2022-03-22; City Council; ; Acceptance of Bids and Award of Contract to Palm Engineering Construction Company for the Magnolia Avenue Storm Drain Project - Phase I

Carlsbad City Council
March 22, 2022

Document
2022-03-22; City Council; ; Acceptance of Bids and Award of Contract to Palm Engineering Construction Company for the Magnolia Avenue Storm Drain Project - Phase I
Meeting
March 22, 2022
Body
Carlsbad City Council
Pages
190
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

2.4 COMPLIANCE TESTS

The manufacturer’s production facil ities shall be open for inspection by the owner or his Authorized Representative. The manufacturer’s inspection and testing shall comply with applicable ASTM standards, a list of the inspection certifications and test certifications shall be submitted pri or to the shop drawing submittal for the HDPE pipe itself. The list shall be submitted as a shop drawing. In case of conflict with Manufacturer’s certifications, the Contractor, the Engineer, or the Owner may request retesting by the manufacturer or have retests performed by an outside testing service. All failed retesting shall be paid for by the manufacturer.

PART 3 - EXECUTION

3.1 GENERAL

High Density Polyethylene pipe and fittings shall be handled, assembled and installed in accordance with the a pplicable sections of AWWA C906 for PE 3408, ASTM D 2321, manufacturer’s recommendations and as specified herein.

3.2 EXCAVATION

A. Excavation and backfill, including the pipe bedding, shall conform to the provisions of Section 02223 except as herein modified.

B. Crushed Rock and Gravel shall comply with Section 200-1.2 SSPWC.

C. Pipe Bedding: 3/8" Crushed rock aggregate shall be used for pipe bedding and shall be compacted to obtain a relative density of 95 -percent unless otherwise specified. The thickness of the pipe bedding shall be a minimum of four inches. The pipe bedding shall be placed over the full width of the trench.

D. Backfill Within Pipe Zone: Crushed rock shall be placed and compacted within the pipe zone from the bottom of the pipe to one foot above top of pipe. The crushed rock shall be compacted to obtain a relative density of 95-percent unless otherwise specified.

3.3 PIPE HANDLING

The manufacturer’s written procedures for unloading, inspection and handling of the HDPE pipe shall be adhered to by the Contractor. A copy of these Manufacturer’s written procedures shall be submitted as a shop drawing and included with the shop drawings for the pipe material.

When lifting with slings, only wide fabric choker slings capable of safel y carrying the load, shall be used to lift, move, or lower pipe and fittings. Wire rope or chain shall not be used. Slings shall be of sufficient capacity for the load, and shall be inspected before use. Worn or damaged equipment shall not be used.

3.4 JOINING

Polyethylene pipe and fittings may be joined together or to other materials by means of flanged connections, mechanical couplings designed for joining polyethylene pipe or for joining

Volume 3 Chapter 6

Page 133 of 190 ends

polyethylene pipe to another material or electro fusion, as s hown on the approved plans or as approved by the City Engineer. The installation instructions of the joining device manufacturer shall be strictly followed when joining by other means is performed.

A. Butt Fusion: Sections of polyethylene pipe should be j oined into continuous lengths on the jobsite above ground. The joining method shall be the butt fusion method and shall be performed in strict accordance with the pipe manufacturer’s recommendations. The butt fusion equipment used in the joining procedur es should be capable of meeting all conditions recommended by the pipe manufacturer, including but not limited to, temperature requirements of 400 degrees Fahrenheit, alignment, and an interfacial fusion pressure of 75 PSI. The butt fusion joining will pr oduce a joint weld strength equal to or greater than the tensile strength of the pipe itself. All field welds shall be made with fusion equipment equipped with McElroy Data Logger. Temperature, fusion pressure and a graphic representation of the fusion c ycle shall be part of the quality control records.

Interior bead from butt fusion welds shall be removed.

B. Sidewall Fusion: Sidewall fusions for connections to outlet piping shall be performed in accordance with HDPE pipe and fitting manufacturer’s spe cifications. The heating irons used for sidewall fusion shall have an inside diameter equal to the outside diameter of the HDPE pipe being fused. The size of the heating iron shall be ¼ inch larger than the size of the outlet branch being fused.

C. Mechanical: Bolted joining may be used where the butt fusion method cannot be used.

Flange joining will be accomplished by using HDPE flange adapter with a ductile iron back-up ring. Mechanical joint joining will be accomplished using either a molded mechanical joint adapter or the combination of a Sur -Grip Restrainer and Pipe Stiffener as manufactured by JCM Industries, Inc. Either mechanical joint joining method will have a ductile iron mechanical joint gland.

D. Other: Socket fusion, hot gas fusion, thre ading solvents, and epoxies may not be used to join HDPE pipe.

3.5 PREVENTING FOREIGN MATTER FROM ENTERING THE PIPE

At all times when pipe laying is not in progress, the open end of the pipe shall be closed with a tight-fitting cap or plug to prevent th e entrance of foreign matter into the pipe. These provisions shall apply during the noon hour as well as overnight. In no event shall the pipeline be used as a drain for removing water which has infiltrated into the trench. The Contractor shall maintain the inside of the pipe free from foreign materials and in a clean and sanitary condition until its acceptance by the Engineer.

3.6 DAMAGED PIPE OR FITTINGS

Sections of pipe having been discovered with cuts or gouges in excess of 1/8 -inch thickness shall be cut out and removed. The undamaged portions of the pipe shall be rejoined using the heat fusion joining method.

3.7 TESTING

A. Butt Fusion Testing

On every day butt fusions are made, the first fusion of the day shall be a trial fusion. The trial fusion shall be cooled completely, then fusion test straps shall be cut. The test strap shall be 12 -inch (min.) or 30 times the wall thickness in length with the fusion in the center, and 1-inch (min.) or 1.5 times the wall thickness in width. Bend the test strap until the ends of the strap touch. If the fusion fails at the joint, a new trial fusion shall be made, cooled completely and tested. Butt fusion of the pipe to be installed shall not commence until a trial fusion has passed the bent strap test.

B. Pressure Testing

Volume 3 Chapter 6

Page 134 of 190 ends

All pipelines shall be flushed and tested in accordance with Section 15044 and the applicable provisions of AWWA C600, except as modified herein.

C. Allowable Leakage

There will be no leakage allowed for the butt fused portions of the pipeline.

END OF SECTION

Volume 3 Chapter 6

Page 135 of 190 ends

SECTION 15074 BLOW-OFF ASSEMBLIES

PART 1 GENERAL

1.1 DESCRIPTION

This section includes materials, testing, and installation of blowoff assemblies.

1.2 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Stand ard Specifications 09900, 15000, 15041, 15044, 15056, 15057, 15061, 15064, and 15100

1.3 SERVICE APPLICATION

A. Blowoff assemblies shall be installed on potable and recycled water mains.

B. Blowoff assemblies shall be sized and located as shown on the A pproved Plans. In general, blowoff assemblies will be installed at low points of pipelines as shown below:

1. 2" blowoff assemblies or multiple 2” blowoff assemblies will be required on pipelines 4”, thru 12”.

2. 4" blowoff assemblies will be required on pipeline sizes 12” thru 16".

3. 6" blowoff assembly will be required on pipeline sizes 18" and larger.

1.4 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed for blowoff assemblies in accordance with Section 15000.

PART 2 MATERIALS

2.1 GENERAL

Blowoff assemblies and appurtenant components and materials shall be selected from the Approved Materials List.

2.2 CONCRETE

Concrete thrust or anchor blocks shall be placed as shown on the approved plans in accordance with Section 03000.

2.3 WARNING/IDENTIFICATION TAPE

Warning/Identification tape materials shall be in accordance with Section 15000 and the Approved Materials List.

2.4 FIELD PAINTING AND COATING

Field painting and coating materials shall be in accordance wit h Section 09900 and the Approved Materials List.

Volume 3 Chapter 6

Page 136 of 190 ends

PART 3 EXECUTION

3.1 INSTALLATION

A. Blowoff assemblies shall be installed at locations shown on the Approved Plans or as directed by the District Engineer in accordance with the Standard Drawings.

B. Blowoff assemblies shall be connected to water mains no closer than 24" to a bell, coupling, joint or fitting.

C. Locations of blowoff assembly shall be in accordance with the Standard Drawings.

3.2 CONCRETE

Concrete thrust or anchor blocks shall be placed as shown on the Approved Plans in accordance with Section 03000.

3.3 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed in accordance with Section 15000 and the Standard Drawings.

3.4 DISINFECTION OF BLOWOFF ASSEMBLIES

Blowoff assemblies shall be disinfected in accordance with Section 15041 in conjunction with disinfecting the main to which it is connected. Blowoff assembly valves shall be operated and the assembly shall be flushed to completely disinfect all internal parts.

3.5 HYDROSTATIC TESTING

Blowoff assemblies shall be hydrostatically tested in accordance with Section 15044 in conjunction with hydrostatically testing the pipeline to which it is connected.

END OF SECTION

Volume 3 Chapter 6

Page 137 of 190 ends

SECTION 15092 MISCELLANEOUS COUPLINGS, PIPE AND APPURTENANCES

PART 1 GENERAL

1.1 DESCRIPTION

All valves, couplings, and appurtenances shall conform to requirements of the standard dimensions and pressure classification of the immediately adjacent pipe, valve or appurtenance as specified.

1.2 RELATED WORK DESCRIBED ELSEWHERE

The Contractor shall refer to the following Specification section(s) for additional requirements:

A. Painting and Coating: 09900
B. Petrolatum Wax Tape Coating: 09902

1.3 SUBMITTALS

Contractor shall furnish submittal s in accordance with the requirements of Section 2 -5.3 of the GENERAL PROVISIONS. The following submittals are required:

A. Submit Shop Drawings for all miscellaneous couplings, pipe and appurtenances.

Shop Drawings shall include listing of materials of construction, with ASTM reference and grade, including lining and paint coating intended for use, with lining and coating manufacturers' and paint numbers listed.

1.4 PAYMENT

Payment for the Work in this section shall be included as part of the lump -sum or unit- price bid amount for which such Work is appurtenant thereto.

PART 2 - MATERIALS

2.1 GASKETS, NUTS, AND BOLTS

Gaskets for flanged joints shall be "drop -in" type asbestos composition sheet packing, graphited on both sides, "drop -in" type, conform ing to the requirements of ANSI B16.21 and shall be as manufactured by Crane Co., Garlock or approved equal.

Bolts and studs for aboveground installations shall be cadmium plated and shall conform to ASTM A307, Grade B, "Steel Machine Bolts and Nuts and T ap Holes," when a ring gasket is used and shall conform to either ASTM A261, "Heat -Treated Carbon Steel Bolting Material" or ASTM A193, "Alloy -Steel Bolting Material for High Temperature Service," when a full-face gasket is used. Bolts and nuts shall be h eavy hexagon series.

Nuts shall conform to ASTM A194, "Carbon and Alloy Steel Nuts for Bolts for High Pressure and High Temperature Service" either in Grade 1, 2 or 2H. The fit shall be ANSI B1.1, "Unified Screw Threads," Class 2, except that Class 3 fit shall be used in holes tapped for studs. Threads may be made by either cutting or cold forming. Between

Volume 3 Chapter 6

Page 138 of 190 ends

1/4-inch and 3/8 -inch shall project through the nut when drawn tight. Washers shall be provided for each nut and shall be the same material as each n ut. All buried flanges, including bolts, nuts and washers, shall be encased in wax tape per Section 09902.

All bolt threads shall be lubricated with non -oxide grease. Flanged faces shall be wire brushed and cleaned prior to joining each flange.

2.2 WAX TAPE COATING

Unless otherwise specified on the Plans, all couplings and appurtenances for underground installation shall be encased in wax tape per Section 09902 and the City Standard Drawings.

2.3 PAINTING AND COATING

All miscellaneous couplings, pipe and appurtenances referenced in this section shall be painted and coated, interior and exterior, in accordance with Section 09900, Painting and Coating.

2.4 FLEXIBLE COUPLINGS

Joints for which flexible couplings are required, shall be selected from the Approved Materials list. Gaskets shall be plain rubber gaskets. Threads on bolts of compression collars shall be lubricated with non-oxide grease before assembling the coupling.

2.5 PIPE UNIONS

Screw unions may be employed on pipelines 2-1/2-inches in diameter and smaller. Pipes and fittings made of non -ferrous metals shall be isolated from ferrous metals by nylon insulating pipe bushings, unions or couplings manufactured by Smith-Blair, Pipe Seal and Insulator Co. or approved equal.

PART 3 - EXECUTION (Not Applicable)

END OF SECTION

Volume 3 Chapter 6

Page 139 of 190 ends

SECTION 15099 PROCESS VALVES, REGULATORS AND MISCELLANEOUS VALVES

PART 1 GENERAL

1.1 DESCRIPTION

This section includes materials, testing and installation of manually operated process valves such as check valve s, pressure control valves, pressure reducing valves and ball valves.

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for.

American Water Works Association
AWWA C508 Standards for Swing Check Valve
ASTM B62 Standards for Ball Vales

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Specification Sections 09900, 15000, 15041, 15044, 15057, 15074, 15108, and 15112

1.4 SERVICE APPLICATIONS

Check valves, pressure control valves, pressure reducing valves, bronze gate valves and ball valves are primarily used in the installat ion of potable and recycled water main appurtenances and where called for on the Approved Plans and indicated on the Standard Drawings.

1.5 SUBMITTALS

The following items shall be submitted to the City for review and approval prior to ordering or delivery of valves per Section 2-5.3 of the GENERAL PROVISIONS.

A. The valve manufacturers catalog data showing the size to be used, valve dimensions, pressure rating and materials of construction.

B. Manufacturers catalog data and proof of NSF certification on the lining materials to be used.

C. Installation procedures including field adjustments as required.

Volume 3 Chapter 6

Page 140 of 190 ends

1.6 SIZING OF VALVES

Valves shall be the same size as the appurtenance in which they are to be installed with unless otherwise called for on the Approved Plans or indicated on the Standard Drawings.

1.7 VALVE ENDS

Valve ends shall be compatible with the piping system or appurtenance in which they are to be installed or as called for on the Approved Plans or indicated on the Standard Drawings.

1.8 DELIVERY, STORAGE AND HANDLING

Valves shall be delivered and stored in accordance with the manufacturer's recommendations. Valves shall remain in factory packaging until ready for installation.

Valves shall not be stored in contact with bare ground.

1.9 POLYETHYLENE WRAP

Polyethylene wrap shall be used for the buried installation of valves in accordance with Section 15000.

1.10 GATE WELLS AND EXTENSION STEMS

Valve boxes and extension stems shall be installed in accordance with Section 15000 and the Standard Drawings.

PART 2 MATERIALS

2.1 RUBBER-FLAPPER SWING CHECK VALVE

A. Swing check valves and appurtenant components shall be in accordance with AWWA C508 and selected from the Approved Materials List. A submittal will be required as described in this Section.

B. Rubber-flapper swing check valves shall have a heavily constructed ductile -iron body and cover. The body shall be long pattern design (not wafer), with integrally cast-on end flanges. The flapper shall be Buna-N having an "O" ring seating edge and be internally reinforced with steel.

C. Flapper shall be captured between the body and the body cover in a manner to permit the flapper to flex from closed to full open position during flow through the valve. Flapper shall be easily remove d without need to remove valve from line.

Check valves shall have full pipe size flow area. Seating surface shall be on a 45º angle requiring the flapper to travel only 35º from closed to full open position, for minimum head loss and non-slam closure.

Volume 3 Chapter 6

Page 141 of 190 ends

D. Buna-N flapper shall be high -strength coated fabric, coated both sides with 70 DURO, which creates an elastic spring effect, molded internally, to assist the flapper to close against a slight head to prevent slamming. When essential to create backflow th rough the check valve, as directed by the City Engineer, an external backflow device shall be furnished.

E. Valve ends shall be flanged ductile -iron in accordance with Section 15056 unless otherwise called for on the Approved Plans or directed by the City Engineer.

F. Check valves shall be tested by the manufacturer and the test results shall be approved by the City Engineer prior to shipment to the project. Check valves must unseat at a head no greater than 24".

2.2 SMALL DIAMETER ISOLATING VALVES

Provide all small diameter valves and cocks for shut -off process connections, instrumentation and other miscellaneous uses in accordance with the Approved Plans.

These valves shall be of the same material and pressure rating as the adjacent process piping. Shutoff valves shall be compatible with instrumentation and other equipment in accordance with the manufacturer's recommendations.

2.3 CORPORATION STOPS

Corporation stops shall be in the ball type with a bronze body and T-Head operator. Valve ends shall be compatible with the piping system in which they are being installed or as called for on the Approved Plans or indicated on the Standard Drawings. Corporation stops shall be rated for a minimum pressure of 1,379 KPa (200 psi). Corporation stops shall be selected from the Approved Materials List.

2.4 ANGLE METER STOPS

Angle meter stops shall be the ball type with a bronze body and 90º lock wing.

Valve ends shall be flare style inlet and swivel meter nut for 1" and meter flange for 2" outlets. Angle meter stops shall be rated for a minimum pressure of 1,379 KPa (200 psi).

Angle meter stops shall be selected from the Approved Materials List.

2.5 CUSTOMER METER SHUT-OFF VALVE

Customer meter shut-off valves shall be the ball type with a bronze body and lever handle operator. Valve ends shall be swivel meter nut for 1" inlets and meter flange for 2" inlets.

Customer meter shut -off valves shall be rated for a minimum pressure of 200 psi. The City Engineer may require the use of a customer meter shut-off valve equipped with a 90º lock wing.

Volume 3 Chapter 6

Page 142 of 190 ends

2.6 BALL VALVES

Ball valves 2" and smaller shall be of bronze construction conforming to ASTM B62 and equipped with a T -Head or lever handle operator as required. Valve ends shall be compatible with the piping system in which they are being installed or as indicated on the Approved Plans or Standard Drawings. Ball valves shall be rated for a minimum pressure of 1,379 KPa (200 psi). Ball valves shall be selected from the Approved Materials List.

2.7 BACKFLOW PREVENTERS

Backflow preventers shall be in accordance with Section 15112 and selected from the Approved Materials List.

2.8 POLYTHYLENE WRAP

Polyethylene wrap shall be in accordance with Section 15000 and selected from the Approved Materials List.

2.9 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be in accordance with Section 15000 and selected from the Approved Materials List.

PART 3 EXECUTION

3.1 INSTALLATION

A. Valves shall be set in true alignment straddling th e centerline of pipe with the valve operator in the vertical position unless otherwise noted on the Approved Plans or shown on the Standard Drawings.

B. Valves shall be installed in accordance with the manufacturer's recommendations and the applicable se ction of these specifications for the piping material and joint type being used.

C. Aboveground valves shall be rigidly held in place using supports and hangers in accordance with the Approved Plans and Standard Drawings. The stem orientation of valves in elevated piping shall be as approved by the City Engineer for accessibility, except that no valves shall be installed with stems aligned below horizontal. Saddle type valve supports shall be provided. Supports shall be of rugged construction providing at least one hundred twenty degrees (120º) under support for the valve body. Valve supports shall be constructed of steel, and shall be anchored to the foundations using stainless steel anchor bolts.

Volume 3 Chapter 6

Page 143 of 190 ends

3.2 POLYETHYLENE WRAP

Installation of polyethylene wra p for buried valves shall be in accordance with Section 15000.

3.3 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be in accordance with Section 15000 and the Standard Drawings.

3.4 DISINFECTION OF THE VALVES

Disinfection and flushing shall be in accordance with Section 15041, as part of the progress of disinfecting the main pipeline. The valves shall be operated during the disinfection period to completely disinfect all internal parts.

3.5 HYDROSTATIC TESTING

Valves shall be hydrostatically tested in conjunction with the pipelines in which they are installed in accordance with Section 15044.

END OF SECTION

Volume 3 Chapter 6

Page 144 of 190 ends

Volume 3 Chapter 6

Page 145 of 190 ends

SECTION 15100 RESILIENT WEDGE GATE VALVES (RWGV's)

PART 1 GENERAL

1.1 DESCRIPTION

This section i ncludes materials, testing, and installation of manually operated resilient wedge gate valves (RWGV's).

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for.

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 15000, 15041, 15044, 15056, 15057, 15061, 150 64, 15074, 15108 and 15112

1.4 SERVICE APPLICATION

A. Resilient wedge gate valves (RWGV's) shall be installed on potable and recycled water mains and appurtenances in accordance with the Approved Plans and the Standard Drawings.

B. Resilient wedge gat e valves shall be used for open/closed operations, throttling service and frequent operation after long periods of no actuation.

C. In general, resilient wedge gate valves shall be used when valves are required on pipelines and appurtenances 4" through 16".

D. Valves for pipelines sized 18" and larger generally require the use of butterfly valves (BFV) in accordance with Section 15102.

E. All valves shall be of at least the same pressure class as the adjoined pipe.

1.5 SUBMITTALS

The following items shall be submitted for review and approval per Section 2 -5.3, prior to ordering or delivery of resilient wedge gate valves.

A. An affidavit from the valve manufacturer stating that valves have successfully passed hydrostatic tests in accordance with AWWA C509 and manufacturer's own coatings tests.

B. The valve manufacturer's catalog data showing the size to be used, valve dimensions, pressure rating and materials of construction.

C. Manufacturer's catalog data and proof of NSF certification for the l ining materials to be used.

Volume 3 Chapter 6

Page 146 of 190 ends

1.6 SIZING OF VALVES

Valves shall be the same size as the line in which they are installed unless otherwise noted on the Approved Plans.

1.7 VALVE ENDS

Valve ends shall be compatible with the piping system in which they are being installed in accordance with the Approved Plans or directed by the City Engineer.

Ductile-iron flanges shall be in accordance with Section 15056.

1.8 VALVE TESTING

Resilient wedge gate valves shall be hydrostatically tested and valve coatings shall be holiday detected prior to shipment to the field in accordance with the testing procedures shown in Appendix A. Valves delivered to the site prior to successful hydrostatic testing and holiday detection shall be subject to rejection.

1.9 DELIVERY, STORAGE AND HANDLING

Valves shall be delivered and stored in accordance with AWWA C550. The port openings shall be covered with plastic, cardboard or wood while in transit and during storage in the field. These covers shall remain in place until valves are ready to be installed. Valves shall not be stored in contact with bare ground. Valves shall not be stacked.

1.10 CORROSION PROTECTION

Buried Valves: All bolted connections and bolted valve components (bonnets, flanges, etc.) shall be coated with Wa x Tape in accordance with Section 09902 and the entire valve encased in polyethylene in accordance with Section 15000.

PART 2 MATERIALS

2.1 RESILIENT WEDGE GATE VALVES (RWGV's)

A. Resilient wedge gate valves and appurtenant components and materials sh all be selected from the Approved Materials List.

B. RWGV's shall be ductile -iron in accordance with AWWA C509 and C515 except as modified herein.

C. Each valve shall have a smooth unobstructed waterway free from any sediment pockets.

D. All RWGV's shall be leak-tight at their rated pressure.

E. RWGV's shall have a non -rising low-zinc bronze or stainless steel stem, opened by turning left (counterclockwise).

F. Stem seals shall be the O -ring type incorporating a minimum of two rings as required by AWWA C509.

Volume 3 Chapter 6

Page 147 of 190 ends

G. Low-friction torque-reduction thrust washers or bearings shall be provided on the stem collar.

H. Wedge (gate) shall be fully encapsulated with a bonded -in-place Nitrile elastomer covering. Minimum thickness of the rubber seating area shall be 1/4".

I. Valves for buried applications shall be provided with a 2" square operating nut, and valves located above ground or in structures shall be equipped with a hand wheel in accordance with AWWA C509 unless otherwise indicated on the Approved Plans.

J. RWGV interior and exterior surfaces (except for the encapsulated disc) shall be coated as described below.

K. All bolts and nuts used in the construction of RWGV's shall be Type 316 stainless steel.

2.2 EPOXY LINING AND COATING

Epoxy linings and coatings for valves shall be provided in accordance with AWWA C210, C213, and C550, with the following modifications:

A. Epoxy lining and coating of valve surfaces shall be performed by the manufacturer in a facility with qualified personnel, where the environment can be controlled.

Epoxy lining and coating of valves in the field is prohibited.

B. Repairs made to manufactures applied coatings shall be performed in a facility with qualified personnel, where the environment can be controlled. The fa cility shall be approved by the valve manufacturer.

C. Surface preparation shall be as detailed in SSPC -SP5, White -Metal Blast Cleaning.

D. Liquid epoxy lining and coating materials shall be listed in the NSF Listing for Drinking Water Additives, Stand ard 61, certified for use in contact with potable water.

E. The minimum dry film thickness for epoxy linings shall be 0.008". Liquid epoxy lining shall be applied in two (2) coats in accordance AWWA C210.

F. Powder epoxy coating materials shall contain one hundred percent (100%) solids, in accordance with AWWA C213.

Volume 3 Chapter 6

Page 148 of 190 ends

2.3 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be in accordance with Section 15000 and selected from the Approved Materials List.

2.4 CONCRETE

Concrete used for anchor or thrust blocks shall be Class 560 -C-3250 as specified in section 03000.

2.5 WAX TAPE COATING

Wax Tape shall be in accordance with Section 09902 and selected from the Approved Materials List.

2.6 POLYETHYLENE ENCASEMENT

Polyethylene encasement shall be in accordance with Section 15000 and selected from the Approved Materials List.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install valves with the bolt holes straddling the vertical centerline of pipe and the operating nut in the vertical position unless otherwise noted on the Approved Plans.

B. Valves shall be installed in accordance with the manufacturer's recommendations and the applicable section of these specifications for the piping material and joint type being used.

C. Joints shall be cleaned and installed in accordance with Section 15056.

3.2 CORROSION PROTECTION

Buried Valves: All bolted connections and bolted valve components (bonnets, flanges, etc.) shall be coated with Wax Tape in accordance with Section 09 902 and the entire valve encased in polyethylene in accordance with Section 15000.

Exposed Valves: The exterior of valves installed above ground or exposed in vaults or enclosures shall be field painted in accordance with Section 09900.

3.3 CONCRETE

Concrete thrust, anchor, and support blocks shall be installed in accordance the Standard Drawings. The concrete shall be placed so that valves and valve operators will be accessible for repairs or replacement.

Volume 3 Chapter 6

Page 149 of 190 ends

3.4 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be installed in accordance with Section 15000 and the Standard Drawings.

3.5 DISINFECTION OF VALVES

Disinfection and flushing of valves shall be in accordance with Section 15041, as part of the process of d isinfecting the main pipeline. The valves shall be operated during the disinfection period to completely disinfect all internal parts.

3.6 HYDROSTATIC TESTING

Valves shall be hydrostatically tested in conjunction with the pipeline in which they are installed in accordance with Section 15044.

END OF SECTION

Volume 3 Chapter 6

Page 150 of 190 ends

Volume 3 Chapter 6

Page 151 of 190 ends

SECTION 15102 BUTTERFLY VALVES (BFV's)

PART 1 GENERAL

1.1 DESCRIPTION

This section includes materials, testing, and installation of manually operated butterfly valves (BFV).

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. References shall be made to the latest edition of said standards unless otherwise called for.

American Water Works Association (AWWA)
C504 Standards for Rubber–Seated Butterfly Valves

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 09900, 15000, 15041, 15044, 15056, 15061 and 15064

1.4 SERVICE APPLICATION

A. Butterfly valves (BFV) shall be installed on potable and recycled water mains and appurtenances where shown on the Approved Plans and in accordance with the Standard Drawings.

B. Butterfly valves shall be used for open/closed operations and th rottling service and frequent operation after long periods of inactivity.

C. In general, butterfly valves shall be used when valves are required on pipelines 18" and larger and where the use of a motor -operated valve is required as shown on the Approved Plans. Butterfly valves smaller than 18" shall only be used as indicated on the Approved Plans or with the prior approval of the City Engineer.

D. Valves for pipelines sized 16" and smaller generally require resilient wedge gate valves (RWGV's) in accordance with Section 15100.

E. All valves shall be of at least the same pressure class as the adjoined pipe.

1.5 SUBMITTALS

A. Submittals are required per Section 2 -5.3 including an affidavit from the valve manufacturer showing the following:

1. Actuators used were furnished and installed by the valve manufacturer.

2. Valves have successfully passed hydrostatic testing per AWWA C504 and coatings testing by the valve manufacturer.

Volume 3 Chapter 6

Page 152 of 190 ends

B. The valve manufacturer's catalog data showing the size to be used, valve dimensions, pressure rating and materials of construction.

C. Actuator manufacturer's catalog data and detail construction sheets showing the dimensions, materials, number of turns, and required torque input of the actuator to be used.

D. Manufacturer's catalog data and proof of NSF certification on the lining materials to be used.

1.6 SIZING OF VALVES

Valves shall be the same size as the line in which they are installed unless otherwise shown on the Approved Plans.

1.7 VALVE ENDS

Valve end s shall be flanged ductile -iron unless otherwise called for on the Approved Plans or as directed by the City Engineer.

Ductile-iron flanges shall generally be in accordance with AWWA C115, rated at a working pressure of 1,724 KPa (250 psi). When Class 25 0 butterfly valves are shown on the Approved Plans or are otherwise required, ductile -iron flanges shall be compatible with AWWA C207, Class "F".

Maximum working pressure of the flange shall be as specified in AWWA or ASME/ANSI.

Flanges shall be integrally cast per AWWA C110.

1.8 VALVE TESTING

Butterfly valves shall be hydrostatically tested and coatings holiday detected prior to shipment to the field. Valves delivered to the site prior to successful hydrostatic testing and holiday detection will be subject to rejection.

1.9 DELIVERY, STORAGE AND HANDLING

Valves shall be delivered and stored in accord with AWWA C504 and AWWA C550.

The port openings shall be covered with plastic, cardboard or wood while in transit and during storage in the field. Thes e covers shall remain in place until the valve is ready to be installed. Valves shall not be stored in contact with bare ground. Valves shall not be stacked.

1.10 CORROSION PROTECTION

Buried Valves: All bolted connections and bolted valve components sh all be coated with Wax Tape in accordance with Section 09902 and the entire valve encased in polyethylene in accordance with Section 15000.

Volume 3 Chapter 6

Page 153 of 190 ends

PART 2 MATERIALS

2.1 BUTTERFLY VALVES (BFV)

A. Butterfly valves and appurtenant components and materials shall be selected from the Approved Materials List.

B. Butterfly valves shall be short body, leak -tight closing, and rubber -seated in accordance with AWWA C504 except as modified herein.

C. Except as modified below, BFV's shall be Class 150B in accordance with AWWA C504, rated for a flow velocity of 16 ft/s.

D. Where the static pressure of the pipeline in which the BFV is to be installed exceeds 1.03 Pa (150psi), a Class 250B butterfly valve in general conformance with AWWA C504 shall be required. Class 2 50B butterfly valves shall be submitted to the Engineer for approval prior to ordering or delivery.

E. Butterfly valves shall open by turning left (counterclockwise). Valve disc shall rotate ninety degrees (90º) from the full open position to the tight shut position.

F. Butterfly valve interior and exterior surfaces shall be coated as described below.

2.2 MANUAL VALVE ACTUATORS

A. General:

1. All valve actuators shall be watertight, designed for buried or submerged uses. Actuators shall be fully ga sketed, sealed, and factory packed with grease.

2. As directed by the City Engineer, actuators for valves located above ground or in vaults and structures may have hand wheels or chain wheels.

Minimum hand wheel diameter shall be 12"). The actuator shall be equipped with a dial indicator, which shows the position of the valve disc.

The City Engineer may require the use of 2" square operating nuts in some cases.

3. Actuators for valves shall be provided with a 2" square-operating nut when buried or when indicated on the Approved Plans.

4. Actuators shall have travel stops, which can be adjusted in the field without having to remove the actuator from the valve.

5. Actuators shall be sized for opening and closing the valve at the valve's full rated working pressure and at a flow velocity of 16 ft/s.

6. Actuators shall accept a minimum of 300 foot -pounds of input torque at the full open and full closed positions without damage to the actuator or the valve.

Volume 3 Chapter 6

Page 154 of 190 ends

7. Actuators equipped with 2" operator nuts s hall require a maximum input torque of 150 foot -pounds to operate the valve. A maximum input torque of 80 foot-pounds shall be required to operate valves with hand wheels.

8. Actuators shall be of the same manufacturer as the valve where possible or as directed by the City Engineer.

9. Actuators shall be installed, adjusted, tested and certified by the valve manufacturer prior to shipping.

10. Actuators shall require a maximum of one hundred (100) input turns for the complete ninety-degree (90º) movement of the disc.

11. Actuators shall receive an epoxy coating on the exterior surface as described below.

B. Traveling Nut Actuators:

1. Actuators for butterfly valve sizes 18" through 24" may be the manual traveling nut type. Traveling nut actuator s shall not be used on valves requiring motor driven actuators or where the City has specified a worm gear type actuator.

2. Actuators shall be capable of producing the below listed output torque at the closed position:

Valve Size in mm (inches) Output Torque Nm (foot-pounds) 450 (18") 3729 (2750)
500 (20") 3729 (2750)
600 (24") 6372 (4700)

C. Worm Gear Type Actuators:

1. Actuators for butterfly valve 30" or larger shall be the worm gear type. In addition, worm gear type actuator s shall be used on butterfly valves requiring motor driven actuators or where the City has specified a worm gear actuator.

2. Worm gear actuators shall be totally enclosed and self-locking.

2.3 EPOXY LINING AND COATING

Epoxy linings and coatings for valves and actuators shall be provided in accordance with AWWA C210, C213 and C550, with the following modifications:

A. Epoxy lining and coating of valve surfaces shall be performed by the manufacturer in a facility with qualified personnel, where the e nvironment can be controlled.

Epoxy lining and coating of valves in the field is prohibited.

B. Repairs made to shop -applied coatings shall be performed in a facility with qualified personnel, where the environment can be controlled. The facility shall b e one that is approved by the valve manufacturer.

Volume 3 Chapter 6

Page 155 of 190 ends

C. Surface preparation shall be as detailed in SSPC -SP5 White Metal Blast Cleaning.

D. Liquid epoxy lining and coating materials shall be listed in the NSF Listing for Drinking Water Additives, Standard 61, certified for use in contact with potable water.

E. The minimum dry film thickness for epoxy linings shall be 0.008". Liquid epoxy lining shall be applied in two (2) coats in accordance with AWWA C210.

F. Powder epoxy coating materials shall contain one hundred percent (100%) solids, in accordance with AWWA 213.

2.4 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be in accordance with Section 15000 and the Approved Materials List.

2.5 CONCRETE

Concrete us ed for anchor or thrust blocks shall be Class 560 -C-3250 as specified in section 03000.

2.6 WAX TAPE COATING

Wax Tape shall be provided in accordance with Section 09902 and the Approved Materials List.

2.7 POLYETHYLENE ENCASEMENT

Polyethylene encasem ent shall be provided in accordance with Section 15000 and selected from the Approved Materials List.

PART 3 EXECUTION

3.1 INSTALLATION

A. Install valves with the bolt holes straddling the vertical and horizontal centerlines of pipe, with the operatin g nut in the vertical position, unless otherwise noted on the Approved Plans.

B. Valves shall be installed per the manufacturer's recommendation in accordance with the applicable specification for the piping material and joint type being used for the valve and the water main.

C. Joints shall be cleaned and installed in accordance with Section 15056.

3.2 FLANGE INSULATING KITS

Flange insulating kits shall be installed where shown on the Approved Plans in accordance with Standard Drawing.

Volume 3 Chapter 6

Page 156 of 190 ends

3.3 CORROSION PROTECTION

Buried Valves: All bolted connections and bolted valve components shall be coated with Wax Tape in accordance with Section 09902 and the entire valve encased in polyethylene in accordance with Section 15000.

Exposed Valves: The exterior of valves installed above ground or exposed in vaults or enclosures shall be field painted in accordance with Section 09900.

3.4 CONCRETE

Concrete thrust, anchor, and support blocks shall be installed as called for in the Standard Drawings. The concrete sh all be placed so that valves and valve operators will be accessible for repairs or replacement.

3.5 GATE WELLS AND EXTENSION STEMS

Gate wells and extension stems for buried valves shall be installed in accordance with Section 15000 and the Standard Drawings.

3.6 DISINFECTION OF THE VALVES

Disinfection and flushing shall be performed in accordance with Section 15041, as part of the process of disinfecting the main pipeline. The valves shall be operated during the disinfection period to completely disinfect all internal parts.

3.7 HYDROSTATIC TESTING

Valves shall be hydrostatically tested in conjunction with the pipeline in which it is connected in accordance with Section 15044.

END OF SECTION

Volume 3 Chapter 6

Page 157 of 190 ends

SECTION 15108 AIR RELEASE VALVE, AIR AND VACUUM VALVE, AND

COMBINATION AIR VALVE ASSEMBLIES

PART 1 GENERAL

1.1 DESCRIPTION

This section includes the materials and installation instructions for above ground air release valve, air and vacuum valve, and combination air valve assemblies.

The term "air valv e" is used generically in this specification to refer to requirements common to all of the specified air release valves, air and vacuum valves, and combination air valves. Otherwise, the various types of air valves are addressed by the individual designations commonly used in AWWA and industry standards.

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shall be made to th e latest edition of said standards unless otherwise called for.

American Water Works Association (AWWA)
C512 Standards for Combination Air Valve Assemblies

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 0990 0, 15000, 15041, 15044, 15056, 15057, 15061, 15064, 15100, 16640

1.4 SERVICE APPLICATION

A. Combination air valves are generally installed on all potable and recycled water mains at high points and where shown on the Approved Plans and in accordance with the Standard Drawings.

B. Unless otherwise directed by the City Engineer, combination air valves will be required as indicated below:

1. 2" combination air valve assemblies shall be installed on pipeline sizes 6" and 8".

2. 2" combination air valve assemblies shall be installed on pipeline sizes 10" and 12".

3. Multiple 2” and 4" combination air valve assemblies shall be installed on pipeline sizes 16" and 20".

4. 6" combination air valve assemblies shall be installed on pipeline sizes 24" through 36".

C. Air release valves and air and vacuum valves shall be installed in accordance with the Approved Plans or as directed by the City Engineer.

Volume 3 Chapter 6

Page 158 of 190 ends

1.5 DELIVERY, STORAGE, AND HANDLING

Valves shall be delivered and stored in accordance with AWWA C550. The port openings shall be covered with plastic, cardboard, or wood while in transit and during storage in the field. These covers shall remain in place until the valve is ready to be installed. Valves shall not be stored in contact with bare ground. Valves shall not be stacked.

1.6 RECYCLED WATER IDENTIFICATION

Air valve assemblies and enclosures used for recycled water shall be identified with purple-colored coating, identification labels or signs in accordance with Section 1500.

1.7 WARNING/IDENTIFICATION TAPE

Warning/Identification tape shall be installed for air valve assemblies in accordance with Section 15000.

PART 2 MATERIALS

2.1 COMBINATION AIR VALVES

A. Combination air valves and appurtenant components and materials suitable for the system pressure shall be selected from the Approved Materials List.

B. Combination air valves shall comply with AWWA C512 except as modified herein.

C. 2" combination air valves shall be the single -body type incorporating stainless steel internal com ponents and National Pipe Threaded (NPT) inlet and outlet configurations.

D. 4" and 6" Combination Air Valves shall be the single -body type. Valves shall incorporate stainless steel internal components, protective hood and flanged inlet.

E. Internal pr otective epoxy coatings shall be provided in accordance with AWWA C550.

1. Liquid epoxy lining and coating materials shall be listed in the NSF Listing for Drinking Water Additives, Standard 61, certified for use in contact with potable water.

2. The minimum dry film thickness for epoxy linings shall be 0.008". Liquid epoxy lining shall be applied in two (2) coats in accordance with AWWA C210.

Volume 3 Chapter 6

Page 159 of 190 ends

2.3 ENCLOSURES

Air Valve Enclosures shall be selected from the Approved Materials List.

2.4 CONCRETE

Concrete used for anchor or thrust blocks and equipment pads shall be in accordance with Section 03000.

2.5 BREAK-AWAY BOLTS

Combination air valves, air release valves and air and vacuum valves located above ground sized 4" and larger shall be installed with break-away bolts in accordance with the Standard Drawings and selected from the Approved Materials List.

2.6 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be in accordance with Section 15000 and selected from the Approved Materials List.

2.7 FIELD PAINTING AND COATING

Field painting and coating materials shall be in accordance with Section 09900 and selected from the Approved Materials List.

PART 3 EXECUTION

3.1 INSTALLATION

A. Air valve assemblies shall be provided as shown on the Approved Plans.

Additional air valve assemblies may be required in areas of potential air entrapment, at the discretion of the City Engineer.

B. Air valve assemblies shall be installed relative to street improvements in accordance with the Standard Drawings.

C. Connections for the air valve assemblies shall be made within a section of the main line no closer than 24" to a bell, coupling, joint or fitting.

3.2 CONCRETE

Concrete thrust or anchor blocks and equipment pads shall be installed in ac cordance with the Standard Drawings.

3.3 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed in accordance with Section 15000 and the Standard Drawings.

3.4 DISINFECTION

Volume 3 Chapter 6

Page 160 of 190 ends

Air valve assemblies shall be disinfected in accordance with Section 15041 in conjunction with disinfecting the main to which it is connected. The assembly valves shall be operated and the assembly flushed to completely disinfect all internal parts.

3.5 HYDROSTATIC TESTING

Air valve assemblies shall be hydro statically tested in accordance with Section 15044 in conjunction with the pipeline to which they are connected.

3.6 FIELD PAINTING AND COATINGS

A. Field repairs to the enclosure shall not be permitted. Enclosures requiring repairs to the coating shall be returned to the supplier or coating vendor for repairs or recoating.

END OF SECTION

Volume 3 Chapter 6

Page 161 of 190 ends

SECTION 15112 BACKFLOW PREVENTERS

PART 1 GENERAL

1.01 DESCRIPTION

This section includes materials, installation, and testing of reduced -pressure backflow prevention devices and check valve and double check valve assemblies.

1.02 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. Reference shal l be made to the latest edition of said standards unless otherwise called for.

State of California Department of Health Services Division of Drinking Water and Environmental Management, Approved Backflow Prevention Assemblies for Service Isolation.

1.3 RELATED WORK SPECIFIED ELSEWHERE

Agencies of Jurisdiction Rules and regulations regarding "Cross Connection Control and Backflow Prevention"
CMWD Standard Drawings
CMWD Standard Specifications 09900, 15000, 15041, 15044, 15056, 15057, 15061, 15064 and 15100

1.4 SERVICE APPLICATION

A. Reduced-pressure backflow prevention assemblies shall be provided on all commercial, industrial irrigation and multi-family water services.

B. Reduced-pressure backflow prevention assemblies shall be provided on all irrigation services by potable and recycled water.

C. Reduced-pressure backflow prevention assemblies shall be provided on potable water services where recycled water, well water or any other water supply is served to the same property.

D. Reduce pressure backflow preventers assemblies shall be provided at all points of connections to City sources at construction sites.

E. Double check detector assemblies shall be provided on all fire services.

F. The City shall be the final authority as to the loca tion, installation, and type of backflow prevention device required.

Volume 3 Chapter 6

Page 162 of 190 ends

1.5 GENERAL DESIGN CONSIDERATIONS

A. The Design and construction of the backflow prevention assembly shall meet the requirements called for in this specification except that any modif ications specifically shown on the Approved Plans shall take precedence over these general standards.

B. The nominal size of the backflow prevention device shall be equal to or greater than the size of the purchased meter. For example, a 1" meter shall h ave a 1" or larger backflow device.

C. The assembly shall include same size valves located on either side of the backflow prevention assemblies. Four test cocks shall be appropriately located on the assembly for testing and certification.

D. The nominal size of double check detector assemblies shall be as shown on the Approved Plans or as directed by the Fire Department.

E. Enclosures and concrete slabs shall be provided only as shown on the Approved Plans.

1.6 DELIVERY, STORAGE AND HANDLING

Backflow prevention assemblies shall be delivered and stored in accordance with AWWA C210, AWWA C213, and AWWA C550. The port openings shall be covered with plastic, cardboard, or wood while in transit and during storage in the field. These covers shall remain in place until the backflow assembly is ready to be installed. Backflow assemblies shall not be stored in contact with bare ground. Backflow assemblies shall not be stacked.

1.7 RECYCLED WATER IDENTIFICATION

Backflow prevention assemblies and enclosures for recycled water shall be identified with purple-colored coating, identification labels, or signs in accordance with Section 15000.

1.8 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed for backflow prevention assemblies in accordance with Section 15000.

PART 2 MATERIALS

2.1 BACKFLOW PREVENTION ASSEMBLIES

Backflow prevention assemblies shall be among those listed on the list of "Approved Backflow Prevention Assemblies for Service Isolation" as issued by the State of California Department of Health Services, Division of Drinking Water and Environmental Management.

2.2 CONCRETE

Volume 3 Chapter 6

Page 163 of 190 ends

Concrete used for slabs and anchor or thrust blocks shall be in accordance with Section 03000.

2.3 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be in accordance with Section 15000 and the Approved Materials List.

PART 3 EXECUTION

3.1 INSTALLATION

A. Installation shall comply with the latest edition of the Uniform Plumbing Code, applicable local agency and City requirements.

B. Backflow prevention assemblies shall be installed in accordance with the Standard Drawings.

C. Water service and fire service shut -off valves will be secured closed during installation until an approved backflow prevention device is installed and te sted in compliance with this specification.

D. When static pressure exceeds 1.03MPa (150psi), or when recommended by the backflow device manufacturer, a pressure -reducing valve shall be installed as shown on the Standard Drawings.

3.2 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed in accordance with Section 15000 and the Standard Drawings.

3.3 CONCRETE

Concrete thrust or anchor blocks and slabs shall be installed in accordance with Standard Drawings.

3.4 ENCLOSURES

Enclosures shall be installed where shown on the Approved Plans in accordance with the Standard Drawings.

3.5 DISINFECTION

Disinfection and flushing shall be performed in accordance with Section 15041, as part of the process of disinfecting the main pipe line. The backflow assemblies shall be operated during the disinfection period to completely disinfect all internal parts.

3.6 HYDROSTATIC TESTING

Volume 3 Chapter 6

Page 164 of 190 ends

Backflow assemblies shall be hydrostatically tested in conjunction with the pipeline to which they are connected in accordance with Section 15044.

3.7 TESTING

The City will inspect and initially test each backflow prevention assembly after inspection of its proper installation is complete.

Required maintenance of the backflow prevention device and appurte nances and annual testing of the device shall be the private owner's responsibility.

END OF SECTION

Volume 3 Chapter 6

Page 165 of 190 ends

SECTION 15121 OPEN TRENCH PIPE CASING

PART 1 GENERAL

1.1 DESCRIPTION

This section includes materials for and installation of open trench pipe casings. Jacked casings or specially-installed pipe casings shall be installed as detailed in Section 15125.

1.2 REFERENCE STANDARD

The publications listed below form part of this specification to the extent referenced and are referred to in the text by the basic designation only. References shall be made to the latest edition of said standards unless otherwise called for.

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 15000, 15056, 15061, and 15064

1.4 SERVICE APPLICATION

Generally, pipe casings are used for protection of utilities (carrier pipes) and may be installed for future utility installations. Pipe casings shall be used for the installation of potable water, reclaimed wate r, and sewer mains where shown on the Approved Drawings or as required by the City.

1.5 DESIGN REQUIREMENTS

A. Pipe casings shall be provided for carrier piping where shown on the Approved Drawings or as required by the City. The sizes and material type for pipe casing shall be as detailed in Part 2 of this Section.

B. The City Engineer may select a greater steel thickness and diameter as appropriate for the intended application.

1.6 SUBMITTALS

The following items shall be submitted for review and approval by the City Engineer prior to the start of the casing work:

A. Casing pipe.

B. Casing spacers and end seals.

C. Installation procedure.

D. Method of restraint to be used for the casing and carrier pipes.

E. Welding procedure.

F. Cathodic Protection.

Volume 3 Chapter 6

Page 166 of 190 ends

1.7 DELIVERY, STORAGE AND HANDLING

A. PVC pipe casing shall be stored in suppliers' yards and on the job site in accordance to AWWA M23 and the manufacturer's recommendations. PVC pipe casing which h as been subjected to excessive ultraviolet radiation from the sun shall not be used. The determination as to the acceptability of PVC pipe casing faded by the sun's radiation shall rest solely with the City.

B. Store PVC pipe casing in the field by the supporting the pipe uniformly per AWWA M23. Do not stack pipe higher than 4' high or stack the pipe with weight on the bell ends. Cover stored PVC pipe casing to protect it from the sun's ultraviolet radiation. Pipe which has been contaminated with any pe troleum products (inside or outside) shall not be installed.

C. Proper care shall be used to prevent damage in handling, moving and placing the pipe casing. All pipe casing materials shall be lowered into the trench in a manner that prevents damage. The pipe casing shall not be dropped, dragged or handled in a manner that will cause bruises, cracks, or other damage.

1.8 CASING SPACERS AND END SEALS

Casing spacers and end seals shall be used for all carrier pipe installations within casings.

1.9 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed in accordance with Section 15000.

PART 2 MATERIALS

2.1 PIPE CASING

Pipe casing materials shall be as indicated below and shall be selected from the Approved Materials List. The size of the pipe casings required for the various sizes of carrier pipe is as follows:

Carrier Pipe Size Minimum Casing Size
6" 14"
8" 16"
10" 18"
12" 20"
16" 30"
20" 36"
24" 42"

Pipe Casing for Carrier Pipe larger than 24" shall be as determined by the City Engineer.

Volume 3 Chapter 6

Page 167 of 190 ends

A. Polyvinyl Chloride Pipe (PVC) casings shall be as follows:

1. Casing pipe sizes 14" through 36" shall be in accordance with AWWA C905, pressure rated 235 (DR18).

2. The color for PVC casing pipe shall be blue or white for potable water carrier pipe and purple for recycled water carrier pipe.

B. Steel pipe casings shall be as follows:

1. Steel pipe casings, unless otherwise approved by the City, shall be butt-welded sheets (spiral welding of pipe not allowed) conforming to ASTM A 36/A 36M, ASTM A 283/A 283M, Grade D, or ASTM A
568/A 568M, Grade 33. Other steel grades may be used upon approval of the City. Steel casings sized 20" or smaller shall have a minimum wall thickness of 3/8". Steel casings sized larger than 20" shall have a minimum wall thickness of 1/2".

2. Steel pipe casings shall not be lined or coated with any material unless otherwise directed by the City Engineer. If required, steel pipe casing shall be lined and coa ted with liquid epoxy paint per AWWA C210. Liquid epoxy shall be applied in three coats to a minimum thickness of 0.012". The final cost of the liquid epoxy shall be blue for potable water and purple for recycled water steel casing pipe.

3. Steel pipe casings shall include the installation of an anode in accordance with the Standard Drawings, unless otherwise directed by the City Engineer.

2.2 CASING SPACERS

Casing spacers shall be stainless steel, centered-position type with PVC liner and non-metallic anti-friction runners selected from the Approved Materials List.

2.3 CASING END SEALS

Casing end seals, selected from the Approved Materials List, shall wrap around the casing and carrier pipe to provide a barrier to backfill material and s eepage.

The casing end seal shall be a minimum 1/4" thick styrene butadiene rubber sheet attached to the carrier pipe and casing with 1" wide stainless steel bands.

Zippered casing end seals with stainless steel bands may also be used.

2.4 WARNING/IDENTIFICATION TAPE

Warning/Identification tape materials shall be in accordance with Section 15000 and the Approved Materials List.

Volume 3 Chapter 6

Page 168 of 190 ends

PART 3 EXECUTION

3.1 TRENCH EXCAVATION, BACKFILL AND COMPACTION

Trenching, bedding, backfilling and compactio n operations shall be performed in accordance with Section 02223.

3.2 DEWATERING

The Contractor shall provide, and maintain at all times during construction, ample means and devices to promptly remove and dispose all water from source entering tre nch excavations or other parts of the work. Any damage caused by flooding of the trench shall be the Contractor's responsibility.

Dewatering shall be performed by methods that will maintain a dry excavation, preservation of the final lines and grades and protection of all utilities. If flooding of the trench does occur, the Contractor shall immediately dewater and restore the trench. Damaged or altered pipeline appurtenances or trench materials shall be repaired or replaced as directed by the Engineer.

3.3 PIPE CASING INSTALLATION

Installation of pipe casing and carrier pipe shall be as described below and in accordance with the Standard Drawings.

A. Pipe casing shall be installed in an open trench type excavation.

B. Pipe casings shal l be lowered onto the bedding of the proper lines and grades called for on the Approved Plans.

C. Pipe casings shall have firm bearing along their full length.

D. Pipe casing sections shall be bell and spigot joint connection for PVC. PVC casing sections shall be restrained by mechanical means or by the use of splined gaskets. Steel casing sections shall be jointed by full-circumference butt welding in the field. Steel casing shall have all areas of damaged coating repaired.

E. Carrier pipe shall be pushed into the casing incorporating the use of casing spacers as described below.

F. PVC or ductile -iron carrier pipe joints shall be restrained either by mechanical means or by use of splined gaskets.

G. Steel carrier pipe sections shall be lap joint welded per Section 15061.

Volume 3 Chapter 6

Page 169 of 190 ends

H. Upstream and downstream elevations of the carrier pipe shall be verified prior to installing the end seals.

I. The portion of carrier pipes installed within casings shall have pressure, leakage, and infilt ration testing completed in accordance with Sections 15043 and 15044 prior to installation of the end seals.

J. The annular space between the carrier pipe and casing shall not be filled with any material unless otherwise noted on the Approved Plans.

3.4 CASING SPACERS

Casing spacers shall be used to prevent the carrier pipe bell from touching the casing and to maintain a uniform space between the carrier pipe and casing interior. A minimum of three casing spacers shall be installed, equally sp aced, on each pipe section at intervals recommended by the manufacturer.

3.5 CASING END SEALS

Casing end seals shall be installed in accordance with the manufacturer's recommendations.

Carrier pipe shall pass hydrostatic or leakage tests in a ccordance with Sections 15044 or Section 15043 prior to the installation of casing end seals or backfilling operations.

3.6 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed above the casing pipe in accordance with Section 15000 and the Standard Drawings.

END OF SECTION

Volume 3 Chapter 6

Page 170 of 190 ends

Volume 3 Chapter 6

Page 171 of 190 ends

SECTION 15125 JACKED PIPE CASING

PART 1 GENERAL

1.1 DESCRIPTION

This section includes materials and installation of jacked pipe casings. Where the contractor proposes to install pipelines usin g directional drilling or boring, a complete submittal of the methods and materials shall be made to the City prior to the initiation of the work.

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent refere nced and are referred to in the text by the basic designation only. References shall be made to the latest edition of said standards unless otherwise called for.

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 15000, 15056, 15061, 15064, and 15065

1.4 SERVICE APPLICATION

Generally, pipe casings are used for protection of utilities (carrier pipes) and may be installed for future utility installations. Pipe casings shall be used in conjunction with the installation of potable water, recycled water, and sewer mains in areas shown on the Approved Plans or as directed by the City Engineer.

1.5 PROTECTION OF EXISTING UTILITIES AND FACILITIES

The contractor shall be responsible for the care and protection of all ex isting utilities, facilities, and structures that may be encountered in or near the area of the work.

1.6 SAFETY AND PERMITTING REQUIREMENTS

A. Pipe jacking and boring projects 30" in diameter or larger are required to be classified by the State of California. Department of Industrial Relations, Division of Occupational Safety and Health.

B. Protection of workers in trench excavation shall be as required by the State of California Construction Safety Orders, the State of California State Health and Safety Code, the requirements of CAL-OSHA.

C. All excavations shall be performed, protected, and supported as required for safety and in the manner set forth in the operation regulations prescribed by CAL - OSHA.

Volume 3 Chapter 6

Page 172 of 190 ends

D. It shall be the Contractor's responsibili ty to obtain excavation permits, traffic control permits, or other applicable permits from the local agency which has jurisdiction.

E. A pre-job safety conference with representatives of the Division of Occupational Safety, CAL-OSHA, the City, the Contra ctor and Contractor's employees shall be held before the work begins.

F. Contractors performing this work are required to hold a current C -34 or General Engineering Contracting License from the State of California.

1.7 DESIGN REQUIREMENTS

A. Pipe casing shall be provided for the carrier piping where shown on the Approved Plans or as required by the City Engineer. The sizes and material type for pipe casing shall be as detailed in Part 2 of this Section.

B. The City Engineer may select a greater steel thickness and diameter as appropriate for the intended application.

1.8 SUBMITTALS

The contractor shall provide to the City and the agency, or agencies, of jurisdiction a drilling, boring, and jacking plan prior to commencing boring operations. The sub mittal shall include:

A. Configuration of the jacking pits and jacking pit bracing or shoring. Pit excavations deeper than 20' require the shoring system to be certified by a Registered Civil Engineer.

B. The pipe casing material to be used. Include pi pe material type, wall thickness, and welding details.

C. Casing spacers and end seals.

D. Jacking plan and profile drawing detailing the placement of the jacked casing.

E. Installation procedure.

F. Manufacturer and type of liquid epoxy paint, inc luding proposed steel preparation and application methods to be used.

G. The jacking machinery and jacking head proposed to be used.

H. Summary of the backfilling method to be used.

I. Worker Protection and Safety Plan.

J. Cathodic Protection.

1.9 DELIVERY AND HANDLING

Volume 3 Chapter 6

Page 173 of 190 ends

Proper care shall be used to prevent damage in handling, moving and placing the pipe casing. All pipe -casing materials shall be lowered into the trench in a manner that prevents damage. The pipe casing shall not be dropped, dragged or handled in a manner that will cause dents, cracks, or other damage to the pipe casing.

1.10 CASING SPACERS AND END SEALS

Casing spacers and end seals shall be used for all pipe installations with casings.

If the carrier pipe is not installed with in the casing, as a continuous operation, following completion of jacking, then bulkhead and portals and backfill the approach trenches.

Bulkheads will be removed at a later time to allow for the installation of the carrier pipe.

PART 2 MATERIALS

2.1 PIPE CASINGS

Jacked pipe casings shall be steel.

A. The minimum size and thickness of jacked steel pipe casings shall be as follows, unless otherwise required by the agency having jurisdiction over the road, utilities, or improvements.

Carrier
Pipe Size
Minimum
Casing Size
Min. Steel Casing
Wall Thickness
6" 14" 3/8"
8" 16" 3/8"
10" 18" 3/8"
12" 20" 3/8"
16" 30" 1/2"
20" 36" 1/2"
24" 42" 1/2"

B. Pipe casing for carrier pipe sizes larger than 24" shall be determined by the City Engineer.

C. The Contractor may submit a greater steel thickness and diameter as appropriate for the method of work and loadings involved, as suitable for the site and as limited by possible interferences. The Contractor shall submit any deviations in the approved design to the City fourteen (14) working days in advance of jacking operations, and may not proceed with any work until the City Engineer has approved the alternate methods proposed.

D. It is the Contractor's responsibility to choose a size of casing at or abo ve the minimum specified, and to ensure that the jacking is done with a high degree of accuracy to permit installation of the carrier pipe to the lines and grades shown on the approved plans.

E. Steel pipe casings, unless otherwise approved by the City, s hall be butt -welded sheets (spiral welding of pipe now allowed) conforming to ASTM A 36/A 36M,

Volume 3 Chapter 6

Page 174 of 190 ends

ASTM A 283/A 283M, Grade D, or ASTM A 570/A 570M, Grade 33. Other steel grades may be used upon approval of the City Engineer.

F. Steel pipe casings shall include the installation of an anode in accordance with the Standard Drawings, unless otherwise directed by the City Engineer.

2.2 CASING SPACERS

Casing spacers shall be stainless steel, centered -position type with PVC liner and non - metallic anti-friction runners in accordance with the Approved Materials List.

2.3 CASING END SEALS

Casing end seals, in accordance with the Approved Materials List, shall wrap around the casing and carrier pipe to provide a barrier to backfill material and seepage. The casing end seal shall be a minimum 1/4" thick styrene butadiene rubber sheet attached to the carrier pipe and casing with 1" wide stainless steel bands. Zippered casing end seals with stainless steel bands may also be used.

2.4 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape materials shall be in accordance with Section 15000 and the Approved Materials List.

PART 3 EXECUTION

3.1 TRENCH EXCAVATION, BACKFILL AND COMPACTION

Trenching, bedding, backfilling and compaction operations shall be performed in accordance with Section 02223.

3.2 JACKING PIT

A. The approach trench for jacking or boring operations shall be adequately shored to safeguard existing substructures and surface improvements and to ensure against ground movement in the vicinity of the casing portal.

B. Placement of equipment in the approach trench of the jacking pit shall be firmly bedded on the required line and grade using heavy timbers, structural steel, or concrete cradles of sufficient length to provide accurate control of jack ing alignment. Provide space to insert the casing lengths to be jacked. Anchor the timbers and structural steel sections to ensure action of the jacks in line with the axis of the casing. Place a timber or structural steel bearing block between the jacks and the end of the casing to provide uniform bearing upon the casing end evenly distribute the jacking pressure.

C. After jacking equipment and debris from the tunnel have been removed from the approach trench of jacking pit, prepare the bottom of the jac king pit as a pipe foundation. Remove all loose and disturbed materials below pipe grade to undisturbed earth and re-compact the material in accordance with Section 02223.

Volume 3 Chapter 6

Page 175 of 190 ends

3.3 PIPE CASING INSTALLATION

Installation of pipe casings shall be as described below and in accordance with the Standard Drawings. Only workers experienced in jacking operations shall be used in performing the work of jacking and boring.

A. The Contractor's attention is called to the fact that extreme care is required in placing the casing so as to permit the installation of the carrier pipe to the lines and grades shown on the Approved Plans.

B. Gravity flow pipelines are designed at grades that do not permit variance from the lines and grade as shown on the Approved Plans.

C. Fit a sectional shield or steel jacking head to the leading section of the casing.

The shield or head shall extend around the outer surface of the upper two-thirds of the casing and project at least 18" beyond the driving end of the casing. It shall not protrude more than 1/2" beyond the outer casing surface.

D. The leading section of casing shall be equipped with a jacking head securely anchored thereto to prevent any wobble or variation in alignment during the jacking operation.

E. To avoid loss of ground outside the casing, carry out excavation entirely within the jacking head and not in advance of the head. In general, excavated materials shall be removed from the casing as jacking progresses and no accumulation of excavated material within the casing will be permitted.

F. A jacking band to reinforce the end of the pipe receiving the jacking thrust will be required.

G. Control the application of jacking pressure and excavation of material ahead of the advancing casing to prevent it from becoming f riction-bound or deviating from required line and grade. Do not encroach upon the minimum annular space detailed. Restrict the excavation of material to the least clearance to prevent binding in order to avoid settlement or possible damage to overlying str uctures or utilities.

H. Steel casing sections shall be full-circumference butt-welded in the field. It shall be the Contractor's responsibility to provide stress transfer across the joints capable of resisting the jacking forces involved.

3.4 CARRIER PIPE INSTALLATION

A. Carrier pipe shall be pushed into the casing incorporating the use of casing spacers as described below.

B. PVC or ductile -iron carrier pipe joints shall be restrained either by mechanical means or by use of splined gaskets.

C. Steel carrier pipe sections shall be lap joint welded in accordance with Section 15061.

Volume 3 Chapter 6

Page 176 of 190 ends

D. Upstream and downstream elevations of the carrier pipe shall be verified prior to installing the end seals.

E. The portion of carrier pipe installed within a casing shall have pressure, leakage, and infiltration testing completed in accordance with Section 15043 and 15044 prior to installation of the end seals.

F. The annular space between the carrier pipe and casing shall not be filled with any material unless otherwise noted on the Approved Plans.

3.5 CASING SPACERS

Casing spacers shall be used to prevent the carrier pipe bell from touching the casing and to maintain a uniform space between the carrier pipe and casing interior. Casing spacers shal l be installed on the carrier pipe at intervals per the manufacturer's recommendations with a minimum of three spacers per pipe section equally spaced.

3.6 CASING END SEALS

Casing end seals shall be installed in accordance with the manufacturer's recommendations.

Carrier pipe shall pass hydrostatic or leakage tests in accordance with Sections 15044 or 15043 prior to the installation of casing end seals or backfilling operations.

END OF SECTION

Volume 3 Chapter 6

Page 177 of 190 ends

SECTION 15139 FIRE HYDRANTS

PART 1 GENERAL

1.1 DESCRIPTION

This section includes the materials for and installation of fire hydrant assemblies.

1.2 REFERENCE STANDARDS

The publications listed below form part of this specification to the extent refe renced and are referred to in the text by the basic designation only. Reference shall be made to the latest edition of said standards unless otherwise called for.

1.3 RELATED WORK SPECIFIED ELSEWHERE

CMWD Standard Drawings
CMWD Standard Specifications 09900, 15000, 15041, 15044, 15056, 15061, 15064, and 15100

1.4 SYSTEM DESCRIPTION

A. Hydrant outlet sizes and configuration shall be as shown on the Approved Plans or as directed by the fire department of jurisdiction.

B. Hydrants shall generally have the following number and size of outlets as directed by the fire department of jurisdiction:

1. Residential: One 2-1/2" outlet and one 4" outlet

2. Commercial: Two 2-1/2" outlets and one 4" outlet

3. Industrial: One 2-1/2" outlet and two 4" outlets

1.5 SERVICE APPLICATION

A. Fire hydrants shall be installed on potable water mains as shown on the approved drawings.

B. Wet-barrel hydrants shall generally be used for pressures up to 1.38 MPa (200 psi). System pressures up to and including 1.03 MPa (150 psi) require standard wet -barrel hydrants, and pressures up to 1.38 MPa (200 psi) require high-pressure wet-barrel hydrants in accordance with the Approved Materials List.

1.6 DELIVERY, STORAGE AND HANDLING

Fire hydrants shall be delivered and stored in accordance with AWWA C210, AWWA C213, and AWWA C550. The port openings shall be covered with plastic, cardboard or wood while in transit and during storage in the field. These covers shall remai n in place until the valve is ready to be installed. Fire hydrants shall not be stored in contact with bare ground. Fire hydrants shall not be stacked.

1.7 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed for fire hydrant ass emblies in accordance with Section 15000.

Volume 3 Chapter 6

Page 178 of 190 ends

PART 2 MATERIALS

2.1 HYDRANTS

A. Fire hydrants and appurtenances shall be selected from the Approved Materials List.

B. Wet-barrel fire hydrants shall comply with AWWA C503 and these specifications unless otherwise indicated on the Approved Drawings.

C. All outlets shall be provided with National Standard Fire -Hose Threads. Outlets shall be equipped with plastic caps.

D. Wet-barrel fire hydrant flanges and appurtenant bury ells and spools shall incorporate a six-hole bolt pattern.

2.2 BOLTS AND NUTS

A. Hydrant flange bolts and nuts shall be selected from the Approved Materials List.

B. Bolts and nuts shall be zinc -plated A307 carbon steel in accordance with Section 15000.

2.3 CONCRETE

Concrete used for splash pads, thru st or anchor blocks shall be in accordance with the Standard Drawings.

2.4 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape materials shall be in accordance with Section 15000 and the Approved Materials List.

2.5 FIELD PAINTING AND COATING

Field painting and coating materials shall be in accordance with Section 09900 in accordance with the Approved Materials List.

Volume 3 Chapter 6

Page 179 of 190 ends

PART 3 EXECUTION

3.1 GENERAL

A. Fire hydrant assemblies shall be installed at locations shown on the Approved Plans or a s directed by the fire department of jurisdiction in accordance with the Standard Drawings.

B. The location and port orientation of the Fire Hydrant shall be in accordance with the Standard Drawings.

C. Fire hydrant flange bolts shall be set with nuts on top. Torque nuts uniformly and progressively in accordance with the manufacturer's recommendations.

D. Depending on location, fire hydrant assemblies may require protection posts o r concrete retaining walls. When required by the City Engineer, or when shown on the Approved Plans, protection posts or retaining walls shall be installed in accordance with the Standard Drawings.

3.2 CONCRETE

Concrete thrust and anchor blocks shall be installed in accordance with the Standard Drawings.

3.3 WARNING/IDENTIFICATION TAPE

Warning/Identification Tape shall be installed in accordance with Section 15000 and the Standard Drawings.

3.4 DISINFECTION OF FIRE HYDRANT

The fire hydrant assembly shall be disinfected in accordance with Section 15041, as part of the process of disinfecting the main pipeline. The assembly valves shall be operated and the assembly flushed to completely disinfect all internal parts.

3.5 HYDROSTATIC TESTING

Fire hydrant assemblies shall be hydrostatically tested in accordance with Section 15044 in conjunction with the pipeline to which it is connected.

3.6 FIELD PAINTING AND COATING

The fire hydrant exterior shall be field painted in accordance with Section 09900.

END OF SECTION

Volume 3 Chapter 6

Page 180 of 190 ends

Volume 3 Chapter 6

Page 181 of 190 ends

SECTION 16640 CATHODIC PROTECTION BY SACRIFICIAL ANODES

PART 1 GENERAL

1.1 SCOPE

This section includes materials, testing, and installation of corrosion protection and monitoring systems for metallic pipes including insulatin g flange kits, test stations, copper/copper sulfate reference electrodes, sacrificial anodes, wiring, and exothermic welds..

1.2 DEFINITIONS

A. CONTRACTOR. The qualified construction firm selected by the Owner to have prime responsibility for the completion of work.

B. OWNER. The Owner, as referred to in these specifications, is the City of Carlsbad.

C. ENGINEER. The Engineer is the Owner’s representative who is assigned to be the direct contact between the Owner and the Contractor.

D. CORROSION ENGINEER. Retained by the Contractor, who is trained and experienced in cathodic protection installations and design and who is either a Registered Corrosion Engineer or a NACE Certified Cathodic Protection Specialist.

1.3 SPECIFICATIONS AND STANDARDS

A. American Society for Testing and Materials (ASTM):

C94-86 Ready-Mixed Concrete
D-2220 Polyvinyl chloride Insulation for Wire and Cable D-1248 Polyethylene Plastics Molding and Extrusion Materials B3 Soft or Annealed Copper Wire
B8 Concentric-Lay Stranded Copper Conductors

B. Federal Specifications (FS)
Military Specification (Mil. Spec):

MIL-C-18480B Coating Compound, Bituminous, Solvent, Coal Tar Base

C. Underwriter's Laboratories, Inc. (UL) Publications:
83-80 Thermoplastic-Insulated Wires
486-76 Wire Connectors and Soldering Lugs for Use with Copper Conductors

D. National Association of Corrosion Engineers (NACE):

RP0169-96 Recommended Practice, Control of External Corrosion on Underground or Submerged Metallic Piping Systems

E. National Association of Corrosion Engineers (NACE):

Volume 3 Chapter 6

Page 182 of 190 ends

RP0286 Electrical Isolation of Cathodically Protected Pipelines

1.4 SUBMITTALS

The following information shall be submitted for approval of the ENGINEER in accordance with Section 1300 of these specifications.

A. Catalog Cuts:

1. High potential magnesium anodes

2. At-grade concrete test box with cast iron lid

3. Shunts

4. Wire and cable

5. Exothermic weld kits

6. Weld caps

7. Weld coating

8. Plastic warning tape

9. Insulating flange kits

10. Wax tape coating system

B. As-Built Drawings.

The CONTRACTOR shall maintain As -Built drawings showing exact locations of anodes, test stations, insulators, and wire trenching runs . Location changes from the design shall be clearly marked in red on a blue line copy of the design drawings. The As-Built drawings shall be submitted to the ENGINEER at the end of the project. The project is not considered complete until As -Built drawi ngs are submitted.

C. Test Results.

1. Insulator tests

2. Continuity tests

3. Anode testing and cathodic protection performance

PART 2 MATERIALS

2.1 GENERAL

Materials and equipment shall be new and the standard product of manufacturers regularl y engaged in the manufacturing of such products. All materials and equipment shall bear evidence of safe operation approval from a nationally recognized testing laboratory.

2.2 HIGH POTENTIAL MAGNESIUM ANODES

A. Capacity. High potential magnesium anodes shall have a theoretical energy content of 1000 ampere-hours per pound and have a minimum useful output of 500 ampere-hours per pound.

Volume 3 Chapter 6

Page 183 of 190 ends

B. Chemical Composition (High Potential Magnesium).

Aluminum 0.01 percent (max)
Manganese 0.5 to 1.3 percent
Zinc 0.002 percent (max)
Copper 0.02 percent (max)
Nickel 0.001 percent (max)
Iron 0.03 percent (max)
Silicon 0.002 percent (max)
Other 0.05 percent each (max)
Magnesium balance

C. Open Circuit Potential. The open circuit potential of all anodes, buried in the soil, shall be between 1.55 and 1.75 volts dc versus a copper-copper sulfate reference electrode.

D. Ingot Size And Weight . Anodes shall be 48 -pound pre-packaged, high potential ingots with a trapezoidal cross section. Ingot length shall be 32 inches long.

The total packaged weight shall be 105 lbs.

E. Anode Construction. Anodes shall be cast magnesium with a galvanized steel core rod recessed on one end to provide access to the rod for connection of the lead wir e. Silver braze the lead wire to the rod and make the connection mechanically secure. Insulate the connection to a 600 -volt rating by filling the recess with epoxy and covering any exposed bare steel core or wire with heat shrinkable tubing. The insulating tubing shall extend over the lead wire insulation by not less than 1/2 inch.

F. Anode Pre-Packaged Backfill Material. The anodes shall be completely encased and centered within a permeable cloth bag in a special low resistivity backfill mix with the following composition:

Gypsum 75%
Powdered bentonite 20%
Anhydrous sodium sulfate 5%

G. Backfill grains shall be such that 100 percent is capable of passing through a screen of 100 mesh. Backfill shall be firmly packed around the anode s uch that the ingot is approximately in the center of the backfill. The resistivity of the backfill shall be no greater than 50 ohm -cm when tested wet in a soil box. Total prepackaged weight shall be approximately 105 pounds.

2.3 AT-GRADE TEST STATIONS

A. Test Box. At-grade test boxes shall be round, pre -cast concrete with a cast iron lid. The dimensions shall be 14 -1/4 inches O.D. by 9 inches I.D. by 12 inches high, similar to Christy G5 Utility Box with a cast iron supporting ring and lid. The lid shall be cast with the legend "Test Station".

B. Identification Tags. All test leads shall be identified with an Avery label (model 5361), self-adhesive covered with polyolefin clear heat shrink tubing (3mfp301).

The label shall include: name of faci lity – size – pipe material; type of insulation; station number.

C. Concrete Pad . Test boxes mounted in unpaved areas shall be mounted in a reinforced 24-inch square by 4-inch thick concrete pad constructed of ASTM C94 ready-mix concrete. Rebar shall be No. 4 steel.

Volume 3 Chapter 6

Page 184 of 190 ends

2.4 WIRE AND CABLE

All wires shall be stranded copper with HMWPE or THWN insulation suitable for direct burial in corrosive soil and water, conforming to UL 83 and ASTM standards B3 or B8. HMWPE insulation shall conform to ASTM D1248 ty pe 1, class c, grade 5. THWN insulation shall conform to ASTM D-2220.

A. Test Leads. No. 8 AWG HMWPE.

B. Anode Lead Wire. Anode lead wires shall be No. 12 AWG THWN.

C. Mechanical Joint Bond Wire. No. 2 AWG HMWPE.

D. All wire and copper connectors shall conform to UL 486-76.

E. Wire Splicing. NO wire splicing is permitted.

2.5 EXOTHERMIC WELD KIT

Wire-to-metal connections shall be made by the exothermic “cadweld” welding process. Weld alloy shall be for steel pipe. It is the CONTRACTOR’ s responsibility to determine the manufacturer’s recommended weld charge size for metallic surfaces.

A. Weld Caps. Royston Roybond Primer 747 and Royston Handy Cap 2 or equal.

B. Weld Coating. Cold-applied fast-drying mastic consisting of bituminous resin and solvents per Mil. Spec. Mil -C-18480B such as Koppers bitumastic 50 or 505, Tnemec 40-h-413, tape-coat TC mastic or 3M Scotch Clad 244. The minimum coating thickness shall be 25 mils (0.025 inch).

2.6 INSULATING FLANGE KITS

A. Gaskets: ANSI B-16.21, Type E, NEMA G10 glass with a rectangular o -ring seal for operation between 20 -deg. F and 150 -deg. F. Gaskets shall be suitable for the temperature and pressure rating of the piping system in which they are installed.

B. Insulating Sleeves: 1/32-inch thick tube, full length, G10 glass material per NEMA LI- 1 for operation between 20-deg. F and 150-deg. F. For installation at threaded valve flanges, half-length sleeves shall be used.

C. Insulating Washers : 1/8 -inch thick, full length, G10 gla ss per NEMA LI -1 for operation between 20-deg. F and 150-deg. F.

D. Steel Washers: 1/8-inch cadmium plated steel placed between the nut and insulating washer.

E. Coating: All buried insulating flanges shall be wax taped coated per AWWA C217.

See section for “External Coating for Buried Surfaces” below.

Volume 3 Chapter 6

Page 185 of 190 ends

2.7 EXTERNAL COATING FOR BURIED SURFACES

A. All buried insulating flange kits, AND buried pipe sections and fitting surfaces that are not epoxy or polyurethane coated shall be wrapped with a three -layer petrolatum wax tape coating system per AWWA C217.

B. Primer: All surfaces shall be prime coated with a blend of petrolatum, plasticizer, inert fillers, and corrosion inhibitors having a paste-like consistency.

C. Wax Tape: Covering material shall be a synthetic felt tape, saturated with a blend of petrolatum, plasticizers, and corrosion inhibitors that is formable over irregular surfaces.

D. Plastic Outer Wrap : The primed and wax taped surface shall be covered with a plastic outer wrap consist ing of three layers of 50 -guage (10-mil) polyvinylidene chloride or PVC, high cling membrane wound together.

2.8 PLASTIC WARNING TAPE

A. Plastic warning tape for all cable trenches shall be a minimum of 4 mils thick and 6 inches wide, inert plastic f ilm designed for prolonged use underground, and printed with "Caution: Cathodic Protection Cable Below".

PART 3 CATHODIC PROTECTION INSTALLATION

3.1 GENERAL

A. Standard. Cathodic protection installation shall conform to NACE RP0169 -96 “Recommended Practice, Control of External Corrosion on Underground or Submerged Metallic Piping Systems.

B. CONTRACTOR Qualifications . All work shall be performed by qualified, experienced personnel working under continuous, competent supervision.

Qualified CONTRA CTORs must demonstrate at least five years of experience with cathodic protection installations.

C. Test Results . The CONTRACTOR shall submit a CORROSION ENGINEER’s report including all test data, conclusions, repairs, and cathodic protection system performance.

D. Notification For Testing. The CONTRACTOR shall notify the ENGINEER at least five days in advance of the anodes and test station installations. The ENGINEER or the OWNER's representative shall, at their discretion, witness the installation of anodes and cathodic protection facilities. Testing shall be as described in this specification section.

3.2 MAGNESIUM ANODES

A. Inspection. All lead wires shall be inspected to ensure that the lead wire is securely connected to the anode core and tha t no damage has occurred to the lead wire. Lead wire failures shall require replacement of the complete anode and lead wire.

B. Pre-Packaged Anode Inspection . Each anode shall be inspected to ensure that the backfill material completely surrounds the a node and that the cloth bag containing the anode and backfill material is intact. If the prepackaged anodes are supplied in a waterproof container or covering, that container or covering shall be

Volume 3 Chapter 6

Page 186 of 190 ends

removed before installation. The CONTRACTOR shall notify th e ENGINEER at least five (5) days in advance of installing the anodes.

C. Location. Anodes are to be installed in augured holes as shown in the drawings.

Anode positions can be adjusted slightly to avoid interference with existing structures. Alternate anode positions must be approved by the ENGINEER.

D. Handling. Care shall be taken to ensure that the anode is never lifted, supported, transported, or handled by the lead wire. All anodes shall be lowered into the hole using a sling or a rope.

E. Anode Hole Size and Depth . Anodes shall be placed vertically at the bottom of a 12 feet deep augured hole, 12 inches in diameter (minimum).

F. Soaking Requirements, Pre -Packaged Anodes. Once the prepackaged anodes are in the hole, 15 gallons of water shal l be poured into the hole so that the anodes are completely covered with water. Allow the anodes to soak for a minimum of 30 minutes before any soil backfill is added.

G. Soil Backfill . After the pre -packaged anodes are soaked, the hole is backfilled with stone-free, native soil. No voids shall exist around the anode bags and the anode lead wire shall not be damaged. The backfill shall be tamped and compacted in 18-inch lifts taking care not to damage the anode lead wire.

3.3 AT-GRADE TEST STATIONS

A. Location. At -grade corrosion monitoring test boxes shall be located at the edge and directly behind the curb. All test box locations shall be approved by the ENGINEER.

B. Test Box Bottom. Test boxes shall be set in native soil.

C. Test Lead Attach ment. Test leads shall be attached to the pipe using the exothermic weld process. An 18 -inch length of slack wire shall be coiled at each weld at the pipe and inside each test box.

D. Concrete Pad . A 24 -inch square by 4 -inch thick reinforced concrete p ad is required around each at-grade test station. Test boxes and concrete pad shall be flush with the top of the curb.

3.4 WIRE AND CABLE

A. Test Lead Trench. Horizontal test or anode lead runs shall be placed in a 36 -inch trench.

B. Wire Handling. W ire leads shall not be stretched or kinked. Care shall be taken when installing wire and backfilling. If wire insulation is damaged during installation, it shall be rejected and replaced completely at the CONTRACTOR's expense. All rejected wire shall be removed from the job site at the close of each workday.

Volume 3 Chapter 6

Page 187 of 190 ends

C. Plastic Warning Tape. Plastic warning tape shall be installed in all wire trenches and 12 inches below finished grade.

D. Splicing. Wire splices are not permitted.

3.5 WIRE-TO-PIPE CONNECTIONS

A. All connections of copper wires to the pipe shall be made by the exothermic weld method.

B. Weld Charge Size . It is the CONTRACTOR’s responsibility to ensure that the manufacturer’s recommended weld charge size is used.

C. Preparation Of Wire. Do not deform cable. Remove only enough insulation from the cable to allow for the exothermic weld.

D. Preparation Of Metal. Remove all coating, dirt, grime and grease from the metal structure by wire brushing. Clean the structure to a bright, shiny surface free of all serious pits and flaws by using a file. The surface area of the structure must be absolutely dry.

E. Wire Position. The wire is to be held at a 30 -degree angle to the surface when welding. Only one wire shall be attached with each weld.

F. Testing of All Completed Welds . After the weld has cooled, the weld shall be tested by striking the weld with a 2 -lb hammer while pulling firmly on the wire. All unsound welds shall be cleaned, re -welded, and re-tested. All weld slag shall be removed.

G. Coating Of Welds . The area to be coated shall be clean and completely dry.

Apply a primer specifically intended for use with an elastomeric weld cap. Apply the weld cap and a bituminous mastic coating material to all exposed areas around the cap in accordance with the manufacturer's recommendations. The coating shall overlap the structure coating by a minimum of 3 inches.

H. Mortar Repair. Coating voids shall be filled with cement grout.

3.6 BOND WIRES

A. Mechanical Joint Bond Wires . Two (2) No. 2 HMWPE bond wires are required across each non -insulating, in -line valve; a third No. 6 HMWPE bond wire is required from the valve to one outside flange as shown in the drawings. The bond wires shall be attached using the exothermic weld process. Bond wires shall have some slack wire at each weld to allow for creep when backfilling.

3.7 INSULATING FLANGE KITS

A. General: Insulating flange kits shall be pre -assembled and installed as recommended by the manufacturer, and per NACE RPO 286. Moi sture, soil, and other foreign matter must be fully removed and prevented from contacting any portion of mating surfaces. If foreign matter contacts any portion of these surfaces, then the entire flange shall be disassembled, cleaned, and dried before reassembly.

B. Installation: Align and install insulating joints according to the manufacturer's recommendations to avoid damaging insulating materials. The manufacturer’s bolt tightening sequence and torque specifications shall be followed.

Volume 3 Chapter 6

Page 188 of 190 ends

C. Paint Pigments: No electrically conductive pigments or paints shall be used either internally or externally on the bolts, washers, or flanges.

D. Inspection: All buried insulating flanges shall be inspected, tested, and approved by the ENGINEER as described in P art 4 of this specification and prior to the application of wax tape coating.

3.8 EXTERNAL COATING

A. All buried insulating flanges shall be covered with a 3 -layer wax tape coating system per AWWA C217. Additionally, all in -line valves, flanges, cou plings, and adapters that are not coated with a bonded dielectric coating shall be wax tape coated per AWWA C217.

B. Primer: Surfaces must be cleaned of all dirt, grime, and dust by using a wire brush and clean cloth. The surface shall be dry. Apply th e primer by hand or brush. A thin coating of primer shall be applied to all surfaces and worked into all crevices. The primer shall be applied generously around bolts, nuts, and threads, and shall fully cover all exposed areas. The primer should overlap the pipe coating by a minimum of 3-inches.

C. Petrolatum Saturated Tape : The wax tape can be applied immediately after the primer. Short lengths of tape shall be cut and carefully molded around each individual bolt, nut, and stud end. For long bolts (such as in couplings), short lengths of tape shall be cut and circumferentially wrapped around each individual bolt. After the bolts are covered, the tape shall be circumferentially wrapped around the flange with sufficient tension to provide continuous adhesion without stretching the tape. The tape shall be formed, by hand, into all voids and spaces.

There shall be no voids or gaps under the tape. The tape shall be applied with a 1-inch minimum overlap.

D. Outer Covering : A plastic outer cover shall be applied over the petrolatum - saturated tape. The plastic shall be a minimum of 50 -guage (10 -mils) and shall have two layers applied.

PART 4 TESTING AND INSPECTION

The CONTRACTOR’s CORROSION ENGINEER shall submit his proposed test procedures to the ENGINEER at least five (5) days in advance of the time that the cathodic protection system testing is scheduled. The ENGINEER shall witness all testing at his discretion. All test data shall be submitted to the ENGINEER within seven (7) days of the completion of the testing. All testing shall be done under the supervision of a qualified CORROSION ENGINEER who is retained by the CONTRACTOR. All deficiencies found to be due to faulty materials or workmanship shall be repaired or replaced by the CONTRACTO R and at his expense. The City of Carlsbad shall be notified at least three (3) days in advance to witness the performance testing.

4.1 TEST LEADS

It is the CONTRACTOR’s responsibility to test all test leads

Volume 3 Chapter 6

Page 189 of 190 ends

A. Test Method. All completed wire connection welds shall be tested by striking the weld with a 2 -lb hammer while pulling firmly on the wire. Welds failing this test shall have the surface re -prepared, have the wire re -welded to the pipe and re - tested. Wire welds shall be spot tested by the Engineer. After backfilling the pipe, all test lead pairs shall be tested using a standard ohmmeter.

B. Acceptance. The resistance between each pair of test leads shall not exceed 150% of the total wire resistance as determined from published wire data.

4.2 Anode Lead Wire . The CONTRACTOR is responsible for inspecting anode lead wires.

Lead wires shall be spot inspected by the ENGINEER.

A. Test Method. A visual inspection and by running his hand along the full length of the lead while installing.

B. Acceptance. All leads shall be free of cuts nicks or abrasions in the wire insulation. Damaged leads shall be rejected.

4.3 TEST LEAD TRENCHING

The ENGINEER, at his or her discretion, shall inspect wire trenches and backfill material and methods.

A. Test Method. The depth, trench bottom, padding, and backfill material shall be visually inspected prior to backfilling.

B. Acceptance. Conformance with specifications.

4.4 PIPELINE CONTINUITY THROUGH IN-LINE VALVES

The CONTRACTOR’s CORROSION ENGINEER shall measure the linear resistance of sections of pipe in which in-line valves or other mechanical joints have been installed. All testing shall be done by the CORROSION ENGINEER in the presence of the ENGINEER.

A. Test Method . Resistance shall be measured by the linear resistance method.

A direct current shall be impressed from one end of the test section to the other (typically test station to test station). A voltage drop is measured for several different current levels. The measured resistanc e (R) is calculated using the equation R=dV/I, where dV is the voltage drop between the test span and I is the current. The resistance shall be measured for at least four (4) different current levels.

B. Acceptance. Acceptance is a comparison between th e measured resistance (from the field test data) and the theoretical resistance. The theoretical resistance must consider the pipe (length and wall thickness) and the resistance of the bond wires. The measured resistance shall not exceed the theoretical resistance by more than 130%. The CONTRACTOR’s CORROSION ENGINEER shall submit, within seven (7) days of the completion of the testing and in a report format, to the ENGINEER all calculations of the theoretical resistance and measured pipe resistance for each section tested.

Volume 3 Chapter 6

Page 190 of 190 ends

4.5 INSULATING FLANGE KITS

A. Responsibility: Insulating flanges shall be inspected and tested by the CONTRACTOR’S CORROSION ENGINEER and in the presence of the ENGINEER, prior to backfilling. Testing of the buried insulating flang e kit prior to backfill will result in non-acceptance of the insulator.

B. Test Method: The assembled flange shall be tested using a Gas Electronics Model 601 Insulation Checker specifically design for testing insulating flanges. The testing shall be done by a qualified CORROSION ENGINEER accepted by the ENGINEER and shall be done in accordance with NACE RPO 286.

C. Acceptance: The installation of the insulating flange kit shall be considered complete when the testing device indicates no shorts or parti al shorts are present.

The CONTRACTOR shall provide assistance in finding any and all shorts or shorted bolts. All disassembly and reassembly necessary for acceptance shall be done at the CONTRACTOR’S expense.

4.6 CATHODIC PROTECTION PERFORMANCE

The c athodic protection system shall be activated and tested by the CONTRACTOR’s CORROSION ENGINEER in the presence of the ENGINEER.

A. Test Method . The installed cathodic protection system testing shall include:
native pipe-to-soil potentials, protected pip e-to-soil potentials, open -circuit anode potentials, and anode current output measurements.

B. Acceptance. Shall be based on achieving the –850 mV criterion as outlined in NACE RPO169-96. All data shall be submitted, in a typed 8 -1/2 X 11 inch report to the City’s ENGINEER and the City’s CORROSION ENGINEER for approval.

C. Compliance With Specifications . Deficiencies or omissions in materials or workmanship found by these tests shall be rectified at the CONTRACTOR’s expense. Deficiencies shall include but are not limited to: broken leads, improper or unclean trenches, lack of 18 -inchor slack wire in test boxes; improperly mounted test boxes; improper installation and testing of insulators; and other deficiencies associated with the workmanship, install ation, and non -functioning equipment.

END OF SECTION

APPENDIX I

CMWD APPROVED

MATERIALS LIST
APPENDIX "I"
Item Description Manufacturer/Model

AIR/VACUUM VALVE
2-INCH
ARI D-040
(up to 250 psi)

AIR/VACUUM VALVE
greater than 2"
Epoxy coated/lined. Stainless steel hardware ARI D-060 HF

AIR/VACUUM VALVE

ABOVE GRADE

ENCLOSURE
Air-Vaccum Valve Assembly. See Standard Dwg W7
See "Valve Box" for below grade components
Pipeline Products VCAS 1424 2"
Pipeline Products VCAS 1830 4"
Pipeline Products VCAS 2436 6"-8"
TN - Potable PR - Recycled

ANGLE METER STOPS
1-INCH
Compression x Meter
Nut
1" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Compression x Outlet Swivel Meter Nut
Ford BA43-444WQ NL
Jones E-1963WSG
Mueller B-24258 N
AY McDonald 74602BQ

ANGLE METER STOPS
1-INCH
Flare x Meter Nut
1" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Flare x Outlet Swivel Meter Nut
Ford BA23-444W NL
Jones E-1964W
Mueller B-24255 N
AY McDonald 74602B

ANGLE METER STOPS
2-INCH
Compression x Meter
Nut
2" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Compression x Outlet Meter Flange
Ford BFA43-777WQ NL
Jones E-1975WSG
Mueller B-24276 N
AY McDonald 74602BQ

ANGLE METER STOPS
2-INCH
Flare x Meter Nut
2" Bronze Angle Meter Stop (Ball Valve) with 90 Degree Lock Wing, Flare x Outlet Meter Flange
Ford BFA23-777W NL
Jones E-1973W
Mueller B-24277 N
AY McDonald 74602B

BACKFLOW
PREVENTER (R.P.)
Reduced Pressure Principal Type Assemblies; Double Check Valve Detector Assemblies for Fire Sprinkler Systems
List of Approved Backflow Prevention
Assemblies by the State of California,
Department of Health Services most
recent version

CORPORATION STOP,

FLARE X MIP
Bronze Flare x MIP Thread Ball Valve (T-Head only) 1"and 2" Full Opening
Ford FB700 NL
Jones E-1929
Mueller B-25025 N
AY McDonald 74704B

CORPORATION STOP,

COMPRESSION X MIP
Bronze Compression x MIP Thread Ball Valve (T-Head only) 1"and 2" Full Opening
Ford FB1100Q NL
Jones E-1957G
Mueller B-25028 N
AY McDonald 74704BQ

CORPORATION STOP,

MIP X MIP
Bronze MIP x MIP Thread Ball Valve (T-Head only), 1" and 2" Full Opening
Ford FB500 NL,
Jones E-1943
Mueller B-2969 N (2")
Mueller B-20013 N (1")
BOLTS AND NUTS, 304
SS
Hex-Head Machine, ASTM A193, Grade B8 Bolts and ASTM
A194, Grade 8 Nuts
BOLTS AND NUTS, 316
SS
Hex-Head Machine, ASTM A193, Grade B8M Bolts and ASTM
A194, Grade 8M Nuts

BOLTS AND NUTS,
A307
Hex-Head Machine, Cadmium/Zinc Plated, ASTM A307, Grade A Bolts and A307 2H Heavy Hex Nuts

BONDING AGENT,
EPOXY
Epoxy Resin Based Bonding Agent for Bonding New Mortar or Concrete to existing concrete
Sika Sikadur 32 Hi-Mod
BUSHING, INSULATING Nylon, 1-1/4" x 1",
1-1/2" x 1", 2-1/2" x 2"
Calpico
Corrosion Control Products
F.H.Mahoney

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES February 16, 2016 1
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES CASING END SEAL 1/4" Thick Styrene Butadiene Rubber Sheet End Seal. Use 1" Wide Stainless Steel Bands. Zippered End Seals with Stainless Steel Bands may also be used.

Advanced Products & Sys.

Cascade
Calpico
Pipeline Seal & Insulator
Powerseal
Raychem
CASING SPACER Stainless Steel Casing Spacer, Center Restrained, Position Type with PVC Liner and Non-metallic Anti-friction Runners
Advanced Products & Sys.

Cascade
Calpico
Pipeline Seal & Insulator
Powerseal
Raychem

CATHODIC TEST

STATION BOX

25.4 Kg (54 lbs) Concrete Body with 5.4 Kg (12 lb) Ductile Iron Lid and Lid Ring. "CP TEST" shall be cast into the Lid in 25mm (1") Letters. For Cathodic Protection Test Stations, Anode Ground Beds and Insulated Flange Test Stations.

Christy G5
CATHODIC WELDING For Welding Cathodic Bond Wires to Steel Pipelines CHLORINE Liquid (Gas) or Sodium Hypochlorite Solution. See Section 15040 COATING, MASTIC Cold applied Coal Tar or Epoxy based single component, self- priming, heavy-duty protective exterior coating for buried concrete Carboline Bitumastic 50
Devoe Devtar 5A
Polykem 938
Tnemec HB Tnemecol
46-465, HB Tneme-Tar
46H-413

COATING,

WATERPROOF
Epoxy Resin Based Cemetous Trowel Grade protective
waterproofing for concrete
Sika Top Seal 107
STO CR 241
COUPLING, C900 PVC

DEFLECTION
4" through 12" Solid PVC for obtaining deflection only. Certainteed Vinyl Iron HD COUPLING, C900 PVC

CLOSURE OR REPAIR
4" through 12" Solid PVC for closure or repair Certainteed Vinyl Iron HD COUPLING, C905 PVC

CLOSURE,

DEFLECTION OR
REPAIR
16" through 36" Solid PVC for Closure, Deflection or Repair IPEX Nyloiplast America
Septer
COUPLING, GROOVED Use for Above Ground Dl or Steel Pipe 100mm (4") or larger Grinnell #7001 Tyler 500
Vitaulic #44, #77

COUPLING,

TRANSITION FLEXIBLE
4" and Larger Steel or Ductile Iron Construction, Slip x Slip, Epoxy Coated with 304 or 316 Stainless Steel Bolts and Nuts. For use on AC, PVC, Dl, or Steel Pipe
Ford FC1, FC2A, FC2W
Romac 501, XR 501, Macro HP
Smith-Blair 411, 413

CUSTOMER SIDE

SHUT-OFF VALVE
3/4" and 1" Bronze Customer Shut-off (Ball Valve), Inlet Swivel Meter Nut x Outlet FIP Thread, Lockable Tabs, with Lever Handle Ford B13-332W w/HT34
B13-444W w/HT34
Jones J-1908W
Mueller B-24351
AY McDonald 76101MW w/SHDLB

CUSTOMER SIDE

SHUT-OFF VALVE
2" Bronze Customer Shut-off (Ball Valve), Inlet Meter Flange x Outlet FIP Thread, Lockable Tabs, with Lever Handle
BF13-777W w/HB-67S
Jones J-1913W
Mueller B-24337
AY McDonald 76101MW w/SHDLB

ELL, BURY, DUCTILE
IRON
6" Ductile Iron Bury Ells, Long Radius, Flg x MJ/PO
(Use of Short Radius Bury Ells with District Engineer Approval Only)
Clow
South Bay Foundry
EPOXY ADHESIVE High-Modulus, Low Vicosity, Epoxy Resin Based Adhesive suitable for Grouting Bolts or Dowels
Sika Sikadur 31, Sikadur 35
February 16, 2016 2
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES EXPANSION JOINT For Water Pipeline Bridge Crossings APAC 703 Dresser 63
Powrseal 3563
Smith-Blair 611, 612

FIRE HYDRANT

SPOOL, DUCTILE OR

CAST IRON, FLANGED
Ductile or Cast Iron Spool with Integrally Cast Flanges and Machined or Cast Exterior Grooves. Spools 12" or longer shall have grooves 3" from each Flange. Spools shorter than 2" shall have one groove centered between the Flanges. Grooves shall be 3/16" deep, + 1/16" and 1/4" wide, + 1/16", 6 Holed
FIRE HYDRANT 6" Standard 150 PSI Wet Barrel Bronze Fire Hydrants with Six- Hole Bolt Pattern. 4" x 2.5" or 4" x 4" x 2.5" Outlets Clow 2050,2065
Jones 3700, 3775
AVK 2462, 2468
FIRE HYDRANT, 200
PSI or Higher
Project Specification Submittal Required

FITTING, DUCTILE
IRON
Flanged, Mechanical, Joint or Push-on Tees, Bends, Crosses, Recucers, Adapters, etc., for Water Lines 4" and larger.

Manufactured per AWWA C100, C111, C153. Double Cement
Mortar Lined.
(SSB Fittings will not be permitted on C905 Pipe.)
Bachman
Griffin
Nappco/Sigma
Pipeline Components
Star
Tyler
FITTING, GROOVED Grooved ductile Iron Fittings for Grooved end Pipes, 4" through 24"
Grinnell
TylerG-B
Victaulic

FITTING,

PIPE RESTRAINT
May be used with or in lieu of thrust blocks with approval of District Engineer
Romac-GripRing
Star Pipe-PVC Ring Lock Series 3500
UniFlange - 1300-C
Eagle LOC 900
GASKET 1/8" Thick Full Face or Ring, Aramid Fiber Bound with Nitrile. No Asbestos Content
Calpico
Garlock 3000
Johns-Manville
Klinger 4401
Tripac 5000

GASKET, JOINT

RESTRAINT
Rubber Ring Type with Stainless Steel Locking Segments
Vulcanized into the Gasket. Fur use on PVC Carrier and Casing Pipes.

US Pipe Field Lok 350

GASKET, RUBBER

GASOLINE RESISTANT
Gasoline Resistant Pipe Gaskets for Water Mains Newby

GASKET, RUBBER
RING
3mm (1/8") Thick, Rubber Ring Type, 1.72 Mpa (250 PSI)
Maximum. For 100mm (4") through 900mm (36" Pipe Flanges Calpico
Johns-Manville
US Pipe
GREASE For Bolt Corrosion Protection on Buried Bolts, NO-OX-ID Type Sanchem NO-OX-ID Dearborn Chemical
GROUT Non-Shrink Cement Based Construction Grout for Crack Repair, Flooring Mortar, Dowel Grouting, Crack Sealing and General Binding
Sika Sikagrout 212
STO Epoxy Binder CR633
STO Epoxy Gel CR635
STO N-S Grout CR732

JOINT SEALING

COMPOUND, PLASTIC
ROPE
For use on Pre-cast Vault and Manhole in Grooved Joints between sections
Quickset Joint Sealing
Compound

LUBRICANT, PIPE
GASKET
Rubber Gasket Pipe Lubricant for use on PVC or ductile Iron Pipe Joints, NSF Listing required.

Whitlam Blue Lube
METER Supplied by CMWD
February 16, 2016 3
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES

METER BOX
1" SERVICE
12" x 20" x 12"Polymer Meter Box and Cover for 1" Water Services with meters 1" or smaller.

Cover color:

Gray for Potable Water Use
Purple Lids and Boxes for Recycled Water Use
Amorcast A6000485
Cover A6000484
Lid, Drop In A6000487

METER BOX
2" SERVICE
17" x 30" x 12" Polymer Meter box with 2-Piece Lid for 2" Water Services with meter larger than 1" and Blowoff Assemblies Cover Color:

Gray for Potable Water Use
Purple Lids and Boxes for Recycled Water Use
Amorcast A6001640PC-12
Cover A6001643
Lid, Drop In A6000482

METER BOX
1" SERVICE
( Exposed to Traffic
Loads)
Gray for Potable Water Use
Purple Lids for Recycled Water Use
Brooks Model No.37 with Traffic Rated
Lid

METER BOX
2" SERVICE
(Exposed to Traffic
Loads & for Combination
Air Release, Std Dwg
W7)
Gray for Potable Water Use
Purple Lids for Recycled Water Use
Brooks Model No.66 with Traffic Rated
Lid
METER FLANGE Bronze Meter Flanges for 1-1/2" and 2" Meters with Slotted Holes Ford CF Series Jones J129
A.Y.McDonald 610F
MORTAR, REPAIR Two Component, Low Shrinkage, Cement Based with High Compressive and Bonding Strength
Sika Sika Top 122, 123
STO CR 735, CR 740
PAINT Valve Box Lids
Prime Coat required on all above ground metal surfaces
Frazee Traffic Line and Marking Paint
Yellow #5020301 (2 coats)
PAINT Fire Hydrants
Prime Coat required on all above ground metal surfaces
Frazee Arothane, SG1360407, Safety
Yellow (2 coats)
PAINT Backflow Assys & Vent Pipes, Meters, Regulators, Vault Piping, Air Valves. Prime Coat required on all above ground metal surfaces
Frazee Arothane, SG1360407, Dunes
Tan (2 coats)
PAINT Backflow Assys & Vent Pipes, Meters, Regulators, Vault Piping, Air Valves. Prime Coat required on all above ground metal surfaces (use Tnemec primer)
Tnemec Series 1029 Enduratone,
Purple Rain/Safety 14SF (2 coats)
PAINT, PRIME COAT Prime Coat, Prime Coat required on all above ground metal surfaces
Frazee C309 Ultratech Universal WB
Metal Primer
PIPE, COPPER TUBING 1" Type K Soft Seamless rolled Tubing 2" Type K Soft Seamless Straight Lengths
1" and 2" Type K Rigid Seamless Straight Lengths
Cerro
Halstead
Lee
Mueller
Phelps-Dodge
PIPE, DUCTILE IRON For Water Lines 100mm (4") and larger manufactured per AWWA C111 C115, C150, C151.

Double Cement Mortar Lined
American Pipe
Griffin
Pacific States
U.S. Pipe
PIPE, PVC C900 For Water Lines 4" through 12" and 8" Gate Wells. AWWA C900 DR18 and DR14
Certainteed
Diamond Plastics
IPEX
JM Eagle
North American Pipe
Pacific Western
VinylTech
February 16, 2016 4
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES PIPE, PVC C905 For Water Lines 16" and 20" through 36". AWWA C905 DR21 and DRJ18
Certainteed
Diamond Plastics
IPEX
JM Eagle
North American Pipe
Pacific Western
Vinyltech

PIPE, STEEL CEMENT

MORTAR LINED AND
COATED (CML+C)
Steel Cylinder (CML/C), Per AWWA M11 and Section 15061. 1/4" Minimum Wall Thickness.

Steel Pipes Used for Recycled Water Installation are to be identified per District requirements. Submittal required.

PLASTIC

ENCASEMENT
12-mil Thick Polyethylene Encasement Sleeve for Ductile Iron Pipe (DIP) per AWWA C105 and Recycled PVC, CMC/L, or DIP Non-Purple Water Pipe.

Clear Sleeve for Potable Water
Purple Color for Recycled Water
PLASTIC WRAP 8-mil Thick Polyethylene Encasement for Buried Fittings and Valves -- Double Wrap
Clear Sleeve for Potable Water
Purple Color for Recycled Water
PRIMER, WAX TAPE Surface Primer for Underground Application of Petrolatum Wax Tape
Carboline Denso Paste
Trenton Tem-Coat

PROTECTOR POST,
STEEL
4" Diameter, 0.250" Wall Galvanized A-120 Steel Pipe, Concrete Filled
SEALANT Chemical Grout for Joint Sealing 3M Scotch Seal

SERVICE SADDLE FOR

ACP AND DI PIPE
Cast Brass ASTM B62 Body with Silicone Bronze Double Straps, IP Outlet Sizes 25mm (1") and 50mm (2")
Ford 202B
Jones J-979
Smith-Blair 323
Romac 202B
Mueller BR2B
AY McDonald 3826

SERVICE SADDLE FOR
PVC C900 PIPE
Bronze or Brass Saddle with Stainless Steel Four Bolt Strap(s), IP Thread Outlet for Sizes 1" and 2" for Pipe Sizes 4" through 12" Ford 202BS
Jones J-969
Smith-Blair 393
Romac 202BS
Mueller BR2S
AY McDonald 3846

SERVICE SADDLE FOR
PVC C905 PIPE
Bronze or Brass Saddle with Stainless Steel Four Bolt Strap(s), IP Thread Outlet for Sizes 1" and 2" for Pipe Sizes 16" and Larger.

Ford 202BS
Jones J-969
Romac 202B
Mueller BR2S
AY McDonald 3846

TAG, BRASS

IDENTIFICATION
1" Diameter, 18 Gauge Brass with 3/16" Die Stamped Letters and Numbers, Suitable for Attachment to Cathodic Protection Wires by means of a Nylon Zip Tie.

Ford 202BS
Jones J-969
Romac 202N
TAPE, OUTER WRAP Adhesive Plastic Outer Wrap for Wax Petrolatum Tape in Underground Applications
Polyken 960
Trenton Polyply
TAPE, UTILITY 10 to 50 Mil x 2" Wide General Utility Tape for Corrosion Protection of Above and Below Ground Pipes and Fittings Calpico
Northtown
Polyken 900
Scotchwrap
3M 50, 51
February 16, 2016 5
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES

TAPE, WARNING/

IDENTIFICATION
6" Wide, Warning/Identification (Non-Metallic) Marking Tape for Buried Facilities with Continuous Warning "Caution Water Main Buried Below" or "Caution Recycled Water Main Buried Below" Tape for Recycled Water shall be Purple
Calpico, Type 1
Line-Tec, Type B
T.Christy Eng., Type 1
Terra Tape, Standard 250
Thor, Elast Tec
Northtown

TAPE WARNING/

IDENTIFICATION FOR

RECYCLED

IRRIGATION
3" Wide, Warning/Identification (Non-Metallic) Marking Tape for Buried Irrigation Pipelines. Purple Color with Continuous warning "Caution Reclaimed Water Main Buried Below"
Calpico, Type 1
Line-Tec, Type B
T.Christy Eng., Type 1
Terra Tape, Standard 250
Thor, Elast Tec
Northtown

TAPE, WAX

ABOVEGROUND
Petrolatum Saturated Synthetic Fabric Tape for use on
Aboveground Couplings, Flanges, Fittings, etc.

Trenton #1 Wax-Tape

TAPE, WAX

UNDERGROUND
Petrolatum Saturated Synthetic Fabric Tape for use on
Underground Couplings, Flanges, Fittings, etc. Primer and Outer Wrap Required.

Carboline Densyl Tape
Trenton #2 Wax-Tape

TAPPING SLEEVE FOR
ACP, DIP, and C-900
Use on 6" - 12" wet taps. All SS flange and construction. No size- on-size taps.

Ford Style Fast
Romac SST/SST3
Smith Blair 663

VALVE STEM

EXTENSION,

FIBERGLASS
Three Part Fiberglass Valve Extension Kit. Use when extension 8 foot or shorter.

Pipeline Products FPU-210,
FPT-200, FPL-220

VALVE STEM

EXTENSION SS
Round or Square 1-1/2" Diameter SS Rod, Welded Construction, with Top Centering Ring and AWWA 2" Operating Nuts Top and bottom. Use when extension longer than 8 foot.

Pipeline Products SX-908

VALVE, BALL WITH

LOCKING TABS
3/4"Bronze, Straight, FIP x Meter Swivel with Locking Tabs and Purple Handle
1" Ford B13-444w
1" Jones J1908
2" Ford BF13-777W
2" Jones J1913
AY McDonald 76101W

VALVE, BUTTERFLY
150 PSI
18" and Larger, AWWA C504, Class B. Thermosetting or Fusion Bonded Epoxy coated and Lined. Class D or E Flange x Flange Ends
M&H 1450, 4500
Mueller Lineseal III
Pratt Groundhog

VALVE, BUTTERFLY
250 PSI
18" and Larger, AWWA C504, Class B. Thermosetting or Fusion Bonded Epoxy coated and Lined. Class D or E Flange x Flange Ends
M&H 1450, 4500 (Class 250)
Mueller Lineseal XP 250
Pratt Triton HP-250

VALVE, GATE,

RESILIENT WEDGE
(RWGV)
4" through 16", non-rising Low Zinc Bronze or Stainless Steel Stern, Ductile Body and Bonnet, encapsulated Wedge per AWWA C509 or C515 with Epoxy Coated Interior. Manufactured to AWWA C509 or C515, with 250 PSI Rating
*Ductile Iron Bodies and Bonnets are required
*Holiday Free per CMWD Standards Sec. 15100-1.8
American FC, Series 2500
AVK 45
Clow F6100, F6100 Ductile
Kennedy Ken-Seal ii, KRSR
Mueller 2361
M&H 4067, 7067, A2361
U.S. Pipe Metroseal &
Metroseal 250

VALVE, PRESSURE

RELIEF AND

SUSTAINING
Epoxy coated in/out. Stainless trim. Model specified for each job. Cla-Val February 16, 2016 6
APPENDIX "I"
Item Description Manufacturer/Model

CARLSBAD MUNICIPAL WATER DISTRICT'S APPROVED MATERIALS LIST

FOR USE ON CONSTRUCTION OF POTABLE AND RECYCLED WATER FACILITIES

VALVE, HANDLE BALL,
150 PSI
3/4" Through 2", Used as part of meter assembly and provided by CMWD
Jones 3/4" J-1098
Jones 1" J-1908, 2" J-1913
Ford 3/4" B13-332W
Ford 1" B13-444W
Ford 2" B13-777W
AY McDonald 76101MW w/SHDLB

VALVE BOX

RECYCLED WATER
VALVES
Lid to be marked "Recycled Water", See Standard Dwg W13 South Bay Foundary SBF 1208-N VALVE BOX For Gate Valves & Butterfly Valves, See Standard Dwg W13, Lids shall be marked "Water"
Brooks Service 4TT J&R 4T
VALVE BOX Normally Close Valve, Lids shall be marked "Water" Brooks Service 3RT VALVE BOX 1" Blow Off or Manual Air Releases. See Standard Dwg W5, Lids shall be marked "Water"
Brooks Service 4TT J&R 4T
VALVE BOX 2" Blow Off or Manual Air Release. See Standard Dwg W6 Lids shall be marked "Water"
South Bay Foundary SBF 1243
VALVE BOX 4" Blow Off Assembly. See Standard Dwg W11 South Bay Foundary SBF 1243 (for 4" Pipe Outlet) and Brooks 4TT or J&R 4T
(for Valve)
VALVE BOX Air-Vaccum Valve Assembly. See Standard Dwg W7 Valve Boxes Located in traffic shall use approved manufacturer's Traffic Rated Lids
Amorcast A600 1640 PC-12
w/#60001643*Service 5 Cover
Brooks 66 (2-piece lid)
J&R No W6B (2-pice lid)
WIRE, TRACER #14 AWG Solid Copper UF Type Wire, with Cross Linked Polyethylene insulation. White or Yellow in Color
Baron
Cosberg Industries
Paige
Regency Wire

WIRE, TRACER

CONNECTOR
Direct Bury Silicone-Filled Capsule Tube with Standard Wire Nut or Silicone-Filled Wire Nut Connectors for Tracer Wire
Connections.
3M DBR-6
King 4
King 5
King 6
February 16, 2016 7

APPENDIX J

ACP REMOVAL TECHNICAL

SPECIFICATIONS
SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

1 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
PART 1 - GENERAL

1.1 DESCRIPTION
A. The work of this Section includes the repair, removal, transport and disposal of asbestos cement pipe (ACP) or asbestos containing material (ACM) typically encountered in water distribution systems.

B. This section includes a summary of the incidental procedures and equipment required to protect workers and the public from exposure to airborne asbestos fibers. This document is not a comprehensive ma nual on the state -of-the-art practice for asbestos abatement procedures, equipment, or materials. The selected contractor represents, by acceptance of this work, that the Contractor is aware of the various state -of-the-art practice procedures, equipment, and materials acceptable by regulatory agencies that are also efficient, effective, and protective of human health and the environment.

1.2 REFERENCED SPECIFICATIONS AND STANDARDS
A. Except as otherwise indicated, the current editions of the following apply to the WORK of this Section.

AWWA C110 Ductile-Iron and Gray-Iron Fittings
AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings AWWA C115 Flanged Ductile-Iron Pipe with Ductile -Iron or Gray-Iron Threaded Flanges
AWWA C150 Thickness Design of Ductile-Iron Pipe
AWWA C151 Ductile-Iron Pipe, Centrifugally Cast
AWWA C153 Ductile-Iron Compact Fittings for Water Service AWWA C213 Fusion-Bonded Epoxy Coatings and Linings for Steel Water Pipe and Fittings
AWWA C219 Bolted, Sleeve-Type Couplings for Plain-End Pipe AWWA C800 Underground Service Line Valves and Fittings
Code of California Regulations, Title 8, Section 1529. Asbestos 29 CFR 1926.1101 – Asbestos

1.3 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02223 – Trenching, Excavation, Backfilling and Compacting B. Section 02262 – Asbestos Cement Pipe Testing
C. Section 15000 – General Piping Systems and Appurtenances

1.4 REGULATORY REQUIREMENTS
A. Except to the extent that more explicit or more stringent requirements are written directly into the Contract Documents, all applicable Federal, State, and local codes, regulations, and standards have the same force and effect (and are made a part of the contract documents) as if copied directly into the Contract Documents, SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

2 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
or as if published copies are bound here within. Regulation references in the text are Federal regulations except where the State of California codes are listed in this section. Where the Federal and State regulations differ, the more stringent regulation shall be relevant to this Specification.

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaini ng to work practices, hauling, disposal, and protection of workers, visitors to the site, and persons occupying areas adjacent to the site.

C. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as r equired by the applicable Federal, State, and local regulations.

D. The Contractor shall hold the Agency and Agency’s consultants harmless for failure to comply with any applicable work, hauling, disposal, safety, health, or other regulation on the part of the Contractor, the Contractor’s employees, and the Contractor’s subcontractors.

E. Federal Requirements:

1. Occupational Safety and Health Administration (OSHA), including, but not limited to Code of Federal Regulations (CFR) – Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite Final Rules:
29 CFR 1910.1001 – General Industry Standard
29 CFR 1926.1101 – Construction Industry Standard
29 CFR 1910.134 – Respiratory Protection
29 CFR 1910.20 – Access to Employee Exposure and Medical Records 29 CFR 1910.1200 – Hazard Communication
29 CFR 1910.145 – Specifications for Accident Prevention, Signs and Tags

2. United States Department of Transportation (DOT), including, but not limited to:
49 CFR 171 and 172 – Hazardous Substances

3. United States Environmental Protection Agency (US EPA), including, but not limited to:
40 CFR 763 Subpart E – Asbestos Abatement Projects, Worker Protection Rule
40 CFR 763 Subpart E – Asbestos Hazard Emergency Response Act (AHERA) Regulation, Asbestos-Containing Materials in Schools Final Rule and Notice
40 CFR 763 Subpart E, Appendix C – Training Requirements of AHERA Regulation, Asbestos -Containing Materials in Schools Final Rule and Notice
40 CFR 61 Subpart A and Subpart M (Revised Subpart B) – National Emission St andards for Hazardous Air Pollutants (NESHAP), National Emission Standard for Asbestos
SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

3 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
Public Law 101-637 – Asbestos School Hazard Abatement Reauthorization Act (ASHARA), enacted November 28, 1990
F. State Requirements

1. Cal/OSHA, including but not limited to:

Title 8 CCR 341.17-Asbestos Trainer and Training Requirements Title 8 California Code of Regulations (CCR) 1529 – Construction Standard Title 8 CCR 2303 – Injury and Illness Prevention Plan
Title 8 CCR 5144 – Respiratory Protection
Title 8 CCR 5194 – Hazard Communication
Title 8 CCR 5208 – General Industry Safety Orders, Asbestos Regulations Title 8, Article 2.5 – Asbestos-Related Work Registration Title 22, Division 4, Chapter 30 – Minimum Standards for Management of Hazardous and Extremely Hazardous Waste

2. California Department of Toxic Substances Control (DTSC) – Transport and Disposal Regulations
G. Local Requirements
Abide by all local requirements which govern asbestos abatement work or hauling and disposal of asbestos waste materials, including:

1. San Diego County Air Pollution Control District ( APCD) Rule 1206 – Asbestos Removal, Renovation, and Demolition

1.5 DEFINITIONS
Asbestos – includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that has been chemically treated and/or altered. Asbestos includes PACM, as defined herein.

Asbestos-Containing Material (ACM) – any material containing more than one percent asbestos.

Asbestos-Containing Waste Material (ACWM): Any material, which is or is suspected of being ACM, or any material contaminated with an asbestos, which is to be removed from a work area for disposal.

Authorized Person – any person authorized by the employer and required by work duties to be present in regulated areas.

Class I Asbestos Work – activities involving the removal of thermal system insulation (TSI) and surfacing ACM and PACM.

Class II Asbestos Work – activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, a nd construction mastics. Removal of ACP is considered Class II asbestos work.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

4 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
Class III Asbestos Work – repair and maintenance operations where ACM, including TSI and surfacing ACM and PACM, is likely to be disturbed. Repair and maintenance of ACP is considered Class III asbestos work.

Class IV Asbestos Work – maintenance and custodial activities during which employees contact but do not disturb ACM or PACM and activities to clean up dust, waste and debris resulting from Class I, II, and III activities.

Competent Person – one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them: in addition, for Class I and Class II, work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR part 763) for supervisor, or its equivalent and, for Class III and Class IV work, who is trained in a manner consistent with EPA requirements for training of local education agency maintenance and custodial staff as set forth at 40 CFR 763.92 (a)(2). Note: For operations involving more than 100 square feet of asbestos containing construction material as defined in Title 8, CCR, Section 1529 (r), the competent person may fulfill the requirement contained in Section 341.9 to specify a certified supervisor for asbestos related work.

Consultant – assigned to record and report on the progress of asbestos abatement work.

The Consultant is retained to conduct site visits, pre- and post-abatement visual surveys, and baseline, area, and clearance air monitoring.

Demolition – the wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.

Disturbance – activities that disrupt the matrix or crumble or pulverize ACM or PACM or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM and PACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or waste bag which shall not exceed 60 inches in length and width.

Glove Bag – an impervious plastic bag-like enclosure affixed around not more than a 60 x 60-inch asbestos-containing material, with glove -like appendages through which material and tools may be handled. Glove bags shall be seamless at the bottom.

HEPA Filter Vacuum Collection Equipment (or vacuum cleaner) – High efficiency particulate air filtered va cuum collection equipment with a filter system capable of collecting and retaining asbestos fibers. Filters should be of 99.97% efficiency for retaining fibers of 0.3 microns or larger. See P100 Filter Vacuum Collection Equipment (or vacuum cleaner).

HEPA Filter – A high efficiency particulate air filter capable of trapping and retaining

99.97% of mono-dispersed particles greater than 0.3 microns in diameter. See P100 Filter below.

Intact – the ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.

Most Contaminated Worker – The employee assigned the breathing zone air sample representing the highest daily exposure in each work area (8-hour TWA).

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

5 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
Negative Initial Exposure Asse ssment: A demonstration by the Contractor, which complies with the criteria in 29 CFR 1926 -1101 (f)(2)(iii), that employee exposure during an operation is expected to be consistently below the PEL.

Permissible Exposure Limit (PEL)-Asbestos – The airborne concentration of asbestos (0.1 f/cc) at which the Contractor shall ensure that no employee is exposed. Where the PEL is exceeded the Contractor shall establish and implement a written program to reduce employee exposure to or below the limit by (1) engineering and work practice controls, and (2) use of required proper respiratory protection. No employee shall be exposed at any time to airborne concentrations of asbestos in excess of 1.0 fibers/cc during any 30- minute period, which is the Excursion Limit.

P100 Filter Vacuum Collection Equipment (or vacuum cleaner) – High efficiency particulate air filter (formerly known as a HEPA filter, currently known as a P100 filter) vacuum collection equipment with a filter system capable of collecting and retaining asbestos fibers. Filters should be of 99.97% efficiency for retaining fibers of 0.3 microns or larger.

P100 Filter – A high efficiency particulate air filter (formerly known as a HEPA filter, currently known as a P100 filter) capable of trapp ing and retaining 99.97% of mono - dispersed particles greater than 0.3 microns in diameter.

PACM – presumed asbestos -containing material, or thermal system insulation and surfacing material found in buildings constructed no later than 1980 unless the designation of a material as PACM is rebutted pursuant to Title 8, CCR, Section 1529 (k)(5).

Regulated Area – an area established by the employer to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulate; and a work area within which airborne concentrations of asbestos, exceed or there is a reasonable possibility they may exceed the permissible exposure limit (as defined in Title 8, CCR, Section 1529) . Requirements for regulated areas are defined in Title 8, CCR, Section 1529 (e).

Removal – all operations where ACM and/or PACM is taken out or stripped from structures or substrates and includes demolition operations.

Wetting Agents – amended water (surfactant) used for asbestos removal and disposal activities. Airless sprayers are used to apply amended water during removal procedures.

Work Area – the area where asbestos-related work is performed which is defined and/or isolated to pr event the spread of asbestos fibers and entry by unauthorized personnel.

Work area is a Regulated Area as defined by 29 CFR 1926.

1.6 QUALITY ASSURANCE
A. Laboratory Qualification
The laboratory shall be regularly engaged in asbestos testing, and personnel used for monitoring airborne concentrations of asbestos fibers shall be proficient in this field. This proficiency shall be demonstrated by current acceptable participation in the Proficiency Analytical Testing (PAT) program and each analyst sha ll have completed the National Institute for Occupational Safety and Health (NIOSH) 582 Course (Sampling and Analysis for Asbestos) or the equivalent. The laboratory that performs PCM or TEM sample analysis must be accredited by National Voluntary Laboratory Accreditation Program (NVLAP).

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

6 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
B. Contractor and/or Contractor’s Certified Industrial Hygienist

1. The Contractor or Contractor's CIH is responsible for the following:
a. Review of this Specification;
b. Assign air monitoring personnel to sample Contractor’s emplo yee exposures and an analytical laboratory that conforms to this Section;
c. Maintain complete air sampling records, keep a daily activity log, and provide a report, which contains all personal air sampling results; and,
d. Monitor air fiber concentrations insid e and outside the regulated area daily.

2. The Contractor shall conduct, on a regular basis, observations regarding the integrity of all barriers constructed to protect outside environment from asbestos fiber release; work and safety plans; and proper perfo rmance of measures used to protect employees, including removal, encapsulation, disposal. The Engineer shall be informed immediately of operational problems or deviations from this Specification, initially by telephone and then in writing.

3. If, at any time the Contractor’s Competent Person or CIH determines that practices are in violation of pertinent and applicable regulations or that air results exceed specified allowable levels, they will notify the Engineer immediately. All work activity in the affecte d area(s) will cease until corrective actions have been taken. Any cost resulting from such a stop work order issued by the CIH or the Engineer will be borne by the Contractor and will not be considered as a basis for an increase in the contract amount.

4. The Contractor is responsible for the safety of all persons in or around the regulated area or within the areas the Contractor is using for ingress and egress.

1.7 ASBESTOS FIBER CONCENTRATION CONTROL LIMITS
A. Inside Enclosed Work Area

1. Air concentrations of asbestos shall not exceed an 8-hour TWA of 0.1 f/cc of air by PCM for personnel selected as Most Contaminated Worker. Air concentrations of asbestos shall not exceed the 30-minute excursion level of 1.0 f/cc of air.

B. Outside Asbestos Work Area

1. Air concentrations of asbestos fibers shall be maintained at an 8-hour TWA at or below 0.01 f/cc of air (by PCM). This applies to all areas outside the contained work areas while work is in progress, except for the asbestos Work Area.

C. Area Clearance Sampling

1. Asbestos abatement clearance may be conducted by the Engineer and will include visual inspection only.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

7 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

1.8 TITLE OF WASTE MATERIAL
ACWMs resulting from abatement activities, except as specified otherwise, shall be the property of the Owner and shall be disposed of by the Contractor as required by applicable Federal, State and local regulations. Waste manifests will be signed by the Owner or Owner’s Representative. Copies of all waste manifests are to be maintained by the Contractor as part of the required “close-out” documents. Contractor will submit the waste disposal site name, location, and US EPA identification number where asbestos waste will be disposed. In addition, the Contractor will submit a letter from the disposal site certifying that the disposal site is legally authorized to receive ACM scheduled to be removed from the work area.

1.9 MEDICAL REQUIREMENTS
The Contractor shall provide workers with a comprehensive medical examination as required in 8 CCR 1529 (m). The Contractor shall submit one copy of most recent physical examination for each employee the Contractor will employ on the project. Physician’s certificate must permit employee to work using a respirator and be dated within the last 12 months.

1.10 TRAINING
The Contractor shall certify that all workers performing asbestos abatement activities shall have successfully completed training provided by a Cal/OSHA approved training provider as defined in 8 CCR Section 341.17 within the past 12 months and have in their possession a valid Asbestos Worker Training Certificate or Contractor/Supervisor Certificate, issued by a Cal/OSHA -accredited trainer within the past 12 months. All certifications must comply with the recent Mod el Accreditation Plan (MAP) provisions (8 CCR 1529 (k)(9)). Contractor will be required to submit a copy of each employee’s training records prior to start of project and maintain a copy of all certifications on site for the duration of the project.

1.11 PERMITS, LICENSES, NOTIFICATIONS, AND PATENTS
The Contractor will secure necessary permits and pay fees for asbestos removal, hauling, and disposal and provide timely notification of such actions as may be required by Federal, State, and local authorities. Copies of such notification shall be provided to the Engineer prior to commencement and following completion of work. Post all notices required by applicable Federal, State, and local regulations at the job site where asbestos abatement work will be performed. One copy of all notices shall also be kept on file in Contractor's office.

1.12 SAFETY COMPLIANCE
A. Contractor will comply with laws, ordinances, rules, and regulations of Federal, State, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work.

B. The Contractor shall develop and keep on site an Emergency Evacuation Plan for each work area in which the Contractor expects to use for ingress and egress. The Emergency Evacuation Plan shall be distributed and read by all personnel required to enter the work area. The Contractor shall post this plan at the entrance to the work area.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

8 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
C. Post warning signs and labels and ensure the employees are properly trained and outside contractors are properly notified. Contractor will conduct “tail-gate” health and safety meetings prior to work each shift to review the Contractor’s Health and Safety Plan and discuss new hazards, if applicable.

D. The Contractor will institute all necessary precautions so that no unauthorized personnel enter the regulated areas by mistake or design. When the work Site is unattended, the regulated area shall be secured so that unauthorized personnel cannot enter the area.

1.13 RESPIRATORY PROTECTION
A. The Contractor shall provide and ensure the proper use and selection of respirators, perform required respiratory fit tests and institute a respiratory program. The Contractor will be required to submit one copy of most recent fit test results for each employee who the Contractor will employ on the project. Evidence of successful fit test within the last year (from the start date of the project) must be provided for each employee.

PART 2 - PRODUCTS

2.1 AMENDED WATER
A mixture of surfactant and water for wetting of the ACP and retardation of fiber release equal to or greater than that provided by the use of one ounce of a surfactant consisting of 50% polyoxyethylene ester and 50% polyoxyethylene ether mixed with five gallons of water.

2.2 DISPOSABLE CONTAINERS
Waste containers shall be suitable to receive and retain any asbestos -containing or asbestos-contaminated materials until disposal at an approved site. Separate waste bins shall be utilized for hazardous and non -hazardous wastes. The containers shall be labeled in accordance with Federal, State and local regulations. Containers must be lockable, closed top bins, which are both airtight and watertight.

2.3 EYE PROTECTION
Full-face masks or goggles must be provided to personnel engaged in asbestos operations. Eye protection must be worn during operations that may present risk or damage to the eyes.

2.4 FITTINGS
A. Fittings (bends, tees, sleeves) used in connection or repair work shall be ductile iron conforming to AWWA C110 , C111, C 115, C150, C151, and C153 as applicable.

B. Couplings for joining plain end pipe shall conform with the requirements of Section 15000 and be selected from the Approved Materials List.

2.5 GLOVES
Gloves shall be disposable poly or rubber gloves to protect hands. Cloth gloves may be worn inside poly or rubber gloves for comfort but shall not be used alone.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

9 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

2.6 PIPE
A. Pipe for ACP connection or repair work shall consist of Polyvinyl Chloride (PVC) pipe conforming to AWWA C900 for 12 inch and smaller pipe diameters. For larger pipe diameters, pipe type shall be as approved by the Engineer and may consist of either PVC conforming to AWWA C900, ductile iron pipe conforming to AWWA C151 or steel pipe conforming to AWWA C200 (submittal required).

B. Pipe linings and coatings for ductile iron or steel pipe shall conform to CMWD Standards.

2.7 PIPE SADDLES
A. Bronze double strap saddles shall be used on pipe sizes 8 inch through 16 inch.

The saddle body shall be manufactured from cast bronze in accordance with ASTM B62 or B584 and AWWA C800. The gasket shall be Buna N.

B. A fabricated steel saddle shall be used for all connections on pipe sizes larger than 16 inch.

C. The carbon steel used in the fabricated steel saddle shall have a minimum yield strength of 30,000 psi. The bolts and nuts shall be Type 316 stainless steel. The entire saddle shall be shop coated with 8 to 10 mils of fusion bonded powder epoxy in accordance with AWWA C213.

D. No wet taps will be allowed where the outlet is the same size as the main.

E. Fabricated steel and cast bronze saddles shall have a minimum 1/ 2-inch NPT threaded tap for testing.

2.8 POLYETHYLENE BAGS
A. Polyethylene bags shall be a minimum 6 -mil thickness and transparent, printed with warning labels per DOT and US EPA regulations and 8 CCR 1529 (k)(8).

2.9 POLYETHYLENE SHEETING
A. Sheeting must be fire retardant and shall be sized in lengths and widths to minimize the frequency of joints. Drop sheets used inside a negative pressure enclosure must be fire retardant material. The minimum thickness shall be as follows:

1. Wall and floor barriers – 6-mil

2. Ceiling barriers – 6 mil

3. All others (critical barriers, etc.) – 6-mil

2.10 RESPIRATORS
A. Respirators shall be selected in accordance with the requirements of Title 8, CCR, Section 1529 and shall conform to not less than the following minimum requirements:

1. Half-mask air purifying respirator equipped with a high efficiency P100 filter.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

10 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

2.11 SIGNS AND LABELS
A. Warning signs and labels shall be printed in letters of sufficient size and contrast so as to be readily visible and legible. Signs shall be visible from a distance of 20 feet.

B. Warning signs shall bear the following information:

DANGER

ASBESTOS

MAY CAUSE CANCER

CAUSES DAMAGE TO LUNGS

AUTHORIZED PERSONNEL ONLY

WEAR RESPIRATORY PROTECTION AND

PROTECTIVE CLOTHING IN THIS AREA
C. Labels of bags or containers of protective clothing and equipment, scrap, waste, and debris containing asbestos fibers bear the following information:

DANGER

CONTAINS ASBESTOS FIBERS

MAY CAUSE CANCER

CAUSES DAMAGE TO LUNGS

DO NOT BREATHE DUST

AVOID CREATING DUST
D. The DOT requires the following language on waste containers:

HAZARDOUS WASTE, SOLID N.O.S., ORM-E, NA 9188 (ASBESTOS)(RQ)

2.12 WATER SPRAYERS
Water sprayer shall be an airless or other low -pressure type emitting a fine mist for amended water application.

PART 3 - EXECUTION

3.1 GENERAL
A. All work involved in the removal, salvage or disposal of ACP shall be the responsibility and performed at the expense of the Contractor.

B. Contractor will be responsible for submitting a Shut Down/Connection Request and scheduling the work with the City and CMWD and confirming that the water system has been shut down or otherwise isolated prior to starting work.

C. Contractor shall furnish and utilize all required protective respirators, clothing and equipment, as applicable, in the performance of the work in accordance with applicable regulations.

D. Connections and repairs to ACP systems shall be as a pproved by the Engineer.

All pipe connections shall be made at existing joints. Field cutting of ACP shall not be permitted. Snap cutting of ACP may be allowed only with the prior approval of the Engineer.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

11 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
E. The Contractor shall install all repair and connection pipe, closure sections, fittings, valves and appurtenances as shown on the Plans including bolts, nuts, gaskets, and jointing materials.

F. The Contractor shall maintain the inside of the pipe clean, sanitary, and free from foreign materials. At all times when the work of installing pipe is not in progress, all openings into the pipe and the ends of the pipe in the trenches shall be kept tightly closed to prevent the entrance of animals and foreign materials.

G. Where closure sections are required, the sections shall be installed in accordance with the manufacturer's installation guide and shall only be used with the approval of the Engineer.

H. Combined deflections at rubber gasket or flexible coupling joints shall not exceed 2-1/2 degrees or the maximum allowed by the coupling manufacturer, whichever is less. Bending of PVC pipe will not be allowed.

I. Use of pipe sections less than 5 feet long shall only be permitted with the approval of the Engineer.

J. Any ACP water line(s) being abandoned sh all be abandoned in place in accordance with CMWD Standards unless otherwise approved.

3.2 REGULATED AREAS
A. ACP removal or repair work shall be conducted in a regulated area demarcated in any manner that minimizes the number of persons within the area and protects persons outside the area from exposure to airborne asbestos. Signs shall be provided and displayed pursuant to the requirements of this section.

B. The Contractor shall ensure that all asbestos work performed within regulated areas is supervised by a competent person.

C. The Contractor shall limit access to the work area to authorized representatives of the Owner. At no time shall any personnel enter a work area without notifying the on-site competent person first and signing the site entry log.

3.3 VISITOR COMMUNICATIONS
A. All inquiries concerning work involving ACP shall be directed to the on -site competent person. The Contractor shall notify the Engineer of visitors (i.e. , regulatory inspectors, law enforcement, press, etc.) that visit the site during the work.

B. The Contractor shall immediately notify the Engineer if a regulatory agency issues a citation to the Contractor.

3.4 SIGNS AND LABELS
A. Warning signs that demarcate the regulated area shall be provided and displayed at each location. Signs shall be posted at such a distance from such a location that an employee may read the signs and take necessary protective steps before entering the area marked by the signs.

B. Labels shall be affixed to all products containing asbestos and to all containers containing such products, including waste containers.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

12 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

3.5 ACP ABANDONMENT
A. If it is necessary to remove abandoned ACP line(s) and/or appurtenances, the appurtenances shall be removed and salvaged, if requested, by CMWD.

B. ACP to be abandoned in -place shall be slurry filled with a sand -cement slurry conforming to Section 02223.

3.6 REMOVAL
A. ACP shall be removed and disposed of in accordance with all applicable laws.

B. All persons entering a regulated area where employees are required to wear respirators pursuant to Title 8, CCR, Section 1529 (h)(1) shall wear a respirator conforming to the requirements therein. Respirators shall be used without exception when the removal of ACP cannot be performed intact.

C. In accordance with Title 8, CCR, Section 1529, the following work practices and controls are prohibited during removal or cleanup of ACP or debris:

1. Cutting or grinding with high-speed abrasive saws or grinding discs that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust air.

2. The use of compressed air to remove asbestos, or materials containing asbestos, unless the compressed air is used in conjunction with an enclosed ventilation system designed to capture the dust cloud created by the compressed air.

3. Dry sweeping, shoveling or other dry clean-up of dust and debris.

4. Employee rotation as a means of reducing employee exposure to asbestos.

5. Eating, drinking, smoking, chewing tobacco or gum or application of lotions, sunscreen or any other cosmetics.

D. Proper methods shall be used to prevent the generation of friable asbestos during removal or handling of ACP. The following methods shall be used:

1. The material shall be thoroughly wetted with amended water (containing a wetting agent to increase the ability of the liquid to penetrate ACP) prior to and during its removal.

2. The material shall be removed in an intact state unless intact removal is demonstrated as not possible.

3. Unnecessary cutting, abrading or breaking the material shall be prohibited unless demonstrated that methods less likely to result in asbestos fiber release are not feasible.

4. Asbestos-containing material removed shall be immediately bagged or wrapped in two layers of 6-mil polyethylene prior to disposal or kept wetted until transferred to an approved closed receptacle no later than the end of the work shift.

5. ACP debris remaining in trenches should be removed by hand and placed into sealed, impermeable, waste bags for appropriate disposal.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

13 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

6. If removal by hand is infeasible, use vacuum cleaners equipped with HEPA filters to collect fine debris containing ACM or PACM. The equipment shall be used and emptied in a manner that minimizes the reentry of asbestos into the work area.

3.7 SAMPLES FOR LABORATORY TESTING
A. The Contractor shall take samples of ACP for laboratory testing in accordance with Section 02262 as follows:

1. When the Work is related to the repair or replacement of ACP at valve replacement or pipeline repair sites, the Contractor shall mark the top of pipe prior to removal and retain the shortest ACP segment removed from each work site.

2. Where the project involves removal of ACP for pipeline replacement projects greater than 500 lineal feet , the Contract or shall identify the shortest segment of ACP to be retained as a sample and provide one sample for every 500 lineal feet of pipeline removed. Mark the top of pipe prior to removal.

B. Individually package and label each sample. Carefully bag and seal the sa mple air-tight with approved bagging and packaging materials. Keep packaged samples dry, sealed, and away from direct sunlight and high temperature during transportation.

C. Clearly label the outside of the bagging with the station/location, unique pipe ID designated by the Owner, and date of removal.

D. Deliver or ship the bagged and sealed sample to the laboratory for testing in accordance with Section 02262.

3.8 DISPOSAL
A. The Contractor shall determine current waste handling, transportation, and disposal regulations for the work area and for the waste disposal landfill to receive ACP. The Contractor must comply fully with these regulations and all DOT and US EPA requirements.

B. Non-friable materials may be disposed as non-hazardous construction waste at a disposal site permitted to receive the waste. The Contractor shall notify the receiving non -hazardous waste landfill of the type and nature of the asbestos debris to be disposed.

C. County of San Diego landfills do not accept friable asbestos -containing materials for disposal. Friable asbestos -containing materials are regulated as hazardous waste (22 CCR 66261.24). A friable material is defined as material that can be crumbled, pulverized, or reduced to powder in the hand.

D. All removed ACP shall be properly manifested and prepared for transport following the criteria of the County of San Diego Department of Public Works, Solid Waste Division.

E. County of San Diego land fills accept non-friable ACP under the following conditions:

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

14 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

1. ACP less than three feet long must have all broken edges encapsulated (sealed) with an approved product and double wrapped in 6 -mil plastic which is properly sealed to prevent expulsion of dust particles.

2. Intact AC P over three feet long does not require double wrap in 6 -mil plastic. Any broken edges, however, must be encapsulated with an approved product.

3. Contractor shall confirm with the landfill the quantity of ACP to be accepted per day per generator and shall obtain prior approval from the Solid Waste Division prior to transport.

4. Transport ACP to the landfill for disposal via dump truck or waste bins.

CMWD will not transport or dispose of ACP generated by the Contractor’s activities.

5. Each load must be accompanied by a Department of Public Works Non- Hazardous, Non-Infectious Special Waste Manifest.

6. All loads may be subject to inspection by County personnel prior to admittance to the landfill.

F. Sealed waste containers may be stored within the work area until a sufficient volume of waste has accumulated for disposal, but not to exceed five days. This storage area will be prominently designated and waste containers will be covered with polyethylene sheeting. Waste should be stored out of sight of the public in a secure area.

G. The Contractor shall fill out manifest forms for the Owner’s (Generator’s) signature.

Original disposal receipts, manifests, and bill of lading forms must be submitted to the Engineer within ten days following legal disposal.

3.9 INSTALLATION
A. Connections shall be made at existing pipe joints and snapping of existing ACP, either ratchet or hydraulic, is permitted only when necessary and with prior wetting of the pipe and throughout the entire process.

B. The Contractor shall use PVC pipe , or other pipe type as approved by the Engineer, to replace removed ACP or where new connections are necessary. All new pipe shall comply with the CMWD Approved Materials List.

C. The Contractor shall dewater the trench to prevent the pipe from floating and shall assume full responsibility for any damage caused and shall, at their own expense, remove and reinstall or replace the pipe to the original line and grade or to the specified line and grade.

D. New pipe or materials shall not be dropped, dragged, or handled in a manner that will cause damage. All pipe, fittings, valves and other materials shall be lowered into the trench using nylon straps or by other approved methods. All materials damaged during installation shall be identified and removed from the job site.

E. The bedding material beneath pipe bells shall be excavated at each joint to permit proper assembly and inspection of the entire joint.

F. Pipe sections shall be laid in the trench to true alignment and grade in accordance with the drawings. The pipe grade shall be approved by the Engineer.

SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL

15 of 15 SECTION 02060

ASBESTOS CEMENT PIPE REMOVAL AND DISPOSAL
G. New pipe segments shall be at least five feet long. Shorter lengths shall be permitted only when necessary due to connection length constraints and with the approval of the Engineer.

H. Fittings shall be supported until concrete thrust blocks are placed so that the pipe is not subjected to the weight of the fitting.

I. Concrete thrust blocks of the size shown on the Plans shall be constructed at all fittings and valves unless otherwise approved by the Engineer and at no additional cost.

END OF SECTION

APPENDIX K

ACP TESTING TECHNICAL

SPECIFICATIONS
SECTION 02262

ASBESTOS CEMENT PIPE TESTING

1 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING
PART 1 - GENERAL

1.1 DESCRIPTION
A. The work of this Section includes sampling and laboratory testing of asbestos cement pipe (ACP) using laboratory energy dispersive x-ray spectroscopy (EDS).

1.2 COORDINATION
A. Sampling of ACP shall be conducted after the pipeline has been isolated by the Owner and authorization to proceed is provided by the Owner . Cutting and removal of ACP without previous authorization from the Owner is prohibited.

B. Contractor shall coordinate with the testing laboratory to determine the requirements for the delivery of ACP and costs for handling and cutting (in the laboratory) of pipe segments that are longer than 16 inches in length.

1.3 REFERENCED SPECIFICATIONS AND STANDARDS
A. Except as otherwise indicated, the current editions of the following apply to the WORK of this Section.

Code of California Regulations, Title 8, Section 1529. Asbestos Code of California Regulations, Title 8, Section 341.17 . Approval of Asbestos Cement Pipe Training and Asbestos Cement Pipe Course Providers for the Purpose of Employer Exemption from Registration Requirements. 29 CFR 1926.1101 – Asbestos

1.4 RELATED WORK SPECIFIED ELSEWHERE
A. Section 02060 – Asbestos Cement Pipe Removal and Disposal

1.5 QUALIFICATIONS
A. Personnel responsible for cutting and handling the ACP:

1. Trained and experienced in the means and methods of cutting ACP per the requirements of California OSHA Title 8, section 341.17. 2 Have completed the Initial 4-hour training course; as required and described in CCR Title 8, Section 341.17.
3 After completing the Initial 4-hour training course; once every 12 months (minimum) complete the refresher 2-hour training course described in CCR Title 8, Section 341.17.

B. Laboratory responsible for EDS testing:

1. Experienced and qualified in performing EDS testing on ACP for a minimum of three (3) projects in the last three (3) years.

C. Personnel responsible EDS testing

1. Trained and experienced in operating scanning electron micros copy and energy dispersive spectroscopy equipment for a minimum of three (3) years, having worked with the equipment used for this project for a minimum of one (1) year.

SECTION 02262

ASBESTOS CEMENT PIPE TESTING

2 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING

1.6 SUBMITTALS
A. Submit the following within 20 calendar days of the Notice to Proceed:

1. Work experience and ACP training certificates of personnel responsible for cutting and handling of the ACP including:
a. Date and Location of work performed.
b. Name and phone number of contacts with Owner or Owner’s representative for whom the work was performed.
c. Name of the individual and training and experience of the "Competent Person" for the duration of work in this Section. d. When requested; provide the air sampling study/studies which were used to demonstrate that the methods used to maintain, and or remove the ACP will maintain air borne asbestos limits below the OSHA Permissible Exposure Limit (PEL). Exposure studies must be relevant to the specific work/task that will be completed.

2. Safety equipment and measures, including personnel safety gear, temporary enclosures, warning signs, fences, etc. to be used at the site.

3. Packaging materials to be used for safe storage and transportation of ACP samples.

4. Work experience of the laboratory in responsible charge of performing EDS testing:
a. Description of work performed and date.
b. Name and phone number of contacts with Agency, Owner, or Owner’s representative for whom the work was performed.

5. Documentation verifying calibration of EDS testing equipment and devices to be used for this project.

6. Work experience of personnel responsible for administering EDS testing on ACP:
a. Date, Laboratory name, and location of work performed. b. Name and phone number of contacts with Agency, Owner, or Owner’s representative for whom the work was performed.

7. EDS scanning e lectron microscope to be used by laboratory for EDS testing.

8. Laboratory ACP testing work plan.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.1 SAFTEY MEASURES
A. Perform all work in accordance with the local building codes, Federal Industrial Safety Orders, Asbestos NESHAP requirements, and requirements of Cal/OSHA.

Personnel working on or in direct vicinity of cutting and handling ACP must wear SECTION 02262

ASBESTOS CEMENT PIPE TESTING

3 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING
protective outerwear, eyewear, and respirators per Cal/OSHA Title 8, Section 5144.

B. Provide safeguards to public and personnel safety i ncluding warning signs, fences, lights, and/or other similar items that are necessary for the protection of all personnel during the cutting and handling activities of ACP.

C. Assemble and use temporary enclosures to contain asbestos fibers that may be released and prevent them from release to the atmosphere during cutting. Wet the ACP during cutting to prevent generation of asbestos fibers that may become airborne.

D. The Contractor shall assume full responsibility for personnel and site safety.

3.2 PIPE CUTTING
A. ACP to be removed shall be removed to the nearest pipe joint. Unnecessary cutting or snapping of pipe shall not be allowed, and the shortest ACP segments removed shall be retained for delivery to the laboratory for cutting and testing.

Perform ACP cutting in accordance with Section 02060.

B. No "high speed" cutting tools can be used to cut ACP. Any tools used to cut ACP must not produce amounts of airborne asbestos fibers that exceed the OSHA PEL.

C. "Wet methods " with amended water must be used during any work including cutting or snapping that may produce airborne asbestos fibers that exceed the OSHA PEL.

D. Prior to cutting or snapping , clearly and accurately mark the following on the segment of pipe to be cut and extracted for testing:

1. Crown of the pipe.

2. Owner-approved unique pipe ID (GIS asset ID number) and date.

E. Pipe samples must be 12 inches in length (minimum) and 16 inches (maximum).

F. The Owner’s representative shall be the sole judge of the quality and acceptability of each sample. If a sam ple is deemed unsuitable for testing, provide an additional sample of ACP at no cost to the Owner.

3.3 PIPE HANDLING
A. Avoid contamination of ACP samples (grease or other foreign matter) during extraction.

B. Carefully handle ACP sample to not damage the pipe. Mi shandling of the ACP sample, including damage from transportation and delivery, that results in chipping, scraping, cracking, deforming, or other damage that may void the results of testing will not be acceptable. The Owner’s representative shall be the sole judge of mishandling of the ACP sample. If a sample is mishandled, deliver an additional sample of ACP to the laboratory for testing at no additional cost to the Owner.

C. Carefully bag and seal the sample air -tight with approved packaging materials.

Clearly label the outside of the packaging with the OSHA required label and with the unique pipe ID and date.

SECTION 02262

ASBESTOS CEMENT PIPE TESTING

4 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING
D. Individually package and label each sample. Keep packaged samples dry, sealed, and away from direct sunlight and high temperature durin g transportation. All temporary ACP storage containers will be properly labeled and secured. Temporary ACP storage containers will have a bottom, sides and a top that can be locked.

E. Deliver the bagged and sealed sample to the Owner -approved laboratory for EDS testing. Transport ACP material in accordance with Department of Transportation (DOT) and any local requirements.

3.4 LABORATORY TESTING
A. Contract with an Owner-approved laborator y to perform EDS testing on each ACP sample. Laboratory test results shall be delivered to the Owner within six (6) calendar weeks of pipe cutting.

1. Wood PLC 9210 Sky Park Ct. San Diego, CA 92123

2. Applied Materials & Engineering, Inc. 980 41st Street, Oakland, CA 94608

3. Other owner-approved laboratory
B. Arrange for safe delivery of ACP samples to the Owner -approved laboratory.

Coordinate with the laboratory to determine the laboratory’s requirements for the maximum pipe length and all costs associated with handling and cutting of ACP samples. All laboratory personnel who may come into contact with ACP will wear personal protective equipment and use processes so that they will not be exposed to airborne asbestos fibers at a level that will be a hazard to their health.

C. Equipment:

1. EDS equipment shall be equipped with a scanning electron microscope (SEM) capable of producing high resolution SEM images of the cross- section (where analyses are being performed) and shall be able to generate EDS elemental area maps or phase maps.

D. Laboratory Testing and Reporting:

1. Phenolphthalein Stain Testing:
a. Prior to conducting testing, coordinate with the Owner to verify testing requirements, measurement and establish a testing protocol. Confirm that ACP samples are labeled for pipe crown, pipe ID (GIS asset ID number) and date.
b. Neatly cut the ACP sample in t he laboratory and apply phenolphthalein to one surface of the pipe cross section. c. Identify the location on the pipe cross section that exhibits the least amount of phenolphthalein staining. Record this location relative to the pipe crown (i.e., 12 o’clock) as the location where 10 equally spaced EDS measurements will be made on each pipe sample.
d. Measure and record the pipe wall thickness and the dimensions of the most phenolphthalein stain loss at the outer and inner pipe surfaces.

SECTION 02262

ASBESTOS CEMENT PIPE TESTING

5 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING

2. EDS Testing:
a. Calibrate EDS equipment by using test peaks of known energy, covering the full analytical span prior to testing.
b. Label 10 equally spaced measurement locations on the pipe cross section in a line perpendicular to the inner and outer wall tangent s (i.e. along the line used to measure wall thickness) , with P oint 1 being closest to the outer pipe surface and Point 10 being closest to the inner pipe surface.
c. Measure and record the percent by weight of each of the following elements at the 10 equally spaced locations: Carbon (C), Oxygen (O), Magnesium (Mg), Aluminum (AI), Silicon (Si), Calcium (Ca), and Iron (Fe).
d. Allow sufficient process time for analysis and ensure a statistically significant number of counts in order to decide if a peak is present or absent. Present a table of maximum number of counts and atomic percentage.
e. Provide the measurements and test data to the Owner in a summary report and in Microsoft Excel file format (.xlsx). See Figure 1 for a sample of the laboratory test data reporting format.

3. Re-bag ACP sample in 6-mil clear plastic . Seal and store ACP sample s until confirmation from the Owner that the summary report and test data are received and complete.

4. Transmit the summary report and Excel data file via email to the City’s Project Manag er. Title the transmittal, report and data file with the City Project Number, Project Name, and Pipe ID Number.

5. After confirmation, the lab oratory shall legally dispose of each ACP sample at no additional cost to the Owner.

SECTION 02262

ASBESTOS CEMENT PIPE TESTING

6 of 6 SECTION 02262

ASBESTOS CEMENT PIPE TESTING
Figure 1 – Laboratory Test Data Reporting Format

Sample ID:

Phenolphthalein Stain Test:

Date of Cut:

Position: o'clock
Pipe Wall Thickness: (in.)
Outer Surface Stain Loss: (in.)
Inner Surface Stain Loss: (in.)

EDS Testing:

Date of EDS Testing:

Percent Element (by Weight)
EDS Test Location C % O % Mg % Al % Si % Ca % Fe %
Outer 1
2 3
4 5
6 7
8 9
Inner 10

END OF SECTION

APPENDIX L
Utility Shutdown/Connection Request
E-28
E-28 Page 1 of 2 REV 0 /1

Public Works
Construction Management & Inspection
ϭϲϯϱ&ĂƌĂĚĂLJǀĞ
760-602-2780
www.carlsbadca.gov

UTILITY SHUTDOWN/

CONNECTION REQUEST
E-28

DATE OF CONNECTION LOCATION OF WORK
CONTRACTORS NAME TEL NO.

NAME OF REP. AT SITE TITLE

SIGNATURE DATE

TYPE OF CONNECTION

SEWER WATER RECYCLED WET TAP SHUT DOWN

LENGTH OF SHUT DOWN FROM TO TOTAL HOURS

SERVICES EFFECTED

MATERIAL/EQUIPMENT TO BE USED

PLEASE READ BELOW

1. Request must include a DETAILED SKETCH showing proposed construction. (See other side for details.)

2. Submission of this request shall be a minimum of two weeks prior to desired shutdown/connection date.

3. If the weather or a situation develops where the time of shut down is not feasible, a new shutdown time shall be resubmitted to the district for approval.

4. Temporary water supply shall be only from an approved and accepted CMWD line.

5. No CMWD valves shall be operate d except under direction of CMWD representative.

6. There shall be NO SHUTDOWNS MONDAYS, FRIDAYS, WEEKENDS OR HOLIDAYS.

7. The contractor shall have his representative, listed above, o n the site of construction during the entire duration of the shutdown and will have authority to act in the company’s behalf.

CONSTRUCTION MANAGEMENT ANDINSPECTION
)$5$'$<$9(
CARLSBAD, CALIFORNIA 92008
TEL. NO. (760) 602-2780
CITY INSPECTOR DATE:

DISTRICT APPROVAL SIGNATURE
DATE:

PUBLIC WORKS MANAGER, UTILITY OPERATIONS
E-28 Page 2 of 2 REV 0/1

CONTRACTOR INSTRUCTIONS – PLEASE READ BEFORE SUBMITTING

1. Request shall not be approved unless a DETAILED SKETCH IS ATTACHED showing proposed construction. (See example below.)

2. Utility shutdown/connection request shall be submitted to Con struction Management & Inspections two weeks before anticipated connection date.

3. Scheduling: Prior to start of work, there shall be a MINIMUM OF TWO WEEKS NOTICE GIVEN TO DISTRICT.

4. Connection shall not be permitted unless BACTERIOLOGICAL TEST RESULTS are attached (required for all potable use lines).

5. If the weather or a situation develops where the time of shut down is not feasible, a new shutdown time shall be resubmitted to the District for approval.

6. Temporary water supply shall be only from an approved and accepted CMWD line.

7. NO CMWD VALVES shall be operated except under the direction of CMWD Representative.

8. There shall be NO SHUTDOWNS MONDAYS, FRIDAYS, WEEKENDS OR HOLIDAYS.

9. The contractor shall have his representative (listed on the f ront) on the site of construction during the entire duration of the shutdown and will have authority to act in the company’s behalf.

10. If the contractor has preferred connection date, please provide with submittal.

11. The City reserves the right to change the schedule.

PROJECT NAME

LOCATION MAP
: :: : :)\c!iU,if:: :. ··-··· · · •-· •·· "· · · ··
:::::HEO/ONDA::.
::::::TAGbON::::': . ......................... ..

OCEANSIDE

PACIFIC
OCEAN

PROJECT
SITE

CITYWIDE DRAINAGE IMPROVEMENT PROGRAM
- MAGNOLIA AVENUE STORM DRAIN PHASE I
Exhibi t 3
:..VICINITY MAP

ENCINITAS
af!:~CR
E.~cR
:'it.~
,...\
.-,::,_
·'in '!,I)
·13
~
GA~Y
GR
VISTA

PROJECT
NUMBER
6608

EXHIBIT
2 Created By: BeMmtQlip 2 "llp!lm'il. S:\Benjamin_Arp\Localion Map\CIP _ 6608\ ToDesign _ 100120\LocationMap_ C/P_ 6608_~~d Page 8 of 8 Acceptance of Bids and Award of
Contract to Palm Engineering for
Construction of the Magnolia Avenue
Storm Drain Project – Phase 1
Lauren Ferrell, Associate Engineer
Hossein Ajideh, Engineering Manager
Public Works
March 22, 2022

TODAY’S PRESENTATION
• Recommended Action
• Project Background
• Project Location
• Proposed Improvements
• Fiscal Analysis
• Next Steps
ITEM 1: Magnolia Avenue Storm Drain Improvements

RECOMMENDED ACTION
Adopt a resolution accepting bids and awarding a contract to Palm Engineering Construction Company Inc. for construction of Magnolia Ave Storm Drain Improvements Project – Phase I, for an amount not to exceed $775,616
ITEM 1: Magnolia Avenue Storm Drain Improvements
• A component of the city’s 2008 D rainage Master Plan
• Project is part of C itywide Drainage Improvement Program, C
apital Improvement Program Project No. 6608
• Nov. 16, 2021, City Council adopted a resolution, approving pl
ans and specifications and authorizing advertising for bids • Jan. 12, 2022, 8 bids were received
• Lowest bidder is P alm Engineering Construction Co. for $775,615.99
ITEM 1: Magnolia Avenue Storm Drain Improvements

BACKGROUND
• Magnolia Ave between Brady Cir and Monroe St
ITEM 1: Magnolia Avenue Storm Drain Improvements

PROJECT LOCATION

• New storm drain system within Magnolia Ave to achieve compliance with city standards
• Phase I (Summer 2022)
– Main storm drain trunk line on Magnolia
– Water main replacement
– Associated trench resurfacing and sidewalk replacement • Phase II (Summer 2023/2024)
– Minor storm drain lateral segment
– Full roadway width pavement overlay
– Speed humps
– Curb bulbs out extension at Valley/Magnolia intersection ITEM 1: Magnolia Avenue Storm Drain Improvements

PROPOSED IMPROVEMENTS
• Construction contract: $775,615.99
• Funding Project with Citywide Drainage Improvement Program, Capital Improvement Program No. 6608
• Funding appropriated from Gas Tax and Infrastructure Replacements funds ITEM 1: Magnolia Avenue Storm Drain Improvements
FISCAL ANALYSIS – PHASE I
• Fully execute construction contract
• Issue a purchase order
• Schedule a pre-c onstruction meeting with contractor
• Construct improvements during the summer break of Carlsbad Unified Sc
hool District
• Return to C ity Council in fall 2022 to request approval plans and specifications and authorization to bid the phase II portion of project ITEM 1: Magnolia Avenue Storm Drain Improvements

NEXT STEPS

RECOMMENDED ACTION
Adopt a resolution accepting bids and awarding a contract to Palm Engineering Construction Company Inc. for construction of Magnolia Ave Storm Drain Improvements Project – Phase I, for an amount not to exceed $775,616