2023-10-10; City Council; 04; Approve Plans, Specifications and Contract Documents and Authorize Advertising for Bids for the Calavera Hills Community Center Refurbishment Project

Carlsbad City Council
October 10, 2023

Document
2023-10-10; City Council; 04; Approve Plans, Specifications and Contract Documents and Authorize Advertising for Bids for the Calavera Hills Community Center Refurbishment Project
Meeting
October 10, 2023
Body
Carlsbad City Council
Pages
176
Original file
704 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

CA Review GH
Meeting Date: Oct. 10, 2023
To: Mayor and City Council
From: Scott Chadwick, City Manager
Staff Contact: Molly Amendt, Senior Engineer
[email protected], 760-573-3368
Subject: Approve Plans, Specifications and Contract Documents and Authorize Advertising for Bids for the Calavera Hills Community Center Refurbishment Project
District: 2
Rec
ommended Action
Adopt a resolution approving the plans, specifications and contract documents and authorizing the City Clerk to advertise for bids for the Calavera Hills Community Center Refurbishment Project.

Executive Summary
The Calavera Hills Community Center, located at 2997 Glasgow Drive, as shown in Exhibit 2, provides a wide range of programs and services to the community including preschool programs, youth day camps, classes for all ages and open gymnasium play.

The Community Center building was built in 1988 and requires refurbishment of the roof, exterior siding and painting. Staff request that the City Council approve the completed and permitted plans, specifications and contract documents for the Calavera Hills Community Center Refurbishment, Capital Improvement Program Project No. 4746 and authorize the City Clerk to advertise the project for construction bids.

City Council approval of these plans and specifications is required under Carlsbad Municipal Code Section 3.28.080(E) because the expected cost of this work is greater than $200,000.

Explanation & Analysis
The city conducted a facilities condition assessment of the Calavera Hills Community Center and nearby restroom and concessions building in 2018. The assessment identified the need to replace the roof and siding and recommended other minor improvements, including painting the facility. The project was approved as part of the city’s Capital Improvement Program budget in fiscal year 2019-20.

In early 2021, staff issued an agreement to an architectural firm to prepare construction drawings and specifications to make the repairs and replacements recommended in the condition assessment report.

Oct. 10, 2023
Item #4 Page 1 of 7
The project design, as shown in Exhibit 3, has been completed, approved by staff and has received a building permit, which is on file for the successful contractor to use upon contract award.

The scope of the project includes:
• Replacing a portion of the existing low-slope roofing with single-ply membrane, a wide sheeting designed for low slope roofs
• Applying a fluid roof system over the existing roof for a portion of the existing low-slope roofing
• Replacing clay tile roofing with standing seam metal roofing consisting of panels locked together with concealed fasteners
• Patching and repairing areas of exterior cement plaster damage • Repainting all previously painted surfaces
Staff recommend that the City Council approve the completed and permitted project plans, specifications and contract documents and authorize the City Clerk to advertise the project for construction bids.

Fiscal Analysis
No additional funding is requested at this time. However, based on the current construction cost estimate, it is anticipated that additional funding will be necessary to complete the project.

Staff will request additional funding, as needed, when the item returns to the City Council to share bid results and request a contract award to the lowest responsive, responsible bidder.

Calavera Hills Community Center Refurbishment Project
Capital Improvement Program Project No. 4746
Total appropriation to date $1,985,000
Total expenditures/encumbrances to date -$96,000
Total available balance $1,889,000
Additional project costs
Construction contract (engineer’s estimate) -$2,101,900 Construction contingency (estimated) -$210,000
Construction management, inspection and testing (estimated) -$210,000 Total estimated construction costs -$2,521,900
Estimated additional funds needed
(To be requested at the time contract is awarded) $632,900 Next Steps
With the City Council’s approval, the City Clerk will advertise a request for bids for the project.

Staff will then evaluate the bids received and identify the lowest responsive and responsible bidder.

Staff will then return to the City Council in early 2024 with a recommendation to award a construction contract to the lowest responsive and responsible bidder and request additional funding if needed.

Oct. 10, 2023
Item #4 Page 2 of 7
Environmental Evaluation
The City Planner, through the process outlined in Carlsbad Municipal Code Section 19.04.060, has determined that the project belongs to a class of projects that the state Secretary for Natural Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents in accordance with Section 15301 (d) of California Environmental Quality Act Guidelines.

In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the CEQA guidelines do not apply to this project. The project is consistent with the Class 1 exemption in Section 15301 (d) because it consists of maintenance of public facilities, such as restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety.

Exhibits

1. City Council resolution

2. Location map

3. Plans, specifications and contract documents (on file in the Office of the City Clerk) Oct. 10, 2023
Item #4 Page 3 of 7
RESOLUTION NO. 2023-258

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, APPROVING THE PLANS, SPECIFICATIONS AND CONTRACT

DOCUMENTS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS

FOR THE CALAVERA HILLS COMMUNITY CENTER REFURBISHMENT PROJECT WHEREAS, the City Council of the City of Carlsbad, California has determined that the plans, specifications and contract documents for the Calavera Hills Community Center Refurbishment, Capital Improvement Program Project No. 4746, have been completed to the satisfaction of staff; and WHEREAS, the City Council has determined it necessary, desirable and in the public interest to advertise the project for construction bids; and
WHEREAS, the plans, specifications and contract documents for the project have been prepared, and are on file at the City Clerk's office and are incorporated by reference; and WHEREAS, City Council approval of the plans and specifications is required under Carlsbad Municipal Code Section 3.28.080(E) because the expected value to construct the project exceeds the $200,000 limit established by the Public Contract Code, including the alternative provisions of the Uniform Public Construction Cost Accounting Act; and
WHEREAS, the City Planner has determined that the project is exempt from the California Environmental Quality Act, or CEQA, per State CEQA Guidelines Section 15301(d), which applies to the restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety, and that no exception to the exemption as set forth in CEQA Guidelines Section 15300.2 applies.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:

1. That the above recitations are true and correct.

2. That the plans, specifications and contract documents for the Calavera Hills Community Center Refurbishment, Capital Improvement Program Project No. 4746, are approved and on file at the City Clerk's Office.

3. That the City Clerk is hereby authorized and directed to publish, in accordance with state law and Carlsbad Municipal Code Section 3.28.080(C), a notice to contractors inviting bids for construction of the project in accordance with plans, specifications and contract documents referred to herein.

Exhibit 1
Oct. 10, 2023 Item #4 Page 4 of 7
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 10th day of Oct., 2023, by the following vote, to wit:

AYES:

NAYS:

ABSTAIN:

ABSENT:

Blackburn, Bhat-Patel, Acosta, Burkholder.

None.

None.

Luna.

KEITH BLACKBURN, Mayor
SHERRY FREISINGER, City Clerk
(SEAL)
Oct. 10, 2023 Item #4 Page 5 of 7

ROCK RIDGE RD

MIDDLETONDR

WOODSTOCK ST

EDGEWARE WY

GLASGOW
DR

HARWICH DR

TAMARACK AV

CARLSBAD VILLAGE DR
COL
LEGE
BL
TAM
ARACK
AV
Copyright nearmap 2015

LOCA TION MA P

PROJECT NAME EXHIBIT
2 CALAVERA HILLS COMMUNITY CENTER

REFURBISHMENT PROJECT
$
!Å
**#
5$
**#
5$ ·|}þ78
VISTA

ENCINITAS

SAN MARCOS
S.D. COUNTY

OCEANSIDE

PACIFIC
OCEAN

TAMARACK AV

LA C OSTA AV

P OINSETTIA LN

CARLSBAD
BL

EL CAMINOREALAVI
AR
A
PY

A LGARD

CA NNONRD
Created By: Sara Jadhav 8/15/2023 J:\SaraJadhav_Customers\MollyAmendt\CalaveraHills\LocationMap-4746.mxd

SITE LOCATION
$
!Å

PROJECT
NUMBER
4746
Exhibit 2
Oct. 10, 2023
Item #4 Page 6 of 7
Exhibit 3
P
lans, specifications and contract documents
(on file in the Office of the City Clerk)
Oct. 10, 2023
Item #4 Page 7 of 7
00 01 01 TITLE PAGE Date Printed: September 14, 2023
D
ocument Version: 1.0 Current Update: May 2023

CITY OF CARLSBAD

CONTRACT DOCUMENTS
FOR:

Calavera Hills Community Center Refurbishment
Project No. 4746
PWS24-2283FAC
1635 Faraday Ave, Carlsbad, CA 92008
Email: [email protected]
Exhibit 3
TABLE OF CONTENTS Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023
Table of Contents
SECTION 1 .................................................................................................................................... 1 00 11 10 NOTICE INVITING BIDS .................................................................................................. 1

1. RECEIPT OF BIDS. ................................................................................................................. 1

2. DESCRIPTION OF WORK. ...................................................................................................... 1

3. COMPLETION OF WORK. ..................................................................................................... 1

4. OPENING AND AWARD OF BIDS. ......................................................................................... 1

5. PERIOD FOR AWARD. ........................................................................................................... 1

6. BIDDER QUALIFICATIONS..................................................................................................... 2

7. PRE-BID CONFERENCE. ........................................................................................................ 2

8. OBTAINING CONTRACT DOCUMENTS. ................................................................................ 2

9. BID GUARANTEE AND BONDS. ............................................................................................ 2

10. PREVAILING WAGE RATES AND LABOR COMPLIANCE. ..................................................... 3

11. PROJECT ADMINISTRATION/QUESTIONS. ......................................................................... 3 00 21 10 INSTRUCTIONS TO BIDDERS .......................................................................................... 4

1. SECURING CONTRACT DOCUMENTS. .................................................................................. 4

2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS. ...................................................... 4

3. INTERPRETATION OF DRAWINGS AND DOCUMENTS. ........................................................ 4

4. QUESTIONS. ......................................................................................................................... 5

5. PRE-BID CONFERENCE. ........................................................................................................ 5

6. ADDENDA. ............................................................................................................................ 6

7. ALTERNATE BIDS. ................................................................................................................. 6

8. COMPLETION OF BID FORMS. ............................................................................................. 6

9. GOVERNING GENERAL PROVISIONS. ................................................................................... 7

TABLE OF CONTENTS Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

10. MODIFICATIONS OF BIDS. .................................................................................................. 7

11. BID GUARANTEE. ............................................................................................................... 7

12. LABOR & MATERIAL BOND AND PERFORMANCE & WARRANTY BOND REQUIREMENTS. 8

13. SUBSTITUTION OF SECURITY. ............................................................................................ 9

14. OPTIONAL ESCROW FOR SECURITY DEPOSIT. ................................................................... 9

15. INSURANCE REQUIREMENTS. ............................................................................................ 9

16. LICENSING REQUIREMENTS. ............................................................................................ 10

17. SUBCONTRACTORS. ......................................................................................................... 10

18. BIDDER INFORMATION AND EXPERIENCE FORM. ........................................................... 11

19. NON-COLLUSION AFFIDAVIT. .......................................................................................... 12

20. IRAN CONTRACTING ACT OF 2010. .................................................................................. 12

21. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION. ..................................... 12

22. PREVAILING WAGES. ........................................................................................................ 13

23. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS. ............................................ 13

24. SIGNING OF BIDS. ............................................................................................................ 13

25. SUBMISSION OF SEALED BIDS. ........................................................................................ 14

26. OPENING OF BIDS. ........................................................................................................... 14

27. WITHDRAWAL OF BID. ..................................................................................................... 15

28. BIDDERS INTERESTED IN MORE THAN ONE BID. ............................................................. 15

29. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES, AND FEES. ........................ 15

30. PERMIT AND INSPECTION FEE ALLOWANCE. .................................................................. 15

31. BASIS OF AWARD; BALANCED BID. .................................................................................. 16

32. AWARD PROCESS. ............................................................................................................ 16

33. EXECUTION OF CONTRACT. ............................................................................................. 16

TABLE OF CONTENTS Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

34. BUSINESS LICENSE ........................................................................................................... 16

35. PARTICIPATION OF MINORITY AND WOMEN-OWNED BUSINESSES. .............................. 16

36. USE OF RECYCLED MATERIALS ......................................................................................... 16

37. STATUTORY REFERENCES ................................................................................................ 17 00 41 00 BID FORM .................................................................................................................... 18

1. BID SCHEDULE ................................................................................................................ 19

2. TOTAL BID PRICE ............................................................................................................ 21

3. RECITALS ........................................................................................................................ 21 00 43 10 BID BOND FORM ......................................................................................................... 27 00 43 20 BID SECURITY............................................................................................................... 29 00 43 30 PROPOSED SUBCONTRACTORS FORM ........................................................................ 30 00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM ....................................................... 32

1. INFORMATION ABOUT BIDDER ...................................................................................... 32

2. LIST OF CURRENT PROJECTS (BACKLOG) ....................................................................... 34

3. VERIFICATION AND EXECUTION ..................................................................................... 38 00 45 10 NON-COLLUSION AFFIDAVIT ....................................................................................... 39 00 45 15 IRAN CONTRACTING ACT CERTIFICATION ................................................................... 40 00 45 20 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION .................................. 41 00 45 25 CERTIFICATE OF INSURANCE ....................................................................................... 42 00 45 30 STATEMENT REGARDING DEBARMENT ...................................................................... 43 00 45 35 DISCLOSURE OF DISCIPLINE RECORD .......................................................................... 44 00 52 00 CONTRACT ................................................................................................................... 46 00 61 10 LABOR AND MATERIALS BOND ................................................................................... 50 00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND .................................................... 53 TABLE OF CONTENTS Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023
00 61 30 OPTIONAL ESCROW AGREEMENT ............................................................................... 57 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS ....................................................... 61 INTRODUCTION ..................................................................................................................... 61 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS (NOT USED) .............................. 139 INTRODUCTION (NOT USED) ............................................................................................... 139 PART 2 CONSTRUCTION MATERIALS (NOT USED) ............................................................... 139 SECTION 2 ................................................................................................................................ 140 01 11 00 SUMMARY OF WORK (NOT USED) ............................................................................ 140 PART 1 GENERAL (NOT USED) ............................................................................................. 140 PART 2 PRODUCTS (NOT USED) ........................................................................................... 140 PART 3 EXECUTION (NOT USED) .......................................................................................... 140 01 11 20 MEASUREMENT AND PAYMENT ............................................................................... 141 PART 1 GENERAL .................................................................................................................. .141 PART 2 PRODUCTS (NOT USED) ........................................................................................... 145 PART 3 EXECUTION (NOT USED) .......................................................................................... 145 01 31 00 PROJECT MANAGEMENT AND COORDINATION ....................................................... 146 PART 1 CONSTRUCTION MANAGEMENT SOFTWARE .......................................................... 146 01 32 00 SUBMITTALS .............................................................................................................. 147 PART 1 GENERAL .................................................................................................................. 147 PART 2 PRODUCTS (NOT USED) ........................................................................................... 152 PART 3 EXECUTION (NOT USED) .......................................................................................... 152 01 33 00 CONSTRUCTION PROGRESS SCHEDULE .................................................................... 153 PART 1 GENERAL .................................................................................................................. 153 PART 2 EXECUTION .............................................................................................................. 163

TABLE OF CONTENTS Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023
01 41 26 PERMIT REQUIREMENTS ........................................................................................... 168 PART 1 GENERAL .................................................................................................................. 168 PART 2 PRODUCTS (NOT USED) ........................................................................................... 169 PART 3 EXECUTION (NOT USED) .......................................................................................... 169 01 50 00 TEMPORARY FACILITIES AND CONTROLS.................................................................. 170 PART 1 GENERAL .................................................................................................................. 170 PART 2 PRODUCTS (NOT USED) ........................................................................................... 176 PART 3 EXECUTION (NOT USED) .......................................................................................... 176

TECHNICAL SPECIFICATIONS…………………………………………………………………………………………………..177 Attachment A – Contractor Staging Area
Attachment B – City Form E-32, Project SWPPP Tier Level Attachment C – City Roof Warranty Forms
Attachment D – San Diego Regional Hazardous Material Questionnaire Attachment E – Construction Waste Management Plan, B-59 Plans – Bid Set Only – Not for Construction

00 11 10 NOTICE INVITING BIDS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 1 of 308 ends

SECTION 1
00 11 10 NOTICE INVITING BIDS

1. RECEIPT OF BIDS.

The City of Carlsbad (“Agency”) will accept Bids via electronic format via the City of Carlsbad Electronic Bidding Site up to and no later than 11 a.m. on November 9, 2023 through the online bidding portal (Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov)) for the construction of the Work entitled:

Calavera Hills Community Center Refurbishment
CONTRACT NO. PWS24-2283FAC
Project No. 4746

2. DESCRIPTION OF WORK.

The Work includes the provision of all equipment, labor, materials, tools, services, transportation, permits, utilities, and all other items necessary to complete the construction of the following, as specified and shown in the Construction Documents: replace a portion of the existing low -slope roof with single -ply membrane, apply a fluid applied roof system over the existing roof for a portion of the existing low- slope roof, replace clay tile roofing w ith standing seam metal roofing, patch and repair areas of exterior cement plaster damage, and repaint all previously painted surfaces.

The Work Site is located at 2997 Glasgow Drive in the City of Carlsbad, in the County of San Diego, California.

3. COMPLETION OF WORK.

The Contract Time is established as eighty (80) Working Days. The Contract Time shall begin as specified in the Notice to Proceed.

The Engineers’ estimate for this Project is $2,101,900.

4. OPENING AND AWARD OF BIDS.

Agency shall cons ider awarding the Contract for the Project to the lowest, responsive, responsible Bidder as determined by the Agency from the base Bid alone. The Agency has the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the Bidding process.

5. PERIOD FOR AWARD.

A period of ninety (90) Calendar Days from the time of Bid opening may be required to award the Contract. No Bidder may withdraw its Bid or Bid G uarantee during this period. Bidders shall assume full responsibility for their Bid Price during this period and shall make certain that such delay does not restrict the Bid Guarantee.

00 11 10 NOTICE INVITING BIDS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 2 of 308 ends

6. BIDDER QUALIFICATIONS.

Bidders shall be licensed contractors pursuant to Business and Professions Code Sections 7000 et seq. under the classification of C-39, Roofing, or Class B, General Building Contractor as of the date of submittal of the Bid Documents and shall maintain such license until final acceptance of the Work. Additional qualifications are included in the Contract Documents.

7. PRE-BID CONFERENCE.

The Agency will conduct a mandatory Pre-Bid Conference at the Agency’s office (address listed below) on October 26, 2023, at 10 a.m. Bidders will have the opportunity to walk a portion of the roof.

Address: 2997 Glasgow Drive, Carlsbad, CA 92010
Representatives of the Agency and consulting engineers and architects, if any, will be present.

Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the Contract Documents shall be answered in writing and shall be sent to all Bidders present at the Pre-Bid Conference and be posted on the online bidding portal . Bids will not be accepted from any bidder who did not attend a mandatory Pre-Bid Conference.

8. OBTAINING CONTRACT DOCUMENTS.

Bidders may obtain a copy of the Contract Documents from Agency’s website (Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) ). To the extent required by Public Contract Code Section 20103.7, upon request from a contractor plan room service, the Agency shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room. It is the responsibility of each prospective Bidder to download and print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a Bid. All Addenda will be posted on the online bidding portal. It is the responsibility of each prospective Bidder to check the online bidding portal on a daily basis through the close of the bidding period for any applicable Addenda.

The Agency does not assume any liability or responsibility for any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information on the online bidding portal may change without notice to prospective Bidders. The Contract Documents shall supersede any information posted or transmitted by the online bidding portal.

No time extensions or other consideration will be gi ven for non- receipt or other circumstance associated with the review or acquisition of Contract Documents. Bids must be submitted on the Agency’s Bid Forms in the Contract Documents.

9. BID GUARANTEE AND BONDS.

Each Bid shall be accompanied by cash, a certified or cashier’s check or Bid Bond secured from a surety company satisfactory to the Agency, the amount of which shall not be less than 10% of the submitted Total Bid Price, made payable to the Agency as bid security. The bid security shall be provided as a guarantee that within 10 Working Days after the Agency provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within these 10 Working Days. No interest will be paid on funds deposited with the Agency.

00 11 10 NOTICE INVITING BIDS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 3 of 308 ends

All Bidders must upload Bidder’s Bond to the online bidding portal. The original Bid Bond for the 3 apparent low Bidders must be submitted to the city within 2 Business Days of Bid opening.

The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Bond each in an amount equal to 100% of the Contract Price. Each bond shall be in the forms set forth in the Contract Documents, shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and t hat is a California admitted surety insurer. Pursuant to Public Contract Code Section 22300, the successful Bidder may substitute certain securities for funds withheld by Agency to ensure its performance under the Contract.

10. PREVAILING WAGE RATES AND LABOR COMPLIANCE.

This Project is subject to prevailing wages and labor compliance per the Labor Code. To this end, Bidder shall sign and submit with its Bid the California Department of Industrial Relations (DIR) Public Works Contractor Registration Certification on the form 00 45 00 provided. Failure to submit this form may render the bid non- responsive. In addition, each Bidder shall provide the registration number for each listed S ubcontractor in the space provided in the Proposed Subcontractors form. In bidding this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its Bid. A copy of the prevailing wage rates may be obtained via the internet at: www.dir.ca.gov/dlsr/.

11. PROJECT ADMINISTRATION/QUESTIONS.

Requests for Information (RFI) or interpretations of Bid Documents during the bid period shall be submitted via Online Q&A in the online bidding portal.

The cutoff date and time to submit questions or substitution request regarding this Project via Online Q&A in the online bidding portal is October 31, 2023, at 5 p.m . No questions will be entertained after that date.

For further information, see the online bidding portal.

END OF SECTION

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 4 of 308 ends

00 21 10 INSTRUCTIONS TO BIDDERS

1. SECURING CONTRACT DOCUMENTS.

Bids must be submitted to the Agency on the Bid Forms which are a part of the Contract Documents for the Project. The Contract Documents may be obtained from the Agency’s online bidding portal (Contracting & Purchasing | Carlsbad, CA (carlsbadca.gov) ). Prospective bidders are encouraged to communicate with the Agency well in advance of the date and time bids are due to the Agency (“Bid Submission Deadline”) to determine the availability of Contract Documents.

The Agency may also make the Contract Documents available for review at one or more plan rooms. Prospective Bidders who choose to review the Contract Documents at a plan room must contact the Agency to obtain the required Contract Documents if they decide to submit a Bid for the Project.

Addenda will be posted on the online bidding portal . Failure to acknowledge all A ddenda may make a Bid nonresponsive and ineligible for award of the Contract. Bidders are advised to verify the issuance of all A ddenda and receipt of them 1 Working D ay prior to bidding. Failure to acknowledge all Addenda may make a Bid nonresponsive and ineligible for award of the Contract.

2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS.

At its own expense and before submitting its Bid, each Bidder shall visit the Site of the proposed Work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the Work, including but not limited to, difficulties and restrictions attending the execution of the Work under the Contract. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract Documents, and all other referenced documents. Each Bidder shall also determine the local conditions which may in any way affect the performance of the Work, including local tax structure, contractors’ licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors. Each Bidder shall also familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the Work, including the cost of permits and licenses required for the Work, and shall mak e such surveys and investigations, including investigations of subsurface or latent physical conditions at the S ite or where Work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract. The fa ilure or omission of any Bidder to receive or examine any contract documents, forms, instruments, addenda, or other documents, or to visit the S ite and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation wi th respect to its Bid or to the Contract and no relief for error or omission will be given except as required under California law. The submission of a Bid shall be taken as conclusive evidence of compliance with this Section.

3. INTERPRETATION OF DRAWINGS AND DOCUMENTS.

Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other parts of the Contract Documents, or discrepancies in or omissions from the Drawings and Specifications, may promptly submit a written re quest for information, interpretation,

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 5 of 308 ends

clarification, or correction (“RFI”) to the Bid Administrator, the Agencies designated representative for soliciting and conducting bids on the Agencies online ebidding portal. (defined below). The Agency may not respond to RFIs submitted past the Q&A Submission Deadline. The Bidder submitting the RFI is responsible for prompt delivery to the Bid Administrator.

Responses to RFIs will be made only by duly issued written Addenda. The Agency shall not provide verbal responses to RFIs. Copies of written Addenda will be posted on the online bidding portal for each prospective Bidder who has downloaded a set of Contract Documents. The Agency will not be responsible for any other explanation or interpretations of the Drawings, Specifications or other parts of the Contract Documents. If any Prospective Bidder becomes aware of any errors or omissions in any part of the Contract Documents, the Prospective Bidder must promptly notify the Agency of such error or omission.

Before award of the Contract, no addition to, modification of, or interpretation of any provision in the Contract Documents will be given by any agent, employee or contractor of the Agency except as otherwise specified in these Instructions to Bidders. No bidder may rely on verbal directions given by any agent, employee or contractor of the Agency except as specified in these Instructions to Bidders.

4. QUESTIONS.

Questions regarding this Project m ust be submitted through the online ebidding portal .

Questions sha ll be definite and certain, and shall reference applicable drawing sheets, notes, details or specification sections. The deadline to submit questions is identified in the Notice Inviting Bids. Questions received after the deadline may not be answered. Responses to questions submitted during the bidding period will be published in an A ddendum and provided to those bidding on the Project no later than the date specified in the Notice Inviting Bids.

Except for the Agency’s Bid Administrator, no other members of the Agency’s staff or Board should be contacted about this procurement during the bidding process. All inquiries and comments from Prospective Bidders regarding a proposed Bid must be communicated in writing, unless otherwise instructed by the Agency. The Agency may, in its sole discretion, disqualify any Prospective Bidder who engages in any prohibited communications.

5. PRE-BID CONFERENCE.

The Notice Inviting Bids shall state whether a Pre-Bid Conference will be held and, if so, whether attendance is mandatory . Bids will not be accepted from any bidder who did not attend a Mandatory Pre-Bid Conference. The Conference will commence at the specified start time and the Site visit will begin at the conclusion of the C onference. Prospective Bidders who arrive late (ten or more minutes after the Conference has started) and who do not sign the “Sign- In” or attendance sheet, may be disqualified from the bidding process.

Representatives of the Agency and its consultants, if any, will be present to the extent possible.

Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the Contract Documents shall be answered in writing and shall be sent to all Bidders present at the Pre-Bid Conference.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 6 of 308 ends

A Pre -Bid Conference may include a Project S ite visit. Personal Protective Equipment (PPE) is required of all Job Walk attendees. Attendees are required to wear closed toe shoes and long pants. Sleeved shirts, safety glasses (may be prescription with side shields if in process areas), safety vests and hard hats are recommended. Only those possessing such attire will be allowed on the Job Site. The Agency will not provide personal protective equipment to Job Walk attendees.

6. ADDENDA.

The Agency may revise the Contract Documents before the Bid Submission Deadline. Revisions, if any, shall be made by written Addenda. All Addenda will be posted on the online bidding portal.

All Addenda issued by the Agency shall be acknowledged by the Bidder on the online bidding portal and made part of the Contract Documents. The Bidder shall acknowledge the Addenda before submitting its Bid. Bidders are responsible for the receipt of all Addenda. The Agency may reject a Bid if the Bidder fails to acknowledge all Addenda.

Pursuant to Public Contract Code Section 4104.5, if the Agency issues an Addendum which includes material changes to the Project less than 72 hours before the Bid Submission Deadline, the Agency will extend the Bid Submission Deadline by no less than 72 hours. The Agency may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid Submission Deadline.

7. ALTERNATE BIDS.

If alternate Bid items are called for in the Notice Inviting Bids and the Contract Docum ents, the time required for completion of the Work for the alternate Bid items is factored into the Contract duration and no additional Contract time will be awarded. The Agency may elect to include one or more of the alternate Bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each Bidder must ensure that each Bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by the Bidder.

If the Agency utilizes alternate Bid items as described above, the Notice Inviting Bids will prescribe predetermined criteria for the Bid package selection or a selection process in which price information and B idder identities are not revealed to the Agen cy before the Bid Submission Deadline.

8. COMPLETION OF BID FORMS.

Bids shall only be prepared using the Bid Forms which are included in the Contract Documents.

The use of substitute Bid Forms other than legible and correct photocopies of those provided by the Agency are prohibited. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. Use of black or blue ink, indelible pencil, or a typewriter is required.

Deviations from these instructions may result in the Bid being deemed non-responsive.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 7 of 308 ends

The following documents must be completed and properly executed including notarization, where indicated, and submitted as a part of the complete Bid Package:

1. Bid Form (00 41 00)

2. Bid Bond (00 43 10) or Bid Security (00 43 20) with check/cash

3. Proposed Subcontractors Form (00 43 30)

4. Bidder Information and Experience Form (00 43 40)

5. Non-Collusion Affidavit (00 45 10)

6. Iran Contracting Act Certification (00 45 15)

7. Public Works Contractor Registration Certification (00 45 20)

8. Certificate of Insurance (00 45 25)

9. Statement Regarding Debarment (00 45 30)

10. Disclosure of Discipline Record (00 45 35)

11. Acknowledgement of ALL Addenda on the online bidding portal.

12. Optional Escrow Agreement, as applicable (00 61 30)

All Bids shall be computed on the basis of the given estimated quantities of work, as indicated in the Bid, multiplied by the unit price as submitted by the Bidder.

When paper copies are submitted, all prices must be written in ink or typewritten. Changes or corrections may be crossed out and typed or written in with ink and must be initialed in ink by a person authorized to sign for the Contractor.

9. GOVERNING GENERAL PROVISIONS.

The Specifications contained in the Agency Supplemental General Provisions (00 73 00) take precedence over the specification language contained in the Standard Specifications for Public Works Construction, “the Greenbook” latest edition and all errata. The Supp lemental General Provisions address the unique conditions in the City of Carlsbad that are not addressed in the Greenbook. Therefore, if there is a conflict between the two, the Supplemental Provisions shall control over the Greenbook.

The Greenbook may b e purchased at Bidder’s/Contractor’s local technical bookstore, online or directly from the publisher. The Supplemental Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies.

10. MODIFICATIONS OF BIDS.

Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions, or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon. Oral, telephonic, and electronic modifications will not be considered.

11. BID GUARANTEE.

Each Bid shall be accompanied by: (a) a cashier’s check; or, (b) a certified check made payable to Agency; or, (c) a Bid Bond secured from a surety company satisfactory to the Board, the amount

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 8 of 308 ends

of which shall not be less than 10% of the total bid price, made payable to Agency as bid security.

Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120.

The bid security shall be provided as a guarantee that within 10 Working Days after the Agency provides the successful Bidder the Notice of Award, the successful B idder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security ma y be declared forfeited if the successful Bidder fails to enter into a contract and provide the necessary bonds and certificates of insurance. Any B id received that does not comply with these Bid Guarantee instructions may be rejected as non-responsive, and Agency may enter into a contract with the next lowest, responsive, responsible B idder, or may call for new Bids. No interest shall be paid on funds deposited with the Agency. Copies of B id Bonds submitted to the Agency shall have the same force and effect as the original.

The Bidder’s security of the second and third next lowest responsive B idders may be withheld until the Contract has been fully executed. The security submitted by all other unsuccessful Bidders shall be returned to them, or deemed void, within 10 Working Days after the Contract is awarded

The proceeds of the B idder’s security may also become property of the Agency if the B idder withdraws its Bid within 15 Calendar Days after the Bid opening date, unless otherwise required by law, including Public Contract Code S ection 5100 et. seq., and notwithstanding the award of the Contract to another Bidder.

The Bidder shall submit Bid Bond (00 43 10) or Bid Security (00 43 20) with properly certified check with the Bid Package.

12. LABOR & MATERIAL BOND AND PERFORMANCE & WARRANTY BOND REQUIREMENTS.

The successful B idder shall furnish Agency with a Labor and Material Payment Bond and a Performance and Warranty Bond, each in an amount equal to 100% of the Contract price. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120 and is admitted by the State of California, and whose assets exceed their liabilities in an amount equal to or in excess of the amount of the bond. The Agency shall not accept personal sureties and unregistered surety companies. Each bond shall be accompanied, upon the request of Agency, with all documents required by Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to Agency within 10 Working Days from the date the Agency provides the successful Bidder with the Notice of Award.

These bonds shall be kept in full force and effect during the course of this Project, and shall extend in full force and effect and be retained by the Agency until they are released as stated in the Contract. The B onds are to be accompanied by an original, o r a certified copy, of the unrevoked appointment, power of attorney, by laws, or other instrument entitling or authorizing the person who executed the bond to do so.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 9 of 308 ends

13. SUBSTITUTION OF SECURITY.

The Contract Documents call for monthly progress payments based upon the percentage of the Work completed. The Agency will retain a percentage of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the Agency will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.

14. OPTIONAL ESCROW FOR SECURITY DEPOSIT.

Pursuant to applicable provisions of law (i.e. , Public Contract Code S ection 10263), appropriate securities may be substituted for any obligation required by these instructions or for any monies withheld by the Agency to ensure performance under the Contract. Public Contract Code Section 10263 requires monies or securities to be deposited with the Agency or a state or federally chartered bank in Califor nia as the escrow agent. The escrow agent shall maintain insurance to cover negligent acts and omissions of the agent in connection with the handling of retentions under this section in an amount not less than $100,000 per contract.

15. INSURANCE REQUIREMENTS.

Before commencing the Work, the successful B idder shall purchase and maintain insurance as set forth in the Agency General Conditions. If the Bid is accepted, and if requested by the Agency, Contractor shall provide Agency or preferred vendor copies of the insurer’s most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Insurance Code Section 900 et seq. within 10 Calendar Days of the insurer’s receipt of a request to submit the statements.

In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the Agency the following certificate before performing the Work under the Contract:

I am aware of the provisions of Labor Code Section 3700, which require every employer to be insured against liability for workers’ compensation or to undertake self -insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of the Contract.

The form of such, Certificate of Insurance (00 45 25), shall be submitted as a part of the Bid Package.

Insurance must be placed with insurers that:
1) Have a rating in the most recent Best’s Key Rating Guide of at least A-:VII, or 2) Appear on the List of Approved Surplus Line Insurers, (“LASLI”) with a Best’s Key Rating Guide of at least A: X.
3) Are admitted to conduct the business of insurance in the State of California by the Insurance Commissioner.
4) Otherwise comply with all other aspects of City Council Policy No. 70.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 10 of 308 ends

Auto policies offered to meet the specification of this Contract must:
1) Meet the conditions stated above for all insurance companies. 2) Cover any vehicle used in the performance of the Contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled.

Workers’ compensation insurance required under this Contract must be offered by a company meeting the above standards with the exception that the Best’s rating condition may be waived.

The Agency does accept policies issued by the State Compensation Fund meeting the requirement for workers’ compensation insurance.

The Contractor shall be required to maintain insurance as specified in the Contract. Any additional cost of the insurance shall be included in the Bid price.

The award of the Contract by the Board is contingent upon the Contractor submitting the required bonds and insurance, as described in the Contract Documents, within 10 Working Days of bid opening. If the Contractor fails to comply with these requirements, the Agency may award the Contract to the second or third lowest B idder and the bid security of the lowest B idder may be forfeited.

16. LICENSING REQUIREMENTS.

Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all Bidders must possess proper licenses for performance of the Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business and Professions Code Section 7028.5, the Agency shall consider any B id submitted by a contractor not currently licensed in accordance with California law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the Agency shall reject the Bid. The Agency shall have the right to request, and Bidders shall provide within 10 C alendar Days, evidence satisfactory to the Agency of all valid license(s) currently held by that Bidder and each of the Bidder’s Subcontractors, before awarding the Contract.

Notwithstanding anything contained in this Contract, if the Work involves federal funds, the Contractor shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public Contract Code Section 20103.5.

17. SUBCONTRACTORS.

Bidder shall set forth the name, address of the place of business, and contractor license number of each Subcontractor who will perform work, labor, furnish materials or render servic es to the bidder on the C ontract. This requirement includes each S ubcontractor licensed by the State of California who, under subcontract to Bidder, specially fabricates and installs a portion of the Work described in the Drawings and Specifications in an amount in excess of one -half of one percent (0.5%) of the total Bid price. Additionally, the Bidder shall indicate the portion of the Work to be done by each Subcontractor in accordance with Public Contract Code Section 4104.

Bidder shall submit Proposed Subcontractors Form (00 43 30) with the Bid Package.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 11 of 308 ends

This form will be used by the Agency to determine the percentage of work that the Bidder proposes to perform. Bidders are cautioned that failure to provide complete and correct information may result in rejection of the Bid as non -responsive. Any B id that proposes performance of more than 50 percent of the Work by S ubcontractors or performance by forces other than the Bidder’s own organization will be rejected as non- responsive. Specialty items of work that may be so designated on the Proposed Subcontractors Form (00 43 30) “Contractor’s Bid” will not be included in computing the percentage of work proposed to be performed by the Bidder.

Suppliers of materials from sources outside the limits of Work are not Subcontractors. The value of materials and transport of materials from sources outside the limits of Work, as shown on the plans, shall be assigned to the Contractor or the Subcontractor, as the case may be, that the Bidder proposes as installer of the materials. The value of material incorporated in any Subcontractor-installed Bid item that is supplied by the Bidder shall be included as a part of the Work that the Bidder proposes to be performed by the Subcontractor installing the item.

When the Bidder proposes to use a Subcontractor to construct or install less than 100 percent of a Bid item, the Bidder shall attach an explanation sheet to the Proposed Subcontractor Form (00 43 30). The explanation sheet shall clearly apprise the Agency of the specific facts that show the Bidder proposes to perform no less than fifty percent (50%) of the Work with its own forces.

Determination of the subcontract amounts for purposes of award of the Contract shall be determined by the Board in conformance with the provisions of the Contract Documents. The decision of the Board shall be final.

Contractor is prohibited from performing any Work on this Project with a Subcontractor who is ineligible to perform work on a public works project pursuant to Labor Code Sec tion 1771.1 or 1777.7.

Bidders shall make copies of the disclosure forms as may be necessary to provide the required information to Subcontractors. The page number and total number of additional form pages shall be entered in the location provided on each type of form so duplicated.

18. BIDDER INFORMATION AND EXPERIENCE FORM.

Each Bidder shall complete the provided questionnaire and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the B id to be rejected as non- responsive. The Agency may reject any Bid if an investigation of the information submitted does not satisfy the Agency that the Bidder is qualified to properly carry out the terms of the Contract.

The Bidder shall submit Bidder Information and Experience Form (00 43 40) with the Bid Package.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 12 of 308 ends

19. NON-COLLUSION AFFIDAVIT.

Bidders on all public works contracts are required to submit an affidavit of non -collusion with their Bid. This form (00 45 10 Non-Collusion Affidavit) is included with the Bid Package and must be signed and dated under penalty of perjury.

20. IRAN CONTRACTING ACT OF 2010.

In accordance with Public Contract Code Section 2200 et seq ., the Agency requires that any person that submits a bid or proposal or otherwise proposes to enter into or renew a contract with the Agency with respect to goods or services of $1,000,000 or more, certify at the time the bid is submitted or the contract is renewed, that the person is not identified on a lis t created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision (b) of Public Contract Code Section 2202.5, as applicable.

The form of such Iran Contracting Certificate is included with the Bid Package and must be signed and dated under penalty of perjury.

21. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION.

Pursuant to Labor Code S ection 1773, the Agency has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in San Diego County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this Contract. A copy of these prevailing wage rates may be obtained via the internet at www.dir.ca.gov/dlsr/.

In addition, a copy of the prevailing rate of per diem wages is available at the Agency and shall be made available to interested parties upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and up on any S ubcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors.

Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded the Contract, the Bidder and its S ubcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements und er the Contract and applicable law in its Bid.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 13 of 308 ends

To this end, Bidder shall sign and submit with its Bid the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained in the registration certificate.

Failure to submit this certificate may render the Bid non-responsive. In addition, each Bidder shall provide the registration number for each listed S ubcontractor in the space provided in the Proposed Subcontractors Form (00 43 30).

22. PREVAILING WAGES.

Pursuant to Labor Code Sections 1720, et. seq. and 1770, et. seq., Contractor shall pay prevailing wages for all Work performed under the Contract. The Agency has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which the Work will be performed for each craft or type of worker needed to execute the Contract. These rates are available at the Agency or may be obtained online at http://www.dir.ca.gov. Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).

23. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS.

In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Section 1777.1 or 1777.7. Any contract on a public works project executed between a contractor and a debarred subcontracto r is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the Agency. The Contractor shall be responsible for the payment of wages to workers of a debarred Subcontractor who has been allowed to work on the Project.

The Agency may disqualify a C ontractor or Subcontractor from participating in bidding when a Contractor or Subcontractor has been debarred by the Agency or another jurisdiction in the State of California as an irresponsible bidder.

24. SIGNING OF BIDS.

All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.

If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations that the Bidder assumes under the Bid and under any Contract

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 14 of 308 ends

arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.

25. SUBMISSION OF SEALED BIDS.

Once the Bid and supporting documents have been completed and signed as set forth in these Instructions to Bidders, they shall be uploaded, along with other required materials, to the online bidding portal before the deadline for submitting bids.

At the time of Bid submission, whether in the form of a cashier’s check, a properly certified check or an approved corporate surety bond payable to the Agency, Bidders must upload an electronic Portable Document Format (PDF) copy of the Bid Guarantee to the online bidding portal. The first 3 apparent low Bidders must provide the Agency with the original Bid Guarantee within 2 Business Days after the Bid opening date.

Failure to submit the electronic version of the Bid Guarantee at time of bid submission shall cause the bid to be rejected and deemed non -responsive. Failure to provide the original within 2 business days may deem the bidder non-responsive.

Original Bid Bond shall be submitted to:

Public Works Contract Administration
Attention: Janean Hawney, Contract Administrator
1635 Faraday Avenue
Carlsbad, California, 92008

No oral or telephonic B ids will be considered. Pursuant to Public Contract Code S ections 1600 and 1601, only where expressly permitted in these Instructions to Bidders and the Notice Inviting Bids may B idders submit their B ids via electronic transmission ( the online bidding portal ). Bids received after the Bid Submission Deadline will not be accepted. Agency may reject any B id not strictly complying with Agency’s designated methods for delivery.

26. OPENING OF BIDS.

Bids submitted on the online bidding portal will be reviewed by the Agency. Once the Bid Submission Deadline has passed, B idders, proposers, the general public, and Agency staff are able to immediately see the results online. Agency shall consider award of the Contra ct to the lowest, responsive, responsible Bidder as determined by the Agency consistent with Section 32 below. In case of a discrepancy between the line item entries submitted in the online bidding portal and the Bid Form, the online bidding portal shall prevail. In the event of any discrepancies, written numbers (e.g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Bid Form.

In the event of any discrepancies, written numbers (e.g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Price Proposal Form. Also, the sum of all lump sum line items will govern over the “Total Proposed Lump Sum Price” line item. The Agency may reject any or all Bids or waive any irregularities or informalities in any Bids or in the Bidding process.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 15 of 308 ends

The Bid and the terms of the Contract Documents constitute an irrevocable offer that shall remain valid and in full force for a period of 90 Calendar Days from the Bid Submission Deadline and such additional time as may be mutually agreed upon by the Agency and the Bidder.

27. WITHDRAWAL OF BID.

Any Bid may be withdrawn via written letter, incurring no penalty, at any time before the scheduled closing time for receipt of B ids. Requests to withdraw B ids shall be worded to not reveal the amount of the original Bid. Withdrawn B ids may be resubmitted until the Bid Submission Deadline, provided that resubmitted Bids are in conformance with these Instructions to Bidders.

Bids may be withdrawn after bid opening only by providing written notice to Agency within five (5) Working Days of the bid opening and in c ompliance with Public Contract Code Section 5100 et seq., or as otherwise may be allowed with the consent of the Agency.

28. BIDDERS INTERESTED IN MORE THAN ONE BID.

No Bidder shall be allowed to make, file or be interested in more than 1 Bid for the same work unless alternate Bids are specifically called for. If the Notice Inviting Bids provides for alternate Bids, a person, firm or corporation that has submitted a sub -proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not disqualified from submitting a sub -proposal or quoting prices to other Bidders. No person, firm, corporation, or other entity may submit a sub - proposal to a Bidder, or quote prices of materials to a Bidder, when also submitting a prime Bid on the same Project.

29. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES, AND FEES.

Contractor and its Subcontractors performing work under the Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.

30. PERMIT AND INSPECTION FEE ALLOWANCE.

Notwithstanding anything contained in these Instructions to Bidd ers, the Bid Form contains an allowance for the Contractor’s cost of acquiring traffic control permits and for construction inspection fees that may be charged to the Contractor by the Agency. The allowance is included within the Bid Form to eliminate the need by Bidders to research or estimate the costs of traffic control permits and construction inspection fees before submitting a Bid. The allowance is specifically intended to account for the costs of traffic control permits and construction inspection fees charged by the Agency. No other costs payable by Contractor to the Agency are included within the allowance.

If such cost is not contained or specified in the Bid Form, the Contractor shall include the costs in the other Bid items on the Bid Form.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 16 of 308 ends

31. BASIS OF AWARD; BALANCED BID.

The Agency shall award the Contract to the lowest responsible Bidder submitting a responsive Bid. The lowest Bid will be determined on the basis of the total B id price. In the event of any discrepancies, written numbers (e .g., fifty, hundred) will govern over numerical numbers (e.g., 50, 100) on the Price Proposal Form. Also, the sum of all lump sum line items will govern over the “Total Proposed Lump Sum Price” line item.

The Agency may reject any Bid which, in its opinion when compared to other Bids received or to the Agency’s internal estimates, does not accurately reflect the cost to perform the Work. The Agency may reject as non-responsive any Bid which unevenly weights or allocates costs, including but not limited to o verhead and profit to 1 or more particular Bid items or otherwise violates Public Contract Code Section 9203.

32. AWARD PROCESS.

Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the Board may award the Contract. Once notified by Agency staff, the apparent successful Bidder should begin to prepare the following documents: (1) the Labor and Materials Bond; (2) the Performance and Warranty Bond; and (3) the required insurance certificates and endorsements. Once the Agency notifies the Bidder of the award, the Bidder will have 10 Working Days from the date of this notification to execute the Contract and supply the Agency with all of the required documents and certifications or the Bidder may forfeit the Bid securi ty and the Agency may pursue award of the Contract to the next lowest, responsive, responsible Bidder.

Once the Agency receives all properly drafted and executed documents and certifications from the Bidder, the Agency shall issue a Notice to Proceed to that Bidder.

33. EXECUTION OF CONTRACT.

As required in these Instructions to Bidders, the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The Agency may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Specifications and shall not be detached.

34. BUSINESS LICENSE
The prime C ontractor and all S ubcontractors are required to have and maintain a valid City of Carlsbad Business License for the duration of the Contract.

35. PARTICIPATION OF MINORITY AND WOMEN-OWNED BUSINESSES.

The Agency encourages the participation of minority and women-owned businesses.

36. USE OF RECYCLED MATERIALS
The Agency encourages Bidders, suppliers, manufacturers, fabricators and contractors to utilize recycled and recyclable materials when available, appropriate and approved by the Agency’s Engineer.

00 21 10 INSTRUCTIONS TO BIDDERS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 17 of 308 ends

37. STATUTORY REFERENCES
All references in these Instructions to Bidders (00 21 10) to any statute, rule or regulation are to the statute, rule or regulation as amended, modified, supplemented or replaced from time to time by the corresponding legislative or regulatory body.

END OF SECTION

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 18 of 308 ends

00 41 00 BID FORM
NAME OF PROJECT: Calavera Hills Community Center Refurbishment CONTRACT NO.: PWS24-2283FAC

NAME OF BIDDER:

AGENCY: City of Carlsbad
1635 Faraday Ave
Carlsbad, CA 92008

The undersigned declares that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all Plans, Specifications, and Addenda, if any, for the above -mentioned Project. The undersigned has acknowledged receipt, understanding, and full consideration of ANY and ALL Addenda to the Contract Documents via the online bidding portal.

We propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project, as described and in strict conformity with the Drawings, and these Specifications for TOTAL BID PRICE.

Attached is the required Bid Bond (00 43 10) or Bid S ecurity (00 43 20) in the amount of not less than 10% of the Total Bid Price.
Attached is the completed Proposed Subcontractors form (00 43 30). Attached is the completed Bidder Information and Experience form (00 45 40) Attached is the fully executed Non-collusion Affidavit (00 45 10). Attached is the completed Iran Contracting Act Certification form (00 45 15). Attached is the completed Public Works Contractor Registration Certification form (00 45 20).
Attached is the completed Certificate of Insurance form (00 45 25). Attached is the Statement of Regarding Debarment form (00 45 30) Attached is the Disclosure of Discipline Record (00 45 35) Attached is the Optional Escrow Agreement (if applicable) (00 61 30)

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 19 of 308 ends

1. BID SCHEDULE
Section Item Description Units Quantity Unit Value Total Value Schedule A Mobilization
(See Contract
Section 7-3.4)

LS N/A N/A
Schedule A General
Provisions

LS N/A N/A
Schedule A Division 1;
General
Requirements

LS N/A N/A
Schedule A Division 2;
Existing
Conditions

LS N/A N/A
Schedule A Division 7;
Thermal and
Moisture
Protection

LS N/A N/A
Schedule A Division 9;
Finishes

LS N/A N/A
Schedule A Division 11;
Equipment

LS N/A N/A
Schedule A Punchlist
Completion
LS N/A N/A $15,000
Schedule A 25-year and 30-
year City Roof
Warranty and
Maintenance
Forms Per
Attachment C
(City Form), for
three roof types
LS N/A N/A $10,000

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 20 of 308 ends

Schedule A Allowance for
square feet of
roof sheathing
that requires
replacement,
with all
associated work
to access and
replace with
new materials
for construction
to restore
completed roof
construction
should
replacement be
required
SF 900
Schedule A Allowance for
percentage of
roof drains that
requires
replacement,
with all
associated work
to access and
replace with
new materials
for construction
Each 4
The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work.

The estimated quantities for Unit Price items are for purposes of comparing Bids only and the Agency makes no representation that the actual quantities of Work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of Work performed based upon the Unit Price.

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 21 of 308 ends

2. TOTAL BID PRICE

The undersigned agrees that this Bid Form constitutes a firm offer to the Agency which cannot be withdrawn for ninety (90) C alendar Days from and after the Bid opening, or until a Contract for the Work is fully executed by the Agency and the lowest responsible Bidder, whichever is later.

The Undersigned has carefully checked all the above figures and understands that the Agency will not be responsible for any error or omission on the part of the Undersigned in preparing this Bid.

3. RECITALS
The successful Bidder agrees to sign the Contract and furnish the necessary bonds and certificates of insurance within 10 Working Days after the Agency issues the Notice of Award to the successful Bidder.

The Undersigned agrees that in case of failure to execute the required Contract with necessary bonds and insurance policies within this time period, the Agency may pursue award ing the Contract to the next lowest responsible Bidder and the Bid Security of the lowest Bidder may be forfeited.

Upon receipt of the signed Contract and other required documents, the Agency will proceed to execute the Contract and issue a purchase order and the Notice to Proc eed. The time of completion shall commence on the date of the Notice to Proceed, unless otherwise specified.

The undersigned agrees to begin the Work within 10 Working Days of the date of the Notice to Proceed, unless otherwise specified.

The Undersigned is aware of the provisions of Labor Code Section 3700, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and agrees to comply with such provisions before commencing the performance of the Work of this Contract and continue to comply until the Contract is complete. The Undersigned is aware of the provisions of Labor Code Section 1770 et The TOTAL BID PRICE on Bid Schedule total of Unit Prices:

Total Bid Price in Numbers:

Total Bid Price in Written Form:

In case of discrepancy between the written price, the numerical price, or the price as submitted via the online bidding portal, the online bidding portal price shall prevail.

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 22 of 308 ends

seq. relative to the general prevailing rate of wages for each craft or type of worker needed to execute the Contract and agrees to comply with its provisions.

The Undersigned Bidder declares, under penalty of perjury, that the undersigned is licensed to do b usiness or act in the capacity of a c ontractor within the State of California and that this statement is true and correct and has the legal effect of an affidavit. The following are the Bidder’s applicable license number(s), with their expiration date(s) and class of license(s):

______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________

If the Bidder is a joint venture, each member of the joint venture must include the required licensing information.

A Bid submitted to the Agency by a Contractor who is not licensed as a Contractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the Agency. In all contracts where federal funds are involved, no Bid submitted shall be invalidated by the failure of the Bidder to be licensed in accordance with California law. However, at the time the Contract is awarded, the Contractor shall be properly licensed.

The Undersigned Bidder represents as follows:

1. That no elected or appointed official, officer , agent, or employee of the Agency is personally interested, directly or indirectly, in this Contract, or the compensation to be paid under it; that no representation, oral or in writing, of the Agency, its officers, agents, or employees has induced Bidder to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part of this Contract by its terms; and

2. That this Bid is made without connection with any person, firm, or corporation making a Bid for the same Work, and is in all respects fair and without collusion or fraud.

Accompanying this Bid is _________________________________ (Cash, Certified Check, Bidder’s Bond or Cashier's Check) for 10% of the amount Bid, payable to Agency as Bid Security and which is given as a guarantee that the undersigned will enter into a Contract and provide the necessary bonds and certificates of insurance if awarded the Contract.

Organized under the laws of the State of ________________________.

an individual
a partnership
a corporation

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 23 of 308 ends

IF A SOLE OWNER OR SOLE CONTRACTOR SIGN HERE:

I certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made in this Bid are true and correct.

1 Name under which
business is
conducted

______________________________________________________

2 Signature (given and
surname) of
proprietor

Printed/Typed Name

______________________________________________________

______________________________________________________

3 Place of Business
(Full Address: street,
number, city, state,
zip)

______________________________________________________

______________________________________________________

______________________________________________________

4 Telephone Number ______________________________________________________

5 Email ______________________________________________________

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 24 of 308 ends

IF A PARTNERSHIP, SIGN HERE:

I certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made in this Bid are true and correct.

1 Name under which
business is
conducted

______________________________________________________

2 Signature (given and
surname and role)
(Note: Signature
must be made by a
general partner)

Printed/Typed Name

______________________________________________________

______________________________________________________

3 Place of Business
(Full Address: street,
number, city, state,
zip)

______________________________________________________

______________________________________________________

______________________________________________________

4 Telephone Number ______________________________________________________

5 Email ______________________________________________________

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 25 of 308 ends

IF A CORPORATION, SIGN HERE:

I certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made in this Bid are true and correct.

1 Name under which
business is
conducted

______________________________________________________

2 Signature (given and
surname and Title)
(Note: Signature
must be made by a
someone who can
bind the
corporation)

Printed/Typed Name

______________________________________________________

______________________________________________________

3 Place of Business
(Full Address: street,
number, city, state,
zip)

______________________________________________________

______________________________________________________

______________________________________________________

4 Telephone Number ______________________________________________________

5 Email ______________________________________________________

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED

00 41 10 BID FORM Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 26 of 308 ends

List below names of president, vice president, CFO, secretary and assistant secretary, if a corporation; if a partnership, list names of all general partners, and managing partners:

Approved as to form this ___________________day of _____________________ 20_______.

______________________________________________
Attorney for Agency

END OF SECTION

00 43 10 BID BOND FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 27 of 308 ends

00 43 10 BID BOND FORM
(Note: This form is not required when other form of Bidder’s Security, e.g. cash, certified check or cashier’s check, accompanies Bid. In that case, use form 00 43 20 Bid Security)

NAME OF PROJECT: Calavera Hills Community Center Refurbishment CONTRACT NO.: PWS24-2283FAC

NAME OF BIDDER:

The makers of this bond are, as Principal,
and , as Surety and are held and
firmly bound unto the City of Carlsbad (“Agency”) in the penal sum of 10% OF THE TOTAL BID PRICE of the Principal submitted to the Agency for the Work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Prin cipal has submitted the accompanying Bid dated .

If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal provides all required documents to the Agency and is awarded the Contract; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.

Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall affect its obligation under this bond, and Surety waives notice of any such changes.

In the event a lawsuit is brought upon this bond by the Agency and judgment is recovered, the Surety shall pay all litigation expenses incurred by the Agency in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.

///

///

///

///

///

00 43 10 BID BOND FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 28 of 308 ends

IN WITNESS WHEREOF, the above -bound parties have executed this instrument under their several seals this_____________ day of _____________________________, 20______, the name and corporate seal of each corporation.

PRINCIPAL:

___________________________________
(Name of Principal)

By:

___________________________________
(sign here)

___________________________________
(Print name here)

___________________________________
(Title and Organization of Signatory)

Executed by SURETY

this ______day of ________________, 20____

SURETY:

_____________________________________
(name of Surety)

_____________________________________
(address of Surety)

_____________________________________
(telephone number of Surety)

By:
_____________________________________
(signature of Attorney-in-Fact)

_____________________________________
(printed name of Attorney-in-Fact)

Required Attachments:
Corporate resolution showing current power of attorney. Proper execution by PRINCIPAL.
Proper notarial acknowledgment of execution by SURETY. President or vice -president and CFO, secretary or assistant secretary must sign for corporations. If only 1 officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.

END OF SECTION

00 43 20 BID SECURITY Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 29 of 308 ends

00 43 20 BID SECURITY
(Note: This form is required when cash, certified check or cashier’s check, accompanies Bid. If Bid Bond is being provided, use form 00 43 10 Bid Bond)

NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

Accompanying this proposal is a Certified / Cashier’s check payable to the order of the City of Carlsbad (“Agency”), in the sum of
dollars ($___________________), this amount being 10% of the total amount of the Bid. The proceeds of this check shall become the property of the Agency, provided this proposal shall be accepted by the Agency through action of its legally constituted contracting authorities and the Undersigned shall fail to execute a Contract and furnish the required Performance, Warranty and Payment Bonds and proof of insurance coverage within the stipulated time; otherwise, the check shall be returned to the Undersigned. The proceeds of this check shall also become the property of the Agency if the Undersigned shall withdraw his or he r Bid within the period of 15 Calendar Days after the date set for the opening of the Bid, unless otherwise required by law, and notwithstanding the award of the Contract to another Bidder.

_______________________________________
BIDDER
Required Attachments:

Certified Check or Cashier’s Check

END OF SECTION

00 43 30 PROPOSED SUBCONTRACTORS FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 30 of 308 ends

00 43 30 PROPOSED SUBCONTRACTORS FORM
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

In compliance with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 et seq.), Bidder shall set forth below: (a) the name and the location of the place of business, (b) the California contractor license number, (c) th e DIR public works contractor registration number, and (d) the portion of the Work which will be done by each Subcontractor who will perform work or labor or render service to the Bidder in or about the construction of the Work or improvement to be perform ed under this Contract in an amount in excess of one - half of one percent (0.5%) of the Bidder’s Total Bid Price. Notwithstanding the foregoing, if the Work involves the construction of streets and highways, then the Bidder shall list each Subcontractor who will perform work or labor or render service to the Bidder in or about the Work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the b elow requested information.

If a Bidder fails to specify a Subcontractor or if a Contractor specifies more than one Subcontractor for the same portion of Work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that porti on of Work and that it shall perform that portion itself. No changes in the Subcontractor’s listed Work will be made without the prior approval of the Agency.

Attach additional pages as required.

(Signature of Bidder)

00 43 30 PROPOSED SUBCONTRACTORS FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 31 of 308 ends

Name of
Subcontractor
Location of
Business
CSLB
Contractor
License
No./ Exp
Date
DIR
Registration
Number /
Exp. Date
Type of Work
to be done by
Subcontractor
% of
Work
Amount of
Work by
Subcontractor
in Dollars*

Pursuant to Public Contract Code Section 4104, subdivision (a)(3)(A), receipt of the information preceded by an asterisk (*) may be submitted by the Bidder up to 24 hours after the deadline for submitting bids contained in the “Notice Inviting Bids.”

END OF SECTION

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 32 of 308 ends

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM
NAME OF PROJECT: Calavera Hills Community Center Refurbishment CONTRACT NO.: PWS24-2283FAC

NAME OF BIDDER:

1. INFORMATION ABOUT BIDDER

(Indicate not applicable (“N/A”) where appropriate.)

NOTE: Where Bidder is a joint venture, pages shall be duplicated, and information provided for all parties to the joint venture.

1. Type, if Entity:

2. Bidder Address:

a. Facsimile Number

b. Telephone Number

c. Email Address

3. How many years has Bidder’s organization been in business as a contractor?

4. How many years has Bidder’s organization been in business under its present name? a. Under what other or former names has Bidder’s organization operated?

5. If Bidder’s organization is a corporation, answer the following:

a. Date of Incorporation:

b. State of Incorporation:

c. President’s Name:

d. Vice-President’s Name(s):

e. Secretary’s Name:

f. Treasurer’s Name:

g. CFO’s Name:

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 33 of 308 ends

6. If an individual or a partnership, answer the following:

a. Date of Organization:

b. Name and address of all partners (state whether general or limited partnership):

7. If other than a corporation or partnership, describe organization and name principals:

8. List other states in which Bidder’s organization is legally qualified to do business.

9. What type of work does the Bidder normally perform with its own forces?

10. Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:

11. Within the last 5 years, has any officer or partner of Bidder’s organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:

12. List Trade References:

Name Company Phone Number

13. List Bank References (Bank and Branch Address):

14. Name of Bonding Company and Name and Address of Agent:

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 34 of 308 ends

2. LIST OF CURRENT PROJECTS (BACKLOG)
[**Duplicate or attach additional pages if needed for listing current projects.**] Project Name
Sub or Prime?
Description of Bidder’s Work Client
Name
Completion
Date
Cost of
Bidder’s Work

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 35 of 308 ends

LIST OF COMPLETED PROJECTS (LAST 3 YEARS)
[**Duplicate or attach additional pages if needed for listing completed projects. **]

Please include only those projects which are similar enough to demonstrate Bidder’s ability to perform the required Work.

Project Name
Sub or Prime?
Description of Bidder’s Work Client
Name
Completion
Date
Cost of
Bidder’s Work

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 36 of 308 ends

EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE
Personnel:

The Bidder shall identify the key personnel to be assigned to this Project in a management, construction supervision or engineering capacity. Add additional pages to identify ALL key personnel. Bidder may submit a 2-page resume of each key personnel mentioned above.

Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the Agency.

Job Title
Name
% time on this
Project
Specialized
Education
Years of
construction
experience
relevant to the
Project
Summarize the
experience

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 37 of 308 ends

Additional Bidder’s Statements:

If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 38 of 308 ends

3. VERIFICATION AND EXECUTION
These Bid Forms shall be executed only by a duly authorized official of the Bidder:

I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:

Name of Bidder:

Signature ________________________________________________________________

Name ______________________________________________________________________

Title ______________________________________________________________________

Date ______________________________________________________________________

END OF SECTION

00 45 10 NON-COLLUSION AFFIDAVIT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 39 of 308 ends

00 45 10 NON-COLLUSION AFFIDAVIT

NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID

NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

Consistent with Public Contract Code Section 7106, t he undersigned declares:

I am the of , the
party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham.

The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or co nference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown of it, or the contents of it, or divulged information or data relative to it, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent of these, to effectuate a c ollusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and c orrect a nd that this d eclaration is e xecuted ________________ 20 ____ at _______________ [city], _____ [state].

Signature

Name _________________________________

Title

END OF SECTION

00 45 15 IRAN CONTRACTING ACT CERTIFICATION Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 40 of 308 ends

00 45 15 IRAN CONTRACTING ACT CERTIFICATION
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

As required by Public Contract Code Section 2204, the Contractor certifies subject to penalty of perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:

1) identified on the current list of persons and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or

2) a financial instruction that extends, for 45 days or more, credit in t he amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The Agency has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the Agency will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature: Date:

Name: Title:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for 3 years.

END OF SECTION

00 45 20 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 41 of 308 ends

00 45 20 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

Pursuant to Labor Code S ections 1725.5 and 1771.1, all Contractors and Subcontractors that wish to Bid on, be listed in a Bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See Public Works (ca.gov) for additional information.

No Bid will be accepted, nor any Contract entered into without proof of the Contractor’s and Subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder certifies that it is aware of the registration requirements set forth in Labor Code Sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Dep artment of Industrial Relations.

Name of Bidder:

DIR Registration Number:

DIR Registration Expiration:

Bidder further certifies:

1. Bidder shall maintain a current DIR registration for the duration of the Project.

2. Bidder shall include the requirements of Labor Code S ections 1725.5 and 1771.1 in its Contract with Subcontractors and ensure that all Subcontractors are registered at the time of Bid opening and maintain registration status for the duration of the Project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the Bid is non- responsive.

Signature: Date:

Name: Title:

END OF SECTION

00 45 25 CERTIFICATE OF INSURANCE Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 42 of 308 ends

00 45 25 CERTIFICATE OF INSURANCE
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

Bidder must attach either of the following to this page.

Certificates of insurance showing conformance with the requirements for each of:

a. Comprehensive General Liability
b. Automobile Liability
c. Workers Compensation
d. Employer’s Liability

Statement with an insurance carrier’s notarized signature stating that the carrier can, and upon payment of fees and/or premiums by the Bidder, will issue to the Bidder the required policies of insurance for Comprehensive General Liability, Automobile Liability, Workers Compensation and Employer’s Liability in conformance and the required Certificates of insurance to the Agency.

END OF SECTION

00 45 30 STATEMENT REGARDING DEBARMENT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 43 of 308 ends

00 45 30 STATEMENT REGARDING DEBARMENT
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

1. Have you or any of your Subcontractors ever been debarred as an irresponsible Bidder by another public agency in the State of California?

YES
NO

2. If yes, what was/were the name(s) of the public agency(ies) and what was/were the period(s) of debarment(s)? Attach additional copies of this page to accommodate more than 2 debarments.

__________________________________
party debarred

__________________________________
public agency

__________________________________
period of debarment

___________________________________
party debarred

___________________________________
public agency

___________________________________
period of debarment

BY CONTRACTOR:

By: __________________________________
(sign here)

___________________________________
(print name/title)

Page _____ of _____ pages of this Statement Regarding Debarment form

END OF SECTION

00 45 35 DISCLOSURE OF DISCIPLINE RECORD Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 44 of 308 ends

00 45 35 DISCLOSURE OF DISCIPLINE RECORD
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against c ontractors if a complaint regarding a l atent act or omission is filed within 4 years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within 10 years of the date of the alleged violation. Any questions concerning a Contractor may be referred to the Registrar, Contractors’ State License B oard, P.O. Box 26000, Sacramento, California 95826.

1. Have you ever had your c ontractor’s license suspended or revoked by the California Contractors’ State license Board 2 or more times within an 8-year period? YES
NO

2. Has the suspension or revocation of your contractor’s license ever been stayed? YES
NO
N/A

3. Have any Subcontractors that you propose to perform any portion of the Work ever had their contractor’s license suspended or revoked by the California Contractors’ State License Board 2 or more times within an 8-year period?
YES
NO

4. Has the suspension or revocation of the license of any Subcontractors that you propose to perform any portion of the Work ever been stayed?
YES
NO
N/A

00 45 35 DISCLOSURE OF DISCIPLINE RECORD Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 45 of 308 ends

5. If the answer to either of 1 or 3 above is “yes,” fully identify, in each and every case, the party disciplined, the date of and violation that the disciplinary action pertains to, the nature of the violation and disciplinary action taken.

(If needed attach additional sheets to provide full disclosure.)

6. If the answer to either of 2 or 4 above is “yes,” fully identify, in each and every case, the party whose discipline was stayed, the date of and the violation that the disciplinary action pertains to, the nature of the violation and the condition (if any) upon which the disciplinary action was stayed.

(If needed attach additional sheets to provide full disclosure.)

BY CONTRACTOR:

By: __________________________________
(sign here)

__________________________________
(print name and title)

END OF SECTION

00 52 00 CONTRACT Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 46 of 308 ends

00 52 00 CONTRACT
This Project No. 4746 (“Contract”) is made and entered into this ____________ day of ________________________________, 20___, by and between the City of Carlsbad, California, a California municipal corporation (“Agency”) and ____________________________________ (“Contractor”), whose principal place of business is
_______________________________________________________.

The parties agree:

1. SCOPE OF WORK.

The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all the Work required in strict compliance with the Contract Documents for the following Project:

NAME OF PROJECT: Calavera Hills Community Center Refurbishment

The Contractor and its surety shall be liable to the Agency for any damages arising as a result of the Contractor’s failure to comply with the obligation described in this Section 1.

2. TIME OF COMPLETION.

Time is of the essence in the performance of the Work. The Work shall be commenced on the date stated in the Agency’s Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within eighty (80) Working Days from the commencement date stated in the Notice to Proceed. Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work.

3. CONTRACT PRICE.

The Agency shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions made in accordance with the Contract Documents, and including all applicable taxes and costs, the sum of ___________________________________ Dollars ($ _____________________________). Payment shall be made as set forth in the General Conditions.

The Engineer will close the estimate of work completed for progress payments on the last working day of each month. The Agency shall withhold retention as required by Public Contract Code Section 9203.

4. LIQUIDATED DAMAGES.

In accordance with Government Code Section 53069.85, it is agreed that the Contractor will pay the Agency the sum set forth in Section 00 73 00 Supplemental General Provisions for each and every Calendar Day of delay beyond the time of complet ion prescribed in this Contract as Liquidated Damages and not as a penalty or forfeiture. If this sum is not paid, the Contractor agrees the Agency may deduct that amount from any money due or that may become due the

00 52 00 CONTRACT Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 47 of 308 ends

Contractor under the Contract. This Sec tion does not exclude recovery of other damages specified in the Contract Documents.

5. CONTRACT DOCUMENTS.

The “Contract Documents” include the following:

● 00 11 10 Notice Inviting Bids
● 00 21 10 Instructions to Bidders
● 00 41 00 Bid Form
● 00 42 10 Bid Bond or 00 43 20 Bid Security
● 00 43 30 Proposed Subcontractors
● 00 43 40 Bidder Information and Experience
● 00 45 10 Non-Collusion Affidavit
● 00 45 15 Iran Contracting Act Certification
● 00 45 20 Public Works Contractor Registration Certification ● 00 45 30 Statement of Regarding Debarment
● 00 45 35 Disclosure of Discipline Record
● 00 52 10 Contract
● 00 61 10 Labor and Materials Bond
● 00 61 20 Faithful Performance and Warranty Bond
● 00 61 30 Optional Escrow Agreement (if applicable)
● 00 73 00 Supplemental General Provisions
● Technical Specifications for the Project
● All Addenda
● Plans and Drawings
● Permits
● 00 74 00 Supplemental Technical Provisions
● “Standard Specifications and Drawings,” as last revised ● Standard Specifications for Public Works Construction “Greenbook ,” latest edition and including all errata
o Part 1 General Provisions
o Part 2 to Part 8 (Construction Materials, Construction Methods, Existing Improvements, Pipeline System Rehabilitation, Temporary Traffic Control, Street Lighting and Traffic Signal Systems, Landscaping and Irrigation) ● Standard Plans for Public Works Construction, latest edition and including all errata ● Applicable Local Agency Standards and Specifications, as last revised ● Approved and fully executed change orders

00 52 00 CONTRACT Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 48 of 308 ends

● Any other documents contained in or incorporated by reference into the Contract Documents
The Contractor shall complete the Work in strict accordance with the Contract Documents. The requirements of the various sections or documents comprising the Contract Documents are intended to be complementary. Work required by 1 of the Contract Documents and not by others shall be done as if required by all. This Contract shall supersede any prior agreement of the parties.

6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.

Every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, in cluding, but not limited to, the provisions of the Labor Code and Public Contract Code which are applicable to the Work.

7. INDEMNIFICATION.

Contractor shall provide indemnification and defense as set forth in the 00 73 00 Agency Supplemental General Provisions.

8. PREVAILING WAGES.

Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.
///

///

///

///

///

///

00 52 00 CONTRACT Date Printed: September 14, 2023
Document Version: 1.0 Current Update: May 2023

Page 49 of 308 ends

NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACHED

(CORPORATE SEAL)
CONTRACTOR City of Carlsbad, California, a California
municipal corporation
By: By:

(sign here)

Keith Blackburn, Mayor

(print name/title)
ATTEST:

By:

(sign here) for Sherry Freisinger, City Clerk

(print name/title)

If required by the Agency, proper notarial acknowledgment of execution by contractor must be attached. If a corporation, the Contract must be signed by 1 corporate officer from each of the following 2 groups.

Group A Group B
Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer

Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

APPROVED AS TO FORM:

CINDIE K. McMAHON, City Attorney

BY: _____________________________
Deputy City Attorney

00 61 10 LABOR AND MATERIALS BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 50 of 308 ends

00 61 10 LABOR AND MATERIALS BOND
KNOW ALL PERSONS BY THESE PRESENTS THAT:

WHEREAS, the City of Carlsbad ( “Agency”) has awarded to (“Principal,”) a Contract for the Work described as follows: Contract No PWS24-2283FAC Project No. 4746 Name of Project: Calavera Hills Community Center Refurbishment (the “Project”) in strict conformity with the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad and all of which are incorporated by this reference; and

WHEREAS, Principal is required to furnish a bond in connection with the Contract providing that if Principal or any of its Subcontractors fail to pay (1) for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the Work contracted to be done, (2) for any Work or labor of any kind performed under the Contract, (3) for amounts due under the Unemployment Insurance Code for any Work or labor of any kind performed under the Contract, or (4) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department under Unemployment Insurance Code Section 13020 or to the Franchise Tax Board under Revenue and Taxation Code Section 18663 from the wages of employees of Principal and its Subcontractors with respect to the Work or labor, the Surety on this bond will pay for the same to the extent set forth below.

NOW THEREFORE, we, Principal and , as Surety, are held and firmly bound unto the Agency in the penal sum of
Dollars ($___________), for the payment of which sum being an amount equal to 100% of the total amount payable under the terms of the Contract by the Agency, and for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if Principal, or its Subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Civil Code Section 9100 ; fail to pay for any materials, provisions , provender, equipment, or other supplies, used in, upon, for or about the performance of the Work contracted to be done; fail to pay for any Work or labor of any kind performed under the Contract; fail to pay amounts due under the Unemployment Insurance Code for any Work or labor of any kind performed under the Contract; or fail to pay for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of Principal or its Subcontractors pursuant to Unemployment Insurance Code Section 13020 or Revenue and Taxation Code Section 18663, with respect to the Work or labor, then the Surety will pay for the same, in an amount not exceeding the penal sum specified above, and also, in case suit is brought upon this bond, all litigation expenses incurred by the Agency in the suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses to be fixed by the court consistent with Civil Code Section 9554.

00 61 10 LABOR AND MATERIALS BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 51 of 308 ends

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon this bond. The Surety stipulates and agrees that this bond shall not be exonerated or released from the obligation of this bond by:

1. Any change, extension of time for performance, addition, alteration or modification in, to, or of any Contract, Plans, Specifications, or agreement pertaining or relating to any scheme or Work of improvement described above, or the furnishing of labor, materials, or equipment pertaining or relating to any scheme or Work of improvement described above.

2. Any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or Work of improvement described above.

3. Any rescission or attempted rescission or attempted rescission of the Contract, agreement or bond.

4. Any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such Contract or agreement or under the bond.

5. Any fraud practiced by any person other than the claimant seeking to recover on the bond.

The Surety also stipulates and agrees that this bond shall be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit this bond has been given by reason of any breach of contract between the Agency and Principal or on the part of any obligee named in this bond. Finally, the Surety waives notice of any such change, extension of time, addition, alteration or modification mentioned in this bond, including but not limited to the provisions of Civil Code Sections 2819 and 2845.

If Principal is an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this bond.

[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

00 61 10 LABOR AND MATERIALS BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 52 of 308 ends

Executed by PRINCIPAL this _________
day of _______________________, 20____.

PRINCIPAL:

____________________________________
(name of Contractor)

By:_________________________________
(sign here)

____________________________________
(print name here)

____________________________________
(title and organization of signatory)

Executed by SURETY this ____________ day
of _______________________, 20____.

SURETY:

____________________________________
(name of Surety)

____________________________________
(address of Surety)

____________________________________
(telephone number of Surety)

By:
____________________________________
(signature of Attorney-in-Fact)

____________________________________
(printed name of Attorney-in-Fact)
(attach corporate resolution showing current
power of attorney)

(Proper notarial acknowledgment of execution by CONTRACTOR and SURETY must be attached.)

(President or vice -president and secretary or assistant secretary must sign for corporations. If only 1 officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.)

APPROVED AS TO FORM:

CINDIE K. McMAHON, City Attorney

BY: _____________________________
Deputy City Attorney

END OF SECTION

00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 53 of 308 ends

00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND
KNOW ALL PERSONS BY THESE PRESENTS THAT:

WHEREAS, the City of Carlsbad ( “Agency”) has awarded to ________________ (“Principal,”) a Contract for the Work described as follows: Contract No PWS24-2283FAC Project No.4746 Name of Project: Calavera Hills Community Center Refurbishment (the “Project”) in strict conformity with the drawings and specifications, and other Contract Documents now on file in the Office of the City Clerk of the City of Carlsbad and all of which are incorporated by this reference; and

WHEREAS, the Work to be performed by the Principal is more particularly set forth in the Contract Documents for the Proj ect dated ____________, (“Contract Documents”), the terms and conditions of which are incorporated by reference; and

WHEREAS, the Principal is required by the Contract Documents to perform the terms of them and to furnish a bond for the faithful performance and warranty of the Contract Documents.

NOW THEREFORE, we, Principal, and
,as Surety, are held and firmly bound unto the Agency in the penal sum of dollars ($ ____________),
which is equal to 100% of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if Principal, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration of the Contract Documents made as provided in the Contract Documents, on its part, to be kept and performed at the time and in the manner specified in the Contract Documents , and in all respects according to their true intent and meaning; and shall i ndemnify and save harmless the Agency, its Board, members of the Board, officers, directors, managers, employees, agents, and authorized volunteers, as stipulated in the Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured by this bond and in addition to the face amount specified in this bond, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, inc urred by Agency in enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

As a condition precedent to the satisfactory completion of the Work unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of 1 year after the acceptance of the Work by the Agency. During this 1-year period, if Contractor fails to make full, complete, and satisfactory repair and replacements and totally protect the Agency from loss or damage resulting from or caused by defective materials or faulty workmanship in connection with Contractor’s Work on the Project, the obligations of Surety under this bond shall continue

00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 54 of 308 ends

so long as any obligation of Principal remains to the Agency. Nothing in this bon d shall limit the Agency’s rights or the Principal’s or Surety’s obligations under the Contract, law or equity, including, but not limited to, Code of Civil Procedure Section 337.15.

Whenever Principal shall be, and is declared by the Agency to be, in def ault under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Agency’s option:

i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents;

ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a c ontract between such bidder, the Surety and the Agency, and make available as Work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the Contract Price, including other costs and damages for which Surety may be liable. The term “balance of the Contract Price” as used in this paragraph shall mean the total amount payable to Principal by the Agency under the Contract and any modification to the Contract, less any amount previously paid by the Agency to the Principal and any other set offs pursuant to th e Contract Documents.

Or

iii. Permit the Agency to complete the Project in any manner consistent with Applicable Law and make available as Work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the Contract Price, including other costs and damages for which Surety may be liable. The term “balance of the Contract Price” as used in this paragraph shall mean the total amount payable to Principal by the Agency under the Contract and any modification to the Contract, less any amount previously paid by the Agency to the Principal and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the Agency may reject any c ontractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.

Surety shall not utilize Principal in completing the Project, nor shall Surety accept a bid from Principal for completion of the Proje ct, if the Agency, when declaring the Principal in default, notifies Surety of the Agency’s objection to Principal’s further participation in the completion of the Project.

The Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed under the Contract Documents shall in any way affect Surety’s obligations on this bond, and Surety waives notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.

00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 55 of 308 ends

If Principal is an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this bond.

[REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 56 of 308 ends

Executed by PRINCIPAL this _________ day of
________________________, 20___.

PRINCIPAL:
____________________________________
(name of Contractor)

By:_________________________________
(sign here)
____________________________________
(print name here)
____________________________________
(title and organization of signatory)

Executed by SURETY this ____________ day
of ________________________, 20___.

SURETY:
____________________________________
(name of Surety)
____________________________________
(address of Surety)
____________________________________
(telephone number of Surety)

By: _________________________________
(signature of Attorney-in-Fact)
____________________________________
(printed name of Attorney-in-Fact)

(attach corporate resolution showing current
power of attorney)

(Proper notarial acknowledgment of execution by CONTRACTOR and SURETY must be attached.)

(President or vice -president and secretary or assistant secretary must sign for corporations. If only 1 officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.)

APPROVED AS TO FORM:

CINDIE K. McMAHON, City Attorney

BY: _____________________________
Deputy City Attorney

END OF SECTION

00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 57 of 308 ends

00 61 30 OPTIONAL ESCROW AGREEMENT
NAME OF PROJECT: Calavera Hills Community Center Refurbishment

NAME OF BIDDER:

This Escrow Agreement is made and entered into by and between the 1200 Carlsbad Village Drive, Carlsbad, California, 92008 ("Agency"), whose address is
("Contractor") and whose address is
("Escrow Agent").

Agency, Contractor and Escrow Agent agree as follows:

1. Pursuant Public Contract Code Section 22300, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Agency pursuant to the construction contract entered into between Agency and Contractor for the Calavera Hills Community C enter Refurbishment in the amount of ___________ dated __________ ("Contract"). Alternatively, on written request of Contractor, Agency shall make payments of the retention earnings directly to Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, Escrow Agent shall notify Agency within 10 Calendar D ays of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract. Securities shall be held in Agency’s name and shall designate Contractor as the beneficial owner.

2. Agency shall make progress payments to Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that Escrow Agent holds securities in the form and amount specified above.

3. When Agency makes payment of retentions earned directly to Escrow Agent, Escrow Agent shall hold them for the benefit of Contractor until the time that the escrow created under this Escrow Agreement is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this Escrow A greement and the rights and responsibilities of the parties shall be equally applicable and binding when Agency pays Escrow Agent directly.

4. Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of Agency. These expenses and payment terms shall be determined by Agency, Contractor, and Escrow Agent.

5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to Agency.

6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from Agency to Escrow Agent that Agency consents to the withdrawal of the amount sought to be withdrawn by Contractor.

00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 58 of 308 ends

7. Agency shall have a right to draw upon the securities in the event of default by the Contractor.

Upon 7 Calendar Days' written notice to Escrow Agent from Agency of a default, Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by Agency.

8. Upon receipt of written notification from the Agency certifying that the Work required by the Contract is final and complete and that Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.

9. Escrow Agent shall rely on the written notifications from Agency and Contractor pursuant to Sections (5) to (8), inclusive, of this Escrow Agreement and Agency and Contractor shall hold Escrow Agent harmless from Escrow Agent's release, conversion and disbursement of the securities and interest as set forth above.

10. The names of the persons who are authorized to give wri tten notices or to receive written notice on behalf of Agency and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

For Agency
(Finance
Director)

Title _________________________________________________________

Name
_____________________________________________________________

Signature
_____________________________________________________________

Address
_____________________________________________________________

For Contractor

Title
_____________________________________________________________

Name
_____________________________________________________________

Signature
_____________________________________________________________

00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 59 of 308 ends

Address
_____________________________________________________________

For Escrow
Agent

Title
_____________________________________________________________

Name
_____________________________________________________________

Signature
_____________________________________________________________

Address
_____________________________________________________________

At the time the Escrow Account is opened, Agency and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Escrow Agreement.

IN WITNESS WHEREOF, the parties have executed this Escrow Agreement by their proper officers on the date first set forth above.

For Agency Title
______________________________________________________________

Name
______________________________________________________________

Signature
______________________________________________________________

Address
______________________________________________________________

For Contractor

Title
______________________________________________________________

00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 60 of 308 ends

Name
______________________________________________________________

Signature
______________________________________________________________

Address
______________________________________________________________

For Escrow
Agent

Title
______________________________________________________________

Name
______________________________________________________________

Signature
______________________________________________________________

Address
______________________________________________________________

APPROVED AS TO FORM:

CINDIE K. McMAHON, City Attorney

BY: _____________________________
Deputy City Attorney

END OF SECTION

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 61 of 308 ends

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS

INTRODUCTION
The specifications contained in this 00 73 00 Agency Supplemental General Provisions take precedence over the specification language contained in the Standard Specifications for Public Works Construction, “The Greenbook,” latest edition and all errata. This specification addresses the unique conditions in Carlsbad that are not addressed in The Greenbook. Therefore, if there is a conflict, these specifications shall control.

The Greenbook may be purchased at Bidder ’s/Contractor’s local technical bookstore or directly from the publisher. These Supplemental General Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies.

When used in the Contract Documents, statements, or command phrases (active voice and imperative mood) refer to and are directed at the “Bidder” or “Contractor” as applicable. The specifications are written to the “Bidder” before award and the “Contractor” after award. Before award, interpret sentences written in the imperative mood as starting with “The Bidder shall .” Interpret the term “you” as “the Bidder” and interpret the term “your” as “the Bidder’s .” After award, interpret sentences written in the imperative mood starting with “The Contractor shall. ” Interpret the term “you” as “the Contractor” and interpret the term “your” as “the Contractor’s.” PART 1 GENERAL PROVISIONS
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND

SYMBOLS

GENERAL
ADD the following:

1. The word “provide” shall mean “furnish and install,” unless otherwise stated.

2. In reference to Drawings, where words “shown,” “indicated ,” “detailed ,” “noted ,” “scheduled,” or words of similar import are used, it shall be understood that reference is made to the Plans accompanying these provisions, unless stated otherwise.

3. Where the words “equal ,” “approved equal ,” “equivalent,” and words of similar import are used, it shall be understood such words are followed by the expression “in the opinion of the Engineer,” unless otherwise stated.

4. The word “perform” shall be understood to mean that the Contractor, at its expense, shall “perform all operations and furnish labor, tools and equipment,” and further, “furnish and install materials that are indicated, specified or required” shall be understood to mean that the Contractor, at its expense, shall “furnish and install the Work, complete in place and ready to use, including furnishing of necessary labor, materials, tools, equipment, and transportation.”

5. Where words “directed,” “designated,” “selected,” or words of similar import are used, it shall be understood that the direction, designation, or selection of the Engineer is intended, unless stated otherwise. The word “required” and words of similar import shall be understood to mean “as required to properly complete the Work as required and as approved by the Engineer,” unless stated otherwise.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 62 of 308 ends

Where the words “approved,” “approval,” “acceptance,” or words of similar import are used, it shall be understood that the approval, acceptance, or similar import of the Engineer is intended.

TERMS AND DEFINITIONS
Where applicable ADD/REPLACE the following:

1. Agency - The City of Carlsbad or the Carlsbad Municipal Water District, the owner of the Project.

2. Agency Approval - Except where stated in this Contract to the contrary, the phrases “Agency approval,” and “Agency’s written approval” or such similar phrases shall mean approval by the City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District, which approval shall not be unreasonably withheld.

3. Agency Forces – City of Carlsbad or Carlsbad Municipal Water District employ ees who perform construction work.

4. Agency Supplement - 00 73 00 Agency Supplemental General Provisions; and 00 74 00 Agency Supplemental Technical Provisions.

5. Allowance (AL) - Payment under Allowance Bid items, denoted as “AL,” shall be based on the actual expenditures and for pre-authorized items of the Work in accordance with the Contract Documents. The unused portions of the Allowances shall revert to the Agency upon acceptance of the Project or Work.

6. Apparent Low Bidder - The Bidder whose Bid having been publicly opened, initially meets the material requirements of the Bid Documents and whose Bid price is the lowest received.

7. Applicable Laws - Laws, statutes, ordinances, rules, orders, and regulations of governmental authorities and courts having jurisdiction over the Project.

8. As-Builts - The CADD drawings prepared from the approved Red-lines for record keeping purposes.

9. Award of Contract (Award) - The date on which the Board or designee executes the Contract.

10. Bid - Any proposal submitted to the Agency in competitive bidding for the construction, alteration, repair, or improvement of any structure, building, road or other improvement of any kind.

11. Bid Administrator – The City’s desi gnated representative for soliciti ng and conducting bids on the City’s online bidding portal.

12. Board – The officer or body constituting the awarding authority of the Agency, which is the City Council for the City of Carlsbad or the Board of Directors for the Carlsbad Municipal Water District.

13. Board of Directors for the Carlsbad Municipal Water District – The legislative body that governs the Carlsbad Municipal Water District and has the authority to pass ordinances and appropriate funds.

14. Business Day - See Working Day.

15. Calendar Day – Every day on the calendar, including weekends and holidays.

16. City - The term “City” or “the City” means, City of Carlsbad. See also Agency.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 63 of 308 ends

17. City Council - The legislative body that governs the City of Carlsbad and has the authority to pass ordinances and appropriate funds.

18. City Engineer - The term “City E ngineer” is defined as the Transportation Director, or designee, and is the person authorized to perform the functions of the City E ngineer as defined in Government Code Section 66416.5. The City Engineer is the City's "duly authorized officer" for the purposes of Public Contract Code Sections 4107 and 4107.5.

19. City Manager – The appointed official who directs the administration of the City of Carlsbad.

20. Construction Documents - Plans and details, including Plans showing installation of major systems, equipment, fixed furnishings and graphics, the technical specifications and all other technical drawings, schedules, diagrams and specifications, accepted Shop Drawings, Working Drawings, and submittals that are necessary to set forth in detail the requirements for the Project.

21. Construction Manager – The City’s Consultant Project Inspector and the Engineer’s designated representative for the first level of appeal for informal dispute resolution.

Contractor to review all work progress, monthly payment applications, monthly schedule updates and project d ocumentation (e.g., submittals, RFI’s, etc.) with Construction Manager.

22. Construction Work - The portion of the Work to construct the Project as set forth in the Contract Documents in conformance with 2-1, “WORK TO BE DONE.”

23. Contract – The written agreement between the Agency and the Contractor covering the Work.

24. Contract Documents - Contract Documents include the following: The signed Contract, Addenda, Notice Inviting Bids, funding agency provisions, Bid including documentation accompanying the Bid and any post -Bid documentation submitted prior to the Notice of Award when attached as an exhibit to the Contra ct, Bonds, Permits, CEQA documents, Standard Specifications (the “Greenbook”), Agency Supplement, Plans, Standard Plans, Construction Documents, Reference Specifications, and Change Orders. Contract Documents, when applicable, shall also include Site and C oastal development permits, NEPA documents, re -vegetation plans, biological letters or technical reports, habitat mitigation plans, storm water documents, and local, state, and federal resource agency permits.

25. Contract Time - The number of Working Days to complete the Work as specified in the Contract Documents.

26. Contractor – The individual, partnership, corporation, joint venture, or other legal entity having a Contract with the Agency to perform the Work. In the case of Work being done under permit issued by the Agency, the permittee shall be constructed to be the Contractor. The term “prime contractor” shall mean Contractor.

27. Critical Path – In the Construction Schedule, the sequence of activities that represents the longest path through the Project network of activities and the shortest possible Project duration.

28. Days – Days shall mean consecutive calendar days unless otherwise specified in this Contract.

29. Defective Work - Work that does not conform to the Contract Documents.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 64 of 308 ends

30. Delay Factor - The Delay Factor may be the basis for compensation for idle equipment time on an excusable delay. The factor has been calculated to include the ownership costs without including operating costs. The Delay Factor recovers all the Contractor’s non - operating costs in an 8-hour day. If payment is made for equipment on an excusable delay, it is limited to 8 hours per day or 40 hours per week maximum.

31. Dispute Board – Persons designated by the City Manager of the City of Carlsbad or Executive Manager of the Carlsbad Municipal Water District, to hear and advise the City Manager or Executive Manager on claims submitted by the Contractor. The City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District is the last appeal level for informal dispute resolution.

32. Drawings - See Plans.

33. D-size Sheet - “D” size paper for engineering design applications refers to 22” x 34” paper.

34. Engineer - The Deputy City Manager , Public Works of the City of Carlsbad acting either directly or through designated representatives and the third level of appeal for informal dispute resolution.

35. Engineer of Record/Design Engineer – A registered Professional Engineer licensed in the State of California who is qualified to act as an agent of a Project Owner or to prepare Plans for facilities to be accepted by the City of Carlsbad or the Carlsbad Municipal Water District. The term includes persons licensed in the State of California as Civil Engineers or Structural Engineers, as well as other licensed professionals like Architects and Landscape Architects.

36. Engineering Manager – For this project, this capacity will be served by the Public Works Manager.

37. Executive Manager – The appointed offici al who directs the administration of the Carlsbad Municipal Water District.

38. Field Book - The Agency field maps showing sewer and water facilities.

39. Field Order - A Field Order is a written agreement by the Engineer to compensate the Contractor for work items in accordance with 2 -8, “EXTRA WORK” or 2 -9, “CHANGED CONDITIONS.” A Field Order does not change the Contract Price or Contract Time or the intent of the Contract. The unused portions of the Field Orders shall revert to the Agency upon acceptance of the Work.

40. Final Environmental Document - The CEQA and/or NEPA document issued for the Project, such as certified environmental impact reports, mitigated negative declarations (MNDs), negative declarations, or exemptions.

41. Final Payment - The last payment for th e Contract made to the Contractor, excluding Retention.

42. Fleet & Facilities Project Manager – The Project Manager with the Fleet & Facilities Division and the Construction Manager’s immediate supervisor and designated representative for the second level of appeal for informal dispute resolution.

43. Float – The number of days by which an activity in the Construction Schedule may be delayed from either its earliest start date or earliest completion date without extending the Contract Time (total float). Total float belongs to the Project and to any Party to accommodate changes in the Work or to mitigate the effect of events which may delay completion.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 65 of 308 ends

44. Holiday - Holidays observed by the Agency are listed below:

Holiday Observed On
New Year’s Day January 1
Martin Luther King Day 3rd Monday in January
Presidents’ Day 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4
Labor Day 1st Monday in September
Indigenous Peoples’ Day 2nd Monday in October
Veteran’s Day November 11
Thanksgiving Day 4th Thursday/Friday in
November
Christmas Day December 25
If any Holiday listed falls on a Saturday, the Saturday and the preceding Friday are both legal Holidays. If the Holiday falls on a Sunday, both Sunday and the following Monday shall be legal Holiday s. Unless specified otherwise in the Contract Documents or authorized by the Engineer, do not work on Holidays.

45. Limited Notice to Proceed (LNTP) - A written notice given from the Agency that authorizes the Contractor to start a limited amount of work that, as described in the notice, is not Construction Work.

46. Minor Bid Item – a single contract item constituting less than 10 percent (10%) of the original Contract Price bid.

47. Night Work - See Working Night.

48. Normal Working Hours - Unless specified otherwise, Normal Working Hours core periods shall be 7:00 AM to 5:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and Agency Holidays are excluded. For Traffic Control Permits, Normal Working Hours are defined as 8:30 AM to 3:30 PM, unless specified otherwise.

49. Notice of Completion (NOC) - A document recorded with the County of San Diego to signify that the Work has been completed and accepted by the Agency.

50. Notice to Proceed (NTP) – A written notice to proceed with the work of the contract as mutually agreed in the Preconstruction Meeting.

51. Party or Parties - The Agency, the Contractor, or both, their respective permitted successors or assigns, and any other future signatories to the Contract.

52. Plans – The drawings, profiles, cross sections, Standard Plans, working drawings, and shop drawings, or reproduction s thereof, approved by the City Engineer, which show the location, character, dimensions or details of the Work.

53. Prime Contractor - See Contractor.

54. Project Site (Site) - Areas where the Work is performed pursuant to the Contract.

55. Public Works Manager – The Public Works Manager of the Fleet & Facilities Division and the Fleet & Facilities Project Manager’s immediate supervisor and designated representative for the third level of appeal for informal dispute resolution.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 66 of 308 ends

56. Punchlist - A list of items of Work or corrections generated after a Walk -through that is conducted when the Contractor considers that the Work and Services are complete.

57. Quality Control Standards and Procedures - The standards and procedures that are stated in a written manual that can be furnished to th e Engineer upon request. The standards and procedures are followed by the Supplier in the production of materials supplied for the Work Site.

58. Red-lines - Plans with annotations of changes made during construction to reflect the actual improvements or facilities built during construction whether concealed or visible.

59. Retention - The amount withheld from the money due to the Contractor in accordance with 7-3.2, “PARTIAL AND FINAL PAYMENT.”

60. Samples - Physical examples of the materials, equipment, or workmanshi p specified or required and which conform with the standards and specifications in the Contract Documents and by which the Work shall be evaluated.

61. Schedule - A Critical Path Method (CPM) schedule of construction activities and their durations to be perfor med during the Contract Time and prepared by the Contractor in accordance with 6 -1, “CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK,” and accepted by the Engineer.

62. Scope of Work (SOW ) - Labor, materials, equipment, facilities, and services required to be performed or provided by the Contractor to complete the entire Project or the various separately identifiable parts of the Project pursuant to the provisions of the Contract Documents.

63. Services - Work performed in connection with the layout, constructio n, testing, inspection, and commissioning of the Work or administration of the Contract and which may include professional services such as engineering, surveying, construction management and legal services that are required in accordance with the Contract Documents. Services are incidental to the Work.

64. Separate Contractors - Those individuals or entities that have entered into arrangements with the Agency for the provision of labor, materials, or other services in connection with the Project who are not under contract with the Contractor.

65. Signal Pre-Check - The procedure that the City uses to evaluate traffic signal systems prior to Signal Turn-On and generating a Punchlist.

66. Signal Turn-On - The day the City activates new traffic signals.

67. Supplemental Provisions – See Agency Supplement.

68. Tonne – Also referred to as “metric ton.” Represents a unit of measure in the International System of Units equal to 1,000 kilograms.

69. Walk-through - The procedure the Agency uses to evaluate the status of the Project and to generate a Punchlist prior to acceptance of the Work.

70. Work – All labor, materials, equipment, tools, and services and other requirements of the Contract Documents as modified by Change Order, whether completed or partially completed, provided or to be provided by Contractor to fulfill Contractor’s obligations.

The Work may constitute the whole or a part of the Project.

71. Working Day - Any day within the period between the start of the Contract time as defined in Section 6-1 and the date provided for completion, or upon field acceptance by the Engineer for all work provided for in the Contract, whichever occurs first, other than:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 67 of 308 ends

• Saturday;
• Sunday;
• any day designated as a holiday by the Agency;
• any other day designated as a holiday in a Master Labor Agreement entered into by the Contractor or on behalf of the Contractor as an eligible member of a contractor association;
• any day the Contractor is prevented from working at the beginning of the workday for cause as defined in Section 6-6.1; or
• any day the Contractor is prevented from working during the first 5 hours with at least 60 percent of the normal work force for cause as defined in Section 6-

6.1. 72. Working Night (Night Work) - A period of nighttime work, allowed only on Sunday through Thursday, excluding Holidays.

73. Work Site - See Project Site (Site).

ABBREVIATIONS
1-3.2 Common Usage.

ADD the following:

AML Approved Material List
CADD Computer Aided Design and Drafting
CA MUTCD California Manual on Uniform Traffic Control Devices CCT Correlated Color Temperature
CEQA California Environmental Quality Act.

CFR Code of Federal Regulations
CGP Construction General Permit
CIPM Cured-In-Place-Manhole
CL Centerline
CMS Content Management System Database
CNC Computer Numerical Control
CRI Color Rendering Index
CSA Canadian Standards Association
DBE Disadvantaged Business Enterprise
DCE Data Computer Equipment
DG Decomposed Granite
DVBE Disabled Veteran Business Enterprise
DWT Detectable Warning Tiles
EOW Engineer of Work
ESL Environmentally Sensitive Lands
ESO Electrical Service Orders
FRP Fiberglass Reinforced Plastic
GFE Good Faith Effort
GMT Greenwich Mean Time
GPS Global Positioning System

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 68 of 308 ends

IDA International Dark Sky Association
IP Ingress Protection
LCD Liquid Crystal Display
LD Laser Diode
LER Luminaire Efficiency Rating
MBE Minority Business Enterprise
MDFT Minimum Dry Film Thickness
MHPA Multiple Habitat Planning Area
MH Manhole
MIL Military
MJ Mechanical Joint
M&M Maintenance and Monitoring
MMC Mitigation and Monitoring Coordination
MOV Metal Oxide Varistor
NA Numerical Aperture
NC Not Connected, Normally Closed
NEPA National Environmental Policy Act of 1969
NEXT Near End Crosstalk
NCHRP National Cooperative Highway Research Program
NOC Notice of Completion
NPDES National Pollutant Discharge Elimination System
NTP Notice to Proceed
OC On Center
ODP Open Drip Proof
OFNR Optical Fiber Nonconductive Riser
OTDR Optical Time Domain Reflectometer
PB Pull Box
PCMS Portable Changeable Message Signs
PCU Photoelectric Control Unit
PEP Plant Establishment Period
PIC Polyethylene Insulated Cable
PL Property Line
RFP Request for Proposal
RFI Request for Information
RPMS Rubber Polymer Modified Slurry
SIC Standard Industry Classification
SMS Short Message Service
SMTP Simple Mail Transfer Protocol
SOW Statement of Work, Scope of Work
SOV Schedule of Values
SPDT Single Pole Double Throw
SSD Surge Suppression Devices
TDR Time Domain Reflectometer
TEES Transportation Electrical Equipment Specifications

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 69 of 308 ends

TFFN Thermoplastic Flexible Fixture Wire Nylon Jacketed TIG Tungsten Inert Gas
UF Underground Feeder
UPRR Union Pacific Railroad Company
VAC Volts AC
VPC Vitrified Polymer Composite
WBE Women Business Enterprise
1-3.3 Institutions.

ADD the following:

AMTRACK American Track National Railroad Passenger Corp.

ANSI American National Standards Institute
AASHTO American Association of State Highway and Transportation Officials AISC American Institute of Steel Construction
ANSI American National Standards Institute
API American Petroleum Institute
AREA American Railway Engineering Association
ASTM American Society for Testing and Materials
AWPA American Wood Preservers Association
AWS American Welding Society
AWWA American Water Works Association
BNSF Burlington Northern Santa Fe Railway
DSD Development Services Department
FHWA Federal Highway Administration
GRI Geosynthetic Research Institute
IPCEA Insulated Power Cable Engineers Association
IES Illuminating Engineering Society (Photometric Data) ISO International Organization for Standardization
MTS San Diego Metropolitan Transit System
NACE National Association of Corrosion Engineers
NAFP National Association of Pipe Fabricators
NCTD North County Transit District
NEMA National Electrical Manufacturers Association
NOAA National Oceanic and Atmospheric Administration (Dept. of Commerce) NFPA National Fire Protection Association
PCI Prestressed Concrete Institute
SANDAG San Diego Association of Governments
SD&AE San Diego & Arizona Eastern Railroad
SDTI San Diego Trolley, Inc.

UL Underwriters’ Laboratories Inc.

USGS United States Geological Survey
UPRR Union Pacific Railroad Company

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 70 of 308 ends

1-6 BIDDING AND SUBMISSION OF THE BID
1-6.2 Subcontractor Listing.

ADD the following:

Each Bidder shall comply with the Chapter of the Public Contract Code including Sections 4100 through 4113. The use of Subcontractors in no way relieves the Contractor of any obligations or responsibilities under the Contract.

The following excerpts or summaries of some of the requirements of this Chapter are included below for information:

The Bidder shall set forth in the Bid, as provided in Section 4104:

“(a) The name and location of the place of business of each Subcontractor who will perform Work or Labor or render service to the prime Contractor in or about the construction of the Work or improvements, or a Subcontractor licensed by the State of California who, under Subcontract to the prime Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed Drawings contained in the Plans and Specifications, in an amount in excess of one-half of 1 percent of the prime Contractor’s total Bid, or, in the case of Bids or offers for the construction of streets or highways, including bridges, in excess of one -half of 1 percent of the prime Contractor’s total Bid or ten thousand dollars ($10,000), whichever is greater.”

“(b) The portion of the Work which will be done by each such Subcontractor under this ac t. The prime Contractor shall list only one Subcontractor for each such portion as is defined by the prime Contractor in his Bid.”

If the Contractor fails to specify a Subcontractor or specifies more than one Subcontractor for the same portion of the Work to be performed under the Contract (in excess of one-half of 1 percent of the Contractor’s total Bid), the Contractor shall be qualified to perform that portion itself, and shall perform that portion itself, except as otherwise provided in the Code.

As provided in Section 4107, no Contractor whose Bid is accepted shall substitute any person as Subcontractor in place of the Subcontractor listed in the original Bid, except for causes and by procedures established in Section 4107.5. This section provides pro cedures to correct a clerical error in the listing of a Subcontractor.

Section 4110 provides that a Contractor violating any of the provisions of the Chapter violates the Contract and the Board may exercise the option either to cancel the Contract or assess the Contractor a penalty in an amount of not more than 10 percent of the Subcontract involved, after a public hearing.
1-7 AWARD AND EXECUTION OF THE CONTRACT
1-7.1 General.

DELETE in its entirety and SUBSTITUTE with the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 71 of 308 ends

1-7.1 Standard Contract Provisions.
1-7.1.1 Successor’s Obligations.

All grants, covenants, provisions and claims, rights, powers, privileges and abilities contained in the Contract Documents shall be read and held as made by and with, and granted to and imposed upon, the Contractor, the Agency, and the Contractor’s and the Agency’s respective heirs, executors, administrators, successors, and assigns. 1-7.1.2 Waiver of Legal Rights.

1. The Agency’s failure to insist, in any 1 or more instances, upon the performance of any provision of the Contract, or to exercise any right therein, shall not be construed as a waiver or relinquishment of such provisions or rights.

2. Any waiver of any breach of the Contract shall not be held to be a waiver of any other or subsequent breach.

3. Any waiver the Agency issues to any provision of the Contract shall only be effective if it is agreed upon in writing by the Agency and if it is specific to the matter concerned. 1-7.1.3 Requests for Information (RFI).

1. Inquiries from the Contractor seeking clarification of the requirements of the Contract Documents shall be submitted in writing to the Agency as a Request for Information (RFI).
1-7.1.4 Assignment to Awarding Body.

1. In accordance with subdivision (b) of Public Contract Code Section 7103 .5, the Contractor and the Contractor’s Subcontractors shall conform to the following requirements:
a. In entering into a public works c ontract or a subcontract to supply goods, services, or materials pursuant to a public works c ontract, the Contractor or the Contractor’s Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Business and Professions Code Section 16700 et seq.) arising from purchases of goods, services, or materials pursuant to the public works c ontract or the subcontract.
b. This assignment shall be made and become effective at the time the awarding body tenders to the Contractor, without further acknowledgment by the Parties.
1-7.2 Contract Bonds.

ADD the following:

1. Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by the Board in the amounts and for the purposes noted below. Bonds issued by a Surety, who is authorized to issue bonds in California, and whose bonding limitation shown in the circular is enough to provide bonds in the amount required by the Contract shall be deemed approved unless specifically rejected by the Agency. Bo nds from all other sureties shall be accompanied by all documents enumerated in Code of Civil Procedure S ection 995.660 (a). The Bidder shall pay all bond premiums, costs, and incidentals.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 72 of 308 ends

2. Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and Surety and the signature of the authorized agent of the Surety shall be notarized.

3. The faithful performance/warranty bond will be reduced to 25 percent of the original amount 30 Calendar Days after recordation of the Notice of Completion and will remain in full force and effect for the 1-year warranty period and until all warranty repairs are completed to the satisfaction of the Engineer. The bond to secure payment of laborers and materials suppliers shall be released 6 months plus 30 Calendar D ays after recordation of the Notice of Completion if all claims have been paid.

4. All bonds are to be placed with a Surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed its liabilities in an amount equal to or in excess of the amount of the bond. The bonds are to contain the following documents:
a. An original, or a certified copy, of the unrevoked appointment, power of attorney, bylaws, or other instrument entitling or aut horizing the person who executed the bond to do so.
b. A certified copy of the certificate of authority of the insurer issued by the insurance commissioner.

5. If the Bid is accepted, the Agency may require a financial statement of the assets and liabilities of the Surety for the quarter calendar year preceding the date of the execution of the bond.

The financial statement shall be made by an officer’s certificate as defined in Corporations Code Section 173. In the case of a foreign Surety, the financial statement may be verified by the oath of the principal officer or manager residing within the United States.

6. If the Surety on any bond furnished by the Contractor is declared bankrupt, becomes insolvent, or its right to do business is terminated in any state where any part of the Project is located, immediately notify the Engineer; and immediately substitute another bond and Surety acceptable to the Agency.

7. The Contractor shall require the Surety to mail its standard “Bond Status” form to the Agency.

ADD the following: 1-7.2.1 Payment.

1. If enumerated in the Contract Documents, the Bid item for “Bonds (Payment and Performance)” includes full compensation for actual costs of payment and performance bonds. The Contractor may submit a request for payment of actual invoi ced costs up to the Bid amount, but not to exceed 2.5% of the Contract Price, no less than 10 Working Days after the award of the Contract.

2. If enumerated in the Contract Documents, if the Bid item for “Bonds (Payment and Performance)” exceeds actual invoic ed costs, any such differential amount up to the Bid amount shall be paid as a part of the Final Payment.

SECTION 2 – SCOPE OF THE WORK
2-1 WORK TO BE DONE
ADD the following:

1. Where approval or acceptance by the Agency is required, only a general approval is required.

However, such approval does not relieve the Contractor from the Contractor’s responsibility

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 73 of 308 ends

for complying with all applicable laws, codes, and best industry practices. Contractor has its obligation to fulfill all conditions of the Contract.

2. In accordance with the provisions of California Law, the Contractor shall possess or require the Contractor’s Subcontractor(s) to possess valid appropriate license(s) for the Work being performed as conveyed in the Bidding Documents.
2-2 PERMITS
DELETE in its entirety and SUBSTITUTE with the following:
2-2 PERMITS, FEES, AND NOTICES

1. The Contractor shall obtain and pay for all business taxes, business licenses, permits, and fees required for constructing the Project and licenses and inspections ne cessary for the proper execution and completion of the Work, unless specified otherwise in the Contract Documents.
a. To the extent that there is a change in the type or cost of any of such permits, fees, licenses, or inspection occurring after Award of Contract, there shall be an equitable adjustment in the Contract Price on account of such change under the Extra Work provisions.
b. The Contractor shall comply with and give notices required by applicable laws. The Contractor is not entitled to damages or additional payment for delays attributable to the acquisition of permits.
c. The Contractor shall pay the Agency for regulatory fees, fines, or penalties imposed on the Agency arising from the Contractor’s failure to complete the Work in accordance with the Contract Documents.

2. Contractor shall not begin work until all permit’s incidental to the Work are obtained. This includes, and is not limited to, encroachment, right-of-way, grading and building permits necessary to perform Work for this Contract on Agency property, streets, or other rights- of-way. Permits for night work, overload, blasting, demolition, and disposal of all materials removed from the Project are also Contractor’s responsibility.

3. The Contractor sh all obtain and pay for all permits for the disposal of all materials removed from the Project. The cost of the permit(s) shall be included in the price Bid for the appropriate Bid item and the Agency shall not pay additional compensation for Contractor to obtain such permits.

4. Permits shall be maintained in valid status until acceptance of the Work by the Agency. 2-2.1 Building Permits.

1. The Contractor shall obtain the required building permits from Agency’s permitting departments. Any prior approval obtaine d for the Plans shall not in any way waive this requirement.

2. Request inspections in accordance with the building codes in effect on the permitted Plans and by City’s Development Services Department, Building Division or Construction Management and Inspecti on Department. Any Work performed without the benefit of the required permit and subsequent inspection shall be removed and replaced at the discretion of the City Building Inspector at no additional cost.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 74 of 308 ends

3. The payment for procuring Building Permits shall be included in the Allowance Bid item for “Building Permits.” If no such Bid item is included in the Bid Schedule, payment shall be included in the various Bid items and no additional payment shall be made. 2-2.2 Caltrans Encroachment Permit. (This section not used) 2-3 RIGHT-OF-WAY
ADD the following:

1. The Contractor shall coordinate access to private property with the property owners and the timing of accessing private propert y when the Agency has already obtained rights of entry.

Unless otherwise provided, the Contractor shall coordinate, pay for, and assume all responsibility for acquiring using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the Agency harmless from all claims for damages caused by such actions. The Contractor shall protect any private and public improvements.
2-4 COOPERATION AND COLLATERAL WORK
ADD the following:

1. The Contractor shall coordinate and cooperate with all the utility companies during the relocation or construction of their lines. The Contractor may be granted a time extension if, in the opinion of the Engineer, a delay is caused by the utility company. No additional compensation will be made to the Contractor for any such delay.

2. If work to be performed by the Agency or its separate Contractors is not shown or specified in the Contract Documents, the Engineer shall notify the Contractor in writing 10 Working Days prior to the start of such work and make available Plans or Specifications for work to be performed by others that may be pertinent to Contractor’s Work. If Contractor determines that the work to be performed by the Agency or its separate Contractors may interfe re with or cause damage or delays to Contractor’s Work, notify the Engineer in writing within 3 Working Days of the Engineer’s notice. The Contractor shall diligently pursue with the Engineer resolution of potential conflicts with the work of others.

3. The Contractor shall prepare and submit to the Engineer for approval a plan and schedule to integrate the work of Contractor or its Subcontractors, Agency or the work of others. The plan shall conform to the tasks identified in the Construction Schedule and identify additional tasks as necessary and the sequencing of interrelated activities. 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES
2-5.2 Temporary Utility Services.

ADD the following:

1. The Contractor shall furnish, install, maintain, and remove all temporary utility services, such as light, power, electrical, gas, and water, at its own expense for construction and maintenance activities until acceptance of Work. These include piping, wiring, lamps, and other equipment necessary for the Work.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 75 of 308 ends

2. The Contractor shall obtain a construction meter for water used for the construction, testing, disinfection and flushing of new water or sewer facilities, vegetation establishment and maintenance, site maintenance, landscaping, cleanup, and all other work requiring wat er.

The Contractor shall contact the water agency that serves the Project Site for requirements.

3. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter, and any, and all, other charges, deposits and/or fees . The costs shall be considered incidental to the items of Work that they are associated with and no additional payment will be made for them.

2-6 CHANGES REQUESTED BY THE CONTRACTOR
ADD the following:

1. Any plan or method of work suggested to the Contractor by the Agency, but not specified or required by the Contract or Change Order, which is adopted or followed by the Contractor in whole or in part shall be done at the Contractor’s sole risk and responsibility.

2. The Contract Price is not subject to adjustment for any type of tax increases after the Award.

ADD the following: 2-6.1 Cost Reduction Proposal.

1. The Contractor may submit to the Engineer in writing, proposals for modifying the Plans, Specifications, or other requirements of the Contract for the sole purpose of reducing the total cost of construction.

2. The cost reduction proposal shall not impair, in any manner, the essential functions or characteristics of the Project such as service life, economy of operation, ease of maintenance, quality, desired appearance, or design and safety standards.

3. The following information must be included in the cost reduction proposal:
a. A description of both the existing Contract requirements for performing the Work and the proposed changes.
b. An itemization of the Contract requirements that shall be changed if the proposal is adopted.
c. A detailed estimate of the cost of performing the Work under the existing Contract and under the proposed change.
d. A statement of the time within which the Engineer s hall act on the cost reduction proposal.
e. The Contract items of Work affected by the proposed changes, including any quantity variation attributable thereto.

4. This subsection does not require the Engineer to consider any cost reduction proposal. The Agency s hall not be liable to the Contractor for not approving or acting upon any cost reduction proposal the Contractor submitted nor for any delays to the Work attributable to the cost reduction proposal.

5. If a cost reduction proposal is similar to the information included in the Contract Documents or adopted by the Agency after the advertisement and prior to Award of the Contract, the Engineer will not accept such proposal and reserves the right to make such changes without compensation to the Contractor under the provisions of this subsection.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 76 of 308 ends

6. The Contractor shall continue to perform the Work in accordance with the requirements of the Contract until a Change Order incorporating the cost reduction proposal has been issued.

7. The Engineer is the sole judge of the acc eptability of a cost reduction proposal and the estimated net savings. In determining the estimated net savings, the Agency has the right to disregard the Contract Bid prices if, in the judgment of the Engineer, such prices do not represent a fair measure of the value of the Work to be performed or to be deleted.

8. The Agency reserves the right to require the Contractor to share in the Agency’s costs of investigating the Contractor’s cost reduction proposal. When this is required, the Contractor shall indicate the Contractor’s acceptance in writing allowing the Agency to deduct amounts payable to the Contractor.

9. If the Engineer accepts the Contractor’s cost reduction proposal in whole or in part, the Engineer shall issue a Change Order to incorporate the changes in the Plans and Specifications which are necessary to permit the cost reduction proposal or such part of it as has been accepted to be put into effect. If the Engineer’s approval is conditional, the Change Order shall include any conditions upon which the Engineer’s approval is based.

10. The Change Order also includes the estimated net savings in the cost of performing the Work due to the accepted cost reduction proposal and provides that the Contract cost be adjusted by crediting the Agency with 50% of estimated net savings amount.

11. The Contract Time shall not be extended by the acceptance of the cost reduction proposal and the performance of the Work unless specified otherwise in the Change Order.

12. The amount specified as payable to the Contractor in the Change Order is full compensation for the cost reduction proposal and the performance of the Work.

13. The Agency expressly reserves the right to adopt a cost reduction proposal for general use on contracts administered by the Agency when it determines that the proposal is suitable for application to other contracts. When an accepted cost reduction proposal is adopted for general use, only the Contractor who first submitted such proposal shall be eligible for compensation subject to this subsection, and in that case, only for contracts awarded prior to submission of the accepted cost reduction proposal.

14. The cost reduction proposals identical or similar to previously submitted proposals shall be eligible for consideration and compensation under the provisions of this subsection if the identical or similar previously submitted proposals were not adopted for general application to other contracts administered by the Agency.

15. Subject to the provisions contained in the Contract, the Agency or any other public age ncy shall have the right to use all or any part of any submitted cost reduction proposal without obligation or compensation of any kind to the Contractor.

16. The Contractor shall bear all costs to revise bonds for the Project to include the cost reduction incentive proposal work.
2-7 CHANGES INITIATED BY THE AGENCY
2-7.1 General.

ADD the following:

1. The Agency may change the Plans, Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive,

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 77 of 308 ends

does not exceed 25 percent of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written s upplemental agreement between the Contractor and Agency, unless both parties agree to proceed with the change, by Change Order.

2. Change Orders shall be in writing and state the dollar value of the change or established method of payment, any adjustment in Contract Time of completion, and when negotiated prices are involved, and shall provide for the Contractor’s signature indicating acceptance.

3. Unless expressly set forth in writing in a Change Order signed by the Agency and the Contractor, changes initiated by the Agency shall not be construed as the Agency directing the Contractor’s mean-and-methods in the execution of the Work. 2-7.2 Payment-Contract Unit Prices.

1. If a change is ordered in an item of work covered by a Contract Unit Price, and such change does not involve substantial change in character of the Work from that shown on the Plans or specified in the Specifications, then an adjustment in payment will be made. This adjustment will be based upon the increase or decrease in quantity and the Contract Unit Price.

2. If the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications varies from the Bid quantity by 50 percent or less, payment will be made at the Contract Unit Price. If the actual quantity of the item of work varies from the Bid quantity by more than 50 percent, payment will be made per Section 2-7.3 or 2-7.4 as appropriate.

3. If a change is ordered in an i tem of work covered by a Contract Unit Price, and such change does involve a substantial change in the character of the Work from that shown on the Plans or specified in the Specifications, an adjustment in payment will be made per Section 2-7.6. 2-7.3 Payment – Increases of More than 50 Percent.

1. Should the actual quantity of an item of W ork covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 50 percent, payment for the quantity in excess of 150 percent of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 2 -8. The Extra Work per Section 2 -8, basis of payment, shall not include fixed costs. Fixed costs shall be deemed to have been recovered by the Contractor through payment for 150 percent of the Bid quantity at the Contract Unit Price. 2-7.4 Payment – Decreases of More than 50 Percent
Should the actual quantity of an item of Work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 50 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 2-8; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 50 percent of the Bid quantity at the Contract Unit Price.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 78 of 308 ends

2-7.5 Stipulated Unit Prices.

Stipulated Unit Prices are unit prices established by the Agency in the Contract Documents as distinguished from Contract Unit Prices submitted by the Contractor. Stipulated Unit Prices may be used for the adjustment of Contract changes when so s pecified in the Supplemental General Provisions.
2-7.6 Agreed Prices.

Agreed Prices are prices for new or unforeseen Work, or adjustments in Contract Unit Prices per Section 2 -7.2, established by mutual agreement between the Contractor and the Agency. If mutual agreement cannot be reached, the Engineer may direct the Contractor to proceed on the basis of Extra Work in accordance with Section 2 -8, except as otherwise specified in Sections 2 -

7.3 and 2-7.4.
2-7.7 Schedule of Values.

Before construction, Contractor shall provide a schedule of values for all lump-sum Bid items that shall be used for the purpose of progress payments. The prices shall be valid for the purpose of Change Orders to the Project.
2-7.8 Eliminated Items.

Should any Bid item be eliminated in its entirety, payment will be made to the Contractor for its actual costs incurred in connection with the eliminated item prior to notification in writing from the Engineer so stating its elimination. If material conforming to the Plans and Specifica tions is ordered by the Contractor for use in the eliminated item prior to the date of notification of elimination by the Engineer, and if the order for that material cannot be canceled, payment will be made to the Contractor for the actual cost of the material. In this case, the material shall become the property of the Agency. Payment will be made to the Contractor for its actual costs for any further handling. If the material is returnable, the material shall be returned, and payment will be made to the Contractor for the actual cost of charges made by the supplier for returning the material and for handling by the Contractor. Actual costs, as used in this Agency Supplement, shall be computed on the basis of Extra Work per Section 2-8. 2-8 EXTRA WORK
ADD the following:

1. New or unforeseen Work will be classified as “Extra Work” when the Engineer determines that it is not covered by Contract Unit Prices or stipulated unit prices.

2. Any request by the Contractor for Extra Work shall be in writing to the Engineer and shall include itemized estimates and in accordance with Section 7 -4. The Contractor shall fully itemize the Extra Work cost estimates such as labor and payroll costs, quantities, crew composition, production rates, material costs, Subcontracto r and Supplier costs, equipment costs, supplemental costs, and time impact.
2-9 CHANGED CONDITIONS
ADD the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 79 of 308 ends

The Contractor shall promptly notify the Engineer of the following Work Site conditions (“Changed Conditions”), in writing, upon their discovery and before they are disturbed:

1. Subsurface or latent physical conditions differing materially from those represented in the Contract;

2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and

3. Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined in Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

The Engineer will promptly investigate conditions which appear to be Changed Conditions. If the Engineer determines that conditions are Chan ged Conditions and they will materially affect performance time, the Contractor, upon submitting a written request, will be granted an extension of time subject to Section 6-4.2.

If the Engineer determines that the conditions do not justify an adjustment in compensation, the Contractor will be notified in writing. This notice will also advise the Contractor of its obligation to notify the Engineer in writing if the Contractor disagrees.

The Contractor’s failure to give notice of Changed Conditions promptly upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection with them.

1. The Contractor shall not be entitled to the payment of any additional compensation for any act, or failure to act, by the Engineer, including failure or refusal to issue a Change Order, or for the occurrence of any event or other cause, unless the Contractor shall have first given the Engineer written notice of potential claim as specified in this Section 2-9. Compliance with this section shall not be required as a prerequisite to notice provisions in Section 6 -4.2(4) Extensions of Time, nor to any claim that is based on differences in measurement or errors of computation as to Contract quantities.

2. The Contractor shall provide the Agency with a written document containing a description of the particular circumstances giving rise to the potential claim, the reasons for which the Contractor believes additional compensation may be due and the nature of any and all costs involved within 20 Working Days of the date of service of the written notice of potential claim for Changed Conditions. Verbal notifications will not be accepted.

3. The potential claim shall include the following certification relative to the California False Claims Act, Government Code Sections 12650-12656.

“The undersigned certifies that the above statements are made in full awareness of the California False Claims Act, Government Code Sections 12650 -12656. The undersigned further understands and agrees that thi s potential claim, unless resolved, must be restated as a claim in response to the Agency’s proposed final estimate for it to be further considered.”

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 80 of 308 ends

By: Title:

Date:

Company Name:

4. The Contractor’s estimate of costs may be updated when actual costs are known. The Contractor shall submit proof of its actual costs to the Engineer within 20 Working Days after the affected Work is completed. Failure to do so shall be cause to deny any later -filed claim regarding a potential claim described in this Section 2-9.

5. The intent of this Section 2 -9 is to have differences between the parties arising under the Contract brought to the attention of the Engineer at the earliest possible time so that such matters can be settled, if possible, or other appropriate action promptly taken. 2-10 DISPUTED WORK
ADD the following: 2-10.1 Claims.

1. A Claim is a written demand by the Contractor that seeks an adjustment in the Contract Price, Contract Time, or other relief associated with a dispute arising under or relating to the Contract, including a breach of any Contract provision. A voucher, invoice, or other routine request for payment is not a Claim.

2. A Claim shall conform to these specifications and may be considered after the Agency has previously denied a req uest by the Contractor for a Change Order seeking the demanded relief.

3. The Contractor shall submit a Claim to the Engineer if a dispute occurs that arises from or relates to the Contract. The Claim shall seek all relief to which the Contractor asserts the Contractor is entitled as a result of the event(s) giving rise to the dispute. The Contractor’s failure to process a Claim in accordance with these specifications shall constitute a waiver of all relief associated with the dispute. Claims are subject to 6-10, “Right to Audit.”

4. The Contractor shall continue to perform the Services and Work and shall maintain the Schedule during any dispute proceedings. The Engineer will continue to make payments for undisputed Services and Work.

5. The Agency’s Claims process specified in the Agency Supplement shall not relieve the Contractor of the Contractor’s statutory obligations to present Claims prior to any action under the Government Code.

6. Except for those final payment items disputed in the written statement re quired in Section 7-3.2, all Claims of any dollar amount shall be submitted in a written statement by the Contractor no later than the date of receipt of the final payment estimate. Those final payment items disputed in the written statement required in Section 7-3.2 shall be submitted no later than 30 Calendar Days after receipt of the Final Payment estimate. No Claim will be considered that was not included in this written statement, nor will any Claim be allowed for which written notice or protest is req uired under any provision of this Contract , including Sections 2 -9 Changed Conditions, 2 -10 Disputed Work, 4 -1(22) Protection, 6- 4.4 Written Notice and Report, or 6 -4.2(4) Extensions of Time, unless the Contractor has complied with notice or protest requirements.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 81 of 308 ends

7. The Engineer will consider Contractor’s filed Claims, which must be detailed enough so the Engineer can determine the basis and amount of the Claims. Contractor shall provide the Engineer additional information to determine the facts or contentions involved in a Claim if requested by the Engineer. If additional information is needed, Contractor must provide Engineer with this information within a reasonable time of being asked for additional information. Failure to submit such information and details will be sufficient cause for denying the Claims.

8. Payment for Claims shall be processed by the next payment application of their resolution for those Claims approved by the Engineer. The Contractor shall proceed with informal dispute resolution under Section 2-10, Disputed Work, for those Claims remaining in dispute. 2-10.1.1 Initiation of Claim.

1. A Claim is a written demand by the Contractor that seeks an adjustment in the Contract Price, Contract Time, or other relief associated with a dispute arising u nder or relating to the Contract, including a breach of any provision of the Contract. A voucher, invoice, payment application or other routine request for payment is not a Claim. A Claim shall conform to these specifications and may be considered after th e City has previously denied a request from the Contractor for a Change Order seeking the demanded relief. The Contractor shall, consistent with 2 -10.1.2, give the Agency written notice of Claim prior to commencing any Disputed Work. Failure to give the notice shall constitute a waiver of all Claims in connection with the Disputed Work. If the Contractor and the Agency are unable to reach agreement on Disputed Work, the Agency may direct the Contractor to proceed with the Work and such direction shall not be construed as the Agency directing the Contractor’s mean-and-methods in the execution of the Work. After the Agency has rejected a Change Order request and prior to proceeding with dispute resolution pursuant to the Public Contract Code, applicable provisions of which are specified below, the Contractor shall attempt to resolve all disputes informally through the following dispute resolution chain of command:

For claims with a monetary value of $50,000 or less:
i. Construction Manager
ii. Fleet and Facilities Project Manager
iii. Public Works Manager
For claims with a monetary value greater than $50,000:
i. Construction Manager
ii. Fleet and Facilities Project Manager
iii. Public Works Manager
iv. Engineer
v. City Manager or Executive Manager

2. Consistent with Section 2 -10.1.2, the Contractor shall submit a complet e report within 20 Working Days after completion of the Disputed Work stating its position on the Claim, the contractual basis for the Claim, along with all documentation supporting the costs, Contract Time, and all other evidentiary materials. At each level of Claim or appeal of Claim the Agency will, within 10 Working Days of receipt of the Claim or appeal of Claim, review the Contractor’s report and respond with a position, request additional information or request that the Contractor meet and present i ts report. When additional information or a meeting

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 82 of 308 ends

is requested the Agency will provide its position within 10 Working Days of receipt of the additional information or Contractor’s presentation of its report. The Contractor may appeal each level’s position up to the Deputy City Engineer/Engineering Manager for claims less than $50,000 and/or up to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District for claims greater than $50,000 after which the Contractor may proceed under the provisions of the Public Contract Code. The Agency’s failure to state a position or otherwise respond to a Claim within the timeframes set forth above shall be deemed a rejection of the Claim by the Agency.

3. The authority within the dispute resolution chain of command is limited to recommending a resolution to a Claim to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District. Actual approval of the Claim is subject to the Change Order provisions in the Contract.

4. Any remaining Claims not resolved by the informal dispute resolution process described above shall be resolved in accordance with Public Contract Code S ection 9204, the relevant portion of which is included below:
(d)(1)(A) Upon receipt of a Claim pursuant to this section, the public entity to which the Claim applies shall conduct a reasonable review of the Claim and, within a period not to exceed 45 days, shall provide the Claimant a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Upon receipt of a Claim, a public entity and a Contractor may, by mutual agreement, extend the time period provided in this subdivision.

(B) The Claimant shall furnish reasonable documentation to support the Claim.

(C) If the public entity needs approval from its governing body to provide the Claimant a written statement identifying the disputed portion and the undisputed por tion of the Claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the Claimant a written statement identifying the disputed portion and the undisputed portion.

(D) Any payment du e on an undisputed portion of the Claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.

(2)(A) If the Claimant disputes th e public entity's written response, or if the public entity fails to respond to a Claim issued pursuant to this section within the time prescribed, the Claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 83 of 308 ends

(B) Within 10 business days foll owing the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the public entity shall provide the Claimant a written statement identifying the portion of the Claim that remains in dispute and the porti on that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the Claimant sharing the associated costs equally. The public entity and Claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the Claim has bee n identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the Claim remaining in dispute shall be subject to applicable procedures outside this section.

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

(D) Unless otherwise agreed to by the public entity and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any furt her obligation under Section 20104.4 to mediate after litigation has been commenced.

(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program if mediation under this section does not resolve the parties' dispute.

(3) Failure by the public entity to respond to a Claim from a Contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the Claim being deemed rejected in its entirety. A Claim that is denied by reason of the public entity's failure to have responded to a Claim, or its failure to otherwise meet the time requirements of this section, shall not constit ute an adverse finding with regard to the merits of the Claim or the responsibility or qualifications of the Claimant.

(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 84 of 308 ends

(5) If a Subcontractor or a lower tier Subcontractor lacks legal standing to assert a Claim against a public entity because privity of Contract does not exist, the Contractor may present to the public entity a Claim on behalf of a Subcontractor or lower tier Subcontractor. A Subcontractor may request in writing, either on their own behalf or on behalf of a lower tier Subcontractor, that the Contractor present a Claim for work which was performed by the Subcontractor or by a lower tier Subcontractor on behalf of the Subcontractor. The Subcontractor requesting that the Claim be presented to the public entity shall furnish reasonable documentation to support the Claim. Within 45 days of receipt of this written request, the Contractor shall notify the Subcontractor in writing as to wh ether the Contractor presented the Claim to the public entity and, if the original Contractor did not present the Claim, provide the Subcontractor with a statement of the reasons for not having done so.

(e) The text of this section or a summary of it shal l be set forth in the Plans or Specifications for any Public Works Project that may give rise to a Claim under this section.

(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a Claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable Change Order, Claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

(g) This section applies to contracts entered into on or after January 1, 2017.

(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes, or extends that date.

In addition, all Claims by Contractor for $375,000 or less shall be resolved in accordance with the procedures in the Public Contract Code Section 20104 et seq., applicable provisions of which are included below:

20104.2 For any Claim subject to this article, the following requirements apply:

(a) The Claim shall be in writing and include the documents necessary to substantiate the Claim. Claims must be filed on or before the date of final payment. Nothing in this

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 85 of 308 ends

subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of Claims.

(b)(1) For Claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written Claim within 45 days of receipt of the Claim, or may request, in writing, within 30 days of receipt of the Claim, any additional documentation supporting the Claim or relating to defenses to the Claim the local agency may have against the Claimant.

(2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the Claimant.

(3) The local agency's written response to the Claim, as further documented, shall be submitted to the Claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the Claimant in producing the additional information, whichever is greater.

(c)(1) For Claims of over fifty thousan d dollars ($50,000) and less than or equal to three hundred seventy -five thousand dollars ($375,000), the local agency shall respond in writing to all written Claims within 60 days of receipt of the Claim, or may request, in writing, within 30 days of rece ipt of the Claim, any additional documentation supporting the Claim or relating to defenses to the Claim the local agency may have against the Claimant.

(2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the Claimant.

(3) The local agency's written response to the Claim, as further documented, shall be submitted to the Claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the Claimant in producing the additional information or requested documentation, whichever is greater.

(d) If the Claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the Claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute.

(e) Following the meet and confer conference , if the Claim or any portion remains in dispute, the Claimant may file a Claim as provided in Chapter 1 (commencing with

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 86 of 308 ends

Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Claimant submits his or her written Claim pursuant to subdivision (a) until the time that Claim is denied as a result of the meet and c onfer process, including any period of time utilized by the meet and confer process.

(f) This article does not apply to tort Claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort Claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code.

20104.4 The following procedures are established for all civil actions filed to resolve Claims subject to this article:

(a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requi rement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15 -day period, any party may petition the court to appoint the mediator.

(b)(1) If the matter remains in dispu te, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code.

The Civil Discovery Act (Title 4 (commencin g with Section 2016.010) of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.

(2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds.

(3) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 87 of 308 ends

addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo.

(b) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process.

20104.6 Payment on undisputed portion of Claim; interest on arbitration awards or judgments:

(a) No local agency shall fail to pay money as to any portion of a Claim which is undisputed except as otherwise provided in the Contract.

(b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law.

5. Although not to be construed as proceeding under Extra Work provisions, the Contractor shall keep and furnish records of disputed Work in accordance with Section 2-10. 2-10.1.2 Claim Certification Submittal.

1. If the Contractor’s Claim seeks an increase in the Contract Price, the Contract Time, or both, submit with the Claim an affidavit certifying the following:
a. The Claim is made in good faith and covers all costs and delays to which the Contractor is entitled as a result of the event(s) giving rise to the Claim. b. The amount Claimed accurately reflects the adjustments in the Contract Price, the Contract Time, or both to which the Contractor believes the Contractor is entitled. c. All supporting costs and pricing data are current, accurate, and complete to the best of the Contractor’s knowledge. The Contractor shall supply a cost breakdown per item of Work.
d. The Contractor shall ensure that the affidavit is executed by an official who has the authority to legally bind the Contractor.
2-10.1.3 Agency’s Final Determination.

1. If the Contractor disagrees with the City Manager or Executive Manager’s final determination, as described in 2 -10.1.1(1-2), Contractor must notify the Engineer in writing of the Contractor’s objection within 15 Working Days after receipt of the written determination and file a “Request for Mediation” in accordance with 2-10.2, “Dispute Resolution Process.”

2. Failure to give notice of objection within the 15 Working Days period shall waive the Contractor’s right to pursue the Claim.
2-10.1.6 Mandatory Assistance.

1. If a third-party dispute, litigation, or both, arises out of or relates in any way to the Services provided under the Contract, upon the Agency’s request, the Contractor shall assist in resolving the dispute or litigation. The Contractor’s assistance includes, but is not limited to the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 88 of 308 ends

a. Providing requested documents in a timely manner.
b. Providing professional consultations.
c. Attending mediations, arbitrations, depositions, trials, or any event related to the dispute resolution and litigation.
2-10.1.6.1 Compensation for Mandatory Assistance.

1. The Agency will reimburse the Contractor for reasonable fees and expenses incurred by the Contractor for any required assistance rendered in accordance with 2 -10.1.6, “Mandatory Assistance” as Extra Work.

2. The Engineer will determine w hether these fees and expenses were necessary due to the Contractor’s conduct or failure to act.

3. If the Engineer determines that the basis of the dispute or litigation in which these fees and expenses were incurred were the result of the Contractor’s cond uct or the Contractor’s failure to act in part or in whole, the Contractor shall reimburse the Agency for any payments made for these fees and expenses.

Reimbursement may be through any legal means necessary, including the Agency’s withholding of the Contractor’s payment.

ADD the following: 2-10.2 Dispute Resolution Process
2-10.2.1 Mandatory Non-binding Mediation.

1. If a dispute arises out of or relates to the Contract, or the breach of it, and if the dispute cannot be settled through those procedures described in Section 2 -10.1.1, the parties must attempt to settle the dispute in an amicable manner, using mandatory mediation under the Construction Industry Mediation Rules of the American Arbitration Association before having recourse in a court of law.

2. To initiate mediation, the initiating party shall serve a Request for Mediation at the American Arbitration Association (AAA).
2-10.2.2 Mandatory Mediation Costs.

1. The expenses of witnesses for either si de shall be paid by the party producing such witnesses. All other expenses of the mediation, including required traveling and other expenses of the mediator and the cost of any proofs or expert advice produced at the direct request of the mediator, shall be borne equally by the parties, unless they agree otherwise.
2-10.2.3 Selection of Mediator.

1. A single mediator, knowledgeable in construction aspects and acceptable to both parties, shall be used to mediate the dispute.

2. If AAA is used, the initiating par ty shall concurrently file with AAA a “Request for Mediation” along with the appropriate fees, a copy of requested mediators marked in preference order, and a preference for available dates.

3. If AAA is selected to coordinate the mediation (Administrator), within 10 Working Days from the receipt of the initiating party’s Request for Mediation, the opposing party shall file the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 89 of 308 ends

a. A copy of the list of the preferred mediators listed in preference order after striking any mediators to which they have any objection. b. A preference for available dates.
c. Appropriate fees.

4. If the parties cannot agree on a mediator, then each party shall select a mediator and those mediators shall select the neutral third party to mediate the matter. 2-10.2.4 Conduct of Mediation Sessions.

1. Mediation hearings shall be conducted in an informal manner and discovery shall not be allowed.

2. Discussions, statements, or admissions shall be confidential to the proceedings and shall not be used for any other purpose regarding th e party’s legal position. The parties may agree to exchange any information they deem necessary.

3. Both parties shall have an authorized representative attend the mediation. Each representative shall have the authority to recommend entering into a settlement. Either party may have attorney(s), witnesses, or expert(s) present. Either party may request a list of witnesses and notifications of whether attorney(s) shall be present.

4. Any resulting agreements from mediation shall be documented in writing. Mediation results and documents, by themselves, shall be “non -binding” and inadmissible for any purpose in any legal proceeding, unless such admission is otherwise agreed upon in writing by both parties. Mediators shall not be subject to any subpoena or l iability and their actions shall not be subject to discovery.

ADD the following: 2-10.3 Governing Law & Forum for Litigation.

1. This Contract shall be governed by and construed in accordance with the laws of the State of California. Any lawsuits, at law or in equity, between the parties arising out of this Contract shall be filed in a court of competent jurisdiction in the County of San Diego. With respect to venue, the parties agree that this Contract is made in and will be performed in the County of San Diego. The parties waive all provisions of law providing for a change of venue in these proceedings to any other county.

ADD the following: 2-10.4 Pre-judgment Interest.

1. The parties stipulate that if a judgment is entered against a party for breaching this Contract, the pre-judgment interest shall be 2% per annum.

SECTION 3 – CONTROL OF THE WORK
3-2 SELF-PERFORMANCE
ADD the following:

1. If Contractor fails to satisfy the provisions requiring the Contractor to complete Work amounting to at least 50 percent of the Contract price with its own organization unless stipulated otherwise in the Contract Documents, the Agency may at its sole discr etion elect

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 90 of 308 ends

to cancel the Contract or deduct an amount equal to 10 percent of the value of the Work performed in excess of 50 percent of the Contract Price by other than the Contractor’s own organization. The Board shall be the sole body for determination of a violation of these provisions. In any proceedings under this section, the Contractor, or prime Contractor, shall be entitled to a public hearing before the Board and shall be notified 10 Calendar D ays in advance of the time and location of the hearing. The determination of the Board shall be final. 3-3 SUBCONTRACTORS
ADD the following:

1. The Contractor shall incorporate these Specifications in the Contractor’s subcontracts for the work being performed by the Contractor’s Subcontractor.

2. The Contractor shall obtain or require that each Subcontractor obtains insurance policies in accordance with 5-4, “INSURANCE” which shall be kept in full force and effect for the duration of the Contract and in any attached supplemental agreements.

3. In any dispute between the Contractor and the Contractor’s Subcontractors, the Agency shall not be made a party to any judicial or administrative proceeding to resolve the dispute.

4. The Contractor shall ensure that the Contractor’s Subcontractors are appropriately licensed for the duration of the work that is performed under the Subcontracts in accordance with 2- 1, “WORK TO BE DONE.” If a Subcontractor is not properly licensed, the Contractor shall cease payment to the Subcontractor for all work performed when the Subcontractor wa s not properly licensed. The Contractor shall return to the Agency any payment the Contractor made to a Subcontractor for work performed when the Subcontractor was not licensed.

5. Subcontractors shall be considered employees of the Contractor, and the Contractor shall be responsible for their work.

6. Where the Contract Documents require that a particular product be installed or applied by an applicator approved by the manufacturer, ensure the Subcontractor or Supplier employed for such work is approved by the manufacturer.

7. Before the work of any Subcontractor is started, the Contractor shall submit to the Engineer for approval a written statement showing the Work to be subcontracted giving the name and business of each Subcontractor and description and value of each portion of the Work to be so subcontracted. This submittal will confirm the Subcontractor’s commitments in the Bid. 3-4 AUTHORITY OF THE ENGINEER
ADD the following:

1. The Engineer shall be the single point of contact and shall be included in all communications between Contractor and any Agency representative.

3-5 INSPECTION
ADD the following:

1. Contractor shall make available to the Engineer accurate books and accounting records regarding all its activities. Contractor shall contractually require all Subcontractors to this

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 91 of 308 ends

Contract to do the same. The Engineer shall have access to the Contractor’s, and any Subcontractors documents described in this Section 3 -5(1) within San Diego County. The Engineer shall have the right to monitor, assess, and ev aluate Contractor’s and its Subcontractor’s performance pursuant to this Contract. The Engineer’s monitoring, assessments, and evaluations will include, but shall not be limited to, audits, inspection of premises, reports, contracts, subcontracts and inter views of Contractor’s staff and the staff of all Subcontractors to this Contract. Upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all Subcontractors to this Contract, records with respect to all matters covered by this Contract. Contractor shall also permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract. Any inspection described in this Section 3 -5(1) shall occur as often as the Engineer deems necessary and during normal business hours. However, any such inspection shall not unreasonably interfere with Contractor’s ongoing business operations. Contractor and all Subcontractors to this Contract shall maintain such data and records for as long as may be required by applicable laws and regulations.

2. The Agency may utilize consultants to assist the Engineer during construction in observing the Contractor’s performance. The consultant shall be the Agency’s Representative on the Site assisting the Engineer and must not be confused with a building inspector with the Agency or with a Special Inspector.

3. The Agency may utilize a Special Inspector for inspection of specialty work and materials, whose costs the Agency will pay for unless the Contractor fails inspection. If inspections or tests reveal non -compliance with the requirements of the Contract Documents, the Contractor shall pay for all corrective measures deemed necessary by the Engineer and also pay the cost of the Agency’s subsequent re-inspection and re-testing.

4. Inspections required by codes or ordinances are the Contractor’s responsibility.

5. The Contractor’s quality control testing and inspections are the Contractor’s responsibility.

Contractor shall coordinate and schedule all inspections and tests. The Contractor shall give the Engineer notice of tests and inspections made by others. At least 5 Working Days of notice shall be given for offsite inspec tions. The Contractor shall wait until the Engineer has responded and agreed to Contractor’s schedule before scheduling test or inspections.

6. The Agency shall schedule any inspections and tests as the Agency deems necessary to ensure the Work is accomplishe d in accordance with the requirements of the Contract Documents (other than inspections for work performed in accordance with a permit). The Contractor is responsible for the inspection of all Work performed in accordance with the Contract Documents.

7. Contractor shall provide access in accordance with Cal-OSHA Standards as necessary.

8. Contractor shall remove and replace any items of Work performed without the required permit or inspection. For required subsequent inspection, the Contractor shall remove and replace Work at the discretion of Engineer at no additional cost to the Agency. Inspection of the Work does not relieve the Contractor of full compliance with the Contract Documents.

9. Contractor shall not conceal the Work prior to inspection, testing, or ap proval required by the Contract Documents, the Engineer’s prior written request, or by other agencies. If any

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 92 of 308 ends

item of Work is done prior to obtaining the required approvals when requested by the Engineer, Contractor shall expose the Work for inspection, te sting, and/or approval. Upon successful completion of the inspection, testing, or approval, the Contractor shall proceed with the Work. The Contractor shall bear all direct and indirect costs and damages of such uncovering and re-covering and shall not be entitled to an increase in the Contract Price or the Contract Time, unless the Contractor has given the Engineer and any other affected agencies written notice of the Contractor’s intention to cover the Work and the Engineer has not acted in response to such notice.

10. When specified, Contractor shall make arrangements for tests, inspections, and approvals with an independent testing laboratory or entity acceptable to the Engineer, or with the appropriate public authority. The payment for such tests, inspectio ns, and approvals are included in the Contract Price.

11. Unless specified otherwise, the Contractor shall pay the cost of inspections and tests. If inspections or tests reveal non -compliance with the requirements of the Contract Documents, the Contractor shall bear the cost of corrective measures deemed necessary by the Engineer and the cost of the Agency’s subsequent re-inspection and re-testing.

12. The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor’s or Subcontract or’s possession pertaining to the Work that the Engineer may request.

13. Contractor agrees to maintain and/or make available, to the Engineer, within San Diego County, accurate books, and accounting records relative to all its activities and to contractually require all Subcontractors to this Contract to do the same. The Engineer shall have the right to monitor, assess, and evaluate Contractor’s and its Subcontractors performance pursuant to this Contract, the monitoring, assessments, and evaluations to include, but not be limited to, audits, inspection of premises, reports, contracts, subcontracts and interviews of Contractor’s staff and the staff of all Subcontractors to this Contract. At any time during normal business hours and as often as the Engineer may deem necessary, upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all of its Subcontractors ’ records with respect to all matters covered by this Contract and will permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract.

However, any such activities shall be carried out in a manner so as to not unreasonably interfere with Contractor’s ongoing business operations. Contractor and all Subcontractors to this Contract shall maintain such data and records for as long as may be required by applicable laws and regulations.
3-6 THE CONTRACTOR’S REPRESENTATIVE
ADD the following:

1. Both the representative and alternative representative shall be the Contractor’s employees and shall not be assigned to a Subcontractor unless otherwise approved by the Agency in writing.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 93 of 308 ends

2. The Contractor’s Project team shall attend scheduled construction meetings as required by the Engineer. If any of Contractor’s staff cannot attend, the Contractor shall notify the Engineer a minimum of 24 hours in advance, prior to the start of the scheduled meeting. If the Contractor does not provide the required notification, the Contractor shall pay for the costs of the Agency’s staff, consultants, or both that attended. The Contractor shall be charged a minimum of 2 hours of the attendee’s time.

3. The payment for the Contractor’s attendance at Project meetings is included in the Contract Price. The Engineer shall deduct costs assessed to the Contractor for not attending the meetings from the monthly progress payment via Change Order. 3-7 CONTRACT DOCUMENTS
3-7.1 General.

ADD the following:

1. Specifications and Plans are divided into groups by engineering discipline for the Agency’s convenience. These divisions are not for the purpose of apportioning the Work or responsibility for the Work among Subcontractors and Suppliers.

2. The Contractor shall supply any Work that may reasonably be inferred from the Specifications or Plans as being required to produce the intended result whether or not it is specifically called for, at no additional cost to the Agency.

3. If referenced documents have been discontinued or updated by the issuing organization, the replacement documents issued or otherwise identified by that organization shall be used or, if there are no replacement documents, the last version of the document before it was discontinued.

4. Scaled dimensions on Contract Documents are approximate. Before ordering materials or commencing the Work, the Contractor shall measure the Site for proper size and fit and verify dimensions and quantities by taking measurements in the field. The Contractor shall be responsible for their accuracy.

5. The Contractor shall verify any conditions affecting the cost of the Work through a reasonable examination of the Work Site prior to submitting the Bid.

6. Existing improvements visible at the Wo rk Site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed, and disposed of by the Contractor.

7. The Plans, Specifications, and other Contract Documents shall govern the Work. The Contract Documents are intended to be complementary and cooperative. Anything specified in the Specifications and not shown on the Plans or shown on the Plans and not specified in the Specifications, shall be as though shown on or specified in both.

8. The Plan s shall be supplemented by such working drawings and shop drawings as are necessary to adequately control the Work.

9. The Contractor shall ascertain the existence of any conditions affecting the cost of the Work through a reasonable examination of the Work Site prior to submitting the Bid.

10. Existing improvements visible at the Work Site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed, and disposed of by the Contractor.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 94 of 308 ends

11. The Contractor shall, upon discovering any error or omission in the Plans or Specifications, immediately call it to the attention of the Engineer.
3-7.2 Precedence of the Contract Documents.

DELETE in its entirety and REPLACE with the following:

1. If there is a conflict between any of the Contract Documents, the document highest in the order of precedence, and most recent in edition, shall control. The order of precedence, from highest to lowest, shall be as follows:
a. Permits (issued by jurisdictional regulatory a gencies including environmental documents).
b. Change Orders and supplemental agreements; whichever occurs last. c. Contract Addenda, whichever occurs last.
d. The signed written Contract.
e. Bid/Proposal.
f. Project Plans.
g. Technical Specifications.
h. Agency Supplemental General Provisions (Section 00 73 00). i. Agency Supplemental Technical Provisions (Section 00 74 00). j. Standard Drawings
k. Standard Plans
i. City of Carlsbad Standard Drawings.
ii. Carlsbad Municipal Water District Standard Drawings. iii. City of Carlsbad modifications to the San Diego Area Regional Standard Drawings.
iv. Traffic Signal Design Guidelines and Standards.
v. State of California Department of Transportation Standard Plans. vi. California Manual on Uniform Traffic Control Devices (CA MUTCD). l. “Greenbook” (Standard Specifications for Public Works Construction). m. Reference Specifications.

2. When additional small business/minority/women -owned/veteran or other special requirements by funding sources are included in the Contract Documents, the funding source’s requirements shall govern.
a. With reference to the Drawings, the order of precedence shall be as follows: Figures govern over scaled dimensions.
b. Detail Drawings govern over general Drawings.
c. Addenda and Change Order Drawings govern over Plans. d. Plans govern over Standard Drawings.

3. When a conflict exists between the ADA requirements of Title 24, and the Agency Supplemental Provisions, the most restrictive requirement shall be followed.

ADD the following: 3-7.3 Red-lines and Record Documents. 3-7.3.1 General.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 95 of 308 ends

1. The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor’s or Subcontractor’s possession pertaining to the Work that the Engineer may request.

2. The Contractor shall keep the Red- lines current with entries checked by the Engineer before the Work is covered. Contractor’s failure to update and deliver Red -lines information monthly to the Engineer for review and approval may result in the withholding of monthly progress payments.

3. The Contractor shall note the source identification, such as RFI numbers and Change Order numbers, as required identifying the source of the change to the Contract Documents.

4. The Contractor shall deliver the Red -lines to the Engineer upon completion of the Construction Work.

5. The Contractor shall legibly annotate a full- size set of Plans daily, in red ink, to record additions, deletions or changes to the Work and changes in location, elevation or character of the Work not otherwise shown or noted in the Contract Documents. This “redline” set of drawings shall be kept on the Job Site, shall be used only as a record set, and shall be delivered to the Engineer within 10 Calendar Days of completion of the Work.

Contractor shall immediately give written notice of any conflicts betwee n these documents to the Engineer.

6. As-built information shall represent field measurements, approved Shop Drawings, Working Drawings, samples, product data, and other pertinent data discovered during the performance of the Work. The Contractor shall note the source of the change such as RFI or Change Order numbers, as required. The Contractor shall clearly record additions or changes in the Work and depth of underground facilities by dimensioning from 2, known, fixed points.

7. Payment for Record Drawings and Documents shall be included in the various Bid items and no additional payment will be made therefore.
3-7.3.2 Asset Specific Red-lines.

1. Utility Red-lines: Utility Red-lines shall show any changes from the Plan for the following:
a. Horizontal and vertical bends
b. Changes in pipe material or pressure class
c. Isolation valves
d. Insulating joints
e. Blow off valves by stationing and offsets.
f. Air vacuum valves by stationing and offsets.
g. Water and recycled water meter boxes replaced.
h. Water sampling stations
i. Cathodic test stations
j. Locations of all sewer laterals and cleanouts.
k. Items abandoned in place following dewatering operation.

2. Building Red -lines: Building Red- lines shall show any changes from the Plans for the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 96 of 308 ends

a. Location by dimension and the depth by elevation of underground lines, valves, plugged tees, and capped ends.
b. By dimension or scale Plans, wiring, conduits, and pull boxes as installed. c. Information necessary to maintain and service concealed items of Work. d. Dimensional changes to the Drawings.
e. Revisions to details shown on the Drawings.
f. Depths of foundations below the first floor.
g. Locations and depths of underground utilities.
h. Revisions to the routing of piping and conduits.
i. Revisions to electrical circuitry.
j. Actual equipment locations.
k. Duct size and routing.
l. Locations of concealed internal utilities.
m. Changes made by Change Orders.
n. Details not shown on original Plans.

3. SWPPP:
a. Upon completion of construction, the Contractor shall submit the SWPPP and all its appendices, records, reports, maps and records of permanent BMPs to the Engineer with the Red-lines.
3-7.3.3 Payment.

1. The payment for Red-lines Drawings shall be included in the Contract Price.

ADD the following: 3-7.4 Measurement and Dimensions.

1. Scaled dimensions are approximate. Before ordering materials or commencing the Work, the Contractor shall measure the Site for proper size and fit and verify dimensions and quantities by taking measurements in the field. Contractor shall be responsible for their accuracy. 3-8 SUBMITTALS
3-8.2 Working Drawings. (This section not used)

3-8.3 Shop Drawings.

ADD the following:

1. Shop Drawings shall be submitted electronically to the Agency.

3-8.4 Supporting Information.

ADD the following:

1. The Contractor shall submit samples of the materials with cut sheets of the products. The Contractor shall organize cut sheets for review and approval by the Engineer prior to use on the Project and identify deviation from any of the specified material clearly, including cut sheets and samples of both the specified material and basis for the substitution. Included should be the Agency’s Project Name, Project Number, and the Engineer’s name, Contractor Name, and Submittal Number and clearly indicate the specific product to be used.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 97 of 308 ends

2. When photos of material are required, they shall be clear in resolution, identify the specific item for review, and shall indicate the name of the item, source, and date taken. The material shown in the photo shall be currently available for use on the Project.

3. Test sections (“Mock ups”) of materials as required in the Special Provisions shall be accepted by the Engineer before proceeding with the Work.

4. The Contractor shall provide and keep up- to-date a complete “As -Built” record set of blue - line prints, which shall be corrected in red daily and show every change from the original Drawings and Specifications and the exact “As-Built” locations, sizes and kinds of equipment, underground piping, valves, and all other Work not visible at surface grade. Prints for this purpose may be obtained from the Agency at cost. This set of Drawings shall be kept on the job and shall be used only as a Record Set and shall be delivered to the E ngineer within 10 Calendar D ays of completion of the Work. Payment for performing the Work required by Section 2-5.4 shall be included in the various Bid items and no additional payment will be made therefore.
3-8.6 Manufacturer’s Operation, Maintenance, and Warranty Instructions.

To sentence (1), DELETE in its entirety and SUBSTITUTE with the following:

For each pre -manufactured product covered by a manufacturer’s warranty, Contractor shall submit 1 electronic copy and 3 bound original or legal copies prior to acceptance of the Contract. 3-9 SUBSURFACE DATA (This section not used)
3-10 SURVEYING (This section not used)
3-11 CONTRACT INFORMATION SIGNS (This section not used) 3-12 WORK SITE MAINTENANCE
3-12.1 General.

ADD the following:

1. Maintain Site improvements including any temporary facilities, equipment, or other materials. Remove graffiti encountered on the Site within 24 hours. See also SECTION 400 - PROTECTION AND RESTORATION.

2. As a condition of Final Payment, the Contractor shall submit a signed and notarized affidavit stating that all brush, trash, debris, and surplus materials resulting from this Project have been disposed of in a legal manner. The cost of disposal is the Contractor’s responsibility.

3. The Contractor shall provide and maintain enclosed toilets for the use of their employees.

Toilets must be kept in a neat and sanitary condition and ensure that they comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. The cost of such is the Contractor’s responsibility.

4. If required in the Special Provisions, the Contr actor shall provide and maintain enclosed toilets for the use of the Agency’s and Contractor’s officers, employees, or agents. Toilets must be kept in a neat and sanitary condition and ensure that they comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. The cost of such is the Contractor’s responsibility.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 98 of 308 ends

5. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Tempor ary dams of sandbags, asphaltic concrete, or other acceptable material will be permitted, when necessary, by the SWPPP and/ or BMP plan. Such dams shall be removed from the Site as soon as their use is no longer necessary.

6. Work Site maintenance shall be co nducted on non- workdays when increased levels of maintenance are deemed necessary, in the opinion of the Engineer, to preserve the health safety or welfare of the public and or to comply with applicable regulations.

7. Disposal of all rubbish and surplus materials is incidental to Work Site maintenance. Disposal shall be made off the Site and shall be in accordance with:
a. Local codes and ordinances that govern locations and methods of disposal. b. All applicable safety laws.
c. Requirements of Subpart H, S ection 192 6.252 of the OSHA Safety and Health Standards for Construction.

8. Work Site maintenance is considered incidental to the items of work that they are associated with and no additional payment will be made.

9. Cleanup and Dust Control. Throughout all phases of construction, including suspension of the Work, and until the final acceptance, the Contractor shall keep the Site clean and free from rubbish and debris. The Contractor shall also abate dust nuisance by cleaning, sweeping, and sprinkling with water, or other means as necessary. The use of water resulting in mud on public streets will not be permitted as a substitute for sweeping or other methods. 3-12.2 Air Pollution Control.

ADD the following:

1. Contractor shall carry out effective measures whenever and as often as necessary to prevent Contractor’s operation from producing dust in amounts damaging to property, cultivated vegetation, domestic animals, or causing a nuisance to persons living or occu pying buildings in the vicinity. Contractor shall be responsible for any damage resulting from any dust originating from Contractor’s operations. The dust abatement measures shall be continued until Contractor is relieved of further responsibility by the Engineer.

2. Contractor shall adhere to Air Pollution Control District County of San Diego regulations for equipment used on the Job Site.
3-12.3 Noise Control.

ADD the following:

1. All internal combustion engines used in the Work shall be equipped with muffle rs in good repair and are subject to the City Noise Control Ordinance, Carlsbad Municipal Code Chapter

8.48. 3-12.4 Storage of Equipment and Materials.
3-12.4.1 General.

ADD the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 99 of 308 ends

1. Equipment and material storage shall be confined to areas appr oved by the Engineer.

Disposal of all rubbish and surplus materials shall be at the Contractor’s expense.

2. The Contractor shall order, purchase, transport, coordinate delivery, accept delivery, confirm the quantity and quality received, prepare storage area(s), store, handle, protect, move, relocate, remove and dispose excess of all materials used to accomplish the Work.

3. Materials shall be delivered to the Work Site only during Working Hours, and shall be accompanied by bills of lading that shall clearly state for each delivery: the name of the Contractor as consignee, the Project name and number, address of de livery and name of consignor and a description of the material(s) shipped.

4. Prior to storage of any materials which have been shipped to or by the Contractor to any location within the City’s boundaries the Contractor shall provide the Engineer a copy of lease agreements for each property where such materials are stored. The lease agreement shall clearly state the term of the lease, the description of materials allowed to be stored and shall provide for the removal of the materials and restoration of the st orage site within the time allowed for the Work.

5. All such storage shall conform to all laws and ordinances that may pertain to the materials stored and to preparation of the storage site and the location of the site on which the materials are stored. Storage of hazardous wastes, construction equipment material, and parking and fueling of equipment shall not occur in biologically sensitive areas.

6. Loss, damage or deterioration of all stored materials shall be the Contractor’s responsibility.

Conformance to the requirements of this section, both within and outside the limits of work is a part of the Work. The Engineer shall have the right to verify the suitability of materials and their proper storage at any time during the Work.

7. The Contractor shall furnish a nd maintain in good condition all equipment and facilities as required for the proper execution and inspection of the Work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.

8. Restore the storage area to an equal or better condition as deemed necessary by the Engineer and at no additional cost to the Agency.

10. When required by the Engineer, the Contractor shall furnish and operate a self-loading motor sweeper with spray nozzles at least once each Working Day for the purpose of keeping paved areas acceptably clean wherever construction, including restoration, is incomplete.

11. Materials and equipment shall be removed from the Site as soon as they are no longer necessary. Before the final inspection, the Site shall be cleare d of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the Contractor’s Bid.

12. Care shall be taken to prevent spillage on haul routes. Any such spillage shall be removed immediately, and the area cleaned.

13. Excess excavation material from catch basins or similar structures shall be removed from the Site immediately. Sufficient material may remain for use as backfill if permitted by the Specifications. Forms and form lumber shall be removed from the Site as soon as practicable after stripping.

14. Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend Work until the condition is corrected. No additional compensation will be allowed because of such suspension.

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 100 of 308 ends

15. Cleanup and dust control required in the Contract shall also be executed on weekends and other non-Working Days when needed to preserve the health safety or welfare of the public.

The Contractor shall conduct effective cleanup and dust control throughout the duration of the Contract. The Engineer may require increased levels of cleanup and dust control that, in his/her sole discretion, are necessary to preserve the health, safety and welfare of the public.

Cleanup and dust cont rol shall be considered incidental to the items of W ork that they are associated with and no additional payment will be made for them.

16. Vermin Control. At the time of acceptance, structures entirely constructed under the Contract shall be free of rodents, i nsects, vermin, and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the Work within the Contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.

17. Temporary Light, Power, and Water. The Contractor shall furnish, install, maintain, and remove all temporary light, power, and water at its own expense. These include piping, wiring, lamps, and other equipment necessary for the Work. The Contractor shall not draw water from any fire hydrant (except to extinguish a fire), without obtaining permissi on from the water agency concerned. The Contractor shall obtain a construction meter for water used for the construction, plant establishment, maintenance, cleanup, testing and all other work requiring water related to this Contract. The Contractor shall c ontact the appropriate water agency for requirements. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter and any, and all, other charges, deposits and/or fees for them . These costs shall be considered incidental to the items of Work that they are associated with and no additional payment will be made for them. 3-12.4.2 Storage in Public Streets.

DELETE in its entirety and SUBSTITUTE with the following:

1. Construction materials shall not be stored in streets, roads, or highways for more than 5 Calendar Days after unloading. All materials not installed or used in construction within 5 Calendar Days after unloading shall be stored at a location approved by the Engineer.

2. Construction equipment shall not be stored at the Work Site before its actual use nor for more than 5 Calendar Days after it is no longer needed. Time necessary for repair or assembly of equipment may be authorized by the Engineer.

3. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets unless otherwise permitted. Immediately after placing backfill, all excess material shall be removed.

4. The Contractor shall not store equipment for traffic control in right of way.

ADD the following: 3-12.4.3 Storage and Staging Areas.

1. The City has designated a staging location in close proximity to the Project, as shown in Attachment A, that the Contractor may utilize for their use. Additional storage and staging areas are the Contractor’s responsibility. The storage and staging areas shall be as close as

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 101 of 308 ends

possible to the Site. Contractor is responsible for obtaining any permits, leases, or any other items necessary to obtain staging areas.

2. Storage of hazardous wastes, construction equipment material, and parking and fueling of equipment shall not be allowed in the MHPA or other biologically sensitive areas. Ensure the fueling of vehicles occurs only within designated staging areas using appropriate catch basins and devices.

3. Return the storage and staging area and the adjacent area to an equal or better condition as deemed necessary by the Engineer, at no additional cost to the Agency.

4. The Contractor shall provide the Engineer a copy of the lease agreement for any property to be used for the storage of materials or equipment prior to delivery or storage of any materials or equipment. Each lease agreement shall clearly state the term of the lease and a description of the materials or equipment allowed to be stored and shall provide for the removal of the materials or equipment and restoration of the storage site with in the time allowed for the Work.

5. Construction equipment shall not be stored at the Work Site before its actual use on the Work nor for more than 5 Calendar Days after it is no longer needed. Time necessary for repair or assembly of equipment may be authorized by the Engineer. 3-12.6 Water Pollution Controls
3-12.6.2 Best Management Practices (BMPs).

ADD the following:

1. Contractor shall submit a BMP plan as a submittal to the Agency. 3-12.6.3 Storm Water Pollution Prevention Plan (SWPPP).

ADD the following:

1. The Project is expected to require a T ier 1 SWPP. The Contractor shall evaluate the requirements for the preparation of a SWPPP for Work within the City’s boundary by reviewing the Determination of SWPPP Tier Level and Construction Threat Level (form E-32), attached as Attachment B.

2. The Contractor shall review the criteria requiring the preparation of a SWPPP conforming with the State Water R esources Control Board Order No. 2022-0057-DWQ, NPDES General Permit No. CAS000002, Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction and Land Disturbance Activities (the Construction General Permit or CGP). The CGP and other information are available at:

https://www.waterboards.ca.gov/water_issues/programs/stormwater/constpermits.shtml

3. If the Agency has not prepared a SWPPP for the Project and the Project is subject to coverage under the CGP, the Contractor shall prepare and implement the SWPPP conforming with the CGP requirements.

4. The Contractor shall comply with all requirements of the approved SWPPP and the CGP including implementation during construction by a QSP, The Contractor shall provide all information necessary for the Agency to obtain coverage under the CGP during the electronic

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 102 of 308 ends

submittal of Permit Registration Documents and supporting data necessary for the filing of the storm water Notice of Intent and Notice of Termination. The Contractor shal l be responsible for conducting all monitoring and inspections and filing all reports required by and in accordance with the CGP.
3-12.6.5 Payment.

DELETE in its entirety and SUBSTITUTE with the following:

1. Unless otherwise specified, payment for water p ollution control, including implementation and maintenance of BMPs, shall be considered as included in the Contract Unit Price for each item in the Bid. Payment for dewatering shall be as specified in the Special Provisions.

ADD the following: 3-12.7 Vermin Control.

1. The Site and structures constructed under the Contract shall be kept free of rodents, insects, vermin, and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the Work within the Contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY
3-13.1 Completion.

DELETE in its entirety and SUBSTITUTE with the following:

1. The Contractor shall comply with the following prior to requesting a Pre -Final inspection of the Work and filing of a written assertion that the Work has been completed:
a. Provide completed and signed redline drawings and record documents including installation, maintenance and operation instructions, manuals and/or tools for installed equipment.
b. Provide and properly label all keys for existing facilities or new permanent work. c. Provide all items specified to be supplied as extra stock and spare parts. Wrap, seal, or place in a container all items as necessary to allow for storage by the Agency for future use. Verify the specified quantities.
d. Provide all final Special Inspection reports and certifications required by equipment manufacturers to demonstrate compliance with applicable codes and standards. e. Obtain any required certifications from the Engineer of Record for permanent BMPs. f. Comply with all requirements of permits issued by jurisdictional agencies. g. Remove temporary facilities from the Site.
h. Thoroughly clean the Site and remove all mark-outs and construction staking.

2. The Agency Inspector will schedule the Pre-Final inspection within 5 Working Days of receipt of the Contractor’s request. The Inspector will generate a list of deficiencies (Punchlist) within 5 Working Days after the Pre-Final inspection.

3. The Contractor shall have 30 Working Days to correct the deficiencies and provide a written response to each Punchlist item. The Inspector will review the corrective work within 5 Working Days of receipt of th e Contractor’s written response to each Punchlist item. Any

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 103 of 308 ends

outstanding deficiencies will be considered incomplete Work and the Punchlist will be returned to Contractor. Full payment will not be made for any Bid item with outstanding deficiencies and a Final Inspection will not be scheduled until all deficiencies are completed to the satisfaction of the Inspector.

4. The Contractor shall submit a request for Final Inspection which shall include a written assertion that the Work has been completed in accordance with the Contract Documents and a written response describing the corrective Work completed for all punch list items identified in the Pre -Final inspection(s). The request for Final Inspection will not be considered without the Contractor’s written response to the punch list items. The Inspector will schedule the Final Inspection within 10 Working Days of receipt of the Contractor’s request and invitees will include the Construction Manager, Engineer and representatives from agencies or utility companies h aving jurisdiction over the Work. The Contractor’s attendance is mandatory.

5. If, in the Engineer’s judgment, the Work has been completed in accordance with the Contract Documents, the Engineer will set forth in writing the date the Work was completed. This will be the date when the Contractor is relieved from responsibility to protect and maintain the Work, and to which liquidated damages will be computed.

ADD the following: 3-13.1.1 Requirements Before Requesting a Walk-through.

1. The following items are required prior to requesting a Walk-through:
a. Remove temporary facilities from the Site.
b. Thoroughly cleaning the Site and removing all mark outs and construction staking. c. Provide completed and signed Red -lines in accordance with Contract Document requirements.
d. Provide all material and equipment maintenance and operation instructions and/or manuals.
e. Provide all tools which are a permanent part of the equipment installed in the Project. f. Provide and properly identify all keys for construction and all keys for permanent work.
g. Provide all final Special Inspection reports required by the applicable building code. h. Provide all items specified to be supplied as extra stock. Wrap, se al, or place in a container all items as necessary to allow for storage by the Agency for future use.

Verify the specified quantities.
i. Ensure that all specified equal opportunity (if applicable) and certified wage rate documentations covering the Contract Time have been submitted. j. Provide the spare parts for the proposed irrigation system as specified in the Special Provisions.

2. Contractor shall notify the Engineer to arrange a final inspection of permanent BMPs installed and shall obtain the completed, signed, and stamped DS-563 Form 30 Calendar Days prior to the issuance of the Notice of Completion.

ADD the following: 3-13.1.2 Walk-through and Punchlist Procedure.

1. When Contractor considers that the Work and Services are complete, notify the Engineer in writing that the Project is complete and request that the Contractor and the Engineer perform

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 104 of 308 ends

a Walk-through for the generation of a Punchlist. Contractor shall notify the Engineer at least 7 Working Days in advance of the Walk-through.

2. The Engineer will fi rst determine if the Project is ready for a Walk -through by verifying whether the Contractor have completed all items as required by 3 -13.1.1, “Requirements Before Requesting a Walk-through.”

3. The Engineer shall facilitate the Walk-through.

4. Contractor shall make Plans, specifications, and technical data, such as submittals and equipment manuals, available at the Site for the Walk-through attendees.

5. The Engineer will provide the Contractor with the Punchlist within 15 Working Days after the date of the Walk -through and submit it to the Contractor. The Agency shall not provide a preliminary Punchlist.

6. If the Engineer finds that the Project is not substantially complete as defined in the Contract, the Engineer will terminate the Walk-through and notify the Contractor in writing.

7. If, at any time during the Engineer’s evaluation of the corrective Work requi red by the Punchlist, the Engineer discovers that additional corrective Work is required, the Engineer may include that corrective Work in the Punchlist. Contractor shall remain solely responsible for the Project Site until the Project is completely operat ional, all Punchlist items have been corrected, and all operation and maintenance manuals have been accepted by the Agency.

8. The Engineer shall meet with the Contractor until all Punchlist items are corrected. If Contractor takes longer than 30 Working Days to complete the corrective Work, the Project shall be subject to re-evaluation.

9. Upon acceptance of the Work, Contractor shall assemble and deliver to the Engineer all records, documents, warranties, material certifications, bonds, guarantees, maintenance and service agreements, and maintenance and operating manuals. Written warranties, except manufacturer’s standard printed warranties, shall be on a letterhead addressed to the Contractor. Warranties shall be submitted in the format described in this section, modified as approved by the Agency, to suit the conditions pertaining to the warranty. 3-13.2 Acceptance
DELETE in its entirety and SUBSTITUTE with the following:

1. Acceptance of the Work will occur after all the requirements of the Contract Documents have been fulfilled. If, in the Engineer’s judgment, the Contractor has fully performed the Contract, the Engineer will recommend to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District that the Contractor’s performance of the Contract be accepted. Upon such certification by the Engineer, the City Manager or Executive Manager may accept the Work. Upon the acceptance of the Work by the City Manager or Executive Manager, a “Notice of Completion” will be filed in the office of the San Diego County Recorder. The date of recordation shall be the date of acceptance of the Work.

2. Once the “Notice of Completion” has been recorded, the Engineer will release the retention. 3-13.3 Warranty.

DELETE in its entirety and SUBSTITUTE with the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 105 of 308 ends

1. Contractor shall warranty and repair all defective materials and workmanship for a period of 2 years. This warranty period shall start on the date the Work was recorded by the “Notice of Completion” unless the Agency has beneficial use of the Project (excluding water, sewer, and storm drain projects). In addition, Contractor shall warranty the Work against all latent and patent defects for a period of 10 years. The Contractor shall warranty metal finishes and joint sealant work for a period of 20 years , and fiber cement siding for 25 years. The Contractor shall warranty the upper roof system and metal roofing system for a period of 30 years, and the mechanical equipment built- up roof area for a period of 25 years, per the terms, conditions and limitations included in Attachment C – City Roof Warranty and the documents shall be signed, notarized, and returned to the City upon completion of the contract work.

2. The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence on the date they are placed into service at the direction of or as approved by the Engineer in writing.

3. All warranties, express or implied, from Subcontractors, manufacturers, or suppliers, of any tier, for the materials furnished and work performed shall be assigned, in writing, to the Agency, and shall be delivered to the Engineer prior to the acceptance of the Contractor’s performance of the Contract.

4. Replace or repair defective materials and workmanship in a manner satisfactory to the Engineer after notice to do so from the Engineer and within the time specified in the notice.

If Contractor fails to make such replacements or repairs within the time specified in the notice, the Agency may perform the replacement or repairs at Contractor’s expense. If Contractor fails to reimburse the Agency for the actual costs, Contractor’s Surety shall be liable for the cost.

5. If, during the warranty period, any item of the Work is found to be Defective Work, Contractor shall correct it promptly after receipt of written notice from the Agency to do so. The warranty period shall be extended with respect to portions of the Work corrected as part of the warranty requirements.

ADD the following: 3-13.3.1 Defective Work.

1. If the Engineer finds any part of the Work, to be defective or not in compliance with the Contract Documents, the Contractor shall correct the Defective Work in accordance with the Engineer’s written instructions and within the specified time limits.

2. The Engineer may order Contractor to stop all or part of the Project if, upon notice, Contractor fails to immediately correct the Defective Work in conformance with the Contract Documents. The Contractor bears all direct and indirect costs and damages that result from the Agency’s Stop Work notice.

3. The Engineer may determine in its sole discretion to accept Defective Work instead of having the Contractor correct the Defective Work. However, the Contractor will still be financially responsible for the Defective Work. The Engineer shall issue a deductive Change Order and will incorporate the necessary revisions in the Contract Docu ments for the Defective Work, the diminished value to the Project, or for the cost to repair the Defective Work.

4. If the Contractor fails to correct Defective Work within the specified time limits, the Engineer may correct the Contractor’s Defective Work. T he Agency has the right to correct any

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 106 of 308 ends

Defective Work without notice in the event of an emergency. Contractor shall bear all direct and indirect costs of the Defective Work that the Agency corrects.

5. When undertaking remedial action under this section, the Agency may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s Work and or services, and incorporate into the Project all materials and equipment stored at the Site or for which the Agency has paid but Contractor has stored elsewhere.

6. For Building Projects which require a certificate of occupancy, not including sewer and water facilities, if the Contractor fails to correct the Defective Work listed on the Agency’s Punchlist within 30 Working D ays in accordance with 6 -1.1, “Construction Schedule,” the Contractor shall reimburse the Agency for all costs to provide inspection services required to monitor the Contractor’s Work beyond the 30 Working Days. The Agency shall bill the Contractor for the additional inspection at the Agency’s established rates.

7. If the Contractor completes the Project or portions of the Project prior to NOC, the Contractor shall preserve equipment by developing and implementing a preventive maintenance program in compliance with manufacturer’s recommendations.

ADD the following: 3-13.3.2 Warranty Format Requirements.

1. Written warranties, except manufacturer’s standard printed warranties, shall be on the Contractor’s and Contractor’s agents’, material suppliers’, installers’, or manufacturers’ own letterhead, addressed to and for the Agency’s benefit. Submit warranties in the format described in this section, modified as approved by Engineer to suit the conditions pertaining to the warranty.

2. The Contractor shall obtain warranties, executed in triplicate by responsible Subcontractors and Suppliers, within 10 W orking Days after completion of the applicable item of Work.

Except for items put into use with the Engineer’s permission with date mutually agreed upon in writing, ensure that the beginning time of the warranty is the Project completion date.

3. The Contractor shall verify that the documents are in proper form, contain full information, and are notarized.

4. The Contractor shall verify that warranties are signed by both the Contractor and the appropriate party.

5. The Contractor shall provide warranties to the Engineer with a neatly typed table of contents, identifying each warranty with the number and title of the applicable specification section requiring the warranty and the name of the product or work item.

6. The Contractor shall separate each warranty with index tab sheets keyed to the table of contents listing. Provide complete information using separate typed sheets as necessary. The information shall include a list of Subcontractors and Suppliers with the name, address, and telephone number of the responsible principals.
3-13.3.3 Long-Term Warranty Contract (LTWC). (This section not used) ADD the following: 3-14 PARTNERING

1. Contractor may request the formation of a formal partnering relationship (Partnering) by submitting a request in writing to the Engineer after approval of the Contract. If Contractor’s request for Partnering is approved by the Engineer, scheduling of a Pa rtnering workshop,

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 107 of 308 ends

selecting the Partnering facilitator and workshop, selecting the Partnering facilitator and workshop site, and other administrative details shall be as agreed to by both Parties.

2. The establishment of a Partnering shall not change or modify the terms and conditions of the Contract and shall not relieve either party of the legal requirements of the Contract.

3. The goals of Partnering include the following:
a. The Engineer and Contractor’s representatives, including Contractor’s Subcontractors, actively working together as partners.
b. Avoidance of destructive confrontation and litigation among the parties. c. Mutual understanding on how the Work is to be conducted. d. Establishment of mutual key results to facilitate Project success. e. Establishment of an atmosphere of teamwork, trust, and open communication. 3-14.1 Payment.

1. The payment for providing a facilitator and a workshop site shall be borne equally by the Agency and Contractor. Contractor shall pay in advance all compensation for the costs of the facilitator and for the costs of obtaining the workshop site.

2. Unless a Bid item has been provided for “Partnering,” the Agency’s share of such costs shall be reimbursed to Contractor as Extra Work. Markups shall not be added. Other costs associated with the Partnering relationship shall be borne separately by the party incurri ng the costs.

ADD the following: 3-15 PUBLIC CONVENIENCE

1. The Contractor shall provide and maintain safe and adequate pedestrian and vehicular access to fire hydrants; hospitals; police and fire stations; commercial and industrial establishments including churches, schools and parking lots; service stations; public transportation; pedestrian crossing; motels and establishments of similar nature. Access shall be continuous and unobstructed unless otherwise approved by the Engineer.

2. The Contractor shall prov ide access for emergency vehicles and mail delivery and trash collection services. The trash hauling schedule can be obtained by c ontacting Republic Services at Customer Support | Republic Services.

3. The Contractor shall post “No Parking” signs 72 hours in advance of the Work. The signs shall state the date and time of parking restriction for a duration not to exceed the time necessary to complete the Work at that location. If the Work is delayed or rescheduled, the signs shall be removed and re-posted 72 hours in advance of the rescheduled Work.

4. Payment for public convenience shall be considered as included in the Contract Price for each item in the Bid and no additional payment will be made.

ADD the following: 3-16 SITE ACTIVITIES BY THE AGENCY OR SEPARATE CONTRACTORS 3-16.1 The Agency’s Right to Award Separate Contracts.

1. The Agency reserves the right to perform work or operations outside the Scope of Work of the Contract related to the Project with Agency Forces, Separate Contractors, or both. If work to be performed by another party was not noted in the Contract, the Agency shall give written notice to Contractor 10 Working Days prior to the start of any Work. If Contractor determines that the work being performed by the Agency or others may interfere with or cause damage

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 108 of 308 ends

to Work being performed by Contractor, notify the Engineer in writing within 3 Working Days of the Engineer’s notice.
3-16.2 Integration of the Work with Separate Contractors.

1. When specified in the Contract Documents, prepare a plan to integrate the work performed by Separate Contractors, Agency Forces, or both with the performance of the Work and submit the plan to the Engineer for approval. The plan shall be fair and reasonable for Contractor and the Separate Contractors. Work with Separate Contractors to reach an agreement for the prepared plan. Arrange the performance of the work so that the Work and the work of the Separate Contractors are, to the extent applicable, prope rly integrated and jointed in a manner that avoids any damage to the Work or to the work of the Separate Contractors.
3-16.3 Coordination.

1. Coordinate Contractor’s activities and the Schedule with the activities and schedules of the Separate Contractors and make any revisions to the Schedule deemed necessary to avoid any disruption to the Work or to the work of the Separate Contractors. 3-16.4 Use of Site.

1. Provide the Agency and the Separate Contractors reasonable opportunities for the storage of materials and equipment and performance of their work. Connect and coordinate work and operations with the work and operations of the Agency and the Separate Contractors as required by the Contract Documents.

2. Coordinate traffic control with the Separate Contractors for other projects and minimize the impact to the community. Prior to the start of construction, submit Contractor’s plan for coordination.

3-16.5 Deficiency in Work of Separate Contractors.

1. If part of Contractor’s Work depends on proper execution or results upon construction or operations by the Agency or a Separate Contractor, prior to proceeding with that portion of the Work, promptly report to the Separate Contractor and the Engineer any appare nt discrepancies or defects in construction that would render it unsuitable for proper execution and results. Use good faith efforts to resolve any such discrepancies or defects or any related disagreements. Contractor’s failure to report constitutes Contractor’s acceptance of the Work of Separate Contractors as fit, proper, and coordinated with the Work. 3-16.6 Payment.

1. Payment for reporting deficiencies, coordinating, and resolving discrepancies shall be included in the Contract Price.

SECTION 4 – CONTROL OF MATERIALS
4-1 PROTECTION
ADD the following:

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 109 of 308 ends

1. The Contractor shall repair or replace any equipment and materials in the event of vandalism, damage, or theft at no additional cost to the Agency.

2. The Contractor shall be responsible for the protection of public and private property adjacent to the Work and shall exercise due caution to avoid damage to such property.

3. All costs to the Contractor for protecting, removing, and restoring existing improvements shall be included in the Bid.

4. The Agency and affected utility companies have, by a search of known records, endeavored to locate and indicate on the Plans, all utilities which exist within the limits of the Work.

However, the accuracy and/or completeness of the nature, size and/or location of utilities indicated on the Plans is not guaranteed.

5. The Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. If no pay item is provided in the Contract for this Work, full compensation for such Work shall be considered as included in the prices Bid for other items of Work.

6. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the owner or order from the Agency. All valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff.

7. Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with Section 5-1, the Contractor shall, unless otherwise provided, furnish, and place the necessary protection at its expense.

8. Upon learning of the existence and location of any utility omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for.

9. The Contractor shall immediately notify the Engineer and the utility owner if any utility is disturbed or damaged. The Contractor shall bear the costs of repair or replacement of any utility damaged if located.

10. When placing concrete around or contiguous to any non -metallic utility installation, the Contractor shall at its expense:
a. Furnish and install a 2 -inch cushion of expansion joint material or other similar resilient material; or
b. Provide a sleeve or other opening which will result in a 2-inch minimum-clear annular space between the concrete and the utility; or
c. Provide other acceptable means to prevent embed ment in or bonding to the concrete.

11. Where concrete is used for backfill or for structures which would result in embedment, or partial embedment, of a metallic utility installation; or where the coating, bedding or other cathodic protection system is expose d or damaged by the Contractor’s operations, the Contractor shall notify the Engineer and arrange to secure the advice of the affected utility owner regarding the procedures required to maintain or restore the integrity of the system.

12. Unless otherwise spec ified, the Contractor shall remove all interfering portions of utilities shown on the Plans or indicated in the Bid documents as “abandoned” or “to be abandoned in place.” Before starting removal operations, the Contractor shall ascertain from the Agency

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 110 of 308 ends

whether the abandonment is complete, and the costs involved in the removal and disposal shall be included in the Bid for the items of Work necessitating such removals.

13. When feasible, the owner is responsible for utilities within the area affected by the Work will complete their necessary installations, relocations, repairs, or replacements before commencement of Work by the Contractor. When the Plans or Specifications indicate that a utility installation is to be relocated, altered, or constructed by others, the Agency will conduct all negotiations with the owners and work will be done at no cost to the Contractor, except for manhole frame and cover sets to be brought to grade as provided in the Contract Documents. Utilities which are relocated to avoid inter ference shall be protected in their position and the cost of such protection shall be included in the Bid for the items of Work necessitating such relocation.

14. After award of the Contract, portions of utilities which are found to interfere with the Work will be relocated, altered, or reconstructed by the owners, or the Engineer may order changes in the Work to avoid interference. Such changes will be paid.

15. When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such Work shall be included in the Bid for the items of Work necessitating such Work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs.

16. The utility owner will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. When directed by the Engineer, the Contractor shall arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements. The relocation of such service connections will be paid and will include the restoration of all existing improvements which may be affected by the relocation . The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement.

17. Contractor shall coordinate the Work with utility agencies and companies. Prior to the installation of any and all utility structures within the limits of work by any utility agency or company, or its contractor, the Contractor shall place all curb or curb and gutter that is a part of the Work and adjacent to the location where such utility structures are shown on the Plans and are noted as being located, relocated or are otherwise shown as installed by others. In order to minimize delays to the Contractor caused by the failure of other parties to relocate utilities that interfere with the construction, the Contractor, upon the Engineer’s approval, may be permitted to temporarily omit the portion of Work affected by the utility. If such temporary omission is approved by the Engineer, the Contractor shall place survey or other physical control markers sufficient to locate the curb or curb and gutter to the satisfaction of the utility agency or company. Such temporary omission shall be for the Contractor’s convenience a nd no additional compensation will be allowed therefore or for additional work, materials or delay associated with the temporary omission. The portion thus omitted shall be constructed by the Contractor immediately following the relocation of the utility involved unless otherwise directed by the Engineer.

18. The Contractor shall notify the Engineer of its Construction Schedule insofar as it affects the protection, removal, or relocation of utilities. The notification shall be included as a part of

00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: September 14, 2023 Document Version: 1.0 Current Update: May 2023

Page 111 of 308 ends