Body
Carlsbad City Council
Pages
139
Original file
658 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

CA Review GH

Meeting Date: Jan. 9, 2024

To: Mayor and City Council

From: Scott Chadwick, City Manager

Staff Contact: Steven Stewart, Municipal Projects Manager [email protected], 442-339-2938

Subject: Approval of Plans, Specifications and Contract Documents and Authorization to Advertise for Bids for the Schulman Auditorium Audio- Visual Update Project

District: 3

Recommended Action
Adopt a resolution approving the plans, specifications and contract documents and authorizing the City Clerk to advertise for bids for the Schulman Auditorium Audio-Visual Update Project.

Executive Summary
The sound and video systems at the Ruby G. Schulman Auditorium at the Carlsbad City Library have had performance failures and are at the end of their expected service life. The Schulman Auditorium Audio-Visual Update Project No. 4753 was developed for this work and similar work in the William D. Cannon Art Gallery.

The cost estimate for the combined project greatly exceeded the available project’s funding so the plans were modified to only address work in the Schulman Auditorium, because this work is more critical. Updates to the Cannon Art Gallery will be reevaluated for City Council consideration and approval at a future date.

The City Council-approved design work on the project to replace and upgrade the audio-visual capabilities and bring the systems up to industry standards has been completed. Staff are now asking the City Council to approve putting the revised project, out for bids for its completion.

Staff request City Council approval of the revised, completed and permitted project plans, specifications and contract documents, shown in Exhibit 3, and authorization for the City Clerk to advertise for bids for the work needed to upgrade the auditorium systems.

The City Council’s approval is required under Carlsbad Municipal Code Section 3.28.080(E) because the expected value of this work is greater than $200,000.

Jan. 9, 2024
Item #3 Page 1 of 7

Explanation & Analysis
This project was originally envisioned to include audio-visual, lighting and infrastructure upgrades in the Schulman Auditorium and the Cannon Art Gallery. However, once the design work for both areas was completed, a preliminary cost estimate showed that the project was significantly more costly than the current funding appropriation. This was due primarily to the audio-visual related work. Accordingly, the Cannon Art Gallery and adjacent courtyard work was deferred to a later date and staff reviewed the scope of work for the Shulman Auditorium for potential cost savings.

The Schulman Auditorium is located at the City Library 1775 Dove Lane, as shown in Exhibit 2.

The auditorium has 215 fixed seats and was designed for a wide range of programs, presentations and performances. It is used by the public and city departments, and as a venue for live performances, such as classical and contemporary concerts, dance and piano recitals, play readings, author lectures, public meetings and other presentations, such as the State of the City Address.

The auditorium averages over 250 events each year, bringing in over 20,000 guests and generating over $60,000 in revenue. The auditorium has a variety of technologies to support these activities, including lighting and an integrated sound and video system. The auditorium systems are approaching the end of their expected service life. The sound system is over 13 years old and has recently experienced failures. The video system was upgraded seven years ago and is also starting to experience failures. Both systems offer only intermittent compatibility with each other. These systems need to be upgraded so the auditorium can offer a seamless production experience and continue to serve the needs of city departments and members of the public.

The design includes the complete replacement of the audio-visual system in the auditorium and the replacement of most of the theatrical lighting. The new systems are expected to have a useful lifespan of at least 15 years.

The City Council approved the agreement for design of the Schulman Auditorium and Cannon Art Gallery Audio-Visual Update Project, Capital Improvement Program Project No. 4753, on July 12, 2022, with Resolution No. 2022-165. Staff from the Public Works and Library & Cultural Arts Departments then met with the consultant Domusstudio Architecture LLP on several occasions to review the programming needs for each location and create an appropriate design for the project.

Staff think the high cost of the combined project was due to an inaccurate estimation of audio- visual and lighting equipment values prior to the start of the project. To move forward, staff plan to only complete the designed work in the auditorium and to defer work in the art gallery and courtyard to a later date. Even with this limited work scope, there is still a current funding shortfall in the project budget, so staff plan to require the bid value for some items (e.g., new drinking fountain, theatrical lighting systems) to be presented separately in the bid so they can be considered as an option for cost reductions or included in the approved scope of work in addition to the audio-visual work, and to present these bid results to the City Council for consideration at the time the contract is to be awarded.

The project’s design has been completed, approved by staff and received a building permit on Aug. 1, 2023, which is on file for the successful contractor to use once the contract is awarded.

Jan. 9, 2024
Item #3 Page 2 of 7

Fiscal Analysis
The engineer’s estimate for the complete work scope in the Schulman Auditorium is $1,327,932. This project is funded from the Infrastructure Replacement Fund, and no additional funding is being requested at this time.

Schulman Auditorium Audio-Visual Update Project
Capital Improvement Program Project No. 4753
Total appropriation to date $1,650,000
Total expenditures/encumbrances to date -$234,801
Total available balance $1,415,199
Construction contract (estimated) -$1,327,932
Construction contingency (estimated) -$133,000
Construction management, inspection and testing (estimated) -$184,000 Total estimated project costs -$1,644,932
Remaining balance -$229,733
Additional appropriation potentially needed at time of contract award $229,733

Next Steps
With the City Council’s approval, the City Clerk will advertise a request for bids for the revised project. Staff will then evaluate the bids received and identify the lowest responsive and responsible bidder.

Staff plan to return to the City Council in early 2024 with a recommendation to award a construction contract to the lowest responsive and responsible bidder and request additional funding if the City Council approves proceeding with any work in excess of the current funding appropriation.

Environmental E
valuation
The City Planner, through the process outlined in Carlsbad Municipal Code Section 19.04.060, has determined that the project belongs to a class of projects that the California Secretary for Natural Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents in accordance with Section 15301(d) Class 1 of the California Environmental Quality Act Guidelines
In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the CEQA Guidelines do not apply to this project. The project is consistent with 15301(d) Class 1 because it consists of maintenance of public facilities, such as restoration or rehabilitation of deteriorated or damaged structures, facilities or mechanical equipment to meet current standards of public health and safety.

Exhibits

1. City Council resolution

2. Location map

3. Plans, specifications, and contract documents ( on file in the Office of the City Clerk ) Jan. 9, 2024
Item #3 Page 3 of 7
RESOLUTION NO. 2024-002

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,

CALIFORNIA, APPROVING THE PLANS, SPECIFICATIONS AND CONTRACT

DOCUMENTS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS

FOR THE SCHULMAN AUDITORIUM AUDIO-VISUAL UPDATE PROJECT WHEREAS, the City Council of the City of Carlsbad, California has determined that the plans, specifications and contract documents for the Schulman Auditorium Audio-Visual Update, Capital Improvement Program Project No. 4753 have been completed to the satisfaction of staff; and WHEREAS, the plans, specifications and contract documents for the project have been prepared, are on file at the City Clerk's office and are incorporated by reference; and WHEREAS, City Council approval of the plans and specifications is required under Carlsbad Municipal Code Section 3.28.080(E) because the expected value to construct the project exceeds the $200,000 limit established by the Public Contract Code, including the alternative provisions of the Uniform Public Construction Cost Accounting Act; and
WHEREAS, the City Planner has determined that the project belongs to a class of projects that the state Secretary for Natural Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15301(d) Class 1 of the California Environmental Quality Act Guidelines. Further, that in making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the California Environmental Quality Act Guidelines do not apply to this project, and that the project is consistent with 15301(d) Class 1 because it consists of maintenance of public facilities, such as restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows:

1. That the above recitations are true and correct.

2. That the plans, specifications and contract documents for the Schulman Auditorium Audio-Visual Update, CIP Project No. 4753, are approved and on file at the City Clerk's Office.

3. That the City Clerk is hereby authorized and directed to publish, in accordance with state law and Carlsbad Municipal Code Section 3.28.080(C), a notice to contractors inviting Exhibit 1
Jan. 9, 2024 Item #3 Page 4 of 7
bids for construction of the Project in accordance with plans, specifications and contract documents referred to herein.

PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 9th day of January, 2024, by the following vote, to wit:

AYES:

NAYS:

ABSTAIN:

ABSENT:

Blackburn, Bhat-Patel, Acosta, Burkholder, Luna.

None.

None.

None.
l
KEITH BLACKBURN, Mayor
SHERRY FREISINGER, City Clerk
(SEAL)
Exhibit 1
Jan. 9, 2024 Item #3 Page 5 of 7
2 : Schulman Auditorium Audio-Visual Update
Project - CIP Project No. 4753

DOVE LIBRARY
SITE

DOVE LIBRARY
SITE
Exhibit 2
Jan. 9, 2024
Item #3 Page 6 of 7
Exhibit 3
Pl
ans, specifications and contract documents
(on file in the Office of the City Clerk)
Jan. 9, 2024
Item #3 Page 7 of 7
TYPE DESCRIPTION OWNERSHIP AGREEMENT SHEET NO. FREQUENCY

MAINTENANCE

STRUCTURAL (POST-CONSTRUCTION) BMP TABLE

MAINTENANCE
STORMWATER REQUIREMENTS THAT APPLY:

STANDARD STORMWATER REQUIREMENTS

PRIORITY PROJECT REQUIREMENTS

YES (SEE SWMP FOR DOCUMENTATION)
NO
EXEMPT FROM HYDROMODIFICATION?

INDEX OF SHEETS
"DECLARATION OF RESPONSIBLE CHARGE"

I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I

HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS.

I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY

THE CITY OF CARLSBAD DOES NOT RELIEVE ME AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN.

FIRM:

ADDRESS:

CITY, ST.:

TELEPHONE:

BY: DATE:
(NAME OF ARCHITECT)
R.C.E. NO.:

REGISTRATION EXPIRATION DATE:

WORK TO BE DONE

THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE

FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CIVIL ENGINEER.

1. CARLSBAD MUNICIPAL CODE

2. CITY OF CARLSBAD ENGINEERING STANDARDS

3. THIS SET OF PLANS

4. RESOLUTION NO. DATED

5. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK).

6. THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS.

ALL STANDARD DRAWINGS ARE SAND DIEGO REGIONAL STANDARD DRAWINGS (SDRSD) UNLESS NOTED OTHERWISE:
* CITY OF CARLSBAD STANDARD
** CARLSBAD MUINICIPAL WATER DISTRICT STANDARD DRAWING
*** SDRSD AS MODIFIED BY CITY OF CARLSBAD

GENERAL NOTES

OF-WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL.

AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRENCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS VII OR BETTER AS ESTABLISHED BY "BESTS" KEY

IMPROVEMENTS ARE NOT CONSTRUCTED PRIOR TO THE DEADLINE DATE OF THE IMPROVEMENT AGREEMENT.

OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND TITLE SHEET.

THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.
(A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION

CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF

CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF COMPLETION OF FIELD TESTS. THE SIGNED BY THE CITY ENGINEER.

BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY.

SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING

SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.

A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING

THE DESIGN OF SHORING, BRACING SLOPE OR OTHER PROVISIONS TO BE MADE

OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE

EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR

MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8

CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A

ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER

UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE

PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN.

AHEAD OF THE CONSTRUCTION TO PERMIT THE REVISIONS OF THE CONSTRUCTION

PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK.

LEAST TWO FULL WORKING DAYS PRIOR TO STARTING CONSTRUCTION NEAR THEIR FACILITIES AND SHALL COORDINATE WORK WITH A COMPANY REPRESENTATIVE.

UNDERGROUND SERVICE ALERT (DIG ALERT)
SDG&E
AT&T

SPECTRUM CABLE

CITY OF CARLSBAD(STREETS AND STORM DRAIN)

CITY OF CARLSBAD(SEWER,WATER & RECLAIMED WATER)

SAN DIEGUITO WATER DISTRICT

VALLECITOS WATER DISTRICT

OLIVENHAIN WATER DISTRICT

AS APPROPRIATE
*
*
*
*
*
*
BUENA SANITATION DISTRICT*
OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL

2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE

CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY

STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.

3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-

5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM

6. REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED

7. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL D:\DRAWING FILES\TITLE SHEETS\IMPROVEMENT TITLE SHEET.DWG REVISED: 2/23/17 THE CITY AND OTHER APPROPRIATE AGENCIES.

8. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING

9. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS

10. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO

11. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF:

13. ALL INSPECTION REQUESTS OTHER THAN FOR PRECONSTRUCTION MEETING WILL BE MADE BY CALLING THE ENGINEERING 24-HOUR INSPECTION REQUEST LINE AT (760) 438-3891. INSPECTION REQUESTS MUST BE RECEIVED PRIOR TO 2:00 P.M.

ON THE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WILL BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2:00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER.

14. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR

15. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING BLASTING PROGRAM AND BLASTING PERMIT.

17. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING

WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS,

EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7:00 A.M. AND 6:00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.)

18. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE

CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE

OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION.

DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY, AND THE PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART

UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO.

21. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES

22. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT

1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS.

CERTIFICATE OF INSURANCE MUST BE FILED NAMING THE CITY OF CARLSBAD AS

WRITTEN FIELD COMPACTION REPORT(S) SHALL BE IMMEDIATELY SUBMITTED TO THE CITY ENGINEERING INSPECTOR UPON COMPLETION OF THE FIELD TESTS.

12. A PRECONSTRUCTION MEETING SHALL BE HELD AT THE SITE PRIOR TO THE

BEGINNING OF WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES

RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR SHALL SCHEDULE THE MEETING BY CALLING THE INSPECTION LINE AT (760) 438-3891 AT LEAST FIVE (5) WORKING DAYS PRIOR TO STARTING CONSTRUCTION. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING.

REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA

EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO

19. NO BLASTING SHALL BE COMMENCED WITHOUT A CITY ENGINEER APPROVED

16. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK ZONE

20. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ( ABOVEGROUND AND UNDERGROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY

LEUCADIA WASTEWATER DISTRICT

4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A EXCAVATION.

COX COMMUNICATIONS
811
(800)411-7343
(619)237-2787
(800)227-2600
(760)434-2980
(760)438-2722
(760)633-2650
(760)744-0460
(760)753-6466
(760)726-1340 x1330
(760)753-0155
(619)262-1122
RATING GUIDE.

SANTA FE

CITY OF ENCINITAS
OCEAN

PACIFIC
B
LVD

LA COSTA AVE
RANC
HO
REAL

CITY OF CARLSBAD
CANNON

PALOMAR
C
ARLSB
AD
AVIARA
PKWY.

AIRPORT

CITY OF OCEANSIDE

INTERSTATE
5 HIGHWAY 78
RD.

EL
CAMINO
ROAD

CITY OF VISTA
ROAD
ALGA
ROAD
MARCOS

CITY OF
SAN
SCALE
NOT TO

VICINITY MAP
C
OLLEGE
B
L.

POINSETTIA LN.

COLLEGE
BLVD.

N

REVISION DESCRIPTION CITY APPROVAL

INITIALDATE

ENGINEER OF WORK

INITIALDATE

ENGINEERING DEPARTMENT
DRAWING NO.PROJECT NO.

CHKD BY:

DWN BY:

APPROVED:

SHEETSSHEET

DATE INITIAL
OTHER APPROVAL RVWD BY:

CITY OF CARLSBAD
"AS BUILT"
DATE

INSPECTOR DATE
REVIEWED BY:

CITY TRAFFIC ENGINEER APPROVAL
BY: DATE:

IMPROVEMENT PLANS FOR:

P.E. EXP.
1 PUBLIC WORKS MANAGER RCE 61909 EXP.9/30/25 DATE

TITLE SHEET
John Maashoff
4753 370-8
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.25
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
28 Nov 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt11/30/2023 4:18:45 PMProject No.:

Pro
ject Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 9201
1 City of Carlsbad Title Sheet
T000
541
Schulman Auditorium and Cannon Art Gallery -
AudioVisual Update
domusstudio architecture
2800 Third Ave
San Diego, CA 92103
619-692-9393
Wayne Holtan 2023.11.14
C12113

09.30.2025
T000 City of Carlsbad Title Sheet
T001 Title Sheet
T002a Code Compliance Plans
T002b Code Compliance Details
T003a CALGreen Checklist
T003b CALGreen Checklist
T003c CALGreen Checklist
A101a Floor Plan - Demolition
A101b Floor Plan - New
A102a Reflected Ceiling Plan - Demolition
A102b Reflected Ceiling Plan - New
A501 Details
S0.1 Structural Notes and Typical Details
AV0.00 General Notes & Legends
AV1.00 AV Overall Floor Plan
AV1.01 AV Overall Reflected Ceiling Plan
AV2.00 AV Enlarged Auditorium
AV2.01 AV Enlarged Gallery
AV3.00 AV Sections and Elevations
AV3.01 AV Sections and Elevations
AV3.02 AV Sections and Elevations
AV5.00 AV Connector Details
AV5.01 AV Standard Details
AV5.02 AV Standard Details
AV5.20 AV Panel Details
AV5.40 AV Rack Details
AV6.00 AV - Systems Schedules
AV7.00 AV Schematic Legend
AV7.30 AV Schematics
AV7.31 AV Schematics
AV7.32 AV Schematics
AV7.33 AV Schematics
AV7.34 AV Schematics
AV7.35 AV Schematics
AV7.36 AV Schematics
AV7.37 AV Schematics
TL0.00 General Notes & Legends
TL1.00 TL Overall Floor Plan
TL1.01 TL Overall Reflected Ceiling Plan
TL2.00 TL Enlarged Gallery
TL3.00 TL Sections
TL4.00 TL RCP Gallery
TL4.50 TL Schulman Light Plot
TL5.00 TL Details
TL6.00 TL Systems Schedules
TL7.00 TL Schematic
E000 Note Sheet
E100 Overall Power Plan
E101 Enlarged Auditorium Poewr Plan
E102 Enlarged Gallery Power Plan
E200 Overall Lighting Plan
E201 Enlarged Auditorium Lighting Plan
E202 Enlarged Gallery Lighting Plan
E300 Panel Schedule
Cover Sheets
Architecture
Structural
Audio Visual
Theatrical Lighting
Electrical
Revision Schedule
No. Revision Issue Date
12/01/2023
Exhibit 3
C.B.C. Table 601
Building Element

TYPE I TYPE II TYPE III TYPE IV TYPE V
A
Primary Structural Frame (f)
(See Section 202)
Bearing Walls
Exterior (e,f)
Interior
Nonbearing walls and partitions
- exterior
Nonbearing walls and partitions
- interior (d)
Floor construction and
associated secondary structural
members (see Section 202)
Roof construction and
associated secondary structural
members (see Section 202)
SEE TABLE 705.5
Fire Resistance Rating Requirements for Building Elements (In hours)

B A B A B HT A B
3(a
,b)
2(a,
b,c)
1(b,
c)
0(c) 1(b
,c)
0 HT 1 0
3 3(a)
2 2(a)
1 1
0 0
2 1
2 0
2 1/HT (g)
1 1
0 0
0 0 0 0 0 0

SEE SEC
2304.11.2 0 0
2 2 1 0 1 0 HT 1 0
1-1/2
(b)
1 (b,c)
1 (b,c)
0 (c)
1 (b,c)
0 HT 1
(b,c)
0 A B
1(b
,c)
0 3
3 2
2 0 0
2 2
1-1/2 1
B
0 2
2 0
2 1
C.B.C. Table 705.5
Fire resistance rating requirements for exterior walls based on fire separation distance (a,d,g)

TYPE OF

CONSTRUCTION

OCC GROUP
H(e), L

OCC GROUP
F-1, M, S-1(f)

OCC GROUP A, B, E,
F-2, I, R(i), S-2, U(h)
X < 5 (b)
5 < X < 10
10 < X < 30
X > 30
All

IA, IVA
Others

IA, IB, IVA, IVB

IIB, VB
Others
All
3 2 1
3 2
2 1
1 1
2 1
1 1
0 1
1(c)
0 1(c)
0 0 0
0 < 3'
Unprotected, Non-
Sprinklered
Maximum Area of Exterior Wall Openings C.B.C. Table 705.8 Unprotected, Non-
Sprinklered
Protected
Classification
of Opening 3' < 5' 5' < 10' 10' < 15' 15' < 20' 20' < 25' 25' < 30' < 30' Not
Permited
Not
Permited
Not
Permited
Not
Permited
No
Limit
Not
Required
Not
Required
No
Limit
No
Limit
No
Limit
No
Limit
70%45%25%15%10%
15% 25% 45% 75%
75%45%25%15%
N
Vicinity Map
Project Site
1775 Dove Ln.

Carlsbad CA 92011
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.25
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
14 Nov 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt11/14/2023 1:54:36 PMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Title Sheet
T001
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update Carlsbad City Library
Technology Upgrades
T000 City of Carlsbad Title Sheet
T001 Title Sheet
T002a Code Compliance Plans
T002b Code Compliance Details
T003a CALGreen Checklist
T003b CALGreen Checklist
T003c CALGreen Checklist
Project Team
Owner: City of Carlsbad
1635 Faraday Ave
Carlsbad, CA 92008
442.339.2938
Contact: Steven Stewart
Architect: domusstudio architecture
2800 Third Avenue
San Diego, CA 92103
619.692.9393 x15
Contact: Wayne Holtan
Structural Engineer: BWE
9449 Balboa Ave
San Diego, CA 92123
619.299.5550
Contact: Dave Adams
Electrical Engineer: Akela Engineering
858.812.9154
Contact: Guy Carpino
Audio/Visual Designer: Idibri
1935 N Marshall Ave
El Cajon, CA 92020
619.569.2027
Contact: Vance Breshears
Sheet Index 54 Total Sheets Project Data
Project Description: Technology Upgrades to the Carlsbad City Library Schulman Auditorium and Cannon Art Gallery, including specialty lighting system upgrades, technology infrastructure improvements, new structural grid for gallery space, replacement access door, additional partitions for AV equipment closet, and minor interior finish maintenance.

Owner: City of Carlsbad
Project Address: 1775 Dove Ln.

Carlsbad CA 92011
Historic: No
Assessor's Parcel No.: -
Existing Use: Theater and Art Gallery
Proposed Use: Theater and Art Gallery (No Change)
Existing Occupancy: A-3
Proposed Occupancy: A-3 (No Change)
Existing Construction Type: II-B Sprinklered
Proposed Construction Type: II-B Sprinklered (No Change) Allowable Area: No Change
Total Area of Work: +/- 4,400 sf
Allowable Height: No Change
Actual Height: 36' - 6" (No Change)
Allowable Stories: No Change
Actual Stories: 2 (No Change)
Commercial Fire Notes

1.0 General Requirements

1.1 All decorative materials shall be maintained in a flame retardant condition.

1.2 Wall, floor and ceiling finishes and materials shall not exceed the flame spread classifications in CFC table 803.3. Decorative materials shall be properly treated by a product or process approved by the state Fire Marshal with appropriate documentation provided to the building official.

1.3 Cutting, welding, or other hot work shall be in conformance with CFC Chapter 35.

2.0 Exiting

2.1 Exits, exit signs, fire alarm panels, hose cabinets, fire extinguisher locations, and standpipe connections shall not be concealed by curtains, mirrors, or other decorative material.

2.2 The egress path shall remain free and clear of all obstructions at all times. No storage is permitted in aisles.

2.3 The exit path shall be illuminated at all times in accordance with CBC 1008. Emergency lighting shall be provided with 90-minute back-up, and not less than one footcandle at the walking surface.

2.4 Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.

Doors shall not be provided with thumb-turn locks or deadbolts that do not unlatch in tandem with the normal operating lever. The opening force for interior doors without closers shall not exceed 5 pounds. The unlatching and opening force for other doors, including fire doors, shall not exceed 15 pounds. CBC 1008

2.5 The exit path shall be clearly identified with exit signs conforming to CBC 1011. Stairs serving 4+ stories shall have stairwell signs conforming to CBC 1022.8. Illuminated exit signs must have 90-minute emergency power back-up. Tactile signs shall be provided in commercial buildings, public buildings and accommodations, and publicly funded housing subject to CBC chapter 11B and shall conform to 11B-703, be located five feet above finish floor level and, whenever possible, on the strike side of the door. Lettering shall be between 5/8” and 2” high. CBC 1011.3
Demolition Notes

1.1 The word "Demolish" shall mean to remove. Make good existing any surface damaged during demolition and disposal of the demolished materials off site entirely at the general contractors expense.

1.2 Extent of demolition work is only graphically shown, full scope of demolition work shall be determined by the general contractor to accommodate new construction.

1.3 Refer to consultants plans for additional demolition notes.

1.4 Refer to plans and details for the interface between new and existing construction, in order to determine the full scope of demolition.

2.0 Verify Existing Conditions

2.1 The drawings reflect general information only. Examine the site to determine the exact existing conditions, character and extent of the work to be performed and operations required. Verify the location of existing utilities prior to demolition and start of work.

2.2 Verify existing dimensions before proceeding with the work. Obtain field measurements for work required to be accurately fitted to other construction. Contractor's responsible for the accuracy of such measurements and precise fitting and assembly of finished work.

2.3 Verify that items to be recessed or semi-recessed in existing walls can be installed properly prior to ordering such items.

2.4 Notify the architect in writing of any discrepancies prior to proceeding with any work.

3.0 Protection

3.1 Protect all existing and new construction especially finishes, equipment and adjacent work which is to remain or to be reused from damage.

3.2 Provide weather protection and waterproofing as needed to prevent damage to remaining existing work and to new work.

3.3 Erect and maintain temporary partitions as required to separate work areas from existing building. To prevent the spread of dust, debris, odors and noise.

3.4 Protect all active utilities, fixtures, pipes and other appurtenances within building and site. Disconnect and cap pipes and services as required by company, utility, or local authority having jurisdiction, and as required for demolition work. Bypass utility services such as pipe and conduit before cutting, where such utility services are shown or required to be removed. After bypass and cutting, cap valve or plug and seal tight remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.

3.5 Provide barricades, maintenance and supervision thereof, in accordance with applicable federal, state and local codes and their respective requirements. Install temporary barricades, enclosures and protections before demolition work is started.

3.6 If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws and ordinances concerning removal, handling and protection against exposure or environmental pollution.

3.7 Protect adjoining property from damage during construction and demolition work. Provide protection for footings, foundations, walls, chimneys, skylights, and roofs. Control water runoff and erosion during construction or demolition activities.

3.8 The person making or causing an excavation to be made shall provide written notice to the owners of adjoining buildings advising them that the excavation is to be made and that the adjoining buildings should be protected, delivered not less than 10 days prior to the scheduled excavation starting date

4.0 Removal of Material

4.1 Provide all demolition as shown on these drawings and as required for a complete and proper installation of new work.

4.2 Remove debris and abandoned items from area and from concealed spaces. Remove rubbish and debris from project site and dispose of in a legal disposal site. Upon completion of work, leave area in clean condition.

4.3 Items that shall be removed and later reinstalled as indicated on the drawings, remove such items with care, protect and store to prevent damage. Replace material or items damaged in its removal with similar new material as required. Other materials and equipment removed from existing building or site shall not be reused in this project except with specific written approval by architect in each case.

4.4 Remove existing work items which are required to be removed in such a manner that minimum damage and disturbance is caused to adjacent and connection work scheduled to remain. Repair or replace, at the discretion of the architect, existing work scheduled to remain which is damaged by these operations.

4.5 Perform the removal, cutting, drilling of existing work with extreme care, in order not to jeopardize the structural integrity of the building. For interior slabs on grade, use removal methods that will not crack or structurally disturb adjacent slabs or partitions. Prevent movement of structure; provide bracing and shoring as required if structure appears to be in danger, cease work at once and notify the architect.

4.6 Drilling or cutting of columns, beams, joists, girders, elevated floor/roof slab, or other structural supporting elements will not be permitted, unless specifically approved by the architect.

4.7 Remove anchorage's to at least 1/2 inch below the surface of concrete or masonry and patch depressions to provide a flush surface.

4.8 Maintain protected egress and access to the work at all times,

5.0 Patching and Replacing

5.1 Patch areas requiring patching, including damage caused by removing, relocating or adding fixtures and equipment, and damages caused by demolition of adjacent materials.

5.2 Replace and restore existing items which have been removed to allow the installation of new work.

Restore exposed finishes to patched areas, U.N.O.

5.3 Match existing products, finishes, textures and work for patching and extending work, U.N.O. provide same products or types of construction as that in existing structure, as needed to patch, extend or match existing work.

5.4 Where removal of partitions or wall results in adjacent spaces becoming one, rework floors, walls, and ceiling to a smooth plane without breaks, steps or bulkheads, unless specifically shown in the drawings. Patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. If necessary to achieve uniform color and appearance, remove existing floor and wall coverings and replace with new materials.

5.5 Where new work abuts or aligns with existing, perform a smooth and even transition, U.N.O. patched work to match existing adjacent work in texture, color and appearance. Repaint entire plane to achieve even uniform appearance.

5.6 When finished surfaces are cut so that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and provide trim appropriate to the finished surface.

Finish patches to produce uniform finish and texture over entire area. When finish cannot be matched, refinish entire surface to nearest intersections.

5.7 Where a 1/4 inch or more change in surface occurs, submit recommendations for providing smooth transition for architects review.

General Notes

1. Do not scale drawings, dimensions prevail.

2. Contractor shall field verify all existing conditions prior to bidding and construction.

3. Contractor shall report in writing all conflicts, discrepancies, and defects promptly to the Architect and prior to proceeding with any subsequent work.

4. Where details are not shown or referenced for part of the work, the details shall be the same as for other similar areas of work and the Architect shall be promptly notified of all such discrepancies.

5. All products purchased for incorporation into the Work shall consist of items that have not previously been incorporated into another project or facility, or otherwise recycled, except that products consisting of recycled-content materials are allowed. All products shall be new at the time of construction unless explicitly stated otherwise.

6. To prevent galvanic corrosion, provide separation between all items made of dissimilar metals and between metals and corrosive substrates, substances, or adhesives.

7. The location of all devices installed in floor, on walls and ceilings, associated with mechanical electrical, fire protection, security and other such systems, including access panels, not specifically indicated on the drawings but part of the construction contract, shall be approved by the Architect. Failure to receive approval shall be cause for removal and relocation at no cost to the owner.

8. Waste Management Plan Required. (CGBSC 5.408.1)
A minimum of 65 percent of the non-hazardous construction and demolition waste shall be recycled and/or salvaged for reuse. Contractor shall provide and coordinate a "Waste Management Plan" on site in accordance with the local jurisdiction's requirements and/or applicable building codes.

9. Systems Manual Required. (CGBSC 5.410.2.5.1)
A "Systems Manual" that documents the operational aspects of the building systems shall be provided to the building owner or facilities operator

10. Operation and Maintenance (O&M) Manual Required. (CGBSC 5.410.4.5) An "O&M Manual" that contains detailed operating and maintenance instructions to the owner, copies of warranties for each system, and copies of all inspection reports shall be provided to the building owner.

Special General Notes

1. To promote clear communication in the field, all questions and clarifications shall be submitted, in writing, to the Architect in a timely manner. Official resolutions to these issues shall be issued in writing only.

2. All work shall be performed in strict accordance with the highest standards of practice related to the trades involved, and shall be complete and properly coordinated with all adjacent or related work.

3. The Contractor shall coordinate, anticipate the locations of, accommodate, and remedy conflicts between the framing and all lighting, mechanical registers, and all other recessed or surface-mounted fixtures prior to proceeding with subsequent work. The Contractor shall bear all cost associated with correcting all such conflicts.

California Green Building Standards Notes

1. Contractor shall prepare and submit to the regulating agency a "Waste Management Plan" that outlines the items listed in CGBSC Section 5.408.1. The waste management plan shall be updated as necessary and shall be accessible during construction for examination by the enforcing agency. (CGBSC sec. 5.408.1.4)

2. A minimum of 50% of the non-hazardous construction waste is to be recycled and / or salvaged for reuse per CGBSC Section 5.408.1.

3. Contractor to provide a building "Systems Manual" as listed in CGBSC Section 5.410.2.5. and deliver to the building owner or representative and the facilities operator. The "Systems Manual" shall contain the required features listed in CGBSC Section 5.410.2.5.1.

4. During storage and rough installation, the ends of duct openings are to be sealed and mechanical equipment is to be covered to prevent dust, water and debris from entering the system per CGBSC Section

5.504.3.

5. The installations of HVAC, refrigeration and fire suppression systems will not contain CFC's or halons, per CGBSC Sections 5.508.1 and 5.508.1.2.

6. Adhesives, sealants, caulks: Adhesive and sealants used on the project shall meet the requirements of the following standards. (Section 5.504.4.1 of CALGREEN) Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers, and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable, or SCAQMD Rule 1168 VOC limits, as shown in Tables 5.504.4.1 and 5.504.4.2 of CALGREEN. (Sec. 5.504.4.1)

7. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507.

8. Architectural paints and coatings shall comply with Table 5.504.2 unless more stringent local limits apply (Section 5.504.3 of CALGREEN)

9. Aerosol Paints and Coatings: Aerosol paints and coatings shall meet the Product-Weighted MIR Limits for ROC in section 94522(a)(3) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). (Section 5.504.4.3.1)

10. The in-place HVAC system shall only be used during construction if necessary to condition the building or areas of alteration within the required temperature range for material and equipment installation. If the HVAC system is used during construction at the areas of improvement, use return air filters with a Minimum Efficieiency Reporting Value (MERV) or 8, based on ASHRAE 52.2-1999, or an average efficiency of 30% based on ASHRAE 52.1-1992. Replace all filters immediately at the conclusion of construction.

S0.1 Structural Notes and Typical Details
A101a Floor Plan - Demolition
A101b Floor Plan - New
A102a Reflected Ceiling Plan - Demolition
A102b Reflected Ceiling Plan - New
A501 Details
Cover Sheets
Architecture
Structural
Audio Visual
Theatrical Lighting
TL0.00 General Notes & Legends
TL1.00 TL Overall Floor Plan
TL1.01 TL Overall Reflected Ceiling Plan
TL2.00 TL Enlarged Gallery
TL3.00 TL Sections
TL4.00 TL RCP Gallery
TL4.50 TL Schulman Light Plot
TL5.00 TL Details
TL6.00 TL Systems Schedules
TL7.00 TL Schematic
Electrical
AV0.00 General Notes & Legends
AV1.00 AV Overall Floor Plan
AV1.01 AV Overall Reflected Ceiling Plan
AV2.00 AV Enlarged Auditorium
AV2.01 AV Enlarged Gallery
AV3.00 AV Sections and Elevations
AV3.01 AV Sections and Elevations
AV3.02 AV Sections and Elevations
AV5.00 AV Connector Details
AV5.01 AV Standard Details
AV5.02 AV Standard Details
AV5.20 AV Panel Details
AV5.40 AV Rack Details
AV6.00 AV - Systems Schedules
AV7.00 AV Schematic Legend
AV7.30 AV Schematics
AV7.31 AV Schematics
AV7.32 AV Schematics
AV7.33 AV Schematics
AV7.34 AV Schematics
AV7.35 AV Schematics
AV7.36 AV Schematics
AV7.37 AV Schematics
E000 Note Sheet
E100 Overall Power Plan
E101 Enlarged Auditorium Poewr Plan
E102 Enlarged Gallery Power Plan
E200 Overall Lighting Plan
E201 Enlarged Auditorium Lighting Plan
E202 Enlarged Gallery Lighting Plan
E300 Panel Schedule
Governing Codes
It is the intent of these contract documents that the new construction of the project when completed shall conform to regulations at the time of plan check, of the following governing codes; perform all work in accordance with the latest edition of California administrative codes and the following adopted codes and regulations, and standards:
- California And Federal Occupational Health And Safety Act (OSHA) - California Green Building Standards Code 2022
- California Building Code 2022 (CBC)
- California Mechanical Code 2022 (which Adopts The 2021 UMC) (CMC) - California Plumbing Code 2022 (which Adopts The 2021 UPC) (CPC) - California Electrical Code 2022 (which Adopts The 2020 NEC) (CEC) - California Title 24 2022
- California Fire Code 2022 (which Adopts The 2021 IFC) - National Fire Protection Assoc.
- American Concrete Code
- Americans with Disabilities Act
- TCNA Ceramic Tile Installation 2022
- Masonry Association
- California Energy Efficiency Standards 2022
Revision Schedule
No. Revision Issue Date
28 Nov 2023
30" x 48" Approach
30" x 48" Approach
60" Dia Turning Circle
60" Dia Turning Circle
F
C
+48"Ui.A
F
2G
+18"iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18"iO
F
2G
+18"iO
F
2G
+18"iO
F
2G
+18"iO
F
2G
+18" iO
F
4S2
+48"Ts.10
F
4S2
+40" Bt.2
F
5G
+18" Av.5
F
5G
+18" Av.5
F
5G
+18"Av.5
F
5G
+18"Av.5
F
5G
+18"Av.5
F
5G
+18" Av.5
F
FB
iO
F
FB
iO
F
FB
iO
F
FB
iO
+18" iO
+18"iO
+24" iO
+24" iO
+18"iO
+18"iO
F
C
+18" Av.7
F
C
+18"Av.7
F
C
+18"Av.7
F
C
+18" Av.7
+39"iO
+34"iO
30" x 48" Approach
30" x 48" Approach
60" Dia Turning Circle
60" Dia Turning Circle
Function of Space: Assembly without
Fixed Seats (Standing Space)
Occupant Load Factor: 5
Occupant Load: 372
Exits Required: 2
Function of Space: Assembly
with fixed seats
Occupant Load Factor: (217
Seats) + OLF 15
Occupant Load: 271
Exits Required: 2 62' - 0"
(20' - 8" Min.)43' - 8" Separation
63' - 0"
(21' Minimum)
28' - 0" Separation
271 Width Required: 40.7"
Width Provided: 72.0"
136 Width Required: 32.0"
Width Provided: 72.0"
372 Width Required: 55.8"
Width Provided: 72.0"
186 Width Required: 32.0"
Width Provided: 34.0"
Existing exit door with panic
hardware and existing tactile exit
signage and illuminated exit
signage
New storefront double swing
door with panic hardware, see
new work plans for additional
information
Existing double doors with panic
hardware and existing tactile
identification signage, tactile exit signage,
and illuminated exit signage
Existing double doors with panic
hardware and existing tactile
identification signage, tactile exit
signage, and illuminated exit signage
New fire extinguisher (2A:10BC)
Existing fire extinguisher
R 75' - 0"
R 75' - 0"
Existing accessible women's restrooms
Existing accessible men's restrooms
New dual height drinking fountain to be
installed at location of existing drinking
fountain, see new work plans for additional
information
(3' - 0" Min.)
3' - 2"
(44" Min.)
4' - 8"(5' - 0" Min.)
5' - 0"
(5' - 0" Min.)
5' - 2"
(44" Min.)
3' - 10"
Existing tactile wall room identification signage
Existing accessible restroom door signage
Existing illuminated exit signage
New tactile signage, see new
work plans for additional
information
Theater Gallery
AV Closet
18" Min. 18" Min.
18" Min.

Note:

For Accessible Mounting height and
dimensions requirements for water
closets, grab bars, mirrors, teoilet
papers, and other accessories, see 1
T002b
18" Min.

Existing accessible parking, typ.

Existing path of travel (Does not exceed 5%
maximum running slope with 2% cross slope)
Existing truncated domes (zero curb), typ.
(E) +/- 85' - 6"
(E) +/- 63' - 9"
(E) +/- 269' - 2"
(E) +/- 259' - 11"
(E) +/- 89' - 6"
T002a
2 Existing Library Building9' - 0" 5' - 0"
9' - 0"
5' - 0"
9' - 0"
5' - 0"
9' - 0"
8' - 0"
18' - 0" 4' - 0" 18' - 0"
4' - 0"
Existing wheel stops, typ.

Existing white striping (3' O.C.)
inside blue border, typ.

Existing ISA, typ.

Existing van accessible parking sign
Existing accessible parking
sign, typ. of (6)
Dove Ln.
(Existing parking
dimensions)
(Existing parking
dimensions)
Existing tow away signage
Existing tow away signage
Existing Entry Driveway
Existing Driveway
Existing Driveway
4 T002a
5 T002a
5 T002a
6 T002a
6 T002a
6 T002a
NOTE: The finish of curb ramp and
flared sides shall be stable, firm and
slip resistant.

Transitions from curb ramps to
adjoining surfaces shall be flush and
free of abrupt change, with 1:20
counter slope within 24" of curb
ramp.

Existing curb
where occurs
Detectable warning per1
4 Flared sides, 1:10 max. slope
Running slope 1:12 max.,
cross slope 1:48 max.
2 MIN
48"
Top landing, 1:48 max. slope3
6" -8" 36" MIN 48" MIN
3 2
44 1
Face of curb
22 1
48" MIN
48" MIN
6" -8" 36" MIN
Face of existing curb
Curb ramp
slope
Adjoining
surface max.
slope
20 1
4 T002a

0.65" min. 0.18" - 0.22"
Base diameter of

0.9" - 0.92"
Top diameter of

0.45" - 0.47"
Detectable warning surfaces shall
be an integral part of the surface.

They shall be yellow to match color
no. FS 33538 in Federal Standard
595c or shall provide a 70% min.
visual contrast with adjacent walking
surfaces per 11B-705.1.1.3.2.

Detectable warning surfaces shall
differ from adjoining surfaces in
resiliency or sound-on-cane contact
per 11B-705.1.1.4.

2.3" - 2.4"

2.3" - 2.4" Existing detectable warning tile
Existing adjacent paving as occurs
Existing concrete
Existing identification
signs, see
Existing accessible pedestrian
route: 5% maximum slope. 2%
maximum cross slope.

Exitsing wheel stops
Existing blue painted borderline and
stripes.

Existing 2% max. surface slope in
any direction.

Within the access aisle, existing
painted 'NO PARKING' in 12" min.
high white letters.

Measured from center of
parking stripes
3' - 0"
18' - 0" Min.

Van Space
12' - 0" Min. 5' - 0" Min. 9' - 0" Min.

O.C.
3' - 0"
Existing 2" wide border, painted white
Existing background painted blue,
approximate FS 15090 in Federal
Standard 595C
Existing International Symbol of
Accessibility complying with CBC
2019 Figure 11B-703.7.2.1, painted
white
Note to Existing:

The centerline of the International
Symbol of Accessibilty shall be a
maximum of 6 inches from the
centerline of the parking spaces, its
sides parallel to the length of the
parking space and its lower corner
at, or lower side aligned with the
end of the parking space length
Typ.
3' - 0"
Typ.
3' - 0"
6 T002a
Notes for Existing:

1. Van space: 9'-0" min. wide when
access aisle is 8'-0" min. Standard
accessible space: 9'-0" min. wide.

2. Access aisle: Must be located on
passenger side at van spaces.

Existing reflectorized sign with the
ISA constructed of porcelain steel
with beaded text or equal. Area of
sign to be a min. of 70 square inches
with white profile on blue background
equal to color no.15090 in Federal
Standard 595b. Designated "VAN
ACCESSIBLE" at Van Parking
Space.

Existing additional language at sign
below the ISA stating "$250
MINIMUM FINE"
Existing 2" diameter galvanized steel
post.

Existing post set in concrete pier

PARKING
ONLY
VAN

ACCESSIBLE
$250

MINIMUM FINE
80" min.

Existing Finish Surface

UNAUTHORIZED VEHICLES

PARKED IN DESIGNATED

ACCESSIBLE SPACES NOT

DISPLAYING

DISTINGUISHING PLACARDS

OR LICENSE PLATES

ISSUED FOR PERSONS

WITH DISABILITIES MAY BE

TOWED AWAY AT OWNER'S
EXPENSE. TOWED

VEHICLES MAY BE

RECLAIMED AT
_________________ OR BY

TELEPHONING
____________
letters
1" min.
17" Min.
22" Min.

Note:

This sign existing at each entrance
to off-street parking facilities. See
site plan for locations.

CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
25 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/25/2023 2:11:07 PMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Code Compliance Plans
T002a
1/8" = 1'-0"2 Floor Plan - Code Review
1" = 40'-0"1 Site Plan - Code Review
Egress path of travel
Accessible path of travel
100
Occupant Load
(5% maximum slope in the
direction of travel with maximum
2% cross slope)
Existing Illuminated Exit Sign
1/4" = 1'-0"3 Curb Ramps - Existing
3" = 1'-0"4 Detectable Warning - Existing
1/8" = 1'-0"5 Accessible Parking Requirements - Existing 3/4" = 1'-0"6 Accessible Parking Signage - Existing
Revision Schedule
No. Revision Issue Date
Accessible path of travel (5% maximum slope in the
direction of travel with maximum
2% cross slope)

OR BY TELEPHONING
SDPD(619) 531-2844
Not In Contract
28 Nov 2023
34" max.
8" min.
6" max. 11" -19"
29" min.
27" min.
9" min.

Existing mirror
Existing wall finish
Existing Lavatory
Existing under-lavatory
accessibility clearance
Trap with existing under-lavatory
guard
Existing Finish Floor
Existing wall & finish
Existing blocking
Cover plate
Existing grab bar, 1-1/4" minimum to
2" maximum diameter
Note:

Allowable stresses shall not be
exceeded for materials used when a
vertical or horizontal force of 250 lbs
is applied at any point on the grab
bar, fastener, mounting device or
supporting structure.

Existing 1 1/2" Clear
Existing 6" min.Existing 1 1/2" min.

Existing 33" - 36" AFF
Notes:

1. Use these typical fixture
and accessory locations,
unless noted otherwise

2. For additional grab
bar information, see

3. Provide backing at all
accessories

4. For additional lavatory
clearance
requirements see

5. For additional accessible
toilet compartment
clearance requirements
see
12" max. 42" min.

C
min.
24" 12" min.

C
A
B
7" - 9"
D
13 1/2" min.

Dimension
Water Closet C.L.

Toilet Seat
A
B
Grab BarC
DispenserD
54" min.
min.
24"
36" min.B
17" max.

Mounting Dimensions
All operable parts of
accessories
40" max.

Urinal
Note #4
34" max.
min.
18"
Edge of reflective
surface
Coat hook
40" max.

All operable parts of
accessories
Typical
19" min.
33"-36"
17"-19"
17"-18"
Where occurs, flush control on open
side of water closet
4 T002b
3 T002b
2 T002b
Accessible Compartment Side Opening Inswing
60" min.
59" min at floor-mount
56" min. at wall-hung
60" min.
36" min.

Accessible Compartment Side Opening Outswing
60" min.
59" min. at floor-mount
56" min. at wall-hung
60" min.

Notes:

1. Fixture and accessory
mounting
requirements per

2. Lavatory knee and toe
clearance
requirements per

3. All clearances measured to
finish face of materials

4. Doors shall be self-closing.

Provide door pull on both
sides of the door near the
latch.

Clear
34" min.
max.
4"
max.
4"Clear
34" min.
1 T002b
4 T002b
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
25 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/25/2023 2:11:07 PMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Code Compliance Details
T002b
1" = 1'-0"4 Accessible Lavatory - Existing
3" = 1'-0"3 Grab Bar Requirements - Existing
1/4" = 1'-0"1 Restroom Mounting Requirements
1/4" = 1'-0"2
Accessible Toilet Compartment Dimensions - For
Reference of Existing Revision Schedule
No. Revision Issue Date
28 Nov 2023
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:23 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
CALGreen Checklist
T003a
x
x
x
x
x
x
x
Revision Schedule
No. Revision Issue Date
28 Nov 2023
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:24 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
CALGreen Checklist
T003b
x
x
x
x
x
x
x
x
x
x
x
x
x
See T001 -
California
Green
Building
Standards
Notes
See T001 -
California
Green
Building
Standards
Notes
x
x
x
x
x
See T001 -
California
Green Building
Standards
Notes
See T001 -
California
Green Building
Standards
Notes
Revision Schedule
No. Revision Issue Date
28 Nov 2023
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:25 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
CALGreen Checklist
T003c
x
x
x
x
x
x
x
x
x
See T001 -
California
Green
Building
Standards
Notes
See T001 -
California
Green
Building
Standards
Notes
Revision Schedule
No. Revision Issue Date
28 Nov 2023
30" x 48" Approach
30" x 48" Approach
60" Dia Turning Circle
60" Dia Turning Circle
Remove existing storefront system
and door for replacement with new
Selective demolition and repair as
required for installation of new wall outlets
per AV, typ.; gypsum board finish to match
existing, repaint typ.

Remove existing single height drinking
fountain and replace with new dual
height fixture
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:11 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Floor Plan - Demolition
A101a
1/8" = 1'-0"1 Floor Plan - Demolition
N
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
30" x 48" Approach
30" x 48" Approach
60" Dia Turning Circle
60" Dia Turning Circle
Repaint existing walls PPG1010-1
Pegasus eggshell (Sherwin Williams,
PPG, or approved equal) to ceiling line,
typ., see Reflected Ceiling Plan for paint
and finish above
New interior partition for new AV cabinet
per AV, see AV for additional information,
paint to match repainted walls
New hollow metal door and frame, paint to
match new walls
New exterior storefront door and
sidelights; 1" Low-E glazing with black
anodized window mullions; hardware
finished black to match
2 A501
Repaint existing wall base to match walls,
finish as noted above, typ.
2 A501
1 A501
Selective demolition and repair as
required for installation of new wall outlets
per AV, typ.; gypsum board finish to match
existing, repaint typ. Note: Surface
mounted conduit will not be accepted
below the lower ceiling line
Install new AV at existing punch outs, typ.
see AV drawings for additional information
A101b 4
A101b3
Paint existing door to match new
Paint existing door to match new
Typ.

New semi-recessed fire
extinguisher cabinet and
fire extinguisher
12 A501
New accessible signage
at exterior and interior;
provide one room
identification sign at
exterior, one accessible
entrance sign at exterior,
one tactile exit sign at
interior, and one blank at
interior, see 11
A501
Connect new unit condensate to
existing sink, seeNew dual height drinking fountain at
removed single drinking fountain
Note:

For work at roof above, see 2
A101b
16 A501
Infill at Existing
+/- 12' - 0"
Infill at Existing
+/- 10' - 0"
7' - 10"
1' - 0"
New glazed double door
(tempered or laminated Low-E
glazing)
New side lite glazing
(tempered or laminated Low-E)
New black annodized
aluminum storefront system
6" Typ.
8 A501
6 A501
5 A501
7 A501
Typ.

Typ.
3' - 11" 3' - 11"
Provide new tactile signage:
"CANON ART GALLERY"
Provide new ISA sign
Hardware Set 01
(Includes required panic hardware)
Provide new tactile signage:
"EXIT" opposite the exterior
signage; provide blank plate
over opposite second exterior
sign
Door Accessibility Notes:

1. Door hardware must be operable with one hand and does not require tight grasping, pinching, or twisting of the hand.

2. Door opening force is 5-pounds maximum.

3. Door opening hardware to be mounted between 34" and 44" above finish floor.

4. Lower 10 inches of the door surface is to be provided with a smooth surface for the full width of the door at the push side of the door. 9' - 4"
3' - 0"
4 A501
3 A501
3 A501
Sim.

Hardware Set 02
New mechanical pad with sheet
metal cap, exact location to be
located by Contractor with field
conditions, verify
manufacturer's minimum
clearance requirements are
maintained. For flashing and
roof repair detail, see
New outdoor condensing unit
for AV equipment closetFrom Building Edge
10' - 0" Min.
+/- 2' - 8"
+/- 1' - 4"
Core through roof, run
electrical conduit and piping
through ceiling space below.

For penetration detail, see
Split System Fan Coil Unit Schedule
Tag Area Served Manufacturer Type Nominal Tons Cooling Total Btu/Hr Cooling Sensible EER/SEER COP (HSPF) Supply CFM (High) Volts/Phase Min. Ckt. Amps MOCP Amps Weight (Pounds) Remarks FC-1 AV Closet Carrier/Toshiba 40MHHQ24---3 2 Ton 22,000 15,400 Btu/Hr 10.5/16.8 2.9/9 553 208/230-1 0.45 25 40.12 *1,*2,*3,*4,*5,*6,*9,*10 CU-1
Split System Condensing Unit Schedule
Tag Area Located Manufacturer Type Nominal Tons Cooling Total Btu/Hr EER/SEER COP (HSPF) Volts/Phase Min. Ckt. Amps MOCP Amps Weight (Pounds) Remarks CU-1 Roof Carrier/Toshiba 38MHRQ24A---3 2 Ton 22,000 10.5/16.8 2.9/9 208/230-1 18 25 105.2 *1,*2,*3,*4,*5,*6,*7,*8 MOCP = Maximum overcurrent protection
Cooling capacities based on conditions of 95 dgrees outisde dry bulb and 67 degrees wet bulb entering air to coil *1 Provide refrigerant R-410A Puron (Non HCFC refrigerant) *2 Rerigeration piping (Suction and liquid copper Type L tubing) and rubitex insulation per manufacturers requirements. *3 Refrigeration piping and sizering per manufactuers requirements. *4 Refrigeration piping shut off valves at equipment for isolation and servicing *5 All control wiring in metal conduit. Contorl wiring gauge, quantity, type, size, routing preferences per manufactuers requirements for a complete system *6 Condensate drain pump kit 53DS-900---118
*7 Provide sheet metal capped roof platform for support of condensing unit with neoprene vibration isolation mounts and seismic restraints at each point of connection to the condensing unit. *8 Factory installed compressor start assist, capacitor and relay, crankcase heater, low ambient cooling, hard shut off expansion valve on indoor coil *9 Heating to be locked out
*10 All condensate piping shall be continuously insulated 19 A501
20 A501
1/8" = 1'-0"1 Floor Plan - New
N
Keynotes
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:13 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Floor Plan - New
A101b
General Floor Plan Notes

1. Unless otherwise indicated, all wall dimensions are to face-of-stud or face-of-block.

2. All dimensions related to existing conditions shall be verified on site as necessary. Notify the Architect of any discrepancies/conflicts.

3. Fire Retardant Treated Wood Backing between the studs shall be coordinated and provided at items such as, but not limited to, toilet accessories, toilet partitions, mirrors, shelving, casework, handrails, etcetera.

4. All recessed equipment shall be installed within the depth of the wall or ceiling per the manufacturer's recommendations. Verify wall depth as necessary.

5. For Room Finishes, Doors, and Wall Assemblies see schedule sheets.

6. For Windows and Storefront see schedule sheets
1/4" = 1'-0"4 New Storefront Door
1/4" = 1'-0"3 New Interior Door
1/8" = 1'-0"2 Partial Roof/Mechanical Plan with Notes
Revision Schedule
No. Revision Issue Date
Not In Contract
Not In Contract
Not In Contract
28 Nov 2023
Demolish existing track system for
replacement with new, remove all attached
systems( light fixtures, conduits, etc.) as
required, see AV and Electrical for
additional information
Remove existing storefront system
and door for replacement with new
Replace existing house light fixtures, typ.

See Electrical for addtional information
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:15:16 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Reflected Ceiling Plan - Demolition
A102a
N
1/8" = 1'-0"1 Reflected Ceiling Plan - Demolition
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
All ceiling, grilles, fixture
escutcheons, upper soffit walls,
structural members, decking, and
exposed conduits above to be
painted PPG1009-6 Armory flat or
eggshell (Sherwin Williams, PPG, or
approved equal)
New support grid in black finish, see
AV for additional information
New acoustical panels installed in
upper ceiling; Tectum panels (or
approved equal) direct attached and
painted to match adjacent elements
New speakers, typ. see AV for
additional information
New projectors and connections at
ceiling grid, typ., see AV for additional
information
New speakers at ceiling grid, typ. see
AV for additional information
New speakers at courtyard, typ. see AV for
additional information
New theatrical lighting, typ. see AV
for additional information
New house lighting, typ. see
Electrical for additional information
New connections for monitor installations, see
AV for additional information
9 A501
Existing punch outs for new AV system,
new punch outs where required (existing
wall is double layer of gypsum board over
3 5/8" metal framing where patch is
required)
Provide 4' high acoustic panels full
width of interior soffit face, all four
sides
Note:

For acoustic panels, paint above
ceiling to match as noted above
New projector and connections, typ.
see AV for additional information
Typ.

Existing architectural lighting fixtures to
be changed out, typ. see Electrical for
additional information
New fire sprinkler
extension from
existing system, as
required
New wall mounted fan
coil unit with
condensate pump
Condensate,
mechanical piping,
and electrical conduit
above ceiling, typ.;
run condensate to
existing sink for new
connection as
required
Flexible joint at
seismic separation
17 A501
FC-1
Note:

For additional mechanical
information see 2
A101b
18 A501
Note:

Patch and repair existing ceiling to
extents required for installation of all
new overhead connections of
replacement grid
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/10/2023 9:37:45 AMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Reflected Ceiling Plan - New
A102b
1/8" = 1'-0"1 Reflected Ceiling Plan - New
N
General Reflected Ceiling Plan Notes

1. Refer to Electrical Plans for Fixture Types

2. All exposed metal ductwork, grilles, fire-lines, water lines, pipes, and conduits shall be primed and painted. The Architect shall select the color prior to painting.

3. At exposed ceilings, all visible mechanical, electrical, and plumbing components shall be run in a neat and orderly manner. All runs shall be perpendicular or parallel to the framing.

Prior to installation review and coordinate routing with the Architect.

4. All fixture/device locations shall be verified and coordinated. Notify the Architect of any discrepancies / conflicts.

5. All Mechanical grilles shall be painted to match the adjacent ceiling color; See Mechanical Plans for grilles and fans.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Hilti KB-TZ2 with 2" minimum
effective embed per ICC ESR-4266
at 32" O.C.

Continuous sealant. At rated
conditions use approved fire rated
sealant.
5/8" Type 'X' gypsum board each
side, unless noted otherwise -
fasten to studs with 1 1/4" type W
bugle head screws at 24" O.C.
maximum vertical
2x4 metal studs full height at 16"
O.C. unless noted otherwise, install
with minimum 3 1/2" insulation for
acoustic dampening.

Ceiling per plans and assembly
schedule
As Required
Existing - Patch and Repair
Base reglet at gypsum board,
install wood base over to match
existing, paint
Existing truss chord
GalleryIT Closet
Existing roof deck
(2) #10 (Min.) TEKS-type screws
or Hilti X-U shot pins at 48" O.C.
max.

Slotted deflection slip track
(MaxTrak or approved equal), typ.

Existing wall
New wall, metal stud at 16" O.C.
with acoustic insulation
New backer stud installed to existing
framed wall, see Structural 2/S0.1
Patch existing gypsum board as
required for installation of new nailer
New gypsum board finish, typ.

Paint existing, typ.

New door
New threshold set in continuous
bed of mastic, 1/2" high
maximum
Existing floor
1/4 1/4
1/21
2 Beveled Change in Level
New glazing
New sill mullion
Existing interior floor finish over
structural slab
Existing exterior paver
New continuous sealant, both sides,
typ. color to be selected by Architect
prior to installation
Anchorage per storefront
manufacturer
New interior door
Existing floor
No threshold, protect transition
finish from existing to new
enclosed space
New door
New door jamb
New wall
Double stud at jamb/wall opening
Head Sim.

At head condition provide vertical
stud box frame header in lieu of
double stud
Existing wall
New mullion - reinstall at location
of removed storefront system to
minimize finish rework, repair
damaged plaster and/or drywall
finishes as required
New glazing
New attachment per storefront
manufacturer
New continuous sealant, both
sides, typ. color to be selected by
Architect prior to installation
New shim as required
Existing wall
New shim as required
New attachment per storefront
manufacturer
New glazed storefront door
New storefront door mullion,
reinstall at location of removed
storefront system to minimize finish
rework
Existing beams as occur, typ. new
paint
Existing roof deck, typ.

New sheet metal screw direct
attachment per acoustic panel
manufacturer, screws installed to
lower rib only
New acoustic treatment tectum
panel or approved equal, painted
typ.
48" Above Finish Floor
Existing wall
Semi-Recessed prefabricated fire
extinguisher cabinet per specs.
- Verify extinguisher size before
ordering and installation
Gypsum wall board cut and patched
as required for installation of semi-
recessed cabinet
4" Maximum
Continuous sealant, all around
1/8" thick backplate, acrylic
1/8" thick acrylic panel to adhere to
backplate using VHB (very high
bond) membrane tape from 3M and
silicone adhesive (RTV108 or
approved equal)
Adhere to storefront glass with VHB
membrane tape from 3M
Storefront glass
Side
Align sign panels and blanks at
opposite face of glass with exterior
sign
Type A
TEXT
Type B
5 1/2"
5 1/2"

BUILDING ENTRANCE

ACCESSIBILITY

TACTILE
5 1/2"
5 1/2"
General Notes:

1. Substrate: 1/4" Black matt acrylic

2. Face: Laminate per Specifications

3. Pictoral / Lettering (graphic art):
minimum 1/32" raised applique with
color to contrast background. See
Specifications.

4. Lettering Height (5/8" minimum - 2"
maximum, sized per reading distance):
5/8" tall typ., unless noted otherwise.

5. Lettering Font: Sans Serif

6. Braille: Grade 2. Dots shall be 1/10" on
center in each cell with 2/10" space
between cells. Dots shall be raised a
minimum of 1.40" above the
background.

7. Attach door signs with 3M VBH heavy
duty double-sided mounting tape. At
storefront and glass, provide matching
blank on opposite of glass to hide tape
marks.

8. Sign mounting heights per

9. Edges of signs shall be eased and
corners rounded with 1/8" radius.
15 A501
Door sign where occurs
(Existing - for reference only)
Wall sign where occurs per plans.

Mount on latch side of door. Where
there is no wall space on the latch
side, signs shall be placed on the
nearest adjacent wall (preferably on
the right).

MEN
MEN
Sign
Centerline
5/8" - 2"
60" max. A.F.F.
60" A.F.F.

Door
Centerline
to baseline of highest line
of raised character
to baseline of lowest braille
cell
48 " A.F.F.
9" min.
14" typ.
3/8"-1/2"3/8" min.

Pipe
Stainless steel hose clamp
8" Minimum
Sealant all around
Metal flange, prime, set in mastic,
and fasten
Lap repair roofing over new metal
flange
Continuous sealant, all around
Pack void with fire insulation
Existing roof assembly, core new
hole as required for penetration
New blocking for nailing as required
Backing per Structural, see S0.1
for additional information
Header and door frame
2 ton wall mounted heat pump
ductless system with condensate
pump accessory - heating mode to
be locked out for cooling only; see
Electrical for additional information
(or as required by Manufacturer)
6' Min. A.F.F.
(or as required by Manufacturer)
6" Min. Clear to Ceiling
+/- 8"
Side wall beyond - provide 8" clear
both sides (minimum 5") for
required maintenance clearance
(or as otherwise required by
Manufacturer)
Wall per plan
Note:

For fan coil condensate
requirements, see 13
A501
Note:

Core through existing walls for
new piping and conduit; locate and
avoid existing reinforcing bar
where required at existing CMU
walls
Length
Live
Length
Live
Existing wall at seismic
separation - pack with fire rated
insulation and provide continuous
fire sealant all around both sides
Pipe hanger, typ.

Flexible metal hose assembly
Elbow
Pipe
Piping anchored on each side of
building separation for movement
transmission to flexible assembly
Piping anchored on each side of
building separation for movement
transmission to flexible assembly
Hose Size
(ID)
Live Length
Schedule
3/4"
19"
1"
20"
1-1/4"
21-3/4"
1-1/2"
23"
2"
25-1/2"
2-1/2"
27-1/2"
3"
29-1/2"
4"
33"
5"
48-1/2"
6"
52"
4" MIN
Rooftop mechanical unit
Wood framed mechanical pad per
Structural with additional framing as
required for minimum height
Grommetted fastener at 12" O.C.

Galvanized Sheet metal platform
cap, extend over edges
Continuous sealant
Roofing system wrap and patch to
existing
Existing roofing over existing roof
assembly
Neoprene pad at each
attachment, attachment per
mechanical unit manufacturer
Lap roofing at interior of framed
pad prior to installation of sheet
metal cap
Existing sink/lavatory
3/4" condensate line from
mechanical unit, see plan for
location of unit
Existing casework as occurs
Patch and repair drywall to extents
necessary for installation of
new/replacement plumbing
connections
1-1/2" washing machine tee
Protective and insulation cover
Slip ring, typ.

Escutcheon, typ.

Existing waste line
Existing wall - open, patch and
repair to extents required for
installation of new
90° elbow
(36" min. if
alcove depth
is > 24")
Existing alcove walls
Plan
Section
9"
B
A
8" min. knee clearance 6" max. toe celarance
Notes:

1. Flow of water shall be activated
by a manually operated system
that is front or side mounted and
located within 6" of the front edge
of the fountain or an automatic
electronically controlled device.

Controls and operating
mechanisms shall be operable
with one hand and shall not
require tight grasping, pinching or
twisting of the wrist. the force
required to activate controls shall
be no greater than 5 pounds of
force.
(CBC 11B-309.4)

2. Spout shall provide a flow of
water 4" min. high. Where spouts
are located <3" from the front of
the unit, the angle of the water
steam shall be 30 degrees max.;
spouts located 3"-5" shall be 15
degrees max.
5" max.
15" min.

CBC 11B-211 & 11B-602or 3 1/2" max.
when spout is 30" max.

A.F.F. (children's use)
Mounting Heights
Dimension
Spout Height
Knee Clearance
Required
Accessible
36" max.
27" min.

A
B
Standing drinking
fountain
18"-19"
Accessible drinking
fountain with 30"x48"
front approach
(18" min.)
as deep as fountain
Required
Standing
N/A
38"-43"
32" min.
32" min.

Provide dual height drinking fountain at
location of existing; provide Elkay Model
LZSTL8WSLK or approved equal, with
required plumbing connection extensions,
any additional required backing, electrical
changeover, and drywall patch and repair
as required for a completed installation.

Install per code minimum dimensions as
identified in this detail.
12" Max.

Flex hose adapter connector
3/4" condensate
3/4" air vent riser
minimum 8" tall
2" Min.
3/4" air vent tee
Typical
6' Maximum
Hanger, see Structural for
additional information
Fan coil with condensate
pump accessory
Fan coil with condensate pump
accessory: All condensate piping
shall be copper with minimum 3/4"
insulation. Condensate piping to
have minimum 1/4" per foot slope.

Note:

Manufacturer's requirements
supersede
Condensate to
terminate at existing
sink, for continuation
see 14
A501
CRADES
No. C12113
YA
S
E
AT
T
L W
NECI
A
OR

CFO FILA
IN
NA

IHHEN TLO
TCET
REN 9.30.23
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture.© COPYRIGHT Construction
Documents
25 July 2023
Drawing Set Issue Schedule
Description Issue Date
Q:\7.0 Project Files\2219 Carlsbad Schulman Auditorium & Gallery\7.06 Drawings\2219 Carlsbad Dove Schulman - Arch(2022).rvt7/25/2023 2:11:03 PMProject No.:

Project Number
Schulman Auditorium and Cannon Art Gallery - AudioVisual Update 1775 Dove Ln,
Carlsbad CA 92011
Details
A501
1 1/2" = 1'-0"1 Interior Partition
1 1/2" = 1'-0"2 New Partition Wall to Existing Wall
1 1/2" = 1'-0"8 Storefront Door Sill Detail
1 1/2" = 1'-0"6 Storefront Sill Detail
1 1/2" = 1'-0"4 Interior Door Sill
1 1/2" = 1'-0"3 Interior Door Jamb
1 1/2" = 1'-0"5 Storefront Jamb Detail
1 1/2" = 1'-0"7 Storefront Head Detail
1 1/2" = 1'-0"9 Acoustic Treatment at Deck
1 1/2" = 1'-0"12 Fire Extinguisher Cabinet Detail
6" = 1'-0"10 Sign Installation
1" = 1'-0"11 Accessible Signage
1/2" = 1'-0"15 Accessible Signage Mounting Location
3" = 1'-0"19 Pipe Penetration through Roof
1 1/2" = 1'-0"17 Wall Mounted Mechanical Unit
1/2" = 1'-0"18 Pipe Penetration at Seismic Gap
3" = 1'-0"20 Mechanical Pad for Rooftop Unit
1 1/2" = 1'-0"14 Condensate Connection to Existing Sink Trap 1/4" = 1'-0"16 Drinking Fountain
1" = 1'-0"13 Condensate Piping Requirements
Revision Schedule
No. Revision Issue Date
28 Nov 2023
AA
12" MAX
1/4"x2" EMBED HILTI KB-3
(ESR-1385), MIN (1) PER CORNER

IN MANUFACTURER'S MOUNTING

HOLES, USE LARGER BOLT IF

MOUNTING HOLES ARE LARGER

EQUIPMENT
(WEIGHT =
100lbs MAX)

CMU WALL

EQUIPMENT
(WEIGHT = 50lbs MAX)
12" MAX
#10 SMS, (1) MIN

PER CORNER

STUD WALL

BACKING TYP
PER 2
S0.1

WALL STUD WHERE
OCCURS
CONTINUOUS 600T150-54 WITH
(3) #10 SMS TO EACH STUD,

CLIP FLANGES AT STUD
NOTE:

AT ISOLATED BACKING, SPAN BACKING TRACK OVER (3) STUDS MINIMUM.

WALL STUD

BACKING

GAP TYP
1/4" MAX
A-A
(2) #8 SELF-TAPPING
SCREWS
3" WIDE x 4" LONG x
12ga STEEL STRAP

BRACING WIRE
(9GA MIN, TYP)
P = 140 LBS MAX
PROVIDE (4) TIGHT
TURNS IN 1 1/2", TYP

AT STEEL ROOF DECK

SHEET METAL
SCREW
16ga x 1"

PREPUNCHED

CLIP HANGER
P = 100 LBS MAX

AT STEEL BEAMS

STRUCTURAL

SHAPES ONLY

HILTI CLIP OR EQUAL
PER ICC ESR-2184

HANGER WIRE
1" WIDE x 2" LONG x
12ga STEEL STRAP

BRACING WIRE
NOTE:

REMOVE AND RE-APPLY FIREPROOFING WHERE REQUIRED TO INSTALL HANGERS. (E) ROOFING
(2) 3x6 P.T. DFL #1 (LAID FLAT) WITH
(4) 1/4"dia. SELF-TAPPING SCREWS
EACH (4-THREADS MINIMUM
THROUGH METAL DECK, 1-SCREW

PER FLUTE), FLAT HEAD OR
COUNTER-SUNK 1/2" MAX. MAY BE
INSTALLED OVER ROOFING. WATER-
PROOFING IS PER ARCHITECTURAL.

VERIFY ANY WARRANTY CONCERNS.
(E) 1 1/2" x 18-GAGE

METAL ROOF DECK

ANCHORAGE OF UNIT

TO SLEEPERS PER

MANUFACTURER

HEAT PUMP PER ARCH
(W = 200 LBS MAX)

RTS R U A
S
No. S 4226
ER
FO E
DPR
ET
E
IS
GR
K.
va
e
D
S
E
AL
SION
I
EER
Nms
NGAda
L
T
F C
A
ET
O
T UC
ORNIA
FALI
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\gvallejo\Documents\2219 Carlsbad Dove Schulman - Struct(2022)_gvallejoTQQ2J.rvt 7/10/2023 1:50:06 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

STRUCTURAL NOTES AND TYPICAL DETAILS
S0.1
JULY 10, 2023

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEV ATIONS, AND EXISTING CONDITIONS

BEFORE STARTING WORK AND NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES THAT ARE FOUND.

2. DO NOT SCALE DETAILS OR DRAWINGS. SEE ARCHITECTU RAL DRAWINGS FOR ADDITIONAL DIMENSIONS WHERE REQUIRED.

3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.

4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF THE WORK, THE DETAILS USED SHALL BE THE SAME AS FOR OTHER SIMILAR WORK.

5. WHEN A DETAIL IS IDENTIFIED AS TYPICAL, THE CONT RACTOR IS TO APPLY THIS DETAIL IN

ESTIMATION AND CONSTRUCTION TO EVERY LIKE CONDITION WHETHER OR NOT THE REFERENCE IS REPEATED IN EVERY INSTANCE.

6. ALL WORK SHALL CONFORM TO THE 2022 EDITION OF TH E CALIFORNIA BUILDING CODE (CBC) AND OTHER REGULATORY AGENCIES WHO MAY HAVE AUTHORITY OVER THE WORK.

7. THESE DRAWINGS REPRESENT THE STRUCTURE IN ITS FI NAL CONFIGURATION. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR FOR ALL MEANS AND METHODS ASSOCIATED WITH

ACHIEVING THIS FINAL CONFIGURATION, INCLUDING BUT NOT LIMITED TO SHORING, BRACING OR SOILS EXCAVATIONS.

8. THE CONTRACTOR SHALL COORDINATE WITH ALL TRADES ANY ITEMS THAT ARE TO BE

INTEGRATED INTO THE STRUCTURAL SYSTEM SUCH AS OPENINGS, PENETRATIONS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. SIZES AND LOCATIONS OF MECHANICAL AND

OTHER EQUIPMENT THAT DIFFERS FROM THOSE SHOWN ON THE CONTRACT DRAWINGS SHALL BE REPORTED TO THE ARCHITECT/ENGINEER. CONTRACTOR SHALL TAKE MEASURES

AS REQUIRED TO ENSURE THAT CONSTRUCTION LOADS SHALL NOT EXCEED DESIGN LOADS FOR THE STRUCTURE.

9. ALL REFERENCED CODES AND STANDARDS SHALL BE THE LATEST APPROVED EDITION, U.O.N.

10. IN THE CASE OF DISCREPANCIES BETWEEN THE STRUCTURAL DRAWINGS AND

SPECIFICATIONS, THE INFORMATION SHOWN ON THE STRUCTURAL DRAWINGS SHALL GOVERN.

1. APPLICABLE CODES:

CALIFORNIA BUILDING CODE, 2022 EDITION

2. LIVE LOADS, UNIFORM AS FOLLOWS (REDUCIBLE U.O.N.):
a. ROOF ........................................... ................... 20psf

3. SEISMIC DESIGN CRITERIA:

SITE CLASS D

SEISMIC DESIGN CATEGORY D

RISK CATEGORY II
SS = 0.995 I = 1.00
S1 = 0.362 S DS = 0.796
SD1 = 0.471
(EQUIVALENT LATERAL FORCE PROCEDURE)

4. WIND DESIGN CRITERIA:

WIND EXPOSURE C V = 96mph
RISK CATEGORY II K d = 0.85
GC pi = ± 0.18 K zt = 1.0
P = q h (GC p - GC pi ) K e = 1.0

GENERAL

DESIGN CRITERIA
COPYRIGHT © BWE

BY USING THIS PERMITTED SET OF CONSTRUCTION DRAWINGS FOR CONSTRUCTION AND/OR

INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU AGREE TO COMPLY WITH THE

REQUIREMENTS OF THE CITY OR JURISDICTION HAVING AUTHORITY OVER THE WORK FOR

SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIALS TESTING

AND OFF-SITE FABRICATION OF BUILDING COMPONENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES.

BY USING THIS PERMITTED SET OF CONSTRUCTION DRAWINGS FOR CONSTRUCTION AND/OR

INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU ACKNOWLEDGE AND ARE AWARE OF THE REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO

COMPLY WITH THE REQUIREMENTS OF THE CITY OR JURISDICTION HAVING AUTHORITY OVER

THE WORK FOR SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION

MATERIALS TESTING AND OFF-SITE FABRICATION OF BUILDING COMPONENTS CONTAINED IN THE

STATEMENT OF SPECIAL INSPECTIONS AND AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES.

NOTICE TO CONTRACTOR

NOTICE TO OWNER / OWNER'S AGENT

EQUIPMENT AND COMPONENT NOTES

1. THE STRUCTURAL PLANS INDICATE THE APPROXIMATE LO CATION OF EQUIPMENT, AS WELL AS RATED FRAMING NECESSARY TO SUPPORT SUCH EQUIPMENT. THE FINAL POSITION OF THESE ITEMS IS DEPENDENT ON THE SPECIFIC EQUIPMENT PROVIDED. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR COORDINATING WORK BETWEEN SUBCONTRACTORS AND MANUFACTURERS.

2. ALL MECHANICAL, PLUMBING, AND ELECTRICAL COMPONE NTS SHALL BE ANCHORED AND INSTALLED PER THE DETAILS ON THE APPROVED CONSTRUCTION DOCUMENTS. WHERE NO

DETAIL IS INDICATED, THE FOLLOWING COMPONENTS SHALL BE ANCHORED OR BRACED TO MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE [IBC/CBC] CHAPTER 16 AND ASCE [7-16] CHAPTER 13, 15, 26, AND 30.

A. ALL PERMANENT EQUIPMENT AND COMPONENTS.

B. TEMPORARY OR MOVABLE EQUIPMENT THAT IS PERMANENT LY ATTACHED (E.G. HARD WIRED) TO THE BUILDING UTILITY SERVICES SUCH AS ELECTRICITY, GAS OR WATER.

C. MOVABLE EQUIPMENT WHICH IS STATIONED IN ONE PLAC E FOR MORE THAN 8 HOURS AND HEAVIER THAN 400 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY ATTACHMENTS.

3. THE FOLLOWING MECHANICAL AND ELECTRICAL COMPONEN TS SHALL BE POSITIVELY

ATTACHED TO THE STRUCTURE, BUT THE ATTACHMENT NEED NOT BE DETAILED ON THE PLANS. THESE COMPONENTS SHALL HAVE FLEXIBLE CONNECTIONS PROVIDED BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT.

A. COMPONENTS WEIGHING LESS THAN 40O POUNDS AND HAV E A CENTER OF MASS LOCATED 4 FEET OR LESS ABOVE THE ADJACENT FLOOR OR ROOF LEVEL THAT DIRECTLY SUPPORT THE COMPONENT.

B. COMPONENTS WEIGHING LESS THAN 20 POUNDS, OR IN T HE CASE OF DISTRIBUTED SYSTEMS, LESS THAN 5 POUNDS PER FOOT, WHICH ARE SUSPENDED FROM A ROOF OR FLOOR OR HUNG FROM A WALL.

4. FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS O N THE APPROVED DRAWINGS, THE

INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE OR STRUCTURAL ENGINEER DELEGATED RESPONSIBILITY.

5. THE PROJECT INSPECTOR WILL VERIFY THAT ALL COMPO NENTS AND EQUIPMENT HAVE BEEN ANCHORED IN ACCORDANCE WITH ABOVE REQUIREMENTS.

S0.1
1EQUIPMENT ANCHORAGE - WALL MOUNTED
S0.1
2STEEL STUD BACKING DETAIL
S0.1
3HANGER WIRE DETAIL
S0.1
4ROOFTOP HEAT PUMP ANCHORAGE
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Box Function (YY):

An Antenna
Av Av Connectivity
Bt Bluetooth Input
Cm Camera
C Ceiling Speaker
Fb Floorbox
Hi HDMI Input
Ht HDMI Transmitter
iC Intercom
iO Input/Output
P Pendent Speaker
Pb Push Button Ctr
Pj Projector
Pt Poke Thru
Sb Subwoofer
Sp Loudspeaker
Sn Projection Screen
Ts Touch Screen
Tv Television/Display
Ui User Interface
Vc Volume Control
F
+48"
2G
YY.X
Mounting Height:

Height shown is from finish
floor (AFF) to center of
installed box UON.

Box Size:

A standard trade size, size is
given in number of gangs or
inches. If custom size "C" is
shown. Ref schedule(s).

Cable Tray ID:

TCT.Level+Area
TCT = Technical Cable Tray
Example: TCT.101
Conduit Destination:

AC = Accessible Ceiling
CT = Cable Tray
Cable Destination:

Cable Destination = Conduit
Destination U.O.N.

Existing Wall -Mounted
Junction Box
Mounting Type
Mounting Height
Box Size
YY L1.AWB.01
1A | EXISTING | TCT.101
Existing Floor -Mounted
Junction Box
YY
Ceiling Speaker
AV Symbols Examples and Nomenclature
Box Size
Mounting Height
Mounting Type
Box Function
Box Type
Box Info Tag
Box ID
Conduit Destination
Conduit Size (Field Verify "Existing")
Conduit Fill (See Cable Schedule)
Box ID Nomenclature:

Group.(Discipline+BoxStyle).Box#
ex: L1.AWB.01 = Level 1.Audio+
Wall Box.Box # 01
System Prefixes:

A = Audio or AV
V = Video
Box Style:

CB = Ceiling -Mount Box
FB = Floor -Mount Box
JB = Junction Box
PB = Pipe -Mount Box
WB = Wall -Mount Box
Box w/ Info Tag
Existing Ceiling -
Mounted Junction Box
YY Mounting Type
Box Size
Mounting Type:

F = Flush Mount
S = Surface Mount
SR = Semi -Recessed Mount
PM = Pedestal Mount
New
Wall -Mounted
Junction Box
Mounting Type
Mounting Height
Box Size
YY.X
New
Floor/Ceiling -Mounted
Junction Box
Mounting Type
Mounting Height
Box Size
YY.X
Box Size
C.#
TV Location TV.Size.Height.Mount
TV Tag Nomenclature:

Size = Diagonal Size in Inches
Height = Mounting Height to Center of TV
Mount = TV Mount Type
W = Tilting Wall Mount
C = Ceiling Mount
S = Swing Arm Mount
P = Portrait Wall Mount
N = Ultra Narrow Bezel Pull -Out Mount
Each TV Location Receives a Duplex Power
Outlet by Div 26. Outlet installed in TV Backbox.

Mounting Type
Remove all existing cable to box and provide new cabling, connectors, and panels.

Provide new box, pathways, cabling, connectors, and panels.

Group A - Microphone and other sensitive wiring (0 - 100mV) Group B - Line Level wiring (100mV - 10V)
Group C - Loudspeaker and Control wiring (10V - 70V)
Refer to the Junction Box Schedule for Special Conditions.

1. Field conditions may require audio/video device locations to deviate from the locations illustrated on the drawings. The spe cific, installed, location of all audio/video devices shall be coordinated with the owner and the audio/visual system designer prior to installation.

2. A minimum of 36" clearance is required at both the front and rear of audio/video equipment racks. Access must be provided to the rear of the equipment racks.

3. All mounting height dimensions are to center of box unless otherwise noted.

ALT-N4 Belden 5543FE 6543FE Intercom 4 Pair #22 Stranded Shielded 0.246 6.25 B ALT-P Belden 5504UE 6504UE Control 6 Conductor, #22 AWG, Stranded, Jacket ed 0.168 4.27 B ALT-Q Belden 5301UE 6301UE Control 3 Conductor, #18 AWG, Stranded, Jacket ed 0.167 4.24 B ALT-Z Belden HD200x Series HDMI HDMI Compsite Cable 0.548 13.92 B D12 Gepco GA618012GFC GA618012PEF 6612HS Line Level Audio 12 Shielded PR #22 AWG Stranded Twisted individually Jacketed Polyethylene Jacket CMR 0.635 16.13 B D16 Gepco GA618016GFC Line Level Audio 16 Shielded PR #22 AWG Stranded Twi sted individually Jacketed Polyethylene Jacket CMR 0 .71 18.03 B E Belden 9451 West Penn AQC291 9451P Mic Level Audio 1 Sh ielded PR #22 AWG Stranded Twisted Orange PVC Jacke t 0.135 3.43 A E4 Gepco GA61804GFC Mic Level Audio 4 Shielded PR #22 AWG Stranded Twist ed individually Jacketed Polyethylene Jacket CMR 0.4 10.16 A E6 Gepco GA61806GFC GA618006PEF Mic Level Audio 6 Shielded PR #22 AWG Str anded Twisted individually Jacketed Polyethylene Ja cket CMR 0.475 12.07 A E8 Gepco GA61808GFC Mic Level Audio 8 Shielded PR #22 AWG Stranded Twist ed individually Jacketed Polyethylene Jacket CMR 0.5 7 14.48 A E12 Gepco GA618012GFC GA618012PEF 6612HS Mic Level Audio 12 Shielded PR #22 AWG Stranded Twisted individuall y Jacketed Polyethylene Jacket CMR 0.635 16.13 A E16 Gepco GA618016GFC Mic Level Audio 16 Shielded PR #22 AWG Stranded Twis ted individually Jacketed Polyethylene Jacket CMR 0. 71 18.03 A F Belden 7810A Antenna 50 Ohm Coax #10 AWG RG-8 0.403 10.24 B G Belden 9311 Antenna 50 Ohm Coax #20 AWG RG-58 0.193 4.9 B H Belden 1694A 1829BC 1695A Digital Video 75 Ohm Precisio n Video Cable #18 AWG 0.274 6.96 B HH Belden 7731A 7731WB 7732A Digital Video 75 Ohm, Precis ion Video Cable, #14 AWG 0.4 10.16 B J Belden 1855A 1855P Digital Video 75 Ohm Precision Video Cable #23 AWG 0.159 4.038 B K Belden 9116 9116P MATV Series 6 #18 AWG MATV CABLE 0.27 6.86 B L Belden 9011 MATV Series 11 #14 AWG MATV CABLE 0.4 10.16 B M Gepco HDP221 HDP221P Camera Power (2) 16 AWG Stranded, (2) 22AWG S tranded 0.135 3.423 B N Belden 9207 9815 89207 Intercom 1 Pair #20 Stranded Shi elded 0.33 8.382 B P West Penn 270 25270B Control 6 Conductor #22 AWG Stranded Jacketed 0.163 4.14 B AV Cable Schedule
Name Manufacturer
Standard Part
Number
Under Ground Wet
Part Number Plenum Part Number Application Description Nominal OD (in) Nominal OD (mm) Signal Group A10 West Penn HA210 C210 25210 Speaker 1 PR #10 AWG Stran ded Twisted Jacketed 0.28 7.11 C A12 West Penn 227 AQ227 25227B Speaker 1 PR #12 AWG Strand ed Twisted PVC Jacket 0.26 6.6 C A14 West Penn 226 AQ226 25226B Speaker 1 PR #14 AWG Strand ed Twisted PVC Jacket 0.23 5.84 C D Belden 9451 West Penn AQC291 9451P Line Level Audio 1 Sh ielded PR #22 AWG Stranded Twisted Green PVC Jacket 0.135 3.43 B D4 Gepco GA61804GFC 6604HS Line Level Audio 4 Shielded P R #22 AWG Stranded Twisted individually Jacketed Po lyethylene Jacket CMR 0.4 10.16 B D6 Gepco GA61806GFC GA618006PEF Line Level Audio 6 Shiel ded PR #22 AWG Stranded Twisted individually Jacket ed Polyethylene Jacket CMR 0.475 12.07 B D8 Gepco GA61808GFC 6608HS Line Level Audio 8 Shielded P R #22 AWG Stranded Twisted individually Jacketed Po lyethylene Jacket CMR 0.57 14.48 B Q West Penn 234 Belden 5302U1 25234B Control 3 Conductor #18 AWG Stranded Jacketed 0.168 4.27 B R Belden 1419A 88102 Control-RS422 2 Pair #24 AWG Stranded Overall S hield 0.248 6.3 B S Belden 7804R 7804P SMPTE 311M 2 Fiber, 2 Conductor 24 AWG, 4 Condu ctor 20 AWG,Belflex Jacket, CMR 0.357 9.06 B S3 Belden 7824R 7824P Triple SMPTE 311M 3 Channel Stadium Cable, 6 Fi ber, 6 Conductor 18AWG, 6 Conductor 24 AWG 0.525 13.3 35 B T Belden 1857A Gepco VT61811PEF Camera 75 ohm Superflex Triax Video Cable #22 AWG stranded 0.36 9.14 B U5 Belden 1700A 1701A CAT5e Data 4 PR #24 AWG BONDED PAIR UTP CAT5e RJ 45 Compatible 0.195 4.95 B U6 Belden 2412 7997A 2413 CAT6 Data 4 PR #23 AWG UTP CAT6 RJ45 Comp. 0.23 5.84 B U6A Belden 10GX62F 10GX63F Cat6A 4 Bonded PR #23 AWG Shielded F/UTP CAT6 A 0.295 7.49 B U6S Belden 2412F OSP6U 2413F CAT6 Data 4 PR #23 AWG Shield ed UTP CAT6 RJ45 Comp. 0.29 7.37 B UH Crestron DM-CBL-ULTRA-P DM-CBL-ULTRA-P DigitalMedia Cable 4 PR #22 AWG Shielded S/FTP CAT7a 0.304 7.7 B W Belden B9W039T B9W202 B9W202 Single Mode Fiber OS2 Six S trand Singlemode Fiber 0.22 5.59 B W12 Belden B9W231 B9W241 Single Mode Fiber OS2 Twelve Strand Singlemode Fiber Armored Jacket 0.62 15.75 B W24 Belden B9W233 B9W242 Single Mode Fiber OS2 Twenty-Four Strand Single mode Fiber Armored Jacket 0.57 14.48 B WA Belden B9W240 B9W240 Single Mode Fiber OS2 Six Strand Singlemode Fib er Armored Jacket 0.506 12.85 B X Belden 1696A Custom TBD Digital Audio 1 PR #22 AWG Str anded Twisted PVC Jacket 0.235 5.97 B Y Belden B9C039T B9C202 B9C202 Multi-Mode Fiber OM3 50/125 Six Strand Multimode Fiber 0.22 5.59 B YA Belden B9C240 B9C240 Multi-Mode Fiber OM3 50/125 Six Strand Multimod e Fiber Armored Jacket 0.506 12.85 B Z West Penn CN-SHRHDMI-xxm HDMI 0.548 13.92 B
ALT-D16 Belden 1819R 6549PA Line Level Audio 16 Shielded PR #22 AWG, Stranded, T wisted, individually Jacketed, Polyethylene Jacket, CMR 0.776 19.71 A ALT-E West Penn (X)454 AQC291 D25454 Mic Level Audio 1 Sh ielded PR #22 AWG, Stranded, Twisted, Orange PVC Jacket 0.135 3.43 A ALT-E Gepco 61801EZ 61801HS Mic Level Audio 1 Shielded PR #22 AWG, Strand ed, Twisted, Orange PVC Jacket 0.138 3.51 A ALT-E4 Belden 1815R 1815WB 1815P Mic Level Audio 4 Shield ed PR #22 AWG, Stranded, Twisted, individually Jack eted, Polyethylene Jacket, CMR 0.384 9.75 A ALT-E6 Belden 1816R 1816WB 1816P Mic Level Audio 6 Shield ed PR #22 AWG, Stranded, Twisted, individually Jack eted, Polyethylene Jacket, CMR 0.462 11.73 A ALT-E8 Belden 1817R 1817WB 1817P Mic Level Audio 8 Shield ed PR #22 AWG, Stranded, Twisted, individually Jack eted, Polyethylene Jacket, CMR 0.503 12.78 A ALT-E12 Belden 1818R 1818WB 1818P Mic Level Audio 12 Shie lded PR #22 AWG, Stranded, Twisted, individually Ja cketed, Polyethylene Jacket, CMR 0.638 16.21 A ALT-E16 Belden 1819R 1819WB Mic Level Audio 16 Shielded PR #22 AWG, Stranded, Tw isted, individually Jacketed, Polyethylene Jacket, CMR 0.776 19.71 A ALT-M Belden 7825R 7825P Camera Control (2) 16 AWG Stranded, (2) 22AWG S tranded 0.25 6.35 B ALT-A10 Belden 5T00UP 8810WB 6T00UP Speaker 1 PR #10 AWG, Stranded, Twisted, Jacketed 0.356 9.04 C ALT-A12 Belden 5000UE 5000U1 6000UE Speaker 1 PR #12 AWG, Stranded, Twisted, PVC Jacket 0.26 6.66 C ALT-A14 Belden 5100UE 5100U1 6100UE Speaker 1 PR #14 AWG, Stranded, Twisted, PVC Jacket 0.218 5.54 C ALT-D West Penn (X)454 AQC291 D25454 Line Level Audio 1 S hielded PR #22 AWG, Stranded, Twisted, Green PVC Ja cket 0.135 3.43 B ALT-D Gepco 61801EZ 61801HS Line Level Audio 1 Shielded PR #22 AWG, Stran ded, Twisted, Green PVC Jacket 0.138 3.51 B ALT-D4 Belden 1815R 1815WB 1815P Line Level Audio 4 Shiel ded PR #22 AWG, Stranded, Twisted, individually Jac keted, Polyethylene Jacket, CMR 0.384 9.75 B ALT-D6 Belden 1816R 1816WB 1816P Line Level Audio 6 Shiel ded PR #22 AWG, Stranded, Twisted, individually Jac keted, Polyethylene Jacket, CMR 0.462 11.73 B ALT-D8 Belden 1817R 1817WB 1817P Line Level Audio 8 Shiel ded PR #22 AWG, Stranded, Twisted, individually Jac keted, Polyethylene Jacket, CMR 0.503 12.78 B ALT-D12 Belden 1818R 1818WB 1818P Line Level Audio 12 Shi elded PR #22 AWG, Stranded, Twisted, individually J acketed, Polyethylene Jacket, CMR 0.638 16.21 B All cabling originating from a box with an "A" prefix (AWB, AFB, etc.) to be provided and installed by the 27 41 36 contracto r.

All cabling originating from a box with a "V" prefix (VWP, VFB, etc.) to be provided and installed by the 27 41 39 contractor .

Terms and Definitions:

Provide = Supply and install equipment High Voltage = >100V Furnish = Supply to another contractor for installation Install = Install equipment provided by another contractor AV Specific Abbreviations
CB Ceiling Box
AR Audio Equipment Rack
AVR Audio -Video Equipment Rack
FB Floor Box
H Horizontal
HDSDI High Definition Serial Digital Interface
i/O Input/Output
PRJ Projector
SDI Serial Digital Interface
SP Speaker
STC Sound Transmission Coefficient
TCT Technical Cable Tray
TV Display/Television
Ui User Interface
V Vertical
VR Video Equipment Rack
WB Wall Box

1. All systems wiring will be in conduit unless app roved by the Consultant or otherwise noted on drawings.

2. There are minimum conduit separations that must be maintained between conduits carrying wire of different signal groups. It is important to note that while different signals may exist in a single box, it is not appropriate to run more than one signal group in a single conduit. Refer to tables below for conduit separation distances.

3. It will be necessary at times for conduits of di fferent signal groups to cross in close proximity. The conduit paths must be designed to cross at 90 degrees to each other.

4. The minimum conduit size shall be 3/4" and the c onduit should be sized for max. 40% fill, or less if required by prevailing code.

5. Per TIA 569-E, indoor conduit runs shall have ac cess to a pull box every 100' if there are more than (2) 90-degree bends. Pull boxes shall be placed in a straight section of the conduit.

6. Conduit for Outside Plant (OSP) optical fiber sh ould have pull boxes placed at intervals no greater than 300'.

7. Conduit bend radius will be no less than 6 times the diameter for conduits less than 2" ⌀, and no less than 10 times the diameter for conduits greater than 2" ⌀.

8. The design will require pull lines to be left in all conduit by the Contractor installing the conduit.

9. The conduit system shall incorporate additional pull boxes as required to match the pull tensions of the wiring to be installed.

10. The installing contractor shall determine from the cable specifications the appropriate pull tensions, and lubricate to ensure that the cable insulation will not be abraded or cut during installation.

11. Signal conduits should be mechanically and elec trically connected to the receptacle boxes. These conduits and boxes should connect to the building safety grounding system.

12. PVC conduit may only be used in underground app lications. All above slab conduit shall be EMT.

13. The tables below define minimum spacing require ments for conduits containing different types and levels of audio, video and communication signals that will be part of the complete systems. It is important that each group be installed in raceways discreet from other group levels.

14. In a situation where there will exist a heavy c urrent demand in adjacent conduits, or where there will be parallel runs >100', there will need to be additional separation between those conduits and the Signal Group A/B/C conduits.

15. Any wiring that is classified within a group ca n be combined in a raceway carrying other wiring that is in the same group. Common junction boxes/wire raceways that combine different signal groups shall not be used.

16. The different levels of signal grouping are def ined as follows:

Common Architectural Abbreviations
AFF Above Finished Floor
Bot Bottom
Clg Ceiling
Col Column
Cont Continuous
Dia Diameter
Dim(s) Dimension(s)
Dn Down
Dwg Drawing
Ea Each
El Elevation
Elec Electrical
Eq Equal
Exist Existing
Ext Exterior
Flr Floor
Ga Gauge
GWB Gypsum Wall Board
HVAC Heating, Ventilating, and Air Conditioning
Int Interior
Max Maximum
Mech Mechanical
Min Minimum
NIC Not in Contract
Nom Nominal
OC On Center
PVC Polyvinyl Chloride
RCP Reflected Ceiling Plan
Reqd Required
Rm Room
Sim Similar
Spec Specified OR Specification
Stl Steel
Struct Structure OR Structural
T&G Tongue and Groove
TME To Match Existing
TO Top Of
Typ Typical
UNO Unless Noted Otherwise
UON Unless Otherwise Noted
W/ With
Minimum Cable Lengths Outside of Boxes
Note
Box
Function Box Size Condition Length Outside of Box
1 CM N/A 2 Feet
2 xCT Cable Tray 20 Feet
3 xER Equipment Rack 20 Feet
4 JB 24"x24" or larger 20 Feet
5 JB Less than 24"x24" 4 Feet
6 iC N/A 2 Feet
7 Ui N/A 2 Feet
8 iO N/A 2 Feet
9 VC N/A 2 Feet
10 SP N/A 2 Feet
11 TV N/A 2 Feet
Separations - EMT or Rigid
Group A Group B Group C
Group A Adjacent Adjacent 3"
Group B Adjacent Adjacent 3"
Group C 3" 3" Adjacent
Branch Circuits (<30A) 6" 6" 6"
Branch Circuits (30A - 60A) 6" 6" 6"
Branch Circuits (>60A) 12" 12" 12"
Dimmer Controlled Lighting 12" 12" 12"
SCR Controlled Devices 12" 12" 12"
208/480V Feeder Circuits 24" 24" 24"
All Others (Plumbing, Heat, Etc.) 12" 12" 12"
AV Division of Responsibilities
Category Description Other 27 41 34
1 Power Provide all AC power circuits, receptacles (except those in the AV Racks), and standard power panels. TP circuits to utilize commercial grade receptacles. DIV 26
2 Power
Provide AC power connections and circuits within audio-video equipment racks. Provide an appropriately sized J-box at the top of each rack with power circuit ca bling terminating in 24" pigtails. - Label each ci rcuit with circuit number.

X
3 Conduit & Boxes
Provide all conduit (with measured pull string), gang boxes, pull boxes, wall panel back boxes, pull string and raceways required for the audio and video systems. Clearly label with permanent marker all boxes and conduits listed above.

DIV 26
4 Conduit & Boxes Provide all cable tray(s). Refer to plans and specifications for sizes and locations. DIV 26 5 Conduit & Boxes Provide cable hooks and/or wireway as shown in drawings. DIV 26 6 Conduit & Boxes Furnish speaker backcans and floorb ox backcans to installing contractor. X 7 Conduit & Boxes Install speaker backcans and floorb ox backcans (provided by contractor above). DIV 26 8 Low Voltage Cabling Provide low voltage cabling. X
9 Low Voltage Cabling Verify all conduit and cable fills for accuracy. Provide to the installing contractor a run list of all wire pulls, including wire numbers. X
10 Low Voltage Cabling Terminate all low voltage cabl es related to the audio systems as shown on drawings AV7.01 thru AV7.49. X 11 Low Voltage Cabling Terminate all low voltage cabl es related to the video systems as shown on drawings AV7.50 thru AV7.99 12 Structural Provide support structure for loudspeak er clusters/arrays weighing less than 500 lbs. X 13 Structural Provide support structure for loudspeaker clusters/arrays weighing greater than 500 lbs. Coordinate with 27 41 36 Contractor. DIV 5
14 Structural Install all speakers and speaker cluste rs. X 15 Equipment Provide all equipment noted on AV series sheets. X 16 Millwork Furnish all millwork at the front-of-house control booth including half-height walls, countertop, and cabinetry. Refer to drawings for exact specifications. DIV 6
17 Millwork Provide and install all loudspeaker grills and/or covers with exceptions noted below. Refer to architectural drawings for extent of grill cloth. Exceptions: Coaxial ceiling speakers with self-contained grills. DIV 9 18 Other Provide a contact closure to the audio-video racks for emergency muting of audio system in Fire Alarm Condition (if required by local code authority). DIV 28
Separations - PVC
Group A Group B Group C
Group A Adjacent Adjacent 6"
Group B Adjacent Adjacent 6"
Group C 6" 6" Adjacent
Branch Circuits (<30A) 6" 6" 6"
Branch Circuits (30A - 60A) 6" 6" 6"
Branch Circuits (>60A) 12" 12" 12"
Dimmer Controlled Lighting 12" 12" 12"
SCR Controlled Devices 12" 12" 12"
208/480V Feeder Circuits 24" 24" 24"
All Others (Plumbing, Heat, Etc.) 12" 12" 12"
1 AV Plan Symbols
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudio architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:49:38 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
General Notes & Legends
AV0.00
3 Conduit Notes
6 Minimum Cable Lengths Outside of Boxes
2 General Notes
5 AV Cable Schedule
7 Division of Responsibilities
4 Abbreviations
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
F
C
+18" Av.7
F
C
+18" Av.7
F
C
+18" Av.7
F
C
+18" Av.7
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3

AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128

GALLERY
155

GALLERY

WORK ROOM
154 STORAGE
153

CORTYARD
00 AV2.01
1 AV2.00
1 AV3.01
2 3
1 4
AV3.00 4
1 3
2 AV3.02 4
1 3
2 CL
AV -20
AV -20
AV -20
AV -20
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:49:46 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Overall Floor Plan
AV1.00
Scale: 1/8" = 1' -0" 1 AV - Floor Plan
AV Keynote Legend
Key Keynote
AV-20 AV Connectivity Panel. DIV 26 to provide 20A, 120V duplex utility power receptacle inside of AV box. (1) Circuit per every (2) AV wall mounted box.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
F
4S1
+108" S.2
F
4S1
+108" S.2
F
4S1
+108" S.2
F
4S1
+108" S.2
F
4S1
+108" An.1
F
4S1
+108" An.1
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3

AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128

GALLERY
155

GALLERY

WORK ROOM
154 STORAGE
153

CORTYARD
00 AV2.01
2 AV2.00
2 AV3.01
2 3
1 4
AV3.00 4
1 3
2 AV3.02 4
1 3
2 CL
AV -21
AV -21 AV -21
AV -21
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:49:57 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Overall Reflected Ceiling Plan
AV1.01
Scale: 1/8" = 1' -0" 1 AV - Reflected Ceiling Plan
AV Keynote Legend
Key Keynote
AV-21 Cortyard Speaker. Support is required for ~74l bs. 274134 to provide appropriately sized wall mount. 274134 to coordinate mounting conditions with GC. DIV 26 to provide 20A, 120V simplex utility power receptacle adjacent to AV box for speaker power. (1) Circuit per every (2) AV wall mounted box.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
F
FB
iO
F
FB
iO
F
FB
iO
F
FB
iO
+18" iO
+18" iO
F
x+102" iO
F
x+102" iO
+24" iO
+24" iO
+18" iO +102" iO
+18" iO
+39" iO
+30" iO
+114" iO
S.1 S.1 S.1
S.1 S.1 S.1
S.1 S.1
Scn.1
Prj.1
F
C
iO
F
C
iO
F
C
iO F
C
iO
S
C
iO
S.1
S.1
1 2 2.4 3 4 4.5
H
J

1.4 1.8 2.2 3.5 4.6
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3 AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128
AV3.00 4
1 3
2 AVR.104
AVR.101 AVR.102
AVR.103
AV -01 AV -01
AV -01
AV -01
AV -02
AV -03
AV -03
AVFB.108
2E,2D | EXISTING | AVWB.101
2H,2U6S,1UH | EXISTING | AVWB.101
AVFB.109
2E,2D | EXISTING | AVWB.101
2H,2U6S,1UH | EXISTING | AVWB.101
AVFB.110
2E,2D | EXISTING | AVWB.101
2H,2U6S,1UH | EXISTING | AVWB.101
AVFB.111
2E,2D | EXISTING | AVWB.101
2H,2U6S,1UH | EXISTING | AVWB.101
AVWB.138
2E,2D,1Y | EXISTING | AVWB.101
2H,4U6S,1UH | EXISTING | AVWB.101
AVWB.143
2E,2D | EXISTING | AVWB.101
2H,4U6S,1UH | EXISTING | AVWB.101
AVWB.100
16U6S | EXISTING | AVWB.101
6H, 6D | EXISTING | AVWB.101
AVWB.101
AVWB.142
2E | EXISTING | AVWB.101
2H,4U6S | EXISTING | AVWB.101
AVWB.129
2E,2D,1Y | EXISTING | AVWB.101
2H,4U6S,1UH | EXISTING | AVWB.101

PTZ CAMERA

PTZ CAMERA
AVWB.113
2U6S,1H | EXISTING | AVWB.101
AVWB.115
2U6S,1H | EXISTING | AVWB.101
CL

PTZ CAMERAS
AVWB.145
4U6S,2H | EXISTING | AVWB.101
AV3.00
5 AV3.00
6 AVWB.143.A
2U6 | EXISTING | AVWB.101
AVWB.143.B
1U6 | EXISTING
4U6S, 4H, 1Y12 | EXISTING | AVWB.101
1 2 2.4 3 4 4.5
H
J

1.4 1.8 2.2 3.5 4.6
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3

AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128
AV -11
AV -10
RSS.101 RSS.102 RSS.103
RRS.101
LRS.101
LSS.103 LSS.102 LSS.101
RMA.101
RMA.102
RMA.103
RSW.101
CMA.103
CMA.102
CMA.101
AV -13
SCN.101
PRJ.101
AV -12
AV -11
LMA.101
LMA.102
LMA.103
LSW.101
3A12 | 3/4" | AVR.103
3A12 | 3/4" | AVR.103
2A12 | 3/4" 1A12 | 3/4"
2A12 | 3/4" 1A12 | 3/4"
1A12 | 3/4" | AVR.103
AVCB.128
4A10 | EXISTING | AVR.103
AVCB.127
4A10 | EXISTING | AVR.103
3A10 | EXISTING | AVR.103
1A12 | 3/4" | AVR.103

EXISTING PROJECTION SCREEN
2U6S,1H | EXISTING | AVR.101
PRJ.102
CL

WIRELESS MIC ANTENNA
2F | EXISTING | AVWB.101
AVCB.190
2U6S,1H | EXISTING | AVR.101
SFS.101
SFS.102
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:50:18 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Enlarged - Auditorium
AV2.00
Scale: 1/4" = 1' -0" 1 AV - Floor Plan - Auditorium
Scale: 1/4" = 1' -0" 2 AV - Reflected Ceiling Plan - Auditorium AV Keynote Legend
Key Keynote
AV-01 Existing Equipment Rack. Label and disconnect all wires from all equipment.

Remove all equipment from rack. Rack to remain for population and retermination of new equipment. Cabling to be removed or augmented to accommodate new equipment. Itemize, catalogue, palletize, store, and protect all equipment during construction. Submit itemized list to owner for review. Discard all owner approved equipment to surplus, landfill, or recycling centers. Update itemized catalogue to reflect remaining inventory and store equipment in areas designated by the owner on provided storage racks at the completion of construction.

AV-02 Existing Production Desk. Label and disconnect wires from all equipment. Remove all equipment from desk. Desk to remain for population and retermination to new equipment. Cabling to be removed or augmented to accommodate new equipment.

Itemize, catalogue, palletize, store, and protect all equipment during construction.

Submit itemized list to owner for review. Discard all owner approved equipment to surplus, landfill, or recycling centers. Update itemized catalogue to reflect remaining inventory and store equipment in areas designated by the owner on provided storage racks at the completion of construction.

AV-03 Existing Storage. Remove all equipment. Itemiz e, catalogue, palletize, store, and protect all equipment during construction. Submit itemized list to owner for review.

Discard all owner approved equipment to surplus, landfill, or recycling centers.

Update itemized catalogue to reflect remaining inventory and store equipment in areas designated by the owner on provided storage racks at the completion of construction.

AV-10 Auditorium Center Speaker Array. Support is re quired for ~165lbs. Structural support will require a minimum of (2) attachment points from the top rigging frame comprised of aircraft cable. Miscellaneous steel, attachment points, & rigging hardware to be designed & installed by 274134 & stamped by Licensed Structural Engineer. Coordinate color of speakers & rigging hardware with Architect. 274134 to coordinate mounting conditions with GC.

AV-11 Auditorium Side Speaker Arrays. Support is req uired for ~270lbs. Structural support will require a minimum of (2) attachment points from the top rigging frame comprised of aircraft cable. Miscellaneous steel, attachment points, & rigging hardware to be designed & installed by 274134 & stamped by Licensed Structural Engineer.

Coordinate color of speakers & rigging hardware with Architect. 274134 to coordinate mounting conditions with GC.

AV-12 Auditorium Projector. Support is required for ~152lbs. 274134 to provide appropriately sized projector mount, projector lensing, & control. Miscellaneous steel by 274134 to support the projector. 274134 to coordinate mounting conditions with GC. DIV 26 to provide (1) dedicated 30A, 208V simplex power receptacle adjacent to AV box.

AV-13 Auditorium Projection Screen. Support is requi red for ~900lbs. 274134 to provide miscellaneous steel, attachment points, & rigging hardware to support the screen from structure above. 274134 to coordinate mounting conditions with Rigging Contractor and GC. DIV 26 to provide dedicated 20A, 120V direct wire power to screen housing.

Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
F
4S2
+48" Ts.10
F
4S2
+40" Bt.2
F
5G
+18" Av.5
F
5G
+18" Av.5
F
5G
+18" Av.5
F
5G
+18" Av.5
F
5G
+18" Av.5
F
5G
+18" Av.5
Pb.4 Pb.4 Pb.4
Pb.4 Pb.4 Pb.4
Pb.4 Pb.4 Pb.4
F
4S1
+150" An.1
F
4S2
+150" An.2

8.5 9 10
G
H
J

8.6 10.1

GALLERY
155

GALLERY

WORK ROOM
154

STORAGE
153
AV -30
AV -30
AV -30
AV -30
AV -30
AV -30
AV3.01
2 3
1 4
AV3.01
5 AV -32
AVR.201
1Y12 | 1-1/4" | AVWB.101

8.5 9 10
G
H
J

8.6 10.1

GALLERY
155

GALLERY

WORK ROOM
154

STORAGE
153
AV -31 AV -31 AV -31
AV -31 AV -31 AV -31
AV -31 AV -31 AV -31
AV -33
AV -33
AV -33 AV -33
SPK.201 SPK.202
SPK.204 SPK.203
PRJ.202
PRJ.204
PRJ.203
PRJ.201
AV -34
AV -34
AV -34
AV -34
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:50:33 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Enlarged - Gallery
AV2.01
Scale: 1/4" = 1' -0" 1 AV - Floor Plan - Gallery
Scale: 1/4" = 1' -0" 2 AV - Reflected Ceiling Plan - Gallery AV Keynote Legend
Key Keynote
AV-30 AV Connectivity Panel. DIV 26 to provide 20A, 120V duplex utility power receptacle adjacent to AV box. If an existing utility receptacle exists 4' on either side of the AV box, then a new receptacle is not required. (1) Circuit per every (2) AV wall mounted box.

AV-31 AV Connectivity Pipe Mount Panel. DIV 26 to pr ovide 20A, 120V duplex utility power receptacle to AV box faceplate. (1) Circuit per every (2) AV pipe mounted box.

AV-32 AV Wall Equipment Rack. DIV 26 to provide (3) dedicated 20A, 120V circuits inside of a 6x6x4 enclosure. Box mounted above rack on wall with FMC extending to internal rack power distribution. In-rack power distribution by 274134.

AV-33 Gallery Portable Speaker. Support is required for ~46lbs. 274134 to provide pipe grid attachment & rigging hardware and coordinate portable mounting conditions with Rigging Contractor. Power and connectivity to the speaker are provided by adjacent pipe mounted box and temporary cabling.

AV-34 Gallery Portable Projectors. Support is requir ed for ~57lbs. 274134 to provide pipe grid attachment & rigging hardware and coordinate portable mounting conditions with Rigging Contractor. Power and connectivity to the projector are provided by adjacent pipe mounted box and temporary cabling.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Ground Floor

0.00 1 2 2.4 3 4 4.5 1.4 1.8 2.2 3.5 4.6
AVR.101 AVR.102
AV -01 AV -01
AV -02
RSS.101 RSS.102 RSS.103
RRS.101
PRJ.101
10'-8 3/8"
AV -12
AV -13
SCN.101
46'-0 1/4"
18'-6"

PTZ CAMERA PTZ CAMERAS

PROJECTION PORT WINDOW
PRJ.102

PTZ CAMERA
4' - 6"

EXISTING PROJECTION SCREEN
AVR.103
AV -01
AVWB.138
CMA.101
CMA.102
CMA.103
AV -10
SFS.101
Ground Floor

0.00 122.4 344.5 1.4 1.8 2.2 3.5 4.6
AV -02
CMA.101
CMA.102
CMA.103
AV -10
10'-8 3/8"
LSS.101 LSS.102 LSS.103
LRS.101
PRJ.101
SCN.101
AV -13
AV -12

PTZ CAMERA PTZ CAMERAS

WIRELESS MIC ANTENNA

PROJECTION PORT WINDOW

PTZ CAMERA
PRJ.102
4' - 6"

EXISTING PROJECTION SCREEN
AVWB.143 AVWB.129
SFS.102
AVWB.143.A
AVWB.143.B
Ground Floor

0.00 H J
RRS.101 LRS.101
2'-0"
2'-0" 10' - 0"
CL

PTZ CAMERAS

WIRELESS MIC ANTENNA

PROJECTION PORT WINDOW
Ground Floor

0.00 HJ
RMA.101
RMA.102
RMA.103
RSW.101
CMA.101
CMA.102
CMA.103
AV -10
AV -11
AV -13
23'-0"
9'-9 1/2"
SCN.101
LMA.101
LMA.102
LMA.103
LSW.101
AV -11
CL
3' - 7"
RMA.101
RMA.102
RMA.103
RSW.101 AV -11
5'-8 3/8" 9'-2 3/8"
LSW.101
LMA.101
LMA.102
LMA.103
AV -11
5'-8 3/8" 9'-2 3/8"
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:50:52 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Sections & Elevations
AV3.00
Scale: 1/4" = 1' -0" 1 Auditorium - North
Scale: 1/4" = 1' -0" 2 Auditorium - South
Scale: 1/4" = 1' -0" 3 Auditorium - East
Scale: 1/4" = 1' -0" 4 Auditorium - West
Scale: 1/8" = 1' -0" 5 Right Main Array
Scale: 1/8" = 1' -0" 6 Left Main Array
AV Keynote Legend
Key Keynote
AV-01 Existing Equipment Rack. Label and disconnect all wires from all equipment.

Remove all equipment from rack. Rack to remain for population and retermination of new equipment. Cabling to be removed or augmented to accommodate new equipment. Itemize, catalogue, palletize, store, and protect all equipment during construction. Submit itemized list to owner for review. Discard all owner approved equipment to surplus, landfill, or recycling centers. Update itemized catalogue to reflect remaining inventory and store equipment in areas designated by the owner on provided storage racks at the completion of construction.

AV-02 Existing Production Desk. Label and disconnect wires from all equipment. Remove all equipment from desk. Desk to remain for population and retermination to new equipment. Cabling to be removed or augmented to accommodate new equipment.

Itemize, catalogue, palletize, store, and protect all equipment during construction.

Submit itemized list to owner for review. Discard all owner approved equipment to surplus, landfill, or recycling centers. Update itemized catalogue to reflect remaining inventory and store equipment in areas designated by the owner on provided storage racks at the completion of construction.

AV-10 Auditorium Center Speaker Array. Support is re quired for ~165lbs. Structural support will require a minimum of (2) attachment points from the top rigging frame comprised of aircraft cable. Miscellaneous steel, attachment points, & rigging hardware to be designed & installed by 274134 & stamped by Licensed Structural Engineer. Coordinate color of speakers & rigging hardware with Architect. 274134 to coordinate mounting conditions with GC.

AV-11 Auditorium Side Speaker Arrays. Support is req uired for ~270lbs. Structural support will require a minimum of (2) attachment points from the top rigging frame comprised of aircraft cable. Miscellaneous steel, attachment points, & rigging hardware to be designed & installed by 274134 & stamped by Licensed Structural Engineer.

Coordinate color of speakers & rigging hardware with Architect. 274134 to coordinate mounting conditions with GC.

AV-12 Auditorium Projector. Support is required for ~152lbs. 274134 to provide appropriately sized projector mount, projector lensing, & control. Miscellaneous steel by 274134 to support the projector. 274134 to coordinate mounting conditions with GC. DIV 26 to provide (1) dedicated 30A, 208V simplex power receptacle adjacent to AV box.

AV-13 Auditorium Projection Screen. Support is requi red for ~900lbs. 274134 to provide miscellaneous steel, attachment points, & rigging hardware to support the screen from structure above. 274134 to coordinate mounting conditions with Rigging Contractor and GC. DIV 26 to provide dedicated 20A, 120V direct wire power to screen housing.

Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Ground Floor

0.00 8.5 9 10 8.6 10.1
Av.5 Av.5
Pb.4 Pb.4 Pb.4
1'-6"
AV -30 AV -30
1'-6"
AV -31 AV -31 AV -31
An.2
12'-6"
AV -33
AV -34
AV -33
SPK.201
PRJ.201
SPK.202
Ground Floor

0.00 8.5 910 8.6 10.1
Av.5 Av.5
Pb.4 Pb.4 Pb.4 AV -31 AV -31 AV -31
AV -30 AV -30
1'-6"
AV -33
AV -34
AV -33
SPK.204
PRJ.202
SPK.203
Ground Floor

0.00 H J
Av.5 Av.5
Pb.4 Pb.4 Pb.4
AV -30 AV -30
1'-6"
1'-6"
AV -31 AV -31 AV -31
AV -34 AV -34 AV -34 AV -34
AV -33 AV -33
PRJ.201 PRJ.203 PRJ.204 PRJ.202
SPK.204 SPK.202
Ground Floor

0.00 HJ
4'-0"
Ts.10
Bt.2
SPK.201
PRJ.201 PRJ.202
SPK.203
AV -33
AV -34 AV -34
AV -33
Av.5
Av.5
AV -30
AV -30
1'-6"
1'-6"

8.5 8.6
AVR.201
AV -32
3' - 0"
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:20 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Sections & Elevations
AV3.01
Scale: 1/4" = 1' -0" 1 Gallery - North
Scale: 1/4" = 1' -0" 2 Gallery - South
Scale: 1/4" = 1' -0" 3 Gallery - East
Scale: 1/4" = 1' -0" 4 Gallery - West
Scale: 1/4" = 1' -0" 5 Gallery - Rack
AV Keynote Legend
Key Keynote
AV-30 AV Connectivity Panel. DIV 26 to provide 20A, 120V duplex utility power receptacle adjacent to AV box. If an existing utility receptacle exists 4' on either side of the AV box, then a new receptacle is not required. (1) Circuit per every (2) AV wall mounted box.

AV-31 AV Connectivity Pipe Mount Panel. DIV 26 to pr ovide 20A, 120V duplex utility power receptacle to AV box faceplate. (1) Circuit per every (2) AV pipe mounted box.

AV-32 AV Wall Equipment Rack. DIV 26 to provide (3) dedicated 20A, 120V circuits inside of a 6x6x4 enclosure. Box mounted above rack on wall with FMC extending to internal rack power distribution. In-rack power distribution by 274134.

AV-33 Gallery Portable Speaker. Support is required for ~46lbs. 274134 to provide pipe grid attachment & rigging hardware and coordinate portable mounting conditions with Rigging Contractor. Power and connectivity to the speaker are provided by adjacent pipe mounted box and temporary cabling.

AV-34 Gallery Portable Projectors. Support is requir ed for ~57lbs. 274134 to provide pipe grid attachment & rigging hardware and coordinate portable mounting conditions with Rigging Contractor. Power and connectivity to the projector are provided by adjacent pipe mounted box and temporary cabling.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Ground Floor

0.00 5 5.5 6 7 7.5 8 8.5 4.6 8.6
3' - 2" 8' - 9"
3' - 2" 8' - 9"
1' - 6"
AV.7
AV -20
Ground Floor

0.00 55.5 677.5 88.5 4.6 8.6
AV.7
AV -20
1' - 6"
8' - 9" 3' - 2"
AV -21
S.2
AV -21
S.2
8' - 9" 3' - 2"
Ground Floor

0.00 H J
S.2 S.2
AV -21 AV -21
3' - 2" 8' - 9"
8' - 9" 3' - 2"
Ground Floor

0.00 HJ CL
Av.7 Av.7
AV -20 AV -20
1' - 6"
1' - 6"
S.2 S.2
3' - 2" 8' - 9"
3' - 2" 8' - 9"
AV -21 AV -21
An.1 An.1
9' - 0"
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:27 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Sections & Elevations
AV3.02
Scale: 1/4" = 1' -0" 1 Cortyard - North
Scale: 1/4" = 1' -0" 2 Cortyard - South
Scale: 1/4" = 1' -0" 3 Cortyard - East
Scale: 1/4" = 1' -0" 4 Cortyard - West
AV Keynote Legend
Key Keynote
AV-20 AV Connectivity Panel. DIV 26 to provide 20A, 120V duplex utility power receptacle inside of AV box. (1) Circuit per every (2) AV wall mounted box.

AV-21 Cortyard Speaker. Support is required for ~74l bs. 274134 to provide appropriately sized wall mount. 274134 to coordinate mounting conditions with GC. DIV 26 to provide 20A, 120V simplex utility power receptacle adjacent to AV box for speaker power. (1) Circuit per every (2) AV wall mounted box.

Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Scale: Scale: Scale: Scale:

Scale: Scale: Scale:

Scale:

Scale:

Scale:

Scale:
21 3
12 3
PUSH
12 3
Use Green Heat Shrink on Shield
Black Heat Shrink Collar Tubing
1_
2"
1_
4"
XXXXX
Use Green Heat Shrink on Shield
Black Heat Shrink Collar Tubing 1_
2"
1_
4"
S
+
-
Use Green Heat Shrink on Shield
Black Heat Shrink Collar Tubing 1_
2"
3__
16 "
Verify Connector
Pinout per device
Use Green Heat Shrink on Shield
Black Heat Shrink Collar Tubing
1_
2"
Printed label with clear heat shrink
1_
4"
Use Green Heat Shrink on Shield
Black Heat Shrink Collar Tubing
1_
2"
1_
4"
1_
4"
Use Green Heat Shrink on Shield
Fold Black wire under heat shrink
Black Heat Shrink Collar Tubing 1_
2"
XXXXX
XXXXX
XXXXX

XXXXX XXXXX
Use Green Heat Shrink on Shield
Use printed heat shrink wire labels, place over snake skin Black Heat Shrink Collar Tubing
1_
2"
1_
4"
XXXXX
1 1
Snake skin sheathing
Snake skin sheathing to be captured by heat shrink
1_
4"
1_
4"
Use Green Heat Shrink on Shield Black Heat Shrink Collar Tubing 1_ 2"
XXXXX
1_
4"
Use Green Heat Shrink on Shield Black Heat Shrink Collar Tubing 1_
2"
XXXXX
Fold Black wire under heat shrink
132
1 3
2 2
3 1
231
Printed label with clear heat shrink
Printed label with clear heat shrink
Printed label with clear heat shrink
Printed label with clear heat shrink
Printed label with clear heat shrink
Printed label with clear heat shrink
Printed label with clear heat shrink
XXXXX
Device ID, printed on self-laminating label
1_
2" 1_
2"
XXXXX
Typical of all power connections within a rack including IEC, PowerCon, Direct Connections and Wall Warts.
1- 1-
In 1+ 1+ 1+
2- 2-
2+ 2+
1- 1-
1+ 1+
In 1-
In 2+
In 2+
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
SPK ID
SPK ID
SPK ID
AMP ID
AMP ID
Black Heat Shrink Collar Tubing
Printed label with clear heat shrink
1_
4"
Panduit CMVDRxx Series Vertical
Cable Management D-Rings.

Wago Insulated Ferrule P/N 216-2xx
Wago End/Intermediate Plate P/N
2010-1392 / 2010-1391
Wago DIN rail P/N 210-112
For Parallel connections use
Wago Push-In Jumper P/N 2010-4xx
Wago Rail-Mounted Terminal Block P/N 2010-1302
Wago Rail-Mounted Terminal Block P/N 2010-1301
Crimp Ferrules with Wago Crimping tool P/N
206-2xx
Align label stating amplifier feeding terminal
block with top of positive connection block. Align label stating speaker being fed from terminal block with top of positive connection
block.

Separate unique signals
with bold line
1 XLR FEMALE PANEL MOUNT
None 2 XLR FEMALE CABLE MOUNT
None 3 RCA MALE CABLE MOUNT
None 4 1/4" TRS CABLE MOUNT
None
5 XLR MALE PANEL MOUNT
None 6 XLR MALE CABLE MOUNT
None 7 PHOENIX CONNECTOR
None
11 FANOUT XLR CONNECTOR
None
8 1/4" TS CABLE MOUNT
None
10 POWER CONNECTIONS
None
9 SPEAKER LEVEL TERMINAL BLOCKS
None
This detail applies to all mixer and mixing system inputs.

Inputs originating at wall/floor boxes:

Engraved numbered connectors, Whirlwind p/n WI3M -XX -# A new boot color shall be used for every group of 8 inputs.

The engraved number shall match the plate number.

Black snake skin sheathing.

Inputs from devices with Stereo Outputs:

Engraved connectors, Whirlwind p/n WI3M -BK -#
Left Outputs shall be engraved "#L" and have a white boot Right Outputs shall be engraved "#R" and have a red boot Blue snake skin sheathing
Inputs from Wireless Microphones:

Engraved connectors, Whirlwind p/n WI3M -BK -#
Outputs shall be numbered and connectors engraved "WXX" White snake skin sheathing
Wires shall have sufficient length to allow patching to any input.

Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:33 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Connector Details
AV5.00
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Scale:

Scale: Scale:

Scale:

Scale:

Scale:

Scale:

Scale: Scale:

Scale: Scale: Scale:

Ceiling
Refer to AV details for in-wall conduit requirements &
AV Drawings for pathway conditions per instance.

TV / Display
Refer to AV Drawings for sizing.

Provided & installed by 274134.

Refer to Details 6 & 7 for
backing & pathway
requirements.

TV Backbox
Refer to AV Drawings for model.

Provided & installed by DIV 26.

Height per
AV Drawings
ADA Accessibility Note:

TV & mount should not protrude from the wall more than 4”.

Notify architect if mount & display exceeds 4".

TV backing provided & installed per
Division of Responsibilities chart on AV
Drawings. Backing to span between a
minimum of (4) studs.

Height per
AV Drawings
36" min
48" min
32" min
Conduit supports provided & installed by DIV 26.

Height per AV
Drawings unless a
Project Outlet Height
has been defined by
Architect
Ceiling
Face plate height & orientation to match adjacent electrical outlets & other devices.

Bottom of face plate not to fall below 15" per ADA.

Electrical box supports provided & installed by DIV 26.

Height per
AV Drawings
36" min
Ceiling
EQ
EQ
Refer to Detail 1 for overhead conduit requirements.

Ceiling
Refer to Details 1, 2, & 3 for overhead conduit requirements.

Single Gang Data Face Plate, mounted
horizontally in top of TV backbox
by telecom contractor.
1-Gang Box, 3-1/2 in. (Raco 592 or similar)
by telecom contractor. 1-Gang Box, 3-1/2 in. (Raco 592 or similar) by DIV 26.

Duplex Receptacle by DIV 26.

Pathway type, quantity & size per AV
Drawings. Pathways provided &
installed by DIV 26.

To AV device below, if
indicated on plans, by DIV 26.

Single Gang Data Face Plate, mounted
horizontally in top of TV backbox
by telecom contractor.
1-Gang Box, 3-1/2 in. (Raco 592 or similar)
by telecom contractor.
1-Gang Box, 3-1/2 in. (Raco 592 or similar)
by DIV 26.

Duplex Receptacle by DIV 26.

Ceiling
TV backing provided & installed by DIV 5.
3/4" plywood, light gauge steel, or
equivalent. Reference project manual for
approved blocking. Blocking to span
between a minimum of (4) studs.

To AV device below, if
indicated on plans, by DIV 26.

Pathway type, quantity & size per AV
Drawings by 274134. Requirements related
to pathways provided & installed by DIV 26.

EQ
EQ
TV Mount
Refer to AV Drawings for sizing.

Provided & installed by 274134.

Refer to Details 6 & 7 for
backing & pathway
requirements.

Refer to Detail 1 for overhead conduit requirements.

AV floor device, size, & mounting condition
requirements
per AV Drawings. AV floor device by DIV 26.

Pathway type, quantity, & size per AV Drawings.

Cable termination, device and/or panel provided by AV contractor.

TV Backbox
Height per AV Drawings
unless a Project Switch
Height has been defined by
Architect
Ceiling
Refer to Detail 1 for overhead conduit requirements.

Cable termination, device and/or panel provided by AV contractor.

AV backbox type, size, mounting condition & mud-ring requirements per AV Drawings.

Pathway type, quantity, & size per AV Drawings.

Face plate and/or device height to match adjacent electrical switches & other devices. Top of face plate and/or device not to exceed 48" per ADA.

Electrical box supports provided & installed by DIV 26.

Stub to Cable Tray by DIV 26
Stub to J-Hooks by AV Contractor
Cabling to be in conduit in hard-lid or open ceilings till conduit reaches the nearest accessible ceiling, pull box, cable tray, or associated AV equipment room by DIV 26.

Conduit to be provided until above condition is met. Cable to then continue to nearest associated AV equipment room by AV Contractor.

Over open or hard-lid ceiling cabling to continue in conduits.

Refer to Detail 1 for overhead conduit requirements.

Pathway type, quantity, & size per AV Drawings.

Cable termination, device and/or panel provided by AV contractor.

AV backbox type, size, mounting condition & mud-ring requirements per AV Drawings.

Rack backing provided & installed
by DIV 5. 3/4" plywood, light gauge
steel, or equivalent. Reference project
manual for approved blocking.

Blocking to span between a minimum
of (4) studs.
4" min
48" min
4" min
Cable tray provided & installed by 270528
Height per
DT Drawings
1'-2" max
Height per
AV Drawings
FRONT
Rack design, installation, grounding,
& bonding to be in accordance with:

AVIXA F502.02:2020
ANSI/NECA/BICSI 607
ANSI/TIA-607-B
Variable speed fan top provided
& installed by 274134.

Vertical multi-circuit modular
power raceway. Circuit quantity &
module types determined by
connected loads.

Provided & installed by 274134.

Conduit & cabling from
AV electrical panel
by DIV 26
Vertical multi-circuit modular
power raceway. Circuit quantity &
module types determined by
connected loads.

Provided & installed by 274134.

Conduit & cabling from
AV electrical panel
by DIV 26
DIV 26 to provided & install
electrical circuits to power
connection box mounted to
cable tray above & FMC tail
from box to rack mounted
raceway.
274134 to coordinate required
circuit count & loads with DIV 26.

Cable tray provided & installed by 270528
FRONT
BACK Height per
DT Drawings
1'-2" max
BACK
AV Equipment Rack (AVR) & associated
accessories provided & installed by 274134.

Rack design, installation,
grounding, & bonding to be
in accordance with:

AVIXA F502.02:2020
ANSI/NECA/BICSI 607
ANSI/TIA-607-B
Variable speed fan top
provided & installed by
274134.

Rack to be electrically
decoupled from flooring.
274134 to provide &
install a rubber mat-style
isolation or equivalent
between rack and floor. SIDE
DIV 26 to provided & install
electrical circuits to power
connection box mounted to
cable tray above & FMC tail
from box to rack mounted
raceway.

Electrical contractor to provide & terminate power
to a duplex receptacle at the projector attachment
location. Coordinate location with AV contractor.

Height per
AV Drawings
Ceiling
Projector provided &
installed by AV contractor.

AV contractor to reference all current
manufacture installation literature.

Attachment to structure including miscellaneous steel supports, a minimum of (3) lateral braces on vertical spans greater than 60", extension columns & attachment points provided & installed by AV contractor.

Projector mount & associated mounting
accessories provided & installed by AV contractor.

Decorative trim ring provided
& installed by AV contractor.

Projection image cone as indicated on AV drawings.

AV contractor to confirm projector lensing
based on mounting & project conditions.

Projection screen provided & installed by AV contractor. AV contractor to reference all current manufacture installation literature.

AV contractor to coordinate length of black drop &
or cable drop with AV Drawings & project conditions
Height per
AV Drawings
Electrical contractor to provide & terminate
power into junction box at screen end.

Coordinate side with AV contractor.

Height per
AV Drawings
A minimum of (4) vertical supports with a minimum of (3) lateral braces on vertical spans greater than 60" are required per screen. Attachment to structure including miscellaneous steel supports, bracing, & attachment points provided & installed by AV contractor.

Height per
AV Drawings
Blocking in wall
Backing provided & installed by DIV 5.
3/4" plywood, light gauge steel, or
equivalent. Reference project manual for
approved blocking. Blocking to extend 1
stud bay wider than screen on each side.

Projection screen provided & installed by 274134.

Attachment to structure including miscellaneous
supports provided & installed by 274134.

Height per
AV Drawings
Electrical contractor to provide &
terminate power into junction box at
screen end. Coordinate side with
274134.
274134 to coordinate length of black drop
with AV Drawings & project conditions
Height per
AV Drawings
1 Overhead - Conduit Accommodations
None
5 Typical TV Mounting Details
None 6 Typical TV Backing & Pathways 4-Studs
None
7 Typical TV Backing & Pathways 3-Studs
None
3 Typical Wall-Mounted AV Input Panel
None
4 Typical Floor-Mounted Devices w/ AV
None
2 Typical Wall-Mounted AV Control Device
None
9 Wall-Mounted Rack Detail
None 8 Floor-Standing AV Rack Details
None
10 Typical Projector Mounting
None 11 TypicalSuspended Projection Screen
None 12 Typical Wall-Mounted Screen
None
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:37 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Standard Details
AV5.01
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
1 2
3LA L-ACOUSTICS A10 i SERIES. TOTAL
WEIGHT: 165 LBS. ATTACHED WITH L -
ACOUSTICS A10 i SERIES RIGGING
HARDWARE. REF AV6.00 FOR AIMING.
1/2" ALL THREAD SECURED ABOVE & BELOW
TO UNISTRUT P1000 -T W/ UNISTRUT P1010
SPRING NUTS, UNISTRUT P1064 BACKING
PLATE, & 1/2" HARDWARE.

UNISTRUT P1000 -T.

LA LA
11 2 2 2
1 UNISTRUT P2875, BEAM CLAMP.
3 3
3 3 3 3
4 UNISTRUT P2486 , SEISMIC ROD STIFFENER.
4 4
4 10" TYP.
4 4
4 4
4 4
1 5 CROSBY HG -228 (1032554), TURNBUCKLE.
5 5 5
6 7
FINISHED CEILING.

CEILING OPENING W/ PROTECTIVE
SLEEVED INSERT & FLANGE.

LOUDSPEAKER ATTACHMENT TO BE FIELD
VERIFIED WITH SITE CONDITIONS.

ADDITIONAL ACCOMMODATIONS OR

HARDWARE TO BE DESIGNED & INSTALLED
BY 27 41 34. DESIGN STAMPED BY 27 41 34
PE. PROJECT STRUCTURAL ENGINEER TO

REVIEW & APPROVE ATTACHMENT
METHOD.
*
B
B

SECTION A A
A

SECTION B
8 STRUCTURAL STEEL.
6 4" DIA. MIN
6 777
8 8 8
1 2
3LA L-ACOUSTICS A10 i SERIES. TOTAL
WEIGHT: 270 LBS. ATTACHED WITH L -
ACOUSTICS A10 i SERIES RIGGING
HARDWARE. REF AV6.00 FOR AIMING.
1/2" ALL THREAD SECURED ABOVE & BELOW
TO UNISTRUT P1000 -T W/ UNISTRUT P1010
SPRING NUTS, UNISTRUT P1064 BACKING
PLATE, & 1/2" HARDWARE.

UNISTRUT P1000 -T.

LA
LA
11 2 2 2
1 UNISTRUT P2875, BEAM CLAMP.
3 3
3 3 3 3
4 UNISTRUT P2486 , SEISMIC ROD STIFFENER.
4 4
4 10" TYP.
4 4
4 4
4 4
1 5 CROSBY HG -228 (1032554), TURNBUCKLE.
5 5 5
6 7
FINISHED CEILING.

CEILING OPENING W/ PROTECTIVE
SLEEVED INSERT & FLANGE.

LOUDSPEAKER ATTACHMENT TO BE FIELD
VERIFIED WITH SITE CONDITIONS.

ADDITIONAL ACCOMMODATIONS OR

HARDWARE TO BE DESIGNED & INSTALLED
BY 27 41 34. DESIGN STAMPED BY 27 41 34
PE. PROJECT STRUCTURAL ENGINEER TO

REVIEW & APPROVE ATTACHMENT
METHOD.
*
B
B

SECTION A A
A

SECTION B
8 STRUCTURAL STEEL.
6 4" DIA. MIN
6 777
8 8 8
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Drawing Set Issue Schedule
Description Issue Date
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 7/7/2023 7:24:34 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Standard Details
AV5.02
Scale: 1" = 1' -0" 2 Auditorium Center Main Array - Attachment Detail Scale: 1" = 1' -0" 1 Auditorium Left & Right Main Array - Attachment Detail Revision Schedule
No. Revision Issue Date
Attachment Details 07.07.2023
28 Nov 2023
Construction
Documents
Scale: Scale:

Scale:

Scale:

Scale: Scale:

Scale:

Scale:

Scale: Scale: Scale: Scale: Scale:

Scale:
50Ω 50Ω
Scale: Scale:

PAIR
IN 3/4 A
IN 3/4 B
OUT 1/2 A
Scale: Scale:

Scale: Scale:

PAIR
IN 3/4 A
IN 3/4 B
OUT 1/2 A
Scale:

Scale:
50Ω
Scale:
50Ω
Scale:

Scale:
4" Panel if Surface 1_
2"
4" Panel if Surface
5" Panel if Flush
5" Panel if Flush
Typical for all wall boxes:
• Flush mounted boxes shall have panels with 1/2" overhang on all sides. • Surface mounted boxes, the panel shall match the dimension of the box. • ALL plates shall be engraved with unique box number.

System Designed by: System Installed by:

Place in top RU of video/audio racks, one per row of racks.

Contractor Logo
Integrator's logo not to extend past
the center, placed on right side.

TH WP-###
Typical Connector ID to Incorporate the Following:
## Two letter room abbreviation
ATIE, ETIE, FTIE, or VTIE system designation
## Two number connector number
ID abbreviation & numbering populated by 274134
(ex. TH ATIE-12). Panels, plates, patchbays, & all
loose connection points to have consistent ID's.

SSRC PM-##/01-520R 4 Gang, 1 duplex receptacle, 3 Gang low voltage

EXAMPLE OF TYPICAL

BOX & PANEL
CONDITIONS.

Typical Connector blank:

Where shown, provide pre-punched
connector hole and blank cover plate/screws.

Neutrik DBA-BL or equal

ETHERNET TIES

VIDEO TIES

AUDIO INPUTS AUDIO TIES

VIDEO TIES

ETHERNET TIES

FIBER TIES
Crestron DM-TX-4KZ-100-C-1G-B-T

VIDEO TX

AUDIO INPUTS AUDIO TIES

VIDEO TIES

ETHERNET TIES
Crestron DM-TX-4KZ-100-C-1G-B-T

FIBER TIES

AUDIO INPUTS AUDIO TIES

VIDEO TIES

ETHERNET TIES
Crestron DM-TX-4KZ-100-C-1G-B-T
Crestron DM-TX-4KZ-100-C-1G-B-T
FSR Inc. FL-540P Floor Boxes
FSR Inc. OWB-500P-FM Boxes
Crestron DM-TX-4KZ-100-C-1G-B-T
FSR Inc. FL-540P Floor Boxes
Crestron DM-TX-4KZ-100-C-1G-B-T
FSR Inc. FL-540P Floor Boxes
INPUT-##

AUDIO INPUTS
INPUT-##

ETHERNET TIES

VIDEO TIES

ETHERNET TIES

VIDEO TIES

ETHERNET TIES

VIDEO TIES
RF Venue DFIN
Wall Mounted Adjacent
TSC-101-G3
Junction Box
AtteroTech unD6IO-BT

ETHERNET TIES

VIDEO TIES
INPUT-##

AUDIO INPUTS
INPUT-##
ATIE-##

AUDIO TIES
ATIE-##

ETHERNET TIES

VIDEO TIES
ATIE-##

AUDIO TIES
ATIE-##
TSC-101-G3
Junction Box
AtteroTech unD6IO-BT
Crestron DM-TX-4KZ-100-C-1G-B-T
FSR Inc. FL-540P Floor Boxes
Shure UA860SWB
Wall Mounted Adjacent
Shure UA860SWB + Williams AV 029
Wall Mounted Adjacent
INPUT-##
INPUT-##

VIDEO TX VIDEO TX
1 Typical Box & Panel Dimensions
6" = 1'-0" 3 Typical Logo Panel
6" = 1'-0"
## ATIE-##
4 AVWB.138
NTS
2 Typical Connector Annotations
6" = 1'-0"
ETIE-##
ETIE-## VTIE-##
VTIE-##
INPUT-## INPUT-## ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-## ETIE-## ETIE-##
FTIE-## FTIE-##
5 AVWB.129
NTS
INPUT-## INPUT-## ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-## ETIE-## ETIE-##
FTIE-## FTIE-##
6 AVWB.143
NTS
INPUT-## INPUT-## ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-## ETIE-## ETIE-##
7 AVFB.108
6" = 1'-0"
INPUT-## INPUT-##
ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-##
17 Type Av.7 Cortyard (QTY: 4)
6" = 1'-0"
INPUT-## INPUT-##
ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-##
8 AVFB.110
6" = 1'-0"
INPUT-## INPUT-##
ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-##
9 AVFB.111
6" = 1'-0"
INPUT-## INPUT-##
ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-##
10 AVWB.142
6" = 1'-0"
ETIE-##
ETIE-## VTIE-##
11 AVWB.113
6" = 1'-0"
ETIE-##
ETIE-## VTIE-##
12 AVWB.115
6" = 1'-0"
ETIE-##
ETIE-##
ETIE-##
ETIE-## VTIE-##
VTIE-##
13 Rear PTZ Twin Cameras
6" = 1'-0"
ETIE-##
ETIE-##
Wireless A Wireless B
14 Rear Wireless Mic Antanna
6" = 1'-0" 15 AVWB.143.A
6" = 1'-0" 16 AVWB.143.B
6" = 1'-0"
INPUT-## INPUT-##
ETIE-##
ETIE-## VTIE-##
VTIE-##
18 Type Av.4 Gallery (QTY: 6)
6" = 1'-0"
ETIE-##
ETIE-## VTIE-##
VTIE-##
19 Type Pb.4 Gallery (QTY: 9)
6" = 1'-0" 20 Type Ts.10 Gallery (QTY: 1)
6" = 1'-0" 21 Type Bt.2 Gallery (QTY: 1)
6" = 1'-0"
7 AVFB.109
6" = 1'-0"
INPUT-## INPUT-##
ATIE-## ATIE-##
VTIE-## VTIE-##
ETIE-## ETIE-##
Wireless A
22 Type An.1 Gallery (QTY: 3)
6" = 1'-0"
Wireless B
23 Type An.2 Gallery (QTY: 1)
6" = 1'-0"
ALS
24 SRP.01
6" = 1'-0"
ETIE-## ETIE-## ETIE-## ETIE-## VTIE-## VTIE-## VTIE-## VTIE-## Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:42 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Panel Details
AV5.20
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
OFE
OFE
OFE
OFE
All critical networking enable
equipment connected to UPS.

Including but not limited to:
switches, AV control processors,
Mixers, & AV signal processors.

All critical networking enable
equipment connected to UPS.

Including but not limited to:
switches, AV control processors,
Mixers, & AV signal processors.

Attach charging
stations to sliding shelf.

Provide Fan Top
DWR-FK32
Provide MPR Series Modular
Power Raceway System

RACK SWING

DIRECTION
Platform BOH (129) Production Equipment Room (131)
All critical networking enable
equipment connected to UPS.

Including but not limited to:
switches, AV control processors,
Mixers, & AV signal processors.

Gallery Rack (###)
FLOOR
All critical networking enable
equipment connected to UPS.

Including but not limited to:
switches, AV control processors,
Mixers, & AV signal processors.

Existing Rack Existing Rack
UPS
Middle Atlantic
UPX-2000R-2
Ethernet Patch Panel
Belden
Per Spec
Owner Furnished
Contractor Installed
(48) Port Minimum
Owner Furnished
Contractor Installed
(48) Port Minimum
2U Brush
Middle Atlantic
BR2
Digital Signal Processor
QSC
Core 110F-V2
4CH Wireless Receiver
Shure
ULXD4Q
4CH Wireless Receiver
Shure
ULXD4Q
TT Audio Patchbay
Bittree
Per Spec
Ethernet Patch Panel
Belden
Per Spec
Ethernet Patch Panel
Belden
Per Spec
48x16 Channel Stagebox
Allen & Heath
GX4816
2U Brush
Middle Atlantic
BR2
BLANK
Assisted Listening
Williams Sound
FM T55
2U Brush
Middle Atlantic
BR2
UPS
Middle Atlantic
UPX-2000R-2
2U Brush
Middle Atlantic
BR2
5U Vented
Middle Atlantic
SS5-23VTR
Middle Atlantic Products
DWR Series (DWR-35-26)
Existing Rack
Wireless Zones
RF Venue
4Zone
BLANK
Dante to AES3
Focusrite PRO
RedNet D16R MkII
1U Brush
Middle Atlantic
BR1
4CH Wireless Receiver
Shure
ULXD4Q
Assisted Listening
Williams Sound
FM T55
BLANK
Fiber Patch Bay
Belden
Per Spec
1U Brush
Middle Atlantic
BR1
Dante Audio I/O
Attero Tech
D16Mio
Video Patchbay
Bittree
Per Spec
Ethernet Patch Panel
Belden
AX103114 (24) AX104596
Ethernet Patch Panel
Belden
AX103114 (24) AX104596
Owner Furnished
Contractor Installed
(48) Port Minimum
2U Brush
Middle Atlantic
BR2
13U
Reserved For Theatrical
Lighting Systems (11 61 00)
Power Amplifier
L-Acoustics
LA2Xi
Power Amplifier
L-Acoustics
LA2Xi
BLANK
Power Amplifier
L-Acoustics
LA2Xi
Power Amplifier
L-Acoustics
LA2Xi
BLANK
Power Conditioner with Lights
Furman
PL-8C
Power Conditioner with Lights
Furman
PL-8C
BLANK
Power Amplifier
L-Acoustics
LA2Xi
Power Amplifier
L-Acoustics
LA2Xi
BLANK
UPS
Middle Atlantic
UPX-2000R-2
BLANK
Power Amplifier
L-Acoustics
LA2Xi
3U Drawer
Middle Atlantic
D3
2U Drawer
Middle Atlantic
D2
Fiber Patch Bay
Belden
Per Spec
1U Brush
Middle Atlantic
BR1
Owner Furnished
Contractor Installed
(12) Port Minimum
2U Brush
Middle Atlantic
BR2
BLANK
Dual 9" Monitor
JVC
DT-X93HX2
Remote Com Station
Clear Com
HRM-4X
1U Brush
Middle Atlantic
BR1
BLANK
BLANK
BLANK
Cinema Audio Processor
QSC

QSC DCIO-H
BLANK
Main Com Station
Clear-Com
ARCADIA-X4-16P
BLANK
Dual 9" Monitor
JVC
DT-X93HX2
3U Drawer
Middle Atlantic
D3
Crestron
DMF-CI-8
MAP
UFA-8
Tascam
BD-MP4K
BLANK
Dual 7" Monitor Recorder
JVC
DT-X93HX2
BLANK
40x40 12G Router
Blackmagic Design
VHUBSMAS12G4040
BLANK
Video Production Switcher
NewTek
TC1
BLANK
Video Patchbay
Bittree
Per Spec
BLANK
Fiber Patch Bay
Belden
Per Spec
1U Brush
Middle Atlantic
BR1
BLANK
2U Drawer
Middle Atlantic
D2
BLANK
BLANK
BLANK
UPS
Middle Atlantic
UPX-2000R-2
BLANK
BLANK
Dante Audio I/O
Attero Tech
D16Mio
TT Audio Patchbay
Bittree
Per Spec
BLANK
BLANK
BLANK
Crestron
DMF-CI-8
BLANK
BLANK
BLANK
BLANK
BLANK
2U Drawer
Middle Atlantic
D2
AVR.103 (Auditorium)
AV Equipment Rack
AVR.101 (Auditorium)
AV Equipment Rack
UPS.01
EPB.01
NWS.01
NWS.02
DSP.01
WRX.01
WRX.02
APB.01
EPB.03
EPB.02
SBX.01
ALS.01
UPS.03
Sliding Shelf
AVR.201 (Gallery)
AV Equipment Rack
AVR.102 (Auditorium)
AV Equipment Rack
WZC.01
DTD.##
WRX.03
ALS.02
FPB.03
AIO.01
VPB.02
EPB.04
EPB.05
NWS.04
AMP.01
AMP.02
AMP.03
AMP.04
AMP.05
AMP.06
UPS.02
AMP.07
FPB.02
NWS.03
MON.02
ICR.01
SRP.01
CAP.01
ICM.01
MON.01
IVC.##
IP Matrix Chassis
Device Shelf
BLR.01
Blueray Player
REC.01
RTR.01
VPS.01
VPB.01
FPB.01
UPS.04
AIO.02
APB.02
IVC.##
IP Matrix Chassis
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:50 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Rack Details
AV5.40
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:55 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV - Systems Schedules
AV6.00
AV Systems - New Junction Box Schedule
Typical Box
ID Device Description
Device
Manufacturer Device Model
Mounting
Height Box Manufacturer Box Model Box Description
Flush
Mount
NEMA
Type
Box Supplied
and Installed
By:

Panel
Supplied and
Installed By: Conduit & Cable (Unless Otherwise Show n on Plan) Notes An.1 Wireless Antenna n/a n/a <varies> Raco or Equivalen t 260 4-11/16" square welded steel electrical box, 3. 25" depth, with 1G mudring. Yes 1 DIV 26 N/A (1) 1" Cond uit with 1F cable to local associated AVR.

An.2 Wireless Antenna n/a n/a 12'-6" Raco or Equivalent 2 60 4-11/16" square welded steel electrical box, 3.25 " depth, with 2G mudring. Yes 1 DIV 26 N/A (1) 1" Condui t with 1F,1H cables to local associated AVR.

Av.5 AV Connectivity Panel n/a n/a 1'-6" Raco or Equival ent 694 5-Gang welded steel electrical box, 2.5" dept h. Yes 1 DIV 26 27 41 34 (1) 1" & (1) 1-1/4" Conduit stu b to accessible ceiling. 4E, 2D, 2H, 2U6S to local AVR.

Av.7 Exterior AV Connectivity Box n/a n/a 1'-6" FSR Inc. OWB-500P-FM Steel junction/pull box with screw cover. Yes 1 DIV 26 27 41 34 (2) 1" Conduit with 4E,2D,2U6S,2H to AVR.101.

Bt.2 Bluetooth IO Panel Attero Tech unD6IO-BT 3'-4" Raco or Equivalent 260 4-11/16" square welded steel elect rical box, 3.25" depth, with 2G mudring. Yes 1 DIV 26 N /A (1) 1" Conduit stub to accessible ceiling. 1U6 t o local AVR. Clearance of 6" required on all sides o f junction box center line for adjacent boxes.

Pb.4 AV Connectivity Pipe Box n/a n/a SSRC or Equivalent 9104 4 Gang pipe moutn box w/riggi ng hardware (3G Low Voltage 1G High Voltage) Yes DIV 26 27 41 34 (1) 1-1/4" FMC with 2D,2U6S,2H cables to local associated AVR.

Prj.1 Ceiling Mounted Projector Christie Projector Projector n/a Cable freerun in accessible ceiling. No Box required. Yes 1 n/a 27 41 34 2U6S,1H Cable freerun to local AVR.

S.1 Surface Mounted Speaker L-Acoustics X8 <varies> Raco or Equivalent 260 4-11/16" square welded steel elect rical box, 3.25" depth, with 1G mudring. Yes 1 DIV 26 N /A Refer to plan drawings.

S.2 Surface Mounted Speaker EAW AC6 9'-0" Raco or Equiva lent 260 4-11/16" square welded steel electrical box, 3.25" depth, with 1G mudring. Yes 1 DIV 26 N/A (1) 3/4" Conduit with 1U6S,1D to AVR.101.

Scn.1 Surface Mounted Projection Screen Stewert Film S creen Screen Motorized Screen n/a Cable freerun in accessible ceil ing. No Box required. Yes 1 n/a 27 41 34 1U6 Cable free run to local AVR.

Ts.10 10" Touchscreen QSC TSC-101-G3 4'-0" Raco or Equiv alent 260 4-11/16" square welded steel electrical box , 3.25" depth, with 2G mudring. Yes 1 DIV 26 N/A (1) 3/4 " Conduit stub to accessible ceiling. 1U6 to local AVR. Clearance of 3" required on all sides of juncti on box center line for adjacent boxes.

AV Systems - Existing Junction Box Schedule
Box ID Level
Mounting
Height
Flush
Mount Box Manufacturer Box Model Box Description
Box Dimensions
NEMA Type
Custom
Panel Notes Height Width Depth
AVCB.127 Ground Floor Yes Field Verify Field Verify Exis ting AV Ceiling Box 4" 4" 3" N/A Yes PULL BACK ALL EXISTI NG CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVCB.128 Ground Floor Yes Field Verify Field Verify Exis ting AV Ceiling Box 4" 4" 3" N/A Yes PULL BACK ALL EXISTI NG CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVCB.180 Ground Floor Yes Field Verify Field Verify Exis ting AV Ceiling Box 4" 4" 3" N/A Yes PULL BACK ALL EXISTI NG CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVCB.190 Ground Floor No Field Verify Field Verify Exist ing AV Ceiling Box 4" 4" 3" N/A Yes PULL BACK ALL EXISTIN G CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVFB.108 Ground Floor Yes Field Verify Field Verify Exis ting AV Floor Box 10" 10" 6" 1 Yes PULL BACK ALL EXISTING CABLES TO THE AS SOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVFB.109 Ground Floor Yes Field Verify Field Verify Exis ting AV Floor Box 10" 10" 6" 1 Yes PULL BACK ALL EXISTING CABLES TO THE AS SOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVFB.110 Ground Floor Yes Field Verify Field Verify Exis ting AV Floor Box 10" 10" 6" 1 Yes PULL BACK ALL EXISTING CABLES TO THE AS SOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVFB.111 Ground Floor Yes Field Verify Field Verify Exis ting AV Floor Box 10" 10" 6" 1 Yes PULL BACK ALL EXISTING CABLES TO THE AS SOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.100 Ground Floor 2'-0" Yes Field Verify Field Verif y Existing AV Wall Box 1'-8" 1'-8" 4" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.101 Ground Floor 2'-0" Yes Field Verify Field Verif y Existing AV Wall Box 1'-8" 1'-8" 4" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.113 Ground Floor 8'-6" Yes Field Verify Field Verif y Existing AV Wall Box 0" 0" 0" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOC IATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.115 Ground Floor 8'-6" Yes Field Verify Field Verif y Existing AV Wall Box 0" 0" 0" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOC IATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.118 Ground Floor 9'-6" Yes Field Verify Field Verif y Existing AV Wall Box 0" 0" 0" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOC IATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.129 Ground Floor 1'-6" Yes Field Verify Field Verif y Existing AV Wall Box 1'-0" 1'-0" 4" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.138 Ground Floor 1'-6" Yes Field Verify Field Verif y Existing AV Wall Box 1'-0" 1'-0" 4" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.142 Ground Floor 1'-6" Yes Field Verify Field Verif y Existing AV Wall Box 0" 0" 0" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOC IATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.143 Ground Floor 1'-6" Yes Field Verify Field Verif y Existing AV Wall Box 1'-0" 1'-0" 4" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AVWB.145 Ground Floor 8'-6" Yes Field Verify Field Verif y Existing AV Wall Box 0" 0" 0" Yes PULL BACK ALL EXISTING CABLES TO THE ASSOC IATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

LSW.114 Ground Floor Yes Field Verify Field Verify Exist ing AV Ceiling Box 4" 4" 3" N/A Yes PULL BACK ALL EXISTIN G CABLES TO THE ASSOCIATE EQUIPMENT ROOM. RE-PULL NEW CABLING & TERMINATE TO NEW CONNECTIVITY PANEL.

AV Systems - Rack Schedule
Rack ID Level Manufacturer Model Description
Rack Dimensions Device
Notes Height Width Depth Supplied By Installed By
AVR.101 Ground Floor Middle Atlantic
Products, Inc.

Field Verify Existing AV Equipment Rack. 35-41RU. 6'- 3 7/8" 1'-11" 2'-8" EXISTING EXISTING AVR.102 Ground Floor Middle Atlantic
Products, Inc.

Field Verify Existing AV Equipment Rack. 35-41RU. 6'- 3 7/8" 1'-11" 2'-8" EXISTING EXISTING AVR.103 Ground Floor Middle Atlantic
Products, Inc.

Field Verify Existing AV Equipment Rack. 35-41RU. 6'- 3 7/8" 1'-11" 2'-8" EXISTING EXISTING AVR.104 Ground Floor Middle Atlantic
Products, Inc.

Field Verify Existing AV Equipment Rack. 35-41RU. 6'- 3 7/8" 1'-11" 2'-8" EXISTING EXISTING AVR.201 Ground Floor Middle Atlantic
Products
DWR-35-26 35 SPACE (61 1/4”) SECTIONAL WALL
RACK, FITS 24” DEEP EQUIPMENT,

BLACK FINISH
5'-8 3/8" 1'-11 3/8" 2'-2" 27 41 34 27 41 34
Speaker Aiming Schedule
Mark Level Manufacturer Model Azimuth Pitch Rotation Weigh t Height Width Depth Notes CMA.101 Ground Floor L-Acoustics A10i Focus 0.00° -12.00 ° 0.00° 42 1'-10 3/8" 1'-1 3/4" 1'-1 1/4" CMA.102 Ground Floor L-Acoustics A10i Wide 0.00° -32.00° 0.00° 40 1'-10 3/8" 1'-1 3/4" 1'-1 3/4" CMA.103 Ground Floor L-Acoustics A10i Wide 0.00° -62.00° 0.00° 40 1'-10 3/8" 1'-1 3/4" 1'-1 3/4" LMA.101 Ground Floor L-Acoustics A10i Focus 38.00° -7.00 ° 0.00° 42 1'-10 3/8" 1'-1 3/4" 1'-1 1/4" LMA.102 Ground Floor L-Acoustics A10i Focus 38.00° -12.0 0° 0.00° 42 1'-10 3/8" 1'-1 3/4" 1'-1 1/4" LMA.103 Ground Floor L-Acoustics A10i Wide 38.00° -32.00 ° 0.00° 40 1'-10 3/8" 1'-1 3/4" 1'-1 3/4" LRS.101 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" LSS.101 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" LSS.102 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" LSS.103 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" LSW.101 Ground Floor L-Acoustics KS21i 38.00° -7.00° 0.00 ° 101 1'-10 3/8" 2'-5 5/8" 2'-0 3/4" RMA.101 Ground Floor L-Acoustics A10i Focus 38.00° -7.00 ° 0.00° 42 1'-10 3/8" 1'-1 3/4" 1'-1 1/4" RMA.102 Ground Floor L-Acoustics A10i Focus 38.00° -12.0 0° 0.00° 42 1'-10 3/8" 1'-1 3/4" 1'-1 1/4" RMA.103 Ground Floor L-Acoustics A10i Wide 38.00° -32.00 ° 0.00° 40 1'-10 3/8" 1'-1 3/4" 1'-1 3/4" RRS.101 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" RSS.101 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" RSS.102 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" RSS.103 Ground Floor L-Acoustics X8 0.00° -38.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" RSW.101 Ground Floor L-Acoustics KS21i 38.00° -7.00° 0.00 ° 101 1'-10 3/8" 2'-5 5/8" 2'-0 3/4" SFS.101 Ground Floor L-Acoustics X8 0.00° -90.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" SFS.102 Ground Floor L-Acoustics X8 0.00° -90.00° 0.00° 26 .5 1'-4 3/4" 9 3/4" 10 3/8" SPK.201 Ground Floor Renkus-Heinz CA121M-RD 40.00° -30.0 0° 0.00° 32 1'-5" 1'-5" 1'-0 5/8" SPK.202 Ground Floor Renkus-Heinz CA121M-RD -40.00° -30. 00° 0.00° 32 1'-5" 1'-5" 1'-0 5/8" SPK.203 Ground Floor Renkus-Heinz CA121M-RD 40.00° -30.0 0° 0.00° 32 1'-5" 1'-5" 1'-0 5/8" SPK.204 Ground Floor Renkus-Heinz CA121M-RD -40.00° -30. 00° 0.00° 32 1'-5" 1'-5" 1'-0 5/8" Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Fm:

To:

Fm:

To:

Scale:

Scale:

Scale:

In Out
Fm:

To:

Fm:

To:

In Out
Scale:

Scale:

In Out
In Out
DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Total
Tap at Watts
Total
Tap at Watts
Total
Tap at Watts
1 2
3 4
In Out
LENS
In Out
In Out
Scale:

Fiber connection on rear of patchbay
Fiber Patch cord from front of patch bay to equipment
8Ω
8Ω
8Ω
8Ω
8Ω
Non-Normalled Patch Bay
Normalled Patch Bay
Half-Normalled Patch Bay
Source Device
Destination
Device
Destination
Sheet Number
Source
Sheet Number Source Device
Destination
Device
Patch Bay ID
Female
Connector
Male Connector
Panel Mount
Loose, Connectorized
Use Looping Plug
Parallel (barrier strip) Connection
These signals are not physically combined.

They remain two discreet signals.

Cable passes through box unspliced
Headphones
Power Supply
Headset
Microphone
Wired keyboard and Mouse per
manufacturer's recommendation
AV Device
AV Display/Touchscreen
Amplifier w/DSP
Helical RX Antenna
Diversity TX Antenna
Omni TX Antenna
Omni RX Antenna
70V Surface-Mounted Speakers
70V Pendant-Mounted Speakers
70V Ceiling-Mounted Speakers
Amplifier w/o DSP
Directional TX Antenna
Directional RX Antenna
Camera Lens PTZ Camera
1-Way/Coaxial Loudspeaker
2-Way Loudspeaker
Dual Driver Subwoofer
Loudspeaker Rigging
Volume Control
Parallel (screw terminal) Connection
Card Inserted in AV Device
Outbound Device Signal Inbound Device Signal
Dual LC Fiber Optic Patch Point
Bay Point Number
Populated by the contractor
Patch Bay ID Data Patch Bay Point
Connection on rear of patchbay Connection on rear of patchbay Bay Point Number
Populated by the contractor
Panel Connector ID Numbering
Populated by the contractor
Designates Signal Type
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
Manufacture
Model
##
Bay ID
##
Bay ID
Bay ID
##
Bay ID
##
##
Bay ID
CCU.101
RTR.101 AV-752 CCU.101
RTR.101 AV-751
Connector Signal ID-##
Signal Type
Connector Signal ID-##
Signal Type
Panel
Connector Signal ID-##
Signal Type
Connector Signal ID-##
Signal Type
Bay ID
##
1 Audio & Video Patch Bay Key
None
4 Page Flag Key
None
3 Connector Key
None
Device
Mixer
Recorder AV-701 Mixer
Recorder AV-751
Device
5 Flag Signal Combining
None
Device ID
Description
6 Equipment Legend
None
Device ID
Description
Device ID
Description
Device ID
Description
Device ID
Description
Diagonal Size
Description
Device ID
Device ID Device ID
QTY
Description
##
Device ID
Description
Device ID
Description
Device ID
Description
Device ID
Description
Device ID Device ID
QTY
Description
##
Device ID Device ID
QTY
Description
##
Description
Device ID
Device ID
Description
Device ID
Description
Device ID
Description
Device ID
Description
Device ID
Device ID
Device ID
Manufacture
Model
Description
Device ID
Device ID
Card ID
Description
Signal ID
Connector
Signal ID
Connector
2 Data & Fiber Patch Bay Key
None
##
FPB.01
##
Sys.DPB
##
Sys.DPB
Panel
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:51:59 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematic Legend
AV7.00
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
In Out
Fm:

To:

In Out
Fm:

To:

Fm:

To: Fm:

To:

Scale:

Scale:

In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

OFE OFE OFE
OFE
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:
27 41 34 to coordinate connection to
fire alarm control panel with DIV 28 for
AV system operation, as directed by
local AHJ, during an emergency event.

Port numbers on switches dependant on logical VLAN
configuration. Equipment with primary & secondary
connections to have matching port numbers on primary
& secondary switches. Connection to facility LAN shall
be coordinated with building IT staff. AV devices on
Facility LAN shall be controlled by DSP.##.

AUDITORIUM PLATFORM

COURTYARD

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM AVL EQUIPMENT ROOM
27 41 34 to provide a method for
controlling all associated architectural &
theatrical lighting systems, shade
systems, acoustical banner systems, &
building management control systems.

Available ports will be patched to ETIE's for ICOM LAN (Intercom) connectivity.

Last ETIE connection on all associated panels to be activated for the ICOM LAN.

Available ports will be patched to ETIE's for Dante connectivity. First ETIE connection on all associated panels to be activated for the Dante LAN.

AUDITORIUM CATWALK
Available ports will be assigned Q-SYS control & VIP LAN (Video over IP).

COURTYARD
Available ports will be assigned Q-SYS control & VIP LAN (Video over IP).

AUDITORIUM AVL EQUIPMENT ROOM
Available ports will be assigned Q-SYS
control & VIP LAN (Video over IP).

Available ports will be assigned Q-SYS
control & VIP LAN (Video over IP).

GALLERY AVL EQUIPMENT ROOM
QSC
Core 110F-V2
Owner Furnished
Contractor Installed
Williams Sound
FM T55
Williams Sound
ANT 024
QSC
TSC-101-G3
Atterotech
unD6IO-BT
Clear-Com
ARCADIA-X4-16P
Clear-Com
110/100
Owner Furnished
Contractor Installed
EAW
AC6
EAW
AC6
EAW
AC6
EAW
AC6
Owner Furnished
Contractor Installed
Owner Furnished
Contractor Installed
DSP.##
Digital Signal Processor
Out
PHNX
QLAN-A
RJ45
GPIO
PHNX
Out
PHNX
In
PHNX
Out
PHNX
In
PHNX
Out
PHNX
In
PHNX
Out
PHNX
In
PHNX
Out
PHNX
In
PHNX
Out
PHNX
NWS.01
(48) Port Minimum
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
10G Port-##
RJ45
ALS.##
Assisted Listening
In-1
XLR3-F
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
10G Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
APB.##
##
APB.##
##
ALS.ANT
Wall Mount Antenna ALS RF
F
LAN
RJ45
ALS.## LAN
NWS.## LAN
TSC.##
10" Touchscreen
AVWB.##
QLAN
RJ45
##
EPB.##
BTN.##
Bluetooth I/O
Dante
RJ45
AVWB.##
##
EPB.##
BTN.## Dante
NWS.## Dante
TSC.## QL-A
NWS.## QL-A NWS.## QL-A
DSP.## QL-A
2 Core Audio DSP & Control Processor | Intercom Processor | Prefunction Audio I/O None
1 Core Technical AV Network System
None
RS-232
PHNX
GPIO|RS-232|CC|TCPiP
PHNX
ICM.#
Main Com Station
Stage Annouunce
XLR3-M
Program In
XLR3-F
LAN
ETHCON
GIM.##
ICM.## ICOM LAN
NWS.## ICOM LAN
NWS.02
(48) Port Minimum
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
10G Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Av.7-1
ETHCON ETIE-##
AV Data
ETHCON ETIE-##
AV Data
##
EPB.##
##
EPB.##
XLR3-F INPUT-##
Mic/Line Level
XLR3-F ATIE-##
Line Level APB.##
##
Out
PHNX
APB.##
##
FALS
RF Cable (G) F
AVWB.##
APB.##
## XLR3-F INPUT-##
Mic/Line Level
APB.##
## XLR3-F ATIE-##
Line Level
APB.##
## XLR3-F INPUT-##
Mic/Line Level
APB.##
## XLR3-F INPUT-##
Mic/Line Level
BNC VTIE-##
HD-SDI
BNC VTIE-##
HD-SDI
##
VPB.##
##
VPB.##
APB.##
##
Av.7-4
ETHCON ETIE-##
AV Data
ETHCON ETIE-##
AV Data
##
EPB.##
##
EPB.##
XLR3-F INPUT-##
Mic/Line Level
XLR3-F ATIE-##
Line Level APB.##
##
APB.##
## XLR3-F INPUT-##
Mic/Line Level
APB.##
## XLR3-F ATIE-##
Line Level
APB.##
## XLR3-F INPUT-##
Mic/Line Level
APB.##
## XLR3-F INPUT-##
Mic/Line Level
BNC VTIE-##
HD-SDI
BNC VTIE-##
HD-SDI
##
VPB.##
##
VPB.##
TYP OF 4 TYP OF 4
S.2
CCS.##
S.2
CCS.##
S.2
CCS.##
S.2
CCS.##
LAN
RJ45
##
EPB.##
##
EPB.##
##
EPB.##
##
EPB.##
10G Port-##
RJ45
NWS.03
(12) Port Minimum
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
10G Port-##
RJ45
10G Port-##
RJ45
10G Port-##
RJ45
P/O NWS.04
(48) Port Minimum
10G Port-##
RJ45
10G Port-##
RJ45
##
FPB.##
##
FPB.##
##
FPB.##
##
FPB.##
NWS.## DANTE LAN
CCS.## DANTE LAN
LAN
RJ45
NWS.## DANTE LAN
CCS.## DANTE LAN
LAN
RJ45
NWS.## DANTE LAN
CCS.## DANTE LAN
LAN
RJ45
NWS.## DANTE LAN
CCS.## DANTE LAN
In
PHNX
In
PHNX
In
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
Flex
PHNX
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-3
DSP.##
COURTYARD Av.7-3
DSP.##
COURTYARD Av.7-3
DSP.##
COURTYARD Av.7-3
DSP.##
DSP.##
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-2
DSP.##
COURTYARD Av.7-3
DSP.##
COURTYARD Av.7-3
Out
PHNX
Out
PHNX
DSP.##
COURTYARD Av.7-4
DSP.##
COURTYARD Av.7-4
DSP.##
COURTYARD Av.7-1
DSP.##
COURTYARD Av.7-1
DSP.##
COURTYARD Av.7-4
DSP.##
COURTYARD Av.7-4
DSP.##
COURTYARD Av.7-1
DSP.##
COURTYARD Av.7-1
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:04 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.30
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Scale:

Scale: Scale:

Scale:

Scale:

TYP OF
TYP OF
TYP OF
TYP OF
TYP OF
TYP OF 4
TYP OF 4
Labels to match what
is scheduled for the
floor boxes & wall
panels.

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM AVL EQUIPMENT ROOM

AUDITORIUM

AUDITORIUM AUDITORIUM

AUDITORIUM

AUDITORIUM
Allow enough length so that-any
Microphone can be plugged into any
stage rack input on SBX.##.

Microphone lines shall be covered in
techflex & bundled in groups that
correspond to the audio panel or box they
are associated with a separate color for
each bundle. Refer to AV5.00.

AUDITORIUM
Box INPUT Qty
AVWB.138 INPUT 1-2 2
AVWB.129 INPUT 3-4 2
AVWB.143 INPUT 5-6 2
AVFB.108 INPUT 7-8 2
AVFB.109 INPUT 9-10 2
AVFB.110 INPUT 11-12 2
AVFB.111 INPUT 13-14 2
AVWB.142 INPUT 15-16 2
Box ATIE Qty Gender
AVWB.138 ATIE 1-2 2 2M
AVWB.129 ATIE 3-4 2 2M
AVWB.143 ATIE 5-6 2 2M
AVFB.108 ATIE 7-8 2 2M
AVFB.109 ATIE 9-10 2 2M
AVFB.110 ATIE 11-12 2 2M
AVFB.111 ATIE 13-14 2 2M
AVWB.100 ATIE 15-20 6 6M
Box ETIE Qty
AVWB.138 ETIE 1-4 4
AVWB.129 ETIE 5-8 4
AVWB.143 ETIE 9-12 4
AVFB.108 ETIE 13-14 2
AVFB.109 ETIE 15-16 2
AVFB.110 ETIE 17-18 2
AVFB.111 ETIE 19-20 2
AVWB.142 ETIE 21-24 4
AVWB.113 ETIE 25-26 2
AVWB.115 ETIE 27-28 2
AVWB.145 ETIE 29-32 4
AVCB.190 ETIE 33-34 2
AVWB.100 ETIE 35-50 16
AVR.103 ETIE 51-54 4
Box VTIE Qty
AVWB.138 VTIE 1-2 2
AVWB.129 VTIE 3-4 2
AVWB.143 VTIE 5-6 2
AVFB.108 VTIE 7-8 2
AVFB.109 VTIE 9-10 2
AVFB.110 VTIE 11-12 2
AVFB.111 VTIE 13-14 2
AVWB.142 VTIE 15-16 2
AVWB.113 VTIE 17 1
AVWB.115 VTIE 18 1
AVWB.145 VTIE 19-20 2
AVCB.190 VTIE 21 1
AVWB.100 VTIE 22-27 6
AVR.103 VTIE 28-31 4
Box FTIE Strands
AVWB.138 FTIE 1-2 4
AVWB.129 FTIE 3-4 4
All associated EtherCON
cables, headsets, &
accessories shall be provided
Patchable to all ETIE's
All associated EtherCON
cables, headsets, &
accessories shall be provided
Patchable to all ETIE's
Patchable to all ETIE's with
provided 25' ethercon
cables by 274134.

Patchable to all ETIE's with
provided 25' ethercon
cables by 274134.

Patchable to all ATIE's with
provided 25' XLR and
power cables per speaker
by 274134.

Patchable to all ATIE's with
provided 25' XLR and
power cables per speaker
by 274134.

AUDITORIUM AUDITORIUM BOH RACK

GALLERY AVL EQUIPMENT ROOM
All associated EtherCON
cables & accessories shall
be provided
Patchable to all ETIE's
Patchable to all ETIE's with
provided 25' ethercon
cables by 274134.

Belden
Per Spec
Belden
Per Spec
Belden
Per Spec
Bittree
Per Spec
Bittree
B64T-2MWNHD
Belden
Per Spec
Clear-Com
CC-110-X4
Clear-Com
Helix Net HXII-BP-X4
Clear-Com
CC-110-X4
Clear-Com
Helix Net HXII-BP-X4
Renkus
CA121M-AB
Renkus
CA121M-AB
Belden
Per Spec
Belden
Per Spec
Allen & Heath
AH-DT168
P/O AVFB.##
ETHCON ETIE-1
AV Data
ETHCON ETIE-2
AV Data
TYP OF 2
P/O AVPB.##
ETHCON ETIE-65
AV Data
ETHCON ETIE-66
AV Data
TYP OF 2
EPB.##
Ethernet Patch Panel
Port 1
RJ45
Port 24
RJ45
3 Auditorium - Ethernet Tie Line System
None
4 Auditorium - Audio Tie Line System
None
XLR3-M INPUT-1
MIC-Level
XLR3-M INPUT-16
MIC-Level
TYP OF 16
P/O AVFB.##
XLR3-F INPUT-4
INPUT-Level
TYP OF 4
P/O AVPB.##
XLR3-F INPUT-1
INPUT-Level
P/O AVFB.##
XLR3-M ATIE-1
Line Level
XLR3-M ATIE-2
Line Level
TYP OF 2
XLR3-F INPUT-81
INPUT-Level
TYP OF 2
XLR3-F INPUT-80
INPUT-Level
EPB.##
Ethernet Patch Panel
Port 25
RJ45
Port 48
RJ45
P/O AVWB.##
OPTICON FTIE-1
Line Level
OPTICON FTIE-2
Line Level
TYP OF 2
P/O AVWB.##
OPTICON FTIE-6
Line Level
OPTICON FTIE-7
Line Level
TYP OF 2
TYP OF 4
5 Auditorium - Fiber Tie Line System
None
FPB.##
Fiber Patch Bay
Port 1
Dual LC
Port 4
Dual LC
APB.##
TT Audio Patchbay
1 Auditorium - Mic/Line Level Input System
None
P/O AVFB.##
BNC-75 VTIE-1
Line Level
BNC-75 VTIE-2
Line Level
TYP OF 2
P/O AVPB.##
BNC-75 VTIE-48
Line Level
VPB.##
Video Patch Panel
Port 1
BNC-75
Port 48
BNC-75
TYP OF31
2 Auditorium - Video Tie Line System
None
EPB.##
Ethernet Patch Panel
Port 49
RJ45
Port 66
RJ45
TYP OF 6
TYP OF 24
TYP OF 24
Intercom Headsets
Intercom Digital Beltpack
Intercom Headsets
Intercom Digital Beltpack

ETHCON ETHCON

ETHCON ETHCON
P/O AVFB.##
XLR3-M ATIE-1
Line Level
XLR3-M ATIE-2
Line Level
TYP OF 6
Active Speakers
Active Speakers
XLR3-FM XLR3-M
XLR3-FM XLR3-M
TYP OF 6
FPB.##
Fiber Patch Bay
Port 1
Dual LC
Port 6
Dual LC
TYP OF 6
Port 5
Dual LC
Port 10
Dual LC
TYP OF 6
FPB.##
Fiber Patch Bay
Port 1
Dual LC
Port 6
Dual LC
TYP OF 6
Port 11
Dual LC
Port 16
Dual LC
SBX.##
16x8 Stage Box

ETHCON ETHCON
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:08 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.31
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents

OFE OFE
In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Scale:

Fm:

To:

Scale:

Scale:

Fm:

To:

DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:
8Ω
8Ω
8Ω
8Ω
Use ETIE on AVWB.##
Use ETIE on AVWB.##
Use ETIE on AVWB.##
Use ETIE on AVWB.##
Microphone inputs from i/o panels.

All cables to associated audio & video wall panels shall be bundled together in braided cable sleeves to form continuous cable looms.

Provide adequate slack, spare cables, & power in looms.

Provided & installed by 27 41 34
Use ETIE on AVWB.##

AUDITORIUM AUDITORIUM AVL FOH BOOTH

AUDITORIUM AVL EQUIPMENT ROOM
Outputs normalled
to ATIE's 1-20
From ETIE on AVWB.##0

AUDITORIUM AVL EQUIPMENT ROOM AUDITORIUM PLATFORM AUDITORIUM WIRELESS LOOSE INVENTORY All associated rechargeable
batteries, charging station, &
accessories shall be provided
All associated rechargeable
batteries, charging station,
headsets, lavalieres &
accessories shall be provided
Use ETIE on AVWB.## Provide tabletop mount
TSC-710t-G3
274134 shall install all
pertinent software to
interface with the system:

Dante Controller
Wireless Workbench
Q-SYS Designer
Avantis Director
Vision Lite
Ki Pro Ultra
Mosaic
CCM for HelixNet
Provide Q-Lab licence.

COURTYARD
RF Venue
DFIN
Allen & Heath
AVANTIS-W-dPACK
Radial Engineering

USB-PRO
Apple
Mac Mini or Equivalent
BenQ
PD2700U
Shure
ULXD4Q
Allen & Heath
M-DL-DANTE64-A
Allen & Heath
GX4816
Shure
ULXD4Q
Visionary Solutions
DuetE-5
Shure
ULXD2/SM86
Shure
ULXD1
QSC
TSC-101-G3
RF Venue
4Zone
Shure
UA860SWB
Shure
UA860SWB
L-Acoustics
LA2Xi
L-Acoustics
X8
L-Acoustics
X8
ANT.##
Wall Mount Antenna
BNC-50
BNC-50
MIX.##
Digital Mixing Console
In-1
XLR3-F
SLink
ETHCON
USA.##
Stereo USB DI - Audio
Left
XLR3-M
Right
XLR3-M
In-2
XLR3-F
USB
Type-B
CPU.##
OFE Computer - Audio
USB
Type C
USB
Type C
Video Out
HDMI
MON.##
Monitor
27"
In
HDMI
USB
Type B
USB
Type-A
NWS.## LAN
CPU.## LAN AV7.##
LAN
RJ45
ETHCON
RJ45s
MIX.## SLink
SBX.## GX
MIX.## LAN
NWS.## LAN AV7.##
WRX.##
4CH Wireless Receiver
BNC-50 Wireless A
RF Cable (F)
BNC-50 Wireless B
RF Cable (F)
ANT-A
BNC-50
ANT-B
BNC-50
WRX.## D-Pri
NWS.## D-Pri AV7.##
MIX.##.B
Card Slot
Dante Pri.

RJ45 ETHCON MIX.##.B D-Pri
NWS.## D-Pri AV7.##
Dante Pri.

RJ45
SBX.##
48x16 Channel Stagebox
GX Link
ETHCON
In-1
XLR3-F
In-16
XLR3-F
Typical of 16
XLR3-M INPUT-1
MIC-Level
XLR3-M INPUT-16
MIC-Level
TYP OF 16
WRX.##
4CH Wireless Receiver
ANT-A
BNC-50
ANT-B
BNC-50
WRX.## D-Pri
NWS.## D-Pri AV7.## Dante Pri.

RJ45
VEN.##
IP AV Encoder - HDMI
In-1
HDMI
Loop-Out
HDMI
USB
Type B
LAN
RJ45
USB
Type-A
USB
Type-A
LAN
RJ45
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
1 Auditorium - Front of House Audio Control Position
None
MIX.## SLink
SBX.## GX
APB.##
##
APB.##
##
Out-1
XLR3-M
Out-20
XLR3-M
Typical of 20
2 Auditorium - Remote Audio I/O Stagebox
None
AVWB.##
Handheld Transmitters
Quantity (4)
Bodypack Transmitters
Quantity (8)
3 Auditorium - Wireless Microphone System
None
TSC.## QL-A
NWS.## QL-A AV7.##
TSC.##
10" Touchscreen
LAN
RJ45
WZC.##
Wireless Zones
ANT-A1
BNC-50
ANT-B1
BNC-50
ANT-A
BNC-50
ANT-B
BNC-50

CASCADE-A
BNC-50

CASCADE-B
BNC-50

CASCADE-A
BNC-50

CASCADE-B
BNC-50
ANT.##
Wall Mount Antenna
BNC-50 BNC-50 Wireless A
RF Cable (F)
An.1
ANT.##
Wall Mount Antenna
BNC-50 BNC-50 Wireless A
RF Cable (F)
An.1
ANT-A2
BNC-50
ANT-B2
BNC-50
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB

AES A&B
PHNX

AES C&D
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
BMS.##
BMS.##
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:12 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.32
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:

Fm:

To:

Scale:

Fm:

To:

Fm:

To:

DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:

DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:

Fm:

To:

Fm:

To:

In Out
DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:

DSP
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
0100 0100
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1011 1011
0110 0110
1101 1101
1001 1001
0110 0110
0110 0110
1001 1001
0110 0110
1 2
3 4
In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω
8Ω

AUDITORIUM - FLOWN AUDITORIUM BOH RACK

AUDITORIUM - SURROUNDS

PLATFORM - FOLD BACK MONITOR
L-Acoustics
A15i-BUMP & A10i-TILT
L-Acoustics
A10i Focus (35|35)
L-Acoustics
KS21i
L-Acoustics
A15i-BUMP & A10i-TILT
L-Acoustics
A10i Focus (55|55)
L-Acoustics
A10i Wide (55|55)
L-Acoustics
LA2Xi
L-Acoustics
LA2Xi
L-Acoustics
A10i Focus (35|35)
L-Acoustics
KS21i
L-Acoustics
A10i Focus (55|55)
L-Acoustics
A10i Wide (55|55)
L-Acoustics
A10i-BUMP
L-Acoustics
LA2Xi
L-Acoustics
A10i Focus (35|35)
L-Acoustics
A10i Focus (55|55)
L-Acoustics
A10i Wide (55|55)
L-Acoustics
LA2Xi
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
L-Acoustics
X8
Focusrite PRO
RedNet D16R MkII
L-Acoustics
LA2Xi
L-Acoustics
LA2Xi
L-Acoustics
X8
L-Acoustics
X8
Left Main Array
RMA.##
SUB.##
Right Main Array
RMA.##
RMA.##
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB
AVJB.##
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB
AVJB.##

AES A&B
PHNX
LAN
RJ45

AES A&B
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
NWS.## LAN
AMP.## LAN AV7.##
1 Auditorium - Loudspeaker System
None
RMA.##
SUB.##
RMA.##
RMA.##
AMP.##
SUB.##
AMP.##
SUB.##
Left Main Array
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB
AVJB.##

AES A&B
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
RMA.##
RMA.##
RMA.##
Power Amplifier
AMP.##
Out 1
TB
Out 3
TB

AES A&B
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
AMP.##
SUB.##
AMP.##
SUB.##
S.1 S.1 S.1
SUR.##
SUR.##
SUR.##
S.1 S.1 S.1
SUR.##
SUR.##
SUR.##
S.1 S.1
SUR.##
SUR.##
DTD.##
Dante to AES3
AES #|#
PHNX
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB

AES A&B
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
Power Amplifier
AMP.##
Out 1
TB
Out 2
TB
Out 3
TB
Out 4
TB

AES A&B
PHNX
LAN
RJ45
NWS.## LAN
AMP.## LAN AV7.##
AES #|#
PHNX
AES #|#
PHNX
AES #|#
PHNX
AES #|#
PHNX
AES #|#
PHNX
LAN
RJ45
NWS.## LAN
DTD.## AV7.##
S.1 S.1
SFS.##
SFS.##
AMP.##
SFS.##
AMP.##
SFS.##
AMP.##
SFS.##
AMP.##
SFS.##
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:16 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.33
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Scale:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

In Out
In Out
In Out
In Out
In Out
In Out
In Out
In Out
Fm:

To:

Fm:

To:

Fm:

To:

In Out
In Out
Fm:

To:

In Out
Fm:

To:

In Out
Fm:

To:

In Out
Fm:

To:

In Out
Fm:

To:

In Out
In Out
Fm:

To:

Fm:

To:

Fm:

To:

AUDITORIUM PROJECTION SYSTEM AUDITORIUM AVL EQUIPMENT ROOM AUDITORIUM PLATFORM Provide Loose
12' HDMI Cable

TO VIDEO ROUTER

TO VIDEO ROUTER

FROM VIDEO ROUTER

FROM VIDEO ROUTER

OFE COMPUTER

OFE COMPUTER
Tascam
BD-MP4K
Barco
UDM 4k22
Barco
R9862030
Crestron
DM-NVX-D30
Crestron
DM-TX-4KZ-100-C-1G-B-T
Crestron
DM-TX-4KZ-100-C-1G-B-T
Mersive
SP-8000-E3
Stewart Filmscreen
CASCADE GRANDE S6
Crestron
DM-TX-4KZ-100-C-1G-B-T
Crestron
DM-TX-4KZ-100-C-1G-B-T
Crestron
DM-TX-4KZ-100-C-1G-B-T
Crestron
DM-TX-4KZ-100-C-1G-B-T
EPSON
EB-PU2216B
Epson
ELPLX02S
Crestron
DM-NVX-D30
QSC

QSC DCIO-H
Crestron
DM-TX-4KZ-100-C-1G-B-T
Crestron
DMF-CI-8
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-E760C
Crestron
DM-NVX-D30C
Stewart Filmscreen
CASCADE GRANDE S6
Crestron
DMF-CI-8
Crestron
DM-NVX-E30C
Crestron
DM-NVX-D30C
Crestron
DM-NVX-E30C
Crestron
DM-NVX-E30C
Crestron
DM-NVX-E30C
Crestron
DM-NVX-E30C
Crestron
DM-NVX-E30C
Crestron
DM-NVX-D30C
BRP.##
Blu-Ray Player
NWS.## LAN
BRP.## LAN AV7.## LAN
RJ45
OUT
HDMI
PRJ.##
Projector
Lens.##

2.8-4.5:1
VCB.##
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
NWS.## VIP LAN
VDE.## VIP LAN AV7.## ##
EPB.##
P/O AVWB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s HDMI HDMI
P/O AVWB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
WPG.##
Wireless Presentation
OUT
HDMI
LAN
RJ45
NWS.## LAN
WPG.## LAN AV7.##
1 Auditorium - Presentational Video System
None
SCN.##
22' x 11'-10" 1.85:1
P/O AVWB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
Control
CC
P/O AVFB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
P/O AVFB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
P/O AVFB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
PRJ.##
Projector
SDI
BNC-75
LAN
RJ45
Lens.##
.35
VCB.##
##
VPB.##
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
NWS.## VIP LAN
VDE.## VIP LAN AV7.## ##
EPB.##
NWS.## VIP
VDE.## VIP AV7.##
CAP.##
Cinema Audio Processor
In
HDMI
LAN
RJ45
CAP.## QL-A
NWS.## QL-A AV7.##
NWS.## LAN
PRJ.## LAN AV7.## ##
EPB.##
SDI
BNC-75
LAN
RJ45
##
VPB.##
NWS.## LAN
PRJ.## LAN AV7.## ##
EPB.##
P/O AVFB.##
VEN.##
HDMI Transmitter
IN
HDMI
DTP
RJ45s
IVC.##
IP Matrix Chassis
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VEN.##
IP Encoder
DTP
RJ45s
VDE.##
IP Decoder
LAN
RJ45
LAN
RJ45
LAN
RJ45
LAN
RJ45
LAN
RJ45
LAN
RJ45
LAN
RJ45
LAN
RJ45
Out
HDMI
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
SCN.##
22' x 11'-10" 1.85:1
Control
CC
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
NWS.## VIP
VDE.## VIP AV7.##
IVC.##
IP Matrix Chassis
VEN.##
IP Encoder
VDE.##
IP Decoder
LAN
RJ45
LAN
RJ45
Out
HDMI
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.##
IP Encoder
LAN
RJ45
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.##
IP Encoder
LAN
RJ45
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.##
IP Encoder
LAN
RJ45
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.##
IP Encoder
LAN
RJ45
VEN.## VIP LAN
NWS.## VIP LAN AV7.##
VEN.##
IP Encoder
LAN
RJ45
VDE.##
IP Decoder
In
HDMI
In
HDMI
In
HDMI
In
HDMI
In
HDMI
In
HDMI
NWS.## VIP
VDE.## VIP AV7.## LAN
RJ45
Out
HDMI
RLC.##
SCN.## AV7.##
RLC.##
SCN.## AV7.##
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:20 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.34
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Scale:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

In Out
In Out
In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

In Out
Fm:

To:

In Out
Fm:

To:

In Out
In Out
In Out
In Out
In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

In Out
Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

Fm:

To:

In Out
Fm:

To:

Fm:

To: In Out
Fm:

To:

In Out
Fm:

To:

Fm:

To:

Fm:

To:

In Out
In Out
Fm:

To:

In Out
In Out
Fm:

To:

In Out
In Out
Fm:

To:

In Out
In Out
Fm:

To:

In Out
In Out
In Out
In Out
Fm:

To:

Fm:

To:

Mount to wall adjacent to panel inverted
with bottom facing the ceiling above.

Provide wall mount bracket.

Use VTIE on AVWB.##
Use VTIE on AVWB.##
Use ETIE on AVWB.##
Mount to wall adjacent to panel on auditorium
centerline inverted with bottom facing the
ceiling above. Provide wall mount bracket.

Mount to wall adjacent to panel inverted
with bottom facing the ceiling above.

Provide wall mount bracket.

Use VTIE onAVWB.##
Use ETIE on AVWB.##
Use ETIE on AVWB.##
Use VTIE on AVWB.##
Mount to wall adjacent to panel on auditorium
centerline inverted with bottom facing the
ceiling above. Provide wall mount bracket.

Use ETIE on AVWB.##
Mount to wall adjacent to panel inverted
with bottom facing the ceiling above.

Provide wall mount bracket.

Use VTIE onAVWB.##
Use ETIE on AVWB.##

AUDITORIUM AVL EQUIPMENT ROOM AUDITORIUM

FROM IP DECODER

FROM IP DECODER

TO IP ENCODER

TO IP ENCODER
Normaled From
VTies on VPB.##
BACK OF HOUSE AVR.103
BirdDog
P110W
BirdDog
P120W
BirdDog
P110
BirdDog
P120W
BirdDog
P110W
Newtek
TC1
Newtek
TC1SP
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Dell
p2418HT
Blackmagic Designs
BMD-VHUBSMAS12G4040
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Ross
UDA-8705A-R2L
Ross

OGX-FR-CNS
Ross
SPG-8260-W
BirdDog
BDOG4
BirdDog
BDOG4
BirdDog
BDOG4
BirdDog
BDOG4
AJA
OG-FiDO-TR-12G
AJA
OG-FiDO-TR-12G
Atomos
Shogun Studio 2
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Decimator Design
12G-Cross
Samsung
QN50QN90B
Decimator Design
12G-Cross
Samsung
QN50QN90B
Decimator Design
12G-Cross
Samsung
QN50QN90B
Decimator Design
12G-Cross
Samsung
QN50QN90B
JVC Professional
DT-X7HUx2
JVC Professional
DT-X7HUx2
BirdDog

BDPTZKEY
BirdDog

BDPTZKEY
1 Auditorium - Production Video System
None
PTZ.## (House Left)
PTZ x10 FHD Camera
PTZ.## (House Center)
PTZ x20 FHD Camera
LAN
RJ45
SDI
BNC-75
PTZ.## (Stage Center)
PTZ x10 FHD Camera
LAN
RJ45
SDI
BNC-75
LAN
RJ45
SDI
BNC-75
SDI
SDI
SDI
SDI
SDI
SDI
VPB.##
##
VPB.##
##
VPB.##
##
RJ45 ETHCON ##
EPB.##
RJ45 ETHCON ##
EPB.##
RJ45 ETHCON ##
EPB.##
PTZ.## (House Center)
PTZ x20 FHD Camera
LAN
RJ45
SDI
BNC-75 SDI SDI VPB.##
##
RJ45 ETHCON ##
EPB.##
PTZ.## (House Right)
PTZ x10 FHD Camera
LAN
RJ45
SDI
BNC-75 SDI SDI VPB.##
##
RJ45 ETHCON ##
EPB.##
PTZ.## NDI
NWS.## NDI AV7.##
PTZ.## NDI
NWS.## NDI AV7.##
PTZ.## NDI
NWS.## NDI AV7.##
PTZ.## NDI
NWS.## NDI AV7.##
PTZ.## NDI
NWS.## NDI AV7.##
SW.##
Switcher
LAN
RJ45
CP.##
Switcher Panel
In
BNC
In
BNC
In
BNC
In
BNC
Out
BNC
Out
BNC
Out
BNC
Out
BNC
HDMI Out
HDMI
CVTR.##
Converter
CVTR.##
RTR.01
SW.01
RTR.01
RTR.01
SW.01
10GB LAN
RJ45
REF In
BNC
NWS.01
SW.01 AV-75#
NWS.02
SW.01 AV-75#
Display Port Out
DP
CVTR.##
Converter
CVTR.##
RTR.01
UCS.##
Touch Monitor
24"
Sync
Device
RTR.##
40x40 12G Router
CVTR.##
Converter
CVTR.##
Converter
CVTR.##
Converter
CVTR.##
Converter
In
BNC
Out
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
Out
BNC
In
BNC
In
BNC
In
BNC
In
BNC
SW.01
RTR.01
Out
BNC
Out
BNC
Out
BNC
Out
BNC
RTR.01
SW.01
CVTR.##
RTR.01
CVTR.##
RTR.01
In
BNC
In
BNC
OGC.##
Sync DA
Out 1
BNC
Out 2
BNC
Out 3
BNC
Out 4
BNC
OGFR.01
Open Gear Frame
BNC
In 1 ##
BC VBP.##
OGC.##
DA
SYNC 1
BNC
SYNC 2
BNC
Black
BNC
Bars
BNC
BNC
In 1
WC
BNC
WC
BNC
Out 5
BNC
Out 6
BNC
Out 7
BNC
Out 8
BNC
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
##
BC VBP.##
SYNC 2
OGC.##
SYNC 1
SW.##
SYNC 1
SW.##
Sync
Device
Sync
Device
SYNC 2
OGC.##
Black
RTR.01
Bars
RTR.01
Black
RTR.01
Bars
RTR.01
In
BNC
In
BNC
USB
Type A
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
Out
BNC
In
BNC
OGC.##
NDI Converter
OGC.##
NDI Converter
OGC.##
NDI Converter
OGC.##
NDI Converter
OGC.##
RTR.01
Out 1
BNC
Out 2
BNC
OGC.##
RTR.01
In
BNC
In
BNC
USB
Type A
DVI-D
DP
In 1
BNC
In 2
SFP
OGC.##
SDI Over Fiber
Out 1
SFP
Out 2
BNC
Out
BNC
FBC.##
RTR.01
FBC.##
RTR.01
In
BNC
FBC.##
FBC.## AV7.##
FBC.##
FBC.## AV7.##
In 1
BNC
In 2
SFP
OGC.##
SDI Over Fiber
Out 1
SFP
Out 2
BNC
Out
BNC
FBC.##
RTR.01
FBC.##
FBC.## AV7.##
FBC.##
FBC.## AV7.##
FBC.##
RTR.01
In
BNC
LAN
RJ45
NWS.## LAN
OGC.## LAN AV7.##
NWS.## LAN
OGC.## LAN AV7.## LAN
RJ45
NWS.## LAN
OGC.## LAN AV7.## LAN
RJ45
NWS.## LAN
OGC.## LAN AV7.## LAN
RJ45
LAN
RJ45
NWS.## LAN
RTR.## LAN AV7.##
TYP OF 4
In
BNC
In
BNC
REC.##
Recorder
Out
BNC
Out
BNC
Out
BNC
Out
BNC
Out
BNC
Out
BNC
Out
BNC
Out
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
In
BNC
LAN
RJ45
NWS.## LAN
REC.## LAN AV7.##
REF In
BNC
Sync
Device
Out 1
HDMI
Out 2
HDMI
CVTR.##
Converter
CVTR.##
RTR.01
CVTR.##
Converter
CVTR.##
RTR.01
CVTR.##
RTR.01
CVTR.##
RTR.01
In
BNC
In
BNC
CVTR.##
Converter
TV.50.##.W
TV
50"
Out
BNC
In
HDMI
LAN
RJ45
NWS.## LAN
REC.## LAN AV7.##
CVTR.##
Converter
TV.50.##.W
TV
50"
Out
BNC
In
HDMI
LAN
RJ45
NWS.## LAN
REC.## LAN AV7.##
CVTR.##
Converter
TV.50.##.W
TV
50"
Out
BNC
In
HDMI
LAN
RJ45
NWS.## LAN
REC.## LAN AV7.##
CVTR.##
Converter
TV.50.##.W
TV
50"
Out
BNC
In
HDMI
LAN
RJ45
NWS.## LAN
REC.## LAN AV7.##
TV.50.##.W
Rack Monitors
Dual 7"
Out
BNC
Out
BNC
In
BNC
In
BNC
Out
BNC
Out
BNC
TV.50.##.W
Rack Monitors
Dual 7"
In
BNC
In
BNC
PTK.##
PTZ Keyboard
PTK.##
PTZ Keyboard
LAN
RJ45
NWS.## LAN
PTK.## LAN AV7.##
LAN
RJ45
NWS.## LAN
PTK.## LAN AV7.##
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:24 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.35
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
In Out
Scale:

Fm:

To:

Fm:

To:

OFE
Gallery PLATFORM Gallery AVL EQUIPMENT ROOM
Port numbers on switches dependant on logical VLAN
configuration. Equipment with primary & secondary
connections to have matching port numbers on primary
& secondary switches. Connection to facility LAN shall
be coordinated with building IT staff. AV devices on
Facility LAN shall be controlled by DSP.##.

All associated
rechargeable
batteries, charging
station, & accessories
shall be provided
All associated
rechargeable
batteries, charging
station, headsets,
lavalieres &
accessories shall be
provided
Use ETIE on AVPB.##
Use VTIE on AVPB.##
Patchable from ETIE
Available ports will be assigned Q-SYS control, ICOM LAN (Intercom), & VIP LAN (Video over IP). Ports will be patched to ETIE's.

Provide pipe grid attachment, rigging
hardware, appropriately sized mount,
projector lensing, & control by 274134.

Use ETIE on AVPB.##
Use VTIE on AVPB.##
Patchable from ETIE
Provide pipe grid attachment, rigging
hardware, appropriately sized mount,
projector lensing, & control by 274134.

Use ETIE on AVPB.##
Use VTIE on AVPB.##
Patchable from ETIE
Provide pipe grid attachment, rigging
hardware, appropriately sized mount,
projector lensing, & control by 274134.

Use ETIE on AVPB.##
Use VTIE on AVPB.##
Patchable from ETIE
Provide pipe grid attachment, rigging
hardware, appropriately sized mount,
projector lensing, & control by 274134.

Owner Furnished
Contractor Installed
Williams Sound
FM T55
Williams Sound
ANT 024
QSC
TSC-101-G3
Atterotech
unD6IO-BT
Shure
ULXD4Q Shure
UA860SWB
Shure
UA860SWB
Visionary Solutions
DuetE-2
Mersive
SP-8000-E3
Shure
ULXD2/SM86
Shure
ULXD1
Attero Tech
D16Mio
Attero Tech
D16Mio
Visionary Solutions
DuetD-5 EPSON
EB-PU2216B
Epson
ELPLX02S
Visionary Solutions
DuetD-5 EPSON
EB-PU2216B
Epson
ELPLX02S
Visionary Solutions
DuetD-5 EPSON
EB-PU2216B
Epson
ELPLX02S
Visionary Solutions
DuetD-5 EPSON
EB-PU2216B
Epson
ELPLX02S
P/O NWS.04
(48) Port Minimum
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
ALS.##
Assisted Listening
In-1
XLR3-F
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
10G Port-##
Dual LC - SFP
ALS.ANT
Wall Mount Antenna ALS RF
F
TSC.##
10" Touchscreen
AVWB.##
QLAN
RJ45
##
EPB.##
BTN.##
Bluetooth I/O
Dante
RJ45
AVWB.##
##
EPB.##
1 Gallery - Head-End, Wireless Microphones, & Video Presentation System None
NWS.## SFP
NWS.## SFP AV7.## | Auditorium Interconnect
FALS
RF Cable (G) F
AVWB.##
Port-##
RJ45
##
FPB.##
AIO.## Out 48
ALS.## In AV7.##
WRX.##
4CH Wireless Receiver
ANT-A
BNC-50
ANT-B
BNC-50
Dante Pri.

RJ45
ANT.##
Wall Mount Antenna
AVWB.##
BNC-50 BNC-50 Wireless A
RF Cable (F)
ANT.##
Wall Mount Antenna
AVWB.##
BNC-50 BNC-50 Wireless A
RF Cable (F)
LAN
RJ45
VEN.##
IP AV Encoder - HDMI
IN
HDMI
LAN
RJ45
WPG.##
Wireless Presentation
OUT
HDMI
LAN
RJ45
Port-##
RJ45
Port-##
RJ45
Handheld Transmitters
Quantity (4)
Bodypack Transmitters
Quantity (4)
P/O AIO.##
Dante Audio I/O
P/O AIO.##
Dante Audio I/O
Dante
RJ45
Dante
RJ45
Port-##
RJ45
SDI
BNC-75
LAN
RJ45
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
LAN
RJ45
ETHCON RJ45
SDI SDI ##
VPB.##
##
EPB.##
PRJ.##
Projector
Lens.##
.35
SDI
BNC-75
LAN
RJ45
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
LAN
RJ45
ETHCON RJ45
SDI SDI ##
VPB.##
##
EPB.##
PRJ.##
Projector
Lens.##
.35
SDI
BNC-75
LAN
RJ45
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
LAN
RJ45
ETHCON RJ45
SDI SDI ##
VPB.##
##
EPB.##
PRJ.##
Projector
Lens.##
.35
SDI
BNC-75
LAN
RJ45
Video Input
HDMI
RS-232
DB9
VDE.##
IP AV Decoder - HDMI
Out
HDMI
RS-232
PHNX
LAN
RJ45
LAN
RJ45
ETHCON RJ45
SDI SDI ##
VPB.##
##
EPB.##
PRJ.##
Projector
Lens.##
.35
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Port-##
RJ45
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:28 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.36
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Scale:

Scale:

Scale:

TYP OF TYP OF
TYP OF
TYP OF
TYP OF 4
TYP OF 2
Gallery AVL EQUIPMENT ROOM
Gallery AVL EQUIPMENT ROOM
Gallery AVL EQUIPMENT ROOM
Gallery Gallery
Gallery
Gallery
Box INPUT Qty
Av.4-1 INPUT 1-4 4
Av.4-2 INPUT 5-8 4
Av.4-3 INPUT 9-12 4
Av.4-4 INPUT 13-16 4
Av.4-5 INPUT 17-20 4
Av.4-6 INPUT 21-24 4
Box ATIE Qty Gender
BB.AVWB.01 ATIE 1-2 2 2M
BB.AVWB.02 ATIE 3-4 2 2M
BB.AVWB.03 ATIE 5-6 2 2M
BB.AVWB.04 ATIE 7-8 2 2M
BB.AVWB.05 ATIE 9-10 2 2M
BB.AVPB.01 ATIE 11 1 1M
BB.AVPB.02 ATIE 12 1 1M
BB.AVPB.03 ATIE 13 1 1M
BB.AVPB.04 ATIE 14 1 1M
BB.AVPB.05 ATIE 15 1 1M
BB.AVPB.06 ATIE 16 1 1M
BB.AVPB.07 ATIE 17 1 1M
BB.AVPB.08 ATIE 18 1 1M
Box VTIE Qty
Av.4-1 VTIE 1-2 2
Av.4-2 VTIE 3-4 2
Av.4-3 VTIE 5-6 2
Av.4-4 VTIE 7-8 2
Av.4-5 VTIE 9-10 2
Av.4-6 VTIE 11-12 2
Pb.4-1 VTIE 13-14 2
Pb.4-2 VTIE 15-16 2
Pb.4-3 VTIE 17-18 2
Pb.4-4 VTIE 19-20 2
Pb.4-5 VTIE 21-22 2
Pb.4-6 VTIE 23-24 2
Pb.4-7 VTIE 25-26 2
Pb.4-8 VTIE 27-28 2
Pb.4-9 VTIE 29-30 2
Box ETIE Qty
Av.4-1 ETIE 1-2 2
Av.4-2 ETIE 3-4 2
Av.4-3 ETIE 5-6 2
Av.4-4 ETIE 7-8 2
Av.4-5 ETIE 9-10 2
Av.4-6 ETIE 11-12 2
Pb.4-1 ETIE 13-14 2
Pb.4-2 ETIE 15-16 2
Pb.4-3 ETIE 17-18 2
Pb.4-4 ETIE 19-20 2
Pb.4-5 ETIE 21-22 2
Pb.4-6 ETIE 23-24 2
Pb.4-7 ETIE 25-26 2
Pb.4-8 ETIE 27-28 2
Pb.4-9 ETIE 29-30 2
Patchable to all ATIE's with
provided 25' XLR, power
cables, pipe grid
attachment, yoke mount,
& rigging hardware per
speaker by 274134.

Patchable to all ATIE's with
provided 25' XLR, power
cables, pipe grid
attachment, yoke mount,
& rigging hardware per
speaker by 274134.

All associated EtherCON
cables, headsets, &
accessories shall be provided
Patchable to all ETIE's
All associated EtherCON
cables, headsets, &
accessories shall be provided
Patchable to all ETIE's
Patchable to all ETIE's with
provided 25' ethercon
cables by 274134.

Patchable to all ETIE's with
provided 25' ethercon
cables by 274134.

Belden
Per Spec
Belden
Per Spec
Bittree
Per Spec
Attero Tech
D16Mio
Attero Tech
D16Mio Renkus
CA121M-AB
Renkus
CA121M-AB
Clear-Com
CC-110-X4
Clear-Com
Helix Net HXII-BP-X4
Clear-Com
CC-110-X4
Clear-Com
Helix Net HXII-BP-X4
P/O AVWB.##
ETHCON ETIE-1
AV Data
ETHCON ETIE-2
AV Data
TYP OF 2
P/O AVPB.##
ETHCON ETIE-65
AV Data
ETHCON ETIE-66
AV Data
TYP OF 2
EPB.##
Ethernet Patch Panel
Port 1
RJ45
Port 24
RJ45
2 Gallery - Ethernet Tie Line System
None
P/O AVWB.##
XLR3-F INPUT-4
INPUT-Level
TYP OF 4
P/O AVPB.##
XLR3-F INPUT-1
INPUT-Level
P/O AVWB.##
XLR3-M ATIE-1
Line Level
XLR3-M ATIE-2
Line Level
TYP OF 2
XLR3-F INPUT-81
INPUT-Level
TYP OF 2
XLR3-F INPUT-80
INPUT-Level
P/O AVPB.##
EPB.##
Ethernet Patch Panel
Port 25
RJ45
Port 36
RJ45
1 Gallery - Mic/Line Level Input System & Audio Tie Line System None
P/O AVWB.##
BNC-75 VTIE-1
Line Level
BNC-75 VTIE-2
Line Level
TYP OF 2
P/O AVPB.##
BNC-75 VTIE-18
Line Level
VPB.##
Video Patch Panel
Port 1
BNC-75
Port 48
BNC-75
TYP OF 48
3 Gallery - Video Tie Line System
None
XLR3-M ATIE-43
Line Level
TYP OF 12
TYP OF 24
P/O AIO.##
Dante Audio I/O
In 1
PHNX
In 16
PHNX
TYP OF 16
P/O AIO.##
Dante Audio I/O
In 17
PHNX
In 32
PHNX
TYP OF 16
TYP OF 16
TYP OF 16
Out 1
PHNX
Out 16
PHNX
Out 17
PHNX
Out 18
PHNX
Active Speakers
Active Speakers
XLR3-FM XLR3-M
XLR3-FM XLR3-M
Intercom Headsets
Intercom Digital Beltpack
Intercom Headsets
Intercom Digital Beltpack

ETHCON ETHCON

ETHCON ETHCON
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 10:52:32 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
AV Schematics
AV7.37
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Name Manufacturer Standard Part Number Application Description Nominal OD
(in)
Nominal OD
(mm) Signal Group
A Belden 1583A DMX-512 or Network Control 4 PR #24 AWG S olid Twisted Pairs PVC Jacket Unshielded 0.195 4.95 B B Belden 1533R DMX-512 or Network Control
4 PR #24 AWG Solid Twisted Pairs PVC Jacket Overall Sheild with Drain Wire 0.26 6.6 B
C Belden 9729 DMX-512 Control 2 Shielded PR #24 AWG Str anded Twisted PVC Jacket 0.266 6.76 B D Belden 8471 Architectural Control 1 PR #16 AWG Strande d Twisted. PVC Jacket Unshielded 0.274 6.96 B E Carol 76812-06 Architectural Control Ground #14 AWG St randed Green PVC Jacket Unshielded 0.136 3.45 B F Carol 76512-01/03
Architectural Control Power or 0-10VDC
Control 2 #16 AWG Stranded PVC Jacket Black/Red Unshielded 0.174 4.42 B H 1.2kW Dimmer Circuit Hot, Neutral, Ground (Wire size TBD by E.E.) 0 0 0 J 2.4kW Dimmer Circuit Hot, Neutral, Ground (Wire size TBD by E.E.) 0 0 0 M 120V @ 20A Utility Circuit Hot, Neutral, Ground (Wir e size TBD by E.E.) 0 0 0 N 208V @ 20A Utility Circuit 2 Hot, Ground (Wire size TBD by E.E.) 0 0 0 P 208V @ 30A Utility Circuit 2 Hot, Ground (Wire size TBD by E.E.) 0 0 0 Q 120/208V 3-Phase @ 20A Utility Circuit 3 Hot, Neutra l, Ground (Wire size TBD by E.E.) 0 0 0 Flush Floor or Ceiling Mounted
Box / Device
120V @ 20A Floor/Ceiling Duplex Outlet
120V @ 20A Floor/Ceiling Quadplex Outlet
120V @ 20A Wall Duplex Outlet
120V @ 20A Wall Quadplex Outlet
Custom Outlet
TL Symbols Examples and Nomenclature Electrical Symbols YY Mounting Type
Mounting Height
Box Size
Box ID Nomenclature:

Location.BoxStyle.Box#
ex: R1.LWP.101 = Room 1.Lighting Wall Panel.Box # 101
Location:

R1 - ROOM 1
R2 - ROOM 2
R3 - ROOM 3
F
+48"
2G
YY
R1.LWP.101
1A | 1" | TCT.101
Box Size
Mounting Height
Mounting Type
Box Function
Box Info Tag
Box ID
Conduit Destination
Conduit Size
Conduit Fill (See Cable Schedule)
Wall Box
with Info Tag
Box Style:

LFB Lighting Floor Box
LWP Lighting Wall Panel
LJB Lighting Junction Box
LER Lighting Equipment Rack
LRP Lighting Relay Panel
LPB Lighting Pipe Box
LDS Lighting Distribution Strip
LCS Lighting Company Switch
LCP Lighting Ceiling Pocket / Panel
LTS Lighting Emergency Transfer Switch
LBC Lighting DMX Emergency Bypass Controller
LDK Lighting Emergency Bypass Detection Kit
Box Function (YY):
iO Input/Output
Ui User Interface
Mounting Type:

F = Flush Mount
S = Surface Mount
Mounting Height:

Height shown is from finish
floor (AFF) to center of
installed box UON.

Box Size:

If a standard trade size, size
is given in number of gangs
(#G), or inches. If a custom
size, "C" is shown. See box
schedule(s) for additional
information.

Cable Tray ID:

TCT.Level+Area
TCT = Technical Cable Tray
Example: TCT.101
Conduit Destination:

AC = Accessible Ceiling
CT = Cable Tray
Utility Power
Flush Mount, Pipe Mount or
Surface Wall Mount Box / Device
Group A - Microphone and other sensitive wiring (0 - 100mV) Group B - Line Level wiring (100mV - 10V)
Group C - Loudspeaker and Control wiring (10V - 70V)
Terms and Definitions:

Provide = Supply and install equipment High Voltage = >100V Furnish = Supply to another contractor for installation Install = Install equipment provided by another contractor

1. All systems wiring will be in conduit unless app roved by the Consultant or otherwise noted on drawings.

2. There are minimum conduit separations that must be maintained between conduits carrying wire of different signal groups. It is important to note that while different signals may exist in a single box, it is not appropriate to run more than one signal group in a single conduit. Refer to tables below for conduit separation distances.

3. It will be necessary at times for conduits of di fferent signal groups to cross in close proximity. The conduit paths must be designed to cross at 90 degrees to each other.

4. The minimum conduit size shall be 3/4" and the c onduit should be sized for max. 40% fill, or less if required by prevailing code.

5. Per TIA 569-E, indoor conduit runs shall have ac cess to a pull box every 100' if there are more than (2) 90-degree bends. Pull boxes shall be placed in a straight section of the conduit.

6. Conduit for Outside Plant (OSP) optical fiber sh ould have pull boxes placed at intervals no greater than 300'.

7. Conduit bend radius will be no less than 6 times the diameter for conduits less than 2" ⌀, and no less than 10 times the diameter for conduits greater than 2" ⌀.

8. The design will require pull lines to be left in all conduit by the Contractor installing the conduit.

9. The conduit system shall incorporate additional pull boxes as required to match the pull tensions of the wiring to be installed.

10. The installing contractor shall determine from the cable specifications the appropriate pull tensions, and lubricate to ensure that the cable insulation will not be abraded or cut during installation.

11. Signal conduits should be mechanically and elec trically connected to the receptacle boxes. These conduits and boxes should connect to the building safety grounding system.

12. PVC conduit may only be used in underground app lications. All above slab conduit shall be EMT.

13. The tables below define minimum spacing require ments for conduits containing different types and levels of audio, video and communication signals that will be part of the complete systems. It is important that each group be installed in raceways discreet from other group levels.

14. In a situation where there will exist a heavy c urrent demand in adjacent conduits, or where there will be parallel runs >100', there will need to be additional separation between those conduits and the Signal Group A/B/C conduits.

15. Any wiring that is classified within a group ca n be combined in a raceway carrying other wiring that is in the same group. Common junction boxes/wire raceways that combine different signal groups shall not be used.

16. The different levels of signal grouping are def ined as follows:

Common Architectural Abbreviations
AFF Above Finished Floor
Bot Bottom
Clg Ceiling
Col Column
Cont Continuous
Dia Diameter
Dim(s) Dimension(s)
Dn Down
Dwg Drawing
Ea Each
El Elevation
Elec Electrical
Eq Equal
Exist Existing
Ext Exterior
Flr Floor
Ga Gauge
GWB Gypsum Wall Board
HVAC Heating, Ventilating, and Air Conditioning
Int Interior
Max Maximum
Mech Mechanical
Min Minimum
NIC Not in Contract
Nom Nominal
OC On Center
PVC Polyvinyl Chloride
RCP Reflected Ceiling Plan
Reqd Required
Rm Room
Sim Similar
Spec Specified OR Specification
Stl Steel
Struct Structure OR Structural
T&G Tongue and Groove
TME To Match Existing
TO Top Of
Typ Typical
UNO Unless Noted Otherwise
UON Unless Otherwise Noted
W/ With

1. All 120V, 20A utility circuits to terminate in a NEMA 5 -20R duplex UON.

2. All 208V, 20A utility circuits to terminate in a NEMA L6 -20R UON.

3. All 208V, 30A utility circuits to terminate in a NEMA L6 -30R UON.

4. All 2.4kw dimmable circuits to terminate in a 20 -2P&GF -flush receptacle UON.

5. All 6.0kw dimmable circuits to terminate in a 60 -2P&GF -flush receptacle UON.

6. Leave 18" service loop at all LWB, LFB, LPB, LCS, LJB, LDOS and LACR locations for control cables UON.

7. Leave 18" service loop at all LWB, LFB, LPB, LCS and LJB locations for power cables UON.

8. Leave 84" service loop at all LDR locations for control cables UON.

9. All control and power cables shall be labeled with a unique identifier which shall be noted on all drawings to allow for proper identification by all parties concerned.

10. All control cable terminations shall be completed by the theatrical lighting supplier in accordance with the device manu facturer's recommendations. All network connections to be terminated per TIA/EIA 568B standards. All cables shall be cut to proper length and bundled with all labels clearly visible i n order to allow for easy identification.

11. All power cable terminations shall be completed by the electrical contractor in accordance with the device manufacturer' s recommendations. All cables shall be cut to proper length and bundled with all labels clearly visible in order to allow for easy identification.

12. Each dimmable circuit shall have individual hot and neutral conductors. These shall be sized to meet all applicable nati onal, state and local electrical codes.

13. Each dimmable circuit shall be properly grounded to the circuit distribution device within which it is located. All grou nd conductors for individual distribution devices shall be sized to meet all applicable national, state and local electrical codes.

14. All mounting height dimensions are to the center of the box UON.

Separations - EMT or Rigid
Group A Group B Group C
Group A Adjacent Adjacent 3"
Group B Adjacent Adjacent 3"
Group C 3" 3" Adjacent
Branch Circuits (<30A) 6" 6" 6"
Branch Circuits (30A - 60A) 6" 6" 6"
Branch Circuits (>60A) 12" 12" 12"
Dimmer Controlled Lighting 12" 12" 12"
SCR Controlled Devices 12" 12" 12"
208/480V Feeder Circuits 24" 24" 24"
All Others (Plumbing, Heat, Etc.) 12" 12" 12"
Separations - PVC
Group A Group B Group C
Group A Adjacent Adjacent 6"
Group B Adjacent Adjacent 6"
Group C 6" 6" Adjacent
Branch Circuits (<30A) 6" 6" 6"
Branch Circuits (30A - 60A) 6" 6" 6"
Branch Circuits (>60A) 12" 12" 12"
Dimmer Controlled Lighting 12" 12" 12"
SCR Controlled Devices 12" 12" 12"
208/480V Feeder Circuits 24" 24" 24"
All Others (Plumbing, Heat, Etc.) 12" 12" 12"
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:26:14 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
General Notes & Legends
TL0.00
1 TL Plan Symbols 4 TL Cable Schedule
3 Conduit Notes
TL Scope of Work
Category Description Other 11 61 00
1 Power Determine the size and quantity of all high v oltage cable per appplicable code(s). DIV 26 X 2 Power Provide all 120V and 208V dimmable/utility di stribution circuits, and all 120V and 120/208V feeder circuits for the theatrical/architectural lighting systems. DIV 26 3 Power Terminate all high voltage cabling. DIV 26
4 Power Provide all conduit, wire, boxes , wireways, cabletrays, power distribution equipment, and transformers required for the theatrical/architectural lighting systems. DIV 26 5 Power Furnish all theatrical lighting connector str ips and pipe mount boxes with mounting hardware, floor boxes, wall panels/boxes, gridiron junction boxes, dimmer racks and control electronic racks.

X
6 Power Install all theatrical lighting connector str ips, pipe mount boxes, floor boxes, wall panels/boxes, gridiron junction boxes, dimmer racks and control electronic racks provided by the 11 61 00 contractor.

DIV 26
7 Control Verify all low voltage cable types with the 11 61 00 contractor before installation. DIV 26 8 Control Provide all low voltage cables as required. DIV 26 9 Control Provide all low voltage control face panels (eg DMX, RFU, Architectural etc.), control electronics and dimmer modules. X 10 Control Terminate all theatrical/architectural lig hting system (including fixtures) low voltage control cables in accordance with the manufacturer's specifications. All network connections to be terminated per TIA/EIA 568 B standards.

X
11 Control Qualify all network circuits for full dupl ex 100BASE - TX operation. Qualification to take place after all building systems are energized and operational. X 12 Control Provide all lighting control consoles and related equipment during the system turn on period. X 13 Structural Provide a set of support pipes (if spec ified) for the theatrical lighting instruments sized for 30 lbs per linear foot above pipe weight. X 14 Structural Provide miscellaneous steel as required for support of theatrical/architectural lighting system components. Lighting contractor to detail requirements. DIV 5 5 Division of Responsibilities 2 General Notes
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
F
C
+18" Av.7
F
C
+18" Av.7
F
C
+18" Av.7
F
C
+18" Av.7
+18" iO
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3

AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128

GALLERY
155

GALLERY

WORK ROOM
154

STORAGE
153

CORTYARD
00 1
TL3.00
TL2.00
1 TL2.00
2 EQUIPMENT ROOM:

DIMMER RACK AND ARCH PROCESSOR LOCATED HERE.

TL4.50
1 2
TL3.00
CL
TL2.00 4
TL1.00
2 4.5 4.6
1A | 3/4" | EXISTING DMX OUTPUT IN ROOM
LBC.101
NOTE: LBC.101 FEEDS THE NEW DMX
CONTROLLED HOUSELIGHTS. THE DMX

BYPASS CONTROLLER DOES NOT NEED

NORMAL/EMERGENCY POWER IF ONLY
ONE DMX LINE IS CONNECTED. IF MORE

THAN ONE DMX RUN IS REQUIRED,
PROVIDE NORMAL/EMERGENCY.

Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:26:17 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Overall Floor Plan
TL1.00
Scale: 1/8" = 1' -0" 1 TL - Floor Plan
Scale: 1/4" = 1' -0" 2 TL - Floor Plan - Callout 1
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
VOM.
130.4

STORAGE
132

PRODUCTION
131
VOM.
130.3

AUDITORIUM
130

STORAGE
130.2
VEST.
130.1
BOH
129

PLATFORM
128

GALLERY
155

GALLERY

WORK ROOM
154

STORAGE
153

CORTYARD
00 1
TL3.00
TL4.00
1 2
TL3.00
CL
TL2.00 4
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:26:20 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Overall Reflected Ceiling Plan
TL1.01
Scale: 1/8" = 1' -0" 1 TL - Reflected Ceiling Plan
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
F
C
+48" Ui.A
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
F
2G
+18" iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO
iO

8.5 9 10
G
H
J

8.6 10.1
1 TL3.00

GALLERY

WORK ROOM
154

STORAGE
153

CORTYARD
00 LRP.101
LWP.109
1A | 3/4" | LER.101
LWP.101
1A | 3/4" | LER.101
1M | BY E.E. | CLOSEST ELECTRICAL PANEL
LWP.102
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.103
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.104
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.105
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.106
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.107
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LWP.108
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
1A | 3/4" | LER.101
2 TL3.00
3 TL3.00
3 LER.101

PROVIDED BY AV CONTRACTOR
TL2.00 4
9"

8.5 9 10
G
H
J

8.6 10.1
1 TL3.00
LPB.101
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.102
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.103
1M | BY E.E. | LRP.101
LPB.104
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.105
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.106
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.107
1M | BY E.E. | LRP.101
LPB.108
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.109
1M | BY E.E. | LRP.101
LPB.110
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.111
1M | BY E.E. | LRP.101
LPB.112
1M | BY E.E. | LRP.101
LPB.113
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.114
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.115
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LPB.116
1M | BY E.E. | LRP.101
LPB.117
1A | 3/4" | LER.101
1M | BY E.E. | LRP.101
LRP.101
2 TL3.00
3 TL3.00
General Notes:
• All power conduit and fill shown on the "TL" series
drawings are for diagrammatic purposes only. Refer to
project electrical drawings for sizing and fill
requirements.
• Refer to sheet TL0.00 for cable schedule.
• All dimensions and loading shown are for diagrammatic purposes only. Verify all location dimensions with field conditions, and all loading with the Structural Engineer before construction or installation. Notify Consultant of any changes required.
• Interstitial steel shown on this drawing is to be designed by the project Structural Engineer and provided by the
project Structural Contractor.
• Miscellaneous steel above and beyond what is shown
may be required for connection of stage lighting to roof steel. It is the responsibility of the Theatrical Lighting Contractor to provide any miscellaneous steel and to
coordinate this with the General Contractor.
• Theatrical Lighting Contractor to verify the load capacity of the structure with the project Structural Engineer.

Drawing Notes:

1. All power conduit and wire sizing to be determined by EE per NEC and all applicable local codes.

2. All cable runs for Type A cable shall not exceed 295 feet.

Ground Floor

0.00 3'-0" 3'-0" 3'-0"
SCHEDULE 40 PIPE

TL FITXTURE HANGING PIPES
NOTE: PROVIDE STUCTURAL

REINFORCEMENT FOR HANGING PIPES
TO MOUNT ON WALL.

Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:27:41 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Enlarged - Gallery
TL2.00
Scale: 1/4" = 1' -0" 1 TL - Floor Plan - Floor
Scale: 1/4" = 1' -0" 2 TL - Floor Plan - Pipe Level
ELECTRICAL NOTES:

LRP.101 WILL REQUIRE A 120/208V, 3 -PHASE, 4W+G @
100A PER LEG FEEDER. NOT A TECH POWER SUPPLY.

Scale: 3 TL - Gallery View
Scale: 1/2" = 1' -0" 4 Elevation 1 - c
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Ground Floor

0.00 1 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10 4.6 8.6 10.1 TL3.00
2 Ground Floor

0.00 8.5 9 10 8.6 10.1
13' - 0"
3 TL3.00
Ground Floor

0.00 HJ
1 TL3.00
2 TL3.00
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:27:44 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Sections
TL3.00
Scale: 1/8" = 1' -0" 1 TL - Section
Scale: 1/4" = 1' -0" 2 TL - Section - Gallery - Plan North Scale: 1/4" = 1' -0" 3 TL - Section - Gallery - Plan West Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents

8.5 9 10
H
J

8.6 10.1
1 TL3.00
2' - 8" 4' - 0"
1' - 4"
2' - 8"
2 TL3.00
3 TL3.00
TL2.00 4
1' - 11" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 2' - 8" 4' - 0" 4' - 0" 4' - 8" 3' - 4" 1' - 4"
General Notes:
• All power conduit and fill shown on the "TL" series
drawings are for diagrammatic purposes only. Refer to
project electrical drawings for sizing and fill
requirements.
• Refer to sheet TL0.00 for cable schedule.
• All dimensions and loading shown are for diagrammatic purposes only. Verify all location dimensions with field conditions, and all loading with the Structural Engineer before construction or installation. Notify Consultant of any changes required.
• Interstitial steel shown on this drawing is to be designed by the project Structural Engineer and provided by the
project Structural Contractor.
• Miscellaneous steel above and beyond what is shown
may be required for connection of stage lighting to roof steel. It is the responsibility of the Theatrical Lighting Contractor to provide any miscellaneous steel and to
coordinate this with the General Contractor.
• Theatrical Lighting Contractor to verify the load capacity of the structure with the project Structural Engineer.

Drawing Notes:

1. All power conduit and wire sizing to be determined by EE per NEC and all applicable local codes.

2. All cable runs for Type A cable shall not exceed 295 feet.

Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:27:46 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - RCP - Gallery
TL4.00
Scale: 1/2" = 1' -0" 1 TL - Reflected Ceiling Plan - Gallery Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
HJ
26 50
26 19 26 26 19 26
50 26
4 TL4.50
FOH ELECTRIC #1
3 TL4.50
2 TL4.50
ELECTRIC #1
ELECTRIC #2
FOH ELECTRIC #2
CL

CURTAIN WARMERS CURTAIN WARMERS
Podium Special Podium Special
A B C
E FD
H IG

A B CA B C

D DE EF F

G H I I

A D AB B E BC F C

A AB B BC CA AB B BC C
D E F
G H
D E F
Ground Floor

0.00 MOUNT ON EXTENSTIONS TO GET BELOW CLOUD
CL
Ground Floor

0.00 CL
Ground Floor

0.00 CL
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 7:35:17 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Schulman Light Plot
TL4.50
Scale: 1/2" = 1' -0" 1 TL - Schulman Light Plot
Scale: 1/4" = 1' -0" 2 FOH ELECTRIC #1
Scale: 1/4" = 1' -0" 3 ELECTRIC #1
Scale: 1/4" = 1' -0" 4 ELECTRIC #2
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
~3-8 '
~3-8'

PIPE SPACING

WILL VARY SEE

DRAWINGS
PLEASE NOTE:
• ALL PIPE GRID COMPONENTS ARE SUPPLIED AND INSTALLED BY DIVISION 11 CONTRACTOR. • ALL HANGING PIPE SHALL BE 1 1/2" SCHEDULE 40 BLACK SEAMLESS STEEL PIPE (NOMINAL OD 1.9") • DIVISION 11 CONTRACTOR MUST HAVE SHOP DRAWINGS STAMPED BY A STRUCTURAL ENGINEER.

ELECTRICAL NOTES:
• NO CONDUIT SHOULD BE RUN HORIZONTALLY WITHIN 6" OF THE TOP EDGE OF THE PIPE GRID EXCEPT WHEN RUN VERTICALLY TO CONNECT TO DISTRIBUTION DEVICES. NO CONDUIT SHALL RUN UNDER THE GRID.

MECHANICAL NOTES:
• NO MECHANICAL DUCTING OR PIPE SHOULD BE RUN HORIZONTALLY WITHIN 12" OF THE TOP EDGE OF THE PIPE GRID AND MUST BE COORDINATED WITH THE AVLR CONSULTANT DURING DESIGN. ABSOLUTELY NO MECHANICAL DUCTING OR PIPE SHALL BE RUN UNDER THE GRID.

STRUCTURAL NOTES:
• WEIGHT LOADING GUIDELINES:

FIXTURES, CABLE & DISTRIBUTION - 12.5 LBS PER SQUARE FOOT OF PIPE GRID PIPE AND HARDWARE WEIGHT - 3 LBS PER LINEAR FOOT OF PIPE 3" MAX.
3 1__
16 "
4 3__
16 "
43_
8"
2 1__
16 "
43_
8"
1/2" UNISTRUT NUT
P1000 UNISTRUT x 1'-8 3/4" LG.
∅1/2" THD ROD
1/2" HEX NUT & LW
P1064-1/2" SQUARE WASHER

EXISTING JOIST/BEAM
(VERIFY DEPTH & SPACING)
P1064-1/2" SQUARE WASHER
1" SCH 40 STL PIPE
P2875 UNISTRUT BEAM CLAMP (4)
1/2" HEX NUT & LW

PIPE GRID
XX'-X" A.F.F.

JR CLANCY MODIFIED
PART 015-100 CROSS
CLAMP

JR CLANCY MODIFIED PART
015-100 CROSS CLAMP
1 1/2" SCH 40 STL PIPE
1/2" NUT (2), FW & LW (2)
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Permit 04.28.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 6/21/2023 12:58:27 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Details
TL5.00
1 Pipe Grid Detail
Scale: 3" = 1' -0" 2 Mounting Detail - Steel Beam
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:27:52 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL - Systems Schedules
TL6.00
Theatrical Lighting Box Schedule
Box ID
Sheet
Reference Level
Mounting
Height
Flush
Mount Manufacturer Model Description
Box Dimensions
NEMA Type
Custom
Panel
Back Box Panel Device
Notes Height Width Depth
Supplied
By Installed By
Supplied
By Installed By
Supplied
By Installed By
LPB.101 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.102 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.103 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.104 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.105 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.106 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.107 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.108 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.109 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.110 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.111 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.112 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.113 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.114 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.115 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.116 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LPB.117 Ground Floor Yes Electronic Theatre Controls o r Equivalent 9102 Standard surface mount outlet box - 2 outlets. Yes 11 61 00 DIV 26 11 61 00 DIV 26 N/A LWP.101 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.102 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.103 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.104 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.105 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.106 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.107 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.108 Ground Floor 1'-6" Yes Raco or Equivalent 691 2-G ang welded steel electrical box, 2.5" depth. 3 3/4" 3 3/4" 2 1/2" 1 Yes DIV 26 DIV 26 11 61 00 DIV 26 | 11 61 0 0 LWP.109 Ground Floor 4'-0" Yes Electronic Theatre Contr ols P-LCD-FBB Custom back box for 7" wall mounted tou chscreen. Flush mount. 5 3/8" 7 3/4" 3 3/4" Yes 11 61 0 0 DIV 26 11 61 00 11 61 00 ENTRYWAY TL Electrical Equipment Schedule
Mark Level Manufacturer Model Description
Dimensions
Device Installed By
Device
Provided By Height Width Depth
LRP.101 Ground Floor Electronic Theatre Controls IQ24 S ensorIQ Intelligent Breaker System, 24 breaker panel. 4'-2" 1'-2 1/4" 4 3/4" DIV 26 | 11 61 00 11 61 00 LBC.101 Ground Floor Electronic Theatre Controls, Inc . DMX Bypass Detection Kit
Wall-Mounted Detection Kit
TL Pull Schedule
Mark Level
Conduit 1 Conduit 2 Conduit 3
Fill Size Destination Fill Size Destination Fill Size Desti nation LPB.101 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.102 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.103 Ground Floor 1M BY E.E. LRP.101
LPB.104 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.105 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.106 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.107 Ground Floor 1M BY E.E. LRP.101
LPB.108 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.109 Ground Floor 1M BY E.E. LRP.101
LPB.110 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.111 Ground Floor 1M BY E.E. LRP.101
LPB.112 Ground Floor 1M BY E.E. LRP.101
LPB.113 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.114 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.115 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LPB.116 Ground Floor 1M BY E.E. LRP.101
LPB.117 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.101 Ground Floor 1A 3/4" LER.101 1M BY E.E. CLOSEST EL ECTRICAL PANEL LWP.102 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.103 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.104 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.105 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.106 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.107 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.108 Ground Floor 1A 3/4" LER.101 1M BY E.E. LRP.101 LWP.109 Ground Floor 1A 3/4" LER.101
LWP.107 1P Rly 20A 23 C 24 20A 1P Rly LWP.108
LWP.105 1P Rly 20A 21 B 22 20A 1P Rly LWP.106
LWP.103 1P Rly 20A 19 A 20 20A 1P Rly LWP.104
LPB.117 1P Rly 20A 17 C 18 20A 1P Rly LWP.102
LPB.115 1P Rly 20A 15 B 16 20A 1P Rly LPB.116
LPB.113 1P Rly 20A 13 A 14 20A 1P Rly LPB.114
LPB.111 1P Rly 20A 11 C 12 20A 1P Rly LPB.112
LPB.109 1P Rly 20A 9 B 10 20A 1P Rly LPB.110
LPB.107 1P Rly 20A 7 A 8 20A 1P Rly LPB.108
LPB.105 1P Rly 20A 5 C 6 20A 1P Rly LPB.106
LPB.103 1P Rly 20A 3 B 4 20A 1P Rly LPB.104
LPB.101 1P Rly 20A 1 A 2 20A 1P Rly LPB.102
Location Rly/Bkr Type Amperage Relay # PH Relay # Amperag e Rly/Bkr Type Location Relay Panel: LRP.101
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Design Progress 12.21.2022
Drawing Set Issue Schedule
Description Issue Date
Design Progress 02.15.2023
Design Progress 04.07.2023
Autodesk Docs://Schulman Auditorium/2219 Carlsbad Dove Schulman - AVL(2022).rvt 4/28/2023 2:27:52 PM Project No.:
222387
Schulman Auditorium & Cannon Art Gallery
1775 Dove Lane, Carlsbad, CA 92011
TL Schematic
TL7.00
TL Pipe Boxes
Mark Control Power
LPB.101 1A 1M
LPB.102 1A 1M
LPB.103 1M
LPB.104 1A 1M
LPB.105 1A 1M
LPB.106 1A 1M
LPB.107 1M
LPB.108 1A 1M
LPB.109 1M
LPB.110 1A 1M
LPB.111 1M
LPB.112 1M
LPB.113 1A 1M
LPB.114 1A 1M
LPB.115 1A 1M
LPB.116 1M
LPB.117 1A 1M
TL Architectural Stations
Mark Location
LWP.109 ENTRYWAY
TL Wall Panels
Mark Control Power
LWP.102 1A 1M
LWP.103 1A 1M
LWP.104 1A 1M
LWP.105 1A 1M
LWP.106 1A 1M
LWP.107 1A 1M
LWP.108 1A 1M
LWP.109 1A
TL Relay Panels
Mark Feed Electrical Data
LRP.101 100A 208 V/3-0 VA

WIREWAY

LOCATED ABOVE

LIGHTING RACKS
120V @ 20A CKTS
120V @ 20A CKTS
120V @ 20A CKTS

CONTROL

CONTROL
TL Lighting Equipment Rack

CONTROL

CONTROL

ARCHITECTURAL

PROCESSOR

NETWORK

PATCHBAY

NETWORK SWITCH

DMX MASTER
NODES
UPS
ARCH

TL INPUT
Mark Control Power
LWP.101 1A 1M

CONTROL

CONTROL

LIGHTING CONSOLE
120V, 1PH, 2W + G @ 20A FEED

FROM CLOSEST ELECTRICAL PANEL
120V, 1PH, 2W + G @ 20A FEED FROM NEAREST ELECTRICAL PANEL

NET / DMX

NET / DMX
LWP.103 LWP.104 LWP.105 LWP.106 LWP.107 LWP.108 LWP.109 BL ANK BLANK BLANK BLANK LRP.101 Port 13 Port 14 Port 15 Port 16 Port 17 Port 18 Port 19 Po rt 20 Port 21 Port 22 Port 23 Port 24 LPB.101 LPB.102 LPB.104 LPB.105 LPB.106 LPB.108 LPB.110 LP B.113 LPB.114 LPB.115 .LPB.117 LWP.102 Port 1 Port 2 Port 3 Port 4 Port 5 Port 6 Port 7 Port 8 Por t 9 Port 10 Port 11 Port 12

PATCH BAY
DMX UNIVERSE 1 1 1 1 1 1
LWP.103 LWP.104 LWP.105 LWP.106 LWP.107 LWP.108 SPARE SPAR E Port 1 Port 2 Port 3 Port 4 Port 1 Port 2 Port 3 Port 4 DMX GATEWAY 4 DMX GATEWAY 5
DMX UNIVERSE 1 1 1 1 1 1 1 1 1 1 1 1
LPB.101 LPB.102 LPB.104 LPB.105 LPB.106 LPB.108 LPB.110 LP B.113 LPB.114 LPB.115 .LPB.117 LWP.102 Port 1 Port 2 Port 3 Port 4 Port 1 Port 2 Port 3 Port 4 Por t 1 Port 2 Port 3 Port 4 DMX GATEWAY 1 DMX GATEWAY 2 DMX GATEWAY 3
LWP.102 LRP.101 ARCH CONTROL WALL CONTROLLER
(LWP.109) DMX GATEWAY DMX GATEWAY DMX GATEWAY DMX GATEWAY DMX GAT EWAY FUTURE FUTURE FUTURE Port 1 Port 2 Port 3 Port 4 Port 5 Port 6 Port 7 Port 8 Por t 9 Port 10 Port 11 Port 12 SWITCH
PATCH
Assembly Code
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents

FEEDER SCHEDULE
20B
30B
40B
LABEL
600V BRANCH CIRCUITS 1Ø 2W

TYPE SETS PHASE
N/A

NEUTRAL CONDUIT GROUND
50B 50A-2W 1 2 # 6 1 # 10
30A-2W 1 2 # 10 1 # 10
20A-2W 1 2 # 12 1 # 12 3/4"
40A-2W 1 2 # 8 1 # 10
N/A
N/A
N/A
3/4"
3/4"
3/4"

LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
600V FEEDER SCHEDULE 1Ø 3W
60S
100S 100A-3W
60A-3W
2 # 1
2 # 4
1 # 1
1 # 4
1 # 8
1 # 10
1 1/4"
1"
1" 1 # 10 1 # 6 2 # 6 50A-3W 50S
1" 1 # 10 1 # 8 2 # 8 40A-3W 40S
3/4" 1 # 10 1 # 10 2 # 10 30A-3W 30S
3/4" 1 # 12 1 # 12 1 2 # 12 20A-3W 20S
1 1
1 1
1 LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
4" 1#500KCM 4000A-3W 4000 10
600V FEEDER SCHEDULE 3Ø 3W
1 # 12
1 # 10
1 # 10
1 # 8
1 # 8
1 # 6
1 # 6
1 # 6
1 # 6
1 # 4
1 # 4
1 # 4
1 # 2
1 # 2
1 # 3/0
1 # 1/0
1#350KCM
1#250KCM
1#500KCM
1 # 2
1 # 2
1 # 1/0
1 # 1/0
1 # 2/0
1 # 4/0
1 # 10
1 # 10
1 # 8
1 # 8
3 # 6 1
50 50A-3W
60A-3W
70A-3W
125A-3W
150A-3W
175A-3W
200A-3W
225A-3W
250A-3W
300A-3W
350A-3W
400A-3W
1200A-3W
800A-3W
2500A-3W
2000A-3W
3000A-3W
450A-3W
500A-3W
600A-3W
700A-3W
1000A-3W
1600A-3W
100A-3W
90A-3W
80A-3W
350
2500
3000
2000
1000
1600
1200
500
600
700
800
400
450
250
300
225
150
200
175
80 100
90 125
60 70
1 3 #500KCM
3 #600KCM
3 # 4/0
3 #350KCM
3 #600KCM
3 #600KCM
3 #500KCM
3 #600KCM
3 #500KCM
3 #250KCM
6 8
5 3
4 3
2 2
2 2
1 2
3 # 1/0
3 # 2/0
3 # 3/0
3 # 4/0
3 #250KCM
3 #350KCM
3 # 1
1 1
1 1
1 1
1 1
1 1
1 1
3 # 2
3 # 1
3 # 2
3 # 4
3 # 4
20A-3W
30A-3W
40A-3W
30 20
40 1
1 1
3 # 12
3 # 10
3 # 8
1"
4"
4"
4"
4"
4"
4"
4"
3"
4"
4"
4"
3"
4"
1 1/2"
1 1/2"
2 1/2"
2 1/2"
3"
2"
2"
1 1/4"
1 1/4"
1 1/4"
1"
3/4"
3/4"
1"
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3 #600KCM
3 #600KCM
3 #600KCM
3 #600KCM

LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
600V FEEDER SCHEDULE 3Ø 4W
250Y
2000Y
2500Y
3000Y
4000Y
600Y
800Y
1200Y
700Y
1000Y
1600Y
300Y
350Y
400Y
450Y
500Y
100Y
125Y
150Y
175Y
200Y
225Y
30Y
50Y
60Y
80Y
20Y
1600A-4W 4 1 # 4/0 4"
4000A-4W 3 #600KCM 1 #600KCM 1#500KCM 4"
1000A-4W 3 3 #500KCM 1 #500KCM 1 # 2/0 4"
700A-4W 2 3 #500KCM 1 #500KCM 1 # 1/0 4"
600A-4W 2 3 #350KCM 1 #350KCM 1 # 1/0 4"
500A-4W 2 3 #250KCM 1 #250KCM 1 # 2 3"
450A-4W 2 3 # 4/0 1 # 4/0 1 # 2 3"
20A-4W 1 3 # 12 1 # 12 1 # 12 3/4"
3000A-4W 8 3 #600KCM 1 #600KCM 1#500KCM 4"
2000A-4W 5 1#250KCM 4"
2500A-4W 6 1#350KCM 4"
800A-4W 2 3 #600KCM 1 #600KCM 1 # 1/0 4"
1200A-4W 3 1 # 3/0 4"
400A-4W 1 1 #600KCM 1 # 2 4"
350A-4W 1 1 #500KCM 1 # 2 4"
300A-4W 1 1 #350KCM 1 # 4 3"
250A-4W 1 1 #250KCM 1 # 4 2 1/2"
225A-4W 1 3 # 4/0 1 # 4/0 1 # 4 2 1/2"
200A-4W 1 3 # 3/0 1 # 3/0 1 # 6 2"
175A-4W 1 3 # 2/0 1 # 2/0 1 # 6 2"
150A-4W 1 3 # 1/0 1 # 1/0 1 # 6 1 1/2"
125A-4W 1 3 # 1 1 # 1 1 # 6 1 1/2"
100A-4W 1 3 # 1 1 # 1 1 # 8 1 1/2"
80A-4W 1 3 # 2 1 # 2 1 # 8 1 1/4"
60A-4W 1 3 # 4 1 # 4 1 # 10 1"
50A-4W 1 3 # 6 1 # 6 1 # 10 1"
30A-4W 1 3 # 10 1 # 10 1 # 10 3/4"
40Y 40A-4W 1 3 # 8 1 # 10 1 # 10 1"
70Y 70A-4W 1 3 # 4 1 # 4 1 # 8
90Y 90A-4W 1 3 # 2 1 # 2 1 # 8 1 1/4"
10 3 #600KCM
3 #600KCM
3 #600KCM
3 #600KCM
3 #500KCM
3 #600KCM
3 #350KCM
3 #250KCM
1 #600KCM
1 #600KCM
1 #600KCM
1 #600KCM
1 1/4"
1 1/4"
AA-8000 ALUMINUM FEEDER SCHEDULE
AA-8000 ALUMINUM GENERAL NOTES:

LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
4" 1#500KCM 4000A-3W 4000 12
600V FEEDER SCHEDULE 3Ø 3W
1 # 8
1 # 6
1 # 6
1 # 6
1 # 6
1 # 4
1 # 4
1 # 4
1 # 2
1 # 2
1 # 3/0
1 # 1/0
1#350KCM
1#250KCM
1#500KCM
1 # 2
1 # 2
1 # 1/0
1 # 1/0
1 # 2/0
1 # 4/0
125A-3W
150A-3W
175A-3W
200A-3W
225A-3W
250A-3W
300A-3W
350A-3W
400A-3W
1200A-3W
800A-3W
2500A-3W
2000A-3W
3000A-3W
450A-3W
500A-3W
600A-3W
700A-3W
1000A-3W
1600A-3W
100A-3W
350
2500
3000
2000
1000
1600
1200
500
600
700
800
400
450
250
300
225
150
200
175
100
125
1 3 #500KCM
3 #600KCM
8 8
5 3
5 4
2 2
2 3
2 2
3 # 4/0
3 #250KCM
3 #350KCM
3 # 3/0
1 1
1 1
1 1
1 1
3 # 2/0
4"
4"
4"
4"
4"
4"
4"
3"
4"
4"
3"
4"
2"
2"
2 1/2"
2 1/2"
3"
2" N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
600V FEEDER SCHEDULE 3Ø 4W
250Y
2000Y
2500Y
3000Y
4000Y
600Y
800Y
1200Y
700Y
1000Y
1600Y
300Y
350Y
400Y
450Y
500Y
100Y
125Y
150Y
175Y
200Y
225Y
1600A-4W
4000A-4W
1000A-4W
700A-4W
600A-4W
500A-4W
450A-4W
3000A-4W
2000A-4W
2500A-4W
800A-4W
1200A-4W
400A-4W
350A-4W
300A-4W
250A-4W
225A-4W
200A-4W
175A-4W
150A-4W
125A-4W
100A-4W
3 #300KCM
3 #750KCM
3 #500KCM
3 #600KCM
3 #350KCM
3 #300KCM
3 #750KCM
3 #500KCM
3 #750KCM
3 #600KCM
3 #600KCM
3 #750KCM
3 #600KCM
3 #750KCM
3 #600KCM
3"
2 1/2"
3"
4" 1#500KCM 12
1 # 8
1 # 6
1 # 6
1 # 6
1 # 6
1 # 4
1 # 4
1 # 4
1 # 2
1 # 2
1 # 3/0
1 # 1/0
1#350KCM
1#250KCM
1#500KCM
1 # 2
1 # 2
1 # 1/0
1 # 1/0
1 # 2/0
1 # 4/0
1 3 #500KCM
3 #600KCM
8 8
5 3
5 4
2 2
2 3
2 2
3 # 4/0
3 #250KCM
3 #350KCM
3 # 3/0
1 1
1 1
1 1
1 1
3 # 2/0
4"
4"
4"
4"
4"
4"
4"
3"
4"
4"
3"
4"
2"
2 1/2"
2 1/2"
3"
2"
3 #300KCM
3 #750KCM
3 #500KCM
3 #600KCM
3 #350KCM
3 #300KCM
3 #750KCM
3 #500KCM
3 #750KCM
3 #600KCM
3 #600KCM
3 #750KCM
3 #600KCM
3 #750KCM
3 #600KCM
3"
1 #500KCM
1 #600KCM
1 # 4/0
1 #250KCM
1 #350KCM
1 # 3/0
1 # 2/0
1 #300KCM
1 #750KCM
1 #500KCM
1 #600KCM
1 #350KCM
1 #300KCM
1 #750KCM
1 #500KCM
1 #750KCM
1 #600KCM
1 #600KCM
1 #750KCM
1 #600KCM
1 #750KCM
1 #600KCM
4"
4"
4"

LABEL TYPE SETS PHASE NEUTRAL CONDUIT GROUND
600V FEEDER SCHEDULE 1Ø 3W
80S 80A-3W 2 # 1 1 # 1 1 # 8 1 1/2" 1
100S 100A-3W 2 # 2/0 1 # 2/0 1 # 8 2" 1

1. ALL GROUND CONDUCTORS SHALL BE STRANDED COPPER.

2. ALL CONDUIT SHALL BE EMT (INSTALLED IN INTERIOR
CONCEALED SPACES) OR SCHEDULE-40 PVC (INSTALLED

UNDERGROUND OR INCASED IN SLAB) UNLESS OTHERWISE
NOTED.

3. ALL AMPACITIES ARE BASED UPON TABLE 310.15(B)16 O F
THE 2014 N.E.C.

4. FEEDER SCHEDULES INDICATED DATA FOR CONDUCTOR
RATED UP TO 600V.

5. ALL CONDUCTOR TERMINATIONS SHALL COMPLY WITH THE

TERMINATION MANUFACTURER'S INSTALLATION AND
TORQUING REQUIREMENTS.

6. FINAL LUG TERMINATIONS FOR AA-8000 SERIES

STRANDED ALUMINUM ALLOY CONDUCTORS SHALL UTILIZE
UL-468B COMPLIANT MECHANICAL FITTINGS.

7. TERMINATIONS FOR AA-8000 SERIES STRANDED ALUMINUM

ALLOY CONDUCTORS SHALL INCLUDE THE USE OF

OXIDE-INHIBITING COMPOUND, APPLIED AFTER THE BARE

CONDUCTORS HAVE BEEN WIRE BRUSHED AND
THOROUGHLY CLEANED.

8. NO BARE CONDUCTORS SHALL BE EXPOSED TO THE AIR.

L1-Xa
EB
F1E
L1-Xa
EB
F1E
ab MS
MS
S
S
DIM
A1 S
KS
3S
ab S
S
MC

CONNECTED TO EMERGENCY INVERTER

INTERMEDIATE METAL CONDUIT

HAZARDOUS MATERIAL

HAND-OFF-AUTOMATIC

ELECTRO-METALLIC TUBING

FINISH FLOOR ELEVATION

FULL VOLTAGE NON-REVERSING

GROUND FAULT INTERRUPTER

GROUND BUS OR WIRE

GROUND FAULT RELAY

GENERAL CONTRACTOR

ELEVATION/ELEVATOR

DEGREES FAHRENHEIT

CONNECT OR CONNECTION

CLOSED CIRCUIT TELEVISION

CONDUIT ONLY WITH NYLON PULLCORD

DISTRIBUTION SWITCHBOARD

CONTROL POWER TRANSFORMER

ELECTRICAL CONTRACTOR

ELECTRICAL DRINKING FOUNTAIN
90-MINUTE BATTERY CONNECTED TO UNIT

CONNECTED TO EMERGENCY GENERATOR

CURRENT TRANSFORMER

CURENT LIMITING FUSE

AMPERES INTERRUPTING CAPACITY

AVAILABLE FAULT CURRENT

AUTOMATIC TRANSFER SWITCH

ARCHITECT OR ARCHITECTURAL

AMERICAN WIRE GAUGE

AMP FRAME/AMP FUSE

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ALTERNATING CURRENT

COPPER CU

H HORIZONTAL

ISOLATED GROUND
HERTZ
HOUR
HEATER
HEIGHT

INCANDESCENT

HORSEPOWER
INCAND
IG
IMC
HAZMAT
HOA
HTR
HT
HR
HP
HZ
GROUND

GREEN GROUND
GAUGE

FEET OR FOOT FEET OR FOOT

FOOTING

GALVANIZED

GARBAGE DISPOSAL

FLUORESCENT
GALV
GC
GND
GG
GFI
GFR
GD
FLUOR
G
FVNR
FTG
FT
GA

FINISH OR FINISHED

ELECTRICAL

EMERGENCY

EQUIPMENT

FIRE ALARM

EXISTING

FIXTURE

EXHAUST FAN

EXIST, EX
FIN
FFE
F
FA
EQUIP
FIXT

EMER, EM
ELECT
EI
ELEV
EMT
EDF
EF
EG
EACH

DISCONNECT

DEDICATED OUTLET

DIRECT CURRENT

DAMP LOCATION

DISTRIBUTION

COLD WATER

DIAMETER

DRAWINGS
DIST
EA
EB
EC
DWGS
DL
DB
DC
DISC
DIA
CW
CT
D

LIGHTING SYMBOLS AND DESCRIPTIONS
A/C

BELOW BEL

CONTRACTOR

COAXIAL CABLE

CEILING

CIRCUIT BREAKER

CABLE TELEVISION

CONDUIT WITH WIRE
CLEAR

CONTINUATION

CONCRETE
CLR
CONTR
CPT
COAX
CONT
CONN
CONC
CO
CLG
CLF
CATV
CCTV
C
CB

BACKBOARD
ABOVE

ALUMINUM

BELOW GRADE

AMP TRIP

AMP SWITCH
ARCH
B/G
BKBD
ATS
AWG
AT
AS
AL
AFC
AFF
AFG
ABV
AIC
AF

AIR CONDITIONING

AMPERES
AC
A

ON CENTER OC

NEW LOCATION OF RELOCATED FIXTURE

FIXTURE WITH QUARTZ RESTRIKE

UNDERGROUND PULL SECTION

TEMPERATURE OR TEMPORARY

SQUARE FEET OR SQUARE FOOT

UNDERWRITERS LABORATORIES

PHOTOCELL/TIMECLOCK CONTROL

OWNER FURNISHED CONTRACTOR INSTALLED

OWNER FURNISHED OWNER INSTALLED

SWITCHBOARD SWBD
XFMR
TRANSF
UGPS
SWGR
TEMP

TEL, TELE
VFD
XN
XR
XL
X
W/
WP
WT
WH
TYP
VA
UL
V
UNO
TC
TV

VARIABLE FREQUENCY DRIVE

EXISTING TO BE RELOCATED

EXISTING TO BE REMOVED

TRANSFORMER

WEATHER PROOF

WATER HEATER
WITH
WEIGHT

EXISTING

VOLTAMPERE

TIMECLOCK

TELEPHONE

TELEVISION

SWITCHGEAR

TRANSFORMER

UNLESS NOTED OTHERWISE

TYPICAL
VOLTS
SPEC
SQ FT
STRUCT
RECEPT
PCTC
PLBG
RGS
SW
SD
RM
QTY
REC
REF
REQ
Q
PP
PVC
PWR
PNL
PL
PH
PIV
PE
OFOI
PC
PB
OFCI

RIGID GALVANIZED STEEL

RECEPTACLE

REQUIREMENTS

REFRIGERATOR

STRUCTURAL

SPECIFICATION

SMOKE DETECTOR
SWITCH
ROOM

QUANTITY

RECESSED

POWER POLE

PILOT LIGHT

PHOTOCELL CONTROL

PNEUMATIC-ELECTRIC

POLYVINYL CHLORIDE

POST INDICATING VALVE

PLUMBING
PHASE
POWER
PANEL

PULLBOX

KS KNEE SPACE
MECH
MANUF
MCC
N
NIC
NO
NTS
NL
NEC
NC
MIN
MLO
MTG
MTD
MCP
LT
MH
MAX
MC
LV
LTG
LBS
LF
LOC
KVA
KWH
KW

MOTOR CONTROL CENTER

MOTOR CIRCUIT PROTECTION

NORMALLY OPEN

NATIONAL ELECTRICAL CODE

MAIN LUGS ONLY

MECHANICAL

NOT IN CONTRACT

NIGHT LIGHT

NOT TO SCALE

NORMALLY CLOSED

NEUTRAL

MINIMUM

MOUNTING

MOUNTED

KILO-WATT

LOW VOLTAGE

LINEAL FEET

KILO-WATT-HOUR

MANUFACTURER

MOUNTING HEIGHT

MECHANICAL CONTRACTOR

KILO-VOLTAMPERE
LIGHT

MAXIMUM

LIGHTING
POUNDS

LOCATION

ABBREVIATIONS AND DESCRIPTIONS

J-BOX JUNCTION BOX

POWER SENTRY EMERGENCY BATTERY UNIT PS

STANDBY SB

FF FURNITURE FEED, FINISHED FLOOR

SEE LUMINAIRE SCHEDULE FOR ADDITIONAL
FIXTURE SYMBOLS.

ALL WIRE SIZES FOR EXTERIOR LIGHTING
SHALL BE #10AWG 3/4"C, UNLESS
OTHERWISE NOTED.

SWITCH, SINGLE POLE 20A, MTD 48" AFF TO
TOP DEVICE: WHITE COVERPLATE: WHITE
PROVIDE 3-1/2" DEEP SINGLE GANG BOX
SWITCH, SINGLE POLE 20A, MTD 48" AFF TO

TOP DESIGNATED TO CONTROL LIGHTING IN
CIRCUIT LEGS. DEVICE: WHITE COVERPLATE:

WHITE. PROVIDE MULTI-GANG BOX AS

REQUIRED TO ACCOMMODATE SWITCH LEGS
INDICATED. PROVIDE 3-1/2" DEEP BOX.

SWITCH, THREE WAY, 20A, MTD 48" AFF TO
TOP DEVICE: WHITE COVERPLATE: WHITE
PROVIDE 3-1/2" DEEP SINGLE GANG BOX.

KEYED SWITCH, SINGLE POLE 20A, MTD 48"
AFF TO TOP DEVICE: WHITE COVERPLATE:

WHITE. PROVIDE 3-1/2" DEEP SINGLE GANG
BOX.

DIMMER SWITCH, MTD. 48" AFF TO TOP.

PROVIDE 3-1/2" DEEP SINGLE GANG BOX.

SPECIALTY SWITCH AS DENOTED ON PLANS.

DEVICE: WHITE COVERPLATE: WHITE
MTD. 48" AFF TO TOP. PROVIDE 3-1/2"
DEEP SINGLE GANG BOX.

WALL MOUNTED VACANCY SENSOR

CONTROLLED LIGHTING SWITCH WITH

AUTOMATIC 'OFF' MANUAL 'ON' AND DUAL
TECHNOLOGY ULTRASONIC/INFRARED. TYPICAL
DEVICE: WHITE, MTD 48" AFF TO TOP.

MOTION SENSOR POWER PACK.

CEILING MOUNTED ULTRASONIC MOTION
SENSOR. DIRECTION OF COVERAGE
INDICATED BY ARROWS DEVICE: WHITE

LIGHTING CONTROL PANEL

LOW VOLTAGE OVERRIDE CONTROL SWITCH,

LETTER DESIGNATES ZONE AND NUMBER
DESIGNATES SWITCH NUMBER. MTD. 48" AFF
TO TOP. PROVIDE 3-1/2" DEEP SINGLE GANG
BOX.
3 GANG / MULTI-CHANNEL MASONRY
WALLBOX DIMMER.

KCM KILO - CIRCULAR - MIL
LUMINAIRE CALLOUT:

UNIQUE LUMINAIRE SYMBOL

LUMINAIRE TYPE

LIGHTING BRANCH

CIRCUIT AND SWITCH LEGS

EMERGENCY POWER
SOURCE:
'EB' IS EMERGENCY BATTERY
'EI' IS EMERGENCY INVERTER
'EG' IS EMERGENCY GENERATOR

ELECTRICAL CONSTRUCTION DOCUMENTS GENERAL INFORMATION
DM

WALL MOUNTED A/B SWITCHING VACANCY

SENSOR CONTROLLED LIGHTING SWITCH WITH

AUTOMATIC 'OFF' MANUAL 'ON' AND DUAL
TECHNOLOGY ULTRASONIC/INFRARED. TYPICAL
DEVICE: WHITE, MTD 48" AFF TO TOP.

1. THE DRAWINGS CONTAINED WITHIN THESE
CONSTRUCTION DOCUMENTS ARE DIAGRAMMATIC.

THE CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS, DIMENSIONS, AND CLEARANCES.

2. THE CONTRACTOR SHALL COORDINATE ALL
INSTALLATIONS WITH ALL OTHER TRADES.

3. FINAL LOCATIONS OF ALL DEVICES, LIGHT FIXTURES,
EQUIPMENT, ETC. SHALL BE INDICATED ON THE
ARCHITECTURAL DRAWINGS. ALL DIMENSIONAL

INFORMATION SHALL BE OBTAINED FROM THE
ARCHITECT. NO DIMENSIONAL INFORMATION SHALL
BE OBTAINED FROM ELECTRICAL DRAWINGS.

4. THESE DRAWINGS ARE SUPPLEMENTED BY PRINTED
DIVISION 16 OR DIVISION 26 ELECTRICAL
SPECIFICATIONS; THE COMPLETE ELECTRICAL

CONSTRUCTION DOCUMENT PACKAGE CONTAINS
BOTH SPECIFICATIONS AND DRAWINGS. THE

CONTRACTOR SHALL OBTAIN AND REVIEW THE

COMPLETE ELECTRICAL CONSTRUCTION DOCUMENT

PACKAGE PRIOR TO THE COMMENCEMENT OF ANY
WORK AND INCLUDE ALL COST IN THIS BID.

5. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL

CODES, CALIFORNIA ELECTRICAL CODE, STATE OF

CALIFORNIA ENERGY CONSERVATION STANDARDS

AND ALL REQUIREMENT OF THE AUTHORITY HAVING
JURISDICTION (AHJ).

6. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT

LOCATIONS WITH ARCHITECTURAL, MECHANICAL,

STRUCTURAL, PLUMBING AND ALL APPROPRIATE
DISCIPLINES.

7. ANY DISCREPANCIES THAT OCCUR SHALL BE

BROUGHT TO THE ATTENTION OF THE DESIGN TEAM

AND/OR ENGINEER PRIOR TO THE START OF
CONSTRUCTION.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR

PROTECTION AND REPAIR OF EXISTING SURFACES,

AREAS, AND PROPERTY THAT MAY BE DAMAGED AS

A RESULT OF ANY ELECTRICAL DEMOLITION AND/OR
NEW WORK.

9. PROVIDE WEATHERPROOF JUNCTION BOXES,

CONDUIT, FITTINGS AND ENCLOSURES AT ALL

EXTERIOR LOCATIONS AND ALL WET OR DAMP
INTERIOR LOCATIONS. ALL EXTERIOR ENCLOSURES
SHALL BE NEMA 4X OR NEMA 3R ALUMINUM (NEMA
3R STEEL ENCLOSURES ARE NOT ACCEPTABLE IN
EXTERIOR LOCATIONS).

10. VERIFY UTILITY COMPANY REQUIREMENTS FOR ALL

WORK INCLUDING MODIFIED OR NEW SERVICE
ENTRANCES. AND INCLUDE ALL COST IN BID.

11. NOTIFY POWER UTILITY COMPANY OF ANY

SIGNIFICANT LOAD INCREASE, SERVICE REVISION,
SHUTDOWN OF SERVICE OR ANY RELATED WORK.

12. VERIFY EXISTING CONDITIONS PRIOR TO BID AND

INCLUDE ALL COSTS AS REQUIRED FOR A
COMPLETE AND FUNCTIONAL INSTALLATION.

13. THE CONTRACTOR SHALL REVIEW EQUIPMENT

MANUFACTURER'S REQUIREMENTS AND PROVIDE

FUSE SIZES AS INDICATED, RELAYS, CONNECTIONS

OR OTHER RELATED WORK TO COMPLETE THE
ELECTRICAL SYSTEM.

14. ALL DEVICES AND EQUIPMENT SHALL BE INSTALLED
IN COMPLIANCE WITH A.D.A. REQUIREMENTS.

15. CONTRACTOR SHALL CONCEAL ALL CONDUIT,

FITTINGS, AND DEVICES FROM VIEW WHERE
REASONABLY POSSIBLE.

16. CONTRACTOR SHALL ENSURE THAT ALL CONDUIT,

FIXTURES, FITTINGS, AND DEVICES LOCATED IN

PUBLIC AREAS ARE TAMPERPROOF AND
PROTECTED FROM PHYSICAL DAMAGE.

17. ALL CURRENT CARRYING CONDUCTORS SHALL BE
COPPER. INSULATION SHALL BE TYPE THHN/THWN

18. ALL GROUND CONDUCTORS SHALL BE INSULATED
COPPER.

19. CONTRACTOR SHALL PROVIDE LABELS ON ALL

ELECTRICAL DEVICES, INCLUDING RECEPTACLES,
SWITCHES, J-BOXES, LIGHT FIXTURES, ETC. LABEL

SHALL INCLUDE PANELBOARD AND CIRCUIT
NUMBER INFORMATION AT MINIMUM.

20. ALL INTERIOR CONDUIT SHALL BE EMT (INSTALLED
IN INTERIOR CONCEALED SPACES). ALL EXTERIOR

CONDUIT SHALL BE RIGID GALVANIZED STEEL

CONDUIT WITH THREADED COUPLINGS AND

FITTINGS (COMPRESSION FITTINGS NOT ALLOWED
FOR RGS CONDUIT). SCHEDULE-40 PVC SHALL

ONLY BE USED WHEN INSTALLED UNDERGROUND
ENCASED IN CONCRETE.

21. ALL AMPACITIES ARE BASED UPON TABLE
310.15(B)16 OF THE 2022 C.E.C.

22. FEEDER SCHEDULES INDICATE DATA FOR COPPER
CONDUCTORS RATED UP TO 600V AT 75 DEGREES
CELSIUS.

23. ALL MULTI-WIRE BRANCH CONDUCTORS SHALL
ORIGINATE FROM THE SAME PANELBOARD. THE

GROUNDED AND UNGROUNDED CONDUCTORS

SHALL BE GROUPED WITHIN THE PANELBOARD

AND THEY SHALL BE PROVIDED WITH A MEANS

THAT WILL SIMULTANEOUSLY DISCONNECT ALL
UNGROUNDED CONDUCTORS. THE CONTRACTOR

SHALL PROVIDE THE DISCONNECTING MEANS

BASED UPON THE FINAL FIELD WIRING, CIRCUITING,
HOMERUNS, ETC. AS REQUIRED TO SATISFY THIS
REQUIREMENT.

24. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED
PERMITS, APPROVALS, LICENSES, ETC. AS NEEDED
FOR THE COMPLETE ELECTRICAL INSTALLATION.

THE CONTRACTOR SHALL COORDINATE WITH THE

OWNER FOR ALL FEES AND DATA NEEDED FOR THE
ABOVE ITEMS.

25. ALL ROOF-MOUNTED EQUIPMENT SHALL BE

SERVED BY CIRCUITS ROUTED BELOW THE ROOF
STRUCTURE. DO NOT ROUTE CONDUITS EXPOSED
ON THE ROOF. LIMIT FINAL CONNECTIONS TO

ROOF EQUIPMENT FROM ROOF PENETRATION TO
10 FEET.

26. FOR ALL EXTERIOR CONDUITS EXPOSED TO

DIRECT SUNLIGHT, THE CONTRACTOR SHALL

ADJUST CONDUCTOR AND CONDUIT SIZES AS

NECESSARY TO COMPLY WITH CODE-REQUIRED
AMBIENT TEMPERATURE AMPACITY DE-RATING.

OS
DM
F1
6-30R
WAP
J
J
A
V
GFI
NEMA 1
ATS 1
N E
L
NEMA 1
G
LSIG
FF
FF
FF

CIRCUIT BREAKER WITH ELECTRONIC SENSING,

TIMING AND TRIPPING CONTROL WITH FIELD
INTERCHANGEABLE TRIP UNITS. PROVIDE TRUE

RMS FUNCTIONS WITH DISCRETE FIELD

ADJUSTABLE SETTINGS INDEPENDENT OF OTHER
ADJUSTMENTS.

SURGE PROTECTIVE DEVICE

DRAWOUT CIRCUIT BREAKER

CIRCUIT BREAKER

FUSED SWITCH

TRANSFORMER

GROUNDING ELECTRODE AND CONDUCTOR

EXTERNALLY OPERATED CIRCUIT BREAKER

SHUNT TRIP
UTILITY METER WITH C.T.s.

IN-LINE UTILITY METER-200A MAXIMUM

VOLT METER

CURRENT TRANSFORMER

AMP METER

GROUND FAULT CIRCUIT INTERRUPTER

MOTOR OR EQUIPMENT AS NOTED

UGPS LANDING LUGS

AUTOMATIC TRANSFER SWITCH

GENERATOR

DIGITAL METER BY POWER
MEASUREMENTS ION-7350

INSULATED CASE CIRCUIT BREAKER

PANELBOARD THROUGH FED OR DOUBLE LUG

PANELBOARD
#10
ST
M
S
M
T

SYMBOLS AND DESCRIPTIONS SINGLELINE SYMBOLS AND DESCRIPTIONS

DUPLEX RECEPTACLE, FLUSH FLOOR

MOUNTED, FOR SLAB ON GRADE
INSTALLATION.

FOURPLEX RECEPTACLE, FLUSH FLOOR

MOUNTED, FOR SLAB ON GRADE
INSTALLATION.

COMBINATION POWER & DATA FOURPLEX

OUTLET, FLUSH FLOOR MOUNTED FOR SLAB
ON GRADE INSTALLATION.

DUPLEX RECEPTACLE, FLUSH FLOOR

MOUNTED, ON FIRE RATED POKE-
THRU.

FOURPLEX RECEPTACLE, FLUSH FLOOR
MOUNTED, ON FIRE RATED POKE-THRU.

COMBINATION POWER & DATA DUPLEX

OUTLET, FLUSH FLOOR MOUNTED ON FIRE
RATED POKE-THRU.

SYSTEMS FURNITURE FLOOR FEED WITH 3/4"
CONDUIT FOR POWER & 1-1/4" CONDUIT
FOR TELE/DATA ON FIRE RATED POKE-THRU.

SYSTEMS FURNITURE FLOOR FEED WITH 3/4"
CONDUIT FOR POWER & 1-1/4" CONDUIT
FOR SLAB ON GRADE INSTALLATION.

TELECOMMUNICATIONS OUTLET, FLUSH

FLOOR MOUNTED, ON FIRE RATED POKE-
THRU.

TELECOMMUNICATIONS OUTLET, FLUSH

FLOOR MOUNTED, FOR SLAB ON GRADE
INSTALLATION.

SFD
SYSTEMS FURNITURE WALL FEED WITH 3/4"
CONDUIT FOR POWER & 1-1/4" CONDUIT
FOR TELE/DATA.

WIRELESS ACCESS POINT ABOVE
CEILING FOR WIRELESS LAN.

CEILING MOUNTED RECEPTACLE

TELECOMMUNICATIONS OUTLET CEILING
MOUNTED.

JUNCTION BOX, WALL MOUNTED.

JUNCTION BOX, SURFACE MOUNTED,
CONCEALED.

SMOKE FIRE DAMPER

PANELBOARD FLUSH MOUNTED

PANELBOARD SURFACE MOUNTED

SWITCHBOARD

TRANSFORMER

FUSED DISCONNECT SWITCH

FVNR COMBINATION MOTOR STARTER,

H-O-A, AUXILIARY CONTACTS, CPT, PILOT

LIGHTS, NEMA ENCLOSURE AS REQUIRED,
WITH FUSED DISCONNECT SWITCH.

FVNR MOTOR STARTER WITH OVERLOADS,

H-O-A, AUXILIARY CONTACTS, CPT, PILOT
LIGHTS, NEMA ENCLOSURE AS REQUIRED.

VARIABLE FREQUENCY DRIVE
MOTOR HORSEPOWER RATED SWITCH.

CONCEALED EMT CONDUIT WITH WIRE
2#12AWG + 1#12AWG GREEN GROUND,
3/4"C MINIMUM.

CONCEALED EMT CONDUIT WITH WIRE
3#12AWG + 1#12AWG GREEN GROUND,
3/4"C MINIMUM.

CONCEALED EMT CONDUIT WITH WIRE
3#10AWG + 1#10AWG GREEN GROUND,
3/4"C MINIMUM.

UNDERGROUND CONDUIT AND #10 WIRE,
UNO. 3/4"PVC MIN.

HOMERUN

HATCHED CONDUIT AND WIRE TO BE

REMOVED

CODE SIZED PULLBOX AS INDICATED
ON PLANS.

CODE SIZED PULLBOX OR SPLICE BOX
AS INDICATED ON PLANS.

INDICATES CONDUIT STUB-UP OR STUB-
OUT LOCATION.

COMBINATION POWER & DATA DUPLEX

OUTLET, FLUSH FLOOR MOUNTED FOR SLAB
ON GRADE INSTALLATION.

COMBINATION POWER & DATA FOURPLEX

OUTLET, FLUSH FLOOR MOUNTED ON FIRE
RATED POKE-THRU.

TELECOMMUNICATIONS OUTLET WITH TRIM

RING AND PULLSTRING TO ACCESSIBLE
CEILING SPACE. MTD. 15" A.F.F. TO BOTTOM
U.N.O.

SPECIALTY CEILING OUTLET.

SPECIALTY OUTLET RECEPTACLE, FLUSH

FLOOR MOUNTED, FOR SLAB ON GRADE
INSTALLATION.

CABLE TRAY.

HALF SWITCH DUPLEX RECEPTACLE MTD 15"
AFF TO BOTTOM. DEVICE: WHITE,
COVERPLATE: WHITE
DL
TF

PANEL PANEL
SPD
IC
LSI
VFD
6-30R
DUPLEX RECEPTACLE MTD 15" AFF TO
BOTTOM. DEVICE: WHITE, COVERPLATE:

WHITE
GFCI TYPE DUPLEX RECEPTACLE MTD 15" AFF
TO BOTTOM. PROVIDED WITH DEDICATED
NEUTRAL. DEVICE: WHITE, COVERPLATE:

WHITE
DUPLEX RECEPTACLE MTD 15" AFF TO
BOTTOM. CONTROLLED VIA OCCUPANCY
SENSOR. SEE LIGHITNG CONTROL DIAGRAM
DEVICE: WHITE, COVERPLATE: WHITE
DUPLEX RECEPTACLE W/USB MTD 15"
AFF TO BOTTOM. DEVICE: WHITE,
COVERPLATE: WHITE

SPECIALTY OUTLET, VERIFY NEMA

CONFIGURATION AS NOTED ON
PLANS MTD 15" AFF TO BOTTOM.

FOURPLEX RECEPTACLE MTD 15" AFF TO
BOTTOM. DEVICE: WHITE, COVERPLATE:

WHITE

GROUND FAULT INTERRUPTER FOURPLEX
RECEPTACLE MTD 15" AFF TO BOTTOM.

PROVIDED WITH DEDICATED NEUTRAL.

DEVICE: WHITE, COVERPLATE: WHITE
FOURPLEX RECEPTACLE MTD 15" AFF TO
BOTTOM. CONTROLLED VIA OCCUPANCY
SENSOR. SEE LIGHTING CONTROL DIAGRAM
DEVICE: WHITE, COVERPLATE: WHITE
FOURPLEX RECEPTACLE W/ USB MTD 15"
AFF TO BOTTOM. DEVICE: WHITE,
COVERPLATE: WHITE
GFCI TYPE DUPLEX RECEPTACLE MTD 15" AFF
TO BOTTOM. CONTROLLED VIA OCC. SENSOR.

PROVIDED WITH DEDICATED NEUTRAL.

DEVICE: WHITE, COVERPLATE: WHITE
GFCI TYPE QUAD RECEPTACLE MTD 15" AFF TO
BOTTOM. CONTROLLED VIA OCC. SENSOR.

PROVIDED WITH DEDICATED NEUTRAL.

DEVICE: WHITE, COVERPLATE: WHITE
A. ARC FLASH REDUCTION
L. LONG TIME TRIP
S. SHORT TIME OVERCURRENT TRIP
I. INSTANTANEOUS TRIP
G. GROUND FAULT TRIP, GROUND

FAULT SENSING INTEGRAL WITH
CIRCUIT BREAKER.

ALSIG
S1 LOW VOLTAGE WALL SWTICH

QUANTITY OF BUTTONS AS NOTED
S1 = 1-BUTTON SWITCH
S2 = 2-BUTTON SWITCH
S3 = 3-BUTTON SWITCH
S4 = 4-BUTTON SWITCH
S5 = 5-BUTTON SWITCH
S8 = 8-BUTTON SWITCH
SD = 1-BUTTON DIMMING SWITCH
S4
S2 S5
S3
SD
S8
DC1
DC2
DC3
0-10V DIMMING CONTROLLER WITH INTEGRAL
RELAYS AND 4 RJ45 PORTS. PROVIDE
QUANTITY OF RELAYS AS SHOWN.
20A MAX 120/277V.

WATTSTOPPER
DC1 = 1-RELAY
DC2 = 2-RELAY
DC3 = 3-RELAY

PL PLUG LOAD CONTROLLER WITH
INTEGRAL 20A RELAY AND (4) RJ45 PORT.

NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
28 Apr 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\NDistel\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_NDistelGSBW5.rvt 4/28/2023 12:21:08 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

NOTE SHEET
E000
Sheet List
Sheet
Number Sheet Name
E000 NOTE SHEET
E100 OVERALL POWER PLAN
E200 OVERALL LIGHTING PLAN
E101 ENLARGED AUDITORIUM POWER PLAN
E102 ENLARGED GALLERY POWER PLAN
E201 ENLARGED AUDITORIUM LIGHTING PLAN
E202 ENLARGED GALLERY LIGHTING PLAN
E300 PANEL SCHEDULES
Revision Schedule
No. Revision Issue Date

PER CITY POLICY, WIRING IS NOT PERMITTED

ON THE ROOF OF A BUILDING AND WIRNG ON THE

EXTERIOR OF A BUILDING EQUIRES APPROVAL BY
THE BUILDNIG OFFICIAL.

27. 28 Nov 2023
Construction
Documents
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1 1 1.4 1.8 2 2.4 2.2 3 3.5 4 4.5 4.6 5 5.5 6 7 7.5 8 8.6 8.5 9 10 10.1 F.1
F.2
G
H
J
K
E101
1 E102
1 1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
CL
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
28 Apr 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\NDistel\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_NDistelGSBW5.rvt 4/28/2023 12:21:13 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

OVERALL POWER PLAN
E100
1/8" = 1'-0" 1 Level 1 - Power Plan
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
1 2 2.4 3 4 4.5
H
J

1.4 1.8 2.2 3.5 4.6 1 1.4 1.8 2 2.4 2.2 3 3.5 4 4.5 4.6 H
J
1 2 2.4 3 4 4.5
H
J

1.4 1.8 2.2 3.5 4.6
CL

NO ELECTRICAL POWER SCOPE IN AUDITORIUM
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
28 Apr 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\NDistel\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_NDistelGSBW5.rvt 4/28/2023 12:21:16 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

ENLARGED AUDITORIUM POWER PLAN
E101
1/4" = 1'-0" 1 AUDITORIUM ENLARGED POWER PLAN
Revision Schedule
No. Revision Issue Date
28 Nov 2023
Construction
Documents

8.5 9 10
G
H
J

8.6 10.1 8.6 8.5 9 10 10.1
G
H
J
2 2
2 2
2 2
2 2
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
1 33
3 3
3 33
3 1
7 5
3 37
51 "LD1"
LD1 -1,3,5
LD1 -7
LD1 -9
D

8.5 9 10
G
H
J

8.6 10.1
4 E102
2 8.6 8.5 9
G
H
5 LD1 -11,13
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\HRuiz\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_hruizSFYBF.rvt 7/13/2023 1:52:54 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

ENLARGED GALLERY POWER PLAN
E102
1/4" = 1'-0" 1 GALLERY ENLARGED POWER PLAN
KEYNOTES:

EXISTING PANELBOARD TO BE REMOVED AND ALL

CIRCUITS TO BE REFED FROM NEW PANELBOARD SHOWN
ON AV CONSULTANT'S PLANS. SAFE -OFF AND RETAIN

EXISTING FEEDER CONDUCTORS AND ROUTE TO NEW
PANELBOARD FOR RECONNECTION. ALL EXISTING TO

REMAIN CIRCUITS FED FROM EXISTING PANELBOARD
SHALL BE RECONNECTED TO NEW PANELBOARD.

EXISTING FLOORBOX TO REMAIN. REFEED EXISTING

CIRCUIT TO NEW PANELBOARD SHOWN ON AV
CONSULTANT'S PLANS.

PROVIDE NEMA 5 -20R DUPLEX RECEPTACLE FOR LIGHTING
WALL PANEL. COORDINATE FINAL LOCATION WITH
CONTRACTOR PRIOR TO ROUGH -IN.

PROVIDE POWER TO FAN COIL UNIT. OUTDOOR
CONDENSING UNIT POWERS INDOOR FAN COIL UNIT.

COORDINATE FINAL LOACTION WITH ARCHITECT
DRAWINGS PRIOR TO ROUGH -IN.

PROVIDE AND INSTALL 30A 1P NEMA -3R DISCONNECT FOR
CONNECTION TO MECHANICAL EQUIPMENT. COORDINATE

FEED LOCATION WITH ARCHITECT AND MECHANICAL PRIOR
TO ROUGH -IN.
1 2
3 4
1/4" = 1'-0" 2 PARTIAL ROOF POWER PLAN
Revision Schedule
No. Revision Issue Date
5 Not In Contract
28 Nov 2023
Construction
Documents
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1 1 1.4 1.8 2 2.4 2.2 3 3.5 4 4.5 4.6 5 5.5 6 7 7.5 8 8.6 8.5 9 10 10.1 F.1
F.2
G
H
J
K
E201
1 E202
1 1
1 2 2.4 3 4 4.5 5 5.5 6 7 7.5 8 8.5 9 10
F.1
F.2
G
H
J
K

1.4 1.8 2.2 3.5 4.6 8.6 10.1
CL
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
28 Apr 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\NDistel\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_NDistelGSBW5.rvt 4/28/2023 12:21:23 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

OVERALL LIGHTING PLAN
E200
1/8" = 1'-0" 1 Level 1 - Lighting Plan
KEYNOTES:

THEATER HOUSE LIGHTING SYSTEM TO BE COMPLETELY

RENOVATED AND IS A REDUCTION IN LIGHTING POWER
WATTAGE. USE EXISTING CIRCUITS TO RECONNECT NEW
LIGHTS TO EXISTING HOUSE LIGHTING CONTROL SYSTEM.

INCLUDE ALL COSTS FOR PROGRAMMING NEW LIGHTING
FIXTURES INTO EXISTING LIGHTING CONTROL SYSTEM.
1 Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents
1 1.4 1.8 2 2.4 2.2 3 3.5 4 4.5 4.6
H
J
1 1 2 2.4 3 4 4.5
H
J

1.4 1.8 2.2 3.5 4.6
CL
2 2 2
222
3 3 3 3 3
3 3 3 3 3
3 3 3 3 3
3 3 3 3 3 NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\HRuiz\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_hruizSFYBF.rvt 7/13/2023 3:03:46 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

ENLARGED AUDITORIUM LIGHTING PLAN
E201
1/4" = 1'-0" 1 AUDITORIUM ENLARGED LIGHTING PLAN
KEYNOTES:

EXISTING TO REMAIN THEATRICAL LIGHTING CONTROL
SYSTEM. REFER TO AV CONSULTANT PLANS FOR MORE
INFORMATION. FIELD -VERIFY EXACT LOCATION.

PROVIDE NEW LIGHT FIXTURE, GOTHAM EVO 6" WITH 4000

LUMENS, DMX DRIVER IN RETROFIT HOUSING (MODEL
NUMBER: EVO6R -35 -40 -AR -- MWD -LSS -MVOLT -EDXB -NLT, OR APPROVED EQUAL. NEW RECESSED LIGHT FIXTURE WITH

DMX CONTROL TO REPLACE EXISTING CAN LIGHT IN SAME
LOCATION AS EXISTING FIXTURE INDICATED. PROVIDE DMX
CONTROL CABLING IF REQUIRED BY EXISTING CONDITIONS.

USE EXISTING CIRCUITS TO RECONNECT NEW LIGHTS TO

EXISTING HOUSE LIGHTING CONTROL SYSTEM AND
POWER. PROVIDE RETROFIT LIGHT FIXTURE SPECTRUM
LIGHTING ESTIMATOR COLLECTION WITH 2000 LUMENS,
MODEL NUMBER: RT8ES -- 20L -- 35K -- DX, OR APPROVED
EQUAL. ARCHITECT TO SELECT FINISH.
1 2
Revision Schedule
No. Revision Issue Date
3 28 Nov 2023
Construction
Documents

8.5 9 10
G
H
J

8.6 10.1 8.6 8.5 9 10 10.1
G
H
J
1 1 1 1
1111
1 1 1 1 1
1111
2 2 4 4
4 6
6688
8 2 12 12
10 10 10
LD1 -2,4,6
LD1 -8,10,12

8.5 9 10
G
H
J

8.6 10.1
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domus studio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
28 Apr 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\NDistel\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_NDistelGSBW5.rvt 4/28/2023 12:21:28 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

ENLARGED GALLERY LIGHTING PLAN
E202
1/4" = 1'-0" 1 GALLERY ENLARGED LIGHTING PLAN
KEYNOTES:

PROVIDE NEMA 5 -20R DUPLEX RECEPTACLE FOR LIGHTING
PIPE BOX. COORDINATE MOUNTING AND FINAL LOCATION
WITH AV CONSULTANT PRIOR TO INSTALLATION.
1 Revision Schedule
No. Revision Issue Date
TYP.

Not In Contract
28 Nov 2023
Construction
Documents
NG
TW
RTE

ANROA ET FO LCA FI
R
Exp. 09 -30 -23
No. E 20510
ST
I
EG
S
R
E
L
CAI I
I
E
NE
I
R
EEDR
ROP
CI
I
E
SS
L
FE NAO
F L
E
TECL
C H
Proprietary design: These drawings and design are protected by common law copyright. All patentable material contained herein and originating with domusstudio architecture shall be property of domusstudi o architecture. © COPYRIGHT Construction
Documents
10 July 2023
Drawing Set Issue Schedule
Description Issue Date
C:\Users\HRuiz\Documents\2219 Carlsbad Dove Schulman - Elec(2022)_hruizSFYBF.rvt 7/13/2023 1:52:55 PM Project No.:

Project Number

CARLSBAD AUDITORIUM & GALLERY RENOVATION
1775 Dove Ln
Carlsbad, CA 92011

PANEL SCHEDULES
E300
Notes:

Total Est. Demand: 40 A
Total Conn.: 40 A
Total Est. Demand: 14300 VA
Misc Power 6800 VA 100.00% 6800 VA Total Conn. Load: 14300 VA Power 7500 VA 100.00% 7500 VA
Load Classification Connected Load Demand Factor Estim ated Demand Panel Totals Total Amps: 50 A 33 A 38 A
Total Load: 5900 VA 3900 VA 4500 VA
41 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 42
39 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 40
37 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 38
35 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 36
33 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 34
31 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 32
29 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 30
27 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 28
25 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 26
23 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 24
21 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 22
19 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 20
17 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 18
15 SPARE 20 A 1 0 VA 0 VA 1 20 A SPARE 16
13 -- -- -- 1500 VA 0 VA 1 20 A SPARE 14
11 ROOF - MECHAINCAL EQUIP. CU-1 25 A 2 1500 VA 800 VA 1 2 0 A GALLERY LIGHTING RECEPT. 12 9 AV CABINET 20 A 1 500 VA 1200 VA 1 20 A GALLERY LIGHTING RECEPT. 10 7 LIGHTING WALL PANEL DUPLEX RECEPT. 20 A 1 1000 VA 1200 VA 1 20 A GALLERY LIGHTING RECEPT. 8 5 LIGHTING WALL PANEL DUPLEX RECEPT. 20 A 1 1000 VA 1200 VA 1 20 A GALLERY LIGHTING RECEPT. 6 3 LIGHTING WALL PANEL DUPLEX RECEPT. 20 A 1 1000 VA 1200 VA 1 20 A GALLERY LIGHTING RECEPT. 4 1 LIGHTING WALL PANEL DUPLEX RECEPT. 20 A 1 1000 VA 1200 VA 1 20 A GALLERY LIGHTING RECEPT. 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Enclosure: Type 1
Mounting: Surface Wires: 4 MCB Rating: 250A 3P
Fed From: Phases: 3 Bus Raing: 250A
Location: GALLERY WORK ROOM 154 Volts: 208Y/120V A.I.C. Rating: 22KAIC Panel: LD1
Revision Schedule
No. Revision Issue Date
Not In Contract
28 Nov 2023
Construction
Documents

00 01 01 TITLE PAGE Date Printed: December 7, 2023
Document Version: 1.0 Current Update: October 202 2

CITY OF CARLSBAD

CONTRACT DOCUMENTS
FOR:

Ruby G. Schulman Auditorium Audiovisual Update
Project No. 4753
PWS24-2264FAC

1635 Faraday Ave, Carlsbad, CA 92008
Email: [email protected]

TABLE OF CONTENTS Date Printed: December 7, 2023
Document Version: 1.0 Current Update: October 20 22
Table of Contents
SECTION 1 ....................................................................................................................................... 1 00 11 10 NOTICE INVITING BIDS ..................................................................................................... 1

1. RECEIPT OF BIDS. ............................................................................................................ 1

2. DESCRIPTION OF WORK. ................................................................................................. 1

3. COMPLETION OF WORK. ................................................................................................. 1

4. OPENING AND AWARD OF BIDS. .................................................................................... 1

5. PERIOD FOR AWARD. ...................................................................................................... 1

6. BIDDER QUALIFICATIONS. ............................................................................................... 2

7. PRE-BID CONFERENCE. .................................................................................................... 2

8. OBTAINING CONTRACT DOCUMENTS. ........................................................................... 2

9. BID GUARANTEE AND BONDS. ........................................................................................ 2

10. PREVAILING WAGE RATES AND LABOR COMPLIANCE. ................................................... 3

11. PROJECT ADMINISTRATION/QUESTIONS........................................................................ 3 00 21 10 INSTRUCTIONS TO BIDDERS ............................................................................................. 4

1. SECURING CONTRACT DOCUMENTS. ............................................................................. 4

2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS. ................................................. 4

3. INTERPRETATION OF DRAWINGS AND DOCUMENTS. .................................................... 4

4. QUESTIONS. .................................................................................................................... 5

5. PRE-BID CONFERENCE. .................................................................................................... 5

6. ADDENDA. ....................................................................................................................... 6

7. ALTERNATE BIDS. ............................................................................................................ 6

TABLE OF CONTENTS Date Printed: December 7, 2023
Document Version: 1.0 Current Update: October 20 22

8. COMPLETION OF BID FORMS. ......................................................................................... 6

9. GOVERNING GENERAL PROVISIONS. .............................................................................. 7

10. MODIFICATIONS OF BIDS. ............................................................................................... 7

11. BID GUARANTEE. ............................................................................................................. 7

12. LABOR & MATERIAL BOND AND PERFORMANCE & WARRANTY BOND REQUIREMENTS. ............................................................................................................................. 8

13. SUBSTITUTION OF SECURITY. .......................................................................................... 8

14. OPTIONAL ESCROW FOR SECURITY DEPOSIT. ................................................................. 9

15. INSURANCE REQUIREMENTS. ......................................................................................... 9

16. LICENSING REQUIREMENTS. ......................................................................................... 10

17. SUBCONTRACTORS. ...................................................................................................... 10

18. BIDDER INFORMATION AND EXPERIENCE FORM. ........................................................ 11

19. NON-COLLUSION AFFIDAVIT. ........................................................................................ 12

20. IRAN CONTRACTING ACT OF 2010. ............................................................................... 12

21. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION. .................................. 12

22. PREVAILING WAGES. ..................................................................................................... 13

23. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS. ......................................... 13

24. SIGNING OF BIDS. .......................................................................................................... 13

25. SUBMISSION OF SEALED BIDS. ...................................................................................... 14

26. OPENING OF BIDS. ........................................................................................................ 14

27. WITHDRAWAL OF BID. .................................................................................................. 15

28. BIDDERS INTERESTED IN MORE THAN ONE BID. .......................................................... 15

29. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES, AND FEES. ..................... 15

TABLE OF CONTENTS Date Printed: December 7, 2023
Document Version: 1.0 Current Update: October 20 22

30. PERMIT AND INSPECTION FEE ALLOWANCE. ................................................................ 15

31. BASIS OF AWARD; BALANCED BID. ............................................................................... 15

32. AWARD PROCESS. ......................................................................................................... 16

33. EXECUTION OF CONTRACT. .......................................................................................... 16

34. BUSINESS LICENSE ......................................................................................................... 16

35. PARTICIPATION OF MINORITY AND WOMEN-OWNED BUSINESSES. ........................... 16

36. USE OF RECYCLED MATERIALS ...................................................................................... 16

37. STATUTORY REFERENCES .............................................................................................. 16 00 41 00 BID FORM ....................................................................................................................... 17

1. BID SCHEDULE ............................................................................................................... 18

2. TOTAL BID PRICE ........................................................................................................... 18

3. RECITALS ....................................................................................................................... 20 00 43 10 BID BOND FORM ............................................................................................................ 25 00 43 20 BID SECURITY.................................................................................................................. 27 00 43 30 PROPOSED SUBCONTRACTORS FORM ........................................................................... 28 00 43 40 BIDDER INFORMATION AND EXPERIENCE FORM .......................................................... 30

1. INFORMATION ABOUT BIDDER ..................................................................................... 30

2. LIST OF CURRENT PROJECTS (BACKLOG) ...................................................................... 33

3. VERIFICATION AND EXECUTION .................................................................................... 37 00 45 10 NON-COLLUSION AFFIDAVIT .......................................................................................... 38 00 45 15 IRAN CONTRACTING ACT CERTIFICATION ...................................................................... 39 00 45 20 PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION ..................................... 40

TABLE OF CONTENTS Date Printed: December 7, 2023
Document Version: 1.0 Current Update: October 20 22
00 45 25 CERTIFICATE OF INSURANCE .......................................................................................... 41 00 45 30 STATEMENT REGARDING DEBARMENT ......................................................................... 42 00 45 35 DISCLOSURE OF DISCIPLINE RECORD ............................................................................. 43 00 52 00 CONTRACT ...................................................................................................................... 45 00 61 10 LABOR AND MATERIALS BOND ...................................................................................... 49 00 61 20 FAITHFUL PERFORMANCE AND WARRANTY BOND ....................................................... 52 00 61 30 OPTIONAL ESCROW AGREEMENT .................................................................................. 56 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS .......................................................... 60 INTRODUCTION ............................................................................................................................. 60 01 41 26 PERMIT REQUIREMENTS .............................................................................................. 134 PART 1 GENERAL ......................................................................................................................... 134 01 50 00 TEMPORARY FACILITIES AND CONTROLS..................................................................... 135 PART 1 GENERAL ......................................................................................................................... 135 PART 2 PRODUCTS (NOT USED) .................................................................................................. 139 PART 3 EXECUTION (NOT USED) ................................................................................................. 139 AGENCY TECHNICAL SPECIFICATIONS / PROJECT MANUAL (see drawing set) ........................... 139

00 11 10 NOTICE INVITING BIDS Date Printed: Decemb er 7, 2023 Document Version: 1.0 Current Update: October 20 22