2024-04-23; City Council; 04; Approval of Plans, Specifications, Contract Documents and Authorization to Advertise for Bids for the Stagecoach Community Garden Project

Carlsbad City Council
April 23, 2024

Document
2024-04-23; City Council; 04; Approval of Plans, Specifications, Contract Documents and Authorization to Advertise for Bids for the Stagecoach Community Garden Project
Meeting
April 23, 2024
Body
Carlsbad City Council
Pages
331
Original file
759 KB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

1.01 WORK COVERED BY CONTRACT DOCUMENTS
a. The Contractor is responsible to obtain all local, state and federal permits and licenses required to perform the Work. Payment for obtaining and complying with permits and licenses including, but not limited to, general construction permits, building permits, grading permits, encroachment permits, haul route permits, excavation permits, drilling permits, water discharge permits, temporary easements, licenses, inspection fees, and Federal, State and local taxes shall be borne by the Contractor and shall be included in prices Bid for Work for which such costs are appurtenant. b. For permits not already obtained by City, the Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, permits required for sewage bypass pumping or discharge; Night Work; overload; blasting or demolition or for any permit related to the operation of equipment used in such Work. c. The Contractor shall obtain and pay for all permits for the disposal of all waste or surplus materials removed from the Project. The cost of the permit(s) shall be included in the price for the Bid items requiring the permits and no additional compensation will be allowed for them.
d. For permits that City has not previously secured, the Contractor shall provide a copy of the permit or license to the Agency prior to performing the Work requiring the permit or license.
e. Contractor shall pay for all fees applicable to Contractor’s operations. f. Contractor shall not begin Work until all permits applicable to the Work are obtained.

Permits shall be maintained in valid status until acceptance of the Work by the Agency. g. The Contractor shall pay all business taxes or license fees that are required for the Work.

1. To the extent that there is a change in the type or cost of any permits, fees, licenses, or inspections after Contract award, there shall be an equitable adjustment in the Contract Price on account of such change under the Extra Work provisions.

2. The Contractor shall comply with and give notices required by Applicable Laws.

The Contractor is not entitled to damages or additional payment for delays attributable to the acquisition of permits.

3. The Contractor shall pay the Agency for regulatory fees, fines, or penalties imposed on the Agency arising from the Contractor’s failure to complete the Work in accordance with the Contract Documents.
h. The Contractor shall obtain, pay for, and comply with required permits, licenses, work permits, and authorizations from appropriate agencies, including the following:

1. Licenses

01 41 26 PERMIT REQUIREMENTS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
219
i. Before submitting Bids, Contractors shall be licensed in accordance with provisions of Chapter 9, Division 3, of the Business and Professions Code. ii. City of Carlsbad Business License.

2. Other permits
i. City Haul Route Permit
ii. Traffic Control Plan Permit
iii. Grading Permit
iv. Right of Way Permit
i. The Agency will obtain for the Contractor, the following:

1. CEQA Notice of Exemption

1.02 HAUL ROUTE PERMIT
a. The Contractor shall prepare a Project specific haul route plan detailing the streets intended for use in delivery of materials and import and export of soil. Contractor will be limited to the routes approved by the City of Carlsbad according to the approved haul route plan contained in the permit.

1.03 TRAFFIC CONTROL PLANS
a. The Contractor shall prepare Project specific traffic control plans, and haul route plan and use such plans to obtain a traffic control permit from the City of Carlsbad Development Services Department.

1.05 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)/ GENERAL PERMIT A. I Water Pollution Prevention. The Contractor shall plan for and implement temporary construction BMPs to mitigate the water quality impacts of land disturbance and non - storm water discharges related to construction activities in accordance the Agency’s current Municipal Stormwater Permit and Carlsbad Municipal Code Chapter 15.12. BMPs are the schedules of activities, prohibitions of practices, maintenance procedures and other management practices employed during construction activities to prevent or reduce pollution of bodies of water protected by the federal Clean Water Act (33 U.S.C. § 1251 et seq. ) and the state Porter -Cologne Water Quality Control Act (Water Code , § 13000 et seq.), which include oceans, lagoons, lakes, streams and other sensitive water bodies and water courses. Construction BMPs also include physical devices and structural construction control measures designed to prevent soil erosion from occurring on the Work Site, or that are designed to prevent sediment from leaving the Work Site, both of which are referred to hereafter as “Water Pollution .” BMPs are also intended to protect the health, safety and welfare of the public and to prevent damage to adjoining public and private property resulting from construction activities.

B. Pollution prevention practices and the minimum BMPs are required during all 12 months of the year. BMPs and other erosion control practices must be implemented as the most important “first line of defense.” The Agency has adopted the CASQA ‘Stormwater Best Management Practices Handbook: Construction,’ latest edition, as its preferred source for adopting construction BMPs. All BMPs must correspond to the BMP Fact Sheets included in the CASQA Construction Handbook. With the approval of the Engineer, or designee, the Agency may accept comparable BMPs from reputable alternative sources.

01 41 26 PERMIT REQUIREMENTS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
220
As used in this section, “Engineer” shall have the same meaning as “Construction Manager.”
C. The Contractor shall utilize the Agency’s Tier 1 or Tier 2 SWPPP templates and include all applicable elements provided in the template. The SWPPP templates are available on the Agency’s website at [ PROJECT ENGINEER insert website address here]. Tier 1 and Tier 2 SWPPP templates include standard storm water prevention construction notes, a Project information block, a Storm Water Compliance Statement, Agency approval block and a BMP Checklist Table. The BMP Checklist Table is intended to help the Contractor select appropriate BMPs best suited to the Project and the Work. Additionally, the SWPPP shall include a Site plan showing the proposed Project Site and depicting the areas of proposed construction and proposed locations of construction BMPs. The Tier 1 and Tier 2 SWPPP plans shall be submitted as additional sheets to the construction plan set.

D. The Engineer may require Contractor to adopt additional BMPs if the Engineer determines the selected BMP(s) are ineffective or incapable of preventing Water Pollution from escaping the Work site. Tier 1 and Tier 2 SWPPPs must be combined with proper and timely installation of the BMPs, thor ough and frequent inspections, maintenance, and documentation. The Contractor shall ensure that the selected BMPs are appropriately incorporated into the Site design and, if required by the Engineer, must employ a qualified professional to ensure proper installation and maintenance of the BMPs.

E. The Engineer may suspend the Work, consistent with Supplemental General Provisions Section 6 -6, at the Contractor’s cost, that create Water Pollution or otherwise violate water quality standards required by the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and the state Porter-Cologne Water Quality Control Act (Water Code , § 13000 et seq.) if the Engineer determines that the Contractor has failed to satisfy all requirements of this section. If the Contractor violates any provisions of this subsection, or if Water Pollution occurs in the Work Site for any reason, the Contractor shall immediately notify the Engineer.

F. The Contractor shall immediately notify the Agency if there is a non-stormwater discharge to the storm drain conveyance system resulting from the Work or Project-related activities. In addition, the Contractor shall, within 24 hours, submit a written report to the Engineer describing the incident and corrective actions taken. If for any reason the Engineer detects Water Pollution, before notification by the Contractor, this written report shall also include an explanation of why the Contractor had not timely notified the Engineer.

G. Implementation Costs. Preparation, implementation and management of Water Pollution prevention activities are incidental to the items of Work and Agency shall not make additional payment to Contractor for these costs.

01 41 26 PERMIT REQUIREMENTS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
221
Annual Report Certification Agency Project Engineer/MPM. No later than September 1st
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)

END OF SECTION

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
222
01 50 00 TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL

1.03 WATER
a. All water required for and in connection with the Work to be performed shall be provided by and at the expense of Contractor. No separate payment for water used or required will be made and all costs in connection with the water shall be included in the Bid. b. All water required for and in connection with the Work to be performed shall be furnished by and at the expense of Contractor through meters installed on hydrants. Contractor shall supply all necessary tools, hose, and pipe, or otherwise transport the water to the point of use, and shall make its own arrangements with the appropriate water department as to the amount of water required and the time when the water will be needed. Indiscriminate use of water so furnished will not be permitted. Special hydrant wrenches shall be used for opening and closing fire hydrants. In no case shall pipe wrenches be used for this purpose.
c.
d.

1.04 POWER
a. Contractor shall provide all power for heating, lighting, operation of Contractor's plant or equipment, or for any other use by Contractor. Temporary heat and lighting shall be maintained until the Work is accepted.
b. Construction Operations. Each Contractor shall provide all power for operation of its plant and equipment, or for any other use, except building heating and lighting. All building heating and lighting shall be provided under Contract.
c. These provisions shall not be construed as a guarantee by Agency of the uninterrupted continuation of power, and interruptions beyond the control of Agency shall not be reason for claims for additional costs nor for extensions of time. Contractor shall provide, at no additional cost to Agency, any necessary power required for prosecution of the Work during such interruptions.
d. XX

1.05 SANITARY FACILITIES
a. Contractor shall furnish temporary sanitary facilities at the Site, as provided in the Contract, for the needs of all construction workers and others performing Work or furnishing services on the Project.
b. Sanitary facilities shall be of reasonable capa City, properly maintained throughout the construction period, and obscured from public view to the greatest practical extent. If toilets of the chemically treated type are used, at least 1 toilet will be furnished for each 20 persons. Contractor shall enforce the use of such sanitary facilities by all personnel at the Site.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
223

1.07 CONSTRUCTION AIDS
a. Contractor shall furnish, install, maintain, and operate all construction aids required by it and its SubContractors in the performance of the Work, except as otherwise provided in the Contract.
b. Contractor under Contract shall provide construction aids necessary for the performance of Work by other Contractors on the Project. Such construction aids shall be suitable for conditions encountered and shall include:

1. Elevators and hoists

2. Cranes

3. Temporary enclosures

4. Swing staging

5. Scaffolding

6. Temporary stairs
c. Construction aids shall be furnished without charge to the other Contractors, and all necessary erection, maintenance, and operating personnel shall be included. In the event of conflict, the Contractor furnishing the equipment shall determine priorities in the best interest of the Project.

1.08 MAINTENANCE OF TRAFFIC
a. Contractor shall conduct its Work to interfere as little as possible with public travel, whether vehicular or pedestrian. Whenever it is necessary to cross, obstruct, or close roads, driveways, and walks, whether public or private, Contractor shall provide and maintain suitable and safe bridges, detours, or other temporary expedients for the accommodation of public and private travel, and shall give reasonable notice to owners of private drives before interfering with them. Such maintenance of traffic will not be required when Contractor has obtained permission from the Agency and tenant of private property, or from the authority having jurisdiction over public property involved, to obstruct traffic at the designated point.
b. Detours. Where required by the authority having jurisdiction thereover that traffic be maintained over any Construction Work in a public street, road, or highway, and the traffic cannot be maintained on the alignment of the original roadbed or pavement, Contractor shall, at its own expense, construct and maintain a detour around the Construction Work. Each detour shall include a bridge across the pipe trench and all necessary barricades, guardrails, approaches, lights, signals, signs, and other devices and precautions necessary for protection of the Work and safety of the public.

1.09 BARRICADES AND LIGHTS
a. All streets, roads, highways, and other public thoroughfares which are closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. Barricades shall be located at the nearest intersecting public highway or st reet on each side of the blocked section.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
224
b. All open trenches and other excavations shall have suitable barricades, signs, and lights to provide adequate protection to the public. Obstructions, such as material piles and equipment, shall be provided with similar warning signs and lights. hAll barricades and obstructions shall be illuminated with warning lights from sunset to sunrise. Material storage and conduct of the Work on or alongside public streets and highways shall cause the minimum obstruction and inconvenience to the traveling public. c. All barricades, signs, lights, and other protective devices shall be installed and maintained in conformity with applicable statutory requirements and, where within railroad and highway rights-of-way, as required by the authority having jurisdiction thereover.tXX

1.10 FENCES
a. All existing fences affected by the Work shall be maintained by Contractor until completion of the Work. Fences which interfere with construction operations shall not be relocated or dismantled until written permission is obtained from the owner of the fence, and the period the fence may be left relocated or dismantled has been agreed upon.

Where fences must be maintained across the construction easement, adequate gates shall be installed. Gates shall be kept closed and locked at all times when not in use. hOn completion of the Work across any tract of land, Contractor shall restore all fences to their original or to a better condition and to their original locations. b. XX

1.11 PROTECTION OF PUBLIC AND PRIVATE PROPERTY
a. Contractor shall protect, shore, brace, support, and maintain all underground pipes, conduits, drains, and other underground construction uncovered or otherwise affected by its construction operations. All pavement, surfacing, driveways, curbs, walks, buildings, utility poles, guy wires, fences, and other surface structures affected by construction operations, together with all sod and shrubs in yards, parkways, and medians, shall be restored to their original condition, whether within or outside the easement. All replacements shall be made with new materials.
b. No trees shall be removed outside the permanent easement, except where authorized by the Engineer or Consulting Engineer. Whenever practicable, Contractor shall tunnel beneath trees in yards and parking lots when on or near the line of trench. Hand excavation shall be employed as necessary to prevent injury to trees. Trees left standing shall be adequately protected against damage from construction operations.eContractor shall be responsible for all damage to streets, roads, highways, shoulders, ditches, embankments, culverts, bridges, and other public or private property, regardless of location or character, which may be caused by transporting equipment, materials, or workers to or from the Work Site or any part of it, whether by Contractor or its SubContractors. Contractor shall make satisfactory and acceptable arrangements with the owner of, or the agency or authority having jurisdiction over, the damaged property concerning its repair or replacement or payment of costs incurred in connection with the damage.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
225
c. All fire hydrants and water control valves shall be kept free from obstruction and available for use at all times.

1.12 DAMAGE TO EXISTING PROPERTY
a. Contractor will be held responsible for any damage to existing structures, Work, materials, or equipment because of its operations and shall repair or replace any damaged structures, Work, materials, or equipment to the satisfaction of, and at no additional cost to, Agency.
b. Contractor shall protect all existing structures and property from damage and shall provide bracing, shoring, or other work necessary for such protection. c. Contractor shall be responsible for all damage to streets, roads, parking lots, curbs, sidewalks, highways, shoulders, ditches, embankments, culverts, bridges, or other public or private property, which may be caused by transporting equipment, materials, or workers to or from the Work Site. Contractor shall make satisfactory and acceptable arrangements with the agency having jurisdiction over the damaged property concerning its repair or replacement.

1.13 TREE AND PLANT PROTECTION
a. All trees and other vegetation which must be removed to perform the Work shall be removed and disposed of by Contractor; however, no trees or cultured plants shall be unnecessarily removed unless their removal is indicated on the Drawings. All trees and plants not removed shall be protected against injury from construction operations. b. Trees considered by Engineer to have any significant effect on construction operations are indicated on the Drawings and those which are to be preserved are so indicated. c. Contractor shall take extra measures to protect trees designated to be preserved, such as erecting barricades, trimming to prevent damage from construction equipment, and installing pipe and other Work by means of hand excavation or tunneling methods. Such trees sha ll not be endangered by stockpiling excavated material or storing equipment against their trunks.tWhen injuring or removal of trees designated to be preserved cannot be avoided, or when removal and replacement is indicated on the Drawings, each tree injured beyond repair or removed shall be replaced with a similar tree of the nearest size possible.
d. All trimming, repair, and replacement of trees and plants shall be performed by qualified nursery workers or horticulturists. Prior written workplan will be provided to Engineer for approval prior to the commencement of any of the aforementioned work.

1.14 SECURITY
a. Contractor shall be responsible for protection of the Site, and all Work, materials, equipment, and existing facilities thereon, against vandals and other unauthorized persons.

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
226
b. No claim shall be made against Agency by reason of any act of an employee or trespasser, and Contractor shall make good all damage to Agency’s property resulting from Contractor's failure to provide security measures as specified. c. Security measures shall be at least equal to those usually provided by Agency’s to protect Agency’s existing facilities during normal operation, but shall also include such additional security fencing, barricades, lighting, watchman services, and other measures as required to protect the Site. t

1.15 ACCESS ROADS
a. Contractor shall establish and maintain temporary access roads to various parts of the Site as required to complete the Project. Such roads shall be available for the use of all others performing work or furnishing services in connection with the Project. b. XX

1.16 PARKING
a. Contractor shall provide and maintain suitable parking areas for the use of all workers and others performing Work or furnishing services in connection with the Project, as required to avoid any need for parking personal vehicles where they may interfere with public traffic, Agency’s operations, or construction activities.

1.17 NOISE CONTROL
a. Contractor shall take reasonable measures to avoid unnecessary noise. Such measures shall be appropriate for the normal ambient sound levels in the area during Working Hours. All construction machinery and vehicles shall be equipped with practical sound - muffling devices, and operated in a manner to cause the least noise consistent with efficient performance of the Work.
b. During construction activities on or adjacent to occupied buildings, and when appropriate, Contractor shall erect screens or barriers effective in reducing noise in the building and shall conduct its operations to avoid unnecessary noise which might interfere with the activities of building occupants.

1.18 DUST CONTROL
a. Contractor shall take reasonable measures to prevent unnecessary dust. Earth surfaces subject to dusting shall be kept moist with water or by application of a chemical dust suppressant. When practicable, dusty materials in piles or in transit shall be covered to prevent blowing dust.
b. Buildings or operating facilities which may be affected adversely by dust shall be adequately protected from dust. Existing or new machinery, motors, instrument panels, or similar equipment shall be protected by suitable dust screens. Proper ventilation shall be included with dust screens.s

01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: April 15, 2024 Document Version: 1.0 Current Update: May 2023
227

1.19 TEMPORARY DRAINAGE PROVISIONS
a. Contractor shall provide for the drainage of storm water and such water as may be applied or discharged on the Site in performance of the Work. Drainage facilities shall be adequate to prevent damage to the Work, the Site, and adjacent property. b. Existing drainage channels and conduits shall be cleaned, enlarged, or supplemented as necessary to carry all increased runoff attributable to Contractor's operations. Dikes shall be constructed as necessary to divert increased runoff from entering adjacent property (except in natural channels), to protect Agency’s facilities and the Work, and to direct water to drainage channels or conduits. Ponding shall be provided as necessary to prevent downstream flooding.

1.20 EROSION CONTROL
a. Contractor shall prevent erosion of soil on the Site and adjacent property resulting from its construction activities. Effective measures shall be initiated prior to the commencement of clearing, grading, excavation, or other operation that will disturb the natural protection.
b. Work shall be scheduled to expose areas subject to erosion for the shortest possible time, and natural vegetation shall be preserved to the greatest extent practicable. Temporary storage and construction buildings shall be located, and construction traffic routed, to minimize erosion. Temporary fast-growing vegetation or other suitable ground cover shall be provided as necessary to control runoff.n1.21 POLLUTION CONTROL a. Contractor shall prevent the pollution of drains and watercourses by sanitary wastes, sediment, debris, and other substances resulting from construction activities. No sanitary wastes shall be permitted to enter any drain or watercourse other than sanitary sewers.

No sediment, debris, or other substance shall be permitted to enter sanitary sewers, and reasonable measures shall be taken to prevent such materials from entering any drain or watercourse.e
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)

END OF SECTION

STAGECOACH

COMMUNITY GARDEN

TECHNICAL SPECIFICATIONS
100% CONSTRUCTION DOCUMENTS SUBMITTAL

CITY OF CARLSBAD

Prepared by:

Rick Engineering
5620 Friars Rd, San Diego, CA 92110
April 16, 2024

STAGECOACH COMMUNITY GARDEN

TECHNICAL SPECIFICATIONS TABLE CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS
01 55 00 MOBILIZATION & DEMOBILIZATION

DIVISION 2 – EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION

DIVISION 3 – NOT USED

DIVISION 4 – MASONRY
04 22 00 CONCRETE MASONRY UNIT

DIVISION 5 – NOT USED

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES
06 44 00 WOOD FOR PLANTER BOXES, GARDEN FENCE AND G ATES

DIVISION 7 to 8 – NOT USED
DIVISION 9 – FINISHES
09 93 00 STAINING AND TRANSPARENT FINISHING

DIVISION 10 TO 12 – NOT USED

DIVISION 13 – SPECIAL CONSTRUCTION
13 31 23 TENSIONED FABRIC STRUCTURES

DIVISION 14 to 30 – NOT USED

DIVISION 31 – EARTHWORK
31 20 00 EARTH MOVING

DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16
32 13 13
32 14 00
32 15 40
32 19 00
32 31 13
32 84 00

GRIND OVERLAY, SLURRY SEAL & PVC PIPE

CONCRETE PAVING

UNIT PAVING

DECOMPOSED GRANITE

SITE FURNISHINGS

GALVANIZED CHAIN LINK FENCE

IRRIGATION SYSTEM

DIVISION 33 to 46 – NOT USED

STAGECOACH PARK COMMUNITY GARDEN 01 55 00 - 1

MOBILIZATION AND DEMOBILIZATION

SECTION 01 55 00

MOBILIZATION & DEMOBILIZATION

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Mobilization and Demobilization.

2. Site Security and Access.

3. Contractor Staging and Parking.

1.2 REFERENCE STANDARDS

A. All references made within these technical provisions to the various standards, requirements and elements shown in Section 1.1.A shall be limited to construction materials, methods, and all work incidental to the item of work only.

1.3 SUBMITTALS

A. Prior to the start of construction, the Contractor shall videotape/ photo log the conditions of the parking lot and project area to be used for hauling demolition materials and delivery of the materials. The videotape/ log shall be prepared by the Contractor and submitted to the City.

B. Catalog Cuts: Submit for each pre-manufactured item.

C. Shop Drawings: Submit shop drawings when required on the plans.

1.4 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Materials and equipment shall be delivered and unloaded at the job site in such a manner that no damage occurs to the product during hauling, handling, or unloading, storage and installation.

PART 2 – PRODUCTS

2.1 No products.

PART 3 – EXECUTION

3.1 MOBILIZATION

A. This item shall consist of payment for mobilization, demobilization, preparatory work, and staging area development and is intended to compensate the Contractor for operations

STAGECOACH PARK COMMUNITY GARDEN 01 55 00 - 2

MOBILIZATION AND DEMOBILIZATION
required to start up and close down the project, including but not limited to:

1. Provide the required submittals after received Notice of Award

2. Obtain any required permits

3. Provide a temporary construction fence

4. Establishment of Contractor Yard or Staging Area

5. Movement of equipment

6. Movement of personnel

7. Supplies

8. Supplies and incidentals for the project site

9. Payment of Bonds and Insurance for the project

10. Utilities required for the Site

11. All other work required to be performed prior to the start of operations and construction.

12. Securing of the Contractor Yard or Staging Area.

13. All temporary chain-link fencing and gate(s) as required on this Project for the safety of the public, security of the staging area and Contractor Office.

14. Demobilization

15. Coordination with Others

16. Shared haul routes

17. Clean up

18. Project close out

B. All facilities, plants and equipment which are established at or brought to the work site by the Contractor shall conform to the provisions of this Section unless the Representative specifically directs otherwise in writing. The Contractor shall be solely responsible for the adequacy of all plants, facilities, and equipment.

3.2 SITE SECURITY AND ACCESS

A. Access to the Site

1. The Contractor's access to the site shall be as shown on the Drawings. The Contractor

STAGECOACH PARK COMMUNITY GARDEN 01 55 00 - 3

MOBILIZATION AND DEMOBILIZATION
shall maintain traffic control to and from the project area. The Contractor shall immediately clean any debris deposited along any route used as a result of its construction traffic.

3.3 CONTRACTOR HAUL ROUTES, STAGING AND PARKING

A. On-Site staging and parking shall be located by the Contractor at the Contractor's expense to accommodate project construction phasing, as necessary. Initial setup and maintenance of the Contractor staging and parking area shall be included in Mobilization.

B. Any damage along haul routes, and within staging and parking areas shall be repaired (to the condition prior to the Contractor's use) by the Contractor prior to the completion of the project for which the route and area is used..

END OF SECTION 01 55 00

02 41 19 - 1

STAGECOACH PARK COMMUNITY GARDEN

SELECTIVE DEMOLITION

SECTION 02 41 19

SELECTIVE DEMOLITION
PART 1 - GENERAL

1.1 SUMMARY
A. The Work of this Section Includes:

1. Demolition and removal of selected portions of exterior site elements.

2. Removal of existing items.

B. Related Requirements:

Greenbook Standard Specifications, 2021 Edition.

1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to the Owner as indicated.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage; prepare for reuse; and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed.

1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes the property of the Contractor.

1.4 COORDINATION
A. Arrange a selective demolition schedule so as not to interfere with the Owner's operations.

1.5 PREINSTALLATION MEETINGS
A. Pre-demolition Conference: Conduct conference at the project site,3420 Camino de los Coches, Carlsbad, CA.

1. Inspect and discuss the condition of construction to be selectively demolished.

2. Review areas where existing construction is to remain and require protection.

02 41 19 - 2

STAGECOACH PARK COMMUNITY GARDEN

SELECTIVE DEMOLITION

3. Review and finalize protection requirements.

4. Review storage, protection, and accounting for items to be removed and protected in place.

1.6 FIELD CONDITIONS
A. The owner will not occupy portions of the building immediately adjacent to the selective demolition area.

B. Conditions existing at the time of inspection for bidding purposes will be maintained by the Owner as far as practical.

C. Notify the Landscape Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials:

1. It is not expected that hazardous materials will be encountered in the Work. a. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify the Landscape Architect and Owner. Hazardous materials will be removed by the Owner under a separate contract.

E. On-site sale of removed items or materials is not permitted.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing conditions . Owner does not guarantee that existing conditions are the same as those indicated in Project Record Documents.

C. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs

02 41 19 - 3

STAGECOACH PARK COMMUNITY GARDEN

SELECTIVE DEMOLITION

or video.

1. Inventory and record the condition of items to be removed. Photograph or video conditions that might be misconstrued as damage caused by removal.

2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.

3.2 PREPARATION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.

3.3 UTILITY SERVICES AND BUILDING SYSTEMS
A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated utilities when requested by the Contractor.

2. Arrange to shut off utilities with utility companies.

3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within the limitations of governing regulations and as follows:

B. Site Access and Temporary Controls: Conduct selective demolition and debris -removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS A. Concrete:

1. Demolish in small sections. Using a power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at the perimeter of areas being demolished, cut reinforcement, and then remove the remainder of the concrete. Neatly trim openings to the dimensions indicated.

2. Demolish in sections. Cut concrete full depth at junctures with construction to remain and

02 41 19 - 4

STAGECOACH PARK COMMUNITY GARDEN

SELECTIVE DEMOLITION

at regular intervals using a power-driven saw, and then remove concrete between saw cuts.

B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using a power-driven saw, and then remove masonry between saw cuts.

C. Concrete Slabs-on-Grade: Saw-cut perimeter of the area to be demolished, and then broken up and removed.

3.6 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from the Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

3.7 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 02 41 19

04 22 00 - 1

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE MASONRY UNIT

SECTION 04 22 00

CONCRETE MASONRY UNIT
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

Concrete Masonry Units
B. Related Requirements:

Greenbook Standard Specifications, 2021 Edition.

1.2 DEFINITIONS
A. CMU(s): Concrete masonry unit(s).

B. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.

C. Exposed: Weather-exposed side of a constructed wall.

1.3 SUBMITTALS
A. Product Data:

1. For CMU product.

B. Samples for Initial Selection:

1. Split face CMU, color per plans.

1.4 QUALITY ASSURANCE
A. Testing Agency Qualifications: Qualified in accordance with ASTM C1093 for testing indicated.

1.5 DELIVERY, STORAGE, AND HANDLING
A. Store masonry units on elevated platforms in a dry location. If units are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied. If units become wet, do not install until they are dry.

04 22 00 - 2

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE MASONRY UNIT

B. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.

C. Store aggregates where grading and other required characteristics can be maintained, and contamination avoided.

D. Store masonry accessories, including metal items, to prevent corrosion and accumulation of dirt and oil.

PART 2 - PRODUCTS

2.1 CONCRETE UNIT MASONRY, GENERAL
A. Masonry Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

B. Defective Units: Referenced masonry unit standards may allow a certain percentage of units to contain chips, cracks, or other defects exceeding limits stated. Do not use units where such defects are exposed in the completed Work.

2.2 MORTAR AND GROUT MATERIALS
A. Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

2.3 REINFORCEMENT
A. Uncoated-Steel Reinforcing Bars: ASTM A615/A615M or ASTM A996/A996M.

B. Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

2.4 MORTAR AND GROUT MIXES
A. Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

04 22 00 - 3

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE MASONRY UNIT

3.2 INSTALLATION, GENERAL
A. Standards: Comply with Greenbook Standard Specifications, 2021 Edition.

B. Use full-size units without cutting if possible. If cutting is required to provide a continuous pattern or to fit adjoining construction, cut units with motor-driven saws; provide clean, sharp, unchipped edges. Allow units to dry before laying unless wetting of units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.

C. Exposed Masonry: Mix units to produce uniform blend of colors and textures.

D. Where existing masonry occurs, match coursing, bonding, color, and texture of existing masonry.

E. Masonry Protection: Protect completed masonry and masonry not being worked on in the following manner.

1. 40 to 32 Deg F (4 to 0 Deg C): Protect masonry from rain for at least 24 hours by covering it with weather-resistive membrane.

3.3 CONTROL JOINTS
A. General: Install control joint materials in CMUs as masonry progresses. Do not allow materials to span control joints without provision to allow for in-plane wall or partition movement.

B. Locate control joints per Greenbook Standard Specifications, 2021 Edition.

3.4 FIELD QUALITY CONTROL
A. Testing and Inspecting: Owner will engage special inspectors to perform tests and inspections and prepare reports. Allow inspectors access to work areas as needed to perform tests and inspections. Retesting of materials that fail to comply with specified r equirements is done at the Contractor's expense.

3.5 REPAIRING, POINTING, AND CLEANING
A. Remove and replace masonry units that are loose, chipped, broken, stained, or otherwise damaged or that do not match adjoining units. Install new units to match adjoining units; install in fresh mortar, pointed to eliminate evidence of replacement.

B. Pointing: During the tooling of joints, enlarge voids and holes, except weep holes, and completely fill with mortar. Point up joints, including corners, openings, and adjacent construction, to provide a neat, uniform appearance. Prepare joints for sealant application, where indicated.

C. In-Progress Cleaning: Clean unit masonry as Work progresses by dry brushing to remove mortar fins and smears before tooling joints.

D. Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows:

04 22 00 - 4

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE MASONRY UNIT

1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels.

2. Wet wall surfaces with water before applying cleaners; remove cleaners promptly by rinsing surfaces thoroughly with clear water.

3.6 MASONRY WASTE DISPOSAL
A. Salvageable Materials: Unless otherwise indicated, excess masonry materials are Contractor's property. At completion of unit masonry work, remove from Project site.

END OF SECTION 04 22 00

06 44 00 - 1

STAGECOACH PARK COMMUNITY GARDEN

WOOD FOR PLANTER BOXES, GARDEN FENCE AND GATES

SECTION 06 44 00

WOOD FOR PLANTER BOXES, GARDEN FENCE AND GATES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Redwood – Clear all Heart

1.2 REFERENCE STANDARDS

Redwood Garden Grade Merchantable Heart

1.3 SUBMITTALS

A. Product Data: Provide manufacturer's standard catalog data for specified products demonstrating compliance with referenced standards.

B. Shop Drawings: Submit Shop Drawings for fabrication and installation.

PART 2- PRODUCTS

2.1 PRESSURE-TREATED WOOD

A. Kiln-dry material after treatment to a maximum moisture content of 19 percent.

B. Mark each treated item with treatment quality mark of an inspection agency approved by the American Lumber Standards Committee Board of Review.

C. All treated wood shown on the drawings shall be Redwood Garden Grade Merchantable Heart.

06 44 00 - 2

STAGECOACH PARK COMMUNITY GARDEN

WOOD FOR PLANTER BOXES, GARDEN FENCE AND GATES
PART 3- EXECUTION

3.1 INSTALLATION

A. Set lumber to required levels and lines, with members plumb, true to line, cut, and fitted. Fit lumber to other construction; scribe and cope as needed for accurate fit. Locate furring, nailers, blocking, and similar supports to comply with requirements for attaching other construction.

B. Securely attach lumber to the substrate by anchoring and fastening as indicated on the plans.

C. Fastening Methods: Use fasteners of appropriate type and length per plan and detail. Predrill members when necessary to avoid splitting wood.

END OF SECTION 06 44 00

STAGECOACH PARK COMMUNITY GARDEN

STAINING AND TRANSPARENT FINISHING

09 93 00 - 1

SECTION 09 93 00

STAINING AND TRANSPARENT FINISHING
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Primers

2. Wood Stains
B. Related Requirements:

1. Comply with Greenbook Standard Specifications, 2021 Edition.

1.2 ACTION SUBMITTALS
A. Product Data:

1. For each type of product.

2. Include preparation requirements and application instructions.

B. Samples for Initial Selection: Manufacturer's standard color sheets, showing full range of available colors for each type of exposed finish.

C. Samples for Verification: Sample for each type of finish system and in each color and gloss of finish required on representative samples of actual wood substrates.

1. Size: 8 inches square

2. Apply coats on Samples in steps to show each coat required for system.

3. Label each coat of each Sample.

4. Label each Sample for location and application area.

D. Product List: Cross-reference to finish system and locations of application areas. Use same designations indicated on Drawings and in schedules. Include color designations.

1.3 MAINTENANCE MATERIAL SUBMITTALS
A. Extra Stock Material: Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Stains and Transparent Finishes: 1 gallon of each material and color applied.

STAGECOACH PARK COMMUNITY GARDEN

STAINING AND TRANSPARENT FINISHING

09 93 00 - 2

1.4 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 degrees F.

1. Maintain containers in clean condition, free of foreign materials and residue.

2. Remove rags and waste from storage areas daily.

1.5 FIELD CONDITIONS
A. Apply finishes only when temperature of surfaces to be finished and ambient air temperatures are between 50- and 95-degrees F.

B. Do not apply finishes when relative humidity exceeds 85 percent, at temperatures of less than 5 degrees F above the dew point, or to damp or wet surfaces.

C. Do not apply exterior finishes in snow, rain, fog, or mist.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS
A. Source: Obtain each coating product (including penetrative sealer) from a single source from a single manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Maximum Moisture Content of Exterior Wood Substrates: 15 percent, when measured with an electronic moisture meter.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Proceed with finish application only after unsatisfactory conditions have been corrected.

1. Beginning finish application constitutes Contractor's acceptance of substrates and conditions.

3.2 PREPARATION
A. Exterior Wood Substrates:

STAGECOACH PARK COMMUNITY GARDEN

STAINING AND TRANSPARENT FINISHING

09 93 00 - 3

1. Scrape and clean knots, and apply coat of knot sealer before applying primer.

2. Prime edges, ends, faces, undersides, and backsides of wood. a. For solid hide stained wood, stain edges and ends after priming. b. For varnish-coated stained wood, stain edges and ends and prime with varnish.

Prime undersides and backsides with varnish.

3. Countersink steel nails, if used, and fill with putty or plastic wood filler tinted to final color. Sand smooth when dried.

3.3 APPLICATION
A. Apply finishes according to the manufacturer’s written instructions.

1. Use applicators and techniques suited for finish and substrate indicated.

2. Finish surfaces behind movable equipment and furniture same as similar exposed surfaces.

3. Do not apply finishes over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

B. Apply finishes to produce surface films without cloudiness, holidays, lap marks, brush marks, runs, ropiness, or other surface imperfections.

3.4 CLEANING AND PROTECTION
A. At the end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

B. After completing finish application, clean spattered surfaces. Remove spattered materials by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

C. Protect work of other trades against damage from finish application. Correct damage by cleaning, repairing, replacing, and refinishing, as approved by Landscape Architect, and leave in an undamaged condition.

D. At completion of construction activities of other trades, touch up and restore damaged or defaced finished wood surfaces.

3.5 EXTERIOR WOOD-FINISH-SYSTEM SCHEDULE
A. Wood Substrates, Wood Trim, Wood Gates, Wood Board Siding and Wood Fences:

1. Solid-Color, Water-Based Stain System
a. Prime Coat: Primer, alkyd for exterior wood.
b. Intermediate Coat: Stain, exterior, water based, solid hide, matching topcoat. c. Topcoat: Stain, exterior, and water based.
d. Sealer

STAGECOACH PARK COMMUNITY GARDEN

STAINING AND TRANSPARENT FINISHING

09 93 00 - 4

END OF SECTION 09 93 00

13 31 23 - 1

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES
SECTION 13 31 23

TENSIONED FABRIC STRUCTURES

PART 1 – GENERAL

1.1 RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification Sections apply to this section.

1.2 SUMMARY
The shade structure contractor shall be responsible for the design, engineering, fabrication, supply, and installation of the work specified herein. The intent of this specification is to have one single contractor to be responsible for the above functions.

1.3 REFERENCES

A. The Shade Structures must comply with the latest revision of the applicable codes and regulations including the International Building Code (IBC) 2012.

B. American Society of Testing Materials (ASTM).

C. American Welding Society: Structural Welding Code AWS D1.1- AWS Structural Welding Code-Steel.

1.4 SUBMITTALS

A. Provide proof of five (5) installed reference sites with structures of similar scope of project and installation that are engineered to IBC specifications. Include in the reference list the structure dimensions with the installation date and project location.

B. Provide a minimum of 5 fabric samples to demonstrate fabric color range and 5 powder-coated paint color chip selections.

1.5 QUALITY ASSURANCE

A. A single shade structure contractor shall design, engineer, and manufacture the shade structure(s).

B. All bidders shall have at least 15 years of experience in the design, engineering, manufacturing, and installation of shade structures.

C. All bidders shall engineer to IBC 2012 requirements with a similar scope.

D. The shade structure contractor shall have a Corporate Quality Control program and manual describing their complete quality assurance program.

13 31 23 - 2

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES

1.6 PROJECT CONDITIONS

Field Measurements: Verify layout information for the shade structure(s) shown on the project drawings in relation to the property survey and existing structures and verify locations by field measurements prior to construction for the shade structures.

1.7 WARRANTY

A. The successful bidder shall provide a 12-month warranty on all labor and materials.

B. A supplemental limited warranty from the manufacturer shall be provided for 20 years Non-Prorated against the Structural Integrity of the steel components and 10 years Prorated on the fabric canopy(s).

PART 2 – PRODUCTS

2.1 GENERAL

A. Scope

1. Quantity to be two (2) triangular shade sails, overall dimensions of shade sails are 22’ x 13’ x 25’-7”.

2. Column height to be 8’ to 10’. See plans for clarification.

B. Manufacturer

The proposed shade structure(s) to be manufactured by Superior Recreational Products Shade Division, also recognized as (SRP Shade or Superior Shade) or approved equal, and shall be modular and prefabricated, and include the structural steel frame, fabric roof, steel cables, and all fasteners.

1. SRP Shade
1050 Columbia Dr.

Carrollton, GA 30117
(866) 959-8004 or Kevin Diner CPSI (Zoom Recreation) (619) 363-1756 www.SRPShade.com

2. Or Equal: Standard for approved equal. Ten (10) days prior, approval is required for the substitution of product design, materials, and features specified above.

Submittals must include plans, drawings, cut sheets, material data sheets, testing results, and samples. Bids failing to meet this requirement will be deemed non - responsive.

1. Fabric Specifications Manufactured as ALNET Extra Block A. The fabric knit is to be made using Monofilament and tape HDPE yarns.

B. UV shade fabric is made of UV-stabilized materials.

C. The high-density polyethylene material shall be manufactured with tensioned fabric structures in mind.

D. Shade fabric has a weight average of 9.6 oz. per sq.yd.

13 31 23 - 3

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES
E. Material to be Rachel-knitted to ensure the material will not unravel if cut.

F. Burst Strength of 363 lb. (ASTM 3786)
G. Cloth meets fire resistance tests as follows:

1. Alnet Extra Block: California State Fire Marshall Reg. #F-93501

2. Others: NFPA 701-99 (Test Method 2). ASTM E-84
H. Fabric Properties:

1. Tear Tests (lbs./ft): WARP 33 and WEFT 36 (ASTM D2261)

2. Burst Test (lbs./ ft): 363 lbs. (ASTM D3787)

3. Fabric Weight (oz/sq. ft.) Average: 1.02 to 1.07

4. Roll Length 150’

5. Roll Size: 63” x 16.5”

6. Weight: 120 lbs.

7. Life Expectancy: 10 Years

8. Fading: Minimum fading after 6 years (Note: 3 years for Red and Yellow)

9. Minimum Temperature: -77 degrees F

10. Maximum Temperature: 167 degrees F

2. Thread
A. Shall be 100% expanded PTFE fiber which carries a 10-year warranty that is high strength and low shrinkage.

B. Shall have a wide temperature and humidity range.

C. Abrasion resistant and UV radiation immunity.

D. Shall be unaffected by non- hydrocarbon-based cleaning agents, acid rain, mildew, rot, chlorine, saltwater, and pollution.

E. Lockstitch thread – 1200 Denier or equal.

F. Chain stitch thread – 2400 denier or equal.

3. Steel Tubing
A. All fabricated steel must be in accordance with approved shop drawings and calculations.

B. All steel is cleaned, degreased, or etched to ensure proper adhesion of powder- coat in accordance with manufacturer specifications.

C. All Steel used on this project needs to be new and accompanied by mill certificates if requested. Structural steel tubing up to 5”- 7 gauge shall be galvanized per Allied Steel FLO -COAT specifications. Schedule 49 black pipe fabrications shall be sandblasted and primed as described below.

D. All non-hollow structural shapes comply with ASTM A-36 unless otherwise noted.

E. All hollow structural steel shapes shall be cold -formed HSS ASTM A -53, grade C unless otherwise noted.

F. Plate products shall comply with ASTM A-36.

4. Powder Coating and Priming
A. All steel (galvanized) must be coated with rust- inhibiting primer prior to applying the powder coat. Primer shall be Marine Grade Cardinal Industrial Finishes Corp. E396 – GR1372 epoxy powder coating semi-gloss smooth zinc rich primer.

B. All steel parts shall be coated for rust protection and finished with a minimum of 3.5 mil thick UV-inhibited weather-resistant powder coating.

13 31 23 - 4

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES
C. Powder used in the powder -coat process shall have the following characteristics:

1. N.3.1 | Specific Gravity | 1.68+/-0.05

2. N.3.2 | Theoretical Coverage | 114+/-4 ft. 2/lb./mil

3. N.3.3 | Mass Loss During Cure | <1%

4. N.3.4 | Maximum Storage Temperature | 75 degrees F

D. Powder-coating shall meet the following tests:

1. ASTM | Gloss at 60 | 85 to 95

2. HOI TM 10.219 | PCI Powder Smoothness | 7

3. ASTM D2454-91 |Over-Bake Resistance Time | 200%

4. ASTM D3363-92A | Pencil Hardness | H-2H

5. ASTM D2794-93 | Dir/Rev Impact, Gardner | 140/140 in./lbs.

6. ASTM D3359-95B | Adhesion, Cross Hatch | 5B PASS

7. ASTM D522-93A | Flexibility Mandrel | ¼” Diameter, No Fracture

8. ASTM B117-95 | Salt Spray | 1000 Hours

9. UL Dtov2 | Organic Coating Steel Enclosures, Elect Eq. | Recognized.

E. Application Criteria:

1. N.5.1 | Electrostatic Spray Cold | Substrate: 0.032 in. CRS

2. N.5.2 | Cure Schedule | 10 Minutes at 400 degrees F

3. N.5.3 | Pretreatment | Bonderite 1000

4. N.5.4 | Film Thickness | 3.5 Mils

5. Welding
A. All shop welds shall be executed in accordance with the latest edition of the American Welding Society Specifications.

B. Welding procedures shall comply in accordance with the AWS D1.1 -AWS Structural Welding Code-Steel.

C. All welding is performed by a certified welder. All welds shall be continuous where length is not given unless otherwise shown or noted on drawings.

D. All welds shall develop the full strength of the weaker member. All welds shall be made using E70xx.035 wire.

E. Shop connections shall be welded unless noted otherwise. Field connections shall be indicated on the drawings. Field- welded connections are not acceptable.

F. All filet welds shall be a minimum of ¼” unless otherwise noted.

G. All steel shall be welded shut at terminations to prevent internal leakage.

H. Internal weld sleeving is not acceptable.

I. On-site welding is not acceptable.

6. Sewing
A. On-site sewing of a fabric will not be accepted.

B. All corners shall be reinforced with Kevlar® extra non-tear cloth and strap to distribute the load.

C. The perimeters that contain the cables shall be double-lock stitched.

13 31 23 - 5

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES

7. Installation Hardware
A. Bolt and fastening hardware shall be determined based on calculated engineering loads.

B. All bolts shall comply with SAE-J429(Grade 8) or ASTM A325 (Grade BD).

All nuts shall comply with the ASTM F-594, alloy group 1 or 2.

C. Stainless Steel hardware shall comply with ASTMA-304.

D. ¼” galvanized wire rope shall be 7x19 strand with a breaking strength of 7,000 lbs. for shades generally under 575 sq. ft. unless requested larger by the customer. For shades over 575 sq. ft., cable shall be 5/16” with a breaking strength of 9,800 lbs. ¼” Stainless Steel wire rope shall be 7x19 strand with a breaking strength of 6,400 lbs. 5/16” Stainless steel wire rope shall be 7/19 strand with a breaking strength of 9,000 lbs.

E. All fittings required for proper securing of the cable are hot-dipped galvanized.

PART 3 – EXECUTION

3.1 INSTALLATION

A. Installations of shade structure(s) shall be performed by an installer who shall follow the manufacturer’s plans, specifications and instructions for assembly, installation, and erection, per approved drawings.

B. Concrete

1. Concrete work shall be executed in accordance with the latest edition of American Concrete Building Code ACI 318 unless specified by the governing municipality.

2. Concrete specifications shall comply in accordance with, and detailed as per plans and as follows:

A. 28 days Strength F’c = 2500 psi
B. Aggregate: HR
C. Slump: 3-5
D. Portland Cement shall conform to C-150
E. Aggregate shall conform to ASTM C-33

3. All reinforcement shall conform to ASTM A-615 grade 60.

4. Reinforcing steel shall be detailed, fabricated, and placed in accordance with the latest ACI Detailing Manual and Manual of Standard Practice.

5. Whenever daily ambient temperatures are below 80 degrees Fahrenheit, the contractor may have mixed accelerators and hot water added at the batch plant. (See Table 1.)

6. TABLE 1
Temperature Range % Accelerator Type Accelerator
75-80 degrees 1% High Early (non-calcium)
70-75 degrees 2% High Early (non-calcium)
Below 70 degrees 3% High Early (non-calcium)

13 31 23 - 6

STAGECOACH PARK COMMUNITY GARDEN

TENSIONED FABRIC STRUCTURES
C. Footings

1. All anchor bolts set in new concrete shall be ASTM A -307, or ASTM F-1554 if specified by engineer.

2. All anchor bolts shall be zinc plated unless specified otherwise.

3. Footing shall be placed in accordance with and conform to engineered specifications and drawings.

END OF SECTION 13 31 23

31 20 00 - 1

STAGECOACH PARK COMMUNITY GARDEN

EARTH MOVING

SECTION 31 20 00

EARTH MOVING
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Preparing subgrades for walks and pavements.

2. Subbase course for concrete walks, pavers, and DG pavement.

B. Related Requirements: Comply with Greenbook Standard Specifications, 2021 Edition.

1.2 DEFINITIONS
A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.

D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.

E. Fill Soil materials used to raise existing grades.

F. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

G. Utilities: On-site underground pipes, conduits, ducts, and cables.

1.3 SUBMITTALS
A. Product Data: For each type of the following manufactured products required:

1. Geotextiles.

2. Warning tapes.

B. Samples for Verification: For the following products, in sizes indicated below:

1. Geotextile: 12 by 12 inches.

2. Warning Tape: 12 inches long; of each color.

3. INFORMATIONAL SUBMITTALS

31 20 00 - 2

STAGECOACH PARK COMMUNITY GARDEN

EARTH MOVING

C. Comply with Greenbook Standard Specifications, 2021 Edition.

1.4 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from the Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by the Owner or authorities having jurisdiction.

3. Do not proceed with work on adjoining property until directed by the Architect.

B. Utility Locator Service: Notify Dig Alert per plans for the area where the Project is located before beginning earth-moving operations.

C. Do not commence earth -moving operations until temporary site fencing and erosion- and sedimentation-control measures are in place.

D. Do not direct vehicle or equipment exhaust toward protection zones.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: Comply with Greenbook Standard Specifications, 2021 Edition.

2.2 GEOTEXTILES
A. Subsurface Drainage Geotextile: Nonwoven needle -punched geotextile, manufactured for subsurface drainage applications, made from polyolefins or polyesters; with elongation greater than 50 percent; complying with AASHTO M 288.

B. Satisfactory Geotextiles: Comply with Greenbook Standard Specifications, 2021 Edition.

2.3 ACCESSORIES
A. Warning Tape: Acid - and alkali -resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, continuously inscribed with a description of the utility; colored as follows:

1. Red: Electric.

2. Yellow: Gas, oil, steam, and dangerous materials.

31 20 00 - 3

STAGECOACH PARK COMMUNITY GARDEN

EARTH MOVING

3. Orange: Telephone and other communications.

4. Blue: Water systems.

5. Green: Sewer systems.

PART 3 - EXECUTION

3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.

B. Protect and maintain erosion and sedimentation controls during earth-moving operations.

3.2 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

3.3 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.

3.4 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing.

Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from grading operations. Do not store within the drip line of the remaining trees.

3.5 SOIL MOISTURE CONTROL
A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction to within 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

31 20 00 - 4

STAGECOACH PARK COMMUNITY GARDEN

EARTH MOVING

2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to the specified dry unit weight.

3.6 COMPACTION OF SOIL BACKFILLS AND FILLS
A. Comply with Greenbook Standard Specifications, 2021 Edition.

3.7 GRADING
A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated.

B. Comply with Greenbook Standard Specifications, 2021 Edition.

C. Provide a smooth transition between adjacent existing grades and new grades.

D. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.

3.8 FIELD QUALITY CONTROL
A. Comply with Greenbook Standard Specifications, 2021 Edition.

3.9 PROTECTION
A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or where they lose compaction due to subsequent construction operations or weather conditions.

1. Scarify or remove and replace soil material to depth as directed by Landscape Architect; reshape and recompact.

C. Where settling occurs before the Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

1. Restore the appearance, quality, and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to the greatest extent possible.

31 20 00 - 5

STAGECOACH PARK COMMUNITY GARDEN

EARTH MOVING

3.10 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus satisfactory soil and waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them off the Owner's property.

END OF SECTION 31 20 00

STAGECOACH PARK COMMUNITY GARDEN 32 12 16 - 1

GRIND OVRELAY SLURRY SEAL & PVC PIPE
SECTION 32 12 16

GRIND OVERLAY, SLURRY SEAL & PVC PIPE

PART 1 – GENERAL

1.1 SUMMARY

A. This applies to:

1. Grind Overlay

2. Tack Coat

3. Slurry seal coatings

4. PVC Pipe

1.2 REFERENCE STANDARDS

A. Comply with Greenbook Standard Specifications, 2021 Edition

1.3 SUBMITTALS

A. Slurry Seal: Contractor shall submit a job mix design for Slurry Seal required for the project.

1.4 QUALITY CONTROL

A. Standard: Provide materials and construction methods complying with Greenbook Standard Specifications, 2021 Edition

B. Manufacturer Qualifications: A firm experienced in manufacturing emulsified asphalt and slurry seal products.

PART 2 – PRODUCTS

2.1 SLURRY SEAL

A. Material for slurry seal shall conform to the requirements in the Greenbook Standard Specifications, 2021 Edition.

B. Aggregate grading shall be in accordance with Greenbook Standard Specifications, 2021 Edition

2.2 TACK COAT

A. Tack coat shall be an asphaltic emulsion per Greenbook Standard Specifications, 2021 Edition

2.3 POLYVINYL CHLORIDE PIPE

STAGECOACH PARK COMMUNITY GARDEN 32 12 16 - 2

GRIND OVRELAY SLURRY SEAL & PVC PIPE

A. All plastic piping and sleeving shall be integral white color, Type 1, Grade 1 (impact modified) designated as Polyvinyl Chloride (PVC), conforming to ASTM D1785 and ASTM D2441.

B. PVC Plastic Pressure Lines: Drinking fountain piping shall be Schedule 80 PVC.

C. Plastic Sleeves: Where required, sleeves shall be PVC SCH 80, sized at twice the diameter of the pipe to be sleeved, with a 2” minimum size.

D. Identification: Furnish plastic pipe continuously and permanently marked with the following information: Manufacturer's name or trademark, size, schedule or class and type of pipe, working pressure rating at 73.4 degrees F., National Sanitation Foundation (NSF) rating, and date of extrusion.

PART 3 – EXECUTION

3.1 PREPARATION - CLEANING OF EXISTING SURFACES

A. Where new asphaltic concrete is to be placed upon existing pavement or where it overlaps existing pavement, the surface to be paved shall be cleaned of all dust, loose material, and vegetation by sweeping with power brooms, or other approved method. The Contractor shall remove scrap and dispose of all dirt and loose material collected during the surface cleaning operations at his own expense. If deemed necessary by the Engineer, excessively dusty or dirty walks shall be washed down by the Contractor with water trucks or fire hoses from adjacent hydrants. After washing, all standing water shall be removed, and the walks shall be dry before applying the tack coat.

3.2 GRINDING OVERLAY

Per Greenbook standard Specifications, 2021 Edition

3.3 PREPARATION-TACK COAT

A. A tack coat shall be applied to existing paved surfaces where new slurry seal is to be placed upon existing pavement, or where it overlaps existing pavement.

B. After the surface has been thoroughly cleaned and dried, a thin asphaltic emulsion tack coat shall be uniformly applied to the surface at a rate of not to exceed 0.10 gallons per square yard.

C. Coat surfaces of manholes and storm drainage structure with oil to prevent bond with asphaltic pavement. Do not tack coat these surfaces.

3.4 SLURRY SEAL

A. General. Except as modified herein, paving materials and construction methods for slurry seal shall be in accordance with Section 37-2 of the State Standard Specifications.

STAGECOACH PARK COMMUNITY GARDEN 32 12 16 - 3

GRIND OVRELAY SLURRY SEAL & PVC PIPE
B. Cleaning Of Existing Surfaces. Immediately prior to placing the slurry seal, the surface to be sealed shall be cleaned of all dust, loose material, vegetation and any other objectionable material in accordance with paragraph 3.1 of this Section.

C. Preparation - Application of Paint Binder. Before placing the slurry seal, the existing surface shall be covered with a paint binder. The paint binder shall be an asphaltic emulsion of the same type and grade specified for the slurry seal. The ratio of asphaltic emulsion to water shall be 1:3. The paint binder shall be applied at the rate not to exceed

0.10 gallons per square yard. Full compensation for applying paint binder shall be considered as included in the price for slurry seal and no additional compensation will be allowed.

D. Application of Slurry Seal. Slurry seal shall be spread on the existing pavement at a rate of 10 to 15 pounds of dry aggregate per square yard depending on existing surface conditions as determined by the Engineer.

3.5 POLYVINYL CHLORIDE PIPE
A. Install per plans.

END OF SECTION 32 12 16

32 13 13 - 1

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE PAVING
SECTION 32 13 13

CONCRETE PAVING
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes concrete paving, including the following:

1. Driveways.

2. Parking lots.

3. Curbs and gutters.

4. Walks.

B. Related Requirements:

Comply with Greenbook Standard Specifications, 2021 Edition.

1.2 DEFINITIONS
A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash, slag cement, and other pozzolans.

B. W/C Ratio: The ratio by weight of water to cementitious materials.

1.3 INFORMATIONAL SUBMITTALS
A. Material Certificates: For the following, from the manufacturer:

1. Cementitious materials.

2. Steel reinforcement and reinforcement accessories.

1.4 QUALITY ASSURANCE
A. Ready-Mix-Concrete Manufacturer Qualifications: A firm experienced in manufacturing ready- mixed concrete products that complies with ASTM C94/C94M requirements for production facilities and equipment.

B. Testing Agency Qualifications: Qualified according to ASTM C1077 and ASTM E329 for testing indicated.

1.5 FIELD CONDITIONS
A. Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other

32 13 13 - 2

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE PAVING
construction activities.

B. Hot-Weather Concrete Placement: Comply with ACI 301 and as follows when hot -weather conditions exist:

1. Cool ingredients before mixing to maintain the concrete temperature below 90 deg F at the time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided the water equivalent of ice is calculated in the total amount of mixing water. Using liquid nitrogen to cool concrete is the Contractor's option.

2. Cover steel reinforcement with water-soaked burlap, so steel temperature will not exceed ambient air temperature immediately before embedding in concrete.

3. Fog-spray forms , steel reinforcement , and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL
A. Comply with Greenbook Standard Specifications, 2021 Edition.

2.2 FORMS
A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces.

B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces.

2.3 STEEL REINFORCEMENT
A. Comply with Greenbook Standard Specifications, 2021 Edition.

2.4 CONCRETE MATERIALS
A. Cementitious Materials: Use the following cementitious materials, of same type, brand, and source throughout Project.

2.5 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal-weight concrete.

B. Comply with Greenbook Standard Specifications, 2021 Edition.

32 13 13 - 3

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE PAVING
PART 3 - EXECUTION

3.1 EXAMINATION
A. Comply with Greenbook Standard Specifications, 2021 Edition.

B. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.

C. Proof-roll prepared sub-base surface below concrete paving to identify soft pockets.

1. Completely proof-roll subbase in one direction and repeat in a perpendicular direction.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION
A. Remove loose material from the compacted subbase surface immediately before placing concrete.

3.3 EDGE FORMS AND SCREED CONSTRUCTION
A. Set, brace, and secure edge forms and intermediate screed guides to required lines, grades, and elevations. Install forms to allow continuous progress of work and so forms can remain in place for at least 24 hours after concrete placement.

B. Clean forms after each use and coat with form -release agent to ensure separation from concrete without damage.

3.4 INSTALLATION OF STEEL REINFORCEMENT
A. General: Comply with Greenbook Standard Specifications, 2021 Edition.

B. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

C. Clean reinforcement of loose rust and mill scale, earth, ice, or other bond-reducing materials.

D. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement.

E. Install welded-wire reinforcement in lengths as long as practicable. Lap adjoining pieces at least one full mesh, and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.

3.5 JOINTS
A. General: Form construction, isolation, and contraction joints and tool edges true to the line, with

32 13 13 - 4

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE PAVING
faces perpendicular to the surface plane of concrete.

1. When joining existing paving, place transverse joints to align with previously placed joints unless otherwise indicated.

B. Construction Joints: Set construction joints at side and end terminations of paving and at locations where paving operations are stopped for more than one -half hour unless paving terminates at isolation joints.

C. Contraction Joints: Form weakened- plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one -fourth of the concrete thickness, and to match jointing of existing adjacent concrete paving.

3.6 CONCRETE PLACEMENT
A. Before placing concrete, inspect and complete formwork installation, and steel reinforcement installation.

B. Moisten subbase to provide a uniform dampened condition at the time concrete is placed. Do not place concrete around manholes or other structures until they are at the required finish elevation and alignment.

C. Comply with ACI 301 requirements for measuring, mixing, transporting, and placing concrete.

D. Do not add water to concrete during delivery or at the Project site. Do not add water to fresh concrete after testing.

E. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place.

F. Screed paving surface with a straightedge and strike off.

G. Curbs and Gutters: Use design mixture for automatic machine placement. Produce curbs and gutters to required cross-sections, lines, grades, finish, and jointing.

3.7 CONCRETE PROTECTION AND CURING
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

B. Comply with ACI 306.1 for cold-weather protection.

C. Begin curing after finishing the concrete but not before free water has disappeared from the concrete surface.

D. Curing Methods: Cure concrete by moisture curing as follows:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:

32 13 13 - 5

STAGECOACH PARK COMMUNITY GARDEN

CONCRETE PAVING
a. Water.
b. Continuous water-fog spray.
c. Absorptive cover, water -saturated and kept continuously wet. Cover concrete surfaces and edges with a 12-inch lap over adjacent absorptive covers.

3.8 REPAIR AND PROTECTION
A. Remove and replace concrete paving that is broken, damaged, or defective or that does not comply with the requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by the Landscape Architect.

B. Protect concrete paving from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur.

C. Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep paving not more than two days before the date scheduled for Substantial Completion inspections.

END OF SECTION 32 13 13

32 14 00 - 1

STAGECOACH PARK COMMUNITY GARDEN

UNIT PAVING

SECTION 32 14 00

UNIT PAVING

PART 1 - GENERAL

1.01 1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY
A. This Section includes the following:

1. Concrete pavers set in aggregate setting beds.

1.03 SUBMITTALS
A. Product Data: For materials other than water and aggregates.

B. Product Data: For the following:

1. Pavers.

C. Sieve Analyses: For aggregate setting-bed materials, according to ASTM C 136.

D. Samples for Initial Selection: For the following:

1. The unit paver indicated.

2. Sand Joint materials for color selection.

E. Samples for Verification:

1. Full-size units of each type of unit paver indicated.

1.04 QUALITY ASSURANCE
A. Source Limitations: Obtain each type of unit paver, joint material, and setting material from one source with resources to provide materials and products of consistent quality in appearance and physical properties.

B. Construction Meeting: Conduct a meeting at the Project site.

32 14 00 - 2

STAGECOACH PARK COMMUNITY GARDEN

UNIT PAVING

1.05 DELIVERY, STORAGE, AND HANDLING
A. Store pavers on elevated platforms in a dry location. If pavers are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied.

B. Store cementitious materials on elevated platforms, undercover, and in a dry location. Do not use cementitious materials that have become damp.

C. Store aggregates where grading and other required characteristics can be maintained, and contamination avoided.

D. Store liquids in tightly closed containers protected from freezing.

E. Store asphalt cement and other bituminous materials in tightly closed containers.

1.06 PROJECT CONDITIONS
A. Cold-Weather Protection: Do not use frozen materials or materials mixed with or coated with ice or frost. Do not build on frozen subgrade or setting beds. Remove and replace unit paver work damaged by frost or freezing.

PART 2 - PRODUCTS

2.01 CONCRETE PAVERS
A. Concrete Pavers: Solid interlocking paving units complying with ASTM C 936, made from normal-weight aggregates.

1. Basis-of-Design Product: The design for concrete pavers is based on Belgard, Cambridge products. Subject to compliance with requirements, provide the named product or a comparable product by one of the following:
a. Belgard, Cambridge Cobble Paver

2. Thickness: 3-1/8 inches (80 mm)

3. Face Size and Shape: 6 inches square.

4. Face Size and Shape: 6 inches by 9 inches rectangle.

5. Color: Victorian

6. Pattern: K Pattern

7. Paver PSI: 8000

2.02 AGGREGATE SETTING-BED MATERIALS
A. Graded Aggregate for Subbase: Sound, crushed stone or gravel complying with ASTM D 448 for Size No. 57

32 14 00 - 3

STAGECOACH PARK COMMUNITY GARDEN

UNIT PAVING
B. Sand for Leveling Course: Sound, sharp, washed, natural sand or crushed stone complying with gradation requirements in ASTM C 144 for fine aggregate.

C. Sand for Joints: Fine, sharp, washed, natural sand or crushed stone with 100 percent passing No. 16 sieve and no more than 10 percent passing No. 200 sieve.

D. Separation Geotextile: Woven geotextile fabric, manufactured for separate applications; made from polyolefins or polyesters, with elongation less than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Apparent Opening Size: No. 60 sieve, maximum; ASTM D 4751.

3. Permittivity: 0.02 per second, minimum; ASTM D 4491.

4. UV Stability: 50 percent after 500 hours' exposure; ASTM D 4355.

E. Drainage Geotextile: Nonwoven needle -punched geotextile, manufactured for subsurface drainage applications, made from polyolefins or polyesters; with elongation greater than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:

1. Survivability: Class 2; AASHTO M 288.

2. Apparent Opening Size: No. 40 sieve, maximum; ASTM D 4751.

3. Permittivity: 0.5 per second, minimum; ASTM D 4491.

4. UV Stability: 50 percent after 500 hours' exposure; ASTM D 4355.

F. Herbicide: Commercial chemical for weed control, registered with the EPA. Provide in granular, liquid, or wettable powder form.

PART 3 - EXECUTION

3.01 EXAMINATION
A. Examine areas indicated to receive paving, with the Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance.

1. Proceed with installation only after unsatisfactory conditions have been corrected.

2. Where pavers are to be installed over waterproofing, examine waterproofing installation, with waterproofing installer present, for protection from paving operations.

Examine areas where the waterproofing system is turned up or flashed against vertical surfaces and horizontal waterproofing. Proceed with installation only after p rotection is in place.

3.02 PREPARATION
A. Remove substances from concrete substrates that could impair mortar bonds, including curing and sealing compounds, form oil, and laitance.

32 14 00 - 4

STAGECOACH PARK COMMUNITY GARDEN

UNIT PAVING
B. Clean concrete substrates to remove dirt, dust, debris, and loose particles.

C. Proof-roll prepared subgrade to identify soft pockets and areas of excess yielding. Proceed with unit paver installation only after deficient subgrades have been corrected and are ready to receive the subbase and base course for unit pavers.

3.03 INSTALLATION, GENERAL
A. Do not use unit pavers with chips, cracks, voids, discolorations, and other defects that might be visible in the finished work.

B. Mix pavers from several pallets or cubes, as they are placed, to produce uniform blend of colors and textures.

C. Cut unit pavers with motor-driven masonry saw equipment to provide clean, sharp, unchipped edges. Cut units to provide the pattern indicated and to fit adjoining work neatly. Use full units without cutting where possible. Hammer cutting is not acceptable.

1. For concrete pavers, a block splitter may be used.

D. Exercise care in handling coated brick pavers to prevent coated surfaces from contacting backs or edges of other units. Remove coating from bonding surfaces before setting paver.

E. Joint Pattern: As shown in drawings.

F. Pavers over Waterproofing: Exercise care in placing pavers and setting materials over waterproofing so protection materials are not displaced, and waterproofing is not punctured or otherwise damaged. Carefully replace protection materials that become displaced and arrange for repair of damaged waterproofing before covering with paving.

G. Tolerances: Do not exceed 1/32-inch unit-to-unit offset from flush (lippage) nor 1/8 inch in 10 feet from level, or indicated slope, for finished surface of paving.

H. Tolerances: Do not exceed 1/16-inch unit-to-unit offset from flush (lippage) nor 1/8 inch in 24 inches and 1/4 inch in 10 feet from level, or indicated slope, for finished surface of paving.

I. Provide edge restraints as indicated. Install edge restraints before placing unit pavers.

1. Install edge restraints to comply with the manufacturer's written instructions. Install stakes at intervals required to hold edge restraints in place during and after unit paver installation.

2. Install job-built concrete edge restraints to comply with requirements.

3.04 AGGREGATE SETTING-BED APPLICATIONS
A. Compact soil subgrade uniformly to 95 percent of ASTM D 69 laboratory density.

32 14 00 - 5

STAGECOACH PARK COMMUNITY GARDEN

UNIT PAVING
B. Proof-roll prepared subgrade to identify soft pockets and areas of excess yielding. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by the Architect, and replace them with compacted backfill or fill as directed.

C. Place separation geotextile over prepared subgrade, overlapping ends and edges at least 12 inches.

D. Place aggregate subbase and base, compact by tamping with plate vibrator, and screed to depth indicated.

E. Place leveling course and screed to a thickness of 1 to 1 1/2 inches, taking care that moisture content remains constant, and density is loose and constant until pavers are set and compacted.

F. Treat the leveling course with herbicide to inhibit the growth of grass and weeds.

G. Set pavers with a minimum joint width of 1/16 inch and a maximum of 1/8 inch, being careful not to disturb the leveling base. If pavers have spacer bars, place pavers hand tight against spacer bars. Use string lines to keep straight lines. Fill gaps between units that exceed 3/8 inch with pieces cut to fit from full-size unit pavers.

1. When the installation is performed with mechanical equipment, use only unit pavers with spacer bars on the sides of each unit.

H. Spread dry sand and fill joints immediately after installing pavers into the leveling course.

Add sand until joints are completely filled, then remove excess sand. Leave a slight surplus of sand on the surface for joint filling.

I. Do not allow traffic on installed pavers until the sand has been vibrated into joints.

J. Repeat the joint-filling process 30 days later.

3.05 REPAIRING, POINTING, AND CLEANING
A. Remove and replace unit pavers that are loose, chipped, broken, stained, or otherwise damaged or that do not match adjoining units. Provide new units to match adjoining units and install them in the same manner as the original units, with the same joint t reatment and with no evidence of replacement.

B. Cleaning: Remove excess sand from exposed paver surfaces; wash and scrub clean.

END OF SECTION 32 14 00

32 15 40 - 1

STAGECOACH PARK COMMUNITY GARDEN

DECOMPOSED GRANITE

SECTION 32 15 40

DECOMPOSED GRANITE

PART 1 – GENERAL

1.1 SCOPE
A. Section Includes: Stabilized decomposed granite (DG) surfacing. Furnish all materials as shown on the drawings and as specified herein.

1.2 SUBMITTALS
A. Submit the following:

1. Manufacturer’s product data sheet and installation instructions indicating that the product complies with specifications.

2. Submit a quart sample of decomposed granite material in color specified in the Construction Legend for selection.

1.3 MOCK-UP

A. Install a 5-square-foot area with stabilized decomposed granite surfacing, including compacted subgrade and concrete edging, at a location approved by the Owner.

B. The owner viewed and approved the mock-up before proceeding with the installation of the stabilized decomposed granite surfacing.

C. Approved mock-up may remain as part of the completed Work.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Protect stabilized decomposed granite from contamination. Store under cover.

1.5 FIELD CONDITIONS

A. Do not install stabilized decomposed granite surfacing when the subbase is wet and/or saturated.

PART 2 – PRODUCTS

2.1 STABILIZED DECOMPOSED GRANITE MATERIALS

A. Acceptable Manufacturer:

1. Specification is based on products by Southwest Boulder and Stone , CA: phone 760-466- 3277; California Gold Decomposed Granite or approved equal.

2. Substitutions: Products by other manufacturers that comply with specifications will b e reviewed prior to approval.

B. Decomposed Granite:

1. Produced from naturally friable granite. Blends of coarse sand and rock dust are not acceptable.

2. Graduation, in accordance with ASTM C136:

STAGECOACH COMMUNITY GARDEN 32 15 40 - 2

STABILIZED DECOMPOSED GRANITE
Sieve Size Percent Passing
½ “ 100
3/8” 90-100
No. 4 50-100
No. 300 25-55
No. 100 10-20
No. 200 5-18

3. Sand Equivalent: 30 minimum in accordance with ASTM D2419.

4. Color: California Gold or approved equal

5. Supplier: Southwest Boulder and Stone . P hone:760-466-3277, website:
www.southwestboulder.com, or approved equal.

6. Binder: Provide Organic Lock binder, provided by Envirobond Products Corporation.

Phone:866-636-8476, website: www.organic-lock.com, or approved equal.

C. Factory Blending:

1. Blend DG and binder per the binder manufacturer’s recommendation.

2.2 ACCESSORIES

A. Water: Free from contaminants that would discolor or be deleterious to stabilized decomposed granite surfacing.

PART 3 – EXECUTION

3.1 EXAMINATION

A. Examine grading and subsoil conditions. Do not proceed until conditions are acceptable.

3.2 PREPARATION

A. Excavation: Excavate to the depth required so edges of stabilized decomposed granite surfacing will match adjacent grades and have a maximum cross slope of 1 percent. Remove excavated soil from the site.

B. Use a blade compactor to achieve 90% compaction.

3.3 STABILIZED DECOMPOSED GRANITE INSTALLATION

A. Prior to installation, thoroughly presoak the surface on which stabilized decomposed granite surfacing is to be placed.

B. Install blended binder per manufacturer recommendations.

C. Compact: After +/ - 4 hours, make 4 -6 passes using a 1 -ton double or single static drum roller, or equivalent.

D. Minimum Compacted Thickness: Install to the depth shown on Drawings.

E. Surface shall follow the overall contours of the landscape. Flat areas shall be crowned for drainage.

F. Installed surface shall be of consistent quality and free of deleterious materials such as organic materials, nails, stones, and loose material. Surface shall not have depressions or humps greater than 1/4 inch in ten feet.

3.4 FIELD QUALITY CONTROL

STAGECOACH COMMUNITY GARDEN 32 15 40 - 3

STABILIZED DECOMPOSED GRANITE
A. Material shall comply with manufacturer specifications.

3.5 PROTECTION

A. Do not allow traffic on stabilized decomposed granite surfacing for four days after placement or until compacted stabilized decomposed granite has fully cured.

B. Protect stabilized decomposed granite surfacing from damage until Project completion . Repair damaged areas to match specified requirements.

3.6 MAINTENANCE & REPAIRS OF STABILIZED DECOMPOSED GRANITE

A. Loose aggregate will appear on the surface over time which is a natural occurrence . If excessive aggregate over ¼ inch occurs, redistribute the stabilized decomposed granite over the entire surface, water thoroughly, and re-compact with a minimum one-ton drum roller. This process can be repeated as needed.

B. To repair and excavate damaged areas leaving a minimum one -inch depth of existing stabilized decomposed granite, water, and scarify. Scarifying existing stabilized decomposed granite will prevent a cold joint layer between the existing stabilized decomposed granite and the newly imported pre - blended stabilized decomposed granite to the excavated area at or above the finished grade.

C. Add water to the pre-blended stabilized decomposed granite to activate. Apply moistened pre-blended stabilized decomposed granite to the excavated area at or above the finished grade.

D. Compact with a walk-behind drum roller . Do not allow traffic on stabilized decomposed granite surfacing for two days after placement or until compacted stabilized decomposed granite has fully cured.

END OF SECTION 32 15 40
STAGECOACH PARK COMMUNITY GARDEN 32 19 00 - 1

SITE FURNISHINGS

SECTION 32 19 00

SITE FURNISHINGS

PART 1 – GENERAL

1.1 SCOPE
A. Work Included: Provide all material, labor, equipment, and services necessary for the furnishing and installation of all site furniture and site equipment items, as shown on the drawings and as specified below. The work includes, but is not limited to:

1. ADA Picnic Table

2. Bench

3. Waste Containers

4. Compost Bin

5. Horizontal Storage Box

6. Drinking Fountain

7. Information Kiosk

1.2 RELATED SECTIONS
A. Related sections include the following:
32 15 40 Decomposed Granite
32 13 13 Concrete Paving

1.3 ACCEPTANCE
A. Prior to the purchase of the items, the Contractor shall supply the Landscape Architect with vendor information, photos, and samples of the finishes for approval. No materials for this section shall be purchased until such approval is granted in writing.

1.4 CERTIFICATION
A. Delivery schedules shall be verified and certified in writing by the Construction Manager within 10 days after the project commences.

1.5 QUALITY ASSURANCE
A. Workmanship and Materials: All workmanship and materials within this Section shall conform strictly to the manufacturer’s specifications, installation instructions , and guarantees.

1.6 SUBMITTALS
STAGECOACH COMMUNITY GARDEN 32 19 00 - 2

SITE FURNISHINGS
A. General: Submittals to be in accordance with the requirements of the Standard Specifications. Review or acceptance, as specified, by the Landscape Architect is required prior to commencement of work.

B. Catalog Cuts: Submit for each pre-manufactured item.

C. Shop Drawings: Submit shop drawings when required in the list of items below.

1.7 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Site furnishings and equipment shall be delivered and unloaded at the job site in such a manner that no damage occurs to the product during hauling, handling, or unloading, storage, and installation.

1.8 SUBSTITUTIONS, ADDITIONS, AND DELETIONS
A. Submit proposals for substitutions in writing to the Construction Manager. Acceptance by the Landscape Architect is required prior to proceeding with the work under this Section.

PART 2 - PRODUCTS

2.1 GENERAL
A. Site furnishing items shall be as indicated on the drawings or approved equal.

B. Shade Structures shall be as indicated on the drawings or approved equal and per Section 13 31 23.

2.2 MANUFACTURERS
A. See the drawings for manufacturers of site furnishings and shade structures or approved equal.

B. ADA Picnic Table: The precast concrete ADA picnic table shall be QCP (866-703-3434) model QLBT102PTADA, color and finish per drawings, or approved equal.

B. Bench: The precast concrete bench shall be QCP (866-703-3434) model Q1-PAS-84 B, color and finish per drawings, or approved equal.

C. Waste containers: The precast concrete waste containers shall be QCP (866 -703-3434) model QR-CAL2832W-H28 with fiberglass bubble top lid , and plastic liner, or approved equal. Contractor to coordinate with the manufacturer to identification inset images and colors for separated waste containers.

D. Compost Bin: The compost bin shall be Busch Systems, model Soilsaver 12 cubic feet, or approved equal.

G. Horizontal Storage Box: The prefabricated Storage Box shall be an Electric life, model 70” outdoor woodshed with galvanized sheet roof, or approved equal.

STAGECOACH COMMUNITY GARDEN 32 19 00 - 3

SITE FURNISHINGS
H. Sail Shade Structure: The Sail Shade Structure shall be Zoom Recreation, a multi-sail 22’ x 13’ custom-made structure. The sail shade fabric shall pass the NFPA 701 or ASTM E84 tests for fire retardation.

I. Drinking Fountain: The drinking fountain shall be Haws model 3216 ADA vandal resistant with bottle filler, color gray, or approved equal.

J. Information Kiosk: The information kiosk shall be as shown on the drawings or approved equal.

PART 3 – CONSTRUCTION

3.1 LAYOUT OF SITE FURNISHINGS / EQUIPMENT
A. Layout site furniture according to the locations shown on the drawings, and as required by the Landscape Architect.

B. Set site furnishings level and true to line, in correct relationship to adjacent materials and structures.

C. Secure site furnishings permanently in place to prevent removal or tampering.

D. Adjustments: The Landscape Architect reserves the right to adjust in the locations of the site furniture without additional cost to the Contractor.

E. Install per manufacturer’s specifications.

F. Quantity of furnishings shall be as specified on plans.

3.2 INSTALLATION
A. Installation of site furnishings and shade structures to be per manufacturer’s recommendations and approved shop drawings.

3.3 PROTECTION
A. Protect installed site furniture, if required, during the construction period to prevent damage and wear.

3.4 REPLACEMENT
A. Replace all defective or damaged site furniture prior to Final Acceptance.

END OF SECTION 32 19 00

32 31 13 - 1

STAGECOACH PARK COMMUNITY GARDEN

GALVANIZED CHAIN LINK FENCE AND GATES

SECTION 32 31 13

GALVANIZED CHAIN LINK FENCE

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings, quality, product and performance requirements, and general and supplemental conditions apply as applicable to the project and project documents.

1.2 SUMMARY

A. This Section includes chain link fence and gates specifications:

1. Galvanized steel chain link fabric

2. Galvanized steel framework and fittings

3. Installation

B. Related Sections:

1. 32 13 13 - Concrete Paving

1.3 REFERENCES

A. ASTM A392 Specification for Zinc-Coated Steel Chain-Link Fence Fabric

B. ASTM A780 Standard Practice for Repair of Damaged and Uncoated Areas of Hot -Dip Galvanized Coatings

C. ASTM F552 Standard Terminology Relating to Chain Link Fencing

D. ASTM F567 Standard Practice for Installation of Chain Link Fence

E. ASTM F626 Specification for Fence Fittings

F. ASTM F900 Specification for Industrial and Commercial Swing Gates

G. ASTM F1043 Specification for Strength and Protective Coatings of Steel Industrial Chain Link Fence Framework

H. ASTM F1083 Specification for Pipe, Steel, Hot -Dipped Zinc -Coated (Galvanized) Welded, for Fence Structure

1.4 SUBMITTALS

STAGECOACH COMMUNITY GARDEN 32 31 13 - 2

GALVANIZED CHAIN LINK FENCE

A. Shop drawings: Site plan showing layout of fence location with dimensions, location of gates and opening size, cleared area, elevation of fence, gates, footings, and details of attachments.

B. Material samples: P rovide a representative sample of chain link fabric, framework, and fittings.

PART 2 – PRODUCTS

2.1 MANUFACTURERS

A. Framework, posts, rails, fabric, and fittings for chain link fence system.

2.2 CHAIN LINK FABRIC

A. Steel Chain Link Fabric: Height indicated on drawings.

1. Zinc-Coated Steel Fabric: ASTM A392 hot dipped galvanized before weaving (GBW) or after weaving (GAW).

a. Class 1 - 1.2 oz/ft² (366 g/m²)

b. Class 2 - 2.0 oz/ft² (610 g/m²)

2. Fabric Selection: Steel chain link mesh 2” in size (see below) and gauges produced in one-piece widths 3 feet (910 mm) to 12 feet (3660 mm)

Mesh
Size
6 Gauge
Core
9 Gauge
Core
11 Gauge
Core
11 ½
Gauge
Core
12 Gauge
Core Notes
In. (mm) 0.192 in. 0.148 in. 0.120 in. 0.113 in. 0.105 in.

4.88 mm 3.76 mm 3.05 mm 2.87 mm 2.67 mm N/A = Not applicable for 2 (50) YES YES YES N/A N/A Industrial/Commercial
1 ¾ (44) YES YES YES N/A N/A Applications
1 (25) N/M YES YES N/A N/A N/M = Not manufactured
5/8 (16) N/M YES YES YES YES* *12 ga. Only per F668
1/2 (13) N/M YES YES YES YES*
3/8 (10) N/M N/M YES YES YES*
2170 lbf 1290 lbf 850 lbf 750 lbf 650 lbf Wire Break Strength

STAGECOACH COMMUNITY GARDEN 32 31 13 - 3

GALVANIZED CHAIN LINK FENCE

(9650 N) (5740 N) (3780 N) (3340 N) (2895 N)

3. Fabric selvage:
a. Standard fabric selvage for 2 in (50 mm) mesh 72 in. (1.8 m) high and higher is knuckle finish at one end, twist at the other.

b. Fabric less than 72 in (1.8 m), knuckle finish top and bottom, K&K.

2.3 ROUND STEEL PIPE FENCE FRAMEWORK

A. Round steel pipe and rail: Schedule 40 standard weight pipe, in accordance with ASTM F1083, 1.8 oz/ ft² (550 g/m²) hot dip galvanized zinc exterior and 1.8 oz/ft² (550 g/m²) hot dip galvanized zinc interior coating.

1. Regular Grade: Minimum steel yield strength 30,000 psi (205 MPa)

2. High Strength Grade: Minimum yield strength 50,000 psi (344 MPa)

a. Line post 1-7/8” outside diameter

b. End, Corner, Pull post 2-7/8” outside diameter

c. Top, brace, bottom, and intermediate rails (at skatepark fencing only)

1.660 in. (42.2 mm)
OD: 1-1/4” outside diameter

B. Typical post and rail size for normal Commercial / Industrial applications

Item Fence Height
Outside
Diameter
Inches (mm)
*F1083 Schedule 40
Weight
lb/ft (kg/m)
F1043-ic (LG-40)
Weight
lb/ft (kg/m)
Line
post Up to 6 ft. (1.8m) 1.900 (48.3) 2.72 (4.0) 2.28 (3.39) Over 6 to 8 ft. (1.8 to

2.4m) 2.375 (60.3) 3.65 (5.4) 3.12 (4.64)
Over 8 to 12 ft. (2.4
to 3.7m) 2.875 (73.0) 5.79 (8.6) 4.64 (6.91)
Over 12 to 16 ft. (3.7
to 4.9m) 4.000 (101.6) 9.11 (13.6) 6.56 (9.78)
Terminal
Post Up to 6 ft. (1.8m) 2.375 (60.3) 3.65 (5.4) 3.12 (4.64) Over 6 to 8 ft. (1.8 to

2.4m) 2.875 (73.0) 5.79 (8.6) 4.64 (6.91)
Over 8 to 12 ft. (2.4
to 3.7m) 4.000 (101.6) 9.11 (13.6) 6.56 (9.78)
Over 12 to 16 ft. (3.7
to 4.9m) 6.625 (168.3) 18.97 (28.2) Not Available

STAGECOACH COMMUNITY GARDEN 32 31 13 - 4

GALVANIZED CHAIN LINK FENCE

8.625 (219.1) 28.58 (42.5) Not Available
Rails 1.660 (42.2) 2.27 (3.4) 1.84 (2.74)
*Regular Grade F1083 Schedule 40

2.4 TENSION WIRE

A. Metallic Coated Steel Marcelled Tension Wire: 7-gauge core (0.177 in.) (4.50 mm) marcelled wire complying with ASTM A824. Match the coating type to that of the chain link fabric.

1. Type II Zinc-Coated, ASTM A817 Class 4 - 1.2 oz/ft² (366 g/m²)

2. Type II Zinc-Coated, ASTM A817 Class 5 - 2.0 oz/ft² (610 g/m²)

2.6 FITTINGS

A. Tension and Brace Bands: Galvanized pressed steel complying with ASTM F626, minimum steel thickness of 12 gauge (0.105 in.) (2.67 mm), minimum width of 3/4 in. (19 mm) and minimum zinc coating of 1.20 oz/ft² (366 g/m²). Secure bands with 5/16 in. (7.94 mm) galvanized steel carriage bolts.

B. Terminal Post Caps, Line Post Loop Tops, Rail and Brace Ends, Boulevard Clamps, Rail Sleeves: In compliance to ASTM F626, pressed steel galvanized after fabrication having a minimum zinc coating of 1.20 oz/ft² (366 g/m²).

C. Truss Rod Assembly: In compliance with ASTM F626, 3/8 in. (9.53 mm) or 5/16” (7.94 mm) diameter steel truss rod with a pressed steel tightener, minimum zinc coating of 1.2 oz/ft² (366 g/m²), assembly capable of withstanding a tension of 2,000 lbs. (970 kg).

D. Tension Bars: In compliance with ASTM F626. Galvanized steel one-piece length 2 in. (50 mm) less than the fabric height. Minimum zinc coating 1.2 oz. /ft² (366 g/m²). Bars for 2 in. (50 mm) and 1 ¾ in. (44 mm) mesh shall have a minimum cross-section of 3/16 in. (4.8 mm) by 3/4 in. (19 mm).

2.9 SWING GATES

A. Swing Gates: Galvanized steel pipe welded fabrication in compliance with ASTM F900.

Gate frame members 1.900 in. OD (48.3 mm). ASTM F 1083 schedule 40 galvanized steel pipes. Frame members spaced no greater than 8 ft. (2440 mm) apart vertically and horizontally. Welded joints are protected by applying zinc -rich paint in accordance with ASTM Practice A780. Positive locking gate latch, pressed steel galvanized after fabrication. Galvanized malleable iron or heavy gauge pressed steel post and frame hinges.

Provide lockable drop bar and gate holdbacks with double gates. Match gate fabric to that of the fence system. Gateposts per ASTM F1083 schedule 40 galvanized steel pipes.

B. Gateposts: Regular Grade ASTM F1083 Schedule 40 pipe

Gate fabric height up to and including 6ft. (1.2m)

STAGECOACH COMMUNITY GARDEN 32 31 13 - 5

GALVANIZED CHAIN LINK FENCE

Gate leaf width Post Outside Diameter Weight
Up to 4 ft. (1.2m) 2.375 in. (60.3 mm) 3.65 lb/ft (5.4 kg/m) Over 4 ft to 10ft. (1.2 to 3.05m) 2.875 in. (73.0 mm) 5.79 lb/ft (8.6 kg/m) Over 10 ft to 18 ft. (3.05 to 5.5m) 4.000 in. (101.6 mm) 9.11 lb/ft (13.6 kg/m) Gate fabric height over 6 ft. to 12 ft. (1.2 to 2.4m)
Gate leaf width Post Outside Diameter Weight
Up to 6 ft. (1.8m) 2.875 in. (73.0 mm) 5.79 lb/ft (8.6 kg/m) Over 6 ft. to 12 ft. (1.8 to 3.7m) 4.000 in. (101.6 mm) 9.11 lb/ft (13.6 kg/m) Over 12 ft. to 18 ft. (3.7 to 5.5m) 6.625 in. (168.3 mm) 18.97 lb/ft (28.2 kg/m) Over 18ft to 24 ft. (5.5 to 7.3m) 8.625 in. (219.1 mm) 28.58 lb/ft (42.5 kg/m)

2.11 CONCRETE

Concrete for post footings shall have a 28-day compressive strength of 2,500 psi. (17.2 MPa).

PART 3 – EXECUTION

3.1 CLEARING FENCE LINE

A. Clearing: Surveying, clearing, grubbing, grading, and removal of debris for the fence line or any required clear areas adjacent to the fence is included in the general contractor’s contract. The contract drawings indicate the extent of the area to be cleared and grubbed.

3.2 FRAMEWORK INSTALLATION

A. Posts: Posts shall be set plumb in concrete footings in accordance with ASTM F567.

Minimum footing depth, 24 in. (609.6 mm) plus an additional 3 in. (76.2 mm) depth for each 1 ft. (305 mm) increase in the fence height over 4 ft. (1220 mm). The minimum footing diameter will be four times the largest cross-section of the post up to a 4.00” (101.6 mm) dimension and three times the largest cross-section of the post greater than a 4.00” (101.6 mm) dimension. Local codes, site soil conditions, fence height, and wind load may require larger diameter or deeper footings - See Chain Link Manufactures Institute – Product Guide and Wind Load Guide CLFMI: WLG 2445. Top of the concrete footing to be at grade and crowned t o shed water away from the post. Line posts were installed at intervals not exceeding 10 ft. (3.05 m) in the center.

B. Top rail: When specified, install 21 ft. (6.4 m) lengths of rail continuously through the line post top. Splice rail using top rail sleeves minimum 6 in. (152 mm) long. Rail shall be secured to the terminal post by a brace band and rail end. Bottom rail or intermediate rail shall be field cut and secured to the line posts using boulevard clamps or brace bands with rail ends.

STAGECOACH COMMUNITY GARDEN 32 31 13 - 6

GALVANIZED CHAIN LINK FENCE

C. Terminal posts: End, corner, pull , and gate posts shall be braced and trussed for fences 6 ft. (1.8 m) and higher and for fences 5 ft. (1.5 m) in height not having a top rail. The horizontal brace rail and diagonal truss rod shall be installed in accordance with ASTM F567.

D. Tension wire: Shall be installed 4 in. (101.6 mm) up from the bottom of the fabric. Fences without top rail shall have a tension wire installed 4 in. (101.6 mm) down from the top of the fabric. Tension wire to be stretched taut, independently and prior to the fabric, between the terminal posts and secured to the terminal post using a brace band. Secure the tension wire to each line post with a tie wire.

3.3 CHAIN LINK FABRIC INSTALLATION

A. Install fabric to the inside of the framework maintaining a ground clearance of no more than 2 inches (50 mm). Attach the fabric to the terminal post by threading the tension bar through the fabric; secure the tension bar to the terminal post with tension bands and 5/16 in. (7.94 mm) carriage bolts spaced no greater than 12 inches (304.8mm) on center. Small mesh fabric less t han 1 in. (25 mm), attach to terminal post by sandwiching the mesh between the post and a vertical 2 in. wide (50mm) by 3/16 in. (4.76 mm) galvanized steel strap using carriage bolts, bolted thru the bar, mesh and post spa ced 15 in. (381 mm) on center. The chain link fabric shall be stretched taut with no sag ging. Fabric to be secured to the line post with tie wires spaced no greater than 12 inches (304.8 mm) on center and to horizontal rail spaced no greater than18 inches (457.2 mm) on center. Aluminum alloy tie wire shall be installed following ASTM F567: Wrap the tie around the post or rail and attached to a fabric wire picket on each side of the post or rail by twisting the tie wire around the fabric wire picket two full turns, cut off excess wire and bend over to prevent injury. Secure the fabric to the tension wire by crimping hogs rings around a fabric wire picket and tension wire.

3.4 GATE INSTALLATION

A. Swing Gates: Installation of swing gates and gateposts in compliance with ASTM F 567.

Direction of swing shall be inward. Gates shall be plumb in the closed position having a bottom clearance of 3 in. (76 mm), grade permitting. Hinge and latch offset opening space shall be no greater than 3 in. (76 mm) in the closed position. Double gate drop bar receivers shall be set in a c oncrete footing minimum 6 in. (152 mm) diameter 24 in. (609.6 mm) deep. Gate leaf holdbacks shall be installed for all double gates.

3.5 NUTS AND BOLTS

A. Bolts: Carriage bolts used for fittings shall be installed with the head on the secure side of the fence. All bolts shall be peened over to prevent removal of the nut.

3.6 CLEAN UP

A. Clean Up: The area of the fence line shall be left neat and free of any debris caused by the installation of the fence.

END OF SECTION 32 31 13

32 84 00 - 1

STAGECOACH PARK COMMUNITY GARDEN

IRRIGATION SYSTEM

SECTION 32 84 00

IRRIGATION SYSTEM

PART 1 – GENERAL

1.1 GENERAL CONDITIONS

The General Conditions and Special Conditions are a part of this section and the Contract for this work and apply to this section as fully as if repeated herein.

1.2 SCOPE OF WORK

A. The scope of work includes the construction of an irrigation system for raised garden planters.

The extent of the irrigation system is shown on the drawings. The work includes all services, labor, materials, transportation, and equipment necessary to perform the work as shown and/or noted on the drawings and/or as specified. The irrigation system shall be fully functional with all capabilities met.

B. Landscape Contractor is responsible for close coordination with other contractors involved with grading, drainage, utilities, and construction of site elements. It is the responsibility of the Landscape Contractor to coordinate his work with other trades throughout the construction period, to avoid conflicts which may interrupt other trades’ work progress.

1.3 RELATED SECTIONS

A. No related sections

1.4 REFERENCES

The latest editions of standards and specifications published by the following organizations, and referenced herein, apply to the work only to the extent specified by the reference.

A. American National Standards Institute (ANSI)
B. American Society for Testing and Materials (ASTM)

1. 5 SUBMITTALS

A. Submit a list of irrigation system components and equipment to be used, manufacturer's brochures, maintenance manuals, warranties, and operating instructions, within three (3) weeks of notice to proceed. Provide an index sheet clearly identifying the product name, manufacturer/model number, any options, and the sheet number where the product cut sheet is located in the submittal package.

B. Substitution of irrigation equipment from that specified on plans if proposed, shall provide in writing the proposed substitution for approval, prior to any installation.

1.6 GUARANTEE

STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 2

IRRIGATION SYSTEM
At the conclusion of the Maintenance Period, the Landscape Contractor shall provide an irrigation system guarantee in accordance with the General Conditions, for a period of one (1) year from the date of final acceptance. The guarantee shall include non-settling of the backfill in trenches and excavations, which if occurs, shall be corrected, including repairs and/or replacement of any material damaged thereby or therefrom.

1.7 SITE OBSERVATION VISITS BY THE LANDSCAPE ARCHITECT

A. In all cases where site observation visits of the irrigation system work are required and/or where portions of the work are specified to be performed under the direction and/or site observation of the Landscape Architect of Record, the Landscape Sub-Contractor shall notify the Landscape Architect of Record at least three (3) working days in advance of the time such site observations and/or directions are required.

B. In all cases where site observation visits of the irrigation system work are required and/or where portions of the work are specified to be performed under the direction and/or site observation of the Landscape Architect of Record, the Landscape Subcontractor shall notify the Olivenhain Municipal Water District’s Backflow and Cross Connection Coordinator at least three (3) working days in advance of the time such site observations and/or direction are required.

C. Site observation will be required for the following work:

1. Upon connecting to any existing mainline.

2. Upon installation and testing of mainlines, when pipes are laid and are to be submitted to pressure tests. Lines shall not be covered until they have been checked and approved.

3. Upon installation and testing of service and control systems, including any valves, backflow prevention devices, and control valves and wires.

4. When the irrigation system is completed, the Landscape Contractor in the presence of the Landscape Architect of Record, shall perform a coverage test to determine if the coverage of water afforded planting areas is complete and adequate. The Landscape Contractor shall promptly furnish all materials and perform all work required to correct any inadequacies, without extra cost.

5. A final site observation visit by Olivenhain Municipal Water District’s Backflow and Cross Connection Coordinator to observe a performance test which shall be at the same time as the final site observation of the specified landscape maintenance period work.

1.8 TESTING

A. P.V.C. mains shall be subjected to a pressure test of existing line pressure for a period of four (4) hours and shall be watertight. All shut-off valves to isolate the section of mainline to be tested shall be fully closed prior to testing. Testing will be done in sections as required per construction schedule.

B. Water mains shall be tested as follows: (1) add water slowly to pipe to avoid water hammer damage, (2) bleed system at pressure gauge location to ensure all air is out of pipes, (3) pressurize system to line pressure for duration specified. Visually inspect for leaks while the system is under constant pressure.

C. Authorization to proceed with installation shall be received prior to backfilling any trench. Do not cover any lines, sleeves, conduits, conductors, or fittings until they have been reviewed, and STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 3

IRRIGATION SYSTEM
authorization to proceed is given by the Landscape Architect of Record.

D. Backflow prevention assembly shall be tested by a certified backflow preventer tester and tested until it passes. Provide certification to Owner, and a copy to Landscape Architect of Record.

1.9 RECORD DOCUMENTS

A. Prior to final acceptance of work, the Landscape Contractor shall provide an electronic record set of drawings showing the irrigation system work. Utilize one complete set of irrigation drawings used for installing system, for indicating installed equipment. Make daily annotations thereon as project progresses, prior to burial of irrigation facilities. All items changed/relocated from original drawings shall be so indicated with the same symbol in the new location, the original symbol erased. All notes/callouts pertaining to the item shall be directed to the new location. All work shall be prepared in the same electronic format and version as the construction drawings and subject to the satisfaction of the County Project Manager.

B. Immediately upon the installation of any pipe or equipment, the Landscape Contractor shall indicate on the drawings the locations of said pipe or equipment if changes have been made. All changes in direction of the mainline, all conduits and sleeves shall be noted on plans with size and depth.

C. All, stub-outs, points of connection to water mains, sleeves, shall be located by measured dimensions, to the nearest one-half foot. Dimensions from two (2) different reference points minimum shall be given from permanent objects such as face of curbs, drain inlets, sidewalks, walls, structures, and driveways.

D. Record drawings shall be signed and dated in black ink by the Landscape Contractor attesting to and certifying the accuracy of the record drawings. Landscape Contractor shall also include company name, supervisor’s name, and company address and phone number on record drawings.

1.10 OPERATION AND MAINTENANCE MANUALS

A. Prepare and deliver to the Program/Project Manager within ten calendar days prior to completion of construction, two (2) 3-ring hard cover binders containing the following information:

1. Index sheet stating Landscape Contractor's address and telephone number, list of equipment with name and addresses of local manufacturers' representatives.

2. Catalog and parts sheets on all material and equipment.

3. Equipment warranties and certificates.

4. Guarantee statement.

5. Complete operating and maintenance instructions for all major equipment.

B. In addition to the above-mentioned maintenance manuals, provide the County’s maintenance personnel with instructions for maintaining major equipment and show evidence in writing to the Landscape Architect of Record at the conclusion of the project that this has been rendered.

1.11 GENERAL REQUIREMENTS
STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 4

IRRIGATION SYSTEM

A. Code requirements shall be those of State and Municipal Codes and Regulations locally governing this work, providing that any requirements of the Drawings and Specifications, not conflicting therewith, but exceeding the Code Requirements, shall govern unless written permission to the contrary is granted by the County.

B. Extreme care shall be exercised at all times by the Landscape Contractor in excavating and working in the project area due to existing utilities and/or existing irrigation systems. Landscape Contractor shall be fully responsible for expenses incurred in the repair of damages caused by his operation.

C. For the purpose of clarity, plan locations of hose bibs, splice boxes, existing facilities, backflow preventers, pressure regulators, and pipelines are diagrammatic and indicate the relative locations of all installations. Location and identification of existing irrigation facilities shall be field verified with the Landscape Architect of Record. Final locations of installations shall be determined by final site conditions and plantings prior to their installation with the Landscape Architect of Record present.

D. All lines shall have a minimum horizontal and vertical clearance of 6" from each other and 6” from lines of other trades. Parallel lines shall not be installed directly over one another.

E. Prior to starting any work, Landscape Contractor shall obtain a reading of existing available water pressure (no flow condition) at the designated point of connection and immediately submit written verification of pressure with date and time of recording to the Landscape Architect of Record. Any differences to stated pressure on plans and readings may cause changes directed by the Landscape Architect of Record. Failure of Contractor to provide stated information in the manner above will cause the Contractor to bear full responsibility in cost, installation and equipment changes or additions for any changes necessary for a fully functional irrigation system.

F. Point of connection shall be approximately as shown on drawings. Connect new underground piping and valves and provide all flanges, adapters, or other necessary fittings for connection.

G. Permission to shut off any existing in-use water line must be obtained 48 hours in advance, in writing from the Project Manager. The Landscape Contractor shall receive instructions from the Project Manager as to the exact length of time of each shut-off.

H. Landscape Contractor shall acquaint himself with all site conditions and proposed site conditions as indicated on the plans and specifications, prior to any installation. Measure site planter areas and dimensions and compare them to drawing area dimensions. Do not proceed with installation in any area until conflicts between these measurements have been brought to the immediate attention of Landscape Architect of Record and resolved by and with the Landscape Architect of Record. Do not willfully install the irrigation system as shown on the drawings when it is obvious in the field that unknown obstructions, grade differences or grade discrepancies in area dimensions exist that might not have been considered during design. Such differences shall be brought to the immediate attention of the Landscape Architect of Record. In the event this notification is not performed, the Contractor shall assume full responsibility and costs involved for any revisions necessary.

1.12 QUALITY ASSURANCE

A. Refer to Section 1.07 Site Observation Visits, for irrigation installation milestones and quality control measures.

STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 5

IRRIGATION SYSTEM

B. Refer to Section 1.08 Testing, for testing and review of installed equipment.

PART 2 – PRODUCTS

2.1 POLYVINYL CHLORIDE PIPE

A. All plastic piping and sleeving shall be integral white color, Type 1, Grade 1 (impact modified) designated as Polyvinyl Chloride (PVC), conforming to ASTM D1785 and ASTM D2441.

B. PVC Plastic Pressure Lines: For piping upstream, shut-off valves, and quick coupling valves.

All piping 2" and larger shall be Class 315 PVC 1120 (SDR 13.5). All piping 1-1/2" and smaller shall be Schedule 40 PVC.

C. Plastic Non-Pressure Lines: For piping downstream of remote-control valves. All pipes shall be PVC SCH 40.

D. Plastic Sleeves: Where required, sleeves shall be PVC SCH 80, sized at twice the diameter of the pipe to be sleeved, with a 2” minimum size.

E. Identification: Furnish plastic pipe continuously and permanently marked with the following information: Manufacturer's name or trademark, size, schedule or class and type of pipe, working pressure rating at 73.4 degrees F., National Sanitation Foundation (NSF) rating, and date of extrusion.

F. All plastic pipes shall conform to ASTM D2441.

2.2 COPPER PIPE

Copper pipe shall be Type K hard copper.

2.3 BRASS PIPE

Brass pipe shall be IPS Standard weight 125 pounds, 85% red brass.

2.4 FITTINGS AND CONNECTIONS

A. Polyvinyl Chloride Pipe Fittings and Connections: Type I, Cell C1. 12454B, Schedule 40, high impact molded fittings, manufactured from virgin compounds as specified for piping tapered socket or molded thread type, suitable for either solvent weld or screwed connections. Machine-threaded fittings and plastic saddle and flange fittings are not acceptable. Furnish fittings permanently marked with the following information: Nominal pipe size, type, and schedule of material, and National Sanitation Foundation (NSF) seal of approval. PVC fitting shall conform to ASTM D2464 and D2466.

B. Copper pipe fittings and connections: Type K hard copper.

C. Brass Pipe Fittings and Connections: Standard 125-pound class 85% red brass fittings and connections, IPS threaded.

D. Flexible risers shall be of line size IPS, PVC plastic threaded adaptors securely held to approximately 4.6" long synthetic rubber or flex-vinyl hose shanks, 85-pound minimum.

STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 6

IRRIGATION SYSTEM

E. Polyvinyl Chloride Schedule 80 Risers and Nipples: Type 1, Grade 1, Schedule 80, high impact molded, manufactured from virgin compounds as specified for piping and conforming to ASTM D- 2464. Threaded ends shall be molded threads only. Machined threads are not acceptable.

F. Swing joint assemblies for sprinklers shall be as indicated on the details or approved equal.

G. PVC unions at valve assemblies shall be PVC SCH 80, molded and threaded inlet, and outlet.

2.5 SOLVENT CEMENTS AND THREAD LUBRICANT

A. Solvent cement shall comply with ASTM D2564. Socket joints shall be made per recommended procedures for joining PVC plastic pipe and fittings with PVC solvent cement by the pipe and fitting manufacturer and procedures outlined in the Appendix of ASTM D2564.

B. Thread lubricant shall be Teflon ribbon-type, suitable for threaded installations as per the manufacturer's recommendations.

2.6 BALL AND GATE VALVES

A. Ball valves and gate valves shall be as specified in the irrigation legend or approved equal.

2.7 BACKFLOW PREVENTER ASSEMBLY

A. The backflow preventer shall be an integral part of an assembly including two ball valves.

Backflow preventers shall be brass, bronze, or epoxy-coated cast iron bodies with all bronze or stainless-steel trim and all moving parts of non-corrosive materials and shall completely and positively prevent back-siphoning of water. The backflow preventer assembly shall include inlet and discharge shutoff ball valves with all risers, connectors, and appurtenances of Class 1 red brass pipe, conforming to WW-P-351, and red brass fittings with pressure rating 1 conforming to WW-P-460. Backflow preventers shall be of the type and size designated in the irrigation legend.

2.8 Y-STRAINER

A. The Y-strainer shall be cast of high tensile bronze, conforming with ASTM B-62, rated at 300 P.S.I. The internal screen shall be cylindrical, 20 mesh, constructed of stainless steel with tapered self-aligning seats. The Y-strainer shall be the type specified in the irrigation legend as part of the backflow preventer assembly.

2.9 PRESSURE REGULATOR

A. Adjustable pressure regulator shall be as specified in the irrigation legend.

2.10 TRENCH MARKER TAPE

Water warning marker tape for pressure irrigation lines shall be “Alarm tape” manufactured by Christy, Paul Potter Warning Tape Inc., or approved equal.

2.11 EXTRA EQUIPMENT

A. Landscape Subcontractor shall provide to the County:

STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 7

IRRIGATION SYSTEM

1. Two (2) quick coupler keys with swivel hose ells of the type installed.

2. One hundred feet (100‘) of dripline of the type specified on this project.

3. Two (2) hand ratchet wrenches with sockets to match the size of locking bolts installed on valve boxes.

PART 3 – EXECUTION

3.1 GENERAL REQUIREMENTS

A. Locations on drawings are diagrammatic and approximate only and shall be changed and adjusted as necessary and as directed to meet existing conditions and obtain complete water access.

B. Install and extend the system as shown on the drawings, and as necessary to carry out the intent of the Drawings and Specifications.

C. Locate existing potable water lines and other underground utilities prior to digging irrigation trenches.

D. All piping, whether existing installation or new, shall be kept free from dirt and debris that may potentially enter piping during construction and following construction. Should the Landscape Contractor’s work cause contamination in the irrigation water and exhibit itself during construction and/or the maintenance period, the Landscape Contractor shall be responsible for decontaminating the entire irrigation system’s components affected by contamination by flushing the debris out until water appears clear at the satisfaction of the Project Manager, at Landscape Contractor’s expense. Components include, but are not limited to the following:
mainlines, valves, sprinkler swing joints, sprinklers, and nozzles. The Landscape Contractor shall replace components where attempts at cleaning them prove unsuccessful. All work to decontaminate the system and put it back into satisfactory working order shall be completed within 48 hours of the time the condition is found and/or at the time of notification by the County.

E. Landscape Contractor shall employ whatever means necessary to protect, lateral lines and mainlines installed, especially when working with other trades. Stake-out facilities; use flat, sturdy material to cover shallow buried piping as required throughout the construction period to minimize damage to the installation and to help prevent bodily injury. Employ removable barriers as required to keep public activity outside of construction areas.

3.2 INSTALLATION OF IRRIGATION SYSTEM

Excavation and backfilling of Trenches

A. Excavate trenches, prepare subgrade, and backfill to line and grade with sufficient room for pipe fittings, testing, and inspecting operations. Do not backfill until the pipe system has been subjected to a hydrostatic test as specified. Do not cover any installed control wiring until it has been visually observed by the Landscape Architect of Record.

B. Depth of Trench

1. In Landscape: (from Soil Finish Grade to Top of Pipe or Tubing) STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 8

IRRIGATION SYSTEM
PVC Pressure Line (2-1/2” & smaller) 18" min.

PVC Pressure Line (3” & larger) 24" min.

PVC Non-Pressure Line with 4” to 6” Pop-Ups or Bubblers 12" min.

PVC Non-Pressure Line with 12” Pop-Ups 18" min.

Subterranean Dripline Tubing 4" min.

2. Under Pavement: (from Base Material to Top of Pipe)
PVC Pressure Line (2-1/2” & smaller) 24" min.

PVC Pressure Line (3” & larger) 36" min.

PVC Non-Pressure Line 18" min.

C. Native soil backfill within 3" of piping shall be free of all rocks over 1" diameter, debris, and litter prior to use as backfill.

D. Deposit soil on one side of the trench and on the opposite side, then install irrigation lines and test each section.

E. Repair any leaks and replace all defective pipes or fittings until lines meet test requirements. Do not cover any lines until they have been checked and approved for tightness, quality of workmanship, and materials.

F. Backfill trenches, after approval of piping, with suitable native soil, tamping soil around the pipe and thoroughly compacting all trench fills until 90% relative compaction has been achieved.

G. Backfill material shall be approved soil, free from rocks and clods, trash, and other debris.

3.3 INSTALLATION OF POLYVINYL CHLORIDE PIPE

A. Because of the nature of plastic pipe and fittings, exercise caution in handling, loading, and storing, to avoid damage.

B. The pipe and fittings shall be stored under cover until using and shall be transported in a vehicle with a bed long enough to allow the length of the pipe to lay flat so as not to be subjected to undue bending or concentrated external load at any point.

C. All pipe that has been dented or damaged shall be discarded unless such dent or damaged section is cut out and the pipe rejoined with a coupling.

D. Trench depth shall be as specified above from the finish grade to the top of the pipe. The bottom of the trench shall be free of rocks, clods, and other sharp-edged objects.

E. Pipe ends and fittings shall be wiped with "MEK" primer, or approved equal, prior to applying welding solvent. Welded joints shall be given a minimum of 15 minutes to set prior to moving or handling. All field cuts shall be beveled to remove burrs and excess material prior to fitting and gluing together.

F. Pipe shall be snaked from side-to-side of trench bottom to allow for expansion and contraction.

G. Center load pipe at 10' intervals with small amount of backfill to prevent arching and slipping under pressure. Leave joints exposed for site observation during testing.

H. No water shall be permitted in the pipe until a period of at least 24 hours has elapsed for solvent STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 9

IRRIGATION SYSTEM
weld setting and curing per manufacturer’s recommendations.

I. Plastic to metal joints shall be made with metal threaded couplings with PVC SCH 80 male adapters hand tightened, plus one turn with a strap wrench.

J. Plastic to plastic joints shall be solvent-weld, assembled per pipe manufacturer's specifications and using solvent recommended by pipe manufacturer only.

K. All pressure pipe shall have a continuous blue-colored metallic three (3) inch wide marker tape placed nine (9) inches below the finished grade directly above the buried pipe, or as detailed on the drawings.

3.4 INSTALLATION OF COPPER PIPE

A. Cut copper piping by power hacksaw, circular cutting machine using an abrasive wheel, or hand hacksaw. No piping shall be cut with a metallic wheel cutter of any description. Ream and remove rough edges of burrs so smooth and unobstructed flow is obtained.

B. Carefully and smoothly place thread lubricant on a male thread only. Tighten screwed joints with tongs or wrenches.

C. Solder piping connections per pipe manufacturer’s recommendations, using silver solder and flux.

3.5 INSTALLATION OF BRASS PIPE

A. Cut brass piping by a power hacksaw, circular cutting machine using an abrasive wheel, or hand hacksaw. No piping shall be cut with a metallic wheel cutter of any description. Ream and remove rough edges of burrs so smooth and unobstructed flow is obtained.

B. Carefully and smoothly place thread lubricant on a male thread only. Tighten screwed joints with tongs or wrenches. Caulking is not permitted.

3.6 INSTALLATION OF SLEEVING AND CONDUIT

A. Sleeving and conduit shall extend twelve inches (12”) beyond the farthest edge of pavement, wall, or structure on each end of the sleeve.

B. Provide removable non-decaying plugs at ends of conduits to prevent entrance of earth. No cloth or cloth Duct tape. Dry-fitted PVC cap is advised.

C. Refer to specific plan notes and details for installation. Exercise extreme caution when working near drainage system lines, structures, and walls. Ensure these facilities have been staked out prior to any installation.

3.7 BALL AND GATE VALVE INSTALLATION

Install all ball valves and gate valves where shown on drawings and as shown on the detail drawings. Install one valve per box. Do not locate in paving.

STAGECOACH PARK COMMUNITY GARDEN 32 84 00 - 10

IRRIGATION SYSTEM

3.8 PRESSURE REGULATOR INSTALLATION

Install adjustable pressure regulator where shown on drawings and per manufacturer’s instructions.

Set pressure to the minimum pressure setting for equipment controlled on the system, at the worst- case scenario.

3.9 Y-STRAINER INSTALLATION

The Y-strainer shall be installed as an integral part of the backflow preventer assembly as shown in the irrigation details.

3.10 FLUSHING OF SYSTEMS

After piping and risers are in place, prior to hose bib installation, a full head of water shall be used to flush out the system. After the system is thoroughly flushed, cap all risers.

3.11 CLEAN-UP

As the project progresses, the Landscape Contractor shall maintain all areas in a neat manner and remove unsightly debris, as necessary. After completion of the project, the Landscape Contractor shall remove all debris and containers used in accomplishing work. He shall sweep and clean all sidewalks, asphalt, and concrete areas, and clean all vertical surfaces affected by his work, to the satisfaction of the Project Manager.

END OF SECTION 32 84 00
Appendix A

FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
□ The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. □ The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. □ Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
□ The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). □ The Fleet does not fall under the Regulation or is otherwise exempted, and a detailed reasoning is attached hereto.

Name of Bidder:

Signature:

Name:

Title:

Date:

PWS24-2413PKS

Exhibit 4
April 23, 2024
Item #4 Page 12 of 15
February 14, 2024
Kyle Lancaster, Director
Parks and Recreation Department
799 Pine Avenue
Carlsbad, CA 92008
C ciiyof
Carlsbad
SUBJECT: CD2023-0017 (PUB2023-0021) - STAGECOACH COMMUNITY GARDEN (CIP 4611) The City Planner has completed a review of your application for a Consistency Determination (APNs: 223- 060-60-00, 223-060-51-00), which is a modification to Conditional Use Permit (CUP), CUP-265, approved by the Planning Commission on June 12, 1985. CUP-265 was approved for the development of Stagecoach Community Park, a 29-acre community park located at 3420 Camino De Los Caches, Carlsbad, CA 92009.

The request is to construct and operate an outdoor 6,700-square-foot community garden at the southeast section of the park near Camino De Los Caches and Maverick Way.

After careful consideration of the request, the City Planner has determined that the request meets all of the findings below and APPROVES this request. The proposed modifications include:
• Install 35 new raised planting beds with irrigation;
• Install a new 12-foot-tall shade structure, a premanufactured tool storage area, one picnic table, two benches, waste containers, compost bins, one drinking fountain, and an information kiosk;
• Remove existing concrete and install 438 square feet of new concrete pavers; • Remove the existing chain-link fence and install 312 linear feet of new fencing with a pedestrian gate and a vehicular double gate;
• Install a new 147-linear-foot retaining wall, that ranges from one to six feet in height, on the southeast section of Stagecoach Community Park
Note that this approval does not include an analysis of the "future police substation," which is shown on the updated layout plan. If a substation is proposed, it will be subject to separate review and approval.

In order for a Discretionary Permit Consistency Determination to be approved, all of the following findings must be made:
1) No project condition, feature, facility or amenity is changed or deleted that had been considered essential to the project's design, quality, safety or function in that the proposed improvements transform an unprogrammed part of the park into a usable space for residents and would not interfere with the current operation and design of the park. 2) The request represents an upgrade in overall design features and or materials and improves upon the project's compatibility with the surrounding neighborhood in that the proposed community garden will upgrade the area and integrate with the surrounding neighborhood, offering a new communal space without impacting the park's existing recreational uses. The community garden was designed to maximize space and access for gardeners, incorporating input from community members and the Carlsbad Community Gardens Collaborative, the city's April 23, 2024
Item #4 Page 13 of 15
CD2023-0017 (PUB2023-0021) - STAGECOACH COMMUNITY GARDEN (CIP 46il) February 14, 2024
Pa e 2
administrative partner for community gardens. Hours of operation for the garden would be limited to 8 a.m. to 10 p.m., the same restriction in place already for the park and would adhere to lighting and noise restrictions consistent with CUP-265. There are no plans to add new lighting; instead, the project will utilize two existing light poles that are within the garden area.

The added accessories, such as the shade structure, picnic tables, and informational kiosks, will match the colors and materials of the existing outdoor furniture throughout the park. The retaining wall will be six feet tall, that ranges from one to six feet in height, and will be a split face CMU with a wheat color finish. The improvements, including the retaining wall, will be screened from public view by the existing site landscaping along Camino De Los Coches. 3) The proposed revision does not change the density or boundary of the subject property in that the proposed community garden is not a change in density and is within the existing developed footprint of the Stagecoach Community Park. When the park was approved, it was required to have 216 parking spaces according to the Environmental Impact Report (EIR} certified on June 12, 1985 (EIR 84-05}. To date, the Parks and Recreation staff have identified 240 parking spaces available on the premises. The proposal to transform a vacant and underutilized area into a community garden will not result in the removal of any parking spaces and is not expected to exceed the existing parking capacity. Moreover, based on the expertise of the Parks and Recreation Department staff, who manage the Stagecoach Community Park along with other community gardens across the city, the introduction of a new community garden will not significantly increase parking demand. Observations by the Parks staff indicate that on weekdays community gardens attract 1-3 vehicles from community members and on weekends the number ranges from 2-5 vehicles. This analysis of parking is provided to articulate that the community garden will not impact off-street parking for the current operation of the park. It is not establishing a requirement for parking spaces for current or future community garden projects.

Table 1. Parking Adequacy for Proposed Community Garden Use Number of Parking Parking Ratio
Spaces
Total parking spaces approved 1 216 n/a
Total parking spaces provided on-site 2 240 n/a
Parking spaces available for the 24 n/ a
proposed community garden (240 -
216 spaces= 24 spaces)
Estimated spaces required for 35 3 1 space/15 planting beds 3, 4 planting beds in the community garden
Parking spaces available following the 21 n/a
comp letion of the community garden
Notes:
1CUP-265 was approved for the development of Stagecoach Community Park by the Planning Commission on June 12, 1985, and required 216 parking spaces. 2Parks and Recreation Department Staff '
3Review of other communities as completed by Parks and Recreation Department staff and survey of neighboring cities including, the County of San Diego, City of Encinitas, and the City of Oceanside, suggests the parking required for a community garden be 1 space per 15 garden beds. If assumed that the community garden would require a reduction of 3 parking spaces, leaving a surplus of 21 parking spaces onsite.

April 23, 2024
Item #4 Page 14 of 15
CD2023-0017 (PUB2023-0021) - STAGECOACH COMMUNli"Y GARDEN (CIP 4611) February 14, 2024
Pa e 3
4Per Carlsbad Municipal Code (CMC} section 21.44.030, where the parking requirements for a use are not specifically defined herein, the parking requirements for such use shall be determined by the city planner.
4) The proposed revision does not involve the addition of a new land use not shown on the original permit in that a community garden is consistent with the Open Space land use of the originally permitted park and would maintain consistency with existing park features. 5) The proposed revision does not rearrange the major land uses within the development in that the community garden is being proposed in an unprogrammed area of the original park site plan and would increase the usable space of the park by 0.05%. These improvements would not rearrange any of the existing park uses.
6} The proposed revision does not create changes of greater than ten percent provided that compliance will be maintained with the applicable development standards of the Carlsbad Municipal Code in that the proposed area of improvement is 6,700 square feet in aggregate, which represents 0.05% of the total park area of 29 acres and would be subject to park rules regarding hours and lighting. The In addition, as demonstrated in Finding 3 and the associated analysis, the community garden would not create a parking demand that exceeds existing capacity. The proposed changes would not conflict with any mitigation measures adopted as part of the park's EIR (EIRB4-05}.
7} The proposed change will not result in any significant environmental impact, and/or require additional mitigation in that the proposed community garden would occur in an already disturbed area of the Stagecoach Community Park adhering to the park's current regulations in alignment with EIR84-05. The garden will operate from 8 a.m. to 10 p.m. consistent with the park hours. There are no plans to add new lighting; instead, the project will utilize two existing light poles that are within the garden area . Gardening, by its nature, is not expected to produce additional noise beyond what has been previously approved by EIR84-05. The new retaining wall is being installed where there is currently ornamental landscaping and no sensitive habitat or cultural resources according to E/R84-0S. The project will implement general Best Management Practices {BMPs) to the extent practical, including defining disturbance boundaries, ensuring equipment is well-maintained, adhering to water quality BMPs, reducing chemical usage near sensitive areas, establishing protocols to minimize spill risks and to control sediment. The project will also comply with all stormwater requirements. Furthermore, as demonstrated in Finding 3, the new community garden does not create a parking demand that exceeds existing capacity.

With three community gardens already established across the city, the introduction of a new community garden in the southeast quadrant will enhance access for residents in this area. This addition is anticipated to reduce the need for daily travel among community members seeking garden spaces, thereby potentially decreasing the number of trips made by individuals within this community. The proposed change would not conflict with any other mitigation measures adopted as part of the park's EIR. Therefore, the project would not result in any significant environmental impacts or require additional mitigation measures. 8) The proposed change would not result in any health, safety or welfare impacts in that the original 1985 project approval, based on a review of related meeting minutes (Parks and Recreation Commission, Planning Commission, and City Council), did not identify major issues or April 23, 2024
Item #4 Page 15 of 15
CD2023-0017 (PUB2023-0021} - STAGECOACH COMMUNITY GARDEN (CIP 4611} February 14, 2024
Pa e 4
controversies with the park, including on-site parking or the project's environmental review document.
9) There were not any major issues or controversies associated with the original project, which would be exacerbated with the proposed change in that the proposed community garden is in compliance with all conditions stipulated in CUP-265. The addition of a community garden meets the local community's needs, as identified in the Parks and Recreation Department's most recent needs assessment and comprehensive action plan. This initiative is prioritized among the plan's short-term action items. Furthermore, the establishment of the Stagecoach Community Garden will expand the city's community garden inventory to four. The existing gardens in this inventory include the Harold E. Smerdu Community Garden, the Pine Avenue Park Community Garden, and the Calavera Schoolhouse Community Garden at Calavera Hills Community Park. 10} The proposed change would not be readily discernable to the decision makers as being substantially different from the project as originally approved in that the project will improve the aesthetics of the site and appear as a continuation of the park.

Therefore, the City Planner has determined that the application qualifies for a consistency determination with the approved permit and approves the changes to the project based on Planning Division Administrative Policy No. 35.

Please submit two (2) blueline copies (11" X 17"} of all applicable exhibits for the project file of the amended site plan. The copies must be submitted, stamped "Consistency Determination," and signed by the City Planner prior to issuance of any grading or building permits for the project. The Consistency Determination Title Block stamp, and other Title Block stamps, can be downloaded from the City's website at https://www.carlsbadca.gov/departments/community-development/permits-applications­ forms/planning-applications-forms . The Title Block (stamp) is located at the bottom of the page.

NOTICE
This decision may be appealed by you or any other member of the public to the Planning Commission within ten days of the date of this letter. Appeals must be submitted in writing to the Planning Division at 1635 Faraday Avenue in Carlsbad, along with a payment of $900.00. The filing of such appeal within such time limit shall stay the effective date of the order of the City Planner until such time as a final decision on the appeal is reached. If you have any questions regarding this matter, please feel to contact lzzak Mireles at (442) 339-2693.

ERIC LARDY, AICP
City Planner
EL:IM:mh
c: lzzak Mir'eles, Associate Planner
Micha
1 el Tully, Parks Planner
Tim Carroll, Project Engineer
Robert Efird, Principal Planner
Scott Donnell, Senior Planner
Laserfiche/File Copy
Data Entry
Stagecoach Community Garden
Authorization to Advertise for Bids
Kyle Lancaster, Parks & Recreation Director
Nick Stupin, Parks Planning Manager
Parks & Recreation Department
April 23, 2024
1 ( City of
Carlsbad
TODAY’S PRESENTATION
• City plan references and project background
• Stagecoach Community Park maintenance yard
• Community garden design features
• Broadened service area for community gardens
• Next steps
• Fiscal Analysis
2 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN
{ City of
Carlsbad
2023-27 STRATEGIC PLAN
• Strategic Goals section details five goals, including:
• Community Character
 Maintain Carlsbad’s unique community character and
connectiveness
 Priority Projects: Complete design and construction of a community garden at Stagecoach Community Park
3 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN
2023-30 PARKS & REC MASTER PLAN
• Chapter 9 provides the department’s Strategic Action Plan  Parks Strategies, Short Term, 0-3 Years section includes:
 Complete construction plans, bidding, and construction implementation for Stagecoach Community Garden
4 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN
{city of
Carlsbad
California
2023 - 2030

PARKS & RECREATION

DEPARTMENT MASTER

PLAN UPDATE

BACKGROUND ON PROJECT
• Grounds maintenance of Stagecoach Community Park
shifted to a contract model about five years ago
• Staff investigated repurposing maintenance yard as a
community garden to further address the expressed need
• City Council approved Capital Improvement Program Project 5 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

BACKGROUND ON PROJECT
• Staff coordinated with a design consultant to develop the garden’s plans, specifications and contract documents
• Staff obtained a consistency determination with the park’s original conditional use permit from the City Planner
• Staff consulted Carlsbad Community Gardens Collaborative board members on the layout and certain details of the plans 6 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

STAGECOACH COMMUNITY PARK MAINTENANCE YARD
7 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

COMMUNITY GARDEN DESIGN FEATURES
• Similar in appearance to the Pine Avenue Community Garden • 35 raised planting beds, an informational kiosk, composting bins, tool storage, a picnic table, benches, and a shade structure • Consistent with Climate Action Plan, Sustainability Element Goal 9-G.6 8 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

COMMUNITY GARDEN DESIGN FEATURES
Final Concept Plan9
ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

EXISTING SIDEWALK
TO BE REMOVED. SEE
~ ~ ---,-,'---- CIVIL PLANS
/ ~so~:eO\AL
/ Pl.ANS
I I
10 ffiBAC~ FROM f4CEOF 8
-~-_.,, ,,.-- EXISTINGWA11:RME11:R
---= TOBERELOCA'll:D
\_
PROPOSED 10' WIDE

VEHICULAR ENTRY-STYLE OF GATE

TO BE GIVEN BY CITY OF CARLSBAD
FUTURE POLICE SUBSTATION {
r---- --- --,t.'.'._j. 1 -·
PROPOSED ELECTRICAL OUTLET • NOT JN
~0NTRACT (TO AF DONF AS PART OF THF
SERVICE =IEOUEST WITHIN THE CITY OF
CARLSBA!J)
· __ r-
~----=-- - - --J · j .- a. .
uis 11 -..u Ll~HI !'051 ,
PROTECT NP.ACE
HJ I URI: Ol((;HAfW AHl:A
- 12'WOE
EXISTING LtGHT POST
PR0 - ECT IN PLACE

EXISTING CURB TO BE

REMOVED
_6EGINNiNG OF 8' HIGH ~ · . -~-
BACKDROP GARDEP\ - . .
•• Fi=tJrs: . ••. : •
• • ,r . • : ·

GAROENDESIGN
RETAiNING WALL PER~ ELEMENT BY OTHERS
CIVIL PLANS ~
END OF 8' HIGH
BACKDROP GA~DEN
FENCE

COMMUNITY GARDEN DESIGN FEATURES
10 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN
~
~
h»l"TIN::1~~"91..,. ,tleT~-~,
#!Aii:.3iD~::-..~ .. "-""-
~t.u!f'k i.- .. -c..&J,..~~r(Jmi:

PI.Nl'TliRlllf'll-1 Cl lllnl..MaliatciKSt~ g ~ O. C.
0 ====~~Af~
POIT1 t,~~ ~m:.&,~~ 't
I 0 -,,11~TRioJ,1JiD~Jlt'Jil .. .iliilli.MIP!IAUX:..n:!N 0 ~~iJQl:~SliPOrll
0 =-~~ir.'.a.NRPiNlillNO
® =~ ~~-Tiua"'J.:11,1,
.•.,..s.r;Q!lbolilii~'l'lllO!lCW :\'~I-Kli.:U,,..,0::11,U. ~r.l.WIC..-!'al!-C:Uf n:t,R.NffiRPAQn,li
~....+----- -'------1...i--<,~ •. t'U'~~
I
11 _,
~
l'l~~ C "li' =i.c
111n~ ,;,a, ~
t'&l,'illi.Ui,~
,i.fii#~~
_..,
i. llH)lll~~~~~
~Util~~ Klll;R&'ili'Mllfhl:fl lO
2 .ALLIIE.N.~~w~~ ~i·
-
~lltw.i.81ii~~~-wmt t «-.TIII
!$-~~
.. i!IIJ,kJIMl«:&~-~:lel.fJe • :Zllii:jfijl •
~~OA~5u.lill..

BROADENED SERVICE AREA
• With completion of project, the city will have at least one community garden in three of the four park districts:
 Harold E. Smerdu Community Garden in Northwest
 Pine Avenue Community Garden in the Northwest
 Calavera Schoolhouse Community Garden in the Northeast  Stagecoach Community Garden in the Southeast
11 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

NEXT STEPS
• Staff will conduct bidding, evaluate the bids received and identify the lowest responsive and responsible bidder
• Staff anticipate returning to the City Council for award of a construction contract to that bidder in late June 2024
• Construction is anticipated to be completed by the end of 2024 12 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

FISCAL ANALYSIS
• Total project funding appropriated to date is $437,000 from the Park Development Capital Project Fund (Park In-Lieu SE) • Based on engineer’s estimate, an additional appropriation of $183,000 is needed to fully address the project components • Maintenance and operations costs are estimated to be
$72,000 per year, to be included in future budget submittals 13 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN
14 ITEM NO.4 – STAGECOACH COMMUNITY GARDEN

STAGECOACH COMMUNITY PARK COMMUNITY GARDEN PROJECT
CAPITAL IMPROVEMENT PROJECT NO. 4611
Project appropriation $437,000
Project expenditures/encumbrances -$67,982
Total available funding $369,018
Construction cost (estimated) -$445,680
Construction contingency (estimated) -$44,568
Construction management & inspection/staffing costs (estimated) -$61,770 Total project costs (estimated) $620,000
Total appropriations -$437,000
Additional appropriation needed (estimated) $183,000

RECOMMENDED ACTION
Adopt a resolution approving the plans, specifications and contract documents for the Stagecoach Community Garden Project (Capital Improvement Program Project No. 4611), authorizing the City Clerk to advertise the project for public bids, and authorizing the City Manager, or designee, to appropriate $183,000 from the Park Development Capital Project Fund (Park In-Lieu SE) to the Fiscal Year 2023-24 Capital Improvement Program Budget