required standards and all performance criteria set forth in the bridging documents and Contract.

B. The Owner seeks equipment from proven, industry leading manufacturers in solid financial standing, producing tier-one (financeable) equipment.

2.02 EQUIPMENT AND MATERIALS
A. Microgrid Control Systems Shall Meet the Following Minimum Requirements:

1. At least three of the same systems proposed for this Project (including overall design and software systems), have been installed in a behind-the- meter arrangement with a utility in the United States.

2. The Microgrid Control System shall be from a proven technology designed for the type of service described by this specification and the bridging documents. For the purposes of this specification, proven technology shall be defined as having been in success ful commercial service in similar applications for a period of time sufficient to establish a service life and maintenance history.

3. The Microgrid Control System must be compatible with Modbus and Sunspec protocols or alternative protocol upon Owner acceptance.

B. The Contractor shall have overall responsibility for the safety of the electrical design and installation of the Microgrid Control System.

C. The Microgrid Control System design and installation shall be modularized and connected in a manner that enables adequate access for easy field removal and replacement of failed modules or equipment. Access areas shall conform to all applicable codes and facilitate access by maintenance personnel. As applicable, the racks shall provide sufficient clearance between tiers to facilitate required maintenance, including testing and inspection, and replacement.

D. All racks and metallic conductive members shall be solidly grounded.

E. Incorporate disconnect switches for AC and DC power disconnect in compliance with applicable codes and utility requirements.

F. Ambient temperature range have been determined by the Contractor and appropriate for the Project location. The BESS has been designed to operate and maintain sustainable operating temperatures within the Project’s ambient temperature range.

2.03 ENERGY MANAGEMENT SYSTEM
A. The Project shall include all necessary software applications and supporting hardware required to meet the specified operational/functional requirements.

Software algorithms, external data input capabilities, and user interfaces shall provide for user specified variable input or set point values, as well as external City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-8

data value streams defined in the Owner’s Project Requirements, Section 1.09 of this document.

B. REMOTE OPERATIONS

1. The EMS shall be able to respond to manual commands that are issued remotely by an external supervisory controller using a secure internet - based protocol.

2. The Project shall remain functional in the absence or loss of communication from the remote controller. The Project shall continue its current mode of operation.

2.04 INFORMATION SECURITY
A. Contractor shall develop and implement a cybersecurity plan that addresses and mitigates the critical vulnerabilities inherent in both the hardware and software that comprise the control and data acquisition systems.

PART 3 - EXECUTION

3.01 REQUIRED PLACARDS & LABELING
A. All placards and labels shall meet all code requirements, these minimum requirements, and industry best practices.

B. All placards shall be machine generated phenolic type with red background and white lettering, affixed to equipment with stainless steel screws or with permanent adhesive where set screws are not feasible. Minimum lettering size to be 1/4" unless otherwise noted or required for legibility.

3.02 UTILITY INTERCONNECTION & PERMITTING
A. Contractor shall coordinate with the utility company to provide all grid intertie requirements and process all required paperwork per utility company requirements.

B. Protection relays for the interconnection shall meet or exceed utility requirements.

C. Contractor shall manage the utility interconnection process and ensure that the systems achieve Permission to Operate (PTO)
D. Contractor shall ensure that all permitting is closed out with the AHJ(s).

3.03 INSTALLATION STANDARDS
A. System Installation shall conform to the equipment manufacturers Installation Manual(s) and requirements or guidelines.

B. All Local, State, and NEC codes shall be observed, including all industry standards related to the installation, operation, and maintenance of the standby power systems.

C. Installation and components must meet utility equipment and safety requirements.

D. Installation must meet incentive requirements, where applicable.

City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-9

E. CIVIL/STRUCTURAL

1. The Project pads, foundations, fencing and other structures have been designed by or under the supervision, reviewed, approved, and signed by a qualified registered professional engineer in the Project state.

2. The Contractor shall gain access to the Site as outlined in the Contract.

The Contractor shall be responsible for damage to site and roadways resulting from the work performed.

3. Existing structures and utilities that are adjacent to or within the limits of the Project area shall be protected against damage. The Contractor shall be fully responsible for all repairs in the event of removal or damage of any existing structure, equipment or systems that are intended to remain in place.

F. Excavation. When necessary, the Contractor shall perform all common and deep excavation necessary for installation of all foundations and utilities. All excavation shall be in accordance with Cal-OSHA regulations. Excavation spoils shall be the Contractor’s responsibility and may be used for backfill or embankment if suitable for this application. Unsuitable or excess excavated material shall be properly and promptly disposed of. The Contractor shall verify that earth material exposed in excavations is consistent with those assumed for the Contractor’s foundation designs. If earth materials are different than assumed for particular foundation design the Contractor shall modify the design and/or treat the earth material (over excavate, replace, etc.) as necessary to provide foundation meeting design requirements.

G. Construction Surveying. When necessary, the Contractor shall furnish all labor, equipment, material and services to perform all surveying and staking essential for the completion of the Project in conformance with the plans and specifications.

H. Fills. When necessary, earth fill material adjacent to and below structures shall conform to the Contractor’s design requirements for the structure. Contractor prepared specifications and drawings shall indicate the types of soil to use for particular fills and compaction requirements. Fill shall be placed as uniformly as possible on all sides of structural units. Fill placed against green concrete or retaining walls shall be placed in a manner which will prevent damage to the structures and will allow the structures to assume the loads from the fill gradually and uniformly.

3.04 TESTING & COMMISSIONING
A. Contractor shall develop a commissioning plan and commission the Microgrid to the requirements of the listed/applicable standards, to industry best practices. All modes of operation should be tested and validated. The commissioning process should address the following at a minimum:

1. Verification of sensors, metering, and alarms

2. Verification of Microgrid system performance
a. Validate Defined Modes of Operation
i. Grid Connected
ii. Island Mode Operations

3. Verification of Control Functions for the Entire System City of Camarillo MICROGRID CONTROLLER
CH-5067-2 263713-10

a. PV
b. Monitoring and Controls
c. Electric Infrastructure.

B. Factory testing shall be performed and documentation provided.

C. Complete testing of the installed system shall be performed by a manufacturer certified representative prior to system start up. All required modifications shall be made, and system signed off prior to making the system operational.

D. Clear and complete documentation shall be provided demonstrating that the commissioning plan was executed and that the system achieved commissioning requirements.

3.05 DOCUMENTATION
A. All commissioning and testing reports shall be provided to the Owner within 15 days of completion of testing.

B. The Contractor shall submit to the Owner a comprehensive Operations and Maintenance (O&M) Manual with details for BESS. O&M Manuals shall be compiled as a single, bookmarked portable document format (PDF) file. The document shall be a well -organized, compr ehensive and custom document created with details for each site. The document shall be provided according to the requirements in Section 01 33 00.

3.06 TRAINING
A. Owner training shall be provided by the Contractor. The training course shall cover a breakdown of the BESS, procedures related to emergency response and operation and control of the Microgrid.

B. Training shall be scheduled before commencing Project performance verification tests. An outline for the training and the O&M manual shall be submitted to the Owner 30 days ahead of the actual date of training. Approval of this outline shall be obtained from the Owner.

3.07 OPERATION
A. Contractor shall provide operational services for the life of the Microgrid per the Contract. Services shall include, at a minimum:

1. Preventative maintenance as specified by the manufacturer(s) and industry standards.

2. Software updates. Updates shall be provided remotely and in prompt response to any utility tariff changes or grid service requirements.

3. Ongoing optimization of energy cost savings function of the M icrogrid Control System.

4. Performance reporting, including energy cost savings provided by the Microgrid Control System.

END OF SECTION 263713 – MICROGRID CONTROLLER

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-1

SECTION 265619 – LED EXTERIOR LIGHTING
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Exterior solid-state luminaires that are designed for and exclusively use LED source technology.

2. Luminaire supports.

3. Luminaire-mounted photoelectric relays.

1.02 DEFINITIONS
A. CCT: Correlated color temperature.

B. CRI: Color rendering index.

C. Fixture: See "Luminaire."
D. IP: International Protection or Ingress Protection Rating.

E. Lumen: Measured output of lamp and luminaire, or both.

F. Luminaire: Complete lighting unit, including lamp, reflector, and housing.

1.03 ACTION SUBMITTALS
A. Product Data: For each type of luminaire.

1. Arrange in order of luminaire designation.

2. Include data on features, accessories, finishes and materials.

3. Include physical description and dimensions of luminaire.

4. Include life, output (lumens, CCT, and CRI), and energy-efficiency data of LED source. Lumens must be shown as delivered.

5. Photometric data and adjustment factors based on laboratory tests, complying with IES Lighting Measurements Testing and Calculation Guides, of each luminaire type. The adjustment factors shall be for lamps and accessories identical to those indicated for the luminaire as applied in this Project, IES LM-79 and IES LM-80.
a. Manufacturer's Certified Data: Photometric data certified by manufacturer's laboratory with a current accreditation under the NVLAP for Energy Efficient Lighting Products.
b. Testing Agency Certified Data: For indicated luminaires, photometric data certified by a qualified independent testing agency. Photometric data for remaining luminaires shall be certified by manufacturer.

6. Wiring diagrams for power, control, and signal wiring.

7. Photoelectric relays.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-2

8. Means of attaching luminaires to supports and indication that the attachment is suitable for components involved.

9. Power supply electrical data including voltage, inrush amps, THD, operating current, system watts and VA.

B. Shop Drawings: For nonstandard or custom luminaires.

1. Include plans, elevations, sections, and mounting and attachment details.

2. Include details of luminaire assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.

3. Include diagrams for power, signal, and control wiring.

C. Samples: For each luminaire and for each color and texture indicated with factory- applied finish.

D. Product Schedule: For luminaires and lamps. Use same designations indicated on Drawings.

E. Delegated-Design Submittal: For luminaire supports.

1. Include design calculations for luminaire supports and seismic restraints.

1.04 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of the items involved:

1. Luminaires.

2. Structural members to which equipment and luminaires will be attached.

3. Underground utilities and structures.

4. Existing underground utilities and structures.

5. Above-grade utilities and structures.

6. Existing above-grade utilities and structures.

7. Building features.

8. Vertical and horizontal information.

B. Qualification Data: For testing laboratory providing photometric data for luminaires.

C. Seismic Qualification Data: For luminaires, accessories, and components, from manufacturer.

1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-3

D. Product Certificates: For each type of the following:

1. Luminaire.

2. Photoelectric relay.

E. Product Test Reports: For each luminaire, for tests performed by manufacturer and witnessed by a qualified testing agency.

F. Source quality-control reports.

G. Sample warranty.

1.05 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For luminaires and photoelectric relays to include in operation and maintenance manuals.

1. Provide a list of all lamp types used on Project. Use ANSI and manufacturers' codes.

2. Provide a list of all photoelectric relay types used on Project; use manufacturers' codes.

1.06 QUALITY ASSURANCE
A. Luminaire Photometric Data Testing Laboratory Qualifications: Luminaire manufacturers' laboratory that is accredited under the NVLAP for Energy Efficient Lighting Products.

B. Luminaire Photometric Data Testing Laboratory Qualifications: Provided by an independent agency, with the experience and capability to conduct the testing indicated, that is an NRTL as defined by OSHA in 29 CFR 1910.7, accredited under the NVLAP for Energy Efficient Lighting Products and complying with applicable IES testing standards.

C. Provide luminaires from a single manufacturer for each luminaire type.

D. Each luminaire type shall be binned within a three-step MacAdam Ellipse to ensure color consistency among luminaires.

E. Installer Qualifications: An authorized representative who is trained and approved by manufacturer.

1.07 DELIVERY, STORAGE, AND HANDLING
A. Protect finishes of exposed surfaces by applying a strippable, temporary protective covering prior to shipping.

1.08 FIELD CONDITIONS
A. Verify existing and proposed utility structures prior to the start of work associated with luminaire installation.

B. Mark locations of exterior luminaires for approval by Architect prior to the start of luminaire installation.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-4

1.09 WARRANTY
A. Warranty: Manufacturer and Installer agree to repair or replace components of luminaires that fail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:
a. Structural failures, including luminaire support components. b. Faulty operation of luminaires and accessories.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
d. Inadequately maintained illuminance levels at end of warranty period as prorated from levels expected at end of useful life. Example, a luminaire expected to produce 70% of initial lumens at 100,000 hours would be expected to last over 11 years (continuous operation), so levels would be expected to be at 87% of initial at end of five year warranty period.

2. Warranty Period: Five years from date of Substantial Completion.

PART 2 - PRODUCTS

2.01 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Acuity Brands Lighting, Inc.

2. BEGA.

3. Eaton.

4. GE Lighting Solutions.

5. Hubbell Lighting, Inc.

6. Philips Lighting Company.

7. Visionaire Lighting, LLC

2.02 PERFORMANCE REQUIREMENTS
A. Seismic Performance: Luminaires shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

B. Seismic Performance: Luminaires and lamps shall be labeled vibration and shock resistant.

1. The term "withstand" means "the luminaire will remain in place without separation of any parts when subjected to the seismic forces specified and the luminaire will be fully operational during and after the seismic event." City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-5

2.03 LUMINAIRE REQUIREMENTS
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. NRTL Compliance: Luminaires shall be listed and labeled for indicated class and division of hazard by an NRTL.

C. FM Global Compliance: Luminaires for hazardous locations shall be listed and labeled for indicated class and division of hazard by FM Global.

D. UL Compliance: Comply with UL 1598 and listed for wet location.

E. L70 lamp life of 50,000 hours.

F. Lamps dimmable from 100 percent to 0 percent of maximum light output.

G. Internal driver.

H. Nominal Operating Voltage: 100 - 300 V ac.

I. Source Limitations: For luminaires, obtain each color, grade, finish, type, and variety of luminaire from single source from a single manufacturer with resources to provide products of consistent quality in appearance and physical properties.

2.04 LUMINAIRE-MOUNTED PHOTOELECTRIC RELAYS
A. Comply with UL 773 or UL 773A.

B. Contact Relays: Factory mounted, single throw, designed to fail in the on position, and factory set to turn light unit on at 1.5 to 3 fc (16 to 32 lx) and off at 4.5 to 10 fc (48 to 108 lx) with 15- second minimum time delay. Relay shall have directional lens in front of photocell to prevent artificial light sources from causing false turnoff.

1. Relay with locking-type receptacle shall comply with ANSI C136.10.

2. Adjustable window slide for adjusting on-off set points.

2.05 MATERIALS
A. Metal Parts: Free of burrs and sharp corners and edges.

B. Sheet Metal Components: Form and support to prevent warping and sagging.

C. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage under operating conditions, and designed to permit relamping without use of tools.

Designed to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during relamping and when secured in operating position.

Doors shall be removable for cleaning or replacing lenses.

D. Diffusers and Globes:

1. Acrylic Diffusers: 100 percent virgin acrylic plastic, with high resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.

2. Glass: Annealed crystal glass unless otherwise indicated.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-6

3. Lens Thickness: At least 0.125 inch (3.175 mm) minimum unless otherwise indicated.

E. Lens and Refractor Gaskets: Use heat - and aging-resistant resilient gaskets to seal and cushion lenses and refractors in luminaire doors.

F. Reflecting surfaces shall have minimum reflectance as follows unless otherwise indicated:

1. White Surfaces: 85 percent.

2. Specular Surfaces: 83 percent.

3. Diffusing Specular Surfaces: 75 percent.

G. Housings:

1. Rigidly formed, weather- and light-tight enclosure that will not warp, sag, or deform in use.

2. Provide filter/breather for enclosed luminaires.

H. Factory-Applied Labels: Comply with UL 1598. Include recommended lamps.

Labels shall be located where they will be readily visible to service personnel, but not seen from normal viewing angles when lamps are in place.

1. Label shall include the following lamp characteristics:
a. "USE ONLY" and include specific lamp type.
b. Lamp diameter, shape, size, wattage and coating.
c. CCT and CRI for all luminaires.

2.06 FINISHES
A. Variations in Finishes: Noticeable variations in same piece are unacceptable.

Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

B. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -tested luminaire before shipping. Where indicated, match finish process and color of pole or support materials.

C. Factory-Applied Finish for Aluminum Luminaires: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

D. Factory-Applied Finish for Steel Luminaires: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

1. Surface Preparation: Clean surfaces to comply with SSPC-SP 1, to remove dirt, oil, grease, and other contaminants that could impair paint bond. Grind welds and polish surfaces to a smooth, even finish. Remove mill scale and rust, if present, from uncoated steel, complying with SSPC-SP 5/NACE No. 1 or SSPC-SP 8.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-7

2. Exterior Surfaces: Manufacturer's standard finish consisting of one or more coats of primer and two finish coats of high-gloss, high-build polyurethane enamel.
a. Color: As selected by Architect from manufacturer's full range.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in for luminaire electrical conduit to verify actual locations of conduit connections before luminaire installation.

C. Examine walls, roofs, and canopy ceilings for suitable conditions where luminaires will be installed.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.02 TEMPORARY LIGHTING
A. If approved by the Architect, use selected permanent luminaires for temporary lighting. When construction is substantially complete, clean luminaires used for temporary lighting.

3.03 INSTALLATION
A. Comply with NECA 1.

B. Use fastening methods and materials selected to resist seismic forces defined for the application and approved by manufacturer.

C. Install lamps in each luminaire.

D. Fasten luminaire to structural support.

E. Supports:

1. Sized and rated for luminaire weight.

2. Able to maintain luminaire position after cleaning and relamping.

3. Support luminaires without causing deflection of finished surface.

4. Luminaire-mounting devices shall be capable of supporting a horizontal force of 100 percent of luminaire weight and a vertical force of 400 percent of luminaire weight.

F. Wall-Mounted Luminaire Support:

1. Attached to structural members in walls, attached to a minimum 1/8 inch (3 mm) backing plate attached to wall structural members or attached using through bolts and backing plates on either side of wall.

G. Wiring Method: Install cables in raceways. Conceal raceways and cables.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-8

H. Install luminaires level, plumb, and square with finished grade unless otherwise indicated.

I. Coordinate layout and installation of luminaires with other construction.

J. Adjust luminaires that require field adjustment or aiming. Include adjustment of photoelectric device to prevent false operation of relay by artificial light sources, favoring a north orientation.

3.04 CORROSION PREVENTION
A. Aluminum: Do not use in contact with earth or concrete. When in direct contact with a dissimilar metal, protect aluminum by insulating fittings or treatment.

B. Steel Conduits: Comply with Section 260533 "Raceways and Boxes for Electrical Systems." In concrete foundations, wrap conduit with 0.010-inch (0.254-mm) thick, pipe-wrapping plastic tape applied with a 50 percent overlap.

3.05 IDENTIFICATION
A. Identify system components, wiring, cabling, and terminals. Comply with requirements for identification specified in Section 260553 "Identification for Electrical Systems."

3.06 FIELD QUALITY CONTROL
A. Inspect each installed luminaire for damage. Replace damaged luminaires and components.

B. Perform the following tests and inspections with the assistance of a factory - authorized service representative:

1. Operational Test: After installing luminaires, switches, and accessories, and after electrical circuitry has been energized, test units to confirm proper operation.

2. Verify operation of photoelectric controls.

C. Illumination Tests:

1. Measure light intensities at night. Use photometers with calibration referenced to NIST standards. Comply with the following IES testing guides:
a. IES LM-5.
b. IES LM-50.
c. IES LM-52.
d. IES LM-64.
e. IES LM-72.

2. Operational Test: After installing luminaires, switches, and accessories, and after electrical circuitry has been energized, test units to confirm proper operation.

D. Luminaire will be considered defective if it does not pass tests and inspections.

E. Prepare test and inspection reports.

City of Camarillo LED EXTERIOR LIGHTING
CH-5067-2 265619-9

3.07 ADJUSTING
A. Occupancy Adjustments: When requested within three months of date of Substantial Completion, provide on-site assistance in adjusting the direction of aim of luminaires to suit occupied conditions. Make up to one visit to Project during other-than-normal hours for this purpose. Some of this work may be required during hours of darkness.

1. During adjustment visits, inspect all luminaires. Replace lamps or luminaires that are defective.

2. Parts and supplies shall be manufacturer's authorized replacement parts and supplies.

3. Adjust the aim of luminaires in the presence of the Architect.

END OF SECTION 265619 – LED EXTERIOR LIGHTING

City of Camarillo SITE CLEARING
CH-5067-2 311100-1

SECTION 311100 – SITE CLEARING
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Clearing and grubbing.

4. Stripping and stockpiling topsoil.

5. Stripping and stockpiling rock.

6. Removing above- and below-grade site improvements.

7. Disconnecting, capping or sealing, and abandoning site utilities in place.

8. Temporary erosion and sedimentation control.

1.02 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow.

D. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow. Its appearance is generally friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects larger than 2 inches (50 mm) in diameter; and free of weeds, roots, toxic materials, or other nonsoil materials.

E. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.

F. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings.

G. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.03 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

City of Camarillo SITE CLEARING
CH-5067-2 311100-2

1.04 INFORMATIONAL SUBMITTALS
A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.

1. Use sufficiently detailed photographs or video recordings.

2. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plant designated to remain.

B. Topsoil stripping and stockpiling program.

C. Rock stockpiling program.

D. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.

E. Burning: Documentation of compliance with burning requirements and permitting of authorities having jurisdiction. Identify location(s) and conditions under which burning will be performed.

1.05 QUALITY ASSURANCE
A. Topsoil Stripping and Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.

B. Rock Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.

1.06 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed trafficways if required by Owner or authorities having jurisdiction.

B. Improvements on Adjoining Property: Authority for performing site clearing indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.

1. Do not proceed with work on adjoining property until directed by Architect.

C. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing.

D. Do not commence site clearing operations until temporary erosion- and sedimentation-control measures are in place.

City of Camarillo SITE CLEARING
CH-5067-2 311100-3

E. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.

PART 2 - PRODUCTS

2.01 MATERIALS
A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."

1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.

PART 3 - EXECUTION

3.01 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Verify that trees, shrubs, and other vegetation to remain or to be relocated have been flagged and that protection zones have been identified and enclosed according to requirements in Section 015639 "Temporary Tree and Plant Protection."
C. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.02 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil -bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation -control Drawings and requirements of authorities having jurisdiction.

B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.

3.03 TREE AND PLANT PROTECTION
A. Protect trees and plants remaining on- site according to requirements in Section 015639 "Temporary Tree and Plant Protection."
B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations according to requirements in Section 015639 "Temporary Tree and Plant Protection." City of Camarillo SITE CLEARING
CH-5067-2 311100-4

3.04 EXISTING UTILITIES
A. Owner will arrange for disconnecting and sealing indicated utilities that serve existing structures before site clearing, when requested by Contractor.

1. Verify that utilities have been disconnected and capped before proceeding with site clearing.

B. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.

1. Arrange with utility companies to shut off indicated utilities.

2. Owner will arrange to shut off indicated utilities when requested by Contractor.

C. Locate, identify, and disconnect utilities indicated to be abandoned in place.

D. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others, unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Architect not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Architect's written permission.

E. Excavate for and remove underground utilities indicated to be removed.

F. Removal of underground utilities is included in earthwork sections; in applicable electrical sections; and in Section 024119 "Selective Demolition.”

3.05 CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.

1. Do not remove trees, shrubs, and other vegetation indicated to remain or to be relocated.

2. Grind down stumps and remove roots larger than 2 inches (50 mm) in diameter, obstructions, and debris to a depth of 18 inches (450 mm) below exposed subgrade.

3. Use only hand methods or air spade for grubbing within protection zones.

4. Chip removed tree branches and dispose of off-site.

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches (200 mm), and compact each layer to a density equal to adjacent original ground.

City of Camarillo SITE CLEARING
CH-5067-2 311100-5

3.06 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.

B. Strip topsoil to depth indicated on Drawings in a manner to prevent intermingling with underlying subsoil or other waste materials.

1. Remove subsoil and nonsoil materials from topsoil, including clay lumps, gravel, and other objects larger than 2 inches (50 mm) in diameter; trash, debris, weeds, roots, and other waste materials.

C. Stockpile topsoil away from edge of excavations without intermixing with subsoil or other materials. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.

1. Limit height of topsoil stockpiles to 72 inches (1800 mm).

2. Do not stockpile topsoil within protection zones.

3. Dispose of surplus topsoil. Surplus topsoil is that which exceeds quantity indicated to be stockpiled or reused.

4. Stockpile surplus topsoil to allow for respreading deeper topsoil.

3.07 SITE IMPROVEMENTS
A. Remove existing above- and below -grade improvements as indicated and necessary to facilitate new construction.

B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.

C. Unless existing full -depth joints coincide with line of demolition, neatly saw -cut along line of existing pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.

D. Paint cut ends of steel reinforcement in concrete to remain with two coats of antirust coating, following coating manufacturer's written instructions. Keep paint off surfaces that will remain exposed.

3.08 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.

B. Burning tree, shrub, and other vegetation waste is permitted according to burning requirements and permitting of authorities having jurisdiction. Control such burning to produce the least smoke or air pollutants and minimum annoyance to surrounding properties. Burning of other waste and debris is prohibited.

C. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials and transport them to recycling facilities. Do not interfere with other Project work.

END OF SECTION 311100 – SITE CLEARING

City of Camarillo EARTH MOVING
CH-5067-2 312000-1

SECTION 312000 – EARTH MOVING
PART 1 - GENERAL

1.01 SUMMARY
A. Section Includes:

1. Excavating and filling for rough grading the Site.

2. Preparing subgrades for slabs-on-grade.

3. Excavating and backfilling for buildings and structures.

4. Drainage course for concrete slabs-on-grade.

5. Subbase course for concrete pavements.

6. Subbase course and base course for asphalt paving.

7. Subsurface drainage backfill for walls and trenches.

8. Excavating and backfilling trenches for utilities and pits for buried utility structures.

9. Excavating well hole to accommodate elevator-cylinder assembly.

1.02 DEFINITIONS
A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

2. Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Base Course: Aggregate layer placed between the subbase course and hot -mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Drainage Course: Aggregate layer supporting the slab- on-grade that also minimizes upward capillary flow of pore water.

F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by Architect.

Authorized additional excavation and replacement material will be paid for according to Contract provisions for unit prices.

2. Bulk Excavation: Excavation more than 10 feet (3 m) in width and more than 30 feet (9 m) length.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction by Architect.

City of Camarillo EARTH MOVING
CH-5067-2 312000-2

Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.

G. Fill: Soil materials used to raise existing grades.

H. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material that exceed 1 cu. yd. (0.76 cu. m) for bulk excavation or 3/4 cu. yd. (0.57 cu. m) for footing, trench, and pit excavation that cannot be removed by rock -excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting, when permitted:

1. Equipment for Footing, Trench, and Pit Excavation: Late- model, track - mounted hydraulic excavator; equipped with a 42- inch- (1065-mm-) maximum-width, short-tip-radius rock bucket; rated at not less than 138-hp (103-kW) flywheel power with bucket-curling force of not less than 28,700 lbf (128 kN) and stick-crowd force of not less than 18,400 lbf (82 kN) with extra-long reach boom.

2. Equipment for Bulk Excavation: Late-model, track-mounted loader; rated at not less than 230-hp (172-kW) flywheel power and developing a minimum of 47,992- lbf (213.3 -kN) breakout force with a general -purpose bare bucket.

I. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rock material 3/4 cu. yd. (0.57 cu. m) or more in volume that exceed a standard penetration resistance of 100 blows/2 inches (97 blows/50 mm) when tested by a geotechnical testing agency, according to ASTM D 1586.

J. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man -made stationary features constructed above or below the ground surface.

K. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.

L. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

M. Utilities: On -site underground pipes, conduits, ducts, and cables as well as underground services within buildings.

1.03 QUALITY ASSURANCE
A. Blasting: Comply with applicable requirements in NFPA 495, "Explosive Materials Code," and prepare a blasting plan reporting the following:

1. Types of explosive and sizes of charge to be used in each area of rock removal, types of blasting mats, sequence of blasting operations, and procedures that will prevent damage to site improvements and structures on Project site and adjacent properties.

2. Seismographic monitoring during blasting operations.

City of Camarillo EARTH MOVING
CH-5067-2 312000-3

B. Seismic Survey Agency: An independent testing agency, acceptable to authorities having jurisdiction, experienced in seismic surveys and blasting procedures to perform the following services:

1. Report types of explosive and sizes of charge to be used in each area of rock removal, types of blasting mats, sequence of blasting operations, and procedures that will prevent damage to site improvements and structures on Project site and adjacent properties.

2. Seismographic monitoring during blasting operations.

C. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E 329 and ASTM D 3740 for testing indicated.

1.04 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authorities having jurisdiction.

B. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.

1. Do not proceed with work on adjoining property until directed by Architect.

C. Utility Locator Service: Notify utility locator service for area where Project is located before beginning earth-moving operations.

D. Do not commence earth- moving operations until temporary site fencing and erosion- and sedimentation-control measures are in place.

E. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

F. Do not direct vehicle or equipment exhaust towards protection zones.

G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.

City of Camarillo EARTH MOVING
CH-5067-2 312000-4

PART 2 - PRODUCTS

2.01 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D 2487, Groups A -1, A -2-4, A -2-5, and A -3 according to AASHTO M 145, or a combination of these groups; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D 2487 , Groups A-2-6, A-2-7, A-4, A-5, A-6, and A-7 according to AASHTO M 145, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940/D 2940M; with at least 90 percent passing a 1- 1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 294/D 2940M 0; with at least 95 percent passing a 1 -1/2-inch (37.5-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940/D 2940M; with at least 90 percent passing a 1 -1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.

G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940/D 2940M; except with 100 percent passing a 1- inch (25-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.

H. Drainage Course: Narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse- aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and zero to 5 percent passing a No. 8 (2.36-mm) sieve.

I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand; ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1- inch (25-mm) sieve and zero to 5 percent passing a No. 4 (4.75-mm) sieve.

J. Sand: ASTM C 33/C 33M; fine aggregate.

K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

City of Camarillo EARTH MOVING
CH-5067-2 312000-5

2.02 GEOTEXTILES
A. Subsurface Drainage Geotextile: Nonwoven needle- punched geotextile, manufactured for subsurface drainage applications, made from polyolefins or polyesters; with elongation greater than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Survivability: As follows:
a. Grab Tensile Strength: 157 lbf (700 N); ASTM D 4632. b. Sewn Seam Strength: 142 lbf (630 N); ASTM D 4632.
c. Tear Strength: 56 lbf (250 N); ASTM D 4533.
d. Puncture Strength: 56 lbf (250 N); ASTM D 4833.

3. Apparent Opening Size: No. 40 (0.425- mm) sieve, maximum; ASTM D 4751.

4. Permittivity: 0.5 per second, minimum; ASTM D 4491.

5. UV Stability: 50 percent after 500 hours' exposure; ASTM D 4355.

B. Separation Geotextile: Woven geotextile fabric, manufactured for separation applications, made from polyolefins or polyesters; with elongation less than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Survivability: As follows:
a. Grab Tensile Strength: 247 lbf (1100 N); ASTM D 4632. b. Sewn Seam Strength: 222 lbf (990 N); ASTM D 4632.
c. Tear Strength: 90 lbf (400 N); ASTM D 4533.
d. Puncture Strength: 90 lbf (400 N); ASTM D 4833.

3. Apparent Opening Size: No. 60 (0.250- mm) sieve, maximum; ASTM D 4751.

4. Permittivity: 0.02 per second, minimum; ASTM D 4491.

5. UV Stability: 50 percent after 500 hours' exposure; ASTM D 4355.

2.03 CONTROLLED LOW-STRENGTH MATERIAL
A. Controlled Low-Strength Material: Self-compacting, low-density, flowable concrete material produced from the following:

1. Portland Cement: ASTM C 150/C 150M, Type I, Type II, or Type III.

2. Fly Ash: ASTM C 618, Class C or F.

3. Normal-Weight Aggregate: ASTM C 33/C 33M, 3/4- inch (19-mm) nominal maximum aggregate size.

4. Foaming Agent: ASTM C 869/C 869M.

5. Water: ASTM C 94/C 94M.

6. Air-Entraining Admixture: ASTM C 260/C 260M.

City of Camarillo EARTH MOVING
CH-5067-2 312000-6

B. Produce low-density, controlled low- strength material with the following physical properties:

1. As-Cast Unit Weight: 30 to 36 lb/cu. ft. (480 to 576 kg/cu. m) at point of placement, when tested according to ASTM C 138/C 138M.

2. Compressive Strength: 80 psi (550 kPa), when tested according to ASTM C 495/C 495M.

C. Produce conventional-weight, controlled low- strength material with 80 -psi (550- kPa) compressive strength when tested according to ASTM C 495/C 495M.

2.04 ACCESSORIES
A. Warning Tape: Acid- and alkali -resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of the utility; colored as follows:

1. Red: Electric.

2. Yellow: Gas, oil, steam, and dangerous materials.

3. Orange: Telephone and other communications.

4. Blue: Water systems.

5. Green: Sewer systems.

B. Detectable Warning Tape: Acid- and alkali -resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of the utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches (750 mm) deep; colored as follows:

1. Red: Electric.

2. Yellow: Gas, oil, steam, and dangerous materials.

3. Orange: Telephone and other communications.

4. Blue: Water systems.

5. Green: Sewer systems.

PART 3 - EXECUTION

3.01 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.

B. Protect and maintain erosion and sedimentation controls during earth- moving operations.

City of Camarillo EARTH MOVING
CH-5067-2 312000-7

C. Protect subgrades and foundation soils from freezing temperatures and frost.

Remove temporary protection before placing subsequent materials.

3.02 DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

3.03 EXPLOSIVES
A. Explosives: Do not use explosives.

B. Explosives: Obtain written permission from authorities having jurisdiction before bringing explosives to Project site or using explosives on Project site.

1. Perform blasting without damaging adjacent structures, property, or site improvements.

2. Perform blasting without weakening the bearing capacity of rock subgrade and with the least-practicable disturbance to rock to remain.

3.04 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

2. Remove rock to lines and grades indicated to permit installation of permanent construction without exceeding the following dimensions:
a. 24 inches (600 mm) outside of concrete forms other than at footings. b. 12 inches (300 mm) outside of concrete forms at footings. c. 6 inches (150 mm ) outside of minimum required dimensions of concrete cast against grade.
d. Outside dimensions of concrete walls indicated to be cast against rock without forms or exterior waterproofing treatments.
e. 6 inches (150 mm) beneath bottom of concrete slabs-on-grade. f. 6 inches (150 mm) beneath pipe in trenches and the greater of 24 inches (600 mm) wider than pipe or 42 inches (1065 mm) wide.

B. Classified Excavation: Excavate to subgrade elevations. Material to be excavated will be classified as earth and rock. Do not excavate rock until it has been classified and cross sectioned by Architect. The Contract Sum will be adjusted for rock City of Camarillo EARTH MOVING
CH-5067-2 312000-8

excavation according to unit prices included in the Contract Documents. Changes in the Contract Time may be authorized for rock excavation.

1. Earth excavation includes excavating pavements and obstructions visible on surface; underground structures, utilities, and other items indicated to be removed; and soil, boulders, and other materials not classified as rock or unauthorized excavation.
a. Intermittent drilling; blasting, if permitted; ram hammering; or ripping of material not classified as rock excavation is earth excavation.

2. Rock excavation includes removal and disposal of rock. Remove rock to lines and subgrade elevations indicated to permit installation of permanent construction without exceeding the following dimensions:
a. 24 inches (600 mm) outside of concrete forms other than at footings. b. 12 inches (300 mm) outside of concrete forms at footings. c. 6 inches (150 mm) outside of minimum required dimensions of concrete cast against grade.
d. Outside dimensions of concrete walls indicated to be cast against rock without forms or exterior waterproofing treatments.
e. 6 inches (150 mm) beneath bottom of concrete slabs-on-grade. f. 6 inches (150 mm) beneath pipe in trenches and the greater of 24 inches (600 mm) wider than pipe or 42 inches (1065 mm) wide.

3.05 EXCAVATION FOR STRUCTURES
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25 mm). If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

1. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

2. Pile Foundations: Stop excavations 6 to 12 inches (150 to 300 mm) above bottom of pile cap before piles are placed. After piles have been driven, remove loose and displaced material. Excavate to final grade, leaving solid base to receive concrete pile caps.

3. Excavation for Underground Tanks, Basins, and Mechanical or Electrical Utility Structures: Excavate to elevations and dimensions indicated within a tolerance of plus or minus 1 inch (25 mm). Do not disturb bottom of excavations intended as bearing surfaces.

B. Excavations at Edges of Tree- and Plant-Protection Zones:

1. Excavate by hand or with an air spade to indicated lines, cross sections, elevations, and subgrades. If excavating by hand, use narrow-tine spading forks to comb soil and expose roots. Do not break, tear, or chop exposed roots. Do not use mechanical equipment that rips, tears, or pulls roots.

City of Camarillo EARTH MOVING
CH-5067-2 312000-9

3.06 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.

3.07 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.

1. Beyond building perimeter, excavate trenches to allow installation of top of pipe below frost line.

B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit unless otherwise indicated.

1. Clearance: 12 inches (300 mm) each side of pipe or conduit.

C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform bearing and support of pipes and conduit. Shape subgrade to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

Remove projecting stones and sharp objects along trench subgrade.

1. For pipes and conduit less than 6 inches (150 mm) in nominal diameter, hand-excavate trench bottoms and support pipe and conduit on an undisturbed subgrade.

2. For pipes and conduit 6 inches (150 mm) or larger in nominal diameter, shape bottom of trench to support bottom 90 degrees of pipe or conduit circumference. Fill depressions with tamped sand backfill.

3. For flat -bottomed, multiple- duct conduit units, hand- excavate trench bottoms and support conduit on an undisturbed subgrade.

4. Excavate trenches 6 inches (150 mm) deeper than elevation required in rock or other unyielding bearing material to allow for bedding course.

D. Trench Bottoms: Excavate trenches 4 inches (100 mm) deeper than bottom of pipe and conduit elevations to allow for bedding course. Hand-excavate deeper for bells of pipe.

1. Excavate trenches 6 inches (150 mm) deeper than elevation required in rock or other unyielding bearing material to allow for bedding course.

E. Trenches in Tree- and Plant-Protection Zones:

1. Hand-excavate to indicated lines, cross sections, elevations, and subgrades. Use narrow-tine spading forks to comb soil and expose roots.

Do not break, tear, or chop exposed roots. Do not use mechanical equipment that rips, tears, or pulls roots.

2. Do not cut main lateral roots or taproots; cut only smaller roots that interfere with installation of utilities.

3.08 SUBGRADE INSPECTION
A. Notify Engineer when excavations have reached required subgrade.

City of Camarillo EARTH MOVING
CH-5067-2 312000-10

B. If Engineer determines that unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed.

C. Proof-roll subgrade below the building slabs and pavements with a pneumatic-tired and loaded 10- wheel, tandem-axle dump truck weighing not less than 15 tons (13.6 tonnes) to identify soft pockets and areas of excess yielding. Do not proof - roll wet or saturated subgrades.

1. Completely proof-roll subgrade in one direction, repeating proof -rolling in direction perpendicular to first direction. Limit vehicle speed to 3 mph (5 km/h).

2. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Architect, and replace with compacted backfill or fill as directed.

D. Authorized additional excavation and replacement material will be paid for according to Contract provisions for unit prices.

E. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities, as directed by Architect, without additional compensation.

3.09 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Architect.

1. Fill unauthorized excavations under other construction, pipe, or conduit as directed by Architect.

3.10 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations. Do not store within drip line of remaining trees.

3.11 BACKFILL
A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Construction below finish grade including, where applicable, subdrainage, dampproofing, waterproofing, and perimeter insulation.

2. Surveying locations of underground utilities for Record Documents.

3. Testing and inspecting underground utilities.

4. Removing concrete formwork.

5. Removing trash and debris.

City of Camarillo EARTH MOVING
CH-5067-2 312000-11

6. Removing temporary shoring, bracing, and sheeting.

7. Installing permanent or temporary horizontal bracing on horizontally supported walls.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

3.12 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.

B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.

C. Trenches under Footings: Backfill trenches excavated under footings and within 18 inches (450 mm) of bottom of footings with satisfactory soil; fill with concrete to elevation of bottom of footings.

D. Backfill voids with satisfactory soil while removing shoring and bracing.

E. Initial Backfill:

1. Soil Backfill: Place and compact initial backfill of subbase material, free of particles larger than 1 inch (25 mm) in any dimension, to a height of 12 inches (300 mm) over the pipe or conduit.
a. Carefully compact initial backfill under pipe haunches and compact evenly up on both sides and along the full length of piping or conduit to avoid damage or displacement of piping or conduit. Coordinate backfilling with utilities testing.

2. Controlled Low -Strength Material: Place initial backfill of controlled low- strength material to a height of 12 inches (300 mm) over the pipe or conduit.

Coordinate backfilling with utilities testing.

F. Final Backfill:

1. Soil Backfill: Place and compact final backfill of satisfactory soil to final subgrade elevation.

2. Controlled Low- Strength Material: Place final backfill of controlled low - strength material to final subgrade elevation.

G. Warning Tape: Install warning tape directly above utilities, 12 inches (300 mm) below finished grade, except 6 inches (150 mm) below subgrade under pavements and slabs.

3.13 SOIL FILL
A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing material.

B. Place and compact fill material in layers to required elevations as follows:

1. Under grass and planted areas, use satisfactory soil material.

2. Under walks and pavements, use satisfactory soil material.

3. Under steps and ramps, use engineered fill.

City of Camarillo EARTH MOVING
CH-5067-2 312000-12

4. Under building slabs, use engineered fill.

5. Under footings and foundations, use engineered fill.

C. Place soil fill on subgrades free of mud, frost, snow, or ice.

3.14 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.15 COMPACTION OF SOIL BACKFILLS AND FILLS
A. Place backfill and fill soil materials in layers not more than 8 inches (200 mm) in loose depth for material compacted by heavy compaction equipment and not more than 4 inches (100 mm) in loose depth for material compacted by hand -operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations and uniformly along the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according to ASTM D 698:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top 12 inches (300 mm) of existing subgrade and each layer of backfill or fill soil material at 95 percent.

2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 92 percent.

3. Under turf or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill soil material at 85 percent.

4. For utility trenches, compact each layer of initial and final backfill soil material at 85 percent.

3.16 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.

City of Camarillo EARTH MOVING
CH-5067-2 312000-13

B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to elevations required to achieve indicated finish elevations, within the following subgrade tolerances:

1. Turf or Unpaved Areas: Plus or minus 1 inch (25 mm).

2. Walks: Plus or minus 1 inch (25 mm).

3. Pavements: Plus or minus 1/2 inch (13 mm).

C. Grading inside Building Lines: Finish subgrade to a tolerance of 1/2 inch (13 mm) when tested with a 10-foot (3-m) straightedge.

3.17 SUBSURFACE DRAINAGE
A. Subsurface Drain: Place subsurface drainage geotextile around perimeter of subdrainage trench. Place a 6 -inch (150 -mm) course of filter material on subsurface drainage geotextile to support subdrainage pipe. Encase subdrainage pipe in a minimum of 12 inches (300 mm) of filter material, placed in compacted layers 6 inches (150 mm) thick, and wrap in subsurface drainage geotextile, overlapping sides and ends at least 6 inches (150 mm).

1. Compact each filter material layer to 85 percent of maximum dry unit weight according to ASTM D 698 with a minimum of two passes of a plate- type vibratory compactor.

B. Drainage Backfill: Place and compact filter material over subsurface drain, in width indicated, to within 12 inches (300 mm) of final subgrade, in compacted layers 6 inches (150 mm) thick. Overlay drainage backfill with one layer of subsurface drainage geotextile, overlapping sides and ends at least 6 inches (150 mm).

1. Compact each filter material layer.

2. Place and compact impervious fill over drainage backfill in 6 -inch- (150- mm-) thick compacted layers to final subgrade.

3.18 SUBBASE AND BASE COURSES UNDER PAVEMENTS AND WALKS A. Place subbase course and base course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place subbase course and base course under pavements and walks as follows:

1. Install separation geotextile on prepared subgrade according to manufacturer's written instructions, overlapping sides and ends.

2. Place base course material over subbase course under hot -mix asphalt pavement.

3. Shape subbase course and base course to required crown elevations and cross-slope grades.

4. Place subbase course and base course 6 inches (150 mm) or less in compacted thickness in a single layer.

City of Camarillo EARTH MOVING
CH-5067-2 312000-14

5. Place subbase course and base course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than 3 inches (75 mm) thick.

6. Compact subbase course and base course at optimum moisture content to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

C. Pavement Shoulders: Place shoulders along edges of subbase course and base course to prevent lateral movement. Construct shoulders, at least 12 inches (300 mm) wide, of satisfactory soil materials and compact simultaneously with each subbase and base layer to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

3.19 DRAINAGE COURSE UNDER CONCRETE SLABS-ON-GRADE
A. Place drainage course on subgrades free of mud, frost, snow, or ice.

B. On prepared subgrade, place and compact drainage course under cast -in-place concrete slabs-on-grade as follows:

1. Install subdrainage geotextile on prepared subgrade according to manufacturer's written instructions, overlapping sides and ends.

2. Place drainage course 6 inches (150 mm) or less in compacted thickness in a single layer.

3. Place drainage course that exceeds 6 inches (150 mm) in compacted thickness in layers of equal thickness, with no compacted layer more than 6 inches (150 mm) thick or less than 3 inches (75 mm) thick.

4. Compact each layer of drainage course to required cross sections and thicknesses to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

3.20 FIELD QUALITY CONTROL
A. Special Inspections: Owner will engage a qualified special inspector to perform the following special inspections:

1. Determine prior to placement of fill that site has been prepared in compliance with requirements.

2. Determine that fill material classification and maximum lift thickness comply with requirements.

3. Determine, during placement and compaction, that in- place density of compacted fill complies with requirements.

B. Testing Agency: Owner will engage a qualified geotechnical engineering testing agency to perform tests and inspections.

C. Allow testing agency to inspect and test subgrades and each fill or backfill layer.

Proceed with subsequent earth moving only after test results for previously completed work comply with requirements.

D. Footing Subgrade: At footing subgrades, at least one test of each soil stratum will be performed to verify design bearing capacities. Subsequent verification and City of Camarillo EARTH MOVING
CH-5067-2 312000-15

approval of other footing subgrades may be based on a visual comparison of subgrade with tested subgrade when approved by Architect.

E. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167, ASTM D 2937, and ASTM D 6938, as applicable. Tests will be performed at the following locations and frequencies:

1. Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer, at least one test for every 2000 sq. ft. (186 sq. m) or less of paved area or building slab but in no case fewer than three tests.

2. Foundation Wall Backfill: At each compacted backfill layer, at least one test for every 100 feet (30 m)or less of wall length but no fewer than two tests.

3. Trench Backfill: At each compacted initial and final backfill layer, at least one test for every 150 feet (46 m) or less of trench length but no fewer than two tests.

F. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompact and retest until specified compaction is obtained.

3.21 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

1. Scarify or remove and replace soil material to depth as directed by Architect; reshape and recompact.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to greatest extent possible.

3.22 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.

B. Transport surplus satisfactory soil to designated storage areas on Owner's property. Stockpile or spread soil as directed by Architect.

1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off Owner's property.

END OF SECTION 312000 – EARTH MOVING

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-1

SECTION 321216 – ASPHALT PAVING
PART 1 - GENERAL

1.01 SUMMARY
A. This Section includes asphalt paving and shall be placed as shown on the plans and marked in the field in accordance with the Plans, Section 302-5 of the SSPWC, and these Specifications.

B. General contractor to furnish all labor and materials necessary and perform other related work as necessary to complete this scope of work; all in accordance with the Standard Specifications, general conditions, specifications, plans, and these special provisions.

1.02 SUBMITTALS
A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.

B. Grading for Asphalt Concrete shall be Class C2 PG 64-10 per SPPWC 203-6.4.4.

C. Material certificates. The Contractor shall furnish to the Engineer, at least ten (10) working days prior to the start of work, a list of his sources of materials together with a Certification of Compliance, indicating that materials to be incorporated in the work fulfill the requirements of these Specifications. The Certification of Compliance shall be signed by the material supplier or his representative. It is the intent of these Specifications that materials to be incorporated in the work must meet the requirements of the Specifications after incorporation in the paved areas shown on the Plans. The Contractor shall be responsible for all costs associated with the required job-mix-formula.

D. Log of placement of asphalt, including dates, times, temperature readings and other pertinent information.

1.03 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer shall be registered with and approved by authorities having jurisdiction or the DOT of the state in which Project is located.

B. Standard Specifications: Comply with the Standard Specifications for Public Works Construction (SSPWC) 2021 edition. These Specifications apply only to performance and materials and how they are to be incorporated into the Work.

1.04 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp or if the atmospheric temperature is at least 50 deg F and rising at time of placement or during unsuitable weather.

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-2

PART 2 - PRODUCTS
The City reserves the right to obtain said samples at the point of delivery and/or at the point of manufacture. The City shall also have the right to inspect sources of materials to be used in the work to determine workmanlike procedures used for the materials supplied.

2.01 AGGREGATES
A. Aggregate for asphalt concrete shall conform to Section 203- 6.3 of the SSPWC.

The air void content shall be 4% (minimum) - 5% (maximum).

B. Aggregate Base material shall conform to SSPWC Section 300.

2.02 ASPHALT CONCRETE MIXTURE
A. Composition and Grading: Conforming to SSPWC Sections 203-1 and 203-6.4.

2.03 ASPHALT MATERIALS
A. Asphalt Binder: Paving asphalt, viscosity grade PG 64- 10 conforming to SSPWC 203-1.2.

B. Tack Coat: PG 64-10 conforming to SSPWC Section 302-5.4.

C. Mixes: Hot-Mix Asphalt (HMA):

The job-mix-formula shall indicate the percentage passing for each specified sieve size and the percent asphalt to be used for each asphalt concrete mixture to be incorporated on the project. The job- mix-formula, with allowable tolerance for a single test, shall be used for job control. In no event shall there be less than 2 percent passing the No. 200 sieve. The job -mix-formula shall include test results for stability and compacted unit weight for the designated oil content.

Grading for Asphalt Concrete shall be Class C2 PG 64 -10 per SPPWC Section 203-6.4.4.

2.04 HERBICIDE APPLICATION AND WEED REMOVAL:

A. Herbicide material shall be approved in advance by the Engineer.

B. Contractor shall carry informational handouts for the public including Material Safety Data Sheets (MSDS) for Herbicide material at all times during the work.

C. Herbicide material shall incorporate a fugitive dye so that limits of spraying can be confirmed after the fact.

D. Any debris caused by the weed removal operation shall be cleaned up by the end of each day.

2.05 AUXILIARY MATERIALS
A. Wheelstops: Pre-cast, air entrained concrete.

1. Dowels: Galvanized steel, 3/4-inch diameter, 24-inch minimum length.

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-3

PART 3 - EXECUTION

3.01 ASPHALT CONCRETE AND ASPHALT CONCRETE PAVEMENT
A. All work shall be in conformance with SSPWC Sections 203-6 and 302-5.

1. The Contractor shall layout and mark the locations of the edges of the paving passes of the surface course and stake finish grade elevations along all pavement edges (e.g. walls) where the finished surface is not controlled by header board or concrete surfaces. Pavement layouts and staking shall be reviewed and approved by the Engineer at least 24 hours prior to paving.

2. For paving which incorporates new quarter points or grade breaks due to keycuts or other conditions, the Contractor shall provide equipment capable of adjusting to the new surface profile at the appropriate locations.

The profile adjustments shall be within twelve inches of the actual quarter point or grade break.

3. The Contractor shall take sufficient measurements during lay down to assure that the full design asphalt concrete layer depth is provided at each quarter point, grade break, or transition. Failure to provide the design depth at these areas will result in rejection of the work. Correction of this rejected work will include milling out the new asphalt concrete from the road edge to the gutter lip and repaving at the Contractor’s expense. The minimum length of the milled and corrected area shall be fifty feet.

3.02 SURFACE PREPARATION
A. Proof-roll subbase using heavy, pneumatic -tired rollers to locate areas that are unstable or that require further compaction.

B. Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.

1. Sweep loose granular particles from surface of unbound- aggregate base course. Do not dislodge or disturb aggregate embedded in compacted surface of base course.

C. Herbicide Treatment: Apply herbicide according to manufacturer's recommended rates and written application instructions. Apply to dry, prepared subgrade or surface of compacted-aggregate base before applying paving materials.

D. Tack Coat: Apply Tack Coat in accordance with Section 302-5.4.

1. Apply tack coat uniformly to sawcut edge of existing asphalt and vertical edge of adjacent portland cement concrete surfaces projecting into new, hot-mix asphalt pavement.

2. Apply at a uniform rate of 0.05 to 0.10 gallons/square yard. of surface.

3. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.

4. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces.

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-4

5. Asphalt binder tack coat temperature must be in the range of 285 to 350 deg F when applied.

3.03 ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted. Distribution and spreading shall comply with Section 302-5.5 of the SSPWC.

1. Spread mix at minimum temperature of 285 deg F and maximum temperature of 350 deg F.

2. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.

B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.

C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot- mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.

3.04 COMPACTION
Place asphalt concrete pavement in accordance with Section 302- 5. Compact asphalt concrete paving in accordance with Section 302-5.6 and shall match the existing section.

A. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.

B. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot -mix asphalt is still hot enough to achieve specified density.

Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:

1. Average Density: 92 percent of reference maximum theoretical density according to ASTM D 2041, but not less than 90 percent nor greater than 96 percent.

C. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot -mix asphalt is still warm.

D. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.

E. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-5

3.05 INSTALLATION TOLERANCES
A. Thickness: Compact each course to produce the thickness indicated within the following tolerances:

1. Base Course: Plus or minus 1/2 inch.

2. Wearing Course: Plus 1/4 inch (no minus).

3. Total Base Course plus Wearing Course shall not be less than specified thickness.

B. Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:

1. Base Course: 1/4 inch

2. Wearing Course: 1/8 inch

3. Crowned Surfaces: Test with crowned template centered and at right angle to crown. Maximum allowable variance from template is 1/4 inch.

3.06 PAVEMENT STRIPING AND MARKING
A. Do not apply pavement -marking paint until layout, colors, and placement have been verified with Architect.

B. Allow paving to age before starting pavement striping and marking, as recommended by the paint manufacturer.

C. Sweep and clean surface to eliminate loose material and dust in addition to recommended surface preparation by the paint manufacturer.

D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.

E. Do not paint if the atmospheric temperature could drop below 50 deg F during the drying period.

3.07 WHEEL STOPS
A. Securely attach wheel stops into pavement with not less than two galvanized steel dowels embedded at one-quarter to one-third points. Securely install dowels into pavement and bond to wheel stop. Recess head of dowel 1 inch beneath top of wheel stop.

3.08 FIELD QUALITY CONTROL
A. Testing Agency: Contractor will engage a qualified independent testing and inspecting agency to perform field tests and inspections for their own records.

Contractor shall provide access to City Inspection team at all times as requested to accommodate for testing.

B. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

City of Camarillo ASPHALT PAVING
CH-5067-2 321216-6

C. Remove and replace or install additional hot -mix asphalt where test results or measurements indicate that it does not comply with specified requirements.

3.09 DISPOSAL
A. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill.

END OF SECTION 321216 – ASPHALT PAVING

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-1

SECTION 321313 - CONCRETE PAVING
PART 1 - GENERAL

1.01 SUMMARY
A. This section pertains to street concrete improvements including but not limited to non-structural sidewalks, reinforced vehicle paving, curbs, curb and gutter, driveways, and cross gutters. Curb and Gutter shall be installed as detail in the City standard Plate E-4.1, Type A-2. Contractor to shall include cost of demolition and root pruning as well as site preparation in the bid.

B. Pedestrian access shall be maintained at all times to all business, residences and buildings adjacent to construction. The Contractor must, at minimum, provide pedestrian access on one side of the roadway and or one side for crossing roadway at locations determined by the Project Engineer. All pedestrian access shall have proper advance warnings and detours. Pedestrian access shall be included in the Traffic Control Plan and approved by the Project Engineer. Under no circumstances may pedestrian access be restricted on both sides of a street simultaneously.

C. General contractor to furnish all labor and materials necessary and perform other related work as necessary to complete this scope of work; all in accordance with the Standard Specifications, general conditions, specifications, plans, and these special provisions.

1.02 SUBMITTALS
A. Product Data: For each type of product indicated, including admixtures.

B. Design Mixtures: For each concrete pavement mixture.

1.03 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products who complies with ASTM C 94/C 94M requirements for production facilities and equipment.

B. ACI Publications: Comply with ACI 301, "Specification for Structural Concrete," unless modified by requirements in the Contract Documents.

C. All work to be performed and materials to be used shall be in accordance with the Standard Specifications for Public Works Construction, 2021 edition and supplements.

D. The Contractor shall have one copy of the Standard Specifications at the job site.

E. The Standard Specifications apply only to performance and materials and how they are to be incorporated into the Work. The legal/contractual relationship sections and the measurement and pavement sections do not apply to this document.

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-2

PART 2 - PRODUCTS

2.01 STEEL REINFORCEMENT
A. Plain-Steel Welded Wire Reinforcement: ASTM A 185, fabricated from as-drawn steel wire into flat sheets.

B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60; deformed.

C. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars, welded wire reinforcement, and dowels in place.

Manufacture bar supports according to CRSI's "Manual of Standard Practice."

2.02 CONCRETE MATERIALS
A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source throughout the Project as called out for in SSPWC 201:

1. Portland Cement: ASTM C 150, Type II, low alkali. Supplement with the following:
a. Pozzolan: ASTM C618, Class F or N Fly Ash, 100 pounds maximum per cubic yard, containing one percent or less carbon. Fly ash shall not be used in excess of 15 percent by weight of total cement quantity.

B. Combined Aggregates: Gradation “C” conforming to SSPWC Section 201-1.3.2.

C. Water: ASTM C 94/C 94M.

2.03 CURING MATERIALS
A. Liquid Curing Compound: ASTM C309, fugitive dye dissipating type, complying with Rule II 13 of the South Coast Air Quality Management District and Federal Air Quality Regulation 40 CFR 52.254.

B. Moisture-Retaining Cover (Curing Sheet): ASTM C 171, non -staining polyethylene film or white burlap-polyethylene sheet.

C. Water: Potable.

D. Evaporation Retarder: Waterborne, monomolecular film forming; manufactured for application to fresh concrete.

2.04 RELATED MATERIALS
A. Expansion- and Isolation- Joint-Filler Strips: ASTM D 1751, asphalt -saturated cellulosic fiber.

B. Slip-Resistive Aggregate Finish: Factory-graded, packaged, rustproof, nonglazing, abrasive aggregate of fused aluminum -oxide granules or crushed emery with emery aggregate containing not less than 50 percent aluminum oxide and not less than 20 percent ferric oxide; unaffected by freezing, moisture, and cleaning materials.

C. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with Caltrans Standard Specifications - Section 84 (Federal Specification No. TT-P-1952 for Blue, Red and Green paint; and State of City of Camarillo CONCRETE PAVING
CH-5067-2 321313-3

California Standard Specification No. PTWB-01 for White, Yellow and Black paint) with drying time of less than 45 minutes.

1. Color: As indicated on the plans.

2.05 WHEEL STOPS
A. W heel Stops: Precast, air-entrained concrete.

1. Dowels: Galvanized steel, 3/4-inch diameter, 24-inch minimum length.

2.06 CONCRETE MIXTURES
A. Prepare design mixtures in conformance with SSPW C Section 201, with the following properties:

1. Concrete class: 520-C-2500

2. Maximum Water-Cementitious Materials Ratio at Point of Placement: 0.45

3. Slump Limit: 4 inches.

2.07 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Furnish batch certificates to City for each batch discharged and used in the Work.

PART 3 - EXECUTION

3.01 GENERAL
A. Concrete improvements shall be constructed with materials as called for in Section 201 – Concrete, Mortar and Related Materials of the SSPWC. The materials and proportioning shall be as called for in Table 201- 1.1.2(A) for specific improvements. All concrete improvements shall be properly cured. Improvements shall be constructed in accordance with the Standard Plans for Public Works Construction, 2012 edition.

B. Contractor shall take pre- construction photos of street sidewalk, curb & gutter, spandrel, landscaping, walls, and other site features within City right -of-way & at adjoining property limits. The photos shall show existing condition of adjacent sidewalk, curb & gutter, spandrel, landscaping, walls and all any other residential or commercial improvements that may be affected by the work.

C. Concrete improvements adjacent to pavement repairs shall be constructed prior to pavement repairs. Pavement repair may be saw cut at the same time as concrete removal. AC conform shall be a minimum of 2 feet with full depth AC replacement.

Pavement repairs shall not be constructed until concrete improvement has cured.

D. Curb & gutter and sidewalks shall be constructed of Class 520-C- 2500 concrete.

Concrete shall be constructed on 4” of PMB and prepared subgrade. Subgrade shall be compacted to 90% of relative compaction and PMB compacted to 95% of relative compaction.

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-4

E. Contractor shall schedule all concrete improvement work such that demolition and placement of new concrete improvements are completed in the same week.

Concrete improvement areas shall not be left unfinished over a weekend. Failure by the Contractor to complete demolition and concrete improvements in the same week may result in suspension of the demolition and concrete operations by the City. The work will be suspended until the Contractor can demonstrate to the City’s satisfaction that the work can be properly scheduled. City reserves the right to limit the amount of demolition work to be performed should the Contractor fail to complete concrete placement of removed concrete areas in the same week.

Suspension of the demolition and concrete operations by the City will not result in a time extension to the Contract in accordance with the General conditions.

F. Aggregate base shall conform to the requirements of Sections 200 -2.2 Crushed Aggregate Base or 200- 2.5 Processed Miscellaneous Base of the Standard Specifications and these Special Provisions. Processed Miscellaneous Base will be acceptable at locations where the base is covered with a finish material.

Aggregate Base exposed to view shall be crushed rock only.

G. Utilities, signs, lights and other items located in the parkway shall be located as called for in accordance with Standard Plan 101- 2. In case of conflict the Project Engineer shall make the final determination.

H. Tie out existing survey monuments prior to demolition. Re- establish and record survey monuments after construction of concrete improvements.

I. Access ramps shall be constructed in accordance with section 321313A – Access Ramps.

J. Sidewalks shall be a minimum of 4” thick and constructed with a maximum 2% cross slope. Curb and sidewalk joints shall be constructed in accordance with standard plan 112-2.

K. Concrete pavement shall be a minimum of 6” thick and constructed in accordance with Standard Plan 132-3.

L. Curb and Gutter shall be in accordance with City of Camarillo Plate E-04.1 (RevD).

Curb and Sidewalk Joints shall be constructed in accordance with Standard Plan 112-2.

M. Curb & gutter and sidewalks shall be constructed in accordance with the Standard Plans for Public Works Construction (2021 Edition), Standard Plan 111-5, Sheets 1 through 10 inclusive.

N. All tree roots encountered during demolition of existing concrete Curb and Gutter, Cross Gutters, Spandrels, Driveways and Sidewalks shall be completely removed to the limits approved by the Engineer prior to construction of new concrete improvements. The Contractor shall provide a Certified Arborist to oversee tree root removal work. Tree roots that interfere with construction shall be cut off in a workmanlike manner. All tree roots larger than 3 inches that are within the work area shall be removed in the presence of a Certified Arborist and shall be subject to the approval of the Engineer. Upon approval by Certified Arborist the Contractor shall remove all interfering tree roots and vegetative matter from the excavation and expose the subgrade. Chainsaw or root pruner will be the only acceptable method of removing roots.

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-5

O. Root barrier shall be installed where tree roots larger than 1” diameter are encountered and removed. Root barrier material shall be placed 12 inches deep on the sidewalk side and 18 inches deep on the curb and gutter side and installed per manufacturer’s instructions or as approved by the Engineer. Root barrier shall be seamless and flexible. Root barrier material shall be Deep Root or approved equal and shall be installed per the manufacturer’s requirements at the back of curbs and sidewalk prior to backfill placement to limits approved by the Engineer.

Proposed equal root barrier products must be seamless and able to withstand being folded in half and stepped on without cracking
P. Immediately repair irrigation systems, landscape and other improvements damaged during the installation of concrete improvements.

Q. Where colored concrete is called for, the color shall be integral and homogenous with the concrete. Surface coloring or staining is not allowed.

R. This work shall be coordinated with survey monuments being added or re- established with the project.

3.02 E XAMINATION
A. Proof-roll prepared subbase surface below concrete pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding.

3.03 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for pavement to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place at least 24 hours after concrete placement.

B. Clean forms after each use and coat with form-release agent to ensure separation from concrete without damage.

3.04 STEEL REINFORCEMENT
A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

3.05 JOINTS
A. Construction Joints: Set construction joints at side and end terminations of pavement and at locations where pavement operations are stopped for more than one-half hour unless pavement terminates at isolation joints.

B. Isolation Joints: Form isolation joints of preformed joint -filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated.

C. Edging: Tool edges of pavement, gutters, curbs, and joints in concrete after initial floating with an edging tool to a 1/4- inch radius. Repeat tooling of edges after applying surface finishes. Eliminate tool marks on concrete surfaces.

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-6

3.06 CONCRETE PLACEMENT
A. Moisten subbase to provide a uniform dampened condition at time concrete is placed.

B. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

C. Deposit and spread concrete in a continuous operation between transverse joints.

Do not push or drag concrete into place or use vibrators to move concrete into place.

D. Screed pavement surfaces with a straightedge and strike off.

E. Commence initial floating using bull floats or darbies to impart an open textured and uniform surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces before beginning finishing operations or spreading surface treatments.

3.07 FLOAT FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.

B. Float Finish: Begin the second floating operation when bleed- water sheen has disappeared and concrete surface has stiffened sufficiently to permit operations.

Float surface with power -driven floats, or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture.

1. Medium-to-Fine-Textured Broom Finish: Draw a soft bristle broom across float-finished concrete surface perpendicular to line of traffic to provide a uniform, fine-line texture.

C. Slip-Resistive Aggregate Finish: Before final floating, spread slip-resistive aggregate finish on pavement surface according to manufacturer's written instructions.

1. Cure concrete with curing compound recommended by slip- resistive aggregate manufacturer. Apply curing compound immediately after final finishing.

2. After curing, lightly work surface with a steel wire brush or abrasive stone and water to expose nonslip aggregate.

3.08 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

B. Comply with ACI 306.1 for cold-weather protection.

C. Evaporation Retarder: Apply evaporation retarder to concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturers written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

City of Camarillo CONCRETE PAVING
CH-5067-2 321313-7

D. Begin curing after finishing concrete but not before free water has disappeared from concrete surface.

E. Curing Methods: Cure concrete by moisture curing, moisture -retaining-cover curing, curing compound or a combination of these methods.

3.09 PAVEMENT TOLERANCES
A. Comply with tolerances as follows:

1. Elevation: 1/4 inch

2. Thickness: Plus 3/8 inch minus 1/4 inch

3. Surface: Gap below 10-foot-long, unleveled straightedge not to exceed 1/4 inch.

4. Joint Spacing: 3 inches.

5. Contraction Joint Depth: Plus 1/4 inch no minus.

6. Joint Width: Plus 1/8 inch, no minus.

3.10 PAVEMENT MARKING
A. Do not apply pavement -marking paint until layout, colors, and placement have been verified with City.

B. Allow concrete pavement to cure for 28 days and be dry before starting pavement marking.

C. Sweep and clean surface to eliminate loose material and dust in addition to recommended surface preparation by the paint manufacturer.

D. Apply paint with mechanical equipment to produce pavement markings of dimensions indicated with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.

E. Do not paint if the atmospheric temperature could drop below 50 deg F during the drying period.

3.11 REPAIRS AND PROTECTION
A. Remove and replace concrete pavement that is broken, damaged, or defective or that does not comply with requirements in this Section.

B. Protect concrete from damage. Exclude traffic from pavement for at least 14 days after placement.

C. Maintain concrete pavement free of stains, discoloration, dirt, and other foreign material. Sweep concrete pavement not more than two days before date scheduled for Substantial Completion inspections.

END OF SECTION 321313 – CONCRETE PAVING

City of Camarillo ACCESS RAMPS
CH-5067-2 321313A-1

SECTION 321313A - ACCESS RAMPS
PART 1 - GENERAL
A. General contractor to furnish all labor and materials necessary and perform other related work as necessary to complete this scope of work; all in accordance with the standard specifications, general conditions, specifications, plans, and these special provisions.

B. This section pertains to constructing access ramps at locations called for in locations as specified on the project drawings. Contractor is responsible for checking the design with layout and constructing ramps so that they are in full conformance with ADA, Title 24 and City of Camarillo requirements.

C. Pedestrian access must be maintained at all times. All pedestrian access shall have proper advance warnings and detours.

D. Ramps not completed by the end of the work week shall be filled with base up to finish grade and pavement conforms filled with asphalt cold mix and vibra- plated so they are smooth and navigable to pedestrian traffic, at no additional cost to the City. Access ramp construction shall be subject to the time limit of completion and opening access ramps within the same week as the start of demolition of the ramp location and construction shall be complete by Friday at 3:00 p.m, and site cleaned up and open to public by 4:00 pm. Overtime, if approved, is subject to inspection overtime requirements per Section 012000-1.07.E.

PART 2 - ACCESS RAMPS
A. Tie out existing survey monuments prior to demolition. Re- establish and record survey monuments after construction of access ramps.

B. Contractor shall take pre- construction photos of each proposed access ramp location. The photos shall show existing condition of adjacent sidewalk, curb & gutter, spandrel, landscaping, walls and all any other residential or commercial improvements that may be affected by the work.

C. Sawcut and remove existing curb, gutter, sidewalk and pavement to limit shown; haul away and properly disposed. All concrete shall be removed and loaded directly into a truck to be hauled away. Concrete debris shall not placed on roadway or surrounding improvements.

D. The use of Skid Steers for demo operations will not be allowed.

E. Access ramps, curb & gutter and sidewalks shall be constructed of class 520-C- 2500 concrete. Concrete shall be constructed on 4” of PMB and prepared subgrade. Subgrade shall be compacted to 90% of relative compaction and PMB base compacted to 95% of relative compaction.

F. Access ramps, curb & gutter and sidewalks shall be constructed in accordance with the Standard Plans for Public Works Construction 2021 Edition, Standard Plan 111-5, Sheets 1 through 10 inclusive. See note H, hereon for detectable warning specifications. Contractor shall use the appropriate configuration for the ramp removal and relocation. Contractor shall provide ramp layout in the field to meet the requirements of the details and applicable ADA regulations. Ramp landing shall City of Camarillo ACCESS RAMPS
CH-5067-2 321313A-2

be minimum of 4’ x 4’. The City shall make a final determination of the appropriate configuration.

G. Contractor shall confirm grades at conform points and confirm that all slopes and landings conform to Standard Plans for Public Works Construction 2021 Edition, Standard Plan 111-5, Sheets 1 through 10 inclusive.

H. Detectable warning material shall be Armor- tile Tactile Systems, Yellow, Federal No. 33538 Detectable Warning Tiles, or equivalent, non-removable, cast-in-place, and installed per manufacturer’s recommendation. All material must be submitted and approved by the Engineer prior to commencement of construction.

I. Where ramps are designated for “Cast-in-Place Detectable Warning Surface” the Contractor shall sawcut and remove existing concrete to construct the required minimum size detectable warning surface as shown in the Typical Ramp Details.

Where there exists a lip greater than an 1/8” at the ramp landing the Contractor shall sawcut and remove the existing concrete to the gutter lip and place concrete landing with no lip. At locations with concrete spandrel the Contractor shall sawcut and remove a minimum of 6” of spandrel and place concrete landing with no lip.

J. Contractor shall confirm all slopes once the forms are in place and prior to placing concrete. No slope shall exceed the allowable slope called for in the Standard Plan. If after the ramp is poured a slope is measured by smart level to exceed the maximum allowable slope, the ramp shall be removed and reconstructed at no additional cost to the City.

K. Contractor shall confirm all slopes once the forms are in place and prior to placing concrete. No slope shall exceed the allowable slope called for in the Standard Plan. If after the ramp is poured a slope is measured by smart level to exceed the maximum allowable slope, the ramp shall be removed and reconstructed at no additional cost to the City.

L. AC Pavement conforms shall be minimum 2’ wide and 1’ past limits of ramp work.

The AC conform shall be paved back full depth of concrete improvements.

M. Immediately repair irrigation systems, landscape and other improvements damaged during the installation of ramp improvements.

N. Where utility pull boxes are located within or near the access ramp the Contractor shall protect and adjust to grade if necessary. Any pull boxes cracked or damaged during the installation of ramp improvements shall be replaced at the Contractor’s expense.

O. Where City owned Traffic Signal Pull Boxes are located within the access ramp the Contractor shall replace the pull box with a Christy # 6 or equal and shall be grouted on the bottom with 1- inch drain hole. Lid shall be marked “TRAFFIC SIGNAL”.

P. Where colored concrete is called for, the color shall be integral and homogenous with the concrete. Surface coloring or staining is not allowed.

Q. This work shall be coordinated with survey monuments being added or re- established with the project.

END OF SECTION 321213A – ACCESS RAMPS
City of Camarillo TREE PROTECTION
CH-5067-2 329200-1

SECTION 329500 - TREE PROTECTION
PART 1 - GENERAL

1.01 GENERAL CONDITIONS
Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section with same force and effect as though repeated in full herein.

1.02 SCOPE OF WORK
Furnish materials, labor, transportation, services, and equipment necessary to protect existing trees as indicated on Drawings and as specified herein.

A. Work included in this Section:

1. Protection of existing trees

2. Selection and hire a certified Arborist

3. Trees pruning and thinning.

4. Placement of protective fencing around tree
B. Work related in other Sections:

1. Section 32 93 00 - Trees, Shrubs, Vines and Groundcover

2. Section 32 80 00- Irrigation

3. Division 01 Section- “Construction Waste Management and Disposal” for recycling requirements.

C. Civil Engineer’s drawings related to Rough Grading Demolition General contractor to furnish all labor and materials necessary and perform other related work as necessary to complete this scope of work; all in accordance with the Standard Specifications, general conditions, specifications, plans and these special provisions.

1.03 TERMINOLIGY
A. Pruning terminology to be utilized as developed by the National Arborist Association and is herein attached.

1.04 S UBMITTALS
A. Certification

1. General Contractor shall submit written certification by a qualified Arborist that trees indicated to remain have been protected during course of construction in accordance with recognized standards and that where damage did occur, trees were promptly and properly treated.

City of Camarillo TREE PROTECTION
CH-5067-2 329200-2

2. Indicate which damaged trees, if any, are incapable of retaining full growth potential and are recommended to be replaced. At the contractor’s expense.

3. Arborist - an individual currently a member of the National Arborist Association or International Society of Arboriculture and verify proof of certification by such organization.

1.05 QUALITY ASSURANCE
A. Arborist Qualifications: Engage a qualified certified Arborist who has successfully completed tree protection and trimming, to perform the following work:

1. Remove branches from protected trees that are either dead, damaged, diseased, or not aesthetically pleasing.

2. Recommend procedures to compensate for loss of roots and perform initial pruning of branches and stimulation of root growth where removed to accommodate new construction.

3. Recommend procedures for excavation and grading work around protected trees.

4. Perform tree repair work for damage incurred by new construction.

5. Pruning to conform to ISA Pruning Standards and National Arborist Association Class I-IV as specified.

6. Ensure that Arborist provides Owner’s Authorized Representative written instructions for long term maintenance procedures to be followed after completion of construction operations.

1.06 GUARANTEE
A. Definitions:

1. Replaceable Tree: Trees of size and species available from commercial nurseries within same climate zone. Trees 8 -inches or less in diameter at chest height are considered replaceable.

2. Nonreplaceable Tree: Trees 8-inches or greater in diameter at chest height.

Smaller specimens of certain tree species may be considered nonreplaceable.

B. Appraisal:

1. Value of nonreplaceable trees lost due to construction activities may be established by a qualified tree appraiser utilizing National Landscape Contractor's "Guide to the Methods and Procedures for Appraising Amenity Plants."

2. In establishing value of trees, conditions of tree prior to construction will be assumed to be in an above average condition.

City of Camarillo TREE PROTECTION
CH-5067-2 329200-3

1.07 PROJECT CONDITIONS
A. Temporary Protection: Provide a minimum of 5- foot height temporary fencing, barricades, or other suitable guards located outside dripline to protect trees and other plants that are to remain from damage.

B. Protect Root Systems:

1. Do not store construction materials, debris, or excavated material within dripline of trees to remain.

2. Do not permit vehicles within drip line.

3. Restrict foot traffic to prevent excessive compaction of soil over root systems within dripline.

PART 2 - PART 2- PRODUCTS

2.01 DRAINAGE FILL
A. Selected stone or gravel, graded to pass a 3 -inch sieve and retained on a 1- inch sieve.

2.02 TOPSPOIL
B. New Topsoil:

1. Fertile, friable, surface soil, containing natural loam.

2. Obtain from local sources or from areas having similar characteristics to indigenous topsoil.

3. Provide topsoil that is reasonably free of subsoil and clay lumps, and free of brush, weeds, roots, stones larger than 2- inches and free of other extraneous or toxic matter harmful to plant growth.

4. Obtain topsoil only from well-drained sites where soil occurs in depth of 4- inches or more. Do not obtain from bogs or marshes.

5. Topsoil, prior to use, must be laboratory tested for horticulture suitability and such test must be approved by Owner’s Authorized Representative prior to placement.

2.03 PROTECTIVE FENCING
A. Chain Link Fencing: 6- foot high, mounted on 2- inch galvanized posts at a maximum of 8-feet on center spacing.

2.04 PROTECTION SIGNS
A. 8- inch by 11-inch weatherproof signs with following phrase clearly noted: “TREE PROTECTION ZONE KEEP OUT” . Sign to be legible from at least 25-feet.

City of Camarillo TREE PROTECTION
CH-5067-2 329200-4

2.05 IRRIGATION WATER
A. Potable Water.

2.06 PRUNING EQUIPMENT
A. Branches and Roots up to 3 -inches in Diameter: Use large pruning loppers or a small (8,12 or 16-inches) hand saw.

B. Branches and Roots over 3-inches in Diameter: Use sharp hand or chain saw for initial cut. Clean tears or gouges as described for branches and roots under 3- inches in diameter. Clean equipment after each cut.

PART 3 - PART 3- EXECUTION

3.01 GENERAL
A. Refer to Drawings for trees to be protected. Identify those trees with pink stretch tape located around trunk of tree at chest height.

B. Install and maintain protection fencing prior to beginning demolition, grading, or construction operations.

C. Install protection fencing at drip line of tree (furthest edge of tree canopy).

D. Protect tree root systems from damage due to noxious materials caused by runoff or spillage during mixing, placement, or storage of construction materials. Protect root systems from flooding, eroding, or excessive wetting resulting from dewatering operations.

E. Do not allow fires under or adjacent to protected trees.

F. Do not store liquids or powders in locations where spills would flow into root area of protected trees. Root area generally extends to just beyond drip line of tree.

3.02 PRUNING
A. Branches may be removed for construction purposes only upon approval of Arborist.

B. Perform pruning of trees only under direct supervision of a certified Arborist.

Coordinate pruning to maintain construction clearances with General Contractor.

C. Remove dead limbs, and sucker branches of trees to be protected. Identify potentially weak limbs or trunks to Arborist.

D. Where directed by Arborist, extend pruning operation to restore natural shape of entire tree.

E. Prune branches to balance loss to root system caused by damage or cutting of root system as directed by Arborist.

F. Root Pruning:

City of Camarillo TREE PROTECTION
CH-5067-2 329200-5

1. Branch pruning may be required to stimulate root growth and to compensate for loss of roots.

2. Cut branches and roots, if required, with sharp pruning instruments. Do not break or chop.

3. Prune roots only under direct supervision of Arborist.

3.03 EXCAVATION AROUND EXISTING TREES
A. Excavate within proximity of existing trees only where indicated on Drawings. Do not machine-excavate within tree dripline.

B. Where excavating for new construction is required within dripline of trees, hand- excavate to minimize damage to root systems. Provide sheeting at excavations if required. Use narrow-tine spading forks and comb soil to expose roots.

1. Relocate roots in backfill areas wherever possible.

2. If large, main lateral roots are encountered, expose beyond excavation limits as required to bend and relocate without breaking.

3. If encountered immediately adjacent to location of new construction and relocation is not practical, cut roots approximately 3-inches back from new construction.

C. Do not allow exposed roots to dry out before permanent backfill is placed. Provide temporary earth cover or pack with peat moss and wrap with burlap.

D. Water and maintain moist condition and temporarily support and protect from damage until permanently relocated and covered with earth.

E. Where trenching for utilities is required within dripline, tunnel under or around roots by hand digging.

F. Do not cut main lateral roots or tap roots; cut only smaller roots that interfere with installation of new work. Cut roots cleanly with sharp, appropriate pruning instruments. Do not break or chop roots.

3.04 GRADING AND FILLING AROUND EXISTING TREES
A. Maintain existing grade within dripline of trees.

B. Lowering Grades:

1. Where existing grade is to be lowered around a protected tree, gradually slope grade away from tree as recommended by Arborist. Do not reduce grade within tree dripline.

2. Consult Owner’s Authorized Representative or Arborist for appropriate plans on grade cuts exceeding 12- inches which may require details as to drains, special backfill mixes and retaining walls.

C. Raising Grades:

1. Where existing grade is to be raised 6-inches or more within tree root zone, consult Owner’s Authorized Representative or Arborist to provide appropriate remedial plans to accommodate this grade change.

City of Camarillo TREE PROTECTION
CH-5067-2 329200-6

2. Such plans may address perforated pipe bends, drainlines, grates and retaining walls as may be required.

3. No soil fill will be allowed to cover over existing tree root zone grade.

4. Do not place soil as to cover tree trunk root flare.

3.05 REPAIR AND REPLACEMENT OF TREES
A. Repair trees damaged by construction operations. Make repairs promptly after damage occurs to prevent progressive deterioration of damaged trees.

B. Remove and replace dead and damaged trees that Arborist determines to be incapable of restoration to normal growth pattern.

C. Provide new trees of same size and species as those being replaced.

D. If trees over 6-inches in caliper measurement (taken 12-inches above grade) are required to be replaced, provide new trees of 6 -inch caliper size and of species selected by Owner’s Authorized Representative.

3.06 CLEANUP
A. Removal from site, excess excavation, displaced trees, and trimmings.

END OF SECTION 329500 - TREE PROTECTION

APPENDIX
CH-5067-2

APPENDICES

APPENDIX A – PERMITS

1. VCAPCD Authority to Construct (81322-100) – Generator at City Hall

2. VCAPCD Authority to Construct (81321-101) – Generator at Corp Yard

3. City of Camarillo Zone Clearance Form

4. Ventura County Fire Department Permit Forms

5. City of Camarillo Building and Safety Permit Form

APPENDIX B – STANDARDS

1. City of Camarillo Standard Trench Detail

2. Standard Specifications for Public Works Construction (SSPWC)

3. Construction & Demolition Materials Management Plan Estimate

4. Here We Come Public Notice

5. Door Hanger

6. Sample “No Parking” Sign

7. TR-10, Construction Project Information Sign

8. Notice of Potential Claim

9. Certificate of Work Completion

APPENDIX C – FEDERAL REQUIREMENTS

1. NOT USED

APPENDIX D – STORMWATER

1. Storm Water Pollution Control Plan (SWPCP)

APPENDIX E – PREVAILING WAGE RATES

1. Download at
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

APPENDIX F – RIGHT OF WAY

1. NOT USED

REFERENCE MATERIAL

1. Solar Canopy System at City Hall, Project No. CH-5067-1 Plans for reference – TO BE CONSTRUCTED BY OTHERS

APPENDIX
CH-5067-2

APPENDIX A – PERMITS

1. VCAPCD Authority to Construct (81322-100) – Generator at City Hall

Authority to Construct generator at City Hall enclosed for reference. Contractor shall coordinate with VCAPCD and the City for any required inspections to obtain Permit to Operate.

2. VCAPCD Authority to Construct (81321-101) – Generator at Corp Yard

Authority to Construct generator at the Corporation Yard enclosed for reference.

Contractor shall coordinate with VCAPCD and the City for any required inspections to obtain Permit to Operate.

3. City of Camarillo Zone Clearance Form

Contractor shall apply for, pay required fees, and obtain the Zone Clearance from the City of Camarillo for both sites prior to construction.

4. Ventura County Fire Department Permit Forms

https://vcfd.org/fire-prevention/
Contractor shall apply for, pay required fees, and obtain a permit from the Ventura County Fire Department for both sites prior to construction.

5. City of Camarillo Building and Safety Permit Form

https://c2g.cityofcamarillo.org/Click2GovBP/index.html
Contractor shall apply for, pay required fees, and obtain a Construction Permit from the City of Camarillo for both sites prior to construction.

* Note: Contractor shall be responsible for reviewing the forms listed herein and fill out any other forms and pay permit fees required in order to obtain necessary permits to complete the work as described in the Specifications.

April 4, 2023, 2023

Greg Ramirez
City of Camarillo
601 Carmen Dr.

Camarillo, CA 93010

Subject: Authority to Construct No. 81322-100

Dear Mr. Ramirez:

Your Authority to Construct for the installation of one (1) new 312 BHP Caterpillar Diesel-Fired Emergency Standby Engine at Camarillo City Hall is enclosed. The Authority to Construct is valid for the two-year period from March 20, 2023 to March 19, 2025. Pursuant to Rule 19, this Authority to Construct, or a copy, shall be posted reasonably close to the equipment and shall be accessible to inspection personnel.

The granting of this permit signifies that the subject emissions unit(s) have been evaluated based on the information provided with your application. It does not, however, either grant or imply an APCD endorsement of the equipment; nor does it guarantee compliance with APCD Rules and Regulations. Prior to beginning operation, an application for an APCD Permit to Operate must be submitted with the corresponding filing fee.

Please note that a Permit to Operate application is required to be submitted prior to operation of the Emergency Standby Diesel Engine.

If you have any questions on this matter, please contact me at 805-303-3685 or email [email protected].

Sincerely,

Samantha Freitag
Engineering Division

Enclosures

C: Keith Macias, VCAPCD Compliance Division Manager
Greg Ramirez, City of Camarillo, via email: gramirez@city of camarillo.org Kevin Jorgensborg, City of Camarillio City Hall, via email:
[email protected]
Monique Jimenez, City of Camarillo, via email: [email protected]

Q:\PRISM\PRISMFileRoom\PermitFiles\81322\Engineering\Applications\100\81322-100-ATC-Final-Letter.docx

⋅

Authority to Construct

81322

- 100
⋅

Page 1 of 3 ends

Final Issue Date: 03/20/2023

Valid: 03/20/2023 to 03/19/2025

THIS PERMIT HAS BEEN ISSUED TO THE FOLLOWING:

EQUIPMENT DESCRIPTION:

Permission is hereby granted to install the equipment listed at the end of this permit in Table A.

1. THIS PERMIT HAS BEEN ISSUED SUBJECT TO THE FOLLOWING PERMITTED EMISSIONS (PURSUANT TO RULE

29.B):

Permitted Emission Tons/Year Pounds/Hour
Reactive Organics 0.00 0.02
Nitrogen Oxides 0.03 0.29
Particulate Matter 0.00 0.02
Sulfur Oxides 0.00 0.02
Carbon Monoxide 0.03 0.27

Note: Because of rounding, values in these tables shown as 0.00 are less than 0.005, but greater than zero.

THIS PERMIT HAS BEEN ISSUED SUBJECT TO THE FOLLOWING CONDITIONS:

2. Annual hours of operation for maintenance and testing of the emergency engine shall not exceed 30 hours per year. This limit does not include emergency operation when electrical line service has failed. When not being operated for maintenance or testing, the emergency engine shall only be used during a failure or loss of all or part of normal electrical power service to the facility. This condition is applied pursuant to the California ARB Airborne Toxic Control Measure (ATCM) for Stationary Compression Ignition Engines.

In order to comply with this condition, the engine shall be equipped with a non-resettable hour meter and the permittee shall maintain a log that differentiates operation during maintenance COMPANY NAME AND ADDRESS: FACILITY NAME AND ADDRESS:

City of Camarillo City Of Camarillo - City Hall 601 CARMEN DR
CAMARILLO, CA 93010
601 CARMEN DR
CAMARILLO, CA 93010

Authority to Construct 81322 - 100

Page 2 of 3 ends

Final Issue Date: 03/20/2023
and testing from emergency operation. These records shall be compiled into a monthly total.

The monthly operating hour records shall be summed for the previous 12 months. Total operating hours for any of these 12 month periods, excluding emergency operation, in excess of the specified annual limit shall be considered a violation of this condition.

3. The emergency engine at this stationary source is located within 1,000 feet of a school.

Operation of the emergency engine for non-emergency use, including maintenance and testing, shall not be conducted between 7:30 am and 3:30 pm on days when school is in session. This condition is more stringent than the ATCM for Stationary Compression Ignition Engines; and is applied pursuant to Rule 51, "Nuisance."

4. The emergency diesel engine(s) shall be operated in compliance with all applicable requirements of the California ARB Airborne Toxic Control Measure (ATCM) for Stationary Compression Ignition Engines, Section 93115 through 93115.15, Title 17, California Code of Regulations. This includes, but is not limited to, the following permit conditions.

5. Pursuant to Section 93115.5(a) of the ATCM for Stationary Compression Ignition Engines, effective January 1, 2006, no owner or operator of a new emergency standby stationary diesel- fueled engine shall fuel the engine with any fuel unless the fuel is CARB diesel fuel or another fuel that meets the requirements of Section 93115.5(a) of the ATCM.

6. Pursuant to Rule 74.9.D.3, an emergency engine is exempt from Rule 74.9, "Stationary Internal Combustion Engines", provided that it is operated during either an emergency or maintenance operation. Maintenance operation is limited to 50 hours per calendar year and is defined as "the use of an emergency standby engine and fuel system during testing, repair, and routine maintenance to verify its readiness for emergency standby use".

7. A log of engine operation for each emergency engine shall be maintained based on readings from a non-resettable hour meter. The logs shall differentiate operation during maintenance and testing from operation during an emergency. The hours of operation shall be totaled on a monthly basis and shall be summed for the previous 12 months.

This data shall be maintained for a minimum of three (3) years from the date of each entry and shall be made available to the APCD upon request.

8. Prior to construction completion, the permittee shall submit an application for a Permit to Operate. The application must be accompanied by the associated filing fee of $450.00.

Authority to Construct 81322 - 100

Page 3 of 3 ends

Final Issue Date: 03/20/2023
Prior to operation of equipment listed on this Authority to Construct, the permittee shall submit a Permit to Operate application (Rule 10).

This Authority to Construct shall expire and shall be cancelled two years from the date of issuance unless an extension has been approved in writing by the District (Rule 10).

Within 30 days after receipt of this permit, the permittee may petition the Hearing Board to review any new or modified condition (Rule 22). This permit, or a copy, shall be posted reasonably close to the subject equipment and shall be accessible to inspection personnel (Rule 19). This permit is not transferrable from one location to another unless the equipment is specifically listed as being portable (Rule 20).

The granting of this Authority to Construct shall not be construed as an endorsement by the District and shall not guarantee compliance with the rules of the District. This Authority to Construct shall not be construed to allow any emission unit to operate in violation of any state or federal emission standard or any rule of the District.

This permit cannot be considered as permission to violate existing laws, ordinances, regulations or statutes of other government agencies.

Ali R. Ghasemi
Air Pollution Control Officer

Attachments:

- Table A - Permit Equipment List(s)
Q:\PRISM\PRISMFileRoom\PermitFiles\81322\Engineering\Permits\ATC 81322 100 - Final Permit - 4-4-2023.docx

Equipment List for Authority to Construct
⋅
81322 - 100

Page 1 of 1 ends

⋅

Final Issue Date: 03/20/2023

PERMIT EQUIPMENT LIST - TABLE A

ATC 81322 100 / FID: 81322 City Of Camarillo - City Hall / SSID: 81322

A PERMITTED EQUIPMENT

1 Caterpillar Diesel-Fired Emergency Standby Engine

Quantity Description
1 312 BHP Caterpillar Diesel-Fired Emergency Standby Engine, Model C9, Serial No. TBD, EPA Family Name: NCPXL08.8NZS, Tier 3, Model Year 2022

September 27, 2022

Greg Ramirez
City of Camarillo
601 Carmen Drive
Camarillo, CA 93010

Subject: Application for Permit to Operate No. 81321-101

Dear Greg Ramirez:

Your APCD Permit to Operate for the City of Camarillo – Corporate Yard facility is enclosed.

APCD Rule 19 requires that the permit be readily accessible to inspection personnel from the Air Pollution Control District and be posted reasonably close to the subject equipment.

Please note that this permit has been issued with specific permitted emissions, which are based on the process limits listed in the accompanying permit conditions. Prior to exceeding any of these limits, you must submit an application to the District to modify your permit. You must also submit an application to the District prior to adding or modifying any equipment on the permit.

If you have any questions on this matter, please contact me at (805) 303-3683 or [email protected].

Sincerely,

Chris Harlin
Engineering Division

C: Kevin Jorgenborg, City of Camarillo, Via Email [email protected] Andrew Grubb, City of Camarillo, Via Email [email protected] Q:\PRISM\PRISMFileRoom\PermitFiles\81321\Engineering\Applications\101\81321-101-Final-PO-Letter.docx

F:\Departments\Community Development\HANDOUTS\MISC - Zone Clearance sample, etc./ZONE CLEARANCE UD 09-2021

ZONE CLEARANCE
City of Camarillo, Department of Community Development
601 Carmen Drive, Camarillo, CA 93010
[email protected] || 805.388.5360 p || 805.388.5388 f DATE: HTE REFERENCE NO:

PROJECT NO.: FEE:
APPLICANT: Please complete this form and attach an 8½” x 11” or 11’ x 17” (as appropriate) site plan and other plans as required (i.e. floor plan, building elevations) of the proposed improvements. Please include the location of the existing and proposed buildings and accurate dimensions to property lines.

APPLICANT: PROPERTY OWNER :

MAILING ADDRESS :

EMAIL: PHONE:

SITE ADDRESS/LOCATION:

DESCRIPTION OF PROPOSED IMPROVEMENTS:

APPLICANT/OWNER’S STATEMENT: I hereby acknowledge that I have read this Zone Clearance and state that the information given is correct and agree to comply with all provisions of the City Municipal Code.

OWNER’S SIGNATURE PHONE:

APPLICANT’S
SIGNATURE: PHONE:

APN: TRACT: LOT:

MINIMUM ZONING STANDARDS

ZONE: ___________________________________
BUILDING & SAFETY PERMIT REQUIRED  YES |  NO
If yes, obtain permit from Building & Safety Division
COMPLIANCE INSPECTION FORM REQUIRED  YES |  NO
If yes, obtain form & signatures prior to final inspection by Building & Safety FRONT YARD: REQUIRED PAID / RECEIVED REAR YARD: HOA APPROVAL:  YES |  NO  YES |  NO
SIDE YARDS: SCHOOL FEES:  YES |  NO  YES |  NO
BETWEEN BUILDINGS: PARK FEES:  YES |  NO  YES |  NO MAXIMUM HEIGHT: AIR QUALITY FEES:  YES |  NO  YES |  NO PARKING: COVERED: RV: TRAFFIC MIT FEES:  YES |  NO  YES |  NO

DEPARTMENT OF PUBLIC WORKS DEPARTMENT OF COMMUNITY DEVELOPMENT ROUGH GRADING HAS | HAS NOT BEEN CERTIFIED ZONING CLEARED BY: BY:

DATE: DATE:

COMMENTS:

Plans Attached:  YES |  NO || # of Sheets _____

If different
from applicant
If different from
site address
REQUIRED:

This zone clearance is for Planning approval of an Administrative Permit Adjustment (CMC 19.68.020.A) only. A separate zone clearance is required for issuance of a building permit.

CITY STAFF USE
APPLICANT: Complete all blue sections below

APPENDIX
CH-5067-2
APPENDIX B – STANDARDS

1. City of Camarillo Standard Trench Detail

2. Standard Specifications for Public Works Construction (SSPWC)

3. Construction & Demolition Materials Management Plan Estimate

4. Here We Come Public Notice

5. Door Hanger

6. Sample “No Parking” Sign

7. TR-10, Construction Project Information Sign

8. Notice of Potential Claim

9. Certificate of Work Completion

Construction & Demolition Materials Management Plan Estimate for Capital Projects (Submit for approval with each pay estimate)
Project: Dates: from to
On the table below, estimate quantities for each type of material to be diverted or landfilled. Diverted means materials will be recycled on- or off-site, re-used, or salvaged. For each material, list the vendor or facility receiving the materials. Use additional sheets if necessary. Provide weigh tickets or receipts when available.

Estimated weight (in tons) to
be processedMaterial Type
(Asphalt, concrete, wood, metal,
cardboard, drywall, green waste, etc.)
Diverted
(Reused or
Recycled)
Landfill
Disposal
Hauler or Processor
(Must be filled in for approval) Destination
Estimated Totals (Tons):

Estimated Total Waste (Diverted & Landfill) tons

CERTIFICATION
I hereby certify that I have read and state that this information is correct to the best of my knowledge.

Contractor Company Name and Representative, Printed
Contractor Signature Date
Tonnages and Volume Conversion of Major C&D Wastes
Material Lbs./cubic yard Cubic yards/ton
Mixed Waste 350 lbs/cubic yard 5.7 cubic yards/ton
Wood 300 lbs/cubic yard 6.7 cubic yards/ton
Metal 150 lbs/cubic yard 13.3 cubic yards/ton
Rubble 1,400 lbs/cubic yard
Clean Dirt/Soil 1.25 cubic yards/ton
Asphalt/paving
crushed
1,380 lbs/cubic yard
(recycle estimate only)

CITY OF CAMARILLO

Please Be Aware of Temporary Inconveniences
While We Maintain Your Street

The City of Camarillo has hired Contractor Name to perform construction work for the Standby Power at City Hall and Corporation Yard, Project No. CH-5067-2. This Project will be under construction for the next several months at 601 Carmen Dr. and 283 S Glenn Dr. Most of the work involved takes months to complete, weather permitting. “No Parking” signs will also be posted 72 hours in advance along parking stalls that may be needed by the contractor to perform work, so please read the dates and times of the restrictions when the signs appear along the parking stalls. You may experience partial road closures when the work is taking place. Please obey the detour signing and construction signs.

In case of inclement weather, work may need to be delayed and message boards will be updated with the rescheduled date.

Emergency Situations Questions
Emergency vehicles always have access
in and out of your neighborhood.

Contractor:

Name
Main Office: (805) xxx-xxxx
, Superintendent: (805) xxx-xxxx
, Dispatcher: (805) xxx-xxxx

City of Camarillo
(805) 388-5340
Public Works Dept.

Please reference City of Camarillo
Standby Power – Project No. CH-5067-2
when you call.

Deliveries
Because trucks are heavy, they can
damage new asphalt. Please schedule
any deliveries before or after the day your
street is to be paved.

Special Circumstances
Please advise us of any major event or
life/safety/medical services you have
scheduled.

Trash/Mail
Trash collection and mail service will be on
the same day as your regular service;
however it may be earlier than normal.

We apologize in advance for any inconvenience this work may cause and thank you for your cooperation and understanding. The completed project will be a great enhancement to your area.

Please visit the City’s website for more information: www.cityofcamarillo.org/construction

CITY OF CAMARILLO

NOTICE OF STREET MAINTENANCE

TO AREA

BUSINESSES AND RESIDENCES

Please be advised that, on the date listed below, <Contractor>, acting as Contractor for City of Camarillo, will be <INSERT SCOPE OF WORK>.

The general order of work will be as follows:

1. Posting of “No Parking” Signs 72 hours in advance of the work.

2. Partial closure of the roadway/sidewalk.

3. Tree Removal.

4. Concrete Improvements.

5. Placement of overlay.

6. Reopen the road to public traffic.

7. Replacement of painted stripes and markings.

The work on your street will be performed on the following dates (weekend work is not planned for this project):

 Monday ______________
 Tuesday ______________
 Wednesday ______________
 Thursday ______________
 Friday ______________
Prior to 8:00 a.m. on the day of work please park your vehicle on a nearby street which is not posted with parking restrictions. Driving on overlay prior to completion of construction time may cause damage to the overlay and your vehicle.

DELIVERIES APPOINTMENTS
In an effort to expedite the
process and avoid drive-
thru's which would require
closing the street again,
please schedule any kind of
delivery the day before or
the day after the street has
been overlayed.

In the event an appointment of
any type (doctor, dentist, etc.) is
scheduled on the same day your
street is scheduled for overlay
you can either:
• Reschedule your
appointment or,
• Arrange to be away
from your residence
between the hours of 8
a.m. and 5 p.m.

Unfavorable weather conditions may cause delays to the work without additional notice. If you should have any questions, please contact the following:

CONTRACTOR 000-000-0000
INSPECTOR 000-000-0000
City’s Project Manager 805-388-5340

AVISO

LA CIUDAD DE CAMARILLO

NOTICIAS DE LA CONSERVACION

DE LA CALLE A NEGOCIOS DEL

AREA Y RESIDENCIAS

Sea avisado por favor que en la fecha describida abajo, <CONTRACTOR>, actuando como el contratista para la ciudad de Camarillo, estará <INSERT SCOPE OF WORK>.

La orden general de trabajo como seguir:

1. Anunciar de "No Parking," no estacionamiento," firma 72 horas por adelantado del trabajo.

2. Remover Arboles.

3. Remover y Reparar Banquetas.

4. El cierre parcial o repleto de la calzada.

5. La colocación del sello de arena y asfalto.

6. Vuelven a abrir el camino a tráfico público.

7. El reemplazo pintó rayas y marcas.

El trabjo en su calle se performará en las fechas siguientes (trabajo excluye fines de semana):

 el Lunes ______________
 el Martes ______________
 el Miércoles ______________
 el Jueves ______________
 el Viernes ______________

ENTREGOS CITAS

En un esfuerzo para facilitar el
processo del asfálto de calles
y tambien para evitar alguvas
personas usando dichas
calles antes de permitido, lo
cual requerira cerrando las
calles de Nuevo, por favor de
planar cualquiera tipo de
entregos el dia antes o el dia
siguiente del asfálto
del las
calles.

En el evento de una cita de
cual tipo (medico, dentista,
etc.), puede usted hacer
cualquiera de:

• Hacer su cita de nuevo o,

• puede usted disponer de
no estar en su residencia
duerante las horas de las
8 A.M. y 5 P.M.

Antes de 8:00 de la mañana en el dia del trabajo estaciona por favor su vehiculo en una calle cercana que no se anunucia con estacionnnamiento restricciones. Impulsar en el sello de arena y asfalto antes de terminacion del tiempo de curación puede causar el daño al sello de arena y asfalto o a su vehiculo.

Las condiciones desfavorables del tiempo pueden causar las demoras al trabajo sin nota adicional. Se debe tener algunas preguntas avisa por favor llamar de lo siguiente:

CONTRACTOR 000-000-0000
INSPECTOR 000-000-0000
City’s Project Manager 805-388-5340

City of Camarillo

NOTICE OF POTENTIAL CLAIM (NOPC)

TO

SPECIFICATION
NUMBER

DATE

IDENTIFICATION
NUMBER

Resident Engineer

This is a Notice of Potential Claim for additional compensation submitted as required under the provisions of Section 12 of the General Conditions/Specifications. The act of the engineer, or his/her failure to act, or the event, thing, occurrence, or other cause giving rise to the potential claim occurred on: Date:

The particular nature and circumstances of this potential claim are described as follows, including costs involved (with breakdown):

The reasons for which I believe additional compensation may be due are:

The nature of the costs involved and amount of Potential Claim (provide estimate if accurate figures are not available or describe types of expenses involved):

(attach additional sheets as needed)
The undersigned originator (Contractor or Subcontractor as appropriate) certifies that the above statements and attached documents are made in full cognizance of the California False Claims Act, Government Code sections 12650-12655. The undersigned further understands and agrees that this potential claim to be further considered, unless resolved, must fully conform to the requirements in Section 12 of the General Conditions and must be restated as a claim in the Contractors written statement of claims in conformance with the Standard Specifications and Public Contract Code Section 20104 et seq..

SUBCONTRACTOR or CONTRACTOR ________________________________________ (Circle One) Firm

________________________________________ ________________________________________ (Signature of Authorized Representative) Printed Name

For a subcontractor potential claim
This notice of potential claim is acknowledged, certified and forwarded

________________________________________ ________________________________________ PRIME CONTRACTOR Printed Name
(Signature of Authorized Representative)
(For City Use Only)
Received (Resident Engr) Date

APPENDIX
CH-5067-2
APPENDIX C – FEDERAL REQUIREMENTS

1. NOT USED

APPENDIX
CH-5067-2

APPENDIX D – STORMWATER

1. Storm Water Pollution Control Plan (SWPCP)

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 1 of 12

City of Camarillo

PUBLIC PROJECT*

Stormwater Pollution Control Plan
For Projects disturbing less than 1 acre, that are not on hillside or does not discharge directly to Revolon Slough, Conejo Creek or Calleguas Creek, and that are not subject to post -construction stormwater quality mitigation.

SWPCP No. ___________
(City Stormwater Program Manager will assign # upon first review of SWPCP)

Project Name: _________________________
Project #: __________________________

Project Location: ________________________

Brief Project Description: _________________________________________ ________________________________________________________________

Amount of Impervious Surface area that is replaced, added, or created _______________(Sq.Ft.)

Project Contractor Responsible for SWPCP Implementation: ___________________________ Name/Phone #

Construction Start Date: ___________________________ Construction Completion Date: ___________________________ Date Project Initiated Project Design: _______________________ (City CIP Engr. To Provide)

SWPCP Prepared by: ______________________________________________ Name, Title
______________________________________________
Company Name & Phone #

Date: __________________________________

*This SWPCP is required for all public projects including those under a Capital Improvement Project Plan that disturb less than one acre of soil. If the project disturbs one or more acres of soil, it is subject to the State General Construction NPDES Permit and related SWPPP (see the Los Angeles and Ventura Counties Municipal Stormwater Permit, Order R4-2021-0105).

Approved by: __________________________________________ City of Camarillo Stormwater Program Manager

Date: _________________________________________________

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 2 of 12

REQUIREMENTS

FOR A

STORMWATER POLLUTION CONTROL PLAN

Prior to the issuance of any construction/grading permit and/or the commencement of any clearing, grading or excavation, contractors of projects with construction activities shall prepare and submit a Stormwater Pollution Control Plan (SWPCP), on the form provided herein, for the review and approval of the City Engineer and the Stormwater Program Manager.

The purpose of the SWPCP is to identify potential pollutant sources that may affect the quality of discharges and to design the use and placement of Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the construction site into the storm drain system during construction. Erosion and sediment source control BMPs should be considered for both active and inactive (previously disturbed) construction areas. BMPs for wind erosion and dust control are also included. The SWPCP may require modification as the project progresses and as conditions warrant.

The SWPCP shall be developed and implemented in accordance with the Waste Discharge Requirements and National Pollutant Discharge Elimination System (NPDES) Permit for Municipal Separate Storm Sewer System (MS4) Discharges within the Coastal Watersheds of Los Angeles and Ventura Counties, Permit No. CAS004004, Board Order R4-2021-0105, and any other requirements established by the City of Camarillo.

The applicant/owner is responsible for ensuring that all project contractors and subcontractors implement all applicable BMPs.

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 3 of 12

STORMWATER POLLUTION CONTROL PLAN

Definitions:

SWPCP - Stormwater Pollution Control Plan
BMP - Best Management Practice

This Stormwater Pollution Control Plan and BMP references are from the California Stormwater Best Management Practice Handbooks (Construction, Municipal, New Development & Redevelopment, and Industrial). The handbooks may be obtained from the California Stormwater Quality Association (CASQA) at www.cabmphandbooks.com or www.casqa.org .

Responsible Party Information

Project Owner/Developer: City of Camarillo Contact: ________ ________

Mailing Address: 601 Carmen Drive

City: Camarillo State: CA Zip: 93010 Phone:

Contractor:

Mailing Address:

City: State: Zip: Phone:

Contractor’s Authorized Representative:

Phone:

Estimated Start Date of Project:

Estimated Finish Date of Project:

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 4 of 12 Site Map Requirements

In addition to proposed construction plans, provide the following information and provide an aerial map or drawing depicting the controls to be applied (i.e., inlet protection, sediment controls, material, equipment, vehicle, portable toilet and stockpile areas, if applicable.

• Parcel Size = __________ acres
Note: Before a grading permit is issued, the City of Camarillo will require proof of receipt of a Notice of Intent for the State National Pollutant Discharge Elimination System General Construction Permit for all construction projects that have a parcel size of one acre or more or that are less than one acre but the site is part of a larger common area of development or sale.
• Boundary of construction site: construction area = __________ acres. • Existing paved areas and buildings.
• Areas of existing vegetation to be protected/preserved. • Areas where it is known that toxic materials have been stored, disposed, spilled, or leaked onto the construction site.
• Affected water courses, lakes, wetlands, springs, and wells. • Watershed boundary of offsite areas that drain into construction site. • Boundary of drainage area where stormwater leaves property. • Areas of soil disturbance and locations of potential soil erosion areas requiring BMPs during construction.
• Areas of cut and fill.
• Drainage patterns and slopes anticipated after major grading activities. • Locations of existing storm drain facilities.

Types and locations of stormwater structures, controls, and/or BMPs that will be built/utilized to control stormwater pollution during construction.

Provide a brief description of BMPs selected and, if appropriate, attach modified fact sheets or additional information.
• Construction and erosion control material storage areas. • Temporary stockpile and construction waste storage areas. • Construction vehicle storage and service areas.

The above information should be updated as needed to meet evolving construction conditions.

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 5 of 12 Inventory of Contractor’s Activities and Special Conditions

1. Describe construction materials, equipment, and vehicles that will be used onsite.

2. Describe the existing soil and source description of fill material (reference or attach soils report).

3. Provide a description of special site conditions that may contribute pollutants to all discharges and how they are to be controlled.

4. Describe stormwater structures/controls on the site prior to construction and how these structures/controls will be integrated into the SWPCP to reduce sediment and other pollutants in all discharges.

5. Provide the sequence for implementation or installation or proposed BMPs.

6. List waters, other than stormwater, which will flow from the site during dry weather, the approximate amount of flow, and methods for preventing or treating these dry weather flows.

7. Hillside or Construction Discharging Directly to Sediment Impaired Waterbody – Contractor shall implement enhanced BMPs on sites located on a hillside (contains slopes that are 20% or greater) or that discharge directly to Conejo Creek, Calleguas Creek, or Revolon Slough/Beardsley Wash. For a list of enhanced BMPs see Table 9 in Pa rt 4.F.4 in the Ventura County Municipal Stormwater Permit (Order No. 2010-0108) available at:
http://www.swrcb.ca.gov/rwqcb4/water_issues/programs/stormwater/municipal/in dex.shtml. In addition to enhanced BMPs, these types of sites must be inspected by a qualified SWPPP Developer at least weekly during the wet season and once each 24 hour period during a storm event that generates runoff from the site to identify BMPs that need maintenance to operate effectively, that have failed or could fail to operate as intended.

Attach sheets if additional space is required.

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 6 of 12 Monitoring, Inspection, and Maintenance Requirements

1. Implement maintenance/repair efforts to ensure that the required BMPs are in good and effective condition. (A maintenance/repair plan is attached? Yes
No See
pages 10-11 of SWPCP.)

2. Before start of construction and during contractor annually t rain all site personnel responsible for installing, inspecting, and maintaining BMPs: SC -14. (Training program/material attached?
Yes
No) Document training on Attachment 2.

Contractor must forward copy of training record to City Stormwater Program Manager before construction can begin.

3. Keep records and document on Inspection form (Attachment 1):
• annual inspection
• pre-storm inspection
• post-storm inspection

4. Contractor shall monitor BMPs at drain inlets before, after and during rain events and modify as needed to prevent flooding of public right -of-way.

Contractor shall remove all BMPs upon completion of roadwork.

Best Management Practices - BMPs
Complete the following charts. The BMPs listed may be used if applicable or adequate. Additional BMPs may apply. Please do not attach the BMP Fact Sheets referenced from the California Stormwater BMP Handbooks to the city’s copy of the SWPCP; however, the BMP Fact Sheets must be attached to the SWPCP that is kept at the construction site. BMPs can be downloaded from the California Stormwater Handbooks at www.cabmphandbooks.com.

BMPs Selected – Noted by Ref. ID from the
California Stormwater BMP Handbooks
Use BMP
(If no, state reason) Yes No

Erosion Control BMPs
EC-1 Scheduling
EC-2 Preservation of Existing
Vegetation
EC-3 Hydraulic Mulch
EC-4 Hydroseeding
EC-5 Soil Binders
EC-6 Straw Mulch
EC-7 Geotextiles & Mats
EC-8 Wood Mulching
EC-9 Earth Dikes & Drainage Swales
EC-10 Velocity Dissipation Devices

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 7 of 12 BMPs Selected – Noted by Ref. ID from the
California Stormwater BMP Handbooks
Use BMP
(If no, state reason) Yes No
EC-11 Slope Drains
EC-12 Stream bank Stabilization
EC-14 Compost Blankets
EC-15 Soil Preparation/Roughening
EC-16 Non-Vegetative Stabilization
Temporary Sediment Control BMPs
SE-1 Silt Fence
SE-2 Sediment Basin
SE-3 Sediment Trap
SE-4 Check Dam
SE-5 Fiber Rolls
SE-6 Gravel Bag Berm
SE-7 Street Sweeping & Vacuuming
SE-8 Sandbag Barrier
SE-9 Straw Bale Barrier
SE-10 Storm Drain Inlet Protection
SE-11 Active Treatment Systems
SE-12 Temporary Silt Dike
SE-13 Compost Socks & Berms
SE-14 Biofilter Bags

Wind Erosion Control BMPs
WE-1 Wind Erosion Control
Temporary Tracking Control BMPs
TC-1 Stabilized Construction
Entrance/Exit
TC-2 Stabilized Construction Roadway
TC-3 Entrance/Outlet Tire Wash
Non-Stormwater Management BMPs
NS-1 Water Conservation Practices
NS-2 Dewatering Operations
NS-3 Paving & Grinding Operations

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 8 of 12 BMPs Selected – Noted by Ref. ID from the
California Stormwater BMP Handbooks
Use BMP
(If no, state reason) Yes No
NS-4 Temporary Stream Crossing
NS-5 Clear Water Diversion
NS-6 Illicit Connection/Discharge
NS-7 Potable Water/irrigation
NS-8 Vehicle & Equipment Cleaning
NS-9 Vehicle & Equipment Fueling
NS-10 Vehicle & Equipment
Maintenance
NS-11 Pile Driving Operations
NS-12 Concrete Curing
NS-13 Concrete Finishing
NS-14 Material Over Water
NS-15 Demolition Adjacent to Water
NS-16 Temporary Batch Plants
Waste Management & Materials Pollution Control BMPs
WM-1 Material Delivery & Storage
WM-2 Material Use
WM-3 Stockpile Management
WM-4 Spill Prevention & Control
WM-5 Solid Waste Management
WM-6 Hazardous Waste Management
WM-7 Contaminated Soil Management
WM-8 Concrete Waste Management
WM-9 Sanitary/Septic Waste Mgmt.

WM-10 Liquid Waste Management
Additional BMPs Selected

Hillside (20%> slope) or Direct
Discharge to Conejo or
Calleguas Creeks or Revolon
Slough/Beardsley Wash
If applicable, apply Condition #7 on
p.5 of this document
EC-11 Building Repair & Construction
(Industrial handbook)

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 9 of 12 Certification

Contractor
As the Contractor of record, I have selected appropriate BMPs to effectively minimize the negative impacts of this project’s construction activities on stormwater quality. The project owner is aware that the selected BMPs must be installed, monitored, and maintained to ensure their effectiveness. The BMPs not selected for implementation are redundant or deemed not applicable to the proposed construction activity.

Name: Title:

Signature: Date:

City Representative:

I certify that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is true, accurate, and complete. I am aware that submitting false and/or inaccurate information, failing to update the SWPCP to reflect current conditions, or failing to properly and/or adequately implement the SWPCP may result in revocation of grading and/or other permits or other sanctions provided by law.

Name: Title:

Signature: Date:

REVIEWED BY CITY STORMWATER PROGRAM MANAGER:

______________________________ Date: ____________________________ Jessica Ouellette (805-383-5659)

Acceptance or approval of this Stormwater Pollution Control Plan in no way precludes the authority of the agency to require modification to the plan as conditions warrant nor does the agency take responsibility for performance of BMPs provided for in the plan.

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 10 of 12 Stormwater Quality Controls – BMP Map (Can use Aerial map and draw in BMPs) Insert drawing/map of project site that identifies location of BMPs and their ID# (ie, SE -10 Silt Fence)

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 11 of 12 Attachment 1 to SWPCP
Construction Site Inspection Checklist
Contractor shall complete this checklist, keep a copy with the SWPCP and provide copy to the city within one business day of inspection. Inspections shall be conducted a minimum of:
• Monthly during nonrainy season (April 16 through September 30) • Weekly during rainy season (Oct. 1 through April 15)
• Before, during and after a significant rain event (.25” or greater). • Contractor shall monitor BMPs at drain inlets before, after and during rain events and modify as needed to prevent flooding of public right-of-way. Contractor shall remove all BMPs upon completion of roadwork.
• All hillside sites or sites that directly discharge to Conejo Creek, Calleguas Creek or Revolon Slough/Beardsley Wash must be inspected by a qualified SWPPP Developer at least weekly during the wet season and once each 24 hour period during a storm event that generates runoff from the site to identify BMPs that need maintenance to operate effectively, that have failed or could fail to operate as intended.

DATE OF INSPECTION: _________________________
Project Name: ___________________________Contractor:_______________________ Weather Conditions during inspection: ___________________________________________

Item
Compliance
Accomplished

YES NO N/A
Date Completed
1 Is the site entrance stabilization adequate?
2 Is equipment/vehicles parked in designated areas
and free from significant leaks? Are drip pans
present as needed?

3 Are maintenance areas free from stains on the soil?
4 Are all materials stored in bins or covered in plastic and protected from storm water?

5 Is construction waste being disposed of in proper
trash containers?

6 Are concrete washout stations present and being
utilized and maintained?

7 Is fugitive dust being controlled and water being
used as needed?

8 Are catch basins, drainage channels, drain
inlets/outlets being protected?

9 Are erosion control measures (BMPs) identified in
SWPCP in place and effective?

1 0
Are sediment control measures (BMPs) identified in
SWPCP in place and effective?

11 If applicable, are enhanced BMPs identified in #7 on p. 5 of SWPCP being implemented as appropriate?

Comments:_____________________________________________________________________

I certify under penalty of law that this inspection is true, and I or a qualified assigned person has performed the required inspection as stated in the SWPCP.

__________________________________ ___________________________________ Inspector Signature Contractor Signature
Copy to: City Stormwater Program Manager ([email protected])

Camarillo spec lang projects under 1 acre SWPCP Public MASTER rev 6-19-2024 No PC Page 12 of 12 Attachment 2 to SWPCP
Trained Contractor Personnel Log
All City employees and contractors (whose interactions, jobs and activities affect stormwater quality) must be trained before start of project construction and annually on Storm Water Pollution Prevention Controls and illicit discharge prevention and reporting. A copy of the training log shall be forwarded to the City of Camarillo Stormwater Program Manager, 601 Carmen Dr. Camarillo CA 93010, 805-383-5659.

Storm Water Management Training Log for Contractors

Contractor Name:

Type of Contract or Service Provided:

City Dept. Rep. Contractor Reports to:

Date of Training:

Instructor: Telephone:

Stormwater quality training was provided on illicit discharge prevention & reporting as well as non-storm water management, erosion controls, waste management and materials pollution control, and spill prevention related to the following categories: (check as appropriate)

Vehicle & Equipment Maintenance Illicit Discharge Prevention & Reporting Graffiti Abatement Good Housekeeping & Building Maintenance Pavement Marking and Painting Storm Drain and Ditch Cleaning & Maintenance Asphalt Use Safety Concerns when maintaining stormwater treatment devices Concrete Use Spill Prevention and Proper Cleanup Procedures Landscape Maintenance Other
Pest and Fertilizer Management, including Integrated Pest Management (IPM)

Attendee Roster
Name Company Phone Number

Comments:

APPENDIX
CH-5067-2
APPENDIX E – PREVAILING WAGE RATES

1. Download at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

APPENDIX
CH-5067-2

APPENDIX F – RIGHT OF WAY

1. NOT USED

APPENDIX
CH-5067-2

REFERENCE MATERIAL

1. Solar Canopy System at City Hall, Project No. CH-5067-1 (11x17) Preliminary Plans  PROJECT TO BE CONSTRUCTED BY OTHERS – included for reference only (8 SHEETS)

VICINITY MAP
SCALE: NONE LOCATION MAP
SCALE: NONE

DRAWING SHEET INDEX
SHEET #
1 T0.0 TITLE SHEET
2 E0.0 ELECTRICAL NOTES, SYMBOLS, AND ABBREVIATIONS
3 E1.0 DEMO PLAN
4 E1.1 ELECTRICAL SITE PLAN
5 E2.0 SINGLE LINE DIAGRAM
6 E3.0 PV CANOPY ELEVATION
7 E4.0 ELECTRICAL EQUIPMENT SPECIFICATIONS
8 E4.1 ELECTRICAL EQUIPMENT SPECIFICATIONS

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

CAJ CAJ CAJ

TITLE SHEET
1 8 T0.0

THESE CONCEPTUAL PLANS ARE FOR

CLEARLY COMMUNICATING THE NATURE OF

THE SOLAR PV SYSTEM PROPOSED AT THE

CAMARILLO CITY HALL REQUESTED AS PART
OF THE PV RFP.

PROJECT LOCATION PROJECT LOCATION

CITY OF CAMARILLO

DEPARTMENT OF PUBLIC WORKS
CONCEPTUAL PLANS FOR:

SOLAR CANOPY SYSTEM AT CITY HALL
PROJECT NO. CH-5067-1
601 CARMEN DRIVE, CAMARILLO, CA 93010

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

GENERAL NOTES

1. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND

SHALL BE LISTED BY UNDERWRITER'S LABORATORIES (UL) AND BEAR

THEIR LABEL, OR LISTED AND CERTIFIED BY A NATIONALLY

RECOGNIZED TESTING AUTHORITY WHERE UL DOES NOT HAVE A
LISTING. CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY.

IN ADDITION, THE MATERIALS, EQUIPMENT, AND INSTALLATION SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

AMERICAN SOCIETY OF TESTING MATERIALS (ASTM)

INSULATED POWER CABLE ENGINEERS ASSOCIATION (IPCEA)

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

AMERICAN STANDARD ASSOCIATION (ASA)

NATIONAL FIRE PROTECTION AGENCY (NFPA)

AMERICAN NATIONAL STANDARD INSTITUTE (ANSI)

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS (IEEE) ALL LOCAL CODES HAVING JURISDICTION.

WHERE THE CODES HAVE DIFFERENT LEVELS OF REQUIREMENTS,
THE MOST STRINGENT RULE SHALL APPLY.

2. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER
TRADES AT THE SITE. ANY COSTS TO INSTALL WORK TO ACCOMPLISH

SAID COORDINATION WHICH DIFFERS FROM THE WORK AS SHOWN ON THE DRAWINGS SHALL BE INCURRED BY THE CONTRACTOR. ANY

DISCREPANCIES, AMBIGUITIES OR CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR CLARIFICATION.

3. THE CONTRACTOR SHALL PROVIDE AND KEEP UP-TO-DATE A
COMPLETE RECORD SET OF DRAWINGS. THESE PRINTS SHALL BE

CORRECTED DAILY AND SHOW EVERY CHANGE FROM THE ORIGINAL DRAWINGS. THIS SET OF DRAWINGS SHALL BE KEPT ON THE JOB SITE AND SHALL BE USED ONLY AS A RECORD SET. THIS SHALL NOT BE

CONSTRUED AS AUTHORIZATION FOR THE CONTRACTOR TO MAKE

CHANGES IN THE LAYOUT WITHOUT DEFINITE INSTRUCTION IN EACH CASE. UPON COMPLETION OF THE WORK, A SET OF REPRODUCIBLE

CONTRACT DRAWINGS SHALL BE OBTAINED FROM THE ENGINEER, AND

ALL CHANGES AS NOTED ON THE RECORD SET OF DRAWINGS SHALL BE

INCORPORATED THEREON WITH BLACK INK IN A NEAT, LEGIBLE, UNDERSTANDABLE AND PROFESSIONAL MANNER. FAILURE TO KEEP

RECORD DRAWINGS UP-TO-DATE SHALL CONSTITUTE CAUSE FOR
WITHHOLDING OF PROGRESS PAYMENTS.

4. ALL INTERRUPTION OF ELECTRICAL POWER SHALL BE KEPT TO A MINIMUM.

5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE

TEMPORARY POWER FACILITIES AND CONNECTIONS FOR ALL FEEDERS

OR SYSTEMS BEING DISCONNECTED IN ORDER TO MAINTAIN SYSTEMS

IN OPERATION OR WHERE SAID FEEDERS OR SYSTEMS REQUIRE
EMERGENCY STANDBY POWER.

6. AFTER ALL REQUIREMENTS OF THE DRAWINGS HAVE BEEN FULLY

COMPLETED, REPRESENTATIVES OF THE OWNER WILL INSPECT THE WORK. THE CONTRACTOR SHALL PROVIDE COMPETENT PERSONNEL

TO DEMONSTRATE THE OPERATION OF ANY ITEM OR SYSTEM TO THE FULL SATISFACTION OF EACH REPRESENTATIVE. FINAL ACCEPTANCE

OF THE WORK WILL BE MADE BY THE OWNER AFTER RECEIPT OF

APPROVAL AND RECOMMENDATION OF ACCEPTANCE FROM EACH
REPRESENTATIVE.

7. ALL FINAL CONNECTIONS TO OWNER FURNISHED EQUIPMENT SHALL BE MADE BY THE CONTRACTOR.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAW CUTTING,

TRENCHING, REMOVAL, BACKFILLING, COMPACTION AND PATCHING OF CONCRETE AS REQUIRED TO PERFORM HIS WORK. ATTENTION IS

CALLED TO THE FACT THAT THERE ARE EXISTING UNDERGROUND
UTILITY LINES. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN TRENCHING FOR HIS WORK. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR THE PROPER AND APPROVED REPAIR OF ANY AND ALL DAMAGES CAUSED BY HIM OR HIS WORK.

9. WHENEVER A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE,

EQUIPMENT DEVICES, CIRCUIT BREAKERS, GROUND FAULT
PROTECTION SYSTEMS, ETC. (ALL MATERIALS), ARISES ON THE

DRAWINGS OR SPECIFICATIONS, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND

SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE

DRAWINGS OR IN THE SPECIFICATIONS TO ENSURE COMPLETE AND OPERABLE SYSTEMS AS REQUIRED BY THE ENGINEER.

10. REFER TO SINGLE LINE DIAGRAM AND FEEDER SCHEDULES FOR CONDUIT AND CONDUCTOR SIZE TO PANELS, ETC. CONDUIT RUNS MAY NOT BE SHOWN ON DRAWINGS, BUT ARE PART OF THIS CONTRACT.

11. STRAIGHT FEEDER, BRANCH CIRCUIT, AND CONDUIT RUNS SHALL BE

PROVIDED WITH SUFFICIENT PULL BOXES OR JUNCTION BOXES TO LIMIT THE MAXIMUM LENGTH OF ANY SINGLE CABLE. PULL BOXES SHALL BE SIZED PER CODE OR AS INDICATED ON DRAWINGS.

LOCATIONS SHALL BE DETERMINED IN THE FIELD OR AS INDICATED ON THE DRAWINGS.

12. WHERE MULTI-HOMERUNS ARE INDICATED ON DRAWINGS INDICATING

THE SAME PANELBOARD CIRCUIT NUMBER, PROVIDE JUNCTION BOX AND ROUTE ONE SET OF WIRES TO CIRCUIT BREAKERS.

13. IDENTIFICATION NAMEPLATES SHALL BE MICARTA 1/8 INCH THICK AND

OF APPROVED SIZE WITH BEVELED EDGES AND ENGRAVED WHITE
LETTERS A MINIMUM OF 1/4 INCH HIGH ON BLACK BACKGROUND.

NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION OR PANELBOARDS. ALL NAMEPLATES SHALL BE
ATTACHED WITH ADHESIVE. PULL BOXES, JUNCTION BOXES, AND DEVICE BOXES SHALL BE MARKED WITH A PERMANENT MARKER.

14. DRAWINGS ARE DIAGRAMMATIC ONLY. ROUTING OF RACEWAYS AND COMBINING OF HOME RUNS ACCEPTABLE PER CODE. SHALL BE AT THE

OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER SECTIONS. DO NOT SCALE THE

ELECTRICAL DRAWINGS FOR LOCATIONS OF ANY ELECTRICAL,

ARCHITECTURAL, STRUCTURAL, CIVIL, OR MECHANICAL ITEMS OR FEATURES.

15. CUTTING, BORING, SAW CUTTING OR DRILLING THROUGH THE NEW OR

EXISTING STRUCTURAL ELEMENTS TO BE DONE ONLY WHEN SO
DETAILED ON THE DRAWINGS OR ACCEPTED BY THE ENGINEER.

16. ALL EXPOSED CONDUITS SHALL BE RIGID GALVANIZED STEEL CONDUIT, SCH. 40, WHERE EXPOSED TO POSSIBLE PHYSICAL DAMAGE. ALL OTHER OUTDOOR CONDUIT TO BE EMT RAIN-TIGHT FITTINGS. ALL INDOOR TO BE EMT SET SCREW STEEL. CONDUIT UNDERNEATH
STREETS OR LOCATIONS WITH VEHICLE ACCESS SHALL BE PVC SCH. 80 PVC.

17. CONTRACTOR SHALL PROVIDE LAMINATE RED NAMEPLATE ON ALL DISCONNECT SWITCHES, WITH CIRCUIT DESCRIPTIONS AND NUMBER.

18. ELECTRICAL GROUNDING SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE.

19. OVERCURRENT PROTECTION SHALL COMPLY WITH NEC ARTICLE 240.

20. SOLAR PHOTOVOLTAIC SYSTEM INSTALLATION SHALL CONFORM TO NEC ARTICLE 690 & 705.

21. INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED

NEC AND NESC CODES AND STANDARDS AND SHALL CONFORM WITH INDUSTRY BEST PRACTICES AND IEE RECOMMENDATIONS. THE AHJ

HAS FINAL JURISDICTIONAL AUTHORITY ON CODE APPLICATION AND COMPLIANCE.

22. SOLAR PHOTOVOLTAIC SYSTEM IS INTERACTIVE GRID PARALLEL MODE ONLY.

23. CONTRACTOR IS RESPONSIBLE TO INSTALL UNDERGROUND CONDUIT SYSTEM AND RESTORE ALL SURFACES REGARDLESS OF TYPE.
(LANDSCAPE, PAVING, CEMENT OR OTHER)

24. CONTRACTOR IS RESPONSIBLE TO PROVIDE CATEGORY 6 OR FIBER CONNECTION FOR DATA ACQUISITION SYSTEM.

25. CONTRACTOR IS RESPONSIBLE TO SUPPLY UTILITY METERING VISIBLE

BLADE DISCONNECT SWITCHBOARD AND ALL THEIR COMPONENTS
NECESSARY TO CONNECT INVERTERS TO DISTRIBUTION SYSTEM.

26. CONTRACTOR SHALL BE RESPONSIBLE TO PRE-COMMISSION AND PROVIDE A FULLY OPERATIONAL SYSTEM AND, FINAL COMMISSIONING.

CB
INV

INVERTER

COMBINATION STARTER WITH FUSIBLE SWITCH
NON-FUSED DISCONNECT SWITCH.

COMBINATION STARTER
FUSED DISCONNECT SWITCH.

F
F
GROUND FAULT PROTECTION DEVICE.

GROUND, "GND".

B-1,3

ELECTRICAL SYMBOLS
CIRCUIT BREAKER, # DENOTES AMPACITY#

TRANSFORMER

DISCONNECT
FUSE, # DENOTES SIZE#

COMBINER BOXCB

INVERTER BOXINV

ABBREVIATIONS
2P 2 POLE J JUNCTION BOX R RED, RAISE, RELAY OR

REVERSE
3P 3 POLE JB JUNCTION BOX OR VAULT RECP RECEPTACLE
2/C 2 CONDUCTOR KV KILOVOLT RMC RIGID METAL CONDUIT
4"C 4" CONDUIT KW KILOWATT RSG RIGID STEEL GALVANIZED

CONDUIT
#8G #8 GROUND WIRE KWH KILOWATT HOUR
Ø DIAMETER KVA "KILOVOLT - AMPERES
°F DEGREES FARENHEIT SCH SCHEDULE

A AMP(S)

AC ALTERNATING CURRENT MAX MAXIMUM, SHLD SHIELDED

AL ALUMINUM MCC MOTOR CONTROL CENTER SHT SHEET

AWG AMERICAN WIRE GAUGE MCM THOUSAND CIRCULAR MIL SP SINGLE POLE

MIN MINIMUM

BLDG BUILDING MISC MISCELLANEOUS STD STANDARD

BLK BLACK MPPT MAXIMUM POWER POINT

TRACKER

SWGR SWITCHGEAR

BLU BLUE MSB MAIN SWITCHBOARD SQ SQUARE

CM CIRCUIT MONITOR

ELECTRONIC POWER QUALITY

MONITOR

NEU NEUTRAL
C. "CONDUIT", WITH

CONDUCTORS AS REQUIRED

BY DRAWINGS OR
SPECIFICATIONS.

NC NORMALLY CLOSED
C.O "CONDUIT ONLY", PROVIDE

PULL ROPE FOR ALL EMPTY
CONDUIT AS REQUIRED.

N.I.C. NOT IN CONTRACT

CONC CONCRETE NEC NATIONAL ELECTRIC CODE

CU COPPER NEMA NATIONAL ELECTRICAL

MANUFACTURE'S ASSOC

CB COMBINER BOX NO NORMALLY OPEN TEMP TEMPERATURE

CL CENTER LINE TYP TYPICAL

NTS NOT TO SCALE

COMM COMMUNICATION O OPEN UG UNDERGROUND

CONN CONNECTION OC ON CENTER UL UNDERWRITERS LABORATORY

DAS DATA ACQUISITION SYSTEM OD OUTSIDE DIAMETER

DC DIRECT CURRENT P PRIMARY OR POLE UON UNLESS OTHERWISE NOTED

DIA DIAMETER PB PUSH BUTTON OR PULL BOX UPS UNINTERRUPTIBLE POWER SUPPLY

DWG DRAWING
(E) EXISTING Ø PHASE V VOLT(S)

EQUIP EQUIPMENT PNL PANEL VA VOLT /AMPERES

PROT PROTECTION W WATTS, WIRE, WHITE OR
WIDE

EMT ELECTRO METALLIC TUBING PV PHOTOVOLTAIC WP WEATHERPROOF

FIN FINISH PVC POLYVINYL CHLORIDE

G GROUND OR GREEN REINF REINFORCED XFMR TRANSFORMER

GALV GALVANIZED QTY QUANTITY Y YELLOW

GEC GROUNDING ELECTRODE

CONDUCTOR

GFI GROUND FAULT INTERRUPTER

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

HH HANDHOLE
CONDUIT RUN UNDERGROUND.

CONDUIT RUN EXPOSED.

CONDUIT STUBBED OUT AND CAPPED. PULL LINE
IN PLACE.

CROSS LINES ON CONDUIT RUNS INDICATE NUMBER OF
#12 CURRENT CARRYING CONDUCTORS CONTAINED
THEREIN. TWO #12 AND ONE #12 GROUND WIRE ARE
INDICATED WHEN CROSS LINES ARE NOT SHOWN.

NUMERALS ADJACENT TO CROSS LINES ON CONDUIT
RUNS INDICATE SIZE OF CONDUCTORS IN LIEU OF #12.

ALL CONDUITS SHALL CONTAIN ONE GROUND WIRE
SIZED PER NEC 250.122, BUT NOT SMALLER THAN #12.

CONDUIT HOMERUN TO PANELBOARD. LETTER AND

NUMERALS INDICATE ELECTRICAL PANEL AND CIRCUIT
NUMBER.

GROUND WELL
3/4" X 10'

COPPER CLAD STEEL GROUND

ROD IN BROOKS BOX
UTILITY METER SOCKET, WITH C.T.S, CLIPS, ETC., PER
SERVING UTILITY COMPANY.

CAJ CAJ CAJ

ELECTRICAL NOTES, SYMBOLS,

AND ABBREVIATIONS
2 8 E0.0
CH

EH EH EH
CHCH
SCALE:
1 E1.0 1" = 30'-0"
GENERAL NOTES:

1. ALL EQUIPMENT SHALL BE LOCKABLE OR GUARDED AGAINST
ACCESS BY UNQUALIFIED PERSONS.

2. EXPOSED NON-CURRENT CARRYING METAL PARTS OF ALL

EQUIPMENT AND ENCLOSURES SHALL BE GROUNDED IN
ACCORDANCE WITH NEC 250.134 AND 250.136(A). GROUND
INVERTERS IN ACCORDANCE WITH LISTING.

3. CONDUIT ROUTING IS DIAGRAMMATIC, EXACT ROUTING TO BE VERIFIED BY CONTRACTOR. CONTRACTOR TO LOCATE AND
AVOID ALL UNDERGROUND INTERFERENCES.

4. ALL SPARE CONDUITS SHALL BE PROPERLY CAPPED AND
INCLUDE (2) SUFFICIENTLY RATED PULL STRINGS PER CONDUIT.

5. ALL NEW OUTDOOR EQUIPMENT TO BE NEMA 3R RATED WITH
PADLOCKABLE DOOR(S).

6. EXISTING UNDERGROUND UTILITIES PRESENT. POTHOLING, GPR

OR OTHER MEANS OF UNDERGROUND UTILITY IDENTIFICATION
ARE TO BE EXPECTED. CONTRACTOR RESPONSIBLE FOR

DETERMINING FINAL UNDERGROUND CONDUIT ROUTING BASED
ON EXISTING CONDITIONS.

KEYED NOTES:

1. REMOVE TREES

2. REMOVE EXISTING PARKING LOT LIGHT POLES. REMOVE LIGHT POLE FOUNDATION, BACKFILL, AND COMPACT. DE-ENERGIZE, CAP,

LABEL, AND ABANDON EXISTING CIRCUITS IN ACCORDANCE WITH CEC.
#

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

CAJ CAJ CAJ

DEMO PLAN
3 8 E1.0
1 1
1 22
1 1
1 2
CH

EH EH EH
CHCH
EH
CH
SCALE:
1 E1.1 1" = 30'-0"
GENERAL NOTES:

1. ALL EQUIPMENT SHALL BE LOCKABLE OR GUARDED AGAINST
ACCESS BY UNQUALIFIED PERSONS.

2. EXPOSED NON-CURRENT CARRYING METAL PARTS OF ALL

EQUIPMENT AND ENCLOSURES SHALL BE GROUNDED IN
ACCORDANCE WITH NEC 250.134 AND 250.136(A). GROUND
INVERTERS IN ACCORDANCE WITH LISTING.

3. CONDUIT ROUTING IS DIAGRAMMATIC, EXACT ROUTING TO BE VERIFIED BY CONTRACTOR. CONTRACTOR TO LOCATE AND
AVOID ALL UNDERGROUND INTERFERENCES.

4. ALL SPARE CONDUITS SHALL BE PROPERLY CAPPED AND
INCLUDE (2) SUFFICIENTLY RATED PULL STRINGS PER CONDUIT.

5. ALL NEW OUTDOOR EQUIPMENT TO BE NEMA 3R RATED WITH
PADLOCKABLE DOOR(S).

6. EXISTING UNDERGROUND UTILITIES PRESENT. POTHOLING, GPR

OR OTHER MEANS OF UNDERGROUND UTILITY IDENTIFICATION
ARE TO BE EXPECTED. CONTRACTOR RESPONSIBLE FOR

DETERMINING FINAL UNDERGROUND CONDUIT ROUTING BASED
ON EXISTING CONDITIONS.

KEYED NOTES:

1. CONTRACTOR TO DETERMINE BEST ARRANGEMENT OF NEW

EQUIPMENT WITHIN EXISTING ELECTRICAL ROOM BASED ON
SELECTED EQUIPMENT DIMENSIONS.

2. INSTALL CONCRETE-ENCASED ELECTRODES IN ACCORDANCE
WITH NEC 250.52(A)(3)(2) CONSISTING OF #4 AWG BARE COPPER AT LEAST 20 FEET LONG (OR INSTALL ONE OR MORE GROUND RODS); MINIMUM LENGTH OF 20 FEET IN ACCORDANCE WITH NEC
250.52(A)(3)(1).

3. EXISTING EQUIPMENT INSTALLED AS PART OF ANOTHER PROJECT.

4. TRENCH PV CONDUIT AND COMMUNICATION CONDUIT TO EXISTING HANDHOLES. EXTEND PV FEEDERS AND COMMUNICATION WIRING
FROM PV CANOPY TO MSG AS INDICATED ON SHEET E2.0.
#

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

EXISTING UTILITY
TRANSFORMER 'XFMR-1'

EXISTING
'GENERATOR'

CAJ CAJ CAJ

ELECTRICAL SITE PLAN
4 8 E1.1

EXISTING 'MSG'

FUTURE 'BESS'
'PV MODULES'

ON PV CANOPY

PV CANOPY
COLUMN, TYP.
3 3
'PNL-PV'
'DAS'

EXISTING

ELECTRICAL
HANDHOLE 'EH2'

EXISTING

COMMUNICATION
HANDHOLE 'CH2'
4 4

NEW CONDUIT

IN TRENCH,
TYP.

PV INVERTER 'INV' ON
CANOPY COLUMN, TYP OF 5
1 E3.0

EXISTING

COURTYARD
WALL

EXISTING

UNDERGROUND
CONDUIT, TYP.
3 'PV-PPM'
'PV-DISC1'
'PV-MAIN'
'WEATHER

STATION'

CONDUIT BETWEEN PV

INVERTER 'INV' AND 'PNL-PV'
IN CANOPY ABOVE, TYP.
2 1

CAMARILLO CITY HALL

ELECTRICAL

HANDHOLE 'EH-EV'

EXISTING

ELECTRICAL
HANDHOLE 'EH1'

EXISTING

COMMUNICATION
HANDHOLE 'CH1'
3 3

COMMUNICATION

HANDHOLE,
CH3
REPLACE TOP SURFACE IN KIND. MATCH EXISTING

ASPHALT/CONCRETE PAVING AND BASE ROCK SECTIONS
SCALE:

TRENCH DETAIL2
E1.1 NONE

YELLOW PLASTIC AND METALLIC

WARNING TAPE TO BE

REQUIRED ABOVE AND ALONG
ENTIRE LENGTH OF DUCT BANK.
30" MIN. TO THE TOP

OF HIGHEST CONDUIT

SEE ELECTRICAL SHEETS FOR

CONDUIT SIZE, TYPE, AND WIRING
12"
VARIES
NOTES:

1. ACTUAL NUMBER OF CONDUIT IN TRENCH MAY VARY, SEE SHEET ELECTRICAL SHEETS.

2. PROVIDE MINIMUM 12" SEPARATION OF POWER AND COMMUNICATION CONDUITS.

3. LIFT HEIGHT AND METHOD OF COMPACTION TO BE COMPLIANT WITH GEOTECH REPORT.

4. REFER TO CITY STANDARD TRENCH DETAIL OR THIS TRENCH DETAIL, WHICHEVER IS MORE CONSERVATIVE.
6"

SAND BEDDING AND BACKFILL
95% COMPACTED

NATIVE BACKFILL
CONDUIT (TYP.)
12"
6"

ROCK BASE
4" MIN.
2" MIN., TYP.
2" MIN. TYP.
4" MIN. 4" MIN.

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1
KEYED NOTES:

1. VERIFY MICROGRID CONTROLLER IS PROGRAMMED TO ALLOW

GENSET AND PV INVERTERS TO OPERATE IN AN ISLANDED STATE WITHOUT CAUSING DAMAGE TO GENSET OR PV INVERTERS.

2. PROVIDE UNDER CANOPY LIGHTING WITH COLOR TEMPERATURE THAT MATCHES EXISTING SITE LIGHTING. PROVIDE LIGHTING

CONTROLS THAT COMPLY WITH CEC AND MATCH SITE LIGHTING
CONTROLS.

3. VERIFY UTILITY PV SYSTEM METERING REQUIREMENTS PRIOR TO ROUGH IN.

4. PROVISION SPACE AND CONDUIT FOR FUTURE NGOM UTILITY

METERING EQUIPMENT THAT WILL BE REQUIRED WHEN FUTURE
BESS IS INSTALLED.

5. INSTALL CONDUCTORS IN EXISTING CONDUIT.

6. INSTALL (1) 3" CONDUIT ONLY FROM 'MSG' TO 'EHEV' FOR FUTURE EVSE. PROVIDE 2 PULL STRINGS AND CAP ENDS WITH PVC FITTINGS. #
GENERAL NOTES:

1. ALL AC CONDUCTORS ARE SIZED TO 2% VOLTAGE DROP.

MAXIMUM VOLTAGE DROP FOR DC WIRING IS 1.0%. MAXIMUM
DC+AC VOLTAGE DROP NOT TO EXCEED 2.25%.

2. ALL AC CONDUCTORS SHALL BE TYPE THWN-2 OR XHHW-2.

3. PV STRING HOMERUN WIRING SHALL BE COPPER #10 PV-2,
RATED 2000V AND WIRED BELOW MODULES AND NOT IN
CONDUIT.

4. TORQUE REQUIREMENTS FOR THE CONDUCTOR AT THE
INVERTERS TO BE VERIFIED PER THE INSTALLATION MANUAL.

5. METER, DATA LOGGERS AND WEATHER STATIONS IN NEMA
3R ENCLOSURE.

6. METER REFERENCE WIRING TO BE PROTECTED BY CIRCUIT
BREAKER OR FUSED DISCONNECTING MEANS.

7. SERVICE ENTRANCE TO BE GROUNDED PER NEC.

8. REFERENCE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
800AT
800AF
600AT
600AF
350AT
600AF
250AT
250AF
M
600AT
600AF

CAJ CAJ CAJ

SINGLE LINE DIAGRAM
5 8 E2.0
SCALE:
1 E2.0 NONE
100AF
70AT
200AS
XXXAF
200AS
XXXAF
30AS
30AF
30AS
30AF
30AS
30AF
30AS
30AF
30AS
15AF
30AS
30AF
30AS
30AF
30AS
30AF
30AS
SPARE
100AF
90AT
600AF
600AT
225AF
225AT
AHU-1 AHU-2 AC-3 AC-4 AC-5 AC-6 WH-3 HP-1 HP-2 HP-5
LBLA
DPA
EXISTING 'MAIN SERVICE DISTRIBUTION SWBD' 600A, 480/277V, 3PH, 4W 30AS
30AF
HP-3
30AS
30AF
HP-4
100AF
70AT
PARK

PANEL A
100AF
100AT
PARK

PANEL B

EXISTING UTILITY

TRANSFORMER
"XFMR1"

EXISTING 'MICROGRID CONTROLLER'
EXISTING MICROGRID MAIN SWITCHGEAR 'MSG' 2500A, 480/277V, 3PH, 4W

CONTROLS
G
800AF
800AT
EXISTING 'GENERATOR' 250
kVA, 480Y/277V, 3PH, 4W CONTROLS
FUTURE 'BESS' 200 kVA, 372 kWH

EXISTING

COMMUNICATION

HANDHOLE
'CH2'

EXISTING

ELECTRICAL

HANDHOLE
'EH1'
(N) PNL-PV 300A, 480/277V, 3Ø, 4W, N3R
15A/3P
15A/2P
DATA

ACQUISITION
SYSTEM
('DAS')
INV-1 36kW
INV- 2 36kW
INV- 3 36kW
INV- 4 25kW
INV- 5 25kW
1-1/4" CONDUIT
1-1/4" CONDUIT
1-1/4" CONDUIT
1-1/4" CONDUIT
1-1/4" CONDUIT
20A/1P
250A/3P
'WEATHER

STATION'
1 1
1 1

TO UNDER
CANOPY

LIGHTING
2 PV SYSTEM SIZE
PV DC NAMEPLATE POWER 193.2 kW
PV AC NAMEPLATE POWER 158 kW

PV MODULE SPECIFICATIONS

PV MODULE MAKE LONGI GREEN ENERGY
TECHNOLOGY CO., LTD.

PV MODULE MODEL LR4-72HPH-460M

MAX POWER-POINT CURRENT
(IPMAX)

10.98A

MAX POWER-POINT VOLTAGE
(VPMAX)

41.9V
OPEN-CIRCUIT VOLTAGE (VOC) 49.7V
SHORT-CIRCUIT CURRENT (ISC) 11.73A
SERIES FUSE RATING (OCPD) 20A
MAXIMUM POWER (PMAX) 460W
VOC TEMP COEFF -0.265%/DEG C
PV MODULE QUANTITY 420

INVERTER SPECIFICATIONS

INVERTER MAKE CHINT POWER SYSTEMS AMERICA
CPS

CHINT POWER SYSTEMS AMERICA
CPS
INVERTER MODEL SCA25KTL-DO-R/US-480 SCA36KTL-DO-R/US-480 MAX DC VOLT RATING 1000V DC 1000V DC
MAX POWER @ 40 C 25 kW 36 kW
NOMINAL AC VOLTAGE 480V AC 480V AC
MAX AC CURRENT 30.5 A 43.5 A
MAX OCPD RATING 50 A 125 A
INVERTER QUANTITY 23
'PV MODULE', TYP.

PV-MAIN
(N) UNFUSED
DISC. SW. WITH

VISIBLE BLADE

DISCONNECT
PER RULE-21
400A 480/277V,
3Ø, 4W, N3R
M
'PV-DISC1'
UNFUSED DISC. SW.

WITH VISIBLE
BLADE

DISCONNECT
400A 480/277V,
3Ø, 4W, N3R
'PV-PPM'
480/277V,
3Ø, 4W, N3R
4 40A/3P
40A/3P
70A/3P
70A/3P
70A/3P
3 4
5 EXISTING

COMMUNICATION

HANDHOLE
'CH1'

EXISTING

ELECTRICAL

HANDHOLE
'EH2'
5 NEW

ELECTRICAL

HANDHOLE
'EHEV'
NEW

COMMUNICATION

HANDHOLE
'CH3'
6 6 6
6 1" COMMUNICATION CONDUIT

25&,7<$33529('(48$/

25&,7<$33529('(48$/
EQ.
℄ COLUMN
EQ.

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

CAJ CAJ CAJ

PV CANOPY ELEVATION
6 8 E3.0
SCALE:
1 E3.0 NTS

ELECTRICAL EQUIPMENT ON
COLUMN

EXISTING

COURTYARD
WALL
PROVIDE 2' MIN CLEARANCE

BETWEEN TOP OF WALL AND

BOTTOM OF CANOPY

ELECTRICAL EQUIPMENT TO

BE MOUNTED NO LESS THAN
80" ABOVE GRADE, NO LESS
THAN 96" IN ACCESSIBLE
AREA.

EXISTING

SIDEWALK

AND CURB

EXISTING

ASPHALT

PARKING LOT

EXISTING
GRADE
KEYED NOTES:

1. PROVIDE UNDER CANOPY LIGHTING WITH COLOR TEMPERATURE THAT MATCHES EXISTING SITE LIGHTING. PROVIDE LIGHTING

CONTROLS THAT COMPLY WITH CEC AND MATCH SITE LIGHTING
CONTROLS.
#
GENERAL NOTES:

1. REFERENCE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
1 1

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

CAJ CAJ CAJ

ELECTRICAL

EQUIPMENT SPECIFICATIONS
7 8 E4.0

CITY OF CAMARILLO
101 LUCAS VALLEY RD, SUITE 302 | SAN RAFAEL, CA 94903
T. (415) 663-9914
www.nv5.com

DRAFT NOT FOR

CONSTRUCTION
CH-5067-1 CH-5067-1

SOLAR CANOPY SYSTEM

AT CITY HALL
601 CARMEN DR.

CH5067-1

CAJ CAJ CAJ

ELECTRICAL

EQUIPMENT SPECIFICATIONS
8 8 E4.1

CH-5067-2

STANDBY POWER AT CITY HALL - PLANS
(14 SHEETS)

CH-5067-2

STANDBY POWER AT CORPORATION YARD - PLANS
(16 SHEETS)