2024-03-26; City Council; 12; Approval of Plans, Specifications and Contract Documents and Authorization to Advertise for Bids for the Traffic Calming Plans for Park Drive, Black Rail Road, Plum Tree

Carlsbad City Council
March 26, 2024

Document
2024-03-26; City Council; 12; Approval of Plans, Specifications and Contract Documents and Authorization to Advertise for Bids for the Traffic Calming Plans for Park Drive, Black Rail Road, Plum Tree
Meeting
March 26, 2024
Body
Carlsbad City Council
Pages
248
Original file
836 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

ADD the following:

1. After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the Contract Bid item and Change Order item with quantities and payment amounts and shall show all deductions made or to be made for prior payments and amounts to b e deducted under provisions of the Contract. All prior estimates and progress payments shall be subject to correction in the Final Payment Estimate.

The Contractor shall have 30 Calendar Days from receipt of the Final Payment Estimate to make a written statement disputing any Bid item or Change Order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its positio n. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all Contract Bid items and Change Order items.

If the Contractor submits a written statement with supporting documents within 30 Calendar Days from receipt of the Final Payment Estimate, the Engineer will review the disputed item within 30 Calendar Days and make any appropriate adjustments on the Final Payment.

Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 2-10.1.1, Initiation of Claim.

The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of the disputed items. The Engineer will consider the merits of the Contractor’s potential claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items.

2. Final Payment and release of Retention shall be paid after Contractor submits the following:
a. An affidavit that payrolls and bills for materials, equipment, and other indebtedness connected with the Work for which the Agency or the Agency’s property might be responsible for or encumbered by. Fewer amounts withheld by the Agency shall have been paid for or otherwise satisfied.
b. If required in the Contract Documents, the successful completion and submittal of the required reports such as construction demolition, waste recycling, and hydrostatic discharge reports.
c. Required documentation, record drawings, operations manuals, test reports, warranty documentation, and UL labels shall be submitted before requesting the release of retention.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 160 ends

ADD the following subsection:
7-3.2.1 Application for Progress Payment.

1. By the 5th day of each month, sign, fill out, and submit to the Engineer a partial payment estimate that identifies acceptable Work performed during the previous month, or since the last partial payment estimate was submitted. If requested by the Engineer, provide such additional data as may be required to support the payment estimate. Such data may include submission of signed field orders and satisfactory evidence of payment for equipment, materials, and labor, including payments to Subcontractors and Suppliers.

2. For application for progress payments, Contractor shall use the format required by the Agency. An electronic copy of the invoice form is available from the Engineer upon request.

Progress payments shall be signed, and the date of the invoice shall be the d ate that the invoice is submitted.

3. The Agency shall not pay progress or partial payments until Contractor submits to the Engineer an updated Schedule. It is solely the Contractor’s responsibility to prepare and submit the Schedule updates.

4. Disputed or incorrect applications shall be returned to the Contractor within 7 Calendar Days with documentation describing the reason for the rejection of the payment request.

ADD the following:
7-3.2.2 Amount of Progress Payments.

1. If an undisputed and properly submitted application for payment is received by the Engineer, the Agency shall pay Contractor within 30 Calendar Days after the Engineer receives the application for Payment consistent with Public Contract Code Section 20104.50. The Agency shall pay Contractor for the Work performed.

ADD the following:
7-3.2.3 Waiver of Claims at Final Payment.

1. Contractor’s acceptance of Final Payment constitutes a waiver of affirmative claims by Contractor, except those previously made in writing and identified as unsettled at the time of Final Payment, which are expressly reserved by Contractor from operation of its Release of Claims pursuant to Public Contract Code Section 7100 or other Applicable Law.

ADD the following:
7-3.2.4 Withholding of Payment and Back Charge.

1. The Engineer may withhold payment for any of the following reasons:
a. Defective or incomplete Work.
b. Stop notices, wage orders, or other withholdings required by Applicable Law. c. Contractor’s failure to comply with 5 -3.3, “Payroll Records” and the Contractor Registration and Electronic Reporting System requirements of the Contract Documents. d. Failure to submit monthly Construction Schedule updates.

2. The Engineer may back charge the Contractor for any of the following reasons:
a. Defective or incorrect Work not remedied.
b. Damage to Agency property or a third party’s property that was caused by Contractor. c. Liquidated Damages.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 161 ends

d. Non-attendance at meetings without prior cancellation notice. e. Failed inspections or re-inspections paid by the Agency.

7-3.3 Delivered Materials.

DELETE in its entirety and SUBSTITUTE with the following:

1. The cost of materials and equipment delivered but not incorporated into the Work will not be included in the progress estimate.

ADD the following:
7-3.3.1 Payment for Stored Materials on Site.

ADD the following:
7-3.3.1.1 General.

1. When authorized, Contractor may request payment for materials and equipment which has not been incorporated into the Work but will be at a later date and will be delivered and stored at the Project Site.

2. The material shall meet the Contract requirements and the material’s required test results and certifications shall be filed with the Engineer.

3. Only non -perishable materials for major items of Work or Materials Subject to Price Adjustment shall be considered for payment for on -site storage. However, each individual item has a value of more than 1% of the Contract Price and shall become a permanent part of the Work.

4. Materials cost shall be evidenced by the manufacturer’s paid invoice bearing the statement that Contractor has paid all invoices in full.

5. The payments for the stored materials shall not exceed the invoice price or 60% of the Bid prices for the pay items into which the materials are to be incorporated, whichever is less, unless otherwise approved by the Engineer.

6. Apply for the payment for materials stored on a form provided by the Engineer and attach documentation to show the following:
a. The amount paid on the invoice (or other record of production cost) for the stored items. b. The dollar amount of the material incorporated into each of the various Work items for the month.
c. The amount that should be retained for stored materials. d. That Contractor has received the materials and equipment free and are clear of all liens, charges, secured interests, and encumbrances.
e. That the materials and equipment are covered by the appropriate property insurance in accordance with the insurance provisions and other arrangements that protect the Agency’s interest.

7. Contractor shall provide the Engineer, upon request and prior to any partial payment, documentation which transfers full legal title to such materials to the Agency conditional only upon receipt of the Final Payment. Such transfer of title or any partial p ayment shall not constitute acceptance by the Agency of the materials nor shall it void the right to reject materials subsequently found to be unsatisfactory in accordance with SECTION 4 – CONTROL OF MATERIALS. This shall also not relieve Contractor of any obligation arising under the Contract Documents.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 162 ends

8. The payments for materials on-site are subject to retention as set forth in 7-3.2, “Partial and Final Payment”.

9. Contractor shall assume all risks associated with the loss or damage to the stored products for which payment has or has not been received.

10. Equipment and materials shall be stored in accordance with manufacturer’s recommendations. The stored products shall be in a form ready for installation. The Agency shall not pay for raw materials or parts and pieces of equipment.

11. Any and all surplus materials that are not incorporated in the Work shall become Contractor’s property at no additional cost to the Agency.

12. Unless specifically provided in the Contract, payment for the materials on hand shall not be included when determining the percentage of Work completed.

13. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the job site in the quantities involved, plus sales tax, freight, and delivery.

The Agency reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary, for the progress of the Work. No markup shall be applied to any material provided by the Agency.

ADD the following:
7-3.3.1.2 Payment for Stored Materials Offsite.

1. The payment of materials and equipment delivered and stored offsite shall be contingent upon Contractor’s compliance with the storage and protective maintenance requirements set forth in the Contract Documents and all other requirements necessary to preserve equipment warranties for the benefit of the Agency.

2. The Agency reserves the right to refuse approval for the payment of any equipment or materials suitably stored offsite in its sole discretion, regardless of whether all conditions in the Contract Documents have been met.

3. Partial payment may be made for products eligible for offsite delivery and storage only upon Contractor’s presentation of a bill of sale, a paid invoice, or an affidavit certifying that the material is received by the Contractor free and clear of all liens, encumbrances, and secured interest of any kind including offsite delivery.

4. Partial payment for products delivered and stored offsite shall be contingent upon Contractor’s compliance with the storage and protective maintenance requirements set forth in the Contract Documents and all other requirements necessary to preserve equipme nt warranties for the benefit of the Agency.

5. The cost of materials and equipment delivered but not incorporated into the Work will not be included in the progress estimate.

6. Costs associated with the delivery to and storage at an offsite facility shall be at Contractor’s expense regardless of the Engineer’s approval to deliver and store the materials.

7. Contractor shall provide written evidence to the Engineer of having made arrangements for unrestricted access by the Agency and the Agency’s authorized representatives to the materials wherever stored, including provisions for the Agency to take control and possession of such materials at any time and without restriction. Contractor shall furnish the Engineer a

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 163 ends

permit of entry, from the owner of the property, for at least 6 months after the NOC has been filed. The permit of entry shall contain information similar to the following:

PERMIT OF ENTRY: Permission is granted to the Agency and its designated employees or agents to enter upon the property described in this permit for a period of not less than 6 months after the NOC has been filed for the TRAFFIC CALMING FOR PARK DRIVE, BLACK RAIL ROAD, PLUM TREE ROAD AND CARRILLO WAY for the purpose of removing materials for which advance materials on hand payment has been made to (Contractor’s Name). The property is owned by (Owner’s Name) and is described as follows: (Address and Description of Property). (Include signature(s) and d ate(s) for owner and lessee or purchaser, and, if appropriate, attach a copy of a warehouse receipt or contract for storage.

8. The material shall be clearly marked and identified as being specifically fabricated, produced, and reserved for use on the Project. The Contractor shall provide payment documentation for the materials.

7-3.4 Mobilization.

ADD the following:

1. Mobilization consists of Work necessary for the movement of personnel, equipment, supplies, and incidentals to and from the Site; for establishment of all offices, buildings, storage yards, and other facilities necessary for the Work; and for all other Work and operations which shall be performed prior to beginning the Work and after completion of the Work on the various Contract items on the Site.

2. Contractor shall properly design the Project parameters to incorporate construction mobility for moving on and off the Site in a manner that limits disturbance to the surrounding residences, businesses, and any other citizens. This includes the designated staging areas, loading areas, and assemblage areas. Contractor shall consider and address access rights of the public at all times. Prepare a mobilization plan that shall describe and govern Contractor’s mobilization activities.

3. When a Bid item has been provided for “Mobilization,” payment for mobilization Work shall be distributed equally over the first 2 progress payments up to the Bid amount of the “Mobilization” Bid item but shall not exceed 3% of the Contract Price. If Contractor’s Bid item for “Mobilization” exceeds 3% of the Contract Price, then anything above 3% of the Contract Price shall be paid as a part of the Final Payment.

4. The complete dismantling and removal of all of Contractor’s properties, temporary facilities, equipment, materials, construction wastes, and personnel at the Site referred to as demobilization is included in the payment for mobilization, unless there is a Bid item for demobilization.

If a separate Bid item has not been provided for mobilization, the payment for mobilization is included in the Contract Price.

7-3.5 Contract Unit Prices.
7-3.5.1 General.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 164 ends

ADD the following:

1. Unit Bid prices shall not be subject to adjustment regardless of quantity used or if none is used for the following Bid items:
a. additional bedding
b. imported backfill
c. shoring
d. water services and connections
e. water pollution control items
f. point repairs for existing sewer mains
g. additional point repairs for existing sewer mains
h. sewer lateral connections
i. sewer lateral linings
j. traffic control
k. additional equipment

2. Should the actual quantity of an item of Work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 50 percent, payment for the quantity in excess of 150 percent of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 2 -8. The Extra Work per Sect ion 2-8, basis of payment, shall not include fixed costs. Fixed costs shall be deemed to have been recovered by the Contractor through payment for 150 percent of the Bid quantity at the Contract Unit Price.

3. Should the actual quantity of an item of Work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 50 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Se ction 2-8; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 50 percent of the Bid quantity at the Contract Unit Price.

ADD the following subsection:
7-3.9 Field Orders.

1. The Agency shall pay Field Order items of the Work in accordance with the limits below if the cumulative total of Field Orders does not exceed the “Field Orders” Bid Item:

Contract Price Maximum Field Order Amount
Less than $100,001 $2,500
$100,001 to $1,000,000 $5,000
$1,000,001 to $5,000,000 $10,000
Greater than $5,000,000 $20,000

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 165 ends

ADD the following subsection:
7-3.10 Compensation Adjustments for Price Index Fluctuations.

1. Unless otherwise specified, the provisions of this section apply only to the paving asphalt used in the following:
a. Asphalt Concrete Pavement
b. Asphalt Pavement Repair
c. Scheduled and Unscheduled Base Repair
d. Slurry Seal or any other asphalt emulsion

2. The compensation for paving asphalt shall be increased or decreased for paving asphalt price fluctuations in accordance with 7 -3.11 “Compensation Adjustments for Price Index Fluctuations” in the Caltrans Standard Specifications.

3. The adjustment in compensation shall also be subject to the following:
a. Show the provided compensation adjustments separately on payment estimates.

Contractor is liable to the Agency for decreased compensation adjustments and the Engineer may deduct the amount from moneys payable or that may become payable to Contractor.
b. In the event of an overrun of Contract Time, adjustment in compensation for asphalt binder included in estimates during the overrun period shall be determined using the California Statewide Crude Oil Price Index in effect on the first business day of the month within the pay period in which the overrun began.
c. In the event that the companies discontinue posting their prices for a field, the Engineer shall determine an index from the remaining posted prices. The Agency reserves the right to include in the index determination the posted prices of additional fields.

4. Contractor may opt out of the payment adjustments for price index fluctuations when specified in the Contract Documents by submitting a letter with the Bid.

7-4 PAYMENT FOR EXTRA WORK.

7-4.1 General.

ADD the following:

1. With every request for payment, Contractor shall submit to the Engineer a breakdown showing monthly and cumulative amounts of the Work performed under the Change Order by Contractor and Contractor’s Subcontractors. The reporting format shall be approved by the Engineer.

7-4.2 Basis for Establishing Costs.
7-4.2.1 Labor.

ADD the following:

1. The Agency reserves the right to request the following:
a. Financial records of salaries for an employee.
b. Wage rates/Certified Payroll.
c. Bonuses and deductions.

2. Contractor shall list the labor rates of its personnel and Subcontractors who work on the Project. The payment for payroll records is included in the Contract Price.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 166 ends

3. If Contractor’s proposal for Extra Work is based upon services and Work to be performed outside Normal Working Hours, the labor charges associated with the Extra Work shall consist of straight time wages and burdens plus the appropriate overtime or shift p remium with no additional burdens, such as fringe benefits, on the premium portion.

7-4.2.3 Tool and Equipment Rental.

DELETE in its entirety and SUBSTITUTE with the following:

1. No payment shall be made for the use of tools which have a replacement value of $200 or less.

2. Regardless of ownership, the rates and delay factors to be used in determining equipment rental costs shall not exceed those listed in the latest edition of the Caltrans publication entitled “Labor Surcharge and Equipment Rental Rates” preceding the date t he Work is accomplished. The latest edition of the Caltrans publication is available at www.dot.ca.gov.

The delay factors therein shall be used as multipliers of the rental rates for determining the value of costs for delay to the Contractor and Subcontractors, if any. The labor surcharge rates published therein are not a part of this Contract.

3. Contractor shall be entitled to a rental rate adjustment when Contractor can substantiate that the rental rates prevailing locally exceed the published rates by more than 15%. For equipment not listed in the Caltrans publication, rental rates shall not exc eed listed rates prevailing locally at equipment rental agencies or distributors at the time the Work is performed.

4. Whenever possible, Extra Work shall be accomplished using equipment available on Site or owned by Contractor. If a specific piece of equipment shall be rented to be used exclusively for the Extra Work, the rental rate shall be the invoiced rate. The rental rates paid shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Necessary loading and transportation costs for equipment used on the Extra Work shall be included.

5. If rental equipment is not being used or used intermittently and could be returned to its rental source rather than holding it at the Work Site, the Contractor shall return the equipment at no expense to the Agency unless Contractor elects to keep it at the Work Site at Contractor’s expense.

6. The reported rental time for equipment already at the Work Site shall be the duration of its use on the Extra Work. This time shall begin when equipment is first used on Extra Work, plus the time required to move it from its previous site and back or from its previous site to a closer site.

7. All equipment shall be acceptable to the Engineer, in good working condition, and suitable for the purpose for which it is to be used.

7-4.2.5 Invoices. Vendors’ invoices for material, equipment rental and other expenditures shall be submitted with the request for payment. If the request for payment is not substantiated by invoices or other documentation, the Agency may establish the cost of the item involved at the lowest price which was current at the time of the report.

7-4.3 Markup.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 167 ends

7-4.3.1 Work by the Contractor.

DELETE in its entirety and REPLACE with the following:

The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:

Labor 20
Materials 15
Equipment Rental 15
Other Items and Expenditures 15

To the sum of the costs and markups provided for in this section, 1 % shall be added as compensation for bonding.

7-4.3.2 Work by a Subcontractor.

DELETE in its entirety and REPLACE with the following:

When all or any part of the Extra Work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractor’s actual cost of such Work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the Extra Work and a markup of 5 percent on Work added in excess of $5,000 of the subcontracted portion of the Extra Work may be added by the Contractor.

7-4.4 Daily Reports.

ADD the following:

Payment for Extra Work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer.

When the price for the Extra Work cannot be agreed upon, the Contractor shall submit a daily report to the Engineer on forms approved by the Agency. Included are applicable delivery tickets, listing all labor, materials, and equipment involved for that day , and other services and expenditures when authorized. Payment for Extra Work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer.

Failure to submit the daily report by the close of the next Working Day may waive any rights for that day. An attempt shall be made to reconcile the report daily, and it shall be signed by the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to e xplain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by Subcontractors or others shall be submitted through the Contractor.

The report shall:

1. Show names of workers, classifications, and hours worked.

2. Describe and list quantities of materials used.

3. Show type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable.

4. Describe other services and expenditures in such detail as the Agency may require.

00 73 00 SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 168 ends

SECTION 8 – FACILITIES FOR AGENCY PERSONNEL

DELETE this Section in its entirety and ADD the following:
8-1 GENERAL.

Field facilities for Agency personnel are not required.

END OF SECTION

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 169 ends

INTRODUCTION TO PARTS 2 THROUGH 8

The Specifications contained in this 00 7400 Agency Supplemental Technical Provisions take precedence over the specification language contained in the Standard Specifications for Public Works Construction, "The Greenbook" latest edition and all errata. This specification addresses the unique conditions in Carlsbad that are not addressed in The Greenbook. Therefore, if there is a conflict, these Specifications shall control.

The Greenbook may be purchased at Bidder/Contractors local technical bookstore or directly from the publisher. These Agency Supplemental General Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies.

When used in the Contract Documents, statements or command phrases (active voice and imperative mood) refer to and are directed at the “Bidder” or “Contractor” as applicable. The Specifications are written to the “Bidder” before award and the “Contractor” after award. Before award, interpret sentences written in the imperative mood as starting with “The Bidder shall .” Interpret the term “you” as “the Bidder” and interpret the term “your” as “the Bidder’s .” After award, interpret sentences written in the imperative mood starting with “The Contractor shall .” Interpret the term “you” as “the Contractor” and interpret the term “your” as “the Contractor’s.

PART 2 CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS

200-2 UNTREATED BASE MATERIALS.

200-2.1 General.

ADD the following:

1. Aggregate base shall be Crushed Aggregate Base per Greenbook Section 200 -2 and as specified in this section.

200-2.2 Crushed Aggregate Base.
200-2.2.1 General.

ADD the following:

Crushed Aggregate Base shall be free from organic matter and other deleterious substances, and shall be of such nature that it can be compacted readily under watering and rolling to form a firm, stable base.

1. The aggregate shall not be treated with lime, cement or other chemical material before tests are performed.

2. Samples for testing shall represent every 500 cubic yards or one day's production, whichever is smaller. If the results of the aggregate grading tests do not meet the requirements for

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 170 ends

Percentage Passing Sieve as specified in Table 200-2.2.2, but meet the Quality Requirements as specified in Table 200 -2.2.3, placement of the aggregate base may be continued for the remainder of that day. However, another day's Work may not be started unti l test results indicate to the satisfaction of the Engineer that the next material to be used in the Work will comply with the requirements specified for Percentage Passing Sieve.

3. If the results of both the aggregate grading and Sand Equivalent tests do not meet the requirements of Section 200-2.2, the aggregate base which is represented by these tests shall be removed. However, if requested by the Contractor, and approved at the sole discretion of the Engineer, the aggregate base may remain in place and the Contractor shall pay to the Agency $50 per cubic yard for such aggregate base left in place. The Agency may deduct this amount from any moneys due, or that may be come due, to the Contractor under the Contract.

SECTION 201 – CONCRETE, MORTAR AND RELATED MATERIALS

201-1 PORTLAND CEMENT CONCRETE.

MODIFY TABLE 201-1.1.2 as follows:

TABLE 201-1.1.2

PORTLAND CEMENT CONCRETE
Type of Construction Concrete Maximum
Class Slump (Inches)
All Concrete Used Within the Right-of-Way 560-C-3250 (1) (2) Trench Backfill Slurry 190-E-400 8”
Street Light Foundations and Survey
Monuments
560-C-3250 4”
Traffic Signal Foundations 650-CW-4000 4”
Concreted-Rock Erosion Protection 520-C-2500P per Table 300-11.3.2 (1) Except that concrete required to be of higher strength by Table 201-1.1.2 SSPWC shall be as per Table 201-1.1.2 SSPWC. (2) As per Table 201-1.1.2 SSPWC.

201-1.2.1 Cement.

SUBSTITUTE the following:
a) Portland Cement. Portland Cement shall be Type II or V Portland cement conforming to ASTM C150 and the optional requirements of ASTM C150, Table 2 for maximum equivalent alkalis (Na2O + 0.658K2O) of 0.60 percent.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 171 ends

SECTION 203 – BITUMINOUS MATERIALS

203-6 ASPHALT CONCRETE.

203-6.1 General.

DELETE in its entirety and REPLACE with the following:

Asphalt Concrete (AC) for patches shall be Type III -C3-PG 64 -10-R0. No recycled asphalt pavement (RAP) shall be used in the AC mix used for patching.

Asphalt Concrete for overlay shall be Type III-C3-PG 64-10-R15. Asphalt Concrete in base course, if necessary or required by the City Inspector, shall be Type III-B2-PG 64-10-R15. No more than 15% RAP shall be used in the full width overlay and base course AC mixes.

Unless otherwise specified in the Special Provisions or shown on the Plans, asphalt concrete mixtures shall conform to 203-6.4.

203-6.3 Job Mix Formula (JMF) and Mix Designs.
203-6.3.1 General.

DELETE in its entirety and REPLACE with the following:

1. The Contractor shall submit in accordance with 3 -8, a JMF that summarizes each asphalt concrete mix design for each class and grade of asphalt concrete required to construct the Work. Supporting information for the WMA technology and/or recycling agent, if included in a mixture, shall also be submitted.

2. The JMF shall identify the source and the individual grading of each material used to produce the mix design (including the percentage and individual gradation of any manufactured or natural sands), the combined gradation, the OBC, void content, RAP percen tage, RAP gradation, RAP binder content, stability value, plant identification, mix number, WMA technology, and the source and performance grade of the paving asphalt. The mix design test data represented by the JMF shall be submitted to the Engineer with the JMF.

3. When greater than 20 percent RAP is to be included in a mixture, a mix design shall be submitted. The submittal shall include supporting information showing the viscosity of the individual binders (both the virgin paving asphalt grade and that of the binder recovered from the RAP); and the amount of recycling agent, if any, and the blended final viscosity in accordance with AASHTO M323.

4. For all mixtures, the asphalt binder content shall be defined as the total bituminous material present in the mix consisting of the blend of virgin paving asphalt, residual paving asphalt from RAP, and recycling agent.

5. When a mix design is more than 30 Calendar Days old, the JMF must indicate that the combined gradation is ± 3 percent from the referenced mix design based on a 30-day moving average or a minimum of the 10 most current results. If the combined aggregate gradation is not within ± 3 percentage points of the gradation shown on the referenced mix design on any sieve, if the source of any aggregate is changed, the performance grade or source of paving asphalt is changed, the grade or source of any other component of asphalt concrete is

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 172 ends

changed, or the mix design is over 1 year old, a new mix design shall be prepared and a new JMF shall be submitted to the Engineer for approval.

6. Asphalt Concrete shall be Class C2-PG-64-10.

203-6.3.2 Hveem Mix Design Method.

DELETE the fourth paragraph and REPLACE with the following:

1. Unless viscosity and blending charts developed in accordance with AASHTO M323 show otherwise, mix designs for mixtures containing more than 20 percent RAP shall drop the high temperature requirement of the virgin paving asphalt by one performance grade and drop the low temperature requirement by a minimum of one performance grade, e.g., a specified "PG 64-1O" shall become a "PG 58-22 or "PG 58-16".

203-6.4.1 Class and Grade.

DELETE letters b) and d) and REPLACE with the following:
b) "R0" if the mixture does not contain RAP, e.g., "C3-PG 64-10-R0". c) "WMA" if the mixture uses a warm mix asphalt technology, e.g., "C2-PG 64-10-WMA".

203-6.4.4 Composition and Grading.

ADD the following:

Table 203-6.4.4, design criteria, shall be modified per the following table, the gradation shall stay the same:

Table 203-6.4.4 – Modified (Design Criteria)
Sieve Size
Percentage Passing Sieves
A B C1 C2 D1 D2 E F
Dense
Coarse
Dense
Medium
Coarse
Coarse
Medium
Dense
Medium
Coarse
Fine
Dense
Fine
Extra
Fine
Channel
Liner
1-1/2” (37.5 mm) 100
1” (25 mm) 90-100 100
¾” (19.0 mm) 78-90 87-100 100 100
½” (12.5 mm) 64-78 70-87 90-100 95-100 100 100
3/8” (9.5 mm) 54-68 55-76 72-88 72-88 90-100 95-100 100 100 No. 4 (4.75 mm) 34-48 35-52 40-54 46-60 40-54 58-72 65-85 95-100 No. 8 (2.36 mm) 25-35 22-40 18-34 28-42 20-32 34-48 45-65 70-84 No. 30 (600 µm) 12-22 8-24 8-20 15-27 6-18 18-32 22-38 36-50 No.50 (300 µm) 8-16 5-18 4-14 10-20 2-12 13-23 16-28 23-35 No. 200 (75 µm) 3-6 0-7 1-6 2-7 0-5 2-9 6-12 6-12
Asphalt Binder % 4.5-6.0 4.7-6.5 5.0-6.5 5.0-6.5 5.3-7.0 5.3-7.0 6.0-8.0 8.0-10.0 Hveem Stability
“S Value” (min.)
37 37 35 35 32 32
Air Voids1 4% 4% 4% 4% 4% 4%

203-6.5.1 Class and Grade.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 173 ends

DELETE the list and REPLACE with the following:
a) No suffix if the mixture contains RAP in an amount up to 20 percent. b) "R0" if the mixture does not contain RAP, e.g., "III-C3-PG 64-10-R0". c) "R" and the percentage of RAP if the mixture contains greater than 20 percent, e.g. "III - C3-PG 64-I0-R25".
d) "WMA" if the mixture uses a warm mix asphalt technology, e.g., "III-C3-PG 64-10-WMA".

203-6.5.4 Table.

DELETE in its entirety and REPLACE with the following:

CLASS B2 B3
Sieve Size Individual
Test Result
Moving
Average
Individual
Test Result
Moving
Average
1" (25.0 mm) 100 100 100 100
3/4" (19.0 mm) 87-100 90-100 90-100 95-100
3/8" (9.5 mm) 50-80 60-75 60-84 65-80
No. 4 (4.75 mm) 30-60 40-55 40-60 45-60
No. 8 (2.36 mm) 22-44 27-40 24-50 30-45
No. 30 (600 µm) 8-26 12-22 11-29 15-25
No. 200 (75 µm) 1-8 3-6 1-9 3-7
Asphalt Binder %
Air Voids %

4.8-6.5
4%

4.8-6.5
4%
CLASS C2 C3
Sieve Size Individual
Test Result
Moving
Average
Individual
Test Result
Moving
Average
3/4" (19.0 mm) 100 100 100 100
1/2" (12.5 mm) 89 -100 95 -100 89 -100 95 - 100
3/8" (9.5 mm) 70-94 75-90 74 -100 80-95
No. 4 (4.75 mm) 44-72 50-67 50- 78 55-72
No. 8 (2.36 mm) 30-54 35-50 32-60 38-55
No. 30 (600 µm) 10-34 15 - 30 14 - 38 18 - 33
No. 200 (75 µm) 2-10 4-7 2-10 4-8
Asphalt Binder %
Air Voids %

5.0 - 6.8
4%

5.0 - 7.0
4%

CLASS D F
Sieve Sizes Combined Average Combined Average
1/2" (12.5 mm)
3/8" (9.5 mm)
100
95-100
-
100
No. 4 (4.75 mm) 65-85 95-100
No. 8 (2.36 mm) 50-70 70-80
No. 30 (600 µm) 28-40 35-50
No. 200 (75 µm) 5-14 7-16
Asphalt Binder %
Air Voids

6.0-8.0
4%

8.0-10.0

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 174 ends

203-6.8 Storage.

DELETE in its entirety and REPLACE with the following:

1. Storage of asphalt concrete shall not be allowed. Asphalt concrete shall be transferred from the mixer by a method that does not cause segregation.

203-6.10 Sampling.

ADD the following:

Evaluation of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder will be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations determined by the Engineer.

All samples shall be taken in accordance with California Test 125, and the following table:

Sampling Location
Asphalt Concrete • Trucks, or
• Mat behind the paver
Aggregate • Cold feed belts, or
• Hot bins prior to addition of asphalt binder
RAP • RAP system, or
• RAP feed belts
Asphalt Binder • Asphalt binder supplier, or
• Storage tanks at the plant during production

When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing.

When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results.

Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot.

1. Evaluation and acceptance of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder shall be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 175 ends

determined by the Engineer. All samples shall be taken in accordance with California Test 125, and the following table:

TABLE 203-6.10
Sampling Location
Asphalt Concrete • Trucks, or
• Mat behind the paver
Aggregate • Cold feed belts, or
• Hot bins prior to addition of asphalt binder
RAP • RAP system, or
• RAP feed belts
Asphalt Binder • Asphalt binder supplier, or
• Storage tanks at the plant during
production

2. When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing.

3. When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results.

4. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot.

203-6.11 Acceptance.

DELETE in its entirety and REPLACE with the following:

1. Acceptance of asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Table 203-6.4.4. Air void values shall be between 2% and 6%. The asphalt binder content shall be within +/ - 0.4 percent of the OBC shown on the respective job mix formula.

2. Acceptance of Type III asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Tables 203-6.5.4 (A) and 203 -6.5.4 (B). Air void values shall be between 2% and 6%. T he asphalt binder content shall be within +/ - 0.4 percent of the OBC shown on the respective job mix formula.

3. Should plant gradation test results be unavailable and allowed by the Engineer, gradation may be determined in accordance with ASTM D2172 or by AASHTO T 308 with adherence to the aggregate correction factor therein. In the case of a continued dispute, fina l acceptance of plant produced mixtures may be based upon binder content, stability and air void values.

4. When dissimilar surface course mix characteristics are the result of production and delivery from multiple plants, the Engineer may require production and delivery from only 1 plant during any 1 day of production.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 176 ends

SECTION 206 – MISCELLANEOUS METAL ITEMS

ADD the following:
206-7 TRAFFIC SIGNS.

206-7.1 Roadside Signs.

1. This Work shall consist of furnishing and installing roadside signs in accordance with details shown on the Plans, the California Sign Specifications and these special provisions.

Permanent and temporary signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearanc e when viewing during daytime and nighttime from a distance of 25 feet. The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches, wrinkles, gel, hard spots, streaks, extrusion marks, and air bubbles. The front, back and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive overspray, and aluminum marks.

206-7.1.2 Sign Identification.

1. The following notation shall be placed on the lower right side of the back of each sign where the notation shall not be blocked by the sign post or frame:

A. PROPERTY OF THE CITY OF CARLSBAD,
B. Name of the sign manufacturer,
C. Month and year of fabrication,
D. Type of retroreflective sheeting, and
E. Manufacturer’s identification and lot number of retroreflective sheeting.

2. The above notation shall be applied directly to the aluminum sign panels in 1/4 -inch upper case letters and numerals by die -stamp and applied by similar method to the fiberglass reinforced plastic signs. Painting, screening, or engraving of the notation will not be allowed.

The notation shall be applied without damaging the finish of the sign.

206-7.1.3 Drawings.

1. Standard signs shall be as per the most recently approved California Sign Specifications. The date of approval shall be the date most closely preceding the date of manufacture of the sign(s) or the date of the “Notice to Proceed” of this Contract, whichever is most recent.

206-7.1.4 Reflective Sheeting.

1. All advisory signs, warning signs and all regulatory signs shall be fabricated with Type IV prismatic sheeting (High Intensity Prismatic or equivalent) or Type IX prismatic cube lens sheeting (Diamond Grade VIP or equivalent) in accordance to ASTM Designat ion D4956 and conforming to the requirements of these special provisions.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 177 ends

206-7.1.5 Sign Panel.

1. Sign panels shall be fabricated from sheet aluminum in accordance with ASTM Designation B209. Sheet aluminum shall be pretreated in accordance to ASTM Designation B449. The surface of sheet aluminum shall be cleaned, deoxidized, and coated with a light and tightly adherent chromate conversion coating free of powdery residue. The conversion coating shall be Class 2 with a mass between 10 milligrams per square foot. Following the cleaning and coating process, the sheet aluminum shall be protected from exposur e to grease, oils, dust, and contaminants. Sheet aluminum shall be free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication.

206-7.1.6 Mounting Traffic Signs.

1. Traffic signs shall be installed on 10-gage or 12-gage cold-rolled steel perforated tubing posts as shown on San Diego Regional Standard Drawing M-45 or, when the sign area exceeds the maximum area allowed for on that drawing, on multiple 10-gage or 12-gage cold-rolled steel perforated tubing posts. The number of posts shall be determined by the parameters in SDRS Drawing M-45 or as approved by the Engineer. Traffic signs will be provided with back braces and mounting blocks as approved by the Engineer consisting of 10-gage or 12-gage cold-rolled steel perforated tubing when multiple posts are used.

206-7.1.6 Traffic Sign Posts.

1. Posts shall be constructed of 10-gage or 12-gage cold-rolled steel perforated tubing posts as shown on San Diego Regional Standard Drawing M-45.

206-7.2 Temporary Traffic Signs.

1. Temporary traffic signs shall consist of all signs used for the direction, warning, and regulation of vehicle (including bicycle) and pedestrian traffic during the Contractor’s performance of the Work. Temporary traffic signs include both stationary and portable signs.

206-7.2.1 General.

1. This Work shall consist of furnishing and installing temporary signs in accordance with details shown on the Plans, the California Sign Specifications and these special provisions.

Permanent and temporary signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearance when viewing during daytime and nighttime from a distance of 25 feet. The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches, wrinkles, gel, ha rd spots, streaks, extrusion marks, and air bubbles. The front, back and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive overspray, and aluminum marks.

206-7.2.2 Drawings.

1. Standard signs shall be as per the most recently approved California Sign Specifications. The date of approval shall be the date most closely preceding the date of manufacture of the sign(s) or the date of the “Notice to Proceed” of this contract, whichever is most recent.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 178 ends

206-7.2.3 Reflective Sheeting.

1. All advisory signs, warning signs and all regulatory signs shall be fabricated with Type IV prismatic sheeting (High Intensity Prismatic or equivalent) or Type IX prismatic cube lens sheeting (Diamond Grade VIP or equivalent) in accordance to ASTM Designat ion D4956 and conforming to the requirements of these special provisions.

206-7.2.4 Sign Panel.

1. Sign panels shall be fabricated from sheet aluminum in accordance with ASTM Designation B209. Sheet aluminum shall be pretreated in accordance to ASTM Designation B449. The surface of sheet aluminum shall be cleaned, deoxidized, and coated with a light and tightly adherent chromate conversion coating free of powdery residue. The conversion coating shall be Class 2 with a mass between 10 milligrams per square foot. Following the cleaning and coating process, the sheet aluminum shall be protected from exposure to grease, oils, dust, and contaminants. Sheet aluminum shall be free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication.

206-7.2.5 Stationary Mounted Temporary Traffic Signs.

1. Stationary mounted temporary traffic signs shall be installed on 10 -gage and 12 -gage cold- rolled steel perforated tubing posts in the same manner shown on the State of California, Department of Transportation Standard Plans RS1, RS2, RS3 and RS4 for instal lation of roadside signs, except as follows:
a. Wood posts shall not be used.
b. Back braces and blocks for sign panels will not be required. c. The height to the bottom of the sign panel above the edge of traveled way shall be at least 2.1 m (7’).
d. Unless otherwise shown on the Plans , traffic signposts shall conform in materials and installation to SDRS Drawing M-45 and shall have 1 post provided for each 0.48 m2 (5 ft2) of sign area, or the signs may be installed on existing lighting standards when approved by the Engineer.
e. Sign panels mounted on temporary traffic signposts shall conform to the requirements of these special provisions.

206-7.2.6 Temporary Traffic Sign Posts.

1. Posts shall be 10-gage or 12-gage cold-rolled steel perforated tubing used for the support and stabilization of stationary mounted temporary signs. Post size and number of posts shall be as shown on the Plans, except that when stationary mounted signs are installed and the type of sign installation is not shown on the Plans, post size and the number of posts will be determined by the Engineer. Sign panels for stationary mounted signs shall consist of reflective sheeting applied to a sign substrate.

206-7.2.7 Portable Temporary Traffic Signs.

1. Each portable temporary traffic sign shall consist of a base, standard or framework and a sign panel. The units shall be capable of being delivered to the site of use and placed in immediate operation. Sign panels for portable signs shall conform to the re quirements of these special

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 179 ends

provisions, or shall be cotton drill fabric, flexible industrial nylon fabric, or other approved fabric. Fabric signs shall not be used during the hours of darkness. Size, color, and legend requirements for portable signs shall be as described for stationa ry mounted sign panels in section 206-7.2 of these special provisions. The height to the bottom of the sign panel above the edge of traveled way shall be at least 0.3 -m (12”). All parts of the sign standard or framework shall be finished with 2 applications of orange enamel which will match the color of the sign panel background. Testing of paint will not be required.

ADD the following subsection:
206-8 LIGHT GAGE STEEL TUBING AND CONNECTORS.

206-8.1 General.

1. This Section pertains to 10-gage and 12-gage cold-rolled steel perforated tubing used for the support and stabilization of signs. All shapes shall have a galvanized finish and shall be cold - roll-formed steel conforming to ASTM Designation A-446, Grade A. Galvanizing shall conform to ASTM A -525, Designation G -90. Galva nizing shall be performed after all forming and punching operations have been completed. Cold -rolled steel perforated tubing shall be perforated on all 4 faces with 11mm (7/16”) holes on 25 mm (1”) centers.

206-8.2 Tolerances.

1. Wall thickness tolerance shall not exceed +0.28 mm, -0.13 mm (+0.011”, -0.005”). Convexity and concavity measured in the center of the flat side shall not exceed a tolerance of +0.25 mm (+0.010”) applied to the specific size determined at the corner. Strai ghtness tolerance variation shall not exceed 1.6 mm in 1 m (1/16 “ in 3’). Tolerance for corner radius is 4.0mm (5/32”), plus or minus 0.40 mm (1/64“). Weld flash on corner -welded square tubing shall permit 3.60 mm (9/64”) radius gage to be placed in the c orner. Using 10 -gage or 12 -gage square tube, consecutive size tubes shall telescope freely for 3.1m (10’). Tolerance on hole size is plus or minus 0.40 mm (1/64“) on a size. Tolerance on hole spacing is plus or minus 3.2 mm in 6.1 m (1/8” in 20’). In addition, for the following specific sizes of light gage steel tubing, dimensional tolerances shall not exceed those listed in tables 206-8.2 (A) and 206-8.2(B).

TABLE 206-8.2(A)

LIGHT GAGE STEEL TUBING SIZE TOLERANCE
Nominal Outside
mm
Dimensions
(inches)
Outside Tolerance for
mm
All Sides at Corners
(inches)
25 x 25 (1 x 1) 0.13 0.005
32 x 32 (11/4 x 11/4) 0.15 0.006
38 x 38 (11/2 x 11/2) 0.15 0.006
44 x 44 (13/4 x 13/4) 0.20 0.008
51 x 51 (2 x 2) 0.20 0.008
56 x 56 (23/16 x 23/16) 0.25 0.010
57 x 57 (21/4 x 21/4) 0.25 0.010
64 x 64 (21/2 x 21/2) 0.25 0.010
51 x 76 (2 x 3) 0.25 0.010

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 180 ends

TABLE 206-8.2(B)

LIGHT GAGE STEEL TUBING SQUARENESS OF SIDES AND TWIST
Nominal Outside
mm
Dimension
(Inches)
Squareness(1)
mm

(Inches)
Twist
Permissible
mm(2)
in 900 mm
(3”)
(Inches)(2)
25 x 25 (1 x 1) 0.15 0.006 1.3 0.050
32 x 32 (1-1/4 x 1-1/4) 0.18 0.007 1.3 0.050
38 x 38 (1-1/2 x 1-1/2) 0.20 0.009 1.3 0.050
44 x 44 (1-3/4 x 1-3/4) 0.25 0.010 1.6 0.062
51 x 51 (2 x 2) 0.30 0.012 1.6 0.062
56 x 56 (2-3/16 x 2-3/16) 0.36 0.014 1.6 0.062
57 x 57 (2-1/4 x 2-1/4) 0.36 1.014 1.6 0.062
64 x 64 (2-1/2 x 2-1/2) 0.38 0.015 1.9 0.075
51 x 76 (2 x 3) 0.46 0.018 1.9 0.075
(1) Tubing may have its sides failing to be 90 degrees to each other by the tolerance listed. (2) Twist is measured by holding down the edge of one end of a square tube on a surface plate with the bottom side of the tube parallel to the surface plate, and noting the height that either corner on the opposite end of the bottom side is above the surface plate.

206-8.3 Fasteners.

1. Fasteners used to assemble cold -rolled steel perforated tubing shall be steel “pull -through” electrogalvanized rivets with 9.5 mm (3/8”) diameter shank, 22 mm (7/8”) diameter head, and a grip range of from 5 mm (0.200”) to 0.90 mm (0.356”). The fasteners s hall conform to ASTM B-633, Type III.

ADD the following subsection:
206-9 PORTABLE CHANGEABLE MESSAGE SIGN.

206-9.1 General.

1. Each portable changeable message sign (PCMS) unit shall consist of a controller unit, a power supply, and a structural support system all mounted on a trailer. The PCMS unit shall be assembled to form a complete self -contained portable changeable message sign, which can be delivered to the site of the Work and placed in immediate operation. The complete PCMS unit shall be capable of operating in an ambient air temperature range of -20ºC (-4ºF) to +70ºC (158ºF) and shall not be affected by unauthorized mobile radio transmissions.

2. The trailer shall be equipped so that it can be leveled and plumbed. Full operation height shall be with the bottom of the sign at least 2.1 m (7') above the ground and the top no more than

4.4 m (14.5') above the ground. After initial placement, PCMS shal l be moved from location to location as directed by the Engineer.

206-9.2 Message Board.

1. The message displayed on the PCMS shall be visible from a distance of 460 m (1500') and shall be legible from a distance of 230 m (750'), at noon on a cloudless day, by persons with vision

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 181 ends

corrected to 20/20. The sign panel shall be 3 -line matrix and shall display not less than 7 characters per line. Sign messages to be displayed shall be as approved by the Engineer. The sign face shall be flat black and shall be protected from glare of the sun by a method which does not interfere with the clarity of the sign message. The sign shall be raised and lowered by means of a power driven lifting mechanism. The matrix sign shall be capable of complete alphanumeric selection.

2. Lamp matrix type signs shall be equipped with an automatic dimming operational mode that automatically compensates for the influence of a temporary light source or other abnormal lighting conditions. The sign shall have manual dimming operation modes of 3 or more different lamp intensities.

3. Matrix signs not utilizing lamps shall be either internally or externally illuminated at night.

4. The controller shall be an all solid -state unit containing all the necessary circuitry for the storage of at least 5 pre-programmed messages. The controller shall be installed in a location allowing the operator to perform all functions from 1 position. A keyboard entry system shall be provided to allow an operator to generate an infinite number of additional messages over the pre -programmed stored messages. The keyboard shall be equipped with a security lockout feature to prevent unauthorized use of the controller. The controller shall contain a nonvolatile memory to hold the keyboard created messages in memory during periods when the power is not activated. The controller shall provide for a variable message display rate which allows the operator to match the information display to the speed of the approaching traffic. The flashing off time shall be operator adjustable within the control cabinet.

206-9.3 Operation and Maintenance.

1. PCMS shall be furnished, placed, operated, and maintained at locations shown on the Plans, specified in this section , or designated by the Engineer. The PCMS will be diligently maintained and repaired by the Contractor throughout the Project in accordance with the manufacturer's recommendations. When ownership is transferred to the Agency (at the end of the job), it must be demonstrated to be in good working condition, and meet the provisions of these Specifications, including current registration.

206-9.4 Measurement and Payment.

The Contract unit price PCMS shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the Work involved in furnishing, placing, operating, maintaining, repairing, replacing, transporting from location to location, and delivery of the signs to the Agency at the completion of the construction, in good working order, and as directed by the Engineer, and no other compensation will be made.

SECTION 211 – MATERIAL TESTS

211-6 RAP CORRECTION FACTOR.

211-6.1 General.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 182 ends

DELETE in its entirety and REPLACE with the following:

1. A RAP correction factor must be determined for asphalt concrete mixtures containing greater than 20 percent RAP. The RAP correction factor shall be determined in accordance with Caltrans Lab Procedure LP-9 dated May 22, 2006. This factor shall be used in determining the combined gradation of the virgin aggregates and RAP.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 183 ends

PART 3 CONSTRUCTION METHODS
SECTION 300 – EARTHWORK

300-1 CLEANING AND GRUBBING.

DELETE the following section:
300-1.2 Root Pruning and Tree Trimming.
300-1.3 Measurement.

DELETE in its entirety and REPLACE with the following:

1. Clearing and grubbing, if measured for payment, will be measured by the acre or lump sum.

300-1.4 Payment.

DELETE the second sentence.

300-2 UNCLASSIFIED EXCAVATION.

300-2.1 General.

ADD the following:

Unclassified excavation shall include removal and stockpile of suitable material, recompaction, mixing, grading for mitigation work, trenching and backfilling of storm drains, sewers, other utilities, disposal of unsuitable materials not included in the bid item for clearing and grubbing, all cut and fill including removal and recompaction of soil salvaging clean excavated material and filling areas to the required grades and cross section. Unclassified excavation shall be utilized onsite to make all fills shown on the plans. Unclassified excavation shall also include scarification and moisture adjustment and compaction of the top 300 mm (1’) of the subgrade in the roadway prism in cut areas to 95 percent relative compaction, wetland mitigation grading and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water.

300-2.2.1 General.

ADD the following to the first paragraph:

Such direction may include, but is not limited to, directing the Contractor to blend, adjust moisture content of, rework, and place unsuitable soils at specific locations or elevations on the site.

ADD the following:

Alluvial and colluvial removal and recompaction shall consist of excavating, blending and recompacting loose soils in areas that are designated to receive fills. The existing loose soils shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. If the excavated material contains 4%, or more, water than the optimum moisture content the Contractor shall blend the wet soil with soils having a lower moisture content and/or spread the excavated mate rial in a manner that enables the material to dry to optimum moisture content. The cost of spreading and/or drying shall be included in the contract

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 184 ends

unit price for removal and recompaction. The excavated material shall be placed and compacted in accordance with section 300-4 of the specifications except that section 300-4.9, Measurement and Payment, shall not apply.

300-2.9 Payment. Substitute the following: Payment for all unclassified excavation shall be incidental to the item requiring excavation to depth specified on the plan and/or standard drawing and no additional compensation will be allowed therefor.

ADD the following subsection:
300-2.10 Grading Tolerance. The Contractor shall finish excavated areas other than slopes and subgrade below structures, within the roadway and sidewalk areas within 30 mm (0.1’) of the grades shown on the plans. Subgrade tolerances shall conform to the requirements of section 301-1.4.

300-3 STRUCTURE EXCAVATION AND BACKFILL.

300-3.1 General.

ADD to first paragraph:

Care shall be taken in performing structure excavation of the soldier pile wall lagging in order to minimize the formation of voids behind the lagging that will need to be backfilled. At end of the work shift, lagging shall be in place the full height of the exposed excavation face.

300-3.5 Structure Backfill.
300-3.5.1 Requirements.

ADD to First paragraph:

Structure backfill behind the solider pile wall lagging shall be compacted by hand tamping, mechanical compaction or other measure approved by the engineer. Structure backfill in fill area behind the lagging shall be keyed into the existing or excavated back slope.

REPLACE: a) Consolidation of structure backfill by jetting will not be permitted.

ADD: A two-sack sand and cement slurry may also be used for structural fill as an alternative to compacted soil. Samples of the slurry should be fabricated and tested for compressive strength during construction. A 28-day compressive strength of 100 pounds per square inch (psi) or more is recommended for the sand and cement slurry. Crushed rock (¾ -inch) completely wrapped in filter fabric (Mirafi 140N or approved equivalent) may also be used as backfill in confined areas.

300-4 UNCLASSIFIED FILL.

300-4.2 Preparation of Placement Areas.

MODIFY second sentence to:

The areas shall then be scarified to a minimum depth of 12 inches, moisture condition to slightly above optimum moisture content and recompacted to 90 percent of the maximum dry density as evaluated by ASTM D1557 unless otherwise approved by the Geotechnical Engineer.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 185 ends

ADD:

In areas of saturated or pumping subgrade, a geogrid such as Tensar BX -1200, Terragrid RX1200 or Mirafi BXG120 (or approved equivalent) may be placed directly on the excavation bottom, and then covered with at least 12 inches of ¾ -inch Aggregate Base (AB). Once the subgrade is firm enough to attain compaction with the AB, the remainder of the excavation may be backfilled. It may be necessary to place additional AB to stabilize the subgrade sufficiently to place fill.

Add the following section:
300-12 STORM WATER POLLUTION PREVENTION PLAN.

ADD the following section:
300-13.1 Dewatering.

Dewatering consists of discharging accumulated stormwater, groundwater, or surface water from excavations or temporary containment facilities. The Contractor shall submit a dewatering and discharge work plan. All work associated with dewatering shall be pe rformed per this specification and Section 3-12.6.4 of the latest version of SSPWC.

Submittals:

1. Submit a dewatering plan and related supporting information detailing proposed plan and methodology of dewatering, treatment, and disposal of accumulated water. a. Dewatering plan shall include proposed dewatering system layout and manufacturer cut sheets for equipment necessary to perform dewatering.
b. Identify the location, type and size of dewatering devices and related equipment, the size and type of materials composing the collection system, the size and type of equipment to be used to retain and treat accumulated water, and the proposed disposal locations.

2. Submit copies of permits from jurisdictions governing disposal of the groundwater.

Dewatering, treatment and disposal of water shall be performed in conformance with the following requirements:

1. Conduct dewatering activities under the Caltrans's Field Guide for Construction Site Dewatering.

2. Discharge from dewatering activities shall not cause erosion, scour, or sedimentary deposits that could impact natural bedding materials.

3. Discharge from dewatering activities shall only be used within the project limits as dust control. Excess discharge that is not used for dust control shall be disposed of by the Contractor in accordance with the Order R9-2015-0013 NPDES NO. CAG919003 or Order WQ 2022-0057-DWQ NPDES No. CA000002 if applicable.

4. Discharge from dewatering activities that has an odor, discoloration other than sediment, an oily sheen, or foam on the surface shall not be used for dust control and shall be disposed of by the Contractor. The Contractor shall notify the Engineer immediately upon discovering any such condition.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 186 ends

Subsurface exploration performed for the project on March 16, 2017 , by Group Delta 9245 Activity Road, Suite 103, San Diego, California 92126; Phone: 858-536-1000. These investigations are provided for reference and information and are presented in the following reports:

Report of Geotechnical Investigation
Park Drive Street and Drainage Improvements
Carlsbad, California
Dated June 1, 2020

Geotechnical Recommendations
Park Drive Street and Drainage Improvements
Carlsbad, California
Dated June 30, 2021

By submitting a bid, the bidder is deemed to have examined the above referenced reports, and is familiar with the findings, recommendations, and conclusions contained therein, and has included with bid all costs associated with groundwater control and dewatering, special remedial earthwork and excavation requirements, and of fill and compaction requirements. It shall be assumed that construction shall be performed in wet conditions that require dewatering. It shall be the responsibility of the Contractor to make provisions for soil conditions that differ from those reported in the soils report referenced above.

300-13.2 Payment. The contract lump sum price paid for the dewatering work shall include full compensation for the dewatering workplan and for furnishing all labor, materials, tools, equipment, and incidentals to permit, install, implement, maintain and remove the dewatering operation.

Partial payment shall be based on the percentage the total value of work completed.

SECTION 301 - SUBGRADE PREPARATION, TREATED MATERIALS AND

PLACEMENT OF BASE MATERIALS

301-1 SUBGRADE PREPARATION.

301-1.2 Preparation of Subgrade.

MODIFY the second and third paragraphs as follows:

Change each instance reading “6 inches (150mm)” to “12 inches (300 mm)”.

ADD the following:

For new/replaced sidewalk or flatwork areas, provide a minimum of 2 feet of subgrade soil with an Expansion Index (EI) of 50 or less as follows. Excavate 12 inches of soil below the sidewalk subgrade elevation. Excavated material can be reused if the EI is less than 50. If clayey soils with

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 187 ends

an EI above 50 is encountered below the initial 12 inch excavation, an additional foot of expansive material should be excavated and replaced with low expansion potential granular material (EI<50). The subgrade soil should then be brought to slightly above optimum moisture content and compacted to at least 90% of the maximum dry density determined using ASTM D1557.

Expansive clay may be encountered. Where expansive clay is encountered at the bottom o f the resultant removal surface during subgrade preparati on, stabilization shall be performed in accordance with Section 300-4.2 Subgrade compaction should be conducted immediately prior to placing base or concrete.

301-1.3 Relative Compaction.

DELETE the first paragraph and substitute the following:

The Contractor shall compact the upper 12” (300 mm) of subgrade beneath areas to be paved, have base or subbase material placed on them (including pipelines), or curb, gutter, curb and gutter, alley pavement, driveway, sidewalk constructed over them , to no less than 95 percent maximum dry density as determined by ASTM test D-1557-12.

301-1.7 Payment.

MODIFY the first paragraph as follows: Payment for subgrade preparation shall be incidental to the contract bid price for which the subgrade is prepared and shall include all labor, materials; including water, operations and equipment to scarify, adjust moisture, compact or recompact the subgrade, both in cut areas and in fill areas, and no further compensation will be allowed.

SECTION 302 - ROADWAY SURFACING

ADD the following Section:
302-1 GENERAL.

302-1.1 Vegetation Treatment.

1. The Contractor shall treat all vegetation within the limits of the paved area to be surfaced with a n herbicide that complies with the City’s Integrated Pest Management program.

Herbicide shall be applied at least 2 Working Days prior to surfacing the street. Allowance for the 2-day period shall be shown in the schedule required per section 6 -1. Payment for pavement surfacing shall include tree trimming and herbicide treatment of the areas to be surfaced and no extra payment will be made for tree trimming and herbicide treatment.

302-1.2 Coordination.

1. The Contractor shall schedule the Work so as to prevent damage by all traffic. The Contractor shall not schedule Work so as to conflict with trash pickup. The trash hauling schedule can be obtained by calling Republic Services at (760) 332-6464. At least 2 weeks prior to Work, Contractor shall send, by first class mail, notification letters to all property addresses within 500-feet of the Work. Obtaining the appropriate addresses shall be the Contractor’s responsibility. A sample letter may be provided by the Agency to be used as an example. The

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 188 ends

letter should provide the name of the Contractor and a 24-hour phone number for residents to call if they have any issues or questions.

2. During operations, the Contractor’s schedule for resurfacing shall be designed to provide residents and business owners sufficient paved parking within an 800-foot distance from their homes or businesses.

3. Seventy-two hours prior to the start of any construction in the public right-of-way that affects vehicular traffic and/or parking or pedestrian routes, the Contractor shall give written notification of the impending disruption. For a full street closure, a ll residences and/or businesses on the affected street or alley shall be notified. For partial street closures, or curb, sidewalk and driveway repairs, the residences and/or businesses directly affected by the Work shall be notified.

4. The Contractor shall deliver the notification which shall state the date and time the Work will begin and its anticipated duration. The notification shall list 2 telephone numbers that may be called to obtain additional information. One number shall be the Contractor’s permanent office or field office and the other number shall be a 24 -hour number answered by a representative of the Contractor who is knowledgeable about the Project. At least 1 of the phone numbers shall be in the (760) area code. An answering machine shall not be connected to either number. The notification shall also give a brief description of the Work and simple instructions to the home or business owner on what they need to do to facilitate the construction. The Contractor shall submit the contents of the notification to the Engineer for approval. Notices shall not be distributed until approved by the Engineer.

5. For door hangers, the notification shall be pre-cut in a manner that enables it to be affixed to a doorknob without adhesives. It shall be a minimum size of 3-1/2 inches by 8-1/2 inches and shall be brightly colored with contrasting printing. The material shall be equivalent in strength and durability to 65 lb. card stock. The printing on the notice shall be no smaller than 12 point.

The precut notices shall be as shown on the example provided by the communications department. The day of the week shall be circled and appropriate information specific to the Work inserted at the locations indicated in the italicized font.

6. The preparation, materials, printing, delivery and distribution of the letters, door hangers and notifications shall be included in the contract price Bid for Traffic Control and the Contractor will not be entitled to any additional compensation for printing and distributing these notices.

302-5 ASPHALT CONCRETE PAVEMENT.

ADD the following:
302-5.8 Manholes and Other Structures.

1. When placing the overlay , the Contractor shall pave over appurtenances in the roadway which includes sanitary and storm access covers, water valve boxes, air vents, sewer dead end boxes and survey monument boxes. Each appurtenance shall be treated or covered to prevent adhesion of the overlay. Each appurtenance shall be located immediately after the overlay is placed and shall be thoroughly cleaned of any and all construction debris which may have entered due to the Contractor’s operation. The Contractor shall adjust all CMWD water valve boxes per CMWD Standard Drawing No. W23. All City of Carlsbad sanitary sewer access covers shall be adjusted per CMWD Drawing No. S1, S-4, or S-6. All storm sewer access

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 189 ends

covers shall be adjusted per SDRSD D -10. Riser rings or extensions shall not be used for the adjustment of these appurtenances.

2. Raising and adjusting to grade all City -owned or CMWD -owned appurtenances in the roadway shall be paid for at the Contract Unit Price per each as shown in the Bid. Such price shall constitute full compensation for all labor, materials, and equipment necessary for completing the Work as described in these Specifications and Plans. Other agencies will be responsible for their own appurtenances.

302-8 SEALCOAT FOR MISCELLANEOUS AREAS.

302-8.2.1 General.

DELETE the second paragraph and REPLACE with the following:

1. Sealcoat material shall be diluted using clean, potable water in an amount not to exceed 20 percent of the total volume.

302-8.2.2. Spreading.

DELETE the first paragraph and REPLACE with the following:

1. Sealcoat shall be applied when the atmospheric temperature is greater than 55°F (13°C) and if rain is not forecast for the period of 24 hours after application; or as specified by the Engineer.

SECTION 303 CONCRETE AND MASONRY CONSTRUCTION

303-1 CONCRETE STRUCTURES

303-1.2 Subgrade for Concrete Structures.

ADD the following:

If groundwater is encountered, Contractor shall work a minimum 2’ deep of ¾” gravel into soil to provide an adequate base for construction of concrete structure.

303-1.12 Payment.

DELETE the subsection in its entirety and replace with the following:

Payment for concrete structures, including but not limited to, pull boxes, thrust blocks, SDRSD D- 25 Curb Outlet, light and signal post foundations as shown on SDRSD E -1, SDRSD D-2 Curb Inlet, D-75 ditch repair for 4” PVC storm drain connection, and protection post per SDRSD CDS W24 are incidental to the respective b id item requiring such structure . Payment shall include compensation for furnishing all labor, materials, tools, and equipment necessary to construct the concrete structures complete in place. Items shall include cast-in-place PCC, steel reinforcement, covers, rims, grates, frames, collars, cone and draft sections, bases, steps, clean up; and for all other work necessary to install the concrete structure, complete in place, and no additional compensation will be allowed therefor.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 190 ends

303-2 AIR-PLACED CONCRETE.

303-2.1.1 General.

ADD the following:

Modify Regional Standard Drawing D-75 as follows: replace stucco netting with 6” x 6” (150mm x 150mm) by No. 10 by No. 10 welded wire mesh.

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.

303-5.1.1 General.

ADD the following:

Portland Cement Concrete construction shall include, but not limited to, curbs, walkways, cross gutters, access ramps, driveways, concrete curb outlet, terrace ditch es, and all other miscellaneous PCC construction items as indicated on the plans and per these Specifications.

6” Curb and Gutter shall conform to the standard referenced on the plan (I.E: CALTRANS A82A), the details on the plans, and these specifications. Adjacent AC/AB removal associated with concrete curb construction shall be full depth AC replacement and a minimum width of one foot from the face of concrete edge. Removal of AC shall be incidental to Section 401 -1 Removals.

Replacement of AC shall be considered incidental to this Section and conform to the requirements of Sections 203-6 and 302-5.

The Contractor shall verify with a “smart level”, string line and/or water testing that positive drainage is maintained upon completion of finishing, and any irregularities causing water ponding shall be corrected and refinished. The CITY shall be present to verify the concrete forms, prior to pouring any PCC construction improvements.

303-5.5.2 Curb.

ADD the following:

The Contractor shall stamp the curb face with 75 mm (3”) high block letters directly above the point that it is crossed by underground facilities with the marking specified in Table 303-5.5.2(A).

TABLE 303-5.5.2(A)
Curb Face Markings
Type of underground facilities Marking
Water Service Lateral W
Sewer Service Lateral S
Irrigation Water Lateral or Sleeve RW

303-5.9 Measurement and Payment.

ADD the following:

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 191 ends

Curb and gutter, and curb, shall be considered as continuing across driveways, access ramps and drainage inlets when constructed adjacent thereto. Neither curb and gutter nor curb will be paid for across the length of local depressions, except that which occurs in gutter transitions at each side of an inlet.

SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS,

AND PAVEMENT MARKERS

314-2 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.

314-2.1 General.

DELETE in its entirety and REPLACE with the following:

1. The Contractor shall remove by wet grinding all existing or temporary traffic markings and lines that may confuse the public. When temporary detour striping or markings are no longer required, they shall be removed prior to painting the new traffic stripes or markings.

2. The Contractor shall remove all existing markings and striping, either permanent or temporary, which are to be abandoned, obliterated or that conflict with the Plans by wet grinding methods. Removal of striping by high velocity water jet may be permitted w hen there is neither potential of the water and detritus from the high velocity water jetting to damage vehicles or private property nor to flow from the street into any storm drain or water course and when approved by the Engineer.

3. The Contractor shall vacuum all water and detritus resulting from high velocity water jet striping removal from the pavement immediately after the water jetting and shall not allow such materials to flow in the gutter, enter the storm drain system or to le ave the pavement surface. Surface variation limitations for high velocity water jet striping removal shall be the same as for grinding.

4. The Contractor shall not use dry or wet sandblasting in any areas. Alternate methods of paint removal require prior approval of the Engineer. Obliteration of traffic striping with black paint, light emulsion oil or any other masking method other than a min imum 30mm (0.10’) thick asphalt concrete overlay is not permitted.

314-2.2 and 314-2.3
REPLACE as follows:
314-2.2 Measurement and Payment.

1. Removal of traffic striping and curb and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 192 ends

314-3 REMOVAL OF PAVEMENT MARKERS.

314-3.2 and 314-3.3
Replace as follows:
314-3.2 Measurement and Payment.

1. Removal of pavement markers as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting . The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.

314-4.3.6 and 314-4.3.7
Replace as follows:
314-4.3.6 Measurement and Payment.

1. Final and temporary traffic striping, curb markings and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-4.4.5 and 314-4.4.6
Replace as follows:
314-4.4.5 Measurement and Payment.

1. Thermoplastic traffic striping and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. R eapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting . The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-5 PAVEMENT MARKERS.

314-5.6 and 314-5.7
Replace as follows:

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 193 ends

314-5.6 Measurement and Payment

1. Pavement markers as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes an d markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting . The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 194 ends

PART 4 EXISTING IMPROVEMENTS

SECTION 400 – PROTECTION AND RESTORATION

400-2 PERMANENT SURVEY MARKERS.

ADD the following:

1. The Contractor shall not cover or disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor or a registered civil engineer authorized to practice land surveying within the State of California (“Surveyor”) to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by the Surveyor no later than 30 Calendar Days after construction at the site of the replacement is completed. The Surveyor shall file corner record(s) as required by Business and Professions Code Sections 8772 and 8773 et seq.

2. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame and cover to the new grade within 7 Calendar D ays of paving unless the Engineer shall approve otherwise. Monument frames and covers shall be protected during street sealing or painting projects or be cleaned to the satisfaction of the Engineer.

SECTION 401 – REMOVAL

401-2 ASPHALT CONCRETE PAVEMENT.

DELETE in its entirety and REPLACE with the following:

1. Asphalt concrete pavement shall be removed to clean, straight lines. Removal performed by cold milling shall conform to 404. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from face of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section shall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete.

401-3 CONCRETE AND MASONRY IMPROVEMENTS.

401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway and Alley Intersections.

DELETE in its entirety and REPLACE with the following:

1. Concrete shall be removed to neatly sawed edges with saw cuts made through the entire thickness. Concrete sidewalk or driveway to be removed shall be neatly sawed in straight lines either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than 30 inches (750 mm) in either length or width.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 195 ends

All existing concrete shall be removed to the nearest joint. Concrete shall be removed to neatly sawed edges with saw cuts made to a depth deep enough to produce a clean straight break without loosening, cracking or damaging adjoining improvements. Curb and gutter shall be sawed on a neat line at right angles to the curb face. PCC and all other material unsuitable for use as fill, as determined by the Engineer, shall be removed from the right-of- way and disposed of by the Contractor at a site of his own choice and shall pay all costs incidental to the disposal.

ADD the following:
401-3.2.1 Adjacent Asphalt Concrete (AC/AB) Sawcut and Removal.

1. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from face of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section s hall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete as specified in Section 303-5.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 196 ends

PART 6 TEMPORARY TRAFFIC CONTROL

SECTION 601 - TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION

AND MAINTENANCE WORK ZONES

601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP).

601-2.2 Payment.

REPLACE this section with the following:

The Contract lump sum price paid for the traffic control system shall include full compensation for, but not limited to, design, submittal and approval of the traffic control plan, furnishing all labor (including flagging costs), materials (including const ruction area signs), tools, equipment, traffic control plans for the project, and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control including channelizers (surface mounted), temporary railing (Type K) markers, lights for illuminating the work site, delineators, temporary striping and pavement marking, barricades, portable flashing beacons, flashing arrow signs, portable changeable message signs, as shown on the Plans, these contract documents, and as directed by the Engineer.

The traffic control plan shall include, at a minimum, one portable changeable message sign positioned on both eastbound and westbound approaches to the work area.

Full compensation for removing and salvaging the traffic control equipment and materials that are to be reused or reset in the project shall be considered included in the Contract lump sum price paid for traffic control system and no additional compensation will be allowed therefor.

Partial payment for traffic control shall be based on the percentage of total value of work completed.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 197 ends

PART 8 LANDSCAPING AND IRRIGATION

SECTION 801 – INSTALLATION

801-1 GENERAL.

ADD the following:

The Contractor shall maintain all landscape and private property surrounding the construction to the greatest extent possible. Any landscape, plants, walls, or steps stones disturbed shall be restored to pre-construction condition.

The Contractor shall hold a valid California Landscape Contractors License, Class C -27, and shall provide a project foreman who has previously overseen successful public landscape projects of at least 5 acres in size in Southern California, including native revegetation.

Contractor shall attend a pre -construction meeting with the City and the City’s designated representative before the start of work.

At all times planting, seeding, irrigation system, and associated landscape treatments shall be installed as prescribed and detailed on the Drawings; these prescriptions shall take precedence over those specified herein or in the Standard Specifications for Public Works Construction latest Edition (Greenbook).

Contractor shall protect in place all existing native plant materials adjacent to the limits of work and newly planted material. Contractor shall be responsible for all costs associated with the replacement of damaged existing native plant material (at a 5:1 replacement ratio) or newly planted material at a 1:1 replacement ratio.

Where it is necessary to excavate adjacent to existing vegetation, use all possible care to avoid injury to trees and shrubs and tree/shrub roots. Excavation in areas where 2-inch and larger roots occur shall be done by hand. Roots 2 inches and larger in diameter, except directly in the path of pipe or conduit, shall be tunneled under and shall be heavily wrapped in burlap, to prevent scarring or excessive drying. Where a ditching machine is run close to trees having roots smaller than 2 inches in diamet er, the wall of the trench adjacent to the tree shall be hand trimmed, make clean cuts through. Roots 1-inch and larger in diameter shall be painted with coats of Tree Seal, or equal. Trenches adjacent to trees should be closed within 24 hours. Where this is not possible, the side of the trench adjacent to the tree shall be kept shaded with burlap or canvas.

801-2 EARTHWORK AND TOPSOIL PLACEMENT.

801-2.2 Topsoil Preparation and Conditioning.
801-2.2.1 General.

INSERT the following before the first paragraph:

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 198 ends

During weed abatement procedures, the Contractor is responsible for the erection of all signs and barriers required to prevent intrusion into the treated areas and to notify the public. No material or methods used for weed abatement shall affect existing vegetation to remain/protected, the landscape plantings, or hydroseed germination. No material or method shall render the job site unusable for more than 10 calendar days from date of application.

Before spreading soil amendments and installation of irrigation systems, cross -rip or otherwise till to a depth of 6” all planting areas to receive soil preparation. All rock 1” and larger shall be removed to a depth of 12”. Dispose of all debris off-site according to State and local regulations.

To all planting areas, uniformly broadcast soil amendments and thoroughly incorporate to minimum 6” depth by means of a rototiller or equal.

Rough grade has been left within one tenth of one foot of finish grade. Work such as fine grading and light cultivation are required of all planting areas indicated on the Drawings to prepare grades before seed or stolon planting. After approximate finished grades have been established, all soil areas shall be lightly compacted and settled by application of heavy irrigation to a minimum depth of 6”. Contractor shall monitor the irrigation and shall adjust the irrigation run time to assure no erosion occurs.

All landscape areas will be graded to finish grades by the landscape contractor, reestablishing flow lines as approved before amending the soil. Finish grades will be inspected upon completion.

All existing weeds and debris within the designated planting areas are to be completely removed and removal work shall be approved by the City’s designated representative before amending site soils. Prior to the application of soil amendments the Contracto r shall implement a “grow and kill” cycle over an approximate three week period, utilizing the irrigation system to promote germination of any remnant weed and/or exotic non -native plant species. The contractor shall kill/control all re -emergent weeds an d exotic species through hand removal and/or through herbicide use. Only herbicides approved for use within the City of Carlsbad can be utilized. See City of Carlsbad Integrated Pest Management Plan (IPM).

The Contractor will not proceed with planting work until the grow and kill cycles have been completed and finish grades have been inspected and accepted by the City.

801-2.2.2 Fertilizing and Conditioning Procedures.

INSERT before the first paragraph:

Soil preparation shall be conducted after finish grades are established and after the “grow and kill” cycle has been completed.

Soil amendments for the planting areas are as specified herein in Section 800 -1.2 and as shown on the Drawings. Soil amending shall be conducted before implementation of planting and

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 199 ends

seeding. All existing weeds and debris are to be completely removed and removal work approved by the City’s designated representative before amending site soils.

801-2.3 Finish Grading.

ADD the following to the end of the section:

After the foregoing specified deep watering (Section 801 -2.2.2), minor modifications to grade may be required to establish the final grade for planting. These areas shall not be worked on until the moisture content has been reduced to a point where working it will not destroy soil structure.

Finished grading shall ensure proper drainage of the site. Finished earth berm surfaces shall be smooth and even between contours. Surface drainage shall be away from all paved surfaces.

Eliminate all erosion scars.

The Contractor shall request a review by the City for recommended approval of the final grades and elevations before beginning planting operations.

801-4 PLANTING.

801-4.1 General.

ADD the following to the end of the section:

Plants shall not be allowed to dry out before or during installation. Contractor shall keep exposed roots moist by means of wet saw dust, peat moss, or burlap at all times during planting operations. Roots shall not be exposed to air except when being placed in ground. Wilted plants, improperly located or installed, whether in place or not, shall not be accepted and shall be replaced at the Contractor's expense. Contractor shall be responsible for watering all container plants on site while being stored before planting.

No area shall be planted where weeds and/or exotic species are present or there is evidence that a weed crop will germinate.

Before excavation of planting pits or placing of plant materials, the Contractor shall locate all existing underground utility lines and irrigation lines and take proper precautions to avoid damage to such improvements. In the event of a conflict between such lines and plant locations, notify the City who shall arrange for the relocation of one or the other. The Contractor assumes responsibility for expenses incurred for all repairs of damage to utility lines and existing irrigation lines resulting from inadequate precautions by Contractor.

Actual planting shall be performed during those periods when weather and soil conditions are suitable in accordance with locally accepted horticultural practice, and/or as approved by the City’s designated representative. Seeding shall be conducted when wi nd and temperature are normal for season in which work is done. In cases of unseasonable weather, work shall be delayed until weather returns to normal.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 200 ends

All excavated holes shall have vertical sides with roughened surfaces and shall be twice the diameter of the root ball. Holes shall be, in all cases, large enough to permit handling and planting without injury or breakage of root balls or roots. After holes have been dug, they are to be filled with water and allowed to drain.

Excess soil, rocks, and debris generated from the planting holes shall be spread evenly on the site as directed by the City and the City’s designated representative.

Contractor shall protect in -place all existing native plant materials outside of the limits of work and/or as otherwise directed by the City’s designated representative.

Plants shall be installed at approved locations with specified existing on-site soil, unless otherwise directed by the City’s designated representative. The plants shall be placed in the planting pits on the backfill soil which has been hand tamped only. F ill plant pits with water and allow to completely drain before the placement of the plants. After setting the plants, the remaining backfill materials shall be carefully tamped and water settled around each rootball to fill all voids.

Plantings will receive amendments as specified herein.

Each container plant shall be placed in the center of the hole, set plumb and held rigidly in position until the backfill soil has been tamped and water settled around each root ball.

All plants shall be set at such a level that after settling they bear the same relationship to the surrounding finish grade as they bore to the soil line grade in the container (approximately 1-inch above finish grade at time of planting).

Immediately after installation, Contractor shall water, by hose or irrigation, each plant until soil around roots is moist from bottom of hole to finish grade.

Install weed-free bark mulch layer to a uniform 3" depth, in an 18" diameter area around base of each container. Hold back mulch 3" from plant trunks.

Throughout the Plant Establishment Period, Contractor shall provide water to each container plant using the prescribed irrigation systems, and as directed by the City’s designated representative.

Contractor shall remove from the project site all non -native debris accumulated during the duration of the project and shall dispose of material at County landfill or a site approved by the City.

801-4.2 Protection and Storage.

ADD the following after the first paragraph:

Deliver all items to the job site in their original containers with all labels intact and legible at time of the City’s review. Immediately remove from the site all plants which are not true to name, and all materials which do not comply with the specified requirements. Use all means necessary to

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 201 ends

protect plant materials before, during, and after installation and to protect the work and materials of all other trades. In the event of damage, immediately make all repairs and replacements necessary to the recommended approval of the City and at no additional cost to the City.

801-4.3 Layout and Plant Location.

ADD the following after the first paragraph:

The layout of locations for plant materials shall be flagged in the field by the Contractor and approved by the City’s designated representative before plant installation. All container plants shall, if necessary, be re -located as part of contract as direc ted by the City’s designated representative.

801-4.9 Erosion Control Planting.
801-4.9.3 Seeding and Mulching.

REPLACE with the following:

Seed application shall occur between October through February, or as otherwise directed by the City’s designated representative. Seed shall be installed using machine hydroseed methods as indicated on the Drawings.
a) Contractor shall protect in place all existing native plant materials adjacent to the limits of work and newly planted material. Contractor shall be responsible for all costs associated with the replacement of damaged existing native plant material (at a 5:1 replacement ratio) or newly planted material at a 1:1 replacement ratio. b) Before seed application, soil surface shall be tilled and/or hand raked to create crevices in which seed will collect.
c) No area located within a planting area shall be seeded where weeds are present or there is evidence that a weed crop will germinate. All weeds shall be removed before seeding, as specified herein.
d) Any concentrated development of weed growth appearing in the seed mix planting areas during the Plant Establishment Period shall be removed on a monthly basis. The Contractor shall remove such concentrations of weeds by hand. e) Seed mix shall consist of a mixture of seed and slurry components as prescribed on the Drawings and herein.

801-4.9.5 Watering.

ADD the following to the end of the section:

Immediately after planting, apply water to each shrub by means of a hose. Apply water in a moderate stream in the planting hole until the material about the roots is completely saturated from the bottom of the hole to the top of the ground.

Apply water in sufficient quantities and as often as seasonal conditions require in order to keep the planted areas sufficiently moist at all times, well below the root system of grass and plants.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 202 ends

All groundcover areas shall be maintained damp at all times and irrigation should be adjusted accordingly. This normally would involve 4 to 6 watering periods daily, each watering period (ON) regulated to just dampen the mulch without creating run-off.

Intervals between irrigation (OFF) sequence should be judged by the length of the time the mulch remains damp. Once the mulch begins to dry out, the water (ON) sequence should be repeated.

ADD the following section:
801-4.10 Planting Observations. The Contractor will contact the City’s designated representative at least two Working Days in advance of each planting work observation. An observation is required at each of the following steps listed below:
a) Observation of all materials, other than plants, delivered to site. b) Observation of rough grade.
c) Acceptance of organic mulch and taking of soil samples. d) Observation of soil amendment work.
e) Observation of plant locations field -marked for planting, but before planting holes are excavated.
f) Observation of plants at nursery and upon delivery to the project site for quality, size, vigor, and appropriate species.
g) Observation of planting progress.
h) Pre-Maintenance Observation: Substantial completion of hardscape and planting work before the start of the Plant Establishment Period; this observation shall be coordinated with the pre-maintenance observation of the irrigation system installation. This is not final acceptance and does not relieve the Contractor from any of the responsibilities in the contract.

A written "punch -list" indicating all items to be corrected and the beginning date of the maintenance period will be sent to the Contractor. This is not final acceptance and does not relieve the Contractor from any of the responsibilities in the contract. Contractor shall complete punch- list items within ten (10) calendar days. Delay of completion of punch -list items will delay the beginning of the 120-day Plant Establishment Period. Written approval by City will establish the beginning of the Plant Establishment Period.

Refer to section 801-5.8 for the required irrigation system observations.

Refer to section 801-6.13 for project Final Acceptance requirements and procedures.

801-5 IRRIGATION SYSTEM INSTALLATION.

801-5.1 General.

ADD the following to end of the first paragraph:

All scaled plan dimensions are approximate. Check and verify all size dimensions, system design pressures, flow requirements as shown on Drawings.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 203 ends

REPLACE the second paragraph with the following:

Contractor shall connect to existing water services at locations indicated on the Drawings and make any minor changes in location necessary due to actual site conditions as a part of this Contract.

ADD the following to the end of the section:

The City of Carlsbad shall provide the water meter for the irrigation system in the size and location as specified. The contractor shall tie into the water meter at the designated “Point of Connection” and shall install applicable backflow protection as shown on the Drawings.

Contractor shall guarantee all equipment, materials, and labor furnished or performed under the contract against defects in design, materials, and workmanship for a period of one year, unless otherwise specified. The guarantee shall start from the date of final acceptance of work at the end of the 120 -day plant establishment period. All equipment and workmanship found to be defective within the guarantee period shall be replaced and installed by the Contractor at Contractor's expense. Replacement equipment shall be the same model and manufacturer as specific in the irrigation legend. Replacement equipment shall be furnished and installed as originally specified.

Manufacturer’s directions and detailed drawings shall be followed in all cases where the manufacturer’s furnishings are used in this Contract for furnish directions covering points not shown in the drawings and specifications. Work called for on the drawin gs by notes or details shall be furnished and installed whether or not specifically mentioned in the specifications.

The Contractor shall not install the irrigation system as shown on the drawings when it is obvious in the field that obstructions, grade differences or discrepancies in equipment usage or area dimensions exist that might not have been considered in the design. Carefully check all grades to be sure that installation may safely proceed before starting work on the irrigation system. Such obstructions or differences shall be brought to the attention of the City’s designated representative. In the event this not ification is not performed, the Contractor shall assume full responsibility for any revision necessary at no cost to the City.

Before excavation for irrigation piping or equipment, Contractor shall locate underground utility lines and existing irrigation lines and take proper precautions to avoid damage to such improvements. In the event of a conflict between such lines and irriga tion piping or equipment locations, Contractor shall notify the City's representative and arrangements will be made for relocation as necessary. The Contractor assumes responsibility for making repairs for damages resulting from work as herein specified. E xercise extreme care in excavating and working near existing utilities. Contractor will be responsible for damages to utilities which are caused by his/her operations or neglect.

Contractor shall examine surfaces for conditions that will adversely affect execution, permanence and quality of work. Contractor shall verify that grading has been completed and the work of this section can properly proceed. Contractor shall exercise extreme care in

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 204 ends

excavating and working near existing utilities. Contractor is responsible for damages to utilities which are caused by his operations or neglect. Check existing utility drawings for locations.

All existing plant material to remain, which are within the project area limits shall be tagged and identified by the City’s designated representative for the Contractor before start of work.

Contractor shall provide the required maintenance to ensure plan t materials are protected during construction. All native vegetation outside of the revegetation area limits shall be protected-in-place. All existing plant material shall be protected at all times from damage by workers and equipment. All minor damages to existing plant materials shall be repaired at the Contractor's expense.

Damage to a tree or shrub, which results in death or permanent disfiguration, shall result in the Contractor's complete removal of said tree or shrub, including roots, from the site. The Contractor shall replace the plant material as established by the City’s designated representative with one of equal value at his/her own expense. The City’s designated representative shall be the sole judge of the replacement of any plant material.

Before installation, stake out all pressure supply lines, non -pressure lateral lines, valves, and location of sprinkler heads; said layout shall be approved by the City’s designated representative before installation.

Install select and temporary irrigation components above grade at locations indicated and as prescribed and detailed on the Drawings.

801-5.2 Irrigation Pipeline Installation.
801-5.2.1 General.

REPLACE the fourth paragraph with the following:

Plastic pipe and threaded fittings shall be assembled using Teflon tape applied to male threads only. Tape all open ends of pipe during installation to prevent entry of any foreign matter into the system.

ADD the following section:
801-5.8 Irrigation System Observations. Contractor shall request site observations at least 48 hours in advance of all required reviews of the City’s designated representative. In the event the Contractor calls for a site visit in which said visit cannot move forward due to lack of preparedness by the Contractor, and needs to get canceled or rescheduled, the Contractor shall be responsible for reimbursing the City’s designated representative at his current billing rates per hour, portal to portal (plus transportation costs), for the inconvenience. No further site visits will be scheduled until this charge has been paid and received. Observation of the work shall not relieve the Contractor of the obligation to fulfill all conditions of the contract, nor requirements of the local jurisdictions.

Project review for irrigation installation by the City’s designated representative shall be scheduled for the following operations:

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 205 ends

a) Layout of the water source point of connection and all main line and lateral line piping. b) Completion of layout of irrigation systems.
c) Main Line Pressure Testing: At completion of installation, during testing, and before backfilling.
d) Four (4) hour pressure test of all irrigation main lines, valves and other pressurized components.
e) Inspection of wires before trench backfill and/or during irrigation installation. f) Operation and Adjustment Test: Adjust and test all installed irrigation rotor, spray, and bubbler systems for coverage and water application before the start of planting operations.
g) Pre-Maintenance Observation: The entire irrigation system shall be completely installed and operational; this observation shall be coordinated with the pre - maintenance observation of the planting installation before the start of the Plant Establishment Period. This is not final acceptance and does not relieve the Contractor from any of the responsibilities in the contract.

A written "punch -list" indicating all items to be corrected and the beginning date of the maintenance period will be sent to the Contractor. This is not final acceptance and does not relieve the Contractor from any of the responsibilities in the contract. Contractor shall complete punch-list items within ten (10) calendar days. Delay of completion of punch-list items will delay the beginning of the 120-day Plant Establishment Period. Written approval by City will establish the beginning of the Plant Establ ishment Period. During the Plant Establishment Period, Contractor shall schedule site observation visits with the City’s designated representative monthly.

Contractor shall provide “walkie-talkie” equipment and/or personnel to maintain communication from review area to automatic controllers and provide up -to-date as -built drawings at each review. In the event the Contractor schedules any review and the system is not fully ready, record drawings are not current, or required corrective work has not been completed, the Contractor shall be responsible for reimbursing the City’s designated representative at an hourly rate, plus all travel expenses. No further reviews will be conducted until this charge is paid.

Refer to section 801-4.10 for the required planting observations.

Refer to section 801-6.13 for project Final Acceptance requirements and procedures.

801-6 MAINTENANCE AND PLANT ESTABLISHMENT.

INSERT the following after the first paragraph:

Upon substantial completion of all specified installation work and with written approval from the City’s designated representative, Plant Establishment Period shall begin, and shall extend for no less than 120 continuous calendar days. The Contractor shall perform all maintenance services described herein for the duration of the Plant Establishment Period.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 206 ends

During the Plant Establishment Period, Contractor shall schedule monthly site observation visits with the City’s designated representative. If necessary, the Plant Establishment Period shall be extended when, in the opinion of the City’s designated represe ntative, improper maintenance and/or possible poor or unhealthy condition of planted materials are evident at the termination of the scheduled Plant Establishment Period. Contractor shall be responsible for additional project site maintenance at no charge until all of the work is completed and acceptable to the City’s designated representative.

INSERT the following subsections:
801-6.1 Planting Maintenance Operations . The Contractor shall continuously maintain all involved planting areas of the Contract during the progress of work and during the Plant Establishment Period, until final acceptance of work by the City’s designated representative. a) Planting maintenance operations shall begin immediately after all plant/seed materials are installed per the approval of the City’s designated representative. Plant material shall be kept in a healthy, optimum growing condition. Plants shall not be pruned or fertilized during the Plant Establishment Period. Pesticides and herbicides shall not be used during the maintenance period unless approved and/or directed by the City and the City’s designated representative.
b) Weedy, non -native species, as defined by the City’s designated representative, may invade planting areas and become a problem before or during the establishment of native plant associations. Throughout the maintenance period, these species should be hand removed as soon as they begin to invade and before they become too large for hand extraction.
c) All damage caused by Contractor during the operations, resulting from a malfunction of installed work during the Guarantee Period, shall be repaired at Contractor's expense. d) Maintenance of plant material shall include proper irrigation, control of weeds and exotic species, and control of plant diseases and animal pests (e.g., gophers, etc.). e) Project maintenance shall include all repairs to the revegetation/mitigation area caused by human activities and the repair of damage to plantings caused by animal and other pests.

The Contractor shall maintain all plants in a vigorous and thriving condition by irrigating, weeding, cultivating, and other necessary operations during the entire period of installation, Plant Establishment Period, and until final acceptance by the City’s designated representative.

Improper maintenance, which may cause poor condition of planted material at termination of the scheduled contract period, will cause postponement of final acceptance. Refer to subsequent subsections for additional requirements and prescriptions. a) The Contractor shall conduct weed removal activities in planting areas on a continual basis following plant installation. "Plant installation" includes installation of container plants and seeding. "Weed removal" includes the removal of weeds, their root s ystem, and removal from the site, and/or other treatments approved by the City’s designated representative.
b) The Contractor shall be responsible for keeping all planted areas free of target exotic species during the maintenance period, as indicated herein and on the Drawings.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 207 ends

c) The Contractor shall review the site for exotic species and exotic species sprouts on a monthly basis for the duration of the Plant Establishment Period. Any exotics or weeds that have germinated or re -sprouted shall be treated and removed from the site each month (minimum) as specified herein.
d) Contractor shall be responsible for immediately controlling any insect infestations and diseases that may spread throughout planted areas.
e) Contractor shall be responsible for monitoring and control of herbivory of plants and shall inform the City and the City’s designated representative within 24 hours of discovery, who shall then prescribe remedial action. Any remedial action such as fencing and/or protective cages shall be provided, at no additional cost. f) Native species leaf and branch drop shall be retained in place unless specifically designated for removal.
g) Contractor shall remove and dispose off -site all weeds, exotic plants and non -organic debris. Removal of trash and litter shall continue on a regular basis during the Plant Establishment Period. Organic debris resulting from weed/exotic plant removal shall be removed from the site(s) and disposed of at County landfill to avoid further introduction of undesirable exotic seed and propagules.
h) Contractor shall monitor for erosion within the revegetation site and shall prohibit gullies, rills and sheet erosion, bare soil areas and silt deposition from occurring. Erosion control shall emphasize prevention. If required, repair of eroded areas may include redirection or dissipation of the water source and re-contouring of soil, followed by seeding, mulching, and planting as directed by the City’s designated representative. The plant palette for areas needing re-seeding or replacement of plants shall conform with the original plant and seed species and quantities. Invasive/exotic species are prohibited for use as erosion control.
i) Contractor shall be responsible for the maintenance of all erosion control measures.

Contractor shall install additional erosion control measures as prescribed by the City’s designated representative after evaluation of erosion problems, on a case-by-case basis.

801-6.2 Plant Performance. The Contractor shall be responsible for plant performance for the 120-day Plant Establishment Period; the City shall be responsible for plant performance during years 1-5 (Table 1 below).
a) All container plantings will be inspected by the City’s designated representative at 30, 60, 90 and 120 days after planting. Contractor shall immediately replace all dead, damaged, or diseased plants in-kind and at a 1:1 replacement ratio, to achieve 100% survival at the end of 120 days.
b) All seeded areas will be inspected by the City’s designated representative 90 days after seeding. Contractor shall re-seed all seeded areas that have not reached 20% germination cover. Contractor shall re-seed all bare areas greater than 100 square feet in size. c) Contractor shall keep exotic plant growth controlled throughout the Plant Establishment Period. No planting area will be approved that supports more than 10% absolute coverage of non-native weed species. Resprouts or seedlings of exotic species shall not be allowed to obtain a height of more than four feet (4') before being retreated or removed.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 208 ends

d) Contractor shall schedule and perform monthly maintenance visits as necessary to prevent exotic species and weeds from producing fruit or setting seed. Failure to kill exotic and weeds before setting seed or producing fruit shall result in the Contractor h aving to perform an additional weeding effort of the affected area at no cost to the City. Additional weeding efforts will be required to be performed as directed by the City’s designated representative.

Period Percent Survival
Container Plants
Percent Relative
Native Cover* Percent Relative Non-
Native Cover*
120-days 100% 50% 15%
*Native and non-native cover to be assessed on a visual basis by City Representative.

801-6.3 Litter.

ADD the following subsection:

All areas in the work sites shall be kept free of, but not limited to, the following items: bottles, glass, cans, paper, cardboard, metallic items, and other debris on a daily basis. Contractor shall promptly remove from the work area all debris generated by their performance.

801-6.4 Use of Chemicals. Contractor shall submit a list of all chemical herbicides, pesticides, and rodenticides proposed for use under this contract for approval by the City’s designated representative. Materials included on this list shall be limited to chemicals approved by the State of California Department of Food and Agriculture and shall include the exact brand name and generic formulation. The use of any chemical on the list shall be based on the recommendations of a licensed pest control advisor where required by law. The use of chemicals shall conform to the current County of Riverside Agriculture Commissioner regulations. No chemical herbicide, rodenticide, or pesticide shall be applied until its use is approved, in writing, by the City’s designated representative as appropriate for the purpose and area proposed.

801-6.5 Disease and Pest Control. Contractor shall regularly inspect all landscaped areas for the presence of disease, snail, insect or rodent infestation. The Contractor shall advise the City’s designated representative, in writing, within four days when any disease, snail, insect or rodent infestation is found; he shall identify the disease, snail, i nsect or rodent and specify control measures to be taken. The Contractor shall implement control measures, exercising extreme caution in the application of all spray materials, dusts or other materials utilized.

Approved control measures shall be continued until the disease, snail, insect or rodent is controlled to the satisfaction of the City’s designated representative. The Contractor shall utilize all safeguards necessary during disease, snail, insect or rodent control operations to ensure safety of the public and the employees of the Contractor.

Contractors shall perform at their sole expense the following services:

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 209 ends

c) All Work involving the use of chemicals will be accomplished by a State of California licensed pest control operator. A written recommendation by a person possessing a valid California Pest Control Advisor License is required before chemical application where required by law.
d) All chemicals requiring a special permit for use shall be registered by the Contractor with the County Agricultural Commissioner’s Office and a permit obtained with a copy given to the City’s designated representative before use.
e) A copy of all forms submitted to the County Agricultural Commissioner shall be given to the City’s designated representative on a monthly basis. f) All regulations and safety precautions listed in the “Pesticide Information and Safety Manual” published by the University of California will be adhered to. g) Utilize City of Carlsbad Integrated Pest Management Plan (IMP)

801-6.6 Weed Control. For the purpose of these specifications, a weed will be considered as “any undesirable or misplaced plant.” All areas within the specified maintenance area, including but not limited to, turf grass, shrub and ground cover areas, planters, tree wells, and hardscape areas shall be kept free of weeds at all times. Weed removal shall consist of complete removal of all weeds, including top growth and roots, as the weeds appear.

Weed control shall be performed a minimum of one time per week. Bare areas between plants shall be cultivated by hand on a weekly basis. Weeds shall be controlled either by hand, mechanical or chemical methods; however, the City’s designated representative may restrict the use of chemical weed control in certain areas.

801-6.7 Method of Irrigation. Irrigation systems shall be as prescribed on the project Drawings and Specifications. However, failure of the existing irrigation system to provide full and proper coverage and water application shall not relieve the Contractor of the responsibility to provide adequate irrigation with full and proper coverage and water application to all areas in the work site. All areas receiving marginal coverage shall be irrigated by a portable irrigation method. The Contractor shall furnish all hoses, nozzles, etc., necessary to accomplish this supplemental irrigation. Care shall be exercised to prevent a waste of water, erosion, and/or detrimenta l seepage into existing underground improvements or structures.

At all times, irrigate planting areas slowly. Use multiple starts and soaking periods between irrigation cycles. Slightly moist soils are easier to wet than dry soils. Balance soil aeration with soil moisture.

801-6.8 Irrigation Maintenance and Repairs. Contractor shall maintain all irrigation systems, at no additional cost to the City, in such a way as to guarantee proper coverage and full working capability. The Contractor shall make whatever adjustments may be necessary to prevent overspray or excessive runoff into areas not meant to be irrigated.

Contractor shall repair or replace inoperable irrigation equipment to maintain a fully operational system, including but not limited to, pressure pipes from the water meter to the control valves,

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 210 ends

all irrigation pipes, all manual and automatic valves, pumps used for the irrigation systems, backflow devices, filters, strainers, pressure regulators, sprinkler heads, irrigation clamps and stakes, anti -drain valves, quick couplers, electrical wiring from the controller to the solenoid valves, emitters, drippers, valve boxes, controllers, valve markers, batteries, fittings and risers. a) Maintenance includes, but is not limited to, tightening of loose fittings and packing nuts; flushing pipes, valves, filters, strainers, and backflow devices; adjusting sprinklers, bubbler nozzles and drip systems; adjusting anti -drain valves and pressure r egulators; adjusting and lubricating controllers; flushing drip irrigation lines; and cleaning bubbler nozzles and sprinklers.
b) Contractor shall repaint by hand all backflow devices, backflow cages, valve box lids, curb faces and curb tops; additional painting may be required as directed. Labor shall be provided at no additional cost to the City; however, the cost of paint shall be incurred by the City.

Irrigation repairs shall be made within the following time limits:

Mainline irrigation breaks shall be repainted within two hours of identification or notification.

All other irrigation repairs shall be made within one calendar day of identification or notification.

Replacement of irrigation components shall be with originally installed materials of the same size and quality. Substitutions shall be approved by the City’s designated representative in writing before installation.

801-6.9 Water Conservation. Contractor shall turn off all irrigation systems during periods of rainfall and/or times when suspension of irrigation is desirable to conserve water while remaining within the guidelines of good horticulturally acceptable maintenance practices. Contractor shall comply with all City of Corona Ordinances and/or Resolutions which relate to water conservation.

Failure to comply with Section 29 may result in an equitable amount deducted from the Contractor’s payment.

801-6.10 Plant Care. All plants shall be adequately irrigated to maintain health and vigor.

Irrigation run-off and overspray shall be minimized. Plants shall be irrigated to promote deep root growth.

Plants shall be fertilized prior to the end of the 120-day plant establishment period, as necessary to maintain horticulturally acceptable health and color. Maintenance fertilizer shall be Calcium Ammonium Nitrate (27-0-0) (“Simplot”, “Yara”, or approved equal product) at 4 lbs./1,000 sq. ft.

Apply gypsum at 15 pounds per 1,000 sq. ft., prior to the end of the 120-day plant establishment period.

Where plants show signs of failure to grow at any time during the life of the contract, including the specified maintenance period, and where plants are so injured, damaged, dead or diseased a)
b)

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 211 ends

as to render them unsuitable for the intended purpose, the Contractor shall replace plant materials at a 1:1 ratio, i.e., (1) new plant for each (1) plant removed within thirty (30) days of receipt of written notice by the City’s designated representative and at no additional cost to the City. Plants used for replacement shall be the same kind and size as specified in the original plant list. Replacement plants shall be furnished, planted, and fertilized as originally specified, without cost to the City.

801-6.11 Green Waste Disposal.

ADD the following subsection:

Green waste shall be defined as tree and shrubbery trimmings, grass, weeds, leaves, wood chips and other garden organic materials. Contractor shall be responsible for recycling all green waste generated from their contract performance. Contractor shall have the duty to keep all green waste from being contaminated to an extent it no longer can be recycled. Contractor shall deliver all green waste to a City approved reclamation site, for the purposes of recycling. Contractor shall submit a monthly report i dentifying the weight and/or volume of green waste recycled during the preceding month. Payment for green waste disposal shall be included in the Bid price of all applicable bid items.

801-6.12 General Cleanup. Remove all trash and accumulated debris from the work sites. In addition, dog feces are also to be removed from all planting and ground cover areas. All areas under maintenance, and other designated areas, will have trash removed between 6:00 AM and 9:00 AM daily, five days per week (Monday through Friday).

The Contractor is responsible for removal of all weeds and non -native species growing in and immediately adjacent to the planting areas. The Contractor is responsible to ensure that all paved surfaces are cleared of all dirt and debris within 4 feet of all areas adjacent to maintenance responsibilities. Walkways shall be cleaned immediately following installation and maintenance work by use of power sweeping or blower equipment not less than once per week.

All drains and catch basins shall be kept free of siltation and debris at all times. All drainage areas and V-ditches shall be kept clean weekly by the Contractor.

Accumulation of debris shall be removed from all areas no less than once per week. All dead, damaged, declining, hazardous or broken plant material (trees, shrubs, vines, ground cover,etc.), whether a result of the Contractor’s negligence or an unforeseen event, shall be removed by the Contractor at no additional cost to the City.

801-6.13 Emergency Calls. Contractor shall have the capability to receive and respond immediately to calls of an emergency nature during normal working hours and outside of normal working hours. Calls of an emergency nature received by the City’s designated representative shall be referred to the Contractor for immediate disposition. If the Contractor cannot be reached within 2 hours, the City will deduct from the monthly billing the cost of City forces, or other sources, used to repair the emergency. The Contractor shall not receive additional compensation

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 212 ends

for responding to emergencies for work included in these general conditions at contract worksites.

801-6.14 Complaints.

ADD the following subsection:

The Contractor shall maintain a monthly written log of all complaints which includes the date and time received and the action taken or the reason for non -action. The monthly log of complaints shall accompany the monthly invoice.

All complaints shall be abated as soon as possible after notification, but in all cases within 24 hours, to the satisfaction of the City’s designated representative. If any complaint is not abated within 24 hours, the City’s designated representative shall be notified immediately of the reasons for not abating the complaint, followed by a written report to the City’s designated representative within five calendar days. If the complaints are not abated within the time specified, or to the satisfaction of t he City’s designated representative, the City’s designated representative may correct the specific complaint and the total cost incurred by the City shall be deducted and forfeited from the payments owing to the Contractor from the City.

801-6.15 Training to City Staff . The Contractor shall provide training of City staff in proper operation of major equipment, including recommended winterization procedures, and shall submit evidence that training has been successfully completed.

801-6.16 As-Built Conditions. Within four (4) weeks of work completion and acceptance of site preparation and planting by the City’s designated representative, Contractor shall furnish and submit to the City and the City’s designated representative one (1) full scale (to each), reproducible plan set showing all "as -built" field changes to erosion control, irrigati on, and planting for the mitigation area. Plan base sheet shall be provided to Contractor by the City’s designated representative. All changes shall be legibly drafted/marked on a print set in ink and supplied to the City and the City’s designated represen tative. All reproduction costs are considered part of Contract.

801-6.17 Final Acceptance. Final inspection will occur at the end of the 120 -day Plant Establishment Period, provided all previous deficiencies have been corrected. Contractor will be notified in writing that contract work and maintenance period has been accepted or that the maintenance period has been extended to correct any deficiencies re maining. Final written acceptance and approval by the City’s designated representative following these site observation visits shall establish the beginning date for the one-year warranty period. a) Final Site Observation and Acceptance: At the conclusion of the maintenance period (120 days), a final site observation will be conducted. The Contractor shall show evidence that the City has received all charts, records, drawings, and extra equipment as required before final site observation a nd operate each irrigation system in its entirety for the City’s designated representative at time of final observation. Any items deemed not acceptable by the City’s designated representative shall be re -worked to the complete satisfaction of the City and the City’s designated representative.

00 74 00 = TECHNICAL SPECIAL PROVISIONS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 213 ends

b) The Contractor shall show all corrections made from the "punch-list." Any items deemed not acceptable shall be reworked during the maintenance period. The Contractor will be notified in writing that the contract work and maintenance period has been accepted or that the maintenance period has been extended to correct any deficiencies remainin g.

Final acceptance shall establish the beginning date for the guarantee period.

801-7 MEASUREMENT.

INSERT the following after the first sentence:

Measurement for Site and Soil Preparation, Irrigation, Planting, and Plant Establishment Maintenance will be per the unit indicated on the Bid Form for each completed item installed/conducted as shown on the Drawings and according to these Special Provisio ns, complete, in place and accepted.

801-8 PAYMENT.

REPLACE the first sentence with the following:

Payment for Site and Soil Preparation, Irrigation, Planting, and Plant Establishment Maintenance work, measured as specified, will be on a contract unit price as indicated for each item in the Bid Form, the price of which shall include all costs connected therein. The unit prices shown in the Bid Form shall include full compensation to complete removals, complete installations and maintain the landscaping and irrigation work shown on the Drawings and in the Specifications, including all material, labor, equipment, samples, testing, manuals, and guarantees.

ADD the following at the end of the section:

If performance by the Contractor is deficient, the City reserves the right to subtract appropriate costs from the monthly billing and/or hire another contractor to provide the service and deduct the expense from the contract retention. Since it is difficul t to quantify and assess a value to every aspect of the work, the City representative shall determine the cost per incident. The following describes deficiencies:
a) Lack of compliance to specifications (i.e., failure to adequately mow, edge, litter pick, sweep/rake, weed, prune, remove dead plant material, etc.). b) Failure to provide specified reports or to falsify reports. c) Failure to supply adequate equipment, labor or supervision. d) Failure to repair irrigation deficiencies in the allotted time frame. e) Failure to comply with schedules. Variances may be approved by request. Delays in part to acquisition or adverse weather conditions will be taken into consideration. f) Failure to protect public health and safety.

END OF SECTION

01 11 00 SUMMARY OF WORK Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 214 ends

SECTION 2

01 11 00 SUMMARY OF WORK
PART 1 GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS.
a. The Contractor shall perform Work and furnish materials, labor, tools, equipment or services that may be reasonably inferred as being required to produce the intended result, whether specifically called for in the Contract Documents, at no additional cost to the Agency.
b. Visible, existing improvements for which no specific disposition is made on the Plans, but which interfere with the Work, shall be removed, and disposed of by the Contractor with the prior approval of the Engineer.
c. The completed Work will install asphalt speed cushions on Park Drive, Black Rail Road, Plum Tree Road and Carrillo Way. The Work shall also include curb extensions on Plum Tree Road as shown on the Plans. Provide all labor, material and equipment for the Bid items listed in this contract.
d. Location of the Project is on Park Drive, Black Rail Road, Plum Tree Road and Carrillo Way in the City of Carlsbad, in the County of San Diego, California e. Work also includes: maintaining the safe passage of pedestrians past the Work area throughout the construction period; traffic control; and obtaining all permits needed to perform the indicated Work.

END OF SECTION

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 215 ends

01 11 20 MEASUREMENT AND PAYMENT
PART 1 GENERAL

1.01 SCOPE.
a. The Contract Price shall cover all Work required by the Contract Documents. All costs in connection with the proper and successful completion of the Work, including furnishing all materials, equipment, supplies, and appurtenances; providing all constructio n plant, equipment, and tools; and performing all necessary labor and supervision to fully complete the Work, shall be included in the unit and lump sum Bid prices. All Work not specifically set forth as a pay item in the Bid Form shall be considered a sub sidiary obligation of Contractor and all costs in connection the Work shall be included in the Bid prices. b. All estimated quantities stipulated in the Bid Form or other Contract Documents are approximate and are to be used only (a) as a basis for estimating the probable cost of the Work and (b) for the purpose of comparing the Bids submitted for the Work. The ac tual amounts of Work done and materials furnished under unit price items may differ from the estimated quantities. The basis of payment for Work and materials will be the actual amount of Work done and materials furnished. Contractor agrees that it will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amounts of Work actually performed and materials actually furnished and the estimated amounts therefor.
c. Payment for each Bid Item shall be made in accordance with Sections 7 -2 and 7 -3 of the Agency Supplemental General Provisions and the Bid. All Work shown or described in the Contract Documents and necessary for the functioning of installed equipment or constructed facilities and the repair or replacement of damaged existing improvements in accordan ce with the Contract Documents shall be considered as included in the Bid Items.

1.02 BID ITEMS.

1. Mobilization (Lump Sum) – Payment for mobilization & demobilization and preparatory Work will be made at the contract Lump Sum . The work associated with this bid item includes full compensation for furnishing all insurance, bonds, licenses, permits, labor, materials, utilities, tools, equipment and incidentals, and for doing all the Work involved in mobilization and preparatory W ork and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to preparing to conduct Work on and off the Project Site and other offsite facilities necessary for Work on the Project; for all other facilities, sureties, Work and operations which must be performed or costs incurred prior to beginning Work on various Contract items on or off the Project Site, applying for and obtaining all required permits, all field survey and staking required for the project, cleanup to

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 216 ends

the satisfaction of the Engineer, and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items, including all related administration throughout its duration, and demobilization, excep ting those specifically paid for under separate sections of these Specifications. The Contractor agrees that the stipulated lump sum amount is sufficient for Mobilization and Preparatory Work, as described in this section, and that the Contractor shall hav e no right to additional compensation for Mobilization & Demobilization and Preparatory Work. The total price bid for Mobilization & Demobilization shall include the cost of all mobilization and administration for the entire CONTRACT period. No separate payments shall be made for re-mobilization due to project phasing.

2. Traffic Control (Lump Sum ) – Payment for Traffic Control Plan and Traffic Control Implementation will be made at the contract Lump Sum price paid for full compensation for all work involved in the developing and implementing the traffic control plans, construction staging and furni shing project traffic control, including furnishing, installation, maintaining and removal of temporary barricades, temporary striping, temporary pavement markers, construction signs, warning signs, portable changeable message signs, or any device for the temporary control of traffic or safety of the workers, including flagmen (i.e. all traffic control as required by City’s Traffic Engineer), tools, equipment, incidentals, providing notices, temporary conflicting traffic stripe application and grinded removal, trench steel plate cover installation and removal, and any other safety measures used for the control of traffic, any temporary rerouting of traffic or maintenance of access to properties, during the Project construction period will considered include d in the contract Lump Sum price for Traffic Control, in accordance with the plans, contract documents, and as described in conformance with Greenbook Part 6 and Sections 302 -2.5, 302-3.8, 302-4.7, 302-10.4, and no additional compensation will be allowed.

3. Water Pollution Control (Lump Sum) – Water Pollution Control work shall be performed in accordance with Section 3-12.6 of the Standard Specifications, City of Carlsbad requirements and these technical provisions. Full compensation for all work involved in developing and implementing water p ollution control plans and water pollution control Best Management Practices (BMPs) will be considered as included in the contract Lump Sum price paid for Water Pollution Control, including maintenance and removal of BMPs, in accordance with the plans, contract documents and standard specifications, complete and in place, and no additional compensation will be allowed therefor.

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 217 ends

4. Clearing and Grubbing (Lump Sum) – Clearing and Grubbing shall comply with Section 300 “Earthwork”, of the Standard Specifications for Public Works Construction. Clearing and Grubbing work shall include all site demolition including, but not limited to, removal of existing curb, gutter, sidewalk, cross gutter, curb ramps, driveway approaches, AC pavement and other surface improvements indicated to be removed. The location of the existing concrete curb, gutter, sidewalk, curb ramps, driveway approaches and AC paving to be removed shall be as indicated on Plan; the resultant materials shall be disposed of legally outside the right of way. Work for this item shall include all necessary saw cutting and shall be performed in accordance with Section 300 -1.3.2 of the Standard Specifications for P ublic Works Construction. The contract Lump Sum price paid for Clearing and Grubbing includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in clearing and grubbing the site, including disposal of all cleared and grubbed materials at a legal site, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

5. PCC Curb and Gutter (Linear Feet) – Construction of Portland Cement Concrete (PCC) curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways shall comply with Section 201-1, "Portland Cement Concrete", Section 300, “Earthwork”, and Section 301-1, "Subgrade Preparation", and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” of the Standard Specifications for Public Works Construction, as shown on the Plans, Standard Drawings and these Special Provisions. PCC curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways shall be measured as indicated in the bid schedule. The contract unit prices paid for PCC curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing PCC surface improvements, including laying out and constructing fully ADA-compliant improvements and detectable warning surfaces, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

6. PCC Sidewalk (Square Feet) - Work to be paid for under this item shall include installation of new PCC sidewalk in accordance with Contract documents and all appurtenant work as required by the Contract Documents. The unit price shall include all work associated with the construction of the sidewalk including but not limited to all labor, materials, tools, equipment, transitions, excavation, forming, subgrade preparation, , sawcutting, and

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 218 ends

removing and replacing pavement adjacent to the curb. Existing sidewalk shall be removed at the joint.

7. PCC Curb Ramps (Each) - Work to be paid for under this item shall include installation of new concrete Curb Ramps in accordance with Contract documents and all appurtenant work as required by the Contract Documents. The unit price shall include all work associated with the construction of the curb ramps including but not limited to all labor, materials, tools, equipment, transitions, excavation, forming, subgrade preparation, installation of detectable warning surface, concrete curb, sawcutting, and removing and replacing pavement adjacent to the curb.

8. Crushed Aggregate Base (Cubic Yard) – Work to be paid for under this item shall be in accordance with the plans, contract documents, and as described in conformance with Section 203-6 & 302-5. The above contract price and payment shall include full compensation for furnishing all labor, ma terials, tools, equipment, sweeping, hauling, disposal costs, cleaning, transportation, compaction, and incidentals, and for doing all the work involved, complete as detailed.

9. Asphalt Concrete (AC ) Paving (Ton) – Construction of Asphalt Concrete (AC) paving, including new paving and overlay. Shall comply with these technical provisions.

Asphalt Concrete Paving shall be measured by the ton. The contract unit price per Ton for Asphalt Concrete Paving, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing AC pacving, including tack coat, as shown on the plans, as specifie d in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

10. Asphalt Concrete (AC) Speed Cushion (Ton) – Work to be paid for under this item shall be in accordance with the plans, contract documents, and as described in conformance with Section 203-6 & 302-5 and paving variable depth of the asphalt concrete speed cushions. The above contract price and payment shall include full compensation for furnishing all labor, materials, tools, equipment, sweeping, haul ing, disposal costs, cleaning, transportation, compaction, and incidentals, and for doing all the work involved, complete as detailed.

11. Cold Milling and Asphalt Concrete Overlay (Square Feet) – Work to be paid for under this item shall be in accordance with the plans, contract documents, and as described in conformance

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 219 ends

with Section 404. No separate measurement and payment shall be made for disposal of grindings, asphalt tack coat, tapers, or pavement joints. The above contract price and payment shall include full compensation for furnishing all labor, materials, tools, equipment, sweeping, hauling, disposal costs, cleaning, transportation, compaction, and incidentals, and for doing all the work involved, complete as detailed.

12. Adjust Existing Water Valve to Grade (Each)– Adjust Valve Well shall include all labor and materials required to adjust existing valve well to the new finish grade in accordance with the provisions of Sections 212-4 and 403 of the Standard Specifications. Aggregate Base shall be measured by the cubic yard, in place. The contract unit price paid Each for Adjust Valve Well, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in adjusting existing valve well to grade as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

13. Signing and Striping (Lump Sum) – Work to be paid for under this item shall include the installation of Signing and Striping and all appurtenant work in accordance with the Contract Documents. The unit price shall include all work associated with installing Signing and Striping including but not limited to furnishing all materials, labor, tools, equipment, installing traffic striping, curb and pavement markings, pavement markers, roadside signs including reflective signs, posts, removals of existing pavement markings, markers, and signage, red curb parking restriction markings, reflective beading, reflective pavement markers; signage, hardware, mounting fasteners, foundations and posts.

1.03 SUBMITTALS.
a. Informational Submittals:

1. Schedule of Values: Submit on Agency’s form.

2. Schedule of Estimated Progress Payments:
i. Submit with initially acceptable Schedule of Values. ii. Submit adjustments thereto with Application for Payment.

3. Application for Payment.

4. Final Application for Payment.

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 220 ends

1.04 SCHEDULE OF VALUES (SOV).
a. The Contractor shall prepare a separate SOV for each schedule of the Work under the Contract.
b. Upon request of the Construction Manager, the Contractor shall provide documentation to support the accuracy of the SOV.
c. The Contractor shall prepare and submit to the Engineer for review a SOV within the time specified in the Contract Documents.
d. When requested by the Engineer, the SOV shall divide each lump sum Bid item into its respective activities as listed in the Construction Schedule, and the sum of the costs apportioned to the activities comprising the Bid item shall equal the Bid item price . The Contractor shall add additional detail to the SOV when, in the opinion of the Engineer, such detail is necessary to represent the basis for payment. The Contractor shall submit to the Engineer a corrected Schedule of Values within 10 Calendar Days of the Engineer’s request.
e. The Contractor shall make adjustments to the approved SOV to account for Change Orders or Extra Work. The SOV entries for adjustments so made shall be approved by the Engineer.
f. Payment for the preparation of or revisions to the SOV shall be included in the Contract Price and no additional payment will be made therefor.
g. Unit Price Work: Must reflect unit price quantity and price breakdown from conformed Bid Form.
h. Lump Sum Work:

1. Must reflect specified cash and contingency allowances and alternates, as applicable.

2. List bonds and insurance premiums, mobilization, demobilization, preliminary and detailed progress schedule preparation, equipment testing, facility startup, and Contract closeout separately.
i. Mobilization includes, at minimum, items identified in Section 01 50 00, Temporary Facilities and Controls.
ii. Include item(s) for monthly progress schedule update and maintenance of Construction Manager’s trailer.

3. Break down by Division 02 through 49 with appropriate subdivision of each specification for each Project facility.
i. An unbalanced or front-end loaded schedule will not be acceptable. j. Summation of the complete SOV representing all the Work shall equal the Contract Price. k. The Contractor shall submit SOV electronically in a spreadsheet format compatible with latest version of MS Excel.
l. SOV shall be submitted as a submittal in Procore.

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 221 ends

1.05 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS.
a. Show estimated payment requests throughout Contract Times aggregating initial Contract Price.
b. Base estimated progress payments on initially acceptable progress schedule. Adjust to reflect subsequent adjustments in progress schedule and Contract Price as reflected by modifications to the Contract Documents.

1.06 APPLICATION FOR PAYMENT.
a. Transmittal Summary Form: Attach 1 Summary Form with each detailed Application for Payment for each schedule and include Request for Payment of Materials and Equipment on Hand as applicable. Execute certification by authorized officer of Contractor. b. Use detailed Application for Payment Form provided by Construction Manager. c. Provide separate form for each schedule as applicable. d. Include accepted Schedule of Values for each schedule or portion of lump sum Work and the unit price breakdown for the Work to be paid on a unit priced basis. e. Include separate line item for each Change Order and Work Change Directive executed prior to date of submission. Provide further breakdown of such as requested by Construction Manager.
f. Preparation:

1. Round values to nearest dollar.

2. Submit Application for Payment, including a Transmittal Summary Form and detailed Application for Payment Form(s) for each schedule as applicable, a listing of materials on hand for each schedule as applicable, and such supporting data as may be requested by Construction Manager.

1.07 PAYMENT.
a. Transmittal Summary Form: Attach 1 Summary Form with each detailed Application for Payment for each schedule and include Request for Payment of Materials and Equipment on Hand as applicable. Execute certification by authorized officer of Contractor. b. Each month, the Engineer will make an approximate measurement of the Work performed to the closure date as basis for making monthly progress payments. The estimated value will be based on Contract Unit Prices, completed Change Order Work.

Progress payments shall be made no later than 30 Calendar Days after the closure date.

Five Working Days following the closure date, the Engineer shall complete the detailed progress pay estimate and submit it to the Contractor for the Contractor’s information.

Should the Contractor assert that additional payment is due, the Contractor shall within

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 222 ends

10 Calendar Days of receipt of the progress estimate, submit a supplemental payment request to the Engineer with adequate justification supporting the amount of supplemental payment request. Upon receipt of the supplemental payment request, the Engineer shall, as soon as practicable after receipt, determine whether the supplemental payment request is a proper payment request. If the Engineer determines that the supplemental payment request is not proper, then the request shall be returned to the Contractor as soon as pr acticable, but not later than 7 Calendar Days after receipt. The returned request shall be accompanied by a document setting forth in writing the reasons why the supplemental payment request was not proper. Consistent with Public Contract Code Section 20104.50, the Agency shall make payments within 30 Calendar Days after receipt of an undisputed and properly submitted supplemental payment request from the Contractor. If payment of the undisputed supplemental payment request is not made within 30 Calendar Days after receipt by the Engineer, then the Agency shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Code of Civil Procedure Code Section 685.010.
c. After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the Contract Bid item and Change Order item with quantities and payment amounts and shall show all deductions made or to be made for prior payments and amounts to be deducted under provisions of the Contract. All prior estimates and progress payments shall be s ubject to correction in the Final Payment Estimate.
d. The Contractor shall have 30 Calendar Days from receipt of the Final Payment Estimate to make a written statement disputing any Bid item or Change Order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its position. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all Contract Bid items and Change Order items.
e. If the Contractor submits a written statement with documentation in the aforementioned time, the Engineer will review the disputed item within 30 Calendar Days and make any appropriate adjustments on the Final Payment. Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 2-10, Disputed Work.
f. The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of the disputed items. The Engineer will consider the merits of the Contractor’s claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 223 ends

may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items.

1.08 MOBILIZATION.
a. Payment for mobilization and preparatory Work will be made at the stipulated lump-sum price Bid therefore in the Bid Schedule and includes full compensation for furnishing all insurance, bonds, licenses, labor, materials, utilities, tools, equipment and incidentals, and for doing all the Work involved in mobilization and preparatory Work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to preparing to conduct Work on and off the Project Site and other offsite facilities necessary for Work on the Project; for all other facilities, sureties, Work and operations which must be performed or costs incurred prior to beginning Work on various Contract items on or off the Project Site, excepting those specifically paid for under separate sections of these Specifications. The Contractor agrees that the stipulated lump sum amount is sufficient for Mobilization and Preparatory Work, as described in this section, and that the Contractor shall have no right to additional compensation for Mobilization and Preparatory Work.
b. Progress payments for mobilization and preparatory Work will be made as follows: For the first progress payment (after the issuance of the Notice to Proceed), 40% of the amount Bid for mobilization and p reparatory Work will be allowed. For the second progress payment, an additional 60% of the amount Bid for mobilization and preparatory Work will be allowed. Mobilization shall include preparatory Work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the Project Site, for the establishment of all offices, buildings and other facilities necessary for the Work, sureties and for all other Work and operations which must be performed or costs incurred prior to beginning and after completion of the Work excepting those specifically paid for under a separate Bid item. The dismantling and removal of temporary facilities, equipment, materials, construction waste and personnel shall be included in the payment for mobilization.
c. When a Bid item has been provided for “Mobilization ”, payment shall be distributed equally over the first 2 progress payments up to the amount of the Bid item price but shall not exceed 3% of the Contract Price. If the Bid item for “Mobilization” exceeds 3% of the Contract Price, the portion above 3% of the Contract Price shall be paid as a part of the Final Payment.

1.09 MISCELLANEOUS CONCRETE.

01 11 20 MEASUREMENT AND PAYMENT Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 224 ends

a. All concrete which is required in connection with manholes or structures, pavement or sidewalk replacement, and other pay items shall be included in the lump sum or unit price Bid for the pay item.
b. The unit price Bid for miscellaneous concrete shall include concrete, reinforcing steel, forms, finishing, curing, and all other Work or materials required to complete the concrete Work.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

01 31 00 PROJECT MANAGEMENT AND COORDINATION Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 225 ends

01 31 00 PROJECT MANAGEMENT AND COORDINATION
PART 1 CONSTRUCTION MANAGEMENT SOFTWARE

1.01 PROCORE PROJECT MANAGEMENT AND COLLABORATION SYSTEM. a. This project may utilize the Owner’s Procore (www.procore.com) online project management and document control platform. The intent of utilizing Procore is to reduce cost and schedule risk, improve quality and safety, and maintain a healthy team dynamic by improving information flow, reducing non -productive activities, reducing rework and decreasing turnaround times. The Contractor is required to create a free web -based Procore user account(s) and utilize web-based training / tutorials (as needed) to become familiar with the system. Unless the Engineer approves otherwise, the Contractor shall process all project documents through Procore because this platform will be used to submit, track, distribute and collaborate on project. If unfamiliar or not otherwise trained with Procore, Contractor and applicable team members shall complete a free training certification course located at http://learn.procore.com/procore-certification-subcontractor. The Contractor is responsible for attaining their own Procore support, as needed, either through the online training or reaching out to the Procore support team. It will be the responsibility of the Contractor to regularly check Procore and review updated documents as they are added. There will be no cost to the Contractor for use of Procore.

It is recommended that the Contractor provide mobile access for Windows, iOS located at https://apps.apple.com/us/app/procore-construction-management/id374930542 or Android devices located at https://play.google.com/store/apps/details?id=com.procore.activities with the Procore App installed to at least one on -site individual to provide real -time access to current posted drawings, specifications, RFIs, submittals, schedules, change orders, project documents, as well as any deficient observations or punch list it ems. Providing mobile access will improve communication, efficiency, and productivity for all parties. The use of Procore for project management does not relieve the contractor of any other requirements as may be specified in the contract documents.

END OF SECTION

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 226 ends

01 32 00 SUBMITTALS
PART 1 GENERAL

1.01 GENERAL.
a. Each submittal shall be consecutively numbered. Resubmittals shall be labeled with the original submittal number followed by an ascending alphabetical designation (e.g., ‘4 -A’ would indicate the first resubmittal of the fourth submittal). Each submittal shall be accompanied by a letter of transmittal on the Contractor’s letterhead which shall contain the following:

1. Agency Project title and Contract number.

2. Specification section number(s) pertaining to material submitted for review.

3. Submittal number.

4. Description of the contents of the submittal.

5. Identification of any deviation from the Contract Documents on the transmittal and by redline on the shop or working Drawings.

6. Contractor’s certification statement.

7. Printed name and signature of submitter, title and date. b. The Contractor shall place the following certification statements on all submittals and shall subscribe to one of the following:
"I certify that the materials, equipment or construction procedure(s) contained in this submittal meet all requirements shown or specified in the Contract Documents with no exceptions.”
Or
"I certify that the materials, equipment or construction procedure(s) contained in this submittal meet all requirements shown or specified in the Contract Documents, except for the following deviation(s):”
c. Shop Drawings and engineering data (submittals) covering all equipment and all fabricated components and building materials which will become a permanent part of the Goods and Special Services under this Contract shall be submitted to Engineer for review, as required. Submittals shall verify compliance with the Contract Documents and shall include Drawings and descriptive information in sufficient detail to show the kind, size, arrangement, and the operation of component materials and devices; the external connections, anchorages, and supports required; the performance characteris tics; and dimensions needed for installation and correlation with other materials and equipment. d. Each submittal shall cover items from only one section of the specification unless the item consists of components from several sources. Contractor shall submit a complete initial submittal including all components. When an item consists of components from several sources, Contractor's initial submittal shall be complete including all components. e. All submittals, regardless of origin, shall be approved by Contractor and clearly identified with the name and number of this Contract, Contractor's name, and references to applicable specification paragraphs and Contract Drawings. Each copy of all submittals, regardless of origin, shall be stamped or affixed with an approval statement of Contractor.

Each submittal shall indicate the intended use of the item in the Goods and Special

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 227 ends

Services. When catalog pages are submitted, applicable items shall be clearly identified and inapplicable data crossed out. The current revision, issue number, and date shall be indicated on all Drawings and other descriptive data.
f. Contractor shall be solely responsible for the completeness of each submittal.

Contractor's stamp or affixed approval statement of a submittal is a representation to Engineer that Contractor accepts sole responsibility for determining and verifying all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data, and that Contractor has reviewed and coordinated each submittal with the requirements of the Goods and Special Services and the Contract Documents. g. All deviations from the Contract Documents shall be identified as deviations on each submittal and shall be tabulated in Contractor's letter of transmittal using Figure P-01300-

2. Such submittals shall, as pertinent to the deviation, indicate essential details of all changes proposed by Contractor (including modifications to other facilities that may be a result of the deviation) and all required piping and wiring diagrams. h. (Optional Paragraph) The Contractor shall submit shop Drawings in either hard copy or electronically. All submittals shall be made with the selected method, and the Contractor shall inform the Engineer by letter 1 week after award of the Contract, which method has been selected. Submittals made by any method other than that selected by the Contractor, will be returned without review.
i. (Optional Paragraph) For hard copy submittals, 5 copies of each drawing and the necessary data shall be submitted to Engineer. Engineer will return 2 marked copies (or 1 marked reproducible copy) to Contractor. Facsimile (fax) or electronic copies will not be acceptable. Engineer will not accept submittals from anyone but Contractor. Submittals shall be consecutively numbered in direct sequence of submittal and without division by subcontracts or trades.
j. (Optional Paragraphs) For electronic submittals, drawings and the necessary data shall be submitted electronically to Engineer as specified below. Submittal documents shall be in black and white unless color is required for the review of the submittal. All electronic files shall be in PDF as generated by Adobe Acrobat Professional latest version. The PDF file(s) shall be fully indexed using the Table of Contents, searchable with thumbnails generated.

PDF images must be at a readable resolution. For most doc uments, they should be scanned or generated at 300 dots per inch (dpi). Optical Character Recognition (OCR) capture must be performed on these images so that text can be searched, selected and copied from the generated PDF file. The PDF documents shall hav e a bookmark created in the navigation frame for each major entry (“Section” or “Chapter”) in the Table of Contents. Thumbnails shall be generated for each page or graphic in the PDF file. The opening view for each PDF document shall be as follows:

1. Initial View: Bookmarks and Page

2. Magnification: Fit in Window

3. The file shall open to the Contractor’s transmittal letter, with bookmarks to the left.

The first bookmark shall be linked to the Table of Contents.

PDF document properties shall include the submittal number for the document title and the Contractor’s name for the author.

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 228 ends

k. Electronic submittal file sizes shall be limited to 10 MB. When multiple files are required for a submittal the least number of files possible shall be created. l. The Contractor shall post submittals and retrieve the Engineer’s submittal review comments through the Engineer’s (Consulting Engineer’s) Project website accessible through the Internet. Instruction on procedures for posting and retrieving submittals will be provided after award of the Contract.
m. Facsimiles (fax) will not be acceptable. Engineer will not accept submittals from anyone but Contractor. Submittals shall be consecutively numbered in direct sequence of submittal and without division by subcontracts or trades.

1.02 ENGINEER’S REVIEW OF SUBMITTALS.
a. Engineer's review of submittals covers only general conformity to the Drawings and Specifications, external connections, and dimensions that affect the layout; it does not indicate thorough review of all dimensions, quantities, and details of the material, equipment, device, or item covered. Engineer's review shall not relieve Contractor of sole responsibility for errors, omissions, or deviations in the Drawings and data, nor of Contractor's sole responsibility for compliance with the Contract Documents. b. Engineer's submittal review period shall be 21 consecutive Calendar Days and shall commence on the first Calendar Day following receipt of the submittal or resubmittal in Engineer's office. The time required to mail the submittal or resubmittal back to Contractor shall not be considered a part of the submittal review period. c. When the Drawings and data are returned with review status "NOT ACCEPTABLE" or "RETURNED FOR CORRECTION," the corrections shall be made as instructed by Engineer.

If submittals are made in hard copy, 5 corrected copies shall be resubmitted. If submittals are made electronically, the corrected Drawings and data shall be resubmitted through the Project website. Resubmittals by facsimile or e -mail will not be accepted. When the Drawings and data are returned with review status "EXCEPTIONS NOTED ," "NO EXCEPTIONS NOTED," or "RECORD COPY," no additional copies need be furnished unless specifically requested by Engineer.

1.03 RESUBMITTAL OF DRAWINGS AND DATA.
a. Contractor shall accept full responsibility for the completeness of each resubmittal.

Contractor shall verify that all corrected data and additional information previously requested by Engineer are provided on the resubmittal.
b. When corrected copies are resubmitted, Contractor shall direct specific attention to all revisions in writing and shall list separately any revisions made other than those called for by Engineer on previous submittals. Requirements specified for initial submittals shall also apply to resubmittals. Resubmittals shall bear the number of the first submittal followed by a letter (A, B, etc.) or a unique identification that indicates the initial submittal and correct sequence of each resubmittal.
c. If more than 1 resubmittal is required because of failure of Contractor to provide all previously requested corrected data or additional information, Contractor shall reimburse Agency for the charges of Engineer for review of the additional resubmittals.

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 229 ends

This does not include initial submittal data such as shop tests and field tests that are submitted after initial submittal.
d. (Optional Paragraph) Resubmittals shall be made within 30 Calendar Days of the date of the letter returning the material to be modified or corrected, unless within 14 Calendar Days Contractor submits an acceptable request for an extension of the stipulated time period, listing the reasons the resubmittal cannot be completed within that time. e. The need for more than 1 resubmittal, or any other delay in obtaining Engineer's review of submittals, will not entitle Contractor to extension of the Contract Times unless delay of the Work is the direct result of a change in the Work authorized by a Change Order or failure of Engineer to review and return any submittal to Contractor within the specified review period.

1.04 COLOR SELECTION.
b. Contractor shall submit samples of colors and finishes for all accepted products before Engineer will coordinate the selection of colors and finishes with Agency. Engineer will prepare a schedule of finishes that include the colors and finishes selected for both manufactured products and for surfaces to be field painted or finished and will furnish this schedule to Contractor within 60 Calendar Days after the date of acceptance of the last color or finish sample.

1.05 OPERATION AND MAINTENANCE DATA AND MANUALS.
a. Adequate operation and maintenance information shall be supplied for all equipment requiring maintenance or other attention. The equipment supplier shall prepare a Project specific operation and maintenance manual for each type of equipment indicated in the individual equipment sections or the equipment schedule. b. (Optional Paragraph) Parts lists and operating and maintenance instructions shall be furnished for other equipment not listed in the individual equipment sections or the equipment schedule.
c. Operation and maintenance manuals shall include the following:

1. Equipment function, normal operating characteristics, and limiting conditions.

2. Assembly, installation, alignment, adjustment, and checking instructions.

3. Operating instructions for startup, routine and normal operation, regulation and control, shutdown, and emergency conditions.

4. Lubrication and maintenance instructions.

5. Guide to troubleshooting.

6. Parts lists and predicted life of parts subject to wear.

7. Outline, cross section, and assembly drawings; engineering data; and wiring diagrams.

8. Test data and performance curves, where applicable.
d. The operation and maintenance manuals shall be in addition to any instructions or parts lists packed with or attached to the equipment when delivered, or which may be required by Contractor.
e. (Optional Paragraph) Three hard copies of each manual shall be submitted to Engineer prior to the date of shipment of the equipment. When the O&M manuals are returned

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 230 ends

with the review status "RETURNED FOR CORRECTION ," the corrections shall be made as instructed by the Engineer, and 2 copies of the corrected portion(s) and 1 complete corrected copy of the O&M manual returned to the Engineer. After review by Engineer, is complete 4 hard copies and 1 electronic copy of each operation and maintenance manual shall be prepared and delivered to Engineer not later than 30 Calendar Days prior to placing the equipment in operation. The electronic copy shall be submitted through the Project website, and will be reviewed for content and organization and assigned a review status by the Engineer. When corrections are required, a corrected version of the electronic copy shall be resubmitted. Procedures for submission of the electronic copy will be provided after award of the Contract. When review of the electronic copy by the Engineer is complete, 3 copies of each electronic O&M manual shall be delivered on CD - ROM to the Engineer. Each CD shall contain only 1 copy of 1 manual. f. (Optional Paragraph) Manuals shall be submitted in electronic format to the Engineer prior to the date of shipment of the equipment. The manuals shall be submitted and the Engineer’s review comments retrieved, through the Project website accessible through the Internet. Instruction on procedures for posting and retrieving O&M submittals and review comments will be provided after award of the Contract. When the O&M manuals are reviewed "RETURNED FOR CORRECTION,” the corrections shall be made as instructed by the Engineer or Consulting Engineer, and corrected manuals resubmitted to the Engineer or Consulting Engineer. When review by the Engineer is complete, 3 copies of each electronic O&M manual shall be delivered on CD-ROM to the Engineer. Each CD shall contain only 1 copy of 1 manual. Delivery of the final O&M shall be made 30 Calendar Days prior to placing the equipment in operation.
g. All material shall be marked with Project identification, and inapplicable information shall be marked out or deleted.
h. Shipment of equipment will not be considered complete until all required manuals and data have been received.

1.06 HARD COPY OPERATIONS AND MAINTENANCE MANUALS.
a. Hard copies submitted for review shall be temporarily bound in heavy paper covers bearing suitable identification. All manuals and other data shall be printed on heavy, first quality 8 1/2 x 11 inch paper, with standard 3-hole punching. Drawings and diagrams shall be reduced to 8 1/2 x 11 inches or 11 x 17 inches. Where reduction is not practicable, larger drawings shall be folded separately and placed in envelopes, which are bound into the manuals. Each envelope shall be suitably identified on the outside. Each volume containing data for 3 or more items of equipment shall include a table of contents and index tabs. The final hard copy of each manual shall be prepared and delivered in substantial, permanent, 3-ring or 3-post binders in heavy paper covers with a table of contents and suitable index tabs.

1.07 ELECTRONIC OPERATIONS AND MAINTENANCE MANUALS.
a. Electronic manuals shall be in Adobe Acrobat’s PDF and shall be prepared at a resolution between 300 and 600 dpi, depending on document type. OCR capture shall be performed

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 231 ends

on these documents. OCR settings shall be performed with the “original image with hidden text” option in Adobe Acrobat Exchange.
b. File size shall be limited to 10 MB. When multiple files are required the least number of files possible shall be created. File names shall be in the format OMXXXXX -YYYZ-V.pdf, where XXXXX is the 5-digit number corresponding to the specification section, YYY is a 3- digit O&M manual number, e.g. , 001, Z is the letter signifying a resubmittal, A, B, C, etc, and V is a number used only when more than one 10 MB file is required for an O&M manual.
c. Documents prepared in PDF format shall be processed as follows:
d. Pages shall be searchable (processed for optical character recognition) and indexed when multiple files are required.

1. Of material to update the manual provided by the manufacturer. Pages shall be rotated for viewing in proper orientation.

2. A bookmark shall be provided in the navigation frame for each entry in the Table of Contents.

3. Embedded thumbnails shall be generated for each completed PDF file.

4. The opening view for PDF files shall be as follows:

5. Initial View: Bookmarks and Page

6. Page Number: Title Page (usually Page 1)

7. Magnification: Set to Fit in Window

8. Page: Single Page

9. Where the bookmark structure is longer than 1 page, the bookmarks shall be collapsed to show the chapter headings only.

10. When multiple files are required the first file of the series (the parent file) shall list every major topic in the Table of Contents. The parent file shall also include minor headings bookmarked based on the Table of Contents. Major headings, whose content is contained in subsequent files (children) shall be linked to be called from the parent to the specific location in the child file. The child file shall contain bookmark entries for both major and minor headings contained in the child file. The first bookmark of any child file shall link back to the parent file and shall read as follows "Return to the Equipment Name Table of Contents ," e.g. , Return to the Polymer Feed System Table of Contents.

11. Drawings shall be bookmarked individually.

12. Files shall be delivered without security settings to permit editing, insertion and deletion.

1.08 LABELING.
b. As a minimum, the following information shall be included on all final O&M manual materials, including CD-ROM disks, jewel cases, and hard copy manuals:

Equipment name and/or O&M title spelled out in complete words.

Project Name.

Agency Project/Contract Number.

Specification Section Number. Example: “Section 15 55 00”.

Manufacturer’s name.

01 32 00 SUBMITTALS Date Printed: February 26, 2024
Document Version: 1.0 Current Update: May 2023

Page 232 ends

File Name and Date.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 233 ends

01 33 00 CONSTRUCTION PROGRESS SCHEDULE
PART 2 EXECUTION

2-1.1 Preconstruction Meeting.

After, or upon, notification of Contract award, the Engineer will set the time and location for the Preconstruction Meeting. Attendance of the Contractor’s management personnel responsible for the management, administration, and execution of the Project is mandatory for the meeting to be convened. Failure of the Contractor to have the Contractor’s responsible Project personnel attend the Preconstruction Meeting will be grounds for default by Contractor per Supplemental General Provisions Section 6 -7. No separate payment will be made for the Contractor’s attendance at the meeting. The Notice to Proceed will only be issued on or after the completion of the Preconstruction Meeting.

2-1.2 Preparation and Review of the Baseline Construction Schedule.

The Contractor shall prepare the Baseline Construction Schedule as a CPM Schedule in the precedence diagram method (activity-on-node) format. The Baseline Construction Schedule shall depict a workable plan showing the sequence, duration, and interdependenc e of all activities required to represent the complete performance of all Project Work as well as periods where Work is precluded. The Baseline Construction Schedule shall begin with the projected date of issuance of the Notice to Proceed and conclude with the date of final completion per the Contract duration. The Baseline Construction Schedule shall include detail of a ll Project phasing, staging, and sequencing, including all milestones necessary to define beginning and ending of each phase or stage.

2-1.2.1 Time-Scaled Network Diagram.

As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a complete time -scaled network diagram showing all of the activities, logic relationships, and milestones comprising the schedule.

2-1.2.2 Tabular Listing.

As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a tabular listing of all of the activities, showing for each activity the identification number, the description, the duration, the early start, the ear ly finish, the late start, the late finish, the total float, and all predecessor and successor activities for the activity described.

2-1.2.3 Bar Chart.

As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a chart showing individual tasks and their durations arranged with the tasks on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the Critical Path.

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 234 ends

2-1.2.4 Schedule Software.

The Contractor shall use commercially available software equal to the Windows compatible “Suretrak” program by Primavera or “Project” program by Microsoft Corporation to prepare the Baseline Construction Schedule and all updates thereto. The Contractor shall submit to the Agency a digital file with all network information contained on it , in a format readable by a Microsoft Windows system. The Agency will use a “Suretrak,” “Project” or equal software program for review of the Contractor’s schedule.

2-1.2.5 Schedule Activities.

Except for submittal activities, activity durations shall not be shorter than 1 Working Day nor longer than 15 Working Days, unless specifically and individually allowed by the Engineer. The Baseline Construction Schedule shall include between 100 and 500 activities, including submittals, interfaces between utility companies and other agencies, Project milestones and equipment and material deliveries. The number of activities will be sufficient, in the judgment of the Engineer, to communicate the Contractor’s plan for Project execution, to accurately describe the Project Work, and to allow monitoring and evaluation of progress and of time impacts. Each activity’s description shall accurately define the work planned for the activity and each activity shall have recognizable beginning and end points.

2-1.2.6 Float.

Float or slack time within the schedule is available without charge or compensation to whatever party or contingency first exhausts it.

2-1.2.7 Restraints to Activities.

Any submittals, utility interfaces, or any furnishing of Agency supplied materials, equipment, or services, which may impact any activity’s construction shall be shown as a restraint to those activities. Time periods to accommodate the review and correction of submittals shall be included in the schedule.

2-1.2.8 Late Completion.

A Baseline Construction Schedule showing a Project duration longer than the specified Contract duration will not be acceptable and will be grounds for determination of default by Contractor, per Agency Supplemental General Provisions Section 6-4.

2-1.2.9 Early Completion.

The Baseline Construction Schedule will show the Contractor’s plan to support and maintain the Project for the entire contractual time span of the Project. Should the Contractor propose a Project duration shorter than Contract duration, a complete Baseline Construction Schedule must be submitted, reflecting the shorter duration, in complete accordance with all schedule requirements of Agency Supplemental General Provisions Section 6-1. The Engineer may choose to accept the Contractor’s proposal of a Project duration shorter than the duration specified; provided the Agency is satisfied the shortened Baseline Construction Schedule is reasonable and the Agency and all other entities, public and private, which interface with the Project are able to support the provisions of the shortened Baseline Construction Schedule. The Agency’s

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 235 ends

acceptance of a shortened duration Project will be confirmed through the execution of a Contract Change Order revising the Project duration and implementing all contractual requirements including liquidated damages in accordance with the revised duration.

2-1.2.10 Engineer’s Review.

The Construction Schedule is subject to the review of the Engineer. The Engineer’s determination that the Baseline Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions shall be a condition precedent to issuance of the Notice to Proceed by the Engineer. If the Engineer determines that the Construction Schedule does not meet the requirements of these specifications the Contractor shall correct the Construction Schedule to meet these specifications an d resubmit it to the Engineer. Failure of the Contractor to obtain the Engineer’s determination that the initial Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions within 30 Working Days after the date of the Preconstruction Meeting shall be grounds for termination of the Contract per Agency Supplemental General Provisions Section 6-4. Days used by the Engineer to review the initial Construction Schedule will not be included in the 30 Working Days.

The Engineer will review and return to the Contractor, with any comments, the Baseline Construction Schedule within 15 Working Days of submittal. The Baseline Construction Schedule will be returned marked as per Sections 2-1.2.10.1 through 2-1.2.10.3.

2-1.2.10.1 “Accepted”.

The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed and will receive payment for the schedule in accordance with Section 2-1.8.1.

2-1.2.10.2 “Accepted with Comments”.

The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed. The Contractor must resubmit the schedule incorporating the comments prior to receipt of payment per Section 2-1.8.1.

2-1.2.10.3 “Not Accepted”.

The Contractor must resubmit the schedule incorporating the corrections and changes of the comments prior to receipt of payment per Section 2 -1.8.1. The Notice to Proceed will not be issued by the Engineer if the changes of the comments are not submitted as required and marked “Accepted” or “Accepted with Comments” by the Engineer. The Contractor, at the sole option of the Engineer, may be considered as having defaulted the Contract under the provisions of Supplemental General Provisions Section 2-7 TERMINATION OF THE CONTRACT FOR DEFAULT if the changes of the comments are not submitted as required and marked “Accepted” by the Engineer.

2-1.3 Preparation of Schedule Updates and Revisions.

The Contractor shall meet with the Engineer during the last week of each month to agree upon each activity’s schedule status and shall submit monthly updates of the Baseline Construction

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 236 ends

Schedule confirming the agreements no later than the fifth Working Day of the following month.

The monthly update will be submitted on electronic media conforming to Section 6 -1.3.3 Electronic Media per the submittal requirements of Section 1.05 (Electronic Progress Schedule Format and Reporting) and will include each item and element of Sections 2-1.2 through 2-1.2.9 and 2-1.3.1 through 2-1.3.7.

2-1.3.1 Actual Activity Dates.

The actual dates each activity was started and/or completed during the month. After first reporting an actual date, the Contractor shall not change that actual date in later updates without specific notification to the Engineer with the update.

2-1.3.2 Activity Percent Complete.

For each activity underway at the end of the month, the Contractor shall report the percentage determined by the Engineer as complete for the activity.

2-1.3.3 Electronic Media.

The schedule data disk shall be a digital file , labeled with the Project name and number, the Contractor’s name and the date of preparation of the schedule data disk. The schedule data disk shall be readable by the software specified in Section 6 -1.2.4 “Schedule Software” and shall be free of file locking, encryption or any other protocol that woul d impede full access of all data stored on it.

2-1.3.4 List of Changes.

A list of all changes made to the activities or to the interconnecting logic, with an explanation for each change.

2-1.3.5 Change Orders.

Each monthly update will include the addition of the network revisions reflecting the Change Orders approved in the previous month. The network revisions will be as agreed upon during the review and acceptance of the Contractor’s Change Orders.

2-1.3.6 Bar Chart.

Each monthly update will include a chart showing individual tasks and their durations arranged with the tasks on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the Critical Path.

2-1.4 Engineer’s Review of Updated Construction Schedule.

The Engineer will review and return the Updated Construction Schedule to the Contractor, with any comments, within 5 Working Days of submittal. The Updated Construction Schedule will be returned marked as per Sections 6 -1.4.1 through 6 -1.4.3. Any Updated Construction Schedule marked “Accepted with Comments” or “Not Accepted” by the Engineer will be returned to the Contractor for correction. Upon resubmittal the Engineer will review and return the resubmitted Updated Construction Schedule to the Contractor, with any comments, within 5 Working Days.

Failure of the Contractor to submit a monthly Updated Construction Schedule will invoke the

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 237 ends

same consequences as the Engineer returning a monthly Updated Construction Schedule marked “Not Accepted.”

2-1.4.1 “Accepted”.

The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed, and will receive payment for the schedule in accordance with Section 2-1.8.1.

2-1.4.2 “Accepted with Comments”.

The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed. The Contractor must resubmit the schedule incorporating the comments prior to receipt of payment per Section 2-1.8.1.

2-1.4.3 “Not Accepted”.

The Contractor must resubmit the Updated Construction Schedule to the Engineer incorporating the corrections and changes noted in the Engineer’s comments prior to receipt of payment per Section 6-1.8.2. The Contractor, at the sole option of the Engineer, may be considered as having defaulted the Contract under the provisions of Agency Supplemental General Provisions Section 6-7 TERMINATION OF THE CONTRACT FOR DEFAULT if the changes of the comments are not submitted and marked “Accepted” by the Engineer before the last day of the month in which the Updated Construction Schedule is due. I f the Contractor fails to submit the corrected Updated Construction Schedule as required the Contractor may elect to proceed with the Project at its own risk. Should the Contractor elect not to proceed with the Project, any resulting delay, impact, or disruption to the Project will be the Contractor’s responsibility.

2-1.5 Late Completion or Milestone Dates.

Should the Schedule Update indicate a completion or contractually required milestone date later than the properly adjusted Contract or milestone duration, the Agency may withhold liquidated damages for the number of Calendar D ays late. Should a subsequent “Accepted” Schedule Update remove all or a portion of the delay, all or the allocated portion of the previously held liquidated damages shall be released in the monthly payment to the Contractor immediately following the “Accepted” schedule.

2-1.6 Interim Revisions.

Should the actual or projected progress of the Work become substantially different from that depicted in the Project Schedule, independently of and prior to the next monthly update, the Contractor will submit a revised Baseline Construction Schedule, with a list and explanation of each change made to the schedule. The Revised Construction Schedule will be submitted per the submittal requirements of Section 1.05 (Electronic Progress Schedule Format and Reporting) and per the schedule review and acceptance re quirements of Agency Supplemental General Provisions Section 6 -1, including but not limited to the acceptance and payment provisions. As used in this section “substantially different” means a time variance greater than 5 percent of the number of Calendar Days of duration for the Project.

01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 238 ends

2-1.7 Final Schedule Update.

The Contractor shall prepare and submit a Final Schedule Update when 100% of the Construction Work is completed. The Contractor’s Final Schedule Update must accurately represent the actual dates for all activities. The Final Schedule Update shall be prepared and reviewed per Sections 6-

1.3. Preparation of Schedule Updates and Revisions and 6 -1.4 Engineer’s Review of Updated Construction Schedule. Acceptance of the Final Schedule Update is required for completion of the Project and release of any and all funds retained per Section 9-3.2.

2-1.8 Measurement and Payment of Construction Schedule.

The Contractor’s preparation, revision and maintenance of the Construction Schedule are incidental to the Work and no separate payment will be made for them.

END OF SECTION

01 41 26 PERMIT REQUIREMENTS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 239 ends

01 41 26 PERMIT REQUIREMENTS
PART 1 GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS.
a. The Contractor is responsible to obtain all local, state and federal permits and licenses required to perform the Work. Payment for obtaining and complying with permits and licenses including, but not limited to, general construction permits, building perm its, grading permits, encroachment permits, haul route permits, excavation permits, drilling permits, water discharge permits, temporary easements, licenses, inspection fees, and Federal, State and local taxes shall be borne by the Contractor and shall be included in prices Bid for Work for which such costs are appurtenant. b. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, permits required for sewage bypass pumping or discharge; Night Work; overload; blasting or demolition or for any permit related to the operation of equipment used in such Work.
c. The Contractor shall obtain and pay for all permits for the disposal of all waste or surplus materials removed from the Project. The cost of the permit(s) shall be included in the price for the Bid items requiring the permits and no additional compensation will be allowed for them.
d. The Contractor shall provide a copy of the permit or license to the Agency prior to performing the Work requiring the permit or license.
e. Contractor shall pay for all fees applicable to Contractor’s operations. f. Contractor shall not begin Work until all permits applicable to the Work are obtained.

Permits shall be maintained in valid status until acceptance of the Work by the Agency. g. The Contractor shall pay all business taxes or license fees that are required for the Work.

1. To the extent that there is a change in the type or cost of any permits, fees, licenses, or inspections after Contract award, there shall be an equitable adjustment in the Contract Price on account of such change under the Extra Work provisions.

2. The Contractor shall comply with and give notices required by Applicable Laws. The Contractor is not entitled to damages or additional payment for delays attributable to the acquisition of permits.

3. The Contractor shall pay the Agency for regulatory fees, fines, or penalties imposed on the Agency arising from the Contractor’s failure to complete the Work in accordance with the Contract Documents.
h. The Contractor shall obtain, pay for, and comply with required permits, licenses, work permits, and authorizations from appropriate agencies, including the following:

1. Licenses
i. Before submitting Bids, Contractors shall be licensed in accordance with provisions of Chapter 9, Division 3, of the Business and Professions Code. ii. City of Carlsbad Business License.

2. State and Federal permits
i. Excavation and Dirt Moving Permit from Cal/OSHA
ii. Safety permit from California Division of Industrial Safety

01 41 26 PERMIT REQUIREMENTS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 240 ends

iii. NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Risk Level 2)
iv. NPDES Permit for discharge of hydrostatic test water and potable water

3. Resource Agency Permits:
i. California Coastal Commission Coastal Development Permit number 6-22-0152 issued on 7/18/2023.

4. Other permits
i. City Haul Route Permit
ii. Traffic Control Plan Permit
iii. Grading Permit
iv. Right of Way Permit
v. Oversize Load Permit
vi. Written authorization from private property owners for property utilized for staging
i. The Agency will obtain for the Contractor, the following:

1. CEQA Initial Study/Mitigated Negative Declaration

2. Habitat Management Plan (HMP) Permit No. 2020-006

3. Hill Side Development Permit (HDP) No. 2020-0003

1.02 HAUL ROUTE PERMIT.
a. The Contractor shall prepare a Project specific haul route plan detailing the streets intended for use in delivery of materials and import and export of soil. Contractor will be limited to the routes approved by the City of Carlsbad according to the approved haul route plan contained in the permit.

1.03 TRAFFIC CONTROL PLANS.
a. The Contractor shall prepare Project specific traffic control plans, and haul route plan and use such plans to obtain a traffic control permit from the City of Carlsbad Development Services Department.

1.05 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)/ GENERAL PERMIT.

A. Water Pollution Prevention. The Contractor shall plan for and implement temporary construction BMPs to mitigate the water quality impacts of land disturbance and non - storm water discharges related to construction activities in accordance the Agency’s current Municipal Stormwater Permit and Carlsbad Municipal Code Chapter 15.12. BMPs are the schedules of activities, prohibitions of practices, maintenance procedures and other management practices employed during construction activities to prevent or reduce pollution of bodies of water protected by the federal Clean Water Act (33 U.S.C. § 1251 et seq. ) and the state Porter -Cologne Water Quality Control Act (Water Code , § 13000 et seq.), which include oceans, lagoons, lakes, streams and other sensitive water bodies and water courses. Construction BMPs also include physical devices and structural construction control measures designed to prevent soil erosion from occurring on the Work Site, or that are designed to prevent sediment from leaving the Work Site, both of which are referred to hereafter as “Water Pollution .” BMPs are also intended to protect

01 41 26 PERMIT REQUIREMENTS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 241 ends

the health, safety and welfare of the public and to prevent damage to adjoining public and private property resulting from construction activities.

B. Pollution prevention practices and the minimum BMPs are required during all 12 months of the year. BMPs and other erosion control practices must be implemented as the most important “first line of defense .” The Agency has adopted the CASQA ‘Stormwater Best Management Practices Handbook: Construction ,’ latest edition, as its preferred source for adopting construction BMPs. All BMPs must correspond to the BMP Fact Sheets included in the CASQA Construction Handbook. With the approval of the Engineer, or designee, the Agency may accept comparable BMPs fro m reputable alternative sources.

As used in this section, “Engineer” shall have the same meaning as “Construction Manager.”
C. The Contractor shall utilize the Agency’s Tier 1 or Tier 2 SWPPP templates and include all applicable elements provided in the template. The SWPPP templates are available on the Agency’s website at [PROJECT ENGINEER insert website address here]. Tier 1 and Tier 2 SWPPP templates include standard storm water prevention construction notes, a Project information block, a Storm Water Compliance Statement, Agency approval block and a BMP Checklist Table. The BMP Checklist Table is intended to help the Contractor select appropriate BMPs best suited to the Project and the Work. Additionally, the SWPPP shall include a Site plan showing the proposed Project Site and depicting the areas of proposed construction and proposed locations of construction BMPs. The Tier 1 and Tier 2 SWPPP plans shall be submitted as additional sheets to the construction plan set.

D. The Engineer may require Contractor to adopt additional BMPs if the Engineer determines the selected BMP(s) are ineffective or incapable of preventing Water Pollution from escaping the Work site. Tier 1 and Tier 2 SWPPPs must be combined with proper and timely installation of the BMPs, thorough and frequent inspections, maintenance, and documentation. The Contractor shall ensure that the selected BMPs are appropriately incorporated into the Site design and, if required by the Engineer, must employ a qualified professional to ensure proper installation and maintenance of the BMPs.

E. The Engineer may suspend the Work, consistent with Supplemental General Provisions Section 6 -6, at the Contractor’s cost, that create Water Pollution or otherwise violate water quality standards required by the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and the state Porter-Cologne Water Quality Control Act (Water Code , § 13000 et seq.) if the Engineer determines that the Contractor has failed to satisfy all requirements of this section. If the Contractor violates any provisions of this subsection, or if Water Pollution occurs in the Work Site for any reason, the Contractor shall immediately notify the Engineer.

F. The Contractor shall immediately notify the Agency if there is a non-stormwater discharge to the storm drain conveyance system resulting from the Work or Project-related activities. In addition, the Contractor shall, within 24 hours, submit a written report to the Engineer describing the incident and corrective actions taken. If for any reason the Engineer detects Water Pollution, before notification by the Contra ctor, this written report shall also include an explanation of why the Contractor had not timely notified the Engineer.

01 41 26 PERMIT REQUIREMENTS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 242 ends

G. Implementation Costs. Preparation, implementation and management of Water Pollution prevention activities are incidental to the items of Work and Agency shall not make additional payment to Contractor for these costs.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 243 ends

01 50 00 TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL

1.03 WATER.
a. All water required for and in connection with the Work to be performed shall be provided by and at the expense of Contractor. No separate payment for water used or required will be made and all costs in connection with the water shall be included in the Bid.

1.04 POWER.
a. Contractor shall provide all power for heating, lighting, operation of Contractor's plant or equipment, or for any other use by Contractor. Temporary heat and lighting shall be maintained until the Work is accepted.
b. These provisions shall not be construed as a guarantee by Agency of the uninterrupted continuation of power, and interruptions beyond the control of Agency shall not be reason for claims for additional costs nor for extensions of time. Contractor shall provide, at no additional cost to Agency, any necessary power required for prosecution of the Work during such interruptions.

1.05 SANITARY FACILITIES.
a. Contractor shall furnish temporary sanitary facilities at the Site, as provided in the Contract, for the needs of all construction workers and others performing Work or furnishing services on the Project.
b. Sanitary facilities shall be of reasonable capacity, properly maintained throughout the construction period, and obscured from public view to the greatest practical extent. If toilets of the chemically treated type are used, at least 1 toilet will be furnished for each 20 persons. Contractor shall enforce the use of such sanitary facilities by all personnel at the Site.

1.07 CONSTRUCTION AIDS.
a. Contractor shall furnish, install, maintain, and operate all construction aids required by it and its Subcontractors in the performance of the Work, except as otherwise provided in the Contract.
b. Contractor under Contract shall provide construction aids necessary for the performance of Work by other Contractors on the Project. Such construction aids shall be suitable for conditions encountered and shall include:

1. Elevators and hoists

2. Cranes

3. Temporary enclosures

4. Swing staging

5. Scaffolding

6. Temporary stairs

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 244 ends

1.08 MAINTENANCE OF TRAFFIC.
a. Contractor shall conduct its Work to interfere as little as possible with public travel, whether vehicular or pedestrian. Whenever it is necessary to cross, obstruct, or close roads, driveways, and walks, whether public or private, Contractor shall provide and maintain suitable and safe bridges, detours, or other temporary expedients for the accommodation of public and private travel, and shall give reasonable notice to owners of private drives before interfering with them. Such maintenance of traffic will not be required when Contractor has obtained permission from the Agency and tenant of private property, or from the authority having jurisdiction over public property involved, to obstruct traffic at the designated point.
b. In making open-cut street crossings, Contractor shall not block more than one-half of the street at a time. Whenever possible, Contractor shall widen the shoulder on the opposite side to facilitate traffic flow. Temporary surfacing shall be provided as nec essary on shoulders.
c. Temporary Bridges. Contractor shall construct substantial bridges at all points where it is necessary to maintain traffic across pipeline construction. Bridges in public streets, roads, and highways shall be acceptable to the authority having jurisdiction thereover. Bridges erected in private roads and driveways shall be adequate for the service to which they will be subjected. Bridges shall be provided with substantial guardrails and with suitably protected approaches. Foot bridges shall be at least 4 feet wide, provided with handrails and uprights of dressed lumber. Bridges shall be maintained in place as long as the conditions of the Work require their use for safety of the public. When necessary for the proper prosecution of the Work in the immediate vic inity of a bridge, the bridge may be relocated or temporarily removed for such period as Engineer may permit. d. Detours. Where required by the authority having jurisdiction thereover that traffic be maintained over any Construction Work in a public street, road, or highway, and the traffic cannot be maintained on the alignment of the original roadbed or pavement, Contractor shall, at its own expense, construct and maintain a detour around the Construction Work. Each detour shall include a bridge across the pipe trench and all necessary barricades, guardrails, approaches, lights, signals, signs, and other devices and precautions necessary for protection of the Work and safety of the public.

1.09 BARRICADES AND LIGHTS.
a. All streets, roads, highways, and other public thoroughfares which are closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. Barricades shall be located at the nearest intersecting public highway or street on each side of the blocked section.
b. All open trenches and other excavations shall have suitable barricades, signs, and lights to provide adequate protection to the public. Obstructions, such as material piles and equipment, shall be provided with similar warning signs and lights. c. All barricades and obstructions shall be illuminated with warning lights from sunset to sunrise. Material storage and conduct of the Work on or alongside public streets and highways shall cause the minimum obstruction and inconvenience to the traveling public.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 245 ends

d. All barricades, signs, lights, and other protective devices shall be installed and maintained in conformity with applicable statutory requirements and, where within railroad and highway rights-of-way, as required by the authority having jurisdiction thereover.

1.10 FENCES.
a. All existing fences affected by the Work shall be maintained by Contractor until completion of the Work. Fences which interfere with construction operations shall not be relocated or dismantled until written permission is obtained from the owner of the fence, and the period the fence may be left relocated or dismantled has been agreed upon.

Where fences must be maintained across the construction easement, adequate gates shall be installed. Gates shall be kept closed and locked at all times when not in use. b. On completion of the Work across any tract of land, Contractor shall restore all fences to their original or to a better condition and to their original locations.

1.11 PROTECTION OF PUBLIC AND PRIVATE PROPERTY.
a. Contractor shall protect, shore, brace, support, and maintain all underground pipes, conduits, drains, and other underground construction uncovered or otherwise affected by its construction operations. All pavement, surfacing, driveways, curbs, walks, buildings, utility poles, guy wires, fences, and other surface structures affected by construction operations, together with all sod and shrubs in yards, parkways, and medians, shall be restored to their original condition, whether within or outside the easeme nt. All replacements shall be made with new materials.
b. (Specifier. Where large trees are within or near the construction easement designate whether or not Contractor will be allowed to remove them.) (Optional Paragraph) No trees shall be removed outside the permanent easement, except where authorized by the Engineer or Consulting Engineer. Whenever practicable, Contractor shall tunnel beneath trees in yards and parking lots when on or near the line of trench. Hand excavation shall be employed as necessary to prevent injury to trees. Trees left standing shall be adequately protected against damage from construction operations. c. (Optional Paragraph) Contractor shall be responsible for all damage to streets, roads, highways, shoulders, ditches, embankments, culverts, bridges, and other public or private property, regardless of location or character, which may be caused by transport ing equipment, materials, or workers to or from the Work Site or any part of it, whether by Contractor or its Subcontractors. Contractor shall make satisfactory and acceptable arrangements with the owner of, or the agency or authority having jurisdiction over, the damaged property concerning its repair or replacement or payment of costs incurred in connection with the damage.
d. (Optional Paragraph) All fire hydrants and water control valves shall be kept free from obstruction and available for use at all times.

1.12 DAMAGE TO EXISTING PROPERTY.
a. Contractor will be held responsible for any damage to existing structures, Work, materials, or equipment because of its operations and shall repair or replace any

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 246 ends

damaged structures, Work, materials, or equipment to the satisfaction of, and at no additional cost to, Agency.
b. Contractor shall protect all existing structures and property from damage and shall provide bracing, shoring, or other work necessary for such protection. c. (Optional Paragraph) Contractor shall be responsible for all damage to streets, roads, curbs, sidewalks, highways, shoulders, ditches, embankments, culverts, bridges, or other public or private property, which may be caused by transporting equipment, materials, or workers to or from the Work Site. Contractor shall make satisfactory and acceptable arrangements with the agency having jurisdiction over the damaged property concerning its repair or replacement.

1.13 TREE AND PLANT PROTECTION.
a. All trees and other vegetation which must be removed to perform the Work shall be removed and disposed of by Contractor; however, no trees or cultured plants shall be unnecessarily removed unless their removal is indicated on the Drawings. All trees and plants not removed shall be protected against injury from construction operations. b. Trees considered by Engineer to have any significant effect on construction operations are indicated on the Drawings and those which are to be preserved are so indicated. c. Contractor shall take extra measures to protect trees designated to be preserved, such as erecting barricades, trimming to prevent damage from construction equipment, and installing pipe and other Work by means of hand excavation or tunneling methods. Such trees shall not be endangered by stockpiling excavated material or storing equipment against their trunks.
d. When injuring or removal of trees designated to be preserved cannot be avoided, or when removal and replacement is indicated on the Drawings, each tree injured beyond repair or removed shall be replaced with a similar tree of the nearest size possible. e. All trimming, repair, and replacement of trees and plants shall be performed by qualified nursery workers or horticulturists.

1.14 SECURITY.
a. Contractor shall be responsible for protection of the Site, and all Work, materials, equipment, and existing facilities thereon, against vandals and other unauthorized persons.
b. No claim shall be made against Agency by reason of any act of an employee or trespasser, and Contractor shall make good all damage to Agency’s property resulting from Contractor's failure to provide security measures as specified. c. Security measures shall be at least equal to those usually provided by Agency’s to protect Agency’s existing facilities during normal operation, but shall also include such additional security fencing, barricades, lighting, watchman services, and other measures as required to protect the Site

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 247 ends

1.15 ACCESS ROADS.
a. Contractor shall establish and maintain temporary access roads to various parts of the Site as required to complete the Project. Such roads shall be available for the use of all others performing work or furnishing services in connection with the Project.

1.16 PARKING.
a. Contractor shall provide and maintain suitable parking areas for the use of all workers and others performing Work or furnishing services in connection with the Project, as required to avoid any need for parking personal vehicles where they may interfere w ith public traffic, Agency’s operations, or construction activities.

1.17 NOISE CONTROL.
a. Contractor shall take reasonable measures to avoid unnecessary noise. Such measures shall be appropriate for the normal ambient sound levels in the area during working hours. All construction machinery and vehicles shall be equipped with practical sound - muffling devices and operated in a manner to cause the least noise consistent with efficient performance of the Work.
b. During construction activities on or adjacent to occupied buildings, and when appropriate, Contractor shall erect screens or barriers effective in reducing noise in the building and shall conduct its operations to avoid unnecessary noise which might interfere with the activities of building occupants.

1.18 DUST CONTROL.
a. Contractor shall take reasonable measures to prevent unnecessary dust. Earth surfaces subject to dusting shall be kept moist with water or by application of a chemical dust suppressant. When practicable, dusty materials in piles or in transit shall be covered to prevent blowing dust.
b. Buildings or operating facilities which may be affected adversely by dust shall be adequately protected from dust. Existing or new machinery, motors, instrument panels, or similar equipment shall be protected by suitable dust screens. Proper ventilation shall be included with dust screens.

1.19 TEMPORARY DRAINAGE PROVISIONS.
a. Contractor shall provide for the drainage of storm water and such water as may be applied or discharged on the Site in performance of the Work. Drainage facilities shall be adequate to prevent damage to the Work, the Site, and adjacent property. b. Existing drainage channels and conduits shall be cleaned, enlarged, or supplemented as necessary to carry all increased runoff attributable to Contractor's operations. Dikes shall be constructed as necessary to divert increased runoff from entering adjacen t property (except in natural channels), to protect Agency’s facilities and the Work, and to direct water to drainage channels or conduits. Ponding shall be provided as necessary to prevent downstream flooding.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: February 26, 2024 Document Version: 1.0 Current Update: May 2023

Page 248 ends

1.20 EROSION CONTROL.
a. Contractor shall prevent erosion of soil on the Site and adjacent property resulting from its construction activities. Effective measures shall be initiated prior to the commencement of clearing, grading, excavation, or other operation that will disturb the natural protection.
b. Work shall be scheduled to expose areas subject to erosion for the shortest possible time, and natural vegetation shall be preserved to the greatest extent practicable. Temporary storage and construction buildings shall be located, and construction traffic routed, to minimize erosion. Temporary fast-growing vegetation or other suitable ground cover shall be provided as necessary to control runoff.

1.21 POLLUTION CONTROL.
a. Contractor shall prevent the pollution of drains and watercourses by sanitary wastes, sediment, debris, and other substances resulting from construction activities. No sanitary wastes shall be permitted to enter any drain or watercourse other than sanitary sewers.

No sediment, debris, or other substance shall be permitted to enter sanitary sewers, and reasonable measures shall be taken to prevent such materials from entering any drain or watercourse.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION
Appendix E
CARB Fleet Compliance Certification
Appendix A
City Attorney Approved Version 12/14/2023

DISCLOSURE & SUBMITTAL REQUIREMENT

VEHICLE EMISSION DISCLOSURE & COMPLIANCE REQUIREMENT.

This Project is subject to the following regulation(s) by the California Air Resources Board. In bidding this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all equipment and vehicle emission requirements under this Contract and applicable law in its Bid.

ADVANCED CLEAN FLEETS.

Vehicles with a Gross Vehicle Weight Rating (GVWR) greater than 8,500 lbs. and light -duty package delivery vehicles operated in California may be subject to the California Air Resources Board Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of air pollutants. For more information, please visit the CARB Advanced Clean Fleets webpage at https://ww2.arb.ca.gov/our-work/programs/advanced-clean- fleets.

Bidders utilizing subcontractors shall provide a signed certificate of reported compliance for each listed subcontractor in the space provided in the Proposed Subcontractors form. Bidders, and its subcontractors must be registered as compliant fleet s at the time of bid submittal. In the event that a bidder, or its subcontractors, are exempt from this regulation, the bidder must submit a signed statement attesting to the fact, and to the reason(s) why it is not subject to the High Priority and Federal Fleets Regulation of Title 13, CCR Section 2015 through 2015.6 and the State and Local Government Fleets Regulation of Title 13, CCR Section 2013 through 2013.4.

Failure to certify as a compliant fleet or provide an attestation to an exemption, may render the bid non-responsive.

IN-USE OFF-ROAD DIESEL-FUELED FLEETS.

Any contractor utilizing off highway vehicles or equipment may be subject to compliance with the In-Use Off-Road Diesel-Fueled Fleets Regulation. For more information, please visit the CARB In-Use Off -Road Diesel -Fueled Fleets Regulation webpage at : https://ww2.arb.ca.gov/our- work/programs/use-road-diesel-fueled-fleets-regulation.

Bidders shall submit with its Bid a valid California Air Resources Board certificate of reported compliance. Bidders utilizing subcontractors shall submit the DOORS ID number for each listed subcontractor in the space provided in the Proposed Subcontractors form. Bidders are responsible for including a certificate of reported compliance for each identified subcon tractor.

Failure to submit valid certificates may render the bid non-responsive.

GENERAL COMPLIANCE WITH LAWS.

Contractor will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Contractor, or in any way affect the performance of the Services by Contractor. Contractor will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of Contractor's services with all applicable laws, ordinances and regulations.

Contractor will be aware of the requirements of the Immigration Reform and Control Act of 1986 and will comply with those requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors and consultants whose services are required by this Agreement.

City Attorney Approved Version 12/14/2023

Contractor is aware of the requirements of the emissions reduction regulations being mandated by the California Air Resources Board (“CARB”) and that it will comply with all applicable regulations before commencing the performance of the work and maintain compliance throughout the duration of this Agreement.

CALIFORNIA AIR RESOURCES BOARD.

The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel- Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024, and apply broadly to all self-propelled off-road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at:

https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf

Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

The City of Carlsbad is a Public Works Awarding Body, as that term is defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, valid Certificates of Reported Compliance (“CRC”) for the Bidder’s fleet, and for the fleets of any listed subcontractors (including any applicable leased equipment or vehicles). Bidders must complete and submit the Fleet Compliance Certification, on the form provided. Failure to provide a CRC for the Bidder, and for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.

COMPLIANCE WITH CALIFORNIA AIR RESOURCES BOARD REGULATIONS.

Contractor shall comply, and shall ensure all subcontractors comply, with all applicable requirements of the most current version of the California Air Resources Board (“CARB”) regulations including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”).

Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and subcontractors’ fleet including, without limitation, Certificates o f Reported Compliance (“CRC”), fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City of Carlsbad.

Contractor shall be solely liable for any and all costs associated with complying with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City of Carlsbad , its officials (appointed and elected), officers, and employees from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.

City Attorney Approved Version 12/14/2023
FLEET COMPLIANCE CERTIFICATION.

Bidder hereby acknowledges that they have reviewed the CARB’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to the penalty of perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
□ The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

□ The Fleet is exempt from the Regulation under Section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

□ Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to Section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. , third party correspondence or vendor bids).

□ The Fleet is exempt from the requirements of the Regulation pursuant to Section 2449(i)(4) because this Project has been deemed an “emergency”, as that term is defined in Section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to Section 2449(i)(4).

□ The Fleet does not fall under the Regulation or are otherwise exempt and a detailed reasoning is attached to this certification.

Name of Bidder:

Signature:

Name:

Title:

Date:

Traffic Calming for Park Drive,
Black Rail Road, Plum Tree Road
and Carrillo Way
John Kim, City Traffic Engineer
March 26, 2024

RECOMMENDED ACTIONS
• Adopt resolution approving the plans, specifications and contract documents.
• Authorize the City Clerk to advertise for bids for
implementing the traffic calming plans for Park Drive,
Black Rail Road, Plum Tree Road and Carrillo Way
ITEM 12: TRAFFIC CALMING PLANS
2 TRAFFIC MANAGEMENT PROGRAM
• Adopted in 2001, revised in 2011
• Establishes process to implement traffic
calming on residential streets
ITEM 12: TRAFFIC CALMING PLANS
3 PROJECT LOCATIONS
• Park Drive
• Black Rail Road
• Plum Tree Road
• Carrillo Way
Carrillo Way
Black Rail Road
Park Drive
ITEM 12: TRAFFIC CALMING PLANS
Plum Tree Road
4 QUALIFICATION FOR TRAFFIC CALMING
Street Street limits Critical speed
Park Drive Monroe Street to Tamarack Avenue 32 mph
Black Rail Road Poinsettia Lane to the northern terminus 33 mph Plum Tree Road Hidden Valley Road to Aviara Parkway *29 mph Carrillo Way Rancho Brasado to Rancho Caballo 32 mph
ITEM 12: TRAFFIC CALMING PLANS
*Exception granted by Traffic & Mobility Commission on Oct. 3, 2022 5 NEIGHBORHOOD MEETINGS
Street Street limits Meeting date
Park Drive Monroe Street to Tamarack Avenue Feb. 16, 2023 Black Rail Road Poinsettia Lane to the northern terminus March 16, 2023 Plum Tree Road Hidden Valley Road to Aviara Parkway March 23, 2023 Carrillo Way Rancho Brasado to Rancho Caballo March 30, 2023 ITEM 12: TRAFFIC CALMING PLANS
6 NEIGHBORHOOD MEETINGS
• Overview of the traffic calming program
• Discuss traffic calming strategies
• Receive feedback from residents on
concept plans
• Select preferred plan
ITEM 12: TRAFFIC CALMING PLANS
7 COMMUNITY SUPPORT
• Mail survey to gauge support
• CRTMP requires a return rate of 50%
• A support rate of 67% among all returned
surveys
ITEM 12: TRAFFIC CALMING PLANS
8 MAIL SURVEY RESULTS
ITEM 12: TRAFFIC CALMING PLANS
Street Surveys
mailed out
Surveys
returned
Response
rate
Surveys in
support
Support
rate
Met
support
criteria?
Park Drive 36 24 67% 23 96% YES
Black Rail Road 35 23 66% 23 100% YES
Plum Tree Road 197 120 61% 101 84% YES
Carrillo Way 83 42 51% 31 74% YES
9 TRAFFIC SAFETY & MOBILITY

COMMISSION
• Aug. 7, 2023 – Unanimously supported staff’s
recommendation of traffic calming on Park
Drive, Black Rail Road, Plum Tree Road and
Carrillo Way
ITEM 12: TRAFFIC CALMING PLANS
10 EMERGENCY VEHICLE CONSIDERATIONS
Fire Department review
• Request to reduce the total number of speed cushions on Carrillo Way from
six to four to minimize potential response time.

City staff supported the requested change
• Provides the best balance between reducing speeding in the neighbor
hood and allowing emergency vehicles to pass through with minimal delay.

ITEM 12: TRAFFIC CALMING PLANS
11 ITEM 12: TRAFFIC CALMING PLANS
12 PARK DRIVE
Park Dr
LEGEND
Monroe St
Tamarack Ave
Scott Dr
May Ct

PROPOSED

SPEED CUSHION

EXISTING

ALL-WAY STOP
(320’)
(320’)
(380’)
ITEM 12: TRAFFIC CALMING PLANS
13 BLACK RAIL ROAD
Black Rail Rd
Maritime Dr
LEGEND

EXISTING

TRAFFIC SIGNAL

PROPOSED

SPEED CUSHION
(400’)
(340’)
ITEM 12: TRAFFIC CALMING PLANS
14 PLUM TREE ROAD
Plum Tree Rd
Hidden Valley Rd
Belleflower

Rd
Scrub Jay Ct
Scaup St
Dowitcher Ct
LEGEND

EXISTING

TRAFFIC SIGNAL

EXISTING

ALL-WAY STOP
Poinsettia
Park
Kindercare

PROPOSED

SPEED CUSHION

PROPOSED

CURB EXTENSION & MARKED

CROSSWALK
(340’)
(260’)
(210’)
(300’)

NEXT STEPS
Advertise for bids to construct project
City Council to award contract
Construction
ITEM 12: TRAFFIC CALMING PLANS
16 RECOMMENDED ACTIONS
• Adopt resolution approving the plans, specifications and contract documents.
• Authorize the City Clerk to advertise for bids for
implementing the traffic calming plans for Park Drive,
Black Rail Road, Plum Tree Road and Carrillo Way
ITEM 12: TRAFFIC CALMING PLANS
17 QUESTIONS?
ITEM 12: TRAFFIC CALMING PLANS
18