(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1

CITY OF CAMARILLO

PUBLIC WORKS CONTRACT
(Informal Bid Work)
This contract (“Contract”) is effective as of September 9, 2026, and is between the CITY OF C AMARILLO, a California general law city and municipal corporation (“ City”), a nd Streetlight Restoration Specialists Inc. corporation/partnership/limited liability company (“Contractor”), collectively referred to as the “Parties.” Section 1. Recitals. This Contract is entered into with respect to the following facts:

1.1 City received a proposal for the work involved in Project No. TM -2026-1 (“Project”), which is more fully described in the Contract Documents defined below.

1.2 Contractor represents it is qualified to perform all of the work required to complete the Project.

1.3 Contractor agrees to perform all such work in the time and manner set forth in the Contract Documents.

Section 2. Contract Documents . This Cont ract consists of the following documents (“Contract Documents”), all of which are made a part of this Contract:

2.1 Proposal, as accepted, including the List of Subcontractors (if any)

2.2 Notice to Proceed

2.3 This Contract

2.4 Verification of California Contractor’s License

2.5 Certificate of DIR Contractor Registration

2.6 Certificate Regarding Workers’ Compensation

2.7 Security for payment (labor and materials)

2.8 Security for performance

2.9 Certificate(s) of Insurance

2.10 Prevailing Wage Scales can be found here: www.dir.ca.gov/public-works/prevailing-wage.html

2.11 Other documents (list here)
Exhibit A – Special Provisions and Scope of Work
Exhibit B - Compensation

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1
Exhibit C – Insurance
Exhibit D - Adjustment for New Tariffs or Tariff Increases Section 3. The Work.

3.1 The work (“ Work”) to be performed by Contractor is desc ribed in the Contract Documents set forth in Exhibit A (“Scope of Work”), which is made a part of this Contract.

3.2 In completing the Work, Contractor must employ, at a minimum, the applicable generally accepted professional standards of its industry in existence at the time of performance as utilized by persons engaging in similar work.

3.3 Except as specifically provided in the Contract Documents, Contractor must furnish, at its sole expense, all of the labor, materials, tools, equipment, services and transportation necessary to perform all of the Work.

3.4 Contractor must perform all of the Work in strict accordance with the Contract Documents.

Section 4. Time to Perform the Work.

4.1 Time is of the essence with respect to Contractor’s Work. Contractor agrees to diligently pursue performance of the Work within the time specified by the Contract Documents.

4.2 Contractor will be excused from any delay in performance or failure to perform due to causes beyond the control of Contractor. Such causes include, but are not limited to, acts of God, acts of terrorism, acts of federal, state or local governments, acts of City , court orders, fires, floods, epidemics, strikes, embargoes, and unusually severe weather.

4.3 If Contractor is delayed by any cause beyond Contractor’s control, City may, but is not required to, grant a time extension for the completion of the Work. If delay occurs, Contractor must notify City in writing within 48 hours of the cause and the extent of the delay and how such delay interferes with Contractor’s performance of the Work.

Section 5. Compensation and Payment.

5.1 Subject to any limitations provided in the Contract Documents, City agrees to pay Contractor as full consideration for the faithful performance of all of the Work the compensation set forth in Exhibit B (“Compensation”), which is made a part of this Contract.

5.2 Contractor must furnish City with a Pay Estimate for the Work performed in accordance with the Contract Documents. Contractor may not submit a Pay Estimate more often than once every 30 days.

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1

5.3 City will review each Pay Estimate and determine whether the Work performed is in accordance with the Contract Documents. The D irector of Public Works (“Director”) may require Contractor to provide a release of all undisputed Contract amounts contained in the Pay Estimate.

5.4 If City disputes any item on a Pay Estimate, City will give Contractor notice stating the reasons for the dispute. The Parties will meet and confer in good faith to attempt to resolve the dispute.

5.5 Except as to any charges for the Work performed that City disputes and the City’s standard five-percent retention of the approved progress payment, City will cause Contractor to be paid within 30 days of the date of the invoice or the date that Contractor furnishes City with a release of all undisputed Contract amounts, whichever occurs later. Federally funded projects will not have a five -percent retention.

5.6 In the event there is any claim specifically excluded by Contractor from the operation of any release, City may retain an amount not to exceed the amount of the excluded claim.

Section 6. Labor Code and Prevailing Wage Requirements.

6.1 Contractor agrees to comply with the requirements of California Labor Code sections 1810 through 1815. E ight hours of labor constitutes a legal day’s work per Labor Code s ection 1810. Contractor will forfeit the statutory penalty to City for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code sections 1810 through 1815.

6.2 Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or type of worker needed to execute this Contract are available for download from the State website: http://www.dir.ca.gov/OPRL/dprewagedetermination.htm.

6.3 Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2.) When applicable, copies of the prevailing rate of per diem wages will be on file at City ’s Department of Public Works and available to Contractor and any other interested party upon request.

6.4 Contractor, and any subcontractor engaged by Contractor, may pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records.

6.5 Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor will forfeit the statutory penalty to City for each worker

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1
employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.

6.6 Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under § 1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.

6.7 Contractor has reviewed and agrees to comply with any applicable provisions for any public work subject to Department of Industrial Relations (DIR) Monitoring and Enforcement of prevailing wages, including the registration requirements of Labor Code Section 1771.1(a). City hereby notifies Contractor that Contractor is responsible for submitting certified payroll records directly to the State Compliance Monitoring Unit (CMU). For further information concerning compliance monitoring please visit the website location at: http://www.dir.ca.gov/dlse/cmu/cmu.html.

6.8 Contractor must comply with Labor Code s ection 1771.1(a), which provides that Contractor may award any contracts and subcontracts for work that qualifies as a “public work” only to subcontractors which are at that time registered and qualified to perform public work pursuant to Labor Code s ection 1725.5. Contractor must obtain proof of such registration from all such subcontractors.”

6.9 If federal funds are used to pay for the Work, Contractor and any subcontractor agree to comply, as applicable, with the labor and reporting requirements of the Davis-Bacon Act (40 USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC §874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following).

Section 7. Non-Discrimination. Contractor, its officers, agents, employees, and subcontractors may not discriminate in the employment of persons to perform the Work in violation of any federal or state law prohibiting discrimination in employment, including based on the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, of any person, except as provided under California Government Code section 12940. Contractor is responsible for compliance with this section.

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1
Section 8. General Legal Compliance.

8.1 In performing the Work, Contractor must comply with all applicable statutes, laws and regulations, including, but not limited to, OSHA requirements and the Camarillo Municipal Code.

8.2 Contractor must, at Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, and give all necessary notices and pay all fees and taxes required by law, including, without limitation, any business license tax imposed by City.

8.3 Contractor must maintain a valid California Contractor’s License throughout the term of this Contract.

Section 9. Clayton and Cartwright Act Assignments. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract for the Project, Contractor and any subcontractor will be deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Project. This assignment will be deemed made and will become effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

Section 10. Independent Contractor. Contractor is and will at all times remain as to City a wholly independent contractor. Neither City nor any of its officers, employees, or agents will have control over the conduct of Contractor or any of Contractor’s officers, employees, agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City.

Section 11. Indemnification.

11.1 Contractor agrees to the fullest extent permitted by law to (1) immediately defend and (2) indemnify City from and against, any and all claims and liabilities, regardless of the nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor, or its officers, employees, agents, or subcontractors com mitted in performing any Work under this Contract or the failure to comply with any of the obligations of this Contract (collectively, “Claims”). The Claims subject to Contractor’s duties to defend and indemnify include, without limitation, all claims, actions, causes of action, proceedings, suits, losses, damages, penalties, fines, judgments, liens, levies, and associated investigation and administrative expenses. Such Claims also include defense costs, including reasonable attorneys’ fees and disbursements, expert fees, court costs, and costs of alternative dispute resolution.

11.2 Contractor’s duty to defend is a separate and distinct obligation from Contractor’s duty to indemnify. Contractor is obligated to defend City in all legal, equitable, administrative, or special proceedings, with counsel approved by City, immediately

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1
upon tender to Contractor of the Claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Contractor are responsible for the Claim does not relieve Contractor from its separate and distinct obligation to defend under this section.

The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Contractor asserts that liability is caused in whole or in part by the negligence or willful misconduct of any City indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of any City indemnified party, then Contractor may submit a claim to City for reimbursement of reasonable attorneys’ fees and defense costs in proportion to the established comparative liability of the City indemnified party.

11.3 Contractor agrees that its defense and indemnification obligation under this section, includes the reasonable costs of attorneys’ fees incurred by the City Attorney’s office to monitor and consult with Contractor regarding the defense of any Claims, including providing direction with regard to strategy, preparation of pleadings, settlement discussions, and attendance at court hearings, mediations, or other litigation related appearances. City will use its best efforts to avoid duplicative attorney work or appearances in order to keep defense costs to a reasonable minimum.

11.4 Contractor agrees that settlement of any Claim will require the consent of City .

City agrees that its consent will not be unreasonably withheld provided that Contractor is financially able (based on demonstrated assets) to fulfill its obligation to indemnify City for the costs of any such settlement as required under this Contract.

11.5 Contractor’s obligation to indemnify City applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of a City indemnified party. If a Claim is finally adjudicated and a determination made that liability was caused by the sole active negligence or sole willful misconduct of a City indemnified party, then Contractor’s indemnification obligation will be reduced in proportion to the established comparative liability.

11.6 For the purposes of this section, “City” includes City’s officers, officials, employees and agents.

11.7 The provisions of this section will survive the expiration or earlier termination of this Agreement.

Section 12. Insurance. Contractor agrees to have and maintain in full force and effect during the term of this Contract the insurance coverages listed in Exhibit C (“Insurance”), which is made a part of this Contract.

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1

Section 13. Notice.

13.1 All written notices required or permitted to be given under this Contract will be deemed made when received by the other Party at its respective address as follows:

To City: City of Camarillo
601 Carmen Drive
Camarillo, California 93010
Attention: Rick Gallegos
Tel.: 805-383-5614
Email: [email protected]
To Contractor: Streetlight Restoration Specialists Inc. 2828 Cochran Street #360
Simi Valley, CA 93065
Attention: Brian Moran
Tel.: (805) 468-5271
Email: [email protected]

13.2 Notice will be deemed effective on the date personally delivered or transmitted by facsimile or email. If the notice is mailed, notice will be deemed given three days after deposit of the same in the custody of the United States Postal Service, postage prepaid, for first class delivery, or upon delivery if using a major courier service with tracking capabilities.

13.3 Any Party may change its notice information by giving notice to the other Party in compliance with this section.

Section 14. City Rights of Termination and to Complete the Work.

14.1 The occurrence of any of the following is a default by Contractor under this Contract:

14.1.1 Contractor refuses or fails to prosecute the Work or any part thereof with such diligence as will insure its completion within the time specified or any permitted extension.

14.1.2 Contractor fails to complete the Work on time.

14.1.3 Contractor is adjudged bankrupt, or makes a general assignment for the benefit of creditors, or a receiver is appointed on account of Contractor’s insolvency.

14.1.4 Contractor fails to supply enough properly skilled workers or proper materials to complete the Work in the time specified.

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1

14.1.5 Contractor fails to make prompt payment to any subcontractor or for material or labor.

14.1.6 Contractor fails to abide by any applicable laws, ordinances or instructions of City in performing the Work.

14.1.7 Contractor breaches or fails to perform any obligation or duty under the Contract.

14.2 Upon the occurrence of a default by Contractor, City will serve a written notice of default on Contractor specifying the nature of the default and the steps needed to correct the default. Unless Contractor cures the default within 10 days after the service of such notice, or satisfactory arrangements accept able to City for the correction or elimination of such default are made, as determined by City, City may thereafter terminate this Contract by serving written notice on Contractor. In such case, Contractor will not be entitled to receive any further payment, except for Work actually completed prior to such termination in accordance with the provisions of the Contract Documents.

Section 15. Project Documents . All data, drawings, maps, models, notes, photographs, reports, studies and other documents (collectively, “ Project Documents”) prepared, developed or discovered by Contractor in the course of performing any of the Work under this Contract will become the sole property of City . Upon the expiration or termination of this Contract, Contractor must turn over all original Project Documents to City in its possession, but may retain copies of any of the Project Documents it may desire.

Section 16. General Provisions.

16.1 Authority to Execute. Each Party represents and warrants that all necessary action has been taken by such Party to authorize the undersigned to execute this Contract and to bind it to the performance of its obligations.

16.2 Assignment. Contractor may not assign this Contract without the prior written consent of City, which consent may be withheld in City’s sole discretion since the experience and qualifications of Contractor were material considerations for this Contract.

16.3 Binding Effect. This Agreement is binding upon the heirs, executors, administrators, successors and permitted assigns of the Parties.

16.4 Integrated Contract. This Contract, including the Contract Documents, is the entire, complete, final and exclusive expression of the Parties with respect to the Work to be performed under this Contract and supersedes all other agreements or understandings, whether oral or written, between Contractor and City prior to the execution of this Contract.

16.5 Modification of Contract. No amendment to or modification of this Contract will be valid unless made in writing and approved by Contractor and by the City Council or City Manager, as applicable. The Parties agree that this requirement for written modifications cannot be waived and that any attempted waiver will be void.

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1

16.6 Electronic Signatures; Counterparts. This Agreement and any amendment will be considered executed when the signature page of a party is delivered by electronic transmission. Such electronic signatures will have the same effect as an original signature. This Agreement may be executed in multiple counterparts.

16.7 Waiver. Waiver by any Party of any term, condition, or covenant of this Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Contract will not constitute a waiver of any other provision, or a waiver of any subsequent breach or violation of any provision of this Contract. Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of the provisions of this Contract.

16.8 Interpretation. This Contract will be interpreted, construed and governed according to the laws of the State of California. Each party has had the opportunity to review this Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance with its fair meaning. It will not be interpreted strictly for or against either party.

16.9 Severability. If any term, condition or covenant of this Contract is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Contract will not be affected and the Contract will be read and construed without the invalid, void or unenforceable provision.

16.10 Venue. In the event of litigation between the parties, venue in state trial courts will be in the County of Ventura. In the event of litigation in a U.S. District Court, venue will be in the Central District of California, in Los Angeles. [Signatures on the following page.]

(1-2025) Specification No. TM-2026-1
CONTRACT 2026-75

CAM #4844-6202-6590 v1
The Parties have caused this Contract to be executed by their undersigned authorized agents as follows:

CITY OF CAMARILLO

Greg Ramirez, City Manager
ATTEST:

Acting City Clerk

STREETLIGHT RESTORATION SPECIALISTS, INC.

Brian Moran, President/Secretary

Camarillo Business Tax Certificated No. OBT-312_ Expiration Date 10/31/2026

Specification No. TM-2026-1
A-1
CONTRACT 2026-75

EXHIBIT A

SPECIAL PROVISIONS & SCOPE OF WORK
TM-2026-1, CAMARILLO SIGNAL PAINTING AND YELLOW BORDERS PROJECT

1. DESCRIPTION
The work to be performed consists of the Contractor furnishing all materials, equipment, tools, labor, and incidentals necessary for the proposed project, complete and in place.

The work to be performed includes the painting of all signal heads, pedestrian housing, and pushbutton assemblies, as well as the installation of reflective yellow borders on each signal head at the twenty-two (22) signalized intersections listed below.

The Contractor must provide all new materials required for the painting and installation of reflective yellow borders. The Contractor must provide a Certificate of Compliance and a One-Year Warranty for all work performed.

All work associated with this project must conform to the requirements of the State of California Department of Transportation most current edition of the Standard Plans and Standard Specifications, City of Camarillo Standards, these Special Provisions, an d the Scope of Work as outlined in EXHIBIT A.

List of Intersections for CAMARILLO SIGNAL PAINTING AND YELLOW BORDERS PROJECT

1. Flynn Rd and Adolfo Rd

2. Adolfo Rd and Mission Oaks

3. Mission Oaks and Woodcreek Rd

4. Pleasant Valley and Pancho Rd

5. Pleasant Valley and Ridge View St

6. Ponderosa and Temple Ave

7. Ventura Blvd and Camarillo Outlets

8. Woodcreek and Upland Rd

9. Avenida Acaso and Adolfo Rd

10. Upland and Flynn Rd

11. Avenida Acaso and Flynn Rd

12. Pleasant Valley and Bridgehampton Way

13. Pleasant Valley and Village Commons Blvd

14. Ventura Blvd and Promenade Ctr

15. Verdugo and Pardee Plaza

16. Upland and Mission Oaks Blvd

17. Ventura and Town Center East

18. Ventura and Springville Dr

19. Arneill and Dunnigan St

20. Ponderosa and Camino Tierra Santa

21. Ponderosa and Earl Joseph Dr

22. Arboleda and Upland Rd

Specification No. TM-2026-1
A-2
CONTRACT 2026-75

2. BASIS OF SPECIFICATIONS
Unless otherwise noted in these Special Provisions, the basis of specifications for this project shall be the City of Camarillo EXHIBIT A.

Contractor is not allow ed to park any vehicles or equipment at the City Corporation Yard.

The Contractor must always be responsible for maintaining the use of sidewalks and keeping the work area clear of debris.

Traffic Signals may be placed on flash mode during working hours.

3. WORK HOURS
Work shall be done only on weekdays, Monday through Friday, excluding holidays, between 8:30 a.m. and 4:00 p.m.

No contractor activity shall encroach into a moving lane o f traffic between the hours of 7:00 a.m. and 8:30 a.m. or after 4:00 p.m., unless otherwise approved by the City Transportation Engineer.

Night work between the hours of 9:00 p.m and 6:00 a.m. is allowed with permission by the City Transportation Engineer.

4. STORMWATER BEST MANAGEMENT PRACTICES (BMPs)
Contractor must train employees and subcontractors on proper best management practices, general good housekeeping, and proper spill containment and cleanup.

Before start of work, Contractor must provide city with written documentation of training. See the attached Trained Contractor Log form and training information.

No water from Contractor’s operations such as potholing, conduit jacking and drilling, pavement/sidewalk cutting, and pavement washing shall be discharged to the stormwater drainage system or watercourses. The system includes streets, catch basins, curbs, gutters, ditches and manmade channels, and storm drains.

Construction wastewater must be contained, collected, and removed from the jobsite using sandbag berms, wet/dry vacuums, sump pumps or other equipment and procedures approved by the City.

Excavated material and concrete rubble must not be stockpiled in or near stormwater drainage devices or watercourses. Stockpiled excavation material must be covered during rainstorms. Building materials left on site should be placed on pallets and covered in event of rain. Do not store materials in the street or gutter area.

Vehicle and equipment washing and fueling must not take place at the jobsite.

The Contractor must inspect vehicles and equipment on each day of use. Leaks must be repaired off-site if possible. If necessary to repair on site, the runoff must be contained or the problem vehicle or equipment must be removed from the project site until repaired. If necessary, drip pans should be placed under the vehicle or equipment while not in use to catch and/or contain drips and leaks.

Contractor must have a spill prevention plan and spill cleanup materials readily available. Spills must be cleaned up immediately using dry methods if possible. Spill cleanup material must be properly disposed of. Refer to SC-11 Spill Prevention BMP from the California Stormwater Quality Association (CASQA) Stormwater Best Management Practice BMP Handbook for Municipal Activities, which is located at BMP Handbooks | California Stormwater Quality Association. Contractor must keep a record of any spills.

Specification No. TM-2026-1
A-3
CONTRACT 2026-75
In addition, at the end of the project, the Contractor must certify that all contaminated materials have been properly disposed. Spill cleanup material must be properly disposed.

5. SEQUENCE OF WORK
a. Prior to City Council award, the selected Contractor will be required to submit required insurance documents (including endorsements that meet the Contract requirements), proof of a valid City of Camarillo business tax certificate, signed Contract (digitally signed via Hello Sign), and possess a valid California Class C - 61/D-64 Light Pole Restoration contractor’s license. The City will also accept a valid License C -33 license. To be considered responsive, C -33 bidders must provide three (3) verifiable refer ences for projects of a similar scope that demonstrate experience working with municipal clients and implementing proper traffic control measures. (Similar scope refers to projects where the contractor has experience working in the public right of way perf orming tasks such as refurbishing and painting traffic signal indications and poles, and installing yellow borders) References must include:
-Project owner contact information (name, title, phone, email) -Project description, scope, and completion date
Bids submitted without complete, verifiable references meeting these criteria will be deemed non-responsive and will not be considered for award. b. City Council will award Contract.
c. Contractor will submit payment/performance bonds.
d. City will execute Contract once payment/performance bonds are provided. e. Contractor submits Typical Traffic Control Plans.
f. Contractor obtains a no fee encroachment permit.
g. Contractor submits a work schedule for City approval. h. City issues a Notice to Proceed and start of workdays period begins.

6. JOBSITE CONDITIONS
It will be Contractor’s responsibility to examine the jobsite where the work is to be performed. If any conditions are noted that might affect the execution of the job, those conditions must be brought to the attention of the City Transportation Engineer prior to commencing the work.

7. PROTECTION OF PROPERTY AND IMPROVEMENTS
Contractor shall assume sole and complete responsibility for protection of public and private property in the vicinity of the jobsite. Contractor, at Contractor’s expense, shall repair or replace to original condition all existing improvements within or i n the vicinity of the jobsite which are damaged as a result of Contractor’s operations.

8. TRAFFIC CONTROL
Typical Traffic control plan for any lane closure includes all labor, tools, equipment, transportation and incidentals necessary to maintain and control all vehicular and pedestrian traffic through the construction site.

Specification No. TM-2026-1
A-4
CONTRACT 2026-75
One traffic control plan must be typical for a right lane closure on a multilane arterial roadway with a bike -lane. One traffic control plan must be typical for a left turn lane closure on a multilane arterial roadway.

All such work must conform to the CA MUTCD Latest Edition. Contractor must provide a typical traffic control plan in conformance with the CA MUTCD Latest Edition for any right or left land closures associated with this work.

Traffic Signals may be placed on flash mode during the installation working hours.

Contractor is responsible for maintaining the use of sidewalks and keeping the work area clear of debris.

Any traffic control that impedes the Caltrans right of way will require specific traffic control plans stamped and approved by the State.

All work area traffic control devices, materials and equipment must be in like new condition, as determined by the City Transportation Engineer.

The overall work-site traffic control, warning, and guidance effort shall be continuously monitored by Contractor for its adequacy in detouring traffic around or circulating traffic through the work area. Any deficiencies by Contractor in such monitoring, or correcting inadequate worksite signing, shall be considered just cause for the City Transportation Engineer or his representative to suspend the work.

The compensation for furnishing, placing, maintaining and removing traffic cones, telescoping tree flags, advanced warning signs, flagmen and other safety devices, as required for public safety or as directed by the City Transportation Engineer shall be included in the contract unit price paid for each item in the contract Bid Proposal and no additional compensation will be allowed therefore.

9. NOISE ABATEMENT
A maximum noise level limit of eighty -five (85) decibels at a distance of fifty (50) feet shall apply to all construction equipment on or related to the project whether owned by Contractor or not. The use of excessively loud warning signals shall be avoid ed except in those cases required for the protection of personnel. The use of generators or other mechanical devices between the hours 5:00 p.m. and 8:00 a.m. shall not be permitted unless approved by the City Transportation Engineer.

10. LIQUIDATED DAMAGES
Contractor will have One Hundred Eighty (180) working days to finish the painting of the intersections. The 180 working days will begin upon contractor after receiving the City issued Notice to Proceed. Liquidated damages of $1,500 per calendar day will be assessed for everyday over the contract time limit.

11. MEASUREMENT AND PAYMENT
The cost of all labor, material and equipment necessary to complete the work as described in the contract drawings, Specifications, and Special Provisions, shall be included in the prices for each bid item, either as a lump sum or by final quantities, whatever is indicated. The final payment quantities will be based on the actual amount of materials installed or measured on the job.

No separate payment will be made for work or other features as required in this Services Contract. Full compensation for such work and features shall be considered included

Specification No. TM-2026-1
A-5
CONTRACT 2026-75
in the prices for the items of work in the Bid Proposal, and no additional compensation will be allowed therefore.

12. WARRANTY
a. The labor and materials bond must remain in effect until expiration of six months after the period in which verified claims may be filed as provided in Civil Code section 9356, and the performance bond must be paid up and in effect for one year after the acceptance of the job by City in accordance with the guarantee required by Subsection 10.b, below.
b. Besides warranties and guaranties otherwise required by the Contract Documents, Contractor warrants and guarantees all Work for a period of one (1) year after date of acceptance of the Work by City, unless a longer period is specified, and must repair or replace any or all such Work, together with any other Work, which may be displaced in so doing, that may prove defective in workmanship, materials o r both within one (1) year from date of acceptance without expense whatsoever to City, ordinary wear and tear, unusual abuse or neglect excepted. The Engineer will give notice of observed defects with reasonable promptness. Contractor must notify the Engineer upon completion of repairs.
c. In the event Contractor fails to commence the corrective work within ten (10) days after being notified in writing to do so by the Engineer and prosecute the corrective work to timely completion, City may proceed to have defects corrected and made good at the expense of Contractor who must pay the costs and charges of such corrective work immediately on demand. d. If, in the opinion of the Engineer, defective work creates a condition that requires immediate corrective work, the Engineer will attempt to give the notice required by this Section. If Contractor cannot be contacted or does not comply with City’s request for correction within a reasonable time as determined by the Engineer, City may, notwithstanding the provisions of this Section, proceed to make such corrective work, and Contractor will be liable for costs of such corrective work. Such action by City will not relieve Contractor of the warranties and guaranties provided in this Section or elsewhere in the Contract.

CONTRACT �2026-75
CAM #4844-6202-6590 v1

EXHIBIT B

COMPENSATION
The total compensation under this Contract will not exceed: $219,800.00

(3-2018) Specification No. TM-2026-1
CAM #4844-6202-6590 v1 CONTRACT 2026-75

EXHIBIT C

INSURANCE

1. General Requirements. Contractor must procure and maintain in full force and effect during the term of this Contract the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:

Ty
pe of Insurance Limits
Commercial General Liability $2,000,000 / $4,000,000 (occurrence/aggregate) Business Automobile Liability $1,000,000 combined single Workers’ Compensation Statutory Requirements

2. I
nsurance Rating. All insurance required to be maintained by Contractor must be issued by companies licensed by or admitted to conduct insurance business in the State of California by the California Department of Insurance and must have a rating of A- or better and Financial Size Category Class VII or better by the latest edition of A.M. Best’s Key Rating Guide, unless otherwise approved by City/District’s legal counsel.

3. Commercial General Liability Insurance. The commercial general liability insurance must meet or exceed the requirements of Insurance Services Office (ISO) form CG 00 01, and must be provided on a per occurrence basis for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended.

The insurance must be on an “occurrence” not a “claims made” basis. Defense costs must be paid in addition to limits. There must be no cross-liability exclusion for claims or suits by one insured against another. The insurance must include a waiver of subrogation applicable to the insurance or self -insurance, a primary and non- contributory endorsement, and an additional insured endorsement, all in favor of the City of Camarillo, its officers, employees and agents, and volunteers; blanket endorsements are acceptable.

Any endorsement restricting standard ISO “insured contract” language will not be accepted.

4. B
usiness Automobile Insurance. The business automobile insurance coverage must be at least as broad as ISO Business Auto Coverage form CA 00 01, covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with the services to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount stated above per combined single limit for each accident. Such insurance must include a waiver of subrogation applicable to the insurance or self -insurance, and a primary and non- contributory endorsement, and an additional insured endorsement, all in favor of the City of Camarillo, its officers, employees and agents, and volunteers; blanket endorsements are acceptable.

5. W
orkers’ Compensation. If Contractor has any employees, Contractor must maintain workers’ compensation insurance (statutory limits) and employer’s liability insurance (with limits of at least $1,000,000). Such insurance must include a waiver of subrogation endorsement in favor of the City of Camarillo, its officers, employees, agents, and volunteers; a blanket endorsement is acceptable.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

6. Umbrella or Excess Liability Insurance. If an excess or umbrella liability policy is used to meet minimum limit requirements, the insurance must provide coverage at least as broad as specified for the underlying coverages. Any such coverage provided under an umbrella or excess liability policy must include a “drop-down provision” requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason. Coverage must be provided on a “pay-on-behalf” basis, with defense costs payable in addition to policy limits. There may be no cross-liability exclusion precluding coverage for claims or suits by one insured against another. The policy must “follow form” to the underlying primary policy. Coverage must be applicable to all insureds under the primary policies. The insurance must contain or be endorsed to contain a waiver of subrogation applicable to the insurance or self - insurance, and a primary and non-contributory endorsement for the benefit of City/District.

The scope of coverage provided is subject to approval of City/District following receipt of the required proof of insurance.

7. Contractor’s Limitations and Endorsements. The Contractor’s insurance policies must not include any endorsements or provisions that limit coverage for the following risks:
explosion, collapse, or underground hazards (XCU); products and completed operations; pollution liability; and contractual liability. These coverages must be specifically included without any exclusions, modifications, or restrictions that would limit the scope of protection otherwise afforded by the basic policies. Any endorsement or exclusion that reduces or eliminates coverage for the above-listed risks is unacceptable.

8. Deductibles and Self -Insured Retention. Any deductibles or self -insured retentions applicable to the insurance policies required under this Agreement must be declared to and approved by City/District. In no event may any required insurance policy have a deductible, self-insured retention or other similar policy provision in excess of $50,000 without prior written approval by City/District in its sole discretion. At the option of City/District, either the insurer will reduce or eliminate such deductibles or self -insured retentions with respect to the City/District’s additional insureds or Contractor will procure a bond guaranteeing payment of any losses, damages, expenses, costs or settlements up to the amount of such deductibles or self-insured retentions.

9. Certificates of Insurance and Endorsements; Notice of Termination or Changes to Policies. Prior to commencing any services under this Agreement, Contractor must file with the City/District certificates of insurance and endorsements evidencing the existence of all insurance required by this Agreement, along with such other evidence of insurance or certified copies of policies as may reasonably be required by City/District. These certificates of insurance and endorsements must be in a form approved by the City/District’s legal counsel. Contractor must maintain current certificates and endorsements on file with City/District during the term of this Agreement reflecting the existence of all required insurance. Each of the certificates must expressly provide that no material change in the policy, or termination or cancellation of the required cov erage, will be effective except upon 30 days’ prior written notice to City/District by certified mail, return receipt requested (except for nonpayment for which a 10 -day notice is required).

The delivery to City/District of any certificates of insurance or endorsements that do not comply with the requirements of this Agreement will not waive the City/District’s right to require compliance. In the event that Contractor’s policies are materially changed, Contractor must provide the City/District with at least 30 days’ prior written notice of the applicable changes. City/District reserves the right to require complete, certified copies of all required insurance policies at any time.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

10. Failure to Maintain Required Insurance. If Contractor, for any reason, fails to have in place at all times during the term of this Agreement all of the required insurance coverage, the City/District may, but is not obligated to, obtain such coverage at Contractor’s expense and deduct the cost from the sums due Contractor. Alternatively, City/District may terminate the Agreement.

11. Effect of Coverage. The existence of the required insurance coverage under this Agreement will not be deemed to satisfy or limit Contractor’s indemnity obligations under this Agreement. Contractor acknowledges that the insurance coverage and policy limits set forth in thi s Agreement constitute the minimum coverage and policy limits required.

Should any coverage carried by the Contractor or any subcontractor of any tier have limits of liability that exceed the limits or have broader coverage than required in this Agreement, those higher limits and that broader coverage are deemed to apply for the benefit of any person or organization included as an additional insured and those limits and broader coverage will become the required minimum limits and insurance coverage in all sections of this Agreement. Any insurance proceeds available to City/District in excess of the limits and coverages required by this Agreement, and which is applicable to a given loss, must be made available to City/District to compensate it for such losses.

12. Required Insurance for Subcontractors. Contractor agrees to ensure that any subcontractors providing services under this Agreement provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to review and monitor all such coverage and assumes responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement.

13. Right to Revise Insurance Specifications. City/District reserves the right to change the amounts and types of insurance required by giving Contractor at least 90 days advance written notice of such change. If such change results in substantial additional cost to Contractor, the parties may renegotiate Contractor’s compensation.

14. Timely Notice of Claims. Contractor must give City/District prompt notice of claims made of lawsuits initiated that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability insurance policies.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

EXHIBIT D

ADJUSTMENT FOR NEW TARIFFS OR TARIFF INCREASES

1. ENTITLEMENT TO ADJUSTMENT

1.1 If, after the date of Contractor's solicitation submission, the United States government imposes or increases tariffs that directly and demonstrably affect the unit pricing or availability of materials or equipment required for the Work, and such increases were unavoidable, and not reasonably foreseeable at the time of solicitation submission, Contractor may be entitled to an adjustment to the Contract Sum subject to the conditions and limitations set forth in this provision.

2. LIMITATIONS ON ENTITLEMENT

2.1 Reasonably Foreseeable Increases. Contractor shall not be entitled to any adjustment to the Contract Sum for new tariffs or tariff increases that were reasonably foreseeable at the time of solicitation submission. For purposes of this provision, "new tariffs or tariff increases that were reasonably foreseeable" include, without limitation:
a. Any increase in the applicable tariff or tariffs to a level which was already in effect, plus ten percent (10%), at any point during the past ten years; b. Any new tariff or increase in tariff level that was Already Announced prior to solicitation submission, regardless of whether it had taken effect;
i. “Already Announced” includes, without limitation, the following circumstances:

A. Notice of a pertinent tariff, or tariff level, has been published by the United States International Trade Commission, or other federal agency, as of the solicitation submission date, regardless of whether the effective date of the tariff is prior to the solicitation submission date, or after. Publication includes, without limitation, notices on an agency website, the Harmonized Tariff Schedule, or in the Federal Register.

B. The President of the United States, a member of the President’s cabinet, or one of the President’s advisors, has stated the federal government will adopt a new or increased tariff, including without limitation making such a statement through a speech, interview, order, social media post, or otherwise, regardless of formality.

C. A reputable news organization has reported that the U.S. federal government is expected to adopt the new or increased tariff.

2.2 General Market Conditions.
a. Contractor shall not be entitled to any adjustment to the Contract Sum for changes in unit pricing attributable to market conditions other than new or increased U.S. tariffs, including but not limited to general inflation, supply chain disruptions, labor costs, currency fluctuations, or other market factors, except to the extent covered by the force majeure provision and other provisions in the contract documents.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75 b. New or increased tariffs imposed by foreign governments, and the effects any such new or increased foreign tariffs have on unit pricing or product availability are general market conditions and do not entitle Contractor to an adjustment in the Contract Sum. New or increased tariffs imposed by foreign governments are not an “acts of a public enemy” or “acts of a governmental entity not occasioned by the Contractor’s, subcontractor’s, or supplier’s conduct” and are considered foreseeable under the contract documents.

2.3 Tariff Avoidance; Duty to Mitigate. Upon learning of a new tariff, or tariff increase, Contractor shall make commercially reasonable efforts to avoid the new costs and mitigate any increased costs to City. Contractor shall, without limitation, determine if there are alternate suppliers that can furnish necessary materials or equipment at a lower cost to Contractor, for example, by sourcing materials or equipment from the United States, or a country subject to lower duties than the Contractor’s original intended supplier. If Contractor is able to identify a lower cost supplier through such efforts, Contractor shall procure supplies from that source before seeking an adjustment in the Contract Sum. Any adjustment to the Contract Sum shall be based on actual increased costs incurred by Contractor despite such efforts.

3. PROCEDURE FOR SEEKING ADJUSTMENT

3.1 Notice Requirement. Contractor shall notify City in writing within fourteen (14) calendar days after Contractor becomes aware or should reasonably have become aware of a new tariff or tariff increase that may entitle Contractor to an adjustment to the Contract Sum.

3.2 Documentation Required. Contractor's request for adjustment shall include:
a. Identification of the specific materials or equipment affected; b. Documentation of the original cost of the affected materials or equipment as included in Contractor's solicitation submission;
c. Documentation of the increased cost directly attributable to the tariff increase; d. Documentation demonstrating that the tariff increase was not reasonably foreseeable as defined in Section 2.1;
e. Documentation demonstrating that the increased costs are not attributable to non- tariff market conditions as defined in Section 2.2; and
f. Proposed adjustment to the Contract Sum.

4. AUDIT RIGHTS

4.1 Prior to agreeing to any adjustment to the Contract Sum, City shall have the right to audit Contractor's books and records to verify that all conditions precedent to a price adjustment have been met.

4.2 Contractor shall provide City and City's authorized representatives access to all books, records, documents, and other evidence pertaining to the request for adjustment, including but not limited to:
a. Original purchase orders and supplier quotes;
b. Subsequent purchase orders and supplier quotes showing increased costs;

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75 c. Correspondence with suppliers regarding tariff impacts; d. Documentation of tariff rates in effect at the time of solicitation submission and at the time of purchase; and
e. Any other documentation reasonably requested by City to verify the entitlement to and amount of the requested adjustment.

4.3 Contractor shall maintain all such records for a period of not less than three (3) years after final payment.

5. DETERMINATION OF ADJUSTMENT AMOUNT

5.1 Any adjustment to the Contract Sum shall be limited to the actual increased cost directly attributable to the unforeseeable new tariff or tariff increase, without any additional markup for overhead and profit.

5.2 City reserves the right to reject any request for adjustment that does not meet the requirements of this provision or is not substantiated by sufficient documentation.

5.3 Nothing in this provision shall be construed to relieve Contractor of its obligation to complete the Work within the Contract Time or to entitle Contractor to any time extension due to new tariffs or tariff increases.

(3-2018) Specification No. TM-2026-1
CAM #4844-6202-6590 v1 CONTRACT 2026-75

CERTIFICATE OF CALIFORNIA
CONTRACTOR’S LICENSE
I
certify, under penalty of perjury, that Contractor has a valid California Contractor’s license issued pursuant to Business and Professions Code section 7000 and following:

C
alifornia Contractor’s License:
8112
27 C-61/D64 and C33 8/31/2028
License Number Class Expiration Date
S
treetlight Restoration Specialists Inc.

Brian Moran, President
Da
te Signature
(
Public Contract Code § 6100)
08 / 12 / 2026
(3-2018) Specification No. TM-2026-1
CAM #4844-6202-6590 v1 CONTRACT 2026-75

CERTIFICATE REGARDING DEPARTMENT OF INDUSTRIAL

RELATIONS CONTRACTOR REGISTRATION
I certify, under penalty of perjury, that Contractor is registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

C
ontractor’s Department of Industrial Relations registration number is 2000006741 exp. 6/30/2028.

S
treetlight Restoration Specialist Inc.

Brian Moran, President
Da
te Signature
(
Labor Code section 1725.5)
08 / 12 / 2026

(3-2018) Specification No. TM-2026-1
CAM #4844-6202-6590 v1 C ONTRACT 2026-75

CERTIFICATE REGARDING
WORKERS’ COMPENSATION
Cont
ractor is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self - insurance in accordance with the provisions of that code, and Contractor will comply with such provisions before commencing the performance of the Work of this Contract.

Brian Moran, President
Dat
e Signature
Brian Moran, President
08 / 12 / 2026
(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

BOND NO.

PAYMENT BOND
On __________________________, the City of Camarillo, California, a municipal corporation (“CITY”), awarded a contract (“Contract”) to ____________________________________________________________________________ (“CONTRACTOR” or “PRINCIPAL”), for the work (“Work”) identified as ____________________________________________________________________________.

PRINCIPAL is required to furnish a bond under the Contract to secure the payment of claims of laborers, mechanics, material persons, and other persons as provided by law.

PRINCIPAL and __________________________________________________ ___________________________________, a corporation incorporated under the laws of the State of _______________________________ and licensed by the State of California to execute bonds and undertakings as sole surety (“SURETY”), are held and firmly bound un to CITY in the sum of ___________________________________________________ ______________________________________ dollars ($_________________________), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument.

BOND CONDITIONS

1. PRINCIPAL will construct the Work identified in the Contract. Such performance will be in accordance with the Contract Documents identified in the Contract, which are hereby incorporated and made a part of this bond. CITY has estimated the required amount of the bond as shown above.

2. If PRINCIPAL, its heirs, executors, administrators, successors, assigns or subcontractors fail to pay any of the persons named in California Civil Code section 3181, or any amounts due under the California Unemployment Insurance Code with respect to work or labor performed under the Contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors under Unemployment Insurance Code section 13020, with respect to work or labor performed under the Contract, SURETY will pay for the same in an amount not exceeding the penal sum specified in this bond.

3. This bond inures to the benefit of any of the persons named in Civil Code section 3181 so as to give a right of action to such persons or their assigns in any suit brought upon this bond. In case suit is successfully brought upon this bond, SURETY further agrees to pay all reasonable attorneys’ fees and costs in an amount fixed by the court.

4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the Camarillo Municipal Code.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

5. SURETY agrees that no changes, extensions of time, alteration or modification of the Contract or of the obligations to be performed thereunder will in any way affect its obligation on this bond, and waives notice of any such change, extension of time, alteration or modification of the Contract or of the obligations to be performed.

Furthermore, SURETY expressly waives the provisions of California Civil Code sections 2845 and 2849.

6. This bond consists of this instrument, the Contract and Contract Documents referenced above, and the following two attached exhibits, all of which are incorporated herein by reference:

A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted.

IN WITNESS THEREOF, we have hereunto set our hands and seals this _______ day of ____________________, 20____.

PRINCIPAL
By
Title
Address

Telephone Number

Signature

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75 SURETY
By
Title
Address

Telephone Number

Signature

* ALL SIGNATURES ON THIS PAYMENT BOND MUST BE NOTARIZED USING APPROPRIATE 8½” x 11” NOTARY ACKNOWLEDGEMENT FORM.

** Appropriate modifications will be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

*** Corporations must affix corporate seal.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75 BOND NO.

PERFORMANCE BOND
On _____________________________, the City Council of the City of Camarillo, California, a municipal corporation (“CITY”), awarded a contract (“Contract”) to ____________________________________________________________________________ (“CONTRACTOR” or “PRI NCIPAL”), for the work (“Work”) identified as ____________________________________________________________________________ The Contract and related documents (“Contract Documents”) are incorporated and made a part of this performance bond.

Under the Contract, CONTRACTOR is required to furnish this bond providing for the faithful performance of the Work
NOW, THEREFORE, we, CONTRACTOR, as PRINCIPAL, and
____________________________________________________________________________, a corporation organized and existing under the laws of the State of ________________________ and duly authorized to transact business under the laws of the State of California, as SURETY , are held and firmly bound unto CITY, in the sum of
_______________________________________________________________________dollars ($_________________________), lawful money of the United States of America, this sum being not less than one hundred percent (100%) of the estimated amount payable by CITY under the terms of the Contract , PRINCIPAL and SURETY, bind ourselves and our heirs, executors, administrators, successors and assigns, jointly and severally, by this instrument.

BOND CONDITIONS

1. PRINCIPAL will perform the Work the identified in the Contract. CITY has estimated the required amount of the bond as shown above.

2. PRINCIPAL’s performance of the Work will be done in accordance with the Contract Documents. Should PRINCIPAL fail to satisfactorily complete all required Work within the time allowed, CITY may, at its sole discretion, either (1) cause all required Work to be done and the parties executing this bond will be firmly bound for the payment of all necessary costs for the performance of this Work or (2) make demand upon the SURETY to complete the required Work in which event the SURETY will commence completion of the Work within 30 days of the CITY’S demand unless otherwise agreed in a writing signed by the parties.

3. PRINCIPAL will guarantee the Work against any defective work, labor or materials for a period of one year following the completion and acceptance of the Work by CITY.

4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the Camarillo Municipal Code.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

5. SURETY agrees that no changes, extensions of time, alteration or modification of the Contract or of the obligations to be performed thereunder will in any way affect its obligation on this bond, and waives notice of any such change, extension of time, alteration or modification of the Contract or of the obligations to be performed.

Furthermore, SURETY expressly waives the provisions of California Civil Code sections 2845 and 2849.

6. This bond consists of this instrument, the Contract and Contract Documents referenced above, and the following two attached exhibits, all of which are incorporated herein by reference:

A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted.

7. In case suit is brought upon this bond, the court will award and SURETY must pay, in addition to the face amount of this bond, all costs and reasonable attorney’s fees incurred by CITY in successfully enforcing any obligation under this bond.

IN WITNESS THEREOF, we have hereunto set our hands and seals this _______ day of ____________________, 20____.

PRINCIPAL
By
Title
Address

Telephone Number

Signature

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75 SURETY
By
Title
Address

Telephone Number

Signature

* ALL SIGNATURES ON THIS PERFORMANCE BOND MUST BE NOTARIZED USING APPROPRIATE 8½” x 11” NOTARY ACKNOWLEDGEMENT FORM.

** Appropriate modifications will be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.

*** Corporations must affix corporate seal.

(3-2018) Specification No. TM-2026-1

CAM #4844-6202-6590 v1 CONTRACT 2026-75

LIST OF SUBCONTRACTORS
WORK IDENTIFICATION: TM-2026-1 Camarillo Signal Painting and Yellow Borders Project

NAME AND ADDRESS OF BIDDER: Streetlight Restoration Specialists, Inc. 2828 Cochran Street #360, Simi Valley, CA 93065

Name/Address/Phone No./State
License Number of
Subcontractor/City of Camarillo
Business License Number
Department of
Industrial Relations
Registration Number*

Items of Work
Portion of Work
(% of Contract Price)

% of Total Contract
Price by Subcontract

% of Total Contract
Price by Contractor
*Pursuant to Division 2, Part 7, Chapter 1, (commencing with section 1720 including section 1725.5) of the Labor Code

R.P. BARRICADE 1200 LAWRENCE
DRIVE #150, N.P., CA 91320
1000022430 TRAFFIC

CONTROL
13%+/-

NONE NONE NONE NONE
13% +/-
13% +/-
Streetlight Restoration Specialists - TM-2026-1, City of... 2_-_CC_2026-75_St...n_Specialists.pdf
b7d83be10850b968d00d5e8a2a104b9388323716

MM / DD / YYYY
Signed
08 / 11 / 2026
17:14:19 UTC
Sent for signature to Brian Moran
([email protected]) from
[email protected]
IP: 104.28.24.21
08 / 12 / 2026
15:30:02 UTC
Viewed by Brian Moran ([email protected]) IP: 66.251.240.224
08 / 12 / 2026
15:33:11 UTC
Signed by Brian Moran ([email protected]) IP: 66.251.240.224
The document has been completed.
08 / 12 / 2026
15:33:11 UTC