CA Review __RK _
Meeting Date:
To:
From:
Staff Contact:
Subject:
District:
Sept. 26, 2023
Mayor and City Council
Scott Chadwick, City Manager
Eric Lardy, City Planner
[email protected], 442-339-2712
Public Hearing to Approve a Coastal Development Permit, Hillside Development Permit, Special Use Permit - Floodplain, Special Use Permit - El Camino Real Corridor Development Standards and Waiver of General Plan Open Space Policy 4-P.6 for the Widening of El Camino Real Between Sunny Creek Road and Jackspar Drive (CDP2022-0044, H
DP2021-0003, SUP2022-0002, SUP2021-0002)
2 Recommended Action
Hold a public hearing and:
1. Adopt a resolution approving a coastal development permit, hillside development permit, special use permit (floodplain, special use permit – El Camino Real corridor development standards) and a waiver of General Plan Open Space Policy 4-P.6 to allow for a road improvement project along El Camino Real generally located within the public right-of-way on El Camino Real from Sunny Creek Road to Jackspar Drive within the Mello II segment of the city’s Local Coastal Program and Local Facilities Management Zone 15 (Exhibit 1).
Executive Summary
El Camino Real was planned as a six-lane arterial north-south roadway through Carlsbad, a major thoroughfare between the City of Oceanside to the north and the City of Encinitas to the south. Portions of the road have only five lanes, with three lanes in one direction and two lanes in the other, including the approximately 0.4-mile section between Sunny Creek Road and Jackspar Drive.
The city has a planned road improvement project to add a third northbound vehicular lane, a buffered bike lane, and a continuous sidewalk along northbound El Camino Real between Sunny Creek and Jackspar (Exhibit 2). Construction of the project requires acquisition of and impact to 844 square feet of private property currently designated in the General Plan as a Category 3 open space, which is defined as open space for outdoor recreation.
Sept. 26, 2023
Item #6 Page 1 of 89
Adjusting the boundaries of any open space area shown on the Land Use Map is allowed under General Plan Policy 4-P.6 if they are replaced with open space equal in size and environmental quality. However, the policy allows for the City Council to exempt public rights-of-way from the open space boundary adjustment requirements if environmental analysis is completed and any significant adverse impacts to the value of the open space system are mitigated.
That process is now complete and staff are requesting that the City Council hold a public hearing and approve the necessary permits and a waiver of General Plan Open Space Policy 4- P.6 to allow for this segment to be widened.
Because Carlsbad Municipal Code Section 21.54.040.C.(3) requires all concurrently processed development permits to be considered and approved by the same decisionmaker, the requested coastal development permit, hillside development permit and special use permits for this project, which would otherwise be approved by the Planning Commission, also require the City Council’s approval.
The Planning Commission conducted a public hearing on May 3, 2023, and recommended by a vote of 6-0-1 that the City Council approve the permits as well as the requested waiver of General Plan Open Space Policy 4-P.6.
Explanation & Analysis
Project overview
In keeping with the Mobility Element in the city’s General Plan, the part focused on transportation, and Carlsbad’s Growth Management Program, it is necessary to widen northbound El Camino Real for approximately 2,300 feet from Sunny Creek Road to Jackspar Drive to add a third northbound vehicular lane through a combination of roadway widening and pavement restriping and to add curbs, gutters and sidewalks where they are currently missing.
The proposed improvements would build out this segment of El Camino Real to match what is called for in the Mobility Element.
This project was expedited by the City Council through adoption of Resolution No. 2020-106 on June 9, 2020, to reduce the significance of the transportation deficiency on northbound El Camino Real that was identified in the annual Growth Management Plan Monitoring Report for the previous year. The City Council authorized funding for this project on Nov. 15, 2022, with Capital Improvement Program Project No. 6094.
While the project predates the city’s declaration of a local state of emergency, the work supports the city’s emergency efforts to improve traffic safety while improving circulation and mobility for people using all forms of transportation by constructing:
• A new sidewalk consistent with the Americans with Disabilities Act • A buffered bike lane,
• Two new curb ramps at Sunny Creek Road
• Four upgraded curb ramps at the intersection of Jackspar Drive and El Camino Real The properties along the project site have General Plan and zoning designations that allow for open space, low/mid-density residential, and local shopping/retail, although the parcels currently contain few to no structures or are part of the Rancho Carlsbad golf course.
Sept. 26, 2023
Item #6 Page 2 of 89
Grading for the proposed improvements includes 5,700 cubic yards of earth to be removed and 2,250 cubic yards to be filled. Expansion of the roadway will require construction of a retaining wall to maintain the road elevation adjacent to Rancho Carlsbad Golf Course near Jackspar Drive/Rancho Carlsbad Drive, which is at a lower elevation than the planned roadway expansion. Black vinyl coated railings will be included between the sidewalk and edge of the retaining wall.
The proposed project requires the following permits:
• Coastal development permit
• Hillside development permit
• Special use permit – floodplain
• Special use permit – El Camino Real corridor development standards • Waiver of General Plan Policy 4-P.6
While some vegetation clearing is necessary for expansion of the roadway and sidewalk, the city’s Landscape Manual guidelines will be strictly followed, with two trees replanted for every tree removed. The project will also enhance the surrounding greenery through the planting of trees, shrubs and a diverse range of vegetation.
Habitat and open space impacts
The proposed project area is approximately six acres, of which about four acres are existing hardscape or landscaped areas. A biological survey of the project area was conducted to assess if any natural vegetation communities were impacted. Based on this assessment, habitat impacts are limited to 29,621 square feet, 0.18 acres of non-native grasslands and 0.5 acres of remnant/isolated native shrubs.
Although some of the isolated native shrub species found on-s ite may be used by the California
gnatcatcher for foraging purposes, it is important to note that this area is fragmented and surrounded by urban development, lacking any connection to high-quality habitat. Therefore, the biological survey concluded that the site’s isolated shrubs are not considered a sensitive vegetation community or habitat for the California gnatcatcher.
The habitats affected by the project were primarily located on the eastern part of the project s
ite, near the intersection of Sunny Creek Road and El Camino Real. Those habitat impacts will be offset through a 0.5:1 ratio through mitigation at the city’s Lake Calavera Mitigation Parcel, as detailed in Exhibit 8, the biological survey for the site. Exhibit 9 shows the project’s extent with the vegetation communities outlined in more detail.
An additional consideration in this project is a small property designated as Open Space on the General Plan Land Use Map. For the roadway to be widened to meet city standards, the project needs to include a triangular area of just 844 square feet that is on private property, designated as Open Space and mapped as Category 3 Open Space, Open Space for Outdoor Recreation, in the city’s General Plan. This property is landscaped and does not have habitat value.
Sept. 26, 2023
Item #6 Page 3 of 89
The map below shows the 844-square-foot property.
The photo and rendering below show the site as it is now and as it will look after the road is widened.
The impact to the 844 square feet will require an adjustment to the boundaries of the open space area shown on the General Plan Land Use Map. The General Plan allows adjustments to boundaries of open space area shown on the Land Use Map if the area lost is replaced with open space equal in size and environmental quality. However, General Plan Policy 4-P.6 allows for the City Council to exempt public rights-of-way from the open space boundary adjustment requirements if environmental analysis is completed and any significant adverse impacts to the value of the open space system are mitigated.
General Plan Policy 4-P.6 states:
Additionally, the City Council may exempt public rights-of-way from the open space boundary adjustment requirements. However, environmental analysis shall be performed for all proposed public right-of-way improvements, and if determined that there are significant adverse impacts to the value of the open space system, those impacts shall be mitigated.
Sept. 26, 2023
Item #6 Page 4 of 89
Current st ate of site
844-square-foot area designated
as Open Space
After pro posed iimprovements
The proposed impact of 844 square feet of landscaped area will not have significant adverse impacts to the city’s Open Space System. The city’s Open Space Status Report shows that Local Facilities Management Zone 15, where this site is located, currently has 55% of the area designated as open space, as shown in Exhibit 10. Additionally, the Local Facilities Management Plan for Zone 15 shows that the zone will continue to add open space if and when undeveloped property is developed, and this waiver will not impact the zone’s continued ability to meet the Growth Management Plan Standard of having 15% of the total land area in the zone be designated as open space exclusive of environmentally constrained non-developable land. Once the project is constructed, the Open Space Report will be updated to reflect the minimal impact.
Planning Commission’s recommendation
The Planning Commission considered the proposed project at a public hearing on May 3, 2023.
After questions and discussion, the Planning Commission voted 6-0-1 to recommend the City Council approve the project. A complete description of the project and the staff analysis that supports the requested permit approvals are included in the Planning Commission staff report, shown in Exhibit 4. The Planning Commission’s actions and decisions are included in the minutes and resolution, shown in Exhibits 5 and 6 respectively.
Community Engagement
Public notice of the Planning Commission hearing was mailed on April 17, 2023, to property owners within 600 feet and occupants within 100 feet of the subject property. No comments in opposition to the project were received at the time of the Planning Commission hearing.
Public notice of the City Council hearing was mailed on Aug. 10, 2023, to property owners within 600 feet and occupants within 100 feet of the subject property. Additionally, a newspaper advertisement was published in the Coast News on Aug. 10, 2023. One comment was received and is included as Exhibit 11.
Fiscal An alysis
There is no immediate fiscal impact associated with the approval of this project.
Options
Staff provide the following options for the City Council’s consideration:
1. Adopt the resolution as recommended by staff
Pros
• Provides the necessary area to construct the project improvements, resulting in better traffic flow and new features that will enhance the safe use of the road by drivers, bicyclists and pedestrians
• Improves traffic flow in the project area
• The city will meet the requirements of the Growth Management Program related to traffic
• Allows the project to proceed towards completion
Cons
• Reduces the amount of designated open space in the city by 844 square feet Sept. 26, 2023
Item #6 Page 5 of 89
2. Do not adopt the resolution
Pros
• Retains the existing 844 square foot open space area
Cons
• There would not be adequate space for the proposed improvements, including a third vehicular travel lane, buffered bike lane, sidewalks and other pedestrian improvements, would have to be redesigned or not completed • If the project is not constructed, the road capacity on this segment will not be increased, which will not comply with the Growth Management Plan and fall short of the General Plan’s circulation standard for the roadway Staff recommend Option 1 for the City Council’s consideration.
Next Steps
Staff will ensure that all project conditions are satisfied and that the project complies with all applicable regulations and laws prior to commencement of construction.
Staff will obtain the necessary right-of-way easements. Staff will then return to the City Council with a recommendation to approve the project plans, specifications and contract documents, and request authorization to advertise for construction bids for the project in fall 2023, and again in early 2024 to award a construction contract.
Environmental E valuation
In accordance with the California Environmental Quality Act and the CEQA Guidelines, on Oct. 19, 2022, the City Planner determined that the project qualified for an exemption pursuant to CEQA Guidelines Section 15303(d) – New Construction or Conversion of Small Structures. A notice of intended decision regarding the environmental determination for this project was advertised and posted on the city’s website. No comment letters or appeals were received and, consistent with Carlsbad Municipal Code Chapter 21.54 - Procedures, Hearings, Notices, and Fees, the City Planner’s written decision is final.
Exhibits
1. City Council resolution
2. Location map
3. Right-of-way exhibit
4. Planning Commission staff report dated May 3, 2023 ( on file in the Office of the City Clerk)
5. Planning Commission meeting minutes dated May 3, 2023
6. Draft project plans
7. Biological survey
8. Vegetation communities map
9. Open Space Annual Status Report
10. Correspondence Received
Sept. 26, 2023
Item #6 Page 6 of 89
RESQI._UTION NO. 2023-245
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING A COASTAL DEVELOPMENT PERMIT, HILLSIDE DEVELOPMENT PERMIT, SPECIAL USE PERMIT {FLOODPLAIN, SPECIAL USE
PERMIT- EL CAMINO REAL CORRIDOR DEVELOPMENT STANDARDS) AND A WAIVER OF GENERAL PLAN OPEN SPACE POLICY 4-P.6 TO ALLOW FOR A
ROAD IMPROVEMENT PROJECT ALONG EL CAMINO REAL GENERALLY
LOCATED WITHIN THE PUBLIC RIGHT-OF-WAY ON EL CAMINO REAL FROM
SUNNY CREEK ROAD TO JACKSPAR DRIVE WITHIN THE MELLO II SEGMENT
OF THE CITY'S LOCAL COASTAL PROGRAM AND LOCAL FACILITIES MANAGEMENTZONE 15
WHEREAS, City of Carlsbad, "Developer," has filed a verified application with the City of Carlsbad described as right-of-way and a portion of property identified by Assessor's Parcel Number 209-060-4800, 209-060-5800, 209-090-1100 ("the Property"); and WHEREAS, the City Council of the City of Carlsbad, California has determined that it is necessary, desirable and in the public interest to widen El Camino Real from approximately 2,300 feet from Sunny Creek Road to Jackspar Drive to add a third northbound vehicular lane through a combination of roadway widening and pavement restriping, and to add curb and gutter where currently missing; and WHEREAS, a coastal development permit, hillside development permit, special use permit - floodplain, special use permit - El Camino Real corridor development standards, and waiver of General Plan Open Space Policy 4-P.6 to allow for a road improvement project on El Camino Real between Sunny Creek Road and Jackspar Drive are required to complete the project; and WHEREAS, a portion of the area outside the existing right-of-way includes approximately 844 square feet currently designated as a Category 3 open space, which is defined as open space for outdoor recreation; and
WHEREAS, the 844 square feet is included within an area that is landscaped under the existing conditions and does not have any natural habitat value; and Exhibit 1
Sept. 26, 2023 Item #6 Page 7 of 89
WHEREAS, the impact to the 844 square feet will require an adjustment to the boundaries of open space area shown on the General Plan Land Use Map; and WHEREAS, the General Plan requires that adjustments of the boundaries of any open space area shown on the Land Use Map be allowed if it is replaced with open space equal in size and environmental quality and that General Plan Policy 4-P.6 allows for the City Council to exempt public rights-of-way from the open space boundary adjustment requirements if environmental analysis is completed and any significant adverse impacts to the value of the open space system are mitigated.; and
WHEREAS, Carlsbad Municipal Code Section 21.54.040.C.{3) requires all concurrently processed development permits to be considered and approved by the same decisionmaker, so the requested coastal development permit, hillside development permit, and special use permits, which normally are approved by the Planning Commission, also require the City Council's approval; and WHEREAS, the City Planner has determined that the road improvements are categorically exempt from the California Environmental Quality Act, or CEQA, pursuant to CEQA Guidelines section 15303{d) Class 3 and that no exception to the exemption as set forth in CEQA Guidelines section 15300.2 applies; and
WHEREAS, the City Council of the City of Carlsbad, California has determined that pursuant to the provisions of the Municipal Code, the Planning Commission did, on May 3, 2023, hold a duly noticed public hearing as prescribed by law to consider Coastal Development Permit CDP2021-0044, Hillside Development Permit HDP2022-0008, Special Use Permit - Floodplain SUP2022-0002, Special Use Permit- El Camino Real Corridor Development Standards SUP2021-0002, and a waiver of General Plan Open Space Policy 4-P.6, as referenced in Planning Commission adopted Resolution No. 7484, Attachment A, recommending to the City Council that they be approved; and WHEREAS, the City Council of the City of Carlsbad held a duly noticed public hearing to consider Coastal Development Permit CDP2021-0044, Hillside Development Permit HDP2022-0008, Special Use Sept. 26, 2023 Item #6 Page 8 of 89
Permit - Floodplain SUP2022-0002, Special Use Permit - El Camino Real Corridor Development Standards SUP2021-0002, and waiver of General Plan Open Space Policy 4-P.6; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the City Council considered all factors relating to Coastal Development Permit CDP2021-0044, Hillside Development Permit HDP2022-0008, Special Use Permit - Floodplain SUP2022-0002, Special Use Permit - El Camino Real Corridor Development Standards SUP2021-0002, and waiver of General Plan Open Space Policy 4-P.6.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the recommendation of the Planning Commission for the approval of Coastal Development Permit CDP2021-0044, Hillside Development Permit HDP2022-0008, Special Use Permit - Floodplain SUP2022-0002, Special Use Permit - El Camino Real Corridor Development Standards SUP2021-0002, and waiver of General Plan Open Space Policy 4-P.6, are adopted and approved, and that the findings and conditions of the Planning Commission contained in the Planning Commission adopted Resolution No. 7484 on file with the City Clerk and incorporated herein by reference, are the findings and conditions of the City Council.
3. This action is final the date this resolution is adopted by the City Council. The provisions of Chapter 1.16 of the Carlsbad Municipal Code, "Time Limits for Judicial Review" shall apply:
"NOTICE"
The time within which judicial review of this decision must be sought is governed by Code of Civil Procedure, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 1.16. Any petition or other paper seeking review must be filed in the appropriate court not later than the ninetieth day following the date on which this decision becomes final; however, if within ten days after the decision becomes final a request for the record is filed with a deposit in an amount sufficient to cover the estimated cost or preparation of such record, the time within which such petition may be filed in court is extended to not later than the thirtieth day following Sept. 26, 2023 Item #6 Page 9 of 89
the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceedings shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, CA 92008.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 26th day of Sept., 2023, by the following vote, to wit:
AYES:
NAYS:
ABSTAIN:
ABSENT:
Blackburn, Bhat-Patel, Acosta, Burkholder, Luna.
None.
None.
None.
��
KEITH BLACKBURN, Mayor
-J0lvv � SHERRY FREISINGER, City Clerk
(SEAL)
,,,,,,111111111111,//
�❖''' � CA b
11111'
-$' O·'" 'l'.' ,�
S � -:!da:'·n�
s�/ -�·:···"�
J ... /�·· •••. ..;-
�CJ[ & ?:.�\c
%
\\�w)i ¾ 6_'··<"11/1"" ..• / f 0, �I.. .......... ·-..,.,,<t-� 11,,111 IFO�"',,,❖
-$'
//1111111111111"'''
Sept. 26, 2023 Item #6 Page 10 of 89
LO·CATION MIAP
N SITE
NOTTO SC ALE
PROJECT NAME
EL CA11,HNO REAL 'WIDENING
OCEANSICE 1/'icinit)" Map
PROJECT
NUMBER
FROM Sut,,WYCREEK ROAD TO JACKSPA.R DRIVE 6094
EXHIBIT
.2
Exhibit 2
Sept. 26, 2023
Item #6 Page 11 of 89
N
.I
i
EXHIBIT "A"
RIGHT-OF-WAY ACQUISITION
APN 209-060-58
PAGE 1 OF 1
THAT PORTION O
F LOT “E” OF THE RANCHO AGUA HEDIONDA, IN THE COU NTY
OF SAN DIEGO, STATE OF CALIFORNIA, STATE OF CALIFORNIA, ACCORDI NG TO MAP THEREOF NO. 823, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY NOVEMBER 16, 1896, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A BRASS DISC STAMPED “LS 6215” SHOWN AS POINT NO. 105 ACCORDING TO RECORD OF SURVEY MAP NO. 17271 FILED IN THE OFFICE OF THE COUNTY RECORDER ON FEBRUA RY 8, 2002 WHICH BEARS NORTH 6814’31” WEST 7549.60 FEET FROM A BRASS DISC STAMPED “LS 6215” SH OWN AS POINT NO. 108 ACCORDING TO SAID RECORD OF SURVEY MAP; THENCE SOUTH 7054’36” EAST 2648.79 FEET TO THE SOUTHWEST CORNER OF PARCEL 4 OF A DEED IN FAVOR OF CAMINO CARLSBAD, LLC RECORDED FEBRUARY 4, 2003 AS DOC. NO. 2003-0130230 OF OFFICIAL RECORDS, SAID POINT A LSO BEING THE TRUE POINT OF BEGINNING;
1. THENCE ALONG SAID SOUTHWESTERLY LINE SOUTH 66°36’50” EAST
61.71 FEET TO THE POINT OF CUSP OF A TANGENT 55.00-FOOT RADIU S
CURVE CONCAVE NORTHEASTERLY, A RADIAL LINE TO SAID POINT BEARS SOUTH 23°23’10” WEST;
2. THENCE LEAVING SAID NORTHEASTERLY LINE NORTHWESTERLY
ALONG THE ARC OF SAID CURVE THROUGH A CENTRAL ANGLE OF
96°34’46” A DISTANCE OF 92.71 FEET TO THE NORTHWESTERLY LINE OF SAID PARCEL 4;
3. THENCE ALONG THE NORTHWESTERLY LINE OF SAID PARCEL 4 SOUTH 29°57’56” WEST 61.71 FEET TO THE TRUE POINT OF BEGINNING.
AREA = 844 SQUARE FEET, MORE OR LESS (BASED ON GROUND DISTANCES).
SEE EXHIBIT “B” ATTACHED AND BY REFERENCE MADE A PART HEREOF.
THE BEARINGS AND DISTANCES USED IN THE ABOVE DESCRIPTION ARE BASED ON THE CALIFORNIA COORDINATE SYSTEM OF 1983, ZONE 6, NAD8 3, EPOCH 1991.35. DIVIDE DISTANCES SHOWN BY 0.99996244 TO OBTAIN G ROUND DISTANCES.
7 - 1 9 -2022
JOEL D. RIIPINEN LS 7942
Exhibit 3
Sept. 26, 2023
Item #6 Page 12 of 89
Sept. 26, 2023
Item #6 Page 13 of 89
EXHIBIT "B"
0 150 300 600
AT POINT #105 PER ROS 17271
CONVERGENCE ANGLE= -00•34'32.469"
COMB. SCALE FACTOR= 0.99996244 ~
NGVD 29 ELEV= 45.41' 1\0) "'-
"'- Q-"
~
0:::
0 z ~
ct Q__~
I
I
I
I
I
I
I
APN 209-060-58
LAND PER 001
I
I C
a::
(.!)
I 1\0)
"'- RANCHO AGU A
I")
CX)
(/)
u u
~~'o
"\(;:,-"., 1
s ri,'o~/
1~
~
n"'-.;;;\ Q__ "" POR.
LOT "E"
ROS 6570
r
------------
N Be-,4',J;--,, .______ .______
II' 7,------ ------
P.O.B. IJ,4S/.~49.Bo:V '1.______
HEDIONDA
MAP 823
PT 105 PER " Of 1:fl?10 .______ .______
ROS 17271 dCJ4b lS4-. .______ .______ .______
N 1999466.124 rl'INGs 9.ee• G .______ .______
E 6241021.960 ~O(JND .______ .______A
----l..!l
PT 108 PER/
ROS 17271
N 1999466.124
E 6241021.960
--
----
LEGEND
POR LOT 11
/
CARLSBAD TR ACT NO.
83-36 UNIT NO. 1
MAP 11242
~:1 RIGHT-OF-WAY ACQUISITION (ACQ)
--~---"-.... ,~__._,....::::::!.... AREA = 844 SQ. FT., MORE OR LESS ~/~ TEMPORARY ACCESS EASEMENT (TCE)
~t._/~,(__~// __ ~ /u~ AREA = 1,242 SQ. FT., MORE OR LESS P.O.B. POINT OF BEGINNING
T.P.O.B. TRUE POINT OF BEGINNING
&, CONTROL POINT PER ROS 17271
E1 SEE EASEMENT LEGEND ON.. SHEET 2
001 DEED TO CAMINO CARLSBAD, LLC
REC. 2/4/2003 AS DOC. NO.
2003-0130230 O.R.
SHEET 1 OF 2 SHEETS
REVISED BY: DATE: CITY OF CARLSBAD SCALE
1· = 300'
DRAWN BY: KA DATE: 7-19-2022 EL CAMINO REAL STREET IMPROVEMENTS DOC. NO.
CHECKED BY: JR DATE: 7-19-2022 APN 209-060-58 DWG. NO.
APPROVED BY: DATE: OWNER: CAMINO CARLSBAD, LLC
Sept. 26, 2023
Item #6 Page 14 of 89
PAR. 1
'-------
~ 0:::
0 z
C
a:: c.,
I')
DO
(/)
(.)
(.)
REVISED BY:
EXHIBIT •B" (SHEET 2 OF 2)
I
I
•
CURVE TABLE
PM 17985
&~
/I')
~' c;.,«S,
Cb"
CURVE NO. DELTA RADIUS LENGTH
I Bo,., 'V<• 'o.,.
""t~
E1 C1 95•34•45• 55.00'
C2 93"25'58. 55.00'
RANCHO AGUA
HEDIONDA
MAP 823
POR. LOT ''E"
APN 209-060-58
LAND PER 001
92.71'
89.69'
EASEMENT LEGEND
E1 A TEMPORARY CONSTRUCTION EASEMENT IN FAVOR OF THE CITY OF CARLSBAD REC. 9/29/2000 AS DOC. NO. 2000-0523120 O.R.
E2 5' WATER PIPELINE EASEMENT IN FAVOR OF PAUL ECKE 1/11/1954 IN BK. 5108, PG. 328 O.R.
NOTE: THE RIGHT TO EXTEND DRAINAGE STRUCTURES AND EXCAVATION AND
EMBANKMENT SLOPES BEYOND THE LIMITS OF THE RIGHT OF WAY OF A COUNTY HIGHWAY GRANTED IN DEED REC. 1/5/1938 IN BK. 727, PG.441 O.R. IS NOT PLOTTABLE.
AT POINT #105 PER ROS 17271
CONVERGENCE ANGLE= -00"34'32.469• I
COMB. SCALE FACTOR= 0.99996244 o
NGVD 29 ELEV= 45.41' 20 40 80
SHEET 2 OF 2 SHEETS
DRAWN BY: KA
DATE: CITY OF CARLSBAD SCA~; = 40'
----1--DA_TE_: _7-_19_-_20_22----r_EL_C_A_M_IN_O_R_E_A_L_S_TR_EE_T_IM_P_R_OVE_M_E_N_TS____, DOC. NO.
CHECKED BY: JR
APPROVED BY:
DATE: 7-19-2022
DATE:
APN 209-060-58
OWNER: CAMINO CARLSBAD, LLC DWG. NO.
Exhibit 4
Planning Commission staff report dated May 3, 2023
(on file in the Office of the City Clerk)
Sept. 26, 2023
Item #6 Page 15 of 89
City Council Chamber
1200 Carlsbad Village Drive
Carlsbad, CA 92008
May 3, 2023
CALL TO ORDER: 5:01 p.m.
ROLL CALL: Hubinger, Kamenjarin, Lafferty, Meenes, Stine, Sabellico, and Merz PLEDGE OF ALLEGIANCE: Commissioner Hubinger led the Pledge of Allegiance.
APPROVAL OF MINUTES:
Minutes of the Regular Meeting held on April 5, 2023
Minutes of the Regular Meeting held on April 19, 2023
Motion by Commissioner Meenes, seconded by Commissioner Kamenjarin, to approve the minutes of the Regular Meeting held April 5, 2023, 6/0/1. (Hubinger – Abstain).
Motion by Commissioner Stine, seconded by Commissioner Kamenjarin, to approve the minutes of the Regular Meeting held April 19, 2023, 7/0.
PUBLIC COMMENT:
Lance Schulte discussed his experience in the field of city planning and made comments related to community input.
CONSENT CALENDAR: None.
At the request of Chair Merz, Item #4 was moved to the end of the agenda.
PUBLIC HEARINGS:
This item was continued from the April 19, 2023, Planning Commission Regular Meeting.
1. CDP 2021 -0056/V 2021 -0003 (DEV2021 -0227) – EDWARDS RESIDENCE - Adoption of a resolution approving a coastal development permit and minor variance to allow for the demolition of an existing single -family residence and construction of a new 3,277 -square- foot, three-story single-family residence with a 537-square-foot attached accessory dwelling unit (under a separate coastal development permit) and attached two-car garage and a front yard setback reduction of five feet and a rear yard setback reduction of one foot six inches, within the Mello II Segment of the city’s Local Coastal Program located at 2669 Garfield Street within Local Facilities Management Zone 1.
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolution.
PLANNER: Eric Lardy ENGINEER: Nichole Fine
City Planner Eric Lardy introduced and reviewed the PowerPoint presentation (on file in the Office of the City Clerk) addressing the concerns that were raised in the last meeting, June 21, 2023
4 -Amended
Exhibit 5
Sept. 26, 2023
Item #6 Page 16 of 89
PLANNING COMMISSION
Minutes
Planning Commission Minutes May 3, 2023 Page 2
At Chairperson Merz request, the following Commissioner provided his additional disclosure:
• Commissioner Sabellico disclosed that he visited the site with special attention to the ocean view.
Commissioner Lafferty expressed concern s tha t approvin g th is coul d b e settin g a bad precedent and she cannot support this item.
City planner Lardy responded to Commissioner Lafferty’s comments noting the variance discussed and the alternative design streets policy are two different issues and indicated that if City Council recommends that the alternative design streets policy be re-evaluated, they will do so at that time.
Commissioner Lafferty offered to share the APA’s Planning for Equity Policy Guide with the other members of the Commission adding that perhaps the Commission should consider policies from there.
In response to Commissioner Lafferty ’s inquiry about the impact of building this home without the variance, Applicant Sam Wright responded that the City would be restricting a homeowner from building a home similar in value to their neighbors noting that most homes on that street have the 15-foot front yard setback.
The applicant’s Civil Engineer, John Strominger, added that the city required the developer to design streets that facilitate future construction of future street improvements like sidewalks.
Chair Merz opened the public testimony at 5:25 p.m. and asked if there were any members of the public who wished to speak on the project.
Seeing no one else wishing to speak, Chair Merz closed the public testimony at 5:26 p.m.
In response to Commissioner Stine's request for confirmation that there is no reason to suspect that the applicant’s statement regarding the 15-foot setbacks in the neighborhood is not accurate, Commissioner Lafferty pointed out that the corner house on the Google maps picture has sidewalks and a 15-foot setback and City Planner Lardy added that staff has no reason to believe the statement is inaccurate.
Commissioner discussion began.
Commissioner Stine, Commissioner Meenes and Chair Merz expressed their support for this project.
Motion by Commissioner Meenes, seconded by Commissioner Sabellico, to adopt Resolution No.7478. Motion carried, 6/1 (Lafferty No).
Chair Merz closed the public hearing at 5:32 p.m.
June 21, 2023
5 Sept. 26, 2023
Item #6 Page 17 of 89
Planning Commission Minutes May 3, 2023 Page 3
2. CDP 2022 -0052 (DEV2022 -0013) – KANTER RESIDENCE – Adoption of a resolution recommending approval of a coastal development permit for the construction of a two-story, 615-square-foot addition and a 402-square-foot second story deck to an existing single-family residence within the Mello II Segment of the city’s Local Coastal Program located at 7249 Mimosa Drive within Local Facilities Management Zone 6.
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolution.
PLANNER: Lauren Yzaguirre ENGINEER: Nichole Fine
Chair Merz opened the duly noticed public hearing at 5:33p.m.
City Planner Eric Lardy introduced the item and announced that Associate Planner Lauren Yzaguirre will not be making a presentation, but that she is available for questions.
At Chair Merz’s request, the following Commissioners made disclosures as follows:
• Commissioner Hubinger drove by the site
• Commissioner Kamenjarin drove by and walked the area
• Commissioner Meenes drove by and walked the site
• Commissioner Stine drove by the site
• Commissioner Sabellico drove by the site
• Chairperson Merz drove by the site
In response to Chair Merz’s inquiry as to whether construction had begun on the project , Associate Planner Yzaguire confirmed that it had but was halted due to the need for an updated permit requirement which is why this item is before the Commission.
In response to Commissioner Lafferty’s question, Associate Planner Yzaguirre responded that the applicant had a permit to start construction legally, but a plan /construction change required them to stop construction and update their application f rom a Minor Coastal Development Permit to a Major Coastal Development Permit.
In response to Commissioner Stine’s inquiry, Associate Planner Yzaguirre confirmed that there are no scenic corridor issues with this project.
Chair Merz opened the public testimony at 5:38 p.m. and asked if there were any members of the public who wished to speak on the item.
Seeing none, Chair Merz closed public testimony at 5:39 p.m.
Motion by Commissioner Meenes, seconded by Commissioner Stine, to adopt Resolution No. 7479. Motion carried, 7/0.
Chair Merz closed the public hearing at 5:40 p.m.
3. CDP 2023 -0010 - AVENIDA ENCINAS COASTAL RAIL TRAIL AND PEDESTRIAN IMPROVEMENTS – Adoption of a resolution approving a coastal development permit for June 21, 2023
6 Sept. 26, 2023
Item #6 Page 18 of 89
Planning Commission Minutes May 3, 2023 Page 4
Avenida Encinas Coastal Rail Trail improvements on property generally located along Avenida Encinas Road between Poinsettia Lane and Windrose Circle in Local Facilities Management Zones 9 and 22.
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolution.
PLANNER: Izzak Mireles ENGINEER: Emad Elias
Chair Merz opened the duly noticed public hearing at 5:40 p.m.
City Planner Eric Lardy introduced the item and Associate Planner Izzak Mireles who reviewed a PowerPoint presentation (on file in the Office of the City Clerk).
At Chair Merz’s request, the following Commissioners made disclosures as follows:
• Commissioner Stine walked by the project
• Commissioner Meenes walked the site
• Commissioner Lafferty indicated familiarity with the site • Commissioner Kamenjarin has driven by the site
• Chair Merz has driven by the site
• Commissioner Sabellico has driven the site many times In response to Commissioner Meenes’ inquiry regarding loss of service (LOS) remaining an A category, Associate Planner Mireles explained that the General Plan and mobility element claim is that a certain level of service needs to be maintained. He added that in this case the vehicles that travel in north and southbound lanes will not be changed with the addition of the bicycle lanes.
Chair Merz opened the public testimony at 5:45 p.m.
Chaz Wick expressed his support for the project and requested more safety precautions for pedestrians in the corridor.
Chairperson Merz closed the public testimony at 5:48 p.m.
In response to Commissioner Meenes’ request for information on improvements included in the project, Associate Engineer Brandon Miles responded with a list of improvements the City has made, based on its research in the area including enhanced crosswalks, other pedestrian/safety improvements and traffic slowing measures including narrowing streets.
In response to Commissioner Stine’s question if there are plans to improve the Windsor Circle crosswalk mentioned in the public comment , Associate Engineer Miles explained the improvements that are already planned for the crosswalk.
In response an inqui ry by Commissioner Lafferty, City Planner Lardy explained that this project design and construction contract was approved by the City Council based on conversations with the Coastal Commission. Mr. Lardy added that since the project changes June 21, 2023
7 Sept. 26, 2023
Item #6 Page 19 of 89
Planning Commission Minutes May 3, 2023 Page 5
capacity of the roadway , staff are processing the C oastal Development Permit prior to construction.
Commissioner Stine expressed support this project adding that it is a good public safety measure.
Commissioner Sabellico concurred, adding that he appreci ates the city’s commitment to safety.
Motion by Commissioner Stine, seconded by Commissioner Meenes, to adopt Resolution No. 7480. Motion carried, 7/0.
Chair Merz closed the public hearing at 5:56pm.
5. CDP 2022 -0019/V 2022 -0002 (DEV 2022-0005) – HOM RESIDENCE: RETAINING WALL VARIANCE – Adoption of a resolution recommending approval of a coastal development permit and variance to allow an unpermitted retaining wall system and wood deck that exceeds standards on a manufactured uphill p erimeter slope with a gradient greater than 40 percent and an elevation differential of greater than fifteen feet on property located at 2170 Twain Avenue within the Mello II Segment of the city’s Local Coastal Program and Local Facilities Management Zone .
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolution.
PLANNER: Kyle Van Leeuwen ENGINEER: Allison McLaughlin Chair Merz opened the duly noticed public hearing at 5:57 p.m.
At Chair Merz’s request, the following Commissioners made disclosures as follows:
• Commissioner Stine drove by the property, parked & walked the area • Commissioner Meenes drove by the site and walked the side street • Commissioner Kamenjarin drove by the property
• Chair Merz visited site and looked over the fence
City Planner Eric Lardy introduced the item and Planner Kyle Van Leeuwen who reviewed a PowerPoint presentation (on file in the Office of the City Clerk).
In response to Commissioner Meenes’ question about the City being able to discern if the integrity of the walls completed follow City regulations, Associate Planner Kyle Van Leeuwen explained that the soil and the retaining wall were tested on multiple occasions, and staff can say confidently that it is safe and built to a certain level of standards. Mr. Van Leeuwen added that the City used an outsid e evaluator for geological stability as an additional measure for stability.
In response to Commissioner Stine ’s inquiry, Planner Van Leeuwen confirmed that the property owners halted construction upon learning they did not have a permit and have been cooperative through the entire process.
June 21, 2023
8 Sept. 26, 2023
Item #6 Page 20 of 89
Planning Commission Minutes May 3, 2023 Page 6
In response to Commissioner Lafferty’s question, Associate Planner Van Leeuwen explained that this was an unusual circumstance where the contractor misled the residents and as far as informing Carlsbad residents in gene ral, the City staff does the best they can to explain regulations to applicants. Mr. Van Leeuwen added that t his is a well -known section of our code for planners who work the counter and typically people do come in and ask clarifying questions.
Applicant’s representative Paul Klukkas spoke in support of the Homs and reiterated the information provided by Associate City Planner Van Leeuwen.
Chair Merz opened the public testimony at 6:23p.m.
The following individuals spoke in support of the project: Ray Patchett , Robert Hom, Ivan Mendelson, Daniel Toro.
Chair Merz asked if there were any more members of the public who wished to speak on the project. Hearing no one else wishing to speak, he closed the public testimony at 6:33pm.
In response to Commissioner Stine’s question as to whether staff received any comments in opposition to this application, Associate Planner Van Leeuwen replied no.
Commissioner Stine explained he will support the variance.
Motion by Commissioner Meenes , seconded by Commissioner Stine, to adopt Resolution No. 7483. Motion carried, 7/0.
Chair Merz closed the public hearing at 6:40 p.m.
6. CDP 2021 -0044/HDP 2022 -0008/SUP 2021 -0002/SUP 2022 -0002 (PUB 2020 -0009) – EL CAMINO REAL ROAD WIDENING - Adoption of a resolution recommending approval of a coastal development permit, hillside development permit, special use permit – floodplain, and special use permit – El Camino Real, and a waiver of General Plan Open Space Policy 4 - p.6 to allow for road improvements along El Camino Real for property generally located within the public rights-of-way on El Camino Real from Jackspar Drive to Sunny Creek Road, within Local Facilities Management Zone 15.
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolution.
PLANNER: Izzak Mireles ENGINEER: Tim Carroll
Chair Merz opened the duly noticed public hearing at 6:42 p.m.
Commissioner Sabellico recused himself because he lives in a community that uses that intersection regularly.
June 21, 2023
9 Sept. 26, 2023
Item #6 Page 21 of 89
Planning Commission Minutes May 3, 2023 Page 7
At Chair Merz’s request, the following Commissioners made disclosures as follows:
• Commissioner Lafferty is familiar with the site and researched historic registry • Commissioner Stine is familiar with site and drives by regularly • Commissioner Meenes is familiar with site and drives by regularly • Commissioner Hubinger is familiar with site and has driven by many times • Chair Merz is familiar with site and drives by regularly City Planner Eric Lardy introduced the item and Associate Planner Izzak Mireles made the staff PowerPoint presentation (on file in the Office of the City Clerk).
Associate Engineer Brandon Miles responded to Commissioner Meenes that City Council directed staff to move forward with improvements without waiting for a developer to assist with the cost.
Associate Planner Mireles responded to Commissioner Stine that there were questions but no opposition to this project.
Engineering Manager Jason Geldert replied to Commissioner Lafferty’s preservation concerns by explaining that this is this is a low vibration work zone. He explained that with this type of grading it is not necessary to measure since no extra amount of vibration is going on. He added that experience and understanding of how vibrations effect construction informs staff that there is no threat to adobes from this project.
Chair Merz asked if there were any members of the public who wished to speak on the project.
Seeing none, he opened and closed public testimony at 6:58 p.m.
Motion by Commissioner Kamenjarin, seconded by Commissioner Hubinger, to adopt Resolution No. 7484. Motion carried, 6/1 (Sabellico – Absent).
Chair Merz closed the public hearing at 7 p.m.
Chair Merz called for a 5-minute break at 7 p.m.
Chair Merz called the meeting back to order at 7:08 p.m.
4. SDP2022-0003, CDP2022-0023, and PCD2023-0001 (DEV2022-0048) – FPC RESIDENTIAL - 1) Adoption of a resolution denying the appeal and upholding the City Planners’ determination that the project is exempt from the California Environmental Quality Act; and 2) Adoption of a resolution approving a site development plan and a coastal development permit to consolidate three parcels of land, demo an existing self-storage facility, former junkyard, and two abandoned structures, and construct 86 two- and three-story multiple-family residential apartments on a 4.64 acre property located at 7200, 7290, and 7294 Ponto Drive in the southwest quadrant of the city and Local Facilities Management Zone 22.
ACTION TYPE: Quasi-judicial
STAFF RECOMMENDATION: Adopt the resolutions.
PLANNER: Jason Goff ENGINEER: Allison McLaughlin
June 21, 2023
10 Sept. 26, 2023
Item #6 Page 22 of 89
Planning Commission Minutes May 3, 2023 Page 8
Chair Merz recused himself from Item No. 4 due to a potential conflict of interest since he is a partner at Lee & Associates, the commercial real estate firm involved with both the seller and the buyer of a certain parcel of the project.
In the absence of Chair Merz, Vice-Chair Sabellico acted as chair for the item.
City Planner Lardy reviewed the appeal hearing procedures.
Vice-Chair Sabellico opened the duly noticed public hearing at 7:10 p.m.
At Vice-Chair Sabellico’s request, the following Commissioners made disclosures as follows:
• Commissioner Stine indicated familiarity with the site, has walked perimeter and surrounding areas
• Commissioner Meenes drove and walked perimeter of the site on Ponto • Commissioner Lafferty drove by the site
• Commissioner Kamenjarin indicated familiarity with the site • Commissioner Hubinger indicated familiarity with the site • Commissioner Sabellico visited the site and is familiar with someone who is speaking on behalf of the applicant adding that he will still be fair and impartial Upon Commissioner Meenes’ request, Senior Assistant City Attorney Ronald Kemp reminded the Commission that the role of the Planning Commission is to assure that all the land use decisions are consistent with the policies plans and ordinances adopted by the City Council, state and federal la w. Additionally, Mr. Kemp reminded the C ommissioners about the Housing Accountability Act to encourage local jurisdictions on housing that directs Committees to approve housing projects unless they pose a safety or health threat that cannot be mitigated.
City Planner Eric Lardy introduced the item and Senior Planner Jason Goff reviewed a PowerPoint presentation (on file in the Office of the City Clerk).
In response to Commissioner Lafferty’s inquiry as to the sequence of consideration for this appeal, Senior Assistant City Attorney Kemp recommended that Commissioners consider the appeal of the City Planner’s determination first because if the City Planner’s determination is upheld, the Commission c an go on to consider the project. Mr. Kemp added that i f it is determined that the appellant is correct, then there is no environmental finding, and it would be sent back to staff.
In response to Commissioner Lafferty’s inquiry as to whether there was documentation of the remediation and if there was a biological report done, Planner Goff responded that there was a biological report.
In response to Commissioner Lafferty’s question about the most recent Environmental Impact Report (EIR) City Planner Eri c Lardy responded that the 2015 EIR studied the city comprehensively, but that the determination did not rely on that for the exemption. Mr.
Lardy added that this exemption could have occurred regardless of that EIR.
June 21, 2023
11 Sept. 26, 2023
Item #6 Page 23 of 89
Planning Commission Minutes May 3, 2023 Page 9
In response to Commissioner Lafferty’s question as to whether the City has been to the site for analysis , City Planner Lardy explained that no, the analysis looked at the databases available that would list sites with hazardous materials, and nothing was identified on th e site.
The applicant, David Gatsky of H.G. Fenton Company, conducted a PowerPoint presentation of the FPC Residential project. (On file in the Office of the City Clerk.) In response to Commissioner Stine’s request for more information regarding the amenities and open space this project offers, Mr. Gatsky replied with a review of that section of the slide show and reaffirmed the developers goal is to provide the residents with some type of park like amenities with the open space and places to play.
In response to Commissioner Stine’s comment regarding the community’s request for park dedication, the developer discussed the community engagement they did in the neighborhood around the topic and explained the City Council has decided that what they want to do to serve residents within th is facilities management zone, in this part of the city, is to collect a fee to support parks located elsewhere. The developer added that this is consistent with the facilities plan.
In response to Commissioner Lafferty’s inquiry regarding the necessity of reduced setbacks, Mr. Gatsky responded that setback reductions are proposed along the street frontage because they wanted to create a strong street scene and neighborly atmosphere.
Commissioner Lafferty acknowledged the gas line was another constraint and requested an explanation since the setbacks are 7,000 square feet when there is 64,000 square feet of open space. Mr. Gatsky added that the developer found that to be the best compromise since it would allow the developer to create private, usable, open space in the rear yards.
In response to Commissioner Lafferty’s questions about why there are only 13 low-income units being provided , not 20 , Mr. Gatsky explained that the developer meets the requirements with 15% of the 86 units provided being affordable . Mr. Gatsky added that if the developer offered more units, then the low-income number of units offered would also increase.
Senior Assistant City Attorney Kemp added that the setbacks in question are a waiver under density bonus law, which is something the City is require d to give in return for the density bonus.
In response to Commissioner Sabellico’ s question about a fence in between residences and the rail on the easter edge of the project, Mr. Gatsky replied in the affirmative and added that the wall will provide safety as well as sound and vibration protection.
Vice Chair Sabellico directed the appellant, Mr. Lance Schulte to begin his PowerPoint presentation appealing the Planning Commission’s decision to move forward with this project (on file in the Office of the City Clerk).
June 21, 2023
12 Sept. 26, 2023
Item #6 Page 24 of 89
Planning Commission Minutes May 3, 2023 Page 10
City Planner Lardy responded to Mr. Schulte’s appeal to the project in a PowerPoint presentation (on file in the Office of the City Clerk).
Vice Chair Sabellico invited the appellant to the podium for questions.
In response to Commissioner Stine's request for clarification of the gas line, Sr. Planner Goff confirmed that it runs up the spine of the project.
In response to Commissioner Stine’s question regarding the validity of the applicant’s studies, Mr. Schulte explained state law and case law dictate that the studies need to be done publicly and the applicant’s studies were not.
In response to Commissioner Stine’s request for the Senior Assistant City Attorney Kem p’s opinion on Mr. Schulte’s last comment regarding applicant studies; Mr. Kemp emphasized that the infill exemption requires the Planning Commissioners to consider if the project does result in any significant effects in the area relating to traffic, noise, air quality or water quality.
Mr. Kemp added it is a part of 15332 and he also mentioned he is not aware of any case law that makes conducting studies a violation of CEQA.
In response to Commissioner Stine’s question regarding the distance to Poinsettia Park, Mr.
Schulte agreed it is 2.5 miles from the site of this project and added that a freeway must be crossed to get there.
In response to Commissioner Sabellico’ s question if a CEQA exemption is ever justified, Mr.
Schulte responded that he does think they are justified when the answer is clear that there is no threat to the environment.
Commissioner Stine asked if Mr. Schulte is arguing that the Planning Commission, must impose a park requirement on this project. Mr. Schulte responded yes.
Senior City Attorney Kemp added that the section Mr. Schulte referenced, 20 .44 of the Carlsbad Municipal Code does not apply. Mr. Kemp argued the City can require the developer to pay park in lieu fees, so the Planning Commission does not have the ability to require a dedication of park land for this site.
In response to Commissioner Stine’s inquiry regarding the claim this project is piecemealed, Mr. Schulte explained the Ponto site 18 project overlays and expands upon the boundaries of this project. Mr. Schulte argued that when the City takes that six -acre project that's not exempt from CEQA and the City makes it a 5 acre project it has been piecemealed. In response to this comment, City Planner Lardy added there are no private discretionary applications that are pending or overlay this project and these three parcels did not have any boundary adjustments. City Planner Lardy also added that the 4.6 acres was what was included in the original application.
June 21, 2023
13 Sept. 26, 2023
Item #6 Page 25 of 89
Planning Commission Minutes May 3, 2023 Page 11
In response to Commissioner Lafferty’s request for clarification regarding the visitor commercial zone not being a part of this, City Planne r Lardy explained this is a split designation zone and that this project is on 3 parcels and was submitted for residential use.
In response to Commissioner Lafferty’s inquiry as to how the project will impact the recently approved road reduction and lack of commercial properties nearby this site, City Planner Lardy responded that now CEQA studies Vehicles Miles Traveled (V MT) and California Pollution Officers Association ( CAPCOA), which is essentially the air pollution control office association that sets forth guidelines of types of developments that they see, and the studies have shown that higher density and low income, especially in areas such as Carlsbad, that have major job centers, does tend to reduce VMT.
In response to Engineering Manager Jason Geldert’s question, Assistant City Attorney Kemp reiterated that staff and the Commission are confined to what was raised in the appeal and further clarified that if staff and Commissioners in evaluating this, think that what Mr. Schulte has now said is not what is in the appeal, then the Planning Commission does not need to consider it in their evaluation. Senior Assistant City Attorney Kemp also addressed the unusual circumstance discussed earlier which is the 10 -inch pipeline running through the middle of the project. Mr. Kemp explained that the significance of making that statement is they're pointing to 15300.2, which is the exemption to the exemption. Mr. Kemp continued to explain that basically, the Commission needs to consider if someone says a 10-inch pipeline on your property is an unusual circumstance you need to consider it by substantial evidence.
Mr. Kemp added that further consideration should be given to whether the appellant has testimony, comparisons or other evidence with regards to the unusual circumstances that will have an impact on the environment.
Vice Chair Sabellico opened public testimony at 8:57 p.m.
The following individuals spoke in opposition to the project: Kathleen Steindlberger, William Rouch, Dale Ordas, Dolores Welty.
The following individuals spoke in support of the project: Bret Schazenbach, Eric Brovold, Andrew Becht, Stacie Green, Jason Santos, Michael McSweeney, Hale Richardson and Heather Riley.
Speaker Chas Wick requested that the developer build a park for the residents nearby.
Vice Chair Sabellico reopened the public testimony at 9:14 p.m. to add the following 15 residents’ names who submitted speaker cards to the record in support of the project but did not wish to speak at the hearing: Ruben Caballos, Mary Chaparro, Emilie Colwell, Tadd Dolfo, Constance Gaughan, Shannon Gaunt, Rhiann Haymes, Whitney Hodges, Anisa Kremer, Toni McMahon, William Morrison, Jeff O’Conner, Angie Ortiz, Chris Rosink, Nicole Weiman.
Vice Chair Sabellico closed the public testimony at 9:16 p.m.
Commissioner Stine, Vice Chair Sabellico, Commissioners Meenes and Kamenjarin expressed their support of the project and staff’s recommendation.
June 21, 2023
14 Sept. 26, 2023
Item #6 Page 26 of 89
Planning Commission Minutes May 3, 2023 Page 12
Motion by Commissioner Meenes, seconded by Commissioner Stine to adopt Resolution No 7481. Motion carried, 6/0/1 (Merz – Absent).
Vice Chair Sabellico , Commissioner Stine, Commissioner Meenes and Commissioner Kamenjarin expressed his support for the rest of staff’s recommendations.
Motion by Commissioner Stine, seconded by Commissioner Meenes to adopt Resolution No. 7482. Motion carried, 6/0/1 (Merz – Absent).
PLANNING COMMISSION REPORTS/COMMENTS:
In response to Commissioner Lafferty’s question regarding if the Commission is supposed to end meetings in four hours, Senior Assistant City Attorney Kemp responded that he did not find anything in the City's Municipal Code dictating that.
Commissioner Lafferty announced that the next Historic Preservation meeting will be held Monday, May 8, 2023.
Commissioner Stine informed the Commission that the Growth Management Citizen’s Committee has completed its work and there will be a report consistent with The City’s determinations on performance standards going to the City Council.
CITY PLANNER REPORTS: None.
CITY ATTORNEY REPORTS: None.
ADJOURNMENT:
Vice Chair Sabellico adjourned the duly noticed meeting at 9:35 p.m.
Cynthia Vigeland
Administrative Secretary
June 21, 2023
15 Cynthia Vigeland
Sept. 26, 2023
Item #6 Page 27 of 89
PROJECT
LOCATION
EL CAMINO REAL
ROADWAY IMPROVEMENT PLANS
FROM SUNNY CREEK ROAD TO JACKSPAR DRIVE
PROJECT NO. 6094
CITY OF CARLSBAD
CARLSBAD, CALIFORNIA
CITY COUNCIL
MATT HALL - MAYOR
KEITH BLACKBURN - MAYOR PRO TEM
PRIYA BHAT-PATEL - COUNCIL MEMBER
TERESA ACOSTA - COUNCIL MEMBER
PEDER NORBY - COUNCIL MEMBER
SCOTT CHADWICK - CITY MANAGER
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Exhibit 6
Sept. 26, 2023
Item #6 Page 28 of 89
INDEX OF SHEETS:
SHEET
1 2
3 4
5-6
7-11
12-13
14-15
16-19
20-21
22-23
24-25
26 27-28
29 30-43
DESCRIPTION
TITLE SHEET
GENERAL NOTES AND INDEX MAP
TYPICAL CROSS SECTIONS
DEMOLITION PLANS
IMPROVEMENT PLANS AND PROFILES
CONSTRUCTION DETAILS
UTILITY PLANS
STORM DRAIN PLANS AND PROFILES
STORM DRAIN DETAILS
SIGNING AND STRIPING PLANS
TRAFFIC CONTROL PLANS
LIGHTING SYSTEM PLANS
TRAFFIC SIGNAL PLANS
RETAINING WALL PLANS
RETAINING WALL DETAILS
LANDSCAPE IMPROVEMENT PLANS
BASIS OF COORDINATES (NAD83)
THE BASIS OF COORDINATES FOR THIS SURVEY IS THE NORTH AMERICAN DATUM OF 1983 {NAD83) CALIFORNIA STATE PLANE COORDINATE SYSTEM OF 1983 (CCS83) ZONE 6 (EPOCH 1991.35) BASED LOCALLY UPON THE FOLLOWING CONTRClL POINTS ~ER RECORD OF' SURVEY 17271.
STATION NORTHING EASTING
6241021.960
DESCRIPTION
105 1999466.124 2.5" BD, LS 6215, IN WALK NE COR CANNON
RD BRIDGE OVER AGUA HEDIONDA CREEK
108 1996667.594 6248033.709 2.5" BD, LS 6215 IN DRAINAGE INLET N. SIDE PALMER WAY, 100' E'LY OF COUGAR DRIVE
GRID BEARING BETWEEN #105 AND #108 = S 68'14'31" E.
VERTICAL CONTROL (NGVD29)
ELEVATIONS SHOWN HEREON ARE IN TERMS OF THE NATIONAL GEODETIC VERTICAL DA TUM OF 1929 {NGVD29) BASED LOCALLY UPON THE FOLLOWING CITY OF CARLSBAD BENCHMARK:
BENCHMARK ELEVATION
CONTROL POINT 105 ROS 17271 45.41'
SUPPLEMENTAL CONTROL
AS ESTABLISHED FOR THIS PROJECT
NOTE: SUPPLEMENTAL CONTROL POINTS WERE ESTABLISHED HORIZONTALLY BY RTK GPS SURVEY WITH REDUNDANCY.
PT#
2004
2005
NORTHING
1880852.55
1880349.05
EASTING
6254830.24
6254729.32
SOURCE OF TOPOGRAPHY:
ELEY.
463.47
452.61
DESCRIPTION
fd l&d ls2813
fd l&d ls2813
TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERATED BY FIELD SURVEY METHODS FROM INFORMATION GATHERED ON 01/06/2021 BY AGUIRRE & ASSOCIATES.
TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS.
PROJECT LOCATION:
THIS PROJECT IS LOCATED ALONG EL CAMINO REAL FROM SUNNY CREEK ROAD TO JACKSPAR DRIVE IN THE CITY OF CARLSBAD.
IMPERVIOUS AREA:
TOTAL DISTURBED AREA = 2.21 ACRES
(THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC
IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT
STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY
TRENCHES, BACKFILL CUTS, AND SLOPE KEYWAYS)
TOTAL EXISTING IMPERVIOUS AREA = 2.59 ACRES
TOTAL REPLACED IMPERVIOUS AREA = 0.21 ACRES
TOTAL PROPOSED IMPERVIOUS AREA (NEW AND EXISTING) = 3.19 ACRES STORM WATER BMP CATEGORY:
EXEMPT FROM HYDROMODIFICATION {SEE FINAL GREEN STREETS
STORM WATER QUALITY TECHNICAL MEMO FOR DOCUMENTATION).
WORK TO BE DONE:
THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER.
1. 2.
3. 4.
5. 6.
7. CARLSBAD MUNICIPAL CODE
CITY OF CARLSBAD ENGINEERING STANDARDS
THIS SET OF PLANS
RESOLUTION NO. _______ DATED _______ _
THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION {GREENBOOK).
SOILS REPORT AND RECOMMENDATIONS BY ALLIED GEOTECHNICAL ENGINEERS, INC.
DATED 07/16/2021
THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS.
8. STORM WATER POLLUTION PREVENTION PLAN: TO BE PREPARED BY OTHERS DATED ______ WDID NO. _______ .
9. DRAFT GREEN STREETS STORM WATER QUALITY TECHNICAL MEMO PREPARED BY DOKKEN ENGINEERING DATED 05/05/2021
10. CALIFORNIA STORM WATER QUALITY ASSOCIATION BMP CONSTRUCTION HANDBOOK,
CITY OF CARLSBAD BMP DESIGN MANUAL, AND CAL TRANS CONSTRUCTION SITE BMP MANUAL.
"DECLARATION OF RESPONSIBLE CHARGE"
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I
HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS.
• THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY I UNDERSTAND THA
THE CITY OF CARLS
RESPONSIBILITIES FD
3AD DOES NOT RELIEVE ME AS ENGINEER OF WORK, OF MY
R PROJECT DESIGN.
:N ENGINEERING FIRM: DOKKE
ADDRESS: FRAZEE ROAD, SUITE 100 1450
SAND CITY, ST.: )IEGO, CA 92108
14.8377 TELEPHONE: 858.5
BY: MARK
(
TARRALL
NAME OF ENGINEER)
R.C.E. NO.: 71953
REGISTRATION EXPIR ATION DATE: 12/31/2023
DI~~RT
~-
-
DATE: 12/1712021
145D FRAZEE ROAD
SUITE 100
CALL 2 FULL WORKING DAYS
SAN DIEGO. CA 98108
BEFORE YOU DIG
CITY OF OCEANSIDE
PACIFIC
OCEAN
(858) 514-8377
78 'i: ·O CITY OF VISTA
~ & .. ,.,,..pl.___,. t'.\
~r#
CITY OF SAN MARCOS
CITY OF ENCINITAS
VICINITY MAP NOT TO SCALE
ABBREVIATIONS:
AB
ABS
AC
APN
AT&T
AVA
BC
BE
Beg
BMP
BVC
CCWD
CFS
CL
CLR
CMWD
Cone
CTSP
DIP
DIST
DWY
Elev
EC
Elect
ESA
EVC
Exist
FG
FL
FPS
GALV
GB
??.oFESS/~l
'@;'° <'l ~ ~
6f MARK TARRALL ~
"' "' No, C71953
.. Exp, 12/31 /23 2 .,.
AGGREGATE BASE
ACRYLONITRILE BUTADIENE STYRENE
ASPHALT CONCRETE
ACCESS PARCEL NUMBER
AMERICAN TELEPHONE & TELEGRAPH
AIR VACUUM VAL VE ASSEMBLY
BEGIN HORIZONTAL CURVE
BOTTOM OF ENCASEMENT
BEGIN
BEST MANAGEMENT PRACTICE
BEGIN VERTICAL CURVE
CITY OF CARLSBAD WASTEWATER DIVISION
CUBIC FEET PER SECOND
CHAIN LINK
CLEAR
CARLSBAD MUNICIPAL WATER DISTRICT
CONCRETE
CALTRANS STANDARD PLAN
DUCTILE IRON PIPE
DISTANCE
DRIVEWAY
ELEVATION
END HORIZONTAL CURVE
ELECTRICAL
ENVIRONMENTALLY SENSITIVE AREA
END VERTICAL CURVE
EXISTING
FINISHED GRADE
FLOW LINE
FEET PER SECOND
GALVANIZED
GRADE BREAK
DATE INITIAL
Gtr
HP
IE
KM
KSI
LF
LT
LN
LOL
LEGEND:
ITEM
Exist RIGHT -OF-WAY ............................................... .
RIGHT-OF-WAY ........................................................ .
CENTERLINE ............................................................ ..
TCE .......................................................................... .
SAWCUT ................................................................... ..
DAYLIGHT .................................................................. .
AC ON AB ............................................................... .
BIOFILTRATION BMP ................................................. .
Cone PAVEMENT ...................................................... .
COLD MILL AC AND PLACE AC .............................. ..
FEMA SPECIAL FLOOD HAZARD AREA ZONE AE. ... ..
PROPOSED RETAINING WALL. .................................. ..
PROPOSED CURB AND GUTTER ............................... .
PROPOSED UNDERDRAIN .......................................... .
PROPOSED STORM DRAIN ....................................... ..
CURB INLET TYPE 8 .............................................. ..
CURB INLET TYPE B-2 .......................................... ..
STORM DRAIN CLEANOUT ......................................... .
MODIFIED CURB OUTLET ........................................... .
UNDERDRAIN CLEANOUT {SIZE/TYPE NOTED) ...... ..
HEADWALL TYPE -A .................................................. .
Exist ELECTRIC ........................................................ .
Exist TELEPHONE ................................................... .
Exist T.V. . .............................................................. .
Exist STORM DRAIN ................................................. .
Exist WATER ............................................................. .
Exist ABANDONED WATER ........................................ .
Exist SANITARY SEWER ............................................ .
Exist RECYCLED WATER .......................................... ..
Exist PETROLEUM .................................................... .
Exist CURB AND GUTTER ....................................... ..
Exist CURB .............................................................. .
GUTTER
HINGE POINT
INVERT ELEVATION
KINDER MORGAN ENERGY PARTINERS L.P.
KILOPOUNDS PER SQUARE INCH
LINEAR FEET
LEFT
LANE
MAT
MAX
LAYOUT LINE
MATERIAL
MAXIMUM
MILLIMETER
MINIMUM
MODIFIED
MIL
MIN
SYMBOL
10 -11-11-11-11-11-1 I-
I I
. ... , ... ,l ('::!:::::.:::.-;::.-_:
I·:~-:-••.•. d.' I
~llll11i11d~ /dt1 lj fli1j Uttt 11,t,
I\ \ \ I
D
I!]
i::!!!,,
121
-
-----E-----
-----1-----
-----TV-----
-----SD-----
-----W-----
--I\----w ---\-I--
-----s-----
-----RW-----
1---□ -□ -□ -□ -
RIGHT
CDP 2021-0044
SUP 2021-0002
{PUB 2020-0009)
RT
RWLOL
R/W
S/C
SCH
RETAINING WALL LAYOUT LINE
RIGHT OF WAY
SD
SDG&E
SDRSD
SF
SW
Swr
TC
TCE
SAWCUT
SCHEDULE
STORM DRAIN
SAN DIEGO GAS AND ELECTRIC
SAN DIEGO REGIONAL STANDARD DRAWING
SQUARE FEET
SIDEWALK
SEWER
TOP OF CURB
TEMPORARY CONSTRUCTION EASEMENT
TOP OF ENCASEMENT MOD
MUTCD
NAD83
NGVD29
No.
MANUAL
OF UNIFORM TRAFFIC CONTROL DEVICES
NORTH AMERICAN DATUM OF 1983
TE
Temp
THVF
Trans
TYP
TEMPORARY
TEMPORARY HIGH-VISIBILITY FENCE
TRANSITION
o.c.
OG
PE
PG
PIP
PLA
POT
PROP
PVC
Pvmt
RCP
RD
Ret
RPM
NATIONAL GEODETIC VERTICAL DA TUM OF 1929
NUMBER TYPICAL
ON CENTER
ORIGINAL GROUND
POLYETHYLENE
PERFORMANCE GRADE
PROTECT IN PLACE
PLASTIC
POINT
OF TANGENT
PROPOSED
POLYVINYL CHLORIDE
PAVEMENT
REINFORCED CONCRETE PIPE
ROAD
RETAINING
REINFORCED POLYMER MORTAR
DATE INITIAL DATE INITIAL
W/ WITH
HAS BUIL TH
P.E. EXP. DATE
REVIEl.'ED BY,
INSPECTOR DATE
I SH~ET I CITY OF CARLSBAD rn TRANSPORTATION DEPARTIMENT 3 TITLE SHEET FOR:
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY: PROJECT NO.
I
I DRAWING NO.
J'~l",t CIVIL ~~ CHKD BY: MEW
REVISION DESCRIPTION 6094 or c~c11 ENGINEER OF WORK DlHER APPROVAL CITY APPROVAL RVWD BY: MI DWG 529-1 EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 29 of 89
GENERAL NOTES:
1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS.
2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY
STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.
3. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES.
4. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUil T CONDITIONS
BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY.
5. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.
6. ALL INSPECTION REQUESTS OTHER THAN FOR PRECONSTRUCTION MEETING WILL BE MADE BY CALLING THE ENGINEERING 24-HOUR INSPECTION REQUEST LINE AT (760) 438-3891. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 2: 00 P.M.
ON THE DAY BEFORE THE INSPECTION IS NEEDED INSPECTIONS WILL BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2:00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER.
7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES,
INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO
ALL LOCAL, STATE AND FEDERAL SAFETY AND HEAL TH STANDARDS, LAWS AND REGULATIONS.
8. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING
A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING
THE DESIGN OF SHORING, BRACING SLOPE OR OTHER PROVISIONS TO BE MADE
OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE
EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR
MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS FSIABI !SHED BY IHF CONSIBLJCTION SAFETY ORDERS TIII E 8 CALIFORNIA ADMINISTRATIVE CODE. THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA
EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION.
9. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK ZONE
DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY AND THE PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART
UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO.
10. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE
OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION.
11. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN
ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER
UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN.
12. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES ( ABOVEGROUND AND UNDERGROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY
AHEAD OF THE CONSTRUCTION TO PERMIT THE REVISIONS OF THE CONSTRUCTION
PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK.
PROJECT STANDARD PLANS:
SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD), 2018
C-9
C-10
D-02
D-09
D-11A
D-11B
D-12
D-30
D-60
D-61
G-2
G-5
G-7
G-9
G-10
G-11
G-14B
G-27
G-28
G-29
G-30
G-32A
G-32B
TCP-10A
TCP-12A
GRAVITY RETAINING WALLS
GENERAL NOTES AND DETAILS FOR GRAVITY RETAINING WALLS
CURB INLET -TYPE B
STORM DRAIN CLEANOUT -TYPE A
INLETS AND CLEANOUTS NOTES AND DETAILS
INLETS AND CLEANOUTS NOTES AND DETAILS
CURB INLET OPENING
STRAIGHT HEADWALL -TYPE A
PIPE BEDDING AND TRENCH BACKFILL FOR STORM DRAINS
ROUNDED PIPE ENDS IN DRAINAGE STRUCTURES
CURBS AND GUTTER -COMBINED
DIKES -ASPHALT CONCRETE
SIDEWALKS -TYPICAL SECTIONS
SIDEWALK JOINT LOCATIONS
CONCRETE JOINT DETAILS
CONCRETE CURB, GUTTER, SIDEWALK, AND PAVEMENT REMOVAL AND
REPLACEMENT
CONCRETE DRIVEWAY (NON-CONTIGUOUS SIDEWALK)
CURB RAMP -TYPE A AND B (NEW CONSTRUCTION)
CURB RAMPS -TYPE A-1 AND B-1 (FOR EXISTING SIDEWALK)
CURB RAMP -TYPE C (FOR EXISTING SIDEWALK)
TRUNCATED DOMES
GENERAL NOTES FOR CURB RAMPS
NOTES FOR CURB RAMPS
SIDE OF ROAD WORK AREA -MUL TILANE TRAFFIC CONTROL WITH
CENTERLINE
RIGHT LANE TRAFFIC CLOSURE -ONE LANE
SIDE OF ROAD WORK AREA -MUL TILANE TRAFFIC CONTROL WITH
CENTERLINE -LEFT TRAFFIC LANE CLOSURE -ONE LANE CLOSED
CALTRANS STANDARD PLANS (CTSP), 2018
A10A
A10B
A10C
A10D
A10E
A10F
A10G
A10H
A24C
A62B
A88B
LINES AND SYMBOLS (SHEET 1 OF 5)
LINES AND SYMBOLS (SHEET 2 OF 5)
LINES AND SYMBOLS (SHEET 3 OF 5)
LINES AND SYMBOLS (SHEET 4 OF 5)
LINES AND SYMBOLS (SHEET 5 OF 5)
LEGEND -SOIL (SHEET 1 OF 2)
LEGEND -SOIL (SHEET 2 OF 2)
LEGEND -ROCK
PAVEMENT MARKINGS SYMBOLS AND NUMERALS
LIMITS OF PAYMENT FOR EXCAVATION AND BACKFILL BRIDGE SURCHARGE AND WALL
CURB RAMP AND ISLAND PASSAGEWAY DETAILS
ALL STANDARD DRAWINGS ARE SAN DIEGO REGIONAL STANDARD
DRAWINGS (SDRSD) UNLESS NOTED OTHERWISE:
* CITY OF CARLSBAD STANDARD
** CARLSBAD MUNICIPAL WATER DISTRICT STANDARD DRAWING
••• SDRSD AS MODIFIED BY CITY OF CARLSBAD
13. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST TWO FULL WORKING DAYS PRIOR TO STARTING CONSTRUCllON NEAR THEIR FACILITIES AND SHALL COORDINATE WORK WITH A COMPANY REPRESENTATIVE.
UNDERGROUND SERVICE ALERT (DIG ALERT)
SDG&E
AT&T
SPECTRUM CABLE
COX COMMUNICATIONS
CITY OF CARLSBAD (STREETS AND STORM DRAIN)
*CITY OF CARLSBAD (SEWER.WATER & RECLAIMED WATER)
*SAN DIEGUITO WATER DISTRICT
*LEUCADIA WASTEWATER DISTRICT
*VALLECITOS WATER DISTRICT
*OLIVENHAIN WATER DISTRICT
811
800~411-7343 619 237-2787
800 227-2600
619 262-1122
760 434-2980
760 438-2722
760 633-2650
760 753-0155
760 744-0460
760 753-6466
• BUENA SANITATION DISTRICT (760)726-1340 x1330
*AS APPROPRIATE
STREET NOTES:
1. STREET LIGHTS SHALL BE INSTALLED AS SHOWN ON THESE PLANS, UNDERGROUND
CONDUIT RUNS, SERVICE POINTS AND HAND-HOLES SHALL BE SHOWN ON THE "AS-BUILT" PLANS. NO DIRECT BURIAL STREET LIGHT FOUNDATIONS WILL BE ALLOWED. ALL LUMINAIRES SHALL BE "CUT OFF" TYPE.
2. ALL UNDERGROUND UTILITIES AND LATERALS SHALL BE INSTALLED PRIOR TO CONSTRUCTION OF CURBS, CROSS GUTTERS OR SURFACING OF STREETS.
3. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED IT SHALL BE REMOVED
WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER.
4. WHEELCHAIR RAMPS SHALL BE INSTALLED PER REQUIREMENTS OF TITLE 24, CALIFORNIA ADMINISTRATIVE CODE.
5. STREET TREES SHALL BE INSTALLED PER SECTION VI OF THE CITY OF CARLSBAD LANDSCAPE MANUAL.
6. FIRE HYDRANT MARKERS SHALL BE PLACED IN THE STREET WITHIN THE LIMITS OF WORK OF THIS PLAN PER SDRS DWG M19.
7. ALL SURVEY MONUMENTS AND POINTS THAT ARE DISTURBED BY THIS WORK
SHALL BE REESTABLISHED, PERPETUATED, AND DOCUMENTED PER THE PROFESSIONAL LAND SURVEYORS ACT.
8. TWO (2) SETS OF SURVEY (CUT) SHEETS SHALL BE PROVIDED TO THE CITY ENGINEERING INSPECTOR.
9. STREET LIGHTS SHALL BE 13,600 LUMENS LED LIGHTS.
SEWER NOTES:
1. SEWER MAIN AND APPURTENANCES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "CITY OF CARLSBAD ENGINEERING STANDARDS (LATEST EDITION), VOLUME 1- GENERAL DESIGN STANDARDS, CHAPTER 6-DESIGN CRITERIA FOR GRAVITY SEWER LINES AND APPURTENANCES, AND VOLUME 3 -STANDARD DRAWINGS AND NOTES
AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION (GREENBOOK).
2. BEFORE ANY CONNECTION TO THE CITY'S EXISTING SYSTEM, A PERMIT SHALL BE OBTAINED FROM THE CITY. IT MUST BE SIGNED AND APPROVED BY THE CITY ENGINEER AND SUPERINTENDENT.
3. BEFORE CONSTRUCTION BEGINS IN ANY PUBLIC RIGHT OF WAY, A CITY RIGHT OF WAY PERMIT SHALL BE REQUIRED.
CALTRANS STANDARD PLANS (CTSP), 2018 (Cont.)
B0-3
B3-4A
B3-5
B11-7
D71
T3A
T56
T58
T62
T65
RSP ES-1A
RSP ES-1B
RSP ES-1C
RSP ES-4A
RSP ES-48
RSP ES-4C
ES-5A
RSP ES-5B
ES-5C
RSP ES-5D
RSP ES-7A
RSP ES-7B
RSP ES-7M
RSP ES-7N
RSP ES-70
RSP ES-BA
BRIDGE DETAILS
RETAINING WALL TYPE 5 (CASE 1)
RETAINING WALL DETAILS No.1
CHAIN LINK RAILING
DRAINAGE INLET MARKERS (NO DUMPING)
TEMPORARY RAILING (TYPE K)
TEMPORARY FIBER ROLL
TEMPORARY CONSTRUCTION ENTRANCE
TEMPORARY DRAINAGE INLET PROTECTION
TEMPORARY WATER POLLUTION CONTROL DETAILS (TEMPORARY HIGH-VISIBILITY FENCE)
ELECTRICAL SYSTEMS (LEGEND)
ELECTRICAL SYSTEMS (LEGEND)
ELECTRICAL SYSTEMS (LEGEND)
ELECTRICAL SYSTEMS (SIGNAL HEAD MOUNTING)
ELECTRICAL SYSTEMS (PEDESTRIAN SIGNAL HEADS)
ELECTRICAL SYSTEMS (SIGNAL HEADS AND MOUNTINGS)
ELECTRICAL SYSTEMS (LOOP DETECTORS)
ELECTRICAL SYSTEMS (DETECTORS)
ELECTRICAL SYSTEMS (ACCESSIBLE PEDESTRIAN SIGNAL AND PUSH BUTTON
ASSEMBLIES)
ELECTRICAL SYSTEMS (CURB AND SHOULDER TERMINATION, TRENCH, AND
HANDHOLE DETAILS)
ELECTRICAL SYSTEI
BUTTON ASSEMBL
ELECTRICAL SYSTEI
IDENTIFICATION CH
ELECTRICAL SYSTEI
ELECTRICAL SYSTEI
ELECTRICAL SYSTEI
ELECTRICAL SYSTEI
~RACTERS)
vlS (SIGNAL AND LIGHTING STANDARD, DETAIL No. 1)
vlS (SIGNAL AND LIGHTING STANDARD, DETAIL No. 2)
vlS (SIGNAL AND LIGHTING STANDARD, DETAIL No. 3)
vlS (NON-TRAFFIC PULL BOX)
CARLSBAD MUNICIPAL l'ATER DISTRICT STANDARD DRAWINGS, 2012 W-4
W-7
W-13
2" WATER SE
ABOVE SURFA
VALVE BOX A
VICE CONNECTION FOR 1t & 2" METERS
;E 1 & 2" AIR-VACUUM VALVE ASSEMBLY & APPURTENANCE
,SEMBLY
DI~~RT
~-
-
145D FRAZEE ROAD
SUITE 100
CALL 2 FULL WORKING DAYS
SAN DIEGO. CA 98108
BEFORE YOU DIG
WATER NOTES:
1. WATER & RECYCLED WATER MAIN AND APPURTENANCES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "CITY OF CARLSBAD ENGINEERING STANDARDS" (LATEST EDITION) VOLUMES 2 & 3.
2. BEFORE ANY CONNECTION OR SHUT DOWN OF VALVES ON EXISTING C.M.W.D.
LINES, A PERMIT SHALL BE OBTAINED FROM THE C.M.W.D. OFFICE AND MUST
BE SIGNED AND APPROVED BY THE CITY OF CARLSBAD'S DEPUTY CITY ENGINEER AND THE UTILITY OPERATIONS' PUBLIC WORKS MANAGER.
3. THE CONTRACTOR SHALL NOTIFY THE CITY OF CARLSBAD ENGINEERING INSPECTION DEPARTMENT 48 HOURS PRIOR TO STARTING WORK SO THAT INSPECTION MAY BE PROVIDED -TELEPHONE NO. (760)438-3891.
4. NO TREES OR STRUCTURES SHALL BE ALLOWED IN THE WATER LINE EASEMENT,
ALL EXISTING TREES AND STRUCTURES SHALL BE REMOVED PRIOR TO
COMMENCEMENT OF WORK -ANY EXCEPTIONS SHALL REQUIRE WRITTEN PERMISSION FROM THE DISTRICT ENGINEER.
5. ALL POTABLE WATER SERVICES SHALL BE 1" AND ALL METERS SHALL BE 1" (UNLESS OTHERWISE NOTED ON PLANS).
6. ALL WATER METER BOXES SHALL BE 17" X 30" X 12" POLYMER CONCRETE AS MANUFACTURED BY ARMORCAST OR EQUAL (UNLESS OTHERWISE NOTED ON PLANS).
7. MINIMUM SPACING BETWEEN POTABLE WATER SERVICES AND SEWER LATERALS SHALL BE 10 FEET.
8. THE TOP OF WATER METER BOXES SHALL BE FLUSH WITH THE FINISHED SURFACE GRADE.
9. CONSTRUCTION OF WATER MAINS AND RECYCLED WATER MAINS SHALL ADHERE TO THE "CRITERIA FOR THE SEPARATION OF WATER MAINS AND SANITARY SEWERS" PUBLISHED BY THE STATE OF CALIFORNIA'S DEPARTMENT OF HEALTH SERVICES.
10. AXIAL DEFLECTION AT THE PIPE JOINTS IS NOT ALLOWED. THE USE OF A HIGH
DEFLECTION COUPLING AT A PIPE JOINT MAY BE PERMITTED BY THE INSPECTOR ON A CASE BY CASE BASIS NOT TO EXCEED 4 DEGREES TOTAL DEFLECTION PER COUPLING (2 DEGREES/EACH GASKET). USE CERTAINTEED "VINYL-IRON" H.D. FOR C900.
11. BEFORE CONSTRUCTION BEGINS IN ANY PUBLIC RIGHT OF WAY, A CITY RIGHT OF WAY PERMIT SHALL BE REQUIRED.
12. NO CUTTING OF ASBESTOS CEMENT PIPE (ACP) IS PERMITTED. CONTRACTOR SHALL
REMOVE ACP TO NEAREST COUPLING AND INSTALL ACP X PVC ADAPTORS AND THE NECESSARY PVC SIZE AND CLASS PIPE TO INSTALL THE TEE AT THE STATION.
13. PRIOR TO BACKFILL, INSTALL TRACER WIRE ON TOP OF PIPE AND SECURE IN PLACE WITH 2-INCH WIDE PLASTIC ADHESIVE TAPE AT MAXIMUM 10-FOOT INTERVALS. WIRE
TO ENTER VALVE STANDS BY MEANS OF DRILLED HOLE IN PIPE STAND WALL JUST BELOW 4TTBOX. WIRE IS NOT TO INTERFERE WITH VALVE NUT OPERATION. RUN TRACER
WIRE CONTINUOUSLY ALONG PIPE AND TERMINATE IN ADJACENT VALVE BOXES FOR BURIED ASSEMBLIES OR BURIED VALVES. WHERE BURIED SPLICES OCCUR, USE AN ELECTRICAL EPOXY RESIN SUCH AS SCOTCHCAST, OR APPROVED EQUAL. PROVIDE 24
INCHES OF COILED WIRE AT ACCESS POINTS FOR ATTACHMENTS OF PIPE LOCATING EQUIPMENT. EACH INSTALLED RUN OF PIPE SHALL BE CAPABLE OF BEING LOCATED USING THE TRACER WIRE. PROTECT WIRE INSULATION FROM DAMAGE DURING INSTALLATION AND BACKFILLING. WIRE INSULATION THAT IS BROKEN, CUT, OR DAMAGED SHALL BE REPLACED.
TRACER WIRE SHALL BE AWG NO. 8 STRANDED COPPER WIRE WITH HIGH MOLECULAR
WEIGHT POLYETHYLENE (HMW/PE) INSULATION SPECIFICALLY DESIGNED FOR DIRECT BURIAL IN CORROSIVE SOIL OR WATER. POLYETHYLENE INSULATION SHALL CONFORM TO ASTM D 1248, TYPE 1, CLASS C. WIRES WITH CUT OR DAMAGED INSULATION ARE NOT
ACCEPTABLE AND REPLACEMENT OF THE ENTIRE WIRE WHICH HAS BEEN DAMAGED WILL BE REQUIRED AT THE CONTRACTOR'S EXPENSE.
SIGNING AND STRIPING NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL SIGNING AND STRIPING.
2. SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO THE CALIFORNIA
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (FHWA'S MUTCD LATEST VERSION, AS
AMENDED FOR USE IN CALIFORNIA), CALTRANS STANDARD SPECIFICATIONS (LATEST VERSION), THESE PLANS AND THE SPECIAL P~OVISIONS.
3. ALL SIGNING AND STRIPING IS SUBJECT TO THE APPROVAL OF THE TRANSPORTATION DIRECTOR OR HIS REPRESENTATIVE, PRIOR TO INSTALLATION.
4. ANY DEVIATION FROM THESE SIGNING AND STRIPING PLANS SHALL BE APPROVED BY THE TRANSPORTATION DIRECTOR OR HIS REPRESENTATIVE PRIOR TO ANY CHANGE IN THE FIELD.
5. ALL SIGNING AND STRIPING SHALL BE REFLECTIVE PER CALTRANS SPECIFICATIONS.
STRIPING SHALL BE REPAINTED TWO WEEKS AFTER INITIAL PAINTING. SIGNING SHALL USE ENCAPSULATED LENS REFLECTIVE SHEETING (HIGH INTENSITY OR EQUAL).
6. CONTRACTOR SHALL REMOVE ALL CONFLICTING PAINTED LINES, MARKINGS AND PAVEMENT LEGENDS BY GRINDING. DEBRIS SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR.
7. ALL PAVEMENT LEGENDS SHALL BE THE LATEST VERSION OF THE CALTRANS ENGLISH STENCILS.
8. LIMIT LINES AND CROSSWALKS SHALL BE FIELD LOCATED. CROSSWALKS SHALL HAVE 1D' INSIDE DIMENSION UNLESS OTHERWISE SPECIFIED.
9. ALL CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS AND PAVEMENT LEGENDS SHALL BE THERMOPLASTIC UNLESS OTHERWISE SPECIFIED.
10. FIRE HYDRANT PAVEMENT MARKERS SHALL CONFORM TO THE CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (FHWA'S MUTCD LATEST VERSION, AS AMENDED FOR USE IN CALIFORNIA) AND SAN DIEGO REGIONAL STANDARD DRAWING M-19.
11. ALL MEDIAN NOSES AND FLARES SHALL BE PAINTED YELLOW.
12. ALL SIGNS SHALL BE STANDARD SIZE AS SHOWN IN THE CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (FHWA'S MUTCD LATEST VERSION, AS AMENDED FOR USE IN CALIFORNIA) UNLESS OTHERWISE SPECIFIED.
13. SIGN POSTS SHALL BE SQUARE PERFORATED STEEL TUBING WITH BREAKAWAY BASE PER SAN DIEGO REGIONAL STANDARD DRAWING M-45.
14. WHEN A SIGN IS ATTACHED TO A POLE, IT SHALL BE MOUNTED USING A STANDARD CITY OF CARLSBAD MOUNTING BRACKET WITH STRAPS.
15. EXISTING SIGNS REMOVED BY THE CONTRACTOR SHALL BE DELIVERED BY THE CONTRACTOR TO THE CITY OF CARLSBAD PUBLIC WORKS YARD AT 405 OAK AVENUE.
16. ALL SIGNS SHOWN ON THESE PLANS SHALL BE NEW SIGNS PROVIDED AND INSTALLED BY
THE CONTRACTOR EXCEPT THOSE SIGNS SPECIFICALLY SHOWN AS EXISTING TO BE RELOCATED OR TO REMAIN.
17. (IF NECESSARY) WHERE R4-7 SIGN AND OM1-3 OBJECT MARKER ARE TO BE INSTALLED IN A 2-FOOT WIDE MEDIAN NOSE, THE R4-7 SIGN SHALL BE 18"X24" AND THE OM1-3 OBJECT MARKER SHALL BE 12"X12"
18. ALL NEW SIGNS SHALL ALL BE CLEARLY VISIBLE, NOT BLOCKED BY ANY OBSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO TRIM OR REMOVE ANY VEGETATION BLOCKING NEW SIGNS. l8:_ ()
►
~~ o ro
~~ ~ <----~ I OJ O 1'"'1'-- ---·1--'------------110- ► ::c • ••••••••••••••• /'-~ : I I \.I' 0 0
••••••-. a .............. I ,nm\,\:
--.. -. -
····~ . ----- CJ ••-••• • --~--.Ccccc.--CC<c _ ·c cccc_-,_, ______ ---,-_ cc~ccccc-cc·_~-• ;~93' ~9 r--••••• -~-:_.:)I=~-~---= -''--,-= ~=--09= ~-----~----~ ----• -~~2= = -0 = -0--:--= =.39-9 =-=i'9a= =39,z=-= 39~5= "•"39_5 ~ 394
------
COASTAL ZONE
BOUNDARY
-z.. -z.. --<
()
0 i;
~
••••••• --·o·····•• ...... .,, ------- - - - - - -"'= = • _ -2 ---•--• ---•-• ••• -"•"~~nu tl ., ---~--- -----4· ---. -------------------------------------------14 '\ ---, -----------' ·-~ •------------,, __ ---~ -" • -----' " ' -' ' :' _ ,'\\, > ,~ -___ ----~--EL CAMINO REAL ! I
4201::=:41,9=-:_:,l~, .. ~~ -·----------7r-------------------// I -
'"'
()
0 "r--
'"'~
~
SHEET 4 -DEMOLITION PLAN
SHEET 5 -IMPROVEMENT PLAN
SHEET 12 -UTILITY PLAN
SHEET 14 -STORM DRAIN PLAN
SHEET 20 -SIGNING AND STRIPING PLAN
SHEET 22 -TRAmc CONTROL PLAN
SHEET 24 -LIGHTING SYSTEM PLAN
SHEET 4 -DEMOLITION PLAN
SHEET 6 -IMPROVEMENT PLAN
SHEET 12 -UTILITY PLAN
SHEET 15 -STORM DRAIN PLAN
SHEET 20 -SIGNING AND STRIPING PLAN
SHEET 22 -TRAFFIC CONTROL PLAN
SHEET 24 -LIGHTING SYSTEM PLAN
SHEET 28 -RETAINING WALL PLAN
SHEET 32 -IRRIGATION PLAN
SHEET 40 -LANDSCAPE PLAN
' • • • • • •
i\
1\1 1-, \\,
:;j
SHEET 13 -UTILITY PLAN
SHEET 21 -SIGNING AND STRIPING PLAN
SHEET 23 -TRAFFIC CONTROL PLAN
SHEET 25 -LIGHTING SYSTEM PLAN
SHEET 33 -IRRIGATION PLAN
SHEET 41 -LANDSCAPE PLAN
3'111>90
HAS BUIL TH
)
-· ·--. ---····---··· -. -···· . . . . . . -. . . .
NOT TO SCALE
P.E. EXP.
REVIEl.'ED BY•
INSPECTOR
DATE
DATE
I SH;ET I CITY OF CARLSBAD rn TRANSPORTATION DEPARTMENT 3
GENERAL NOTES AND INDEX MAP FOR
EL CAMINO REAL
??.oFESS/~l ROADWAY IMPROVEMENTS '@;'° <'l ~ ~ FROM SUNNY CREEK Rd TO JACKSPAR Dr 6f DANIEL NUTTER ~ APPROVED: HOSSEIN AJIDEH
"' "' No. C76641
-I< Exp. 12/31 /22 2_ * ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE I
I DRAWING NO. DWN BY:
~
PROJECT NO.
(858) 514-8377 J'~l",t CIVIL ~~ DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: MEW REVISION DESCRIPTION 6094 or c~c11 ENGINEER OF WORK DlHER APPROVAL CITY APPROVAL RVWD BY: MI DWG 529-1 EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 30 of 89
4.5'
4.5'
4.5'
Exist
R/W
Exist
R/W
Exist
R/W
, TC
5.5 -SW
63'
53'
Exist CURB
ct.
EL CAMINO REAL
I
I 35'
T
I
I
I Exist CURB
I
VARIES
70'-79'
S/C
3' 15' TC 4,
Exist
R/W
Ret WALL
7' LOL
6'
SW
I I I TC ON PROFILE
I
___ l __ ==p-======---~=====--=--_
L ______________ ------
I
VAR
2% -4% , -I _____ _.ti~ , \l \ -... BLACK VINYL COATED CL RAILING PER CTSP B11-7
5.5' TC
SW
2• COLD MILL AC
2" AC PG 64-10
24" OVEREXCAVATION AND SUBGRADE RECOMPACTION
6" AC PG 64-10
12" CLASS II AB
TO 95% OF RELATIVE COMPACTION
63'
"ECR" 413+25.00 TO 417+00.45
NEAR SUNNY CREEK Rd TO INTERSECTION OF RANCHO CARLSBAD Dr
NOT TO SCALE
ct.
EL CAMINO REAL
I
53' 35'
I
I
Exist CURB I Exist CURB
I
VARIES
45'-108'
S/C
3'
-,, -...
" -... -... Ret WALL
--...
1 \ --... --... H'=-!~R SDRSD G-7
-... --... --... --... --...
TYPE G CURB & Gtr
PER SDRSD G-2
Exist
R/W
15' T~ 5' 1 5' HP
SW
TC ON PROFILE!
VAR
--... .._,___ ______ _
____ j __
==p-======---~=====--== =-
L ______________ ------
I 1% -4% r -·< _ _ .t-1~ \l \
TC 5, I 5'
Iii II I
SW
TC 5,
Exist
R/W
Ret WALL
6, LOL
5'
SW
I 11
TC ON PROFILE
I
w
BLACK VINYL CL RAILING
PER CTSP B11-7
Ret WALL
PER SDRSD G-7
TYPE G CURB & Gtr
PER SDRSD G-2
"ECR" 413+25.00 TO 413+37.21
Exist
R/W
NOT TO SCALE
TC , , HP
4 I • 6 I
SW
Exist
R/W
TC ON PROFILE TC ON PROFILE
2%
MAX
-SW WITH THICKENED SW EDGE
2%
~IT\
OROUS SW
2" COLD MILL AC
2" AC PG 64-10
SEE DETAIL SHEET 18
, TC
5.5 SW
6" AC PG 64-10
12" CLASS II AB
24" OVEREXCAVATION AND SUBGRADE RECOMPACTION TO 95% OF RELATIVE COMPACTION 63'
"ECR" 404+11.64 TO 413+25.00
NEAR SUNNY CREEK Rd TO INTERSECTION OF RANCHO CARLSBAD Dr
NOT TO SCALE
ct.
EL CAMINO REAL
I
53' 35'
I
I
Exist CURB I Exist CURB
I
____ j __
63'
S/C
3'
==p-=====--------=======--
------------------------
L---------------------
2• COLD Ml
2" AC PG
------_J
-
.L AC
,4-10 -
-
-
PG 64-10
15'
I
VAR
1% -4%
6" AC
12" C
24" OVEREXCAVATION AND SUBGRADE RECOMPACTION TO 95% OF RELATIVE C -
"ECR" 401 + 75.25 TO 403+56.94
NEAR SUNNY CREEK Rd TO INTERSECTION OF RANCHO CARLSBAD Dr
NOT TO SCALE
LASS II AB
JMPACTION
-
DIC }ll ;-RT
,~·
-SW
PER SDRSD G-7
TYPE G CURB & Gtr
PER SDRSD G-2
Exist
R/W
TC 5.5'
,,"~ SW
TC ON PROFILE
2%
MAX '):,\
-
' ,
SW
PER SDRSD G-7
TYPE G CURB & Gtr
PER SDRSD G-2
1450 FRAZEE ROAD
SUITE 100
CALL 2 FULL WORKING DAYS
SAN DIEGO, CA 9210B
BEFORE YOU DIG
IOFIL TRATION BMP -SEE SHEET 16
MBEDDED MOD CURB AND Gtr
"ECR" 404+ 70.84 TO 406+02.00
"ECR" 408+61.00 TO 410+03.60
"ECR" 410+57.92 TO 411+41.43
NOT TO SCALE
?l(Of"ESS /~
'J:" <'.l
ti-~
§ DANIEL NUTTER ~
"' "' No, C76641
-1< E,p, 12/31 /22 >!-
J'~?~ Cl\/1L ""i,-. (Hi'iB) 514-8377 DATE INITIAL
OF c~c11 ENGINEER OF WORK
TYPE G CURB & Gtr
PER SDRSD G-2
"ECR" 406+03.00 TO 408+60.00
NOT TO SCALE
DATE INITIAL DATE INITIAL
REVISION DESCRIPTION OlHER APPROVAL CITY APPROVAL
HAS BUIL TH
P.E. EXP. DATE
REVIEIJED BY,
INSPECTOR DATE
I SH;ET I
rn CITY OF CARLSBAD
TRANSPORTATION DEPARTMENT 3
TYPICAL CROSS SECTIONS FOR:
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6 /30 /24 DATE
DWN BY:
I
I DRAWING NO.
~
PROJECT NO.
CHKD BY: MEW 6094 RVWD BY: MI DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
APN 209-060-58-00
APN 209-060-53-00
APN 212-160-31-00
APN 209-090-11-00 APN 209-060-48-00
Sept. 26, 2023
Item #6 Page 31 of 89
PROP R/W
64.16' RT "ECR" 418+01.05
END REMOVE CURB & GUTTER
PROP R/W
Ill LI 103.39' RT "ECR" 417+28.42 \ \ '
I Ow Beg REMOVE WALL
WI Q 76.33' RT "ECR" 417+33.44 \/
--a I O Beg REMOVE CURB & GUTTER \
• ~ \ LEGEND:
U OJ REMOVE 68' WALL Exis_LEl/W-v ~
REMOVE 143 SF Cone-, ccJ Z . "I · REMOVE CITY TREE ~M.O · -CITYTl~'kE~)-/ ~ ------ _ 53.QO' RT "ECR'.' 418+26.6? ~-~~L,~f~\. //f1 f 5362'.,RI "ECR" 417+0702 ~TrF ~ .~b~// /»1/4___L ~~51:{'-c, ----~ ~
AC Pvmt REMOVAL
-Beg RE
_XIS o•~ LJ'] ,-V :H-~ / \.~~~,/ - -.;:;...... -~--c;;-~ ~r ~ . ~ \.~ • t R/W ~o \ \ ~~'" -I/"' W IP::> 1 ·st I\ fl\ ',\\~~\\ / Beg REMOVE AC DIKE / ..-,~~~ ~-. ~~ ~~ 77 1,
, -,. r .,;,. ./2 , °' ~ ----• ~ :t;,l t~~&== ' i., o o ~~--~-~[~ :'4, 0n~~n n~1.~~, -,~~53.3"4~1,GR~i'~s ii I -~~~~.Jd/ / ElEMOJT,j. A)D1/E:J\// 1 1~~~ ~o H;:!f,lo
Cone REMOVAL
T fl~ ,;; = 1 ~ 'SL1 JI . U "_ }:;> .. r ~~-Nl:)~~M_G~tl / 1 / 0 -'--Q. ~ ~ u I{) . , CJ ' / ' ~ ',\;,-, I • "(-(;,·S-0, c(·» '?< • • ~ ~ ;;;.-?,'2 / Q -0 , T '' -_ ~ + -' ~ I ' b~~~ T _______--= u. ------.--J ,.., __'.,____...__-,--..... ,,. r T _ / ,-1, ___ _, 1......-,.. T---...
T l I T .,.,.,. / c=::i-~K i---'vloo " '\ ""'/ T -.-.<v\-\ \ / 1\ , / , .,Y / / / v'\ -----u '7"' ,-/ / ~ -_.,--I _-------. ~ T T -0 ✓ / ✓ -/ C 'i=:' ',/ " T ;~ .-;, ,I I ltl I I V ~ I y LI -ui / / ii ,.<, ,;s--/ / / ' -• ' ~ b -REM0Vii>0:z9' ~; / c= ;=-REli!UV,it-37' CUfilB LG!D.IIEH r . -I: n/ew= o ~ o -1<\, /1 -r,;,:f c:SI ' R":..L 7,',! _L--R',/ / R:t, -R;,/. -, --,-.:, CURB ,mj,T.IEH" '=-°R',/ R',/ 1 Ri-1 , -~•□-=!□ ~ 0 --j ~c:, -/ ~/ / • +,t,_',/ I ',/·-✓-:;-',/ ;:,'Ii ~ _ -W-.: I- , R',/r 1/ ~,, ',/~ 'lt:::; _ ✓n i;iL□-=~RE/y10V~~.O SE;n~ 1 -y ; Y / 7 / ',// ~. / /: / ~ / / ',/ ' \,/ / -:;; _;,L . ~~[D , -/',/ , -~ ~ -n □ f-"'.□ u ;p -~ ~6 ef° ;1 / N63"1 28' Q2.13"W / / , / / / / ef°/ , ' /l~J • f • ·cJ IC7 / , \,/ &3 ....1 □ u u \ : '-\ ' ,~ /.c I -< ' , 471 845'~16 □ -'\-o -'o ~□ .fHl □"--□ -=.o □ 'l--0414 o\ □ .cl; □ -1-\:illc 4,1!,I □ □ .1 '" □4•1·2·□ --!Irr ..rh·.1. ¼ : ~ □+□-□ □41,g□ □ □f-□--Jllrcll8 ~~□--~-□=In '\cJ"l,1 □"' □~□ • _\ _\ \. ,\-\ \_ ~ .~ -\L ~ \-,,-□□ □-iu,.''o □ <(O -~---= '~ -i\~ \~ '"~ ~~QVE9~\£F-AQ~vmt\\ ~\\ \t:: 10-~tv,:l·N\8',/R-'~=JS;-~ G~ -~-~GCf_"is~CA~INO~~(:"=/~--G_\"~ G-'\~· -\ 'w ~~ ~ \-~ >l~g --IJ ~ _ '"RE ~E_lQS°SF ~~vrn , G '\ G 1=-\ G-\ _,-~G-\G \ 0 \G \
0 .'\ \0 °' 0°'.. °'.. , ', ., , /'-, , G .:--,, n G -G~ s_ WW -
0 -...-. RE1vipvEG24',cURB ~ G£ntE]F\~::, " , ~7/ ~EM0V~"-C.l:l~=& G~+i:E:R \ .n , , , ".. _',,_ '-".. .':-.,. -"'. '-.. _'-., ~ _'-, = "-n .7..... 0 G-,~(/)w s ~ -\°'.. c,::i "I'\ -::;\ '-~~~ :3 =-" _\s \ ' ~ / • _\ ,_,.L ___ L .. I I I ~ .::::,._ ::::o-_ ____ ---------~ 'C 'CJ I \ ' / j ~~. ~ ~ _J ___!~ ~ • ..J I ,i'~ ~ -.. C~ c;.=--c, ~· ... -.J I '' =-----:c 1 1 / I,( ~ tl1J b} ~c0 .~ --==-=---------= ---~~ --. ,-,·1 1 ,, ----i,,., ., n I n n O , ,...-,;-in:---==--==------~~ su -as -·,, ........ :--- ~ --~ 'l---.:_, ,._f ' u u u 1/,\ -I tc...----~ / 1/✓ -• --~ ---• -~-',..-r- v '0.~\\ 1w li II /Y :~ //fr ---=-25------~ -55------911 <C ~ ~54\2· 'T,tECR" 418+11 90 I ~ .,. ll r ,,'lf!!t ,i' 5!'!:59:..--t:.J~EGR":S."1"7~ ==----=~ -----·· --II •-ii~ =:::---.:..~~~B 'RiMov~tu~ & GUTTER ~ L ,c' II,,; :i~'o--'.R~;Mw·o.v~~ ~-UR~0-&9{[lfli(;TE:~ l.D~ --911 i -95 -~ - ~g TI P' ' V --1/ / / _;; :::::-::--------. -. --11 __, 5 r 1/h /__,, _------Q"h -95 1~ "·-==------===
~~)f'~E 1~1/sF-co.ri_c ) ,; • 'f 1= = \ u~9'~(.:op?::::=,_,;~ --::c.--:::___ • --=-. •• •• -JOii-n -===--=-=~
67.36' LT "ECR" 417+92.78 .;,.;, V, 0::: 1 i ---._
END REMOVE CURB & GUTTER /.;, I <( \'. II
"' /, 1/ \I I II
". /,1/1/ I CL, " I 77.44' LT "ECR" 417+44.36 !;I; I
)\
.;, 1/ (J)'\ " Beg REMOVE CURB & GUTTER
o' 20' 40• 80'
SCALE· 1"=40'
1/1/ \ ,c ~ \ U' , u C
\/\ ~ ~ DEMOLITION PLs!A~E; 1 .. =~~ CAMINO REAL \ I
~\~~\ I \ 1
98.63' RT "ECR" 410+«.21
\
'
i
END R~OVE AC DIKE I
106.00· lu "ECR" 410+3'.1.51
Beg REMOVE AC DIKE \ Exist R/W \
-~~ i~ - - --1
\~\\
REMOVE 7,348 SF AC Pvmt -:f.-\ \
53.35' RT "ECR" 401 +90.38
END REMOVE AC DIKE
Beg REMOVE CURB & GUTTER
TCEl ~\\ ,-REMOVE HEADWALL
~ --56.97' RT "ECR" 404+00.16 \ \~... REMOVE 39' OF 36" CMP -L__ --_ END REMOVE AC DIKE ~~\\\I' / / / REMOVE 75 S/c --,,.,,_~°fflc/' / ~ //),J;j!.l///
1 /j: J} )) ¾RE!~//i/1/lTi TR~\1 " \_~'e=----'1/To~/-<~,<c~I =~~iv~;N.~:;R .. 403+fuo TCElfl/153.00' RT "ECW' 401+75.25t • o/,,_ □- O,~ &'n--~-o~□ -~ ~/// ,@;J,.1 / II L !!U. L --1 \ \ ~ PROP R/W~ ~'/4 1w;~--", ~ ~ Beg REMOVE AC DIKE END REMOVE/CURB & GUTTER ~ . / 1 •~ / / ) / ~ __} / 11ipi ~:Ari~, :2 \ -~----~ --Exist R/W , -,"'b"""••,c,rn" ~IT~ ~-,-
1 ~ /;(f/c,~ ,' ,•· -·'~~.~~.ElEMOYLi6.0' AC>Dll<i _ ~~a, ~ v--._..--90 ,,o , :,;/~ ~ ~ ·~_,i ____ "-~~~~~T 5~ -..c.\..· --------~ W.c
T ~ml
~ =
r<1Z
fT1 '::' ==±==I=~======= )> ,c ,. --------R"---~ ~~~- {D (/) ,·',/~•-_ R'w _ _ w _ /-~"~ ---\,I R'w R'w O j;! ~ t -1----',/ ;7 ✓ --~ .i ---~ ±: I
~ = ---i\:,-~ Lp66:i75, R=3499.87 I~ l~~l~ ~
',/-~.L.,.~
..,.. fT1 \□ ;;u.:,_,l+□ ,no·□ -□ --!'tii.,:J10·55•53"i -4'1!l91, J L'-14 , : ' ~ 0 . ---·'= 08 G)::0
-□ -□ -Ii -.::□--□
',/ --=~-=-~=-- I = -.:: -l ~ ~\' __ s ___ \J s ~
~ \; \'-_c G
',/ --;:-___ ~ s .--
S =c-:::::__=-G --
(J1~
o=-
t
F
\
I
------
~-~~--,-------
90 --===::~~
APN 212-160-31-00
s
-.~---~~
,::
T
T
R',/
T ::=-r T T ----~ , , --M✓w~t: \ \ \ \ \ \\\~"-~¼~~:s:s's;~~"'•m•, T T T ~),. T <r= • -T ~ ----------l-I --• '.r I~
R'w R'w R\J RIJ R',/ l l L:
-R'w MOVE 36' ••
-~ -~~-~ -=~~-~
----'~o--~ ------'w -'8;5Q__--==---'w -",w --==-~~ -.,,. ¥ - ~ Ns-2•-31·,,-,,~,~Q-,,,
R',/
, .. ~ l ,T
=nEM.0~.1.5~
CURB & GUTT~
~~=-w ---=-w -
R.
~-~~ ',/
7 fl" 4 )1.,~·S'--.-2.9 v....._,,_ ~ ,,..--,----,
□405~-=I□ -□ -1tiso.890• ·01(-□ □ -0 4:03 ~□ -□ -JJ_-=::4eJz-□ --□ □ -□ -,m1□ 'w cc----:,--:',/ -'"cc---~-=ls. --cc---=---'w 'w -'w __ -;,.,,,._ __ 'w / 'w ------:::~~---'w ------'w ',/ II ',/ 0 ~"Ei;i'~AMIN~·"Rt~·?-0 [l__-o :il□ -G_A·Mlli8□_RE§b;'2 --□-.,,.~ 0 0 -□ -□--=□ ~□ --□ 0 ·o -~~o _ _ ~ ~-;; __ G s G s G s Ci --s G ~ - - - -~ ~-----s ------~---__ O-__ s -□ -=.,; □ -□ □ =-s-=-II - □ -
s D
',/
0 -I ----t .-El - - - -~ •
. =-:-r7-:--:-.----:--c--,----,-----_---1/_ ~ ~--,-----,--- --~ F=------=---------------=---=---=----=-- -
-------------
:C· ' ••••• ~~~-••....... ' ............. '
---------------- 85
85. --- 9Q -------
95 ~ ~---9-.._~~ ~ II -=::;
~ " -..._____,------------,.,,,,,....,
~· - :,.-' ~
~ ~ ' -•. ' ......__-....,___ 9 --- II --tS ---·.,, 5 ~· ,//
APN /12-102-75-00
/i
DEMOL ITION PLAN: EL CAMINO REAL
SCALE: 1 "=40'
DIC }ll ;-RT ?RoFESS/~l
~-
r:t? <'.l
~ ~
§ DANIEL NUTTER ~
"' "' No, C76641
" Exp. 12L31 L22 >t -
145D FRAZEE ROAD
"',;?~ Cl\/1L ;
SUITE 100
SAN DIEGO. CA 9210B (B5B) 514-B3?7 DATE INITIAL DATE INITIAL CALL 2 FULL WORKING DAYS REVISION DESCRIPTION BEFORE YOU DIG or c~c11 ENGINEER OF WORK DlHER APPROVAL
DATE INITIAL
CITY APPROVAL
o· 20· 40• 80'
~ I
SCALE: I '=40'
HAS BUIL TH
P.E. EXP. DATE
REVIEl.'ED BY1
INSPECTOR DATE
I SH~ET I CITY OF CARLSBAD rn TRANSPORTATION DEPARTMENT 3
DEMOLITION PLANS FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
OWN BY:
I
I DRAV¥1NG NO. '.~ PROJECT NO.
CHKD BY: MEW 6094 RVWD BY: MI DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
APN 209-060-58-00
APN 209-060-53-00
APN 212-160-31-00
Sept. 26, 2023
Item #6 Page 32 of 89
li=----=-==-==f-=====+==== I BO 11' _-----+-----+-========±=== -~t== ===-==~t=== o~ ;~ Jf •g "cc"" oo • C •/l :ti: 'f' =====t1====--________ J_ 90 90
60 -------- -===+====--=======t=--__ -_-_-_-_-_-_-J-~B::_'.:0'....__J I , -----------p R 6fl tE • E
E==t=====±====~=====T--=
gn
0 on or-.. a~ ocn -'\-
0 r--+ + + ~ + + + o+oo ._,::,n __J
--'-D-• 0 0 ·-• • ' + • " " N N -+lri
,:': _ ii~ O ~ • O ,!; ~· C • " O C _ ~ • -• -, sf------~ S' !X) _I :;j: Tl___ ,. • • • ',... _,_,,, -'·"'" ---S,M '·""-= __ _.,, "'" 1 "' (.) 9C ______ __'.:S::~~ _5.66o/~e--_ "'" • _,,,. _,_ -• > I/ T~i'"\_'~O~G~@~R~Tr71TCC--~~= ===---• 0 I .56% \,_.-~ 80 0 a:>
Inb__1_o._ .-. --.t'D>---------------t----------------+--------...-------+---------------J---------1--___.::._:::'.._ _ _J .-------1 "-"' "! ~ LO '° LO lo
-=='-----------l-----r0-m-~ ~~ r-,. ci rp,'~--------------t----------------+-------+--------1----------------1---------_J LOr--. + J"").....J N.!..J
~-= .-------PROFILE: RT TC ~~~~-t~ -t_b---------+----------+----_._----f-----------1-------_J -
...---
7"------
70 =~ ------
~
-----------
SCALE: Horiz. 1"=40' ~ t:5 c, st1~'-" Vert. 1 '=8 ~--------j------------t------------+-------1-------1-------------1-------_J 60 419+00 41B+00 417+00 416+00 415+00 414+00 413+00 412+00 411 +00 I 'I L I 76.33' RT "ECR" 417+33.44 64.00' RT "ECR" 413+25.00 \ PROP R/W O Beg TYPE G CURB & Gtr PER SDRSD G-2 END Ret WALL W/ CL RAILING
64.16' RT "ECR" 418+01.05 '"I "' 89.44' RT "ECR" 417+24.40 PER CTSP B11-7 63.00' RT "ECR" 410+56.93 \/ END TYPE G CURB & Gtr PER SDRSD G-2 I O O Beg GRAVITY Ret WALL -SEE DETAIL SHEET 11 \ END SW W/ THICKENED SW EDGE END SW PER SDRSD G-7 -a I 69.54' RT "ECR" 417+30.19 , Beg SW PER SDRSD G-7 U <( Beg SW PER SDRSD G-7 , ,. ., Exil!Ju-R,6'LJ,__ 63.00' RT "ECR" 411+42.43 CURB RAMP -TYPE C;\ ffi ,, 65.05' RT "ECR" 417+07.48 58.00 RT ECR 413+3~.21-;,----~O STAL ZbNE/ '·WJ½liW PER SDRSD G-7 , .. PE~ SDRSD G-Z9 Z • I~ END GRAVITY Ret WALL -SEE DETAIL SHEET 11 , , -~.ND-;-S~Trgns / , /Bbl)!'l_Q-AB,Y c--c·_eef'sw ·WJ"AH~NED SW, ~DGE 'i"-::"::--;--.. . -- 53-~~g ~~PEECGR cli~~+i6;1~_\-7·.-i\. <( / j\, j 1, , \II\\\ "Beg Ret JALL No. 413 W/ CL RAILING PER CTSP 811-7 ~b 57"00-R-T,-,iEc:~6 ~Jti!'Js~ __., :_.,,-::: ~-. ~_E_-~D-,Df.l'AI~ Sl;fliEJ~ta._____\~-8.00 :RT EC~ 410+57.92 --occ,/<::no<::,',.ci?\ ~:\"1'•, ,·,.JQ[:\ 1.1\\~\\\~_.;,,,-i-iDR/W .-a-1TCE ~<_Q,-m· ~~~~r_i~:OO'\;_R-"0-'ECR~~1':i:_\1-,, ,v, ~-I~--------~ --~~•r·
-~-\ti---------~ ~/ I -~-----:::=:::== .
~~~c~~~_:__:__;; . '.-~ c-i~ ~~~ / • '. J ~
~~~i~#"~· i~~O~~""~u~u-~~-::::;'.'::'~~:jp'...:. ti;-. , , ~~~ -c ~--------;c~=• -~,=c;;;c_ ~~ "c~~ ~ . =---=~~ .-tr_../ D ?L ' d,-? ~T.. :½--' I _··=. --·;:r-;;; -, + l ---=---:=---= r= ii-~~~iii~~~-ij~ -:...v -' -...._ ~ -------O ~~~~~~~=~===~2'.I ~ '.;)~--lf-==:::,;z"f~\/•:.._•i/ i _ T -:__s ~ ~ _,,./--.--"ill'71' ----yi!~ --. -.~~ -·~-~ ----.__ --=----t '-r----=:e: ....._ ,.., • ,, '.Z.-~i:.0;;· ~-;.,:E·e -• ---A--1--="' :1;-=,:a-1 ---+------+-l7c --/----R'.:t).L§J~O'....R.:r....'.' -CR" 411+42::!S": ~---, -----=-·= ~ -l,JL._7 -=~-y;i '"':'.":'.::....+~;;; --+~.,__--t R\J = " 6, 'R-\,1---A; -'° , 1 _______ -_,.__~_.,__vr-_ ~ f----r-IT'f:"Ret W fil'. -TYPE A -PER SDRSD C-.:". ____ 1-_: ~ " '~="•-• ,,, " " • ',)' " ---,a::co 1-----R ., -AMP -::_ ]jYEE. ,1 -t1==\!1-..::;;:~~-1J 11 ,:,o,;d) R • , ~-1-../-.J.-......:.j[t-----,L.----;f---~,r--. ' -= -\I --\I ~,L---~---\I -- --11----r-\J "----;;-+ n-==i::r"JR~ R:5I R-SD G-,7 '---r·_g_SJC .. -le=, 6875, R=, ~'99. 1-0 / ---&3 I- -□ ----□ , I I • o2 •. 13_w__ 04-14-□ -□ --1Qi56'53" -mi-□ --□ --□4-1 .. □ i = w ,71A!4•5-1<1-6 7,-0 cr-□ ~ W
o +□ -□ -□ 4 , _ _ _ -Ct "EL GAMINO-REAL" _ 53.00' R11:_~'ECR" 4114-42.43 ,,. □ -.:E_ri~ ~ = _ _ ----'.-~---".~ ---''<----c-----\--11 -¾-----w..----'-c-11 __ [ND C..LIBB & Gfr, PER S0RSD'-,G~2 _ en = -',,-=----\---~----'<--11 --',---,..--11 ..\---¾---\I " _ -- - --Be~~MB1:IJG)ED fulOD-CURS-&'-cGtr--11 _ ____,_-; __ --'-..._ f.tJ --=-\J ~s:---=---1--'>sc------"s----1+---~~-i--~ \I t---tc==-\I -=->.-----¾ --\-----';c o-=E \ -c A K!llN-8-R-~---I=--'',---->c~ •1----G -~--G ',----~ G --"<---s~E""CON TRl:J(l'flON-0 -l'Arb SHE~T-:1( -G ~'=~\/ -;: ~ w w -~--=---c--~=----, -,..,:-____ G "-c---4''---'°E¾G -+--'<j-'-G G • -5"';3:'5[f=R,T~C .'" .. -4.1' +§"'. a, 2--G -~ (/) ,_ _ _ , _ _ _ _ s_ -~_. __ _ _ _ _ . . . -----~ ------Be§~6R!'v'ITI'cc.Ret W~b.L -TYPEA ~~-SDRS0-G-~ ~4-' ;);; __ _ ' ~~,L..---__ ----------~-::,!,_---J ----53.00~ITT 'ECR"-410,+.§e:9,3~ I ~-~=~-r::.' -== ---11~ --~~ -=isND=l;ljdl':lc'DDEIJ=MQ~R~Gtc-.--..-(.) -~~c --V 1~-f,~Mr~lltJ"t ":, ~~ I 15 ---~ ss-Beg~~~IB=c&=.G:ti'c=EleB-~D~:8[cG~~,~ ..._ ~54.22' tTRnECR" 418+11.90 \ ;;.' ~:8 1:;:s~fill~ 9il 95 11 ---= ~ , ~~--~ 'Beg-...T-'l'l;'E G7CURB & Gtr ,, llf~T,)'.PV~CURB_v&Y"_.Gf~~~~~ 95 11 ~
' -:::-...._ ~ 55 •• "\ \P~R SD,B.S,P G-2 = ffi _ ' [)::'.'.sW;'.'.fi[i$::filiRSfl/G";7~ _ 1 OD -o =--=, ~"---= ~ ::S,e.g, S~ PE:R, ?DRSD-...G, 7 -:I -/71/'~// /.7/, / / -=------H ---:::::
" 0:: ----- CURB RAMP _ TYPE A-1 ,;-1 CURB RAMP -TYPE A-1 11 PERs_SDRSD G-28 /. 1/ \I <( I PER SDRSD G-28 J
"' 1/1/ "' 0..,, A) • I , .. .. 0 I U)j ~ I 7 4 + 66.48 LT ECR A17+91.57 I Beg TYPE G CURB & Gtr PER SDRSD G-2 END TYPE G CURB & Gt?\Pl;~'/SDRSD G-2 \ ,cl ~ I Beg SW PER SDRSD G-7 END sw, ·J\ER sDRsD G-7 u 1 \/'\ 6\
✓ "' ~
_,,_
l.' b [El Ill
"
I
\
~
o· 20· 40•
~
SCALE: 1 "=40'
80'
I
HAS BUIL TH
P.E. __ _ EXP. ___ _ DATE
REVIEl.'ED BY,
INSPECTOR DATE
IMPROVEMENT PLAN: EL CAMINO REAL
SCALE: 1 "=40'
fSHml CITY OF CARLSBAD I SHEETS I
1--+1---+-1--------------+1------,1f-----t1------,1f-----ll ~ TRANSPORTATION DEPARTMENT 43 ~~T
CALL 2 FULL WORK>NG DAYS
BEFORE YOU DIG
145D FRAZEE ROAD
SUITE 100
SAN DIEGO, CA 98ta8 (858) 514-83?7
"?ROI' ESS I°'~ ' ,.'"I{
'.ffe;"' 11 -t' ;,~ ~ DANIEL NUTTER ~
"' "' No. C76641
.. , Exp, 12/31 /22 >t
.J'11",t CIVIL ~,~
• or c~c11 ~
' '
DA TE I INlllAL
ENGINEER OF WORK
DATE I INlllAL DATE I INlllAL
REVISION DESCRIPTION DlHER APPROVAL CITY APPROVAL
IMPROVEMENT PLANS FOR:
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY: CP PROJECT NO,
CHKD BY: MEW 6094
RVWD BY: MT
I
DRAV¥1NG NO.
DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
APN 209-090-11-00
APN 209-060-48-00
APN 212-160-31-00APN 212-102-75-00
Sept. 26, 2023
Item #6 Page 33 of 89
---,;;:;;;
0 0 al~ 0 .. 0 ro Olt--o.,-
"'1'· Biro 90
0 ,.._
+ '-
+ui olro 00 OltO
air--oro -<G ,.._
+.;: +· ulu OtO
+N
~i(X)
ro <D IX)
j:t"l
01' l()
0 G
cilro ....
-~l
-iro
+ui 0, IX)
:10
.. ('.)
Oro
~1: ~~~
Q
~J8 _Q
" "'I('.) ~I~
~ -
.. ('.)
OG@ (j: ~ ~1o
~lo
~l,
;::1 -0
90 ~lo ~t== ±= ~1 ;10 <{ 0
~lb
-"1 "EL CAMINO REAL"_ ~t==
r-C/1 C/1
m1 -I
~
-
--
~
BO BO
70 I I I I I I I p R-BFIL~~t~~~~~~*~INB-R-~A L I I I I I I OG @ RT ifC~ 70
\
-FG-@-R-T-TG----,---t--+----------+-----------t------------+-----------+------------+-----------+---+----------+-----------l ~· n~ i g~ o N \ g;; \ g,i .~ : : : OCO DV or---. . . • "LO \ ·I.() \ • • Os::t OU1 I I I
gl o. ~ _· .. ..;.
1, 0_.,,: o .. g:J g _tO ~-ro g ro g. g:J O . ..,: ~-o, ':? .. ~_ _ _ _ *-'.'3 ~--:" , , , • _ . d~ 8~ ~ro \ ~co + + .T ~f + ~co ffi~ ci~ ~": ~ c-..iN8~ g~ o~ ocolO ~ ~ • ·~·1,.-; c5· ---------m-er 0·1 a· 0 =-------~ "---=-q-tO ;t; ~--,.,.. U")--~ ,.... 0 ~-ce-~ ~ o·,.... d· ~ ~--:i~ ~-:r: I I I 90 90
~~ ~-~ BB% ~-o 64%___x_ ec5·6-% v1 0-:-2-4~~----Q.1-7-% v 0.-2-0-%-----Q,SQ.% ,. 40"6rc--~"' 1 04 ~-~-,t. :!"--~ ;;-: ~ oo +-ro ~-.rn ~---..J---t·-~2 : : :
o/ '-.,.1.Ztf7V o. o • o O • % 1.46% °V .. QA-~ ~~ s;;j" 8 t"") ('J C'J ;::;~ffi Q~-ct I I I • 'f"/o 0.64% V V o-O V OC) c., 'V W ..2. 1 1 1
: ----...... "' ~ 11/ x' ~ _::; a.50% .. 0"12~]=----'" I I I I so I r _,.,,--... J w ...J.1 V "V I"'--
BO
-----------,,,.,,,,. N r---, r . LO • LO • ~-_o,_ . •e_qJ_O_D,&s-C;"·o • • • ,;;1-01 f"1 vtO v('.j mco0>co N ~co • • •
I I I I I I I I I
~ ~ ~ '.::---"'! a3 ~ IN , :::r4 _J__g; [E :::: ,
f"')(X)NCO ~_J ~1:-QLLQ.)LL i +LL I ___,.L ~ 'I =---1-. •;:,I-· L ..-.. L T""" 7 0 ..J. c: -i-c: ! "-..i-u ' F'j 0-~ c:,-;f c'o 7 0
P·R-lJf j· LE : RI-IL~ b ~ 5~-t; ~r~
0 1 :
I " ('.)_
60 SCALE: Horiz. 1 =40
0----------+--------------<---------------+--------------+---------------,----------------+-----------Ver-t~1" -><'-' ------------0-----------------+--------------+----------------+---+------------+---------_, 60 410+00 409+00 408+00 407+00 406+00 405+00 404+00 403+00 402+00 401 +00 \ "' ' " " 44 21 , " " , ,, ,, (l\, A\\ 82.19' RT "ECR" 403+ 79.64 9o.63 RT ECR 410+ • , 58.00 RT ECR 408+61.00 74.08 RT ECR 403+97.92 '\\V, Be AC DIKE _ TYPE A PER SDRSD G-5 / "'106.00' RT "ECR" 410+31.51 END GRAVITY Ret WALL -TYPE A PER SDRSD C-09 END AC DIKE -TYPE A PER SDRSD G-5 ~ Q \\ g 61.92' RT "ECR" 403+ 70.65 \ I \ 15' Dwy PER\SDRSD G-14B 63.00' RT "ECR" 408+60.00 63.00' RT "ECR" 406+03.00 58-50' RT "ECR" 4o4+oo.o3 (f';\,P-~ 5850' RT "ECR" 403+68.55 '<;[ 63.00' RT "li:CR" 410+04.60 END SW W/ THICKENED SW EDGE END POROUS SW J~ END CURB & Gtr TYPE G ~~~ ~g~~g g=~ --f-. \---z;_ \\ END AC DIKE -TYPE A PER SDRSD G-5 />/ END SW PER\,. SDRSD G-7 Beg POROUS SW Beg SW W/ THICKENED SW EDGE END SW _ ~ \ Beg CURB & Gtr TYPE G PER SDRSD G-2 ' "Beg SW W/ ~10HICKENED SW EDGE SEE SD DETAIL SHEET..J.§ SEE SD DETAIL SHEET 16 Beg AC DIKE -TYPE A PER SDRSD G 5 ?J \\ Beg SW PER SDRSD G-7 ~
I _ _?~ SD DETAIL SHEET 16 _ _ .,--__ E~i~t R/W /~--58.00' RT "ECR" 406+03.00 TCE CURB RAMP_ CASE CM~ 0--(·~t\11'\\ CURB RAMf1/ ~ /ECR" 401+75.25 / / < 58 00\RT "ECR'f 410+04 60 -COASTAL ZONE BOUNDARY ll-11 END GRAVITY Ret WALL -' CTSP A88B ,,, /~, -'\\ CASE C /PER CTSP A88B ,t 38 O' RT END S/ " ,\ • , • ;. • ~c="2 ~• -~~ ., ~ TYPE A PER' S SD' CL· ' \ -----) I c> ~ \ ,-:; · ":./J I TCE ., . , / ~-/'------.[NO GR1,¥11'-Y~ebt WATL------~~PE'--~-k c.-c= y~r -o~,O"' / // E~llvl1'rdn~½'/ /!~///lh\J_\_\_11-1141~11-11-11-11-11,,,...rf 1,11)\:/-'<tn. __...A~-_,,_.~\,,.oo' RT\,,ECR" 403+56.94" " _[ (/ 53.00 RT END,?uRB & Gtr TYPE G • ~~ P8R-SDiiSD '9-9 -□ -=-~i~IL __ _i r--li-=11-11~ ~~'§1;~~//.L ,,!.,J // /, ///J. l-i !-1\.-!.11,~I 53.00' RT,"ECR" 404+11.64 / 'ti-l-ft:'1Y'<'A, .._____.:::_\ <~ \ \ ~~ ": PER SDRSD G-,,2 / \~~:~ ~~,-g__ ;.:..11-~1~1q11-o1·
1 ;
1 ~ "--58c00' R-l "EGR" 408+6 • l'F="!'====-U /-I_/ ,-,1 ½'~ hw;f---,11-f11f11/ V\ ) PROe_ R/w~J/?yJ<r/'IJ'Z(\\\, r., ~ ~~\\ L---'-':'..'._~ ---,___ 58.5' RT END Ls.w PER SDRSD LG-7 _ Exist R/W / l;i)J ~\'
1 11
'\" '\·1------= B~~~W_:Trnns~-. ,., . _. ~//1/Y-/...-,'l\io':'--'::-,.__ L c..:1~ \ -~ -'-/!r_'/j[kj ~\ ':'l.lJ~~\\__11 __ 11"-(1-11 II I.I-J.1=-l!::::'11 11 11 11. -=:£COASTAL ZONE BOUNDARY ....J. ~"-. ~ ,'::v , ......-"-(,,\ • • • • • -:. . ' . --; •• •:~' •• • :--;-;-',•.!~...,...-:;C ~:,__o.,.?J • ,,-_ ~-.~-•---;.•-~....,~ .'--,. •.-.· '• • ~ • ___ ,.~ _.__._,_7_,;; __ 1 • 1, I~'>.,,.•->--.....--~~~•:: ..... ~:-=---• ~-·•~·~~~ , . '7:\~.~~ ~ :./, I~., 1/ .~ ~--l 1 \\',_~-....._ ___ , , r:: -...._ ~' .....__ · A . T ='~ S::-0 LJ , \'-'-<''-' .' ·-•• '. .... "•"•"• • ., .. •• .. ' ~ ' ' v, -~ • • .. • ... · .. :. -c,_ , ,..---< • V,,~.~' .. "~~· · ,~•-"~ '',----Cell, '--~~ w:j-.'; -..._ )> "' ' • • • T •-T -I ~ /--=e ---.... . -\Jl - .,..·. _ -~ SC ~ \ 1•·~;=--i I ---/ -~\ r--,. ✓ / t:,· -~ -Ir +. ~ 1>"':1~.',.,.., ~\\ ~ --~-~ , _ _ -.. , . . •. -~ ,._, ··= --. -. 1 1 . _ _ ,. _ _ -_ .) ~ z """ _ c . _ 7 7 ~ 0-. -N --· ------'~-SC ,--=,r ,,-,,,c '"""'·"' ad.00' " .,,,. '"·"'" , ' • -J •J --· J • ~, ' ' ·> ', ' f I - I ...... '"'. + ~, w -w =r-I ', ' __:;.,___ '-,f:f " ' " 40•-• "'0 8 ' -~ ' ~ ' ' . e--'----" ' $: T ~,=:a =--~\-53_50' RT "EGR.'.'.__41-0+Q4f6nolJ R✓ EN[) S ,ans R,. v R\J B~g SWwTrans~/ R\J §8.QQ JC C:GR~ "'*'' . ~ . R\J ~ "JI/ '1l--R',/ R .. ·,',/· R',/ R',/ R _,, R',/- C \"'--~-: ~ = Rlt Beg GRAVITY R-et-W-A[L :... TYPE ,,,A -w -;;c5.0.00'-RT "ECR'.'., 40Rj60.01 »----;;, "'-53.50' RI "1:'CR" 4()6+03.00---....,f;;Q _END-GRAVIT.Yl'/Ret WALL ...,_";Rt_~ A_ ~\7 -\~ ~\--~ .. ~-~ _______.? {/) Z / 1, >-\ Po!R SBRSl'r:.c~9¥ <'t\lQ_EMBEQQ.E,~~OD CURB ~+< Gtr B.eg 'GtlAYITY Ret WALL -TYPE A -"---.. PER-SDRSD~09 \ /. 1 .. ~ %.,-'<_ , . __ c:-;, .. ~ -,,,, ~ c:-;, • c:-;, fTl fTl -_, I ;i;.o \\ , '66"''""~ R 3499.87 . 1, \I \ Beg 1<2tJR8';1& Gtr Pie.Es... SDRSD 'ti,, 2 '--.. . 1? v \PER SORSO e-; !'l?=ia , , --• \J 7 , ; , , "' , "°' " ~-,.,, '"' "' " "'-~ . ""'5,~·· "1 '-----------()'"'--"2"W· . = . fT1 -9t=', L )0 • ./'>.!.1, .1:.i W'. \I ~ ' 'w ., " ~ I ,-I I -, L ._; .J.L I·* '-,,I . ~ ~ {/)
1 ~ ' -, __ ,1 0 _fu_10·55'53" o 4CID91
'1, -~J ~ L"( 408 " " '40Y.~ ·\ILI'1 " 1~r•I406 .. :...~-.Jl'I 0/"-0405~ P o\'~~-=r~c@4 □ u'S,-1: □Jj--□ □403't1 1 ::11 □ □ ~ -=::.ro2 1050.890'----',[g_--;;;rf□ □ 401□ ~-□ :;:ff-□ {/) -I '.0 _,,m _1.\.-o 41() □ 1 o -□ 11 " " <> 1 -<>-./ v. --,-,, ::C )> \-----....\ --",/ _ u _u ,:::□-,.c ~□ =-□-°-= r'f-.-_ □ ~ °-= c/ ~ _ _,.,,_ ~" "/ " " ,....d'EGR-"--40~+§4.10 F>O+ ,., v1 '.I v1 \ --" --_ • " -, " '/ ---__./ ---"SUNNY CREE " 1'0+00.00 POT---0 _ ~ = -: \---~Ssiuo~R-T--"BeR=4-10"f:04_c6_o',/_ s_ -s_ ----=-·c--._-:g -_,[ ELCAMlN.Q_ftEAL □~~-□-=-□--=□--□---□---=--□--o-:9L_J-□-□1_5-□5-~5o'RT"E~~4'64+2234 ~~□--~~',/-- -I fTl ·~ 1,, -, END=€l:JREr&-Gfr~1f8 Sr1BSD-G=Z G c G-=-+ G , c _ _ G G G / _. -• --□-o--=-C::-1-0-A-~ Aj 1\-1-/'\ G)'.[:'C._,f\.~ () --=-..____ ',-B .Ji El'ABEDDED M ' C.URB &: Gt O r--l' '53.00' l'U "EGR''--40'6+oroo/ s s _...--' ,--__ ,,_ '--1 G :::, EN0~-Ws__T~ _ s _ s s D t.l~I.D-~JNJ_ l~~c-s-L\lb§ o (JI ;o -1~_] ey " _ ,<'. ~ ,,, ,.. , .-- = ~ • •-,
0 Sl:'ECOlll5TRI:TG'TI0N 0E'fAll::t Scll:'l:'i 11 -......__ sic EN19:::€0R~ Gtr l?E'.R=SElRSl'J=G _,, , , _ =fr3c00' RJ-"EGR~Q'1±6K8'1---, , _,, "-~ ~ 1 , , ~ueg MBEi00E8 MOD GcJRlil..c& (;tr= 1 '' _ _;::N[)"=SW W'/_ +HIGKle'Nle'Q=SW EDGE; ~ c ' ., ~
~ ----------'\ 1 _ \ ~5'3.50' R'f "EGR' 'Q8Cf61J.00 ,;;<:i·sEE CO~STR~GTIQN· ·E>E:TIAl=c:Sl:IEE'f 11 ,~ __I;_ -=r--iz;JBi,G t.W' E~R SBRSD-cG--'7 -$ --:n :~ _ l::GR 4·10-t22.87 POT ER SDRt.D-e-09 ~ ........ u, -+ _ _ ,, . =" .. __ . 1:,__ 0 cc..----:'_1_,, ,, .. -;,c _ \ ::_,.,.-;Beg GR&YI_D'-Re\iWAtLT_-.1 YPvF~-A, 0 .r ~----'' 85 ---B~W +AF'l::R -x o' 20' 40' 80'
+ \ = "DW¥ 41-0+23" 1oaeee.ee-=20· ' -v, ..._.N , _ F _ , ,_ L aJ,Q_l'.):-1R'f _EGR'7-,t,04ek6-9 .8_ 4 cf (.JI -90 --~" ~( _J -......__~ M_ • Y,'J ·_...:---;:z -"" -lei'ID~g~Rieli) s)J:~.f.l_g,:'e_____i;!glilc"":£t _ -u, ~- 0 --~ ~ --......._ 11 ,,,,.. rf,1~ ~ ~ , ~ -eo'::eiJREb~fre:PER'BBR lil -2 w -:=::::::-:::: ---+ ::-f:
-:RE0.GA.1E=MAIEB0x= 9:o "--= :_::-..., ti'-.... fl /jJ~ 95 -~ 9 _ --...: 1/ II_.... '"'~5,.,:;Rcl-...!'.i;;'G~TQ,R4 , ""-, ---+ A ~~ ' -......__ 1, ,,.,,.~ ,Ill//~ -~ ,.-1/ ,; ~ ~Be~_:f'/?RA•yi'f-Y Re.cWAt:~T¥~~ -~ ~ ~ - °' /; PER SDHSD C-09 ......._ ~ - -,c I /,
i}
~ ~-~~ --
g-------= =·
.5~
-85 ~
SCALE· 1'=40'
I
HAS BUIL TH
//
\ I 11 I d P.E. __ _ EXP. ___ _ DATE
REVIEl.'ED BY,
I INSPECTOR DATE
IMPROVEMENT PLAN: EL CAMINO REAL
SCALE: 1 "=40'
fSHml CITY OF CARLSBAD I SHEETS I
1--+1---+-I-------------+I-------l1f---------l1-----,1f---------ll ~ TRANSPORTATION DEPARTMENT 43 ~~T
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
145D FRAZEE ROAD
SUITE 100
SAN DIEGO, CA 98ta8 (858) 514-83?7
'?ROI' ESS I°'~ -"-"'l
'.ffe;"' 11 -t' :,,~ ~ DANIEL NUTTER ~
"' "' No. C76641
-.\ Exp. 12/31 /22 >t
.J'11',t CIVIL ~,~
• or c~c11 ~ - -
DA TE I INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE I INITIAL
DlHER APPROVAL
DATE I INITIAL
CITY APPROVAL
IMPROVEMENT PLANS FOR:
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY: I PROJECT NO. I DRAV¥1NG NO.
CHKD BY: MEW 6094 DWG 529-1 RVWD BY: MT
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 34 of 89
66 68
65 67
64 _Lt,J
...J 66
r-------r----------t---t-----+---+--+---+----+--+----+--------+-----jL-a--------l N 0:::
~
63 -..,·r ID ,. 65 -~ =:j (1) ,J et:: I f, ~ I m TN ~
o m '<I" a_ ~ ~:-a:i t.)
~ V N I") ~._?'!co +:2 __
D.... ··1 O N D.... c--,j -<r.. ..... .....J <(....., ~ -s:_ro_~ Ir,,"\ lO lo.n C.O ~-~ C.0 _ 0::: £~LL 0,!"1-U CJ 62 j <CIIl1--' "'-' -: a_ m·+·' -' 64 ,..... a::: • d-__'¢ u..1-• u._r O:::LC1 ~ ~ ::?::m a::: m ~ ,:.... a_ ~-~ N_Xcn ~ Xi-"1 rn ""+--......_ <i:: .... <r: m _J ~ ~ I I n r---~ ~N QJ+'{. +ooQ +r---x o::rt...i-a:::~ a:::(O~ U-.;;f-1") ~ a:::: LO -'-D-1f.> ---co-!R--co--r-..-~ ::::J -G-cn--~--,-,-lfl © ~ G I "" ' "' 1· 0:: V ::, N ...... • I • ..----• LL I"') ,r;f-0 '"" • 9. <:( ,, I ~ -~ ~ ~--~ -r1 I_, -~-~ u + g __ ...t-g ~ ~ ~-B ~: ~ o ~~ ~ ~-~ !-~ p _3_53% LL l~__J ~~ o:::_t_1::' 0~-~ ~-~r~Q-~~<C -~--~-J._-r-n~P~ :z;_t;P ~_;i'._ 1 __ f2..:!_~ G@. HI IC_/ LO IT) HO~IZONTAL DATA TABL~ I wtllC:::< v,o ~~:!; ti~'S-. 0a ~ I-63 .;.mw, l<c~ J-•-r--1<[, I I I 1--' '"·:·'VLL~;~~~~r·~ ·~~~~~~·L;~~;~·.· TO•;L!;;·~:RB ---~ '_ L:nc'w 1-2--(:2~~~J~150%ffic;~-c-,-I ~~ I -17
~
,.n
-
· ·e---Exist-Te-----~.;,,;;.,,,,,,,~:__-l-------------l-------------l-------1(1') ml~ 0~-[9Ll =;;Jt2b I I~.vv,~ 1 /. I I : I ··-~·--·--••... I I ~ __ , I -. ---1 -~ ...... , I , I I I·-• 60 -w 62
. '
-
)
-
_L 4
-
N63"2B'o2'Jw I - I 2. 74' I BACK I OF WALK
fJ
re.I 5 09·2o·ssr 1 15.oo· 1 2.45' 1 BACK I oF WALK -
6 28"51'53'1 15.00' 7.56' Ret CURB 1
I ; I ''JVV l~\dFIL[__ _ I I r=c_ '°' ~\c!l::'\Q l::'\F\IVlr= I I 'I 04"51'47'! 29.00' 2.46' Rei CURB j,,J_E; J,~0-~ILE T'riPE A ClJ_j;:_E3 j;:A,_tJj_D •r~n,.n~n '""" I I 8 I • •• I • I •• I : I I II "Fnna nnnl •1c-• ,· I I 61 ""-'-' , , -,..., 1 ..,...,, vv ,..., ,_,...., -_1,,.,~_oc;n_vu'F"' I 1 • ,,._,, i'-'' vvnu --··-•• • ·" • I I
--· ·~~-~~t·:,_;,_
1 _-1 i I R?•_"7'??'i' ?.~ nn' ' ?7 -""' J:IAf':I( In~ WAI k' • ....,...,,......_._. '_'.:::_'tL. _;, __ .... ~--------+-----------L' _____ J, 59 -
-
8 58
418+50
I
-..___....--
C
._____/ I
I
I'---./ /
I
I
ver. , -, • ert 1 =1
.
C
418+25 418+ 00 9.08' RT "ECR&RCD-NE" 417+38.35 417 + 50 417 + 25 L ~ V -£/ , '1"" : 1(1~'/' ~\ \ \ ---~ ''°'~
I v ..,,__ -
60 417+00
£__I" "/ w • I "ECR&RCD_"NW" 418+24•13 L 1,,, ,..---.._" '"" NE~CLJRB "P,LAN -TYPE A CURB RAMP MATCH Exist \ 0 , )--------~==~====::;~:!:,:!,~'-/ '--t----'s\-·\--\t--'l:J'9 //, " ~ PROI R/w / FG 60.47 {/41 1 ( , I, rl .. ) I CD '" o.-69'-lr_:~GR&R~--NE~;~+~4~;~s--✓-''-"--= ' "/r,,,1,• , ' ' ~ .. ~~:t;.c~.;--_N5~· \~--"
Dr
\;
TC 60.97 FG 60.44 , 0 ~ \ , ' . , . -
\ '4 MATC\
1 1
xist J::i; <('-+--~ rEeR&RCD-NE" 417+44.17 ~~ !::>'·.s. \_ ;-PIP Exis} / U~ ~--17 I MATCH EXIST 1,,, I --._ , ,<:-J o_.,. " ...._ TRAFFIC SIGNAl 8.43' LT "ECR&RCD-NW" 418+20.05 Z U) ~~ ~--7 I . ()() ';; ~-..... ,........ -_ _J__ PROz'OSED TRAFFl~GNAL ~ (FG 59.98) I ,,, ,,, ~ POLE .I / .., ~ (fG 60_73) <( I 2J • .· -'~o <o SEE SSET. ~ MATCH Exist .A / I ~~ I • ATCH Elxist 0::: ID:::'. ~ r100 \' Exist Ry.W / I r _....F7 .:: ,_; v_.s, ooo❖o LI (> /~,.__ ~
FG 60.37 FG 60_ ~/4---I 1 "' -----
00 06°0° , ~• • ~ , ' '°'
Ex~tRfe ~~~ ~~~ I O f ,___ _
~
E ~ --_L -+---+--+-+---+--11-----\---11 t_+----~,'-,P,ci:T re ~ -....____ ---r -FG 60. -. _ = , \ _ _ ~ --'-c---\--f-1 - ----- ---'-------i-----\ --\ I -I -u,---~ -~/'11,.,t.--;7'.at,"""'.S-.s!, /) '-.... . . /) 4o00% ------7 • /4--os: :,,.-"-c-;v=~S--,<7'-,.., ~t..f'.,,~~; -, ------T --j-+-+-T -""rsc1---\----+--+---i----+--+---+----+.-=:='.---i:::=t=~~-=====Ff"P.Te~~ I ,~--J\.c • ~ Im '·PG'60n4 :Ji(. . 0 '\,.' LI j (H'Gl60.6()) '-~ '-~ -' F'(,T62cl2-)r-T T, __ /)6T·---'~-~"-,,,;,'-...c;-Y-.;:--A+--• I> __ _:·~~· ~- -T r=--i\ , -:.'.. r • I I '; 4 , • I /I A l:CH Ekist L--~ -"' I ,. T r r -=ca=i~F'~....,-----_, ''sJ+f:; ~ .,. . "ECR&RCG-NWi' I u l__J ---------------------------LI ---::::::: ~ ' • o 60 84' RT -; '"' FL gil.25
j;_ I ~\ ~\~cc LI • __.._",-, . . -~~~,;t4~~NO REAL" FL 60.57 < /z 1-· ------1'.l-m-. ----,,4-----f-..Jc:_'---Ll------j/)~-'t--;'-----~------c__J • ' ~i '-\j> ~ .2
1 L\\}·----------~ LI TYPE"C CURB RAMP \ ) "' LI D &, = • .,,_c:,__-~ .
1 PER 'SDRSD Gzi29 '(> /) /\ LI _________ _ __ ,
--'-'-~ -I '""' tJ I. µ ~------------------"-------
7~ /) . ~ . \ j_ _____ , ________ ]> ____ ---~~------r----------------- ----- -----~ ,------,, - ,__"' -;;-ECR&RCD-NW'' 418+5~.8;--~ '--....I', .:: --------T --t----T ---+---;E_c:f1t!~°s~9N9E~T ----T ----T .--···.
MATCH Exist I I --='= -...,__'sc--T ----T -+-+----T --~-T ~.<'.---T ---1-T T 64.00' RT~_ --------T-------Mi'I CH Exist ~p_'.;J~'.'._E1R4~!::Nwt:lii~µt:::==!_T~===\ ~ ----T\---7"''---T ----T -"-n·'--GR0SS-61:J'T-TER--T ----i;,-----7"-T -"1:'LCAMING RE'A[' T T T r (FG"--59.52) \ ------::-T --i---T r T ----+ REPLACE IN KIND WITH 417+25.93 IL-----------',! -~1~--f-_- MATCH Exis.----+-.J---T ED TC-AM-IN-e-~t'.AL AND 'R,ANCHO I ARLS. B-A--0 Dr RAPID SETTING CONCRETE TYPE A ql{<B R~~~ ',/ "°' ~ , • PER SG,B.SD G LU ~-----------7-----__ _J I REVIEl.'ED BY• \
_\
o' 25' 5'
~
SCALE· 1"=5'
10'
I
HAS BUIL TH
P.E. __ _ EXP. ___ _ DATE
,., NW CURB PLAN -TYPE-----C CURB/RAMPl EL CAMINO REAL "---------------,, _____ ,_: , "ECR&RCD-NW" / -------',/ ---------------Q INSPECTOR DATE SCALE: 1''=5' ~•
-E E }' ',/ ~ " t---t----+------------+---+---+---+------11 SHEET I CITY OF CARLSBAD I SHEETS I ~ ~ " ---------------.:: 1-----+--+----------------+----+----1----+------1 7 TRANSPORTATION DEPARTMENT 43 <-.,_ ______ \ ~ --<:--~-~"-----;-------T--------T----T----T ----+T ~1------+--+----------------+-----+--+----+----1 CONSTRUCTION DETAIIB FOR , --~ ~,, -.---'--'------~-----'--------"----~--~;;::_----'---+----+--+-----------+--+----+--+-------1 EL CAMINO REAL _',/ l'-P!""'..i~ll == -,__ -_ --+-+--_ --1--t -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ -_ --+-+--_ --+-+--_ --1--t1--,__ -_ --1_;-f-------1___. ROADWAY IMPROVEMENTS
38.00' RT "ECR" 418+26.67
(FG 60.09)
MATCH EXIST
""li DOKKEN 1-----+--+----------------+----+----1----+------1 FROM SUNNY CREEK Rd TO JACKSPAR Dr Ii DANIEL NUTTER 1----+--+----------------+----+--l----+-----I APPROVED: HOSSEIN AJIDEH CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
145D FRAZEE ROAD
SUITE 100
SAN DIEGO, CA 98ta8
No. C76641
E N C3i I N E E R I N C3i -. Exp. 12131122 >t 1-----+--+----------------+----+----1----+------1 ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE DWN BY:~
'"~?~ c1111L
1®_,..,. DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: MEW • or c~c1 ENGINEER OF WORK REVISION DESCRIPTION DlHER APPROVAL CITY APPROVAL RVWD BY: MT (858) 514-83?7
PROJECT NO.
6094 I
DRAV¥1NG NO.
DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 35 of 89
66 66
65 65
~
I 64 I I I I I
z • I I n ~ I I ••
l r. cri . ~ ~ l • u• • 7, -z -• • " """ ,_m •
0 .~.- ••. ,ac• •• ,.-----z. 0 CZN•• I
•• o • • +o , ~ • .~ •. " o ••a • " ~ • + • • I
' u<"I o•" <-<o •••"'" u•• <O -• h _7•"'" 7
w,__.s p~ o•O Coo nn00I c•X-• o+O o"'LO-Co' o,< '
I
'
• «•• •• •e o o"
•
2 +-• ~• • o•a o • • -•«><•
O<C <.0~ ul· ~ci o::o
•• ~• Z e u ___ , o £ -• -+ o • • • + -o + -• • e u <
----+
±!Ull-:::,~Lfl ~~~ ~c<t:u~ Oz.cw u<" _oC ,Z ,,.oo!c.s ------ -• •• "•e < ---•-,- "-65% r" e•-o+ ••• c,
0 • SI □<" -B• a o<U ·~ -------"
e • e • _ u z ~ e ,. /.
~ i ~ o~~ -~;:::--=> I"'" ,c ~,u< -~~ ,,,, t,<' I ,'- 7 --....!_65,; rn (f) e-rn (f) ~ <l°'"'• ~ I 7 -; en e..:::. rn (f) ~ m ti; 2.___ ~ 10'1° / -..:_ ~ "'. ',:,..--c:;,-,, - 1--------I ~
I ----------l
-'
I I '
'
l ~ ' I '
, I ' I '
7 ' I
63 63
62 61
62 61
Zr
60 60
59 S-W-T-C-8 e_oi:=::ILE l-Y8E A-~ CJJ_e_a e-AMP SE I~-Oi:=:: IL [ I'i8E A.=.l CJJ_e_a e-AMP 59 e-------+------------+--~" CR&JACKSe.AR-S_W" "Er:R&JACKSe.AR-S~_" ----+------------+-------------+-------------+--------1 SCALE: Horiz 1 "=5' SCALE: Horiz 1 "=5'
'i'ert,·"=1' Vert l"=r~---+------------+-------------+-------------+---------1 58 58
418+00 417+75 417+50 417+25 417+00
...
EL CAMINO REAL
(FG 61.98) ~ ' ~
/
\
5.50' RT "ECR.&JACKSPAR-SE" 417+22.34
MATCH Exist ~ ~-=======
- - - -~1
5.50' RT "ECR&JACKSPAR-SW" 41'7+94.56
(Fq '6Q.06)
MATG:H E~ist
~
"ECR&JACKSPAR-SW" 417+94.56 "'. / .......... .._.._
I
rs
J I
<:
I
0 rs
MATCH Exist \~ -....._._ \
~~~__,___I ~_J_' ~---,-.. \ J .:
~====~~rA--1-1",,,
TO BE REPLACED ~ 1-.. DLI ~\ "'j/ , TYPE A-1 CURB RAMP PER SDRSD •G-28
7.50' LT "ECR&JAGK-SPAR-SW"-4-1-7-+94.56 "'. C_1__
0 >~ ~, ,r, ~• ' / i--7
\
(FG 60~2➔ . ~ [). ·1oJ! , "'¾ '/.,.'?0 ', ,--i r-7 1
1 (TC 60.42)~-.'::::,,J,.. /. -~ ··~ '-.
END ReLCURB PER SDRSD G-01 ~. ~~• o0o~o a ~ '-.
MATCH Exist A 1 o0o0o0o0o0o00 . ,
-,· 00000\00000 -, 6' '
. ---,---/ 0000000000 . ~ ~
0 HORIZONTAL
NO. I DELTA/BEARING I RADIUS
38"43'06" 35.00'
2 N27"40'15"W -
3 N22"39' 42"W -
4 N16"21'04"W -
5 35"52'16" 35.00'
6 N65"12'00"W -
7 S72"24'04"W -
---. _/ --J / 1 ,°
0 o
0 o?o
0 a
0 o0 "' '· I I I C
. I ~ ~I ''-:fs~q~ c9,,, '11 // 5.50' RT "ECR&UAaK0,r-m, 0n "Tl IT/U.~V Exist R W -.... ~ &• '-. '..::: t'?~• ·6'~ ••. ~ ~FG 60.29)1 ,~ ~~• , • ~ \ MATCH Exist
7 ~ I -I I
G 60.36 '-s! ~'s>.'-.'.7 '" ~"ECR&JACKSF/AR-SW" 417+10'.90 TC,B0.58 .'.'s,.~ «; 0,
01 ~ MA CH ~xist I L_J /
~ ~ :{6'.:,_ 'Q:~/PIP Exis~RAFFIC SIGNAL PULLB@X
3'-~ ~ ... ~:t , \~KPl~st TRAFFIC SIGNAL POJE
A Ig 6
6 i'6
4 ~~ \~~ {Fbo·~;~&jAeKSRA\iS\W"--417',--7(:lc9n
' \ ~6~~ C
EL CAMINO REAL AND
SW CURB PLAN -TYPE
"ECR&JACKSPAR-SW"
SCALE: 1 "=5'
\ Beg ... Ret CURB PER SDRS.D G,01
MATCH Exist
\
rs~
N,
JACKSPAR
A-1 CURB
Dr
RAMP
,:
I
~~T
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
L
0 Q'.':
<(
o_
(J)
~
u
<(
-:i
1450 FRAZEE ROAD
SUITE 100
SAN DIEGO, CA 9210B
DATA TABLE
LENGTH REMARKS
23.65' TOP OF CURB
9.91' Ret CURB
4.05' Ret CURB
3.86' Ret CURB
21.91' TOP OF CURB
7.32' Ret CURB
10.48' Ret CURB
/
,:--"' 5ECR JAC.8 AR,-SE" 417+22.34
MATC /Exist
//'
/
r£"' -~ /// -./PIPI Exist TRAPF~J POLE
g&JACKSPAR-SEi" 417+32.34= 11 <b # I"\ z'. / \
66.91'\ LT 'iEL CAMINq> R~AL" 417+38.92 . 11 • • . li'IP Exist TRAFFIC SIGNAL PULLBOX TYPE A-1 QURB RAMR PE\R SDRSD G1 28 o >, -,,...-..,, • • . . . .-~ I / ~s0_.,,,. -c> -• . . .
'° I "-.. ~ • ,,-6' ------
~ \ <:\ • •• t11Y <
6 ..? •
0 °
0 °/ ;so>. )
4 ~ v,✓,, CT "ECR~ACf(,;:::.~~+2085
N /y co: (FG 62.~5)/ .......... /
/ '---~ 0, lcs0 __ (-l:C-62~55) ....-
;o
<: / • . G· e1g ]Ret CURB Pg3/SDRSD G-01
/ _,.--,-0 ~ "~H Exist..,....--
/ 1..1...--O FG 61.97 'j.........--....-
7 I 11 TC 62'.47 ';-;\--,-,-J
I • 7/ \ \
;o
"
..... .._ ,fl FG 61.91 \ \
\
~
o· 25• 5' 10· 1/. TC 67.4 \ \
p; I 6 \ '
/ Exist TRAF IC ,SIGNAL PUL~
5.50' RT "ECR&JACKSPAR-SE" 417+44.25 ~
SCALE· 1"=5'
I
(B6B) 614-BS??
(FG 60.33)
MATCH Exist
"ECR&JACKSPAR-SE" 417+\44.25
MA TCH~Exist
<:
I
EL CAMINO
I
Ii TO BE ADJvSTED TO 33ADE I\ \\
1 (
7.08' LT "ECR&JACKSPAR-SE"i:417+44.25
I (~g ~;:~gl / \\ I \ ;·
, END Ret C,URB PER SDRSD G-0•1 \ \
MATCH Exist
REAL AND JACKSPAR Dr
SE CURB PLAN -TYPE A-1 CURB RAMP
"ECR&JACKSPAR-SE"
SCALE: 1 "=5'
/
I
HAS BUIL TH
P.E. __ _ EXP. ___ _ DATE
REVIEl.'ED BY,
INSPECTOR DATE
fSHml CITY OF CARLSBAD
11----+1--+-1-------------+1----,1f-----t1----,1f------ll ~ TRANSPORTATION DEPARTMENT ~
~
·?\\Of ESS In.~ . ,.'"I{
:ffe;"' @
~ ~J
@ DANIEL NUTTER •~,
No. C76641
-I<\ Exp.
\ ,J'.
• ~>"~
. ~~
12/31 /22 ,..
CIV1L ®_''<;
or c~c11 ~ . .
DATE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INlllAL DATE INlllAL
OlHER APPROVAL CITY APPROVAL
CONSTRUCTION DETAIIB FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING ~ANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY: MC PROJECT NO.
CHKD BY: MEW 6094
RVWD BY: MT
I
DRAWING NO.
DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 36 of 89
86 86
85 85
I , I
J
-l.t-1
J I Q O <0 Q
c::: Q_ ~ Q_ t') ....: c::: ~--2~00 ~~ _ o
84 84
<( • ...J r--0::: N ...J m-a:: ,-..._.._ Q_ oo '° Q_ .,.,, , , I +'--::;; oo n. _ ::;.,, m+'--0:: _c::: __ fg • .,-:;; <(-.;, N ::;; <O 00 ~ ~ 00 <C1~: ~ l<l-~-~-. ::::) ::J O • 0::: • "'! .,-_ n a:: b ...J 00 ::J O . _, 'cl nv o~ "'N o:'oo...J r--LL LLU'l;,i UV~ ''
00 LL-o, Oo, o,LL -+-~. o+• C<( •
s,<C
0 +....: -, • Cf"-a::nr--noo ,n-u '
" f---< v 00 v 00 0::: n 00 ::J O -:ls·-~ --.,.,--,c.-~C::: I Q •m-'S o 0 oC O<N O<o -0 B?
83 83
W ~--,. -st...J U-stN 00 J= LL I ~ ~ LL 00 ~£ <C'-.. I:: <( '-.. -<!~. • <l z ,-::: u ~ , ' ~ II< ---.:C.'o~ ma:1' om -ZC u em -• ~ ~ II< I
S? -cc • e, ,c Lie_ / ~~ , ·"• o~,x -".-SO> '7 ~ ,c ,._ 1 "--"--RL3£
i CO TCJ '
u "'" I-m<DO
W
-N "
-oo " w +-= ' 81
"T" vu ,_ ...... 0 I-_j_
•-~ st ' I ,_ · I --~ I i '
4 , I i
" f-I
I l w (/) .l.
m ,
co .u.1~-R
I- m ..
~
'.0 .-:: LffOCi
+u
I
;-,"')-1-
'I')-
,c;>
<(
80 w- 1-!-
w
(/)
(/)
79 1J-W-1-C-E2 ~-OE! I ~ CASLCM-CU-~-8-l--~-AM P lSE-1-C-!=2 ~-OE! I ~ CASLCM-C-U-lfB-~-AM P e--------+--------~• CR&S,Ul'lNYCBEEK=N'" "RCR&S_UNNYCREEK-s~•-• ----+-------------+------------+---------1 SCALE: Horiz 1 "=5' 1SCALE: Horiz 1 "=5'
v'ert-r"=r I vert-r"=-r-~-----+-------------+------------+---------1 78 404+25 404+00
t£:_
-z_ -z_
/
?J-(
0-0
?J
~
~ 5.50' RT "ECR&SUNNYCREEK-NE" 404+17.34 1 , .
ts
FG 82.54 PRJP R/W
TC 82.54
_ END Ret J _ PER SDRSD .:!._-V _ -+-___,_, __ _J_ -l -/ 7 I re 82!52 /7/
------
7' I 10,3' I -1W
--✓
~ ------ ~ ~ , I \ I
~
~ ~t I ~ _ .2.50% I__.¼~, 0 o\o o o o o P ;; ,
0-.--------:---L(} ,n 1,.o ooooooooOO • • ~, -booooo~o V 0~~ · ii{ 000
000000 ~ "ECR&SUNNYCREEK-NE" 403+98.36
N LO D 00000000°
--------~~---~ ~ ~ooooo•ooo o
~ ----
---~ [j
-------_ _/
0 0
~ ~
¼
"ECR&SUNNYCREEK-NE" 404+17.34 I ---------
FL 81.88
TC 82.38
Beg Ret CURB PER SDRSD G-01
'---( 2
"ECR&SUNNYCREEK-NE" 404+04.35~
54.73' RT "EL CAMINO REAL" 404+04.64
CASE CM CURB RAMP PER CTSP A88B
-
--------------~ 1 I
T \_ Exist R/W T
L__,
T T
7 '-) HORIZONTAL DATA TABLE
NO. DEL TA/BEARING RADIUS LENGTH REMARKS
1 S52"31 '09"W -5.71' TOP OF CURB
2 50'42'13" 15.00' 13.27' TOP OF CURB
3 S52"31 '09"W -17.32' Ret CURB
4 50'42'13" 15.00' 13.27' TOP OF CURB
5 N52'31 '09"W -4.71' TOP OF CURB
6 N52'31 '09"W -16.32' Ret CURB
403+ 75 403+50
t£:_
-z_ -z_
?J-(
0-0
?J
~
~
\ \
V
\
\
\
-" £
/
~
I
\
\
£
Q
stR/M
-----
7 --FG ,81.71 --\·--
PROP R/W \ TC 82':'2·1~A \
\ 10.3' ~ ~ 6'
I ---
5.50' RT "ECR&SUNNYCREEK-SE" 403+52.23
FG, 82.16
TO 82.16
Belg Ret ~RB PER SDRSD G-01
"ECR&SUNNYCREEK-SE" 403+ 70.21
FL 81.67 \
TC 82.17 \
END Ret CURB PER SDRSD G-01
4 "ECR&SUNNYCREEK-SE" 403+64.22-
54.73' RT "EL CAMINO REAL" 403+63.94
CASE CM CURB RAMP PER CTSP A88B
I/ ' -~ ./ -....._: ·,
o·o-o·o~~uouo~o / >
o00°/},ef{i_oogp%o 0.45%
0~000000.0000000000000 • ~i
"'-"f00oC!oo000o0ooo090 0
~~,..,0oO,o0°0°0°0oo°o9o00o O
oo.< 0000. o -,
~qooooo09Qooooooo N
~ \ 000000000
~ 0000
-~ ' ~
\~~-- ~I • t>
f\ > •
\
~ ;; \4 \ ~Z! ~
~\ "ECR&SUNNYCREEK-SE" 403+52.23
\
_________ ___i T -'c
T
T <
~
o' 2.s' s· 10'
~ I
SCALE· f "=5'
HAS BUIL TH
EL CAMINO REAL AND SUNNY CREEK Rd
SE CURB PLAN -CASE CM ICURB RAMP
"ECR&SUNNYCREEK-SE"
SCALE: 1 "=5'
P.E. __ _ EXP. ___ _
REVIE'v/ED BY,
INSPECTOR
81 80
79 78
DATE
DATE
EL CAMINO REAL AND SUNNY CREEK Rd EL CAMINO REAL fSHml CITY OF CARLSBAD I SHEETS I l---+---+--------------+---!-~l---+----1 ~ TRANSPORTATION DEPARTMENT 43
NE CURB PLAN -CASE CM CURB RAMP
"ECR&SUNNYCREEK-NE"
SCALE: 1 "=5' D~~T
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
1450 FRAZEE ROAD
SUITE 100
SAN DIEGO, CA 921□9 (B5!l) 514-9377
. °?iOfESS/@
rt"' '1el " ,~ j DANIEL NUTTER ~
No. C76641
.«\ E,~ 12/31/22 ,;
.J'?fl't' CIVIL ~,"t-.t,
• OF c~c'' ~
DA TE I INITIAL
ENGINEER OF WORK
DA TE I INITIAL DA TE I INITIAL
REVISION DESCRIPTION OlHER APPROVAL CllY APPROVAL
CONSTRUCTION DETAIIB FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED:
ENGINEERING MANAGER
DWN BY:~ CHKD BY: MEW
RVWD BY: MT
HOSSEIN AJIDEH
RCE 75991 EXPIRES 6/30/24 DATE
PROJECT NO.
6094 I
DRAWING NO.
DWG 529-1
'
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 37 of 89
Q
Q
Q
Q
Q
100
90 80
9+75
I"
,(
I"
,(
D ';N-'r'-----£Cl=l~[)W bi:-
I WIDTH LENGTH O~IVEWAY STATION L/R SURFACE (FT.) (FT.) TYPE Gb-1-,i.o
N
4-10¾-23 -r5~D•-co
EL CAMINO REAL " ~c---'ITDO <Xl
<Xl
u > (Il
NOTE: 0 -<D "' 1. AC DWY SHALL BE 3" AC/6" AB OVER 6" NATIVE r<) cci O"l
SUBGRADE COMPACTED TO 95% RC. <Xl
+
2. DWY LENGTH SHALL BE MEASURED FROM BACK OF SW. -
0 " - ;~
I v N
u ,.... v <Xl
"' f--,.... I') <Xl
<( r<) I') <Xl u :::;; <Xl <Xl >
_J u w S:2_ rn--;,.
(!) (Il 0 (/) ~ 0
-0 0 cci 0 (!) 0 0
"EL CAMINO REAL" 0 r<) <D ~
·~ cci "' <Xl +
-------
/,,,, <Xl LO co 0 410+ 22.87 '? c,j + + -
~r
0 LO 0
- -+ -/ 0
0 - 0
/ ci \
0 +
/ V 0
-OG -J/ \_ v
----- ~ 6 ,'1· 2.00%
--------2.39% 9.
10+00 11 +00
PROFILE: "DWY 410+23"
/4 CAMINO REAl'
I
D
I
D
[x;
m
O"l
v
'
,(_J
<C
w er::
0 z
\
~ u
" ,(
" ,(
SCALE: Horiz. 1'' =1 O'
Vert. 1''=2.5'
!I I' l r ~
I I I
I ill
, ....
{ i
,1
A
"
;--f ~
>C = \
/ I 0
= \ I a
UYYI 41U±L.)/ IUtOQ 4:~
~~,"' v/10~~
cr~~
~/ _,,-.::>
.L _.._
I ~ □ ....... ,_, ______ ~
100
-" X
w
u f-
<(
:::;;
-I')
C, 0
O"l • <X)-O"l
<Xl
u (!)
c'.i 0
0 0
LO 0
r-') (0
0 0
+ +
--Exist R/W --
90 (0.83%)
'-o.83%
80 11+25
I
7.50' LT "DWY 410+23" 11+06.00
OG 89.12
MATCH Exist
I
"0°wY 410+23" 11+06.00 /
OG 89.03 /
MATCH Exist ,,.-,,.-
1 ~ I ,,.-
/
I ) ' \.1\1 \~ '/,__......,, I
re: \
i • ,_J \ 1 \\ 7\ ,,_ .... ·" .... , ;, ": 1.:: . . . r I ;,, ';I lw • . • I I /) ~ ~. _,,' • . . v· • -•o • ,
0 -"'-.ti---"--A I 111 11 1 ,~" •3 cl' _,.
0 ' C•~ , C ' T I ., "' -<1, / A -a , ,, 0 ,>
,( DI 10 00 I N3 67.231' I ' . . i ,,✓
V / PARCEL LINE
OG 89.00
MATCH Exist
I"
I I I Lf i:-✓ __ :
"EL GAMIN© REAL" 410+22.87 POT=
"ow'\' 410-tf23" 10+00 od POl]
I I I I N 19982p6.08,
" E 62441r3.5i
,( I D
I "
I
o· 10' 20·
~
SCALE: /'=/0'
~I~
~ D V
1□
40'
I
,(
,(
I ·"' I \'<
" ' ,ef
,c "'11~ ~
"' • DWY PER '("" \ I
\ l -/ . /~~,S[) G-14B/, \ •• _/ / ;:-
" ,(
"'
if; 1 1 /. _ / i _ I
1" ~1' / . 1
o, ....
(
\l:1 .jl~ I /
PLAN: "DWY 410+23"
SCALE : 1"=10'
-
l
'
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
145D FRAZEE ROAD
SUITE 100
Exist R/W
/~
DOKKEN
ENC3ilNEERINC3i
SAN DIEGO, CA 98ta8 (858) 514-83?7
90 90
v
-N
-" X
w
Exi t -R (W " X
w
0 REAL" "EL CAMIN
403 154_13
I v
~
I!)
I!)
.... <(
<Xl
-,.... :::;;
<Xl
I
~
0 <Xl
§; <Xl LO
u
0 f-
(Il
(Il
u 0
<(
(!)
>
:::;;
v
0 C,
(!)
,....
I')
0 0
I!)
0 0
-
I!)
,....
0 <Xl
0 +
+
<Xl v
0 +
0 0
-+ I!)
0 0
-
0 0
-
-+
+
L_G
0 ~-~~-
-1. 9 %
-
I
L ------------
0 -
~J.1,s-
80 _____:" ~ (' .._ l ,J
·.J..'l!-D
------.:z
80 -
74 74
9+90 10+00 11+00
o'
PROFILE: "SUNNY CREEK"
SCALE: H oriz.1 "= 1 O'
Vert. 1''=2.5'
~/"EL CAtlNO RiL"
I I j
' Q
1/
'/ I
\
I
I
.,,
'
I
J I I /
y j I \ ,· \ \ lj' I
( \ \ J! I
>C
I
>C
I
I
I
I " '
\ fl II"'--. I • /
I
_,, I
// ,"/ !"" IS\ /!Cl
1 / 1 'Jfj!f{'~ _ Fc1-8~88\(~TG~82-'<~ ,,,,-\ ,,-~ I J:: I ( y 1tiif!o -------,_ '°' ,A.:__ l ,,, c:, ff /;j "" \ \ .' I ' ".:_ '~?f ---......_ , ✓ '~ ~';/------------ / i;,;r~ I I \ \ / / \ ~o' -------...._J\~\:(~~
c:, j;, [2 ",EL CAMINO RE:O.L" 403+54.1/3 POT= ..,\ IX I ;-----~ 10.00' l-l ~NNY"GREEK" 10+85.48 / <:' "su,NNf/ CREE(; 1 o+oo.oo i;(oT .., 19'-1 oG..._ 79':-Q.5 ;':---J:.C -...80* c:, 1997807.35 I · , -~MATGH Exi~ ~
/ E 244660.119 \ / / A.• ,, r--....::::::::s;~~ \ _ ~
Q ~;"{0NNY CREEi(/' 7 I ~I I ' I .. \ -~~""
1------/.__ / .., / a/ R=15.0_ QG 80.0?\_
/ "' '/ ? "/ , ~/I ~ IM TCH Exis\
fff' 1t13" 33' 44.7,~"E // ) ' SUN Y CREEK 11+Joo
/ / ;1 100-000'' }/ / / r;. -1 R=15.0' Rd / 9.9t' RT "s NNY CREEK" 10+85.53 c:, I '-I I / f-/ J f . OG/79.86 /1TC 80.36
"[ .., -, ' 1 __ ........, J Ml\'TCH Exist
'
,\/ '/ I
10' 20'
SCALE· 1'=10'
DANIEL NUTTER
C76641
11.foJlfl.4. /*
t-
'/
40'
I
'/ 0? ;·""/ I I ~-- -I --\'(_ Cl::-; I , _ I
,q:_,!!f!.1' • -·. 10.00' R; "SUNNY CR~EK" 11~30~ \ PARCEL LINE ()i ~
~
ar,4,,,:,,{,J' ~ ff-;)j------Z........ y___ I C7r
Jf
(;j ,_y,J/-----------f-----1------t \ -Exist Rl¢f' / / 1 J --- 'VJ~~)~ -j _ -t -I P.E. --EXP. --DATE
I
II lli II! _,,
'
PLAN: "SUNNY CREEK"
REVIEl.'ED BY,
SCALE : 1''=1 O' INSPECTOR DATE
fSHml CITY OF CARLSBAD
1--+1--+-1-------------+1-----,1f-----t1-----,1f----ll ~ TRANSPORTATION DEPARTMENT ~
~
DA TE I INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE I INITIAL
DlHER APPROVAL
DATE I INITIAL
CITY APPROVAL
CONSTRUCTION DETAIIB FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
OWN BY: lit' 11 PROJECT NO.
CHKD BY: MEW
RVWD BY: __MI 6094 I
DRAV¥1NG NO.
DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 38 of 89
--------------~ 111~ \ ~~
11-11-11-11-11-11-11-11-11-11-11-11-11-11-11-11-11_,._, ,. L ')-' I I I I \ /'1,\ 'j,J)/1--L---Y
~
!>.
----,.-,-
. "
• • • " .
·-=.1-
/
63.00' RT "ECR" 404+69.84 / ll'!~'~,I j
• / r--11-'' I R=30.0~=oc-.:-___ _., 58.60' R1 "ECR" 404+24.33 -1-EH2c85'7'T "ECR" 404+66.85_ r;PROP R/W R=20(0· ( ( ( I ___j_j 5/J.50•! RT, "E~R", 40,4+f2.34 // /
b • <l--/ --I ~-_17 __l_ I TT I I t
D
• '"7) "-~-.p·=--.-·-· ' I ,,.,., , •• 1t v I , o--____.J 000°0°:oO:ooo \ I _...,./ -----0000000°,:>000000
-...---[:, I ,. __--0000:::!cJt:❖r::~'?o"° l /jl ---' :.-------=-: -0❖0°❖".;,.:t.❖0°:° • .I----, , _ __,,--o"o"ooo'oo • ~
' ---• ,.,........~)1
~ ---·· ~
-=--
--6-----=----., /
,57.88' RT "ECR" 404+67.35
R=25.0' -~ ~ --
53.50' RT "ECR" 404+22.34 _ 58.00' RT "ECR"-404+69.84
R=25.0'
53.62' RT "ECR" 404+24.8
-----T T T -''°"'-,cc------~~E=xi~t_RLW T ____ T -~
----4T~---~+;7---~I'--===~=~:=,-JI~===~I~=,=:==:-T T T- -----~7-----+E-+=Lc--1CA~:l:~:.O~ ~ ///: /
o' 10' 20'
~
SCALE: 1"=10'
FG
R\J R\J RI,/ R\J R'w' ~ R\J / / R\J-
40'
I
~
-
PLAN: SW TAPER STA 404
SCALE : 1"=10'
BLACK VINYL COATED
CL RAILING PER CTSP B11-7
;,.
N
STA H I TOP OF WALL Elev
417+07.48 4.5 64.5
417+24.40 4.0 64.0
TOP EX TEN SI ON
:r:
z 0
(/)
w 0
NOTES:
1. TOP EXTENSION TO BE
INCLUDED PER SDRSD C-10.
2. WALL TO INCLUDE CLASS 1
FINISH MOJAVE BEIGE COLORED
CONCRETE STAINING, AND
ANTI-GRAFFITI COATING.
---....._---....._/OG
---....._
---....._
---....._
---....._
---....._
---....._
---....._
GRAVITY Ret WALL TYPE C DETAIL
STA 417+07.48 TO 417+24.40
NOT TO SCALE
Bot OF FOOTING Elev
60.0 60.0
---....._
---....._
....__
DIC }ll ;-RT
~-
-
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
145D FRAZEE ROAD
SUITE 100
/
/
{;,
b
l>
+-
-
b
CD
I
<l
b
R=25.0'
R=25.D'
1/i
-------
~ ---~~
-~ ------------
-~ ••-L~" ~-, 3+47.2,1 ~
7.33,-RT.'.'.EeR"°413+·43.25 __..--
57.~R-T-"ECR"...44"3+41,2.§.......-----
r11-11_,,_ r
t "!-'' ,, I f
<l
L
I
<l!
L
;::
<l "'! <l ) 0
L-
I
L
~
"
--y L
~~"h<---~ ~~~;FE}~ ---
==tt
.. ~ 1TrER:J~
------T T ---,.~---T/°-----T ------T ------/
~::::, ~¢;EL vAMINO R\J~-~~ P=fe R\J / R\J--. R\J 1 ~ ½ / REAL
PLAN: SW Trans STA 413
SCALE : 1"=10'
,,
--~~,L
====------=== .,,7"' □
·□ -□ -□ -□-□~-
~ --□-
-----~~\ ,·
-11-n~1.1.,::::::1_1_-11-11-11-11-11-11-11-11:,... 1-11-11-11-11-11-1-1-1.Li ---=-''--''-~~~:::_- s:
"l""r-.1""\"
·--., . -·· 408+60.01
57.67' RT "ECR" 408+55.99
,;7_33' RT "ECR" 408+53.96
-'~o;:;,_oo· RT "ECR" 408+50.01
I
0 ,i ' 4 t,.. ,1: 4 OA
' t>. ·4 " > -t> U')·
/> t> • CD--() t>-•
• '
V
,i > i <l C, 4'
• . " "
t, I I .
' • • • • \ • •
'
-. • • I I " •
t,
' ,i .
\_ LR=25.0
R=25.0' -r~,
~ o/ I
~~/~-T~~ ~~F~t~~-:1==
EL CAMINO REAL
::=-R9W R\,/
---------------\J --
R\J R\J R\J RII-
PLAN: SW Trans STA 408
SCALE : 1"=10'
??-oFESS/~l
r:t? <'.l
~ ~
§ DANIEL NUTTER ~
"' "' No. C76641
-. Exp. 12L31 L22 >t
SAN DIEGO, CA 98ta8 (858) 514-83?7 "',;?~ Cl\/1L J. DATE INITIAL or c~c11 ENGINEER OF WORK
w (/) a::z w <(
I-'
3: 0..
t-z
0.. 0 w uo xw wt-
<(
, (.)I ;,£!-
10 _z
I I
~
-
I
' I /rp;:R::.. J_ --1--1
--....... -. -/ I 11-11-11- ......... I I I-I Ji --! ,,....,.. / --....... .,.__ ----7f Ex-1st R1W _11-11-llz 7,,--1 I /_ \\ 11
....... ,, 1-;:::T /-I [ L, ,-11--11::7 59' RT /.ECR" . 6+07.52 ....... ,, ,...-, I '. -_/ I
--.... 1--1 R=25.0 /
l I ,--....,1...__11 __ 11 1 ·i~. l 8.ool.RT "EBR-"-406+03.0G,-...___ I k ....__ ---.......___ -------
/ . 4/ / t> I t> ]'-.__ -~. • • --- ' '-'-.. -------, -------~---- . I O<O > . • UC) I>----• . / 4 . > • ,i ,i ~ ~----~ ~-~ 8 (,
/
~~ • ;---. ---c.___• • • -
_,.,, I
57.00' RT "ECR" 406+13.00
R~
57.41' RT "ECR"406+08.48
.,....._ ----------.:,.I .,, .,,
~.,,~----~ ....... ·-""
. ------..,, "'~ ~ .:,/ ... -II
t> > • ----------
IJ rr7-rr1-r=Tr1-r1-1~r: =--0, 1 r1 1 i1 rr1 , r l •
CAMINO REAL
-R\J------R\./ R\J------R\J------R\J------R\J---
PLAN: SW Trans STA 406
SCALE : 1"=10'
1" RADIUS w z
::J
OJ
2" WEAKENED ~ a:: ::,
PLANE JOINT7 u1 6"
\ \ 1 I .,,.,-r½" RADIUS
3~ ,-
NOTES:
1. CURB HEIGHT IS 6".
2. Cone SHALL BE 520-C-2500.
3. SEE SDRSD G-9 AND G-10 FOR JOINT DETAILS.
I 4. SLOPE TOP OF CURB 2% TOWARD GUTTER.
-----1. I
I BILFILTRATION BMP
. :;:::
CD ::,
~I. 24• • I
EMBEDDED MOD CURB & GUTTER DETAIL
REVISION DESCRIPTION
STA 404+69.84 TO 406+03.00
STA 406+60.01 TO 410+04.60
STA 410+56.93 TO 411+42.43
NOT TO SCALE
DATE INITIAL DATE INITIAL
DlHER APPROVAL CITY APPROVAL
HAS BUIL TH
P.E. EXP. DATE
REVIEl.'ED BY1
INSPECTOR DATE
~ CITY OF CARLSBAD rn
1 TRANSPORTATION DEPARTMENT 3
CONSTRUCTION DETAIIB FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY:
I
I DRAV¥1NG NO.
~
PROJECT NO.
CHKD BY: MEW 6094 RVWD BY: MI DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 39 of 89
L
PIP CMWD 8" STEEL ABANDONED WATER LINE
PIP CMWD 8" ACP WATER LINE
PIP CCWD 24" PVC SEWER LINE SPECTRUM TELECOM HANDHOLE
TO BE RELOCATED BY OTHERS
PIP AT&T TCG TELECOM LINE
\
APN 209_060_53_00 PIP VERIZON TELECOM LINE \ ' GENERAL NOTES:
-AMERICAN TELEPHONE & TELEGRAPH (AT&T)
PIP SDG&E ELECTRICAL LINE
PIP CMWD WATER VALVE (3)
PIP CMWD WATER METER (2)
PIP SDG&E 3" GAS LINE
01 0 Ow
::r::<(
Um
ZU)
<( _J
PIP CMWD WATER VALVE (3)
PROP R/W
APN 209-060-58-00
PIP KM 1 O" HIGH PRESSURE
STEEL PETROLEUM LINE
I /''''' S/W
PIP SPECTRUM TELECOM LINE\\ I
-CITY OF CARLSBAD WASTEWATER DIVISION (CCWD)
PROP R/W SPECTRUM TELECOM HANDHOLE -11-----;:: -~---\ VERIZON TELECOM HANDHOLE, TO BE RELOCATED BY OTHERS l<M WARNING s1'6N ,f j ~ TO BE RELOCATED BY OTHERS -CARLSBAD MUNICIPAL WATER DISTRICT (CM\\O)
POTHOLE #2
POTHOLE flj_.),-~
=="!PTl""SD-G&t 3" ELECTRIC..;_L-1::INE
0:::: er:
<;(
TCE CMWD ABANDONED
TO BE REMOVED
POTHOLE #3, 1
AT&T TCG TELECOM HANDHOLE ',/ ~ TO BE RELOCATED _,__~ --1-1-+---- ------, I TO BE RELOCATED BY OTHER~ BY OTHERS----~ 1,r 1 -KINDER MORGAN ENERGY PARTNERS L.P. (KM) POTHOLE #3 ~ ',/ _ -+-----FUTURE 12" ACP EFFLUENT DISPOSAL -SAN DIEGO GAS & ELECTRIC (SDG&E) Exist R/W ----•
PIP CMWD 2,0~STEEL, o 4
ABANDONE[l,,-wA TER LINE \ 6 ;,
-,--PloR-GM.WD DWG 85-101
c.b t~ i/f/ Pl P ~ W.Q.J 2.:...E V£....IY A..IEB .LlJil.E -:::;:::::::',/ _____ - -----{PIPELINE/RECYCLED WATER LINE \J it: ,PIP AT&T TELECOM LINE
\,r~ ►
-□/o
-CONTRACTOR TO CONTACT CM\\O FOR REMOVAL
- - - -• •• ~-; . ,· .. .,
, ' • ' AND REPLACEMENT OF THEIR FACILITIES. . ' ~
g_ LJ_] 17 [fl ,111------\~
T
----E
T T
r-=
---""'T---'=,--=--c--"":'
" • · I II' ·ef ·_ ...!. •
-~.-....ea.
·~·
--'-L_
T------- _LJ'------T -------T T T -'------T f---+---'--_n-q1--□---i~I . , • If)
I I ----= T L\A .-..... + -
'"' ' I -g: -• T ~ Q
-CM\\O VALVE CAN ADJUSTMENlS TO FOLLOW CM\\O
STANDARD DRAWING W-13
E E
, ·1 ',/ / T T~ , _'.-o □ T o=□ ' 1 , ' ' ' T-.-
-.J..-\;I -r,k -\ R\J R\J R'w' -R-l,,.l-, -= n RV= 0 D R\J R\J R\J R'w' R\J R'w' -V R\J R\J ~ r<w R\J l~ □ ______...... □ -□ -D -u u R\./ R - .',' \J
11 \J 11"1 ,
1 _ " n {J-____..-D -0 \J D ....-------\J \J \J \J \J \J vi \,/ \J , , \J R\J : ,._ ',/ ',/ 0 ',/0 D LI -"' w ',/ ;;;J""r.,_ D -,c \/ '-'-'-• 0 _
0 0~0-□--c . , I• I .I J • ',/ U....1'-'-'
. I • I I l
-o -□ □ o 41,,0 □ □ ' □ o -s--□ ~□ _vu - o --1!o_--4t10 □ o o □ iil-16-□ o □ □ □ -4+5 □ □ o o 1041-4-□ o o □ □I =4c11;5I o □ , o d 044-2-0 ~□ b' R. l :L,J 3::
I EL CAMINO REAL
00 0~1--!□-o--.::<1'0
-',/ ',/ ',/ ',/ ',/ ',/ ; ',/ ',// ',/ ',/ ',/ ',/
o' 20' 4-0•
~
_,_ G ~ G G G G G / G /. G G G J G f G \I \I
-+ s-----s----s s s • s s s s s ----sl s-c ____ --_-_--c SCALE-I "=40'
-----G G G ~
---s s s ~ -
:;_~---= = =;:: = = = = = = = = = ~=;: = = = = _= :::----::: = r-=------=--=--=--=--=--=--=--=--=--=--=--==-- - ---=--==--==--=-=-=--=--=--=-- - - -_,_ -_ ::_ ---------------0
raw ~~-Y---PIP CMWD 36" DIP WATER LINE ------------•~
'~ PIP CCWD 8" PVC SEWER LINE PIP SDG&E 4" PE GAS LINE II I<( UTILITY SIZE MAT ,----.. Exist R/W ELECTRIC 3" PLA
~ ~~ PIP KM 16" HIGH PRESSURE STEEL PETROLEUM LINE II :ii:
~"' II
2 GAS 3" STEEL
II
APN 212-160-31-00 II
II
~IP CMWD 14" DIP WATER LINE ,
'-., ,;;..·(11 I 0:::
1/ -<I ,;;.. I '--1.,
\
3 3.1
4 TELECOM (2)2" PLA
TELECOM 1· PLA
TELECOM (3)2'' PLA
"' ,c J I
I
5 TELECOM -ENCASED
PIP CMWJ;J~ PVC WATER LINE U
\_-:::-\ ,c~
\
6 PETROLEUM 1 o· STEEL
-),,\ 7 PETROLEUM 1 o· STEEL
CMWD WATER Ms,TER TQ BE
REMOVED AND REPLACE(\ 7 UTILITY PLAN: EL CAMINO REAL I
A TELECOM -ENCASED
I
CCWD SEWER MANHOLE TO BE ADJUSTED TO GRADE
r
I
I
0 AT&T OVERHEAD TELECOM LINE TO BE RELOCATED BY OTHERS
AT&T/SDG&E UTILITY POLE TO BE RELOCATED BY OTHERS
SCALE: 1 "= 40'
AT&T TELECOM MANHOLE TO BE ADJUSTED TO GRADE BY OTHERS 0\~ \ \ B TELECOM (2)1" -
APN 209-090-11-00
\\ t~
POTHOLE #6
'S.Exist R/W
'-"
<)
r
I
b
PIP AT&T TCG TELECOM LINE
PIP AT&T TELECOM LINE
PIP VERIZON TELECOM LINE ,
----L___
-/□ PIP~
0 ~PEgTRUM
0 TELE~OM O
PIP AT&T TELECOM MANHOLE ~ C\ \\'
CMWD 2" AIR-VACUUM VALVE ASSEMBLY, APPURTENANCE, AND SERVICE (2) ~\ ,.,-;1£ \ TO BE REMOVED AND REPLACED PER CMWD STANDARD DRAWING W-7 \ ·; \//. \ KM WARNING SIGN TO BE RELOCATED BY OTHERS APN 209-060-48-00 --f--~ \ dTCE SPECTRUM TELECOM PEDESTAL PIP CMWD 20" STEEL --<\ \\
TO BE RELOCATED BY OTHERS ABANDONED WATER LINE [TCE I"
POTHOLE A PER CMWD DWG 85-101 ___ 0--'\.
POTHOLE #7........._ ........._ POTHOLE #4 ------~ 1 \ £ \\\ -SPECTRUM TELECOM HANHOLE f----{PROP R/W ~ \\\,
PIP CMWD 6" STEEL WATER LINE
FUTURE 12" ACP EFFLUENT DISPOSAL PIPELINE/
RECYCLED WATER LINE
PIP CMWD 12" PVC WATER LINE
SPECTRUM TELECOM HANDHOLE
I
I
TO BE ADJUSTED TO GRADE BY OTHERS ~
3::
~
0 :c
TO BE RELOCATED BY OTHERS POTHOLE B I ~ \__
--f---
AT&T TCG TELECOM HANDHOLE /_Exist R/
TO BE ADJUSTED TO GRADE BY OTHERS
---7 0
----f --T 11 T I.()
--· --••• -· , -'--• ,,. ,. --1 T T / TT __ '~ T T \. ----,,~\.~' '. / / " g ' I ' T • ,·• T' ~ .-T -~ ..,.
I I -----,_,+--· 'r 'r T •
R\/ / R\/ R\/ R\/ R\/ RC!/ \ R\/ T ' / ' :J'S: t T t T • / ,;-· \ I R\/ R\/ R\/ R\/ R\/ R b::: I")
• ',/ I ',/ FL CA~INO RE"AL ',/ ,<,-'Jf. -, .... ,, ',/ ',/ ' ',/ ',/ . ',/ ',/ ',/ WO= I 7 I I 7 , , ,,, \;/ \I .L!:. 'w a> ' J r-
• 'S;
□ -□ -□ -rD
OTHOLE #5 LINE
. . . ,: . .!_;_ • ..I.~
... --~~: ....... :.-.~·•·.,:;-:-~:_._ ;, .. •.~'
0 T
3 , rnm-mn
R\/
0 ',/
" '
./•~~~~-\:·,:, .•
i· • ·.·-.;•
~ • ' ' ' I • 7 / I 7 f"'II 7 I: w I -~ Uiklw • • , , .1 _, ,, , , , -, , --, 1,-7 '"" r---~• I D <ttt)-D LI • LI • u -~" ~ ~-o -fa!'. L 1406 cL,,--cD_[ D ~□405c@r, .□ □ , ·p, L D ~4 D □') □ ' □ D h O D ' • ,. ' , W ;;ti O L . ' 0 -o Ii ',/ ',/ ,., ',/ 0 =-I , 0 ' 4():ye. • D '° ::-31-le)z--□ D ._□ : □ D 401□ :_ □ : □ <( I c5 :;t) ---\,/ --,c□ -O -□ -□ -O -~-0 -0 -□ -,-- □ Ju 'w 'vi 'vi/~--'vi 'w •~ 'w 'vi I-CJ) = C: ',/ ',/ s O O // ',/ ',/ 0 ',/ (/)
:C \/ \/ s s --T '--□-□-/ -□- □-□-□-□-/ -,□-□. -,oL__□ -□-□-□-□ -□-□-□-o-o ~~ w ',/ &.
-I ~ S S G G G G LJ S " G , S G S ~ G r; -, , G /_,, / r; -0 --......_ 0 I;/ W LLJ _. G s s s ► s s ~-I / ' I s i "I ,4'ti"-s 7 s C O s s -□s-o n=-,;o □ □cs--=□ □ rs--Z(I) Q S S S S ,/;1, G G G G _J ------------. _ I _/ __ 'J_ /. S , _J /, S, SI-S S G G G + I -,_ -1/1 "-L_ s s s s s ► if
(J1 ~--· ________ ---m-~ • • • cRsff_:) ,· ~TI cr-PIP CMWD 36" DIP.-) • -7·. --~,.rr---7:l _I!. '= . . . . . . .. . . . . . . . . . . _.3il . . . • . . I I O ,----\ RE;YCLED IRRIGATION SERVICE POINT (5~Ac6~~~~~jg_. t'"--===_ -__< _:__Jv. . PIP CCWD 8" PV;~~~E~l~~NE // ~o□ --o-------~~c-c •• ~ ------:--------,-,--,-ID ~ METER 'SIZE\ :\1½" .., PIP CCWD 8" VCP SEWER LINE ;/ ::::i:
STATIC WATER PRESSURE: ~95,_PSI-__ • 'P!PKM16" HIGH PRESSURE: S-TEE:l..PETROLEUM LINE // PLA
80'
I
POTHOLE DATA
OWNER LANDMARK DIST
SDG&E TRAFFIC SIGNAL 5.30'
SDG&E TRAFFIC SIGNAL 11.70'
AT&T TRAFFIC LIGHT 10.20'
SPECTRUM TRAFFIC LIGHT 9.20'
AT&T ASPHALT CURB 6,10'
AT&T ASPHALT CURB 2.50'
KINDER MORGAN EDGE OF ASPHALT 1.90'
KINDER MORGAN TELECOM BOX 3.90'
AT&T TELECOM BOX 8.80'
VERIZON ASPHALT CURB 2.80'
o' 20· 4-0' 80'
~ I
SCALE: I '=40'
TOP I TE I BE
3.30'
3.92'
2.80'
1.84'
3.78'
-I 5.10·
3.76'
5.52'
2.72'
1.50'
\
\
MAXIMUM GPM DEMAND: 2-~ GPM---:::: "-', ~ '· ::---._ ~ ~ -----..__ // PIP SDG&E 4" PE GAS Ll'f,E-1 ----
HAS BUIL TH
-c I PIP SDG&E 3" PE GAS
CMWD 2" WATER SERVICE TO BE REMOVED I I
AND REPLACED PER CMWD STANDARD
DRAWING W-4
.INE --
,I/
I
APN /12-102-75-00
/i P.E. EXP. DATE
APN 212-160-31-00
I I
REVIEl.'ED BY,
INSPECTOR DATE
UTIL ITY PLAN: EL CAMINO REAL ~ CITY OF CARLSBAD rn SCALE: 1 "=40' 2 TRANSPORTATION DEPARTMENT 3
UTIIJTY PLANS FOR
EL CAMINO REAL
DIC }ll ;-RT ??.oFESS/~l ROADWAY IMPROVEMENTS
~-
r:t? <'.l FROM SUNNY CREEK Rd TO JACKSPAR Dr ~ ~
§ DANIEL NUTTER ~ APPROVED: HOSSEIN AJIDEH
"' "' No. C76641
-. Exp. 12L31 L22 >t ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE - 145D FRAZEE ROAD
"',;?~ Cl\/1L J.
DWN BY: GH
I
I DRAW1NG NO. SUITE 100 PROJECT NO.
SAN DIEGO, CA 98ta8 (858) 514-83?7 DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: MEW CALL 2 FULL WORKING DAYS REVISION DESCRIPTION 6094 BEFORE YOU DIG or c~c11 ENGINEER OF WORK DlHER APPROVAL CITY APPROVAL RVWD BY: MI DWG 529-1 EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 40 of 89
GENERAL NOTES:
-AMERICAN TELEPHONE & TELEGRAPH (AT&T)
-CITY OF CARLSBAD WASTEWATER DIVISION (CCWD)
-CARLSBAD MUNICIPAL WATER DISTRICT (CM\\O)
-KINDER MORGAN ENERGY PARTNERS L.P. (KM)
-SAN DIEGO GAS & ELECTRIC (SDG&E)
PIP AT&T TELECOM LINE ~~ I I \ \
I I PIP CMWD 12" PVC WATER LINE I r e,e """"" mcco, ""' e,e SOO&C me;"'"''-"" I I C ' 0 I )_ I I I APN 209-090-11-00 PIP SDG&E 3" PE GAS LINE 1 ,, rt> 0 11 .\ I PIP CMWD 36" STEEL WATER LINE PIP VERIZON TELECOM LINE . I :¾: '"-Uv r[ II ~ _ r ,FUTURE CMWD 12" ACP EFFLUENT DISPOSAL PIPELINE/ // I I "'~ r[ 11 PIP CMWD AVA (5) -------- RECYCLED WATER LINE § I I ~~ c ~ -
/
PIP CMWD 12" PVC WATER LINE PIP CM7WD A'f!,/ J I I ~~-~~ dJlll _ ---- ,,; 1/ 11 mD ~> ----=-- a ,,;1/ 0 "':,_ 0 --- ll) _ PIP AT&T TCG TELECOM LINE j,,-I\\ n _ _ u -~ + -/, • 1/ \\ -I 1 ~ ---- g L --t --r_ -_ ~ _ _ rExist R/W #f/ ,, 1~1 1 ~ ~"
V r -r --_ _ _ J,,------:;; 1\1 +---7' ---· ~ ~"
" f T ~ C-= .,= -\\I 1 ---= -----,, ~----= g,
,,,. N II f ' !viol "' • , ~" o -3 ..... ,------R'' I V • N " -- (.) •-----RI/-____ T T o ' C _-0 WI-r----11-----RII-----L__ RI!----+-t r t II r ' " 111_, " o _-o = w \I-----R\1-____ f f I . I O =--~~ -
\I-----\I-----RI!;:::--,-:----R'v./ RW R,w= \ --=--=--------o -_::,'j,t.., D --- < ~ -o -o ,-----; ---II ~--11 [I C,A M / [\/ Q RE fl L ~~~ 1/1 ~___t-----_ -_#---_ ----:-:~ w I " • -· -· ---:::==-□-----~ -o _-~s - 1--en C --:=-.!j!og::---o -□ , 0 , . • ~. 11 11 v v " 111 v -~-= _ 0 -□ __--s ~ G en --'--' o :::m-@ -□--=-_0 ~ _o __------------
w D -0 -0 -130-0------□ ----□ ==:D Vl . \ D 'T7'1",f O -D -""" p O -0 --------S G w "
0 -□ -o -□ -----'£1"□ ;O J':,"T ----= 9-= -----□ ---------- z ~ II-----\I-----:,,==,i= -:39'7 -o -O -□ -□ -□3m,□ -□ -0 11-1 -□ ~ 5-□ 1 \"'~ _! = = =w-=-= ~□ -~□-□ -0 -0 \..----G ~ :::::; ·:-------□-□-□-□__!:__□-□ m: □-□-□-□-□-□-□-o-o_ ----------"11 -□ □. o-1-n □-□ ~ ___ s G - s s -----11 □-□-□- □-□-~--□□--□-□-□-□ 11 s ------
:r __ G _-_-_-_-_-_-_-_-_-G ----_-_-_-_-_-_-_-Gs r s ---i---s ___ --__-_--__~f-------f-V-----v-----v---------------°',J II w I\\ s ---,' % G ------~~)20" STEEL ABANDONED WATER LINE (.) ----------G ----,1-------G ---~-_-::_fr=_-::_~,:_-::_-::__-~' __________ ---,t,----m----s_-_-_.,,~.-~--t-T-~s•1\• -G ----"'. ____ ____ PER C1,1WD DWG 85-101 ,-..;.. ---------G~ S S S S----,C-----I--G ----~ .,.,,-:'l <( -;------,---------------------G -----G -----G ----.t,--G I G . I I /,,.-; ,,----------/':.--- /
' --c, ------------====-----II ~ IP\ > A -1/' ~ ------,---r-===~-------'0\-~ "' ~ . QY 1/ e,e CMWO oe· me wm, u,C n •• • • • ••• • n •• :· ..' ·• ]': ~·::· ~ 3~-=--=-~--=-~ ~:s \ \ "-/? /~ PIP sDG&E 4• PE GAs LINE :d._.-y, __ m ""'c, -.J-1 1 _ v / /
PIP CMWD 6"ABS SEWER LINE O YJ ',o-I\ 8= _ r /'
PIP KM 16" HIGH PRESSURE STEEL PETROLEUM LIN~-_ ___ -----=----=------II . . '\ ~ ="~r""=-~"' PIP KM 1 O" HIGH PRE-SSl:IRE---S'fEE~ PE-TR()_tElJM_tll\JE:-~ ---\ "' 0 .,,,}\ \ -1 . "> "'- I I =-= 11! 'iCK r'1 ~
/
PIP CCWD 8" PVC SEWER LINE PIP SDG&E ~.iiirlNF 1-0 I \ ¼::¼"Q_.~:::_ C) ~ -0 I 11~~ -:c--.._----0"' I I I I I ----::c-'---'. I
APN 212-101-67-00 PIP SDG&E ELECTRICA LINE I
j 111
I • .-.. , n• n • -.n • • nn I I I 1
I
\
C
"-
\
/
o· 20· 40•
~
SCALE: 1 "=40'
80'
I
/,JJ~~----
--------HAS BUIL TH -------- -------- l\t"l'I ,1.1,1.-I .JU""t<t<t-uu I, ,,o• ---- ·1111"'1 ----' I \ \ 1\
UTILITY PLAN: EL CAMINO REAL
\ I \ I I P.E. EXP. DATE • ' I
SCALE: 1 "=40' REVIEl.'ED BY•
INSPECTOR DATE
~ CITY OF CARLSBAD rn 3 TRANSPORTATION DEPARTMENT 3
UTIIJTY PLANS FOR
EL CAMINO REAL
DIC }ll ;-RT ??-oFESS/~l ROADWAY IMPROVEMENTS
~-
r:t? <'.l FROM SUNNY CREEK Rd TO JACKSPAR Dr ~ ~
§ DANIEL NUTTER ~ APPROVED: HOSSEIN AJIDEH
"' "' No, C76641
-. Exp. 12L31 L22 >t ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE - 145D FRAZEE ROAD
"',;?~ Ci\/1L J.
DWN BY: GH
I
I DRAV¥1NG NO. SUITE 100 PROJECT NO.
SAN DIEGO, CA 9210B (B5B) 514-B3?7 DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: MEW CALL 2 FULL WORKING DAYS REVISION DESCRIPTION 6094 BEFORE YOU DIG or c~c11 ENGINEER OF WORK DlHER APPROVAL CITY APPROVAL RVWD BY: MI DWG 529-1 EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
APN 209-060-58-00
APN 209-060-53-00
APN 212-160-31-00
Sept. 26, 2023
Item #6 Page 41 of 89
6" MIN EMBEDDED
MOD CURB & GUTTER
SEE DETAIL SHEET 11
ASPHALT
CONCRETE
' N
~
STREET
FLO),\(
-. . --.
·~· • • :;:
~ ...• ,
i:--~1~-.-_-_:,_:._~~--~~
'ffrr/!!!in@i
COMPACT!
SUBGRA
30 MIL PLASTIC LINER
SEE DETAIL SHEET 16
SPLASH PAD
SEE DETAIL SHEET 18
CURB CUT
SEE DETAIL SHEET 18
' -, "' i1 I I
' <fl a,
w -o (l'. f
<(
>•
"'
SUBGRADE
4.5'
SHREDDED
HARDWOOD
MULCH
;,.
,(.,,I=
5' SIDEWALK
2% MAX
- -.---.... .... -:
1-. " ;;rr 12 COMPACTED
~, -• • ll!ii u SUBGRADE
SIDEWALK PER SDRSD G-7
W/ THICKENED SIDEWALK EDGE TREATMENT
30 MIL PLASTIC LINER
SEE DETAIL SHEET 16
3" CHOKER LA YER
6" MIN EMBEDDED
MOD CURB & GUTTER
SEE DETAIL SHEET 11
ASPHALT
CONCRETE
' N
~
STREET
FLO),\(
-. . --.
. ~-·-. . t •,A:;:
-i~ . '., ·(
Jj • • ' ~
·-:.:;::-•-· .
---,,.~. =r
r1-~g~l"'1
COMPACTED
SUBGRADE ,_,
30 MIL PLASTIC LINER
SEE DETAIL SHEET 16
SPLASH PAD
SEE DETAIL SHEET 18
CURB CUT
SEE DETAIL SHEET 18
' <fl a,
w -o
~ f-
> •
"'
4.5'
SHREDDED
HARDWOOD
MULCH
'st
5' SIDEWALK
2% MAX
- . ... ' ... -.,·
••• • 1;;111~nt1 :frlll~;;'iD@I I rgjing
COMPACTED
SUBGRADE
SIDEWALK PER SDRSD G-7
W/ THICKENED SIDEWALK EDGE TREATMENT
30 MIL PLASTIC LINER
SEE DETAIL SHEET 16
3" CHOKER LAYER
BIOFIL TRATION SOIL MEDIA GRAVEL LAYER
(AASHTO #57 STONE)
BIOFIL TRATION SOIL MEDIA GRAVEL LAYER
(AASHTO #57 STONE) 8" PERFORATED
SCH 40 PVC PIPE
8" PER FORA TED
SCH 40 PVC PIPE
30 MIL PLASTIC LINER
BIOFIL TRATION BMP 1 & 2 TYPICAL SECTION BIOFIL TRATION BMP 3 TYPICAL SECTION
NOT TO SCALE
ll
-,
'"I
I -,
0 w
Oo
I<(
u
:,
FEMA SPECIAL
FLOOD HAZARD
AREA ZONE AE
,.Of) I,}
\\~
\\
NOT TO SCALE
56.88' RT "ECR" 411+38.50
8" OBSERVATION WELL
RIM=81.65'
SEE STORM DRAIN DETAIL
SHEET 17
55.75' RT "ECR" 411+37.51
8" OVERFLOW RISER
RIM=81.33', IE=77.13
SEE STORM DRAIN DETAIL SHEET 17
\
\ \
53.00' RT "ECR" 413+35 00
UNDERDRAIN CON~ECTIO~O~IFIED CURB OUTLET \
53.50' RT "ECR" 410+57.92
END BIOFILTRATION BMP 1
55.75' RT "ECR" 410+61.85
8" CLEANOUT
RIM=82.50', IE=78.44'
SEE STORM DRAIN DETAIL SHEET 17
BIOFIL TRATION BMP 1
SEE DRAINAGE DETAIL SHEET 16
\ I
', I
\,I
z ml :,\
/ , ~ • 0 • 1 I _j_J PROP
-a' /PR-OP R/~ ~-ill:'.:" 1\ -~
\ \ \'~ STORM ORAi~ i~~~~~ ~~~~~-l~-~ _____
2 ,1 ,1 \
Exist R/W ---------7,. ~ / ~ _ _,"•::\;-/ ,er-L >~~-~;; -~= _;,~'---·-,------\----/ 11-11-11 " ~ 0 ~65 --~-70 11'" y--r'~,,)-.__ v'r ~ ~~ 1',iil , 'II 's , . ~W~ ::, D • -l,f!AH--&-'---+-:_,~~\,~~--'-.
~ . LJJ_ I IF~=='----1--.J-----------
/ ~ ~, J~
w ' . • : ---=,,,__{_'It's.'' ..______ <I?_ 1 +
--R',1-----R',/ ,. = f:==E~;Ec~= T -----'
1 ~-=--·
1 '77
1 l.:"l -, -11
st
...___ 0
',/ --',/ --t-----J R',/ = R',/ . 0-: -~I'~-' ; • .'-------'"" .. ,-sc,•-m+,S5<L < 0 1 '"=, '• -";;-'_c-li --"l; ji S ~
J -----',/
0 • _n-o=o~o-'A-8--lL=R',/o-o-~-rl~o o o-□-·-o II ~ -' """'=ie,,,-Jt,l ,----~~= ~-~ .,. ,, .,_ --• '
----w --c:,'w-R',/ / = -__-r ~ T -•• --:· ,, ,1 --'\ _ R\J I -~ --::, . <'. = --!'-'---\,/-----',/--------4' ,,--- --_ I RIJ---~!iL R',/-----BltF=-79~--T -'2c T -~ ~ o ~□ --o --o 41-go ~o --o □~I -<:: v \ = ef' --cl, GAMIN0-RE-AL<:i'~c-----;..,..:-') ',/-----v~ -~1N'de'76:62':_---R r -,~-~, ~ .- , _8 0 r--0 7 □ ___\ 0 I -4-~ 0 ~ 0 --- -----r SEE STORM •IEifil1)lJ-l'.=-7'.6.62~ ',/ --;%;'---_-_--R',/------= T Lu I- I = □ ~o --1415-0 □ ~ __ \ ef'/ ' DRAl]ILD~l'.A'[b-SHEE-T-1-9 / 5:3c5()'',/R-T...c'. -• -c_,1_____ : l.u --',/ ',/ -----', c-----1----= 0 0 ~o -4-llJ -0 ~o O ~ -IF"'.\i \ -----• EGR-=-41J+,4J.45--R',/------=2'.1 Lu -_ -=----=----_ ' '\l ~-, ~---~-',-~---=-----=--
0 041-4-o o -□ _
0 -ol--
1 IFB;e l'll0Fll=-TRA'[email protected] ',/----~....:: <C:r c c c ~ ' , , --_ _ cl ~□ -o -~ I ,1 __ -_-I-(/) -S - -S ~=~~~s-"' G -t----J-G --:':,--\----,--:=-:___G---::._~.,.__----_ +------',!-----',/------=-------·□4-12-0 --[ l'f<'5C~---=~ (/) -------,, -,'-\ / G ---G -E-\:::=+-'-'-1..l,ijl-NS--R E?A-1::----\-_ c-=---=-_;~-=---,1 -=---,1 -~--~ --o □-□ , Lu /::::J Q
T
T =
:::::::=-r_
T T T
T T
, = I ~ ~ ~ c -----c ___ -_---- ---~~-',/ en--=-------=---• □ -□ -~ Cl) ----===-==---------------G ___ _:__G------'"-=-=-Lc-',/-------= ',/-----__ __:: __, ~ ----=-=----:-7 ---- -G--',/ __ -::._-::.__ ::X:
-~---· .. ,7 . ----G s I(.)
'o~ I,--"~ ==========-,c,,,_ ' -_ _ • --<>_ _ _ CC~ !.: ~,-~ -0-e'c-_, ~ --,;-~----, ,, __ "' --------------- tmF--·-.Ga
~-. Exist R/~ \7~
~55~ \ \ ,
=
/, ,,:,
/1/
/1/
/1/
/, /
/, 1/
/, 1/
/, 1/ . 1/
i e;
I I
D ~~D
i
_.-~
.,
= ,c{=
Lh
:l
0 " x .: '-j'--I
7 //, / -- ,_ ~
c..----=---
9Il 9.5.
:9:5 TOO-
II
d
!
t
-=···· -
----=--=
=----=; ====..::
--= ===
I
NOTES:
1. BIOFILTRATION BMP CONFINED BY TYPE A GRAVITY WALL,
THICKENED SIDEWALK, AND EMBEDDED MOD CURB & Gtr.
SEE IMPROVEMENT PLAN SHEETS.
2. FOR 8" CLEANOUT, 24"x24" CLEANOUT, 8" OBSERVATION
WELL, 8" OVERFLOW RISER, MODIFIED CURB OUTILET, AND
BIOFILTRATION BMP, SEE STORM DRAIN DETAIL SHEETS.
3. MODIFIED CURB OUTLET STATION/OFFSET TAKEN AT CENTIER OF STRUCTURE AT TOP OF CURB.
4. BIOFILTRATION BMP STATION/OFFSET TAKEN AT BACK OF
CURB.
5. 24"X24" CLEANOUT STATION/OFFSET TAKEN AT CENTER OF
STRUCTIJRE.
o' 20· 40• 80'
~ I
SCALE· f"=40'
HAS BUIL TH
P.E. __ _ EXP. ___ _ DATE
REVIE'v/ED BY<
INSPECTOR DATE
STORM DRAIN PLAN: EL CAMINO REAL
SCALE: 1 "=40'
fSHml CITY OF CARLSBAD I SHEETS I l---+---+--------------+---!-~l---+-----1 ~ TRANSPORTATION DEPARTMENT 43 0 STORM
NO. BEARING RADIUS
1 S61'10'13"E -
2 S59"33'15"E -
3 S58'08'16"E -
4 S57'00'35"E -
DRAIN DATA
LENGTH REMARKS
98.28' 8" NON-PERFORATED PVC
98.28' 8" NON-PERFORATED PVC
76.20' 8" PERFORATED PVC
62.50' 8" NON-PERFORATED PVC
CALL 2 FULL WORKING DAYS
BEFORE YOU DIG
1450 FRAZEE ROAD
SUITE 100
DOKKEN
ENGINEERING
SAN DIEGO, CA 921□9 (B5!l) 514-B::177
:oFESS/
-
PAMELA
DALCIN-WALLING
C52187
12/31/22 ,.
DA TE I INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DA TE I INITIAL
OlHER APPROVAL
DA TE I INITIAL
CllY APPROVAL
STORM DRAIN PLANS AND PROFILES FOR
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED:
DWN BY:
CHKD BY: ~
RVWD BY: POW
HOSSEIN AJIDEH
RCE 75991 EXPIRES 6/30/24 DATE
PROJECT NO.
6094 I
DRAWING NO.
DWG 529-1
'
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
APN 209-090-11-00
APN 209-060-48-00
APN 212-160-31-00APN 212-102-75-00
Sept. 26, 2023
Item #6 Page 42 of 89
~
,---------------------7 92· r -----,
'7 ~ I ,:--
100
90 80
;!!. "' -r--~ v 11 -• __ co ..... ,..., A
-0 Ul • -,-..;: .-
'1i' '+ 11;;!; -·a 11::!2
• X ~+ 11·t----'.· . 6 V X' t :;:; I • <(-.;;j-....:..· I·•'-N I <l'.-0 v 0 I --le
w' 1° ~-..:v mo •
• -/Lo:: wo >-0:: • -v
I
:,-0 o__,-.. '--0 L,Jjy W '
, I I I >--}'-' >-+ _w :,-0 o__, • . I I L_ :.... I"") I-A r-W ;,-00:: • ~>--~ -• • f--• , ::::,1~"' --'1S' --'=ro -w • o· '-z 0:: "1 f--f--v f--, , . -<l'. • :::,IC,"' w I I , Z o_ro ,:: • 0 " CF .-' "J-·-
1 1
w"':k o5 \.IJ.o_'f' z0ro zO::...-,
I I I -c/. ~--i:;S W ::::, ,-,j O ~ -,,.,-1, D_.,,: • ~ u:: FG -o "' >----' <ci :a, <D o '° 7 :r: t-o ~ a::: ~-_·_)I
--f--0:: "' •
_ f OG :r -i::r:: 0 "1 f--I
1 1
..--~ ~-~-N • ,r OG j
I I 1-• r I I ~[ • r -v I • I I I : ~
10 !_,£g'i____"__\ tr; ;c ~ _ 7 r-00) ,_ _ r-"'I-'~ .!-I I I 90 100
80 '
I _I/ -' " ~ ',.,. .J I
I 70 I I I I I i-}u_ --"· ;; ~o ' 5sl._t_._ ' J.00~ I ~ ,. , , s 0. 7'9% <X! _ ~ 7 "' I \ l'j-'°' ---" " ; ,...._ -l O, 11 -"" ' f 1·-,-.. ,-.. II /--f;j \ ~I • v I II w -L. -·-" «> I , , __ r::,_ w w / v -le-~:\';. 9--18-RGP-f1-350-0J•-~"' 7 0 • II <O I') ,-.. ~f L II
I
I w o, ,-.. -ro---n-_ G,t,, -178.30 w 1 ,
: r,t Fi +~-~ d ~ -E~Conc DTTCH '.-B~RGP-(-1-350-07-8-/ / d-~-~ .:,·,-~,Q !!fi ~100=6-44 FPS '1 J c!\ ::.· ccJ 'ii" L 50.26' / ,-.. R W-1~ '"'100 'l.46-GF-S ~ ~ I I I I ~ o:: w ~100-4. 63 FPS / t -c!\ ,;,{/, 1
1 / ."' >--~roo=,b-10-GF-S i'\I~
I I x1•-
• 36" RCP {1350-D)6ol----i w,:: t.XISTING----:36" RCF=
' L+53.47' w IL100=7 __ 9.5_[n~ • " •
60 60
: 100=8'134-FP-S lei O,oo-17.19 CFS ' .
50 0100=29.27 CFS (/)
' <D
50 STORM DRAIN PROFILES
SCALE: Hori
1 z. 1''=40'
40 Vert 1"=8·~---------+-------------+--------------,-------------+-------------+----------1 40 l 405+00 404+00 403+00
\
56.88' R',T "ECR" 410+00.67 ~ l \\
8" OBSE~VATION WELL C\\uL Exist Cone DITCH
RIM=83.71J' 55 75' RT "ECR" 408+64.93 55.75' RT "ECR" 405+98.00 )) 0 \\ PROTECT IN PLACE SEE STORM DRAIN DETAIL SHEET 17 , 8 ... CLEANOUT 8" CLEANOUT , • .. ~ \-?-\ REMOVE Exist HEADWALL \
<>-so 55-75' Rc,T "ECR" 4o9+99•58 RIM=84 41 ', IE=80.22' RIM=83.87', IE=80.45' 56•88 ~T ECR 404+ 73•84 ~ \---z;~\/; 102.25' RT "ECR" 403+ 70.00 '-'-8" OVERifLOW RISER SEE STORM DRAIN DETAIL SHEET 17 SEE STORM DRAIN DETAIL SHEET 17 8 OBSERVATION WEL~ ~ \ STRAIGHT HEADWALL TYPE-A \
', RIM=83 413' IE=79.26' / Exist R/W , " " RIM=82-78 ..-<1 \\ PER SDRSD D-30 '-SEE STORM• DRAIN DETAIL SHEET 17 r.=_ -53•5o RT ECR 4o5+o2.oo SEE STORM DRAIN DETAIL SHEET 17 ;v \· , _ _ • '----_ _ /11-11-11-11-11-ii::.. -Beg BIOFILTRATION BMP 3 PROP 0-.-:,.;[\'\\\\\"' REMO.YE 39' OF Exist :, >----~ //-1 ::-:---... C _,,/\~ ,v ~ \ 1,u 36"/C:MP f ~ r@ ,l: ~ = ,,;~~ ~~ -,,_, ·<-I I ' I 1 , \ \ _, ...._----_!YW ) ,.,. ~ \ ,c,f; '.~ \ \ I - ...-....:'I,:' -~,,,~ ~I ~i--1-1-11-1 1-1_ 53.50 _f'U "ECR_'.'____40 ,='R'foiJ0 0'cl«-7 _, ;,-,-J,,..L.-111-"1 \1~:i: 0' r / ,,,fflp,((,7\ -'r~ \~, 9 \1~~ -~'"--1~-
11 -:
11 ~ ~. ,~ -1-EJiD BIOEII TRk.+IQ!UlMR..,2 ~ /?'f;t;:tl,,/-c_ ~-t( I '-c___:\~ -~ .. ~I /!l!r i1~,,,....-\-~ 'fii?:l.l .,. .. ~\\_ .. _, ~11 11 ll=IJ~II '~1.::---11 %lli ~ "-. ~ v ~ \.. I • • • • • • • u u ; ~ / / I I _,,.-,,,' ~ ~-----------::-----. . ~~ ~ J'1l 1 , , , V \ .__,,,,. , 1, \ "..":----.. , _ , , c ~ _,,.. '""' , ~~-•• ~'''•;•=-••• •••• •--•1••• , • • T / T: :--~;-~•-•~;g•~~--~~,,-------\ -:::''~ ~~11 / _ .-,--"' -I -~ '--r _ I --r-. ,,
\
402+00
(/
--'-----o
H-1-1--1±
--
,.,fl_F
401 +00
'Exist R/W
cJ_
---.... -I _-I ,-_, 1 I --;.-, T r T , ',5•' ~~ T f, T ' / • ~--N5~ _ _:, (") ' ~ ~ T -,la-T -T T T ' T "'-T , _,_ -, ~ REMOVC: ;:i.g' €lie C:xist 1 ~\ l / 7 ::r: r • r -, -;;-L' ' • • -• , ''--' I i -.is" ~..-..P-½--,,_ t + !: ----+ \ W __. R\J R\,/ R 1./ '-R\./ R'v./ -..._ r ''w • . .::::J-5 -R:1, -~-• -le~.-· _J ·\.-T -/ ~---~op T , , ,_ f / '\ \ r,,..'w V _ .......... _ ' "~.. ........ "'w RI,/ ~--R'w' R __.,..., C ,1 "
11 Rio/ _ -cl1g¥1L'l'R TJON-iMP 2-, w " " -~ '-;;; -"-,., BIGFILTRAllQN BMP__3~ _ ~..8_ OVER:tGW_E_ISE~ l "-" -'---@ :-\46_30' RT "EcMo-:5-+--l0.73_ R',/ R',/ Rv R R',/- ~ Z \21 -. \ v SE'.~s-rt1v1-DRAIN DET),,,IL--5J:IEEL~ 1--, SEE STORM DRAIN DETAIL SBEET 16...:a;,'-(::: _ . r<IM=8T.4C4;-1~7!l_:26 =-v , ~~ ~-".----tc[_D;,f'!OtJ;Fl'YPic--/\ f"X-=6',-Y=o') ~. \~ • ~ l"'1 l"'1 . ~l • ['(' ',\ \y-t='c;i -_ • ,,~ -s:i '-.. _, ,, -1s, -,~'7 51::1:"'"S'f()~IM ~IR;AIN--Fl'Al,l-~j;\,C:C:P-1;1' . . -~-:-... ,1 , ~~\-:a,flE~ SDRSD D 09 Qi=r\l \ I! Ll I JI 11...._J_I ~w~_,'f'I v------ll-.' 'w '1" f'I I. ,. 7 --:: I -I ~I --I--, ' I --,, \ 1,r-+·~ . ~-1.;;:-i Ul Ul. "' p ____ \ 0 1½_n I O o ,f(D9I'v "a _ L':, 408 ·40';',-1 -\""-1 -L._,_-.,L 406 ~;_l,_:.--_J □r-□405Ulll: fl □ ~~ :ff,w\( o u'S,~□lJl-----□ □ 403_.,, 1 --' □ 0 ~. ,W2 -!J c\---',/.Q_-:;;;ri□ 0 • 0 ~□ ---4-□ _ ::r:--1 '0 r' 0 41Q□ -0 -□ Ii ',j ',j (> 0. / / -\, C, 1/ <!'01 ..,/_I l"'1 )> ~~ ~-"'" "'"' RT "n'□" A.1-"~"" r_; _-u -.:0~ □ ~□ _a_-□-~°';: □ --=__/{ ~□--□ _y_ 53.50' 'fn "ECFl" 404±'?0.84_, __;:-;, • _ j 53.00' RT "ECvR,,.. 404±24.84 YI -~--"EL CA I1\JCJ-'RE'/iE" -1 \":_5100' R,\J'EGR~401+87.75 , l"'1 : ---< v B.e~IQC:lb+RA-Tl0N BM!" 2-s s -• f="L ICAtvll",]@ BEA'L'-e-□ 0 n O O c,EJ\LD ijllOBL;i-RAil~N-BMJi?---·J □ ryL □ □ □clj_RB---INtPr 'fYf>E B-~L 5')□ 0 □-CURB-INJ;ET TYPnsc:.Z_(,f:=11)_ --11"'1 ---=:___,1 s s s u G G G s ' G s c s s c s c ~ c .,.._' c ~ER r,SDRSD D 02 0 -0-0 --=: --PEFl SDRSD.::--~ ~ ~ £ ~ ' G C ,. C ' ,. ------' r ----.L__ s \-=29~SJR'E'AM ~FlMWAJER ~ACTQT;Y~coNNECTION " s O n =-s □ n n cs--= n ~ □ - ~ =,~1' ,. • , ---. ~ ~ s s , ... , "", , EE=-ST.ORM=tlRAIN 1aiscicAI1e s cci: 1g s ---_2__ ·---, __ zt, ---", ~
~ ~ -. ~ _ 'c:J . 1_ J . I _//, , c\-c :.i'E
_,J,. \ ---;::;-,.,.--\ H'. / Cl ,_, • o ■'-'.. ·""77 ~FI ~-73· 0 .. _._ -=i-·:c LI V f --~ ~ 'I '
-•• \ ~-7 ----'--1-_ r' _ ~~ -'-85 'J · , , • , ! : =~ M~ ,~
3 1
G
~
o' 20' 40' 80'
~ \--:-= -90 . \ \ _) --..... k Ill · ~"~ ~ --.. d~T.:::JN=:f'J;AG1 '-JI + -_ ' ~---v, ----~
1---.: • Y, ,. -Ll/1--'"'*is• -f5' ,,__.RJG.P d[) / ' ,, _ ~ • , ~ --..... 11 \.._I~ // ~ _ ,. -------~,. l ~ 'Q =-:.v: = '-l''i --97 -' --.___,_ ·11 95 ~ -:--------r---..._r I ~"'~~~ . ~, l,.-...~"-/4.,.,111~ ~ ~ 11 =====----~
-.·: . -. ----._ ----r;I'--. ----g .__ A1/ II 1 ----,;: v NOTES:
1. PROVIDE STENCILING OR LABELING INDICATING "NO DUMPING ONLY RAIN IN THE DRAIN" AT PROPOSED CURB INLETS.
2. BIOFILTRATION BMP CONFINED BY TYPE A GRAVITY WALL,
THICKENED SIDEWALK, AND EMBEDDED MOD CURB & Gtr.
SEE IMPROVEMENT PLAN SHEETS.
,: I f
ii
//
d
~~ -
~ ~-:::--::::--..._---....::::::::· - 9 --------= = -
_5~
-85 ~
SCALE· 1'=40'
I
HAS BUIL TH
P.E. __ _ EXP, ___ _ DATE
REVIEl.'ED BY,
INSPECTOR DATE
3. FOR 8" CLEANOUT, 24"x24" CLEANOUT, 8" OBSERVATION
WELL, 8" OVERFLOW RISER, MODIFIED CURB OUTILET, AND
BIOFILTRATION BMP, SEE STORM DRAIN DETAIL SHEETS.
STORM DRAIN PLAN: EL
SCALE: 1"=40'
CAMINO REAL fSHml CITY OF CARLSBAD I SHEETS I
t---+---+--------------+---+---+---+----t l...2.:_J TRANSPORTATION DEPARTMENT 43
4. CURB INLET STATION/OFFSET TAKEN AT CENTER OF
STRUCTURE AT TOP OF CURB.
5. HEADWALL STATION/OFFSET TAKEN AT CENTER OF
STRUCTURE.
6. BIOFILTRATION BMP STATION/OFFSET TAKEN AT BACK OF
CURB.
7. 24"X24" CLEANOUT STATION/OFFSET TAKEN AT CENTER OF
STRUCTURE.
0 NO.
4 5
6 7
8 9
10 STORM
BEARING RADIUS
S57'00'35"E -
S55'23'52"E -
S52"31 '09"E -
S52"19'1 O"E -
S40'54'29"E -
S55"14'02"E -
N33'12'45"E -
DRAIN DATA
LENGTH REMARKS
62.50' 8" NON-PERFORATED PVC
136.22' 8" PERFORATED PVC
122.50' 8" PERFORATED PVC
47.67' 8" NON-PERFORATED PVC
50.26' 18" RCP
1 145D FRAZEE ROAD
178.30' 18" RCP
SUITE 100
CALL 2 FULL WORKING DAYS SAN DIEGO, CA Si3taB
53.47' 36" RCP BEFORE YOU DIG
·?j(QFESS/~ . ~=cc l
(ff;"' <'.i'
~ PAMELA ~~ ~ DALCIN-WALLING ~
"' "' No. C52187
-I<\ Exp. 12/31 /22 >t
(858) 514-83?7 .J'~ Cl~L ~,~
• ?~ or c~c'1 ~
DA TE I INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE I INITIAL
DlHER APPROVAL
DATE I INITIAL
CITY APPROVAL
STORM DRAIN PLANS AND PROFILES FOR '
EL CAMINO REAL
ROADWAY IMPROVEMENTS
FROM SUNNY CREEK Rd TO JACKSPAR Dr
APPROVED: HOSSEIN AJIDEH
ENGINEERING MANAGER RCE 75991 EXPIRES 6/30/24 DATE
DWN BY:~ CHKD BY: SK
RVWD BY: PDW
PROJECT NO. I DRAV¥1NG NO.
6094 DWG 529-1
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 43 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 44 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 45 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 46 of 89
AHEADAHEAD
SIGNALSIGNAL
AHEAD
SIGNAL
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sunny Creek
SPEED
LIMIT
55 Rd 2800
OPEN TO
THE PUBLIC
Sept. 26, 2023
Item #6 Page 47 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 48 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
ROAD WORK
END
WORK
AHEAD
ROADSIDEWALK CLOSED
CROSS HERE
LANE
CLOSEDCLOSED
BIKE LANE
MAY USE
FULL LANE
BIKE
AHEAD
Sept. 26, 2023
Item #6 Page 49 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
WORK CLOSED CLOSED
CLOSED
SHOULDER
M P H
SIDEWALK CLOSED
AHEAD
CROSS HERE
LANE
CLOSEDCLOSED
BIKE LANE ROAD
AHEAD
SHOULDER SHOULDER
RIGHT
AHEAD
SIDEWALK
NO
45 BIKE
AHEAD
SIDEWALK CLOSED
CROSS HERE
SIDEWALK CLOSED
USE OTHER SIDE
MAY USE
FULL LANE
Sept. 26, 2023
Item #6 Page 50 of 89
AHEADAHEAD
SIGNALSIGNAL
AHEAD
SIGNAL
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 51 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 52 of 89
AHEADAHEAD
SIGNALSIGNAL
AHEAD
SIGNAL
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
TRAFFIC SIGNAL NOTES
CONSTRUCTION NOTES
LEFT TURN
YIELD
ON GREEN
Sept. 26, 2023
Item #6 Page 53 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 54 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 55 of 89
EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 100% PS&E SUBMITTAL (09/01/2022) 811
Sept. 26, 2023
Item #6 Page 56 of 89
Sept. 26, 2023
Item #6 Page 57 of 89
Sept. 26, 2023
Item #6 Page 58 of 89
Sept. 26, 2023
Item #6 Page 59 of 89
Sept. 26, 2023
Item #6 Page 60 of 89
Sept. 26, 2023
Item #6 Page 61 of 89
Sept. 26, 2023
Item #6 Page 62 of 89
Sept. 26, 2023
Item #6 Page 63 of 89
Sept. 26, 2023
Item #6 Page 64 of 89
Sept. 26, 2023
Item #6 Page 65 of 89
Sept. 26, 2023
Item #6 Page 66 of 89
Sept. 26, 2023
Item #6 Page 67 of 89
Sept. 26, 2023
Item #6 Page 68 of 89
Sept. 26, 2023
Item #6 Page 69 of 89
Sept. 26, 2023
Item #6 Page 70 of 89
1450 Frazee Road San Diego CA 92108 Tele: 858 514 8377 Fax: 858 514 8608 BIOLOG
ICAL SURVEY MEMORANDUM
Agency: Cit
y of Carlsbad
Attention: Brandon Miles, Project Manager
From: Amy Dunay, Senior Environmental Planner
Project: El Camino Real Widening Sunny Creek to Jackspar Project Subject: Biological Survey Memorandum
Date: July 6, 2022
A biological survey was completed for the El Camino Real Widening Sunny Creek to Jackspar Project (Project) on April 14, 2021 by Dokken Engineering b iologist Scott Salembier. No endangered, rare, or threatened species were observed, nor was habitat which could support any such species observed. Vegetation communities mapped within the Project Area consist of non- native grassland and remnant/isolated native shrubs such as coast goldenbush (Isocoma menziesii), coyoe brush (Baccharis pilularis), and a few California sagebrush (Artemisia californica) and toyon (Heteromeles arbutifolia). While some isolated native shrub species found onsite may be used by the California gnatcatcher for foraging, this area is fragmented, completely surrounded by urban development and/or disced fields, and has no connection to high quality habitat. Therefore, the isolated shrubs are not considered a sensitive vegetation community or habitat for the California gnatcatcher. No other plant or animal species would be impacted. No waters of the State or waters of the US would be impacted.
The non- native grassland is a habitat communit y that requires mitigation per the Cit y of Carlsbad (City) Habitat Management Plan (HMP). The Project is a part of El Camino Real Widening to a 6-lane arterial, as identified in the HMP Appendix B, and therefore is a covered City project eligible for mitigation through the Lake Calavera mitigation parcel.
Please see
below for discussion of Project details, habitat communities , and evaluation of Project impacts and mitigation.
Project Descr
iption El Camino Real currently exists as a six -lane roadway through much of its length in the City of Carlsbad. In the area of the Project, the current layout of El Camino Real includes three southbound lanes but only two northbound lanes. Through a combination of roadway widening and pavement restriping, the Project will provide for three northbound through lanes, including the addition of curb, gutter, and sidewalk. The widening of the roadway will occur between the future extension of Sunny Creek Road and Jackspar Drive, a distance of approximately 1,600 feet (see Figures 1-3).
Pedestrian and bi
cycle improvements will also be provided as part of the P roject. In the southbound direction the existing pedestrian and bicycle facilities meet current city standards, Exhibit 7
Sept. 26, 2023
Item #6 Page 71 of 89
1450 Frazee Road San Diego CA 92108 Tele: 858 514 8377 Fax: 858 514 8608 including a sidewalk and a striped bicycle lane. In the northbound direction, a bicycle lane exists for much of the length of the project, but there is a gap in the bicycle lane of approximately 300 feet in the area just south of the Jackspar Drive intersection. There is no sidewalk provided in the northbound direction along the entire length of the Project. To alleviate this situation, the P roject will provide a new sidewalk and will also include improvements to the bicycle lane along the entire P roject length to meet current city standards.
The Project is predominantly within the right of way and adjacent to Assessor Parcel Numbers (APN) 209-060-5800, 209-060-5300, 209-060-4800, 209-090-1100. These properties feature limited improvements and are mostly vacant. Along these properties a right of way acquisition and temporary construction easements are proposed. Earthwork will consist of 5,700 cubic yards of cut and 2,250 cubic yards of fill. The following P roject design considerations are also being proposed to minimize impacts and address community character: El Camino Real Corridor Development Standards.
Project improvements will allow for this segment of El Camino Real to become 6- lane arterial roadway facility consistent with the Mobility Element of the City’s General Plan.
Minor right -of-way a nd temporary construction easements will be acquired at key locations along the Project alignment from approximately four (4) parcels. The new right-of-way would match the ultimate right -of-way to the north and south of the Project limits. Traffic would be accommodated during construction to allow movement through the area. Construction is expected to last approximately six months.
Utility relocations may be needed to accommodate the proposed improvements to the roadway corridor. Of note, there are dual hi gh-pressure petroleum lines running underneath the median and existing embankment. Existing telecom lines run parallel to the Project . An existing overhead power pole will be relocated outside Project improvements. In addition, existing fire hydrants and w ater meters will be relocated. All utility relocations would occur within the Project area.
Species Observed
The Project Area consist of non-native grassland and remnant/isolated native shrubs (see Figure 4 and Representative Photographs). See below for more details.
Non-nat
ive Grassland
Non-native grassland is found in the northeast portion of the Project area, adjacent to El Camino Real. The grassland habitat is dominated by non -native species including telegraph weed (Heterotheca grandiflora), wild oat ( Avena fatua), and ripgut brome ( Bromus diandrus).
A few other non- dominant species in this community include California brome ( Bromus carinatus), black mustard ( Brassica nigra), and hawkbit ( Leontodon saxatilis) . The Project area contains approximately 0.88 acres of non-native grassland habitat.
Remnant/Isolated Native Shrubs
The Project area also contains approximately 710 linear feet of remnant/isolated native shrubs, such as coast al goldenbush (Isocoma menziesii), coyot e brush (Baccharis pilularis), and a few California sagebrush (Artemisia californica) , toyon (Heteromeles arbutifolia) , mule fat (Baccharis salicifolia), lemonade berry (Rhus integrifolia), and black elderberry (Sambucus nigra). While some of these plant species can be used by the California gnatcatcher for Sept. 26, 2023
Item #6 Page 72 of 89
1450 Frazee Road San Diego CA 92108 Tele: 858 514 8377 Fax: 858 514 8608 foraging, the remnant of disturbed vegetation is fragmented and completely surrounded by urban development and/or disced fields, and have no connection to high-quality habitat Eucalyptus Grove
The Project area contains one grove of blue gum eucalyptus ( Eucalyptus globulus) and is dominated by this single species. The Project area contains approximately 0.15 acres of eucalyptus grove.
Hardscape
Hardscape within the Project area is defined as urban, impervious, non -vegetated surfaces including El Camino Real roadway , medians, and sidewalks. The Project area contains approximately 6.34 acres of hardscape.
Landscape
Landscape habitat within the Project area consist s of a regularly mowed patch of golf course grass. This habitat community is dominated by Bermuda grass ( Cynodon dactylon ) but contains other grass species such as ripgut brome and red -stemmed filaree ( Erodium cicutarium). The Project area contains approximately 0.61 acres of landscape.
Species Observed Table
Species Common Name Species Scientific Name Native (N)/Not Native (X) [Cal-IPC Rating]
Forbs
Alkali Mallow Malvella leprosa N
Barry Saltbush Atriplex semibaccata X – [Moderate]
Black Medick Medicago lupulina X
Black Mustard Brassica nigra X – [Moderate]
Bur Chevril Anthriscus caucalis X
California Buckwheat Eriogonum fasciculatum N
Canada Horseweed Erigeron canadensis N
Coast Morning Glory Calystegia macrostegia N
Common Fiddleneck Amsinckia intermedia N
Curly Dock Rumex crispus X – [Limited]
Deerweed Acmispon glaber N
Field Mustard Brassica rapa X – [Limited]
Garland Daisy Glebionis coronaria X – [Moderate]
Hawkbit Leontodon saxatilis X
Jersey Cudweed Pseudognapgalium
luteoalbum
X
Jimsonweed Datura wrightii N
Poison Hemlock Conium maculatum X – [Moderate]
Prickly Lettuce Lactuca serriola X
Red-Stem Filaree Erodium cicutarium X – [Limited]
Russian Thistle Salsola tragus X – [Limited]
Sand Mat Cardionema ramosissimum N
Scarlet Pimpernel Lysimachia arvensis X
Shepherd’s Purse Capsella bursa-pastoris X
Sept. 26, 2023
Item #6 Page 73 of 89
1450 Frazee Road San Diego CA 92108 Tele: 858 514 8377 Fax: 858 514 8608 Sweet Fennel Foeniculum vulgare X – [Moderate]
Telegraph Weed Heterotheca grandiflora N
Western Blue Eyed Grass Sisyrinchium bellum N
Western Ragweed Ambrosia psilostachya N
Yellow Sweetclover Melilotus indicus X
Grasses
Bermuda Grass Cynodon dactylon X – [Moderate]
California Brome Bromus carinatus N
Fountaingrass Pennisetum setaceum X – [Moderate]
Foxtail Brome Bromus madritensis X
Italian Rye Festuca perennis X – [Moderate]
Mediterranean Barley Hordeum marinum X
Mexican Feathergrass Stipa tenuissima X
Pampas Grass Cortaderia jubata X –[High]
Ripgut Brome Bromus diandrus X – [Moderate]
Soft Chess Bromus hordeaceus X – [Limited]
Wild Oat Grass Avena fatua X – [Moderate]
Shrubs
Black Elderberry Sambucus nigra N
California Sage Artemisia californica N
Coastal Goldenbush Isocoma menziesii N
Coyote Brush Baccharis pilularis N
Lemonade Berry Rhus integrifolia N
Mule Fat Baccharis salicifolia N
Toyon Heteromeles arbutifolia N
Trees
Blue Gum Eucalyptus globulus X – [Limited]
Chamise Adenostoma fasciculatum N
Laurel Sumac Malosma laurina N
Pacific Willow Salix lasiandra N
Tree Tobacco Nicotiana glauca X – [Moderate]
Mammals
California Ground Squirrel Otospermophilus beecheyi N/A Birds
Black Phoebe Sayornis nigricans N/A
Song Sparrow Melospiza melodia N/A
Project Impacts and Mitigation
Project impacts to habitat communities are summarized in the table below. The Project would result in permanent impacts to the following vegetation community: non-native grassland (0.68 acres) (see Figure 5). Permanent impacts would occur as a result of the proposed bike lanes, storm drain improvements and grading limits. While some isolated native shrub species found onsite may be used by the California gnatcatcher for foraging, this area is fragmented, completely surrounded by urban development and/or disced fields, and has no connection to high quality habitat. Therefore, the isolated shrubs are not considered a sensitive vegetation community or habitat for the California gnatcatcher. No other plant or animal species would be impacted. No waters of the State or waters of the US would be impacted.
Sept. 26, 2023
Item #6 Page 74 of 89
1450 Frazee Road San Diego CA 92108 Tele: 858 514 8377 Fax: 858 514 8608 Access for Project construction would occur from the existing El Camino Real roadway and two pre-existing dirt roads just northeast of El Camino Real. No temporary impacts to habitat communities are anticipated. Additionally, the Project is within the coastal zone and is subject to the Coastal Zone Standards , which requires a no net loss of specific habitat comm unities.
However, non-native grassland has not been identified as a habitat requiring no net loss (HMP page D-115). Therefore, offset for these impacts can be accomplished through the City’s Lake Calavera Mitigation Parcel.
Summary of Impacts
Habitat Community (*Type) Permanent Impact (acres) Mitigation Requirement Non-native Grassland (Type
E) 0.68 acres
Purchase acre-credits at a
0.5:1 ratio at the Lake
Calavera Mitigation Parcel
*Type of habitat community is taken from Table 11 in the City of Carlsbad HMP
Per the City of Carlsbad’s HMP (HMP Table 11) , if onsite revegetation for impacts to non- native grassland and disturbed lands is not possible, then the City could purchase acres at the Lake Calavera Mitigation Parcel to offset the impacts. As onsite revegetation cannot occur for the Project, the following will be included as part of the project description:
As revegetation of non -native grassland and remnant/isolated native shrubs is not possible due to the narrow right -of-way, in accordance with the City of Carlsbad’s HMP, permanent impacts to 0.68 acres of non- native grassland within the Project area will be offset at a 0.5:1 ratio, respectively, through purchase of acre- credits at the Lake Calavera Mitigation Parcel (a total of 0. 34 acres will be debited). Purchased credits may be out -of-kind for this habitat community.
Attachments
• Map Figures 1-5
• Representative Photographs
Sept. 26, 2023
Item #6 Page 75 of 89
I
0 10 20 30
Miles
Source: ESRI 2008; Dokken Engineering1/13/2021; Created By: rroberts
R I V E R S I D E
S A N B E R N A R D I N O
S A N D I E G O I M P E R I A L
L O S A N G E L E S
O R A N G E
K E R N
§¨¦8
§¨¦40
§¨¦10§¨¦15
§¨¦5
§¨¦215
§¨¦805
§¨¦405
§¨¦605
§¨¦210
§¨¦110
§¨¦105
§¨¦710 §¨¦10
§¨¦5
§¨¦5
§¨¦210
§¨¦15
§¨¦215
§¨¦8
§¨¦210
§¨¦215
§¨¦710
§¨¦215
§¨¦15
§¨¦40
§¨¦5
§¨¦15
§¨¦110
§¨¦5
£¤395
UV78
UV62
UV247
UV2
UV14
UV111
UV94
UV76
UV19
UV74
UV18
UV98
UV38
UV60
UV86
UV177
UV78UV86
UV86
UV74
UV14
Joshua Tree National Park
Angeles National Forest
Mojave National Preserve
San Bernardino National Forest
Cleveland National Forest
Sweetwater Marsh National Wma
Cabrillo Natl Monument
M e x i c o
\\kings\gis\2751 ECR Jackspar\F1_Vicinity.mxd
FIGURE 1
Project Vicinity
El Camino Real Widening Sunny Creek to Jackspar Project Carlsbad, San Diego County, California
PACIFIC
OCEAN
San Diego
County
CA
NV
AZ
OR
UT
ID
^_
Project Location
Sept. 26, 2023
Item #6 Page 76 of 89
CR 12
CR S11
College Blvd
Tamarack
Ave
K
elly
D
r
Carlsbad Vil l age Dr
CR S11
CR 12
College Blvd
Faraday Ave
Cannon Rd
Sunny Cr eek Rd
PontiacDr
College
Blvd
Glasgow
Dr
O
rion
St
Frost Ave
Park Dr
St
R utherford Rd
Palom
arO
aksW
ay Yarrow
Dr
Aston Ave
Rockefeller Rd
Stewart Rd
Hemin gway Dr
Camino Hills Dr
PalmerW
ay
A ircraft Rd
Impala Dr
Don Miguel Dr
Owens Ave
Tolkien Way
Carrier Ave
Leisure Vi lla geWay
Priestly Dr
Gateway Rd
Foxtail Loop
W Oaks Way
W
isteriaDr
Alverton Dr
Brya nt Dr
Salk Ave
Wh itmanW
ay
Regent Rd
Saddle Dr
Galicia
W
ay
Peninsula Dr
Laredo St
Otis Ct
Gateshea d Rd
Kellogg Ave
Don R odolfo Dr
Don Juan Dr
Stanford St
Tiburon Ave
Pindar Way
M
ajorca Way
Pirgos Way
Lancaster Rd
Dryden Pl
Kingston St
Byron Pl
Master s Rd
Carnegie Ct
Coyote Ct
Van Allen Way
VIA Marta
Cordoba W
ay
Ravine Dr
Merwin Dr
Crestview Dr
Lynch Ct
Jetty Pt
Cindy Ave
Darwin Ct
Newton Dr
Forecastle Ct
Corte Del Cedro
Coleridge Ct
Athos Way
Cougar Dr
Wright Pl
St
CannonRd
Cannon Rd
FaradayAve
CollegeBlvd
Agua
Hedionda Creek
Agua Hedionda Creek
Agua Hed ionda Creek
McClellan-Palomar AirportMcClellan-Palomar Airport
Legoland Family
Park
v:\1836_11thStBridge\Cultural\F2_Loc_10-12-10.mxd
0 0.25 0.5 0.75 1
Miles
I
Source: ESRI World Street Maps Online; Dokken Engineering 8/24/2021; Created By: amyd Project Area Limits
Project Location
FIGURE 2
Project Location
El Camino Real Widening Sunny Creek to Jackspar Project Carlsbad, San Diego County, California
Sept. 26, 2023
Item #6 Page 77 of 89
!
!
!
!
!
!
! !
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!!
!
!
!!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
El Camino Real
Jackspar Dr
Sunny Creek Rd
Camino Hills Dr
College Blvd
Longfellow Rd
Shelley Pl
Forecastle Ct
Browning Rd
Frost Ave
Keats Pl
Don Miguel Dr
Bryant Dr
Morgan Rd
Spencer Ln
Palmer Way
Byron Pl
Rancho Carlsbad Dr
Masters Rd
Lanyard Pl
Don Quixote Dr
Figure 3
Project Features
El Camino Real Widening Sunny Creek to Jackspar
Carlsbad, San Diego County, California
Source: ESRI Maps Online; Dokken Engineering 4/7/2022; Created By: amydV:\2751 ECR Jackspar\F3_Project Features.mxd I
0 170 340 510 680
Feet
Project Area Limits
Bike Lane
Roadway Striping
Grading Limits
Retaining Wall
! ! Storm Drain Improvements
Existing ROW
Sept. 26, 2023
Item #6 Page 78 of 89
El Camino Real
College Blvd
Jackspar Dr
Sunny Creek Rd
Camino Hills Dr
College Blvd
Shelley Pl
Palmer Way
Forecastle Ct
Longfellow Rd
Browning Rd
Don Miguel Dr
Bryant Dr
Morgan Rd
Frost Ave
Keats Pl
Spencer Ln
Don Quixote Dr
Rancho Carlsbad Dr
Lanyard Pl
Don Tomaso Dr
Byron Pl
Figure 4
Vegetation Communities
El Camino Real Widening Sunny Creek to Jackspar
Carlsbad, San Diego County, California
Source: ESRI Maps Online; Dokken Engineering 6/3/2022; Created By: amydV:\2751 ECR Jackspar\Biology\F4_Veg Communties_Rev.mxd I
0 200 400 600 800
Feet
Preliminary Study Area
Vegetation Communities
Non-Native Grassland (0.88 acres)
Remnant/Isolated Native Shrubs (0.75 acres)
Eucalyptus Grove (0.15 acres)
Hardscape (3.66 acres)
Landscape (0.61 acres)
Sept. 26, 2023
Item #6 Page 79 of 89
Existing Access Route
Existing Access Route
El Camino Real
Sunny Creek Rd
Camino Hills Dr
Forecastle Ct
Figure 5
Project Impacts
El Camino Real Widening Sunny Creek to Jackspar
Carlsbad, San Diego County, California
Source: ESRI Maps Online; Dokken Engineering 6/3/2022; Created By: amydV:\2751 ECR Jackspar\Biology\F5_Impact Map.mxd I
0 75 150 225 300
Feet
Preliminary Study Area
Project Features
Bike Lane
Roadway Striping
Grading Limits
Retaining Wall
! ! ! Storm Drain Improvements
Vegetation Communities
Non-Native Grassland (0.88 acres)
Remnant/Isolated Native Shrubs (0.75 acres)
Permanent Impacts
Non-Native Grassland (0.18 acres)
Remnant/Isolated Native Shrubs (0.50 acres)
Sept. 26, 2023
Item #6 Page 80 of 89
Representative Photographs
Representative Photo 1: Representative of disturbed annual grassland habitat within the Project area, facing west (taken April 2021).
Sept. 26, 2023
Item #6 Page 81 of 89
Representative Photo 2: Representative of Jackspar Drive and El Camino Real intersection, considered a hardscape within the Project area, facing west (taken April 2021).
Sept. 26, 2023
Item #6 Page 82 of 89
Representative Photo 3: Representative of the eucalyptus grove located adjacent to El Camino Real, facing northwest (taken April 2021).
Sept. 26, 2023
Item #6 Page 83 of 89
Representative Photo 4: Representative of landscape habitat within the Project area facing southeast (taken April 2021).
Sept. 26, 2023
Item #6 Page 84 of 89
Representative Photo 5: Representative of remnant/isolated native shrubs within the Project area, facing southwest (taken April 2021).
Sept. 26, 2023
Item #6 Page 85 of 89
Open
Space
Exhibit 8
Sept. 26, 2023
Item #6 Page 86 of 89
City of Carlsbad
Annual Open Space Status Report for Fiscal Year 2021-22 July 1, 2021 - June 30, 2022
The table below shows the amount of designated open space acreage by category in each of the Local Facilities Management Zones (LFMZ). This data is current through the end of the Fiscal Year 2021-22, ending on June 30, 2022.
A total of 4.67 acres of open space was added to the city’s inventory under open space category 1 (preservation of resources) during the reporting period, which consists of a 1.64-acre conservation easement in LMFZ 5 and two conservation easements (3.03 acres total) in LMFZ 6.
1 2 3 4
LFMZ
Preservation
of Resources
(acres)
Managed
Production
of
Resources
(acres)
Outdoor
Recreation
(acres)
Aesthetic,
Cultural,
Educational
(acres)
Total
LFMZ
Open
Space
Total
LFMZ
Acreage
Percentage
of LFMZ in
open
space
1 540.2 6.8 133.2 35.6 715.8 3,395.5 21.10%
2 91.9 0.0 9.5 25.8 127.2 805.4 15.80%
3 55.7 0.0 3.3 0.0 59.0 625.4 9.40%
4 32.9 0.0 25.3 44.6 102.8 507.8 20.20%
5 484.8 0.0 110.9 4.7 600.4 2,440.0 24.61%
6 231.9 0.0 280.4 18.9 531.2 2,606.9 20.38%
7 276.9 0.0 28.3 39.2 344.4 812.8 42.40%
8 490.8 0.0 90.9 13.8 595.5 743.1 80.10%
9 195.1 0.0 3.9 8.7 207.7 471.6 44.10%
10 246.8 0.0 114.2 103.2 464.2 766.8 60.50%
11 920.2 0.0 41.9 148.7 1,110.8 2,290.6 48.50%
12 95.3 0.0 16.5 25.9 137.7 660.9 20.80%
13 113.7 232.4 0.0 0.0 346.1 736.9 47.00%
14 535.0 0.0 21.1 9.0 565.1 827.5 68.30%
15 716.6 89.5 34.2 5.1 845.4 1,536.3 55.00%
16 219.7 0.0 0.0 0.0 219.7 413.7 53.10%
17 187.7 0.0 5.6 31.2 224.5 588.4 38.20%
18 299.9 0.0 14.0 30.8 344.7 899.9 38.30%
19 794.5 0.0 200.9 18.7 1,014.1 1,611.6 62.90%
20 200.2 0.0 34.8 23.6 258.6 805.1 32.10%
21 108.5 0.0 5.5 4.4 118.4 267.4 44.30%
22 69.2 0.0 1.5 3.5 74.2 431.0 17.20%
23 184.4 0.0 0.0 0.0 184.4 284.4 64.80%
24 65.3 0.0 10.0 6.6 81.9 199.6 41.00%
25 232.0 0.0 0.1 0.0 232.1 299.9 77.40%
TOTAL
CITYWIDE 7,389.3 328.7 1,186.0 602.0 9,506.0 25,028.5 38.0% Exhibit 9
Sept. 26, 2023
Item #6 Page 87 of 89
OCEANSIDE
SAN MARCOS
}} 7 8