ROADS &

TRANSPORTATION
Five-Year
Capital Improvement Program

SOURCES OF FUNDING: 23/24 24/25* 25/26* 26/27* 27/28* TOTAL FEDERAL FUNDING 1,128,080$ 2,817,582$ 5,970,000$ 8,099,020$ 540,000$ 18,554,682$ STATE FUNDING 3,829,550$ 8,315,000$ 17,005,300$ 12,344,500$ 4,250,000$ 45,744,350$ LOCAL FUNDING 17,545,361$ 22,993,318$ 26,422,450$ 17,502,280$ 10,837,000$ 95,300,409$ ANNUAL TOTAL: 22,502,991$ 34,125,900$ 49,397,750$ 37,945,800$ 15,627,000$ 159,599,441$ FIVE YEAR TOTAL: 159,599,441$

FUNDING SOURCE TYPE:

Notes:
* FY 2024/25 thru 2027/28, is an estimate and is contingent on receiving Federal and State grant funding.

VENTURA COUNTY ROADS & TRANSPORTATION

CAPITAL PROJECTS FINANCING

FIVE-YEAR PLAN
2024-2028
FEDERAL - Active Transportation Program (ATP), Congestion Mitigation and Air Quality (CMAQ), Highway Bridge Program (HBP), Highway Safety Improvement Program (HSIP), and Highway Infrastructure Program (HIP).

STATE - Active Transportation Program (ATP), Highway Safety Improvement Program (HSIP-State), Rubberized Asphalt Concrete Program (RAC), State Coastal Conservancy (SCC), Transportation Development Act (TDA), and Wildlife Conservation Board (WCB).

LOCAL - Road Fund, SB1-Road Maintenance and Rehabilitation Account (RMRA), Traffic Impact Mitigation Fee (TIMF), Developer fees/ local funds, Assessment District Funds, and Assigned Program Mitigation Funds for Bike Lanes.

PROJECT LOCATION & DESCRIPTION EST. COST
Bridge Program Various locations - Rehabilitation of
bridges and structural improvements. $ 796,900
Camino Cielo Bridge Replacement Bridge replacement, slope protection and channel improvements. $ 1,020,000
Drainage Improvements Improving existing drainage facilities such as culverts and storm drain systems. $ 1,800,000
El Rio Sidewalk Improvements
Construction of sidewalks and intersection
improvements on various roads within the
El Rio area.
$ 1,000,000
** Hueneme Road Widening - Phase I Widening Hueneme Road from two lanes to four lanes - Environmental Services $ 600,000
Las Posas at East Fifth Street Intersection
Improvements
Intersection Improvements, bike lanes, right
turn lane, drainage improvements, railroad
crossing improvements and signal
modifications.
$ 400,000
Lewis Road - Slope Protection
Armoring of the slope on the east side of
Lewis Road, removal of existing down
drains and appurtenant work.
$ 290,000
Moorpark Operations Yard Upgrade
Reconstruct the aging and deficient
Moorpark Operations Yard facilities to meet
current safety requirements.
$ 2,500,000
** Nonmotorized Transportation Program
(Pedestrian & Bike Lane Projects)
Various locations - pedestrian and bicycle
improvements. $ 557,591
Pavement Resurfacing Program
Resurface various roads throughout the
County in various thicknesses and
treatments in order to strengthen, reclaim,
modernize and extend the life of County
roads.
$ 9,000,000
** Piru Pedestrian Improvements Pedestrian improvements various locations in the Piru Area. $ 200,000

VENTURA COUNTY ROADS & TRANSPORTATION

PLANNED CAPITAL PROJECTS

FIVE-YEAR PLAN
FY 2023-24
PROJECT LOCATION & DESCRIPTION EST. COST
FY 2023-24
* Preliminary Engineering/Feasibility Studies Various locations feasibility study in order to prepare and apply for Federal/State Grants. $ 150,000 Rose Avenue Bike Lanes (Central Ave to
SR 118)
Construct Class II Bike Lanes on Rose
Avenue from Central Avenue to SR 118. $ 200,000
Rose Avenue Bike Lanes (Collins St -
Simon Wy)
Construct Class II Bike Lanes on Rose
Avenue from Collins Street to Simon Way. $ 200,000 Santa Ana Road Slope Stabilization
Various locations along Santa Ana Road to
mitigate for future damages as a result of
fire and/or storm damage.
$ 25,000
* Santa Clara Ave Widening
(SMP Priority Rank # 3)
Oxnard City Limits to Highway 118 - Widen
to 4 lanes (Feasibility Study). $ 200,000
Santa Rosa Bike Lanes and Pedestrian
Improvements
Construction of bike lanes,
relocation/removal of guardrail and rumble
strips and appurtenant work on Santa Rosa
Road from Yucca Drive to Moorpark Road.
$ 1,365,000
Saticoy Pedestrian Improvements Pedestrian improvements various locations in the Saticoy Area. $ 225,000
Systemic Countywide Signalized
Intersection Improvements
Install Retroreflective Back-Plates to all
signal heads and Advance Dilemma Zone
Detection at all County maintained
signalized intersections.
$ 1,150,000
** Traffic Safety Improvement Program
Various locations - install or update traffic
signals, intersection lane modification, and
other safety improvements.
$ 648,500
Ventura Avenue Pedestrian & Bike Lane
Improvements
Pedestrian and bike lane improvements on
Ventura Avenue from Crooked Palm Road
to Los Cabos Lane.
$ 175,000
(*) Design and/or Study Only. TOTAL 22,502,991$
(**) Partially contingent on availability of State/ Federal funding.

PROJECT LOCATION & DESCRIPTION EST. COST
** Bridge Program Various locations - Rehabilitation of bridges and structural improvements. $ 7,293,200
Bridge Road Bridge Rehabilitation County
Bridge No. 442
Bridge Rehabilitation including bank slope
protection, modification of lane geometry,
upgrade to crash barriers & railings, and
superstructure repairs including paint touch-
up on the bridge structure.
$ 1,293,750
** Camino Cielo Bridge Replacement Bridge replacement, slope protection and channel improvements. $ 9,400,000
* Channel Islands Blvd Widening
(SMP Priority Rank #7)
Widen Channel Island Boulevard to 4 lanes
and construct bike lanes from Oxnard city
limits to Rice Avenue to improve traffic and
bicycle safety (Feasibility Study).
$ 150,000
Drainage Improvements Improving existing drainage facilities such as culverts and storm drain systems. $ 2,700,000
El Rio Sidewalk Improvements
Construction of sidewalks and intersection
improvements on various roads within the
El Rio area.
$ 5,150,000
** Guardrail Upgrades Upgrade of guardrails at various locations. $ 2,000,000 ** Hueneme Road Widening - Phase I Widening Hueneme Road from two lanes to four lanes - Environmental Services $ 2,100,000

PLANNED CAPITAL PROJECTS

FIVE-YEAR PLAN

VENTURA COUNTY ROADS & TRANSPORTATION

PLANNED CAPITAL PROJECTS

FIVE-YEAR PLAN
FY 2025-2028
PROJECT LOCATION & DESCRIPTION EST. COST
FY 2025-2028
Las Posas at East Fifth Street Intersection
Improvements
Intersection Improvements, bike lanes, right
turn lane, drainage improvements, railroad
crossing improvements and signal
modifications.
$ 3,900,000
* Las Posas Road Widening
(SMP Priority Rank # 8)
Hueneme Road to Pleasant Valley Road -
Widen to 4 lanes including bike lanes to
improve traffic safety and bicycle safety
(Feasibility Study).
$ 200,000
Lewis Road - Slope Protection
Armoring of the slope on the east side of
Lewis Road, removal of existing down
drains and appurtenant work.
$ 805,000
Moorpark Operations Yard Upgrade
Reconstruct the aging and deficient
Moorpark Operations Yard facilities to meet
current safety requirements.
$ 18,500,000
** Nonmotorized Transportation Program
(Pedestrian & Bike Lane Projects)
Various locations - pedestrian and bicycle
improvements. $ 12,747,000
* Olivas Park Drive Widening
(SMP Priority Rank # 9)
Widen Olivas Park Drive to 4 lanes from
Telephone Road to Seaborg Drive to
improve traffic safety. This is a multi-
jurisdictional project (Feasibility Study).
$ 200,000
Pavement Resurfacing Program
Resurface various roads throughout the
County in various thicknesses and
treatments in order to strengthen, reclaim,
modernize and extend the life of County
roads.
$ 36,000,000
** Piru Pedestrian Improvements Pedestrian improvements various locations in the Piru Area. $ 3,250,000
* Pleasant Valley Road Widening
(SMP Priority Rank # 6)
Rice Avenue to Camarillo C/L - Widen to 4
lanes (Feasibility Study). $ 200,000
* Preliminary Engineering/Feasibility Studies Various locations feasibility study in order to prepare and apply for Federal/State Grants. $ 400,000 PROJECT LOCATION & DESCRIPTION EST. COST
FY 2025-2028
** Rose Avenue Bike Lanes (Central Ave to
SR 118)
Construct Class II Bike Lanes on Rose
Avenue from Central Avenue to SR 118. $ 3,437,500
Rose Avenue Bike Lanes (Collins St -
Simon Wy)
Construct Class II Bike Lanes on Rose
Avenue from Collins Street to Simon Way. $ 3,437,500 ** Rumble Strip and Curve Warning Sign
Project
Various locations throughout the County to
improve safety. $ 10,287,800
Santa Ana Road Slope Stabilization
Various locations along Santa Ana Road to
mitigate for future damages as a result of
fire and/or storm damage.
$ 1,675,000
Saticoy Pedestrian Improvements Pedestrian improvements various locations in the Saticoy Area. $ 3,272,000
Systemic Countywide Signalized
Intersection Improvements
Install Retroreflective Back-Plates to all
signal heads and Advance Dilemma Zone
Detection at all County maintained
signalized intersections.
$ 5,000,000
** Traffic Safety Improvement Program
Various locations - install or update traffic
signals, intersection lane modification, and
other safety improvements.
$ 2,602,700
Ventura Avenue Pedestrian & Bike Lane
Improvements
Pedestrian and bike lane improvements on
Ventura Avenue from Crooked Palm Road
to Los Cabos Lane.
$ 945,000
* Victoria Avenue Widening
(SMP Priority Rank # 5)
Gonzales Road to Olivas Park Drive
(County Section: 247's/o river bridge to 119
s/o Olivas Park Drive) - Widen to 6 lanes
(Feasibility Study).
$ 150,000
(*) Design and/or Study Only. TOTAL 137,096,450$
(**) Partially contingent on availability of State/ Federal funding.

Bridge Program Project No.: Varies
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
107,000$ 571,900$ 275,000$ 325,000$ 150,000$ 150,000$ 5,291$ -$ -$ -$ -$ -$ -$ 25,000$ 300,843$ 225,000$ 280,000$ 80,000$ -$ 200,000$ 105,000$ 1,100,000$ 1,600,000$ 700,000$ 112,291$ 796,900$ 2,683,200$ 1,650,000$ 2,030,000$ 930,000$ Cat. Ex. X Neg. Dec. X EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023
Fiscal Year Total:

Total Estimated Cost: 8,090,100$

ENVIRONMENTAL REQUIREMENTS

REMARKS
Projects funded by Highway Bridge Program (HBP - Federal Grant) and Road Fund.

Category
Design:

Right of Way:

Con. Eng/Insp.

Construction:
*Miscellaneous:

SCOPE OF WORK AND OBJECTIVE
Rehabilitate bridges throughout the County by various means, including replacements, minor structural improvements, and scour protection to extend their life and improve traffic safety.

ESTIMATED COST PER FISCAL YEAR
Santa Paula Street Bridge
Replacement - Bridge #403
Adams Barranca, 0.59 miles west of Peck Road. 2026-27
Grand Avenue Bridge
Replacement - Bridge #427
Jepson Wash, 0.88 miles north of Old Telegraph
Road.
2024-25
Riverside Avenue Bridge
Replacement - Bridge #406
Grimes Canyon Wash, 0.24 miles west of
Chamberburg Road.
2025-26
Bridge Maintenance/
Rehabilitation - Countywide
Various Locations. 2024-28
Carne Road Bridge Replacement
- Bridge #347
McNell Creek, 0.66 miles north of State Highway 150. 2024-25 Bridge Deck Rehabilitation Various Locations. 2027-28
Bridge Inspection Program
(Local Bridges)
Inspection of local bridges not inspected by Caltrans,
various locations
2024-28

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name:

LOCATION MAP
Project Name: Location: Anticipated Year of
Completion
Bridge Road Bridge Rehabilitation County Bridge No. 442 Project No.: 50562 Supervisorial District: 1 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
540,000$ -$ -$ -$ -$ -$ 17,056$ -$ -$ -$ -$ -$ -$ -$ -$ 168,750$ -$ -$ -$ -$ -$ 1,125,000$ -$ -$ 557,056$ -$ -$ 1,293,750$ -$ -$ Cat. Ex. X Neg. Dec. X EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

REMARKS
Project funded by Highway Bridge Program (HBP - Federal Grant) and Road Fund.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 1,293,750$

ENVIRONMENTAL REQUIREMENTS
Bridge Rehabilitation including bank slope protection, modification of lane geometry, upgrade to crash barriers & railings, and superstructure repairs including paint touch-up on the bridge structure.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

Con. Eng/Insp.

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name:

LOCATION MAP

SCOPE OF WORK AND OBJECTIVE

PROJECT
Project No.: 50635/50636
Supervisorial District: 1 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
650,000$ 1,020,000$ 50,000$ -$ -$ -$ -$ -$ 150,000$ -$ -$ -$ -$ -$ -$ 1,200,000$ -$ -$ -$ -$ -$ 8,000,000$ -$ -$ 650,000$ 1,020,000$ 200,000$ 9,200,000$ -$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Road Fund and reimbursed by State Coastal Conservancy (SCC - State Grant) and Wildlife Conservation Board (WCB - State Grant).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 10,420,000$

SCOPE OF WORK AND OBJECTIVE
Bridge replacement, slope protection and channel improvements.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Camino Cielo Bridge Replacement

LOCATION MAP

Project No.: NA
Supervisorial District: 3 Zone: Unincorporated Area: X City of: Oxnard Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
-$ -$ -$ -$ 150,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 150,000$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee Program (TIMF).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 150,000$

SCOPE OF WORK AND OBJECTIVE
Widen Channel Island Boulevard to 4 lanes and construct bike lanes from Oxnard city limits to Rice Avenue to improve traffic and bicycle safety (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Channel Islands Blvd Widening (SMP Priority Rank #7)

LOCATION MAP

Drainage Improvements Project No.: Varies
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
150,000$ 200,000$ 250,000$ 100,000$ 100,000$ -$ 1,120$ -$ -$ -$ -$ -$ 50,000$ 200,000$ 50,000$ 100,000$ 100,000$ -$ 300,000$ 1,400,000$ 400,000$ 800,000$ 800,000$ -$ 501,120$ 1,800,000$ 700,000$ 1,000,000$ 1,000,000$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Projects funded by Road Fund.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 4,500,000$

SCOPE OF WORK AND OBJECTIVE
Improving existing drainage facilities such as culverts and storm drain systems.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

East Loop Drive - Storm Drain
Reparis
Reconstruction of failed storm drain pipe along East
Loop Drive between Mesa Drive and Alosta Drive. 2023-24 Storm Drain Condition
Assessment Study
Study to assess condition of storm drain system
within urban areas of the County. 2024-25
Countywide Drainage Study Countywide study to evaluate areas with drainage deficiencies and identify improvements needed. 2024-25
Drainage Repairs/Replacement Replacing and/or repairing failed culverts and storm drains. 2024-28

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name:

LOCATION MAP
Project Name: Location: Anticipated Year of
Completion
Project No.: 50616
Supervisorial District: 3 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
500,000$ 250,000$ -$ -$ -$ -$ 80,000$ 200,000$ -$ -$ -$ -$ -$ 50,000$ 450,000$ -$ -$ -$ -$ 500,000$ 4,700,000$ -$ -$ -$ 580,000$ 1,000,000$ 5,150,000$ -$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Active Transportation Program (ATP - State Grant) and Road Fund.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 6,150,000$

SCOPE OF WORK AND OBJECTIVE
Construction of sidewalks and intersection improvements on various roads within the El Rio area.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: El Rio Sidewalk Improvements

LOCATION MAP

Project No.: NA
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
100,000$ -$ 100,000$ -$ 100,000$ -$ -$ -$ -$ -$ -$ -$ 100,000$ -$ -$ 150,000$ -$ 150,000$ 1,000,000$ -$ -$ 750,000$ -$ 750,000$ 1,200,000$ -$ 100,000$ 900,000$ 100,000$ 900,000$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Highway Safety Improvement Program (HSIP - State Grant).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 2,000,000$

SCOPE OF WORK AND OBJECTIVE
Upgrade of guardrails at various locations.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Guardrail Upgrades

LOCATION MAP

Project No.: 50629
Supervisorial District: 5 Zone: Unincorporated Area: X City of: Oxnard Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
200,000$ 600,000$ 300,000$ 400,000$ 200,000$ -$ -$ -$ 600,000$ 600,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000$ 600,000$ 900,000$ 1,000,000$ 200,000$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Highway Infrastructure Program (HIP - Federal Grant) and Traffic Impact Mitigation Fee Program (TIMF).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 2,700,000$

SCOPE OF WORK AND OBJECTIVE
Widening Hueneme Road from two lanes to four lanes - Environmental Services

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Hueneme Road Widening - Phase I

LOCATION MAP

PROJECT
Las Posas at East Fifth Street Intersection Improvements Project No.: 50564 Supervisorial District: 5 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
308,000$ 400,000$ 200,000$ -$ -$ -$ 9,159$ -$ 250,000$ -$ -$ -$ -$ -$ -$ 450,000$ -$ -$ -$ -$ -$ 3,000,000$ -$ -$ 317,159$ 400,000$ 450,000$ 3,450,000$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

REMARKS
Project Funded by Railway-Highway Crossings - Section 130 Program (State Grant).

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 4,300,000$

ENVIRONMENTAL REQUIREMENTS
Intersection Improvements, bike lanes, right turn lane, drainage improvements, railroad crossing improvements and signal modifications.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

Con. Eng/Insp.

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name:

LOCATION MAP

SCOPE OF WORK AND OBJECTIVE

PROJECT
Project No.: NA
Supervisorial District: 5 Zone: Unincorporated Area: X City of: Camarillo Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
-$ -$ -$ -$ -$ 200,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee Program (TIMF).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 200,000$

SCOPE OF WORK AND OBJECTIVE
Hueneme Road to Pleasant Valley Road - Widen to 4 lanes including bike lanes to improve traffic safety and bicycle safety (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Las Posas Road Widening (SMP Priority Rank # 8)

LOCATION MAP

PROJECT
Project No.: 50615
Supervisorial District: 5 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
70,000$ 50,000$ -$ -$ -$ -$ 3,152$ 10,000$ -$ -$ -$ -$ -$ 30,000$ 105,000$ -$ -$ -$ -$ 200,000$ 700,000$ -$ -$ -$ 73,152$ 290,000$ 805,000$ -$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Road Fund.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 1,095,000$

SCOPE OF WORK AND OBJECTIVE
Armoring of the slope on the east side of Lewis Road, removal of existing down drains and appurtenant work.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Lewis Road - Slope Protection

LOCATION MAP

PROJECT
Project No.: P6T14407
Supervisorial District: 4 Zone: Unincorporated Area: X City of: Moorpark Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
69,099$ 2,500,000$ 2,500,000$ -$ -$ -$ -$ -$ 1,000,000$ -$ -$ -$ -$ -$ -$ 1,000,000$ -$ -$ -$ -$ -$ 14,000,000$ -$ -$ 69,099$ 2,500,000$ 3,500,000$ 15,000,000$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Design and Construction of the Moorpark Operations Yard Upgrade will be carried out jointly with PWA's Watershed Protection District and Roads & Transportation. Project Funded by Road Fund and other financing options.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 21,000,000$

SCOPE OF WORK AND OBJECTIVE
Reconstruct the aging and deficient Moorpark Operations Yard facilities to meet current safety requirements.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Moorpark Operations Yard Upgrade

LOCATION MAP

PROJECT
Project No.: Varies
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
87,409$ 367,591$ 880,000$ 420,000$ 380,000$ 330,000$ -$ -$ -$ -$ -$ -$ 10,000$ 25,000$ 15,000$ 440,000$ 405,000$ 365,000$ 60,000$ 165,000$ 105,000$ 3,169,000$ 3,311,000$ 2,927,000$ 157,409$ 557,591$ 1,000,000$ 4,029,000$ 4,096,000$ 3,622,000$ Cat. Ex. X Neg. Dec. X EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Funded by Road Fund, Active Transportation Program (ATP - State Grant), Assigned Program Mitigation Funds for Bike Lanes, and Article 4-TDA.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 13,304,591$

SCOPE OF WORK AND OBJECTIVE
Various locations - pedestrian and bicycle
improvements.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

Transit Improvements County Wide Bus stop improvements at various locations within the County.
2024-28
Regional Bike Routes - Category B
and C Bike Lanes
Various locations within the County to construct regional bike routes.
2024-28
Norway Tract Sidewalks Sidewalk Repair in the Norway Tract Area 2024 Countywide Bike & Pedestrian
Improvements
Projected improvements based on ATP study. 2024-28
Project Name: Location: Anticipated Year of
Completion
Active Transportation Plan Countywide study to evaluate multi-modal needs in the County.
2025

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Nonmotorized Transportation Program (Pedestrian & Bike Lane Projects)

LOCATION MAP
Project No.: NA
Supervisorial District: 1 Zone: Unincorporated Area: X City of: Ventura Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
-$ -$ -$ -$ -$ 200,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee Program (TIMF).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 200,000$

SCOPE OF WORK AND OBJECTIVE
Widen Olivas Park Drive to 4 lanes from Telephone Road to Seaborg Drive to improve traffic safety. This is a multi- jurisdictional project (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Olivas Park Drive Widening (SMP Priority Rank # 9)

LOCATION MAP

PROJECT
Project No.: Varies
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
150,000$ 150,000$ 150,000$ 150,000$ 150,000$ -$ -$ -$ -$ -$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 8,600,000$ 8,600,000$ 8,600,000$ 8,600,000$ 8,600,000$ 9,000,000$ 9,000,000$ 9,000,000$ 9,000,000$ 9,000,000$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Funded by Road Fund, Rubberized Asphalt Concrete Program (RAC - State Grant), and SB1-Road Maintenance and Rehabilitation Account.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 45,000,000$

SCOPE OF WORK AND OBJECTIVE
Resurface various roads throughout the County in various thicknesses and treatments in order to strengthen, reclaim, modernize and extend the life of County roads.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

Pavement Resurfacing - Priority 4 Various Roads. 2027
Pavement Resurfacing - Priority 5 Various Roads. 2028
Pavement Resurfacing - Priority 2 Various Roads. 2025
Pavement Resurfacing - Priority 3 Various Roads. 2026
Project Name: Location: Anticipated Year of
Completion
Pavement Resurfacing - Priority 1 Various Roads. 2024

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Pavement Resurfacing Program

LOCATION MAP

Project No.: NA
Supervisorial District: 3 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-2026 2026-27 2027-28
-$ 200,000$ 390,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 373,040$ -$ -$ -$ -$ -$ 2,486,960$ -$ -$ 200,000$ 390,000$ -$ 2,860,000$ -$ Cat. Ex. X Neg. Dec. X EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Active Transportation Program (ATP - State Grant).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 3,450,000$

SCOPE OF WORK AND OBJECTIVE
Pedestrian improvements various locations in the Piru Area.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Piru Pedestrian Improvements

LOCATION MAP
LEGEND:

PROPOSED SIDEWALK
Project No.: NA
Supervisorial District: 3,5 Zone: Unincorporated Area: X City of: Camarillo Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ -$ -$ -$ 200,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee Program (TIMF).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 200,000$

SCOPE OF WORK AND OBJECTIVE
Rice Avenue to Camarillo C/L - Widen to 4 lanes (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Pleasant Valley Road Widening (SMP Priority Rank # 6)

LOCATION MAP

PROJECT
Project No.: NA
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ 150,000$ 100,000$ 100,000$ 100,000$ 100,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 150,000$ 100,000$ 100,000$ 100,000$ 100,000$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Road Fund
Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 550,000$

SCOPE OF WORK AND OBJECTIVE
Various locations feasibility study in order to prepare and apply for Federal/State Grants.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Preliminary Engineering/Feasibility Studies

LOCATION MAP

Project No.: 50621
Supervisorial District: 3 Zone: Unincorporated Area: X City of: Oxnard Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
120,000$ 200,000$ 100,000$ 75,000$ -$ -$ 5,700$ -$ 50,000$ 50,000$ -$ -$ -$ -$ -$ -$ 412,500$ -$ -$ -$ -$ -$ 2,750,000$ -$ 125,700$ 200,000$ 150,000$ 125,000$ 3,162,500$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Funded by Road Fund and Assigned Program Mitigation Funds for Bike Lanes.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 3,637,500$

SCOPE OF WORK AND OBJECTIVE
Construct Class II Bike Lanes on Rose Avenue from Collins Street to Simon Way.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Rose Avenue Bike Lanes (Collins St - Simon Wy)

LOCATION MAP

PROJECT
Project No.: 50623
Supervisorial District: 3 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
130,000$ 200,000$ 100,000$ 75,000$ -$ -$ 6,000$ -$ 50,000$ 50,000$ -$ -$ -$ -$ -$ -$ 412,500$ -$ -$ -$ -$ -$ 2,750,000$ -$ 136,000$ 200,000$ 150,000$ 125,000$ 3,162,500$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Road and pursuing State Grant Funding for construction phase.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 3,637,500$

SCOPE OF WORK AND OBJECTIVE
Construct Class II Bike Lanes on Rose Avenue from Central Avenue to SR 118.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Rose Avenue Bike Lanes (Central Ave to SR 118)

LOCATION MAP

PROJECT
Project No.: NA
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ -$ 700,000$ 700,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8,887,800$ -$ -$ -$ 700,000$ 700,000$ 8,887,800$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Highway Safety Improvement Program (HSIP - Federal Grant) Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 10,287,800$

SCOPE OF WORK AND OBJECTIVE
Various locations throughout the County to improve safety.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Rumble Strip and Curve Warning Sign Project

LOCATION MAP

Project No.: 50603
Supervisorial District: 1 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
40,000$ 25,000$ 25,000$ -$ -$ -$ 2,242$ -$ -$ -$ -$ -$ -$ -$ 100,000$ 150,000$ -$ -$ -$ -$ 400,000$ 1,000,000$ -$ -$ 42,242$ 25,000$ 525,000$ 1,150,000$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date:1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project funded by Road Fund, to be reimbursed by settlement funds received from Southern California Edison.

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 1,700,000$

SCOPE OF WORK AND OBJECTIVE
Various locations along Santa Ana Road to mitigate for future damages as a result of fire and/or storm damage.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Santa Ana Road Slope Stabilization

LOCATION MAP

PROJECT
Project No.: NA
Supervisorial District: 3 Zone: Unincorporated Area: X City of: Oxnard Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ 200,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 200,000$ -$ -$ -$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee Program (TIMF) Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 200,000$

SCOPE OF WORK AND OBJECTIVE
Oxnard City Limits to Highway 118 - Widen to 4 lanes (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Santa Clara Ave Widening (SMP Priority Rank # 3)

LOCATION MAP

PROJECT
Project No.: 50622
Supervisorial District: 2 Zone: Unincorporated Area: X City of: Thousand Oaks Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
100,000$ 100,000$ -$ -$ -$ -$ 500$ -$ -$ -$ -$ -$ -$ 165,000$ -$ -$ -$ -$ -$ 1,100,000$ -$ -$ -$ -$ 100,500$ 1,365,000$ -$ -$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Road Fund and Active Transportation Program (ATP - State Grant).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 1,365,000$

SCOPE OF WORK AND OBJECTIVE
Construction of bike lanes, relocation/removal of guardrail and rumble strips and appurtenant work on Santa Rosa Road from Yucca Drive to Moorpark Road.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Santa Rosa Bike Lanes and Pedestrian Improvements

LOCATION MAP

PROJECT
Project No.: NA
Supervisorial District: 1 Zone: Unincorporated Area: X City of: Ventura Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ 225,000$ 400,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 374,610$ -$ -$ -$ -$ -$ 2,497,390$ -$ -$ 225,000$ 400,000$ -$ 2,872,000$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Active Transportation Program (ATP - State Grant).

Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 3,497,000$

SCOPE OF WORK AND OBJECTIVE
Pedestrian improvements various locations in the Saticoy Area.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Saticoy Pedestrian Improvements

LOCATION MAP
LEGEND:

PROPOSED SIDEWALK
Project No.: 50617
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
220,000$ 400,000$ -$ -$ -$ -$ 8,250$ -$ -$ -$ -$ -$ -$ 50,000$ 700,000$ -$ -$ -$ -$ 700,000$ 4,300,000$ -$ -$ -$ 228,250$ 1,150,000$ 5,000,000$ -$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023
Fiscal Year Total:

Total Estimated Cost: 6,150,000$

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Highway Safety Improvement Program (HSIP - State Grant) Category
Design:

Right of Way:

Con. Eng/Insp.

Construction:
*Miscellaneous:

SCOPE OF WORK AND OBJECTIVE
Install Retroreflective Back-Plates to all signal heads and Advance Dilemma Zone Detection at all County maintained signalized intersections.

ESTIMATED COST PER FISCAL YEAR

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Systemic Countywide Signalized Intersection Improvements

LOCATION MAP

Traffic Safety Improvement Program Project No.: Varies
Supervisorial District: All Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
188,000$ 15,000$ 145,000$ 125,000$ 100,000$ 75,000$ 10,139$ -$ -$ -$ 25,000$ -$ -$ 62,500$ 120,000$ 50,000$ -$ 50,000$ -$ 571,000$ 1,012,700$ 350,000$ -$ 550,000$ 198,139$ 648,500$ 1,277,700$ 525,000$ 125,000$ 675,000$ Cat. Ex. X Neg. Dec. X EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023
Fiscal Year Total:

Total Estimated Cost: 3,251,200$

ENVIRONMENTAL REQUIREMENTS

REMARKS
Projects funded by Road Fund, Traffic Impact Mitigation Fee Program (TIMF), Assessment District - Santa Rosa Road, and Highway Safety Improvement Program (HSIP - State & Federal Grant).

Category
Design:

Right of Way:

Con. Eng/Insp.

Construction:
*Miscellaneous:

SCOPE OF WORK AND OBJECTIVE
Various locations - install or update traffic signals, intersection lane modification, and other safety improvements.

ESTIMATED COST PER FISCAL YEAR
Santa Rosa Road Traffic
Signal System Upgrade
Santa Rosa Road from Hill Canyon Road to Moorpark Road. Upgrading hardware and software for all the traffic signalized locations. (To be included into the HSIP Cycle 10 project as non-participating funds). 2024
Telegraph Rd @ Briggs Rd
Traffic Signal Improvements
Replace signal poles to install protected left turn signals for Telephone Rd and include other intersection enhancements to improve safety. 2025 Pedestrian Crossing
Enhancements (Countywide)
Installation of rectangular rapid flashing beacon and other pedestrian improvements at various locations throughout the County. 2024-25 Rose Avenue @ SR 118
Intersection Improvements
Construction of dual left turn lanes on Rose Avenue @ SR 118. 2028
Local Roadway Safety Plan
Update
Update the existing Local Roadway Safety Plan completed in 2021 to validate/determine high incidence areas and confirm/identify corrective treatments to decrease future collisions on County roads and intersections.
2026
Kanan Road Signal
Improvements
Adaptive signal control software & hardware, detector loops and other equipment for adaptive signal control. 2026
Central Avenue @ Santa Clara
Avenue Traffic Signal
Improvements
Replace signal poles to install protected left turn signals for Central Avenue and include other intersection enhancements to improve safety. 2025 Laguna Road (Corner Turn) Install high friction surface treatment, solar-powered curve signs, and refresh traffic stripes 2024

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name:

LOCATION MAP
Project Name: Location: Anticipated Year of
Completion
Project No.: 50574
Supervisorial District: 1 Zone: Unincorporated Area: X City of:

Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
200,000$ 100,000$ 25,000$ -$ -$ -$ 5,297$ 75,000$ -$ -$ -$ -$ -$ -$ 120,000$ -$ -$ -$ -$ -$ 800,000$ -$ -$ -$ 205,297$ 175,000$ 945,000$ -$ -$ -$ Cat. Ex. X Neg. Dec. EIR/EIS
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Congestion Mitigation and Air Quality Program (CMAQ - Federal Grant) Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 1,120,000$

SCOPE OF WORK AND OBJECTIVE
Pedestrian and bike lane improvements on Ventura Avenue from Crooked Palm Road to Los Cabos Lane.

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Ventura Avenue Pedestrian & Bike Lane Improvements

LOCATION MAP

PROJECT
Project No.: NA
Supervisorial District: 1 Zone: Unincorporated Area: X City of: Ventura, Oxnard Prev Yrs 2023-24 2024-25 2025-26 2026-27 2027-28
-$ -$ -$ 150,000$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 150,000$ -$ -$ Cat. Ex. Neg. Dec. EIR/EIS X
Date
Completed: Date Filed:

Prepared by: Glenn Derossett Date: 1/30/2023

ENVIRONMENTAL REQUIREMENTS

REMARKS
Project Funded by Traffic Impact Mitigation Fee (TIMF)
Con. Eng/Insp.

Construction:
*Miscellaneous:

Fiscal Year Total:

Total Estimated Cost: 150,000$

SCOPE OF WORK AND OBJECTIVE
Gonzales Road to Olivas Park Drive (County Section: 247's/o river bridge to 119 s/o Olivas Park Drive) - Widen to 6 lanes (Feasibility Study).

ESTIMATED COST PER FISCAL YEAR
Category
Design:

Right of Way:

VENTURA COUNTY PUBLIC WORKS AGENCY

ROADS & TRANSPORTATION
Project Name: Victoria Avenue Widening (SMP Priority Rank # 5)

LOCATION MAP