Cities Index.
2023-08-22; City Council; ; Approving a Professional Services Agreement with GHD Inc. for the Kelly Drive and Park Drive Complete Street Improvements Project

Carlsbad City Council
August 22, 2023

Document
2023-08-22; City Council; ; Approving a Professional Services Agreement with GHD Inc. for the Kelly Drive and Park Drive Complete Street Improvements Project
Meeting
August 22, 2023
Body
Carlsbad City Council
Pages
17
Original file
86 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

CA Review GH
Meeting Date:

To:

From:

Staff Contact:

Subject:

District:

Aug. 22, 2023
Mayor and City Council
Scott Chadwick, City Manager
Brandon Miles, Associate Engineer
[email protected], 442-339-2745
Hossein Ajideh, Engineering Manager
[email protected], 442-339-2756
Approving a Professional Services Agreement with GHD Inc. for the Kelly Drive and Park Drive Complete Street Improvements Project 1 Recommended Action
Adopt a resolution approving a professional services agreement with GHD Inc. to provide engineering and construction support services for the Kelly Drive and Park Drive Complete Street Improvements, Capital Improvement Program Project No. 6075, and authorizing the City Manager to execute the agreement.

Executive Summary
The City of Carlsbad is working to design roads that will encourage drivers to slow down, improve pedestrian and cyclist safety and improve access and connectivity to trails, creating what are known as "complete streets."
To enhance safety and connectivity for all users, complete street improvements for Kelly Drive and Park Drive near Kelly Elementary School include:
• Traffic calming, or slowing down speeds, with roundabouts at Kelly and Hillside drives and Kelly and Park drives
• Wider sidewalks
• Realigned crosswalks
• Buffered bike lanes
• A biking and walking connection from El Camino Real to the Agua Hedionda Lagoon While this project was initiated in 2017, before the city’s current traffic safety emergency, the proposed improvements support the city’s focus on creating safer streets for all modes of transportation.

To continue design of the project, staff request that the City Council approve a professional services agreement with GHD Inc. (Attachment A to Exhibit 1) to prepare the plans, Aug. 22, 2023
Item #1 Page 1 of 24

specifications, technical studies and cost estimates for construction of the Kelly Drive and Park Drive Complete Street Improvements Project, for an amount not to exceed $475,803.

The agreement requires the City Council’s approval under Carlsbad Municipal Code Section

3.28.060(D)(5) because it will cost the city more than $100,000 per year.

Explanation & Analysis
Project goals
The project will make improvements to enhance safety along Kelly Drive from El Camino Real to Park Drive and along Park Drive from Kelly Drive to Neblina Drive. (A location map is provided as Exhibit 2.) The goal is to create a roadway on which people can easily and safely get where they want to go through their choice of travel, whether by driving, biking or walking.

This project is included in the Carlsbad Comprehensive Active Transportation Strategy, which was developed in coordination with the Trails Master Plan.

The project also aligns with the strategic objective identified in the Carlsbad Strategic Plan to “manage, maintain and enhance the city’s roadways to provide a safe, efficient and cost- effective multi-modal transportation system,” that is, one suited for all means of getting around.

Public input
Since the project planning began and through 2022, community feedback has helped shape the design of the proposed improvements. Based on that feedback, the project incorporated:
• Improved pedestrian safety with designated crosswalk areas and shortened crossing distances
• Maintained and enhancing street parking for residents and users of Laguna Riviera Park • Added a designated right turn only lane on Kelly Drive into the school parking lot from Hillside Drive separate from the lane for through traffic • Improved the design of the intersection control object markers that are currently in place
• Implemented buffered bike lanes and a separated multiuse path within the project area • Refined the design of the roundabout at Kelly and Hillside drives to ensure delivery trucks, trash trucks and emergency vehicles can navigate the roundabout Traffic & Mobility Commission review
The Traffic & Mobility Commission, on Dec. 5, 2022, supported staff’s recommendation to create buffered bike lanes along Kelly Drive, from Hillside Drive to Park Drive, and on Park Drive from Kelly Drive to Neblina Drive. It also supported installing what is known as an urban compact roundabout at the intersection of Kelly Drive and Hillside Drive. An urban compact roundabout, a smaller and less expensive type of roundabout, is an effective and low-cost way to make the intersection safer and easier to use for pedestrians and bicyclists by slowing vehicle traffic down.

Staff then outlined the next steps to finalize the construction plans and environmental documents for the project and to obtain the necessary permits.

Aug. 22, 2023
Item #1 Page 2 of 24

Bidding process
• Staff posted a request for proposals soliciting professional design services for the project on March 3, 2023
• Three proposals were received on April 5, 2023
• A selection committee comprised of city staff evaluated and rated the proposals using the criteria specified in the request for proposals, in accordance with Carlsbad Municipal Code Section 3.28.060.
• Based on a review of the proposals, the selection committee selected GHD Inc. as the most qualified consultant for the project
• Staff then negotiated the project’s scope of work and fees with GHD Inc.

Fiscal Analysis
Sufficient funds are available to complete this phase of the project. A total of $5,890,000 in TransNet-Local,1 public facilities fee and gas tax funds have been appropriated, as detailed in the table below:

Kelly Drive and Park Drive Complete Street Improvements Project Capital Improvement Project No. 6075
Current appropriation – TransNet Local, public facilities fee and gas tax funds $5,890,000 Current expenditures/encumbrances -$827,782
Total available funds $5,062,218
Design engineering – GHD Inc -$475,803
Project management – City staff (estimated) -$250,000
Estimated design costs -$725,803
Remaining balance $4,336,415
Additional appropriation needed $0

Next Steps
Upon receiving the City Council’s approval, the City Manager will execute a professional services agreement with GHD Inc. Staff then will work with the consultant to prepare plans, specifications, technical studies and cost estimates for construction.

Once the engineering design phase is complete, staff will return to the Traffic and Mobility Commission and the City Council in mid-2024 with a recommendation to approve the work and to authorize advertisement for construction bids.

Staff plan to request that the City Council award a construction contract to the lowest responsive and responsible bidder in late 2024. Construction is expected to start in early 2025 and be completed by late-2025.

1 TransNet is a countywide sales tax collected to fund regional transportation projects.

Aug. 22, 2023
Item #1 Page 3 of 24

Environmental Evaluation
Under Public Resources Code Section 21065, this action to approve a professional services agreement does not constitute a “project” within the meaning of the California Environmental Quality Act in that it has no potential to cause either a direct physical change in the environment, or a reasonably foreseeable indirect change in the environment, so does not require environmental review.

As the design for the Kelly Drive and Park Drive Complete Street Improvements is finalized, the project will be subject to environmental review in keeping with the CEQA Guidelines.

Exhibits

1. City Council resolution

2. Location map

Aug. 22, 2023
Item #1 Page 4 of 24
Exhibit 1
RESOLUTION NO. .

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, APPROVING A PROFESSIONAL SERVICE S AGREEMENT WITH GHD INC. TO PROVIDE ENGINEERING AND CONSTRUCTION SUPPORT

SERVICES FOR THE KELLY DRIVE AND PARK DRIVE COMPLETE STREET IMPROVEMENTS, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 6075,

AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE AGREEMENT

WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the pu blic interest to improve Kelly Drive and Park Drive with complete street improvements, Capital Improvement Program, or CIP, Project No. 6075, or Project; and WHEREAS, per Carlsbad Municipal Code Section 3.28.060, staff issued a Request for Proposals from consultants to prepare technical studies, construction plans, specifications and cost estimates for the Kelly Drive and Park Drive Complete Street Improvements, CIP Project No. 6075, and received a total of three proposals from qualified consulting firms; and WHEREAS, after reviewing the proposals, staff selected GHD Inc. as the most qualified consultant for the Project based on the best-value criteria specified in the RFP; and WHEREAS, staff and GHD Inc. have negotiated the scope o f work and the associate d fee to provide professional services for the Project in an amount not to exceed $475,803; and WHEREAS, sufficient TransNet-Local funds, Public Facilities Fees and Gas Tax funds have been appropriated for the Project; and
WHEREAS, p ursuant to Public Resources Code Section 21065, this action to approve a professional services agreement does not constitute a "project" within the meaning of the California Environmental Quality Act, or CEQA, in that it has no potential to cause either a direct physical change in the environment, or a reasonably foreseeable indirect change in the environment, and therefore does not require environmental review. Furthermore, as the Project design is finalized, the Project will be subject to environmental review per CEQA Guidelines.

Aug. 22, 2023
Item #1 Page 5 of 24

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:

1. That the above recitations are true and correct.

2. That the City Council approves the professional services agreement with GHD Inc. in an amount not to exceed $ 475,803 for the Kelly Drive and Park Drive Comp lete Street Improvements, CIP Project No. 6075 and authorizes the City Manager to execute the Agreement, with GHD Inc., which is attached hereto as Attachment A.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the __ day of ________, 2023, by the following vote, to wit:

AYES:

N AYS:

ABSTAIN:

ABSENT:

______________________________________
KEITH BLACKBURN, Mayor

______________________________________
SHERRY FREISINGER, City Clerk
(SEAL)
Aug. 22, 2023
Item #1 Page 6 of 24
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϭŽĨϭϳ
'ZDEd&KZ<>>zEWZ<Z/sKDW>d^dZd/DWZKsDEd^^Zs/^
',͕/E͘

d,/^ 'ZDEd ŝƐ ŵĂĚĞ ĂŶĚ ĞŶƚĞƌĞĚ ŝŶƚŽ ĂƐ ŽĨ ƚŚĞ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ĚĂLJ ŽĨ ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ͕ ϮϬϮϯ͕ ďLJ ĂŶĚ ďĞƚǁĞĞŶ ƚŚĞ ŝƚLJ ŽĨ Ăƌ ůƐďĂĚ͕ ĂůŝĨŽƌŶŝĂ͕ Ă ŵƵŶŝĐŝƉĂů ĐŽƌƉŽƌĂƚŝŽŶ;ΗŝƚLJΗͿĂŶĚ',/ŶĐ͕͘ĂĂůŝĨŽƌŶŝĂĐŽƌƉŽƌĂƚŝŽŶ;ΗŽŶƚƌĂĐƚŽƌΗͿ͘

Z/d>^

͘ ŝƚLJƌĞƋƵŝƌĞƐƚŚĞƉƌŽĨĞƐƐŝŽŶĂůƐĞƌǀŝĐĞƐŽĨĂĐŽŶƐƵůƚĂŶƚƚŚĂƚ ŝƐĞdžƉĞƌŝĞŶĐĞĚŝŶƉƌŽĨĞƐƐŝŽŶĂů ĚĞƐŝŐŶƐĞƌǀŝĐĞƐ͘
͘ ŽŶƚƌĂĐƚŽƌ ŚĂƐ ƚŚĞ ŶĞĐĞƐƐĂƌLJ ĞdžƉĞƌŝĞŶĐĞ ŝŶ ƉƌŽǀŝĚŝŶŐ ƉƌŽĨĞƐƐ ŝŽŶĂů ƐĞƌǀŝĐĞƐ ĂŶĚ ĂĚǀŝĐĞ ƌĞůĂƚĞĚƚŽƉƌŽĨĞƐƐŝŽŶĂůĚĞƐŝŐŶƐĞƌǀŝĐĞƐ͘
͘ ŽŶƚƌĂĐƚŽƌŚĂƐƐƵďŵŝƚƚĞĚĂƉƌŽƉŽƐĂůƚŽŝƚLJƵŶĚĞƌZ&WϮϯͲϮϭϯϰdZEĂŶĚŚĂƐĂĨĨŝƌŵĞĚŝƚƐ ǁŝůůŝŶŐŶĞƐƐĂŶĚĂďŝůŝƚLJƚŽƉĞƌĨŽƌŵƐƵĐŚǁŽƌŬ͘

EKt͕d,Z&KZ͕ŝŶĐŽŶƐŝĚĞƌĂƚŝŽŶŽĨƚŚĞƐĞƌĞĐŝƚĂůƐĂŶĚƚŚĞŵƵƚƵĂůĐŽǀĞŶĂŶƚƐĐŽŶƚĂŝŶĞĚŚĞƌĞŝŶ͕ ŝƚLJĂŶĚŽŶƚƌĂĐƚŽƌĂŐƌĞĞĂƐĨŽůůŽǁƐ͗

ϭ͘ ^KWK&tKZ<
ŝƚLJƌĞƚĂŝŶƐŽŶƚƌĂĐƚŽƌƚŽƉĞƌĨŽƌŵ͕ĂŶĚŽŶƚƌĂĐƚŽƌĂŐƌĞĞƐƚŽƌĞŶĚĞƌ͕ƚŚŽƐĞƐĞƌǀŝĐĞƐ;ƚŚĞΗ^ĞƌǀŝĐĞƐΗͿƚŚĂƚ ĂƌĞ ĚĞĨŝŶĞĚ ŝŶ ĂƚƚĂĐŚĞĚ džŚŝďŝƚ Η͕Η ǁŚŝĐŚ ŝƐ ŝŶĐŽƌƉŽƌĂƚĞĚ ďLJ ƚŚŝƐ ƌĞĨĞƌĞŶĐĞ ŝŶ ĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚ ƚŚŝƐ ŐƌĞĞŵĞŶƚ͛ƐƚĞƌŵƐĂŶĚĐŽŶĚŝƚŝŽŶƐ͘

Ϯ͘ ^dEZK&WZ&KZDE
tŚŝůĞ ƉĞƌĨŽƌŵŝŶŐ ƚŚĞ ^ĞƌǀŝĐĞƐ͕ ŽŶƚƌĂĐƚŽƌ ǁŝůů ĞdžĞƌĐŝƐĞ ƚŚĞ ƌĞĂ ƐŽŶĂďůĞ ƉƌŽĨĞƐƐŝŽŶĂů ĐĂƌĞ ĂŶĚ ƐŬŝůů ĐƵƐƚŽŵĂƌŝůLJ ĞdžĞƌĐŝƐĞĚ ďLJ ƌĞƉƵƚĂďůĞŵĞŵďĞƌƐ ŽĨ ŽŶƚƌĂĐƚŽƌΖƐ ƉƌŽĨĞƐƐŝŽŶ ƉƌĂĐƚŝĐŝŶŐ ŝŶ ƚŚĞDĞƚƌŽƉŽůŝƚĂŶ ^ŽƵƚŚĞƌŶ ĂůŝĨŽƌŶŝĂ ĂƌĞĂ ĂŶĚ ǁŝůů ƵƐĞ ƌĞĂƐŽŶĂďůĞ ĚŝůŝŐĞŶĐĞ ĂŶĚ ďĞƐƚ ũƵĚŐŵĞŶƚ ǁŚŝůĞ ĞdžĞƌĐŝƐŝŶŐ ŝƚƐ ƉƌŽĨĞƐƐŝŽŶĂůƐŬŝůůĂŶĚĞdžƉĞƌƚŝƐĞ͘

ϯ͘ dZD
dŚĞƚĞƌŵŽĨƚŚŝƐŐƌĞĞŵĞŶƚǁŝůůďĞĞĨĨĞĐƚŝǀĞĨŽƌĂƉĞƌŝŽĚŽĨĨŝǀĞ;ϱͿLJĞĂƌƐĨƌŽŵƚŚĞĚĂƚĞĨŝƌƐƚĂďŽǀĞǁƌŝƚƚĞŶ͘

ϰ͘ d/D/^K&d,^^E
dŝŵĞŝƐŽĨƚŚĞĞƐƐĞŶĐĞĨŽƌĞĂĐŚĂŶĚĞǀĞƌLJƉƌŽǀŝƐŝŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

ϱ͘ KDWE^d/KE
dŚĞ ƚŽƚĂů ĨĞĞ ƉĂLJĂďůĞ ĨŽƌ ƚŚĞ ^ĞƌǀŝĐĞƐ ƚŽ ďĞ ƉĞƌĨŽƌŵĞĚ ĚƵƌŝŶŐ ƚŚĞ ŝŶŝƚŝĂů ŐƌĞĞŵĞŶƚ ƚĞƌŵ ǁŝůůďĞ &ŽƵƌ ŚƵŶĚƌĞĚƐĞǀĞŶƚLJĨŝǀĞƚŚŽƵƐĂŶĚĞŝŐŚƚŚƵŶĚƌĞĚƚŚƌĞĞĚŽůůĂƌƐ;Ψϰϳϱ ͕ϴϬϯͿ͘EŽŽƚŚĞƌĐŽŵƉĞŶƐĂƚŝŽŶĨŽƌƚŚĞ ^ĞƌǀŝĐĞƐǁŝůůďĞĂůůŽǁĞĚĞdžĐĞƉƚĨŽƌŝƚĞŵƐĐŽǀĞƌĞĚďLJƐƵďƐĞƋƵĞŶƚ ĂŵĞŶĚŵĞŶƚƐƚŽƚŚŝƐŐƌĞĞŵĞŶƚ͘/ĨƚŚĞ ŝƚLJ ĞůĞĐƚƐ ƚŽ ĞdžƚĞŶĚ ƚŚĞ ŐƌĞĞŵĞŶƚ͕ ƚŚĞ ĂŵŽƵŶƚ ƐŚĂůů ŶŽƚ ĞdžĐĞĞ Ě ŽŶĞ ŚƵŶĚƌĞĚ ƚŚŽƵƐĂŶĚ ĚŽůůĂƌƐ ;ΨϭϬϬ͕ϬϬϬͿƉĞƌŐƌĞĞŵĞŶƚLJĞĂƌ͘dŚĞŝƚLJƌĞƐĞƌǀĞƐƚŚĞƌŝŐŚƚƚŽ ǁŝƚŚŚŽůĚĂƚĞŶƉĞƌĐĞŶƚ;ϭϬйͿƌĞƚĞŶƚŝŽŶ ƵŶƚŝůŝƚLJŚĂƐĂĐĐĞƉƚĞĚƚŚĞǁŽƌŬĂŶĚͬŽƌ^ĞƌǀŝĐĞƐƐƉĞĐŝĨŝĞĚŝŶdžŚŝďŝƚΗ͘Η

/ŶĐƌĞŵĞŶƚĂůƉĂLJŵĞŶƚƐ͕ŝĨĂƉƉůŝĐĂďůĞ͕ƐŚŽƵůĚďĞŵĂĚĞĂƐŽƵƚůŝŶĞĚŝŶĂƚƚĂĐŚĞĚdžŚŝďŝƚΗ͘Η

ϲ͘ WZs/>/E't'Zd^
ŶLJĐŽŶƐƚƌƵĐƚŝŽŶ͕ĂůƚĞƌĂƚŝŽŶ͕ĚĞŵŽůŝƚŝŽŶ͕ƌĞƉĂŝƌ͕ĂŶĚŵĂŝŶƚĞŶĂŶĐĞǁŽƌŬ͕ŝŶĐůƵĚŝŶŐǁŽƌŬƉĞƌĨŽƌŵĞĚĚƵƌŝŶŐ ĚĞƐŝŐŶĂŶĚƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶƐƵĐŚĂƐŝŶƐƉĞĐƚŝŽŶĂŶĚůĂŶĚƐƵƌǀĞLJŝŶ ŐǁŽƌŬ͕ĐƵŵƵůĂƚŝǀĞůLJĞdžĐĞĞĚŝŶŐΨϭ͕ϬϬϬ

Attachment A
W^ϮϰͲϮϮϲϲdZE
Aug. 22, 2023
Item #1 Page 7 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϮŽĨϭϳ
ĂŶĚƉĞƌĨŽƌŵĞĚƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚĂƌĞƐƵďũĞĐƚƚŽƐƚĂƚĞƉƌĞǀĂŝů ŝŶŐǁĂŐĞůĂǁƐ͘dŚĞŐĞŶĞƌĂůƉƌĞǀĂŝůŝŶŐ ƌĂƚĞ ŽĨ ǁĂŐĞƐ͕ ĨŽƌ ĞĂĐŚ ĐƌĂĨƚ Žƌ ƚLJƉĞ ŽĨ ǁŽƌŬĞƌ ŶĞĞĚĞĚ ƚŽ ĞdžĞĐƵƚĞ ƚŚĞ ĐŽŶƚƌĂĐƚ͕ ƐŚĂůů ďĞ ƚŚŽƐĞ ĂƐ ĚĞƚĞƌŵŝŶĞĚďLJƚŚĞŝƌĞĐƚŽƌŽĨ/ŶĚƵƐƚƌŝĂůZĞůĂƚŝŽŶƐƉƵƌƐƵĂŶƚƚŽ ƚŚĞ^ĞĐƚŝŽŶϭϳϳϬ͕ϭϳϳϯĂŶĚϭϳϳϯ͘ϭŽĨƚŚĞ ĂůŝĨŽƌŶŝĂ>ĂďŽƌŽĚĞ͘WƵƌƐƵĂŶƚƚŽ^ĞĐƚŝŽŶϭϳϳϯ͘ϮŽĨƚŚĞĂůŝĨŽƌŶŝĂ>ĂďŽƌĐŽĚĞ͕ĂĐƵƌƌĞŶƚĐŽƉLJŽĨĂƉƉůŝĐĂďůĞ ǁĂŐĞƌĂƚĞƐŝƐŽŶĨŝůĞŝŶƚŚĞŽĨĨŝĐĞŽĨƚŚĞŝƚLJŶŐŝŶĞĞƌ͘ŽŶƚƌĂĐƚŽƌƐŚĂůůŶŽƚƉĂLJůĞƐƐƚŚĂŶƚŚĞƐĂŝĚƐƉĞĐŝĨŝĞĚ ƉƌĞǀĂŝůŝŶŐƌĂƚĞƐŽĨǁĂŐĞƐƚŽĂůůƐƵĐŚǁŽƌŬĞƌƐĞŵƉůŽLJĞĚďLJŚŝŵŽƌŚĞƌŝŶƚŚĞĞdžĞĐƵƚŝŽŶŽĨƚŚĞŐƌĞĞŵĞŶƚ͘ ŽŶƚƌĂĐƚŽƌĂŶĚĂŶLJƐƵďĐŽŶƚƌĂĐƚŽ ƌƐƐŚĂůůĐŽŵƉůLJǁŝƚŚ^ĞĐƚŝŽŶϭϳϳ ϲŽĨƚŚĞĂůŝĨŽƌŶŝĂ>ĂďŽƌŽĚĞ͕ǁŚŝĐŚ ŐĞŶĞƌĂůůLJƌĞƋƵŝƌĞƐŬĞĞƉŝŶŐĂĐĐƵƌĂƚĞƉĂLJƌŽůůƌĞĐŽƌĚƐ͕ǀĞƌŝĨLJŝŶŐ ĂŶĚĐĞƌƚŝĨLJŝŶŐƉĂLJƌŽůůƌĞĐŽƌĚƐ͕ĂŶĚŵĂŬŝŶŐ ƚŚĞŵĂǀĂŝůĂďůĞĨŽƌŝŶƐƉĞĐƚŝŽŶ͘ŽŶƚƌĂĐƚŽƌƐŚĂůůƌĞƋƵŝƌĞĂŶLJƐƵďĐŽŶƚƌĂĐƚŽƌƐƚŽĐŽŵƉůLJǁŝƚŚ^ĞĐƚŝŽŶϭϳϳϲ͘ ϳ͘ KE^dZhd/KEDE'DEd^K&dtZ
WƌŽĐŽƌĞ WƌŽũĞĐƚ DĂŶĂŐĞŵĞŶƚ ĂŶĚ ŽůůĂďŽƌĂƚŝŽŶ ^LJƐƚĞŵ͘ dŚŝƐ ƉƌŽũĞĐƚ ŵĂLJ ƵƚŝůŝnjĞ ƚŚĞ KǁŶĞƌ͛Ɛ WƌŽĐŽƌĞ ;ǁǁǁ͘ƉƌŽĐŽƌĞ͘ĐŽŵͿŽŶůŝŶĞƉƌŽũĞĐƚŵĂŶĂŐĞŵĞŶƚĂŶĚĚŽĐƵŵĞŶƚĐŽŶƚƌŽůƉůĂƚĨŽƌŵ͘dŚĞŝ ŶƚĞŶƚŽĨƵƚŝůŝnjŝŶŐ WƌŽĐŽƌĞ ŝƐ ƚŽ ƌĞĚƵĐĞ ĐŽƐƚ ĂŶĚ ƐĐŚĞĚƵůĞ ƌŝƐŬ͕ ŝŵƉƌŽǀĞ ƋƵĂůŝƚLJ ĂŶĚ ƐĂĨĞƚLJ͕ ĂŶĚ ŵĂŝŶƚĂŝŶ Ă ŚĞĂůƚŚLJ ƚĞĂŵ ĚLJŶĂŵŝĐ ďLJ ŝŵƉƌŽǀŝŶŐ ŝŶĨŽƌŵĂƚŝŽŶ ĨůŽǁ͕ ƌĞĚƵĐŝŶŐ ŶŽŶͲƉƌŽĚƵĐƚŝǀĞ ĂĐƚŝǀŝƚŝĞƐ͕ ƌĞĚƵĐŝŶŐ ƌĞǁŽƌŬ ĂŶĚ ĚĞĐƌĞĂƐŝŶŐ ƚƵƌŶĂƌŽƵŶĚ ƚŝŵĞƐ͘ dŚĞ ŽŶƚƌĂĐƚŽƌ ŝƐ ƌĞƋƵŝƌĞĚ ƚŽ ĐƌĞĂ ƚĞ Ă ĨƌĞĞ ǁĞďͲďĂƐĞĚ WƌŽĐŽƌĞ ƵƐĞƌ ĂĐĐŽƵŶƚ;ƐͿ ĂŶĚ ƵƚŝůŝnjĞ ǁĞďͲďĂƐĞĚ ƚƌĂŝŶŝŶŐ ͬ ƚƵƚŽƌŝĂůƐ ;ĂƐ ŶĞĞĚĞĚͿ ƚŽ ďĞĐŽŵĞ ĨĂŵŝůŝĂƌ ǁŝƚŚ ƚŚĞ ƐLJƐƚĞŵ͘ hŶůĞƐƐ ƚŚĞ ŶŐŝŶĞĞƌ ĂƉƉƌŽǀĞƐ ŽƚŚĞƌǁŝƐĞ͕ ƚŚĞ ŽŶƚƌĂĐƚŽƌ ƐŚĂůů ƉƌŽĐĞƐƐ Ăůů ƉƌŽũĞĐƚ ĚŽĐƵŵĞŶƚƐ ƚŚƌŽƵŐŚ WƌŽĐŽƌĞ ďĞĐĂƵƐĞ ƚŚŝƐ ƉůĂƚĨŽƌŵ ǁŝůů ďĞ ƵƐĞĚ ƚŽ ƐƵďŵŝƚ͕ ƚƌĂĐŬ͕ ĚŝƐƚƌŝďƵƚĞ ĂŶĚ ĐŽůůĂďŽƌĂƚĞ ŽŶ ƉƌŽũĞĐƚ͘ /Ĩ ƵŶĨĂŵŝůŝĂƌ Žƌ ŶŽƚ ŽƚŚĞƌǁŝƐĞ ƚƌĂŝŶĞĚ ǁŝƚŚ WƌŽĐŽƌĞ͕ ŽŶƚƌĂĐƚŽƌ ĂŶĚ ĂƉƉůŝĐĂďůĞ ƚĞĂŵ ŵĞŵďĞƌƐ ƐŚĂůů ĐŽŵƉůĞƚĞ Ă ĨƌĞĞ ƚƌĂŝŶŝŶŐĐĞƌƚŝĨŝĐĂƚŝŽŶ ĐŽƵƌƐĞ ůŽĐĂƚĞĚĂƚŚƚƚƉ͗ͬͬůĞĂƌŶ͘ƉƌŽĐŽƌĞ͘ĐŽŵͬƉƌŽĐŽƌĞͲĐĞƌƚŝĨŝĐĂƚŝŽŶͲ ƐƵďĐŽŶƚƌĂĐƚŽƌ͘dŚĞŽŶƚƌĂĐƚŽƌŝƐƌĞƐƉŽŶƐŝďůĞĨŽƌĂƚƚĂŝŶŝŶŐƚŚĞŝƌŽǁŶWƌŽĐŽƌĞ ƐƵƉƉŽƌƚ͕ĂƐŶĞĞĚĞĚ͕ĞŝƚŚĞƌ ƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƚƌĂŝŶŝŶŐŽƌƌĞĂĐŚŝŶŐŽƵƚƚŽƚŚĞWƌŽĐŽƌĞƐƵƉƉŽƌƚƚĞĂŵ͘/ƚǁŝůůďĞƚŚĞƌĞƐƉŽŶƐŝďŝůŝƚLJŽĨƚŚĞ ŽŶƚƌĂĐƚŽƌƚŽƌĞŐƵůĂƌůLJĐŚĞĐŬWƌŽĐŽƌĞĂŶĚƌĞǀŝĞǁƵƉĚĂƚĞĚĚŽĐƵŵĞŶƚƐĂƐƚŚĞLJĂƌĞĂĚĚĞĚ͘dŚĞƌĞǁŝůůďĞŶŽ ĐŽƐƚƚŽƚŚĞŽŶƚƌĂĐƚŽƌĨŽƌƵƐĞŽĨWƌŽĐŽƌĞ͘
/ƚ ŝƐ ƌĞĐŽŵŵĞŶĚĞĚ ƚŚĂƚ ƚŚĞ ŽŶƚƌĂĐƚŽƌ ƉƌŽǀŝĚĞ ŵŽďŝůĞ ĂĐĐĞƐƐ ĨŽƌ tŝŶĚŽǁƐ͕ ŝK^ ůŽĐĂƚĞĚ Ăƚ ŚƚƚƉƐ͗ͬͬĂƉƉƐ͘ĂƉƉůĞ͘ĐŽŵͬƵƐͬĂƉƉͬƉƌŽĐŽƌĞͲĐŽŶƐƚƌƵĐƚŝŽŶͲŵĂŶĂŐĞŵĞŶƚͬŝĚϯϳϰϵϯϬϱϰϮŽ ƌ Ŷ Ě ƌ Ž ŝ Ě Ě Ğ ǀ ŝ Đ Ğ Ɛ ůŽĐĂƚĞĚ ĂƚŚƚƚƉƐ͗ͬͬƉůĂLJ͘ŐŽŽŐůĞ͘ĐŽŵͬƐƚŽƌĞͬĂƉƉƐͬĚĞƚĂŝůƐ͍ŝĚсĐŽŵ͘ƉƌŽĐŽƌĞ͘ĂĐƚŝǀŝƚŝĞƐ ǁŝƚŚ ƚŚĞ WƌŽĐŽƌĞ ƉƉ ŝŶƐƚĂůůĞĚ ƚŽ Ăƚ ůĞĂƐƚ ŽŶĞ ŽŶͲƐŝƚĞ ŝŶĚŝǀŝĚƵĂů ƚŽ ƉƌŽǀŝĚĞ ƌĞĂůͲƚŝ ŵĞ ĂĐĐĞƐƐ ƚŽ ĐƵƌƌĞŶƚ ƉŽƐƚĞĚ ĚƌĂǁŝŶŐƐ͕ ƐƉĞĐŝĨŝĐĂƚŝŽŶƐ͕ Z&/Ɛ͕ ƐƵďŵŝƚƚĂůƐ͕ ƐĐŚĞĚƵůĞƐ͕ ĐŚĂŶŐĞ ŽƌĚĞƌƐ͕ ƉƌŽũĞĐƚ ĚŽĐƵŵĞŶƚƐ͕ ĂƐ ǁĞůů ĂƐ ĂŶLJ ĚĞĨŝĐŝĞŶƚ ŽďƐĞƌǀĂƚŝŽŶƐ Žƌ ƉƵŶĐŚ ůŝƐƚŝƚĞŵƐ͘ WƌŽǀŝĚŝŶŐ ŵŽďŝůĞ ĂĐĐĞƐƐ ǁŝůůŝŵƉƌŽǀĞ ĐŽŵŵƵŶŝĐĂƚŝŽŶ͕ ĞĨĨŝĐŝĞŶĐLJ͕ ĂŶĚ ƉƌŽĚƵĐƚŝǀŝƚLJĨŽƌĂůůƉĂƌƚŝĞƐ͘dŚĞƵƐĞŽĨWƌŽĐŽƌĞĨŽƌƉƌŽũĞĐƚŵĂŶĂŐĞŵĞŶƚĚŽĞƐŶŽƚƌĞůŝĞǀĞƚŚĞĐŽŶƚƌĂĐƚŽƌŽĨ ĂŶLJŽƚŚĞƌƌĞƋƵŝƌĞŵĞŶƚƐĂƐŵĂLJďĞƐƉĞĐŝĨŝĞĚŝŶƚŚĞĐŽŶƚƌĂĐƚĚŽĐƵŵĞŶƚƐ͘ ϴ͘ ^ddh^K&KEdZdKZ
ŽŶƚƌĂĐƚŽƌǁŝůůƉĞƌĨŽƌŵƚŚĞ^ĞƌǀŝĐĞƐŝŶŽŶƚƌĂĐƚŽƌΖƐŽǁŶǁĂLJĂƐĂŶŝŶĚĞƉĞŶĚĞŶƚĐŽŶƚƌĂĐƚŽƌĂŶĚŝŶƉƵƌƐƵŝƚ ŽĨŽŶƚƌĂĐƚŽƌΖƐŝŶĚĞƉĞŶĚĞŶƚĐĂůůŝŶŐ͕ĂŶĚŶŽƚĂƐĂŶĞŵƉůŽLJĞĞŽĨ ŝƚLJ͘ŽŶƚƌĂĐƚŽƌǁŝůůďĞƵŶĚĞƌĐŽŶƚƌŽůŽĨ ŝƚLJŽŶůLJĂƐƚŽƚŚĞƌĞƐƵůƚƚŽďĞĂĐĐŽŵƉůŝƐŚĞĚ͕ďƵƚǁŝůůĐŽŶƐƵůƚǁŝƚŚŝƚLJĂƐŶĞĐĞƐƐĂƌLJ͘dŚĞƉĞƌƐŽŶƐƵƐĞĚďLJ ŽŶƚƌĂĐƚŽƌƚŽƉƌŽǀŝĚĞƐĞƌǀŝĐĞƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚǁŝůůŶŽƚďĞ ĐŽŶƐŝĚĞƌĞĚĞŵƉůŽLJĞĞƐŽĨŝƚLJĨŽƌĂŶLJ ƉƵƌƉŽƐĞƐ͘
dŚĞƉĂLJŵĞŶƚŵĂĚĞƚŽŽŶƚƌĂĐƚŽƌƉƵƌƐƵĂŶƚƚŽƚŚĞŐƌĞĞŵĞŶƚǁŝůůďĞƚŚĞĨƵůůĂŶĚĐŽŵƉůĞƚĞĐŽŵƉĞŶƐĂƚŝŽŶ ƚŽ ǁŚŝĐŚ ŽŶƚƌĂĐƚŽƌ ŝƐ ĞŶƚŝƚůĞĚ͘ ŝƚLJ ǁŝůů ŶŽƚ ŵĂŬĞ ĂŶLJ ĨĞĚĞƌĂů Žƌ ƐƚĂƚĞ ƚĂdž ǁŝƚŚŚŽůĚŝŶŐƐ ŽŶ ďĞŚĂůĨ ŽĨ ŽŶƚƌĂĐƚŽƌ Žƌ ŝƚƐ ĂŐĞŶƚƐ͕ ĞŵƉůŽLJĞĞƐ Žƌ ƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘ ŝƚLJ ǁŝůů ŶŽƚ ďĞ ƌĞƋƵŝƌĞĚ ƚŽ ƉĂLJ ĂŶLJ ǁŽƌŬĞƌƐΖ ĐŽŵƉĞŶƐĂƚŝŽŶ ŝŶƐƵƌĂŶĐĞ Žƌ ƵŶĞŵƉůŽLJŵĞŶƚ ĐŽŶƚƌŝďƵƚŝŽŶƐ ŽŶ ďĞŚĂůĨŽĨ ŽŶƚƌĂĐƚŽƌ Žƌ ŝƚƐ ĞŵƉůŽLJĞĞƐ Žƌ ƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘ ŽŶƚƌĂĐƚŽƌ ĂŐƌĞĞƐ ƚŽ ŝŶĚĞŵŶŝĨLJ ŝƚLJ ǁŝƚŚŝŶ ƚŚŝƌƚ LJ ; ϯ Ϭ Ϳ Ě Ă LJ Ɛ Ĩ Ž ƌ Ă Ŷ LJ ƚ Ă dž ͕ ƌ Ğ ƚ ŝ ƌ Ğ ŵ Ğ Ŷ ƚ ĐŽŶƚƌŝďƵƚŝŽŶ͕ ƐŽĐŝĂů ƐĞĐƵƌŝƚLJ͕ ŽǀĞƌƚŝŵĞ ƉĂLJŵĞŶƚ͕ ƵŶĞŵƉůŽLJŵĞŶƚ ƉĂLJŵĞŶƚ Žƌ ǁŽƌŬĞƌƐΖ ĐŽŵƉĞŶƐĂƚŝŽŶ ƉĂLJŵĞŶƚ ǁŚŝĐŚ ŝƚLJ ŵĂLJ ďĞ ƌĞƋƵŝƌĞĚ ƚŽ ŵĂŬĞ ŽŶ ďĞŚĂůĨ ŽĨ ŽŶƚƌĂĐƚŽƌ Žƌ ĂŶLJ ĂŐĞŶƚ͕ ĞŵƉůŽLJĞĞ͕ Žƌ

Aug. 22, 2023
Item #1 Page 8 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϯŽĨϭϳ
ƐƵďĐŽŶƚƌĂĐƚŽƌŽĨŽŶƚƌĂĐƚŽƌĨŽƌǁŽƌŬĚŽŶĞƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘ƚƚŚĞŝƚLJ͛ƐĞůĞĐƚŝŽŶ͕ŝƚLJŵĂLJĚĞĚƵĐƚ ƚŚĞŝŶĚĞŵŶŝĨŝĐĂƚŝŽŶĂŵŽƵŶƚĨƌŽŵĂŶLJďĂůĂŶĐĞŽǁŝŶŐƚŽŽŶƚƌĂĐƚŽƌ͘

ϵ͘ ^hKEdZd/E'
Ž Ŷ ƚ ƌ Ă Đ ƚ Ž ƌ ǁ ŝ ů ů Ŷ Ž ƚ Ɛ Ƶ ď Đ Ž Ŷ ƚ ƌ Ă Đ ƚ Ă Ŷ LJ Ɖ Ž ƌ ƚ ŝ Ž Ŷ Ž Ĩ ƚ Ś Ğ ^ Ğ ƌ ǀ ŝ Đ Ğ Ɛ ǁ ŝ ƚŚŽƵƚ ƉƌŝŽƌ ǁƌŝƚƚĞŶ ĂƉƉƌŽǀĂů ŽĨ ŝƚLJ͘ /Ĩ ŽŶƚƌĂĐƚŽƌƐƵďĐŽŶƚƌĂĐƚƐĂŶLJŽĨƚŚĞ^ĞƌǀŝĐĞƐ͕ŽŶƚƌĂĐƚŽƌǁŝůůďĞ ĨƵůůLJƌĞƐƉŽŶƐŝďůĞƚŽŝƚLJĨŽƌƚŚĞĂĐƚƐĂŶĚ ŽŵŝƐƐŝŽŶƐŽĨŽŶƚƌĂĐƚŽƌΖƐƐƵďĐŽŶƚƌĂĐƚŽƌĂŶĚŽĨƚŚĞƉĞƌƐŽŶƐĞŝƚŚ ĞƌĚŝƌĞĐƚůLJŽƌŝŶĚŝƌĞĐƚůLJĞŵƉůŽLJĞĚďLJƚŚĞ ƐƵďĐŽŶƚƌĂĐƚŽƌ͕ĂƐŽŶƚƌĂĐƚŽƌŝƐĨŽƌƚŚĞĂĐƚƐĂŶĚŽŵŝƐƐŝŽŶƐŽĨƉ ĞƌƐŽŶƐĚŝƌĞĐƚůLJĞŵƉůŽLJĞĚďLJŽŶƚƌĂĐƚŽƌ͘ EŽƚŚŝŶŐĐŽŶƚĂŝŶĞĚŝŶƚŚŝƐŐƌĞĞŵĞŶƚǁŝůůĐƌĞĂƚĞĂŶLJĐŽŶƚƌĂĐƚƵĂůƌĞůĂƚŝŽŶƐŚŝƉďĞƚǁĞĞŶĂŶLJƐƵďĐŽŶƚƌĂĐƚŽƌ ŽĨŽŶƚƌĂĐƚŽƌĂŶĚŝƚLJ͘ŽŶƚƌĂĐƚŽƌǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌƉĂLJŵĞŶƚŽĨƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘ŽŶƚƌĂĐƚŽƌǁŝůůďŝŶĚ ĞǀĞƌLJ ƐƵďĐŽŶƚƌĂĐƚŽƌ ĂŶĚ ĞǀĞƌLJ ƐƵďĐŽŶƚƌĂĐƚŽƌ ŽĨ Ă ƐƵďĐŽŶƚƌĂĐƚŽƌ ď LJ ƚ Ś Ğ ƚ Ğ ƌ ŵ Ɛ Ž Ĩ ƚ Ś ŝ Ɛ Ő ƌ Ğ Ğ ŵ Ğ Ŷ ƚ ĂƉƉůŝĐĂďůĞƚŽŽŶƚƌĂĐƚŽƌΖƐǁŽƌŬƵŶůĞƐƐƐƉĞĐŝĨŝĐĂůůLJŶŽƚĞĚƚŽƚŚĞĐŽŶƚƌĂƌLJŝŶƚŚĞƐƵďĐŽŶƚƌĂĐƚĂŶĚĂƉƉƌŽǀĞĚ ŝŶǁƌŝƚŝŶŐďLJŝƚLJ͘

ϭϬ͘ Kd,ZKEdZdKZ^
dŚĞŝƚLJƌĞƐĞƌǀĞƐƚŚĞƌŝŐŚƚƚŽĞŵƉůŽLJŽƚŚĞƌŽŶƚƌĂĐƚŽƌƐŝŶĐŽŶŶĞĐƚŝŽŶǁŝƚŚƚŚĞ^ĞƌǀŝĐĞƐ͘

ϭϭ͘ /EDE/&/d/KE
Ž Ŷ ƚ ƌ Ă Đ ƚ Ž ƌ Ă Ő ƌ Ğ Ğ Ɛ ƚ Ž ŝ Ŷ Ě Ğ ŵ Ŷ ŝ Ĩ LJ Ă Ŷ Ě Ś Ž ů Ě Ś Ă ƌ ŵ ů Ğ Ɛ Ɛ ƚ Ś Ğ ŝ ƚ LJ Ă Ŷ Ě ŝƚƐ ŽĨĨŝĐĞƌƐ͕ ŽĨĨŝĐŝĂůƐ͕ ĞŵƉůŽLJĞĞƐ ĂŶĚ ǀŽůƵŶƚĞĞƌƐĨƌŽŵĂŶĚĂŐĂŝŶƐƚĂůůĐůĂŝŵƐ͕ĚĂŵĂŐĞƐ͕ůŽƐƐĞƐĂŶĚĞdžƉĞŶƐĞƐŝŶĐůƵĚŝŶŐĂƚƚŽƌŶĞLJƐĨĞĞƐĂƌŝƐŝŶŐŽƵƚ ŽĨ ƚŚĞ ƉĞƌĨŽƌŵĂŶĐĞ ŽĨ ƚŚĞ ǁŽƌŬ ĚĞƐĐƌŝďĞĚ ŚĞƌĞŝŶ ĐĂƵƐĞĚ ďLJ ĂŶLJ ŶĞŐůŝŐĞŶĐĞ͕ ƌĞĐŬůĞƐƐŶĞƐƐ͕ Žƌ ǁŝůůĨƵů ŵŝƐĐŽŶĚƵĐƚŽĨƚŚĞŽŶƚƌĂĐƚŽƌ͕ĂŶLJƐƵďĐŽŶƚƌĂĐƚŽƌ͕ĂŶLJŽŶĞĚŝƌĞĐƚůLJŽƌŝŶĚŝƌĞĐƚůLJĞŵƉůŽLJĞĚďLJĂŶLJŽĨƚŚĞŵ ŽƌĂŶLJŽŶĞĨŽƌǁŚŽƐĞĂĐƚƐĂŶLJŽĨƚŚĞŵŵĂLJďĞůŝĂďůĞ͘

dŚĞƉĂƌƚŝĞƐĞdžƉƌĞƐƐůLJĂŐƌĞĞƚŚĂƚĂŶLJƉĂLJŵĞŶƚ͕ĂƚƚŽƌŶĞLJ͛ƐĨĞĞ͕ĐŽƐƚƐŽƌĞdžƉĞŶƐĞŝƚLJŝŶĐƵƌƐŽƌŵĂŬĞƐƚŽŽƌ ŽŶďĞŚĂůĨŽĨĂŶŝŶũƵƌĞĚĞŵƉůŽLJĞĞƵŶĚĞƌƚŚĞŝƚLJ͛ƐƐĞůĨͲĂĚŵŝŶŝƐƚĞƌĞĚǁŽƌŬĞƌƐ͛ĐŽŵƉĞŶƐĂƚŝŽŶŝƐŝŶĐůƵĚĞĚĂƐ ĂůŽƐƐ͕ĞdžƉĞŶƐĞŽƌĐŽƐƚĨŽƌƚŚĞƉƵƌƉŽƐĞƐŽĨƚŚŝƐƐĞĐƚŝŽŶ͕ĂŶĚƚŚĂƚƚŚŝƐƐĞĐƚŝŽŶǁŝůůƐƵƌǀŝǀĞƚŚĞĞdžƉŝƌĂƚŝŽŶŽƌ ĞĂƌůLJƚĞƌŵŝŶĂƚŝŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

ϭϮ͘ /E^hZE
ŽŶƚƌĂĐƚŽƌ ǁŝůů ŽďƚĂŝŶ ĂŶĚ ŵĂŝŶƚĂŝŶ ĨŽƌ ƚŚĞ ĚƵƌĂƚŝŽŶ ŽĨ ƚŚĞ ŐƌĞ Ğ ŵ Ğ Ŷ ƚ Ă Ŷ Ě Ă Ŷ LJ Ă Ŷ Ě Ă ů ů Ă ŵ Ğ Ŷ Ě ŵ Ğ Ŷ ƚ Ɛ ͕ ŝŶƐƵƌĂŶĐĞ ĂŐĂŝŶƐƚ ĐůĂŝŵƐ ĨŽƌ ŝŶũƵƌŝĞƐ ƚŽ ƉĞƌƐŽŶƐ Žƌ ĚĂŵĂŐĞ ƚŽ ƉƌŽƉĞƌƚLJ ǁŚŝĐŚ ŵĂLJ ĂƌŝƐĞ ŽƵƚ ŽĨ Žƌ ŝŶ ĐŽŶŶĞĐƚŝŽŶ ǁŝƚŚ ƉĞƌĨŽƌŵĂŶĐĞ ŽĨ ƚŚĞ ƐĞƌǀŝĐĞƐ ďLJ ŽŶƚƌĂĐƚŽƌ Žƌ ŽŶƚƌĂĐƚŽƌ͛Ɛ ĂŐĞŶƚƐ͕ ƌĞƉƌĞƐĞŶƚĂƚŝǀĞƐ͕ ĞŵƉůŽLJĞĞƐ Žƌ ƐƵďĐŽŶƚƌĂĐƚŽƌƐ͘ dŚĞ ŝŶƐƵƌĂŶĐĞ ǁŝůů ďĞ ŽďƚĂŝŶĞĚ ĨƌŽŵ ĂŶ ŝŶƐƵƌĂŶĐĞ ĐĂƌƌŝĞƌ ĂĚŵŝƚƚĞĚ ĂŶĚ ĂƵƚŚŽƌŝnjĞĚƚŽĚŽďƵƐŝŶĞƐƐŝŶƚŚĞ^ƚĂƚĞŽĨĂůŝĨŽƌŶŝĂ͘dŚĞŝŶƐƵƌ ĂŶĐĞĐĂƌƌŝĞƌŝƐƌĞƋƵŝƌĞĚƚŽŚĂǀĞĂĐƵƌƌĞŶƚ ĞƐƚΖƐ<ĞLJZĂƚŝŶŐŽĨŶŽƚůĞƐƐƚŚĂŶΗͲ͗s//Η͖KZǁŝƚŚĂƐƵƌƉůƵƐůŝŶĞŝŶƐƵƌĞƌŽŶƚŚĞ^ƚĂƚĞŽĨĂůŝĨŽƌŶŝĂ͛Ɛ>ŝƐƚŽĨ ƉƉƌŽǀĞĚ^ƵƌƉůƵƐ>ŝŶĞ/ŶƐƵƌĞƌƐ;>^>/ͿǁŝƚŚĂƌĂƚŝŶŐŝŶƚŚĞůĂƚĞƐƚĞƐƚ͛Ɛ<ĞLJZĂƚŝŶŐ'ƵŝĚĞŽĨĂƚůĞĂƐƚ͗͞y͖͟ KZĂŶĂůŝĞŶŶŽŶͲĂĚŵŝƚƚĞĚŝŶƐƵƌĞƌůŝƐƚĞĚďLJƚŚĞEĂƚŝŽŶĂůƐƐŽĐŝĂƚŝ ŽŶŽĨ/ŶƐƵƌĂŶĐĞŽŵŵŝƐƐŝŽŶĞƌƐ;E/Ϳ ůĂƚĞƐƚƋƵĂƌƚĞƌůLJůŝƐƚŝŶŐƐƌĞƉŽƌƚ͘

ϭϮ͘ϭ ŽǀĞƌĂŐĞĂŶĚ>ŝŵŝƚƐ͘
ŽŶƚƌĂĐƚŽƌ ǁŝůů ŵĂŝŶƚĂŝŶ ƚŚĞ ƚLJƉĞƐ ŽĨ ĐŽǀĞƌĂŐĞ ĂŶĚ ŵŝŶŝŵƵŵ ůŝŵŝƚƐ ŝŶĚŝĐĂƚĞĚ ďĞůŽǁ͕ ƵŶůĞƐƐ ƚŚĞ ZŝƐŬ DĂŶĂŐĞƌ Žƌ ŝƚLJ DĂŶĂŐĞƌ ĂƉƉƌŽǀĞƐ Ă ůŽǁĞƌ ĂŵŽƵŶƚ͘ dŚĞƐĞ ŵŝŶŝŵƵŵĂŵŽƵŶƚƐ ŽĨ ĐŽǀĞƌĂŐĞ ǁŝůů ŶŽƚ ĐŽŶƐƚŝƚƵƚĞĂŶLJůŝŵŝƚĂƚŝŽŶƐŽƌĐĂƉŽŶŽŶƚƌĂĐƚŽƌΖƐŝŶĚĞŵŶŝĨŝĐĂƚŝŽŶŽďůŝŐĂƚŝŽŶƐƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘ŝƚLJ͕ ŝƚƐŽĨĨŝĐĞƌƐ͕ĂŐĞŶƚƐĂŶĚĞŵƉůŽLJĞĞƐŵĂŬĞŶŽƌĞƉƌĞƐĞŶƚĂƚŝŽŶƚŚĂƚƚŚĞůŝŵŝƚƐŽĨƚŚĞŝŶƐƵƌĂŶĐĞƐƉĞĐŝĨŝĞĚƚŽďĞ ĐĂƌƌŝĞĚ ďLJ ŽŶƚƌĂĐƚŽƌ ƉƵƌƐƵĂŶƚ ƚŽ ƚŚŝƐ ŐƌĞĞŵĞŶƚ ĂƌĞ ĂĚĞƋƵĂƚĞ ƚŽ ƉƌŽƚĞĐƚ ŽŶƚƌĂĐƚŽƌ͘ /Ĩ ŽŶƚƌĂĐƚŽƌ ďĞůŝĞǀĞƐ ƚŚĂƚ ĂŶLJ ƌĞƋƵŝƌĞĚ ŝŶƐƵƌĂŶĐĞ ĐŽǀĞƌĂŐĞ ŝƐ ŝŶĂĚĞƋƵĂƚĞ͕ ŽŶƚƌĂĐƚŽƌ ǁŝůů ŽďƚĂŝŶ ƐƵĐŚ ĂĚĚŝƚŝŽŶĂů ŝŶƐƵƌĂŶĐĞĐŽǀĞƌĂŐĞ͕ĂƐŽŶƚƌĂĐƚŽƌĚĞĞŵƐĂĚĞƋƵĂƚĞ͕ĂƚŽŶƚƌĂĐƚŽƌΖƐƐŽůĞĞdžƉĞŶƐĞ͘dŚĞĨƵůůůŝŵŝƚƐĂǀĂŝůĂďůĞ ƚŽƚŚĞŶĂŵĞĚŝŶƐƵƌĞĚƐŚĂůůĂůƐŽďĞĂǀĂŝůĂďůĞĂŶĚĂƉƉůŝĐĂďůĞƚŽƚŚĞŝƚLJĂƐĂŶĂĚĚŝƚŝŽŶĂůŝŶƐƵƌĞĚ͘

Aug. 22, 2023
Item #1 Page 9 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϰŽĨϭϳ
ϭϮ͘ϭ͘ϭ ŽŵŵĞƌĐŝĂů'ĞŶĞƌĂů>ŝĂďŝůŝƚLJ ;'>Ϳ/ŶƐƵƌĂŶĐĞ͘/ŶƐƵƌĂŶĐĞǁƌŝƚƚĞŶŽŶĂŶ͞ŽĐĐƵƌƌĞŶĐĞ͟ďĂƐŝƐ͕ ŝŶĐůƵĚŝŶŐƉĞƌƐŽŶĂůΘĂĚǀĞƌƚŝƐŝŶŐŝŶũƵƌLJ͕ǁŝƚŚůŝŵŝƚƐŶŽůĞƐƐƚŚ ĂŶΨϮ͕ϬϬϬ͕ϬϬϬƉĞƌŽĐĐƵƌƌĞŶĐĞ͘/ĨĂŐĞŶĞƌĂů ĂŐŐƌĞŐĂƚĞůŝŵŝƚĂƉƉůŝĞƐ͕ĞŝƚŚĞƌƚŚĞŐĞŶĞƌĂůĂŐŐƌĞŐĂƚĞůŝŵŝƚƐŚĂůůĂƉƉůLJƐĞƉĂƌĂƚĞůLJƚŽƚŚŝƐƉƌŽũĞĐƚͬůŽĐĂƚŝŽŶ ŽƌƚŚĞŐĞŶĞƌĂůĂŐŐƌĞŐĂƚĞůŝŵŝƚƐŚĂůůďĞƚǁŝĐĞƚŚĞƌĞƋƵŝƌĞĚŽĐĐƵƌƌĞŶĐĞůŝŵŝƚ͘

ϭϮ͘ϭ͘Ϯ ƵƚŽŵŽďŝůĞ>ŝĂďŝůŝƚLJ͘ ;ŝĨƚŚĞ ƵƐĞ ŽĨ ĂŶ ĂƵƚŽŵŽďŝůĞ ŝƐŝŶǀŽůǀĞĚ ĨŽƌŽŶƚƌĂĐƚŽƌΖƐǁŽƌŬ ĨŽƌ ŝƚLJͿ͘ΨϮ͕ϬϬϬ͕ϬϬϬĐŽŵďŝŶĞĚƐŝŶŐůĞͲůŝŵŝƚƉĞƌĂĐĐŝĚĞŶƚĨŽƌďŽĚŝůLJŝŶũƵƌLJĂŶĚƉƌŽƉĞƌƚLJĚĂŵĂŐĞ͘

ϭϮ͘ϭ͘ϯ tŽƌŬĞƌƐΖ ŽŵƉĞŶƐĂƚŝŽŶ ĂŶĚ ŵƉůŽLJĞƌΖƐ >ŝĂďŝůŝƚLJ͘ tŽƌŬĞƌƐΖ ŽŵƉĞŶƐĂƚŝŽŶ ůŝŵŝƚƐ ĂƐ ƌĞƋƵŝƌĞĚďLJƚŚĞĂůŝĨŽƌŶŝĂ>ĂďŽƌ ŽĚĞ͘tŽƌŬĞƌƐΖŽŵƉĞŶƐĂƚŝŽŶǁŝůůŶŽƚďĞƌĞƋƵŝƌĞĚŝĨŽŶƚƌĂĐƚŽƌŚĂƐŶŽ ĞŵƉůŽLJĞĞƐĂŶĚƉƌŽǀŝĚĞƐ͕ƚŽŝƚLJΖƐƐĂƚŝƐĨĂĐƚŝŽŶ͕ĂĚĞĐůĂƌĂƚŝŽŶƐƚĂƚŝŶŐƚŚŝƐ͘

ϭϮ͘ϭ͘ϰ WƌŽĨĞƐƐŝŽŶĂů>ŝĂďŝůŝƚLJ͘ƌ ƌŽƌƐĂŶĚŽŵŝƐƐŝŽŶƐůŝĂďŝůŝƚLJĂƉƉƌŽƉƌŝĂƚĞƚŽŽŶƚƌĂĐƚŽƌ͛ƐƉƌŽĨĞƐƐŝŽŶ ǁŝƚŚůŝŵŝƚƐŽĨŶŽƚůĞƐƐƚŚĂŶΨϭ͕ϬϬϬ͕ϬϬϬƉĞƌĐůĂŝŵ͘ŽǀĞƌĂŐĞŵƵƐƚďĞŵĂŝŶƚĂŝŶĞĚĨŽƌĂƉĞƌŝŽĚŽĨĨŝǀĞLJĞĂƌƐ ĨŽůůŽǁŝŶŐƚŚĞĚĂƚĞŽĨĐŽŵƉůĞƚŝŽŶŽĨƚŚĞǁŽƌŬ͘

ϭϮ͘Ϯ ĚĚŝƚŝŽŶĂůWƌŽǀŝƐŝŽŶƐ͘ ŽŶƚƌĂĐƚŽƌ ǁŝůů ĞŶƐƵƌĞ ƚŚĂƚ ƚŚĞ ƉŽů ŝĐŝĞƐŽĨ ŝŶƐƵƌĂŶĐĞ ƌĞƋƵŝƌĞĚ ƵŶĚĞƌ ƚŚŝƐ ŐƌĞĞŵĞŶƚĐŽŶƚĂŝŶ͕ŽƌĂƌĞĞŶĚŽƌƐĞĚƚŽĐŽŶƚĂŝŶ͕ƚŚĞĨŽůůŽǁŝŶŐƉƌŽǀŝƐŝŽŶƐ͗

ϭϮ͘Ϯ͘ϭ dŚĞŝƚLJǁŝůůďĞŶĂŵĞĚĂƐĂŶĂĚĚŝƚŝŽŶĂůŝŶƐƵƌĞĚŽŶŽŵŵĞ ƌĐŝĂů'ĞŶĞƌĂů>ŝĂďŝůŝƚLJǁŚŝĐŚ ƐŚĂůůƉƌŽǀŝĚĞƉƌŝŵĂƌLJĐŽǀĞƌĂŐĞƚŽƚŚĞŝƚLJ͘

ϭϮ͘Ϯ͘Ϯ ŽŶƚƌĂĐƚŽƌǁŝůůŽďƚĂŝŶŽĐĐƵƌƌĞŶĐĞĐŽǀĞƌĂŐĞ͕ĞdžĐůƵĚŝŶŐWƌ ŽĨĞƐƐŝŽŶĂů>ŝĂďŝůŝƚLJ͕ǁŚŝĐŚǁŝůůďĞ ǁƌŝƚƚĞŶĂƐĐůĂŝŵƐͲŵĂĚĞĐŽǀĞƌĂŐĞ͘

ϭϮ͘Ϯ͘ϯ dŚŝƐŝŶƐƵƌĂŶĐĞǁŝůůďĞŝŶĨŽƌĐĞĚƵƌŝŶŐƚŚĞůŝĨĞŽĨƚŚĞ ŐƌĞĞŵĞŶƚĂŶĚĂŶLJĞdžƚĞŶƐŝŽŶƐŽĨŝƚ ĂŶĚǁŝůůŶŽƚďĞĐĂŶĐĞůĞĚǁŝƚŚŽƵƚƚŚŝƌƚLJ;ϯϬͿĚĂLJƐƉƌŝŽƌǁƌŝƚƚĞŶŶŽƚŝĐĞƚŽŝƚLJƐĞŶƚďLJĐĞƌƚŝĨŝĞĚŵĂŝůƉƵƌƐƵĂŶƚ ƚŽƚŚĞEŽƚŝĐĞƉƌŽǀŝƐŝŽŶƐŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

ϭϮ͘ϯ WƌŽǀŝĚŝŶŐĞƌƚŝĨŝĐĂƚĞƐŽĨ/ŶƐƵƌĂŶĐĞĂŶĚŶĚŽƌƐĞŵĞŶƚƐ͘WƌŝŽƌƚŽŝƚLJΖƐĞdžĞĐƵƚŝŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͕ ŽŶƚƌĂĐƚŽƌǁŝůůĨƵƌŶŝƐŚĐĞƌƚŝĨŝĐĂƚĞƐŽĨŝŶƐƵƌĂŶĐĞĂŶĚĞŶĚŽƌƐĞŵĞŶƚƐƚŽŝƚLJ͘

ϭϮ͘ϰ &ĂŝůƵƌĞƚŽDĂŝŶƚĂŝŶŽǀĞƌĂŐĞ͘/ĨŽŶƚƌĂĐƚŽƌĨĂŝůƐƚŽŵĂŝŶƚ ĂŝŶĂŶLJŽĨƚŚĞƐĞŝŶƐƵƌĂŶĐĞĐŽǀĞƌĂŐĞƐ͕ ƚŚĞŶŝƚLJǁŝůůŚĂǀĞƚŚĞŽƉƚŝŽŶƚŽĚĞĐůĂƌĞŽŶƚƌĂĐƚŽƌŝŶďƌĞĂĐŚ͕ŽƌŵĂLJƉƵƌĐŚĂƐĞƌĞƉůĂĐĞŵĞŶƚŝŶƐƵƌĂŶĐĞŽƌ ƉĂLJƚŚĞƉƌĞŵŝƵŵƐƚŚĂƚĂƌĞĚƵĞŽŶĞdžŝƐƚŝŶŐƉŽůŝĐŝĞƐŝŶŽƌĚĞƌƚŽŵĂŝŶƚĂŝŶƚŚĞƌĞƋƵŝƌĞĚĐŽǀĞƌĂŐĞƐ͘ŽŶƚƌĂĐƚŽƌ ŝƐƌĞƐƉŽŶƐŝďůĞĨŽƌĂŶLJƉĂLJŵĞŶƚƐŵĂĚĞďLJŝƚLJƚŽŽďƚĂŝŶŽƌŵĂŝŶƚĂŝŶŝŶƐƵƌĂŶĐĞĂŶĚŝƚLJŵĂLJĐŽůůĞĐƚƚŚĞƐĞ ƉĂLJŵĞŶƚƐ ĨƌŽŵ ŽŶƚƌĂĐƚŽƌ Žƌ ĚĞĚƵĐƚ ƚŚĞ ĂŵŽƵŶƚ ƉĂŝĚ ĨƌŽŵ ĂŶLJ ƐƵŵ Ɛ ĚƵĞ ŽŶƚƌĂĐƚŽƌ ƵŶĚĞƌ ƚŚŝƐ ŐƌĞĞŵĞŶƚ͘

ϭϮ͘ϱ ^ƵďŵŝƐƐŝŽŶ ŽĨ /ŶƐƵƌĂŶĐĞ WŽůŝĐŝĞƐ͘ ŝƚLJ ƌĞƐĞƌǀĞƐ ƚŚĞ ƌŝŐŚƚ ƚ Ž ƌ Ğ Ƌ Ƶ ŝ ƌ Ğ ͕ Ă ƚ Ă Ŷ LJ ƚ ŝ ŵĞ ͕ Đ ŽŵƉ ů Ğ ƚ Ğ Ă Ŷ Ě ĐĞƌƚŝĨŝĞĚĐŽƉŝĞƐŽĨĂŶLJŽƌĂůůƌĞƋƵŝƌĞĚŝŶƐƵƌĂŶĐĞƉŽůŝĐŝĞƐĂŶĚĞŶĚŽƌƐĞŵĞŶƚƐ͘

ϭϯ͘ h^/E^^>/E^
ŽŶƚƌĂĐƚŽƌǁŝůůŽďƚĂŝŶĂŶĚŵĂŝŶƚĂŝŶĂŝƚLJŽĨĂƌůƐďĂĚƵƐŝŶĞƐƐ>ŝĐĞŶƐĞĨŽƌƚŚĞƚĞƌŵŽĨƚŚĞŐƌĞĞŵĞŶƚ͕ĂƐ ŵĂLJďĞĂŵĞŶĚĞĚĨƌŽŵƚŝŵĞͲƚŽͲƚŝŵĞ͘

ϭϰ͘ KhEd/E'ZKZ^
ŽŶƚƌĂĐƚŽƌ ǁŝůů ŵĂŝŶƚĂŝŶ ĐŽŵƉůĞƚĞ ĂŶĚ ĂĐĐƵƌĂƚĞ ƌĞĐŽƌĚƐ ǁŝƚŚ ƌĞƐ ƉĞĐƚ ƚŽ ĐŽƐƚƐ ŝŶĐƵƌƌĞĚ ƵŶĚĞƌ ƚŚŝƐ ŐƌĞĞŵĞŶƚ͘ůůƌĞĐŽƌĚƐǁŝůůďĞĐůĞĂƌůLJŝĚĞŶƚŝĨŝĂďůĞ͘ŽŶƚƌĂĐƚŽƌǁŝůůĂůůŽǁĂƌĞƉƌĞƐĞŶƚĂƚŝǀĞŽĨŝƚLJĚƵƌŝŶŐ

Aug. 22, 2023
Item #1 Page 10 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϱŽĨϭϳ
ŶŽƌŵĂů ďƵƐŝŶĞƐƐ ŚŽƵƌƐ ƚŽ ĞdžĂŵŝŶĞ͕ ĂƵĚŝƚ͕ ĂŶĚ ŵĂŬĞ ƚƌĂŶƐĐƌŝƉƚƐ Žƌ Đ Ž Ɖ ŝ Ğ Ɛ Ž Ĩ ƌ Ğ Đ Ž ƌ Ě Ɛ Ă Ŷ Ě Ă Ŷ LJ Ž ƚ Ś Ğ ƌ ĚŽĐƵŵĞŶƚƐ ĐƌĞĂƚĞĚ ƉƵƌƐƵĂŶƚ ƚŽ ƚŚŝƐ ŐƌĞĞŵĞŶƚ͘ ŽŶƚƌĂĐƚŽƌ ǁŝůů ĂůůŽǁ ŝŶƐƉĞĐƚŝŽŶ ŽĨ Ăůů ǁŽƌŬ͕ ĚĂƚĂ͕ ĚŽĐƵŵĞŶƚƐ͕ƉƌŽĐĞĞĚŝŶŐƐ͕ĂŶĚĂĐƚŝǀŝƚŝĞƐƌĞůĂƚĞĚƚŽƚŚĞŐƌĞĞŵĞŶƚĨŽƌĂƉĞƌŝŽĚŽĨƚŚƌĞĞ;ϯͿLJĞĂƌƐĨƌŽŵƚŚĞ ĚĂƚĞŽĨĨŝŶĂůƉĂLJŵĞŶƚƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘

ϭϱ͘ KtEZ^,/WK&KhDEd^
ůůǁŽƌŬƉƌŽĚƵĐƚƉƌŽĚƵĐĞĚďLJŽŶƚƌĂĐƚŽƌŽƌŝƚƐĂŐĞŶƚƐ͕ĞŵƉůŽLJĞĞ Ɛ͕ĂŶĚƐƵďĐŽŶƚƌĂĐƚŽƌƐƉƵƌƐƵĂŶƚƚŽƚŚŝƐ ŐƌĞĞŵĞŶƚŝƐƚŚĞƉƌŽƉĞƌƚLJŽĨŝƚLJ͘/ŶƚŚĞĞǀĞŶƚƚŚŝƐŐƌĞĞŵĞŶƚŝƐƚĞƌŵŝŶĂƚĞĚ͕ĂůůǁŽƌŬƉƌŽĚƵĐƚƉƌŽĚƵĐĞĚ ďLJŽŶƚƌĂĐƚŽƌŽƌŝƚƐĂŐĞŶƚƐ͕ĞŵƉůŽLJĞĞƐĂŶĚƐƵďĐŽŶƚƌĂĐƚŽƌƐƉƵƌƐƵ ĂŶƚƚŽƚŚŝƐŐƌĞĞŵĞŶƚǁŝůůďĞĚĞůŝǀĞƌĞĚ ĂƚŽŶĐĞƚŽŝƚLJ͘ŽŶƚƌĂĐƚŽƌǁŝůůŚĂǀĞƚŚĞƌŝŐŚƚƚŽŵĂŬĞŽŶĞ;ϭͿ ĐŽƉLJŽĨƚŚĞǁŽƌŬƉƌŽĚƵĐƚĨŽƌŽŶƚƌĂĐƚŽƌ͛Ɛ ƌĞĐŽƌĚƐ͘

ϭϲ͘ KWzZ/',d^
ŽŶƚƌĂĐƚŽƌ ĂŐƌĞĞƐ ƚŚĂƚ ĂůůĐŽƉLJƌŝŐŚƚƐ ƚŚĂƚ ĂƌŝƐĞ ĨƌŽŵƚŚĞ ƐĞƌǀŝĐ Ğ Ɛ ǁ ŝ ů ů ď Ğ ǀĞ Ɛ ƚ Ğ Ě ŝ Ŷ ŝ ƚ LJ Ă Ŷ Ě ŽŶ ƚ ƌ Ă Đ ƚ Žƌ ƌĞůŝŶƋƵŝƐŚĞƐĂůůĐůĂŝŵƐƚŽƚŚĞĐŽƉLJƌŝŐŚƚƐŝŶĨĂǀŽƌŽĨŝƚLJ͘

ϭϳ͘ EKd/^
dŚĞŶĂŵĞŽĨƚŚĞƉĞƌƐŽŶƐǁŚŽĂƌĞĂƵƚŚŽƌŝnjĞĚƚŽŐŝǀĞǁƌŝƚƚĞŶŶŽƚŝĐĞŽƌƚŽƌĞĐĞŝǀĞǁƌŝƚƚĞŶŶŽƚŝĐĞŽŶďĞŚĂůĨ ŽĨŝƚLJĂŶĚŽŶďĞŚĂůĨŽĨŽŶƚƌĂĐƚŽƌƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘

&ŽƌŝƚLJ &ŽƌŽŶƚƌĂĐƚŽƌ
EĂŵĞ ƌĂŶĚŽŶDŝůĞƐ EĂŵĞ ŝůů^ŝůǀĂ
dŝƚůĞ ƐƐŽĐŝĂƚĞŶŐŝŶĞĞƌ dŝƚůĞ WƌŽũĞĐƚDĂŶĂŐĞƌ
ĞƉĂƌƚŵĞŶƚ WƵďůŝĐtŽƌŬƐ ĚĚƌĞƐƐ
ϮϯϬϱ,ŝƐƚŽƌŝĐĞĐĂƚƵƌZŽĂĚ͕^ƵŝƚĞ
ϭϬϮ
ŝƚLJŽĨĂƌůƐďĂĚ ^ĂŶŝĞŐŽ͕ϵϮϭϬϲ
ĚĚƌĞƐƐ ϭϲϯϱ&ĂƌĂĚĂLJǀĞ WŚŽŶĞEŽ͘ ϳϬϳ͘ϱϮϯ͘ϭϬϭϬ
ĂƌůƐďĂĚ͕ϵϮϬϬϴ ŵĂŝů ďŝůů͘ƐŝůǀĂΛŐŚĚ͘ĐŽŵ
WŚŽŶĞEŽ͘ ϰϰϮͲϯϯϵͲϮϳϰϱ

ĂĐŚƉĂƌƚLJǁŝůůŶŽƚŝĨLJƚŚĞŽƚŚĞƌŝŵŵĞĚŝĂƚĞůLJŽĨĂŶLJĐŚĂŶŐĞƐŽĨ ĂĚĚƌĞƐƐƚŚĂƚǁŽƵůĚƌĞƋƵŝƌĞĂŶLJŶŽƚŝĐĞŽƌ ĚĞůŝǀĞƌLJƚŽďĞĚŝƌĞĐƚĞĚƚŽĂŶŽƚŚĞƌĂĚĚƌĞƐƐ͘

ϭϴ͘ KE&>/dK&/EdZ^d
ŽŶƚƌĂĐƚŽƌ ƐŚĂůů ĨŝůĞ Ă ŽŶĨůŝĐƚ ŽĨ /ŶƚĞƌĞƐƚ ^ƚĂƚĞŵĞŶƚ ǁŝƚŚ ƚŚĞ ŝƚLJ ůĞƌŬ ŝŶ ĂĐĐŽƌĚĂŶĐĞ ǁŝƚŚ ƚŚĞ ƌĞƋƵŝƌĞŵĞŶƚƐŽĨƚŚĞŝƚLJŽĨĂƌůƐďĂĚŽŶĨůŝĐƚŽĨ/ŶƚĞƌĞƐƚŽĚĞ͘dŚĞŽŶƚƌĂĐƚŽƌƐŚĂůůƌĞƉŽƌƚŝŶǀĞƐƚŵĞŶƚƐŽƌ ŝŶƚĞƌĞƐƚƐĂƐƌĞƋƵŝƌĞĚŝŶƚŚĞŝƚLJŽĨĂƌůƐďĂĚŽŶĨůŝĐƚŽĨ/ŶƚĞƌĞƐƚŽĚĞ͘

zĞƐ☐EŽ܈
ϭϵ͘ 'EZ>KDW>/Et/d,>t^
ŽŶƚƌĂĐƚŽƌǁŝůůŬĞĞƉĨƵůůLJŝŶĨŽƌŵĞĚŽĨĨĞĚĞƌĂů͕ƐƚĂƚĞĂŶĚůŽĐĂůůĂǁƐĂŶĚŽƌĚŝŶĂŶĐĞƐĂŶĚƌĞŐƵůĂƚŝŽŶƐǁŚŝĐŚ ŝŶĂŶLJŵĂŶŶĞƌĂĨĨĞĐƚƚŚŽƐĞĞŵƉůŽLJĞĚďLJŽŶƚƌĂĐƚŽƌ͕ŽƌŝŶĂŶLJǁĂLJĂĨĨĞĐƚƚŚĞƉĞƌĨŽƌŵĂŶĐĞŽĨƚŚĞ^ĞƌǀŝĐĞƐ ďLJ ŽŶƚƌĂĐƚŽƌ͘ ŽŶƚƌĂĐƚŽƌ ǁŝůů Ăƚ Ăůů ƚŝŵĞƐ ŽďƐĞƌǀĞ ĂŶĚ ĐŽŵƉůLJ ǁŝƚŚ ƚŚĞƐĞ ůĂǁƐ͕ ŽƌĚŝŶĂŶĐĞƐ͕ ĂŶĚ ƌĞŐƵůĂƚŝŽŶƐĂŶĚǁŝůůďĞƌĞƐƉŽŶƐŝďůĞĨŽƌƚŚĞĐŽŵƉůŝĂŶĐĞŽĨŽŶƚƌ ĂĐƚŽƌΖƐƐĞƌǀŝĐĞƐǁŝƚŚĂůůĂƉƉůŝĐĂďůĞůĂǁƐ͕ ŽƌĚŝŶĂŶĐĞƐĂŶĚƌĞŐƵůĂƚŝŽŶƐ͘

Aug. 22, 2023
Item #1 Page 11 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϲŽĨϭϳ

ŽŶƚƌĂĐƚŽƌǁŝůůďĞĂǁĂƌĞŽĨƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐŽĨƚŚĞ/ŵŵŝŐƌĂƚŝŽŶZĞĨŽƌŵĂŶĚŽŶƚƌŽůĐƚŽĨϭϵϴϲĂŶĚǁŝůů ĐŽŵƉůLJǁŝƚŚƚŚŽƐĞƌĞƋƵŝƌĞŵĞŶƚƐ͕ŝŶĐůƵĚŝŶŐ͕ďƵƚŶŽƚůŝŵŝƚĞĚƚŽ͕ǀĞƌŝĨLJŝŶŐƚŚĞĞůŝŐŝďŝůŝƚLJĨŽƌĞŵƉůŽLJŵĞŶƚŽĨ ĂůůĂŐĞŶƚƐ͕ĞŵƉůŽLJĞĞƐ͕ƐƵďĐŽŶƚƌĂĐƚŽƌƐĂŶĚĐŽŶƐƵůƚĂŶƚƐǁŚŽƐĞƐĞƌǀŝĐĞƐĂƌĞƌĞƋƵŝƌĞĚďLJƚŚŝƐŐƌĞĞŵĞŶƚ͘

ϮϬ͘ /^Z/D/Ed/KEE,Z^^DEdWZK,//d
ŽŶƚƌĂĐƚŽƌ ǁŝůů ĐŽŵƉůLJ ǁŝƚŚ Ăůů ĂƉƉůŝĐĂďůĞ ůŽĐĂů͕ ƐƚĂƚĞ ĂŶĚ ĨĞĚ ĞƌĂů ůĂǁƐ ĂŶĚ ƌĞŐƵůĂƚŝŽŶƐ ƉƌŽŚŝďŝƚŝŶŐ ĚŝƐĐƌŝŵŝŶĂƚŝŽŶĂŶĚŚĂƌĂƐƐŵĞŶƚ͘

Ϯϭ͘ /^WhdZ^K>hd/KE
/ĨĂĚŝƐƉƵƚĞƐŚŽƵůĚĂƌŝƐĞƌĞŐĂƌĚŝŶŐƚŚĞƉĞƌĨŽƌŵĂŶĐĞŽĨƚŚĞ^Ğƌǀ ŝĐĞƐƚŚĞĨŽůůŽǁŝŶŐƉƌŽĐĞĚƵƌĞǁŝůůďĞƵƐĞĚ ƚŽƌĞƐŽůǀĞĂŶLJƋƵĞƐƚŝŽŶƐŽĨĨĂĐƚŽƌŝŶƚĞƌƉƌĞƚĂƚŝŽŶŶŽƚŽƚŚĞƌǁŝƐĞƐĞƚƚůĞĚďLJĂŐƌĞĞŵĞŶƚďĞƚǁĞĞŶƚŚĞƉĂƌƚŝĞƐ͘ ZĞƉƌĞƐĞŶƚĂƚŝǀĞƐŽĨŽŶƚƌĂĐƚŽƌŽƌŝƚLJǁŝůůƌĞĚƵĐĞƐƵĐŚƋƵĞƐƚŝŽŶƐ͕ĂŶĚƚŚĞŝƌƌĞƐƉĞĐƚŝǀĞǀŝĞǁƐ͕ƚŽǁƌŝƚŝŶŐ͘ ĐŽƉLJŽĨƐƵĐŚĚŽĐƵŵĞŶƚĞĚĚŝƐƉƵƚĞǁŝůůďĞĨŽƌǁĂƌĚĞĚƚŽďŽƚŚƉĂƌƚŝ ĞƐŝŶǀŽůǀĞĚĂůŽŶŐǁŝƚŚƌĞĐŽŵŵĞŶĚĞĚ ŵĞƚŚŽĚƐŽĨƌĞƐŽůƵƚŝŽŶ͕ǁŚŝĐŚǁŽƵůĚďĞŽĨďĞŶĞĨŝƚƚŽďŽƚŚƉĂƌƚŝĞƐ͘dŚĞƌĞƉƌĞƐĞŶƚĂƚŝǀĞƌĞĐĞŝǀŝŶŐƚŚĞůĞƚƚĞƌ ǁŝůůƌĞƉůLJƚŽƚŚĞůĞƚƚĞƌĂůŽŶŐǁŝƚŚĂƌĞĐŽŵŵĞŶĚĞĚŵĞƚŚŽĚŽĨƌĞƐ ŽůƵƚŝŽŶǁŝƚŚŝŶƚĞŶ;ϭϬͿďƵƐŝŶĞƐƐĚĂLJƐ͘/Ĩ ƚŚĞƌĞƐŽůƵƚŝŽŶƚŚƵƐŽďƚĂŝŶĞĚŝƐƵŶƐĂƚŝƐĨĂĐƚŽƌLJƚŽƚŚĞĂŐŐƌŝĞǀĞĚƉĂƌƚLJ͕ĂůĞƚƚĞƌŽƵƚůŝŶŝŶŐƚŚĞĚŝƐƉƵƚĞƐǁŝůů ďĞĨŽƌǁĂƌĚĞĚƚŽƚŚĞŝƚLJDĂŶĂŐĞƌ͘dŚĞŝƚLJDĂŶĂŐĞƌǁŝůůĐŽŶƐŝĚĞƌƚŚĞĨĂĐƚƐĂŶĚƐŽůƵƚŝŽŶƐƌĞĐŽŵŵĞŶĚĞĚ ďLJĞĂĐŚƉĂƌƚLJĂŶĚŵĂLJƚŚĞŶŽƉƚƚŽĚŝƌĞĐƚĂƐŽůƵƚŝŽŶƚŽƚŚĞƉƌŽď ůĞŵ͘/ŶƐƵĐŚĐĂƐĞƐ͕ƚŚĞĂĐƚŝŽŶŽĨƚŚĞŝƚLJ DĂŶĂŐĞƌǁŝůůďĞďŝŶĚŝŶŐƵƉŽŶƚŚĞƉĂƌƚŝĞƐŝŶǀŽůǀĞĚ͕ĂůƚŚŽƵŐŚŶŽƚ ŚŝŶŐŝŶƚŚŝƐƉƌŽĐĞĚƵƌĞǁŝůůƉƌŽŚŝďŝƚƚŚĞ ƉĂƌƚŝĞƐĨƌŽŵƐĞĞŬŝŶŐƌĞŵĞĚŝĞƐĂǀĂŝůĂďůĞƚŽƚŚĞŵĂƚůĂǁ͘

ϮϮ͘ dZD/Ed/KE
/ŶƚŚĞĞǀĞŶƚŽĨƚŚĞŽŶƚƌĂĐƚŽƌΖƐĨĂŝůƵƌĞƚŽƉƌŽƐĞĐƵƚĞ͕ĚĞůŝǀĞƌ͕ŽƌƉĞƌĨŽƌŵƚŚĞ^ĞƌǀŝĐĞƐ͕ŝƚLJŵĂLJƚĞƌŵŝŶĂƚĞ ƚŚŝƐŐƌĞĞŵĞŶƚĨŽƌŶŽŶƉĞƌĨŽƌŵĂŶĐĞďLJŶŽƚŝĨLJŝŶŐŽŶƚƌĂĐƚŽƌďLJĐĞ ƌƚŝĨŝĞĚŵĂŝůŽĨƚŚĞƚĞƌŵŝŶĂƚŝŽŶ͘/ĨŝƚLJ ĚĞĐŝĚĞƐƚŽĂďĂŶĚŽŶŽƌŝŶĚĞĨŝŶŝƚĞůLJƉŽƐƚƉŽŶĞƚŚĞǁŽƌŬŽƌƐĞƌǀŝĐĞ ƐĐŽŶƚĞŵƉůĂƚĞĚďLJƚŚŝƐŐƌĞĞŵĞŶƚ͕ŝƚLJ ŵĂLJ ƚĞƌŵŝŶĂƚĞ ƚŚŝƐ ŐƌĞĞŵĞŶƚ ƵƉŽŶ ǁƌŝƚƚĞŶ ŶŽƚŝĐĞ ƚŽ ŽŶƚƌĂĐƚŽƌ͘ hƉŽŶ ŶŽƚŝĨŝĐĂƚŝŽŶ ŽĨ ƚĞƌŵŝŶĂƚŝŽŶ͕ ŽŶƚƌĂĐƚŽƌŚĂƐĨŝǀĞ;ϱͿďƵƐŝŶĞƐƐĚĂLJƐƚŽĚĞůŝǀĞƌĂŶLJĚŽĐƵŵĞŶƚƐŽǁŶĞĚďLJŝƚLJĂŶĚĂůůǁŽƌŬŝŶƉƌŽŐƌĞƐƐƚŽ ŝƚLJĂĚĚƌĞƐƐĐŽŶƚĂŝŶĞĚŝŶƚŚŝƐŐƌĞĞŵĞŶƚ͘ŝƚLJǁŝůůŵĂŬĞĂĚĞƚĞ ƌŵŝŶĂƚŝŽŶŽĨĨĂĐƚďĂƐĞĚƵƉŽŶƚŚĞǁŽƌŬ ƉƌŽĚƵĐƚĚĞůŝǀĞƌĞĚƚŽŝƚLJĂŶĚŽĨƚŚĞƉĞƌĐĞŶƚĂŐĞŽĨǁŽƌŬƚŚĂƚŽŶƚƌĂĐƚŽƌŚĂƐƉĞƌĨŽƌŵĞĚǁŚŝĐŚŝƐƵƐĂďůĞ ĂŶĚŽĨǁŽƌƚŚƚŽŝƚLJŝŶŚĂǀŝŶŐƚŚĞŐƌĞĞŵĞŶƚĐŽŵƉůĞƚĞĚ͘ĂƐĞĚƵƉŽŶƚŚĂƚĨŝŶĚŝŶŐŝƚLJǁŝůůĚĞƚĞƌŵŝŶĞƚŚĞ ĨŝŶĂůƉĂLJŵĞŶƚŽĨƚŚĞŐƌĞĞŵĞŶƚ͘

ŝƚLJŵĂLJƚĞƌŵŝŶĂƚĞƚŚŝƐŐƌĞĞŵĞŶƚďLJƚĞŶĚĞƌŝŶŐƚŚŝƌƚLJ;ϯϬͿĚĂLJƐǁƌŝƚƚĞŶŶŽƚŝĐĞƚŽŽŶƚƌĂĐƚŽƌ͘ŽŶƚƌĂĐƚŽƌ ŵĂLJ ƚĞƌŵŝŶĂƚĞ ƚŚŝƐ ŐƌĞĞŵĞŶƚ ďLJ ƚĞŶĚĞƌŝŶŐ ƚŚŝƌƚLJ ;ϯϬͿ ĚĂLJƐ ǁƌŝƚƚĞŶ ŶŽƚŝĐĞ ƚŽ ŝƚLJ͘ /Ŷ ƚŚĞ ĞǀĞŶƚ ŽĨ ƚĞƌŵŝŶĂƚŝŽŶŽĨƚŚŝƐŐƌĞĞŵĞŶƚďLJĞŝƚŚĞƌƉĂƌƚLJĂŶĚƵƉŽŶƌĞƋƵĞƐƚŽĨŝƚLJ͕ŽŶƚƌĂĐƚŽƌǁŝůůĂƐƐĞŵďůĞƚŚĞǁŽƌŬ ƉƌŽĚƵĐƚĂŶĚƉƵƚŝƚŝŶŽƌĚĞƌĨŽƌƉƌŽƉĞƌĨŝůŝŶŐĂŶĚĐůŽƐŝŶŐĂŶĚĚ ĞůŝǀĞƌŝƚƚŽŝƚLJ͘ŽŶƚƌĂĐƚŽƌǁŝůůďĞƉĂŝĚĨŽƌ ǁŽƌŬƉĞƌĨŽƌŵĞĚƚŽƚŚĞƚĞƌŵŝŶĂƚŝŽŶĚĂƚĞ͖ŚŽǁĞǀĞƌ͕ƚŚĞƚŽƚĂůǁŝůů ŶŽƚĞdžĐĞĞĚƚŚĞůƵŵƉƐƵŵĨĞĞƉĂLJĂďůĞ ƵŶĚĞƌƚŚŝƐŐƌĞĞŵĞŶƚ͘ŝƚLJǁŝůůŵĂŬĞƚŚĞĨŝŶĂůĚĞƚĞƌŵŝŶĂƚŝŽŶĂƐ ƚŽƚŚĞƉŽƌƚŝŽŶƐŽĨƚĂƐŬƐĐŽŵƉůĞƚĞĚĂŶĚ ƚŚĞĐŽŵƉĞŶƐĂƚŝŽŶƚŽďĞŵĂĚĞ͘

Ϯϯ͘ KsEEd^'/E^dKEd/E'Ed&^
ŽŶƚƌĂĐƚŽƌǁĂƌƌĂŶƚƐƚŚĂƚŽŶƚƌĂĐƚŽƌŚĂƐŶŽƚĞŵƉůŽLJĞĚŽƌƌĞƚĂŝŶĞĚĂŶLJĐŽŵƉĂŶLJŽƌƉĞƌƐŽŶ͕ŽƚŚĞƌƚŚĂŶĂ ďŽŶĂĨŝĚĞĞŵƉůŽLJĞĞǁŽƌŬŝŶŐĨŽƌŽŶƚƌĂĐƚŽƌ͕ƚŽƐŽůŝĐŝƚŽƌƐĞĐƵƌĞƚŚŝƐŐƌĞĞŵĞŶƚ͕ĂŶĚƚŚĂƚŽŶƚƌĂĐƚŽƌŚĂƐ ŶŽƚƉĂŝĚŽƌĂŐƌĞĞĚƚŽƉĂLJĂŶLJĐŽŵƉĂŶLJŽƌƉĞƌƐŽŶ͕ŽƚŚĞƌƚŚĂŶĂďŽŶĂĨŝĚĞĞŵƉůŽLJĞĞ͕ĂŶLJĨĞĞ͕ĐŽŵŵŝƐƐŝŽŶ͕ ƉĞƌĐĞŶƚĂŐĞ͕ďƌŽŬĞƌĂŐĞĨĞĞ͕ŐŝĨƚ͕ŽƌĂŶLJŽƚŚĞƌĐŽŶƐŝĚĞƌĂƚŝŽŶĐŽŶƚŝŶŐĞŶƚƵƉŽŶ͕ŽƌƌĞƐƵůƚŝŶŐĨƌŽŵ͕ƚŚĞĂǁĂƌĚ ŽƌŵĂŬŝŶŐŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘&ŽƌďƌĞĂĐŚŽƌǀŝŽůĂƚŝŽŶŽĨƚŚŝƐǁĂƌƌĂŶƚLJ͕ŝƚLJǁŝůůŚĂǀĞƚŚĞƌŝŐŚƚƚŽĂŶŶƵůƚŚŝƐ ŐƌĞĞŵĞŶƚǁŝƚŚŽƵƚůŝĂďŝůŝƚLJ͕Žƌ͕ŝŶŝƚƐĚŝƐĐƌĞƚŝŽŶ͕ƚŽĚĞĚƵĐƚĨƌŽŵƚŚĞŐƌĞĞŵĞŶƚƉƌŝĐĞŽƌĐŽŶƐŝĚĞƌĂƚŝŽŶ͕Žƌ

Aug. 22, 2023
Item #1 Page 12 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϳŽĨϭϳ
ŽƚŚĞƌǁŝƐĞƌĞĐŽǀĞƌ͕ƚŚĞĨƵůůĂŵŽƵŶƚŽĨƚŚĞĨĞĞ͕ĐŽŵŵŝƐƐŝŽŶ͕ƉĞƌĐĞŶƚĂŐĞ͕ďƌŽŬĞƌĂŐĞĨĞĞƐ͕ŐŝĨƚ͕ŽƌĐŽŶƚŝŶŐĞŶƚ ĨĞĞ͘

Ϯϰ͘ >/D^E>t^h/d^
LJ ƐŝŐŶŝŶŐ ƚŚŝƐ ŐƌĞĞŵĞŶƚ͕ ŽŶƚƌĂĐƚŽƌ ĂŐƌĞĞƐ ƚŚĂƚ ĂŶLJ ŐƌĞĞŵĞŶƚ ĐůĂŝŵ ƐƵďŵŝƚƚĞĚ ƚŽ ŝƚLJ ŵƵƐƚ ďĞ ĂƐƐĞƌƚĞĚ ĂƐ ƉĂƌƚ ŽĨ ƚŚĞ ŐƌĞĞŵĞŶƚ ƉƌŽĐĞƐƐ ĂƐ ƐĞƚ ĨŽƌƚŚ ŝŶ ƚŚŝƐŐƌĞĞŵĞŶƚ ĂŶĚ ŶŽƚ ŝŶ ĂŶƚŝĐŝƉĂƚŝŽŶ ŽĨ ůŝƚŝŐĂƚŝŽŶŽƌŝŶĐŽŶũƵŶĐƚŝŽŶǁŝƚŚůŝƚŝŐĂƚŝŽŶ͘ŽŶƚƌĂĐƚŽƌĂĐŬŶŽǁ ůĞĚŐĞƐƚŚĂƚŝĨĂĨĂůƐĞĐůĂŝŵŝƐƐƵďŵŝƚƚĞĚƚŽ ŝƚLJ͕ ŝƚ ŵĂLJ ďĞ ĐŽŶƐŝĚĞƌĞĚ ĨƌĂƵĚ ĂŶĚ ŽŶƚƌĂĐƚŽƌ ŵĂLJ ďĞ ƐƵďũĞĐƚƚŽ ĐƌŝŵŝŶĂů ƉƌŽƐĞĐƵƚŝŽŶ͘ ŽŶƚƌĂĐƚŽƌ ĂĐŬŶŽǁůĞĚŐĞƐƚŚĂƚĂůŝĨŽƌŶŝĂ'ŽǀĞƌŶŵĞŶƚŽĚĞƐĞĐƚŝŽŶƐϭϮϲϱϬĞƚƐĞƋ͕͘ƚŚĞ&ĂůƐĞůĂŝŵƐĐƚĂƉƉůŝĞƐƚŽƚŚŝƐ ŐƌĞĞŵĞŶƚĂŶĚ͕ƉƌŽǀŝĚĞƐĨŽƌĐŝǀŝůƉĞŶĂůƚŝĞƐǁŚĞƌĞĂƉĞƌƐŽŶŬŶŽǁ ŝŶŐůLJƐƵďŵŝƚƐĂĨĂůƐĞĐůĂŝŵƚŽĂƉƵďůŝĐ ĞŶƚŝƚLJ͘dŚĞƐĞƉƌŽǀŝƐŝŽŶƐŝŶĐůƵĚĞĨĂůƐĞĐůĂŝŵƐŵĂĚĞǁŝƚŚĚĞůŝďĞƌĂƚĞŝŐŶŽƌĂŶĐĞŽĨƚŚĞĨĂůƐĞŝŶĨŽƌŵĂƚŝŽŶŽƌŝŶ ƌĞĐŬůĞƐƐĚŝƐƌĞŐĂƌĚŽĨƚŚĞƚƌƵƚŚŽƌĨĂůƐŝƚLJŽĨŝŶĨŽƌŵĂƚŝŽŶ͘/ĨŝƚLJƐĞĞŬƐƚŽƌĞĐŽǀĞƌƉĞŶĂůƚŝĞƐƉƵƌƐƵĂŶƚƚŽƚŚĞ &ĂůƐĞ ůĂŝŵƐ Đƚ͕ ŝƚ ŝƐ ĞŶƚŝƚůĞĚ ƚŽ ƌĞĐŽǀĞƌ ŝƚƐ ůŝƚŝŐĂƚŝŽŶ ĐŽƐƚ Ɛ͕ ŝŶĐůƵĚŝŶŐ ĂƚƚŽƌŶĞLJΖƐ ĨĞĞƐ͘ ŽŶƚƌĂĐƚŽƌ ĂĐŬŶŽǁůĞĚŐĞƐ ƚŚĂƚ ƚŚĞ ĨŝůŝŶŐ ŽĨ Ă ĨĂůƐĞ ĐůĂŝŵ ŵĂLJ ƐƵďũĞĐƚ ŽŶƚƌĂĐƚŽƌ ƚŽ ĂŶ ĂĚŵŝŶŝƐƚƌĂƚŝǀĞ ĚĞďĂƌŵĞŶƚ ƉƌŽĐĞĞĚŝŶŐĂƐƚŚĞƌĞƐƵůƚŽĨǁŚŝĐŚŽŶƚƌĂĐƚŽƌŵĂLJďĞƉƌĞǀĞŶƚĞĚƚŽĂĐƚĂƐĂŽŶƚƌĂĐƚŽƌŽŶĂŶLJƉƵďůŝĐǁŽƌŬ Žƌ ŝŵƉƌŽǀĞŵĞŶƚ ĨŽƌ Ă ƉĞƌŝŽĚ ŽĨ ƵƉ ƚŽ ĨŝǀĞ ;ϱͿ LJĞĂƌƐ͘ ŽŶƚƌĂĐƚŽƌ ĂĐŬŶŽǁůĞĚŐĞƐ ĚĞďĂƌŵĞŶƚ ďLJ ĂŶŽƚŚĞƌ ũƵƌŝƐĚŝĐƚŝŽŶŝƐŐƌŽƵŶĚƐĨŽƌŝƚLJƚŽƚĞƌŵŝŶĂƚĞƚŚŝƐŐƌĞĞŵĞŶƚ͘

Ϯϱ͘ :hZ/^/d/KEEsEh
ŶLJĂĐƚŝŽŶĂƚůĂǁŽƌŝŶĞƋƵŝƚLJďƌŽƵŐŚƚďLJĞŝƚŚĞƌŽĨƚŚĞƉĂƌƚŝĞƐĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨĞŶĨŽƌĐŝŶŐĂƌŝŐŚƚŽƌƌŝŐŚƚƐ ƉƌŽǀŝĚĞĚ ĨŽƌ ďLJ ƚŚŝƐ ŐƌĞĞŵĞŶƚ ǁŝůů ďĞ ƚƌŝĞĚ ŝŶ Ă ĐŽƵƌƚ ŽĨĐŽŵƉĞƚĞŶƚ ũƵƌŝƐĚŝĐƚŝŽŶ ŝŶ ƚŚĞ ŽƵŶƚLJŽĨ ^ĂŶ ŝĞŐŽ͕^ƚĂƚĞŽĨĂůŝĨŽƌŶŝĂ͕ĂŶĚƚŚĞƉĂƌƚŝĞƐǁĂŝǀĞĂůůƉƌŽǀŝƐŝŽŶ ƐŽĨůĂǁƉƌŽǀŝĚŝŶŐĨŽƌĂĐŚĂŶŐĞŽĨǀĞŶƵĞŝŶ ƚŚĞƐĞƉƌŽĐĞĞĚŝŶŐƐƚŽĂŶLJŽƚŚĞƌĐŽƵŶƚLJ͘

Ϯϲ͘ ^h^^KZ^E^^/'E^
/ƚŝƐŵƵƚƵĂůůLJƵŶĚĞƌƐƚŽŽĚĂŶĚĂŐƌĞĞĚƚŚĂƚƚŚŝƐŐƌĞĞŵĞŶƚǁŝůůďĞďŝŶĚŝŶŐƵƉŽŶŝƚLJĂŶĚŽŶƚƌĂĐƚŽƌĂŶĚ ƚŚĞŝƌƌĞƐƉĞĐƚŝǀĞƐƵĐĐĞƐƐŽƌƐ͘EĞŝƚŚĞƌƚŚŝƐŐƌĞĞŵĞŶƚŶŽƌĂŶLJƉĂƌƚŽĨŝƚŶŽƌĂŶLJŵŽŶŝĞƐĚƵĞŽƌƚŽďĞĐŽŵĞ ĚƵĞ ƵŶĚĞƌ ŝƚ ŵĂLJ ďĞ ĂƐƐŝŐŶĞĚ ďLJ ŽŶƚƌĂĐƚŽƌ ǁŝƚŚŽƵƚ ƚŚĞ ƉƌŝŽƌ ĐŽŶ Ɛ Ğ Ŷ ƚ Ž Ĩ ŝ ƚ LJ ͕ ǁ Ś ŝ Đ Ś Ɛ Ś Ă ů ů Ŷ Ž ƚ ď Ğ ƵŶƌĞĂƐŽŶĂďůLJǁŝƚŚŚĞůĚ͘

Ϯϳ͘ Ed/Z'ZDEd
dŚŝƐŐƌĞĞŵĞŶƚ͕ƚŽŐĞƚŚĞƌǁŝƚŚĂŶLJŽƚŚĞƌǁƌŝƚƚĞŶĚŽĐƵŵĞŶƚƌĞĨĞƌƌĞĚƚŽŽƌĐŽŶƚĞŵƉůĂƚĞĚďLJŝƚ͕ĂůŽŶŐǁŝƚŚ ƚŚĞ ƉƵƌĐŚĂƐĞ ŽƌĚĞƌ ĨŽƌ ƚŚŝƐ ŐƌĞĞŵĞŶƚ ĂŶĚ ŝƚƐ ƉƌŽǀŝƐŝŽŶƐ͕ ĞŵďŽĚ LJ ƚŚĞ ĞŶƚŝƌĞ ŐƌĞĞŵĞŶƚ ĂŶĚ ƵŶĚĞƌƐƚĂŶĚŝŶŐďĞƚǁĞĞŶƚŚĞƉĂƌƚŝĞƐƌĞůĂƚŝŶŐƚŽƚŚĞƐƵďũĞĐƚŵĂƚƚĞƌŽĨŝƚ͘/ŶĐĂƐĞŽĨĐŽŶĨůŝĐƚ͕ƚŚĞƚĞƌŵƐŽĨƚŚĞ ŐƌĞĞŵĞŶƚ ƐƵƉĞƌƐĞĚĞ ƚŚĞ ƉƵƌĐŚĂƐĞ ŽƌĚĞƌ͘ EĞŝƚŚĞƌ ƚŚŝƐ ŐƌĞĞŵĞŶƚŶŽƌ ĂŶLJ ŽĨ ŝƚƐ ƉƌŽǀŝƐŝŽŶƐ ŵĂLJ ďĞ ĂŵĞŶĚĞĚ͕ŵŽĚŝĨŝĞĚ͕ǁĂŝǀĞĚŽƌĚŝƐĐŚĂƌŐĞĚĞdžĐĞƉƚŝŶĂǁƌŝƚŝŶŐƐŝŐŶĞĚďLJďŽƚŚƉĂƌƚŝĞƐ͘

΂ƐŝŐŶĂƚƵƌĞƐŽŶĨŽůůŽǁŝŶŐƉĂŐĞ΃

Aug. 22, 2023
Item #1 Page 13 of 24
W^ϮϰͲϮϮϲϲdZE
ŝƚLJƚƚŽƌŶĞLJƉƉƌŽǀĞĚsĞƌƐŝŽŶϲͬϯϬͬϮϬϮϯ
WĂŐĞϴŽĨϭϳ
Ϯϴ͘ hd,KZ/dz
dŚĞŝŶĚŝǀŝĚƵĂůƐĞdžĞĐƵƚŝŶŐƚŚŝƐŐƌĞĞŵĞŶƚĂŶĚƚŚĞŝŶƐƚƌƵŵĞŶƚƐƌĞ ĨĞƌĞŶĐĞĚŝŶŝƚŽŶďĞŚĂůĨŽĨŽŶƚƌĂĐƚŽƌ ĞĂĐŚƌĞƉƌĞƐĞŶƚĂŶĚǁĂƌƌĂŶƚƚŚĂƚƚŚĞLJŚĂǀĞƚŚĞůĞŐĂůƉŽǁĞƌ͕ƌŝŐŚƚĂŶĚĂĐƚƵĂůĂƵƚŚŽƌŝƚLJƚŽďŝŶĚŽŶƚƌĂĐƚŽƌ ƚŽƚŚĞƚĞƌŵƐĂŶĚĐŽŶĚŝƚŝŽŶƐŽĨƚŚŝƐŐƌĞĞŵĞŶƚ͘

KEdZdKZ /dzK&Z>^͕ĂŵƵŶŝĐŝƉĂůĐŽƌƉŽƌĂƚŝŽŶŽĨ
ƚŚĞ^ƚĂƚĞŽĨĂůŝĨŽƌŶŝĂ',/E͕͘ĂĂůŝĨŽƌŶŝĂĐŽƌƉŽƌĂƚŝŽŶ

LJ͗ LJ͗

;ƐŝŐŶŚĞƌĞͿ <ĞŝƚŚůĂĐŬďƵƌŶ͕DĂLJŽƌ

dŚĞŽĚŽƌĞtŚŝƚŽŶ͕WƌĞƐŝĚĞŶƚ

;ƉƌŝŶƚŶĂŵĞͬƚŝƚůĞͿ
dd^d͗
LJ͗

;ƐŝŐŶŚĞƌĞͿ ĨŽƌ^ŚĞƌƌLJ&ƌĞŝƐŝŶŐĞƌ͕ŝƚLJůĞƌŬ

:͘ƵŶĐĂŶ&ŝŶĚůĂLJ͕^ĞĐƌĞƚĂƌLJ

;ƉƌŝŶƚŶĂŵĞͬƚŝƚůĞͿ

/ĨƌĞƋƵŝƌĞĚďLJŝƚLJ͕ƉƌŽƉĞƌŶŽƚĂƌŝĂůĂĐŬŶŽǁůĞĚŐŵĞŶƚŽĨĞdžĞĐƵƚŝŽ ŶďLJĐŽŶƚƌĂĐƚŽƌŵƵƐƚďĞĂƚƚĂĐŚĞĚ͘ /ĨĂ ĐŽƌƉŽƌĂƚŝŽŶ͕ŐƌĞĞŵĞŶƚŵƵƐƚďĞƐŝŐŶĞĚďLJŽŶĞĐŽƌƉŽƌĂƚĞŽĨĨŝĐĞƌĨƌŽŵĞĂĐŚŽĨƚŚĞĨŽůůŽǁŝŶŐƚǁŽŐƌŽƵƉƐ͘

'ƌŽƵƉ 'ƌŽƵƉ
ŚĂŝƌŵĂŶ͕ ^ĞĐƌĞƚĂƌLJ͕
WƌĞƐŝĚĞŶƚ͕ Žƌ ƐƐŝƐƚĂŶƚ^ĞĐƌĞƚĂƌLJ͕
sŝĐĞͲWƌĞƐŝĚĞŶƚ &KŽƌƐƐŝƐƚĂŶƚdƌĞĂƐƵƌĞƌ

KƚŚĞƌǁŝƐĞ͕ƚŚĞĐŽƌƉŽƌĂƚŝŽŶŵƵƐƚĂƚƚĂĐŚĂƌĞƐŽůƵƚŝŽŶĐĞƌƚŝĨŝĞĚďLJƚŚĞƐĞĐƌĞƚĂƌLJŽƌĂƐƐŝƐƚĂŶƚƐĞĐƌĞƚĂƌLJƵŶĚĞƌ ĐŽƌƉŽƌĂƚĞƐĞĂůĞŵƉŽǁĞƌŝŶŐƚŚĞŽĨĨŝĐĞƌ;ƐͿƐŝŐŶŝŶŐƚŽďŝŶĚƚŚĞĐŽƌƉŽƌĂƚŝŽŶ͘

WWZKs^dK&KZD͗

/E/<͘DĐD,KE͕ŝƚLJƚƚŽƌŶĞLJ

z͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ĞƉƵƚLJŝƚLJƚƚŽƌŶĞLJ

Aug. 22, 2023
Item #1 Page 14 of 24
The Power of Commitment
2305 Historic Decatur Road, Suite 102
San Diego, CA 92106
www.ghd.com
31 July 2023
Brandon Miles. P.E.,T.E.

Associate Engineer
Public Works – Transportation
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008-7314
Re: Kelly & Park Road Diet and Multi-use Trail Project – Updated Scope and Fee Dear Brandon,
Thank you for the opportunity to amend our scope of work and associated fee for the Kelly & Park Road Diet and Multi-use Trail Project (Project) with the City of Carlsbad (City). GHD is fully committed to the City to deliver a valued Project for the Carlsbad community within the scope of the City’s expectations.

Per our conversations, the scope and associated fee of the Project has been significantly reduced, by over $330,000 from our original proposal that was selected for award. We believe we have come up with an innovative approach to save the City as much money as possible, while still delivering a project that the City can be proud of and that will greatly enhance the users experience along the Kelly Drive and Park Drive corridors.

A detailed description of our updated Scope of Work and Fee broken down by hours is attached. The GHD team looks forward to continuing this project and benefiting the City with our innovative designs.

If you have any questions, please do not hesitate to contact us.

Sincerely,
Lindsey Van Parys, PE, QSD/P William Silva, PE, QSD/P
Project Manager Project Director
[email protected] [email protected]
916.245.4220 707.523.1010
Copy to: Brittany Zambrano, PE

Page 9 of 17 ends

PSA24-2266TRAN
Exhibit "A"

Aug. 22, 2023
Item #1 Page 15 of 24
Scope of Work
31 July 2023
This project proposes balanced mult i-modal user enhancements to Kelly Drive and Park Drive Compete Street Improvements. With design and public input substantially complete, the City desires to finalize the project plans, specifications, and estimates. The project is required to meet the guidelines of the:

1. City of Carlsbad Engineering Codes, Standards, and Policies (https://www.carlsbadca.gov/departments/community-development/land-development- engineering/engineering-codes-standards-policies),

2. Mobility Element of the General Plan (https://www.carlsbadca.gov/departments/community- development/planning/general- plan)

3. Sustainable Mobility Plan (https://www.carlsbadca.gov/departments/streets- traffic/biking- walking/mobility/sustainable-mobility-plan),

4. CAMUTCD or California Manual on Uniform Transportation Control Devices (https://dot.ca.gov/programs/safety-programs/camutcd)

5. Highway Design Manual (http://dot.ca.gov/design/manuals/hdm.html),

6. Standard Plans and Specifications as outlined by Caltrans (https://dot.ca.gov/programs/design/ccs- standard-plans-and-standard-specifications).

Task 1 – Project Management
Includes project management, project meetings, invoicing, etc. The Consultant shall:

1.1 Kick Off Meeting
GHD will attend (1) Kick Off meeting with the city to discuss goals, review concepts and get direction to move forward with the update of the preferred alternatives presented in the proposal and discussions during the previous phase of the project. GHD will prepare meeting minutes following the kick off meeting and submit to the City staff within three (3) business days. This meeting is assumed to be a combination of virtual and in-person.

GHD will identify the schedule for the QA/QC process, the QA Lead, and the QC discipline leads for the Project.

GHD will provide the City with a Project specific Quality Management Plan (QMP) for the QA/QC team to follow.

At this meeting GHD and the City will go through the design revisions requested by the City in December 2022 to confirm the revisions to be made to the design. It is assumed that the design revisions finalized at this meeting will be drafted and presented to the City in task 2.2.

1.2 Team Meetings
GHD will schedule and attend regular virtual team meetings with the City and other notable stakeholders/sub consultants as needed to review design progress with City staff. It is assumed that the meetings will be held once a month for a total of 6 months. GHD will prepare a meeting summary following the meeting and submit to the City staff within three (3) business days. Should additional project time or meetings be required, additional scope and fee may be required.

1.3 Monthly Status Reports
GHD will prepare monthly status reports detailing progress and budget at the individual task level. The monthly status reports will be included with monthly invoices.

1.4 Traffic and Mobility Commission Meeting
GHD will prepare graphics and materials for presentation s for one (1) Traffic & Mobility Commission meeting to present the Final plans for public review and comment.

Assumptions

Page 10 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 16 of 24
x Graphics will be snippets from the plans or renderings previously done for proposal phase of project with minimal efforts. Should significant rendering edits be needed, additional scope and fee may be required. x Project manager to attend meeting virtually (if presence is needed)

1.5 City Council Meeting
GHD will prepare graphics for presentation for one (1) City Council meeting in preparation of bidding.

Assumptions
x Graphics will be snippets from the plans or renderings previously done for proposal phase of project with minimal efforts. Should significant rendering edits be needed, additional scope and fee may be required. x Project manager to attend meeting virtually (if presence is needed)

1.6 Quality Assurance / Quality Control (QA/QC)
GHD will provide internal review for quality assurance and quality control with a dedicated QA Lead. The time spent in this task will follow the procedures laid out in the QMP described in task 1.1.

1.7 Project Management
GHD will utilize this task to conduct other project management activities, such as value engineering and construction feasibility as needed to keep the project within schedule and budget. Project Manager and Lead Engineer will notify City staff of any issues that have the possibility of affecting the schedule or budget of the project as soon as they occur.

Task 2 – Investigations

2.1 Basis of Design Memorandum
GHD will develop a Basis of Design memorandum that highlights the standards used for the design of the project, assumptions made, and documents design decisions made by GHD and the City. This document will be updated throughout the design process with any major updates to the assumptions in the project or changes in design direction from what is discussed in the kickoff meeting or project team meetings. The Basis of design memo will be provided after the kickoff meeting and after any subsequent change. Changes will be clearly marked in the document for ease of review.

2.2 Revise Concepts
GHD will prepare revised design concepts of the entire corridor based upon finalized comments obtained during the kick-off meeting. This scope and fee are based upon the anticipated level of effort to make the plan revisions consistent with the comments received in December 2022. Should the comments received at the kickoff meeting significantly change the character or level of effort anticipated, an additional scope and fee may be required.

The design will be revised will be done in 2-D only. This submittal is assumed to include only the 2D layout plans that will include solely the main proposed features including the curb, gutter, sidewalk, edge of pavement, landscape areas, and striping in PDF format. The roundabout at Kelly Drive at Park Drive will be revised to modify the footprint to stay within the existing right of way. Design checks will also be performed on the two roundabouts at the intersection of Park Drive and Kelly Drive and the intersection of Kelly Drive and Hillside drive. GHD will provide tabular documentation of the fastest path analysis and intersection and stopping sight distance considerations. GHD will provide design check exhibits showing design vehicle AutoTURN analysis (buses to navigate without encroaching onto the truck apron and heavy trucks utilizing the truck apron.) GHD will review this updated layout plan and design check exhibits with the city and discuss any changes in the regularly scheduled team meetings described in Task 1.2

Page 11 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 17 of 24
It is assumed no additional horizontal or vertical geometric changes will be required after the completion of this task. It is assumed the proposed profile will closely follow the existing roadway profile, therefore, design efforts do not include significant horizontal design considerations.

2.3 Preliminary Lighting & Photometric Analysis
GHD will prepare a conceptual lighting layout, limited to intersection safety lighting, based on city standards and photometrics analysis to meet appropriate lighting levels. GHD will use city selected LED lighting fixture or will propose a fixture if city does not currently have a standard. The conceptual lighting layout will be submitted to the city for approval as described in task 2.2.

2.4 Optimize compliance to the City of Carlsbad BMP Regulations GHD shall limit impervious surfaces to not exceed threshol ds requiring substantial changes in design as required to meet storm water regulations as outlined in Volume 5 of the City of Carlsbad BMP Design Manual.

Task 3 – Engineering Services
The following engineering tasks are expected to be provided by GHD:

3.1 Existing Conditions Review
GHD shall review and evaluate the existing conditions and plans and compile related supplemental data, such as technical reports, information/maps, topograph ic survey, the City’s General Pl an and geographic information system (GIS) inventory/database. The Consultant shall also establish an understanding of the City’s existing and proposed conditions utilizing previously completed survey and studies.

3.2 Drainage Study Updates
GHD will update the existing drainage report to comply with City of Carlsbad design standards and the County of San Diego Hydrology Manual. GHD will address permanent, post-construction water quality requirements by ensuring the proposed improvements and associated documents incorporate water quality elements to comply with Volume 5 of the newly updated City of Carlsbad BMP Design Manual. The project scope shall include a drainage report of which shall include storm water design with hydraulic calculations and hydrology report, water quality improvement plans, storm water quality management plan (SWQMP, E-35), a standard project requirement checklist (E-36), and a draft storm water pollution prevention plan submitted into SMARTS.

To address construction-phase water quality requirements, a draft Storm Water Pollution Prevention Plan (SWPPP) will be completed by GHD and uploaded to SMARTS. GHD assumes the following for this task:
x As a roadway reconstruction project, it is anticipated that the project will be classified as a Standard Project and will incorporate USEPA Green Streets Guidance. x An E-34 Stormwater Standards Questionnaire and E-36 Standard Project Requirement Checklist will be completed to document this approach.

3.3 Surveying Services
The City will provide project survey information for the Consultant’s consideration. The Consultant may consider additional surveying to confirm and/or enhance the existing survey to prepare detailed construction plans for the project improvements. All surveys shall be based on City of Carlsbad standards and delivered in an AutoCAD format using NAD '83 horizontal and NGVD '29 vertical datum, including ASCII point files of all survey ties made.

An existing base map of the site shall be provided to the City in .dwg and .pdf format upon completion of the survey services.

Alta Land Surveying will update supplemental ground topography, locate edge conditions, tie ins and additional shot points from Park Drive from Neblina Drive to Kelly Drive and the entire length of Kelly Drive from Park Drive to El Camino Real. Provide a Cad base file and a sheeted drawing with 1-foot contours and spot elevations.

Page 12 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 18 of 24

3.4 Utility Coordination and Relocation
GHD shall review existing utility information and coordinate any relocation with agencies (e.g., SDGE, AT&T, Spectrum, Crowncastle, etc.) to avoid conflicts for proposed improvements. GHD will utilize the existing coordination done and minimize conflicts to the best extent possible when conducting the updates to the design.

3.6 Engineering Design Services – 100% PS&E
The Consultant shall perform engineering design services to provide multi-modal enhancements to Kelly Drive and Park Drive.

This scope of work assumes the 3-D geometrics previously prepared will need to be completely re-done.

Construction documents and plan requirements are outlined in the City of Carlsbad standards, the Mobility Element of the General Plan, and Sustainable Mobility Plan. The design shall include traffic control and address accessibility during all phases of construction.

The City will provide a specification template to the Consultant. The City’s specifications are currently based on the “Greenbook” and the City of Carlsb ad standards. The Consultant shall edit the technical specifications as needed to meet project needs. The format of the design submittals shall be as follows:

The 90% submittal plans shall be submitted with scalable digital files. Complete set of specifications and cost estimate covering all aspects of the Project shall be submitted with the 90% design drawings.

The plans will include the following plan sheets. Should additional sheets be required additional scope and fee may be needed. As a cost savings to the city, GHD has removed the cross sections sheets from the package and will instead utilize the plan, profiles, and typical sections to detail the construction of the corridors.

Page 13 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 19 of 24
Sheet Description Number of
sheets
Title sheet 1
General Notes 1
Index Map and Project Control 1
Typical sections 5
Demolition 6
Layout and Roadway Profiles 12
Roundabout Profiles 4
Construction Details 12
Drainage plans, profiles and details 13
Erosion Control Plans and details 9
Pavement Delineation Plans 6
Signing Plans and Details 6
Traffic Signal Modification Plans 1
Traffic Control Plans 6
Retaining Wall Plan and Profile 4
Retaining Wall Details 4
Recycled Water Title Sheet 1
Landscape and Irrigation 23
Lighting and Electrical Plans and Details* 4
Total 120
*See task 3.9 for detailed lighting and electrical scope of services.

All specifications shall be submitted digitally using latest version of MS Word.

GHD shall prepare quantities and engineering cost estimates for construction and bidding purposes.

All design submittal intervals shall be submitted in both scalable PDF and AutoCAD format. Final submittal package shall be digitally submitted.

The following disciplines are included in the Engineering Design Services submittals and have supplemental scope of work described below.

It is assumed that the Survey and Geotechnical reports provided in the previous design will be sufficient for the redesign and no additional survey or Geotechnical work will be required. If additional survey or Geotech services

Page 14 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 20 of 24
are needed then GHD can provide with an additional scope and fee.

Structural Scope to Include:
x Reviewing existing drawings and compare to updated alignment and profiles from Civil. x Provide wall calculations to verify that existing heights shown on drawings are adequate. x Modify structural drawings as needed for two design cases shown on drawings (walls 0’-3’ and walls 3’- 6’).

Assumptions
x Civil will provide updated alignment and profile showing TOW and BOW elevations. x Assumes no changes in existing wall design will be required and existing calculations and geotechnical will be sufficient to proceed to construction.
x Assumes no horizontal or vertical changes will be required at this phase of the project and the comments received will primarily be drafting focused.
x Major redesign work not accounted for.
x No modifications required to culvert or other structural components outside of retaining wall along Park Dr. x Assuming preliminary and 100% submittals with drawings, calculations, and specifications.

Landscape Scope to Include:
x Construction Documents (submittals 100% and Final for IFC) x Water efficient landscape worksheet shall comply with the City of Carlsbad Conceptual Water Conservation Plan - Efficient Landscape Regulations that calculate the MAWA and ETWU for the project. x Recycled Water Irrigation plans/details, schedule, and notes. x Irrigation water-use calculations.
x Planting plans/details, legends, and notes.
x Specifications (Greenbook and City of Carlsbad Standards). x Recycled Water Irrigation Plans & Permitting
Assumptions
x All plan review fees/deposits/permit fees, and inspection fees will be waived or paid for by the City. x Landscape will not be present for site meetings with Agencies. The City/The City’s representativewill attend all on-site meetings with Carlsbad Municipal Water District (Pre-Construction, Construction Review, Irrigation Coverage Review, Cross-Connection Test, etc.).

Traffic Signal Scope to Include:
x Review and update of one (1) Traffic Signal Modification Plan for Kelly Drive and El Camino Real and the Rectangular Rapid Flashing Beacons (RRFBs) to comply with latest standards and updated section of roadway
Assumptions
x Option for GHD to provide lighting and electrical plans or recommendations for lighting improvements along the corridors for an additional scope and fee.

3.8 Engineering Design Services – Final Submittal for Bid Package (PS&E) Final Submittal for Bid Package - plans shall be submitted with scalable digital files. The submittal shall be complete set of plans, specifications and cost estimate ready for bidding purposes. GHD will modify the 100% plans based on review comments from the City. It is assumed that no additional sheets will be added for the Final Submittal for Bid Package.

3.9 Engineering Design Services – Lighting & Electrical 100% and Bid Package (PS&E) Electrical services will include:
x Photometric analysis as described in task 2.3
x Street lighting design plans, details, and schedules, limited to safety lighting at each intersection (Kelly and Park, Kelly and Hillside, Kelly and El Camino Real)

Page 15 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 21 of 24
x Specifications.
x Construction cost estimate.
x Coordination with local power utility for new power services where appliable. x One (1) utility coordination site visit.

Assumptions
x 1 new power service is required.
x City will provide light fixture and pole manufacturer model numbers to be used on this project. x Coordinatization with utility power company includes (1) application submittal and up to (4) coordination online meetings to communicate project intent, and (1) site visit by local GHD staff. Contractor will coordinate with utility power company during construction. x As built lighting plans will be provided by City.

Task 4 – Permitting and Environmental Processing
Services
The Consultant will be responsible to coordinate with the environmental consultant. The Project boundaries are within the coastal zone and under California Coastal Commission permit authority. It is assumed that GHD will have two (2) meetings with Helix and the City to coordinate design changes and provide figures. GHD will provide meeting minutes following the meetings.

Page 16 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 22 of 24
Kelly and Park Roundabout Proposal
12605087
Description
Project
Director
Project
Manager QA/QC
Lead
Engineer
Roundabout
Expert
Structural
Lead
Complete
Streets
Lead
Stormwater
Lead
Traffic
Modeling
Lead
Traffic
Engineering
Lead
Project
Engineer
Staff
Engineer
Junior
Engineer
Engineer Tech
/ Project
Coordinator
Senior
Electrical
Electrical
Designer Total Hours Labor Total
Alta Land
Surveying
KTU&A
Planning and
Landscape
Architechture
Subs Markup Total Subs
Other Direct
Costs
Estimated
Project Total
Bill Silva
Lindsey Van
Parys Chris Bretall
Brittany
Zambrano Ronald Boyle
Francisco
Andrade Chenin Otto
Nathan
Towlerton
Todd
Trengenza Frank Penry Varies Varies Varies Varies Richards Osorno $319 $298 $298 $204 $319 $226 $226 $226 $268 $268 $187 $179 $153 $132 $272 $210 Task1 Project Management 13 44 41 63 1 2 2 2 4 4 30 0 82 0 0 1 235 $55,832 $0 $1,660 $83 $1,743 $2,000 $59,575 Subtask 1.1 Kick Off Meeting (1 meeting) 12 1 2 0 1111 1 00 0 001 12 $3,045 $0 $0 $0 $0 $0 $3,045 Subtask 1.2 Team meetings (once a month, 6 months) 61 8 0 18 1 1 1 1 1 1 00 0 000 48 $12,483 $0 $1,500 $75 $1,575 $0 $14,058 Subtask 1.3 Monthly Status Reports (8 total) 0 4 0 8 00000 0 00 0 000 12 $2,824 $0 $0 $0 $0 $0 $2,824 Subtask 1.4 Traffic and Mobility Commission Meeting (1 meeting) 0 1 0 2 0000 22 00 4 000 11 $2,390 $0 $0 $0 $0 $0 $2,390 Subtask 1.5 City Council Meeting (1 meeting) 0 1 0 1 00000 0 00 4 000 6 $1,114 $0 $0 $0 $0 $0 $1,114 Subtask 1.6 QA/QC 00 40 00 0 0 0 0 0 30 000 0 0 70 $17,530 $0 $0 $0 $0 $0 $17,530 Subtask 1.7 Project Management 61 8 0 32 00000 0 00 0 20 00 76 $16,446 $0 $160 $8 $168 $2,000 $18,614 Task2 Investigations 0 20 0 58 26 4 22 10 2 18 56 60 14 0 4 11 305 $66,334 $0 $0 $0 $0 $0 $66,334 Subtask 2.1 Basis of Design Memorandum 0 8 0 14 4 4 2 2 2 2 00 0 02 0 40 $9,940 $0 $0 $0 $0 $0 $9,940 Subtask 2.2 Revise Concepts 0 12 0 40 22 0 20 00 16 40 60 00 0 0 210 $45,782 $0 $0 $0 $0 $0 $45,782 Subtask 2.3 Preliminary Lighting & Photometric Analysis 00 0 4 00000 0 00 14 0 2 11 31 $5,812 $0 $0 $0 $0 $0 $5,812 Subtask 2.4 Optimize compliance to the City of Carlsbad BMP Regulations 00 0 0 0 0 0 8 00 16 000 0 0 24 $4,800 $0 $0 $0 $0 $0 $4,800 Task3 Engineering Services 12 72 0 144 20 14 44 56 4 24 166 248 464 310 6 53 1637 $294,416 $8,000 $40,425 $2,421 $50,846 $0 $345,262 Subtask 3.1 Existing Conditions Review 0 2 0 2 0 4444 0 8 000 0 0 28 $6,284 $0 $0 $0 $0 $0 $6,284 Subtask 3.2 Drainage Study Updates 0 2 0 2 000 24 00 20 0 40 000 88 $16,288 $0 $0 $0 $0 $0 $16,288 Subtask 3.3 Surveying Services 0 2 0 2 00000 0 4 000 0 0 8 $1,752 $8,000 $0 $400 $8,400 $0 $10,152 Subtask 3.4 Utility Coordination and Relocation 0 2 0 2 00000 0 20 0 40 000 64 $10,864 $0 $0 $0 $0 $0 $10,864 Subtask 3.6 100% PS&E 84 8 0 100 20 8 32 20 0 20 90 200 240 230 00 1016 $182,266 $0 $22,350 $1,118 $23,468 $0 $205,734 Subtask 3.8 Final Submittal for Bid Package (PS&E) 41 6 0 30 0 288 0 42 4 4 88 08 0 00 304 $53,184 $0 $18,075 $904 $18,979 $0 $72,163 Subtask 3.9 Lighting and Electrical PS&E (90%, 100% and Bid) 00 0 6 00000 0 00 64 0 6 53 129 $23,778 $0 $0 $0 $0 $0 $23,778 Task4 Permitting and Environmental Processing Services 0 4 0 8 0008 00 0 0 0 0 0 0 20 $4,632 $0 $0 $0 $0 $0 $4,632 Subtask 4.1 Enviornmental/Permitting Coordination 0 4 0 8 000 8 00 0 0 0 0 0 0 20 $4,632 $0 $0 $0 $0 $0 $4,632 Total Labor Hours 25 140 41 273 47 20 68 76 10 46 252 308 486 330 10 65 2197 $421,214 $8,000 $42,085 $2,504 $52,589 $2,000 $475,803 x Estimated Project Total $7,975 $41,720 $12,218 $55,692 $14,993 $4,520 $15,368 $17,176 $2,680 $12,328 $47,124 $55,132 $74,358 $43,560 $2,720 $13,650 2197 $421,214 $8,000 $42,085 $2,504 $52,589 $2,000 $475,803

Page 17 of 17 ends

PSA24-2266TRAN
Exhibit "A" (continued)

Aug. 22, 2023
Item #1 Page 23 of 24

NOT TO SCALE

LOCATION
AGUA

HEDIONDA
LAGOON
MAP

PROJECT NAME
KELL y DRIVE AND PARK DRIVE
COM

PLETE STREET IMPROVEMENTS
PLOTTfD BY: SCOTT EVANS PLOT DATE:2/21/17 PA7H:D: \1RANSPORTA710N DEPAR1MENT\LOCA710N MAPS\AUrocAD\6075.DKG

PROJECT EXHIBIT
NUMBER
26075
Exhibit 2
Aug. 22, 2023
Item #1 Page 24 of 24
Kelly Drive and Park Drive
Complete Street Improvements
Project No. 6075
Tom Frank, Transportation Director
Public Works
Brandon Miles, Associate Engineer
Public Works
Aug. 22, 2023

RECOMMENDED ACTION
ITEM 1: Kelly and Park Drive Improvements - 6075
Adopt a resolution approving a professional
services agreement with GHD Inc. to provide
engineering and construction support services
for the Kelly Drive and Park Drive Complete
Street Improvements, Capital Improvement
Program Project No. 6075, and authorizing the
City Manager to execute the agreement.

COMPLETE STREETS
• Get where you want to go by your choice of
travel – walking, biking, driving
• Safety for all modes of travel
• Connectivity
ITEM 1: Kelly and Park Drive Improvements - 6075

IMPROVEMENTS
• Biking and walking connection from El Camino Real to the Agua Hedionda Lagoon
• Traffic calming features, or slowing down speeds
• Wider and enhanced sidewalks
• Realigned crosswalks with high visibility
• Enhanced multi-modal safety features at the intersection of Kelly Drive and Hillside Drive and the intersection of Kelly Drive and Park Drive • Buffered bike lanes
• Enhanced curb ramps
ITEM 1: Kelly and Park Drive Improvements - 6075

WHAT WE HEARD
• Make crossing safest for walkers
• Slow down traffic
• Separate bicyclists from cars
• Concerns about emergency
evacuation from Park Drive south
of Kelly Drive
ITEM 1: Kelly and Park Drive Improvements - 6075

STAFF’S RECOMMENDATION
• Approve a Professional Services Agreement with
GHD Inc. for the Kelly Drive and Park Drive
Complete Street Improvements Project
ITEM 1: Kelly and Park Drive Improvements - 6075

Kelly Drive looking north –
Hillside Drive and El Camino
Real
*For graphical purposes only.

Final design may vary
Park Drive looking east –
Neblina Drive and Kelly Drive
*For graphical purposes only.

Final design may vary
Kelly Drive looking south
*For graphical purposes only.

Final design may vary
Kelly Drive looking north
*For graphical purposes only.

Final design may vary
Hillside Drive looking east
*For graphical purposes only.

Final design may vary
• Finalize project plans, specifications and cost estimate • Finalize environmental documents
• Obtain necessary permits from resource agencies
• Request Planning Commission approval
• Request City Council to
• approve plans and specifications and authorize
for bids
• request City Council to award a construction
contract

NEXT STEPS
ITEM 3: Kelly and Park Drive Improvements - 6075

Kelly Drive
Kelly Elementary
ITEM 3: Kelly and Park Drive Improvements - 6075
Right-turn only lane
Class II buffered bike lanes
Class II buffered bike lanes
Main island with
vertical element
Raised medians
Pedestrian ramp and crosswalk
Pedestrian ramp and crosswalk

Agreement with GHD for the Kelly
Drive and Park Drive Complete
Street Improvements Project
Agenda Item #1
City of Carlsbad
City Council
8/22/23
Kris Wright
Carlsbad Resident and Stakeholder
20XX presentation title 2
Project Location

20XX presentation title 3

20XX presentation title 4
Proposed Kelly Drive
Roundabout
20XX presentation title 5
Map from California Dept of Fish and Wildlife
https://apps.wildlife.ca.gov/lands/
Agua Hedionda
Lagoon
Ecology Reserve
20XX presentation title 6
Kelly Drive Traffic Circle
Agua Hedionda
Lagoon
Ecology Reserve
7 Conclusions

1. Loma Laguna has one egress to exit in case of fire

2. Agua Hedionda Lagoon Ecology Reserve has no
control for cleaning up brush to prevent a fire

3. Although no one is allowed in the reserve, homeless people have been found inside the reserve.

4. When questioned at the Traffic and Mobility mtg,
staff had NOT brought up the Kelly/Park Traffic
Circle and had not spoken with the Fire Marshal.

5. Please insure that there is no traffic circle at Kelly/Park Drive for the safety of the Loma
Laguna residents

← All documents from this meeting