DEVELOPMENT PLANS RESUBMITTAL | 05.15.2024
CAMARILLO, CA
VILLAGE GATEWAY
HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 1 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
1 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of CamarilloSITE PLAN
SCALE: 1” = 50’-0”
0 1005025
LOT 6
0.45 Ac.
LOT 4
0.53 Ac.
LOT 3
0.63 Ac.
LOT 5
1.17 Ac.
LOT 1
3.07 Ac.
COFFEE
2,190 SF
26 PS
Trash /Loading
Village at the Park Drive
Westpark Court
101 FWY
Petit St.
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 2 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
2 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of CamarilloFLOOR & ROOF PLANS
SCALE: 1/8” = 1’-0”
0 1684
NOTES:
1. RTU LOCATIONS ARE SUBJECT TO CHANGE.
2. DRAIN LOCATIONS ARE TBD.
3. ROOF SLOPES ARE TBD.
4. ALL GAS LINES TO RUN UNDERGROUND AND
THROUGH INTERIOR OF THE BUILDING.
TRELLIS ABOVE
PAD A
±2,190 SF
TRELLIS WITH SOLAR
PANELS ABOVE
TRELLIS WITH SOLAR
PANELS ABOVE
SLOPE:
14" PER FOOT
SOLAR PANELS
(± 425 SF)
RTU
RTU
SOLAR PANELS
(± 1000 SF)
FLOOR PLAN ROOF PLAN1 2
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 3 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
3 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of Camarillo
CONCEPTUAL ELEVATIONS
SCALE: 1/8” = 1’-0”
0 1684
1 13
5 53
5 5 5
3 62 263 1
5 51
24 41 3
22 44 41 33 36213
6 A
BJ
K H G GK B
KG G H LH GK
M E B
GP PGB E O N FF L ND
K G GBM
PC CA J
PP FCC CA N LBJ ME BGEPFAEJ
G
H
+8’-0”
+13’-2”
+13’-2”
+13’-2”
+8’-6”
T.O. ROOF
T.O. PARAPET
T.O. ROOF
T.O. ROOF
T.O. TOWER
B.O. TRELLIS
B.O. TRELLIS
B.O. CANOPY
B.O. TRELLIS
B.O. CANOPY
T.O. PARAPET
T.O. PARAPET
T.O. TOWER
+22’-0”
+24’-9”
+22’-0”
+22’-0”
+35’-0”
+24’-9”
+24’-9”
+35’-0”
A STUCCO: OMEGA, "20/30 FINE SAND FLOAT" G WALL TILE N WROUGHT IRON GRILLE 1 PAINT: SHERWIN WILLIAMS-SW7006 "EXTRA WHITE" B ARCHITECTURAL TRIM H ROOF TILE O LANDSCAPE TRELLIS 2 PAINT: SHERWIN WILLIAMS-SW7036 "ACESSIBLE BEIGE" C METAL CANOPY J TRELLIS P PRECAST CONCRETE 3 PAINT: SHERWIN WILLIAMS-SW7510 "CHATEAU BROWN" D DOOR K SIGNAGE (Under separate Submittal) Q METAL GATE 4 PAINT: SHERWIN WILLIAMS-SW7020 "BLACK FOX" E STONE VENEER : EL DORADO STONE, LIMESTONE "SAN MARINO" L LIGHTING R METAL MESH 5 WALL TILE: ARTO "SD100B CERAMIC TILE" 6X6 F ALUMINUM STOREFRONT: ARCADIA-AB4 "MEDIUM BRONZE" M SOLAR PANELS S STRUCTURAL STEEL 6 WALL TILE: DALTILE "TS71 AUTUMN MIST", 4X4
MATERIALS FINISHES
NORTH ELEVATION (RIGHT)EAST ELEVATION (FRONT)
WEST ELEVATION (BACK) SOUTH ELEVATION (LEFT)
1 2
43 CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 4 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
4 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of CamarilloSECTIONS
SCALE: 1/4” = 1’-0”
0 842
22'
TOP OF ROOF
16'-8"
TOP OF ROOF
35'
TOP OF ROOF
5'-9"
5'-5"
8'
B.O. CANOPY
22'
BUILDING HEIGHT
35'
TOP OF ROOF
15'-6"
TOP OF WALL
24'-9"
TOP OF WALL
5'-4"
5'-3"
13'
BOTTOM OF TRELLIS
13'-6"
BOTTOM OF TRELLIS
15'-5"
TOP OF ROOF
8'-6"
B.O. CANOPY
LONGITUDINAL SECTION
CROSS SECTION
A
B
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 5 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
5 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of Camarillo
PERSPECTIVE VIEW
PERSPECTIVE VIEW - NORTHEAST CORNER OF BUILDING
COVERED PATIO SEATING LOW WALL
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 6 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
6 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of Camarillo
PERSPECTIVE VIEW
PERSPECTIVE VIEW - SOUTHEAST CORNER OF BUILDING
SOLAR PANELS
INTEGRATED INTO
THE TRELLIS CANOPY
OVER THE PICK UP
WINDOW
STARBUCKS DRIVE
THRU SIGNAGE OVER
THE PICK UP WINDOW
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 7 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
7 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of Camarillo
PERSPECTIVE VIEW
PERSPECTIVE VIEW - SOUTHWEST CORNER OF BUILDING
SOLAR PANELS
INTEGRATED INTO
THE TRELLIS CANOPY
OVER THE PICK UP
WINDOW
DECORATIVE TRELLIS
OVER THE DRIVE-
THRU LANE WITH
OPTION TO PUT SOLAR
PANELS ON TOP LOW WALL
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 8 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
8 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of Camarillo
PERSPECTIVE VIEW
PERSPECTIVE VIEW - NORTHWEST CORNER OF BUILDING
DECORATIVE TRELLIS
OVER THE DRIVE-
THRU LANE WITH
OPTION TO PUT SOLAR
PANELS ON TOP
STARBUCKS LOGO
DISK ON THE TOWER
CLOSEST TO THE
FREEWAYLOW WALL
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 9 of 9
Planning Commission Meeting of October 15, 2024
Architecture + Planning
949.851.2133
ktgy.com
CAMARILLO, CA 93012 # 2023-0251
VILLAGE GATEWAY
MAY 15, 2024
DEVELOPMENT PLANS
9 HIJI INVESTMENT CO., LLC
203 Village Commons Blvd., Suite 11
Camarillo, CA 93012
attn: Dennis Hardgrave
[email protected]
(805) 402-1589
CPD #255
Lot 1, Tract 5753
Village at the Park
City of CamarilloTRASH ENCLOSURE, TRELLIS,
AND LOW WALL DETAILSSCALE: 1/4” = 1’-0”
0 842
10'-2"
9'-0" 3'-4"
R.O
7'-0"
19'-4"
5'-0" CLR.
11'-0"
8"
8"
1'-0"
1'-0" 17'-4" 1'-0"
9'-0"
9'-0"
R.O
9'-0"
R.O
18'-0" CLR.
3FT LOW WALL
TRELLIS WITH SOLAR
PANELS ABOVE
1 1
13 3
33 3
33 3
4 4
42 2
2 2 2 3
A
A
AC
C
CS
S
SQ
Q
R
R
RP
P
P
P P JM E
T.O. ROOF
T.O. ROOF
B.O. TRELLIS
T.O. ROOF
T.O. WALL
T.O. WALL
T.O. WALL
+10’-0”
+10’-0”
+11’-6”
+10’-0”
+7’-0”
+7’-0”
+3’-0”
+0’-0”
+7’-0”
TRASH ENCLOSURE FLOOR PLAN TRELLIS & LOW WALL FLOOR PLAN T.E. ELEVATION (E)
T.E. ELEVATION (W)
T.E. ELEVATION (N/S)
TRELLIS ELEVATION (LONG) TRELLIS ELEVATION (SHORT)
1 2
A
B
C
D E
A STUCCO: OMEGA, "20/30 FINE SAND FLOAT" G WALL TILE N WROUGHT IRON GRILLE 1 PAINT: SHERWIN WILLIAMS-SW7006 "EXTRA WHITE" B ARCHITECTURAL TRIM H ROOF TILE O LANDSCAPE TRELLIS 2 PAINT: SHERWIN WILLIAMS-SW7036 "ACESSIBLE BEIGE" C METAL CANOPY J TRELLIS P PRECAST CONCRETE 3 PAINT: SHERWIN WILLIAMS-SW7510 "CHATEAU BROWN" D DOOR K SIGNAGE (Under separate Submittal) Q METAL GATE 4 PAINT: SHERWIN WILLIAMS-SW7020 "BLACK FOX" E STONE VENEER : EL DORADO STONE, LIMESTONE "SAN MARINO" L LIGHTING R METAL MESH 5 WALL TILE: ARTO "SD100B CERAMIC TILE" 6X6 F ALUMINUM STOREFRONT: ARCADIA-AB4 "MEDIUM BRONZE" M SOLAR PANELS S STRUCTURAL STEEL 6 WALL TILE: DALTILE "TS71 AUTUMN MIST", 4X4
MATERIALS FINISHES
CPD-255, Hiji Investment & TFR Investment Companies
Exhibit A Page 10 of 9
Planning Commission Meeting of October 15, 2024