Cities Index.
2023-04-18; City Council; Resolution 2023-115

Carlsbad City Council
April 18, 2023

Document
2023-04-18; City Council; Resolution 2023-115
Meeting
April 18, 2023
Body
Carlsbad City Council
Pages
3
Original file
5 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

RESOLUTION NO. 2023-115

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, AUTHORIZING THE CITY MANAGER TO APPROVE CHANGE ORDER NO. 3 TO THE ACE ELECTRIC, INC. CONSTRUCTION CONTRACT FOR THE TEMPORARY FIRE STATION 7, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 4091, IN AN AMOUNT NOT TO EXCEED $10,865
WHEREAS, on Nov. 2, 2022, the City of Carlsbad entered into a contract with Ace Electric, Inc., for the Temporary Fire Station 7 site and building electrical work in an amount of $199,700; and WHEREAS, on Dec. 6, 2022, the City Council adopted Resolution No. 2022-272, authorizing the City Manager to execute construction contract change orders in an amount not to exceed $25,000; and WHEREAS, staff have determined that the value of the contract change order work required to complete the project exceeds the City Manager's authorization by $10,865; and WHEREAS, Change Order No. 3, the final change order to the contract with Ace Electric, Inc. is necessary due to the actual quantity of required conduits and wiring exceeding those represented on the contract drawings; and
WHEREAS, staff recommend that the City Council authorize an additional increase in the City Manager's authority to sign change orders in an amount not to exceed $10,865; and WHEREAS, staff recommend that the City Council authorize the City Manager to execute Change Order No. 3.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:

1.That the above recitations are true and correct.

2.That the City Manager is hereby authorized to execute Change Order No. 3, to the Ace Electric, Inc. construction contract for Temporary Fire Station 7, Capital Improvement Program Project No. 4091, attached hereto as Attachment A.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 18th day of April, 2023, by the following vote, to wit:

AYES:

NAYS:

ABSTAIN:

ABSENT:

Blackburn, Bhat-Patel, Acosta, Burkholder, Luna.

None.

None.

None.

KEITH BLACKBURN, Mayor iJwv rSHERRY FREISINGER, City Clerk (SEAL)

�ocuSign Envelope ID: A570335B-556E-4632-9972-661 F3D3ACBF1 ATTACHMENT A Project: 4091; Temporary Fire Station 7 Building and Electrical Work Change Order No. 03 CITY OF CARLSBAD -CONTRACT CHANGE ORDER NO. 03
Contract: 4091 {PWS23-1940FAC) -Temporary Fire Station 7 Electrical Work CONTRACTOR: Ace Electric, Inc.
6061Fairmount Ave
San Diego, CA 92120
P.O. NO. P141831
The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and.services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work including charges for field overhead, extended home office overhead, delays, disruptions, cumulative impacts, loss of efficiency, extended equipment costs and overtime premium costs and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor or his/her designee.

Pursuant to the General Provisions of this contract, oerform the followina: Item 1: The master meter breaker was determined to be 300A rather than 400A as shown on the plans and the dimensions of the main feeder conduits and conductors were not accurately This item constitutes compensation for all labor, equipment and shown on sheet E200. materials necessary to install the main electrical feeder conduits and conductors from the main service switchboard to the new automatic transfer switch as shown on sheet E200. ·:... . t,/!:IFO l Increase to contract cost.. ........................................................................... $7,483.78 Item 2: The drawing scale on sheet E200 wasn't accurate and actual quantities of conduit and This item constitutes compensation for all conductors was more than scaled on the plans. additional labor, equipment and materials necessary to install the conduits and conductors between panel PB and Transformer T-TR1, T-TR2 and the sewer lift station disconnect.

Increase to contract cost ................. .-.............................. ?/#..9.':1 ................ $3,4 70.46 TOTAL INCREASE TO CONTRACT COST .................................................................. $10,954.24 TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL NOT BE INCREASED AS A RESULT OF THIS CHANGE ORDER.

RECOMMENDED BY:
3/21/2023

MUNICIPAL PROJECTS MANAGER (DATE)
� 3/21/2023
ENGINEERING MANAGER (DATE) /J-e, � 4/19/2023

DEPARTMENT HEAD (DATE)
APPROVED AS TO FORM:
(JIA.,J.it-k �it12012023

CITY ATTORNEY (DATE)
4/19/2023
(DATE)
(DATE)

← All documents from this meeting