Camrosa
Extend existing water line to 24” in Santa Rosa Road (Upland Rd. to San Rafael Way)(Begin Winter 2025)
This project would extend the 24” pipeline 1,700 feet along Santa Rosa Road from the reduction point to where the 12” pipeline splits near San Rafael Way into two 12” pipelines, one that continues west along Santa Rosa Road and one that enters Leisure Village. The larger diameter pipe would reduce the head loss experienced in this section, improving flow and allowing for reliable, uniform pressures across the area.

Repair Sewer Hotspots ( Begin July 1, 2025)
1) Oak Canyon Road, north of Saddleback way 250’
2) Holly Ridge Drive at Birchview Lane, westerly 400’
3) Cervato Drive at Calle Luminoso, northerly 400’
4) San Onofre Drive at Cervato Drive, easterly 400’
5) Fieldcrest drive, easterly and westerly of Mission Oaks Blvd. 6) Elm View Drive at Woodcreek Road, NE 200’
7) Stacy Lane at Upland Road, northerly 300’
8) Jeffrey Road at Upland, northerly 450’
9) Mission Oaks Blvd at intersection of Adolfo Rd westerly 400’

Sampling Stations – various sites (TBD)
Installation of various Water Quality Sampling Stations