1851 EAST FIRST STREET • SUITE 1400 • SANTA ANA • CA 92705 • PHONE (714)953-2665 October 11, 2021
C
ity of Camarillo
Attention: Ken Matsuoka
601 Carmen Drive
Camarillo, CA 93011
RE
: Camarillo Hills Drain Replacement At Ventura Blvd - Contract No. SD-5052 D
ear Mr. Matsuoka,
E
ffective May 31, 2021, HDR Engineering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly-owned subsidiary of HDR Engineering, Inc. WKE, Inc. will continue to operate as a legal entity in the State of California. As a result, HDR is not requesting contracts be re-assigned.
WK
E staff will continue working on this project with no change to personnel.
S
incerely,
D
aniel Weddell
Vice President
WKE, Inc.
CC Agreement No. 2021-30A
AGREEMENT NO. 2021-30B
SECOND AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This Second Amendment to Professional Services Agreement No. 2021-30 Amendment) effective date of February 16, 2022, is entered into between the City of Camarillo, a general law city ( City) and WKE, Inc., a California corporation ( Consultant), collectively referred to as the Parties.
Recitals.
A. The parties have entered into a written agreement entitled " Professional Services Agreement Number 2021-30" having an effective date of March 10, 2021 Agreement) to provide for certain professional services in the amount of $ 994,530 as outlined in Exhibit A of Agreement from Consultant.
B. The parties have entered into a written agreement entitled " Camarillo Hills Drain Replacement At Ventura Blvd — Contract No. SD - 5052 Agreement Number 2021- 30A" having an effective date of October 11, 2021 ( CC Agreement 2021-30A) notifying City that effective May 31, 2021, HDR Engineering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly -owned subsidiary of HDR Engineering, Inc. in a zero dollar amount.
C. All capitalized terms not defined in this Amendment have the meaning set forth in the Agreement.
D. The parties desire to modify the scope of work in accordance with Section
3.3 of the Agreement.
Section 1. Amendment. The Agreement is amended to add the following:
1. Additional " Scope of Services" of the Agreement is
amended to add the following:
Provide additional professional services in the amount of 9,400 as included in the proposal dated February 15,
2022, to provide additional services for the soil cuttings produced during the geotechnical field investigation. See attached Exhibit A, Scope of Services.
Section 2. Compensation and Payment. Second Amendment to Professional Services Agreement is for a not - to - exceed amount of $ 9,400 for services provided in proposal dated February 15, 2022, for a total agreement amount of $ 1,003,930.
Section 3. Continuation of Terms of Agreement. Except as expressly modified by the terms and provisions of this document, the remaining terms and provisions of the Agreement remain in full force and effect.
THE AUTHORIZED REPRESENTATIVES of the Parties have caused this Second Amendment to Agreement No. 2021-30 to be executed as of the Effective Date.
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
cw
Carrie Weal, Interim City Clerk
APPROVED AS TO FORM:
BRIAN A. PIERIK, CITY ATTORNEY
euvLA
WKE, INC., a California corporation
Ca/do,s Cadence.
Carlos Cadena, Senior Vice President
4k -rid watdt,11.
Daniel Weddell, Vice President
Attachments: Exhibit A, Scope of Services
043743 ( HDR Business License Number)
Camarillo Business Tax Certificate Number
WKE is a wholly owned subsidiary of HDR)
08/31/2022
Expiration Date
EXHIBITA
February 15, 2022
City of Camarillo
Attention: Andrew Grubb
601 Carmen Drive
Camarillo, CA 93011
RE: Camarillo Hills Drain ReplacementAt Ventura Blvd - Contract No. SD - 5052 Dear Mr. Grubb,
As discussed, the original proposal assumed that soil cuttings produced during the geotechnical field investigation could be re - used to backfill the boring holes. The draft ISA by Geocon West January 10th, 2022, indicates " Any excess soil generatedfrom construction excavations should be properly characterized for potential contaminants of concern ( including metals and pesticides) prior to offsite reuse or disposal."
The attached proposal from Earth Mechanics outlines the changein scope needed to test and dispose of the soil cuttings per the new ISA information. This includes switching the boring machine from a hollow stem auger to and rotary wash, backfill of the holes with cement-bentonite slurry, and collection, testing and disposal of the soil. The 55 - gallon drums will be stored at the City Yard at 283 Glenn Dr until the tests have been completed and the appropriate waste facility is identified.
The Total fee for this changeorder request is $ 9,400. The work will be billed on a time and materials basis, not to exceed the total amount of $ 9,400.
Sincerely,
Daniel Weddell
Vice President
WKE, Inc.
1851 EAST FIRST STREET SUITE 1400 • SANTA ANA • CA 92705 PHONE ( 714)953-2665 Earth Mechanics Inc.
Geotechnical & Earthquake Engineering
AMENDMENT TO GEOTECHNICAL SERVICES SCOPE OF WORK
Camarillo Hills Drain RCB Replacement Project
City of Camarillo, Ventura County, California
EMI Project No. 22-101
Date: February 4, 2022
Additional Scope of Work
Earth Mechanics, Inc. ( EMI) original scope and budget for the geotechnical field work involved using a hollow - stem auger drill rig and using the spoils ( mixed with cement) to backfill the borehole excavations — the assumption was that the in - situ soils are not contaminated and could be reused as backfill. A City review comment, on the EMI work plan, asked to describe the process for testing soils for contaminants prior to using them to backfill the borehole. Because soil testing cannot be performed in the field, during an investigation, EMI proposes changing the drilling method to rotary - wash, which includes backfilling the boreholes with slurry and disposing the soil spoils that are generated from the borehole excavations. This amendment includes the following changes to the geotechnical scope of work:
1. Use a rotary -wash drill rig instead of a hollow - stem drill rig to excavate boreholes; backfill boreholes with cement-bentonite slurry.
2. Collect the soil spoils in 55 - gallon steel drums.
3. Analytical lab tests on samplesof the soil spoils for contaminants ( for waste characterization).
4. Rent one support truck to move drums to City - designated storage site.
5. Arrange for the removal of the steel drums from the site after contaminant testing is completed.
Additional Cost
The additional cost for the added geotechnical work described above is estimated to be $ 9,400.
The $ 9,400 additional cost includes $ 7,900 for field work changes and $ 1,500 for outside analytical laboratory testing for contaminants ( the cost for conventional geotechnical laboratory testing remains unchanged).
If you have any follow-up questions or require additional information, please call our office.
AK:avk
17800 Newhope Street, Suite B, Fountain Valley, California 92708 • Tel: ( 714) 751-3826 • Fax: ( 714) 751-3928 AGREEMENT NO. 2021-30C
THIRD AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This Third Amendment to Professional Services Agreement No. 2021-30 ( Amendment) effective date of May 1, 2023, is entered into between the City of Camarillo, a general law city City), and WKE, Inc., a California corporation ( Consultant), collectively referred to as the Parties.
RECITALS
A. The Parties have entered into a written agreement entitled " Professional Services Agreement Number 2021-30" having an effective date of March 10, 2021 ( Agreement) to provide for certain professional services in the amount of $ 994,530 as outline in Exhibit A of Agreement from Consultant.
B. The Parties have entered into a written agreement entitled " First Amendment to Professional Services Agreement CC 2021-30A" having an effective date of October 11, 2021, notifying City that effective May 31, 2021, HDR Engineering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly owned subsidiary of HDR Engineering, Inc. in a zero dollar amount.
C. The Parties have entered into a written agreement entitled " Second Amendment to Professional Services Agreement CC 2021-30B" having an effective date of February 16, 2022, to provide additional services for the soil cuttings produced during the geotechnical field investigation in the amount of $ 9,400 for a total agreement amount of $ 1,003,930.
D. All capitalized terms not defined in this Amendment have the meaning set forth in the Agreement.
E. The Parties desire to modify the Scope of Work in accordance with Section 3.3 of the Agreement.
Section 1. Amendment. The Agreement is amended to add the following:
1. Additional " Scope of Services" of the Agreement is amended to add the following:
Provide additional professional services in the amount of $ 140,597, to provide additional grant application support and additional utility location services. See attached Exhibit A Scope of Services.
Section 2. Compensation and Payment. Third Amendment to Professional Services Agreement is for a not - to - exceed amount of $ 140,597 for a total agreement amount of 1,144,527.
Section 3. Continuation of Terms of Agreement. Except as expressly modified by the terms and provisions of this document, the remaining terms and provisions of the Agreement remain in full force and effect.
THE AUTHORIZED REPRESENTATIVES of the Parties have caused this Third Amendment, Agreement No. 2021-30, to be executed as of the Effective Date.
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
Kristy Buxkemper, City Clerk
WKE, INC., a California Corporation
Callas Cade La_
Carlos Cadena, Senior Vice President
Daniel Weddell, Vice President
Attachments: Exhibit A Scope of Services
043743 ( HDR Business License Number) 8/31/2023
Camarillo Business Tax Certificate Number Expiration Date WKE is a wholly owned subsidiary of HDR)
AGREEMENT NO. 2021-30D
FOURTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This Fourth Amendment to Professional Services Agreement No. 2021-30 Amendment) effective date of April 1, 2024, is entered into between the City of Camarillo, a general law city ( City) and WKE, Inc., a California corporation ( Consultant), collectively referred to as the Parties.
RECITALS
A. The parties have entered into a written agreement entitled " Professional Services Agreement Number 2021-30" having an effective date of March 10, 2021 Agreement) to provide for certain professional services in the amount of $ 994,530 as outlined in Exhibit A of Agreement from Consultant.
B. The parties have entered into a written agreement entitled " First Amendment to professional Services Agreement Number 2021-30A" having an effective date of October 11, 2021, notifying City that effective May 31, 2021, HDR Engineering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly -owned subsidiary of HDR Engineering, Inc. in a zero dollar amount.
C. The Parties have entered into a written agreement entitled " Second Amendment to Professional Services Agreement CC 2021-30B" having an effective date of February 16, 2022, to provide additional services for the soil cuttings produced during the geotechnical field investigation in the amount of $ 9,400 for a total agreement amount of $ 1,003,930.
D. The Parties have entered into a written agreement entitled " Third Amendment to Professional Services Agreement CC 2021-30C" having an effective date of May 1, 2023, to provide services for additional grant application support and additional utility location services in the amount of $ 140,597 for a total agreement amount not - to - exceed $ 1,144,527.
E. All capitalized terms not defined in this Amendment have the meaning set forth in the Agreement.
F. The parties desire to modify the scope of work in accordance with Section
3.3 of the Agreement.
Section 1. Amendment. The Agreement is amended to add the following:
1. " Fee Schedule" of the Agreement is amended.
See attached Exhibit A, Fee Schedule.
Section 2. Compensation and Payment. Fourth Amendment to Professional Services Agreement is for a zero - dollar amount, for a total agreement amount of 1,144,527.
Section 3. Continuation of Terms of Agreement. Except as expressly modified by the terms and provisions of this document, the remaining terms and provisions of the Agreement remain in full force and effect.
THE AUTHORIZED REPRESENTATIVES of the Parties have caused this Fourth Amendment to Agreement No. 2021-30 to be executed as of the Effective Date.
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
Kristy Buxkemper, City Clerk
WKE, INC., a California corporation
Anna Lantin, Vice President
Daniel Weddell, Vice President
043743 08/31/2024
Camarillo Business Tax Certificate Number Expiration Date Attachments: Exhibit A, Fee Schedule
Updated Rate Tables- Camarillo Hills Drain Bridge Replacement Project April 30, 2024
Updated Rate Table: SD - 5052 Camarillo Hills Drain Bridge Replacement
WKE/HDR
Category
Principal in Charge
Grant Manager
Project Manager 11
Project Manager I
QA/QC Engineer
Sr. Engineer
Project Engineer III
Project Engineer 11
Assistant Engineer 11
Assistant Engineer 1
Technician/Drafter
Clerical
Sr. Economist
Economist
Project Planner 11
Project Planner 1
Graphic Design
Project Administrator II
Billing Rates
297.20
330.90
297.20
261.00
238.00
184.00
164.00
122.00
115.00
95.00 134.00
64.00 266.35
172.03
202.65
136.50
171.25
92.60 GPA Consulting, Inc.
Category Billing Rates
Principal $ 271.93
Sr. Assoc. Env. Planner $ 197.22
Sr. Env Planner $ 149.61
Assoc. Env Planner $ 95.31
Sr. Assoc. Biologist $ 183.62
Sr. Biologist $ 147.06
Assoc. Biologist $ 95.20
Sr. Architectural Historian $ 126.49
Assoc. Architectural Historian $ 85.78
Sr. GIS Analyst $ 136.02
1851 East First Street, Suite 1400, Santa Ana, CA 92705-4044 714) 442-2800
CC Agreement 2021-30D
Updated Rate Tables- Camarillo Hills Drain Bridge Replacement Project April 30, 2024
Kasraie Consulting
Category
Principal in Charge
Senior Project Engineer
Project Engineer
Billing Rates
220.00
143.00
132.00
Earth Mechanics, Inc.
Category
Principal
Principal Engineer
Senior Engineer
Senior Staff Engineer
Staff Engineer
Senior Tech.
Clerical
Billing Rates
279.72
245.91
193.65
113.73
107.58
138.32
67.62 WM Surveys
Category Billing Rates
1 -Man Survey Crew
Prevailing Wage
2 -Man Survey Crew
Prevailing Wage
3 -Man Survey Crew
Prevailing Wage
Senior Mapping Technician
Project Manager
Office Technician
299.00
350.00
430.00
185.00
210.00
186.00
Tatsumi & Partners
Category
Principal in Charge
Senior Associate
Tech Staff I II
Tech Staff II
Tech Staff I
Billing Rates
232.33
128.36
102.86
90.60 66.56
LIN Consulting
1851 East First Street, Suite 1400, Santa Ana, CA 92705-4044 714) 442-2800
CC Agreement 2021-30D
Updated Rate Tables— Camarillo Hills Drain Bridge Replacement Project April 30, 2024
Category
Principal in Charge
Senior Project Manager
Assistant Project Manager
Project Engineer
Billing Rates
315.38
246.69
170.18
124.90
Hamner - Jewel Associates
Category
Managing Senior Associate
Senior Associate II/Project
Manager
Senior Associate I/Project
Manager
Associate 11
Acquisition/Relocation)
Associate I
Acquisition/Relocation)
Project Coordinator/Quality
Control
Transaction/Escrow Coordinators
Transaction Assistant
Assistant/Clerical Support
Billing Rates
265.00
175.00
146.00
122.00
116.00
112.00
107.00
67.00 52.00
Kennedy Jenks Consultants
Category
Eng-Sci-1
Eng-Sci-2
Eng-Sci-3
Eng-Sci-4
Eng-Sci-5
Eng-Sci-6
Eng-Sci-7
Eng-Sci-8
Eng-Sci-9
Sr. CAD - Designer
CAD - Designer
Sr. CAD - Technician
CAD - Technician
Project Assistant
Project Administrator
Aide
Billing Rates
155.00
190.00
210.00
230.00
250.00
275.00
300.00
320.00
335.00
195.00
180.00
165.00
145.00
145.00
130.00
105.00
1851 East First Street, Suite 1400, Santa Ana, CA 92705-4044 714) 442-2800
CC Agreement 2021-30D
AGREEMENT NO. 2021-30E
FIFTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This Fifth Amendment to Professional Services Agreement No. 2021-30 Amendment) effective date of November 13, 2024, is entered into between the City of Camarillo, a general law city ( City) and WKE, Inc., a California Corporation ( Consultant), collectively referred to as the Parties.
RECITALS
A. The Parties have entered into a written agreement entitled " Professional Services Agreement Number 2021-30" having an effective date of March 10, 2021 Agreement) to provide for certain professional services in the amount of $ 994,530 as outlined in Exhibit A of Agreement from Consultant.
B. The Parties have entered into a written agreement entitled " First Amendment to Professional Services Agreement" having an effective date of October 11, 2021 Agreement No. 2021-30A) notifying City that effective May 31, 2021, HDR Engineering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly -owned subsidiary of HDR Engineering, Inc. in a zero - dollar amount.
C. The Parties have entered into a written agreement entitled " Second Amendment to Professional Services Agreement" having an effective date of February 16, 2022 ( Agreement No. 2021-30B) to provide additional design services for soil cuttings produced during the geotechnical field investigation in the amount of $ 9,400 for a total agreement amount of $ 1,003,930.
D. The Parties have entered into a written agreement entitled " Third Amendment to Professional Services Agreement" having an effective date of May 1, 2023 ( Agreement No. 2021-46C) to provide services additional grant application support and additional utility location services in the amount of $ 140,597 for a total agreement amount of $ 1,144,527.
E. The Parties have entered into a written agreement entitled " Fourth Amendment to Professional Services Agreement" having an effective date of April 1, 2024 Agreement No. 2021-46D) to amend Fee Schedule in a zero - dollar amount.
F. All capitalized terms not defined in this Amendment have the meaning set forth in the Agreement.
G. The parties desire to modify the scope of work in accordance with Section
3.3 of the Agreement.
Section 1. Amendment. The Agreement is amended to add the following:
1. Additional " Scope of Services" of the Agreement is amended to add the following:
2. Provide additional professional services in the amount of 202,135.02 as included in the proposal dated October 28, 2024, for additional grant support, environmental and right-of-way services.
See attached Exhibit A.
CC Agreement No. 2021-30E
3. " Fee Schedule" of the Agreement is amended. See attached Exhibit B, Fee Schedule.
Section 2. Compensation and Payment. Fifth Amendment to Professional Services Agreement is for a not - to - exceed amount of $ 202,135.02 for additional services provided on the proposal dated October 28, 2024, for a total agreement amount of 1,346,662.02
Section 3. Continuation of Terms of Agreement. Except as expressly modified by the terms and provisions of this document, the remaining terms and provisions of the Agreement remain in full force and effect.
THE AUTHORIZED REPRESENTATIVES of the Parties have caused this Fifth Amendment to Agreement No. 2021-30 to be executed as of the Effective Date.
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
Kristy Buxkemper, City Clerk
WKE, INC., a California corporation
Anna Lantin, Vice President
Daniel Weddel, Vice President
043743 08/31/2025
Camarillo Business Tax Certificate Number Expiration Date Attachments: Exhibit A, Scope of Services
Exhibit B, Fee Schedule
CC Agreement No. 2021-30E
EXHIBIT A
FEZ
October 28, 2024
City of Camarillo
Andrew Grubb, PE
Principal Civil Engineer
601 Carmen Drive
Camarillo, CA 93010
RE: Addendum 5 Request: CC2021-30 Bridge Replacement at Las Posas Rd and Ventura Blvd ( Project No. SD - 5052) Proposal for Additional Environmental Services and TCEP Grant Application Support
Dear Mr. Grubb,
HDR Engineering, Inc. ( HDR or CONSULTANT) proposes to assist the City of Camarillo ( City) in preparing the 2024 Transportation Corridor Enhancement Program ( TCEP) State grant application and additional environmental and ROW support for the Camarillo Hills Drain Bridge Replacement Project. Amendment No. 5 as proposed, includes the scope of the Benefit Cost Analysis ( BCA) required for the BIP Grant application and the full RAISE application and BCA.
A number of studies were prepared for the standalone CEQA document in early 2023 prior to Federal Funding. Once the federal grant funding was secured, we began working with Caltrans on the Preliminary Environmental Study PES, which was approved in February 2024. The lapse in time between the preparation of the technical studies and the approved PES, compounded by Caltrans' prolonged reviews, led to a number of studies being deemed by Caltrans as outdated. Additionally, the circulation of the Draft Initial Study prepared in May 2023 was placed on hold to ensure consistency between the CEQA and NEPA documentation.
hdrinc.com
Since the original fee proposal, one additional private property has been identified as needing a TCE.
Caltrans has also increased the req uired information for Right of Way certification of Federally funded projects. Our subconsultant Hamner, Jewell has added one parcel, and reforecasted the hours needed for the other four TCEs proposed on the project to meet these new requirements.
The following tasks are proposed for Amendment No. 5:
Task 2.0 Environmental Documents
Task 2.2 Technical Studies
Task 2.2.1: Archaeological Survey Report
Stantec Consulting Ltd., ( formerly Paleo Solutions), as a sub - consultant to GPA, has prepared an Archaeological Survey Report ( ASR) to address their cultural resource requirements under CEQA for the project. Updates to the design required additional revisions to the Area of Potential Effects ( APE) map prepared for the project. Additionally, Caltrans requested an updated Sacred Land Files search and updated Section 106 consultation letters to Additional revisions to the ASR — not considered as 3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Proposal for Amendment 5 - Bridge Replacement at Las Posas Rd. and Ventura Blvd.
October 28, 2024
part of the initial scope of work — will be necessary to address Caltrans requirements and revise the report. These revisions will require additional time to support Caltrans' tribal consultation obligations, document these efforts in a revised ASR, and coordinate and respond to comments on the ASR.
Task 2.2.5: Natural Environment Study
GPA has prepared a Natural Environment Study ( NES) to describe the existing biological resources on the project site, identify potential project impacts, and develop appropriate impact avoidance, minimization, and mitigation measures. Additional revisions to the NES to address updates to the design and project description — not considered as part of the initial scope of work or Amendment 3 — will be necessary to address Caltrans requirements and revise the report. It is assumed that additional biological reconnaissance survey(s) would not be required for approval of the report by Caltrans.
Task 2.2.9: Initial Site Assessment
Geocon West, Inc., acting as a sub - consultant to G PA, has prepared an Initial Site Assessment ( ISA) to estimate the existing potential for impacts to the project Site ( i.e., levels of hazardous materials/wastes warranting regulatory cleanup action) from the presence of hazardous materials/wastes on, or within, the vicinity of the Site. Based on feedback from Caltrans, dated September 5, 2024, the record searches and site reconnaissance included in the ISA fall outside the 180 - day viability window recommended by ASTM E1527-21. Geocon will conduct an updated environmental regulatory database review and perform an updated site reconnaissance of the project study area to assess for the presence, or make visual observations of indicators of the potential presence, of RECs at the project study area.
Geocon will update the pertinent portions of the report to be in general accordance with ASTM International ( ASTM) Designation E1527-21, Standard Practice for Environmental Site Assessments:
Phase I Environmental Site Assessment Process, including the definitions of recognized environmental condition, historical recognized environmental condition, and controlled recognized environmental condition. The updated report will include an updated summary of the findings of the EDR provided regulatory database report, our review of GeoTracker and EnviroStor databases, and updated site reconnaissance information. The updated report will include an updated summary of potential impacts to the project study area, if any. The updated report will include a copy of the EDR report, any applicable supporting regulatory records, site plan, and site photographs.
Task 2.3: CEQA Initial Study/Mitigated Negative Declaration Administrative Draft IS/MND
Following Caltrans approval of the required technical studies, GPAwill reference the results of these studies, as well as other background research, and update the Administrative Draft IS/MND submitted to the City in May 2023 in accordance with the CEQA ( Public Resources Code Sections 21000-21189), State CEQA Guidelines ( 14 CCR Sections 15000-15287), and the City's CEQA Guidelines ( approved May 2020). GPA will then resubmit the Administrative Draft IS/MND to the City for review and will coordinate, as needed, for review and approval of the document.
Deliverable: Environmental Tech studies listed above, and an Administrative Draft IS/MND. 3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Proposal for Amendment 5 - Bridge Replacement at Las Posas Rd. and Ventura Blvd.
October 28, 2024
Task 3 Detail Plans, Specifications and Estimates
Task 3.6.5 TCEP Grant Application Scope of Work
Based on our previous efforts to construct a BIP and RAISE application forthe same project, we propose to prepare a new application meeting the State of California based TCEP program requirements and evaluation criteria. Our current understanding is that the bridge project will be a shovel - ready project with all environmental, design and permitting requirements completed and the grant application is specifically for the purpose of seeking construction funds.
Based on this understanding, the following tasks forthe grant application will be performed in order to complete this scope of work. It should be noted that as with the previous BIP and RAISE applications, the TCEP application requires a Benefit - Cost Analysis, and that task ( Task 3) is also described in this proposal.
Task 3.6.5.1. Project Kick-Off/Strategic Guidance/Data Request Guidelines forthe FY 2024 TCEP program were published on August 16, 2024 with nominations due November 22, 2024. HDR will review the published guidelines with the City and discuss the general approach ( relating to project eligibility, in particular) so as to reach agreement on a project definition for the application as well as how it meets the specific evaluation criteria for the given program application.
This task will include a kick-off conference call to discuss various options for the development of the application. HDR will use the project kick-off call as an opportunity to present a data request to the City and also to discuss our initial approach, work plan and proposed project schedule. Given that we have already prepared the prior BIP and RAISE applications, we believe that we can take the opportunity to better address the goods /freight movement and tourism aspects of the project. We also intend to further speak to the equity and environmental justice issues surrounding the projectas these are required elements of the TCEP application.
The kick-off call will also be an opportunity to review any relevant and new documentation related to the project and to identify/revise the local match and funding plan that will enable the project to be competitive.
Task 3.6.5.2. Grant Application Preparation
HDR will assist the City in the preparation of a 2024 TCEP grant application. The orientation of the application will be for the award of construction funds.
HDR will provide technical writing and review services for the application as well as the preparation of select graphics to enable the grant application to achieve its best possible fitto the TCEP evaluation criteria. We intend to leverage the graphics and the narrative developed for the previous applications prepared for the project as a starting point for this effort.
HDR will also provide the preparation of the Community Impact Factors including an air quality analysis and economic impact analysis that are required to be addressed in the application. For this section, HDR will work with the City to gather data related to community engagement as it relates to the project and is required to be addressed in the application. Please refer to page 52 of the TCEP program guidelines ( https://catc.ca.gov/-/media/ctc-media/documents/programs/tcep/2024/2024- trade-corridor-enhancement-program-guidelines-adopted-8-15-2024.pdf) for the additional information on this requirement. Development of a community engagement plan is specifically excluded from this scope of services.
3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Proposal for Amendment 5 - Bridge Replacement at Las Posas Rd. and Ventura Blvd.
October 28, 2024
The City will be responsible for obtaining the required letter of RTP consistency from your MPO and any letters of support needed to supplement the grant application. Lastly, the City will be responsible for the actual submittal of the grant application including the coordination required to submit to your MPO. Any submission activities are specifically excluded from our scope of services.
The application narrative will follow the latest g uidance to describe the project, its costs, funding, benefits, and other factors. HDR will design the application narrative to be easily accessible and emphasize the project's strengths with key themes throughout the application narrative. the City will provide HDR with the current documentation ( in response to the data request submitted as part of Task 1) detailing the project scope, budget, schedule, and likely impacts on transportation, the environment and equity in the region. HDR will then work with city staff to identify the material risks to the project and the strategies needed to mitigate any identified risks.
It should be noted that identification of matching funds is critical to the grant application process. It is HDR's experience that upwards of 50% of the project cost should be from funding sources other than the RAISE grant in orderforthe application to be competitive. Identification of committed funds as well as identification of potentially non - committed funds will be the responsibility of the City. In the case of non - committed funds, the City will be responsible for seeking out a letter of supportfrom the proposed funding agency.
Deliverables: Completed FY 2024 TCEP Grant Application including the Benefit - Cost Analysis described in Task 3.6.5.3 below.
Task 3.6.5.3. Benefit - Cost Analysis
HDR will review and revise the previous BCA that was produced forthe project. We will update and quantify the previously identified public benefits expected from the project as needed in order to demonstrate adherence with the TCEP program goals. A key challenge of any grant application will be to provide compelling evidence of the merit of the project and its quantitative benefits in comparison to other applicants' projects. In this case, we will review the previous BCA in order to furthermonetize any foreseen benefits that were not p reviously captured. We will also make sure that the BCA model is in accordance with the most recent USDOTand TCEP guidelines. This scope of work specifically excludes the construction of a new BCA.
Deliverable: Revised Benefit - Cost Analysis and technical appendix to support the TCEP grant application.
Task 3.6.6 RASIE 2025 Grant Application Scope of Work
Based on our previous efforts to construct a BIP, TCEP and previous round of RAISE applications forthe same project, we propose to prepare a new application meeting the 2025 guidelines for the federal RAISE program req uirements and evaluation criteria. Guidelinesforthe RAISE program have not been published. The following scope of work is based on the last Notice of Funding Opportunity NOFO) published December 14, 2022 and assumes similar application requirements. The grant application is for the purpose of seeking construction funds.
Task 3.6.6.1. Project Kick-Off/Strategic Guidance/Data Request When the new NOFO is published, HDR shall review the specific requirements for the NOFO with the City and discuss the general approach ( and specifically relating to project eligibility and 3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Proposal for Amendment 5 - Bridge Replacement at Las Posas Rd. and Ventura Blvd.
October 28, 2024
competitiveness) so as to reach agreement on a project definition for the application as well as how it meets the specific evaluation criteria for the given program application.
This task will include a kick-off conference call to discuss various options for the development of the application. HDR will use the project kick-off call as an opportunity to present a revised data request to the City and discuss our initial approach, work plan and proposed project schedule. Given that we have already prepared the prior BIP application, we believe that we can take the opportunity to better address the goods movement and tourism aspects of the project. We also intend to further speak to the equity and environmental justice issues surrounding the project. This may occur through review of the " Reconnecting Communities" activities described in the NOFO.
The kick-off call will also be an opportunity to review any relevant and new documentation related to the project already in hand and to identify a local match and funding plan that will enable the project to be competitive.
Task 3.6.6.2. Grant Application Preparation
HDR will assist the City in the preparation of ( 1) 2025 RAISE grant application. The orientation of the application shall be for the award of construction funds.
HDR will provide technical writing and review services for the application as well as the preparation of select graphics to enable the grant application to achieve its best possible fit to each program's evaluation criteria. We intend to leverage the graphics used previously as well as use of the narrative as a starting point for the new application.
HDR shall also provide guidance to the City on the preparation of the required SF424 forms which will need to accompany the application. These forms will require add itional effort from the City in order to finalize and sign them. the City shall be responsible for obtaining any letters of support to supplement the g rant appl ication. Lastly, the City shall be responsiblefortheactualsubmittalofeach g rant application through the www.grants.govwebsite as this element of the grant application process is specifically excluded from our scope of services.
The application narrative will follow the latest NOFO guidance which will identify the project definition and closely follow the project evaluation and grant application requirements. HDR will design the application narrative for each to be easily accessible and emphasize each project's strengths with key themes throughout the application narrative.
The City will provide HDR with the current documentation ( in response to the data request submitted as part of Task 3.6.6.1) detailing the project scope, budget, schedule, and likely impacts on transportation, the environment and equity in the region. HDR will then work with the City staff to identify the material risks to the project and the strategies that the City has developed to mitigate those risks.
It should be noted that identification of matching funds is critical to thegrantapplication process. It is HDR's experience that upwards of 50% of the project cost should be from funding sources other than the funding source for the application to be competitive. Identification of committed funds as well as identification of potentially committed funds shall be the responsibility of the City. In the case of non - committed funds, the City shall be responsible for seeking out a letter of support from the proposed funding agency.
3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Proposal for Amendment 5 - Bridge Replacement at Las Posas Rd. and Ventura Blvd.
October 28, 2024
Deliverable:
1) completed FY 2023 RAISE Grant Application including the Benefit - Cost Analysis described in Task 3.6.6.3 below.
Task 3.6.6.3. Benefit - Cost Analysis ( BCA)
HDR will review the previous BCA that was produced for the project. We will update and quantify the previously identified public benefits expected from the project as needed in order to demonstrate adherence with the RAISE program goals. A key challenge of any grant application will be to provide compelling evidence of the merit of the project and its quantitative benefits in comparison to other applicants' projects. In this case, we will review the previous BCA in order to further monetize any foreseen benefits that were not previously captured. This scope of work specifically excludes the construction of a new BCA.
Deliverable: Benefit - Cost Analysis and technical appendix to support the RAISE grant application.
Task 4 ROW Services
Task 4.6 ROW Acquisition
Conduction TCE acquisition process in accordance with Caltrans guidelines needed for Rightof Way Certification.
The relevant properties are the following:
APN: 229-0-340-070 ( owner: CPG Partners LP)
APN: 229-0-010-690 ( owner: Mian Metropolitan Holdings) APN: 229-0-010-140 & - 160 ( owner: Mian Metropolitan Holdings) APN: 230-0-030-225 ( owner: County of Ventura; Camarillo Airport) APN: 230-0-152-025 ( owner: Golden State Self Storage)
Budget
Based on the tasks described in this proposal, HDR proposes an additional time and materials not - to - exceed fee of $ 202,135.02 based on the updated Fee Schedule attached.
Confidentiality
HDR staff assigned to this project will maintain confidentiality with the City on this project, including all materials, information, and work products developed.
We very much appreciate this opportunity to assist the City with this critical project. Please direct any questions or concerns related to this proposal to HDR's Project Manager, Dan Weddell by phone at:
714-442-2823, or by email at: [email protected].
Sincerely,
HDR Engineering, Inc.
wdM
Daniel Weddell, PE
Vice President
Attachments: Task Level Fee Proposal, Updated Rate Table 3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
EXHIBIT B
EXHIBIT A-1
HDR TEAM SUMMARY
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
DESCRIPTION MDR SPA Kasraie CansulUng EMI ( DBE) WM Survey LIN ( DBE) TAP ( DBE) Hamner - Jewell Kenedy Jenks TOTALS
0.01 GEMENT 56 11,861.60 16 5 2,969.56 0 0 0
0 0 5 - 0
L
S -
S -
0 5 - o
0 72 14,831.16
Administration Aid Mana:urn,1 3< 6.101-01 0 b 2.30910 2 5 - 0 a - u 48 b 0_.25310
0.02 P : 005 Team Med n s 5.52325 1 - 0 5 - J U S S - L L 5 - o 2 4 580.00 plate) 0 0 0 0 0 0 5 - 0 0 0 5 0 5
Jo 0 nt 24 5,884.00 48 5,919.58 0 0 0 0 0 0 mains 0 72 11,583.58 22 1,1 cal$wdiee
2.2.1 ASR 4 S 994.00 ft 1.137.52 0 0 S - 0 0 S - 0 0 E 0 5 12 2.081.52
2.25 NES 8 5 1..6.00 16 1 ; 6.68 0 0 S - 0 0 0 0 S - 24 3754.88
2.2.9 ISA 0 4 516.40 0 0 0 0 5 0 0 4 616.40
2.3 CEO AIS: M\L, 12 0 2.832.00 20 S 2.298.98 0 3 0 5 0 0 5• 0 5 • 0 5 0 S 32 5.130,98 TASK 3- Detail Plana, Specifications, 6 Estimates 606 S L 0 0 8 6,557.26 0 0 682 110,467.28
3.1 30% DESIGN SUBMITTAL
11.3 Hydraulic Report 52 5 7.360.00 0 5 - 0 0 5 - 0 8 - 0 S - 0 0 5 - 0 52 7.360.00
3.2 80% PSSE ( Unchecked Details)
12.1 Draft Roadway Plans
3.2.1.9 Landscape Plans 0 5 - 0 5 - 0 0 S - 0 5 0 5 - 50 5 4.314.00 0 5 - 0 S - 50 5 4.314.00
3.3 90%PSSE ( Checked Details)
3.1.1 Uodale Roadway and Structure POSE
3.3.1.7 Sewer Relocation 20 3.840.00 0 0 0 5 - 0 0 5 - 0 5 - 0 5 - 0 5 - 20 3.040.00
3.3.1.9 landscape Plans 0 0 0 5 - 0 5 - 0 0 5 - 18 1,551.04 0 5 - 0 5 - 18 1,553.04
3.4 100%PS&E
3.4.1 FInal PSSE Submittals
3.4.1.9 Landscape Plans 0 0 0 0 5 - 0 0 5 - 6 690.24 0 5 - 0 8 690.24
3.60 Funding
18.5 Prepare TCEP Grant Application ( 2024) 252 5 42.502.80 0 0 0 0 0 0 5 - 0 5 - 0 252 42.502.80
3.8.6 4.2
P - • - - Federal RAISE Fund . A• • ( ration
ROW Research
025 282
0 5020720 0
O
0 0
5 - 0
0 5 -
5 -
0 3
S -
5 011.00
0 0 S -
0 0 5 -
0 0
0 0
S -
5 -
282
9 5020720
611.00
4.3 Edsling ROW Mapang 0 8 - 0 5 - 0 5 - 0 5 - 11 5 2673.00 0 5 - 0 0 0 11 8 2,673.00
4.5 ROW Requirements Mm 9 5 1,470.00 0 5 - 0 0 S - 0 5 - 0 5 - 0 5 - 0 0 5 - 9 1.470.00
4.5 ROW Appraisal Maps and Legal Descriptions 0 0 S - 0 5 - 0 5 - 11 222100 0 5 - 0 9 - 0 0 S - 11 5 2223.00
4.6a ROW A5Ouislllon 13 0 2286.00 0 0 - 0 0 - 0 S - 0 5 0 0 365 72.995,00 0 5 - 378 75.261.00
4.60 TASK 53, .
OTHER
ROW ' . uislli59 CRED
Arc0eedaoNPaleo Sub
0 0 S - 0 0 0 Si 0 l 1 - 0 3 132.92600 0 5 - 0 3 100.925.00 00 S - 0 18'
10.940.00 4 S - S - e S S S 10.940.00
ISA 5 5000.00 5 - S - 5 - 5 5 5 5 5.000.00
TThe Reports 5 - 5 - S - 5 1.000.00 S - S S 5 1,000.00
5 365 $ 39,070.00 0 1,238 202,135.02
10128124
CC Agreement No. 2021-30E
EXHIBIT A-2
HDR Engineering, Inc.
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
TASK DESCRIPTION
Principal in
Charge Project Manager II
OAIOC
Engineer
Project
Engineer III
Assistant
Engineer I
Technician
Drafter
Project
Accountant
Gram
Manager Sr. Economist
Project
Planner II
Project
Planner I
Project
Engineer II Graphic Design
Assistant
Engineer II
Project
Administrator II
TOTAL Hours Fee312.00 300.00 282.00 0172.00 598.00 1134.00 592.60 0330.30 5290.00 5150.70 120.00 5165.00 121.00 5115.00 120.75 7 ASK 0- PROJECT MANAGEMENT 0 28 0 0 0 0 16 0 0 0 0 12 0 0 0 56 11,861.60
0.0 Administration and Management 16 16 0 32 6.281.60
0.0 Project Team Meetings 12 12 24 5.580.00
1 Scoping Study 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
tASK4,ASK 2 Environmental Documents 0 12 0 12 0 0 0 0 0 0 0. 0 0 0 0 24 5,664.00
2.2 Technical Studies
2.2.1 ASR 2 2 4 944.00
2.2.5 NES 4 4 8 1,888.00
2.3 CEOA ISIMND 6 6 12 2,832.00
i(IASK 3- Detail Plans, Specifications, 8 Estimates 0 18 0 0 0 0 0 44 86 84 264 34 58 18 0 806 3103,919.00
3.1 30% DESIGN SUBMITTAL
3.1.3 Hydraulic Report 4 0 8 40 52 7,360.00
3.3 90% PS&E ( Checked Details)
3.3.1 Update Roadway and Structure PS&E
3.3.1.7 Sewer Rebcatbn 4 16 20 3,840.00
3.6 Funding
3.6.5 Prepare TCEP Grant Application(2024) 4 16 40 40 130 4 10 8 252 42.502.80
3.6.6 Prepare Federal RAISE Funding Application(2025) 6 28 48 44 134 6 8 10 282 550,207.20 ItASK4 ROW Services 0 6 2 0 14 0 0 0 0 0 0 0 0 0 0 22 3,736.00
4.5 ROW Requirements Map 2 1 6 9 1,470.00
4.6a ROW Acquisticn 4 1 8 13 2,266.00
5- SERVICES DURING CONSTRUCTION 0 0.00
ASKHER DIRECT COST 0.00
TOTAL 64 2 12 14 0 16 44 86 84 264 46 58 18 708 125,171.60 CC Agreement No. 2021-30E
EXHIBIT A-3
GPA
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
Break Even Multiplier 141.9314 Profit 10% Escalation 0%
TASK DESCRIPTION
Principal Env
Planner Sr. Env Planner
Associate Env
Planner
Sr. Associate
Biologist Sr. Biologist
Associate
Biologist
Sr. Architectural
Historian
Architectural
Historian II
Sr. GIS
Analyst
OTAL Hours Fee280.09 154.10 98.17 183.62 151.47 98.06 130.28 88.35 140.10 TASK 0- PROJECT MANAGEMENT 4 12 0 0 0 0 0 0 0 16 2,969.56
0.01 Administration and Management 4 12 16 2,969.56
TASK 1- Scoping Study 0 0 0 0 0 0 0 0 0 0 0.00
TASK 2 - Environmental Documents 0 14 14 0 4 10 4 0 2 48 5,919.58
2.2 Technical Studies
2.2.1 ASR 4 4 8 1,137.52
2.2.5 NES 4 10 2 16 1,866.68
2.2.9 ISA 4 4 616.40
2.3 CEQA IS/MND 6 14 20 2,298.98
TASK 4- ROW Services 0 0 0 0 0 0 0 0 0 0 0.00
TASK 5- SERVICES DURING CONSTRUCTION 0 0 0 0 0 0 0 0 0 0 0.00 OTHER DIRECT COST 15,940.00
Subconsultant ( Paleo Solutions) - ASR/Paleo 10,940.00
Subconsultant ( Geocon) - ISA 5,000.00
TOTAL, 4 26 14 0 4 10 4 0 2 64 24,829.14
CC Agreement No. 2021-30E
EXHIBIT A-4
Tatsumi and Partners
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
Break Even Multiplier 201.69% Profit 10% Escalation 0.0%
TASK DESCRIPTION
Principal in
Charge Senior Associate
Tech Staff
111 Tech Staff 11 Tech Staff 1
TOTAL Hours Fee345.13 227.06 122.99 99.13 86.28 0.00 0.00 TASK 0- PROJECT MANAGEMENT 0 0 0 0 0 0 0 0 0.00
TASK 1- Scoping Study 0 0 0 0 0 0 0 0 0.00
TASK 3- Detail Plans, Specifications, & Estimates 0 0 0 0 76 0 0 76 6,557.28
3.2 60% PS&E ( Unchecked Details)
3.2.1 Draft Roadway Plans
3.2.1.9 Landscape Plans 50 50 4,314.00
3.3 90% PS&E ( Checked Details)
3.3.1 Update Roadway and Structure PS&E
3.3.1.9 Landscape Plans 18 18 1,553.04
3.4 100% PS&E
3.4.1 Final PS&E Submittals
3.4.1.9 Landscape Plans 8 8 690.24
TASK 4- ROW Services 0 0 0 0 0 0 0 0 0.00
TASK 5- SERVICES DURING CONSTRUCTION 0 0 0 0 0 0 0 0 0.00 OTHER DIRECT COST 0.00
TOTAL 0 0 0 0 76 0 0 76 6,557.28
CC Agreement No. 2021-30E
EXHIBIT A-5
Hamner, Jewell & Associates
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
Break Even Multiplier Profit 10% Escalation 0.0%
TASK DESCRIPTION
Managing Sr
Assoc Sr Assoc II/ PM
Sr Assoc I/
PM
Assoc II
Acq/reloc)
Assoc I
Acq/reloc) Proj Coord
Transaction
Coord
Clerical
Suport
TOTAL Hours Fee288.00 205.00 185.00 150.00 135.00 135.00 130.00 60.00 TASK 0- PROJECT MANAGEMENT 0 0 0 0 0 0 0 0 0 0.00
TASK 1- Scoping Study 0 0 0 0 0 0 0 0 0 0.00
TASK 4 - ROW Services 80 105 94 20 16 16 24 10 365 39,070.00
4.6a ROW Acquisition 80 105 94 20 16 16 24 10 365 72,995.00
4.6b ROW Acquisition ( CREDIT) 33,925.00)
TASK 5- SERVICES DURING CONSTRUCTION 0 0 0 0 0 0 0 0 0 0.00 OTHER DIRECT COST 0.00
TOTAL 80 105 94 20 16 16 24 10 365 39,070.00
CC Agreement No. 2021-30E
EXHIBIT A-6
WM Survey
PAED and Final PS&E AMENDMENT 5
Bridge Replacement at Las Posas Rd. and Ventura Blvd. ( Project No. SD - 5052) City of Camarillo
Break Even Multiplier Profit Escalation 0.0
TASK DESCRIPTION
Project Manager
Sr Mapping
Technician
Office
Technician
1 -Man Survey
PW)
1 -Man
Survey ( PW)
1 -Man
Survey ( PW)
TOTAL Hours Fee221.00 195.00 196.00 314.00 367.00 451.00 TASK 0- PROJECT MANAGEMENT 0 0 0 0 0 0 0 0 0.00
TASK 1- Scoping Study 0 0 0 0 0 0 0 0 0.00
TASK 2- Environmental Documents 0 0 0 0 0 0 0 0 0.00
TASK 3- Detail Plans, Specifications, & Estimates 0 0 0 0 0 0 0 0 0.00 TASK 4- ROW Services 6 15 0 4 0 0 0 25 5,507.00
4.2 ROW Research 1 2 3 611.00
4.3 Existing ROW Mapping 2 5 4 11 2,673.00
4.5 ROW Appraisal Maps and Legal Descriptions 3 8 11 2,223.00 TASK 5- SERVICES DURING CONSTRUCTION 0 0 0 0 0 0 0 0 0.00 OTHER DIRECT COST 1,000.00
Title Reports 1,000.00
TOTAL 6 15 0 4 0 0 0 25 6,507.00
CC Agreement No. 2021-30E
Updated Rate Tables— Bridge Replacement at Las Posas Rd. and Wentura Blvd.
October 28, 2024
Updated Rate Table: SD - 5052 Bridge Replacement at Las Posas Rd. and Ventura Blvd.
HDR Engineering, Inc.
Category
Principal in Charge
Grant Manager
Project Manager II
Project Manager
QA/QC Engineer
Sr. Engineer
Project Engineer I I I
Project Engineer II
Assistant Engineer II
Assistant Engineer I
Technician/Drafter
Project Accountant
Clerical
Sr. Economist
Project Planner II
Project Planner I
Graphic Design
Project Administrator II
Billing Rates
312.00
330.30
300.00
284.90
282.00
199.00
172.00
165.00
115.00
98.00 134.00
92.60 66.00
290.00
150.70
120.00
121.00
120.75
GPA Consulting, Inc.
Category Billing Rates
Principal $ 280.09
Sr. Assoc. Env. Planner $ 197.22
Sr. Env Planner $ 154.10
Assoc. Env Planner $ 98.17
Sr. Assoc. Biologist $ 183.62
Sr. Biologist $ 151.47
Assoc. Biologist $ 98.06
Sr. Architectural Historian $ 130.28
Architectural Historian II $ 88.35
Sr. GISAna lyst $ 140.10
3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Updated Rate Tables— Bridge Replacement at Las Posas Rd. and Wentura Blvd.
October 28, 2024
Kasraie Consulting
Category
Principal in Charge
Senior Project Engineer
Project Engineer
Billing Rates
220.00
143.00
132.00
Earth Mechanics, Inc.
Category
Principal
Principal Engineer
Senior Engineer
Senior Staff Engineer
Staff Engineer
Senior Tech.
Clerical
Billing Rates
279.72
245.91
193.65
113.73
107.58
138.32
67.62 WM Surveys
Category Billing Rates
1 -Man Survey Crew Prevailing Wage
2 -Man Survey Crew Prevailing Wage
3 -Man Survey Crew Prevailing Wage
Senior Mapping Technician
Project Manager
Office Technician
314.00
367.00
451.00
195.00
221.00
196.00
Tatsumi & Partners
Category
Principal in Charge
Senior Associate
Senior Technical Staff
Tech Staff II I
Tech Staff II
Tech Staff I
Billing Rates
345.13
227.06
145.19
122.99
99.13 86.28
3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
Updated Rate Tables— Bridge Replacement at Las Posas Rd. and Wentura Blvd.
October 28, 2024
LIN Consulting
Category Billing Rates
Principal in Charge $ 315.38
Senior Project Manager $ 246.69
Assistant Project Manager $ 170.18
Project Engineer $ 124.90
Hamner, Jewell & Associates
Category Billing Rates
Managing Senior Associate $ 288.00
Senior Associate II/Project Manager $ 205.00
Senior Associate I/Project Manager $ 185.00
Associate II ( Acquisition/Relocation) $ 150.00
Associate I ( Acquisition/Relocation) $ 135.00
Contract Administrator $ 170.00
Project Coordinator $ 135.00
Transaction/Escrow Coordinators $ 130.00
Transaction Assistant $ 85.00
Assistant/Clerical Support $ 60.00
Kennedy Jenks Consultants
Category
Eng-Sci-1
Eng-Sci-2
Eng-Sci-3
Eng-Sci-4
Eng-Sci-5
Eng-Sci-6
Eng-Sci-7
Eng-Sci-8
Eng-Sci-9
Sr. CAD - Designer
CAD - Designer
Sr. CAD - Technician
CAD - Technician
Project Assistant
Project Administrator
Aide
Billing Rates
155.00
190.00
210.00
230.00
250.00
275.00
300.00
320.00
335.00
195.00
180.00
165.00
145.00
145.00
130.00
105.00
3220 El Camino Real, Suite 200, Irvine, CA 92602
714) 730-2300
CC Agreement No. 2021-30E
AGREEMENT NO. 2021-30F
SIXTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT
This Sixth Amendment to Professional Services Agreement No. 2021-30 (Amendment) effective date of May 1, 2026, is entered into between the City of Camarillo, a general law city (City) and WKE, Inc., a California Corporation (Consultant), collectively referred to as the Parties.
RECIT
ALS
A. The Parties have entered into a wr itten agreement entitled “Professional Services Agreement Number 2021-30” hav ing an effective date of March 10, 2021 (Agreement) to provide for cert ain professional services in the amount of $994,530 as outlined in Exhibit A of Agreement from Consultant.
B. The Parties have entered into a written agreement entitled “First Amendment to Professional Services Agreement” hav ing an effective date of October 11, 2021 (Agreement No. 2021-30A) notifying City that effective May 31, 2021, HDR Engine ering, Inc. acquired all of the capital stock of WKE, Inc., making WKE, Inc. a wholly-owned subsidiary of HDR Engineering, Inc. in a zero-dollar amount.
C. The Parties have entered into a written agreement entitled “Second Amendment to Professional Services Agreement” having an effect ive date of February 16, 2022 (Agreement No. 2021-30B) to provide additi onal design serv ices for soil cuttings
produced during the geotechnical fiel d inv
estigation in the amount of $9,400 for a total
agreement amount of $1,003,930.
D. The Parties have entered into a written agreement entitled “Third Amendment to Professional Services Agreement” having
an effective date of May 1, 2023 (Agreement
No. 2021-46C) to provide services additional grant application support and additional utility location services in the amount of $140,597 for a total agreement amount of $1,144,527.
E. The Parties have entered into a written agreement entitled “Fourth Amendment to Professional Services Agreement” having an effective date of April 1, 2024 (Agreement No. 2021-46D) to amend Fee Schedule in a zero-dollar amount.
F. The Parties have entered into a written agreement entitled “Fifth Amendment to Professional Services Agreement” having an effective date of November 13, 2024 (Agreement No. 2021-46E) to provide additional grant support, environmental and right-of- way services in the amount of $202,135.02 for a total agreement amount of $1,346.662.02.
G. All capitaliz
ed terms not defined in this Amendment have the meaning set forth in the Agreement.
H. The parties desire to modify
the scope of work in accordance with Section 5.1
of the Ag
reement.
Section 1. Amendment. The Agreement is amended to add the following:
1. “Fee Schedule” of the Agreement is amended. See attached Exhibit A, Fee Schedule.
CC Agreement 2021-30F
Section 2. Compensation and Paymen t. Sixth Amendment to Professional Services Agreement is for a zero-dollar amount, for a total agreement amount of $1,346,662.02
Section 3. Continuation of Terms of Ag reement. Except as expressly modified by the terms and provisions of this document, the remaining te rms and provisions of the Agreement remain in full force and effect.
THE AUTHORIZED REPRESENTATIVES of the Parties have caused this Sixth Amendment to Agreement No. 2021-30 to be executed as of the Effective Date.
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
Carrie Weal, City Clerk
WKE, INC., a California corporation
Anna Lantin, Vice President
Daniel Weddel, Vice President
043743 08/31/2026
Camarillo Business Tax Certificate Number Expiration Date
Attachments: Exhibit A, Fee Schedule
CC Agreement 2021-30F
hdrinc.com
3220 El Camino Real, Suite 200, Irvine, CA 92602-1377
(714) 730-2300
May 8, 2026
City of Camarillo
Attention: Andrew Grubb
601 Carmen Drive
Camarillo, CA 93011
RE: Camarillo Hills Drain Replacement At Ventura Blvd - Contract No. SD-5052 Dear Mr. Grubb,
The survey subcontractor must use prevailing wages which do not match the current billing rates in our 2024 amendment and have been updated. The category rates for our subconsultant LIN Consulting and Earth Mechanics, Inc. were set in 2021. Due to the delay in Caltrans providing a Federal ID and approving the NEPA document, these rates are now out of date. We are proposing updated category billing rates starting May 1, 2026 and including 2027 rates for January 1, 2027 to December 31, 2027, per the attached rates by firm.
Thank you for your consideration.
Daniel Weddell
Vice President
WKE, Inc., a wholly owned subsidiary of HDR Engineering, Inc.
At
tachments:
2026 and 2027 Category Billing Rates for contract SD-5052 Attachment A
CC Agreement 2021-30F
Updated Rate Tables– Camarillo Hills Drain Bridge Replacement Project May 8, 2026
hdrinc.com 3220 El Camino Real, Suite 200, Irvine, CA 92602-1377 (714) 730-2300
Updated Rate Table: SD-5052 Camarillo Hills Drain Bridge Replacement
WKE/HDR
Category
2026 Billing
Rates
2027 Billing
Rates
Principal in Charge $312.00 $324.00
Grant Manager $300.00 $312.00
Project Manager II $310.00 $322.00
Project Manager I $285.00 $295.00
QA/QC Engineer $280.00 $291.00
Sr. Engineer $199.00 $207.00
Project Engineer III $172.00 $179.00
Project Engineer II $122.00 $127.00
Assistant Engineer II $115.00 $120.00
Assistant Engineer I $100.00 $104.00
Technician/Drafter $134.00 $139.00
Clerical $68.00 $71.00
Sr. Economist $290.00 $302.00
Economist $180.00 $187.00
Project Planner II $151.00 $157.00
Project Planner I $120.00 $125.00
Graphic Design $121.00 $126.00
Project Administrator II $93.00 $97.00
GPA Consulting, Inc.
Category
2026 Billing
Rates
2027 Billing
Rates
Principal $291.30 $303.00
Sr. Assoc. Env. Planner $205.10 $213.30
Sr. Env Planner $160.30 $166.70
Assoc. Env Planner $102.10 $106.20
Sr. Assoc. Biologist $191.00 $198.60
Sr. Biologist $157.50 $163.80
Assoc. Biologist $102.00 $106.10
Biologist $135.50 $140.90
Sr. Architectural Historian $91.90 $95.60
Assoc. Architectural Historian $145.70 $151.50
CC Agreement 2021-30F
Updated Rate Tables– Camarillo Hills Drain Bridge Replacement Project May 8, 2026
hdrinc.com 3220 El Camino Real, Suite 200, Irvine, CA 92602-1377 (714) 730-2300
Kasraie Consulting
Category
2026 Billing
Rates
2027 Billing
Rates
Principal in Charge $237.00 $237.00
Senior Project Engineer $148.00 $154.00
Project Engineer $137.00 $142.00
Earth Mechanics, Inc.
Category
2026 Billing
Rates
2027 Billing
Rates
Principal $326.00 $339.00
Principal Engineer $252.00 $262.00
Senior Engineer $223.00 $232.00
Senior Staff Engineer $166.00 $173.00
Staff Engineer $131.00 $136.00
Senior Tech. $167.00 $174.00
Clerical $98.00 $102.00
WM Surveys
Category
2026 Billing
Rates
2027 Billing
Rates
1-Man Survey Crew
Prevailing Wage $275.00 $289.00
2-Man Survey Crew
Prevailing Wage $351.00 $369.00
3-Man Survey Crew
Prevailing Wage $458.00 $481.00
Professional Surveyor $273.00 $287.00
Senior Mapping Technician $184.00 $193.00
Project Manager $222.00 $233.00
Office Technician $186.00 $195.00
CC Agreement 2021-30F
Updated Rate Tables– Camarillo Hills Drain Bridge Replacement Project May 8, 2026
hdrinc.com 3220 El Camino Real, Suite 200, Irvine, CA 92602-1377 (714) 730-2300
Tatsumi & Partners
Category
2026 Billing
Rates
2027 Billing
Rates
Principal in Charge 358.94 373.3
Senior Associate 236.14 245.6
Senior Technical Staff 151 157
Tech Staff III 127.91 133.00
Tech Staff II 103.1 107.2
Tech Staff I 89.73 93.3
LIN Consulting
Category
2026 Billing
Rates
2027 Billing
Rates
PIC $329.40 $342.60
Sr. Project Manager. $240.49 $250.10
Asst. Project Manager $166.16 $172.80
Project Engineer $132.63 $137.90
Asst. Engr. $84.54 $87.90
Technical Support $62.67 $65.20
Hamner-Jewel Associates
Category
2026 Billing
Rates
2027 Billing
Rates
Managing Senior Associate $288.00 $300.00
Senior Associate II/Project
Manager $205.00
$213.00
Senior Associate I/Project
Manager $185.00
$192.00
Associate II
(Acquisition/Relocation) $155.00
$161.00
Associate I
(Acquisition/Relocation) $140.00
$145.00
Project Coordinator $135.00 $140.00
Transaction/Escrow
Coordinators $130.00
$135.00
Transaction Assistant $85.00 $88.00
Assistant/Clerical Support $75.00 $78.00
CC Agreement 2021-30F
Updated Rate Tables– Camarillo Hills Drain Bridge Replacement Project May 8, 2026
hdrinc.com 3220 El Camino Real, Suite 200, Irvine, CA 92602-1377 (714) 730-2300
Kennedy Jenks Consultants
Category
2026 Billing
Rates
2027 Billing
Rates
Eng-Sci-1 $161.00 $167.00
Eng-Sci-2 $197.00 $205.00
Eng-Sci-3 $218.00 $227.00
Eng-Sci-4 $239.00 $249.00
Eng-Sci-5 $260.00 $270.00
Eng-Sci-6 $286.00 $297.00
Eng-Sci-7 $312.00 $324.00
Eng-Sci-8 $332.00 $345.00
Eng-Sci-9 $348.00 $362.00
Sr. CAD-Designer $202.00 $210.00
CAD-Designer $187.00 $194.00
Sr. CAD-Technician $171.00 $178.00
CAD-Technician $150.00 $156.00
Project Assistant $150.00 $156.00
Project Administrator $135.00 $140.00
Aide $109.00 $113.00
CC Agreement 2021-30F